Loading...
HomeMy WebLinkAbout14-189( -.. FOR OFFICE use p~ y CASE NO.: ~J~-·~\~o~\ ____ _ CrTY OF CoUEGE STATIO Homt ofT= A&M University " SITE PLAN APPLICATION GENERAL DATE SUBMITIED:g;-· (t;-14 TIME :~:~ STAFF : ~ MINIMUM SUBMITTAL REQUIREMENTS: ~ ~ Site Plan Application Fee. 0 $350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable). 0 $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). O Application completed in full. This application form provided by the City of College Station must be used ~· ·~~~~~~~;:~~~;;~;~:!::pe plan. O One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). ~ Building elevations to scale for all buildings. D A list of building materials for all facade and screening. 0 Color samples for all buildings or list colors to be used from the approved color palette . O Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. O Two (2) copies of the grading , drainage, and erosion control plans with supporting drainage report. O Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). 0 Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). O The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management ConJ;rence NAMEOFPROJECT .S /Jou~i'Jtl 'Jl}f'//3(' ' , ADDRESS d ITX) ~ lith~ ~ Lf. I UJU£6£. s 7:4-J'/U/1 / ;;;--1K -J/@ - LEGAL DESCRIPTION (Lot, Block, Subdivision) --~~/ 8,~~--_7Y __ (J_'t.J~f3~/)~f U_/f_J_&_lv _______ _ APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): / Name .:rv Ii 0 A",· /q E-mail we..~a/J y~ mo d12 L@ Va ht>o -c. Of'"Y7 • Street Address 900 S /b+ !) k City ~r7aa Phone Number 9 7 '1-</02. -50 7 3 State _-0,_-,t _____ Zip Code _7_7_~_6___.__( __ _ __,_ ___ Zip Code ']?!14 · Fax Number 9J q,__ t{BS-0 Q l Revised 4/14 Page 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION : Name ~ B e~ gv-o iµ.J ~Y-o Lt)'E-mail --------------- Street Address 3 ) Q Cj :;;-Wee... ffl -r 10 «?... j)J2. City &-r'/ o...., ~ State ---"@? ______ Zip Code 77802, Phone Number 97 c; r--]5 7 ,,. ?._0 02._ Fax Number OTHER CONTACTS (Please specify type of contact): Name Street Address City State _________ Zip Code Phone Number Fax Number Current zoning ------------------------------------- Present use of property Proposed use of property Number of parking spaces required Number of parking spaces proposed ______ _ Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes pao Th is information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? Yes No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : City Project Number (in known): Date I Timeframe when submitted : Revised 4/14 Page 2of11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local , state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. AH of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to ______________ (name or firm) is authorized for bidding purposes only. I understand that final approval and relea p sand development for construction is contingent on contractor signature on approved Developme t Permit. 13. I, THE OWNER, AGRE D CERTIFY HAT STATEMENTS HEREIN, A DIN ATIACHMENTS FOR THE DEV NT PERMIT APP TIO E, TO THE BEST OF Y KNO LEDGE, TRUE, AND Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3 . The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATIACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE. Engineer Date Rev ised 4/14 Page4of11 ·&__..... MEMORANDUM DATE: August 15 , 2014 TO : Juilo Avila , wecanremodel@yahoo .com FROM : Jerry Cuaron , Staff Planner SUBJECT: HOLIDAY INN & SUITES (SP-MINOR) Staff reviewed the above-mentioned site plan as requested . Please submit the following documents for approval. City of College Station Transmittal Letter Seven (7) site plans . Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not addressing with the revised site plan, please attach a letter explain i ng the details. If you have any questions or need additional information , please call me at 979.764 .3570 . cc: Case file #14-00900189 Pc: Case file #14-00900193 ., Pla11ni11g & Development Services P.O. BOX 9960 • l l OJ TEXAS AVENUE • COLLEGE STAT I ON · TEXA S • 77842 TEI.. ')7'l.764 . .35 70 ·FAX. 979.764.3496 .. ·'·· cst>t .gov/devservices • ,1· i' '#· ' ls~-,~~";.:\ ... '"•lllallillie•••••w•..,.,. __________ ~CITY OF CoUEGE STATION~------------11;$&,..,....,.1•-"-"" 24!ite Home of Texas A&M University • - ·ia;; m= .a& MEMORANDUM DATE : August 7, 2014 TO: Juilo Avila , wecanremodel@yahoo .com FROM : Jerry Curano , Staff Planner SUBJECT: HOLIDAY INN & SUITES (SP-MINOR) Thank you for the submittal of your Site Plan -Minor application . Kevin Ferrer, Graduate Civil Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Wednesday , August 20 , 2014 . If you have questions in the meantime , please feel free to contact us . PC : Salim Ismail , via ; salim .ismail@texashotelmgt.com P&DS Project No. 14-00900189 Pla11ni11g & Development Services P .O. BOX 9960 • 1101 TEXAS AVENUE · COLLEGE STATIO N · TEXAS · 7784 2 TEL. 979 764.3570 ·FAX. 9 79.76 4.3496 cstl<.gov/devservices