HomeMy WebLinkAbout14-189(
-..
FOR OFFICE use p~ y
CASE NO.: ~J~-·~\~o~\ ____ _
CrTY OF CoUEGE STATIO
Homt ofT= A&M University " SITE PLAN APPLICATION
GENERAL
DATE SUBMITIED:g;-· (t;-14
TIME :~:~
STAFF : ~
MINIMUM SUBMITTAL REQUIREMENTS:
~ ~ Site Plan Application Fee.
0 $350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable).
0 $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
O Application completed in full. This application form provided by the City of College Station must be used
~· ·~~~~~~~;:~~~;;~;~:!::pe plan.
O One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate
Building Review (if applicable).
~ Building elevations to scale for all buildings.
D A list of building materials for all facade and screening.
0 Color samples for all buildings or list colors to be used from the approved color palette .
O Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
O Two (2) copies of the grading , drainage, and erosion control plans with supporting drainage report.
O Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
0 Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
O The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management ConJ;rence
NAMEOFPROJECT .S /Jou~i'Jtl 'Jl}f'//3(' ' ,
ADDRESS d ITX) ~ lith~ ~ Lf. I UJU£6£. s 7:4-J'/U/1 / ;;;--1K -J/@ -
LEGAL DESCRIPTION (Lot, Block, Subdivision) --~~/ 8,~~--_7Y __ (J_'t.J~f3~/)~f U_/f_J_&_lv _______ _
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): /
Name .:rv Ii 0 A",· /q E-mail we..~a/J y~ mo d12 L@ Va ht>o -c. Of'"Y7 •
Street Address 900 S /b+ !) k
City ~r7aa
Phone Number 9 7 '1-</02. -50 7 3
State _-0,_-,t _____ Zip Code _7_7_~_6___.__( __
_ __,_ ___ Zip Code ']?!14 ·
Fax Number 9J q,__ t{BS-0 Q l
Revised 4/14 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION :
Name ~ B e~ gv-o iµ.J ~Y-o Lt)'E-mail ---------------
Street Address 3 ) Q Cj :;;-Wee... ffl -r 10 «?... j)J2.
City &-r'/ o...., ~ State ---"@? ______ Zip Code 77802,
Phone Number 97 c; r--]5 7 ,,. ?._0 02._ Fax Number
OTHER CONTACTS (Please specify type of contact):
Name
Street Address
City State _________ Zip Code
Phone Number Fax Number
Current zoning -------------------------------------
Present use of property
Proposed use of property
Number of parking spaces required Number of parking spaces proposed ______ _
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes pao
Th is information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
Yes
No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name :
City Project Number (in known):
Date I Timeframe when submitted :
Revised 4/14 Page 2of11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re-issued.
4 . Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local , state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP.
7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken
to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. AH of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to ______________ (name or firm) is authorized for bidding purposes
only. I understand that final approval and relea p sand development for construction is contingent on
contractor signature on approved Developme t Permit.
13. I, THE OWNER, AGRE D CERTIFY HAT STATEMENTS HEREIN, A DIN ATIACHMENTS FOR
THE DEV NT PERMIT APP TIO E, TO THE BEST OF Y KNO LEDGE, TRUE, AND
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction
including NOi and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3 . The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations .
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATIACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE , TRUE , AND
ACCURATE.
Engineer Date
Rev ised 4/14 Page4of11
·&__.....
MEMORANDUM
DATE: August 15 , 2014
TO : Juilo Avila , wecanremodel@yahoo .com
FROM : Jerry Cuaron , Staff Planner
SUBJECT: HOLIDAY INN & SUITES (SP-MINOR)
Staff reviewed the above-mentioned site plan as requested . Please submit the following
documents for approval.
City of College Station Transmittal Letter
Seven (7) site plans .
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein . If there are
comments that you are not addressing with the revised site plan, please attach a letter
explain i ng the details. If you have any questions or need additional information , please call me
at 979.764 .3570 .
cc: Case file #14-00900189
Pc: Case file #14-00900193
.,
Pla11ni11g & Development Services
P.O. BOX 9960 • l l OJ TEXAS AVENUE • COLLEGE STAT I ON · TEXA S • 77842
TEI.. ')7'l.764 . .35 70 ·FAX. 979.764.3496
.. ·'·· cst>t .gov/devservices • ,1· i' '#· ' ls~-,~~";.:\
... '"•lllallillie•••••w•..,.,. __________ ~CITY OF CoUEGE STATION~------------11;$&,..,....,.1•-"-"" 24!ite Home of Texas A&M University • -
·ia;; m= .a&
MEMORANDUM
DATE : August 7, 2014
TO: Juilo Avila , wecanremodel@yahoo .com
FROM : Jerry Curano , Staff Planner
SUBJECT: HOLIDAY INN & SUITES (SP-MINOR)
Thank you for the submittal of your Site Plan -Minor application . Kevin Ferrer, Graduate Civil
Engineer, and I have been assigned to review this project. It is anticipated that the review will be
completed and any staff comments returned to you on or before Wednesday , August 20 , 2014 .
If you have questions in the meantime , please feel free to contact us .
PC : Salim Ismail , via ; salim .ismail@texashotelmgt.com
P&DS Project No. 14-00900189
Pla11ni11g & Development Services
P .O. BOX 9960 • 1101 TEXAS AVENUE · COLLEGE STATIO N · TEXAS · 7784 2
TEL. 979 764.3570 ·FAX. 9 79.76 4.3496
cstl<.gov/devservices