Loading...
HomeMy WebLinkAbout14-193FOR OFFICE u.sep~ y CASE NO.: }~ \ol . DATE SUBMITTED : • (J2 · t4 CITY OF COIJ..EG E STATION Home o/Texas A&M Uni versity" SITE PLAN APPLICATION GENERAL MINIMUM SUBMITTAL REQUIREMENTS: ~~Site Plan Application Fee. TIM E: <;: z.,S . STAFF: ~ D $350 Non-Residential Architectural Standards I Northgate Build i ng Review Application Fee (if applicable). 0 $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). D Application completed in full . This application form provided by the City of College Station must be used ,and may not be adjusted or altered . . ~ Six (6) folded copies of site plan. ~· One (1) folded copy of the landscape plan . O One (1) copy of the following for Non-Residential Architectural Standards building rev iew or Northgate Building Review (if applicable). ~ Building elevations to scale for all build ings. D A list of building materials for all facade and screening. 0 Color samples for all buildings or list colors to be used from the approved color palette . O Electron ic copy of Site Plan e-mailed to csuelectdesign@cstx .gov. D Two (2) copies of the grading , drainage , and erosion control plans with supporting dra i nage report . D Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). 0 Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for t he proposed request (if applicable). O The attached Site Plan Non-Residential Arch itectural Standards Building Review and Northgate Build ing Review checklists (as applicable) with all items checked off or a brief explanation as to why they are no t check off. Date of Optional Preappl ication or Stormwater Management ConJ;rence NAME oF PROJECT ~ Lh u ,_, 'N {>( ~ u rT « ADDRESS c;rco ~ mtJY· CLE(£. s-a--r1(/)1 K -'J)· LEGAL DESCRIPTION (Lot, Block, Subdivision) __ ;__· ~I /3,~:u;-~_TL/ ___ (}_()=~~/)~!_U_/f_J_61'v _______ _ APPLICANT/PRO~ECT MAN~~ER'S INFORMATION (Primary co~tact for the project): / Name .:{V / 1 O A'( 1 /q E-mail ()Jfl !._a /l Y-~ mu d a L @ • Street Address l./ 0 0 S ffe !} y City -<5r7aa Phone Number 9 7 9 -</02 -So 7 3 State --'-0:--'-'-'-----Zip Code 77 Yo I Fax Number Street Address Revised 4/14 Page 1 of 11 , ARCHITECT OR ENGINEER'S INFORMATION : Name '1tv--i3<2-.--. EY'oi,v.,J 6-<o~ E-mail Street Address 3 ) 09 5: (//e e... ftJ-oo £.. /)12 _ --------------- City f3-Y1CJ,_.., ~ State __,_&-4---_____ ZipCode 7 ·7802_ Phone Number 9 7 ~ ~ 7 3 1 ,..-2 00 2.... Fax Number OTHER CONTACTS (Please specify type of contact): Name Street Address City State _________ Zip Code ______ _ Phone Number Fax Number ---------------- Current zoning ------------------------------------ Present use of property Proposed use of property Number of parking spaces required Number of parking spaces proposed ------- Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes ~o This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the ·application be reviewed under previous ordinance as applicable? Yes No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: .City Project Number (in known): Date I Timeframe when submitted : Revised 4/14 Page 2of11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made here i n. 3. If revoked , all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local , state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7 . If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction . 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9 . If, stormwater mitigation is required , including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to ______________ (name or firm) is authorized for bidd ing purposes only. I understand that final approval and relea p sand development for construction is contingent on contractor signature on approved Developme t Permit. 13 . I, THE OWNER, AGRE D CERTIFY HAT STATEMENTS HEREIN , A DIN ATIACHMENTS FOR THE DEV NT PERMIT APP TIO E, TO THE BEST OF Y KNO LEDGE , TRUE , AND Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds , proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES : i.e., projects over 10 acres may requ i re a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATIACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE. Engineer Date Revised 4/14 Page 4of1 1