HomeMy WebLinkAbout14-191C ITY OF C OLLEGE S TAT ION
Home of Texas A&M Univmity"
DEVELOPMENT PERMIT APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
[8] $600 (m inimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of
acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is due prior
to the issuance of any plans or development permit).
~ Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report .
[8] Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Date of Optional Preapplication or Stormwater Management Conference NIA
SPECIAL FLOOD HAZARD AREA? 0Yes [8J No
(Zone A or Zone AE on FEMA FIRM panels)
NAME OF PROJECT Castlegate II Subdivision Phase 200 6 " Waterline
ADDRESS 4205 Norwich Dr
LEGAL DESCRIPTION (Lot , Block , Subdivision) Castlegate 11 Common Area 10511139
APPLICANT I PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Wallace Phillips IV E-mail dustyphillips52@yahoo .com
Street Address 4490 Castlegate Drive
C ity College Station State Texas Zip Code _7_78_4_5 ____ _
Phone Number 979 .690 . 7250 Fax Number 979 .690.1041 ------------------------------
PROPERTY OWNER 'S INFORMATION:
Name Castlegate Homeowners Association
Street Address 4490 Castlegate Drive
E-mail _____________ _
City College Station State _Ti_ex_a_s ______ Zip Code _7_78_4_5 ____ _
Phone Number 979 .690 .2330 Fax Number ----------------
ARCHITECT OR ENGINEER 'S INFORMATION :
Name Schultz Engineering, LLC -Joe Schultz, P.E. E-mail Schultz Engineering, LLC -Joe Schultz,
Street Address 2730 Longmire Drive , Suite A
City College Station State Te x as Zip Code _7_78_4_5 ____ _
Phone Number 979 . 764 .3900 Fax Number 979 . 764 .3910 ----------------
10/10 Page 1 of 4
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
8-8-t4
Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigat ion , including detention ponds , proposed as part
of the project will be constructed first in the construction sequence .
2 . I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
includ ing NOi and SWPPP . Design will not preclude compliance with TPDES : i.e ., Project over 10 acres may
require a sedimentation basin .
3. The information and conclusions contained in the attached plans and support ing documents comply with the
current requirements of the C ity of College Station , Texas City Code , Chapter 13 and associated BCS Unified
Design Guidelines. All develog.rq,e.{lt as been designed in accordance with all applicable codes and ordinances
of the City of College Sta ti.Qff-:iiO d cstat~f ederal Regulations .
4 . I, THE ENGINEER , AG \0 'ctAIND0ew ' ~THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS
FOR HE DEVELOP . N-r°F>E ·. APFJ h lGA ION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND
ACC TE . ....# ... ::::.,," .... ~.~~ .. I,) C,. ,,. () ( L;. ~.···a··· p SCHULTZ 1i U P r ( ~~___1._p.~L--"'.~"----~<&£0.~'~~o~•~~!o~•·~~·~"~··~··-••_••_••~:~~~~~~J ~~~~~~~~~~~~~~
,-0 ~ 6511''l(\ :; 0 ,•J -'.):l •n , '-UV A .6 /.J../ j,J
' 0 "•/)';:: ~vo ~' rJ
A;.('-··-G1s· r'<'··'"" ·''"9
\I ~ ... v,:,~'°' " ,1o\0.r7
Date
10/10 Page 2 of 4
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only
Permits:*
A. I, certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit , shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area ;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor
(v) increase Base Flood velocities .
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances .
Engineer Date
Initial
D * If a platting-status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits:
B. I, , certify to the following :
(i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm .
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction , improvement , or fill covered by this
permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments .
Engineer Date
10/10 Page 3 of 4
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D . I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor , including all utilities, ductwork and any basement , at an
elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates w ill be provided with
elevations certified during construction (forms at slab pre-pour) and post construction .
Engineer I Surveyor Date
Commercial Structures:
E. I, ________________ , cert ify that all new construction or any substantial improvement
of any commercial , industrial , or other non-residential structure are designed to have the lowest floor , including all
utilities , ductwork and basements , elevated at least one foot above the Base Flood Elevation
Engineer I Surveyor Date
OR
I, , certify that the structure with its attendant utility, ductwork ,
basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities , ductwork ,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation , and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions .
Required Elevation Certificates will be provided with elevations certified during construction {forms at slab pre-
pour) and post construction .
Engineer I Surveyor Date
Conditions or comments as part of approval :
Print Form _ j
10/10 Page 4 of 4
DEVELOPMENT PERMIT
PERMIT NO . 14-191
Crrv OF C O U EC E S ·r.~TION
Pf.:.'l tti1tf&l"ln-~/,;pmrn1 ~.u"
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Castlegate II Common Area 10511/39
DATE OF ISSUE: 08/29/2014
OWNER:
Castlegate Homeowner's Association
4490 Castlegate Dr
College Station, TX 77845
SITE ADDRESS:
4205 Norwhich Dr
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized .
2 . The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re-
issued .
3. The permit will expire if no significant work is progressing within 24 months of issuance .
4 . Other permits may have been required to fulfill local , state and federal requirements . Construction will be in
compliance with all necessary State and Federal Permits .
5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements .
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to , paint, oil,
solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited .
9 . All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically
requested and approved will be allowed .
10 . Special Cond itions :
!, ________________ , the Contractor, hereby agree to comply with all conditions herein .
Contractor Signature Date
Phone number E-mail
I hereby grant this permit for development. Contact fsyt.«e / /{";Je 777-b~ZI , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
CityJ;f;;(~entative r-.i ,_ i.011.f
Date
DEVELOPMENT PERMIT
PERMIT NO . 14-191
CITY OF COLLEGE ST,\TION
P/.JmtiJ1<! tJ. (k,.y:li;p1H111I S,.,,:iM
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE CO LLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Castlegate II Common Area 10511/39
DATE OF ISSUE: 08/29/2014
OWNER:
Castlegate Homeowner's Association
4490 Castlegate Dr
College Station , TX 77845
SITE ADDRESS:
4205 Norwhich Dr
DRAINAGE BASIN:
Spring Creek
VALID FOR 24 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The perm it may be revoked if any fa lse statements are made here in. If revoked , all work must cease until perm it is re-
issued .
3. The permit will expire if no s ignificant work is progressing within 24 months of issuance.
4 . Other permits may have been required to fulfill local , state and federal requirements . Construction will be in
compliance with all necessary State and Federal Perm its .
5. Stormwater m itigation , including detention ponds will be constructed first in the construct ion sequence of the project.
6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing
drainage facil ities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevent ion Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the
Contractor 's responsib ility to implement measures that will meet City , State , and Federal requirements .
7 . All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operat ions of th is
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil ,
solvents , asphalt, concrete , mortar, or other harmful liquids or materials with in the drip line of any tree required to
remain is also prohibited .
9. All construct ion shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations
that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically
requested and approved w ill be allowed .
10 . Special Conditions :
I, ~ ~ , the Contractor, hereby agree to comply with all conditions herein .
Date
Phone number E-mail
I hereby grant this perm it for development. Contact fsxtd / l{"i/e 777-bi71 , the Public Works
Inspector ass igned to this project 24 hours prior to beginning construction for scheduling requ ired Inspections.
City ~(~entative Date
Item
I
2
3
4
5
6
7
8
9
10
II
12
13
14
15
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Castlegate II Subdivision Phase 200 -6" Waterline
E ' E f t fC t f ngmeer s s 1ma e o ons rue 100
Description Unit Es timated
Quantity
General Items
Mobilization, O verhead and Construction Staking LS I
Erosion & Sediment Control -SWPPP Implementation & Maintenance, Silt Fence, LS I Construction Exit, Rock Filter Dam, etc ., complete in place
Unit Price
$ 1,000 .00
$ 500.00
General Items Subtotal
Demolition & Sidewalk Construction Items
Remove and Replace Sidewalk SF 845 $ 6 .00
Demolition & Sidewalk Construction Items Subtotal
Water Construction Items
Waterline Testing LS I $ 1,000 .00
6" C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 159 $ 26 .00
Connect to Existing 8" Water Line EA I $ 1,500 .00
Fire Hydrant Assembly (w/valve, vert. extension), complete in place EA I $ 3,500 .00
8"x6" M .J . Reducer, complete in place EA I s 400 .00
6"x 6" M.J . Tee, complete in place EA I $ 500 .00
6" Isolation Valve, complete in place EA I $ 1,000 .00
6" x 45° M.J . Bend, complete in place EA 2 $ 400 .00
6" x 22 .5° M.J . Bend, complete in place EA 2 $ 400 .00
Extend Existing l" Water Service into Proposed 6" Waterline EA I $ 700.00
Tie Existing I" Water Service into Proposed 6" Waterline EA 2 $ 500.00
Replace Existing Service with 5 LF of 1.5" Water Service EA 1 s 750.00
Water Construction Items Subtotal
F'-12327,
SCHULTZ ENGINEERING; LLC..
General Items Subtotal $
Demolition & Sidewalk Construction Items Subtotal $
Water Construction Items Subtotal $
TOTAL CONSTRUCTION $
Page 1of1
$
$
$
$
$
$
$
$
s
$
s
$
$
s
$
s
$
$
Total
1,000.00
500.00
1,500.00
5,068 .32
5,068.32
1,000.00
4,134.00
1,500 .00
3,500.00
400 .00
500.00
1,000.00
800.00
800.00
700.00
1,000.00
750.00
16,084.00
1,500.00
5,068.32
16,084.00
22,652.32
Item
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No.12327
Castlegate II Subdivision Phase 200 -6" Waterline
E ' Er t re t r ngmeer s s 1ma e o ons rue 100
Description Unit Est im ated
Quantity
Ge n eral Items
Mobilization , Overhead and Construction Staking LS I
Erosion & Sediment Control -SWPPP Implementation & Maintenance, Silt Fence, LS I Construction Exit, Rock Filter Dam, etc ., comp lete in place
Unit Price
$ 1,000 .00
$ 500 .00
Genera l Items Subtotal
Demolition & Sidewalk Con stru ctio n Item s
Remove and Replace Sidewalk SF 845 $ 6.00
Demolition & S idewalk Con struction Items S ubtotal
Water Con struction Items
Waterline Testing LS I $ 1,000 .00
6" C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 159 $ 26 .00
Connect to Existing 8" Water Line EA I $ 1,500 .00
Fire Hydrant Assembl y (w/valve, vert. extens ion), complete in place EA 1 $ 3,500 .00
8"x6" M.J . Reducer, complete in place EA 1 $ 400 .00
6"x 6" M .J . Tee, complete in place EA 1 $ 500 .00
6" Iso lation Valve, complete in p lace EA 1 $ 1,000.00
6" x 45 ° M.J . Bend, complete in place EA 2 $ 400.00
6" x 22.5 ° M.J. Bend, complete in pl ace EA 2 $ 400.00
Extend Existing l" Water Serv ice into Proposed 6" Waterline EA 1 $ 700 .00
Tie Existing I" Water Service into Proposed 6" Waterline EA 2 $ 500.00
Replace Existing Service with 5 LF of 1.5'' Water Service EA 1 $ 750.00
Water Construction Items Subtotal
F-12327
SCHULTZ ENGINEERING, LLC.
General Items S ubtotal $
Demolition & Sidewalk Construction Items Su btotal $
Water Con struction Items Subtotal $
TOTAL CONST R UCTION $
Page 1of1
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
1,000 .00
500.00
1,500.00
5,068 .32
5,068.32
1,000.00
4 ,134 .00
1,500.00
3,500.00
400.00
500.00
1,000.00
800.00
800.00
700 .00
1,000.00
750 .00
16,084.00
1,500.00
5,068.32
16,084.00
22,652.32
CITY OF COI,LEGE STATION
Home o/Texas A&M University•
FOR OFFICE USE ONLY
CASE NO .: 1'1'1Cf)
DATE SUBMITTED : ~' lf!, <J ~
TIME: \() ', ()C --"-'---------
ST AF F: <f1C...
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
D New Proj ect Submittal
D Incomplete Project Submittal -documents needed to complete an application . Case No .:
[g] Existing Project Submittal. Case No.: 14-00900191
Project Name CASTLEGA TE II SEC 200 WATER LINE (DP)
Contact Name JOE SCHULTZ P.E. Phone Number..;...9'-79'-'.'-76""'"4'-. 3""'"9;;...;0:....:;0 ________ _
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
D Comprehensive Plan Amendment D Non-Residential Architectural Standards
D Rezoning Application D Irrigation Plan
D Conditional Use Perm it D Variance Request
D Preliminary Plan D Development Permit
D Final Plat D Development Exaction Appeal
[g] Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR
D Site Plan D Grading Plan
D Special District Site Plan D Other -Please specify below
D Special District Building I Sign
D Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Comprehensive Plan Amendment D Waterline Construction Documents
D TxDOT Driveway Permit D Sewerline Construction Documents
D TxDOT Utility Permit D Street Construction Documents
D Drainage Letter or Report D Easement Application
D Fire Flow Analysis D Other -Please specify
Special Instructions:
10/10 Print Form
«gchultz Engi ne er ing , LLC
August 22, 2014
Kevin Ferrer
Graduate Civil Engineer
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: CASTLEGATE II SEC 200 WATER LINE (DP)-14-00900191
Dear Mr. Ferrer:
Office: 979.764.3900
Fax: 97 9 .764.3910
Attached are five (5) revised sets of revised construction drawings , the response to staff comments,
and one ( 1) 11 "x17 " copy of the Grading, Drainage & Erosion & Sediment Control Plan.
If you have any questions, please do not hesitate to call.
Very truly yours,
Schultz Engineering, LLC.
Joe Sch~
Civil Engineer
P.O . Box 11995 • College Station , Tex a s 77842
sc hultzeng ineerin g ll c.com
STAFF REVIEW COMMENTS
Project: Castlegate II Section 200 Water Line (DP) -14-00900191
ENGINEERING COMMENTS NO. 1
1. Please add a note stating that the reconstruction of the existing driveway to be
same as previous condition or better.
A note was added on both pages.
2. Coordinate with property owners when they're expecting water outage.
A note was added on the lots to be affected.
3 . Please provide grading, erosion control plan , and construction details.
Sheet 1 of 2 was added to show the erosion and sediment control and a
note stating the proposed grades will be at the same elevation as existing
grade. The waterline detail sheets have been added to the plan set.
MEMORANDUM
DATE : August 22 , 2014
TO : Wallace Phillips IV, via ; dustyphillips52@yahoo .com ./
FROM : Kevin Ferrer, Graduate Civil Engineer
SUBJECT: CASTLEGATE II SEC 200 WATER LINE (DP)
ENGINEERING COMMENTS NO. 1
1. Please add a note stating that the reconstruction of the existing driveway to be
same as previous condition or better.
2 . Coordinate with property owners when they're expecting water outage .
3 . Please provide grading , erosion control plan , and construction details.
Reviewed by: Kevin Ferrer Date : August 19 , 2014
PC : Castlegate Homeowner's Association , via USPS ; 4490 Castlegate Dr, College Station
TX , 77845 j
Joe Schultz , P.E., Schultz Engineering , via ; joeschultz84@verizon .net
P&DS Project No . 14-00900191
Pla11ni11g & Developm ent Sn·vices
P.O. BOX 9960 • 11 0 1 'JTXA S AVENUE · COLLEG E STATION • TLXAS • 77 84 2
T EL 97 9 .764 .. 'Vi 7 0 ·FAX. 97 9.7 64.3496
csbt.gov/devservices