Loading...
HomeMy WebLinkAbout14-197I ' ... CASE NO.: CITY OF C oLJ...EGE S TATIO Home o/Texas A&M Univmity • \\~,\O'~ SITE PLAN APPLICATION GENERAL TIME : STAFF : -,,,,,.-...~------- MINIMUM SUBMITTAL REQUIREMENTS: [8J $932 Site Plan Application Fee . [8J $350 Non-Residential Architectural Standards I Northgate Building Rev iew Application Fee (if applicable). ~-y( · $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). [8J Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered . [8J Six (6) folded copies of site plan . "W One (1) folded copy of the landscape plan . [g] One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). [8J Building elevations to scale for all buildings. [8J A list of building materials for all facade and screening . [8J Color samples for all buildings or list colors to be used from the approved color palette. [8J Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report. Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference ----------------- NAME OF PROJECT Aggie/and Express Carwash at Castlegate Plaza ADDRESS 800 W D. Fitch Parkway -State Hwy 40 LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1R-A , Block 1, Castlegate Business Center APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name J4 Engineering clo Glenn Jones PE-CFM E-mail gjones@j4engineering.com Street Address PO Box 5192 ----------------------------------~ City Bryan State TX Zip Code 77805 ------- Phone Number 979 739 0567 Fax Number 979 774 5025 ------------------------------ PROPER TY OWNER 'S INFORMATION : Name Jed Waltermathe E-mail jed@circlenurseries.com Street Address 2014 F infeather Road C ity Bryan State _TX ________ Zip Code _7_78_0_1 ____ _ Phone Number 361 765 0968 Fax Number NA. ---------------~ -------------- Rev ised 4/14 Page 1 of 11 :ARCHITECT OR ENGINEER'S INFORMATION : Name J4 Engineering clo Glenn Jones PE-CFM E-mail gjones@j4engineering.com Street Address PO Box 5192 ------------------------------------- City Bryan State TX Zip Code _7_78_0_5 ____ _ Phone Number 979 739 0567 Fax Number 979 774 5025 ----------------~ OTHER CONTACTS (Please specify type of contact): Name NA E-mail -----------------~ ------------------~ Street Address City State Phone Number Fax Number Current zoning (GCJ General Commercial Present use of property Vacant ---------------------------------~ Proposed use of property Automated Carwash ---------------------------------- Number of parking spaces required 0 Number of parking spaces proposed 0 -------- Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? IX Yes I No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance . Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes IX No If yes, provide information regarding the first approved application and any related subsequent applicat ions (provide add iti onal sheets if necessary): Project Name: NA City Project Number (in known): NA Date I Timeframe when submitted : NA Revised 4/14 Page 2 of 11 MUL Tl-FAMILY RESIDENTIAL Total Acreage Floodplain Acreage ____ _ Housing Units #of 1 Bedroom Units --- #of 2 Bedroom Units --- #of 3 Bedroom Units --- #of 4 Bedroom Units --- FOR 2 BEDROOM UNITS ONLY # Bedrooms= 132 sq . ft. --- # Bedrooms < 132 sq . ft. --- PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) #of Multi-Family Dwelling Units x $1636 = $ # of acres in floodplain # of acres in detention #of acres in greenways Date dedication approved by Parks & ____ Recreation Advisory Board COMMERCIAL Total Acreage _1._2_5_4 ___ _ Bu il ding Square Feet _36_3_6 __ _ Floodplain Acreage . 18 ----- * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information . The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Date Revised 4/14 Page 3of11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued . 2. The permit may be revoked if any false statements are made herein. 3. If revoked , all work must cease until permit is re-issued . 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state , and federal requirements . Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compl iance . 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications , and Standard Details . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12 . Release of plans to (name or firm) is authorized for bidding purposes only . I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATIACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE. ~-" 6--l'l-l'f p ~ Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation , including detention ponds, proposed as part of the project will be constructed first in the construction sequence . 2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP . Design will not preclude compliance with TPDES : i.e ., projects over 10 acres may require a sedimentation basin . 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the Cit}l College Station and State and Federal Regulations . 4 . I, THEE NEER, REE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATI~~TS FOR T EL P NT PERMIT APPLICATION , ARE, TO THE BEST OF MY KNOWLE~~"!mij}.~ ACCU ;'-. •••• ~···.~tt , ... · ··~ ;'"··:: ·. ~ ., -B / "'"[ J_ s ..... a~:::······ \.~ ----------t---------l \ T ~'?i ·····~s··· ...... J •• ~ ,.,. a....... .., Date 1,0·. ...r~······ , ' "4'• ~ ~ ... " f~,:..vQ .····w Vi'•, ,• - Revised 4/14 lhe following CERTIFI TIONS apply to development in Sp cial Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A. I, "'~ certify, as demonstrated in the attached drainage~. that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation ; (ii) create additional areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) ase Flood cities. __ ,,,,, pted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordi~i5"_.§J."-r(~~~•1 I I ! ···:.... ~ ·· .. ~,,, t> 1 't 14 !if"·~~:~ \~~ ZO! 7-!' '·... :., Engineer Date ~-;\ <"'. :.>&~···· ·····~•I fc.P.· •• ~ ~ •••• .., t 4~0"· '7:h. •••• -. . -·. ~:.,.,8£0 •• • ·..r Initial ·, ~('·· ....... ~~ .. - D ~~ .. ~NGltl~,.- * If a platting-status exemption to this requirement is asserted, provide written justification uh~t"S:eparate letter in lieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction , improvement, or fill covered by this permit shall not increase the base flood elevation . I will. apply for a variance to the Zoning Board of Adjustments. Engineer Date Revised 4/14 Page 5of 11 Required for all projects proposing structures in Special Flood Hazar Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substan · improvement of any residential structure shall have the lowest floor , including all utilities , ductwork and any sement, at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificate ill be provided with elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: E. I, new construction or any substantial improvement of any commercial , industrial , or other non-residential str ure are designed to have the lowest floor, including all utilities , ductwork and basements, elevated at least on oot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility , ductwork, basement and sanitary facilitie 1s designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilif s are designed to be watertight and impermeable to the intrusion of water in all areas be low the Base Floo Elevation , and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodyn mic conditions . Required Elevation C rtificates will be provided with elevations certified during construction (forms at slab pre- pour) and post con uction . Engineer I Date Cond itions or comments as part of approval : Revised 4/14 Page 6of11 CITY Of' C OLLEGE S TATI01 Hom e of Texas A&M Univenity" SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: [8] Sheet size -24" x 36" (minimum). [8] A key map (not necessarily to scale). [8] Title block to include: [8] Name , address , location , and legal description [8] Name , address , and telephone number of applicant [8] Name , address , and telephone number of developer/owner (if differs from applicant) [8] Name , address , and telephone number of architect/engineer (if differs from applicant) [8] Date of submittal [8] Total site area [8] North arrow. [8] Scale should be largest standard engineering scale possible on sheet. [8] Ownership and current zoning of parcel and all abutting parcels. ~ .e(The total number of multi-family buildings and units to be constructed on the proposed project site . ~ The density of dwelling units per acre of the proposed project. [8] The gross square footage of all buildings and structures and the proposed use of each . If different uses are to be located in a single building, show the location and size of the uses within the building . Building separation is a minimum of 15 feet w/o additional fire protection . Locations of the following on or adjacent to the subject site: Des ignate between existing and proposed ~f<~he density of dwelling units per acre of the proposed project. ~Phasing . Each phase must be able to stand alone to meet ordinance requirements . [8] Buildings (Existing and Proposed). [8] Setbacks according to UDO, Article 5. Geography [8] Water courses . [8] 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site . Please note if there is none on the site with confirming FEMA/FIRM map number. [8] Existing topography (2' max or spot elevations) and other pertinent drainage information . (If plan has too much information , show drainage on separate sheet.) [8] Proposed grading (1 ' max for proposed or spot elevations) and other pertinent drainage information. (If plan has too much information, show drainage on separate sheet.) Rev ised 4/14 Page 7of11 Street's, Parking, and Sidewalks [R] Existing streets and sidewalks (R .O.W.). [R] Existing Driveways , both opposite and adjacent to the site accord ing to UDO , Article 7. [R] Proposed drives . Minimum drive aisle width according to UDO , Article 7 18) Indicate proposed driveway throat length according to UDO, Article 7 [R] Proposed curb cuts . [R] For each proposed curb cut (including driveways , streets , alleys, etc .) locate existing curb cuts on the same and opposite side of the street to determine separation distances between existing and proposed curb cuts . [R] Proposed curb and pavement detail. [R] A 6" raised curb is required around all edges of all parts of all paved areas without exception . (To include island , planting areas, access ways , dumpster locations, utility pads , etc.) No exception will be made for areas designated as "reserved for future parking". #~Proposed medians . [R] Proposed sidewalks (both public and private). [R] Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO, Article 7). [R] Off-Street parking areas with parking spaces drawn , tabulated , and dimens ioned . [R] Designate number of parking spaces required by ordinance and provided by proposal. ~~~andicap parking spaces . ~fAParking Islands drawn and dimensioned with square footage calculated according to UDO , Section 7.2 or 7.9 fornon - ~ T residential buildings . [R] Parking setback from R.O .W. to curb of parking lot as required . ~~Wheelstops may be requ ired when cars overhang onto property not owned by the applicant or where there may be conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities , signs or other conflicts . ~~Security gates , showing swing path and design specs with colors . ~Guardrails . Include design and colors . ~~raffic Impact Analysis for non-residential development (UDO , Article 7). IX! Please note if none is required . ~~Will there be access from a TxDOT R.O .W .? D Yes .8J No ~ If yes , then TxDOT permit must be submitted with this application . Easements and Utilities [R] Easements -clearly designate as existing or proposed and type (utility, access , etc .) [R] Util ities (noting size and designate as existing or proposed) within or adjacent to the proposed site , including building transformer locations , above ground and underground service connections to buildings , and drainage inlets . ~psewer Design Report (if applicable). ""fo Water Des ign Report and/or Fire Flow Report (if appl icable). ~~Drainage Report with a Technical Design Summary . [R] Meter locations , existing and proposed (must be located in public R.O.W. or public utility easement). [R] Provide a water and sanitary sewer legend to include [R] Minimum water demands [R] Max imum water demands [R] Average water demands in gallons per minute , and [R] Maximum sewer loadings in gallons per day #.J2f Will there be access from a TxDOT R.O .W .? D Yes [R] No If yes , then TxDOT permit must be submitted with th is application . Revised 4/14 Page 8of11 'Fire Protection ~ Show fire lanes . Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway . ~ Show proposed and existing fire hydrants . Fire hydrants must be located on the same side of a major street as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1 , R-1A, or R-2 must be w ithin 300 feet of a fire hydrant as measured along a public street, highway or designated fire lane . NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a building perm it can be issued . ~~Will building be sprinkled? O Yes ~ No If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted. If Yes , ~Show fire department connections . FDC's should be within 100' of the fire hydrant. They shall be accessible from .-.-/--' the parking lot without being blocked by parked cars or a structure . Landscaping ~ Landscape plans as required in Article 7 of the Unified Development Ordinance . The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree points , then those trees need to be shown appropriately barricaded on the landscape plan . Attempt to reduce or eliminate plantings in easements . Include information on the plans such as : ~ required point calculations ~ additional streetscape points required . Streetscape compliance is required on all streets. fVl calculations for # of street trees required and proposed (proposed street tree po ints will accrue toward total ~ landscap ing points.) ~ proposed new plantings with points earned ~ proposed locations of new plantings ~ screen ing of parking lots, 50% of all shrubs used for screening shall be evergreen . fVl screen ing of dumpsters, concrete retaining walls , off street loading areas , utility connection points , or other ~ areas potentially visually offensive . ~~existing landscaping to remain 6ffAshow existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are tl~ up before the first development permit is issued . l-+~ Buffer as required in Article 7 of the Unified Development Ordinance . \~ j2f'Show irrigation system plan . (or provide note on how irrigation system requirement will be met prior to issuance of C. 0 .) All plans must inc lude irrigation systems for landscaping . Irrigation meters are separate from the regula r wate r systems for buildings and will be sized by city accord ing to irrigation demand submitted by applicant and must include backflow prevention protection . ~~s there any landscaping in TxDOT R.O.W.? O Yes ~ No If yes, then TxDOT permit must be submitted at the time of application . Other \~~Common open spaces sites ,;~L oading docks ~,(0'Detention ponds ~Retaining walls ~ Sites for solid waste containers w ith screening . Locations of dumpsters are accessible but not v isible from streets or resident ial areas. Gates are discouraged and visual screening is required . (Minimum 12 x 12 pad required .) ~ Are there impact fees associated with this development? ~ Yes O No NOTE: Signs are to be permitted separately . Revised 4/14 Page 9of11 Cnv OF C ou£GE STATIO Home o/Texas A&M University " NRA BUILDING REVIEW MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Refer to UDO Section 7 .9 Non-Residential Architectural Standards, as appropriate. [8] Sheet size -24" x 36" (minimum). [8] Title block to include: [8] Name, address, location , and legal description [8] Name, address, and telephone number of applicant [8] Name, address, and telephone number of developer/owner (if differs from appl icant) [8] Name, address , and telephone number of arch itect/engineer (if differs from applicant) [8] Date of subm ittal [8] Scale should be largest standard scale possible on sheet. [8] List of colors from the City of College Station color palette to be utilized or proposed equivalents. [8] Color samples. [8] List of materials to be utilized . [8) Elevations of each non-residential building and screening structure. Show placement of materials and colors on the facades accord ing to UDO Section 5 .6.B o r 7 .9 . [8] Include the following dimensions : [8] Total vertical square footage minus openings (for each fac;:ade separately) [8] Total vertical square footage of transparency (for each fac;:ade separately in Northgate) [8] Total vertical square footage of each building material (for each fac;ade separately) [8] Total vertical square footage of each color (for each fac;ade separately) [8] Graphic representation and/or description of existing buildings in building plot to show material , color, and architectural harmony . Rev ised 4/14 Page 10of11 ----------------- DEVELOPMENT PERMIT PERMIT NO. 14-197 CIT Y O F C oLw ;r:: 5TMION JlUnn i~& l>nv/lJp11ti'1tt ~~ FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 1 R-A , Block 1 Castlegate Business Center Aggieland Express Carwash DATE OF ISSUE: 10/31/2014 OWNER: Jed Waltermathe 2014 Finfeather Road Bryan, TX 77801 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: 800 W. D. Fitch Parkway -State Hwy 40 DRAINAGE BASIN: Spring Creek VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4 . Other permits may have been required to fulfill local , state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor's responsibility to implement measures that will meet City , State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to , paint, oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Cond itions : I, ~d U {h/11!.(-L_ , the Contractor, hereby agree to comply with all conditions herein . Date Phone number ~d c;bJ.c f ~ J 11 IJlSd I~, S .. Cd»\ E-m ii I hereby grant this permit for development. Contact Rg~ At9e1!.:~~rr 393 "1f bb , the Public Works Inspector assigned to this project 24 hours prior to beg( ning construction for scheduling required Inspections . [O-31 -Wll/ Cit Date CITY OF CoUEGE STATION Home ofT= A&M University• FOR OFFICE USE ONLY CASE NO.: /~-{ Vfl DATE SUBMITTED: aq(2 1Ji'f l lf TIME : 3 ·-oo ;;> STAFF: -+-A+=~=-------- PLANNING & DEVELOPMENT SERVICES TRANS MITT AL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No.: 1lJ. Existing Project Submittal. Case No.: \ y -\ t?J / -------- Project Name AC(j?J \ e. \ d n& Contact Name ---------------Phone Number ____________ ~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply ): D Comprehensive Plan Amendment D Rezoning Application D Conditional Use Permit D Prelim inary Plan D Final Plat D Development Plat ~ Site Plan D Special District Site Plan O Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS O Non-Residential Architectural Standards 0 Irrigation Plan D Variance Request D Development Permit D Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR D Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D D TxDOT Driveway Permit TxDOT Utility Permit D Drainage Letter or Report D Fire Flow Analysis Special Instructions: 10/10 D Waterline Construction Documents D Sewerline Construction Documents ';0--Street Construction Documents D Easement Application D Other -Please specify Glenn Jon es PE #9 7600 CFM#1021-06N Firm #9951 Jerry Cuaron City of College Station PO Box 9960 College Station , Texas 77842 J4 [ngineering Consulting • Engineering • Construction Services PO Box 5192 Bryan, Texas 778 05 Phon e: 9 79-739-0567 gjones@ j4engineering.com September 26, 2 014 RE: Case# 14-00900197: Aggieland Express Carwash Site Plan Revised Submittal Mr. Cuaron: Attached are the requested copies of the Site Plan for Aggie land Express Carwash. These plans have been revised to reflect the requested alterations received on September 2, 2014 and are now resubmitted for review and approval. Below is a description of the revisions made for this submittal: Planning: • All structural calculations and drawings are a part of the building permit process . These items will be submitted with the Architectural Building Plans which are to follow . • One ADA van accessible parking space bas been added . • All parking and drive isles for this site are in excess of the UDO requirements , i.e . 14 ' wide parking stalls and 27' wide drive isle . • As we discussed, back of curb measurements are industry standards. • Parking analysis has been revised as requested. Landscaping: • Additional screening bas been added to the transformer. Engineering: • Existing and proposed contour labels have been added. • Water services have been relocated as requested. • One ADA van accessible parking space has been added. • The location and size of the grit traps have been shown on sheet C2. This facility will be using an extensive RO and reclamation system to reduce and reuse water and the grit traps are a part of that system. Additional design information will be included with Architectural Building Plans, which are to follow. "Aggie Owned and Operated " -Page 1 of2- • All backflow prevention devices will be a part of the water system noted above . Additional design information along with locations will be included with the Architectural Building Plans , which are to follow. • The drainage channel/swell for the Green Prairie frontage has been changed to concrete as requested. • Additional grading for the drainage channel/swell for the W.D . 40 frontage has been added as requested to insure discharge will continue to the creek. • As noted in our phone conversation , that flow of water in this area is less than 1.5" in depth for the 1 OOyr storm event. • As noted in our phone conversation, there is a 1.5% cross slope to this drive to divert the flow of storm water away from the tunnel entrance and the proposed curbs shown on sheet C3 which were originally intended but were left of the plans. No rip-rap or other channel lining will be necessary as there is a minimal discharge of storm water. • Standard detail sheets Wl, W2, Sl, and S2 have been added to the plan set as requested. • As noted in our phone conversation , the flow into the manhole has been adjusted to insure a less than 2 ' drop and the stack within the clean out of the service adjusted as well. • Traffic control note #2 has been added to sheet CS to help show that we are following TxDOT's general detail TCPl-lA and the detail has been amended to show that the 240 ' spacing is measured from the channeling devices along the work area, as shown in TCPl-lA. • The channeling devices on the opposite side of the road have been removed . Electrical : • AutoCAD file has been emailed as requested. • The temporary fire lane turn-around has been added to sheet C2 as discussed in our phone conversation and Construction Note #20 added as well. • Construction Note #19 shows that a kno x box is required. No other changes have been made to this drawing. If there are any questions or further correction s needed , please do not hesitate to contact me at 979-739-0567. "Aggie Owned and Operated " -Page 2 of2- CITY or Coll.EGE STATION Home ofTtxaS A&M Univmity" \'\~,'{'\~ SITE PLAN APPLICATION GENERAL MINIMUM SUBMITTAL REQUIREMENTS: [8J $932 Site Plan Application Fee . CASE NO.: [8J $350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable). ~-y( · $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). [8J Application completed in full . This application form provided by the City of College Station must be used and may not be adjusted or altered . [8J Six (6) folded copies of site plan . [8J One (1) folded copy of the landscape plan . (8) One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). [8J Building elevations to scale for all buildings. [8J A list of building materials for all facade and screening . [8J Color samples for all buildings or list colors to be used from the approved color palette. [8J Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. [8J Two (2) copies of the grading , drainage, and erosion control plans with supporting drainage report. igJ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). _ • ..v( Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the ~ proposed request (if applicable). The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT Aggie/and Express Carwash at Castlegate Plaza ADDRESS 800 W D. Fitch Parkway -State Hwy 40 LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1R-A , Block 1, Cast/egate Business Center APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name J4 Engineering clo Glenn Jones PE-CFM E-mail gjones@j4engineering .com PO Box 5192 Street Address City Bryan State TX Zip Code _77_8_0_5 ____ _ Phone Number 979 739 0567 Fax Number 979 77 4 5025 ~-------------~ PROPERTY OWNER'S INFORMATION : Name Jed Waltermathe E-mail jed@circlenurseries .com Street Address 2014 Finfeather Road City Bryan State _TX _______ Zip Code _77_8_0_1 ___ _ Phone Number _36_1_7_6_5_0_9_68 __________ Fax Number :_:.N:_1':_. __________ _ Revised 4/14 Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION: Name J4 Engineering clo Glenn Jones PE-CFM E-mail gjones@j4engineering .com Street Address PO Box 5192 ----------------------------------~ City Bryan State TX Zip Code _7_78_0_5 ____ _ Phone Number 979 739 0567 Fax Number 979 77 4 5025 ---------------- 0 THE R CONTACTS (Please specify type of contact): Name NA E-mail ----------------~ ------------------ Street Address City -----------------State ________ Zip Code ______ _ Phone Number Fax Number ---------------- Current zoning (GCJ General Commercial Present use of property Vacant --------------------------------- Proposed use of property Automated Carwash --'-~----"-'-------------------------- Number of parking spaces required 0 Number of parking spaces proposed 0 -'-------- 1 s there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? fX Yes I No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes fX No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : NA City Project Number (in known): NA. ----------------------------~ Date I Timeframe when submitted: NA. Revised 4/14 Page 2of11 MULTl-FAMIL Y RESIDENTIAL Total Acreage Floodplain Acreage ____ _ Housing Units # of 1 Bedroom Units --- # of 2 Bedroom Units --- # of 3 Bedroom Units --- ___ # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq. ft. --- # Bedrooms < 132 sq. ft . --- PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi-Family Dwelling Units x $1636 = $ # of acres in floodplain # of acres in detention # of acres in greenways Date dedication approved by Parks & ____ Recreation Advisory Board COMMERCIAL Total Acreage _1._2_5_4 ___ _ Building Square Feet 3636 ---- Floodplain Acreage . 18 ----- * Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information . The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. · nd title Date Revised 4/14 Page 3of11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein . 3. If revoked, all work must cease until permit is re-issued. 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The perm it will expire if no significant work is progressing within 24 months of issuance. 6 . Other permits may be required to fulfill local , state , and federal requirements. Owner will obta in or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project , it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12 . Release of plans to (name or firm) is authorized for bidding purposes only . I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE. ~,re 6--1'1-ll/ Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e ., projects over 10 acres may require a sedimentation basin . 3 . The information and conclusions contained in the attached plans and supporting documents comply with the curre nt requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ord inances of the Ci College Station and State and Federal Regulations. 4 . I, THEE NEER, REE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATT~~TS FORT EL P NT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLE~l!MJJ?.~ ACCU ~~····· *····~·· ,,..... ·. ~ ·~ l I ······· -.. "1 11 / • • ± ,.... Gu:::··... ~ • ~ 0 l...,. \ ~;i ·····~Jth;.::·· .. -=.~~ '·o·· 91,,;;;.~~ ~ Date '·1~" ,, ~ ···.. , •~··.'A .····-,, ~·.. .. - Revised 4/14 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A. I, bkW'--:::S-o~ 1 Yt: ... l..~ certify, as demonstrated in the attached drainage~•~that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) ase Flood ities. . __ ,,,,, ---STAT. '' pted by ordinance in Section 5 .11 .3a of Chapter 13 Code of Ordi~:·······~·~""~'• I I ! ··.:.... hl. ···.~·,, t> 1 't If fif'"·~~:~ ·~~ ~o: ~t~·.. . ~ .. _ . 9 .. .. .., Engineer Date ~;\ <.: ~&:·... ··· .. :..s feiP.· •• ~ -..iv •••. ··~ t~. ~. .. -~~o··:":'~ ..... ., Initial · "~-4('•• ...... •ii" ~ D ~, .. ~NGttl,..- * If a platting-status exemption to this requirement is asserted, provide written justification uti~~separate letter in lieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, . certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Enginee r Date Additional certification for Floodway Encroachments: c. I, , certify that the construction , improvement, or fill covered by this permit shall not increase the base flood elevation. I will. apply for a variance to the Zoning Board of Adjustments. Engineer Date Revised 4/14 Page 5of11 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substan · improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any sement, at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificate ill be provided w ith elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: new construction or any substantial improvement of any commercial, industrial, or other non-residential st ure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least on oot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility , ductwork, basement and sanitary facilitie 1s designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilif s are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Floe Elevation , and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrody mic conditions. Required Elevation C rtificates will be provided with elevations certified during construction (forms at slab pre - pour) and post con ction . Date Conditions or comments as part of approval : Revised 4/14 Page 6of1 1 CITY or Cou.EGE STATION Home o/TtXAS A&M Univmity • SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: [g] Sheet size -24" x 36" (minimum). [g] A key map (not necessarily to scale). [g] Title block to include: 12) Name, address, location, and legal description 12) Name, address, and telephone number of applicant 12) Name, address, and telephone number of developer/owner (if differs from applicant) 12) Name, address, and telephone number of architect/engineer (if differs from applicant) 12) Date of submittal [g] Total site area [RI North arrow. 12) Scale should be largest standard engineering scale possible on sheet. 12) Ownership and current zoning of parcel and all abutting parcels. ylc jZ(The total number of multi-family buildings and units to be constructed on the proposed project site . ~The density of dwelling units per acre of the proposed project. [gj The gross square footage of all buildings and structures and the proposed use of each. If different uses are to be located in a single building, show the location and size of the uses within the building . Building separation is a minimum of 15 feet w/o additional fire protection . Locations of the following on or adjacent to the subject site: Designate between existing and proposed ~f(~e density of dwelling units per acre of the proposed project. ~Phasing. Each phase must be able to stand alone to meet ordinance requirements . [RI Buildings (Existing and Proposed). [RI Setbacks according to UDO, Article 5. Geography 12) Water courses . [RI 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site . Please note if there is none on the site with confirming FEMA/FIRM map number. [RI Existing topography (2' max or spot elevations) and other pertinent drainage information . (If plan has too much information , show drainage on separate sheet.) 12) Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information . (If plan has too much information, show drainage on separate sheet.) Revised 4/14 Page 7 of 11 Streets, Parking, and Sidewalks lg] Existing streets and sidewalks (R.O .W .). lg] Existing Driveways, both opposite and adjacent to the site according to UDO, Article 7 . lg] Proposed drives. Minimum drive aisle width according to UDO, Article 7 lg] Indicate proposed driveway throat length according to UDO, Article 7 ~ Proposed curb cuts . lg] For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts on the same and opposite side of the street to determine separation distances between existing and proposed curb cuts . lg] Proposed curb and pavement detail. [g] A 6" raised curb is required around all edges of all parts of all paved areas without exception . (To include island , planting areas, access ways, dumpster locations, utility pads, etc.) No exception will be made for areas designated as "reserved for future parking". it flProposed medians. [g] Proposed sidewalks (both public and private). [g] Proposed pedestrian/bike circulation and facilities for non-residential buildings (UDO, Article 7). ~ Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned . ~ Designate number of parking spaces required by ordinance and provided by proposal. ~ KHandicap parking spaces . t(fAParking Islands drawn and dimensioned with square footage calculated according to UDO, Section 7.2 or 7.9 fomon - ~ T residential buildings. ~ Parking setback from R.O .W . to curb of parking lot as required . ~~Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities, signs or other conflicts . ~~Security gates, showing swing path and design specs with colors . ~Guardrails. Include design and colors . ~~raffle Impact Analysis for non-residential development (UDO, Article 7). ~ Please note if none is required . ~J6'Will there be access from a TxDOT R.O .W.? O Yes kl No ~ If yes, then TxDOT permit must be submitted with this application . Easements and Utilities lg] Easements -clearly designate as existing or proposed and type (utility, access, etc.) lg] Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site , including building transformer locations, above ground and underground service connections to buildings , and drainage inlets. ~)a"Sewer Design Report (if applicable) . .ff2J.Water Design Report and/or Fire Flow Report (if applicable). ~~Drainage Report with a Technical Design Summary . ~ Meter locations, existing and proposed (must be located in public R.O .W . or public utility easement). ~ Provide a water and sanitary sewer legend to include ~ Minimum water demands ~ Maximum water demands ~ Average water demands in gallons per minute, and ~ Maximum sewer loadings in gallons per day #.,0'Will there be access from a TxDOT RO .~.? . O :es . ~ No If yes, then TxDOT permit must be submitted with this application . Revised 4/14 Page 8of 11 Fire Protection [8J Show fire lanes. Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway. [8J Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1, R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire lane. NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a building permit can be issued . ~~Will building be sprinkled? O Yes [8] No If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted . If Yes , tbt"!A Show fire department connections . FDC's should be within 100' of the fire hydrant. They shall be accessible from t"' ~ the parking lot without being blocked by parked cars or a structure . Landscaping [8J Landscape plans as required in Article 7 of the Unified Development Ordinance. The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree points , then those trees need to be shown appropriately barricaded on the landscape plan . Attempt to reduce or eliminate plantings in easements . Include information on the plans such as: [8] required point calculations [8] additional streetscape points required . Streetscape compliance is required on all streets. 1v1 calculations for # of street trees required and proposed (proposed street tree points will accrue towa rd total ~ landscaping points.) · [8] proposed new plantings with points earned [8] proposed locations of new plantings [8] screening of parking lots, 50% of all shrubs used for screening shall be evergreen . 1v1 screening of dumpsters, concrete retaining walls , off street loading areas, utility connection points, or othe r ~ areas potentially visually offensive . ~~existing landscaping to remain ~IAshow existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are tl~ up before the first development permit is issued . &~ Buffer as required in Article 7 of the Unified Development Ordinance. ~ j6'Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to issuance of C. ~ 0 .) All plans must include irrigation systems for landscaping . Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must include backflow prevention protection. ~s there any landscaping in TxDOT RO .~.? D :es [8] .No _ If yes, then TxDOT permit must be submitted at the time of application . Other \~~Common open spaces sites ;gloading docks ~.f WDetention ponds ~Retaining walls [8J Sites for solid waste containers with screening . Locations ~f d~mpste~ are a.c~essible but not visible.from streets or residential areas. Gates are discouraged and visual screening 1s required . (Minimum 12 x 12 pad required .) [8] Are there impact fees associated with this development? [8] Yes D No NOTE: Signs are to be permitted separately . Revised 4/14 Page 9of11 CITY OF C OJJ .EGE STAT ION Home o/Texas A&M Univmity" NRA BUILDING REVIEW MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Refer to UDO Section 7.9 Non-Residential Architectural Standards, as appropriate. [8] Sheet size -24" x 36" (minimum). [8] Title block to include: [8] Name, address, location , and legal description [8] Name, address, and telephone number of applicant [8] Name , address, and telephone number of developer/owner (if differs from applicant) [8] Name, address , and telephone number of architect/engineer (if differs from applicant) [8] Date of submittal [8] Scale should be largest standard scale possible on sheet. [8] List of colors from the City of College Station color palette to be utilized or proposed equivalents . [8] Color samples. [8] List of materials to be utilized. [8] Elevations of each non-residential building and screening structure. Show placement of materials and colors on the facades according to UDO Section 5.6 .B or 7 .9. [8] Include the following dimensions: [8] Total vertical square footage minus openings (for each fayade separately) [8] Total vertical square footage of transparency (for each fayade separately in Northgate) [8] Total vertical square footage of each building material (for each fayade separately) [8] Total vertical square footage of each color (for each fayade separately) [8] Graphi c representation and/or description of existing buildings in building plot to show material , color , and architectural harmony . Revised 4/14 Page 10of11 CITY O F COT.LEG E S TATION! --------"""""' __ ......... pa~ -~~~=------------Home of Texas A&M Univ ersity • = MEMORANDUM DATE : October 8, 2014 TO : Glenn Jones , J4 Engineering , via ; gjones@j4engineering .com FROM : Jerry Cuaron , Staff Planner SUBJECT: AGGIELAND EXPRESS CARWASH (SP) Staff reviewed the above-mentioned site plan as requested . The following page is a list of staff review comments detailing items that need to be addressed . The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal , another $932 processing fee will need to be subm itted for the subsequent set of three (3) reviews . City of College Station Transmittal Letter Two (2) revised site plans Please note that this application will exp ire in 90 days from the date of this memo , if t he appl icant has not provided written response comments and revised documents to the Admin istrator that seek to address the staff review comments contained here in . If there are comments that you are not addressing with the revised s ite plan, please attach a letter explaining the details . If you have any questions or need additional information , please call me at 979 .764 .3570 . Attachments : Staff review comments PC : Jed Waltermathe , via ; jed@circlednurseries .com P&DS Project No . 14-00900197 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE · CO LL EGE TAT ION ·TEXAS · 7784 2 TEL. 97 9.7 6 4.35 7 0 ·FAX. 979 .7 64.34 96 cstx.gov/devservices PLANNING 1. No comments 2. Please note that any changes made to the plans, that have not been requested by the City of College Station , must be explained in your next transmittal letter and "bubbled " on your plans . Any additional changes on these plans that the City has not been made aware of will constitute a completely new review . Reviewed by : Jerry Cuar6n Date : October 6 , 2014 ENGINEERING COMMENTS NO. 2 1. Please relocate the water meters within the PUE, and not on top of the PUE. Also please make sure that the outfall of the proposed rip rap has adequate grading away from the meters . 2. Also please remove the waterline shown on plan that is connecting the existing Fire Hydrant on Greens Prairie Road to the line on William D Fitch since this line does not exist. The existing Fire Hydrant is connected to Wellborn and it should be running south along Greens Prairie rd. 3. Please design the discharge of the concrete flume in an acute angle towards the existing drainage ditch to minimize erosion . The current design is showing a perpendicular discharge to the ditch. 4. Please provide the calculation that determined the flow of water being 1.5" in depth for a 100 year storm event. 5. Please clarify the "1.5" depth area" since after looking at it closer , it seems that the concrete flume area is actually collecting half of the runoff of the developed property . 6. FYI due to the runoff through the graded sidewalk island, the sidewalk may become slimy and slip hazard . 7. Please provide a drawing of the fire lane layout once the turnaround goes away and the lot develops. Reviewed by : Kevin Ferrer Date : October 7, 2014 MEMORANDUM DATE : September 2, 2014 TO : Glenn Jones , J4 Engineering , via ; gjones@j4engineering .com ./ FROM : Jerry Cuar6n , Staff Planner SUBJECT : AGGIELAND EXPRESS CARWASH (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a li st of staff review comments detailing items that need to be addressed . Please address the comments and submit the follow ing information for further staff review : City of College Station Transm ittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) 24 "x36 " revised site plans ; One (1) 24 "x36 " landscaping plan ; One (1) 24 "x36 " grading and erosion control plan ; One (1) 24 "x36 " pavement plan ; One (1) 24 "x36 " utility plan ; Please note that this application w ill expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not addressing with the revised site plan , please attach a letter explaining the details . If you have any questions or need additional information , please contact Jerry Cuar6n at 979-764-5030 . PC : Jed Waltermathe , via ; jed@circlenurseries .com J P&DS Project No . 14-00900197 Attachments : 5 l''l. Staff Review Comments Plttmzing & Development Services P .O. BOX 9%0 • 1101 TEXAS AVENUE · COLLEGE STAT ION ·TEXAS · 7784 2 TEL. 979.764 3570 ·FAX . 979.764 .3 496 cst)(.gov/devservices STAFF REVIEW COMMENTS NO . 1 Project: Aggieland Express Carwash (SP) 14-00900197 PLANNING 1. Please provide structural calculations and engineered drawings for car wash shade canopies . 2. Please provide one handicap van accessible space . 3. Please provide angle of parking and increased depth in accordance with UDO 12-7 .3(C). 4 . Please use a face of curb measurement. 5. Please revise Total Parking Spaces provided to 14 , queue spaces do not compute to parking spaces . 6. Please show proposed Typical Curb-Cut Detail on Site Plan . 7. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled " on your plans . Any additional changes on these plans that the City has not be made of aware of w ill constitute a completely new review . Reviewed by: Jerry Cuar6n Date: 8/28/14 LANDSCAPING/STREETSCAPING/BUFFER 1. Please show proposed screening for transformer. Reviewed by: Jerry Cuar6n Date: 8/28/14 ENGINEERING COMMENTS NO. 1 1. Please label existing and proposed contour elevation for Grading plan. 2. Proposed water service and irrigation meter shall be within the P.U.E ., or dedicate additional P.U.E. Please note that we don 't want the meters in the pavement. 3. It seems that your provided parking are the Vacuum stalls . Therefore , one parking lot (Vacuum stall) shall be for handicapped and be designed accordance Texas Architectural Barriers Act (TABA). 4 . Provide a Grit trap for the car wash and show the general location of it such as a labeled rectangle. Please make sure that Grit trap design meets College Station , Texas -Code of Ordinance , Chapter 11 Section 6 . Also add a note on the site plan stating that it meets the requirements . 5. FYI an additional backflow valve for the water line is going to be required to be place prior to the connection of the car wash equipment. This needs to be shown on the site plan if it 's not shown on the plumbing plans . 6 . The proposed Rip Rap apron discharging to the street and sidewalk is not going to work . Provide an inlet with a storm drain pipe connecting to the existing storm drain inlet on Greens Prairie Road W . Include detail S3-01 from B/CS guidelines and indicate connection to storm inlet box will be per detail S3-01 . 7. The proposed Rip Rap apron on the north side of the car wash is going to require a swale leading the runoff from the Rip Rap discharge to the floodplain to prevent the point discharge flowing to the adjacent properties . 8 . Please provide adequate grading at the drive entrance of the car wash in such a way that the runoff does not enter the car wash facility leading into the sewer lines. 9. Please re-grade the surrounding area of the sidewalk island at the southern property in such a way that the runoff is not running through the sidewalk . 10 . Is there a particular reason why the proposed cleanout is showing a 10 foot drop on the Utility plan? 11 . On Utility Note# 11 , please specify B/CS Unified Design Details and provide. 12 . The 6" Sewer line connecting to the existing Manhole is going to need a drop connection due to the drop being greater than 2 feet. 13. Please move Road Work ahead further for advance notice. 14 . Why are there channelizing devices on the opposite side? Reviewed by: Kevin Ferrer Date: August 29, 2014 AGGIELAND CARWASH ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital , AutoCAD dwg format, version of plat and I or site plan as soon as it is available . Email to : ehorton@cstx.gov 2 . LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers , and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements , could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: All easements on site are existing . Electric facilities will be designed within existing easements . 4 . EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU , as shown on plat or site plan . 5. If easements are existing , the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries . GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design . 2. CSU will provide drawings for electrical installation . 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4 . Developer will intercept existing conduit at designated transformers or other existing devices and extend as required . 5. If conduit does not exist at designated transformer or other existing devices , developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings , i.e . transformers, pull boxes , or other device , per CSU specs and design . 7 . Developer installs pull boxes and secondary pedestals per CSU specs and design , Pull boxes and secondary pedestals provided by CSU . 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service , i.e . transformers , pull boxes , or switchgears , all meter locations, and conduit routing as designed by CSU . 9. To discuss any of the above electrical comments please contact Eric Horton at 979 . 764 .6280 . Reviewed by: Eric Horton Date: 8/28/14 FIRE 1) The building will require a Fire Lane . The needed Fire Lane appears to be longer than 100 '. If a Fire Lane is longer than 100 ' a Turn-a-round is required . International Fire Code 2012 Section "D ". Although Greens Prairie road is close to the building the Fire Department will not stop and block this road . The Turn -a-round requirement is listed in the IFC 2012 Section "D" 103 .1 2) Knox Box required I can be reached at (979) 764-6273 Reviewed by: Steve Smith Date: 08/19/2014 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: August 20, 2014 CITY OF COLLEGE STATJON~ ________ .............. ----Home of Texas A&M University " --- MEMORANDUM DATE : August 18, 2014 TO : Glenn Jones , J4 Engineering , via ; gjones@j4engineering .com FROM: Jerry Cuaron , Staff Planner SUBJECT: AGGIELAND EXPRESS CARWASH (SP) Thank you for the submittal of your Site Plan -Commercial application. Kevin Ferrer, Graduate Civil Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Tuesday , September 2 , 2014 . If you have questions in the meantime , please feel free to contact us . PC : Jed Waltermathe, via ; jed@ci rclenurseries .com / P&DS Project No. 14-00900197 Planning & Development Services P.O . BOX 9960 · 110 I TEXAS AVENUE ·COLLEGE STAT ION • T EXAS • 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cstx.gov/devservices DEVELOPMENT PERMIT PERMIT NO. 14-197 CITY O F C OLLEGE 5 -r;\TION P/.:nnilif d-rki>r:/1Jp!111'"I .5mr.M FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 1 R-A, Block 1 Castlegate Business Center Aggieland Express Carwash DATE OF ISSUE: 10/31/2014 OWNER: Jed Waltermathe 2014 Finfeather Road Bryan , TX 77801 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: 800 W . D . Fitch Parkway -State Hwy 40 DRAINAGE BASIN: Spring Creek VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2 . The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3 . The perm it will expire if no significant work is progressing within 24 months of issuance. 4 . Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits. 5 . Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State , and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8 . All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9 . All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed. 10 . Special Conditions : I, _______________ , the Contractor, hereby agree to comply with all conditions herein . Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact Re.~ AY~ey!.;Vl~rr 393 -8'tbh , the Public Works Inspector assigned to this project 24 hours prior to begi ning construction for scheduling required Inspections . Io-3 I -WI I/ Cit Date Glenn Jones PE #97600 CFM#/02/-06N Firm #9951 Carol Cotter, PE City of Co ll ege Station PO Box 9960 College Station, Texas 77842 J4 [ngineering Consulting • Engineering • Construction Services POBox5/92 Bryan, Texas 77805 Phone : 979-739-0567 gjones@ j4engineering.com August 15, 2014 RE: Drainage Letter -Aggieland Express Carwash at Castlegate Plaza Mrs . Cotter: This letter is to certify that the project knows as Aggieland Express Carwash at Castlegate Plaza is being developed in compliance the Walter P. Moore LOMR for the Tower Point Area This site meets the impervious cover and storm flow assumptions used in the report analysis . In addition, the proposed improvements will not obstruct or divert storm water flows form adjacent properties or alter the storm water carrying capacity of the State Highway 40 drainage ditch. All drainage features for this development have been designed in accordance with the applicable provisions of the BCS Design Guidelines. This letter only addresses the proposed deve lopment as shown in the site plans designed and developed by J4 Engineering and submitted this date for review by the City. Any alterations or changes to these plans , both now or by future redevelopment, will void this letter and require another review of the altered storm water runoff patterns to ensure there are no adverse effects . In addition, any future development or redevelopment will need to evaluate the site assuming a completely undeveloped tract. [f there are any questions , please do not hesitate to contact me at 979-739-0567. "Aggie Owned and Op erated" -Page I of 1- _,,,,,,,, ---:.\t°-OF T£A: \\l : s-<...~ ••••••••• -1,s •t ;: .·· * ·.. ,, '*: ·.• '1 ~*: ".*'I. ~···························'I. ~ GLENN JONES ~ I':· •..••.•.•.....••......•.. ·'-~ •• 97600 : : ,~·. ..~,, 11:0,;_ · · ~ICfNSt.~ •. ~~ t, ~ss~o"N;.~. £.~::.: \'\."'"''"'