Loading...
HomeMy WebLinkAbout14-181·.-FOR OFFICE ljS ~_ONL Y CASE NQ: /~ (y/ CITY OF CouJ:O:GE STATION Home o/Texas A&M Un iversity• DATE SUBMITTED :------ TIME: (Check one) 0 Minor ($700) STAFF : <'r '' ~Vtjt j_ FINAL PLAT APPLICATION 0 Amending ($700) ~Final ($932) 0 Vacating ($932) 0Replat ($932) Is this plat in the ET J? D Yes [gJ No Is this plat Commercial D or Residential ~ MINIMUM SUBMITTAL REQUIREMENTS: [8:J $700-$932 Final Plat Application Fee (see above). D $233 Waiver Request to Subdivision Regulations Fee (if applicable). [8:J $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). [8:J Application completed in full . This application form provided by the City of College Station must be used and may not be adjusted or altered . Please attach pages if additional information is provided . [8:J Six (6) folded cop ies of plat. (A signed mylar original must be submitted after approval.) [8:J Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report. [8:J Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). [8:J Copy of original deed restrictions/covenants for replats (if applicable). [8:J Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days . The report must include applicable information such as ownership , liens, encumbrances, etc. [8:J Paid tax certificates from City of College Station , Brazos County and College Station l.S .D. D The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete . If the mylar is submitted with the final plat application , it shall be considered a submittal for the preliminary plan project and processed and reviewed as such . Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete . Date of Optional Preapplication or Stormwater Management Conference .:..:.M.;..;;a""rc;;.;..h.;__5~2~0....:..1....:..4 __________ _ NAME OF PROJECT 12 at Rock Prairie Phase 1 ADDRESS 3270 Rock Prairie Road West SPECIFIED LOCATION OF PROPOSED PLAT: North side of Rock Prairie Road 0. 5 miles west of Wellborn Road I APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Craig Browne E-mail craig@craigbrowne .com ~_;:_=---------------~ Street Address 2801 Earl Rudder Freeway C ity College Station state Texas Zip Code _7_78_4_5 ___ _ Phone Number 979 . 764. 7653 Fax Number Re vis ed 4/14 Page 1 of 9 .: ;,. PROPERTY OWNER'S INFORMAT.'71 (All owners must be identified . Please e::a•ach an additional sheet for multiple owners): Name DWS Development -David Scamardo E-mail david@dwsdevelopment.com Street Address 1289 North Harvey Mitchell Parkway City Bryan State Texas Zip Code 77803 ------ Phone Number 979-779-7209 Fax Number 979-775-5258 ---------------~ ARCHITECT OR ENGINEER'S INFORMATION : Name Joe Schultz, P.E. -Schultz Engineering LLC E-mail joeschultz84@verizon .net Street Address 3730 Longmire Drive, Suite A City College Station State Texas Zip Code 77845 ------- Phone Number 979. 764 .3900 Fax Number 979. 764 .3910 ----------------- Do any deed restrictions or covenants exist for this property? O Yes [gj No Is there a temporary blanket easement on this property? If so , please provide the Volume ____ and Page No . __ _ Total No . of Lots 51 ------R-0-W Acreage _3_. 0_2_2 ____ _ Total Acreage 9 .223 ---------- Existing use _H_o_rs_e_s ___________ _ Proposed Use Residential ---------------- Number of Lots By Zoning District 51 T 0 I GS I Average Acreage Of Each Residential Lot By Zoning District: 0.087 I T 0 GS Floodplain Acreage NIA ----------------------------------- 1 s there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? D Yes [8J No Th is information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is th is application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? lgJ Yes D No If yes , provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : EQUINOX SUBDIVISION PRELIMINARY PLAN C ity Project Number (if known): Date I Timeframe when submitted : JUNE 2014 Rev ised 4/14 Page 2 of 9 6 . r: The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7 . fi The proposed development contains frontage on a Freeway I Expressway as designated by Map 6 .6, Thoroughfare Plan -Functional Classification , in the City's Comprehensive Plan . Detailed explanation of condition identified above: I 'i . ----·----.. ---· ------·· ··-----·--· ---·-·· ---·-·------·--------------·---·-__j NOTE: A wa iver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission . Requested Oversize Participation _____________________________ _ Total Linear Footage of Proposed Public: 2525 Streets 5050 Sidewalks 1152 Sanitary Sewer Lines 1964 Water Lines 1571 Channels _E!_ Storm Sewers 1600 Bike Lanes I Paths Parkland Dedication due prior to filing the Flnal Plat: ACREAGE : ___ No. of acres to be dedicated + $ ____ development fee ___ No. of acres in floodplain ___ No . of acres in detention ---No. of acres in greenways OR FEE IN LIEU OF LAND : __ No . of SF Dwelling Units X $ = $ -------- (date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPUCA TION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as 00$rib~?iJJ&rJ Signature and title Date Revised 4/14 Page 4 of9 FOR OFFICE USE ONLY CASE NO.: tl-1-l 9 ( DATE SUBMITTED : Q1 / 1 '0/ l 4- C ITY OF C OI.J..EGE S TATION Home a/Texas A&M University• TIME : \ \ : 2.Q STAFF : ~/f. ..... IT_,__ _____ _ (Check one) D Minor ($700) FINAL PLAT APPLICATION D Amending ($700) ~Final ($932) D Vacating ($932) 0Replat ($932) Is this plat in the ET J? D Yes [8] No Is this plat Commercial D or Residential ~ MINIMUM SUBMITTAL REQUIREMENTS: [8] $700-$932 Final Plat Application Fee (see above). D $233 Waiver Request to Subdivision Regulations Fee (if applicable). [8] $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). [8] Application completed in full . This application form provided by the City of College Station must be used and may not be adjusted or altered . Please attach pages if additional information is provided . [8] Six (6) folded copies of plat. (A signed mylar original must be submitted after approval.) [8] Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report . [8] Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). [8] Copy of original deed restrictions/covenants for replats (if applicable). [8] Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days . The report must include applicable information such as ownership, liens, encumbrances , etc . [8] Paid tax certificates from City of College Station , Brazos County and College Station l.S .D. D The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete . If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete . Date of Optional Preapplication or Stormwater Management Conference :..:..M:.::ac....:rc::..:..h'-5=-=2:.::0...:..1...:..4 __________ _ NAME OF PROJECT Equinox Subdivision Phase 1 ADDRESS 3270 Rock Prairie Road West SPECIFIED LOCATION OF PROPOSED PLAT: North side of Rock Prairie Road 0. 5 miles west of Wellborn Road APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Craig Browne E-mail craig@craigbrowne .com ------------------ Street Address 2801 Earl Rudder Freeway City College Station state Texas Zip Code _7_78_4_5 ___ _ Phone Number 979 . 764 . 7653 Fax Number Revised 4/14 Page 1 of 9 ...;.....--· - PROPERTY OWNER'S INFOR owners): ON (All owners must be identified . Pie attach an additional sheet for multiple Name Charles & Mary Turner E-mail diamondt3375@yahoo .com Street Address 3270 Rock Prairie Road West City College Station State _0_ex_a_s _____ _ Zip Code 77845 ------ Phone Number 979 . 764 .2967 Fax Number ---------------~ ARCHITECT OR ENGINEER'S INFORMATION : Name Joe Schultz, P.E. -Schultz Engineering LLC E-mail joeschultz84@verizon .net Street Address 3730 Longmire Drive, Suite A City College Station State Texas Zip Code _7_78_4_5 ____ _ Phone Number 979 . 764 .3900 Fax Number 979 . 764 .3910 ----------------- Do any deed restrictions or covenants exist for this property? D Yes [g] No Is there a temporary blanket easement on this property? If so , please provide the Volume ____ and Page No . __ _ Total No. of Lots 51 ------R-0-W Acreage _3_. 0_2_2 ____ _ Total Acreage _9_.2_2_3 _______ _ Existing Use _H_o_rs_e_s ___________ _ Proposed Use Residential ---------------- Number of Lots By Zoning District 51 I T 0 GS I Average Acreage Of Each Residential Lot By Zoning District: 0.087 I T 0 I GS Floodplain Acreage _N_YA _________________________________ _ Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? D Yes IX] No This in formation is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the appl ication be reviewed under previous ordinance as applicable? [8] Yes D No If yes, provide in formation regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : EQUINOX SUBDIVISION PRELIMINARY PLAN City Project Number (if known): Date I Timeframe when submitted : JUNE 2014 Rev is ed 4/14 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): Re uested wa ive r to subd iv ision re ulations and reason for same if a licable : Regarding the waiver request , explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivis ion re ulations will de rive the a licant of the reasonable use of his land . 2 . The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 3. The granting of the waiver will not be detrimental to the public health , safety , or welfare , or inj urious to other property in t he area , or to the City in administering subd ivision regulations . 4 . The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance . Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. [l An alternative pedestrian way or multi-use path has been or w ill be provided outside the right-of-way ; 2. D The presence of unique or unusual topographic , vegetative , or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan ; 3. 0 A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean t he project is funded or projected to commence within twelve (12) months; 4 . D Ex ist ing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context ; 5 . O When a sidewalk is required along a street where a multi-use path is shown on the Bicycle , Pedestrian, and Greenways Master Plan ; Rev ised 4/14 Page 3 of 9 6 . n The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO ; or 7 . n The proposed development contains frontage on a Freeway I Expressway as designated by Map 6 .6 , Thoroughfare Plan -Functional Classification , in the City's Comprehensive Plan . Det ailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered a t the same t i me by the Planning & Zoning Commission . Total Linear Footage of Proposed Public: Z 5Z~ Streets 9250 Sidewalks I 15-Z San itary Sewer Lines JOJ''f Water Lines 1<71 Channels '377... Storm Sewers /6oo Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE : ___ No . of acres to be dedicated + $ ____ development fee ___ No . of acres in floodplain No . of acres in detention --- ---No . of acres in greenways OR FEE IN LIEU OF LAND : No . of SF Dwell i ng Units X $ ------= $ (date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and e x hibits attached hereto are true, correct, a nd complete. IF THIS APPL/CATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a comp a ny, the application must be accompanied by proof of authority for the company's representative to sign the application on its beha lf LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as desc ribed above. Signature and t itle Date Rev ised 4/14 Pa ge 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2 . The permit may be revoked if any false statements are made herein . 3 . If revoked , all work must cease until permit is re-issued . 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The perm it will expire if no significant work is progressing within 24 months of issuance. 6 . Other permits may be required to fulfill local, state, and federal requirements . Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7 . If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance . 9 . If, stormwater mitigation is required , including detention ponds proposed as part of this project , it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications , and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12 . Release of plans to (name or firm) is authorized for bidding purposes only . I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13 . I , THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCU~RATE . 1 4 ~ } -15° ... l.o t'{ Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation , including detention ponds , proposed as part of the project will be constructed first in the construction sequence . 2 . I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES : i.e., projects over 10 acres may require a sedimentation basin . 3 . The information and conclusions contained in the attached plans and supporting documents comply with the curr~nt req.uir~ments ol t ~~.of College Station.' Texas City Code, Ch~pter 13 a~d associated BCS Unified Design Guidelines ~e~~ has been designed in accordance with all applicable codes and ordinances of the City of Co ~a'tf tt <>a and Federal Regulations. 4 . I, THE ENG.INofR ,.iA'G . 0 A Q,~RTIFY THAT ALL STATEMENTS HEREIN , AND IN ATIACHMENTS FOR THE DE ~~f..!lJ.fi ••••• f.BM T.1'..b\ PLICATION , ARE, TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE.1 ••• m~~r . ~; .. ~.9~~.~~·a:.·r ~ 0 8 9 /~"1 •'fi e "'" Date Revised 4/14 Page 5 of 9 - .,. The following CERTl ~u l TIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only Permits:* certify , as demonstrated in the attached drainage study , that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation ; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ord inances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) increase Base Flood velocities . beyond those areas exempted by ordinance in Section 5 .11 .3a of Chapter 13 Code of Ordinances. Enginee r Date Initial D * If a platting-status exemption to this requirement is asserted, prov ide written justification under separate letter in lieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits: B. I, , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Engineer Date Additional certification for Floodway Encroachments: C . I, , certify that the construction , improvement, or fill covered by this permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments . Engineer Date Revised 4/14 Page 6 of 9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: E. I, , certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities , ductwork and basements , elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility , ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . Engineer I Surveyor Date Conditions or comments as part of approval : Rev ised 4/14 Page 7 of 9 Existing ~ FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) ~ Drawn on 24 " x 36" sheet to scale of 100' per inch . ~ V icinity map which includes enough of surrounding area to show general location of subject property in re lationship to College Station and its City Limits . No scale required but include north arrow . ~ T it le Block w ith the follow ing information : ~ Name and address of subdivider, recorded owner, planner, engineer and surveyor. ~ Proposed name of subdivision . (Subdiv ision name & street names will be approved through Brazos County 911 .) ~ Date of preparation . ~ Engineer's scale in feet. D Total area intended to be developed . ~ North Arrow . ~ Subdivision boundary ind icated by heavy lines. ~ If more than 1 sheet, an index sheet showing entire subdivis ion at a scale of 500 feet per inch or larger. ~ A ll applicab le certificat ions based on the type of final plat. ~ Ownership and Dedication ~ Surveyor and/or Engineer ~ City Engineer (and C ity Planner, if a minor plat). ~ Planning and Zoning Commission (delete if minor plat) ~ Brazos County Clerk D Brazos County Commissioners Court Approval (ET J Plats only) D If submitting a replat where there are existing improvements , submit a survey of the subject property showing the improvements to ensure that no encroachments will be created . D If using private septic systems , add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Un it under the provisions of the private facility regulat ions adopted by the Commissioner's Court of Brazos County , pursuant to the provis ions of Section 21 .084 of the Texas Water Code . ~ Location of the 100-Year Floodplain and floodway , if applicable , according to the most recent available data . ~ Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. ~ Matches the approved preliminary plan or qualifies as minor amendments (UDO Sect ion 3.3 .E.2). The location and description with accurate dimensions , bearings or deflection angles and radii , area , center angle, degree of curvature , tangent distance and length of all curves for all of the following : (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary w ith the subdivision , as well as , those within the subdivis ion). Proposed ~ Streets. Continuous or end in a cul-de-sac , stubbed out st reets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O .W . locations and widths . (All existing and proposed R.O .W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance . Rev ised 4/14 Page 8 of 9 Ekisting D ~ ~ ~ Proposed D ~ ~ ~ Alleys . Easements . A number or letter to identify each lot or site and each block (numbered sequen ti ally). Park land dedication/greenbelt area/park linkages. All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation prov ided prior to being scheduled for P&Z Commission cons ideration . ~ Co nstruction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following : ~ Street, alley and sidewalk plans , profiles and sections . One sheet must show the overall street , alley and/or sidewalk layout of the subdivision . (may be combined with other utilities ). Sewer Design Report. Sanitary sewer plan and profile show ing depth and grades . overall sewer layout of the subdivision . (Util ities of sufficient master plan and any future growth areas .) Water Design Report and/or Fire Flow Report . One sheet must show the size/depth to meet the utility Water line plan showing fire hydrants , valves , etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivis ion . (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas .) Storm dra inage system plan with contours , street profile , inlets , storm sewer and dra inage channels , with profiles and sections . Drainage and runoff areas , and runoff based on 5, 10 , 25 , 50 and 100 year rain intensity . Detailed drainage st ructure design , channel li ning design & detention if used . One sheet must show the overall drainage layout of the subdiv ision . ~ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. ~ Letter of completion for public infrastructure or guarantee I surety in accordance with UDO Section 8 .6 . ~ Dra inage Report with a Technical Design Summary . ~ Eros ion Control Plan (must be included in construction plans). D A ll off-site easements necessary for infrastructure construction must be shown on the final plat w ith a volume and page listed to indicate where the separate instrument easements were filed . Separate instrument easements must be provided in recordable form to the City prior to be ing scheduled for P&Z Commission consideration . ~ Are there impact fees assoc iated with this development? ~ Yes 0 No Impact fees must be pa id prior to building permit. ~ W ill any construction occur in TxDOT rights-of-way? D Yes ~ No If yes , TxDOT permit must be submitted along with the construction documents. NOTE: 1. We w ill be requesting the corrected Final Plat to be submitted in digital form if available prio r to filing Rev ised 4/14 the plat at the Courthouse . 2. If the construction area is greater than 5 acres , EPA Notice of Intent (NOi) must be submitted prior to issuance of a development permit. Print Fo rm Page 9 of 9 /rhrou~~1r;xvearj "" TAX CERTIFICATE /ce~~~~~e#j ~. ~-L-. ~\/~~~--~·~~~·~· Issued By: KRISTEEN ROE , CTA PH# (979) 361-4470 BRAZOS COUNTY TAX ASSESSOR COLLECTOR 300 E . WM . J BRYAN PKWY BRYAN , TX 77803 Owner ID: 300277 100.00% TURNER CHARLES I & MARYE 3270 ROCK PRAIRIE RD W COLLEGE STATION , TX 77845-5057 Property Information Property ID : 10538 Geo ID : 000701 -0182-0010 Legal Acres : 21 .8501 Legal Desc: A00070 1, CRAWFORD BURNETT (ICL ), TRACT 182 .1, 21 .8501 ACRES , SER# 1 PTX49 16ATX , HUD# NTA06223 74 Situs: 3270 ROCK PRAIRIE RD W OBA : Exemptions : HS , OV65 For Entities BRAZOS COUNTY CITY OF CO LL. STAT. COLLEGE STATION ISD EMG SVCS DIST #1 Z REFUND ENTITY Value Information Improvement HS : Improvemen t NHS : Land HS : Land NHS : Productivity Marke t: Productivity Use : Assessed Value 20,410 50 ,000 262 ,850 24 ,320 0 0 357 ,580 Current/Delinquent Taxes This is to certify that, after a careful check of the tax records of this office, the following delinquent taxes , penalties , interes and any known costs and expenses as provided by Tax Code §33.48, are due on the described property for the following taxing unit(s): Year Entity 20 13 COLLEGE STATION ISD 20 13 BRAZOS COUNTY 20 13 CITY OF COLL . STAT . Totals : Effective Date: 07/03/2014 Tax Certificate Issued for: CITY OF COLL. STAT . BRAZOS COUNTY COLLEGE STATION ISD Taxable 327 ,580 282 ,580 327 ,580 Taxes Paid in 2013 661.24 674 .06 1,975 .84 Tax Due 1,975.85 674 06 661 .24 3 ,311.15 Disc./P&I 79 .03 26.96 26.46 132.45 Attorney Fee 0.00 0.00 0.00 0 .00 Total Due if paid by: 07/31/2014 Thi s certificate is issued on real es.rate onl y. It does not include mmerals and/or personal property. SPECIAi, CONJ)TTJONS EXIST ON THISACCU L '.\ i, SE E BELOW Total Due 2,054 .88 701.02 687 .70 3,443.60 3 ,443 .60 If applicable, the above-described property has/is receiving special appraisal based on its use, and additional rollback taxes may become due based on the provisions of the special appraisal (Comptroller Rule 9.3040) or property omitted from the appraisal roll as described under Tax Code Section 25 .21 is not included in this certificate [Tax Code Section 31.0S(b)]. Pursuant to Tax Code Section 31 .08, if a person transfers property accompanied by a tax certificate that erroneously indicates that no delinquent taxes , penalties or interest are due a taxing unit on the property or that fails to include property because of its omission from an appraisal roll , the unit's tax lien on the property is extinguished and the purchaser of the property is absolved of liability to the unit for delinquent taxes , penalties or interest on the property or for taxes based on omitted property. The person who was liable for the tax for the ear the tax was im osed or the ro e was omitted remains ersonall liable for the tax and for an enalties or interest. A tax certificate issued through fraud or collusion is void . This certificate does not clear abuse of granted exemptions as defined in Section 11.43 Paragraph(1) of the Texas Property Tax Code . Date of Issue : Requested By : Fee Amoun t: Reference #: Signature of Autho ri zed Officer of Collecting Office 07/03/2014 SCHULTZ ENGINEERING LLC 10.00 Page : 1OF 1 True Automation, Inc. RESOLUTIONS ADOPTED BY UNANIMOUS WRITTEN CONSENT OF DIRECTORS IN LIEU OF REGULAR MEETING OF DWS DEVELOPMENT, INC. We, DA YID W. SCARMARDO, GREG SCARMARDO AND MARK SCARMARDO, the only members of the Board of Directors of DWS DEVELOPMENT, INC., a corporation organized under the Texas Business Corporation Act, being the only members of such Board as presently constituted, do by this writing consent to take the following actions and adopt the following resolutions: The following individuals are elected as Officers of the Corporation to serve for one year and until their successors are elected and qualified: DA YID W. SCARMARDO President GREG SCARMARDO Vice-President/Secretary MARKSCARMARDO Vice-Presidentffreasurer The next ammal meeting of the Board of Directors shall be held on June 30, 2015. I direct that this consent be filed with the minutes of the proceedings of the Board of Directors of the Corporation. This consent is executed pursuant to Article 9. lO(B) of the Texas Business Corporation Act and Article VII, Section 1.of the Bylaws of this Corporation which authorize the taking of action by the Board of Directors by unanimous written consent without a meeting. Dated June 30, 2014 MARK SCARMARDO, Director COMMITMENT FOR TITLE INSURANCE · T-7 ISSUED BY OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY SCHEDULE A Effective Date : June 9, 2014, 07:00 am Commitment issued June 17, 2014, 08:30 am l . The policy or policies to be issued are : a. OWNER'S POLICY OF TITLE INSURANCE (Form T-1) (Not applicable for improved one-to-four family residential real estate) Policy Amount: $1,250,000.00 PROPOSED INSURE D: David Scarmardo b . TEXAS RESIDENTIAL OWNER'S POLICY OF TITLE INSURANCE ONE-TO-FOUR FAMILY RESIDENCES (Form T-lR) Policy Amount: PROPOSED INSURED: c . LOAN POLICY OF TITLE INSURANCE (Form T-2) Policy Amount: PROPOSED INSURED: Proposed Borrower: d . TEXAS SHORT FORM RESIDENTIAL LOAN POLICY OF TITLE INSURANCE (Form T-2R) Policy Amount: PROPOSED INSURED: Proposed Borrower: e . LOAN TITLE POLICY BINDER ON INTERIM CONSTRUCTION LOAN (Form T-13) Binder Amount: PROPOSED INSURED: Proposed Borrower: f. OTHER Policy Amount: PROPOSED INSURED: 2 . The interest in the land covered by this Commitment is: Fee Simple 3. Record title to the land on the Effective Date appears to be vested in: Charles I. Turner and Mary E. Turner 4 . Legal description of land: SEE ATTACHED EXHIBIT "A" Form T-7: Commitment for Title Insurance GFNo. 31423 Page 1 Continuation of Schedule A GF No . 31423 EXHIBIT"A" Metes and bounds description of all that certain tract of land lying and being situated in the CRAWFORD BURNETT LEAGUE, ABSTRACT No. 7, City of College Station, Brazos County, Texas. Said tract being the remainder of a called 22.97 acre tract as described by a Deed to Charles I. Turner and Mary E. Turner recorded in Volume 3331, page 61 of the Official Public Records of Brazos County, Texas. Said tract being more particularly described by metes and bounds as follows: BEGINNING at a 112 inch iron rod found on the Northwest line of Rock Prairie Road marking the South corner of said remainder of 22.97 acre tract and the East corner of a called 23.00 acre tract as described by a Deed to Henry P. Mayo and wife, Sandra K. Mayo, recorded in Volume 1253, page 878 of the Official Public Records of Brazos County, Texas. THENCE: N 47° 44' 50" W along the common line of said remainder of 22.97 acre tract and said 23.00 acre tract, at 1592.89 feet pass a 112 inch iron rod found, continue on for a total distance of 1593.41 feet to the Southeast line of the remainder of a called 108.88 acre tract as described by a Deed to Heath Phillips Investments, LLC recorded in Volume 9627, page 73 of the Official Public Records of Brazos County, Texas, for reference a 1/2 inch iron rod found marking the South corner of said remainder of 108.88 acre tract bears: S 41° 21' 39" W for a distance of 60.12 feet: THENCE: N 41° 21' 39" E along the common line of said remainder of 22.97 acre tract and said remainder of 108.88 acre tract for a distance of 741.33 feet to the Southwest line of the Barracks II Subdivision, Phase 101, according to the plat recorded in Volume 11191, page 123 of the Official Public Records of Brazos County, Texas, for reference a 1/2 inch iron rod found bears N 38° 03' 26" E for a distance of 0.13 feet; THENCE: S 49° 58' 35" E along the common line of said remainder of 22.97 acre tract and said Phase 101 for a distance of 562.09 feet to the Northwest line of Buena Vida Subdivision according to the plat recorded In Volume 10140, page 169 of the Official Public Records of Brazos County, Texas, for reference a 1/2 inch iron rod found bears: N 00° 39' 03" W for a distance of 0.26 feet; THENCE: S 41° 27' 23" W along the common line of said remainder of 22.97 acre tract and Buena Vida Subdivision for a distance of206.39 feet to a 1/2 inch iron rod found marking the most Westerly corner of Buena Vida Subdivision; THENCE: S 47° 49' 48" E continuing along the common line of said remainder of 22.97 acre tract and Buena Vida Subdivision for a distance of 721.01 feet to the North corner of a called 0.5693 acre tract as described by a Deed to Diamond T . Storage, LLC recorded in Volume 7009, page 255 of the Official Public Records of Brazos County, Texas, for reference a 112 inch iron rod found bears: S 42° 20' 10" W for a distance of0.45 feet; THENCE: along the common line of said remainder of 22.97 acre tract and said 0.5693 acre tract for the following calls: S 42° 20' 10" W for a distance of 155.63 feet to a fence corner post found marking the West corner of said 0.5693 acre tract; S 47° 49' 48" E for a distance of 159.95 feet to a 112 inch iron rod found marking the South corner of said 0.5693 acre tract; N 42° 20' 10" E for a distance of 5.63 feet to a 112 inch iron rod set marking the West corner of a called 0.5506 acre tract as described by said Deed to Diamond T Storage, LLC (7009/255); THENCE: S 47° 49' 48" E along the common line of said remainder of 22.97 acre tract and said 0.5506 acre tract for a distance of 160.52 feet to a 1/2 inch iron rod set on the Northwest line of Rock Prairie Road marking the South corner of said 0.5506 acre tract, for reference a 1/2 inch iron rod found on the Northwest line of Rock Prairie Road marking the East corner of said 0.5506 acre tract bears: N 42° 22' 16" E for a distance of 150.00 feet; THENCE: S 42° 22' 16" W along the Northwest line of Rock Prairie Road for a distance of 408.23 feet to the POINT OF BEGINNING containing 21.842 acres of land, more or less. Form T-7: Commitment for Title Insurance Pagel .,. Continuation of Schedule A GFNo. 31423 Note: The Company is prohibited from insuring the area or quantity of the land described herein. Any statement in the above legal description of the area of land is not a representation that such area or quantity is correct, but is made only for informational and/or identification purposes and does not override Item No. 2 of Schedule B. Form T-7: Commitment for Title Insurance Page 3 •' COMMITMENT FOR TITLE INSURANCE T-7 ISSUED BY ·.OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY SCHEDULEB EXCEPTIONS FROM COVERAGE In addition to the Exclusions and Conditions and Stipulations , your Policy will not cover loss, costs, attorney's fees , and expenses resulting from : 1. The fellowiAg restrieti•1e eoveAaa.ts of reeord itemized belo•w (We HH:lst either iAsert speeific recording data or delete this tH<eeptioA): 2. Any discrepancies, conflicts, or shortages in area or boundary lines , or any encroachments or protrusions, or any overlapping of improvements. Company has approved the current land title survey and upon request, and payment of any promulgated premium, this item will be amended in the policy(ies) to be issued to read: 'shortages in area'. 3. Homestead or community property or survivorshjp rights, if any of any spouse of any insured. (Applies to the Owner's Policy only.) 4 . Any t itles or rights asserted by anyone, including, but not limited to, persons, the public, corporations, governments or other entities , a. to tidelands, or lands comprising the shores or beds of navigable or perennial rivers and streams, lakes, bays , gulfs or oceans, or b . to lands beyond the line of the harbor or bulkhead lines as established or changed by any government, or c. to filled-in lands, or artificial islands, or d. to statutory water rights, including riparian rights, or e. to the area extending from the line of mean low tide to the line of vegetation, or the rights of access to that area or easement along and across that area. (Applies to the Owner's Policy only.) 5. Standby fees, taxes and assessments by any taxing authority for the year 2013, and subsequent years; and subsequent taxes and assessments by any taxing authority for prior years due to change in land usage or ownership, but not those taxes or assessments for prior years because of an exemption granted to a previous owner of the property under Section 11.13 , Texas Tax Code, or because of improvements not assessed for a previous tax year. (If Texas Short Form Residential Loan Policy of Title Insurance (T-2R) is issued, that policy will substitute "which become due and payable subsequent to Date of Policy" in lieu of "for the year __ and subsequent years .") 6. The terms and conditions of the documents creating your interest in the land. 7. Ma terials furnished or labor performed in connection with planned construction before signing and delivering the lien do cu ment described in Schedule A, if the land is part of the homestead of the owner. (Applies to the Loan T itle Policy Binder on Interim Construction Loan only, and may be deleted if satisfactory evidence is furnished to us before a binder is issued .) 8. Liens and leases that affect the title to the land, but that are subordinate to the lien of the insured mortgage . (Applies to Loan Policy (T-2) only.) 9. The Exceptions from Coverage and Express Insurance in Schedule B of the Texas Short Form Residential Loan Policy of Title Insurance (T-2R). (Applies to Texas Short Form Residential Loan Policy of Title Insurance (T-2R) only.) Separate exceptions 1 through 8 of this Schedule B do not apply to the Texas Short Form Residential Loan Policy of Title Insurance (T-2R). Form T-7: Commitment for Title Insurance Page 4 Continuation of Schedule B GF No . 31423 10. The following matters and all terms of the documents cre ating or offering evidence of the matters (We must insert matters or delete this exception.): a. Sixteen foot (16') utility easement along Gandy Road (nka Rock Prairie Road) as shown on Final Plat of Gandy Road recorded in Volume 352, page 555, Official Public Records of Brazos County, Texas, and as shown on survey dated February 3, 2014 prepared under the supervision of Brad Kerr, RPLS No. 4502. b. Aerial electric lines run from the south corner northwest along the property line, then branches out to the various buildings, as shown on survey dated February 3, 2014 prepared under the supervision of Brad Kerr, RPLS No. 4502. c. Property is fenced and cross-fenced; however the perimeter fencing is not exactly on the property lines in some places, as shown on survey dated February 3, 2014 prepared under the supervision of Brad Kerr, RPLS No. 4502. d. This policy does not insure the title to, nor encumbrances against, the mobile homes or manufactured housing units which are situated on the herein described land. (This exception to be deleted after acceptable evidence as to the removal of the mobile home(s) from the property.) e. Easement granted to the City of Bryan, Texas by W.E. Gandy, et ux as set out in instrument dated April 7, 1937, recorded in Volume 98, page 95 of the Deed Records of Brazos County, Texas, and as noted on survey dated February 3, 2014 prepared under the supervision of Brad Kerr, RPLS No. 4502. f. Easement granted to the City of Bryan, Texas by Patsy Graham d/b/a Palomino Enterprises as set out in instrument dated June 2, 1983, recorded in Volume 589, page 635 of the Deed Records of Brazos County, Texas, and as noted on survey dated February 3, 2014 prepared under the supervision of Brad Kerr, RPLS No. 4502. g. Affidavit giving notice of on -site wastewater treatment system, executed by Charles Ivan Turner, dated October 31, 2003 recorded in Volume 5699, page 171 of the Official Public Records of Brazos County, Texas. h. Mineral Reservation as set out in deed dated May 13, 1983 from John C. Schmidt and wife, Suzanne Schmidt, formerly Suzanne Wheeless to Patsy Graham d/b/a Palomino Enterprises, recorded in Volume 580, page 138, Deed Records of Brazos County, Texas. Title to this Interest not investigated subsequent to date of said instrument. i. Mineral Reservation as set out in deed dated November 30, 1998 from Patsy Graham nka Patsy Williamson to Charles I. Turner and Mary E. Turner, recorded in Volume 3331, page 61, Official Public Records of Brazos County, Texas. Title to this interest not investigated subsequent to date of said instrument. j. Affidavit of Non-Production executed by Charles L. Turner and Mary E. Turner dated March 3, 2014 and recorded in Volume 11920, page 9, Official Public Records of Brazos County, Texas. I<. Rights of parties in possession. Form T-7: Commitment for Title Insurance Page 5 COMMITMENT FOR TITLE INSURANCE T-7 ISSUED BY OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY SCHEDULEC Your Policy will not cover Joss, costs, attorneys' fees, and expenses resulting from the following requirements that will appear as E xceptions in Schedule B of the Policy, unless you dispose of these matters to our satisfaction, before the date the Policy is issued: 1. Documents creating your title or interest must be approved by us and must be signed, notarized and filed for record. 2 . Satisfactory evidence must be provided that: a. no person occupying the land claims any interest in that land against the persons named in paragraph 3 of Schedule A, b . all standby fees, taxes , assessments and charges against the property have been paid, c. all improvements or repairs to the property are completed and accepted by the owner, and that all contractors, sub-contractors, laborers and suppliers have been fully paid, and that no mechanic's , laborer's or materialmen 's liens have attached to the property, d . there is legal right of access to and from the land, e. (on a Loan Policy only) restrictions have not been and will not be violated that affect the validity and priority of the insured mortgage. 3 . You must pay the seller or borrower the agreed amount for your property or interest. 4. Any defect, lien or other matter that may affect title to the land or interest insured, that arises or is filed after the effective date of this Commitment. 5. We reserve the right to search buyer name in the real property records and make additional requirements, if any, in the event that the contract for sale is assigned. Countersigned Agg~~~and Title Comp~ I _ 1'l J. By~@NU L / Form T-7: Commitment for Title Insurance Page 6 COMMITMENT FOR TITLE INSURANCE T-7 SCHEDULED GFNo. 31423 Effective Date: June 9, 2014, 07:00 am Pursuant to the requirements of Rule P-21 , Basic Manual of Rules, Rates and Forms for the writing of Title Insurance in the State of Texas, the following disclosures are made : I. The following individuals are directors and/or officers, as indicated, of the Title Insurance Company issuing this Commitment DIRECTORS OF OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY HARRINGTON BISCHOF DENNIS P . VAN MIEGHEM JOHN M . DIXON JAMES A. KELLOGG JAMES HELLAUER RANDE K. YEAGER ARNOLD L. STEINER CHARLES F. TITTERTON A. C. ZUCARO LEO E. KNIGHT, JR . STEVER. WALKER FREDERICKA TAUBITZ OFFICERS OF OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY MARK BILBREY, President RANDE K. YEAGER, Chairman and CEO GARY J. HORN, Executive Vice President MARK M . BUDZINSKI, Executive Vice President R. WAYNE SHUPE, Executive Vice President PATRICK A. CONNOR, Executive Vice President CHERYL JONES, Executive Vice President MIKE TARPEY, Vice President, Treasurer CHARLES KOY ALESKI, Executive Vice President ROBERT J. CHAPMAN, Executive Vice President STEPHEN C. WILSON, Executive Vice President, Vice DANIEL M. WOLD, Sr. Vice President, Secretary, Chairman General Council JOHN A. MAGNESS, Executive Vice President Shareholders owning, controlling or holding, either personally or beneficially, 10% or more of the shares of Old Republic National T itle Insurance Company as the last day of the year preceding the date herein above set forth are as follows : Old Republic National Title Insurance Company-100%, a wholly owned subsidiary of Old Republic Title Insurance Group , Inc ., a wholly owned subsidiary of Old Republic International Corporation . 2. The following disclosures are made by the Title Insurance Agent issuing this Commitment: Aggieland Title Company Owners Directors Officers Page D. Thornton Page D. Thornton Page D. Thornton, President, Secretary , Treasurer J . Fred Bayliss Page D. Thornton, Office Manager Tebbi S. Mayes, Office Co-Manager 3 . You are entitled to receive advance disclosure of settlement charges in connection w ith the proposed transaction to which this commitment relates. Upon your request, such disclosure will be made to you. Additionally, the name of any person, firm or corporation receiving a portion of the premium from the settlement of this transaction will be disclosed on the closi ng or settlement statement. You are further advised that the estimated title premium• is: Owner's Policy Loan Policy Endorsement Charges Other Total $7,001.00 $0.00 $0.00 $0.00 $7,001.00 Of this total amount: 15% will be paid to the policy issuing Title Insurance Company: 85% will be retained by the issuing Title Insurance Agent; and the remainder of the estimated premium will be paid to other parties as follows: To Whom For Services 'The estimated premium is based upon information furnished to us as of the date of this Commitment for Title Insurance. Final determination of the amount of the premium will be made at closing in accordance with the Rules and Regulations adopted by the Commissioner of Insurance ." Form T-7: Commitment for Title Insurance Page7 --------·----------------~~ DELETION OF ARBITRATION PROVISION (Not applicable to the Texas Residentia l Owner's Policy) ARBITRATION is a common form of alternative dispute resolution. It can be a quicker and cheaper means to settle a dispute with your Title Insurance Company . However, if you agree to arbitrate, you give up your right to take the Title Insurance Company to court and your rights to discovery of evidence may be limited in the arbitration process. In addition, you cannot usually appeal an arbitrator's award. Your policy contains an arbitration provision (shown below). It allows you or the Company to require arbitration if the amount of insurance is $2,000,000 or less. If you want to retain your right to sue the Company in case of a dispute over a claim, you must request deletion of the arbitration provision before the policy is issued. You can do this by signing this form and returning it to the Company at or before the closing of your real estate transaction or by writing to the Company. The arbitration provision in the Policy is as follows : "Either the Company or the Insured may demand that the claim or controversy shall be submitted to arbitration pursuant to the Title Insurance Arbitration Rules of the American Land Title Association ("Rules"). Except as provided in the Rules, there shall be no joinder or consolidation with claims or controversies of other persons. Arbitrable matters may include, but are not limited to, any controversy or claim between the Company and the Insured arising out of or relating to this policy, any service in connect ion with its issuance or the breach of a policy provision, or to any other controversy or claim arising out of the transaction giving rise to this policy. All arbitrable matters when the Amount of Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or the Insured, unless the Insured is an individual person (as distinguished from an Entity). All arbitrable matters when the Amount of Insurance is in excess of $2,000,000 shall be arbitrated only when agreed to by both the Company and the Insured. Arbitration pursuant to this policy and under the Rules shall be binding upon the parties . Judgment upon the award rendered by the Arbitrator(s) may be entered in any court of competent jurisdiction." SIGNATURE DATE . *** *~* * . * * * * *** Commitment for Title Insurance Issued by Old Republic National Title Insw ·ance Company TIIE FOLLOWING COMMITMENT FOR TITLE INSURANCE IS NOT VALID UNLESS YOUR NAME AND TIIE POLICY AMOUNT ARE SHOWN IN SCHEDULE A, AND OUR AUTIIORIZED REPRESENTAIB'E HAS COUNTERSIGNED BELOW. · We (Old Republic National Title Insurance Company) will issue our title inswance policy or po licies (the Policy) to You (the proposed insured) upon payment of the premium and other charges due, and compliance with the require me11ts in Sched ul e B a·nd Schedule C. Ou r Policy will be in the form approved by the Texas Department oflnslU'ance at the date of issuance, and will insure your interest in the land described in Sched ule A The .estimated premium for our Policy and applicable endorsements is shown on Schedule D. There may be additional charges such as recording fees, and expedited delivery expenses . This Commitment ends ninety (90) days from the effective date, unless the Policy is issued sooner, or fai!w'C to issue the Policy is our fault. Ow· liability and obligations to you are under the e:qiress terms of this Commitment and end whe n this Commitment expires. AGGIELAND TITLE COMPANY 3740 Copperfield Dr .. Su ite 101 Bryan , TX 77802 '~·, a;- Authori. ed Signatory ORTl'orm 2067 Comrninnenl for lide lnsurauce Eff<ctivc 11/1/09 OLD REPUBLIC NATI ONAL TJnE INS URANCE COMPANY A Stoc.t Comp!Jrry 4110 Second Awn11e So11th. MiMeapolis, Mi1U1esota 5S401 (612)371-1117 By President Secretary I . CONDITIONS AND STIPULATIONS 1. If you have actual knowledge of any matter which may affect the title of mortgage covere d by this Commitment, that is not shown in Schedule B, you must notify us in writing. If you do not notify us in writing, our liability to you is ended or reduced to the extent that yow· failure to notify us affects . our liability. If you do notify us, or we learn of such matter, we may amend Schedule B, but we will not be relieved of liability already incmred. 2. Ow· liability is only to you, and others who are included in the defin ition of Jnsw-ed in the Policy to be issued. Our liability is only for actual loss incurred in your reliance on this Commitment to comply with its requirements or to acquire the interest in the land . Our liability is limited to the amount shown in Schedule A of this Commitment and will be subject to the following terms of the Policy: Insuring Provisions, Conditions and Stipulations, E."<ceptions and faclusions . TEXAS TlTLE INSURANCE INFORMAT10N Title Insurance insures you against loss resulting form certain risks to your title. The Commitment for Title lnsmance is the title insurance company 's promise to issue the title insurance policy. The Commitment is a legal docwnent. You should review it carefully to completely understand it before your closing date. El seguro de titulo le asegu ra en relaci6n a perdidas resultantes de ciertos riesgos que pueden afectar el titulo de su propiedad . El Compromiso para Seguro de Titulo es la promesa de la compaiiia aseguradora de titulos de emitir la p6liza de seguro de litulo . El Compromiso es un documento legal. Usted debe leerlo cuidadosamente y entenderlo completamente antes de la fecha para finalizar su transacci6n . Your Commitment for Title In surance is a legal contract between you and us. The Conunitment is not an opinion or report of your title. It is a contract to issue you a policy subject to the Commitment 's tetms and requirements . Before issuing a Commitment for Title Jnsmance (the Commitment) or a Title Insurance Policy (the Policy), the Title Insurance Company (the Company) determines whether the title is insw·able. This determination has already been made. Part of that determination involves the Company's decision to insure the title except for certain risks that will not be covered by the Policy. Some of these risks are listed in Schedule B of the attached Commitment as Exceptions . Other risks are stated in the Policy as Exclusions. These risks will not be covered by the Policy. The Policy is not an abstt'act of title nor does a Company have an obligation to dete1mine the ownership of any mineral interest. -IVUNERALS AND !VUNERAL RIGHTS may not be covered b)' the Policy . The Company may be unwilling to insure title uuless there is an exclusion or au exception as to Minerals and Mineral Rights in the Policy. Optional endorsements insuring certain risks involving minerals, and the use of improvements (excluding lawns, shrubbery and trees) and permanent buildings may be available for purchase. If the title insurer issues the title policy with an exclusion or exception to the minerals and mineral rights, neither this Policy, nor the optional endorsements, ensme that the purchaser has title to the mineral rights related to the swface estate . Another part of the determination involves whether the promise to insure is conditioned upon certain requirements being met. Schedule C of the Commitment lists these requirements that must be satisfied or the Company will refuse to cover them. You may want to discuss any matters shown in Schedules B and C of the Commitment with an attorney. These matters will affect y01rr title and your use of the land. When your Policy is issued, the coverage will be limited b)' the Policy's Exceptions, Exclusions and Conditions, defined below. -EXCEPTIONS are title risks that a Policy generally covers but does not cover in a particular instance. Exceptions are shown on Schedule B or discussed in Schedule C of the Commitment. They can also be added if you do not comply with the Conditions section of the Commitment. When the Policy is issued, all Exceptions will be on Schedule B of the Policy . -EXCLUSIONS are title risks that a Policy generally does not cover. Exclusions are contained in the Policy but not shown or discussed in the Commitment. -CONDITIONS are additional prov1s1ons that qualify or limit your coverage. Conditions iuclude your responsibilities and those of the Company. They are contained in the Policy but not shown or discussed in the Commitment The Policy Conditions are not the same as the Commitment Conditions. You can get a co py of the policy form approved by the Texas Department oflnsurance by calling the Title Insurance Company at 1-888-678-1700 or by calling the title insurance agent that issued the Commitment. The Texas Department of Insurance may revise the policy form from time to time . You can also get a brochure that explains the policy from the Texas Department of Insurance by calling 1-800-252-3439. Before the Policy is issued, you may request changes in the policy. Some of the changes to consider are: -Request amendment of the "area and boundary" exception (Schedule B, paragraph 2). To get this amendment, you must furnish a survey and comply with other requirements of the Company. On the Owner Policy, you must pay an additional premium for the amendment. If the survey is acceptable to the Company lllld if the Company's other requirements are me~ your Policy will insure you against loss because of discrepancies or conflicts in boundary lines, encroachments or protrusions, or overlapping of improvements . The Company may then decide not to insw·e against specific boundwy or swvey problems by making special exceptions in the Policy. Whether or not you request amendment of the "area and boundat'y'' exception, you should determine whether you want to purchase and review a sw-vey if a survey is not being provided to you . -Allow the Company to add an exception to "rights of paities in possession." If you refuse this exception, the Company or the title insurance agent may inspect the property. The Company may except to and not insure you against the rights of specific persons, such as renters, adverse owners or easement holders who occupy the land. The Company may charge you for the inspection . If you want to make your own inspection, you must sign a Waiver of Inspection form and allow the Company to add this exception to your Policy. The entire premium for a Policy must be paid when the Policy is issued. You will not owe any additional premiwns unless you want to increase your coverage at a later date and the Company agrees to add an Increased Value Endorsement. Old Republic National Title Insurance Company 400 Second A venue South Minneapolis, Minnesota 55401 . **** * * ! OLD REPUBLIC * * *** -------------------- Commitment for Title Insurance Issued through the Office of NATlO.NAL TlTL.E .lNSURANC.lt C01'-ll'ANY AGGIELAND TITLE COMPANY 3740 Copperfield Dr., Suite 101 Bryan, TX 77802 9791731-8400 AGGIELAND TITLE COMPANY Pnvacy Polley Notice · PURPOSE OP THIS NOTICE Title v of the Gramm-Leach-Biiiey Ac:t (GLBA) generally prohibits any financial Institution, directly or through Its affiliates, from sharing nonpubllc personal Information about you with a nonaffiliated third party unless the institution provides you with a .notice of Its pnvacy policies and practices, such as the type of Information that It collects about you and the i;:ategorles of persons or entitles to whom It may be dlsdosed. In compliance with the GLBA, we are providing you . with this document, which notifies you of the privacy policies an9 practices of . OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY AND AGGIELAND TITLE. We may collect nonpubllc personal Information about you from the following sources: Information we receive from you such as on applications or other forms. Information about your transactions we seaJre from our flies, or from our afflllates or others. Information we receive from a consumer reporting agency. Information that we receive from others Involved in your transaction, such as the real ·estate agent or lender. Unless It ts speclflcally stated otherwise In an amended Privacy Polley Notice, no addltlonal nonpublic personal Information wlll be collected about you, · We may disclose any of the above information that we collect about our customers or former customers to our afflllates or to nonafflllated third parties as permitted by law. · We also may disclose this Information about our customers or former customers to the following types of nonafflllated companies that perform services on our behalf or with whom we have joint marketing agreements: Financial service providers such as companies engaged in banking, consumer finance, securities and Insurance. Non.-flnancral companies such as envelope stuffers and other fulfillment service providers, WE DO NOT DISCLOSE ANY NONPUBLIC PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT SPECIFICALLY. PERMIHED BY LAW. I We restrict access to nonpublic personal Information about you to those employees who need to know that information in order to provide products or services to you. We maintain physical, electronlc, and procedural safeguards that comply with federal regulations to guard your personal Information. • •• ; ~ • • OLD REPUBLIC .If 'ft • tialbr'l•I Tiit lnlUl'll'C• Comp.In, ...... ,.. ~_.,,,. __ ""'""----------:C:ITY OF COILEGE STATION Home of Texas A&M University • ~ ,..,,....,_-~~ MEMORANDUM DATE : September 11 , 2014 TO: Craig Browne , via: craig@craigbrowne .com v/ FROM : Mark Bombek, Staff Planner SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP) Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24 "x36 " copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; Five (5) copies of the revised construction documents One (1) copy of the engineering cost estimate and; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting , your project will be considered formally filed with the City of College Station . Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting . Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting , the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting . http://www.cstx .gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information , please call me at 979 .764 .3570 . Attachments: Staff review comments PC: Charles & Mary Turner, via: diamondt3375@yahoo .com Joe Schultz , P.E., Schultz Engineering , via : joeschultz84@verizon.net J P&DS Project No . 14-00900181 Planning & Development Services P.O . BOX 9960 • J 10 1 T EXAS AVENU E · COLLE G E STATI ON ·T EXAS · 77842 TEL. 979 .76 4.j 570 . FAX. CJ /9.76 4.5 4 % cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: EQUINOX SUBDIVISION PH 1 (FP) -14-00900181 PLANNING COMMENTS NO. 2 1. No comments Reviewed by: Mark Bombek Date : September 10, 2014 ENGINEERING COMMENTS NO. 2 2 . Sorry for the confusion on the first set of comments . Note 4 on construction sheet 3/16 should say : PAVEMENT STRUCTURE FOR TOWERS PARKWAY SHALL BE AS FOLLOWS: 6" LIME STABILIZED SUBGRADE OR CEMENT STABILIZED SUBRADE AS REQUIRED BY SOIL P.I. 5" HMAC BASE OR 8" CRUSHED LIMESTONE BASE MATERIAL 2" HOT MIX ASPHAL TIC CONRETE Please fix and update cost estimate reflecting this . 3 . Please fix culvert details on construction sheet 10/16. The units shown on the cross section detail are in feet. 4 . Confirm that all the flow from Bueda Vida & Williamsgate Phase 1 subdivision have been taken into account in the Sewer report . 5. Define the cross drainage swale between the lots and lead the concentrated flow under the sidewalk . 6 . Please grade outfall of emergency spillway of the Detention Pond 2 away from existing homes . 7. Appendix B3 for Addendum to Drainage Report is showing the concrete flume slope as 75%. The slope typo seem to have no effect to the ith-year storm calculations. Is this cell not linked to the flow calculation? Please double check and fix . 8. Double check engineering estimate for street construction items. Subtotal do not match on page 1 and 4 . Reviewed by : Kevin Ferrer Date : September 9 , 2014 ' ... ·-. DATE : TO : FROM : rd' CrTY OF Cm.LEGE STATION~-----------------Home of Texas A&M Uni versity • fl $1 --- MEMORANDUM August22, 2014 Craig Browne , via : craig@craigbrowne .com a/' Mark Bombek , Staff Planner SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP) Staff reviewed the above-mentioned final plat as requested . The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and submit the follow ing information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting : One ( 1) 24 "x36 " copy of the revised final plat ; One (1) 24 "x36 " grading and erosion control plan ; Th irteen (13) 11 "x17" copies of the revised final plat ; Parkland Dedication in the amount of $64 ,311 must be submitted prior to the filing of the final plat; Easement Dedication Sheet for Temporary Turnaround ; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to : pdsdigitalsubmittal@cstx .gov. Upon receipt of the required documents for the Planning & Zoning meeting , your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting . Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid . Once your item has been scheduled for the P&Z meeting , the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting . http ://www .cstx .gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information , please call me at 979 . 764 .3570 . Attachments : Staff Review Comments PC : Charles & Mary Turner, via : diamondt3375@yahoo.com Joe Schultz , P.E., Schultz Engineering , via: joeschultz84@verizon.net P&DS Project No . 14-00900181 Planning & D et1eloprn ent S er vi ces P .O . BOX 996 0 · 1101 TEXAS AVEN UE · COLLEGE STATION · T EXAS · 77842 T EL 97 9.76 4.3 570 ·FA X. 979.764.34 96 cstx.gov Id evservi ces STAFF REVIEW COMMENTS NO. 1 Project: Equinox Subdivision Ph 1 (Fp) (14-00900181) PLANNING 1. Please correct the label for Rock Prairie Road to read as Rock Prairie Road W. 2 . Please include the Common Area Acreage in the Title Block . 3. Please insert the proper scale range in the Title Block . Scale range should be 1 "=40 ' 4 . Please note that any changes made to the plans , which have not been requested by the City of College Station , must be explained in your next transmittal letter and "bubbled " on your plans . Any addit ional changes on these plans that the City has not been made aware of will constitute a completely new review. 5. Please note that you may be required to subm it paid tax certificates if they are not current prior to the filing of your plat. 6. The construction documents and reports are still under review and may affect the plat. 7. Please be aware that each lot will be required to provide a minimum of two (2) trees of at least two inches (2") in caliper or one ( 1) tree of four inch ( 4") caliper per Ordinance No . 3222 . Reviewed by : Mark Bombek , Staff Planner Date : 08/21/2014 ENGINEERING COMMENTS NO. 1 1. Please label existing pavement widths of Rock Prairie Road & Kate Ln on Final Plat. 2 . Please fix the following street name Sophies Lane, street is shown as Summerway Drive on Preliminary Plat. 3 . Please provide a temporary turn around with temporary access easement at the end of Papa Bear Drive on Final Plat. 4 . Please use updated FEMA Maps April 2, 2014 when determining if property lies within the 100-year floodplain, and update your note reflecting this . 5. Please provide adequate Private Drainage Easement reflecting the construction grading plan on all Blocks on Final Plat. Also, please change Public Drainage easement between lot 6 & 5 on Block 1 to Private Drainage Easement. Additionally, change Public Drainage easement between lot 10 on block 1 & Diamond Storage Property to Private Drainage Easement. 6 . Please add one of the following notes to the Final Plat: a. Private drainage easement to be maintained by individual lot owners . Fences, grading, and landscape cannot impede the flow of the private drainage easement. b. Private drainage easement to be maintained by HOA. Fences , grading , and landscape cannot impede the flow of the private drainage easement. 7 . Tie a corner of the property to a City of College Station horizontal control Monument on the Final Plat. 8 . Please add a note on Final plat specifying that the area is in Impact fee area , Steeplechase-Wellborn . 9 . Please fix note 4 on construction sheet 3/16 . "6 " Crushed Limestone Base material " should be 8". 10 . Please add TW to the Legend on sheet 7/16 of the construction plans . 11. Please verify Storm sewer pipe 101 slope . Construction sheet 8/16 shows pipe 101 slope as 1.80%, while on Appendix B4 of the Drainage Report pipe 101 slope is shown as 2.25%. 12 . Please fix Drainage Report. Combined Outfall on table Runoff Flow Direction 2 does not add up. Fix the Freeboard column on Table 3 . Please answer questions on Part 4 Appendix D pg.20 of 26 . Please confirm the 100 year flow for Detention Pond 1, summary table shows 6 .9 while the Hydrograph is showing 7 .03 . 13 . Please confirm that Detention Pond 1 's outflow to Rock Prairie Road drainage swale has adequate armoring. 14 . Please provide the flow depth and velocity at mid-block cross drainage valley gutter , and cross lot drainage swale . 15. Please Justify and explain how the flow in the Private Drainage on all Blocks is being discharge to the street. 16 . Please fix , the drainage along Block 1 adjacent to Buena Vida Subdivision. It seems to flow into the rear lot of Buena Vida Subdivision . 17 . Please confirm that existing structures on Diamond Storage property is not adjacent to the proposed drainage swale . 18 . Please verify that the elevation of Diamond Storage property adjacent to Detention Pond 1 & common area is at least 327 feet. If not please provide a 327 feet high Berm along Detention Pond 1 & common area adjacent to Diamond Storage property. 19 . The proposed street intersection does not meet the "dried up " guideline , please provide additional justification. 20 . Please define the flow path for emergency spillway of Detention Pond 2. In the future development of Phase 2 , what's the orientation and flow path for the emergency Spillway of Detention Pond 2? 21. Please redesign concrete flume 1 & 2 in such a way that the flow through the channel is sub-critical flow . Design flow depth must be greater than critical depth . Also please label each concrete flume uniquely on the construction plan. 22 . Please base culvert des ign on TxDOT minimum details, or provide a structural analysis with justification of the proposed box culvert . 23 . Please verify and place note on the plan that water services will be left between 2 feet and maximum of 3 feet deep at the point of terminus by developer's contractor. Also note that a ball valve is required at the point of terminus . 24 . Please provide adequate Public Utility easement on Block 1 Lots 9 & 10 in such a way that the centerline of the sewer lines are no closer than 5.5 feet to the edge of easement, and that the wyes do not pass the easement. 25 . Please Note that the existing sewer line on Kate Lane is 6''. Please fix the construction plans & Sewer report reflecting this . Please provide documentation that the existing 6 " line through Buena Vida Subdivision has sufficient Capacity to serve the increase flow from Equinox Subdivision . 26 . Please fix the Stationing for Sewer Line S-3. The stationing on profile are not match ing the plan . 27 . Due to the depth of Sewer Line S-3 & S-2 , we would requi re an additional 5 feet easement totaling to 15 feet Public Utility Easement on all the lots adjacent to these sewer lines . 28 . Sewer Line 3 from Stationing 3+32 to Stationing 4+50 does not meet B/CS minimum slope, please provide justification . 29. Provide a typical layout detail of water meter, cleanout , and transformer. To ensure that adequate fits within proposed easement when you include other private utilities . Please confirm w ith BTU. 30 . Please provide Street Sign table . If you have not received block ranges , contact Robin rkrause@cstx .gov. 31 . Should there not be a streetl ight on Towers Parkway and Rock Prairie Road? 32 . Please remove ADA crossing ramps for Towers Parkway next to Sophies Lane . 33 . On block 3 , the finish floor elevation for the lots seems to be the same elevat ion as the top of Kat ie Lane 's pavement. We recommend to raise the finish floor elevat ion by at least 6 ". Reviewed by : Kevin Ferrer Date : August 19 , 2014 FIRE 1) No more than thirty (30) dwelling units without two points of egress . Reviewed by : Steve Smith Date : 08/11/2014 SANITATION 1. Sanitation is ok with this project. Reviewed by : Wally Urrutia Date : August 12 , 2014 MEMORANDUM DATE : August 8, 2014 TO : Craig Browne , via: craig@craigbrowne .com V FROM : Mark Bombek, Staff Planner SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP) Thank you for the submittal of your Final Plat -Residential application. Jason Schubert, Principal Planner, Kevin Ferrer, Graduate Civil Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Friday , August 22 , 2014 . If you have questions in the meantime , please feel free to contact us . PC : Charles & Mary Turner, via : diamondt3375@yahoo.com I Joe Schultz, P.E ., Schultz Engineering , via: joeschultz84@verizon.net P&DS Project No . 14-00900181 Pla11ning & Development S ervices P.O. BOX 9960 • 110 1 TEXAS AVENUE · COLLEGE STl\Tl ON ·TEXAS • 77842 TEL. 97 9 .764 .. ?570 ·FAX . 979.764.3496 cst11.gov/dev serv ices TO : FROM : CITY OF C o 1.L r·:GE STAT IO N Home of Texas A &M Unive rsity • MEMORANDUM Craig Browne , via : craig@craigbrowne.com Jason Schubert, Principal Planner SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP) I reviewed the above-mentioned Final Plat -Residential application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal. Please submit the following information so this application can be forwarded for review : In accordance with the requirements for processing applications , the Preliminary Plan for this project has not been approved by the Planning & Zoning Commission to enable this application to be forwarded for review . Please be aware that if this application is not completed before Monday, September 15, 2014 , it will expire and a new application and fees will be necessary to continue the platting process . If you have any questions or need additional information , please call me at 979 .764 .3570 . PC : Charles & Mary Turner, via : diamondt3375@yahoo.com Joe Schultz, P.E., Schultz Engineering , via : joeschultz84@verizon.net P&DS Project No. 14-00900181 Planning & Development Se1·vices l'.l). HOX 9%0 • I I 0 I TEXA\ WEN UE • COLLE(;[ STATJO N • TEXA\ • 77 842 J'EL. 9 7 9 .7 (11.35"'0 ·FAX. 9 7 9 .7(1-1 .. 14% cstx.gov/devservices September 11 , 2014 MattBombek Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Equinox Subdivision Phase 1-14-00900181 Dear Mr. Bombek: Office: 979 .764.3900 Fa x : 979 .764 .3910 Attached are 5 sets of revised construction documents , 1-24"x36" copy of the re vised erosion & control drawing, 1-24"x36" copy of the revi sed Final Plat, 13- 11 "x17 " copies of the revised Final Plat, 1 copy of the revised engineer 's estimate and the response to staff comments . If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. P.O . Box 11995 • College Station , Texas 77842 schultzengineeringllc.com C ITY OF C OLLEGE STAT ION Home o/Texas A&M University" PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: [8] Existing Project Submittal. Case No .: 14-00900181 Project Name EQUINOX SUBDIVISION -Ph 1 Contact Name JOE SCHULTZ P.E. Phone Number 979-764-3900 ~~~~~~~~~~~~~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan . D Development Permit ~ Final Plat \ \'(.t1 (lo) 2J·-l )(.3ep( 1 ') D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan [8] Grading Plan 2..4 )05 G, ( l ) D Special District Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D TxDOT Driveway Permit D TxDOT Utility Permit D D Drainage Letter or Report Fire Flow Analysis Special Instructions: 10/10 [8] Waterline Construction Documents )S [8] Sewerline Construction Documents [8] Street Construction Documents D Easement Application D Other -Please specify Print Form ~hultz Engin e er ing , LLC September 12 , 2014 MattBombek Staff Planner City of College Station 1101 Tex as Avenue College Station, TX 77840 Re: Equinox Subdivision Phase 1 -14-00900181 Dear Mr. Bombek: Office: 979 .764 .3900 Fax : 979 .764 .3910 Attached i s a revised Final Plat application ownership page, an authority to sign for DWS Dev elopment, Inc. and a check in the amount of $7 ,751.13 for the Development Permit Fee. If you hav e any questions , please do not hesitate to call. Sincerel y, Schultz Engineering, LLC. P.O. Box 11995 • College Station , Texas 77842 schu ltzengineering ll c .com CITY OF C OLLEGE STATION Home o/Texas A&M Univers ity" . FOR OFFICE USE ONLY CASE NO .: 1L1 -L9 r DATE SUBMITTED : oq [ 12--J 1g TIME: ~W STAFF : ?CJ' ~~------~ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: Existing Project Submittal. Case No.: 14-00900181 Project Name EQUINOX SUBDIVISION -Ph 1 Contact Name JOE SCHULTZ P.E. Phone Nu mber""'9"--79'--""""7-'--64"----"-39"-0"-'0'---------- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan ~ Other -Please specify below D Special District Building I Sign Development Permit Fee D Landscape Plan Revised Ownership sheets INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Print Form City of College Station Administrative Approval for Required Parkland Dedications of Less than Five Acres 1. Applicant Name: ______________ C_ra_i~g_B_ro_w_ne _________________ _ Address: ______________ 2=8~0~1~E=a~rl~R~u~d~d=e~r~F~re~e~w~a~y ______________ _ Phone: ____ ___,9'--'-7=9-'-7-=6-=4-'-7-=6'-"5-=3 _____ _ E-Mail: _____ ---=c"'""ra=ig"'"'@=-=c..:...:ra=i=gb=r-=o-"w'"'-n=e..:...:.c=-=o:..:..:m'-'------- 2. Development Name: ______ ~1=2-=a~t~R~o-=c~k~P~r=ai""'ri=e~P~h~a=s=e_1'-------Project #: __ ----'1'--'4'--1"'""'8~1,__ __ Development Location: 3270 Rock Prairie Road West, located west of Buena Vida and South of the Barracks II 3. Dwelling Units: ___§_1_ Single Family ___ Multi-family Units , located in Neighborhood Park Zone _1-'-'5,____ __§j__ Single Family Multi -family Units, located in Community Park Zone B 4. Development Fees and Dedication Requirements: a. Land Dedication or Fee in Lieu of Land (Choose One): Neighborhood Community Single Family : One (1) acre per 117 DU 's ____ ac One (1) acre per 128 DU 's ___ ac = ______ ac Multi -family : One (1) acre per 117 DU 's ____ ac One (1) acre per 128 DU 's ___ ac = ______ ac TOTAL = ------Acres -OR- Fee Paid in Lieu of Land Dedication Neighborhood Community Single Family :51@ $274 .00 per DU $ __ 1_3~9_7_4_ @$250 .00 per DU $_~12~7~5~0_ = $ __ =2~6 ~7=24~_ Multi-family : @ $274 .00 per DU $ ____ _ @ $250.00 per DU $ ____ _ = $ ____ _ TOTAL (Neighborhood and Community) = $_--=2=6'-'-7=24-'--- b. Development Fee: Neighborhood Community Single Family 51@ $362 .00 per DU $ 18 462 Single Family@ $375.00 per DU$ 19 ,125 = $ 37 587 Multi-family @ $362 .00 per DU $ ___ _ Multi -family@ $750 .00 per DU $ __ _ =$ __ _ TOTAL (Neighborhood and Community) = $ 37,587 5. Comments: There are 51 townhouse lots and 0 single-family lots in this phase. The City of College Station agrees to accept: GRAND TOTAL (Neighborhood and Community) 51 Units x $1,261 = $ 64 311 Land Dedication _N"""'"o_n_e ______ _ ·~ Name Date STAFF REVIEW COMMENTS NO. 1 Project: Equinox Subdivision Ph 1 (Fp) (14-00900181) PLANNING 1. Please correct the label for Rock Prairie Road to read as Rock Prairie Road W. The label has been changed. 2. Please include the Common Area Acreage in the Title Block. The total common area acreage has been added to the title block. Also, the individual acreage of the 2 common areas has been added to the plan view. 3. Please insert the proper scale range in the Title Block. Scale range should be 1 "=40' The title block has been revised. 4. Please note that any changes made to the plans, which have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans . Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Noted. 5. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Noted. 6 . The construction documents and reports are still under review and may affect the plat. Noted. 7. Please be aware that each lot will be required to provide a minimum of two (2) trees of at least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No . 3222. Noted. Note 13 is on the final plat ENGINEERING COMMENTS NO. 1 /. Please label existing pavement widths of Rock Prairie Road & Kate Ln on Final Plat. The pavement widths are now labeled on the Final Plat and on the construction documents. ,I. Please fix the following street name Sophies Lane, street is shown as Summerway Drive on Preliminary Plat. The street names now match the Preliminary Plat. ~ Please provide a temporary turn around with temporary access easement at the end of Papa Bear Drive on Final Plat. The construction plans now show a temporary turn around at the end of Papa Bear Drive. Also, a temporary access easement is shown at the end of Papa Bear Drive on the Final Plat. The addition of a temporary turnaround made it necessary to extend Pipe 200. Appendix B4 was updated to reflect this change. The additional base material and the additional pipe is reflected in the attached revised Engineer's Estimate. /( Please use updated FEMA Maps April 2, 2014 when determining if property lies within the 100-year floodplain, and update your note reflecting this. The FEMA flood information has been updated. Y. Please provide adequate Private Drainage Easement reflecting the construction grading plan on all Blocks on Final Plat. Also , please change Public Drainage .. easement between lot 6 & 5 on Block 1 to Private Drainage Easement. Additionally, change Public Drainage easement between lot 10 on block 1 & Diamond Storage Property to Private Drainage Easement. Private Drainage Easements have been added between the lots at various locations. The Public Drainage Easements between Lots 6 & 5, Block 1 and adjacent to the diamond storage property have both been changed to Private Drainage Easements. ,fa'. Please add one of the following notes to the Final Plat: a. Private drainage easement to be maintained by individual lot owners . Fences , grading, and landscape cannot impede the flow of the private drainage easement. b. Private drainage easement to be maintained by HOA. Fences, grading, and landscape cannot impede the flow of the private drainage easement. Option A has been added as note 14 ;r. Tie a corner of the property to a City of College Station horizontal control Monument on t he Final Plat. The plat is now shown to be tied to monument #117 Ji Please add a note on Final plat specifying that the area is in Impact fee area , Steeplechase-Wellborn. Note #10 is updated to show the project is in the Steeplechase-Wellborn ~ Sanitary Sewer Impact Fee Area lbl. Please fix note 4 on construction sheet 3/16 . "6'' Crushed Limestone Base material " should be 8". Note #4 has been updated. 'y( Please add TW to the Legend on sheet 7/16 of the construction plans. TW has been added to the Legend. J1'. Please verify Storm sewer pipe 101 slope . Construction sheet 8/16 shows pipe 101 slope as 1.80%, while on Appendix B4 of the Drainage Report pipe 101 slope is shown as 2.25%. The information in Appendix 84 is incorrect. It has been updated to fix the flowlines and the slopes of Pipes 100 and 101. A copy of Appendix 84 is included in this submittal. 12. Please fix Drainage Report . Combined Outfall on table Runoff Flow Direction 2 does not add up . Fix the Freeboard column on Table 3. Please answer questions on Part 4 Appendix D pg .20 of 26 . Please confirm the 100 year flow for Detention Pond 1, summary table shows 6.9 while the Hydrograph is showing 7.03. The Combined Outfall for Flow Direction 2 is not the sum of the Detention Pond 1 Outfall and Drainage Area 230. The Combined Outfall for Flow Direction 2 is a combination of the hydrographs and takes into account timing in the watershed. The Freeboard column on Table 3 has been updated. Questions on Part 4 Appendix D pg. 20 of 26 have been answered. The 100 year flow for Detention Pond 1 is 7.03, the summary table has been revised. ., p{. Please confirm that Detention Pond 1 's outflow to Rock Prairie Road drainage swale has adequate armoring. Additional Concrete and rock riprap was added at this location to provide additional armoring. 14 Please provide the flow depth and velocity at mid-block cross drainage valley gutter, and cross lot drainage swale. A drainage addendum is included in this submittal with an Appendix E showing depth of flow and velocity at this location. An Appendix F is included evaluating the cross lot drainage swale. 1 . Please Justify and explain how the flow in the Private Drainage on all Blocks is being discharge to the street. Drainage will flow over the sidewalk as sheet flow and into the curb and gutter. Appendix F evaluates depth of flow over sidewalk. rf 6r Please fix, the drainage along Block 1 adjacent to Buena Vida Subdivision . It seems to flow into the rear lot of Buena Vida Subdivision. A drainage swale is proposed in this location taking drainage over the sidewalk into the Kate Lane curb and gutter. Spot elevations are shown on the grading plan to indicate intent. yf. Please confirm that existing structures on Diamond Storage property is not adjacent to the proposed drainage swale. The berm from the pond is proposed to extend between the drainage swale and the Diamond Storage property. f. Please verify that the elevation of Diamond Storage property adjacent to Detention Pond 1 & common area is at least 327 feet. If not please provide a 327 feet high Berm along Detention Pond 1 & common area adjacent to Diamond Storage property. The detention pond berm is proposed in this area. 19. The proposed street intersection does not meet the "dried up " guideline, please provide additional justification . The intersections in this project are either "local-local" or "collector-local" in which case valley gutters are acceptable. On Towers Parkway the valley gutters are proposed parallel to Towers Parkway. Appendix B1 and Exhibit C have been updated to evaluate the depth of flow at the curve return of the Kate Lane and Summerway Drive intersection. 20. Please define the flow path for emergency spillway of Detention Pond 2. In the future development of Phase 2, what's the orientation and flow path for the emergency Spillway of Detention Pond 2? The emergency spillway will only be used in the clogged condition of the outflow structure. It is not intended for use unless under extreme conditions. In the case that the outflow structure is clogged, the runoff will continue in a northerly direction towards The Barracks Subdivision similar to existing conditions. In the future the detention pond will be re-designed and likely connect to the infrastructure into a future section of the Barracks Subdivision and the future overflow spillway will likely be directed to a street right of way. JA . Please redesign concrete flume 1 & 2 in such a way that the flow through the channel is sub"'.'critical flow. Design flow depth must be greater than critical depth. Also please label each concrete flume uniquely on the construction plan. The slope of concrete flume is now 0.75%. The cross-section of concrete 1 flume 2 and the slope have changed so that the flow depth is greater than , '\ . the critical depth. A revised appendix 83 is included in this submittal. ~Please base culvert design on TxDOT minimum details, or provide a structural analysis with justification of the proposed box culvert. The 24" x 15" box culvert design exceeds the minimum TX.DOT design requirements and details for Single Box Culverts, Cast in Place, O' fill, Detail SCC-3 & 4. A comparison to a 3' x 2' box for the wall thickness and rebar spacing is as follows: Concrete Design TxDOT Detail Top Slab Thickness 7"+ 7" Wall Thickness 8 " 7" Bottom Thickness 8 " 7" Reinforcin Steel Top Slab Thickness Top Material Bottom Material 7" Transverse Material 18" Wall Th ickness To Material 10" Bottom Material 18" Transverse Material 18" Bottom Thickness To Material 7" Bottom Material 10" Transverse Material 18" This design for a direct travel box culvert has previously been constructed with a greater span than the 24" span proposed for this box culvert and has performed well. The box culvert design will support the anticipated loads for the street. ~Please verify and place note on the plan that water services will be left between 2 feet and maximum of 3 feet deep at the point of terminus by developer's contractor. Also note that a ball valve is required at the point of terminus. Notes have been added to all of the water construction sheets. '(4 · Please provide adequate Public Utility easement on Block 1 Lots 9 & 10 i n such a way that the centerline of the sewer lines are no closer than 5.5 feet to the edge of easement, and that the wyes do not pass the easement. A 15' PUE is shown on the plat and the plans. JS . Please Note that the existing sewer line on Kate Lane is 6''. Please fix the construction plans & Sewer report reflecting this. Please provide documentation that the existing 6" line through Buena Vida Subdivision has sufficient Capacity to serve the increase flow from Equinox Subdivision. The plans have been corrected to show the sewer line at Kate Lane being 6". A revised sewer report is included in this submittal. The 6" line through Buena Vida Subdivision is analyzed in the revised report. '13 . Please fix the Stationing for Sewer Line S-3 . The stationing on profile are not matching the plan. The stationing has been fixed for this line. J'1 · Due to the depth of Sewer Line S-3 & S-2, we would require an additional 5 feet easement totaling to 15 feet Public Utility Easement on all the lots adjacent to these sewer lines . A 15 ' PUE is added to all lots adjacent to sewer lines ti Sewer Line 3 from Stationing 3+32 to Stationing 4+50 does not meet B/CS minimum slope , please provide justification. Minimum slope for an 8" pipe is 0.55%. Since the outflow pipe is a 6" pipe, the sewer system in this project will all be 6" pipe .,')'d. Provide a typical layout detail of water meter, cleanout, and transformer. To ensure that adequate fits within proposed easement when you include other private ut ilities. Please con firm with BTU . ~tt-e Due to the wider street an additional 5' was added to the PUE wbeFe necessary. A detail was added to sheet 2 showing the proposed layout. This detail was sent to Walter Williams BTU and an email with his approval is attached to this submittal. . The detail is in accordance with BTU's Guidelines. ~-Please provide Street S ign table. If you have not received block ranges, contact Robin rk ra use @cstx.g ov. A street sign table is included in the plans . ./1 . Should the re not be a streetlight on Towers Parkway and Rock Prairie Road? A street light has been added at this location. f · Please remove ADA crossing ramps for Towers Parkway next to Sophies Lane. These ADA ramps have been removed from the plans. ~On block 3 , t he finish floor elevation for t he lots seems to be the same elevation as the top of Katie Lane 's pavement. We recommend to raise the finish floor elevation by at least 6''. The finished floor of all the lots on this block has been raised 6". FIRE 1) No more than thirty (30) dwelling units without two points of egress . Noted~ SANITATION 1. Sanitation is ok with this project. Noted. • I Ricky Flores From: Sent: To: Subject: Hey Ricky, Walter Williams <williams@btutilities.com> Tuesday, August 26, 2014 3:43 PM Ricky Flores RE : Equinox Phase 1 I'm sorry for the delayed response. I am just getting back to the office. David and I reviewed the layout and it looks fine . Thank yo u, Wa lte r Williams BTU Line Design 979 -821 -5766 office 979 -200 -0441 cell 979 -821 -5796 fax This e-mail and/or attachment is for the sole use of the intended recipient(s) and may conta in confidential and /or legally privileged information . Any unauthorized review, use , disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments. From: Ricky Flores [mailto:ricky@schultzengineeringllc.com] Sent: Tuesday, August 26, 2014 2:59 PM To: Walter Williams Subject: Equinox Phase 1 Walter, Can I get your blessing on this detail I made for our construction plans? I followed the details from BTU's guideline I just proposed a set distance off of the ROW. I couldn't find a set distance in the guidelines. Thanks Ricky Flores This e-mail and/or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited . If you are not the intended recipient, please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments . 1 C ITY or C m.LEGE STATION Home a/Texas A&M Univmity• CASE NO.: PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No.: [8] Existing Project Submittal. Case No .: 14-00900181 Project Name EQUINOX SUBDIVISION -Ph 1 Contact Name JOE SCHULTZ P.E. Phone Number 979-764-3900 ~~~~~~~~~~~~~- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit [8] Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan [8] Grading Plan D Special District Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment [8] Waterline Construction Documents D TxDOT Driveway Permit [8] Sewerline Construction Documents D TxDOT Utility Perm it [8] Street Construction Documents [8] Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Print Form ~hU1tz Engin eerin g, LLC August 2 7, 2014 MattBombek Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Equinox Subdivision Phase 1-14-00900181 Dear Mr. Bombek: Office : 979 .764 .3900 Fax : 979 .764 .3910 Attached are one (1) 24" x 36" copy of the revised final Plat , one (1) 24"x36" copy of the revised grading and erosion control plan ,~ ('/) set! of revised construction documents , the revised Engineer's Estimate, an addendum to the drainage report , a revised sewer report and the response to staff comments. We are working on the easement dedication for the Temporary Turnaround. This information will be submitted separately. If you hav e any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. Joe Sc ltz, P .E. Civil ngineer P.O . Box 11995 • College Stat ion , Texas 77842 sc hul tzengineeri ngll c.com C ITY OF COLI.EGE STATION Home o/Texas A&M University" FOR OFFICE USE ONLY CASE NO.: l L\-l~ DATE SUBMITTED : Q l jOs / lS TIME : \0 ·.w STAFF : -+Pi~Cf _____ _ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: (8] Existing Project Submittal. Case No .: 14-00900181 Project Name 12 at Rock Prairie Contact Name JOE SCHULTZ P.E. ~-------- Phone Number _9_79_-_7_64_-_3_90_0 ________ _ We are transmittin g the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit [8] Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan [8] Other -Please specify below D Special District Building I Sign Mylar and updated tax certificate D Landscape Plan Parkland Dedication INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/1 0 Print Form January 5, 2015 MattBombek Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: 12 at Rock Prairie Subdivision Phase 1-14-00900181 Dear Mr. Bombek: Attached are the following items for the above referenced projest: 1. Mylar original of the Final Plat 2 . CAD file of plat on a CD 3. An updated tax certificate 4 . A check for $64,311 for the Parkland Dedication If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. tz ,P .E. Civil ngineer P.O . Box 11995 • College Stat ion , Texas 77842 schu ltzengineeringll c .com Office : 979 .764 .3900 Fax : 979 .764 .3910 ClTY OF COLLEGE STAT ION Home o/Texas A&M University • FOR OFFICE USE ONLY CASE NO .: DATE SUBMITTED : _____ _ TIME : STAFF : PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. [8] New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: D Existing Project Submittal. Case No .: Project Name EQUINOX SUBDIVISION -Ph 1 Contact Name JOE SCHULTZ P.E. Phone Number 979-764-3900 ------------~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Rezoning Application D Conditional Use Permit D Preliminary Plan [8] Final Plat D Development Plat D Site Plan D Special District Site Plan D Special District Building I Sign D Landscape Plan D Non-Residential Architectural Standards D Irrigation Plan D Variance Request D Development Permit D Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR [8] Grading Plan D Other -Please specify below INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit [8] Sewerline Construction Documents D TxDOT Utility Permit [8] Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions : 10/10 Pri nt For ~ CITY OF C OLLEGE STATION Home of Texas A&M University" FOR OFFICE USE ONLY CASE NO .: 14-l fO \ DATE susM1nEo : lo I 2--7 / t q TIME : ...... \·_. '2,_.0 _____ _ STAFF : _,f\O'~~------- PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: [8] Existing Project Submittal. Case No.: 14-00900181 Project Name 12 at Rock Prairie Contact Name JOE SCHULTZ P.E. PhoneNumber~9~79~-~76~4~-~39~0~0 ________ _ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit [8] Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMNCLOMR/LOMNLOMR D Site Plan D Grading Plan D Special D istrict Site Plan D Other -Please specify below D Special District Building I Sign D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: Equinox Subdivision is being changed to 12 at Rock Prairie 10/10 r : Pri nt Forr;i I October 21 , 2014 MattBombek Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: 12 at Rock Prairie Subdivision Phase 1-14-00900181 Dear Mr. Bombek: Office: 979 .764 .3900 Fax: 979 .764 .3910 We are requesting a name change from Equinox Subdivision Phase 1 to 12 at Rock Prairie Subdivision Phase 1. Attached are 1-24"x36" and 13-ll"x17" copies of the revised Final Plat and 1 copy of the revised Final Plat Application. If you have any questions, please do not hesitate to call. Sincerely, P.O. Box 11995 • College Station, Texas 77842 sch ul tzengineeringll c.com C ITY OF C m.LEGE STATION Home of Texas A&M Un iversity• FOR OFFICE USE ONLY CASE NO.: 1u , 1 ~ DATE SUBMITTED : \a -\~ \4 TIME : 3· ..i)Q STAFF: '\(/\'?;; PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: [8] Existing Project Submittal. Case No .: 14-00900181 Project Name 12 at Rock Prairie Contact Name JOE SCHULTZ P.E. Phone Number 979-764-3900 ~~~~~~~~~~~~~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Rezoning Application D Conditional Use Permit D Preliminary Plan D Final Plat D Development Plat D Site Plan D Special District Site Plan D Special District Building I Sign D Landscape Plan D Non-Residential Architectural Standards D Irrigation Plan D Variance Request D Development Permit D Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR D Grading Plan [8] Other -Please specify below Letter of Credit Engineer's Estimate to Complete INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions : 10/10 11 Print Fpr m ~hultz Engineering, LLC December 18 , 2014 Kevin Ferrer Graduate Civil Engineer City of College Station 1101 Texas A venue College Station, TX 77840 Re: 12 at Rock Prairie Subdivision Phase 1-14-00900181 Dear Mr. Ferrer: Office : 979.764 .3900 Fax : 979 .764 .3910 Attached is the Engineer's Estimate for construction remaining for the 12 at Rock Prairie financial guarantee. If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. P.O . Box 11995 • College Station , Texas 77842 schultzengineeringllc.com Item 1 2 3 4 4A 5 6 7 7 8 9 10 11 12 14 15 17 18 19 75 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No.12327 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Construction Description Unit Estimated Unit Price Quantity ,. Genenl Items · ,.-.. . . Mobilization, Overhead and Construction Staking LS 1 s 20 ,000.00 Right of Way and Site Preparation LS 1 $ 10,000 .00 Topsoil Removal and Replacement, complete in place LS . I $ 6,500 .00 Install End of Street Signs, complete in place EA 12 s 150.00 Install Stop Signs, complete in place EA 8 s 150.00 Erosion & Sediment Control -SWPPP Implementation & Maintenance, Silt LS 1 s 7,500 .00 Fence Construction Exit Rock Filter Darn etc . comolete in olace Hydroseed and Hydromulch, ROW Easements, Channels , Detention Ponds, SY 22 ,830 s 0.50 complete in place Seeding of Disturbed Areas, complete in place SY 24 ,513 $ 0.10 General Items Subtotal .~. ~ ·' · . St~eet Construct~~ items AspbaH Pa~eme~t c Excavation & Grading including Channel Grading, complete in place LS 1 s 25,000 .00 Mixing & incorporation of lime, 6" deep, complete in place SY 7,385 $ 3.00 Mixing & incorporation of lime, 6" deep, complete in place -Towers Parkway SY 3,631 $ 3.00 Hydrated Lime . complete in place (27 lb/sy foot 6" deep & 36 lb/sy for 8" deep) Ton 150 $ 180.00 Crushed Limestone Base Material -6" thick, complete in place SY 549 $ 11.00 Crushed Limestone Base Material -8' thick, complete in place SY 2,753 s 14 .00 HMAC -Type D Pavement 2" thick -includes prime coat, complete in place -SY 2,753 s 12 .00 Towers Parkway Concrete Curb & Gutter (Standard), complete in place LF 1,291 s 12.00 Reinforced Concrete Pavement -Aprons -6' Thick w/ Monolithic Standard Curb , SF 9,759 s 5.50 comolete in olace Concrete Sidewalk & Ramps -4" thick, complete in place SF 27 ,165 $ 4.00 ADA Ramps -Detectable Warning Surfaces, complete in place EA 20 s 600 .00 6" Reinforced Concrete Pavement w/Curb, complete in place SY 5,254 $ 31.00 Street Construction Asphalt Pavement Items Subtotal Page 1of4 Total %Complete Amount Amount Quantity Complete ($) Remainin g ($) s 20 ,000 .00 100% s 20 ,000 .00 $ - s 10,000 .00 100% $ 10,000.00 $ - s 6,500.00 70% s 4,550 .00 s 1,950.00 s 1,800.00 0% s -$ 1,800 .00 $ 1,200 .00 0% $ -$ 1,200 .00 $ 7,500 .00 75% $ 5,625 .00 s 1,87 5.00 $ 11 ,415 .15 0% $ -$ 11 ,41 5.15 $ 2,451.28 0% $ -$ 2,451.28 s 60,866.43 Remaining Subtotal s 20,691.43 $ 25,000 .00 90% $ 22,500 .00 $ 2,500 .00 s 22 ,155 .00 100% $ 22,155.00 $ - $ 10,893.00 66% s 7,189 .38 $ 3,703 .62 s 27 ,000 .00 75% $ 20 ,250 .00 s 6,750 .00 $ 6,039 .00 95% $ 5,737 .05 $ 301.95 $ 38 ,542.00 0% s -$ 38 ,542.00 s 33,036 .00 0% s -s 33 ,036 .00 s 15,492.00 0% s -$ 15 ,492 .00 $ 53,674 .50 70% s 37,814 .05 s 15 ,860 .45 $ 108,660.00 0% $ -s 108 ,660 .00 $ 12,000.00 0% $ -s 12,000 .00 $ 162,874.00 100% $ 162,874 .00 $ - s 515,365.50 Remaining Subtotal s 236,846.02 20 21 21A 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 18 " RCP Pipe, complete in place (Structural) 18" HOPE Pipe, complete in place (Structural) 15" x 24" Box Culvert, complete in place (Structural) Curb Inlet -5' wide, complete in place Curb Inlet - 1 O' wide, complete in place 3'x3 ' J unction Box, co mplete in place Concrete Flume Inlet, complete in place Rock RipRap, complete in place TV Testing and Inspection, complete in place Trench Drain, complete in place Concrete Channel, complete in place ·,·. . ;· '· Pond Excavating and Grading, complete in place 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Construction Storm Sewer Construction Items LF 226 $ 45 .00 LF 218 $ 40.00 LF 60 $ 40.00 EA 2 $ 2,800.00 EA 2 $ 3,500.00 EA 1 $ 2,750.00 EA 2 $ 3,500.00 Ton 40 $ 60.00 LF 444 $ 3.00 EA 7 $ 250.00 SF 1,927 $ 6 .00 Storm Sewer Construction Items Subtotal i>eteiitidia ro.icft CoiisiinctiOn Ite~ · · .. ; . ,. ·.· .... , . . . LS 1 $ 6,500.00 15 " HOPE Pipe, complete in place (Non-Structural), complete in place LF 60 s 30.00 15 " -6H:lV Concrete SET, complete in place EA 2 $ 1,500.00 4' Wide Concrete Flume, complete in place SF 1,050 $ 6.00 Detention Pond l Construction Items Subtotal -· :· Det~~ttO.i Pond ~ CO'mtl'llCtioD Items .. .. Pond Excavating and Grading, complete in place LS l $ 10,000 .00 Connect to Existing Inlet -including remove & rep lace existing fence and repairs LS l $ 2,000.00 to the vard comolete in olace 18" HOPE Pipe, complete in place (Non-Structural) LF 75 $ 35 .00 Concrete Pond Outlet Structure, complete in place EA I $ 2,500.00 Detention Pond 2 Construction Items Subtotal Page 2 of 4 $ 10 ,170 .00 100% $ 10 ,170.00 $ - $ 8,720 .00 100% $ 8,720.00 $ - $ 2 ,400.00 40% $ 960 .00 $ 1,440 .00 $ 5,600 .00 100% $ 5,600 .00 $ - $ 7,000.00 100% s 7,000 .00 $ - $ 2,750.00 100% $ 2,750 .00 $ - $ 7,000 .00 0% $ -$ 7,000.00 $ 2 ,400 .00 0% $ -$ 2,400 .00 $ 1,332 .00 0% $ -$ 1.332.00 $ 1,750.00 0% $ -$ 1,75 0 .00 s 11,562 .00 0% $ -$ 11 ,562 .00 $ 60,684.00 Remaining Subtotal $ 25,484.00 $6,500 100% $ 6,500.00 s - Sl ,800 100% s 1,800.00 s - $3,000 100% s 3,000 .00 $ - $6,300 0% $ -$ 6,300 .00 $17,600 Remaining Subtotal $ 6,300.00 : $10,000 100% $ 10,000 .00 $ - $2,000 100% $ 2,000 .00 $ - $2,625 100% $ 2,625 .00 $ - $2,500 0% $ -s 2,500.00 $17,125 Remaining Subtotal s l ,500.00 • 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Construction Water Construction Items 8" C900 Water Pipe w/tracer wire -Structural Backfill , complete in place LF 1164 s 30 .00 8" C900 Water Pipe w/tracer wire -Non-Structural Backfill, complete in place LF 14 s 28.00 6" C900 Water Pipe w/tracer wire -Structural Backfill , complete in place LF 786 s 25 .00 Fire Hydrant Assembly (w/valve, vert. extension), complete in place EA 2 $ 3,500.00 8"x 8" M.J. Cross, complete in place EA 1 $ 450.00 8"x 8" M.J. Tee, complete in place EA 1 $ 400 .00 8"x 6" M.J. Tee, complete in place EA 2 $ 400 .00 6"x 6" M.J. Tee, complete in place EA 1 $ 350 .00 8"x 6" M.J. Reducer, com plete in place EA 2 $ 550 .00 8" M.J. Gate Valve, complete in place EA 5 $ 1,250 .00 6" M.J. Gate Valve, complete in place EA 2 s 1,000.00 8" x 45° M.J . Bend, complete in place EA 2 s 350 .00 6" x 45° M.J. Bend, complete in place EA 5 $ 350 .00 6" x 22 .5° M.J. Bend, complete in place EA 2 $ 350 .00 1" Water Service,< 15 ft (avg length = 3 ft) (6" Line) EA 4 $ 800 .00 I" Water Service,> 15 ft (avg length = 47 ft) (6" Line) EA 2 $ 1,000.00 1.5" Water Service,< 15 ft (avg length = 3 ft) (6" Line) EA 4 s 850 .00 1.5" Water Service,> 15 ft (avg length= 47 ft) (6" Line) EA 7 $ 1,250 .00 1" Water Service , < 15 ft (avg length= 3 ft) (8" Line) EA 2 $ 800 .00 1.5 " Water Service,< 15 ft (avg length= 3 ft) (8" Line) EA 4 $ 850 .00 1.5" Water Service,> 15 ft (avg length ~ 47 ft) (8" Line) EA 7 s 1,250 .00 Meter Boxes, complete in place EA 52 $ 100.00 2" Blowoff Assembly, complete in place EA 3 s 1,000 .00 Connect to Existing 8" Water Line EA 1 $ 1,500 .00 Waterline Testing LS 1 $ 1,000 .00 Water Construction Items Subtotal Page 3 of 4 s 34,920.00 100% $ 34,920 .00 s - s 392 .00 100% s 392 .00 $ - $ 19 ,650 .00 100% $ 19,650 .00 $ - $ 7,000 .00 100% $ 7,000 .00 $ - $ 450 .00 100% s 450 .00 $ - $ 400 .00 100% $ 400 .00 $ - $ 800 .00 100% $ 800 .00 s - s 350 .00 100% s 350 .00 $ - s 1,100.00 100% $ 1,100 .00 s - $ 6,250 .00 100% s 6,250 .00 s - s 2,000 .00 100% s 2,000.00 s - $ 700.00 100% s 700.00 $ - $ 1,750.00 100% s 1,750.00 $ - $ 700 .00 100% $ 700 .00 s - s 3,200.00 100% $ 3,200 .00 s - $ 2,000.00 100% s 2,000 .00 $ - s 3,400 .00 100% s 3,400 .00 $ - $ 8,750 .00 100% s 8,750 .00 s - $ 1,600 .00 100% $ 1,600 .00 $ - $ 3,400.00 100% $ 3,400 .00 $ - $ 8,750 .00 100% $ 8,750.00 $ - $5,200 100% $ 5,200 .00 s - $ 3,000 .00 100% $ 3,000.00 s - $ 1,5 00 .00 100% s 1,500.00 $ - $ 1,000 .00 50% s 500 .00 s 500.00 $ 118,262.00 Remaining Subtotal $ 500.00 • 63 64 65 66 67 68 69 70 71 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Construction Sanitary Sewer Construction Items 6" PVC Sewer Line -D3034 -Structural Backfill. complete in place LF 1,112 $ 22.00 6" PVC Sewer Line -ASTM D-2241 -Structural Backfill , complete in place LF 40 $ 24.00 4" Sewer Service-Single (avg . length = 2 ft), complete in place EA 5 s 450 .00 4" Sewer Service-Double (avg length = 2 ft), complete in place EA 13 s 600.00 4" Sewer Service-Double (avg length = 51 ft), complete in place EA 10 s 1,000 .00 Tie-In to Existing Manhole, complete in place EA 1 $ 1,000 .00 Concrete Drop Manhole -4' Dia. -complete in place EA 5 s 3,500.00 Concrete Manhole -4' Dia. -complete in place EA 1 $ 3,250 .00 TV Testing and Inspection, complete in place LF 1,152 $ 2.00 Sanitary Sewer Construction Items Subtotal General Items Subtotal S Street Construction Asphalt Pavement Items Subtotal S Storm Sewer Construction Items Subtotal S Detention Pond 1 Construction Items Subtotal Detention Pond 2 Construction Items Subtotal Water Construction Items Subtot.I S Sanitary Sewer Construction Items Subtotal S SO"• Additional for Grass TOTAL CONSTRUCTION S Page 4 of 4 $ 24,459 .60 0% $ -$ 24 ,459 .60 s 960 .00 0% $ -$ 960 .00 $ 2,250 .00 0% $ $ 2,250.00 s 7,800 .00 0% s -$ 7,800 .00 s 10,000 .00 0% s -$ 10,000 .00 $ 1,000 .00 0% $ -s 1,000 .00 s 17 ,500 .00 0% s -$ 17 ,5 00 .00 $ 3,250 .00 0% $ -$ 3,2 50 .00 $ 2,303 .60 0% $ -s 2,303 .60 s 69,523.20 Remaining Subtotal s 69,523.20 Remaining 60,866.43 s 20,691.43 515,365.SO s 236,846.02 60,684.00 s 25,484.00 $17,600 s 6,300.00 $17,125 s 2,500.00 118,262.00 s 500.00 69,523.20 s 69,523 .2 0 s 5,707 .58 859,426.13 s 367,552.23 ...... : ~ PROSPERITY BANK® . ...,...., FROM: DWS Development, Inc. ISSUER: Prosperity Bank 12995 FM 2154 Rd, College Station, TX 77845 IRREVOCABLE LETTER OF CREDIT DATE: December 15, 2014 TO BENEFICIARY: City of College Station Attention: Director of Development Services 1101 Texas Avenue College Station , Texas 77840 IRREVOCABLE LETTER OF CREDIT NO.: 1827 ISSUE DATE : 12:0 0 Noon Central Standard Time , December 15, 20 14 EXPIRATION DATE : 12 :00 Noon Central Standard Time, December 15 , 2015, or upon the comp letion and final payment to all contractors, whichever occurs first. LOCATION OF PROJECT: Rock Prairie Subdivision -Phase I, College Station, TX AMOUNT: ACCOUNT OF: Three Hundred Sixtv-Seven Thousand Five Hundred Fifty-Two and 23 /100 DOLLARS ($367,552.23) DWS Development. Inc., (herein "DEVELOPER ") P.O. Box 4508 Bryan, TX 77805 GENERAL TERMS & CONDITIONS: The Issuing Bank set out above hereb y issues its IRREVOCABLE LETTER OF CREDIT NO. 18 27 in favor of the CITY OF COLLEGE STATION, TEXAS, in accordance with CHAPTER 5, V.T.C.A . TEXAS BUSINESS AND COMMERCE CODE as va ried by and pursuant to the CITY OF COLLEGE STATION UNIFIED DEVELOPMENT ORDINANCE for the Account of DEVELOPER for an aggregate amount of up to Three Hundred Sixty-Seven Thousand Five Hundred Fifty-Two and 23 /100 DOLLARS ($367,552.23). This amount is available by your draft(s) payable at sight when accompanied by the following : I. Sworn Statement by a duly authorized representative of the City of College Station, Texas , statin g that Developer(s) has/have defaulted and failed to complete the perfonnance and co nstruction of the improvements described below in accordance with the UNIFIED DEVELOPMENT ORDINANCE of the CITY OF COLLEGE STATION, Texas , and that the proceeds from this Letter of Credit will either be utilized by the City of College Station , Texas , to complete such construction or will be retu rned by the City of College Station to the Issuing Bank : Paving, drainage and utility improvements to 12 at Rock Prairie Subdivision -Phas e I Prepared by: sda vison I 2-12-20 14 SPECIAL TERMS & CONDITIONS : I. All banking fees /expenses/charges incurred are for the account of Developer. The City of College Station is not responsible for any charges in connection with a drawing under this Letter of Credit. This Letter of Credit is issued in conjunction with the development of Developer in the City of College Station, Texas, specifically for the following: To guarantee the payment and performance of the proposed construction im provements in 12 at Rock Prairie Subdivision -Phase I, a proposed subdivision in the City of College Station, Texas, for a period not to exceed one (I) year(s) from the date hereof. 2. Disbursements pursuant to this Letter of Credit will never exceed the above -stated amount, less any amount released by the City of College Station, Texas. The amount of credit under this Letter of Credit may be reduced upon approval and acceptance by the City of College Station of completed improvements, which reduction may only be made with the written authorization of the Director of Planning and Development Services of the City of College Station. 3. In accordance with SECTION 5.106 of the TEXAS BUSINESS AND COMMERCE CODE, this Letter of Credit may be modified, upon the execution and delivery to Issuer of a sworn statement giving consent to modification by the Director of Planning and Development Services of the City of College Station. 4 . The Issuer of this Letter of Credit has caused this Letter to be signed by the undersigned officer who has attached proof of his authorization to sign, together with attestation by Issuer 's authorized attesting officer and sealed with the seal of Issuer. STATE OF TEXAS * * COUNTY OF BRAZOS * This instrument was acknowledged before me on December 15 , 2014, by Blake Steven Osina, Banking Center President, the authorized officer of Prosperity Bank, Issuer , a Texas Banking Corporation , on behalf of said Banking Corporation and in the capacity stated . e MARY L. HEGAR Notary Public . State of .Texas My commission Expires FEBRUARY 20, 2016 Prepared by : sdavison 12-12-2014 Notary PublicCSt~e of Texas FOR OFFICE USE ONLY CASE NO .: t ti-l 9 ( DATE SUBMITTED : 01 / 1 f?J ( 'J- TIME: \ \ : 2.Q CITY OF Col.LEGE STATION Home of Texas A&M University" STAFF: ~h-IT_.__ _____ _ FINAL PLAT APPLICATION (Check one) D Minor ($700) D Amending ($700) .[8] Final ($932) D Vacating ($932) 0Replat ($932) Is this plat in the ET J? D Yes [8] No Is this plat Commercial D or Residential [g] MINIMUM SUBMITTAL REQUIREMENTS: [8] $700-$932 Final Plat Application Fee (see above). D $233 Waiver Request to Subdivision Regulations Fee (if applicable). [8] $600 (minimum) Development Permit Applica t ion I Public Infrastructure Review a nd Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). [8] Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered . Please attach pages if additional information is provided. [8] Six (6) folded copies of plat. (A signed mylar original must be submitted after approval.) [8] Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report. [8] Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). [8] Copy of original deed restrictions/covenants fo r replats (if applicable). [8] Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current w ithin ninety (90) days. The report must include applicable information such as ownership , liens , encumbrances, etc. [8] Paid tax certificates from City of College Station, Brazos County and College Station l.S .D. D The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application , it shall be considered a submittal for the prelim inary plan project and processed and reviewed as such . Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference _M_a_rc_h_5_,__2_0_14 __________ _ NAME OF PROJECT Equinox Subdivision Phase 1 ADDRESS 3270 Rock Prairie Road West SPECIFIED LOCATION OF PROPOSED PLAT: North side of Rock Prairie Road 0. 5 miles west of Wellborn Road APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Craig Browne E-mail craig@craigbrowne .com ~---------------~ Street Address 2801 Earl Rudder Freeway City College Station Zip Code _7_78_4_5 ___ _ state Texas ~-------- Phone Number 979 . 764 . 7653 Fax Number ~-------------~ Rev ised 4/14 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified . Please attach an add itiona l sheet for mu ltiple owners): Name Charles & Mary Turner E-mail diamondt3375@yahoo .com Street Address 3270 Rock Prairie Road West City College Station State Texas Z ip Code _7_78_4_5 ___ _ Phone Number 979 . 764 .2967 Fax Number ---------------~ ARCHITECT OR ENGINEER 'S INFORMATION : Name Joe Schultz, P.E. -Schultz Engineering LLC E-mail joeschultz84@verizon .net Street Address 3730 Longmire Drive, Suite A City College Station State Texas Zip Code 77845 ------ Phone Number 979. 764 .3900 Fax Number 979 . 764 .3910 ----------------- Do any deed rest ri ctions or covenants exist for this property? D Yes [gj No Is there a temporary blanket easement on this property? If so , please prov ide the Volume ____ and Page No . __ _ Total No . of Lots 51 ------R-0-W Acreage 3.022 -------Tota l Acreage _9._2_2_3 _______ _ Existing Use Horses Proposed Use Residential -----------------------------~ Number of Lots By Zoning D istrict 51 T 0 I GS Average Acreage Of Each Residentia l Lot By Zoning District: 0. 087 I T 0 I GS ___ / __ _ Floodplain Acreage _N._YA ________________________________ _ Is there Special Flood Haza rd Area (Zone A or Zone AE on FEMA FIRM panels) on the property? [J Yes IX] No This information is necessary to help staff identify the appropriate standards to review the appl ication and will be used to help determine if the appl ication qualifies for vesting to a previous ord inance . Notwithstanding any assertion made , vest ing is lim ited to that wh ich is provided in Chapter 245 of the Texas Local Government Code or other appl icable law. Is th is application a continuation of a project that has received prior City platting approval(s) and you are requesting the app li cation be rev iewed under previous ordinance as applicable? IX] Yes [J No If yes , provide information regarding the first approved application and any related subsequent applications (prov ide add itional sheets if necessary): Proj ect Name : EQUINOX SUBDIVISION PRELIMINARY PLAN City Project Number (if known): Date I Timeframe when submitted : JUNE 2014 Rev ised 4/14 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision re ulations will de rive the a licant of the reasonable use of his land . ~~~~~~~~~~~~~~~~~~~~ 3. The granting of the waiver will not be detrimental to the public health, safety , or welfare , or injurious to other property in the area , or to the City in administering subdivision regulations . 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. ~~~~~~~~~~~~~~~~~~~ Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. n An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way ; 2. O The presence of unique or unusual topographic , vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan ; 3. 0 A capital improvement project is imminent that will include construction of the required sidewalk . Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4 . [j Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5. O When a sidewalk is required along a street where a multi-use path is shown on the Bicycle , Pedestrian , and Greenways Master Plan; Revised 4/14 Page 3 of 9 6 . n The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO ; or 7. ,--; The proposed development contains frontage on a Freeway I Expressway as designated by Map 6 .6 , Thoroughfare Plan -Functional Classification , in the City's Comprehensive Plan . Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission . Total Linear Footage of Proposed Public: Z 5ZS" Streets ~5() Sidewalks I 15Z Sanitary Sewer Lines JO/''( Water Lines t<:7 I Channels '37'?.-Storm Sewers /Goo Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE : ___ No. of acres to be dedicated + $ ____ development fee ___ No. of acres in floodplain No . of acres in detention --- ---No . of acres in greenways OR FEE IN LIEU OF LAND : __ No . of SF Dwelling Units X $ __ _ = $ (date) Approved by Parks & Recreation Adv is ory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and ex hibits attached here to are true , correct, and complete . IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Sign at~ 7 -f 5'-z.01 '-/ Date Revised 4/14 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a perm it is issued . 2 . The perm it may be revoked if any false statements are made herein . 3. If revoked , all work must cease until permit is re-issued . 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6 . Other permits may be required to fulfill local , state , and federal requirements . Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7 . If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8 . Owner hereby gives consent to City representa t ives to make reasonable inspections required to verify compliance . 9. If, stormwater mitigation is requ ired , including detention ponds proposed as part of this project , it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in c ity streets , o r existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ord inances of the City of College Station shall apply . 11 . The information and conclusions contained in the attached plans and supporting documents will comply with t he current requirements of the City of College Station, Texas City Code , Chapter 13 and associated BCS Un ified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12 . Release of plans to (name or firm) is authorized for bidding purposes only . I understand that final approval and release of plans and development for construction is contingent on contracto r signature on approved Development Permit. 13 . I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACC~L-.... 1 -15 ~ ZP t'{ Property Owner(s) Date Engineer Certification : 1. The project has been designed to ensure that stormwater mitigation , including detention ponds , proposed as part of the project will be constructed first in the construction sequence . 2 . I will obtai n or can show compliance with all necessary Local , State and Federal Perm its prior to construction including NOi and SWPPP . Design will not preclude compliance with TPDES : i.e ., projects ove r 10 acres may require a sedimentation basin . 3 . The information and conclusions contained in the attached plans and supporting documents comp ly with the current requirements oft~~. ~~~of College Station , Texas City Code, Chapter 13 and associated BCS Unifi ed Design Guideline~~l_~(eto has been designed in accordance with all applicable codes a nd ordinances of the City of Co~* ~and Federal Regulations . 4 . I, THE EN~IN~R 1,rAG . 0 ,A)JQ<~RTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMEN T S FOR THE DE'f.!~f..~.I; ••••• f..BMh:*..A,PLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE .1~~9.~~r • ~; •• ~.9]1~.~~·a:·I ~~o a 9 .://JI . ·~ 0 ~ i) 4"'e-..j e ~ .;;I Date Rev ised 4/14 Page 5 of 9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* certify , as demonstrated in the attached drainage study , that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation ; (ii) create additional areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) increase Base Flood velocities . beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances. Engineer Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I , , certify to the following: (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Engineer Date Additional certification for Floodway Encroachments: C . I, , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments. Engineer Date Revised 4/14 Page 6 of 9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any res idential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates will be provided w ith elevations certified du ri ng construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: E. I, ----------------, certify that all new construction or any substantial improvement of any commercial , industrial, or other non -residential structure are designed to have the lowest floor, includ in g all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation , and sha ll resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Cond itions or comments as part of approval : Revised 4/14 Page 7 of9 Existing ~ FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) ~ Drawn on 24" x 36" sheet to scale of 100' per inch. ~ Vic inity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. ~ Title Block with the following information : [RJ Name and address of subdivider, recorded owner, planner, engineer and surveyor. [RJ Proposed name of subdivision . (Subdiv ision name & street names will be approved through Brazos County 911.) [81 · Date of preparation . [RJ Engineer's scale in feet. D Total area intended to be developed . [81 North Arrow . [RJ Subdivision boundary indicated by heavy lines. [RJ If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. [RJ All applicable certifications based on the type of final plat. [RJ Ownership and Dedication [RJ Surveyor and/or Engineer [RJ City Engineer (and City Planner, if a minor plat). [81 Planning and Zoning Commission (delete if minor plat) [RJ Brazos County Clerk D Brazos County Commissioners Court Approval (ET J Plats only) D If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created . D If using private septic systems , add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County , pursuant to the provisions of Section 21.084 of the Texas Water Code . [RJ Location of the 100-Year Floodplain and floodway , if applicable, according to the most recent available data. [RJ Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data . ~ Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E .2). The location and description with accurate dimensions , bearings or deflection angles and radii , area , center angle, degree of curvature , tangent distance and length of all curves for all of the following : (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Proposed ~ Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O .W. locations and widths. (All existing and proposed R.O .W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersect ion angles meet ordinance . Rev ised 4/14 Page 8 of 9 .· Item I 2 3 4 4A 5 6 7 7 8 9 10 11 12 13 14 15 16 17 18 19 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Equinox Subdivision Phase 1 Engineer's Estimate of Construction Description Unit General Items Mobilization, Overhead and Construction Staking LS Right of Way and Site Preparation LS Topsoil Removal and Replacement, complete in place LS Install End of Street Signs, complete in place EA Install Stop Signs, complete in place EA Erosion & Sediment Control -SWPPP Implementation & Maintenance, Silt Fence, LS Construction Exit. Rock Filter Dam etc . complete in place Hydroseed and Hydromulch, ROW Easements, Channels, Detention Ponds , SY complete in place Seeding of Disturbed Areas , complete in place SY Stree! Construction Items Asphalt Pavement Excavation & Grading inc luding Channel Grading, complete in place LS Mixing & incorporation of lime, 6" deep, complete in place SY Mixing & incorporation of lime, 6" deep, complete in place -Towers Parkway SY Hydrated Lime, complete in place (27 lb/sy foot 6" deep & 36 lb /sy for 8" deep) Ton Crushed Limestone Base Material -6" thick, complete in place SY Crushed Limestone Base Material -8" thick, complete in place SY HMAC -Type D Pavement 2" thick -includes prime coat, complete in place SY HMAC -Type D Pave ment 2" thick -includes prime coat, complete in place -SY Towers Parkway Concrete Curb & Gutter (St andard), complete in place LF Concrete Curb & Gutter (Laydown), complete in place LF Reinforced Concrete Pavement -Aprons -6" Thick w/ Monolithic Standard Curb, SF complete in olace Concrete Sidewalk & Ramps -4" thick, complete in place SF ADA Ramps -Detectable Warning Surfaces, complete in place EA Estimated Unit Price Quantity I $ 20,000 .00 I $ 10,000.00 I $ 6,500.00 12 $ 150 .00 8 $ 150 .00 I $ 7,500 .00 22 ,830 $ 0 .50 24,513 $ 0 .10 General Items Subtotal I $ 25,000 .00 7,385 $ 3 .00 3,631 $ 3 .00 150 $ 180 .00 5,232 $ 11.00 2,753 $ 14 .00 4,683 $ 12.00 2,753 $ 12 .00 1,2 91 $ 12 .00 2,571 $ 12 .00 9,759 $ 5 .50 27,165 $ 4 .00 20 $ 600 .00 Street Construction Asphalt Pavement Items Subtotal Page 1of4 Total $ 20,000 .00 $ 10,000 .00 $ 6,500 .00 $ 1,800.00 $ 1,200 .00 $ 7,500 .00 $ 11 ,415 .15 $ 2,451.28 s 60,866.43 $ 25 ,000.00 $ 22,155 .00 $ 10,893 .00 $ 27 ,000.00 $ 57 ,552.00 $ 38,542.00 $ 56,196.00 $ 33 ,036.00 $ 15 ,492 .00 $ 30 ,852 .00 $ 53,674.50 $ 108,660.00 $ 12 ,000 .00 s 491,052.50 20 21 21A 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Equinox Subdivision Phase 1 Engineer's Estimate of Construction Storm Sewer Construction Items 18" RCP Pipe, complete in place (Structural) LF 18" HDPE Pipe, complete in place (Structural) LF 15" x 24" Box Culvert, complete in place (Structural) LF Curb Inlet -5' wide, complete in place EA Curb lnlet -10' wide, complete in place EA 3'x3' Junction Box, complete in place EA Concrete Flume Inlet , complete in place EA Rock RipRap, complete in place Ton TV Testing and Inspection, comp lete in place LF Trench Drain, complete in place EA Concrete Channel , complete in place SF 226 $ 45.00 218 $ 40.00 60 $ 40 .00 2 $ 2,800.00 2 $ 3,500.00 I $ 2,750 .00 2 $ 3,500.00 40 $ 60 .00 444 $ 3 .00 7 $ 250.00 1,927 $ 6 .00 Storm Sewer Construction Items Subtotal Detention Pond 1 Construction Items Pond Excavating and Grading, complete in place LS l $ 6,500 .00 15" HDPE Pipe, complete in place (Non-Structural), complete in place LF 60 $ 30.00 15" -6H: l V Concrete SET, complete in place EA 2 $ 1,500 .00 4' Wide Concrete Flume, complete in place SF 1,050 $ 6.00 Detention Pond 1 Construction Items Subtotal Detention Pond 2 Construction Items Pond Excavating and Grading, complete in place LS l $ 10,000.00 Connect to Existing Inlet -including remove & replace existing fence and repairs to LS l $ 2,000 .00 the vard comolete in olace 18" HDPE Pipe, complete in place (Non-Structural) LF 75 $ 35.00 Concrete Pond Outlet Structure, complete in place EA l $ 2,500.00 Detention Pond 2 Construction Items Subtotal Page 2 of 4 $ 10,170.00 $ 8,720 .00 $ 2,400.00 $ 5,600.00 $ 7,000.00 $ 2,750 .00 $ 7,000.00 $ 2,400.00 $ 1,332 .00 $ 1,750.00 $ 11 ,562.00 s 60,684.00 $6,500 $1,800 $3,000 $6,300 $17,600 $10,000 $2,000 $2,625 $2,500 SI 7,125 , 3 8 39 40 41 42 4 3 4 4 45 46 4 7 4 8 49 50 51 52 53 54 55 56 57 58 59 60 61 62 Equinox Subdivision Phase 1 Engineer's Estimate of Construction Water Construction Items 8" C900 Water Pipe w/tra ce r wire -Structural Backfill, complete in place LF 8" C900 Water Pipe w/tracer w ire -Non-Structural Backfill, complete in place LF 6" C900 Water Pipe w/tracer wire -Structural Backfill , complete in place LF Fire Hydrant Assembly (w/v alve , vert . extension), complete in pl ac e EA 8"x 8" M.J . Cross , complete in place EA 8"x 8" M.J. Tee , compl ete in place EA 8"x 6" M.J. Tee , complete in pl ace EA 6"x 6" M.J . Tee, complete in pl ace EA 8"x 6" M.J . Reducer, complete in place EA 8" M.J . Gate Valve, complete in place EA 6" M.J . Gate Valve, complete in place EA 8" x 45 ° M.J . Bend, complete in place EA 6" x 4 5° M.J . Bend, complete in place EA 6" x 22 .5° M.J . Bend, complete in place EA I" Water Service,< 15 ft (avg length = 3 ft) (6" Line) EA I" Water Service ,> 15 ft (avg length = 47 ft) (6" Line) EA l.5" Water Service,< 15 ft (avg length = 3 ft) (6" Line) EA 1.5" Wat er Service,> 15 ft (avg length = 47 ft) (6" Line) EA I" Water Service,< 15 ft (avg length = 3 ft) (8" Line) EA l.5" Water Service ,< 15 ft (avg length = 3 ft) (8" Line) EA l.5" Water Service,> 15 ft (avg length= 47 ft) (8" Line) EA Meter Boxes, complete in place EA 2" Blowoff Assembly, complete in pl ace EA Connect to Existing 8" Water Line EA Waterline Testing LS 1164 $ 30 .00 14 $ 28 .00 786 $ 25 .00 2 $ 3,500.00 I $ 450.00 I $ 400 .00 2 $ 400 .00 I $ 350.00 2 $ 550.00 5 $ 1,250 .00 2 $ 1,000.00 2 $ 350.00 5 $ 350.00 2 $ 350.00 4 $ 800.00 2 $ 1,000 .00 4 $ 850.00 7 $ 1,250 .00 2 $ 800 .00 4 $ 850 .00 7 $ 1,250 .00 52 $ 100 .00 3 s 1,000 .00 I s 1,500.00 I s 1,000 .00 Water Construction Items Subtotal Page 3 of 4 $ 34 ,920.00 $ 392 .00 $ 19 ,650.00 $ 7,000 .00 $ 450 .00 $ 4 00.00 $ 800 .00 $ 350 .00 $ 1,100 .00 $ 6,2 50 .00 $ 2,000.00 $ 700.00 $ 1,750.00 $ 700 .00 $ 3,200.00 $ 2 ,000.00 $ 3,400.00 $ 8,750 .00 $ 1,600 .00 $ 3 ,400 .00 $ 8,750 .00 $5,200 s 3,000 .00 s 1,500.00 s 1,000.00 s 118,262.00 63 64 65 66 67 68 69 70 71 Equinox Subdivision Phase 1 Engineer's Estimate of Construction Sanitary Sewer Construction Items 6" PVC Sewer Line -D3034 -Structural Backfill , complete in place LF 6" PVC Sewer Line -ASTM D-2241 -Structural Backfill, complete in place LF 4" Sewer Service-Single (avg. length = 2 ft), complete in place EA 4" Sewer Service-Double (avg length = 2 ft), complete in place EA 4" Sewer Service-Double (avg length = 51 ft), complete in place EA Tie-In to Existing Manhole, complete in place EA Concrete Drop Manhole -4' Dia. -complete in place EA Concrete Manhole -4' Dia. -complete in place EA TV Testing and Inspection, complete in place LF 1,112 $ 22.00 40 $ 24.00 5 $ 450.00 13 $ 600 .00 10 $ 1,000 .00 1 $ 1,000.00 5 $ 3,500.00 1 $ 3,250 .00 1,152 $ 2.00 Sanitary Sewer Construction Items Subtotal General Items Subtotal s Street Construction Asphalt Pavement Items Subtotal s Storm Sewer Construction Items Subtotal s Detention Pond 1 Construction Items Subtotal Detention Pond 2 Construction Items Subtotal Water Construction Items Subtotal s Sanitary Sewer Construction Items Subtotal s TOTAL CONSTRUCTION S $ 24,459 .60 $ 960.00 $ 2,250.00 $ 7,800 .00 $ 10 ,000 .00 $ 1,000.00 $ 17 ,500.00 $ 3,250.00 $ 2,303 .60 s 69,523.20 60,866.43 491,052.50 60,684.00 $17,600 $17,125 118,262.00 69,523.20 835,113.13 F-12327· SCHULTZ ENGINEERING, LLC. Page 4 of 4 Ite m 1 2 3 4 4A 5 6 7 7 8 9 10 II 12 14 15 17 18 19 75 .. SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Con struction Description Uni t Est im ated Unit Price Quantity General Items Mobilizatio n, Overhead an d Construction Stakin g LS I $ 20 ,000 .00 Right of Way and Site Preparati o n LS I $ 10,000.00 Topso il Re moval and Repl ace ment, complete in pl ace LS I $ 6,500 .00 Install End of Street Signs, co mpl ete in place EA 12 $ 150 .00 Install Sto p Signs , complete in pl ace EA 8 $ 150 .00 Erosion & Sediment Control -SWPPP Im pl ementation & Ma inte nance, Silt LS I $ 7,500 .00 Fe nce Constru ction Exit Roc k Filter Dam etc. comolete in olace Hydroseed and Hydromulc h, ROW Easements , C ha nne ls, De tention Ponds , SY 22 ,830 $ 0 .50 complete in pl ace Seeding of Disturbed Areas, complete in place SY 24 ,5 13 $ 0 .10 General Items Subtotal Street Construction Items As phalt Pavement Excavation & Grading inclu di ng Channel Grad ing, complete in place LS I $ 2 5,000.00 Mixing & inc orporation of lime, 6" deep, co mplete in place SY 7,385 $ 3.00 Mixing & incorporatio n of lime , 6" dee p, complete in pl ac e -Towers Parkway SY 3,631 $ 3.00 Hydrated Lime, complete in pl ace (27 lb/sy foo t 6" deep & 36 lb/sy fo r 8" deep) Ton 150 $ 180 .00 Crushed Li mestone Base Material -6" thick, co mpl ete in place SY 549 $ 11.00 Crushed Li mestone Base Material - 8" thick, complete in place SY 2,753 $ 14 .00 HMAC -Ty pe D Pavement 2" th ick - includes prime coat, complete in pl ace -SY 2,753 $ 12 .00 Towers Pa rkway Concrete Curb & Gutter (Sta ndard), compl ete in pl ace LF 1,29 1 $ 12 .00 Reinforced Co ncrete Pavement -Aprons -6" Thi ck w/ Monol ith ic Standard Cur b, SF 9,759 $ 5.50 comp lete in pl ace Concrete Side walk & Ra mps -4" thick, complete in place SF 27,165 $ 4 .00 ADA Ram ps -Detectable War ni ng Surfaces, com ple te in place EA 20 s 600.00 6" Reinforced Concrete Pave ment w/Curb, complete in pl ace SY 5,25 4 $ 31.00 Street Construction Asphalt Pavement Items Subtotal Page 1of4 Total %Complete Amount Amount Quantity Compl ete($) Remai ning ($) $ 20 ,000.00 100% $ 20,000 .00 $ - $ 10,000.00 100% $ 10,000 .00 $ - $ 6,5 00.00 70% $ 4,55 0 .00 $ 1,950.00 s 1,800 .00 0% s -$ 1,800.00 $ 1,200 .00 0% s -s 1,200.00 $ 7,500.00 75% $ 5,625 .00 $ 1,875 .00 $ 11,4 15.15 0% $ -s 11 ,41 5.15 s 2,45 1.28 0% $ -$ 2,451.28 s 60 ,866.43 Remaining Subtotal s 20,691.43 $ 25 ,000 .00 90% $ 22 ,500 .00 $ 2 ,500.00 $ 22 ,15 5.00 100% $ 22,155 .00 $ - $ 10,893.00 66% $ 7,189.38 $ 3,703 .62 $ 27,000 .00 75% $ 20 ,250 .00 $ 6 ,750 .00 $ 6,039 .00 95% $ 5,737 .05 $ 301.95 $ 38 ,54 2 .00 0% $ -$ 38,542.00 $ 33 ,036.00 0% $ -$ 33,036.00 s 15,492 .00 0% s -$ 15,492 .00 s 53 ,6 74.50 25 % s 13,41 8.63 $ 40,255 .88 $ 10 8,660.00 0% s -$ 108 ,660.00 $ 12 ,00 0.00 0% $ -$ 12,000.00 $ 162,874 .00 73% $ 118,898 .02 s 43 ,9 75.98 $ 515,365.50 Remaining Subtotal s 305,217.43 20 21 21A 22 23 24 25 26 27 2 8 29 30 31 32 33 34 35 36 37 l 8" RCP Pi pe, com plete in pl ace (Structural) l 8" HDPE Pipe, complete in pl ace (Structural) 15 " x 24 " Box C ulvert, com plete in place (Structural) Cur b Inlet -5' wide , complete in pl ace C urb Inlet -l O' wide, co mpl ete in place 3'x3' Junction Box, co m plete in pl ace Concrete Fl ume Inlet, com plete in place Rock RipRap, complete in pl ace TV Testing and Inspectio n, compl ete in place Trench Drain, complete in place Concrete Channel , comp lete in place Po nd Excavatin g and Grading, compl ete in pl ace 12 at Rock Prairie Subdivision Ph as e 1 Engineer's Estimate to Complete Construction Storm Sewer C on struction Items LF 226 $ 45 .00 LF 218 $ 40 .00 LF 60 s 40 .00 EA 2 $ 2,800.00 EA 2 s 3,500.00 EA l $ 2,750 .00 EA 2 $ 3,500 .00 Ton 40 $ 60.00 LF 444 $ 3.00 EA 7 $ 250 .00 SF 1,927 $ 6.00 Storm Sewer Construction Items Subtotal Detention Pond 1 Construction Items LS I $ 6,500 .00 15 " HDPE Pipe , complete in pl ace (Non-Stru ctural), co mpl ete in place LF 60 $ 30 .00 15 " -6H: I V Concrete SET, complete in pl ace EA 2 $ 1,5 00.00 4' Wide Concrete Flume, complete in place SF 1,05 0 $ 6.00 Detention Pond 1 Construction Items Subtotal Detention Pond 2 Construction Items Pond Excavating and Grading, com plete in pl ace LS 1 $ 10 ,000.00 Conn ect to Existing In let -including remove & repl ace existing fen ce and re pairs LS l $ 2,000 .00 to the ya rd com ol ete in olace l 8" HDPE Pipe, co mpl ete in pl ace (Non-Structural) LF 75 $ 35.00 Concrete Pond Outlet Structure, complete in pl ac e EA l $ 2,500 .00 Detention Pond 2 Construction Items Subtotal Page 2 of 4 $ 10,170.00 100% $ 10 ,170.00 $ - s 8,720 .00 100% $ 8,720 .00 $ - $ 2,400 .00 40% $ 960 .00 $ 1,440 .00 $ 5,600.00 100% $ 5,600 .00 $ - s 7,000 .00 100% $ 7,000 .00 $ - s 2,750.00 100% $ 2,750 .00 $ - $ 7,000.00 0% $ -s 7,000.00 s 2,400.00 0% $ -$ 2,400.00 s 1,332 .00 0% $ -$ 1,332 .00 s 1,750 .00 0% $ -$ 1,750 .00 $ 11 ,562 .00 0% $ -$ 11 ,562 .00 s 60,684.00 Re maining S ubtota l s 25,484.00 $6 ,500 100% $ 6,500 .00 $ - $1,800 100% $ 1,800 .00 $ - $3 ,000 100 % $ 3,000.00 $ - $6,300 0% $ -$ 6,3 00 .00 $17,600 Remaining Subtotal s 6,300.00 $10,000 100% $ 10 ,000 .00 $ - $2,000 100% $ 2,000 .00 $ - $2,625 100% $ 2,625 .00 $ - $2,500 0% $ -$ 2,500 .00 $17,125 Remaining Subtotal s 2,500.00 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 12 at Rock Prairie Subdivision Phase l Engineer's Estimate to Complete Construction Water Construction Items 8" C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 1 164 $ 30.00 8" C900 Water Pipe w/tracer wire -Non-Structural Backfill , complete in place LF 14 $ 28.00 6" C900 Water Pipe w/tracer wi re -Structural Backfi ll , co mpl ete in place LF 786 $ 25 .00 Fire Hydrant Assembly ( w/va lve, vert. extension), complete in place EA 2 $ 3,500.00 8"x 8" M .J . Cross, complete in place EA I $ 450.00 8"x 8" M.J. Tee, complete in place EA I $ 400.00 8"x 6 " M.J. Tee, complete in place EA 2 $ 400.00 6"x 6 " M.J. Tee, complete in place EA I $ 350.00 8"x 6" M.J . Reducer, co mplete in place EA 2 $ 550.00 8" M.J . Gate Valve, complete in place EA 5 $ 1,250.00 6" M .J. Gate Valve, complete in place EA 2 $ 1,000.00 8" x 45° M.J . Bend, complete in place EA 2 $ 350.00 6" x 45 ° M .J. Bend, complete in place EA 5 $ 350.00 6" x 22.5° M .J . Bend, complete in place EA 2 $ 350.00 I " Water Service,< 15 ft (avg length = 3 ft) (6 " Line) EA 4 $ 800.00 I " Water Service,> 15 ft (avg length = 47 ft) (6" Line) EA 2 $ 1,000.00 1.5 " Water Service,< 15 ft (avg length = 3 ft) (6" Line) EA 4 $ 850.00 1.5 " Water Service,> 15 ft (avg length = 47 ft)(6" Line) EA 7 $ 1,250.00 I " Water Service, < 15 ft (avg length = 3 ft)(8" Line) EA 2 $ 800.00 1.5" Water Service,< 15 ft (avg length = 3 ft) (8" Line) EA 4 $ 850 .00 1.5" Water Service,> 15 ft (avg length = 47 ft) (8" Line) EA 7 $ 1,250.00 Meter Boxes, complete in place EA 52 s 100.00 2 " Blowoff Assembly, complete in place EA 3 s 1,000.00 Connect to Existing 8" Water Line EA I s 1,500.00 Waterline Testing LS I s 1,000.00 Water Construction Items Subtotal Page 3 of 4 $ 34,920.00 100% $ 34,920 .00 $ - $ 392.00 100% $ 392.00 $ - $ 19,650.00 100% $ 19 ,650.00 $ - $ 7,000.00 100% $ 7,000.00 $ - $ 450.00 100% $ 450.00 $ - $ 400.00 100% $ 400.00 $ - $ 800.00 100% $ 800.00 $ - $ 350.00 100% $ 350.00 $ - $ 1,100 .00 100% $ 1,100.00 $ - $ 6,250.00 100% $ 6,250.00 $ - $ 2,000.00 100% $ 2,000.00 $ - $ 700.00 100% $ 700.00 $ - s 1,750.00 100% $ 1,750.00 $ - $ 700.00 100% $ 700.00 $ - $ 3,200.00 100% $ 3,200.00 $ - $ 2,000.00 100% $ 2,000.00 $ - $ 3,400.00 100% $ 3,400.00 $ - s 8,750.00 100% $ 8,750.00 $ - $ 1,600.00 100% s 1,600.00 $ - $ 3,400.00 100% $ 3,400 .00 $ - s 8,750.00 100% $ 8,750.00 $ - $5 ,200 100% $ 5,200.00 $ - s 3,000.00 100% $ 3,000.00 s - s 1,500.00 100% s 1,500.00 s - $ 1,000.00 50% $ 500.00 s 500.00 $ 118,262. 00 Remaining Subtotal $ 500.00 63 64 65 66 67 68 69 70 71 12 at Rock Prairie Subdivi sion Ph as e 1 Engineer's Esti mate to Comp let~ Con st ruction Sanitary Sewer Construction Items 6" PVC Sewer Line -D3034 -Structural Backfill , co mpl ete in place LF 1,11 2 $ 22 .00 6" PVC Sewer Line -ASTM D-2241 -Structural Backfill , co mplete in place LF 40 $ 24 .00 4" Sewer Service-Single (avg . length = 2 ft), co mpl ete in place EA 5 $ 450 .00 4" Sewer Service-Double (avg length = 2 ft), comp lete in place EA 13 $ 600 .00 4" Sewer Service-Double (avg length = 5 1 ft), co mpl ete in place EA 10 $ 1,000 .00 Tie-In to Existing Manho le , co mpl ete in place EA 1 $ 1,000 .00 Concrete Drop Manhole -4' Dia. -complete in place EA 5 $ 3,500 .00 Concrete Manhole - 4' Dia. -complete in place EA 1 $ 3,250 .00 TV Testing and Inspection, compl ete in place LF 1,152 s 2.00 Sanitary Sewer Construction Items Subtotal General Items Subtota l s Street Construction Asphalt Pavement Items Subtotal s Storm Sewer Construction Items S ubtotal s Detention Pond 1 Construction Items Subtotal Detention Pond 2 Construction Items S ubtotal Water Construction Items Subtotal s Sanitary Sewer Construction Items S ubtotal s 50 % Additional for Grass TOTAL CONSTRUCTION s Page 4 of 4 $ 24 ,459 .60 100% $ 24 ,459 .60 $ - $ 960 .00 100% $ 960.00 $ - $ 2,250 .00 100% $ 2,250 .00 $ - $ 7,800 .00 100% $ 7,800 .00 $ - $ 10 ,000 .00 100% $ 10,000 .00 s - $ 1,000.00 100% $ 1,000 .00 $ - $ 17 ,500.00 100% $ 17 ,500.00 $ - $ 3,250 .00 100% $ 3,250 .00 $ - $ 2,303.60 50% $ 1,151.80 s 1,151.80 s 69,523 .20 Remaining Subtotal s 1,151.80 Remaining 60,866.43 s 20,691.43 515,365.50 s 305,217.43 60 ,684.00 s 25,484.00 $17,600 s 6,300.00 S17,12 s 2,500.00 118,262.00 s 500.00 69,523.20 s 1,151.80 s 5,707 .58 859,426.13 s 367,552.23 &chultz Engin eering, LLC December 15 , 2014 MattBombek Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: 12 at Rock Prairie Subdivision Phase 1 -14-00900181 Dear Mr. Bombek: Office : 979 .764.3900 Fax : 979 .764 .3910 Attached is the Engineer's Estimate for construction remaining for the 12 at Rock Prairie financial guarantee and the financial guarantee. If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. P.O . Box 11995 • College Station , Texas 77842 schultzengineeringllc.com •·'*·• : ~ PROSPERITY BANK ~' ... ...._.., FROM: DWS Development, Inc. ISSUER: Prosperity Bank 12995 FM 2154 Rd, College Station, TX 77845 IRREVOCABLE LETTER OF CREDIT DATE: December 15, 2014 TO BENEFICIARY : City of College Station Attention: Director of Development Services 110 I Texas Avenue College Station, Texas 77840 IRREVOCABLE LETTER OF CREDIT NO.: 1827 ISSUE DATE : 12 :00 Noon Central Standard Time, December 15 , 2014 EXPIRATION DATE : 12 :00 Noon Central Standard Time, December 15 , 2015, or upon the completion and final payment to all contractors, whichever occurs first. LOCATION OF PROJECT: Rock Prairie Subdivision -Phase I, College Station, TX AMOUNT: ACCOUNT OF: Three Hundred Sixty-Seven Thousand Five Hundred Fifty-Two and 23/100 DOLLARS ($367,552 .23) DWS Development. Inc ., (herein "DEVELOPER ") P.O. Box 4508 Bryan, TX 77805 GENERAL TERMS & CONDITIONS: The Issuing Bank set out above hereby issues its IRREVOCABL E LETTER OF CREDIT NO . 18 27 in favor of the CITY OF COLLEGE STATION, TEXAS, in accordance with CHAP TE RS, V.T.C.A . TEXAS BUS IN ESS ANO COMMER CE CODE as varied by and pursuant to th e CITY OF COLLE GE STA TI ON UNIFIED DEVELOPMENT ORDINANCE for the Account of DEVELOPER for an aggregate amount of up to Three Hundred Sixty-Seven Thousand Five Hundred Fifty-Two and 231100 DOLLARS ($367,552 .2 3). This amount is available by yo ur draft(s) payable at sight when accompanied by the following : I . Sworn Statement by a dul y authorized representative of the City of College Station, Texas, stating th at Developer(s) has/have defaulted and failed to complete the performance and construction of the improvements described below in accordance with th e UNIFIED DEVEL OPMENT ORDINANCE of the CI TY OF COLLEGE STAT ION, Texas, and that the proceeds from this Letter of Credit will either be utilized by the City of Co llege Station, Texas , to complete such co nstruction or will be ret urned by the C ity of College Station to the Issuing Bank : Paving, drainage and utility improvem ents to 12 at Rock Prairi e Subdivision -Phase I Prepare d by: sda viso n 12-12-2014 .. SPECIAL TERMS & CONDITIONS : I. A II banking fees /expenses /charges incurred are for the account of Developer. The City of College Station is not responsible for any charges in connection with a drawing under this Letter of Credit. This Letter of Credit is issued in conjunction with the development of Developer in the City of College Station, Texas , specifically for the following : To guarantee the payment and performance of the proposed construction improvements in I 2 at Rock Prairie Subdivision -Phase I, a proposed subdivision in the Cit y of College Station, Texas, for a period not to exceed one (I) year(s) from the date hereof. 2. Disbursements pursuant to this Letter of Credit will never exceed the above-stated amount, less any amount released by the City of College Station, Texas. The amount of credit under this Letter of Credit ma y be reduced upon approval and acceptance by the City of College Station of completed improvements , which reduction may onl y be made with the written authorization of the Director of Planning and Development Services of the City of College Station . 3. In accordance with SECTION 5. I 06 of the TEXAS BUS INESS AND COMMERC E CODE, this Letter of Credit may be modified, upon the execution and delivery to Issuer of a sworn statement giving con sent to modification by the Director of Planning and Development Services of the City of College Station . 4 . The Iss uer of thi s Letter of Credit has caused this Letter to be signed by the under s igned officer who ha s att ached proof of his authorization to sign, together with attestation by Issuer's authorized atte sting officer and sealed with the seal of Issuer . ISSUER : Prosperity Bank sv-1%/-42~ STAT E OF TEXAS * * COUNTY OF BRAZOS * This instrument was acknowledged before me on December 15 , 2014, by Blake Steven Os ina , Banking Center President, the authorized officer of Prosperity Bank, Issuer, a Texas Banking Corporation, on behalf of said Ban king Corporation and in the capacity stated . e MARY L. HEGAR Notary Public. State of Texas My Comm1ss1on Expires FEBRUARY 20, 2016 Prepared by: sdavi so n 12-12-20 14 '('\"\_ ~ 7~ Notary Qc -State of Texas •·*·• : ~ PROSPERITY BANKqt, .. ......,..., STANDBY LEITER OF CREDIT AMENDMENT Date: January 26, 2015 Letter of Credit Number: 1827 Amendment No: Beneficiary : Applicant: 1 City of College Station 1101 Texas Avenue College Station, TX 77840 DWS Development, Inc . P.O. Box 4508 Bryan, TX 77840 Irrevocable Letter of Credit No . 1827 Issued on December 15, 2014 for the account of DWS Development, Inc, in favor of City of College Station, in the amount of USO $367,552 .23 is hereby amended as follows: AMOUNT: From: $367,552.23 To: 257,015.71 All other terms and conditions remain unchanged. Please acknowledge acceptance and return the copy of this amendment in the envelope provided. ProsperityBan~A • By:~~~ Blake Steven Osina, Banking Center President Acknowledgement: City of College Station hereby acknowledges and accepts this amendment and all changes as described herein . ~ By : _J:~-------~--- kevi'n 2Gvre>-PDs (printed name and title) Prepared by : ydiaz 1/26/2015 Item I 2 3 4 4A 5 6 7 7 8 9 10 II 12 14 15 17 18 19 75 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Construction Description Unit Estimated Unit Price Quantity General Items Mobilization, Overhead and Construction Staking LS I s 20,000 .00 Right of Way and Site Preparation LS I $ 10,000.00 Topsoil Removal and Replacement, complete in place LS 1 s 6,500 .00 Install End of Street Signs, complete in place EA 12 $ 150 .00 Install Stop Signs, complete in place EA 8 s 150 .00 Erosion & Sed iment Control -SWPPP hnplementation & Maintenance, Silt LS I s 7,500.00 Fence Construction Exit Rock Filter Dam etc . comnlete in nlace Hydroseed and Hydromulch, ROW Easements, Channels, Detention Pond s, SY 22,830 $ 0.50 complete in place Seeding of Disturbed Are as, complete in place SY 24,513 $ 0.10 General Items Subtotal Street Construction Items Asphalt Pavement Excavation & Grading including Channel Grading, complete in place LS I s 25,000.00 Mixing & inc0<p0ration of lime , 6" deep, complete in place SY 7,385 $ 3.00 Mixing & incorporation of lime , 6" deep, complete in place -Towers Parkway SY 3,631 s 3.00 Hydrated Lime, complete in place (27 lb/sy foot 6" deep & 36 lb/sy for 8" deep) Ton 150 s 180 .00 Crushed Limestone Base Material -6" thick , complete in place SY 549 $ 11.00 Crushed Limestone Base Material -8" thick, complete in place SY 2,753 $ 14.00 HMAC -Type D Pavement 2" thick -includes prime coat , complete in place -SY Towers Parkwav 2,753 $ 12 .00 Concrete Curb & Gutter (Standard ), complete in place LF 1,291 $ 12 .00 Reinforced Concrete Pavement -Aprons -6" Thick w/ Monolithic Standard Curb , SF 9,759 $ 5.50 comdete in nlace Concrete Sidewalk & Ramps-4" thick, complete in place SF 27,165 $ 4 .00 ADA Ramps -Detectable Warning Surfaces, complete in place EA 20 s 600.00 6" Reinforc ed Concre te Pavement w/Curb, complete in place SY 5,254 s 31.00 Street Construction Asphalt Pavement Items Subtotal Page 1of4 Total %Com plete Amount Amount Quantity Complete (S) Remaining ($) $ 20,000 .00 100% $ 20,000 .00 s - $ 10,000.00 100% $10,000.00 $ - s 6,500 .00 85% s 5,525 .00 s 975 .00 s 1,8 00 .00 0% s -$ 1,800 .00 s 1,2 00 .00 0% $ $ 1,200 .00 $ 7,500.00 85% $ 6,375 .00 $ 1,125 .00 $ 11,415.15 0% s -$ 11 ,415 .15 $ 2,451.28 0% s -$ 2,451.28 s 60,866.43 Remainini: Subtotal $ 18,966.43 $ 25,000 .00 90% $22,500.00 s 2,500 .00 s 22,155 .00 100% $22,155 .00 $ s 10 ,893 .00 100% s 10,893 .00 $ - s 27,000.00 100% $ 27,000 .00 $ $ 6,039 .00 100% s 6,039 .00 $ - $ 38,542 .00 90% $ 34,687 .80 $ 3,854 .20 s 33,036 .00 0% s -s 33,036 .00 s 15 ,492 .00 100% s 15,492 .00 $ - $ 53 ,674 .50 100% $ 53,674.50 $ - $ 108,660 .00 10 % $ 10,866 .00 $ 97 ,794 .00 s 12,000.00 0% s -$ 12 ,000 .00 $ 16 2,874 .00 100% $ 162,874.00 $ s 515,365.50 Remaining Subtotal $ 149,184.20 20 21 21A 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 18" RCP Pipe, complete in place (Structural) 18" HDPE Pipe, complete in place (Structural) 15" x 24 " Box Culvert, complete in place (Structural) Curb Inlet -5' wide, complete in place Curb Inlet -IO' wide, complete in place 3'x3' Junction Box, complete in place Concrete Flume Inlet, complete in place Rock RipRap, complete in place TV Testing and Inspection, complete in place Trench Drain, complete in place Concrete Channel , complete in place Pond Excavating and Grading, complete in place 12 at Rock Prairie Subdivision Phase 1 Engineer's Estimate to Complete Construc tion Storm Sewer Construction Items LF 226 $ 45 .00 LF 218 $ 40 .00 LF 60 $ 40 .00 EA 2 $ 2,800 .00 EA 2 $ 3,500.00 EA 1 $ 2,750.00 EA 2 $ 3,500.00 Ton 40 $ 60 .00 LF 444 $ 3 .00 EA 7 $ 250 .00 SF 1,927 $ 6 .00 Storm Sewer Construction Items Subtotal Detention Pond 1 Construction Items LS 1 $ 6,500 .00 15" HDPE Pipe, complete in place (Non-Structural), complete in place LF 60 $ 30 .00 15 " -6H: IV Concrete SET, complete in place EA 2 $ 1,500 .00 4' Wide Concrete Flume, complete in place SF 1,050 $ 6.00 Detention Pond 1 Construction Items Subtotal Detention Pond 2 Construction Items Pond Excavating and Grading, complete in place LS I $ 10 ,000 .00 Connect to Existing Inlet -including remove & replace existing fence and repairs LS I $ 2,000 .00 to the vard comolete in olace 18" HDPE Pipe, complete in place (Non-Structural) LF 75 $ 35 .00 Concrete Pond Outlet Structure, complete in place EA I s 2,500.00 Detention Pond 2 Construction Items Subtotal Page 2 of 4 $ 10,170 .00 100% $ 10 ,170 .00 $ - $ 8,720 .00 100% $ 8,72 0 .00 $ $ 2,400 .00 100% $ 2,400 .00 $ - $ 5,600.00 100% $ 5,600.00 $ - $ 7,000 .00 100% $ 7,000.00 $ - $ 2,750.00 100% $ 2,750 .00 $ - $ 7,000.00 25% $ 1,750.00 $ 5,250.00 $ 2,400 .00 0% $ $ 2,4 00 .00 $ 1,332 .00 100% $ 1,332.00 $ - $ 1,750 .00 0% $ -$ 1,75 0 .00 $ 11 ,5 62 .00 85% $ 9,827.70 $ 1,734 .30 s 60,684.00 Remaining Subtotal s 11,134.30 $6,500 100% $ 6 ,500 .00 $ - $1,800 100% $ 1,800 .00 $ - $3,000 100% $ 3,000 .00 $ - $6,300 100% $ 6,300 .00 $ $17,600 Remaining Subtotal s - $10,000 100% $ 10,000 .00 . s $2,000 100% $ 2,000 .00 s - $2,625 100% $ 2,625 .00 $ $2,500 0% $ -$ 2,500 .0 0 $17,125 Remaining Subtotal s 2,500.00 ')i. Please confirm that Detention Pond 1 's outflow to Rock Prairie Road drainage swale has adequate armoring. Additional Concrete and rock riprap was added at this location to provide additional armoring. 14 Please provide the flow depth and velocity at mid-block cross drainage valley gutter, and cross lot drainage swale. A drainage addendum is included in this submittal with an Appendix E showing depth of flow and velocity at this location. An Appendix F is included evaluating the cross lot drainage swale. 1 . Please Justify and explain how the flow in the Private Drainage on all Blocks is being discharge to the street. Drainage will flow over the sidewalk as sheet flow and into the curb and gutter. Appendix F evaluates depth of flow over sidewalk. (1' 6; Please fix, the drainage along Block 1 adjacent to Buena Vida Subdivision. It seems to flow into the rear lot of Buena Vida Subdivision. A drainage swale is proposed in this location taking drainage over the sidewalk into the Kate Lane curb and gutter. Spot elevations are shown on the grading plan to indicate intent. yf. Please confirm that existing structures on Diamond Storage property is not adjacent to the proposed drainage swale . The berm from the pond is proposed to extend between the drainage swale and the Diamond Storage property. J'. Please verify that the elevation of Diamond Storage property adjacent to Detention Pond 1 & common area is at least 327 feet. If not please provide a 327 feet high Berm along Detention Pond 1 & common area adjacent to Diamond Storage property. The detention pond berm is proposed in this area. 19. The proposed street intersection does not meet the "dried up" guideline, please provide additional justification . The intersections in this project are either "local-local" or "collector-local" in which case valley gutters are acceptable. On Towers Parkway the valley gutters are proposed parallel to Towers Parkway. Appendix B1 and Exhibit C have been updated to evaluate the depth of flow at the curve return of the Kate Lane and Summerway Drive intersection. 20. Please define the flow path for emergency spillway of Detention Pond 2. In the future development of Phase 2, what's the orientation and flow path for the emergency Spillway of Detention Pond 2? The emergency spillway will only be used in the clogged condition of the outflow structure. It is not intended for use unless under extreme conditions. In the case that the outflow structure is clogged, the runoff will continue in a northerly direction towards The Barracks Subdivision similar to existing conditions. In the future the detention pond will be re-designed and likely connect to the infrastructure into a future section of the Barracks Subdivision and the future overflow spillway will likely be directed to a street right of way. JA· Please redesign concrete flume 1 & 2 in such a way that the flow through the -h----· :--· ....... -..-:"-=--· "'-'·' '"'--:--"'-'·' ,., __ ... a.... _....,, ·-"-L,..,. __ .,.. __ ..__ .... .._h_"'"" -.... :.i.:--1 ,., ___ ... L-vl IQl II lvl 1;:, ;:,uu-:-v11uva1 11uvv. uc;:,1~11 11uvv Uvt-Jlll 111u;:,l uc ~1calv1 L11a11 vllllva utµu1. Also please label each concrete flume uniquely on the construction plan. The slope of concrete flume is now 0.75%. The cross-section of concrete 1 flume 2 and the slope have changed so that the flow depth is greater than , \ _ the critical depth. A revised appendix 83 is included in this submittal. ~Please base culvert design on TxDOT minimum details, or provide a structural analysis with justification of the proposed box culvert. The 24" x 15" box culvert design exceeds the minimum TXDOT design requirements and details for Single Box Culverts, Cast in Place, O' fill, Detail SCC-3 & 4. A comparison to a 3' x 2' box for the wall thickness and rebar spacing is as follows: Concrete Design TxDOT Detail Top Slab Thickness 7"+ 7" Wall Thickness 8" 7" Bottom Thickness 8" 7" Reinforcing Steel Top Slab Thickness To Material Bottom Material 7" Transverse Material 18" Wall Thickness To Material 10" Bottom Material 18" Transverse Material 18" Bottom Thickness Top Material #4 7" Bottom Material #4 10" Transverse Material #4 18" This design for a direct travel box culvert has previously been constructed with a greater span than the 24" span proposed for this box culvert and has performed well. The box culvert design will support the anticipated loads for the street. 'f1. Please verify and place note on the plan that water services will be left between 2 feet and maximum of 3 feet deep at the point of terminus by developer's contractor. Also note that a ball valve is required at the point of terminus. Notes have been added to all of the water construction sheets. '(4· Please provide adequate Public Utility easement on Block 1 Lots 9 & 10 in such a · way that t he centerline of the sewe r lines are no closer than 5.5 feet to the edge of easement , and that the wyes do not pass the easement. A 15' PUE is shown on the plat and the plans. j,. Please Note that the existing sewer line on Kate Lane is 6". Please fix the construction plans & Sewer report reflecting this. Please provide documentation that the existing 6" line through Buena Vida Subdivision has sufficient Capacity to serve the increase flow from Equinox Subdivision. The plans have been corrected to show the sewer line at Kate Lane being 6". A revised sewer report is included in this submittal. The 6" line through Buena Vida Subdivision is analyzed in the revised report. 'f8. Please fix the Stationing for Sewer Line S-3. The stationing on profile are not matching the plan. The stationing has been fixed for this line. Jlf ·Due to the depth of Sewer Line S-3 & S-2, we would require an additional 5 feet easement totaling to 15 feet Public Utility Easement on all the lots adjacent to these sewer lines . A 15' PUE is added to all lots adjacent to sewer lines J'-Sewer Line 3 from Stationing 3+32 to Stationing 4+50 does not meet B/CS minimum slope, please provide justification. Minimum slope for an 8" pipe is 0.55%. Since the outflow pipe is a 6" pipe, the sewer system in this project will all be 6" pipe ,)9. P rovide a typ ical layout detail of water meter, cleanout, and transformer. To ensure that adequate fits w ithin proposed easement when you include other private utilities. Please confirm with BTU . \.'t'f't' Due to the wider street an additional 5' was added to the PUE where necessary. A detail was added to sheet 2 showing the proposed layout. This detail was sent to Walter Williams BTU and an email with his approval is attached to this submittal. The detail is in accordance with BTU's Guidelines. ~· Please provide Street Sign table. If you have not received block ranges , contact Robin rkra use@cstx.gov. A street sign table is included in the plans. /1. Should there not be a streetlight on Towers Parkway and Rock Prairie Road? A street light has been added at this location. 'f2.· Please remove ADA crossing ramps for Towers Parkway next to Sophies Lane. These ADA ramps have been removed from the plans . .,,: On block 3 , the finish floor elevation for the lots seems to be the same elevation as the top of Katie Lane 's pavement. We recommend to raise the finish floor elevation by at least 6". The finished floor of all the lots on this block has been raised 6". STAFF REVIEW COMMENTS NO. 2 Project: Equinox Subdivision Ph 1 (Fp) (14-00900181) ENGINEERING COMMENTS NO. 2 1. Sorry for the confusion on the first set of comments. Note 4 on construction sheet 3/16 should say: PAVEMENT STRUCTURE FOR TOWERS PARKWAY SHALL BE AS FOLLOWS: 6" LIME STABILIZED SUBGRADE OR CEMENT STABILIZED SUBRADE AS REQUIRED BY SOIL P.I. 5" HMAC BASE OR 8" CRUSHED LIMESTONE BASE MATERIAL 2 " HOT MIX ASPHAL TIC CONRETE Please fix and update cost estimate reflecting this. The note has been corrected and the line item for the cost estimate has been corrected on an updated engineer's estimate. 2. Please fix culvert details on construction sheet 10/16. The units shown on the cross section detail are in feet. The details have been corrected. 3. Confirm that all the flow from Sueda Vida & Williamsgate Phase 1 subdivision have been taken into account in the Sewer report. According to the City's GIS there are 95 lots in Sueda Vida and Williamsgate Phase 1. Manholes EX1 through EX6 have 95 lots taken into account as shown in the Sewer Report. 4. Define the cross drainage swale between the lots and lead the concentrated flow under the sidewalk. Trench drains have been added where the cross drainage swales disperse water into the streets. A callout has been added to the appropriate street sheets and the Grading Plan. Also, A trench drain detail has been added to sheet 5116. 7 Trench Drains have been added to the revised Engineer's Estimate 5. Please grade outfall of emergency spillway of the Detention Pond 2 away from existing homes. The emergency spillway has been moved so that the outfall is directed away from the existing homes. 6. Appendix 83 for Addendum to Drainage Report is showing the concrete flume slope as 75%. The slope typo seem to have no effect to the ith-year storm calculations. Is this cell not linked to the flow calculation? Please double check and fix. The typo has been fixed. It did not affect the calculation because the typo is only in the summary. The Channel Report shows the full calculations. 7. Double check engineering estimate for street construction items. Subtotal do not match on page 1 and 4. The Engineer's Estimate has been updated. Q;g;chultz Engineering, LLC July 17, 2014 Alan Gibbs , P .E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards -Equinox Subdivision -Phase 1 Dear Mr. Gibbs: Office: 979.764.3900 Fax : 979.764.3910 The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above-referenced project, to the best of my knowledge , do not deviate from the B/CS Design Guideline Manual except that due to the flat terrain for the portion of the site adjacent to Rock Prairie Road, there is not enough elevation change to have curb inlets at the low point in Sophies Lane. A valley gutter for mid-block drainage is proposed in this location instead of curb inlets with storm sewer pipes. The valley gutter discharges into a concrete channel, which conveys the runoff to Detention Pond 1. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B/CS Standard Details. Sincerely, F-12327 SCHULTZ ENGINEERING, LLC. P.O . Box 11995 • College Station , Texas 77842 schultzeng in eeringllc.com Cm OF COll.EGE STATION H-efT-AON ~· FOR OFFICE USE ONLY CASE NO.: 1 L..f . I fl \ DATESUBMITTEO :O\-Z.lO · IS. TIME: 3: ()0 STAFF: ..,,.E\--'-"''j<------- PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to dearfy define the purpose of your submittal . D New Project Submittal 0 Incomplete Project Submittal -documents needed to complete an application . Case No.: 1$J. Existing Project Submittal. case No.: \ L-\ · l 0 l I Project Name \-i.. @ R._blK pr ~ i r\ e Contact Name Phone Number ~-~~---~~~~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): O Comprehensive Plan Amendment 0 Rezoning Application D Concfrtional Use Pennit 0 Prefiminary Plan O Final Plat O Development Plat O Site Plan 0 Special District Site Plan 0 Special Oistriet BUilding I Sign O Landscape Plan 0 Non-Residential Architectural Standards 0 Irrigation Plan 0 Variance Request O Development Permit D Development Exaction Appeal 0 FEMA CLOMAICLOMRILOMNLOMR 0 Grading Plan 0 Other -Please specify below INFRASTRUCTURE ANP ENGINEERING OQCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: O Comprehensive Plan Amendment 0 TxDOT Driveway Permit 0 TxDOT Utility Pennit D Drainage Letter or Report O Fire Flow Analysis Special Instructions: 10/10 O waterline Construction Documents D Sewerline Construction Documents 0 Street Construction Documents 0 Easement Application F{i. Other -Please specify ~- [ -~~--::_-_, .. ·_ ·~·. _ . ..r-· -_ CITY OF C OJ...LEGE STATION Home o/Texas A&M Univers ity" FOR OFFICE CASE NO .: DATE SUBMITIED: ~~~~-+-- TIME: ~/ti) STAFF: -+---+""'---------- PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: Existing Project Submittal. Case No .: 14-00900181 Project Name 12 at Rock Prairie Contact Name JOE SCHULTZ P.E. --------- Phone Number 979-764-3900 -------------- We are transmitting the following for Planning & Development Services to review and comment (check all that apply): D Comprehensive Plan Amendment D Non-Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Permit D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Development Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D Site Plan D Grading Plan D Special District Site Plan ~ Other -Please specify below D Special District Building I Sign Engineer's Estimate to Complete D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Print Form ~hultz Engineering, LLC December 5, 2014 Kevin Ferrer Graduate Civil Engineer City of College Station 1101 Texas A venue College Station, TX 77840 Re: Equinox Subdivision Phase 1-14-00900181 Dear Mr. F errer: Office: 979 .764 .3900 Fax : 979 .764.3910 The Construction Contractor is having difficulty with compaction of the lime stabilized subgrade on a small section of Towers Parkway for the abo v e referenced project. The Contractor is requesting to use fly ash to stabilize the subgrade so that it will h ave adequate strength and stability to support the curb and gutter and the pavement section. I recommend this method of stabilization be allowed for this project. If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. F-1 2327 SCHULTZ ENG INEERING, LLC. P.O . Box 11995 • College Station , Texas 77842 schultzeng ineeringll c .com CITY OF C OLLEGE STATION Home o/Texas A&M University" FOR OFFICE USE ONLY CASE NO.: \~L~\ -_\~<(}~I -,--__ DATE susM1nED: 12\os/1 LJ TIME : _,\r:-·-'-0_0 _____ _ STAFF : _f\~:r~------ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options be low to clearly define the purpose of your subm ittal. D New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: Existing Project Subm ittal. Case No.: 14-00900181 Project Name 12 at Rock Prairie Contact Name JOE SCHULTZ P.E. ~-------~ Phone Number -'-9_79_-_7_64_-_3_90_0 ________ _ We are transmitting the following for Plann ing & Development Services to review and comment (check all that app ly ): D Comprehensive Plan Amendment D Non -Residential Architectural Standards D Rezoning Application D Irrigation Plan D Conditional Use Perm it D Variance Request D Preliminary Plan D Development Permit D Final Plat D Development Exaction Appeal D Develop ment Plat D FEMA CLOMA/CLOMR/LOMA/LOMR D S ite Plan D Grading Plan D Special D istrict Site Plan ~ Other -Please specify below D Special D istrict Building I Sign Letter to Kevin Ferrer D Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following a re included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Dri veway Perm it D Sewerline Construction Documents D TxDOT Utility Perm it D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Specia l Instructi ons: 10/10 I -· Print Form ENGINEERING COMMENTS NO. 1 1. Please show the proposed PUE line and waterline that is going through the lot, and ensure that the portable building is not in the PUE and is at least 20 feet away from the waterline. FIRE The proposed PUE line and waterline is currently being redesigned away from this area, therefore no easement will exist in this area. 1 . I couldn't tell ifthe Portable was covered by a Fire Hydrant. Existing fire hydrants have been located. Please see attached revised sheet Al.11 . SANITATION 1. Sanitation is ok with this project. No response required at this time. If further information is required to address the above listed comments please do not hesitate to contact the office. Thank you, ~:7. Ben Lamons Enc: Al.11 Member Ameri c an I n s ti tute of Architec t s . 7915 F.M . 1 960 West Suite 214 . Hous t on Texas 77070 Ph 281.671.2300 ·Fax 281 .671.2313. vlkarc h 1tects.com Ricky Flores From: Sent: To: Subject: Hey Ricky, Walter Williams <williams@btutilit ies.com> Tuesday , August 26, 2014 3:43 PM Ricky Flores RE : Equinox Phase 1 I'm sorry for the delayed response. I am just getting back to the office . David and I reviewed the layout and it looks fine. Than k you , W alte r W i lli am s BTU Line Design 979 -821 -5766 office 979 -200 -044 1 ce ll 979 -82 1-57 96 fax Th is e-mail and /or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information . Any unauthorized review, use , disclosure or distribution is prohibited . If you are not the intended recipient , please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments . From: Ricky Flores [mailto:ricky@schultzengineeringllc.com] Sent: Tuesday, August 26, 2014 2:59 PM To: Walter Williams Subject: Equinox Phase 1 Walter, Can I get your blessing on this detail I made for our construction plans? I followed the details from BTU's guideline I just proposed a set distance off of the ROW. I couldn't find a set distance in the guidelines . Thanks Ricky Flores This e-mail and/or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information. Any unauthorized rev iew, use , disclosure or distribution is prohibited . If you are not the intended recipient, please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments . 1 DEVELOPMENT PERMIT PERMIT NO. 14-181 CITY OF COLLECE 5TM ION iJ.f.U1 1fi~ cf [)t'J,'C'i;;flllNJ/ 5".-"UC FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Equinox Subdivision Phase 1 DATE OF ISSUE: 9/12/2014 OWNER: Charles & Mary Turner 3270 Rock Prairie Road West College Station, TX 77845 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: 3270 Rock Prairie Road West DRAINAGE BASIN: Bee Creek Trib. "B" VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked, all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4 . Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) w ill be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor's responsibility to implement measures that will meet City, State , and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8 . All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscap ing and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Conditions : I, ________________ , the Contractor, hereby agree to comply with all conditions herein . Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact Ts'fae { Ko;fe 777-hf7/ , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections . City ~resentative o/-U -).O/lf Date w ~ a_ ("') N TEXAS COM::MISSION ON ENVIRONMENTAL QUALIIT Texas Pollutant Discharge Elimination System Stormwater Construction General Permit The Notice of1ntent (NOI) for the facility listed below WqS received on September 12, 2014 . The intent to clischarge storrnwater associated with oonstructipn activity under the terms and conditions imposed by the Texas Pollutant Discharge Elimination System (TPDFS) stormwater construction general permit TXR.150000 is acknowledged. Your facility's TPDES construction storrnwater general pennit number is: TX1l150012826 C<>verage Effective: September 12, 2014 TCEQ 's stormwater construction general permit requires certain stonnwat er pollution prevention and control measures, possible monitoring and reporti ng, and periodic inspections. Among the conditions and requirements of this permit, you must have prepared and implemented a stormwater pollution prevention plan (SWP3) that is tailored to your construction site. As a facility authorized to discharge under the stonnwater construction general permit, all terms and conditions must be complied with to maintain coverage and avoid pos sib1 e penalties. Project/Site Information : RNi o6438427 EQUJNOX SUBDJVISION 3270 ROCK PRAIRIE RD W COLLEGE STATION, TX 77845 BRAWS County Operator: CN602575839 SCHIEFFER CORP 2 1 03 TABOR RD BRYAN , TX 77803 Thi s permit expires on March 05, 2018, unless otherwise amended . If you have any questions related to processing, you may contact the Stormwater Processing Center by email at swpermit@t ceq.tex.as.gov or by telephone at (512) 239-3700. For technical issues, you may cc>ntact the stormwa ter technical staff by email at swgp@tceq.texas.gov or by telephone at (512) 239-4671 . Also , you may obtain information on I he TCEQ web site a t http://WWW2 .tceq .texas .gov/wq_dpa/index .cfm. A copy of this document should be kept with your SWP3- Issued Date: September 12, 2014 FOR THE COMMISSJON TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Texas Pollutant Discharge Elimination System Stormwater Construction General Permit The Notice of Intent (NOI) for the facility listed below was received on September 12, 2014. The intent to discharge stormwater associated with construction activity under the terms and conditions imposed by the Texas Pollutant Discharge Elimination System (TPDES) stormwater construction general permit TXR150000 is acknowledged. Your facility's TPDES construction stormwater general permit number is: TXRt50012826 Coverage Effective: September 12 , 2014 TCEQ's stormwater construction general permit requires certain stormwater pollution prevention and control measures, possible monitoring and reporting , and periodic inspections. Among the conditions and requirements of this permit, you must have prepared and implemented a stormwater pollution prevention plan (SWP3) that is tailored to your construction site. As a facility authorized to discharge under the stormwater construction general permit, all terms and conditions must be complied with to maintain coverage and avoid possible penalties. Project/Site Information: RN106438427 EQUINOX SUBDIVISION 3270 ROCK PRAIRIE RD W COLLEGE STATION, TX 77845 BRAZOS County Operator: CN602575839 SCHIEFFER CORP 2103 TABOR RD BRYAN, TX 77803 This permit expires on March 05, 2018, unless otherwise amended. If you have any questions related to processing, you may contact the Stormwater Processing Center by email at swpcrmit@tceq.texas.gov or by telephone at (512) 239-3700. For technical issues, you may contact the stormwater technical staff by email at swgp@tceq .texas .gov or by telephone at (512) 239-4671. Also, you may obtain information on the TCEQ web site at http://www2.tceq.texas.gov/wq_dpa/index.cfm. A copy of this document should be kept with your SWP3. Issued Date: September 12, 2014 FOR THE COMMISSION DEVELOPMENT PERMIT PERMIT NO. 14-181 CITY OF C OLLl:.GE S·rnTION i¥.J11"i!tf & l~'l'1i;pmm1 ~ua FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Equinox Subdivision Phase 1 DATE OF ISSUE: 9/12/2014 OWNER: Charles & Mary Turner 3270 Rock Prairie Road West College Station, TX 77845 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: 3270 Rock Prairie Road West DRAINAGE BASIN: Bee Creek Trib . "B" VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re - issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4 . Other permits may have been required to fulfill local , state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities. Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) w ill be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor 's responsibility to implement measures that will meet City , State , and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscap ing and Tree Protection Section of the City 's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Conditions : l ,_(J~lt~a~v_f<_e_b __ ~ __ , -~--=--_o_/_~ ____ , the Contractor , hereby agree to comply with all conditions herein . . Contractor Signature Date ' q1 er -'17 6'-q 5" JI Phone number E-mail I hereby grant this permit for development. Contact I.s.Y4e[ Ko;fe 771-laf7/ , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections . City ~resentative '-12 -io11f Date . ' Sewer System Report for Equinox Subdivision Phase 1 College Station, Texas July 2014 Revised August 2014 Prepared By: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 f'-12327 SCHULTZ ENGINEERING. U.C. GENERAL INFORMATION Equinox Subdivision is a 21 .842-acre development in the area generally bounded by Rock Prairie Road to the south, Buena Vida and the Barracks II Subdivisions to the east and north. It is zoned GS and TH and is comprised of residential land uses as shown on Exhibit A. There are 140 residential lots planned for the site. The area surrounding the site is residential with an undeveloped tract to the southwest. Phase 2 of this subdivision will have a different sewer outfall. Sewer service to the area is provided by a 6" line running along Kate Lane. This line will be the outfall for phase 1 of this development. This report includes an analysis of the existing 6" sewer line through the Buena Vida and Williamsgate Subdivision to where it connects to the 12" line. This development is at the top of a hill and will not be serving any adjoining tracts as the tracts across Rock Prairie Road already have sewer service and the Mayo tract will get service from the Barracks II Development. Design Criteria: Primary Sewer Ouifall: Phase 1 -6" sewer line at existing terminus of Kate Lane Domes tic Demand: Avg. Pop D ensity: A verage Flow: Peaking Factor: Pipe: Applicable Exhibits : Conclusion: 2.67 people per lot 100 gpd/cap or 267 gpd per lot 4 PVC D3034 SDR 26 Exhibit A-Overall Sewer System Layout Exhibit B -Sanitary Sewer Analysis Spreadsheet The sewer system shown in Exhibit A has been laid out using the criteria in the Bryan/College Station Design Guidelines and TCEQ. It is analyzed assuming peak flow conditions when this portion of the subdivision is fully developed . The spreadsheet in Exhibit B shows all lines depicted in Exhibit A to be capable of carrying the flows that come to them under these conditions. This analysis will be used as the basis for all subsequent sewer line designs in the subdivision. The system will function as intended as long as the line sizes and slopes are equal to or greater than those shown herein . EXHIBIT A Overall Sewer System Layout Exhibit B Sanitary Sewer Analysis Spreadsheet Line From I To ;; . ., 5 "Cl ·5 a:: 267 Contribnting Flows g I. au I:~ .. ::> .. Q ~ ... 1200 .!! ::: .. E a u 1500 ;; c 0 -~ -~ .5 1050 GPO per,GPD per,GPD perlGPD per Lot Acre Acre Acre $ .. "Cl 0 z E~ 0 0 ~z ~ r;;: E ~"' ;c: ~ 0 0 I>: z .. a -~ e ] -;; ·i:: ... c :> u Exhibit B The Barracks II Sewer Analysis Spreadsheet Flow Calcnbtions I ! Average Daily Flows (ADF) Infiltration I Peaking (10"/o ADF) Factor Peak Flows ) Size Material I Milnnings n I Inside Diameter Pipe Calculations Manning Friction Slope Pei1k Flows ! I Min. I Actual Slope i Design for Existing I , Slope Peak or Designed I Flows Systems I I MR# I MH # I Lots I Acres I Acres I Acres I GPO ! GPO I GPO I CFS I CFS I I CFS I (in ) I I I Inches I 'Vo I 'Vo I ~. Pipe Slope Check I ! Peak Flow Depth Inches I 6 5 16 0 0 I 0 4,272 I -4,272 0.0066 0.0007 4.00 0.027 6 03034 0.013 5.793 0.617 I 0.80 ! 1.00 -i-OK 1 1.06 I 5 4 5 0 0 I 0 1,335 ! 4,272 5,607 0.0087 0.0009 4.00 0.036 6 03034 0.013 5.793 0.683 0.8-0 I 1.00 I OK i -us I 4 1 6 0 0 I 0 1,602 j 5,607 7,209 0.0112 0.0011 4.00 0.046 6 03034 0.013 5.793 0.729 0.80 I 1.00 I OK u: 3 1 5 0 0 I 0 1,335 I -1,335 0.0021 0.0002 4.00 0.008 6 03034 0.013 5.793 0.398 0.80 I 1.00 I OK 0.73 --2 I I 19 I 0 I 0 I 0 I 5,073 5,073 0.0078 0.0008 4.00 0.032 6 03034 I 0.013 I 5.793 I 0.666 I 0.80 + 1.00 I OK ; 1.13 I I EX 1 0 0 0 0 l 13,617 13,617 0.0211 0.0021 4.00 0.086 6 03034 0.013 5.793 0.854 ~· 1.00 O~D-EX I I EX 2 I 0 I 0 I 0 I 0 I -I 13,617 I 13,617 I 0.0211 I 0.0021 I 4.00 I 0.086 I 6 I 03034 I 0.013 I 5.793 I 0.854 I 0.80 I 1.00 I OK I 1.73 EX 2 EX 3 I 31 I 0 I 0 I 0 1--8,277 13,617 21,894 . 0.0339 0.0034 • 4.00 0.139 6 I 03034 0.013 5.793 1.530 I 0.80 ·-·H·90 OK I 1.89 EX 3 EX 4 25 0 0 0 6,675 21,894 28,569 ' 0.0442 0.0044 ; 4.00 0.181 6 03034 0.013 5.793 0.839 0.80 0.80 OK , 2.54 I EX 4 I EX 5 I 39 I 0 I 0 I 0 !0,413 28,569 38,982 i 0.0603 0.0060 4.00 0.247 6 03034 0.013 ' 5.793 0.798 0.80 I 0.80 ~~:.~-EX 5 EX 6 0 0 0 0 38,982 38,982 0.0603 0.0060 4.00 0.247 6 03034 0.013 I 5.793 1.145 0.80 1.10 OK i 2.76 Page I of I t • I • Sewer System Report for Equinox Subdivision Phase 1 College Station, Texas July 2014 Prepared By: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 F-12327 SCHULTZ ENGINEERING, LLC. ) j •• GENERAL INFORMATION Equinox Subdivision is a 21.842-acre development in the area generally bounded by Rock Prairie Road to the south, Buena Vida and the Barracks II Subdivisions to the east and north. It is zoned GS and TH and is comprised of residential land uses as shown on Exhibit A. There are 140 residential lots planned for the site. The area surrounding the site is residential with an undeveloped tract to the southwest. Phase 2 of this subdivision will have a different sewer outfall. Sewer service to the area is provided by an 8" line running along Kate Lane. This line will be the outfall for phase 1 of this development. This development is at the top of a hill and will not be serving any adjoining tracts as the tracts across Rock Prairie Road already have sewer service and the Mayo tract will get service from the Barracks II Development. Design Criteria: Prima ry S ewer Ouifall: Phase 1 -8" sewer line at existing terminus of Kate Lane Domestic D e mand: A vg. Pop D e ns ity: Average Flow : P eaking Fac tor: Pipe: Applicable Exhibits: Conclusion: 2 .67 people per lot 100 gpd/cap or 267 gpd per lot 4 PVC D3034 SDR 26 Exhibit A -Overall Sewer System Layout Exhibit B -Sanitary Sewer Analysis Spreadsheet The sewer system shown in Exhibit A has been laid out using the criteria in the Bryan/College Station Design Guidelines and TCEQ . It is analyzed assuming peak flow conditions when this portion of the subdivision is fully developed. The spreadsheet in Exhibit B shows all lines depicted in Exhibit A to be capable of carrying the flows that come to them under these conditions. This analysis will be used as the basis for all subsequent sewer line designs in the subdivision. The system will function as intended as long as the line sizes and slopes are equal to or greater than those shown herein. EXHIBIT A Overall Sewer System Layout I . ' Exhibit B Sanitary Sewer Analysis Spreadsheet ExhibitB ... The Barracks II Sewer Analysis Spreadsheet Line Contributing Flows Flow Calculations Pipe Calculations Cii ~ .. 2 QJ !. u " .§ e :.:: C> .. :; O.= < e-:.:: .., '-~ .., .: = ;;; ~-C> Actual Slope ·;; e z .. .E ~ ~ Manning Min. Design Pipe Peak .. VJ : Q C> e .., Average Daily Flows infiltration Peaking Peak inside for Existing or From To g:: u ..: .... Q. 'g Size Material Mannings n Friction Slope Slope Peak Slope Flow e~ = ;;;> C> (ADF) (10%ADF) Factor Flows Diameter Designed 267 1200 1500 1050 '-~ e z Peak Flows Flows Check Depth s ~ C> Systems GPDper GPO per GPDper GPDper C> ; -= Lot Acre Acre Acre ;.: u MH# MH# Lots Acres Acres Acres GPD GPD GPD CFS CFS CFS (in.) Inches % % % Inches 6 5 16 0 0 0 4,272 4,272 0.0066 0.0007 4.00 '0.027 6 D3034 0.013 5.793 0.570 0.80 0.90 OK 1.08 5 4 5 0 0 0 1,335 4,272 5,607 0.0087 0.0009 4.00 0.036 6 D3034 0.013 5.793 0.683 0.80 1.00 OK 1.18 4 I 6 0 0 0 1,602 5,607 7;109 0.0112 0.0011 4.00 0.046 6 D3034 0.013 5.793 0.729 0.80 1.00 OK 1.32 3 I 5 0 0 0 1,335 1,335 0.0021 0.0002 4.00 0.008 6 D3034 0.013 5.793 0.360 0.80 0.85 OK 0.75 2 I 20 0 0 0 5,340 5,340 0.0083 0.0008 4.00 0.034 6 D3034 0.013 5.793 0.679 0.80 1.00 OK 1.15 I EXIST 0 0 0 0 -13,884 13,884 0.0215 0.0021 4.00 0.088 8 D3034 0.013 7.754 0.445 0.55 0.60 OK 1.87 Pagel of l Water System Report for Equinox Subdivision, Phase 1 College Station, Texas July , 2014 Prepared Bv: Schultz Engineering, LLC TBPE Firm Registration No . 12327 2730 Longmire , Suite A College ·Station, Texas 77845 979.764.3900 F-12327 SCHULTZ ENGINEERING, LLC. General Information Location: The Equinox Subdivision, Phase 1 is a 9.269-acre residential subdivision being developed immediately southwest of the existing Buena Vida Subdivision. The Final Plat shows a total of 51 lots in this section. Primary Water Supply : Water service to the Equinox Subdivision is provided by an existing 8" line on Kate Lane. The waterlines provide a closed loop within Phase 1. Phase 2 of Equinox Subdivision will tie into the future development of Barracks Phase 202 . An 8" waterline is stubbed out to the end of Towers Parkway for service to the Mayo tract and to be looped back to Towers Parkway on the CSISD tract. Land Use: Single family residential Design Criteria/ Analysis Primary Water Supply: Existing 8" water line along Kate Lane. Existing System Pressure Tests : Flow Hydrant -See Exhibit B Flowrate: 1,244 gpm Static Pressure: 65 psi Residual Pressure: 55 psi Exhibits: Fire Flow: Exhibit A -Water Layout Exhibit B -Wellborn SUD Flow Test Report Exhibit C -Analysis Summary 1,000 gpm for Single Family Residential Domestic Use 1.5 gpm per lot for Single Family Residential Phase 1 -51Lots==76.5 gpm The proposed 8"& 6" water lines are in accordance with the BCS Water Design Guidelines. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, (1076 .5 gpm) which produced the lowest pressure in the system. Water System Summary of Phase 1 Summary of Calculations Domes tic Demand Pressure Min. Velocity Max. Pressure Min. Velocity Max. Pressure Min. 56.3 psi 0.49 fps 37 .5 psi 6 .87 fps 40 .0 psi 6.87 fps F ire Flow D emand FH 1 Fire Flow Demand FH 2 Conclusion Velocity Max. A s shown above the system exceeds the minimum required pressures of 35 psi for domestic flow and 20 psi for fire flow in both analyses . The maximum velocity of 6 .87 fps is less than the required maximum of 12 fps . The proposed 8" and 6" water lines meet or exceed all of the design criteria for the City of College Station. They will provide adequate water pressure, flowrate and velocity for both domestic and fire flow demands . " EXHIBIT A WATER LAYOUT EXHIBIT B WELLBORN SUD FLOW TEST REPORT EXHIBIT B SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT 5-23-2014 Date: Water System Owner: _Wellborn SUD __________________ _ Development Project: Equinox Subdivision Capps Drive and General Parkway Flow Test Location: ---------------------------- Nozzle size (in.): _2.5 __ 55 Pitot Reading (psi): __ _ 1244 Flowrate (gpm): ___ _ Discharge Coeff: (c) = 0.90 Flowrate Formula : Q=29 .84cd 2 p1 ' 2 c = discharge coeff. d = orifice size (in) P = pitot pressure (psi) Capps Drive and Cullen Trail Pressure Gauge Location : --------------------------- 65 Static Pressure (psi): 55 Residual Pressure (psi): 2802 Computed Discharge at 20 psi Residual Pressure: QR= _____ _ Note: The flow test and report were prepared in accordance with NFPA 291. Joe Schultz Report Prepared by: Ricky Flores Others Present : Clenden Adams -Wellborn SUD _ _ Britt Curless _______ _ EXHIBITC PIPE & JUNCTION ANALYSIS Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-res Length (ft) 950 119 172 325 197 218 15 27 264 536 204 19 Exhibit C WaterCAD Analysis Summary Pipe Analysis -Domestic Demand Size (i n) Material Hazen- Williams C 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 WaterCAD Analysis Summary Junction Analysis -Domestic Demand Junction Elevation Demand Pressure Junction (gpm) (psi) J-1 308 .98 0 64.8 J-2 320 .86 0 59.6 J-3 323.47 0 58 .5 J-4 326.89 18 57 J-5 328.57 14 56.3 J-6 325 .8 0 57.5 J-7 323.3 15 58.6 FH-2 322 .97 0 58.7 J-9 322.37 0 59 J-10 325.15 0 57.8 FH-1 328.1 30 56.5 Flow Velocity (gpm) (ft/s) 77 0.49 77 0.49 77 0.49 29 0 .19 0 0 15 0 .1 0 0 0 0 0 0 14 0 .16 -16 0 .18 77 0.49 Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-res Length (ft) 950 119 172 325 197 218 15 27 264 536 204 19 Exhibit C WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-1) Size (in) Material Hazen- Williams( 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-1) Junction Elevation Demand Pressure Junction (gpm) (psi) J-1 308 .98 0 57 .1 J-2 320.86 0 45.4 J-3 323.47 0 43.4 J-4 326.89 18 40.7 J-5 328 .57 14 39.2 J-6 325 .8 0 40.4 J-7 323 .3 15 42.3 FH-2 322 .97 0 42.4 J-9 322.37 0 42 .7 J-10 325 .15 0 41.5 FH-1 328.1 1,030 37.5 Flow Velocity (gom) (ft/s) 1,077 6.87 1,077 6.87 1,077 6.87 614 3.92 0 0 15 0 .1 0 0 0 0 0 0 429 4.87 -601 6.82 1,077 6.87 • ' ' > Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-res Length (ft) 950 119 172 325 197 218 15 27 264 536 204 19 Exhibit C WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-2) Size (in) Material Hazen - Williams( 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-2) Junction Elevation Demand Pressure Junction (gpm) (psi) J-1 308 .98 0 57.1 J-2 320.86 0 45.4 J-3 323.47 0 43.4 J-4 326 .89 18 40.7 J-5 328.57 14 40 J-6 325.8 0 41.2 J-7 323.3 15 40.9 FH-2 322 .97 1,000 41 J-9 322.37 0 41.2 J-10 325 .15 0 40.1 FH-1 328.1 30 40.2 Flow Veloc ity (gpm) (ft/s) 1,077 6.87 1,077 6.87 1,077 6.87 29 0 .19 0 0 1,015 6.48 1,000 6.38 0 0 0 0 14 0.16 -16 0.18 1,077 6.87 ~hultz Engin e ering , LLC December 16 , 2014 Kevin Ferrer Graduate Civil Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: 12 at Rock Prairie Subdivision Phase 1-14-00900181 Dear Mr. Ferrer: Attached is the Fire Hydrant Flow Test Report for 12 at Rock Prairie. If you hav e any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. P.O . Box 11995 • College Station , Texas 77842 schu ltzengineering llc .com Office : 979 .764 .3900 Fax : 979 .764.3910 FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT Date: 12-16-2014 Water System Owner: Wellborn SUD Development Project: 12 at Rock Prairie Flow Test Location: SW corner of Summerway Drive and Papa Bear Drive Nozzle Size (inch): _2_.s __ _ Discharge Coeff (c) = 0.90 Pitot Reading (psi): _s_o __ _ Flowrate Forula: 0=29.84cd 2 p112 Flowrate (gpm): 1187 c = discharge coeff. d = orifice size P = pitot pressure (psi) Pressure Gauge Location: NW corner of Summerway Drive and Towers Parkway Static Pressure (psi): _6_8 __ _ Residual Pressure (psi): _s_o __ _ Compute Discharge at 20 psi Residential Pressure: OR= _2_0_1_5 __ _ Discharge Formula: OR= OF x (hr0 ·54/ht°·54 ) Note: The Flow Test and Report were prepared in accordance with NFPA 291 Report Prepared By: _D_e_v_e_n_D_o_y_e_n ________ _ Ricky Flores Others Present: Glenden Adams -Wellborn SUD CITY OF COLLEGE STAT I ON Home of Texas A&M University• PLANNING & DEVELOPMENT SERVICES TRAN SM ITT AL LETTER Please check one of the options below to clearly define the purpose of your submittal. 0 New Project Submittal O Incomplete Project Submittal -documents needed to complete an application . Case No.: [8] Existing Project Submittal. Case No .: 14-00900181 Project Name 12 at Rock Prairie Contact Name JOE SCHUL Tl P.E. ~~~~~~~~~ Phone Number 979-764-3900 ~~~~~~~~~~~~~ We are transmitt ing the following for Planning & Development Services to review and comment (check all that apply): O Comprehensive Plan Amendment 0 Rezoning Application 0 Conditional Use Permit D Preliminary Plan 0 Final Plat D Development Plat O Site Plan O Special District Site Plan 0 Special District Building I Sign 0 Landscape Plan D Non-Residential Architectural Standards 0 Irrigation Plan 0 Variance Request 0 Development Permit D Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR 0 Grading Plan [8] Other -Please specify below Fire Hydrant Flow Test Report INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analysis D Other -Please specify Special Instructions: 10/10 Ir Print Form Addendum to Drainage Report for Equinox Subdivision Phase 1 College Station, Texas August 2014 Developer: DWS Development P.O. Box 4508 Bryan, Texas 77805 Prepared By: TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 > .. > ' ENGINEER Equinox Subdivision, Phase 1 Drainage Report -Addendum 1 Schultz Engineering, LLC P.O. Box 11995 College Station, Texas 77842 Phone/Fax : (979) 764-3900 OWNER/DEVELOPER DWS Development P.O . Box 4508 Bryan, Texas 77805 Addendum changes • The values in Table 2 & 3 were changed • Exhibit C was revised to include an evaluation point of "XlO". Drainage area 323 is now split into 323A and 323B . • Appendix Bl was revised to include an evaluation point ("Xl O") at the intersection of Kate Lane and Summerway Drive. • The slope of Flume 1 was changed and the analysis was updated to reflect this change (appendix B3). • The cross section and slope of Flume 2 was changed and the analysis was updated to reflect this change (appendix B3). • The slope and flowlines of pipes 100, 101 & 200 were updated to reflect the changes to construction plans (appendix B4). • Page 20 of Appendix D was updated to include information about culvert 300. Addendum additions • Exhibit D -showing the drainage area contributing to the mid-block cross drainage valley gutter. • Exhibit E -Showing the drainage areas contributing to the cross lot drainage swales. • Appendix E -analyzing the mid-block cross drainage valley gutter. • Appendix F -analyzing the cross-lot drainage and flow over sidewalk. CERTIFICATION f-t.2Ji1 SCHULTZ ENGINt:ERING~ LLC:. I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Equinox Subdivision, Phase 1, was prepared by me in accordance with the provisions of the Unified Stormwater Design Guidelines. Page 1 of l . ' . \ As shown in Table 2, the post-development peak outflows from the project site are less than the allowable peak outflow for each design storm event. Additionally, Tables 3 presents the maximum water surface and the amount of freeboard for the Detention Ponds. The peak flow out of the detention ponds and the maximum water surface was determined by the Storage Routing Analysis and the combining of the resulting hydro graphs with the hydrographs from the areas that do not flow into the ponds . TABLE 3-Su mma ry of Detention Po nds Maximum Wa ter S urfac e Levels Detention Pond 1 Storm Event Peak F low out Water Surface Freeboard of Pond, (cfs) E levation, ft. ft. 2-year 5.36 325.30 1.95 10-year 6 .1 5 325.58 1.67 25-year 6.46 325.69 1.5 6 50-year 6.78 325.82 1.43 100-year 6 .90 325.86 1.39 100-year plugged 8.29 326.08 1.17 Top of Berm= 327.25, Spillway Crest = 325.86, Spillway Width= 20' Detention Pond 2 Storm Event Peak Flow out Water Surface Free board of Pond, (cfs) Elevation, ft . ft. 2-year 3.29 308 .84 1.96 10-year 3.69 309.42 1.38 25-year 3.89 309.72 1.08 50-year 4.90 310.01 0.79 100-year 5.96 310.09 0.71 100-year plugged 9.55 310.26 0.54 Top of Berm= 310.80, Spillway Crest= 310.09, Spillway Width= 40' The Detention Ponds have overflow spillways which discharges when the outlet structure is clogged. The Detention Pond spillways will be grass lined at the flat crest. The ponds have greater than 6" of free board even with the outlet structure clogged. The grading plan for the Detention Ponds and the pond outlet structure and discharge pipe details are shown on Exhibit E.1 & E.2. revised: August 26, 2014 Page 7of8 . ' . \ TABLE 2-Pre-& Post-Development Runoff Comparison -Detention Analysis Runoff Flow Direction l Northeasterly Outfall to Buena Vida Location Q2 QlO Q25 Q50 QlOO cfs cfs cfs cfs cfs Pre-Development @ Outfall (Flow from Buena Vida Drainage Area 9.24 12.58 14.37 16 .26 16.98 Map Exhibits Sum of Areas OSI, OS2, & OS3) Post-Development Drainage Area 240 (outfalls directly to Buena 7.83 10 .69 12.20 13 .80 14.40 Vida Subdivision) Decrease in Peak Flow 1.41 l.89 2.17 2.46 2.58 Runoff Flow Direction 2 Southeasterly Outfall to Rock Prairie Road West Location Q2 QlO Q25 Q50 QlOO cfs cfs cfs cfs cfs Pre-Development Drainage Area 101 (Outfalls to roadside ditch 8.19 11.58 13.30 15.12 15.78 along Rock Prairie Road West) Post-Development 15.01 20.48 23.39 26.44 27.61 Drainage Area 210 (Outfalls to Detention Pond 1) Detention Pond 1 Outfall 5.36 6.15 6.46 6 .78 7.03 Post-Development Drainage Area 230 (Outfalls to roadside ditch 2 .20 3.01 3.43 3.88 4.05 along Rock Prairie Road West) Combined Outfall 6 .63 7.92 8.59 9.25 9.47 Decrease in Peak Flow 1.56 3.66 4.71 5.87 6.31 Runoff Flow Direction 3 Northwesterly Outfall to Barracks II Section 101 Location Q2 QlO Q25 Q50 QlOO cfs cfs cfs cfs cfs Pre-Development @ Outfall (Design flow for Barracks II 3.61 5.13 5.89 6.70 6.99 Subdivision Section 101 Storm Sewer Pipe) Post-Development 22.53 30 .75 35.12 39.70 41.45 Drainage Area 220 (Outfalls to Detention Pond 2) Detention Pond 2 Outfall 3.29 3.69 3.89 4.90 5.96 Decrease in Peak Flow 0.32 1.44 2.00 1.80 l.03 revised: August 26, 2014 Page6of8 ' ' .. Exhibit C -Drainage Area Map Post-Development Pipe Design revised: August 26, 2014 Exhibit D -Drainage Area Map Mid-Block Cross Drainage Valley Gutter August 26, 2014 Exhibit E -Drainage Area Map Cross Lot Drainage Swale August 26, 2014 Appendix Bl -Depth of Flow in Gutter Analysis revised: August 26, 2014 APPENDIXB1 Equinox Subdivision Phase 1 Depth of Flow in Gutter (Refer to Exhibit C for Gutter Locations) Guttorllnlet A LC>Qtion Aru• (•cru) 5100 322 0.170 -5101 323 1.260 5200 325 0 .250 5201 324 0.710 X1 326 0 .510 X2 327 0.050 X3 328 0.530 X4 321 0 .170 XS 341 0.100 XS 342 0 .830 X7 311 A 0 .920 X8 3116 0 .700 X10 323A 1.200 Transverse CCrownl slope !M!l 34 street = 0.0300 38 street = 0 .0300 c Slope le (ft/fl) (min) 0.75 0 .0198 10.000 0 .75 0.0198 10.000 0.75 0 .0200 10.000 0 .75 0 .0200 10.000 0 .75 0.0290 10.000 0 .75 0 .0290 10.000 0 .75 0 .0198 10.000 0 .75 0 .0198 10.000 0.75 0 .0304 10.000 0 .75 0.0304 10.000 0 .75 0.0103 10.000 0 .75 0 .0106 10.000 - 0 .75 0 .0127 10.000 Strajqht Crown Flow !Solve<! to find as;tual !leP!h offlow in gutter. yl: Q = 0 .56 " (z/n) • S vz " y"' Q y = {QI (0.56 • (z/n) • S ";}"' n =Roughness Coefficient= 0 .016 S = StreeUGutter Slope (Mt} y = Depth of flow at inlet (ft} z = Reciprocal of crown slope: 34' street= 33 10-yNr storm 1,. o,. Q 1.+ bypau Y1o..c...,. (inlhr) (ct.) (ct.) (ft) (in) 6 .327 1.10 0 .160 1.92 6 .327 8 .16 0 .339 4.07 6 .327 1.62 0.185 2 .21 --1--· 6 .327 4 .60 0.273 3.28 6 .327 3.30 -0.225 2.70 6 .327 0.32 0 .094 1 .13 6 .327 3.43 6 .39 0 .309 3.71 6 .327 1.10 1.36 0 .173 2 .08 6 .327 0.65 0.121 1.45 6 .327 5 .37 -0.268 3.21 6 .327 5.96 0.341 4 .09 6 .327 4 .53 0.306 3.67 6 .327 1.n -0.362 4 .34 5tandanl and Loydown Cur1> -10-yr stonn max design depth -4 .5" v (fps) 2 .58 4 .26 2 .85 3.70 3.92 -- 2.19 ·- 2 .15 2.20 2 .65 4 .50 3.06 2 .91 ··-3 .56 Equinox Subdivision Phase 1 Depth of Flow in Gutter (Refer to Exhibit C for Gutter Locations) GutUlrllnlet A Loe11tion At-.1 (acres) 5100 322 0.170 5101 323 1.260 5200 325 0.250 5201 324 0.710 Xl 326 0.510 X2 327 0.050 X3 328 0.530 X4 321 0.170 XS 341 0.100 X6 342 0.830 X7 311A 0.920 X8 3118 0.700 ----· X10 323A 1.200 Transverse !Crown! slooo !ftll!l 34 street = 0.0300 38 street = 0.0300 c sto,.. le: (ft/It) (min) 0.75 0.0198 10.000 0.75 0.0198 10.000 0.75 0.0200 10.000 0.75 0.0200 10.000 0.75 0.0290 10.000 0.75 0.0290 10.000 0.75 0.0198 10.000 0.75 0.0198 10.000 0.75 0.0304 10.000 0.75 0.0304 10.000 0.75 0.0103 10.000 0.75 0.0106 10.000 0.75 0.0127 10.000 Stnlight Crown Flow !Solved to find actual d!pth of flow in gutter. yl: Q "0.56 • (z/n) • 5111" y111 ~ y" (QI (0.56 • (z/n) • S"'}},.. n = Roughness Coefficient = S = StreeVGutter Slope (ft/fl) y = Depth of flow at inlet (ft} z = Reciprocal of crown slope: 0.016 34' street= 33 ~ .. Q, .. (inlhr) (cfs) 11.639 1.48 11.639 11.00 11.639 2.18 11.639 6.20 11.639 4.45 11.639 0.44 11.639 4.63 11.639 1.48 11.639 0.87 11.639 7.25 11.639 8.03 11.639 6.11 11.639 10.48 APPENDIX 81 100-yaar storm 100-year storm Q, ... bypau Ytoo AJl-•ble v Top of Gutter Gutter ROW Flffboanl (cfs} (ft} (in} Depth (fps} Curb FL Runoff, Elev. Elev. ft. 0.179 2.15 9_5• 2.78 324.35 323.85 324.03 324.64 0.61 0.379 4.55 9.5" 4.59 324.35 323.85 324.23 324.64 0.41 1--· I-· 0.206 2.48 5.67" 3.07 326.43 326.12 326.32 326.59 0.27 -0.305 3.66 5.67" 3.99 326.43 326.12 326.42 326.59 0.17 -------0.252 3.02 5.67" 4.22 324.54 324.23 324.48 324.70 0.22 -0.105 1.26 5.67" 2.36 324.54 324.23 324.33 324.70 0.37 9.36 0.357 4.28 5.67" 2.18 32.z.13 321.82 322.17 322.29 0.12 .. 1.94 0.198 2.38 5.67" 2.27 322.13 321.82 322.02 322.29 0.27 0.135 1.62 5.67" 2.86 323.43 323.12 323.25 323.59 0.34 0.299 3.59 5.67" 4.85 323.43 323.12 323.42 323.59 0.17 0.381 4.57 5.67" 3.32 327.09 326.78 327.16 327.25 0.09 -0.342 4.10 5.67" 3.13 327.10 326.79 327.13 327.26 0.13 0.405 4.86 5.67" 3.64 325.36 325.05 325.45 325.52 0.07 Appendix B3 -Concrete Flume Design Analysis revised: August 26, 2014 Equinox Subdivision Phase 1 Concrete Flume -Design Analysis (Refer to Exhibit C for Flume Locations) cone.-A Channel c Location AINI (ocru1 Fl 311 1.620 0 .7 5 F2 312 0240 0.75 le (mlnl 10.000 10.000 APPENDIXB3 Concrete Channel information Oopfl1 BoaomWkith Slope .Unnlr19'• 1,. (Ill (Ill (111111 n (In/hr) 0.500 6 .000 75 .0% 0.018 6 .327 0.500 4.000 1.0% 0.018 6 .327 10-yaar storm 100-year storm Q,. Flow Depth v FrMboordto .... Q,,. Flow Depth v Freeboard to Top of Top of (cfsl (Ill (fp•I Concrete (lnlhrl (cfsl (Ill (fp•I Concf'9ta Curb Channel (Ill (Ill 10.49 o . .so 3.81 0.62 11 .639 14 .14 0.740 5 .76 0.34 1.55 0.340 3.04 0.41 11.639 2.10 0.420 3 .33 0.33 Channel Report Hyd raflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Concrete Flume 1 -10 Year Storm User-defined Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) = 325.52 = 0.75 = 0.018 Known Q = 10.49 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) Monday, Aug 25 2014 . = 0.46 = 10.49 = 2.75 = 3.81 = 6.90 = 0.46 = 6.00 = 0.69 (Sta, El, n)-(Sta, El, n) ... ( 0 .00 , 326 .59)-(4 .00 , 326.02, 0.045)-(4.50, 326 .02, 0.018)-(4.51, 325 .52 , 0.018)-(10.49, 325 .52, 0 .018)-(10.50, 326.02 , 0 .018)-(11 .00, 326.02, 0 .018) -(15.00, 326 .59 , 0 .042) Elev (ft) Section Depth (ft) 327 .00 1.48 -- - '\.. / "-/ ~ 326 .50 0.98 " / I\. / ·--·--, /,, 326.00 '\ ~ "7' _/ ·- 0.48 -=-- ---· '---M--· -·- -- 325 .50 -0.02 -- ---·-· - - 325 .00 -0.52 -2 0 2 4 6 8 10 12 14 16 18 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk , Inc. Monday, Aug 25 2014 Concrete Flume 1 -100 Year Storm User-defined Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) (Sta, El, n)-(Sta, El, n) ... = 325.52 = 0.75 = 0.027 Known Q = 14.14 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.74 = 14.14 = 5.08 = 2.79 = 11.36 = 0.60 = 10.34 = 0.86 ( 0.00, 326 .59)-(4.00, 326.02 , 0 .045)-(4 .50, 326 .02, 0 .018)-(4.51 , 325 .52 , 0 .018)-(10.49, 325 .52 , 0.018)-(10.50 , 326 .02 , 0 .018)-(11 .00, 326 .02 , 0 .0 18) -(1 5.00 , 326 .59, 0 .042) Elev (ft) Section Depth (ft) 327 .00 -....----.----.----.----.----.----,,.-----,----,------~ 1.48 326.50 I\.. / -+---+-~"--t----t----t----+----+---+---~+-:7~--+----+-0.98 ~~-i.-~"-~-~-l-~-~___:~~~~~~.l--~/-+~-~~----< ~ v / 0.48 !---+-----+--'-------1----=--·----l-----~--'--·--1----1 " / 326 .00 -+---+---+---"-1-Fl---+---+---+-1_/===================~4- >----'-·--1-----1--1-------·---1----·-·~--J----1----+------1 325 .50 -t---+---+---+~=~==~==~~-~--~--___j---~ -0 .02 1----+-----i...--...-, .. ---1------+----+------i----·--''----->------+-----l 325 .00 ----'------"----'----'----'----'----'----'----'----'L---L..... -0.52 -2 0 2 4 6 8 10 12 14 16 18 Sta (ft) Channel Report Hydraflow Express Exte nsion for Autodesk® AutoCAD® Civil 30® by Autodesk , Inc. Concrete Flume 2 -10 Year Storm Rectangular Bottom Width (ft} Total Depth (ft} Invert Elev (ft} Slope(%} N-Value Calculations Compute by: Known Q ( cfs} Elev (ft} = 1.50 = 0 .75 = 325.50 = 1.00 = 0 .018 Known Q = 1.55 Section Highlighted Depth (ft} Q (cfs} Area (sqft} Velocity (ft/s} Wetted Perim (ft} Grit Depth, Ye (ft} Top Width (ft} EGL (ft} Monday, Aug 25 2014 = 0.34 = 1.550 = 0.51 = 3.04 = 2.18 = 0.33 = 1 .50 = 0.48 Depth (ft} 327.00 --.------.-------,---------,.-------~-----..-1.50 326 .50 -+------+-------+-------+------+------~ 1.00 326.00 --+------+------1-------1------+------t-0 .50 v 325 .50 -+------t-------+-------+------+------t-0.00 325 .00 ~-----~-----~------'--------'-------L---0.50 0 .5 1 1.5 2 2.5 Reach (ft} Channel Report Hydraflow Ex press Exte nsion for Autodesk® Au toCA D® Civi l 30® by Auto desk , Inc. Monday, Aug 25 20 14 Concrete Flume 2 -100 Year Storm Rectangular Bottom Width (ft) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by : Known Q ( cfs) Elev (ft) = 1.50 = 0.75 = 325.50 = 1 .00 = 0.018 Known Q = 2.10 Section Highlighted Depth (ft) Q (cfs) Area {sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.42 = 2 .100 = 0 .63 = 3 .33 = 2 .34 = 0.40 = 1.50 = 0 .59 Depth (ft) 327 .00 --.-------.,.-------,-------.-------.-------.,...--1 .50 326 .50 -+------+------+-------+------+-------+--1 .00 326 .oo --+------+------;------,=v =-----+------+-------1-o .5o 325.50 --+-----_...,------+-------+-------4-------+---0 .00 i---------i--·------+--·----t--------+-------1 325 .00 __._ _____ __._ _____ ___.._ _____ .......__ _____ _.____ _____ ....__ -0 .50 0 .5 1.5 2 2 .5 Reach (ft) ---------------------~ . ' Appendix B4 -Storm Sewer Pipe Design Analysis revised: August 26, 2014 APPENDIX B4 Equinox Subdivision Phase 1 Storm Sewer Pipe Design Analysis (10 yr Storm) Pipe Pipe Pipe Pipe Size Length Slope No. (Inches) (feet) (%1 Nonn•I Depth Surcharged Q10 V10 Depth HG10 V10 (cfs) (fps) (feet) Slope (fps) Downstream Top Structure Elev. 100 18 38.0 1.00 1.08 4 .24 0.33 0 .01% 0.61 5101 324.35 101 18 146.1 1.80 729 8 .52 0 .80 0.48% 4 .13 OUT100 ----- 200 18 41 .9 0 .80 1.42 4 .41 0 .40 0.02% 0 .80 5201 326.43 201 18 12 1.4 0 .80 5.67 5.87 0 .89 0 .29% 3 .21 5202 325.20 -io2 18 96.0 2 .25 --5 .67 8.72 0 .64 029% 3.21 OUT200 --- Notes 1. Friction losses and minor losses for 18° diameter pipe are computed as for a 15.6° diameter pipe which represents a 25% reduction in pipe flow area. 2 . Friction losses and minor losses for 24• diameter pipe are computed as for a 20.8° diameter pipe which represents a 25% reduction in pipe now area. APPENDIX B4 Equinox Subdivision Phase 1 Storm Sewer Pipe Design Analysis (100 yr Storm) Pipe Pipe Pipe Pipe S ize Length Slope No. (inches) (feet) (%) Nonn11 Depth Surcharged Q100 V100 Depth HG100 V100 (cfs) (fps) (feet) Slope (fps) Downstream Top Structure Elev. 100 18 38.02 1.00 1.37 4.53 0.37 0.02% 0.78 5101 324.35 101 18 146.06 1.80 8.78 8.83 0 .91 0.70% 4 .97 OUT100 - 200 18 41 .90 0 .80 1.74 4 .72 0 .44 0 .03% 0 .99 5201 326.43 201 18 121 .35 0.80 7.28 6 .11 1.17 0.48% 4.12 5202 325.20 202 18 96.00 225 I-- 7 .18 9.27 0 .74 0 .47% 4 .07 OuT200 - Notes 1. Friction losses and minor losses for is· diameter pipe are computed as for a 15.6" diameter pipe which represents a 25% reduction in pipe flow area. 2 . Friction losses and minor losses for 24" diameter pipe are computed as for a 20.8" diameter pipe which represents a 25% reduction in pipe now area . Upstreom Pipe Top Pipe FL Structure Elev. FL 319.59 5100 324.35 319 .97 ~- 316.86 5101 324.35 319.49 322.58 5200 326.43 322.918 321 .51 5201 326.43 322 .482 --319.25 5202 325.20 321 .411 Upstream Pipe Top Pipe FL Structure Elev. FL 319.59 5100 324.35 319.97 '--316.86 5101 324.35 319.49 322.58 5200 326.43 322.918 321 .51 5201 326.43 322 .482 319.25 5202 325.20 321 .411 HG10 Elev. ·-320.29 320.30 323.32 323.38 322.40 HG100 Elev. 320.41 .. 320.34 323.36 ----._32_~ 322.64 HG10 Depth Below Gutter (feet) 3.56 2 .61 2.55 2 .30 HG100 Depth Below ROW (feet) 4.27 ---4.34 !------- 3.40 0.29 ----2 .89 . ' ... Appendix D -Technical Design Summary revised: August 26, 2014 ' .. SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 - Drai nage Co n ce~t and Design Parame ters I Co nti n ue d (Page 4 .11) 0,,_~ ,. :~~ ;!~ :.~§to rmtater Mana gement co nE:e pt l~"n'ti~u·e d >~: •l ~!:;~;l#~ :~..-'!:; • ·i ,l..P· ' :'f " ' .. ..;:~. ~ --.:;--~ ; -~ ...t--:,·,:t,·.~. ,::;,,~-.. ' ~1;.~ . •<J_; ;,.· : aii'"':'·~~~ -Clfl,!,i v .~ Wi t hin O r Serving Subject P roperty (Ph ase , o r Si te) (co ntin ued) Named Re g ulato O£ Watercourses {&Tri buta rie s}: Are culverts proposed on these facil ities? _:f_ No __ Yes, then prov ide full re port documenting ass umptions, criteria , analysis , computer programs, an d study findings that supp ort proposed design(s). Is report provided? __ Yes --No If "no", explain: -Arterial or Major Coll ecto r Streets: Wi ll culverts serve these types of roadways? -Q) Q) __ No _:L_ Yes How many instances? I For each identify the ..c: (/) Q) location and provide the information below. -(/) co Instance 1: Proposed culvert crossing at Towers Parkway where it meets Rock Prairie Q) ..... >-~ v'I ~ Instance 2: Instance 3: c: 0 :;::::; Yes or No for the 100-year design flow: 1 2 3 0 co z E I ~ Headwater WSE 1 foot below lowest curb top? YES Spread of headwater within ROW or easement? YES E C'· co Is velocity limited per conditi o ns (Table C-11 )? YES (/) (/) g>-o Explain any "no" answer(s): ·-c: ~ co 0 c: ..... 0 u:;::::; ~~ ~Q "O Q) co .0 M in o r Collector or Local Stre ets : W ill cul v erts se rv e these types of streets? 0 ·-.......... u u No Yes How many instances? fo r each identify the ·-(/) -Q) -- --.g "O location and provide the information below: ~~ Instance 1: co .&!' "O >. Instance 2: Q) c: (/) co ::J .... Instance 3 : (/) 0 t (/) Q) Q) For each instance e nte r value, or "yes" / "n o " for: 2: u 1 2 3 ::J c: u 2:! Design yr. headwater WSE 1 ft. below curb top? Q) (/) ..... c: ~ ·-100-yr. max . depth at street c ro wn 2 feet or less? ~ 0 Product of velocity (fps) & depth at crown (ft}=? E ..... .2 Is velocity limited per conditio ns (Table C-11 )? ........ Limit of down stream analysis (feet)? Explain any "no" answers: ST ORMW ATER DESIG N GUIDELINES Effective February 2007 Pa ge 20 of 26 AP PEN DIX. D: TEC H. DESIGN SUMMARY As Revised August 2012 Appendix E -Mid Block Cross Drainage Valley Gutter Design Analysis August 26, 2014 APPENDIXE Equinox Subdivision Phase 1 Mid-Block Cross Drainage Valley Gutter -Design Analysis (Refer to Exhibit D for Locations) Concrete Channel Information 1 ()..year stonn 100-year storm Concn.W A le 0.plh Bottom Width Slope llllannlng's 1,. Q,. Flow Depth v .... Q,., FlowO.plh v Channel c Location Ar.a# (ac:< .. ) (min) (II) (ft) (ft/ft) n (In/hr) (cfs) (ft) (fps) (In/hr) (els) (ft) (fps) X9 410 1.000 0 .75 10.000 0 .150 50.000 1.5% O.Q18 6.327 6.48 0.160 1.56 11 .639 8 .73 0 .170 1.89 Channel Report Hydraflow Express Extension for Autodesk® AutoC AD® Civil 30® by Autodesk , Inc . Monday, Aug 25 2014 Mid-Block Cross Drainage Valley Gutter -10 Yr Storm Triangular Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q (cfs) Elev (ft) = 160.00, 160.00 = 0.31 = 326.92 = 1.50 = 0.018 Known Q = 6.48 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.16 = 6.480 = 4.10 = 1.58 = 51.20 = 0.16 = 51 .20 = 0 .20 328 .00 --..---.-----.----.-----.---...----.-----.--~-~--~-~--~ ~---1------+------·---+----t--··--+·---+----·-t----+--1---·---- Depth (ft) 1.08 327 .50 --+---+-----+---+----1----1----+---+---+-----+---+----i---I--0 .58 1----===:--=---F==-.:----·-··-·---+----~1-'T-. -· ~ .....__ -=i::-~ --327.00 -+--t----t---t----t__;;;:-....~.±---........----'l-~--:::1;........,"---t---t---+----+--+-0 .08 1----+-----+---+---r -----~---11~--1---~---1---1 1----1-----+---l----··-+---1---+--- 326 .50 --+--+----+---+----t---t----+----+---t-----+---+----t---t---0.42 1----1---1-----·-·>---·-l---1----+---1----+-·-+----·---- 326 .00 --1---...l..-..---'---...__ _ __._ _ _....__ _ _,__ _ ___,_ __ _,__ _ _...... __ ...__ _ __._ __ ~ -0.92 0 10 20 30 40 50 60 70 80 90 100 110 120 Reach (ft) Channel Report Hyd rafl ow Express Extension for Aut odesk® AutoCAD® Civil 30® by Autodesk. Inc. Monday, Aug 2 5 20 14 Mid-Block Cross Drainage Valley Gutter -100 Yr Storm Triangular Highlighted Side Slopes (z :1) = 160.00, 160.00 Depth (ft) = 0 .17 Total Depth (ft) = 0 .31 Q (cfs) = 8 .730 Area (sqft) = 4.62 Invert Elev (ft) = 326 .92 Velocity (ft/s) = 1.89 Slope(%) = 1.50 Wetted Perim (ft) = 54.40 N-Value = 0.018 Crit Depth , Ye (ft) = 0.18 Top Width (ft) = 54.40 Calculations EGL (ft) = 0 .23 Compute by: Known Q K nown Q ( cfs) = 8.73 E lev (ft) Section Depth (ft) 328 .00 ---r--.-----,.---,-----.--.----,.----,.--.....---,.----.-----T---~ 1 .08 327 .50 --+--+---+---+-----+-----i---+----+--+---+--+-----1---1---0.58 -1~- ~,....__ -:: c:-._....i.-- 327 .00 -t---+---+--+-----l--:::!11 .... _.,,.t--_1----+--___,.,..---4_....=---1------1----+----+---~ 0 .08 1----1----1----+-·----...,._,_--.1---.--.1---·--t----:it-----+----+--+----1 326 .50 --+--+---+--+----t---t----t----t---+---+--+----t---1----0.42 1----+--·---+---t-----1------·-•.,.H--~-e--.--I---'----'----- , __ _,__ ___ &.------1----1----........i---~---4------l---·I------11------H ~--- 326 .00 ___._ __ ......_ _ __.__ __ ..__ _ _.._ _ ___. __ _,__ _ __..L __ __.__ _ __._ __ ..__ _ _...i_ __ L._ -0 .92 0 10 20 30 40 50 60 70 80 90 100 1 10 120 Reach (ft) Appendix F -Depth of Flow in Cross-Lot Drainge & Over Sidewalk Design Analysis August 26, 2014 APPENDIXF Equinox Subdivision Phase 1 Depth of Flow in Cross-Lot Drainage & Over Sidewalk (Refer to Exhibit E for Gutter Locations) 10-year stonn Drainage Area Cross-Lot Drainage Over Sidewalk Flow Gutterllnlet Slope Minimum Minumum A c tc 110 a 10 Y10-v Y10....ctuaj v Location (ft/ft) Side Slope Depth Area# (acres) (min) (in/hr) (cfs) (ft) (in) (fps) (ft) (in) (fps) X21 0 .0132 9 :1 0 .83 501 0 .190 0.75 10 .000 6 .327 1.23 0 .350 4.20 1.12 0 .080 0 .96 0 .97 -- X22 0 .01 27 10:1 0 .75 502 0 .030 0 .75 10.000 6 .327 0 .19 0 .190 2.28 0 .66 0 .02 0 0 .24 0 .52 - .. X23 0 .0167 8 :1 1.50 503 0 .240 0 .75 10.000 6 .327 1.55 0 .380 4.56 1.34 0 .100 1.20 1.05 -- X24 0 .0136 5 :1 0 .70 504 0.480 0 .35 10.000 6 .327 1.45 0 .460 5 .52 1.37 0 .090 1.08 1.02 - -r-------- X25 0 .0124 7 :1 1.00 505 0 .160 0 .75 10.000 6 .327 1.04 0 .360 4 .32 1.15 0 .060 0 .96 0 .92 - X26 0 .0080 15 :1 1.33 506 0 .280 0 .75 10.000 6 .327 1.81 0 .360 4 .32 0 .93 0 .110 1.32 1.10 - X27 0 .00 80 6 :1 1.25 507 0.450 0.75 10.000 6 .327 2 .91 0 .610 7 .32 1.30 0 .150 1.80 1.29 100-year stonn Drainage Area Cross-Lot Drainage Over Sidewal k Flow Gutterllnlet Slope Min imum Min um um A tc 1100 a 100 Y100 v Y100 v Locatio n c (fttft) Side Slope Depth Area# (acres) (min) (in/hr) (cfs) (ft) (in) (fps) (ft) (in) (fps) X21 0 .0132 9 :1 0 .83 501 0 .190 0 .75 10.000 11 .639 1 .66 0 .390 4 .66 1 .21 0 .100 1.20 1.07 -- X22 0 .0127 10:1 0 .75 502 0 .030 0 .75 10.000 11 .639 0 .26 0.190 2.26 0 .72 0 .030 0 .36 0 .58 X23 0 .0167 6 :1 1.50 503 0 .240 0 .75 10.000 11 .639 2 .10 0 .42 0 5 .04 1.49 0 .120 1.44 1.16 -·· ---·-·---·- X24 0 .0136 5 :1 0 .70 504 0 .460 0 .35 10 .000 11 .6 39 1.96 0 .510 6 .12 1.51 0 .120 1.44 1.13 ·--·-----f--------- X25 X26 X27 0 .0124 7 :1 1 .00 505 0.160 0 .7 5 10.000 11 .639 1.40 0.410 4 .92 1.19 0 .090 1.06 - 0 .0080 15:1 1.33 506 0.260 0.75 10.000 11.639 2 .44 0 .410 4 .92 0 .97 0 .130 1 .56 - 0 .0080 6:1 1.25 507 0 .450 0 .75 10 .000 11 .639 3 .93 0 .680 6 .16 1.42 0 .160 2 .16 - Notes: The Cross Section of the cross lot drainage swales are not uniform . Each swale was evaluated at the most extreme cross-sections The flow spreads out as it approaches the sidewalks so the sidewalk flow is evaluated as a 15' wide weir. The concentrated flow will begin to s pread out at the bu ~ding setback ti ne and a 15' spread is a conservative evaluation. 1.01 1.22 - 1 .43 t ( J · Drainage Report for Equinox Subdivision Phase 1 College Station, Texas July 2014 Dev elop er: DWS Development P.O. Box 4508 Bryan, Texas 77805 Prepared By: Schultz Engineering, LLC TBPE Firm No. 12327 P.O . Box 11995 College Station; TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 ENGINEER Equinox Subdivision, Phase 1 Drainage Report -Executive Summary . Schultz Engineering, LLC P.O. Box 11995 College Station, Texas 77842 Phone/Fax: (979) 764-3900 O\VNER/DEVELOPER DWS Development P.O. Box 4508 Bryan, Texas 77805 GENERAL DESCRIPTION AND LOCATION Location: Description: •Area: • Proposed Land Use: • #of Lots: • Existing Land Use: • Land Description: • Adjoining Land Use: Primary Drainage Facility: Flood Hazard Information: FEMAFIRM: Floodplain: 3270 Rock Prairie Road West approximately 700 feet west of the intersection between Keefer Loop and Rock Prairie Road West. 9.269 acres R-3 -Townhouse 51 lots Residential & Horse Facility , Flat terrain with a slight high point near the middle of the property. The site partially developed with horse facilities, pasture and riding areas. The site is bounded on the south by Rock Prairie Road West, on the east by Buena Vida Subdivision and Diamond T Storage Facility, on the west by a 23 acre tract, and on the North by future phases of the Equinox Subdivision and Barracks II Subdivision. Bee Creek # 48041C0305 F (April 2, 2014) No portion of this Phase lies within the floodplain. HYDROLOGIC CHARACTERISTICS The site partially developed with a residence, horse facilities, pasture and riding areas. The elevations range from 330 to 309. The site drains in three directions. One direction sloping generally in a southeasterly direction where the runoff enters the roadside ditch along Rock Prairie Road West, then into a tributary of Bee Creek. The second direction sloping generally in a northeasterly direction where the runoff enters the Buena Vida development. The flow from the site into the Buena Vida development is sheet flow, there is no existing drainage way or channel. The third direction sloping generally in a northwesterly direction where the runoffenters the Barracks II development. The flow from the site into the Barracks II development is sheet flow , there is no existing drainage way or channel. Page 1 of8 GENERALSTORMWATERPLAN The drainage plan for this development will involve the installation of curb and gutter, inlets, junction boxes, storm sewer pipes, drainage channels, and drainage flumes which will convey the runoff into two different detention ponds and with some areas discharging directly off site. The runoff draining in the northeasterly direction will discharge directly into Kate Lane and the Buena Vida Subdivision drainage system. The drainage report for the Buena Vida drainage system accounted for 3.24 Acres of upstream undeveloped property. The post development area contributing to the Buena Vida drainage system will decrease in size and the post development peak runoff is less than or equal to the peak runoff accounted for in the drainage report for the Buena Vida Subdivision. The Tables presented later in this report show the peak runoff comparisons. The majority of runoff draining in the southeasterly direction will be captured by Detention Pond 1 and will discharge into the roadside ditch along Rock Prairie Road West through a proposed storm sewer pipe. A small portion of the runoff draining in the southeasterly direction will bypass the detention pond and discharge directly to the Rock Prairie Road West roadside ditch. The combined outfall is less than or equal to the predevelopment peak runoff draining in the southeasterly direction. The runoff draining in the northwesterly direction will be captured by temporary Detention Pond 2 and will discharge into an existing storm sewer pipe stubbed out from the Barracks II Subdivision Section 101 until phase 2 is developed and the final Detention Pond 2 is constructed. The temporary Detention Pond 2 decreases the peak runoff to less than or equal to the design flows for the existing storm sewer pipe found in the drainage report for the Barracks II Subdivision Section 101. The final Detention Pond 2 will utilize the outfall for the temporary detention pond and add an additional outfall to the Barracks II Subdivision Phase 202 storm sewer system. A subsequent drainage report will be submitted with the development of phase 2 for the final Detention Pond 2. COORDINATION & STORMWATER PERMITTING The project will require that a Notice ofllitent be submitted to the Texas Commission for Environmental Quality. No other permits are anticipated for this project. DRAINAGE DESIGN -STORM SEWER General Information: Stormwater runoff from Phase 1 of the subdivision will be collected by curb & gutters along the street and conveyed to storm inlets, storm pipes, drainage channels and drainage flumes. The runoff will discharge in three directions as described above. The runoff will ultimately discharge into a tributary of Bee Creek. The location of the drainage areas for evaluation of the gutter depth check, inlet sizing, storm sewer pipe sizing, drainage channel and flume evaluation are shown on Exhibit C. Also shown are the location of the inlets, junction boxes, storm sewer pipes, drainage channels and concrete flumes. A summary of the drainage areas and design flow values is provided in Appendix A. Page 2 of8 Stree t D esign: Tc M ethodology: Tc Minimum Design Storm Event: Pipe Ma te rials: Manning 's n Value : Runoff Coefficients : Design Constraints: D esign Software: Design Results Due to the flat terrain for the portion of the site adjacent to Rock Prairie Road, there is not enough elevation change to have curb inlets at the low point in Sophies Lane. A valley gutter for mid-block drainage is proposed in this location instead of curb inlets with storm sewer pipes. The valley gutter discharges into a concrete channel, which conveys the runoff to Detention Pond 1. Standard cross-section (3% cross-slope, 38' B-B & 34 ' B-B residential) Lay down curb & gutter on residential streets Asphalt pavement Standard recessed curb inlets (5', 10' and 15' in length) TR55 10 minutes 10-year -residential street & storm sewer Corrugated HDPE w/smooth interior, RCP , Profile Gasket in accordance with ASTM C443 , ASTM C76 , Class ill 0 .013 or 0.012 for HDPE w/smooth interior 0 .75 for townhouse developed lots Max. water depth in curb= 4.0 in. or 0 .33 ft . Min. flow velocity= 2.5 fps Max. flow velocity = 15 fps 100-yr storm runoff maintained within the ROW ( 4 inches above curb) 25% Reduction in cross-sectional area of pipes less than 24" in diameter Excel spreadsheets, Autodesk Civil 3D Storm Sewer Analysis and Hydraflow This software was used to compute pipe capacity, flow rate and velocity through each pipe, and determine hydraulic grade line elevations at each inlet or junction box. All of this information is shown in the summary tables in Appendices A, B 1, B2, & B3. The College Station requirement for a 25% reduction in cross-sectional area of pipes less than 24" diameter is achieved by using internal pipe diameters that are less than the standard diameter. The 24" diameter pipe areas were reduced by 25 % and a 20.6" diameter pipe used in the analysis and the 18' diameter pipe areas were reduced by 25% and a 15 .6" diameter pipe was in the analysis. The data presented in the Appendices indicates the gutter depth, inlet sizing, pipe sizes, drainage channel sizing, and concrete flume sizing are in accordance with the requirements of the design guidelines . Page 3 of8 DETENTION ANALYSIS & DESIGN . General: The stormwater runoff from this subdivision discharges into 3 different outfalls as shown on Exhibit A. Two of the outfalls discharge from two detention ponds for this site. Refer to Exhibit B for their locations. Detention Ponds 1 & 2 will be constructed with Equinox Subdivision Phase 1 and the runoff from this development will discharge in accordance with the requirements of the design guidelines. DETENTION PONDS (RATIONAL EQUATION ANALYSIS): Tc Methodology: Tc Methodology: Tc Minimum Design Storm Events: Pond Discharge Pipe Materials: Manning 's n Value: Runoff Coefficients: Design Constraints: Rational Equation: Design Software: Design Analysis: TR55 TR55 10 minutes 2, 10, 25, 50 and 100-year storms-detention analysis Corrugated HDPE w/smooth interior 0.013 0.35 -undeveloped/greenspace property, 0.45 -existing developed site conditions, 0.75 -townhome developed area Post Development flow less than or equal to Pre-Development flow 6" freeboard for 100 year storm with outlet clogged The rational equation is utilized to determine peak storm water runoff rates for Detention Pond 3 design. Q=CIA Q =Flow (cfs) A= Area (acres) C = Runoff Coefficient I= Rainfall Intensity (in/hr) Excel spreadsheets, Hydraflow Hydrographs Extension The software was used to compute the pond storage and discharge data and the pre and post development flow and the routing of the flow through the detention ponds. The Pre-development Drainage area, DA 101, is shown on Exhibit A. The post-development drainage areas, DA 210 -240, are shown on Exhibit B. All of the runoff does not flow into Detention Ponds as some of the runoff drains off site. The design data and descriptions of the detention pond outlet structures, discharge pipes and overflow spillways are found in Appendix C. Page 4 of8 The peak flow out of the detention ponds were determined by a Storage Routing Analysis based on the Continuity Equation as follows : (Il +I2)+((2sl/dt)-01)=((2s2/dt)=02). The time interval, dt, used was 1 minute. The calculations and results of the Storage Routing Analysis were used to generate hydrograph peak flows and graphs for the pre and post development conditions. A summary of the peak flows from the site are shown in Table 1. The hydrographs for the drainage area that does not flow into the detention ponds was combined with the detention pond outflows to determine the total post development peak flows. Triangular hydrographs were created for each area assuming the peak runoff value occurs at the time of concentration and then goes to a runoff value of zero at three times the time of concentration. TABLE 1-Pre-& Post-Development Drainage Area Information Area# Area c Tc Acres Min. Pre 101 4 .69 0.45 25 Pre (From Barracks II Section 101 Area to 2.44 0.40 27 drainage report for storm sewer Barracks pipe design) Post 210 3.54 0.67 10 Post 220 6.14 0.52 10 Post 230 0.58 0.60 10 Post 240 1.65 0.75 10 Page 5 of8 TABLE 2-Pre-& P ost-D evelopment Runoff Comparison -Detention Analysis Runoff Flow Direction 1 Northeasterly Outfall to Buena Vida Location Q2 QlO Q25 Q50 QlOO ~ cfs cfs cfs cfs cfs ~ Pre-Development ~ @ Outfall (Flow from Buena Vida Drainage Area 9.24 12.58 14 .37 16.26 16.98 . Map Exhibits Sum of Areas OS 1, OS2 , & OS3) o~' Post-Development c. ~1 f~'~ Drainage Area 240 (outfalls directly to Buena 7.83 10 .69 12.20 13 .80 14.40 Vida Subdivision) Decrease in Peak Flow 1.41 1.89 2 .17 2.46 2 .58 ,. Runoff Flow Direction 2 Southeasterly Outfall to Rock Prairie Road West Location Q2 QIO Q25 Q50 QlOO cfs cfs cfs cfs cfs Pre-Development Drainage Area 101 (Outfalls to roadside ditch 8.19 11.58 13 .30 15.12 15 .78 along Rock Prairie Road West) Post-Development 15 .01 20.48 23.39 26.44 27 .61 Drainage Area 210 (Outfalls to Detention Pond 1) Detention Pond 1 Outfall 5.36 6.15 6.46 6.78 6 .90 Post-Development Drainage Area 230 (Outfalls to roadside ditch 2 .20 3 .01 3.43 3 .88 4.05 along Rock Prairie Road West) Combined Outfall 6 .63 7.92 8.59 9 .2 5 9.47 Decrease in Peak Flow 1.56 3.66 4.71 5 .87 6.31 Runoff Flow D irection 3 Northwesterly Outfall to Barracks II Section 101 Location Q2 QlO Q25 Q50 QlOO cfs cfs cfs cfs cfs Pre-Development @ Outfall (Design flow for Barracks II 3 .61 5.13 5.89 6.70 6 .99 Subdivision Section 101 Storm Sewer Pipe) Post-Development 22.53 30 .75 35.12 39 .70 41.45 Drainage Area 220 (Outfalls to Detention Pond 2) Detention Pond 2 Outfall 3.29 3.69 3 .89 4 .90 5.96 Decrease in Peak Flow 0 .32 1.44 2.00 1.80 1.03 Page 6 of8 As shown in Table 2, the post-development peak outflows from the project site are less than the a llowable peak outflow for each design storm event. Additionally, Tables 3 presents the maximum water surface and the amount of freeboard for the Detention Ponds . The peak flow out of the detention ponds and the maximum water surface was determined by the Storage Routing Analysis and the combining of the resulting hydro graphs with the hydro graphs from the areas that do not flow into the ponds . TABLE 3-Summary of Detention Ponds Maximum Water Surface Levels Detention Pond 1 Storm Event Peak Flow out Water Surface Freeboard of Pond, ( cfs) Elevation, ft. ft. 2-year 5.36 325.30 1.70 10-year 6.15 325 .58 1.42 25-year 6.46 325 .69 1.31 50..:.year 6.78 325 .82 1.18 100-year 6 .90 325 .86 1.14 100-year plugged 8 .29 326.08 0 .92 Top of Berm= 327.25, Spillway Crest= 325 .86, Spillway Width= 20' Detention Pond 2 Storm Event Peak Flow out Water Surface Freeboard of Pond, ( cfs) Elevation, ft. ft . 2-year 3 .29 308.84 1.96 10-year 3.69 309.42 1.38 25-year 3 .89 309.72 1.08 50-year 4 .90 310 .01 0.79 100-year 5.96 310 .09 0.71 100-year plugged 9 .55 310.26 0.54 Top of Berm= 310.80, Spillway Crest= 310.09, Spillway Width= 40 ' The Detention Ponds have overflow spillways which discharges when the outlet structure is clogged. The Detention Pond spillways will be grass lined at the flat crest. The ponds hav e greater than 6" of freeboard ev en with the outlet structure clogged. The grading plan for the Detention Ponds and the pond outlet structure and discharge pipe details are shown on Exhibit E.1 & E.2. Page 7 of8 APPLICABLE EXHIBITS & APPENDICIES CONCLUSION Exhibit A -Drainage Area Map -Pre-Development Exhibit B -Drainage Area Map -Post-Dev elopment Pond Design Exhibit C -Drainage Area Map -Post-Development Pipe Design Exhibit D.1 & D.2 -Buena Vida Drainage Report Exhibits Exhibit E .1 & E.2 -Detention Pond 1 & 2 Design Appendix A -Drainage Area Summary Appendix B 1 -Depth of Flow in Gutter Summary Appendix B2 -Inlet Design Analysis Appendix B3 -Flume Design Analysis Appendix B4 -Storm Sewer Design Analy sis Appendix BS -Culvert Design Summary Appendix B6 -Channel Design Summary Appendix C -Detention Pond 1 & 2 Design Appendix D -Technical Design Summary The storm sewer drainage and detention facilities described in this report are designed in accordance with the standards in the BCS Drainage Design Guidelines with the exception of the use of a mid-block cross drainage valley gutter on Sophi es Lane. The peak runoff flowrate from the site will be less than the pre-development flowrates for all storm ev ents. CERTIFICATION I, Joseph P . Schultz, Licensed Professional Engineer No . 65889, State of Texas, certify that this report for the drainage design for Equinox Subdivision, Phase 1 , was prepared by me in accordance with the provisions of the Unified Stormwater Design Guidelines. .F--123~7 S.CHUL.ti ~,~JNEER(NG1 i,i~; Iosep Page 8 of8 Exhibit A -Drainage Area Map Pre-Development Appendix A -Drainage Area Summary APPENDIX A Equinox Subdivision Phase 1 Drainage Ar ea Summarv Area# 310 311 311A 311B 312 320 321 322 323 324 325 326 327 328 329 330 340 341 342 The Rational Method: Q=CIA Q =Flow (cfs) A= Area (acres) C = Runoff Coeff. I = Rainfall Intensity (in/hr) Brazos County: Area, A c tc (acres) (min) 1.63 0.750 10.0 1.62 0 .750 10.0 0 .92 0 .750 10.0 0.70 0 .750 10.0 0.24 0.750 10.0 1.39 0.350 10.0 . 0.17 0.750 10.0 0 .17 0.750 10.0 1.26 0.750 10.0 0.71 0.750 10.0 0.25 0.750 10.0 0.51 0.750 10.0 0.05 0.750 10.0 0.53 0.750 10.0 0.92 0.350 10.0 1.98 0.500 15.0 0 .68 0.750 10.0 0.10 0.750 10.0 0.83 0.750 10.0 I = b I (tc+d)0 tc =Time of concentration (min) I 0 year storm b= 80 d= 8.5 e = 0.763 10 year storm 100 year storm 110 (in/hr) 8.635 8.635 8.635 8 .635 8.635 8.635 8.635 8.635 8 .635 8.635 8.635 8.635 8.635 8.635 8.635 7.194 8.635 8.635 8.635 010 (cfs) 10.56 10.49 5.96 4.53 1.55 4.20 1.10 1.10 8.16 4 .60 1.62 3 .30 0 .32 3.43 2.78 7.12 4.40 0 .65 5.37 tc; = L/(V*60) L = Length (ft 1100 (in/hr) 11.639 11.639 11.639 11 .639 11 .639 11.639 11 .639 11.639 11.639 11.639 11.639 11.639 11.639 11.639 11 .639 9.732 11.639 11 .639 11 .639 V =Velocity (ft/sec) I 00 year storm b= 96 d= 8.0 e = 0.730 0100 (cfs) 14.23 14.14 8.03 6.11 2.10 5.66 1.48 1.48 11.00 6.20 2.18 4 .45 0.44 4.63 3.75 9 .63 5.94 0.87 7.25 Appendix Bl -Depth of Flow in Gutter Summary Equinox Subdivision Phase 1 Depth of Flow in Gutter (Re fe r to Exhi bi t C for Gutter Locations) Gutter/Inlet A Location Area# (acres} $100 322 0.170 $101 323 1.260 $200 325 0.250 $201 324 0.710 X1 326 0.510 X2 327 0.050 X3 328 0.530 X4 32 1 0.170 XS 341 0.100 X6 342 0.830 X7 311A 0.920 X8 3118 0.700 c Slope (ft/ft) 0.75 0.0198 0.75 0.0198 0.75 0.0200 0.75 0.0200 0.75 0.0290 0.75 0.0290 0.75 0.0198 0.75 0.0198 0.75 0.0304 0.75 0.0304 0.75 0.0103 0.75 0.0106 APPENDIX 81 10-year storm le 1,. o,. a,o +bypass Y1 0 .. ctual (min) (in/hr) (els) (els) (ft) (in) 10.000 6.327 1.10 -0.160 1.92 10.000 6.327 8.16 0.339 4.07 10.000 6.327 1.62 -. 0.1 85 2.21 10.000 6.327 4.60 0.273 3.28 10.000 6.327 3.30 -0.225 2.70 10.000 6.32 7 0.32 0.094 1.13 10.000 6.327 3.43 6.39 0.309 3.71 10.000 6.327 1.10 1.36 0.173 2.08 10.000 6.327 0.65 0.121 1.45 10.000 6.327 5.37 0.268 3.21 10.000 6 .327 5.96 0.341 4.09 10.000 6.327 4.53 -0.306 3.67 Transverse (Crown) slope (ft/ft) Standard and Laydown Curb -10-yr storm max design depth - 4.5" 34 street = 0 .0300 36 street = 0 .0300 Straight Crown Flow (Solved to find actual depth of flow In gutter. yl : Q = 0.56 • (z/n) • S 112 • y113 c> y ={QI [0.56 • (z/n) • S 112]}"' n = Roughness Coefficient = 0 .018 S = StreeUGutter Slope (ft/ft) y = Depth of flow at inlet (ft} z = Reciprocal of crown slope: 34' street= 33 v (fps) 2.58 4.26 2.85 3.70 3.92 2.19 2.15 2 .20 2.65 4.50 3.08 2.91 . Equinox Subdivision Phase 1 Depth of Flow in Gutter (Refer to Exhibit C for Gutter Locations) Gutter/Inlet A Location Area# (acres) S100 322 0 .170 S101 323 1.260 5200 325 0.250 5201 324 0 .710 X1 326 0 .510 X2 327 0 .050 X3 328 0.530 X4 321 0.170 XS 341 0 .100 xe 342 0.830 X7 311A 0 .920 X8 3116 0.700 Transverse fCrownl slope f!Vftl 34 street = 0.0300 38 street = 0.0300 c Slope le (fl/ft) (min) 0 .75 0 .0198 10.000 0.75 0.0198 10.000 0.75 0.0200 10.000 0 .75 0.0200 10.000 0.75 0.0290 10.000 0.75 0.0290 10.000 0.75 0.0198 10.000 0.75 0.0198 10.000 0.75 0.0304 10.000 0.75 0.0304 10.000 0.75 0.0103 10.000 0.75 0.0106 10.000 Straight Crown Flow !Solved to find actual depth of now In gutter. y): Q = o.56 • (zlnJ • s112 • y'" Q v =co / [0.56 • (z/n) • sv'n"' n =Roughness Coefficient= 0.018 S = StreeVGutter Slope (!VII} y = Depth of flow at inlet (ft} z = Reciprocal of crown slope: 34' street= 33 1, .. Q,,. (1n1hr> (els) 11 .639 1.48 11 .639 .11 .00 11 .639 2.18 11 .639 6 .20 11 .639 4.45 11 .639 0.44 11 .639 4.63 11.639 1.48 11 .639 0.87 11 .639 7.25 11 .639 8.03 11 .639 6 .11 APPENDIX 81 100-yaar storm 100-year storm Q1oo + bypass Y100 Allowable v Top of Gutter Gutter ROW Freeboard (els) (ft) (in) Depth (fps) Curb FL Runoff, Elev. Elev. fl. 0.179 2 .15 9 .5" 2 .78 324 .35 323 .85 324.03 324 .64 0.61 0 .379 4 .55 9.5" 4 .59 324.35 323.85 324 .23 324.64 0.41 0 .206 2.48 5 .67" 3 .07 326.43 326.12 326.32 326.59 0 .27 0.305 3.66 5.67" 3.99 326.43 326.12 326.42 326.59 0 .17 0.252 3 .02 5.67" 4.22 324.54 324.23 324.48 324 .70 0.22 0 .105 1.26 5.67" 2 .36 324.54 324.23 324.33 324.70 0 .37 9 .36 0.357 4.28 5 .67" 2.18 322 .13 321 .82 322.17 322 .29 0 .12 1.94 0.198 2.38 5.67" 2.27 322 .13 321 .82 322 .02 322 .29 0.27 0.135 1.62 5.67" 2 .86 323.43 323.12 323 .25 323.59 0.34 0.299 3.59 5.67" 4 .85 323.43 323.12 323.42 323.59 0.17 -0.381 4.57 5.67" 3.32 327.09 326 .78 327.16 327.25 0 .09 0 .342 4 .10 5.67" 3.13 327.10 326.79 327.13 327 .26 0.13 Appendix B2 -Inlet Design Analysis APPENDIX B2 Equinox Subdivision Phase 1 Storm 1 Sewer Inlets on Grade -Design Analysis Inlet Length Street No. ft. Slope S100 5 1.98% S101 10 1.98% S200 5 2.00% S201 10 2.00% Assume 10% clogging for design Se= Sx + (a/w)* Eo Eo= Qw/Q = 1 - [ 1 -W /T]2"67 L=Kc*Q0 .47 *S 0 ·3*(1 /(n *Se) )°"6 Q10 cfs 1.10 8.16 1.62 4 .60 L10,ft. Design 9.06 23.22 10 .89 17.79 W =Width of Depressed Gutter (ft)= 2 Sx=Cross flow of Road Surface 0.03 T=Total Spread of water in gutter (ft) 12.5 a=Gutter depression depth (ft)= 0.33 n=Manning's Roughness Coefficient= 0.018 Kc= 0 .6 Qw=Flow in width, W E=Efficiency of inlet or percentage of intercepti.on S=Longitudinal Slope Li=Curb opening length Se = Sx + (a/w)* Eo Eo= Qw/Q = 1 -[ 1 - W /T]2·57 0.091412 0.372194 Bypass cf s 0.26 2.96 0 .54 1.04 0100 L 100, ft. Bypass cfs Design cfs 1.48 10.42 0.46 11.00 26.72 4 .73 2.18 12.53 0.87 6.20 20.47 1.85 Appendix B3 -Concrete Channel Design Analysis Equinox Subdivision Phase 1 Concrete Channel -Design Analysis (Refer to Exh ibit C for Flume Locations) Concrete A Channel c Location Area# (acres) F1 31 1 1.620 0.75 - F2 31 2 0.240 0.75 le (min) 10.000 10.000 APPENDIXB3 Concrete Channel Information Dept h Bottom Width Slope Mann ing 's 1,. (fl) (fl) (ft/fl) n (In/hr) 0.500 6 .000 2 .0% 0.016 6.327 0.500 4.000 3.1% O.D16 6.327 10-year storm 100-yea r storm a,. Flow Depth v Freeboard to 1,,. a,,. Flow Depth v Freeboa rd to Top of Top of Concrete Concrete Curb (els) (fl) (fps) Channel (fl) (In/hr) (els) (fl) (fps) (fl) 10.49 0.340 5.15 0.74 11 .639 14.14 0.41 0 5.76 0.67 1.55 0.120 3.23 0.36 11.639 2.10 0 .150 3.50 0.35 - Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® _Civil 3D® by Autodesk , inc. Concrete Flume 1 -10 Year Storm User-defined Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) (Sta, El, n)-(Sta, El, n) ... = 325.52 = 2.00 = 0.018 Known Q = 10.49 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) Tuesday, Jul 15 2014 = 0.34 . = 10.49 = 2.04 = 5.15 = 6.66 = 0.46 = 5.99 = 0.75 ( 0 .00 , 326 .59)-(4.00, 326.02, 0 .045)-(4.50, 326.02 , 0 .018)-(4 .51 , 325 .52 , 0.018)-(10.49, 325.52, 0.018 )-(1 0 .5 0, 326 .02, 0 .018)-(11.00, 326.02 , 0 .018) -(15.00, 326 .59, 0.042) Elev (ft) Section Depth (f1 327.00 1.48 f'-/ "'" ~v 326 .50 0.98 '\ / ["\. / "'" )/ 326.00 '\ -_/ 0.48 "---v--- ·~·~HH ···-----· ~--------·-·-HHoH----··•--H "-~--- 325.50 -0 .02 325.00 -0.52 -2 0 2 4 6 8 10 12 14 16 18 Sta (ft) .. Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Tuesday, Jul 15 2014 Concrete Flume 1 -100 Year Storm User-defined Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) (Sta, El, n)-(Sta, El, n) ... = 325.52 = 2.00 = 0 .018 Known Q = 14.14 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.41 = 14.14 = 2.46 = 5 .76 = 6.80 = 0.60 = 6.00 = 0.93 ( 0.00 , 326.5 9)-(4 .00 , 326 .02, 0.045)-(4.50, 326.02 , 0 .018)-(4.51, 325 .52, 0 .018)-(10.49, 325 .52, 0.018)-(10.5 0 , 326.02 , 0.018)-(11.00, 326 .02 , 0.018) -(15.00, 32 6.59 , 0 .042) Elev (ft) Section Depth (ft 327 .00 1.48 I\.. / ' / ~ 326.50 0 .98 " 7 I' / ' /7 '\ .... _/ v 326.00 0.48 - ---~------.. ··--·-----·· ·----·------·---·-··---··----· 325 .50 -0.02 325 .00 -0.52 -2 0 2 4 6 8 10 12 14 16 18 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk , Inc. Concrete Flume 2 -100 Year Storm Rectangular Bottom Width (ft) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) = 4.00 = 0.50 = 325.50 = 3.10 = 0.018 Known Q = 2.10 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) Tuesday, Ju l 15 201 4 = 0.15 = 2.100 = 0.60 = 3.50 = 4.30 = 0.21 = 4.00 = 0.34 Depth (f1 327.00 -----,------,-----,----,-----...----r----.------.----~--,..------,-1.50 326 .50 -+----+---+----+-----+----+---+---+---+------1f------+-1.00 326 .00 -+---+---+---+----t----+----+---+---+----1-------l-0.50 1---+----------------t-----t--------------1----1--- --1------'-t------------· --------· -----·-· ------------· ------· --------'-----~----- 325.50 --+----+----+-----+----+----+----+----+----+----.__----11--0 .00 325.00 ~--~-----'-----'-----'-----'-----'------'------'-----'-------'--0.50 0 .5 1 1.5 2 2 .5 3 3 .5 4 4 .5 5 Reach (ft) Channel Report Hydrafl ow Express Extension for Autodesk® Au toCAD® Civil 30® by Autodesk , Inc . Concrete Flume 2 -10 Year Storm Rectangular Bottom Width (ft) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) = 4.00 = 0.50 = 325.50 = 3.10 = 0.018 Known Q = 1.55 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) Tuesday, Ju l 15 2014 = 0.12 = 1.550 = 0.48 = 3.23 = 4.24 = 0.17 = 4.00 = 0.28 Depth (fl 327 .00 ----r'----,----..------.----.-----r-----.-----.-----,-------,...------,-1.50 326.50 --+----+-----+-----+----+----+----+---+----+----1--------l-1.00 326.00 --+----t----+----+----+----+----i----+----1-------Ji-----+-0 .50 1------4---·----------·-----------1-----1----+-----t 1---l~=~===+===t====-=-=~-=-·I=-·=-· =::1====t===--=--1-.. f--· ·-·----- 325.50 ----r----t----T-----t----t----t----+----+----+-----lf-----j-0 .00 325 .00 ~--~--~--~--~--~--~---'-----'------'-----------'--0.50 0 .5 1 1 .5 2 2.5 3 3.5 4 4 .5 5 Reach (ft) Appendix B4 -Storm Sewer Pipe Design Analysis APPENDIX 84 Equinox Subdivision Phase 1 Storm Sewer Pipe Design Analysis (1 O yr Storm) HG10 Depth Pipe P ipe Pipe Pipe No. Size Length Slope (Inches) (feet) (%) Nonnal Depth Surcharged Q10 V10 Depth HG10 V10 (els) (fps) (feet) Slope (fps) Downstream Top Pipe Structure Elev. FL Upstrea m Top Pipe HG10 Structure Elev. FL Elev. Below Gutter (feet) 100 18 38 .0 1.00 1.08 4.24 0.33 0.01% 0.61 S101 324 .35 320.59 S100 324 .35 320 .97 320 .29 3.56 101 18 146.1 ..-2.25 7.29 8.52 0.80 0.48% 4.13 OUT100 317 .21 S101 324 .35 320.49 320 .30 3.55 200 18 42 .0 0.80 1.42 4.41 0.40 0.02% 0.80 S201 326 .43 322 .58 S200 326.43 322 .918 322 .40 3.53 201 18 121.4 0.80 5.67 5.87 0.89 0.29% 3.21 S202 325 .20 321 .51 S201 326.43 322.482 323 .38 2.55 202 18 24 .0 2.25 5.67 8.72 0.64 0.29% 3.21 OUT200 -320 .87 S202 325 .20 321.411 323.32 1.38 Notes 1. Friction losses and minor losses for 16" diameter pipe are computed as for a 15.6" diameter pipe which represents a 25% reduction in pipe flow area. 2 . Friction losses and minor losses for 24" diameter pipe are computed as for a 20.6" diameter pipe which represents a 25% reduction in pipe flow area. APPENDIXB4 Equinox Subdivision Phase 1 Storm Sewer Pipe Design Analysis (100 yr Storm) HG100 Depth Pipe P ipe Pipe Pipe No. S ize Length Slope (inches) (feet) (%) Nonnal Depth Surcharged Q100 V100 Depth HG100 V100 (els) (fps) (feet) Slope (fps) Downstream Top Pipe Structure Elev. FL Upstream Top Pipe HG100 Structure Elev. FL Elev. Below ROW (feet) 100 18 36 .02 1.00 1.37 4.53 0.37 0.02 % 0.78 S101 324.35 320 .59 S100 324.35 320.97 320 .41 4.27 101 16 146.06 2.25 8.78 8.83 0.91 0.70% 4.97 OUT100 317 .21 S101 324.35 320.4 9 320 .34 4.34 200 16 42 .02 0.60 1.74 4 .72 0.44 0.03% 0.99 S201 326.43 322 .58 S200 326.43 322 .918 322.64 4 .12 201 18 121 .35 0.80 7.28 6.11 1.17 0.48% 4.12 S202 325.20 321 .51 S201 326.43 322.462 326.47 0.29 202 18 24.02 2.25 7.18 9.27 0.74 0.47% 4.07 OUT200 -320.87 S202 325.20 321.4 11 323.36 2.17 Notes 1. Friction losses and minor losses for 16" diameter pipe are computed as for a 15.6" diameter pipe which represents a 25% reduction in pipe flow area. 2 . Friction losses and minor losses for 24' diameter pipe are computed as for a 20.6" diameter pipe which represents a 25% reduction in pipe flow area. Appendix BS -Culvert Design Summary Equinox Subdivision Phase 1 Culvert Design Summary (Refer to Exhibit C for Culvert Locations) Pipe Pipe Size Length No. (in) (ft) 300 15"x24" Box 60.0 Appendix BS Slope Contributing Drainage Areas (%) 0.5 330 Q10 V10 D10 Q100 V100 D100 (cfs) (fps) (ft) (cfs). (fps) (ft) 7 .12 4.85 0.73 9.63 5.36 0 .90 Culvert Report Hyd rafl ow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autod esk, Inc. CULVERT 300 -10 YEAR STORM Invert Elev Dn (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in)" No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M ,c ,Y ,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) = 324.09 = 60.00 = 0.50 . = 324 .39 = 15.0 = Box = 24.0 = 1 = 0 .012 = Rectagular Concrete = Slope tapered, more favorable edges = 0.5 , 0.667, 0 .0378, 0.71 , 0.2 = 326.32 - = 48.00 = 48.00 Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal ( cfs) Qpipe (cfs) Qovertop ( cfs) Veloc On (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Tu esday, J ul 15 2014 = 7.12 = 9.63 = (dc+D)/2 = 7.12 = 7 .12 = 0.00 = 3 .59 = 4 .85 = 325.08 = 325.12 ~56 <­ ~ = Inlet Control Elev (ft) CULVERT JOO -10 YEAR STORM Hw Depth (ft) 327.00 ~---.---.---..------r---.---.---..------r---.---.---.-------.----.--.----,--,---2.61 to 1s 20 2D 30 36 40 45 60 65 60 66 10 1s so --Box Culvert --HGL --Embank Re1c:h(ft) Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk , Inc. CULVERT 300 -100 YEAR STORM Invert Elev On (ft) Pipe Length (ft) Slope(%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) Elev(ft) = 324.09 = 60.00 = 0.50 = 324.39 = 15.0 = Box = 24.0 = 1 = 0.012 = Rectagular Concrete = Slope tapered, more favorable edges = 0.5, 0.667, 0.0378, 0.71, 0.2 = 326.32 = 48.00 = 48.00 CULVERT 300 -10 YEAR STORM Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal ( cfs) Qpipe (cfs) Qovertop (cfs) Veloc On (ft/s) Veloc Up (ft/s) HGL On (ft) HGL Up (ft) Hw Elev (ft) Hw/O (ft) Flow Regime · Tuesday, Jul 15 2014 . = 7.12 = 9.63 = (dc+0)/2 = 9.63 = 9.63 = 0 .00 = 4.49 = 5.36 = 325.16 = 325.29 = 325.84 = 1.16 = Inlet Control ttw Depih (ft) 32:3.50 --+--+---+--t---+--+---+--t---+--+--+--1----+--l---l---lf----l----0.69 10 16 20 25 30 35 40 45 50 65 60 65 70 75 60 --Bex CUNOll --HGL --Embank Reoch(ft) . ·.:=:-.•.•.·,,-. Appendix B6 -Channel Design Summary Equinox Subdivision Phase 1 Channel Design Summary (Re fe r to Exhibit C for Channel Locations) Channel Channel Geometry No. ChlOO 4' Bottom -4H: 1 V Ch200 4' Bottom -4H:lV Slope (%) l.ll 1.4 App end ix B6 Contributing Contributing Drainage Areas Pipes or Channels 320 ,321 ,328 Ch200 , PlOl 326,327,329 P202 010 V 10 D 10 0 100 V 100 0 100 (cfs) (fps) (ft) (cfs) (fps) (ft) 29 .85 3.42 1.06 40 .23 3 .71 1.22 12.22 2.91 0 .64 16.47 3.20 0 .74 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 100 -10 yr Storm Trapezoidal Bottom Width (ft) Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 312.00 311 .50 311.00 310.50 310 .00 309.50 309.00 308.50 0 '\. 2 '\. '\. '\. " I'\. 4 = 4.00 = 4.00, 4 .00 = 2.00 = 309 .02 = 1.11 = 0.035 Known Q = 29.85 '\. '\. '\. ' I'\. '\. '\. '\. 6 ' I'\. 8 Section '~ -- '\. '\. '\. ., 10 12 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft). EGL (ft) / / / '"' / / / / I/ / / / / I/ 14 16 18 / / . I/ / 20 · Tuesday, Jul 15 2014 = 1.06 = 29.85 = 8.73 = 3.42 = 12.74 = 0.90 = 12.48 = 1 .24 / / 22 24 Depth (ft 2.98 2.48 1.98 1.48 0 .98 0.48 -0 .02 -0.52 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Au todesk, Inc. Channel No 100 -100 yr Storm Trapezoidal Bottom Width (ft) Side Slopes (z:1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 312 .00 311.50 311 .00 310.50 310.00 309.50 309.00 308.50 0 ' 2 ' ' ' ... ' = 4.00 = 4.00 , 4.00 = 2.00 = 309.02 = 1.11 . = 0.035 Known Q = 40.23 ' ... ' ... I\. ' ' ' ... ' 4 6 8 Section ~ ~ -- ' ' ' ' 10 12 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) / 'I' / / I / , / / / / 'I' / / / / / 14 16 18 20 / Tuesday, Jul 15 2014 = 1.22 = 40.23 = 10.83 = 3.71 = 14.06 = 1.05 = 13.76 = 1.43 / / 22 24 Depth (ft 2.98 2.48 1.98 1.48 0.98 0.48 -0.02 -0.52 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 30® by Autodesk, Inc. Channel No 200 -10 yr Storm Trapezoidal Bottom Width (ft) Side Slopes (z:1) Total Depth (ft} Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft) 318.00 " " " 317.50 317.00 316.50 316.00 315.50 315.00 0 2 '\ ' " = 4.00 = 4.00, 4.00 = 2.00 = 315.93 = 1.40 = 0.035 Known Q = 12.22 " " " ' "' " " " ' "' 4 6 8 Section "I: t7' -- " '\ " ' 10 12 Reach (ft) Highlighted Depth (ft} Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft} Crit Depth, Ye (ft) Top Width (ft) EGL (ft} / / / , 7 / 7 ,/ / / J , ~ / / / / , 14 16 18 20 Tuesday, Jul 15 2014 = 0.64 = 12.22 = 4.20 = 2.91 = 9.28 = 0.55 = 9.12 = 0.77 / / 22 24 Depth (f1 2 .07 1.57 1.07 0.57 0.07 -0.43 -0.93 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc . Channel No 200 -100 yr Storm Trapezoidal Bottom Width (ft) Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) Elev (ft ) 318 .00 317 .50 317.00 316.50 316.00 315.50 315 .00 0 \. 2 \. \. \. ' \. 4 = 4.00 = 4.00 , 4.00 = 2 .00 = 315.93 = 1.40 = 0.035 Known Q = 16.47 \. \. \. ' \. \. " \. ' \. \. \. \. ' 6 8 10 Section ~ 17 -- 12 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft) / / ' / / / / , / / , / , / / / / If 14 16 18 20 Tuesday, Jul 15 2014 = 0.74 = 16.47 = 5.15 = 3 .20 = 10.10 = 0.65 = 9.92 = 0.90 / / 22 24 Depth (ft 2 .07 1.57 1.07 0.57 0.07 -0.43 -0.93 Appendix C -Detention Ponds 1 & 2 E quinox Subd iv isi on P hase 1 Detent ion A ppendix C P ro pose d Dra in age An a lys is Drainage A r ea S u mmary -Detention Facilit ies Area, A c le Area # (acres) (min) 101 4.69 0.45 25 .0 Area to Barracks 2.44 0.40 27.0 II Section 101 2 10 3.54 0.67 10 .0 220 6.14 0.58 10 .0 230 0.58 0.60 10.0 240 1.65 0.75 10.0 *Detention Pond Area 210 Routed Through Detention Pond 1 1 Outflow Combined Outfall Detention Pond 1 Outfall Combined with 1 Area230 *Detention Pond Area 220 Routed Through Detention Pond 2 2 Outflow T he R atio n al Meth od : Q =CIA I= b I (tc;+d)• 2 yea r storm 12 Q, (in/hr) (cfs) 3.88 8.19 3.70 3.61 6.33 15.01 6.33 22 .53 6.33 2.20 6.33 7.83 5.36 6.63 3.29 Q =Flow (cfs) A= Area (acres) C = Runoff Coeff. tc =Time of concentration (min) I= Rainfall Intensity (in/hr) Brazos County: 2yearstorm b= 65 d=8 e = 0.806 10 vear storm b= 80 d= 8.5 e= 0.763 10 year storm 110 Q,o (in/hr) (c fs) 5.49 11.58 5.25 5.13 8.63 20.48 8.63 30 .75 8.63 3.00 8.63 10 .69 6.15 7.92 3.69 25 year storm b= 89 d= 8.5 e= 0.754 25 year storm 1,, Q,, (in/hr) (cfs) 6.30 13 .30 6.03 5.89 9.86 23 .39 9.86 35 .12 9.86 3.43 9.86 12.20 6.46 8.59 3.89 50 vear storm b= 98 d = 8.5 e = 0.745 50 year storm lso (in/hr) 7.1 6 6.86 11.15 11.15 11.15 1U5 Q50 (cfs) 15 .12 6.70 26.44 39.70 3.88 13 .80 6.78 9.25 4.90 t. = L/(V*60) L = Length (ft 100 year storm 1100 Q100 (in/hr) (cfs) 7.48 15.78 7.16 6.99 11.64 27 .61 11.64 41.45 11.64 4 .05 11.64 14.40 6.90 9.47 5.96 V =Velocity (ft/sec) 100 year storm b= 96 d= 8.0 e = 0.730 Tsheet = 0.007(L*n)0.8 (P 2) 0.5 *(S) 0.4 T,hee• = time of concentration for sheet flow (b.r) L = length (ft) n = MaruJ.i.ng's n P 2 = 2-yr rainfall intensity (in/hr) for Brazos Co . = S = slope (ft/ft) 4.5 Equinox Subdivision Phase 1 Detention Time of Concentration Appendix C (TR-55 Method) DA101 T= L/(60*V) T = travel time through ditch. or gutter (min) L = length of travel path (ft) V = velocity (ft/sec) Sheet Flow Shallow Concentrated Flow Culvert Flow Concentrated Flow 1--~~~~~~~~~~~~-1-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-1-~~~~~~~~~~~~TotalTc Length Slope T ,,_ Length Slope Velocity I T '"'"""'" Length Slope Velocity T w,,,.,.,. Length Slope Velocity T '"'"'""' Drainage Area n ft % min. ft % ft/sec min ft % ft/sec min ft % ft/sec min min 101 ·~. 25.0 Detention Pond 1 AppendixC Detention Pond 1 Summary Detention Pond 1 Design Storm Inflow Outflow W.S. Elevation (yr) (cfs) (cfs) (ft) 2 15.01 5.36 325.30 -----------------------------------------------------------------------------10 20.48 6.15 325.58 25 23.39 6.46 325.69 50 26.44 6.78 325.82 100 27.61 6.90 325.86 100 Plugged 27.61 8.29 326 .08 Top of Pond Berm= 327 .25', Top of Spillway 325 .86' Elevation (ft) 323.5 324 .0 324 .5 325.0 325.5 326 .0 326.5 Detention Pond 1 Appendix C Detention Pond 1 Area-Capacity Data Detention Pond 1 Depth Volume Cumulative Volume (ft) (ft3) (ft3) 0.0 0 0 0.5 28 28 1.0 458 486 1.5 3 ,067 3,553 2 .0 6,800 10,353 2 .5 10,133 20,486 3.0 15,892 36,378 90% Cumulative Volume (ft3) 0 26 442 3,230 9,412 18 ,624 33 ,071 Elevation (ft) 323.5 324.0 324 .5 325.0 325 .5 326 .0 326 .5 Notes: Detention Pond 1 Appendix C Elevation -Discharge Data Depth-Disc harge Data 15" Outfall Pond Pipe Depth . Flow (ft) (cfs) 0.0 0.00 0.5 1.10 1.0 2.89 1.5 4 .30 2.0 5 .94 2.5 7 .22 3.0 8.31 zoidal 20' Trape Wei r Flow (cfs ) 0.00 0.00 0 .00 0 .00 0.00 0 .00 0 .00 Total Design Flow (cfs) 0.00 1.10 2.89 4.30 5.94 7.22 8 .31 1. The Outlet Structure is a 15" outfall pipe. 2. The overflow spillway is a trapezoidal weir at 325.86 ' and 20' wide. Pond Elevation Depth (ft) (ft) 323.5 0 .0 324 .0 0.5 324 .5 1.0 325 .0 1.5 325.5 2.0 326 .0 2 .5 . 326.5 3.0 Notes: Detention Pond 1 Plugged Condition Depth-Disc harge Data 15" Outfall Pipe Flow (cfs) 0.00 0.00 0.00 0 .00 0.00 0 .00 0 .00 zoidal 20' Trape Wei . r Flow (cfs ) 0.0 0 0 .0 0 0.0 0 0.0 0 0 .0 0 3.4 9 34.1 0 Total Design Flow (cfs) 0.00 0.00 0.00 0 .00 0.00 3.49 34.10 1. The Outlet Structure is a 15" outfall pipe. 2. The overflow spillway is a trapezoidal weir at 325.86 ' and 20 ' wide. - t=60s Elevation (ft) 323 .50 324.00 324.50 325.00 325.50 326.00 326 .50 Detention Pond 1 AppendixC Storage Routing Analysis Parameters Detention Pond 1 Depth Discharge Storage 2 sit (ft) (0, cfs) (s, cf) 0.0 0.00 0 .0 0.0 0.5 1.10 25.6 0.9 1.0 2.89 442.0 14.7 1.5 4.30 3230.0 107 .7 2.0 5.94 9412.0 313.7 2.5 7 .22 18624.0 620.8 3.0 8.31 33071.0 1102.4 . 2 sit+ 0 0.00 1.95 17.62 111.97 319.67 628.02 1110.68 The Outlet Structure is a 15" pipe. The overflow spillway is a trapezoidal weir at elev= 325 .86' . ~/· ·-~ • Inflow; ·;:;, .l'r411·: ,·,~,. : ~zyr r. .,:Time'{ ·rilin) Q(cfs) ~-)!Ji~;j; ;~ Q}\1t .-:, 0.00 ,.,•!'.·..{;[i~'i~·'.) 1.50 }i;f-'.jt2)< ·~.•:•: 3.00 ~w.-,;;.·3.~ !ij)i.i\,o, 4.50 ... ·-.. 6.00 . •'.:' ~ .. ~.,,,. ·:"::;.::rn ,._. .. '.'< ~:: 7.50 ,' • 04 ')"\ 9.00 •' .. ,7;;,z,::;, 10.50 . ->c~6JL 12.00 . ·"'':~}fit,/':'•· 13.50 :.;::;;_: 10~:·;:;:,. .'.·15.01''· ~. ,, n1},'ii$-.• 14.25 lii;l.2.~i: j 13.50 ·, *lf3;tt,~1~' 12.75 /"., ';1i'~J..4;jj:l: ;~ 12.00 .I~ tk. f?;~J\F 11.25 ;,.,; '·f·)l6'f~'l'l' 10.50 " ;'ff1' '"'ifr 9.75 ·<1_8:: , .. -:-9.00 :•: ~ 12~~;;;: -8.25 tf ,'{'i{J:" •.· 7.50 "' . 2.Vt':'' -6.75 -;;I" :22.~·.ii'c'· 6.00 . ,:~<~'~:~23 ;~4~·\: 5.25 : ~UJ24.~W>1~f' 4.50 y·'.':; -~ 2!ift'\i'(l 3.75 '(.;b/J,,l26t);.f':~-~ 3.00 1~f!/~~{2]fi~j;~;,' .· •. 2.25 -~f-~28<'. ,' 1.50 •A~5~1'.:~ :2~r~.~t~;• '' 0.75 zw~.:«,~Q;;.,; .. 0.00 ... ,.,1)!~\j;,.,,.,. 0.00 · ,~;·3:zv,t' 0.00 .,r. ·: 3l ",,; 0.00 ~3~~ :~4~·-.:,.~,-"'· 0.00 ; ; ,/~ff/;t,''" 0.00 ',' ·;.,.;i(l~6t%" ·~< 0.00 .. .,,.,"' '""'""-i;to~: ·<;;> 0.00 j w Ji.:38'.~t;'{f 0.00 ,,H ·.~~S, ~· ·i< :°_r:;i;; 0.00 ,£.ij/!"~~4Q~~ ~s~?~ 0.00 .... ; 4ti: :'·'· '. 0.00 ,.~ •,-<42~ .,, 0.00 -""'Vf~: ·1~~?· 0.00 ~· •• ~t.,~~~~-0.00 .z~~~;'.t1$~tt~ 0.00 ~· "'j:4<i '§;t" 0.00 .::~;:'(AJ·~~~i<. 0.00 ·"'"'''\:46~~\\J:· 0.00 ~t;~--~:)'.~9:/).tx~~ 0.00 ;',;.:::'=...501,fJ\. 0.00 'i°";i/f!~J;~·~ 0.00 'f•.;j>:,52-'t"~ .-0.00 · z,'ii\53~-'''" , 0.00 ·\,.,,54 .... ~'i~,, 0.00 "":'.:. 55 <·,: 0.00 "<. ;;, 56'.<,,'. ':'. 0.00 ·~ ~t·:s1-~--: :~~ 0.00 , •• ;; ;/:;5 8;,, .;t;';\' 0.00 ··,-s"~'i59;\''"',.:. 0.00 Detention Pond 1 Inflow & Outflow Bydrographs Appendix C Qu'tflow <.·hi,flow 'ouffiow '"Inflow Oiitflow • ·Iii.tfow· ~>'2yr'· _-;t-lOyr :\ 5+1C>Y,r _ '25yf:.,,. :: f;t5yt ;1 ·~. ·;spyi/~ Q(cfs) Q(cfs) Q(cfs) Q(cfs) Q(cfs) Q(cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.79 2.05 1.12 2.34 1.15 2.64 1.41 4.10 1.60 4.68 1.73 5.29 1.97 6.14 2.42 7.02 2.66 7.93 2.70 8.19 2.96 9.36 3.01 10.58 2.98 10.24 3.11 11.69 3.17 13.22 3.11 12.29 3.24 14.03 3.21 15.86 3.22 14.34 3.37 16.37 3.70 18.51 3.19 16.38 3.95 18.71 4.31 21.15 3.65 18.43 4.40 21.05 4.59 23.80 4.13 • 20.48:'> .. 4.67 ,, 23;39?' 4.89 i~•26-.44 ·'' 4.42 19.46 4.93 22.22 5.18 25.12 4.59 18.43 5.15 21.05 5.43 23.80 4.74 17.41 5.35 19.88 5.65 22.47 4.87 16.38 5.52 18.71 5.84 21.15 4.98 15.36 5.67 17.54 5.99 19.83 5.07 14.34 5.80 16.37 6.09 18.51 5.15 13.31 5.91 15.20 6.17 17.19 5.22 12.29 5.98 14.03 6.25 15.86 5.27 11.26 6.04 12.86 6.31 14.54 5.31 10.24 6.08 11.69 6.36 13.22 5.34 9.22 6.11 10.53 6.40 11.90 5.36 8.19 6.14 9.36 6.43 10.58 /~'S.36.-7.17 6.15 8.19 6.45 9.25 5.35 6.14 ,;,,:6;15' -· 7.02 !·"6.4&H•: 7.93 5.33 5.12 6.15 5.85 6.46 6.61 5.30 4.10 6.14 4.68 6.45 5.29 5.26 3.07 6.11 3.51 6.43 3.97 5.21 2.05 6.08 2.34 6.40 2.64 5.15 1.02 6.04 1.17 6.36 1.32 5.07 0.00 5.99 0.00 6.31 0.00 4.99 0.00 5.93 0.00 6.26 0.00 4.91 0.00 5.85 0.00 6.20 0.00 4.83 0.00 5.77 0.00 6.15 0.00 4.75 0.00 5.69 0.00 6.09 0.00 4.66 0.00 5.60 0.00 6.04 0.00 4.58 0.00 5.52 0.00 5.98 0.00 4.50 0.00 5.44 0.00 5.92 0.00 4.42 0.00 5.36 0.00 5.84 0.00 4.34 0.00 5.28 0.00 5.76 0.00 4.20 0.00 5.20 0.00 5.68 0.00 4.02 0.00 5.11 0.00 5.60 0.00 3.84 0.00 5.03 0.00 5.51 0.00 3.66. 0.00 4.95 0.00 5.43 0.00 3.48 0.00 4.87 0.00 5.35 0.00 3.30 0.00 4.79 0.00 5.27 0.00 3.20 0.00 4.71 0.00 . 5.19 0.00 3.25 0.00 4.62 0.00 5.11 0.00 3.23 0.00 4.54 0.00 5.02 0.00 3.19 . 0.00 4.46 0.00 4.94 0.00 3.13 0.00 4.38 0.00 4.86 0.00 3.06 0.00 4.29 0.00 4.78 0.00 2.98 0.00 4.11 0.00 4.70 0.00 2.90 0.00 3.93 0.00 4.62 0.00 2.34 0.00 3.75 0.00 4.53 0.00 1.79 0.00 3.57 0.00 4.45 0.00 1.37 0.00 3.39 0.00 4.37 0.00 0.66 0.00 3.21 0.00 4.27 0.00 0.00 0.00 3.22 0.00 4.09 0.00 0.00 0.00 3.24 0.00 3.91 0.00 Outflow •• lfilloW.' Ou~QWc . ~ 50yr. " " 100Yf ~ ., lOOyr''· Q(cfs) Q(cfs) Q(cfs) 0.00 0.00 0.00 1.19 2.76 1.21 1.86 5.52 1.91 2.89 8.28 2.90 3.06 11.04 3.08 3.22 13.80 3.24 3.35 16.56 3.45 4.01 19.32 4.13 4.47 22.08 4.53 4.78 24.85 4.86 5.12 ·'f\21.61' 5.20 5.43 26.23 5.53 5.71 24.85 5.81 5.95 23.46 6.03 6.09 22.08 6.18 6.22 20.70 6.31 6.33 19.32 6.43 6.43 17.94 6.53 6.52 16.56 6.62 6.59 15.18 6.69 6.65 13.80 6.76 6.70 12.42 6.81 6.73 11.04 6.85 6.76 9.66 6.92 6.77 8.28 7.01 _,,.,_6.78'~ 6.90 '' 7jj3::{ 6.77 5.52 7.00 6.75 4.14 6.91 6.73 2.76 6.84 6.69 1.38 6.81 6.64 0.00 6.76 6.58 0.00 6.70 6.53 0.00 6.65 6.47 0.00 6.59 6.42 0.00 6.54 6.37 0.00 6.48 6.31 0.00 6.43 6.26 0.00 6.37 6.20 0.00 6.32 6.15 0.00 . 6.26 6.09 0.00 6.21 6.04 0.00 6.15 5.98 0.00 6.10 5.92 0.00 6.04 5.84 0.00 5.99 5.75 0.00 5.93 5.67 0.00 5.85 5.59 0.00 5.77 5.51 0.00 5.69 5.43 0.00 5.60 5.35 0.00 5.52 5.26 0.00 5.44 5.18 0.00 5.36 5.10 0.00 5.28 5.02 0.00 5.20 4.94 0.00 5.11 4.86 0.00 5.03 4.78 0.00 4.95 4.69 0.00 4.87 4.61 0.00 4.79 · ~:IIiflow.t"· ;outflo\V :· . Iiilli>:"'.bi' "O!ifflow,. ''tlnflowi',. 1 Outflow·; ::)Qllo"'.~· , Qutftow; lf~~iU,li'>wJ' :~OJi!flo\if.' -:,,·,:2.y~,,~11, '.i~;2:Yr,,,., .1.:;101f&· f;:2.l:Q}'rio,?,· .l:;j'2:5Yi'}~i' ·t',iSif"'\'li ~,;%10W'?; ~t 'sqyr~ ;p;£lOOYi ,. :tllOO)ir~s.: 0.00 0.00 0.00 3.21 0.00 3.73 0.00 4.53 0.00 4.71 0.00 0.00 0.00 3.16 0.00 3.55 0.00 4.45 0.00 4.62 0. 0.00 3.16 0.00 3.55 0.00 4.45 0.00 4.62 0.00 0.00 0.00 3.09 0.00 3.37 0.00 4.37 0.00 4.54 0.00 0.00 0.00 3.02 0.00 3.19 0.00 4.27 0.00 4.46 0.00 0.00 0.00 2.94 0.00 3.23 0.00 4.09 0.00 4.38 •.,;:;,z:t)5,'!l;~'i11'fl o.oo I o.oo I o.oo I 2.66 I o.oo I 3.24 I o.oo I 3.90 I o.oo I 4.29 I"';;:,, Q(i.~i;·I o.oo I o.oo I o.oo I 2.07 I o.oo I 3.21 I o.oo I 3.72 I o.oo I 4.11 o.oo I o.oo I o.oo I 1.58 I o.oo I 3.15 I o.oo I 3.54 I o.oo I 3.93 1,, fj;.'·.f~~c,0;i'jhJ o.oo I o.oo I o.oo I 1.19 I o.oo I 3.09 I o.oo I 3.36 I o.oo I 3.75 o.oo I o.oo I o.oo I 0.07 I o.oo I 3.01 I o.oo I 3.19 I o.oo I 3.57 o.oo I o.oo I o.oo I 0.02 I o.oo I 2.93 I o.oo I 3.23 I o.oo I 3.39 o.oo I o.oo I o.oo I 0.01 I o.oo I 2.60 I o.oo I 3.24 I o.oo I 3.21 o.oo I o.oo I o.oo I 0.01 I o.oo I 2.02 I o.oo I 3.21 I o.oo I 3.22 o.oo I o.oo I o.oo I 0.01 I o.oo I 1.54 I o.oo I 3.15 I o.oo I 3.24 o.oo I o.oo I o.oo I o.oo I o.oo I 1.16 I o.oo I 3.08 I o.oo I 3.21 o.oo I o.oo I o.oo I o.oo I o.oo I 0.01 I o.oo I 3.01 I o.oo I 3.16 I o.oo I o.oo I o.oo I o.oo I o.oo I 0.01 I o.oo I 2.93 I o.oo I 3.10 Hrnf!#[/Z7lfiT.£.f'I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 2.57 I o.oo I 3.02 J.•ri;;:~1.s·~·1'.i'YI 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 1.99 I 0.00 I 2.94 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 1.52 I o.oo I 2.66 "· .•.;·so:PJ;¥.'.icj;J 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 1.15 I 0.00 I 2.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 -·G,~, o.oo I 0.00 I o.oo I o.oo I o.oo I 0.00 I o.oo I 0.00 I 0.00 I 0.02 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 0.01 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 0.01 o.oo I o.oo I o.oo I o.oo I 0.00 I o.oo I o.oo I o.oo I o.oo I 0.01 ii}i.8.$;ji',.,~\!f, 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 li'l;\,jj9:;/¢;,'!'.·' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo I o.oo I 0.00 I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I 0.00 I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo ,,,t..,f,;.96~)i!i'ii:I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo J;rw;;97~4,;'.>'~I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo .f~~!';''·~flt~}i''' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ~i'O!it~~ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 •••:'~:\'{(Of~?~f;;' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 l;~ft~:\:I,qt;;.;;,\J o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l;::•:',!i'lo~;i·;, 'kl o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo c~~Q4:$$"'.i!·l o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l'•·:':i~~fpss'fo;: I o .. oo I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 ·~~"'•;\!,tp~"i~h~efl o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo i.;t'~HQ1f!iYJJ. I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I . o.oo ."•·;;;.~(O~J!i~1;:; I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo · /ii~b!l!i£ilL I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo j.):.4f~t10f;£;!!~:1 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo :J¥s6,·n1!*'ii1z: o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo :~:"'i:tM~~" o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo '""''' .i' ,~,,!J:i:H;t:''·~ I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l~i~~0:1..15~~·~: I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo "".'{¥Mlli'",i-;11 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo .•~f'~:Ll'J·'~:'~':I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 :;i~.·r:itg~~;;/l o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I·~~~". i2~0;~ I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo 88888888888888888888888888888888888888888888888888888888888888 dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd 88888888888888888888888888888888888888888888888888888888888888 dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd 88888888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici ~--0~888 8 8888 8 88 8 88 8888 88 8 88888 8 8 8 88888 888 8 8 8 8 8 8 8888888888 88888 8 8 8 8 8 ~~ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd ,.;;:. - ·.,., .. 88888888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888888 dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd 88888888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888888 dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd 88888888888888888888888888888888888888888888888888888888888888 dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd ,-{. ~~888888888888888888888888888888888888888888888888888888888888888 ~Ncicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici '~·W\ ~'88888888888888888888888888888888888888888888888888888888888 =~cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 18·1•.\f > »>· '"; 8888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 8888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 8888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 8888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici %~88888888888888888888888888888888888888888888888888888888888 ~~cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici > ::-:: '::(" 1i:t '"' $i~~888888888888888888888888888888888888888888888888888888888 ,,= .....( 0 0 ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ,ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci ci O ;c, i~88888888888888888888888888888888888888888888888888888888888 1~00000000000000000000000000000000000000000000000000000000000 ~ ,;t~· -;:;:·!:'!." $~~8888888888888888888888888888888888888888888888888888888888 8 ~ocicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici "k·kh, ·~J *' ~~88888888888888888888888888888888888888888888888888888888888 !~00000000000000000000000000000000000000000000000000000000000 ',,~. :.,. ; 16.00 14.00 12.00 10.00 ~ ~ QI bO 8 .00 ... Ill .c .u "' c 6 .00 4 .00 2.00 0.00 15 .01 , "'5.36 I ' I \ I ,. I • ' \ .,. ' ' \ ' ' 2 Year Pond Inflow & Outflow Hydrographs Appendix C 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow 2yr --Pond Outflow 2yr 22.00 20 .00 18 .00 16.00 14.00 ~ 12.00 Cll bO ... ltl ..c u 10.00 "' c 8 .00 6 .00 4 .00 2 .00 0 .00 20 .48 ~ 6 .15 -, ' I ' I I I ' ' ,, \ \ ' 10 Year Pond Inflow & Outflow Hydrographs Appendix C - 0 10 20 30 4 0 so 60 70 80 90 100 110 120 130 14 0 15 0 160 170 180 190 200 210 22 0 23 0 240 25 0 260 Time (min) -Pond Inflow lOyr --Pond Outflow 10yr 26.00 24.00 22.00 20.00 18 .00 16.00 ~ -14.00 QI ~ RI ..c ~ 12.00 c 10.00 8 .00 6.00 4 .00 2.00 0.00 23 .39 /6.46 -..... , ' I I . " ' ' ' .. . "" ' ' ' 25 Year Pond Inflow & Outflow Hydrographs Appendix C 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow 2Syr - -Pond Outflow 25yr 28.00 26.00 24.00 22 .00 20.00 18.00 Vi 16.00 ~ QI ~ 14.00 111 .c u Ill 0 12.00 10.00 8 .00 6.00 4 .00 2 .00 0 .00 26.44 6.78 -..... / - I I J I ..... ' ' ' .... \ \ •. 50 Year Pond Inflow & Outflow Hydrographs Appendix C 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow SOyr - -Pond Outflow SOyr 30.00 28.00 26 .00 24.00 22.00 20 .00 18.00 Vi ~ 16.00 Cll ~ IO -£ 14.00 "' i5 12.00 10.00 8.00 6 .00 4.00 2 .00 0 .00 27.61 ,. ~7.03 ..... -, I I I ' ' ' ,, • • ' 100 Year Pond Inflow & Outflow Hydrographs Appendix C - 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow 100yr - -Pond Outflow 100yr ;;~;.\:''\i'." ~ .•. ·~ ~~: :~; Runoff Flow Direction 2 -Pre-Development VS. Post Development Hydrograpbs Appendix C Pre"'•{ ·~., Pci'st··· "'Pre<<:;: A.f>ost '. r' ~~' P-ie1}~::-.,. Post .-~ i-:'Pre~" · i>oSf:r £{\Pre· · .. . 2'tf-. l~f.2yr ,,, :;, loYf ef ]'rtO'yr .. " 2'5yi(,, '' 25yr . '(;):~5oyi-' .;. 50yr >!Y ,;looyr 1'.imef'miiif ~Q{cfs) ?}Q(cfs) Q (d's}-. •. ,,;Q. (cfs) " .tQ(c'fsV' •Q (cfs) Q{cTuf Q (cfs). >l'Q{cfs) \.; '~ Q-~· ~; ' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 '' !; ,·~-f~' $ '.· 0.33 1.01 0.46 1.42 0.53 1.50 0.60 1.58 0.63 ,,~.;~~;'2'.'.'i.~ : ... 0.66 1.85 0.93 2.20 1.06 2.41 1.21 2.64 1.26 . r.,j;:r_ '""'"·~. 0.98 2.63 1.39 3.32 1.60 3.69 1.81 4.05 1.89 £;1'> 1.31 3.58 1.85 4.16 2.13 4.38 2.42 4.61 2.53 ,. ":~\-:-:· 1.64 4.08 2.32 4.62 2.66 4.89 3.02 5.16 3.16 · ;~,,,(IX 1r 1.97 4.43 2.78 5.04 3.19 5.27 3.63 5.68 3.79 l'<•'i'""';;;'tJ.'\~~;," 2.29 4.76 3.24 5.47 3.72 6.10 4.23 6.73 4.42 ' ~::~~~~:~;'li~ , -~'~ 2.62 4.95 3.71 6.35 4.26 7.05 4.84 7.57 5.05 ~-r'{~i·~\j; 2.95 5.63 4.17 7.10 4.79 7.68 5.44 8.27 5.68 ·-~'. ;;J--~9tf''x.,:r 3.28 ·6.34 4.63 7.67 5.32 8.32 6.05 8.99 6.31 '',,,;'-;_1.µ:.~·:; 3.60 6.51 5.10 7.78 5.85 8.44 6.65 9.12 6.94 .,;.,ff?,'%/" 3.93 6.57 5.56 7.85 6.38 8.52 7.26 9.20 7.57 j"'-'·:~:~t~;_,~~}i 4.26 6.61 6.02 7.90 6.92 8.57 7.86 ;" ·9:2s··t,: 8.21 ' :i . i] 4):""(<+ 4.59 ·1:,6.63'. . 6.49 .j(,7.92-Jl, 7.45 >:8.59;": 8.47 9.20 8.84 :.1~" t~. 4.92 6.63 6.95 7.92 7.98 8.56 9.07 9.13 9.47 "·g~5 :. ';; 5.24 6.62 7.41 7.90 8.51 8.49 9.67 9.05 10.10 +7,r1/• 5.57 6.59 7.88 7.86 9.04 8.40 10.28 8.95 10.73 "i' ?-'.l°81 ... 5.90 6.54 8.34 7.79 9.58 8.31 10.88 8.84 11.36 ~ ;' ·r~i--1!;~9-~~;:~~ , 6.23 6.48 8.80 7.69 10.11 8.20 11.49 8.72 11.99 ~:~. -~'2tY1' '< 6.55 6.41 9.27 7.58 10.64 8.08 12.09 8.59 12.63 ',:,'"~21:~. "' 6.88 6.33 9.73 7.46 11.17 7.95 12.70 8.44 13.26 f;<22:>. 7.21 6.24 10.19 7.34 11.71 7.81 13.30 8.29 13.89 ,/· il1f·'.?~/~~-· 7.54 6.13 10.66 7.20 12.24 7.65 13.91 8.12 14.52 "~tit.•; .. 7.86 6.01 11.12 7.06 12.77 7.49 14.51 7.94 15.15 ::~~;gs:•h./,"'; , .s;19;:<Jc 5.89 ~i1.5s:&>: 6.90 13l3<i";.;; 7.32 '.-t15:12)':..• 7.75 ~;15.is ~ : .:~26_':,~ 8.03 5.75 11.35 6.74 13.04 7.14 14.81 7.55 15.47 ,, -;;;21.-: . ' 7.86 5.59 11.12 6.56 12.77 6.95 14.51 7.34 15.15 ic,i8"1'."• .... 7.70 5.43 10.89 6.38 12.50 6.75 14.21 7.11 14.83 ' ,;29,t ,~ 7.54 5.26 10.66 6.19 12.24 6.53 13.91 6.88 14.52 ':> ;,?: ·l,3,0.;-~ ~:_t-~ 7.37 5.07 10.43 5.99 11.97 6.31 13.60 6.64 14.20 ,, ~~ii-31%$ ; l 7.21 4.99 10.19 5.93 11.71 6.26 13.30 6.58 13.89 ,, ./;3:?·.-1• 7.04 4.91 9.96 5.85 11.44 6.20 13.00 6.53 13.57 "~ :~;l3. > 6.88 4.83 9.73 5.77 11.17 6.15 12.70 6.47 13.26 /;,i :~46~; 6.72 4.75 9.50 5.69 10.91 6.09 12.40 6.42 12.94 . ~ ~('!:,~ ~-"" ,.;., 6.55 4.66 9.27 5.60 10.64 6.04 12.09 6.37 12.63 4r ::;;f_~,s~~~::-.~~t-6.39 4.58 9.04 5.52 10.37 5.98 11.79 6.31 12.31 I? :t,;#;$ 71#' . 6.23 4.50 8.80 5.44 10.11 5.92 11.49 6.26 11.99 =,ff: ·~ JlL i+·-· . 6.06 4.42 8.57 5.36 9.84 5.84 11.19 6.20 11.68 J!;t.,3'9 .. 5.90 4.34 8.34 5.28 9.58 5.76 10.88 6.15 11.36 "'. ·~40, h 5.73 4.20 8.11 5.20 9.31 5.68 10.58 6.09 11.05 .. j"'$'"'4f.~.,r 5.57 4.02 7.88 5.11 9.04 5.60. 10.28 6.04 10.73 "''ii!4':4t~i1fj!• 5.41 3.84 7.65 5.03 8.78 5.51 9.98 5.98 10.42 ,; '"\/43 ~"':' ~ 5.24 3.66 7.41 4.95 8.51 5.43 9.67 5.92 10.10 \<;;~. '>i4~ ''; 5.08 3.48 7.18 4.87 8.25 5.35 9.37 5.84 9.78 ~ ;: :;45.· 4.92 3.30 6.95 4.79 7.98 5.27 9.07 5.75 9.47 : 4_6· ' " 4.75 3.20 6.72 4.71 7.71 5.19 8.77 5.67 9.15 :11f*t47 .. ,;,' 4.59 3.25 6.49 4.62 7.45 5.11 8.47 5.59 8.84 ,;:~;. 148 '."'•· 4.42 3.23 6.26 4.54 7.18 5.02 8.16 5.51 8.52 ":" :~74~ 'qc' -4.26 3.19 6.02 4.46 6.92 4.94 7.86 5.43 8.21 ... '~;so· .. "'· 4.10 3.13 5.79 4.38 6.65 4.86 7.56 5.35 7.89 ·:~51','· 3.93 3.06 5.56 4.29 6.38 4.78 7.26 5.26 7.57 ,,,;:, 52' ;,;.' :_.: 3.77 2.98 5.33 4.11 6.12 4.70 6.95 5.18 7.26 ' . •;s3' .; ,-;; ,,., 3.60 2.90 5.10 3.93 5.85 4.62 6.65 5.10 6.94 "'>1'tc $4"/:" f 3.44 2.34 4.87 3.75 5.59 4.53 6.35 5.02 6.63 .. :•1."-'.5~~& .. 3.28 1.79 4.63 3.57 5.32 4.45 6.05 4.94 6.31 .:.';'56 '~,.: 3.11 1.37 4.40 3.39 5.05 4.37 5.74 4.86 6.00 '''~°''51 ;;_;. 2.95 0.66 4.17 3.21 4.79 4.27 5.44 4.78 5.68 .?i'.t/58-'\ .. : 2.79 0.00 3.94 3.22 4.52 4.09 5.14 4.69 5.37 · -.;;n'.i'~·9,:;' 2.62 0.00 3.71 3.24 4.26 3.91 4.84 4.61 5.05 ' 'Po~t;'.f' ·tOQyr':; , Q (cfs). 0.00 1.61 2.72 4.12 4.70 5.26 5.88 6.96 7.77 8.50 9.25 9.38 9.46 tfl,~:9.47,{;'.f. 9.42 9.35 9.26 9.16 9.05 8.92 8.78 8.63 8.47 8.34 8.23 8.05 7.81 7.52 7.25 7.01 6.76 6.70 6.65 6.59 6.54 6.48 6.43 _6.37 6.32 6.26 6.21 6.15 6.10 6.04 5.99 5.93 5.85 5.77 5.69 5.60 5.52 5.44 5.36 5.28 5.20 5.11 5.03 4.95 4.87 4.79 ,~' . ~}f}Pre~'KI.. %¥1 Posi1~j; t · ; Pre~;;:!' .. _Fi P9st. • ~'.fCC:i;" ;;~~<istit~-:$t, p-~:;_;-~, .;i,);.P~o: ,:~~fa.'4~ ... ;;-:r:osi'.f'.\ t&<.».;~,,2~ . r.:·;:2Y,Ii.:,f0: ~,~'2Yi-ii\\.:t ::1~ 1,oy~.~:1' f;°°'lo'Yr!r';t; t'" 2syi:~:r· "~ zsyi:lh tf;t,!iGyt]{ M:so.yr.;,,,;: '~1tooYI-;~; >f 100yr:#' '1'.r. ,i;'.60'&1'i.. 2.46 o.oo 3.48 3.21 3.99 3.73 4.53 4.53 4.73 4.71 .o.\;~1.tk6f;~··'' 2.29 0.00 3.24 3.16 3.72 3.55 4.23 4.45 4.42 4.62 :J;:"!_'fj2·~1:$.. 2.13 0.00 3.01 3.09 3.46 3.37 3.93 4.37 4.10 4.54 W?lt;'O.t'7·1J< 1.97 0.00 2.78 3.02 3.19 3.19 3.63 4.27 3.79 4.46 ·:·.;·ri~•.!ll.wi ... ,: 1.80 o.oo 2.55 2.94 2.93 3.23 3.33 4.o9 3.47 4.38 .·'\.; ~· , ~-.-.<..... 1.64 0.00 2.32 2.66 2.66 3.24 3.02 3.90 3.16 4.29 ·'"'2' :1n::r1 . .r 1.47 o.oo 2.09 2.01 2.39 3.21 2.12 3.72 2.84 4.11 f;'.' ,,.,,.,.... 1.31 0.00 1.85 1.58 2.13 3.15 2.42 3.54 2.52 3.93 ~.,. -"• :~·" "l 1.15 0.00 1.62 1.19 1.86 3.09 2.12 3.36 2.21 3.75 lf . .jjp'. ri.;~i'" 0.98 0.00 1.39 0.07 1.60 3.01 1.81 3.19 1.89 3.57 $'~1;7.!l·~·'~f 0.82 0.00 1.16 0.02 1.33 2.93 1.51 3.23 1.58 3.39 ~: -., 0.66 I o.oo I 0.93 I 0.01 I 1.06 I 2.60 I 1.21 I 3.24 I 1.26 I 3.21 , ... ".'" -• ,., :'. 0.49 0.00 0.70 0.01 0.80 2.02 0.91 3.21 0.95 3.22 I :~:)'j-~t3.'ft~~!: 0.33 0.00 0.46 O.Ql 0.53 1.54 0.60 3.15 0.63 3.24 l:fJr\/1;P;"i':'.,_ 0.16 0.00 0.23 0.00 0.27 1.16 0.30 3.08 0.32 3.21 l:f'•~··fJ.'i ~ 0.00 0.00 0.00 0.00 0.00 0.01 0.00 3.01 0.00 3.16 ···, •'<•·-,, ... ,~"' " 0.00 0.00 0.00 0.00 0.00 0.01 0.00 2.93 0.00 3.10 I ;:;.'1;;;.rm'f'"'· ,t 0.00 0.00 0.00 . 0.00 0.00 0.00 0.00 2.57 0.00 3.02 1->..~i~78'.~-"--0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.99 0.00 2.94 I.~;;;!'~·-~ '.!*" > o.oo o.oo o.oo o.oo o.oo o.oo o.oo 1.52 o.oo 2.66 ·1 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 1.15 I o.oo I 2.07 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 1.58 1·~<t'f¥-B2:$;'fl o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I 1.20 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I O.Q7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo -,,:>l~i.:\Y5~~,~!til o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l•j:,,[-!;9~#~?'1 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l;).,~J;:,\"'.1)9'~'~ I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l"~lio!O(lli;'.4'C: I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo . .,.&f~lyt;!i'.-<\f:hl o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo .''~~{Q4'.~1.JI o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l~'~l/'?:1t"J)Q3;;l¥·-?I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo 'H!.%£"1dit';:f1~,;,I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo ·1 o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo l'.·;]0~~t06:~fr''"' I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo 1.;.;~~ftO':ZJ1'i: '"..,I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo :ii)/~1P8~·w;. -I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo IJiF~·tO~;'l>1'\I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo /k:'!~HWc>'.~i . o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo ~ :;1,~;f.1:],";~i\:~ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 "'ii!]i2"~ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 r;>;t~(1·3\j:l-if, I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo c;l~ff4~t,;, I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo ""'~%41$.-~i,ftl o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I, '':-~'lrt%l"\'. I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I'. ' ;,;,. l,l$~~·c.1 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 I 0.00 ~-'.~'.:·j.:f~]&'i:{i~I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo 1.-,,"'t?i>.f20~';:;."il o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo I o.oo ·:;,r,;12i21!!.;,,' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 f,f0t~fZ2*~ '~:', o.oo o.oo o.oo o.oo o.oo · o.oo o.oo o.oo o.oo o.oo ~ii dB ~1~888888888888888888888888888888888888888888888888888888888888888 &~cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici ,,,. I ~ '} 1 ~ .... 1 fe ~888888888888888888888888888888888888888888888888888888888888888 ;n ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd ~;) ft;t. ~1~~88888888888888888888888888888888888888888888888888888888888888 ~~odddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd , li1> ;~~888888888888888888888888888888888888888888888888888888888888888 t~ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd -;;~{'. ,, 1 !~88888888888888888888888888888888888888888888888888888888888888 ~~odddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd -~:.1 •i;c·i 88888888888888888888888888888888888888888888888888888888888888 dddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd 88888888888888888888888888888888888888888888888888888888888888 ciciciciciciciciciciciciciciciciciciciciciciciciQcicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici ~i 888888888888888888888888888888888888888888888888888888888888888 ~"ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd -~~)4: "-:.'~ .~) ~-~888888888888888888888888888888888888888888888888888888888888888 ~~ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd 'J_. :~f 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 88888888888888888888888888888888888888888888888888888888888 cicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicicici 6 .00 ~ ~ QI bO ... Ill .c u "' c 4 .00 2.00 I ' I I ' I I I \ \ \ \ \ 2 Year Pre & Post Development Hydrographs Appendix C 0 10 20 30 40 so 60 70 80 90 100 11 0 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development 2yr - -Post Developm e nt 2yr 10 Year Pre & Post Development Hydrographs Appendix C 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) 25 Year Pre & Post Development Hydrographs Appendix C Vi 8.00 -+------------------------------------------ ~ ~ l'O .s::. u "' c 6.00 +-..L...§---~-_.,_ ____________________________ _ 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development 25yr --Post Development 25yr SO Year Pre & Post Development Hydrographs Appendix C 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development SOyr - -Post Development SOyr 18 .00 100 Year Pre & Post Development Hydrographs Appendix C ~ 10.00 +-~--~~~+--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ QI ~ IQ ..c u 5 8.00 +-~1----+~~--'1--~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development lOOyr --Post Development lOOyr Detention Pond 2 Appendix C Detention Pond 2 Summary Detention Pond 2 Design Storm Inflow Outflow W.S. Elevation (yr) (cfs) (cfs) (ft) 2 22 .53 3.29 308.84 10 . 30.75 3.69 309.42 -----------------------------------------------------------------------------25 35.12 3.89 309 .72 50 39.70 4.90 310.01 100 41.45 . 5.96 310.09 100 Plugged 41.45 9 .55 310.26 Top of Pond Berm= 310.80', Top of Spillway 310.09' Detention Pond 2 Appendix C Detention Facility Area-Capacity Data Detention Pond 2 Elevation Depth Volume (ft) (ft) (ft3) 306.04 0.0 0 307.0 1.0 1,331 308.0 2.0 7,043 309.0 3.0 11,310 310.0 4 .0 13,581 311.0 5 .0 16,589 Cumulative 90% Cumulative Volume Volume (ft3) (ft3) 0 0 1,331 1,210 8,374 7,613 19,685 17,895 33,265 30,241 49,854 45,322 Pond Elevation Depth (ft) (ft) 306.0 0.0 307.0 1.0 308 .0 2 .0 309.0 3.0 310 .0 4.0 311.0 5.0 Notes: Detention Pond 2 Appendix C Elevation -Discharge Data Depth -Discharge Data 18" Outfall 24" x 24" 40' Trapezoidal Pipe 18" x 4" Slot Grate Inlet Weir Flow Flow Flow Flow (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 .00 0 .00 1.07 1.07 0.00 0.00 2.64 2.61 0.00 0.00 3.43 3.41 0.00 0 .00 4.76 3 .91 0.84 0 .00 16.79 0.89 15 .90 0.00 Total Design Flow (cfs) 0.00 1.07 2 .64 3.43 4 .76 16.79 1. The Outlet Structure is a concrete box with a 18" outfall pipe and an 18" tall x 4" wide slot in the front of the box. 2. The overflow spillway is a trapezoidal weir at 310 .09', with a width of 40'. The outlet structure will also have a 24" x 24"'grate at 309.90' to be used as overflow if the slot is clogged. Detention Pond 2 Plugged Condition Depth -Discharge Data 18" Outfall 24" x 24" 40' Trapezoidal Pond Pipe 18" x 4" Slot Grate Inlet Weir Total Design Elevation Depth Flow Flow Flow Flow Flow (ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) 306.04 0 .0 0.00 0 .00 0 .00 0.00 0.00 307.0 1.0 0 .00 0.00 0.00 0.00 0 .00 308 .0 2.0 0 .00 0.00 0.00 0.00 0.00 309.0 3.0 0.00 0 .00 0.00 0 .00 0.00 310.0 4.0 0.00 0.00 0.00 0.00 0.00 311.0 5 .0 0.00 0 .00 0.00 115.63 115 .63 Notes: 1. The Outlet Structure is a concrete box with a 18" outfall pipe and an 18" tall x 4" wide slot in the front of the box. 2 . The overflow spillway is a trapezoidal weir at 310.09', with a width of 40'. The outlet structure will also have a 24" x 24" grate at 309.90' to be used as overflow if the slot is clogged. t=60s Elevation (ft) 306.04 307.00 308 .00 309 .00 310 .00 311.00 Detention Pond 2 AppendixC Storage Routing Analysis Parameters Detention Pond 2 Depth Discharge Storage 2 sit (ft) (0, cfs) (s, ct) 0.0 0 .00 0.0 0.0 1.0 1.07 1331.0 44.4 2.0 2 .64 8374 .3 279 .1 3.0 3.43 19684 .5 656.2 4.0 4.76 33265.l 1108.8 5.0 16.79 49854.2 1661.8 2 sit+ 0 0.00 45.44 281.78 659 .58 1113.60 1678.60 The Outlet Structure is a box structure with an 18" outfall pipe and an 18" x 4" slot in the front. The overflow spillway is a trapezoidal weir at elev= 310 .09' and a 24" grate inlet at elev= 309.90' ... · '' ,~'i:i...·,,.,_ ,Jnf19w .. .;':t',1~.' .'?·· :,, 29£~:;,/ Tiin:e(?min) Q(cfs) " ~o ;;-;-0.00 c:• i,.ll?\~ , . 2.25 i\;i)i2);'' ; .. 4.51 "".:t\· '3~·. 6.76 .At'.''.!\ 9.01 ... , ~:t.11; S> ~r l 11.26 ~f ii' f6'-;,,•?"'. 13.52 .···_.'4:;7. ··:· 15.77 ;; ' •;,f.Jf/ ,.' 18.02 '_,,, .... 0'>·•··' 20.28 -~~A-t 10~t". "'·! ~-22:s3~: '\;· ':·ll •·. 21.40 '1_2w 20.28 . ~::i.fl3~.'" 19.15 ~iri<t4~{ ·1· 18.02 •'' .·~~· l~' !•.d. 16.90 : '.~6:?i . 15.77 . ¢-1•::J7''?:, .. 14.64 /-~ ~t~·~~~: ~-13.52 .. ·.··• •1_9. to, 12.39 ·. 21F"".., 11.26 ' :'?~~)11 .. ~ 10.14 'C ·tt11~; ~2~~~i' 9.01 "· "'P•z.r · 7.89 T"· ,,24 :. -'-'-6.76 i;~2$;-t··" 5.63 .• ~ .. ::26, '-.: 4.51 "'':27" ··. ,. 3.38 ..,. ;;;..,'~it:2,s--t··:.t, ,, 2.25 .1~;;;4.·2~~;:; .. 1.13 "-!"',)'30.IV'.'., 0.00 ' '.#·i'3f ': ·: 0.00 .... ~3.2"""'' 0.00 "' .;; :•);3iI!,· ' -0.00 •;. ' ~-34/• ·~\ 0.00 -~~35•' 0.00 : ~'\36; '!, .T 0.00 ,.: I: ·7'3:7";,, iil 0.00 ,, ·;3gl'>· 0.00 '' :39, ..... 0.00 ~, -:::~o:~,;, 0.00 .. ""''i{l.'~ ·~, 0.00 ·~· '42i!,l' 0.00 .. :;43 .,_·. 0.00 ; t•,44'~~:;. 0.00 ;':'f.'45~···, · .. 0.00 '46····· ,,. 0.00 • "i• 4? 0.00 1-'A$~~,.., 0.00 .,,,~-.. t.~9'1::'.~ 0.00 · ·;;,so<-· 0.00 ··: r;.,51'' 0.00 c:;:.j52:,;~,. ·: 0.00 _:. _ ':s3,~;~. 0.00 .. •. 54 ;.~1 .. 0.00 "'• •. ? 5.5 ."r. 0.00 ~,&l . .'56 ;1"'!1'. 0.00 ~; 57 .. " .. 0.00 " .;-;., .S.8~ .,." · 0.00 ·: ... ·59\_·' 0.00 Detention Pond 2 Inflow & Outflow Hydrographs Appendix C ,'buttlbw, ,..Iriflow·,\ ,oiilttow, 'iinflpw.· Outflow fiiiflo:W· ""::tr2yr-?'•~ •;,..·I.OYr.~::; •, IOyrf.;, "; 25~~}. ·'\::25yr":'. "!°:' ~OYr. ,_., Q(cfs) Q(cfs) Q(cfs) Q(cfs) Q(cfs) Q(cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.01 3.07 0.02 3.51 0.02 3.97 0.10 6.15 0.16 7.02 0.20 7.94 0.35 9.22 0.57 10.54 0.70 11.91 0.84 12.30 1.12 14.05 1.17 15.88 1.17 15.37 1.32 17.56 1.41 19.85 1.35 18.45 1.59 21.07 1.73 23.82 1.58 21.52 1.93 24.58 2.10 27.79 1.86 24.60 2.24 28.09 2.40 31.76 2.15 27.67 2.50 31.61 2.63 35.73 2.38 i30:1s% 2.68 :r~3s:12\~' 2.79 G!39.10 , 2.57 29.21 2.82 33.36 2.94 37.71 2.67 27.67 2.94 31.61 3.08 35.73 2.76 26.14 3.05 29.85 3.20 33.74 2.84 24.60 3.15 28.09 3.31 31.76 2.91 23.06 3.25 26.34 3.41 29.77 2.97 21.52 3.32 24.58 3.49 27.79 3.03 19.99 3.40 22.83 3.55 25.80 3.08 18.45 3.46 21.07 3.62 23.82 3.13 16.91 3.51 19.32 3.67 21.83 3.16 15.37 3.54 17.56 3.72 19.85 3.20 13.84 3.58 15.80 3.76 17.86 3.22 12.30 3.62 14.05 3.79 15.88 3.25 10.76 3.64 12.29 3.82 13.89 3.27 9.22 3.66 10.54 3.85 11.91 3.28 7.69 3.67 8.78 3.86 9.92 3.29 6.15 3.68 7.02 3.88 7.94 j:;.3:29 ';. 4.61 "!'··3.69~'-5.27 J.'"Hs 5.95 3.29 3.07 3.69 3.51 3.88 3.97 3.28 1.54 3.69 1.76 3.88 1.98 3.27 0.00 3.68 0.00 3.87 0.00 3.26 0.00 3.66 0.00 3.86 0.00 3.24 0.00 3.65 0.00 3.85 0.00 3.23 0.00 3.64 0.00 3.84 0.00 3.21 0.00 3.63 0.00 3.82 0.00 3.20 0.00 3.62 0.00 3.81 0.00 3.18 0.00 3.61 0.00 3.80 0.00 3.17 0.00 3.60 0.00 3.79 0.00 3.15 0.00 3.58 0.00 3.78 0.00 3.14 0.00 3.57 0.00 3.77 0.00 3.13 0.00 3.56 0.00 3.75 0.00 3.12 0.00 3.55 0.00 3.74 0.00 3.10 0.00 3.54 0.00 3.73 0.00 3.09 0.00 3.52 0.00 3.72 0.00 3.07 0.00 3.51 0.00 3.70 0.00 3.06 0.00 3.50 0.00 3.69 0.00 3.04 0.00 3.49 0.00 3.68 0.00 3.03 0.00 3.48 0.00 3.67 0.00 3.01 0.00 3.47 0.00 3.66 0.00 3.00 0.00 3.46 0.00 3.65 0.00 2.99 0.00 3.44 0.00 3.63 0.00 2.97 0.00 3.43 0.00 3.62 0.00 2.96 0.00 3.42 0.00 3.61 0.00 2.95 0.00 3.41 0.00 3.60 0.00 2.93 0.00 3.39 0.00 3.59 0.00 2.92 0.00 3.38 0.00 3.57 0.00 2.90 0.00 3.36 0.00 3.56 0.00 2.89 0.00 3.35 0.00 3.55 0.00 2.87 0.00 3.33 0.00 3.54 0.00 2.86 0.00 3.32 0.00 3.53 0.00 ·outf1ow: 1nflow Qutfloj_. ~· -s·oyf~ir;· h.JOOYr'·' . "'lOO}tr,{1 Q(cfs) Q(cfs) Q(cfs) 0.00 0.00 0.00 0,03 4.14 0.03 0.24 8.29 0.26 0.84 12.43 0.89 1.23 16.58 1.25 1.51 20.72 1.54 1.87 24.87 1.93 2.24 29.01 2.29 2.54 33.16 2.58 2.72 37.30 2.76 2.89 ;I4usr 2.94 3.06 39.38 3.11 3.21 37.30 3.26 3.35 35.23 3.40 3.46 33.16 3.51 3.55 31.09 3.61 3.64 29.01 3.69 3.71 26.94 3.77 3.78 24.87 3.84 3.84 22.80 3.90 3.89 20.72 3.95 3.94 18.65 4.00 3.97 16.58 4.48 4.07 14.51 4.94 4.38 12.43 5.38 4.62 10.36 5.70 4.78 8.29 5.89 . '4.!!0t-i' 6.22 .,.5.96~:·: 4.90 4.14 5.92 4.80 2.07 5.77 4.65 0.00 5.52 4.48 0.00 5.23 4.32 0.00 4.96 4.17 0.00 4.72 4.02 0.00 4.55 3.99 0.00 4.38 3.98 0.00 4.23 3.97 0.00 4.08 3.96 0.00 3.99 3.94 0.00 3.98 3.93 0.00 3.97 3.92 0.00 3.96 3.91 0.00 3.95 3.89 0.00 3.94 3.88 0.00 3.92 3.87 0.00 3.91 3.86 0.00 3.90 3.85 0.00 3.89 3.83 0.00 3.87 3.82 0.00 3.86 3.81 0.00 3.85 3.80 0.00 3.84 3.79 0.00 3.83 3.78 0.00 3.82 3.76 0.00 3.80 3.75 0.00 3.79 3.74 0.00 3.78 3.73 0.00 3.77 3.71 0.00 3.76 3.70 0.00 3.74 po· ·r?<¥:-.. , . lnfl(l_w~ ~Outflow Inflow~. .Outflow· Inflow.< f_Oµtflow • WIC!w. outflow, i::Jpflow. Outfli>F:, f•f:it.'.''<· :•: .. 2yi'.F'i it~'.-~'Yi-1' ' /,:-JO)ir:li: G.10yr;'~: J2Syi:i~ ?'. 25yr ,; '&:;5,(fyt;. ,. ~oyr.;;i :;;'lilPoYr· . lOO)ir\'. ;:•. * 60: ¥ •. ': 0.00 2.85 0.00 3.31 0.00 3.52 0.00 3.69 0.00 3.73 if 61'. .. t 0.00 2.83 0.00 3.29 0.00 3.50 0.00 3.68 0.00 3.72 '• ,,62; 0.00 2.82 0.00 3.28 0.00 3.49 0.00 3.67 0.00 3.71 -•~.:f;; .. 0.00 2.81 0.00 3.27 0.00 3.48 0.00 3.65 0.00 3.69 }l~ ~ . ~\ >~· .t;,. 0.00 2.79 0.00 3.25 0.00 3.47 0.00 3.64 0.00 3.68 I · · \.:';,\ .•• 65 -~~ . /· 0.00 2.78 0.00 3.24 0.00 3.46 0.00 3.63 0.00 3.67 . ,i'f66· ;: ;,\,;.;-0.00 2.77 0.00 3.22 0.00 3.45 0.00 3.62 0.00 3.66 ""'' <:tv"'-0.00 2.75 0.00 3.21 0.00 3.43 0.00 3.61 0.00 3.65 F?6s·~ ,. 0.00 2.74 0.00 3.19 0.00 3.42 0.00 3.60 0.00 3.64 . "";:::,_69.•''~· 0.00 2.72 0.00 3.18 0.00 3.41 0.00 3.59 0.00 3.63 .. .:;.f-~_i:J.76£~·-:~, 0.00 2.71 0.00 3.16 0.00 3.39 0.00 3.57 0.00 3.62 . . <''l!!. 7li1i' •. 0.00 2.69 0.00 3.15 0.00 3.38 0.00 3.56 0.00 3.60 .;. ;:T eti'iJ2'c!f."'''. 0.00 2.68 0.00 3.14 0.00 3.37 0.00 3.55 0.00 3.59 • "'" :;i,73-'.ir,;~·., 0.00 2.67 0.00 3.12 0.00 3.35 0.00 3.54 0.00 3.58 -'·.· \74';<f' 0.00 2.65 0.00 3.11 0.00 3.34 0.00 3.53 0.00 3.57 .. :'·75,:;:•'-'.; 0.00 2.64 0.00 3.10 0.00 3.32 0.00 3.51 0.00 3.55 "'i-76' : 0.00 2.63 0.00 3.08 0.00 3.31 0.00 3.50 0.00 3.54 . ,·•·:,:N7.7.~,: .. 0.00 2.61 0.00 3.07 0.00 3.30 0.00 3.49 0.00 3.53 ·:'d:··qg":,·' 0.00 2.60 0.00 3.05 0.00 3.28 0.00 3.48 0.00 3.52 : \~7.9. 0.00 2.58 0.00 3.04 0.00 3.27 0.00 3.47 0.00 3.51 ·,·'·so· 0.00 2.55 0.00 3.02 0.00 3.25 0.00 3.46 0.00 3.50 ; .;$t'. ... 0.00 2.53 0.00 3.01 0.00 3.24 0.00 3.44 0.00 3.49 · .. ;;d~82' .. z 0.00 2.51 0.00 3.00 0.00 3.22 ;.. 0.00 3.43 0.00 3.47 .-/ "'~r &) ;,~:=~'.1 0.00 2.49 0.00 2.98 0.00 3.21 0.00 3.42 0.00 3.46 ~·}_/'?-'.~.Mr-< -~ 0.00 2.46 0.00 2.97 0.00 3.19 0.00 3.41 0.00 3.45 .·''85;. ';:': 0.00 2.44 0.00 2.96 0.00 3.18 0.00 3.39 0.00 3.44 ;,, ,_,,; 86·:,.,,· 0.00 2.42 0.00 2.94 0.00 3.17 0.00 3.38 0.00 3.42 :.;t . ~$1~. 0.00 2.39 0.00 2.93 0.00 3.15 0.00 3.36 0.00 3.41 ~ ::~.~~·~:l: ~f . .ii'; 0.00 2.36 0.00 2.91 0.00 3.14 0.00 3.35 0.00 3.40 i,;t~~-~ 0.00 2.33 0.00 2.90 0.00 3.13 0.00 3.33 0.00 3.38 \(•. :90:+ .; 0.00 2.31' 0.00 2.88 0.00 3.11 0.00 3.32 0.00 3.37 '~--. 9'.f;, 0.00 2.28 0.00 2.87 0.00 3.10 0.00 3.31 0.00 3.35 i;~~-~.2'' . _,., 0.00 2.25 0.00 2.86 0.00 3.09 0.00 3.29 0.00 3.34 ' ,,; . ..:~~, t'<~ 0.00 2.23 0.00 2.84 0.00 3.07 0.00 3.28 0.00 3.33 ·~l~\f ~?4.~'2;y; -~.: 0.00 2.20 0.00 2.83 0.00 3.06 0.00 3.27 0.00 3.31 . ~F·:;~;9s~r:t~\ --~: 0.00 2.17 0.00 2.82 0.00 3.04 0.00 3.25 0.00 3.30 .,,. ' 96';" '. 0.00 2.14 0.00 2.80 0.00 3.03 0.00 3.24 0.00 3.29 : :-in·~·· 0.00 2.11 0.00 2.79 0.00 3.01 0.00 3.22 0.00 3.27 . "•c.98r•&'·; · 0.00 2.07 0.00 2.78 0.00 3.00 0.00 3.21 0.00 3.26 "!;>'.-;? ~9P.'~~; . 0.00 2.04 0.00 2.76 0.00 2.99 0.00 3.19 0.00 3.24 '· ··;-,~;./?-10.Q.1,l;', 0.00 2.01 0.00 2.75 0.00 2.97 0.00 3.18 0.00 3.23 · · ,'.'"101t,. 1i 0.00 1.98 0.00 2.73 0.00 2.96 0.00 3.16 0.00 3.21 " 102 . 0.00 1.94 0.00 2.72 0.00 2.95 0.00 3.15 0.00 3.20 . ::Jo3· 0.00 1.90 0.00 2.70 0.00 2.93 0.00 3.14 0.00 3.18 .;; _:; 1,04~' ' . 0.00 1.87 0.00 2.69 0.00 2.92 0.00 3.13 0.00 3.17 "./;°105'::~'' 0.00 1.83 0.00 2.67 0.00 2.90 0.00 3.11 0.00 3.16 ·/fl()~'·>· .. 0.00 1.80 0.00 2.66 0.00 2.89 0.00 3.10 0.00 3.14 ~;i'.107~t ;-.~ 0.00 1.77 0.00 2.65 0.00 2.87 0.00 3.08 9.00 3.13 1()85'' 0.00 1.73 0.00 2.64 0.00 2.86 0.00 3.07 0.00 3.12 ., . c..109·::. 0.00 1.70 0.00 2.62 0.00 2.85 0.00 3.05 0.00 3.10 .t. l~Wi' ~,: 0.00 1.67 0.00 2.61 0.00 2.83 0.00 3.04 0.00 3.09 • ,.. l]J !!·. • ; . 0.00 1.64 0.00 2.59 0.00 2.82 0.00 3.02 0.00 3.07 ;,·\:i:ti).~~ ' 0.00 1.61 0.00 2.57 0.00 2.81 0.00 3.01 0.00 3.06 . '·1 i-;J:3':: -.i• 0.00 1.58 0.00 2.55 0.00 2.79 0.00 3.00 0.00 3.04 .. ·~"11:4.'' ,;' 0.00 1.56 0.00 2.53 0.00 2.78 0.00 2.99 0.00 3.03 . '~"'f'Jl5 ' ,,, . 0.00 1.53 0.00 2.50 0.00 2.76 0.00 2.97 0.00 3.02 d~16: ' 0.00 1.50 0.00. 2.48 0.00 2.75 0.00 2.96 0.00 3.00 ,5~:,.;1'17.,!l\. ' 0.00 1.48 0.00 2.46 0.00 2.73 0.00 2.95 0.00 2.99 :· .~:.ns·,~,: .. 0.00 1.45 0.00 2.43 0.00 2.72 0.00 2.93 0.00 2.98 i"l-~:.;3-J~l9 rr;.:'"6,~ 0.00 1.42 0.00 2.41 0.00 2.71 0.00 2.92 0.00 2.96 -~~iw>: 0.00 1.40 0.00 2.38 0.00 2.69 0.00 2.90 0.00 2.95 '''~4t ·. :: 0.00 1.38 0.00 2.35 0.00 2.68 o.po 2.89 0.00 2.94 ''·''122'2 ''.' 0.00 1.35 0.00 2.33 0.00 2.66 0.00 2.87 0.00 2.92 .~:' '!\>··:/"![i,' ·.~ :.Infll\w -outf!Qw ,·· 1riflow-t, .outtfoW.: · ·.:Inflow. :Qutflowc ;r.:)iiflow~ Out_fl9w ,, Jnflow':~ Outflow-· ' ,i;•·y:, ' ·:z,.2yr f.''t2yi . ioyr.~. ' 10yr;,~;f ;;,.·25yr,. !J 25yr ·:~soyr soyr-:. .-. J OOyi':· . •:. IOoYf' ;. ~'.123· •. 0.00 1.33 0.00 2.30 0.00 2.65 0.00 2.86 0.00 2.91 ··I·'~ JZ>t_.,:.:··. 0.00 1.31 0.00 2.27 0.00 2.64 0.00 2.84 0.00 2.89 t f~5·,' 0.00 1.29 0.00 2.24 0.00 2.63 0.00 2.83 0.00 2.88 ., ,(1:26 :;.· 0.00 1.27 0.00 2.22 0.00 2.61 0.00 2.82 0.00 2.86 ";;~}Z7''·' 0.00 1.25 0.00 2.19 0.00 2.59 0.00 2.80 0.00 2.85 .• ,,;~f2·8;JCi •:· 0.00 1.23 0.00 2.16 0.00 2.57 0.00 2.79 0.00 2.84 •\',;• :f29 ,, ... 0.00 1.21 0.00 2.13 0.00 2.55 0.00 2.78 0.00 2.82 .. -~''130 ,· 0.00 1.19 0.00 2.10 0.00 2.53 0.00 2.76 0.00 2.81 Y.,,,13J·~ .• 0.00 1.17 0.00 2.07 0.00 2.51 0.00 2.75 0.00 2.80 · :~:"LJJ2. ·0' > 0.00 1.15 0.00 2.03 0.00 2.49 0.00 2.73 0.00 2.78 ; .;13~'-'\'i:-,: 0.00 1.13 0.00 2.00 0.00 2.46 0.00 2.72 0.00 2.77 '-~134/ • 0.00 1.11 0.00 1.96 0.00 2.44 0.00 2.70 0.00 2.75 •t;-f35·J.. : '. 0.00 1.10 0.00 1.93 0.00 2.41 0.00 2.69 0.00 2.74 >":¥µ<;';: -~· 0.00 1.08 0.00 1.89 0.00 2.39 0.00 2.68 0.00 2.72 /i~Ip,.;', 0.00 1.03 0.00 1.86 0.00 2.36 0.00 2.66 0.00 2.71 -"'138~, .. " 0.00 0.96 0.00 1.82 0.00 2.33 0.00 2.65 0.00 2.69 "''J39, .... 0.00 0.89 0.00 1.79 0.00 2.30 0.00 2.64 0.00 2.68 · :··~~r40·<· .. · 0.00 0.83 0.00 1.76 0.00 2.28 0.00 2.62 0.00 2.67 ''f4l-'•" 0.00 0.77 0.00 1.72 0.00 2.25 0.00 2.61 0.00 2.66 ·.....; ·.tii~''.,, 0.00 0.71 0.00 1.69 0.00 2.22 0.00 2.59 0.00 2.64 ;;:}4~\ 0.00 0.66 0.00 1.66 0.00 2.20 0.00 2.57 0.00 2.63 "''~'\' l'.H'. 0.00 0.62 0.00 1.63 0.00 2.17 0.00 2.55 0.00 2.62 . r,,..)~5: 0.00 0.58 0.00 1.60 0.00 2.14 0.00 2.53 0.00 2.60 ~! ;: 1:46 Iii! .: 0.00 0.54 0.00 1.57 0.00 2.10 0.00 2.51 0.00 2.58 U.4J.:i.\., 0.00 0.51 0.00 1.55 0.00 2.07 0.00 2.48 0.00 2.56 ;,; ;'143' ;:./ 0.00 0.48 0.00 1.52 0.00 2.04 0.00 2.46 0.00 2.54 ·.J49i·~··t 0.00 0.45 0.00 1.49 0.00 2.01 0.00 2.43 0.00 2.52 q'SO.\ 0.00 0.42 0.00 1.47 0.00 1.97 0.00 2.41 0.00 2.49 .... ;~ !.50i:l'J,.: 0.00 0.39 0.00 1.44 0.00 1.94 0.00 2.38 0.00 2.47 ); ' f~2)~;r.~ 0.00 0.37 0.00 1.42 0.00 1.90 0.00 2.36 0.00 2.44 '}53; "~ 0.00 0.35 0.00 1.39 0.00 1.86 0.00 2.33 0.00 2.42 "· ~154~ . 0.00 0.33 0.00 1.37 0.00 1.83 0.00 2.30 0.00 2.39 '·' t~5''" ·.'. 0.00 0.32 0.00 1.35 0.00 1.79 0.00 2.27 0.00 2.37 .. t ''156'' '•' \ 0.00 0.30 0.00 1.32 0.00 1.76 0.00 2.25 0.00 2.34 157.. 0.00 0.28 0.00 1.30 0.00 1.73 0.00 2.22 0.00 2.31 ;153 .. 0.00 0.27 0.00 1.28 0.00 1.70 0.00 2.19 0.00 2.29 ·'0''. I-59.'.''':" 0.00 0.25 0.00 1.26 0.00 1.67 0.00 2.17 0.00 2.26 ·•;.; 160"'1'_ 0.00 0.24 0.00 1.24 0.00 1.64 .. ~0.00 2.13 0.00 2.23 ..,-l6l,i, ". 0.00 0.23 0.00 1.22 0.00 1.61 0.00 2.10 0.00 2.20 ~·. ,;;16J::..· 0.00 0.22 0.00 1.20 0.00 1.58 0.00 2.07 0.00 2.18 ~~o~l.63tf~ .. 'i>. 0.00 0.21 0.00 1.18 0.00 1.55 0.00 2.04 0.00 2.15 ··164" ,,, 0.00 0.20 0.00 1.16 0.00 1.53 0.00 2.01 0.00 2.11 ,.'H65 · 0.00 0.19 0.00 1.14 0.00 1.50 0.00 1.97 0.00 2.08 I _ _,, ji66·/• » 0.00 0.18 0.00 1.13 0.00 1.47 0.00 1.93 0.00 2.05 !',• 'kl6.7.!!:'':>; 0.00 0.17 0.00 1.11 0.00 1.45 0.00 1.89 0.00 2.02 .'~'.flSs:'.'1'',. 0.00 0.17 0.00 1.09 0.00 1.42 0.00 1.86 0.00 1.98 ·]69.•~ 0.00 0.16 0.00 1.07 0.00 1.40 0.00 1.82 0.00 1.95 · lj.O,i· 0.00 0.15 0.00 1.01 0.00 1.38 0.00 1.79 0.00 1.91 ,;; ,:;f7H1,l": 0.00 0.15 0.00 0.94 0.00 1.35 0.00 1.76 0.00 1.87 J12'''' 0.00 0.14 0.00 0.87 0.00 1.33 0.00 1.73 0.00 1.84 .. H3' 0.00 0.14 0.00 0.81 0.00 1.31 0.00 1.70 0.00 1.80 l'<.:IR";,_ 0.00 0.13 0.00 0.75 0.00 1.29 0.00 1.66 0.00 1.77 '. ·er":f.is.i: .,,, 0.00 0.13 0.00 0.70 0.00 1.26 0.00 1.63 0.00 1.74 ;/) 76~:· -~ 0.00 0.12 0.00 0.65 0.00 1.24 0.00 1.60 0.00 1.71 " :,-f77 .. 0.00 0.12 0.00 0.61 0.00 1.22 0.00 1.58 0.00 1.68 ' 'ilit78. 'i· -• 0.00 0.11 0.00 0.57 0.00 1.20 0.00 1.55 0.00 1.65 ... "'17.9'.>!' 0.00 0.11 0.00 0.53 0.00 1.18 0.00 1.52 0.00 1.62 ,:<18.0· 0.00 0.10 0.00 0.50 0.00 1.17 0.00 1.50 0.00 1.59 t;. is1 "'; 0.00 0.10 0.00 0.47 0.00 1.15 0.00 1.47 0.00 1.56 :,;;,~i.l821!", 0.00 0.10 0.00 0.44 0.00 1.13 0.00 1.44 0.00 1.53 ~~ ~ii183):~}'. 0.00 0.09 0.00 0.41 0.00 1.11 0.00 1.42 0.00 1.51 "'184-i 0.00 0.09 0.00 0.39 0.00 1.09 0.00 1.40 0.00 J.48 . lS5Y•; 0.00 0.09 0.00 0.36 0.00 1.08 0.00 1.37 0.00 1.45 ·~~llt-".i,· lnflQw,'!-;•Outfloyv inf!QW't· : .. outflow · InfloW, · ·outflow .. ,1rifluw.' 'Outflow' ~·..iri:flow. Outflow;; ,_ '·''' , "''"""'' 'r'·''{ ·;. Zyr>f!. t~~:;2)'r"· -~ , fQYr"l'f, r IDYti>: ,· 25yr.F " 25yr: ;i~SOY,f ,· -,50y{.,._ .. ~. 1~\:10oyr :r l'OO}it•r · ', ·.,,18611!_~ 0.00 0.08 0.00 0.34 0.00 1,03 0.00 1.35 0.00 1.43 < .c1s1:5" 0,00 0.08 0,00 0.33 0,00 0.95 0.00 1.33 0.00 1.41 -~.188' :;'. , 0.00 0.08 0,00 0.31 0,00 0.88 0.00 1.30 0.00 1.38 :· '.J89,1'_. 0.00 0.08 0.00 0.29 0,00 0.82 0,00 1.28 0.00 1.36 ""·""i.90.·.: Ii 0.00 0.07 0.00 0.28 0.00 0.76 0.00 1.26 0.00 1.34 :j;;r9'.fa:.;. 0.00 0.07 0.00 0.26 0.00 0.71 0.00 1.24 0.00 1.31 H92'{;.~/ 0.00 0.07 0.00 0.25 0.00 0.66 0.00 1.22 0.00 1.29 1'.'" ··~[93 J" • 0.00 O.Q7 0.00 0.24 0.00 0.61 0.00 1.20 0.00 1.27 ' , ··19~~· 0.00 0.07 0.00 0.23 0.00 0.58 0.00 1.18 0.00 1.25 , '" ;~9~\?' 0.00 0.06 0.00 0.22 0.00 0.54 0.00 1.16 0.00 1.23 ', '1:9~'.k~ 0.00 0.06 0.00 0.21 0.00 0.50 0.00 1.14 0.00 1.21 ,, t.~.f97d,\t: , 0.00 0.06 0.00 0.20 0.00 0.47 0.00 1.13 0.00 1.19 • .f:1'.l9,8/•!' .. 0.00 0.06 0.00 0.19 0.00 0.44 0.00 1.11 0.00 1.17 .. . ~199;~~~ ' 0.00 0.06 0.00 0.18 0.00 0.42 0.00 1.09 0.00 1.15 ~ •;•:zpQ .e 0.00 0.06 0.00 0.17 0.00 0.39 0.00 1.07 0.00 1.13 :'l'l ••. 2qr·; .... 0.00 0.05 0.00 0.16 0.00 0.37 0.00 1.02 0.00 1.12 fr .202' ~I';, 0.00 0.05 0.00 0.16 0.00 0.35 0.00 0.94 0.00 1.10 :>'~··703 ~w· · • 0.00 0.05 0.00 0.15 0.00 0.33 0.00 0.87 0.00 1.08 •::)01V~~-' · 0.00 0.05 0.00 0.15 0.00 0.31 0.00 0.81 0.00 1.05 ::t;20s, ... ~~ 0.00 0.05 0.00 0.14 0.00 0.30 0.00 0.75 0.00 0.97 206·~· 0.00 0.05 0.00 0.13 0.00 0.28 0.00 0.70 0.00 0.90 .'. 2DT·>· 0.00 0.05 0.00 0.13 0.00 0.27 0.00 0.65 0.00 0.84 'j _,;; 2QS.-.£1"';, 0.00 0.05 0.00 0.12 0.00 0.25 0.00 0.61 0.00 0.78 ~"(!: iQ9~·'.'.' 0.00 0.04 0.00 0.12 0.00 0.24 0.00 0.57 0.00 0.72 ··!'"tHf''•: 0.00 0.04 0.00 0.12 0.00 0.23 0.00 0.53 0.00 0.67 ·. ·2tl 't<, . 0.00 0.04 0.00 0.11 0.00 0.22 0.00 0.50 0.00 0.63 ;..>2l2 ~ 0.00 0.04 0.00 0.11 0,00 0.21 0.00 0.47 0.00 0.59 "~,4'~13~ . 0.00 0.04 0.00 0.10 0.00 0.20 0,00 0.44 0.00 0.55 ""' '~Z:HY,· 0.00 0.04 0.00 0.10 0.00 0.19 0.00 0.41 0.00 0.51 fl, '.-.,~~:zrs11?:~· 0.00 0.04 0.00 0.10 0.00 0.18 0.00 0.39 0.00 0.48 7t6"~: .... · 0.00 0.04 0.00 0.09 0.00 0.17 0.00 0.37 0.00 , 0.45 ~· 217,~}.· 0.00 0.04 0.00 0.09 0.00 0.17 0.00 0.35 0.00 0.42 < .. ,218.'> 0.00 0.03 0.00 0.09 0.00 0.16 0.00 0.33 0.00 0.40 ",!,'-219.~, . 0.00 0.03 0.00 0.08 0.00 0.15 0.00 0.31 0.00 0.38 ~ \s720:!)~.~ 0.00 0.03 0.00 0.08 0.00 0.15 0.00 0.30 0.00 0.35 , "i·22r"ii· '..· ·; 0.00 0.03 0.00 0.08 0.00 0.14 0.00 0.28 0.00 0.34 . ,, .• ~222.~;_. 0.00 0.03 0.00 0.08 0.00 0.14 0.00 0.27 0.00 0.32 223", " 0.00 0.03 0.00 0.07 0.00 0.13 0.00 0.25 0.00 0.30 ·.·2.Mf::,' 0.00 0.03 0.00 0.07 0.00 0.13 0.00 0.24 0.00 0.29 . "'"-,22:51, . ; 0.00 0.03 0.00 0.07 0.00 0.12 0.00 0.23 0.00 0.27 ";;.,,:::2t6;~··: 0.00 0.03 0.00 O.Q7 0.00 0.12 0.00 0.22 0.00 0.26 ·''~2f;:7. 0.00 0.03 0.00 O.Q7 0.00 0.11 0.00 0.21 0.00 0.24 .;,:i··~:22s·: ~' 0.00 0.03 0.00 0.06 0.00 0.11 0.00 0.20 0.00 0.23 t".· 229' t 0.00 0.03 0.00 0.06 0.00 0.10 0.00 0.19 0.00 0.22 ,2W ,N · 0.00 0.03 0.00 0.06 0.00 0.10 0.00 0.18 0.00 0.21 .:•i:l(;h' ·. 0.00 0.03 0.00 0.06 0.00 0.10 0.00 0.17 0.00 0.20 .,:;.~+~2~ 0.00 0.02 0.00 0.06 0.00 0.09 0.00 0.16 0.00 0.19 ti!:.ff'.233';." "'· 0.00 0.02 0.00 0.06 0.00 0.09 0.00 0.16 0.00 0.18 ·«,;2~4 0.00 0.02 0.00 0.05 0.00 0.09 0.00 0.15 0.00 0.18 i235' .... 0.00 0.02 0.00 0.05 0.00 0.08 0.00 0.15 0.00 0.17 236 ,,, 0.00 0.02 0.00 0.05 0.00 0.08 0.00 0.14 . 0.00 0.16 '?23-h: •. " 0.00 0.02 0.00 0.05 0.00 0.08 0.00 0.14 0.00 0.15 '""''238{\i". 0.00 0.02 0.00 0.05 0.00 0.08 0.00 0.13 0.00 0.15 ·;2'.Wif., · 0.00 0.02 0.00 0.05 0.00 O.Q7 0.00 0.13 0.00 0.14 ::: . 2~Hi ;·;!'\ 0.00 0.02 0.00 0.05 0.00 0.07 0.00 0.12 0.00 0.14 '~ .~\24t~; ' 0.00 0.02 0.00 0.04 0.00 0.07 0.00 0.12 0.00 0.13 4' .. ,,,242,ef:>il' ,, 0.00 0.02 0.00 0.04 0.00 0.07 0.00 0.11 0.00 0.13 < : .. 243 '.'i:~" 0.00 0.02 0.00 0.03 0.00 0.05 0.00 O.Q7 0.00 0.08 . U'i24MA·;: 0.00 0.02 0.00 0.03 0.00 0.04 0.00 0.07 0.00 0.08 24 .00 22 .00 20.00 18.00 16.00 14.00 ~ Qj ~ 12.00 ro .c u "' c 10.00 8.00 6 .00 4 .00 2 .00 0 .00 22 .53 (3.29 I , .. ---, --- I I . 2 Year Pond Inflow & Outflow Hydrographs Appendix C ' i:.~ '' .' --~ ----' ---- 0 10 20 30 40 5 9 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow 2yr --Pond Outflow 2yr 34.00 32.00 30.00 28 .00 26.00 24.00 22 .00 20.00 tJ -; 18 .00 ~ ra ti 16.00 .,, 0 14.00 12.00 10.00 8 .00 6 .00 4 .00 2.00 0 .00 30.75 3.69 -----.,,,. --, I .. ' - 10 Year Pond Inflow & Outflow Hydrographs Appendix C ---------..... --- 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow lOyr - -Pond Outflow lOyr 38 .00 36.00 34 .00 32.00 30.00 28.00 26 .00 24 .00 -22.00 -0 -; 20 .00 ~ ~ 18.00 u "' c 16.00 14.00 12.00 10.00 8 .00 6.00 4.00 2 .00 0 .00 35 .12 .r3.88 .,,.. ------/ I ~. 25 Year Pond Inflow & Outflow Hydrographs Appendix C --------------- 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow 25yr - -Pond Outflow 25yr 42 .00 40 .00 38 .00 36.00 34.00 32.00 30 .00 28.00 26.00 u;-24.00 't; -; 22 .00 ~ ~ 20 .00 u "' c 18.00 16 .00 14.00 12.00 10.00 8.00 6 .00 4.00 2.00 0.00 ,j~. /U -11 rt.I"\ ~<. ·-- ------/ , ~ 50 Year Pond Inflow & Outflow Hydrographs Appendix C ---------------- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow 50yr - -Pond Outflow 50yr Iii 44 .00 42.00 40.00 38.00 36.00 34.00 32 .00 30.00 28 .00 26.00 ~ 24.00 QI ~ 22 .00 111 .c Ii( 20.00 c 18.00 16.00 14.00 12.00 10.00 8.00 6 .00 4 .00 2.00 0 .00 41.45 rs.96 I ' ' _. --/ ---, ,, 100 Year Pond Inflow & Outflow Hydrographs Appendix C -------------- 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pond Inflow lOOyr --Pond Outflow lOOyr ·: ':;~)?.~;,·· -~} . ·~1.'-· 't-~·t':t: . 'Tim~'!Jftn)< ·':.a.o:~~ ·:i .•. ')'1 ;x-;·:r;;;.; =· "'·"·'•" "' .... ~ ~t:.~ , r1~;;~,.. ~.:. "~4:'::,'f*i J'j . '5: ,~'.:" .;_;1 ~6Ng;.~,, "·I'! ·'~7''t'.;.:.'';., ••Oc•»•· ., >f." •,; v;:>~:}V' ,, ... ,,,.,., ' lOJ· ... , lTtt .. , l2~~'.j\-'. ·; ·"''' q'W•/:\)i:. ·31l'<l4'iJtlf'~ "'i·'' i5l~~'i ' ·1'''J fr~~.:~· .,,;HJ~·"'°' "'.~)Sifi:i· ,, ii"l9~i{'.' ,, '·~/;t'Q:~ff).\):'~ ·:"+l·;J/' y 22'·~· : ';";;'·23:~'.' Ii, ~24~" ~: .; ..• ' 25;\ii,_;i' w ~ms'2~:!~:-~. ~ ·t·· ·2;.;.:·· ·,,,·,28'frt" '".,,;291~-.... '30:~;{' ,-:~t'1~11iiV .: •.. ' 'i34\' ... ;!i : 33'.'t' ._, 'd<f4(: >'•,/' ,35:~ ,,-;.."';~~-6~1:.,; ·~ ' . . r~J'.;'..>¥;(• :,. ~38: :?E. ·i ·~39. ,,.., . :40:::~· 0 ·'.i;;.:A.l~t. . ,; ~N·2l~1t'J'-, B~~il;~'J!$:; .< ' ,. ~j.44 j~\fi ... ~.~;~45 ir ,~, 41r.·· 1·, :~AJ5,~ ""'48)'.' "· · "All.:+r...:j' .,;--f\:jQ~);', " ·_ .. ::-;51,,,· -~~· -~,~s~;~·~ } !>iF\;$'3, '''·i'.54'.~~. ·: ... i;,5~tif<· · :,5Qf•. : -."' ·>.57 ";; . ~-r 58~:S-0: .' '')59 .R •. Runoff Direction 3 -Pre-Development VS. Post Development Hydrographs Appendix C ...,, Pr~•.t Vj>o5t ·'.·'Pre':/' ~{:Post '. Pre';'1'it, /•:'Post ,. Jf~'ff6t' . Post'i". ·.,.. 2yrc. '" N·J2yr 'lOyLq ~· 'lOyr · '25}ir:.,., : 25yr' '_;;5oyc f '" 50jir'I . Q (crsy ·Q (cfs) : Q (cfs)' ·;Q (cfs)·· . Q (cfsY · Q (cfs) ·'Q.(ff~1· Q (cfs). 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13 0.01 0.19 0.02 0.22 0.02 0.25 0.03 0.27 0.10 0.38 0.16 0.44 0.20 a.so 0.24 0.40 0.35 0.57 0.57 0.65 0.70 0.74 0.84 0.54 0.84 0.76 1.12 0.87 1.17 0.99 1.23 0.67 1.17 0.95 1.32 1.09 1.41 1.24 1.51 0.80 1.35 1.14 1.59 1.31 1.73 1.49 1.87 0.94 1.58 1.33 1.93 1.53 2.10 1.74 2.24 1.07 1.86 1.52 2.24 1.74 2.40 1.98 2.54 1.20 2.15 1.71 2.50 1.96 2.63 2.23 2.72 1.34 2.38 1.90 2.68 2.18 2.79 ' 2.48 2.89 1.47 2.57 2.09 2.82 2.40 2.94 2.73 3.06 1.61 2.67 2.28 2.94 2.62 3.08 2.98 3.21 1.74 2.76 2.47 3.05 2.83 3.20 3.22 3.35 1.87 2.84 2.66 3.15 3.05 3.31 3.47 3.46 2.01 2.91 2.85 3.25 3.27 3.41 3.72 3.55 2.14 2.97 3.04 3.32 3.49 3.49 3.97 3.64 2.27 3.03 3.23 3.40 3.71 3.55 4.22 3.71 2.41 3.08 3.42 3.46 3.93 3.62 4.46 3.78 2.54 3.13 3.61 3.51 4.14 3.67 4.71 3.84 2.68 3.16 3.80 3.54 4.36 3.72 4.96 3.89 2.81 3.20 3.99 3.58 4.58 3.76 5.21 3.94 2.94 3.22 4.18 3.62 4.80 3.79 5.46 3.97 3.08 3.25 4.37 3.64 5.02 3.82 5.70 4.07 3.21 3.27 4.56 3.66 5.23 3.85 5.95 4.38 3.35 3.28 4.75 3.67 5.45 3.86 6.20 4.62 3.48 3.29 4.94 3.68 5.67 3.88 6.45 4.78 3.6t'1i •i"3;29 ·.·,s:n.¥:. "" 3.69 "\·5~89~1. "·3.88 ,. 'it6:70 : 4.9iV~ 3.55 3.29 5.03 3.69 5.78 3.88 6.57 4.90 3.48 3.28 4.94 3.69 5.67 3.88 6.45 4.80 3.41 3.27 4.84 3.68 5.56 3.87 6.32 4.65 3.35 3.26 4.75 3.66 5.45 3.86 6.20 4.48 3.28 3.24 4.65 3.65 5.34 3.85 6.08 4.32 3.21 3.23 4.56 3.64 5.23 3.84 5.95 4.17 3.14 3.21 4.46 3.63 5.12 3.82 5.83 4.02 3.08 3.20 4.37 3.62 5.02 3.81 5.70 3.99 3.01 3.18 4.27 3.61 4.91 3.80 5.58 3.98 2.94 3.17 4.18 3.60 4.80 3.79 5.46 3.97 2.88 3.15 4.08 3.58 4.69 3.78 5.33 3.96 2.81 3.14 3.99 3.57 4.58 3.77 5.21 3.94 2.74 3.13 3.89 3.56 4.47 3.75 5.08 3.93 2.68 3.12 3.80 3.55 4.36 3.74 4.96 3.92 2.61 3.16 3.70 3.54 4.25 3.73 4.84 3.91 2.54 3.09 3.61 3.52 4.14 3.72 4.71 3.89 2.48 3.07 3.51 3.51 4.03 3.70 4.59 3.88 2.41 3.06 3.42 3.50 3.93 3.69 4.46 3.87 2.34 3.04 3.32 3.49 3.82 3.68 4.34 3.86 2.27 3.03 3.23 3.48 3.71 3.67 4.22 3.85 2.21 3.01 3.13 3.47 3.60 3.66 4.09 3.83 2.14 3.00 3.04 3.46 3.49 3.65 3.97 3.82 2.07 2.99 2.94 3.44 3.38 3.63 3.84 3.81 2.01 2.97 2.85 3.43 3.27 3.62 3.72 3.80 1.94 2.96 2.75 3.42 3.16 3.61 3.60 3.79 1.87 2.95 2.66 3.41 3.05 3.60 3.47 3.78 1.81 2.93 2.56 3.39 2.94 3.59 3.35 3.76 1.74 2.92 2.47 3.38 2.83 3.57 3.22 3.75 1.67 2.90 2.37 3.36 2.73 3.56 3.10 3.74 1.61 2.89 2.28 3.35 2.62 3.55 2.98 3.73 1.54 2.87 2.18 3.33 2.51 3.54 2.85 3.71 1.47 2.86 2.09 3.32 2.40 3.53 2.73 3.70 ~-'.+:·PrC; ~ . ,.·'·J>osrt1 ~l(){)yr. -. l()()yt: < '":Q(cfs) Q (cfs)'.• 0.00 0.00 0.26 0.03 0.52 0.26 0.78 0.89 1.04 1.25 1.29 1.54 1.55 1.93 1.81 2.29 2.07 2.58 2.33 2.76 2.59 2.94 2.85 3.11 3.11 3.26 3.37 3.40 3.63 3.51 3.88 3.61 4.14 3.69 4.40 3.77 4.66 3.84 4.92 3.90 5.18 3.95 5.44 4.00 5.70 4.48 5.96 4.94 6.21 5.38 6.47 5.70 6.73 5.89 _;,·~5,99. 5.96'* 6.86 5.92 6.73 5.77 6.60 5.52 6.47 5.23 6.34 4.96 6.21 4.72 6.08 4.55 5.96 4.38 5.83 4.23 5.70 4.08 5.57 3.99 5.44 3.98 5.31 3.97 5.18 3.96 5.05 3.95 4.92 3.94 4.79 3.92 4.66 3.91 4.53 3.90 4.40 3.89 4.27 3.87 4.14 3.86 4.01 3.85 3.88 3.84 3.75 3.83 3.63 3.82 3.50 3.80 3.37 3.79 3.24 3.78 3.11 3.77 2.98 3.76 2;85 3.74 ~63~i'.bc~ I ·:~~~:-Pre\~~·~ ,~:iftf.oSt:.:>., 1;~ ·~ Pfe-~~-~.r. J,;:/ fO,st, *~ . .:r-~·-~~·";a: }-.~~~Q.St<-:~: ~~f~,~~~~~. ~!-"'. RQSt~;}:~_: ~~~~.t>fe~'#'.. :·?<·.PoSt,~.<::· •• i!J '?.¥r-f<:c· -~it~~yr·\l:t :,:1oyrJ;. }Y:l:lOri !<''i: ';'"'25.Y.t!Y '.;!":2:5~,}1;: · \~tf..$Oyir\i'9 'f~,56Y£t; ··.' 'fi'lOQyr;.~. l~lOO%!: 1.40 2.85 1.99 3.31 2.29 3.52 2.60 3.69 2. 72 3. 73 1.34 I 2.83 I 1.90 I 3.29 I 2.18 I 3.50 I 2.48 I 3.68 I 2.59 I 3.72 1.27 I 2.82 I 1.80 I 3.28 I 2.07 I 3.49 I 2.36 I 3.67 I 2.46 I 3.71 1.20 I 2.81 I 1.71 I 3.27 I 1.96 I 3.48 I 2.23 I 3.65 I 2.33 I 3.69 1.14 I 2.79 I 1.61 I 3.25 I 1.85 I 3.47 I 2.11 I 3.64 I 2.20 I 3.68 1.07 I 2.78 I 1.52 I 3.24 I 1.74 I 3.46 I 1.98 I 3.63 I 2.07 I 3.67 1.00 I 2.77 I 1.42 I 3.22 I 1.64 I 3.45 I 1.86 I 3.62 I 1.94 I 3.66 o.94 I 2.75 I 1.33 I 3.21 I 1.53 I 3.43 I 1.74 I 3.61 I 1.81 I 3.65 0.87 I 2.74 I 1.23 I 3.19 I 1.42 I 3.42 I 1.61 I 3.60 I 1.68 I 3.64 o.80 I 2.72 I 1.14 I 3.18 I Ul I 3.41 I 1.49 I 3.59 I 1.55 I 3.63 0.74 I 2.71 I 1.04 I 3.16 I 1.20 I 3.39 I 1.36 I 3.57 I 1.42 I 3.62 1-'.",~;~~·~~'i7~1/J(t~r: 0.67 I 2.69 I o.95 I 3.15 I 1.09 I 3.38 I 1.24 I 3.56 I 1.29 I 3.60 0.60 I 2.68 I 0.85 I 3.14 I 0.98 I 3.37 I 1.12 I 3.55 I 1.17 I 3.59 0.54 I 2.67 I o. 76 I 3.12 I 0.87 I 3.35 I o.99 I 3.54 I 1.04 I 3.58 "~ H4~'.{t' 0.47 I 2.65 I 0.66 I 3.11 I 0.76 I 3.34 I 0.87 I 3.53 I 0.91 I 3.57 0.40 I 2.64 I 0.57 I 3.10 I 0.65 I 3.32 I 0.74 I 3.51 I 0.78 I 3.55 ~i~;.g~ ?~1¥~/f-~ 0.33 I 2.63 I 0.47 I 3.08 I 0.55 I 3.31 I 0.62 I 3.50 I 0.65 I 3.54 0.27 I 2.61 I 0.38 I 3.07 I 0.44 I 3.30 I 0.50 I 3.49 I 0.52 I 3.53 0.20 2.60 0.28 3.05 0.33 3.28 0.37 3.48 0.39 3.52 0.13 2.58 0.19 3.04 0.22 3.27 0.25 3.47 0.26 3.51 0.07 2.55 0.09 3.02 0.11 3.25 0.12 3.46 0.13 3.50 0.00 2.53 0.00 3.01 0.00 3.24 0.00 3.44 0.00 3.49 0.00 2.51 0.00 3.00 0.00 3.22 0.00 3.43 0.00 3.47 o.oo I 2.49 I o.oo I 2.98 I o.oo I 3.21 I o.oo I 3.42 I o.oo I 3.46 . :~.1;<\'84$1.'b<U o.oo I 2.46 I o.oo I 2.97 I o.oo I 3.19 I o.oo I 3.41 I o.oo I 3.45 '~;;s?.,;(:~;ciU 0.00 I 2.44 I 0.00 I 2.96 I 0.00 I 3.18 I 0.00 I 3.39 I 0.00 I 3,44 ,;c:; ,, ·s~:m:::e:;. o.oo 2.42 o.oo 2.94 o.oo 3.17 o.oo 3.38 o.oo 3.42 0.00 2.39 0.00 2.93 0.00 3.15 0.00 3,36 0.00 3.41 0.00 2.36 0.00 2.91 0.00 3.14 0.00 3.35 0.00 3.40 0.00 2.33 0.00 2.90 0.00 3.13 0.00 3.33 0.00 3.38 o.oo I 2.31 I o.oo I 2.88 I o.oo I 3.11 I o.oo I 3.32 I o.oo I 3.37 o.oo I 2.28 I o.oo I 2.87 I o.oo I 3.10 I o.oo I 3.31 I o.oo I 3.35 §" 'l;,9t~!~\I o.oo I 2.25 I o.oo I 2.86 I o.oo I 3.09 I o.oo I 3.29 I o.oo I 3.34 o.oo I 2.23 I o.oo I 2.84 I o.oo I 3.07 I o.oo I 3.28 I o.oo I 3.33 ,,, ·~ 0.00 2.20 0.00 2.83 0.00 3.06 0.00 3.27 0.00 3.31 . ,,;t:,~~J"""'$~ 0.00 2.17 0.00 2.82 0.00 3.04 0.00 3.25 0.00 3.30 ~: :~r:.:~6~¥Wt' 0.00 2.14 0.00 2.80 0.00 3.03 0.00 3.24 0.00 3.29 'if?'.~c_ 0.00 2.11 0.00 2.79 0.00 3.01 0.00 3.22 0.00 3.27 I o.oo I 2.07 I o.oo I 2.78 I o.oo I 3.oo I o.oo I 3.21 I o.oo I 3.26 P~.,~~','9,<!1!~~:1 o.oo I 2.04 I o.oo I 2.76 I o.oo I 2.99 I o.oo I 3.19 I o.oo I 3.24 l~7!,'iilQiJ7~;t:lJ o.oo I 2.01 I o.oo I 2.75 I o.oo I 2.97 I o.oo I 3.18 I o.oo I 3.23 ';:·,,~:foH.~01:!.I o.oo I 1.98 I o.oo I 2.73 I o.oo I 2.96 I o.oo I 3.16 I o.oo I 3.21 . )O§t11€ti1' o.oo 1.94 o.oo 2.72 o.oo 2.95 o.oo 3.15 o.oo 3.20 [.'il'~~.(p3;;•\\1~: 0.00 1.90 0.00 2.70 0.00 2.93 0.00 3.14 0.00 3.18 ,;,':+.\fl0'4'i:0r':J o.oo I 1.87 I o.oo I 2.69 I o.oo I 2.92 I o.oo I 3.13 I o.oo I 3.17 '!"~;~105~1Rtii,>I o.oo I 1.83 I o.oo I 2.67 I o.oo I 2.90 I o.oo I 3.11 I o.oo I 3.16 :'-;if,:t0:6;'~~':~1 o.oo I 1.80 I o.oo I 2.66 I o.oo I 2.89 I o.oo I 3.10 I o.oo I 3.14 :;;;~'j£t101,~~rq o.oo I 1.77 I o.oo I 2.65 I o.oo I 2.87 I o.oo I 3.08 I o.oo I 3.13 ~~~+ws;g1\,fd 0.00 I 1.73 I 0.00 I 2.64 I 0.00 I 2.86 I 0.00 I 3.07 I 0.00 I 3.12 t@9'?,!:,':I o.oo I 1.70 I o.oo I 2.62 I o.oo I 2.85 I o.oo I 3.05 I o.oo I 3.10 ·ft&ltP<~l"""I o.oo I 1.67 I o.oo I 2.61 I o.oo I 2.83 I o.oo I 3.04 I o.oo I 3.09 1;;;;~··;:1.'UJ(&lit'.ZI o.oo I 1.64 I o.oo I 2.59 I o.oo I 2.82 I o.oo I 3.02 I o.oo I 3.07 .,,,, .. f.,,,.,,.~,,., I o.oo I 1.61 I o.oo I 2.57 I o.oo I 2.81 I o.oo I 3.01 I o.oo I 3.06 0.00 1.58 0.00 2.55 0.00 2.79 0.00 3.00 0.00 3.04 0.00 1.56 0.00 2.53 0.00 2.78 0.00 2.99 0.00 3.03 0.00 1.53 0.00 2.50 0.00 2.76 0.00 2.97 0.00 3.02 I o.oo I 1.50 I o.oo I 2.48 I o.oo I 2.75 I o.oo I 2.96 I o.oo I 3.00 ·lt~'i:;tl7At;.J\ I 0.00 I 1.48 I o.oo I 2.46 I 0.00 I 2.73 I 0.00 I 2.95 I o.oo I 2.99 fi;'iJ:"liSl%• ·I o.oo I 1.45 I o.oo I 2.43 I o.oo I 2.72 I o.oo I 2.93 I o.oo I 2.98 ~ _1s:U9"l,~:>'.0; o.oo 1.42 o.oo 2.41 o.oo 2.n o.oo 2.92 o.oo 2.96 'fl;"·; 12P):<ti.\ o.oo 1.40 o.oo 2.38 o.oo 2.69 o.oo 2.90 o.oo 2.95 ';q';:d2~~?,;i{l~~ 0.00 1.38 0.00 2.35 0.00 2.68 0.00 2.89 0.00 2.94 'i'.5;, 1'2~ i.'1µ~;d o.oo I 1.35 I o.oo I 2.33 I o.oo I 2.66 I o.oo I 2.87 I o.oo I 2.92 I rt"'''Ft1t: .!1}(. ;'. Pre:i · ;.l~i.Post <~ ,; -i>r~r-·,, -~·~Post-~ · , PteiL ~· PosJ '•·,. ~···P(e'\:•. r Post_, • ,5,: 'Pre: ,,;, ::. rosf:: I• ,(!: ••;;,:;,,''(\'.('•·.~ .:·•;2yr~.·. ~:·:iyr , .. -~:;'roy.r~,t-:'iYloY1"',+ . ·25y~:;,· .;;_, 25y.i ,,, .~~5~·~. ;,:50yr':t;'. . 1:l00Yr-· ; . 'ici()y'i,.l','. / ?!:' li3;)'.:;\ ·. ~-0.00 1.33 0.00 230 0.00 2.65 0.00 2.86 0.00 2.91 \ ~ :"l~!f1f}> ·. 0.00 1.31 0.00 2.27 0.00 2.64 0.00 2.84 0.00 2.89 "; ;~ 125~'··· 0.00 1.29 0.00 2.24 0.00 2.63 0.00 2.83 0.00 2.88 ',' ,_,l:t~'',_: 0.00 1.27 0.00 2.22 0.00 2.61 0.00 2.82 0.00 2.86 ::··{:•127,:~' . 0.00 1.25 0.00 2.19 0.00 2.59 0.00 2.80 0.00 2.85 :: · tz;~~-'f\ 0.00 1.23 0.00 2.16 0.00 2.57 0.00 2.79 0.00 2.84 .. , 129' ,-: 0.00 1.21 0.00 2.13 0.00 2.55 0.00 2.78 0.00 2.82 .. 13()':"' ' 0.00 1.19 0.00 2.10 0.00 2.53 0.00 2.76 0.00 2.81 13ff1-i'• ' 0.00 1.17 0.00 2.07 0.00 2.51 0.00 2.75 0.00 2.80 ',~/ ll2,$t;.~ ,'f'J 0.00 1.15 0.00 2.03 0.00 2.49 0.00 2.73 0.00 2.78 t.2r1; (~3J+l+.; 0.00 1.13 0.00 2.00 0.00 2.46 0.00 2.72 0.00 2.77 .:; ~:~·1·34~;~:}~ -0.00 1.11 0.00 1.96 0.00 2.44 0.00 2.70 0.00 2.75 -~i·i3S~:iii> 0.00 1.10 0.00 1.93 0.00 2.41 0.00 2.69 0.00 2.74 ':t ~·j3~%;;~;"'.;€ 0.00 1.08 0.00 1.89 0.00 2.39 0.00 2.68 0.00 2.72 , .:1•''i3 7'!f ~'/ 0.00 1.03 0.00 1.86 0.00 2.36 0.00 2.66 0.00 2.71 ~··o:: B8·•:r~· 0.00 0.96 0.00 1.82 0.00 2.33 0.00 2.65 0.00 2.69 ,, <; 13~9.~~/ ' 0.00 0.89 0.00 1.79 0.00 2.30 0.00 2.64 0.00 2.68 !f .'5140' -0.00 0.83 0.00 1.76 0.00 2.28 0.00 2.62 0.00 2.67 J4L·r 0.00 0.77 0.00 1.72 0.00 2.25 0.00 2.61 0.00 2.66 :,,;F142.'. · 0.00 0.71 0.00 1.69 0.00 2.22 0.00 2.59 0.00 2.64 ;1 'i'~}4~~\' . 0.00 0.66 0.00 1.66 0.00 2.20 0.00 2.57 0.00 2.63 ?· ,;i.:!(<\4\;,, .• 0.00 0.62 0.00 1.63 0.00 2.17 0.00 2.55 0.00 2.62 .. ~,1}45\f ·~ 0.00 0.58 0.00 1.60 0.00 2.14 0.00 2.53 0.00 2.60 ,, ,;~J46·~~\; '. 0.00 0.54 0.00 1.57 0.00 2.10 0.00 2.51 0.00 2.58 · ·1147;'L3 0.00 0.51 0.00 1.55 0.00 2.07 0.00 2.48 0.00 2.56 , }1~3 :!;:(:' 0.00 0.48 0.00 1.52 0.00 2.04 0.00 2.46 0.00 2.54 -.:149/:'ij 0.00 0.45 0.00 1.49 0.00 2.01 0.00 2.43 0.00 2.52 ; :-;-fsQ'"1f1· 0.00 0.42 0.00 1.47 0.00 1.97 0.00 2.41 0.00 2.49 ~n·s·1"'5~ · 0.00 0.39 0.00 1.44 0.00 1.94 0.00 2.38 0.00 2.47 .. <1521"'.i; 0.00 0.37 0.00 1.42 0.00 1.90 0.00 2.36 0.00 2.44 ;, f53'·:, ,., 0.00 0.35 0.00 1.39 0.00 1.86 0.00 2.33 0.00 2.42 ~· ·154i,t1i: ,: 0.00 0.33 0.00 1.37 0.00 1.83 0.00 2.30 0.00 2.39 r~5l;;-;:.c~ 0.00 0.32 0.00 1.35 0.00 1.79 0.00 2.27 0.00 2.37 '.4. 1$6;\\.~"'i;:, 0.00 0.30 0.00 1.32 0.00 1.76 0.00 2.25 0.00 2.34 ,,· ·1•1,57~~"'' 0.00 0.28 0.00 1.30 0.00 1.73 0.00 2.22 0.00 2.31 -."f·:'1'$fl>'Ji:. 0.00 0.27 0.00 · 1.28 0.00 1.70 0.00 2.19 0.00 2.29 '.£, 159•:.'I:.:' 0.00 0.25 0.00 1.26 0.00 1.67 0.00 2.17 0.00 2.26 ,. if1H(l:0'-'?: t. 0.00 0.24 0.00 1.24 0.00 1.64 0.00 2.13 0.00 2.23 .;,· ··1!)1 ~ .·' 0.00 0.23 0.00 1.22 0.00 1.61 0.00 2.10 0.00 2.20 162·.-;·· , 0.00 0.22 0.00 1.20 0.00 1.58 0.00 2.07 0.00 2.18 0',\163:~' 0.00 0.21 0.00 1.18 0.00 1.55 0.00 2.04 0.00 2.15 . Ji,• i(;4~':;:,~t 0.00 0.20 0.00 1.16 0.00 1.53 0.00 2.01 0.00 2.11 , ,.;-,16s-,c~~ 0.00 0.19 0.00 1.14 0.00 1.50 0.00 1.97 0.00 2.08 ·;'', t66;;t,, 0.00 0.18 0.00 1.13 0.00 1.47 0.00 1.93 0.00 2.05 ' ,,167.f.'' 0.00 0.17 0.00 1.11 0.00 1.45 0.00 1.89 0.00 2.02 ,· .~f68tii' 0.00 0.17 0.00 1.09 0.00 1.42 0.00 1.86 0.00 1.98 ,, .ff,'"1695'~{"::; 0.00 0.16 0.00 1.07 0.00 1.40 0.00 1.82 0.00 1.95 , : ,,-.' :' l1~~ii'.~ ~ 0.00 0.15 0.00 1.01 0.00 1.38 0.00 1.79 0.00 1.91 :;~~;d11$'< 0.00 0.15 0.00 0.94 0.00 1.35 0.00 1.76 0.00 1.87 : '.'f'l ~t2 !; ~!" 0.00 0.14 0.00 0.87 0.00 1.33 0.00 1.73 0.00 1.84 ,, ,: · 1~73:-~\,;: 0.00 0.14 0.00 0.81 0.00 1.31 0.00 1.70 0.00 1.80 7{{74"~· :, 0.00 0.13 0.00 0.75 0.00 1.29 0.00 1.66 0.00 1.77 "' ~i.1$.,..; 0.00 0.13 0.00 0.70 0.00 1.26 0.00 1.63 0.00 1.74 ~;-,:116# ... 0.00 0.12 0.00 0.65 0.00 1.24 0.00 1.60 0.00 1.71 -,_. '171·'.f 0.00 0.12 0.00 0.61 0.00 1.22 0.00 1.58 0.00 1.68 ~:ps;i;'~ , 0.00 0.11 0.00 0.57 0.00 1.20 0.00 1.55 0.00 1.65 ·~,. J19;~;,;._, 0.00 0.11 0.00 0.53 0.00 1.18 0.00 1.52 0.00 1.62 i, /"JSQ~fii';;; 0.00 0.10 0.00 0.50 0.00 1.17 0.00 1.50 0.00 1.59 , .. · ,;tt ~1.~::.r:: 0.00 0.10 0.00 0.47 0.00 1.15 0.00 1.47 0.00 1.56 '',... . ';':I $2' '.:) ';" 0.00 0.10 0.00 0.44 0.00 1.13 0.00 1.44 0.00 1.53 ,.,, ,C-f;l83 :~~;: " 0.00 0.09 0.00 0.41 0.00 1.11 0.00 1.42 0.00 1.51 _J,, f.84{,, . 0.00 0.09 0.00 0.39 0.00 1.09 0.00 1.40 0.00 1.48 · ·;, ~ 185.·., V•:" 0.00 0.09 0.00 0.36 0.00 1.08 0.00 1.37 0.00 1.45 ~lP~e~;'.'. '.fife.Osf'::'· 1dLP~;'1t~: ':'.'.lP.ost!i'.~ ~ ,::P,i-e~~> .;i; i>c:fst!:~ "\:'Post-~ ,:';1>'2)!ri5<:' ~;~2:Yr ;:::-'.i;fiOyf'.t,~ §'.)1JGYJ:~%" -i1:'.:1sir7r' ~,,¥.tsYi: ~, ;;!~5.QYr;!' ·''lOOYfi\~' 0.00 0.08 0.00 0.34 0.00 1.03 0.00 1.43 0.00 0.08 0.00 0.33 0.00 0.95 0.00 1.33 0.00 1.41 0.00 0.08 0.00 0.31 0.00 0.88 0.00 1.30 0.00 1.38 0.00 0.08 0.00 0.29 0.00 0.82 0.00 1.28 0.00 1.36 . _,.. o.oo I o.o7 I 0.00 I o.28 I o.oo I o.76 I 0.00 I 1.26 I 0.00 I 1.34 ~F-S,'•< 0.00 0.07 0.00 0.26 0.00 0.71 0.00 1.24 0.00 1.31 iiit1?'1H\!t'.J,T''? 0.00 O.D7 0.00 0.25 0.00 0.66 0.00 1.22 0.00 1.29 "''.~?(,?S~if~{~ 0.00 0.07 0.00 0.24 0.00 0.61 0.00 1.20 0.00 1.27 ;.~~'·iiJl}4~~ 0.00 0.07 0.00 0.23 0.00 0.58 0.00 1.18 0.00 1.25 . 'i'"';'!Q~)ti'l,hi 0.00 0.06 0.00 0.22 0.00 0.54 0.00 1.16 0.00 1.23 ;,,;~ .J:?6"::itt~\ 0.00 0.06 0.00 0.21 0.00 0.50 0.00 1.14 0.00 1.21 ~i'.;':''lil?J{.'s;,; '-o.oo 0.06 o.oo 0.20 o.oo 0.47 o.oo 1.13 o.oo 1.19 ~~~i~'.l:9St'~+'.'.; o.oo 0.06 o.oo 0.19 o.oo o.44 o.oo 1.11 o.oo 1.17 r_;•)i'l99i~~~t 0.00 0.06 0.00 0.18 0.00 0.42 0.00 1.09 0.00 1.15 .,;:·~,zvuif,~v 0.00 0.06 0.00 0.17 0.00 0.39 0.00 1.07 0.00 1.13 '..:\\fir20~-~··,; o.oo o.o5 o.oo 0.16 o.oo o.37 o.oo 1.02 o.oo u2 F:'.}l~2Q2·i'~; 0.00 0.05 0.00 0.16 0.00 0.35 0.00 0.94 0.00 1.10 ~l:Ji·20~~~0~t, 0.00 0.05 0.00 0.15 0.00 0.33 0.00 0.87 0.00 1.08 4!J7i:t·itl4';~~)Z~ 0.00 0.05 0.00 0.15 0.00 0.31 0.00 0.81 0.00 1.05 ir-~~~2Q5;<:'.c;:ilit o.oo o.o5 o.oo o.14 o.oo o.30 o.oo o.75 o.oo 0.97 i),}2Q9~1i 0.00 0.05 0.00 0.13 0.00 0.28 0.00 0.70 0.00 0.90 . Sf'P:2Q71lli'!.i11-I o.oo I o.05 I o.oo I 0.13 I o.oo I 0.27 I o.oo I o.65 I o.oo I 0.84 f'.i".,'4\lSi:lll,i'fl o.oo I o.o5 I o.oo I 0.12 I o.oo I 0.25 I o.oo I 0.61 I o.oo I o.78 l',•d>209;f~;H o.oo I o.o4 I o.oo I 0.12 I o.oo I 0.24 I o.oo I 0.57 I o.oo I 0.72 1•;,::.~2xo:·~j'}<I 0.00 I 0.04 I 0.00 I 0.12 I 0.00 I 0.23 I 0.00 I 0.53 I 0.00 I 0.67 jif,•!£f2.i\(9~1f;d o.oo I o.o4 I o.oo I 0.11 I o.oo I 0.22 I o.oo I o.50 I o.oo I o.63 ~1;1:;i;·:~J210~r o.oo o.o4 o.oo 0.11 o.oo 0.21 o.oo o.47 o.oo o.s9 ;J;i",i¥:Z:iil"'+lt" 0.00 0.04 0.00 0.10 0.00 0.20 0.00 0.44 0.00 0.55 0.00 0.04 0.00 0.10 0.00 0.19 0.00 0.41 0.00 0.51 1~ .• ;~2{$~{\1>~1 o.oo I o.o4 I o.oo I 0.10 I o.oo I 0.18 I o.oo I o.39 I o.oo I 0.48 ,f~Ji;'iJ61it'*? I o.oo I o.o4 I o.oo I o.o9 I o.oo I 0.17 I o.oo I o.37 I o.oo I 0.45 'f2}~·t.?irl o.oo I o.o4 I o.oo I o.o9 I o.oo I 0.17 I o.oo I o.35 I o.oo I 0.42 ;;,.;;;1,1•21~~1~1 o.oo I o.o3 I o.oo I o.o9 I o.oo I 0.16 I o.oo I o.33 I o.oo I 0.40 -~~;:z:1~)r"5.~ifl o.oo I o.o3 I o.oo I 0.08 I o.oo I 0.15 I o.oo I o.31 I o.oo I o.38 1..:.~~.:{22'.~~[I o.oo I o.o3 I o.oo I 0.08 I o.oo I 0.15 I o.oo I o.30 I o.oo I o.35 0.00 0.03 0.00 0.08 0.00 0.14 0.00 0.28 0.00 0.34 0.00 0.03 0.00 0.08 0.00 0.14 0.00 0.27 0.00 0.32 0.00 0.03 0.00 0.07 0.00 0.13 0.00 0.25 0.00 0.30 l/;.fi¥224fjf~;i I o.oo I o.o3 I o.oo I o.07 I o.oo I o.13 I o.oo I o.24 I o.oo I 0.29 l·1'~t.~,~ii~~if~il o.oo I 0,03 I o.oo I o.o7 I o.oo I 0.12 I o.oo I 0.23 I o.oo I 0.27 ::>_?',\.~26;1J:z.htl o.oo I o.03 I o.oo I 0.07 I o.oo I 0.12 I o.oo I 0.22 I o.oo I 0.26 .;f•':~227;v:;,::·J o.oo I 0.03 I o.oo I o.o7 I o.oo I 0.11 I o.oo I 0.21 I o.oo I 0.24 ··;;*,~'22g;t';i,i~ 0.00 0.03 0.00 0.06 0.00 0.11 0.00 0.20 0.00 0.23 0.00 0.03 0.00 0.06 0.00 0.10 0.00 0.19 0.00 0.22 0.00 0.03 0.00 0.06 0.00 0.10 0.00 0.18 0.00 0.21 ?rci'Z~t/",\.", 'I 0.00 I 0.03 I 0.00 I 0.06 I 0.00 I 0.10 I 0.00 I 0.17 I 0.00 I 0.20 I~/~%, 2~i;?;~;i'.'I o.oo I 0.02 I o.oo I 0.06 I o.oo I o.o9 I o.oo I 0.16 I o.oo I 0.19 ,ffrlti:'.2:33~17>" ~I o.oo I 0.02 I o.oo I 0.06 , I o.oo I 0.09 I o.oo I 0.16 I o.oo I 0.18 1,'l;'~..WZJ4'.1w~*I o.oo I 0.02 I o.oo I o.o5 I o.oo I o.o9 I o.oo I 0.15 I o.oo I 0.18 l:I~\l~~·z35,;¥:«''i'I 0.00 I 0.02 I 0.00 I o.05 I 0.00 I 0.08 I 0.00 I 0.15 I o.oo I 0.17 ;:t;!(.;1,23"~·· ;;.,.~. 0.00 0.02 0.00 0.05 0.00 0.08 0.00 0.14 0.00 0.16 /.\il!I2.3;1~~i:r'41 o.oo 0.02 o.oo o.o5 o.oo 0.08 o.oo 0.14 o.oo 0.15 ',+j~";:fJ~liV~I o.oo I 0.02 I o.oo I o.o5 I o.oo I 0.08 I o.oo I o.13 I 0,00 I 0.15 · i,.,4;,.2~9.i;;,1-l•I o.oo I 0.02 I o.oo I o.05 I o.oo I o.07 I o.oo I o.13 I o.oo I o.14 }~\n40J'.'-'>I o.oo I 0.02 I o.oo I o.05 I o.oo I o.o7 I o.oo I 0.12 I o.oo I 0.14 1~·:,,, , 0.00 0.02 0.00 0.04 0.00 0.07 0.00 0.12 0.00 0.13 iv~,,J·Z4i/.;\l;t 0.00 0.02 0.00 0.04 0.00 0.07 0.00 0.11 0.00 0.13 ;()ij'~,v~,4:3,"(0YV~ 0.00 0.02 0.00 0.03 0.00 0.05 0.00 O.Q7 0.00 0.00 I ;;;)l£:<244;~,"'.d 0.00 0.02 0.00 0.03 0.00 0.04 0.00 0.07 0.00 0.00 0.00 I o.oo I 0.00 I o.oo I 0.00 I o.oo I 0.00 I o.oo I 0.00 I o.oo I I I I ~ I I I ' ' ' ' ' ' ' ' \ 2 Year Pre & Post Development Hydrographs Appendix C \ ai I ~2.00 -t-~--~~~~--~~~~~~__i_~~~~~~~~~~~~~~~~~~~~~~ ~ ' u "' o I ' I I ' I I \ \ \ \ ' ' ' \ \ \ \ \ ' ' ...... 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development 2yr - -Post Development 2yr ~ QI e.o l'O .r:. u "' 0 6 .00 10 Year Pre & Post Development Hydrographs Appendix C ' ' ' ' 2 .00 +-~~~~~~~--'--~~~~~~~~~-'-,~~~~~~~~~~~~~~~~~~ ' ' ' ' ' \ ' ' ' .... 0 10 20 30 40 50 60 70 80 90 100 110 1 2 0 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development lOyr - -Post Development lOyr 25 Year Pre & Post Development Hydrographs Appendix C ..... ..... ..... ..... ' ' ' ' ' ' \ ' ' ..... 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development 25yr - -Post Development 25yr 8.00 t I \ -I \ cu ~ 4 .00 ro .c I u Ill c ..... ..... .... l I I 2.00 50 Year Pre & Post Development Hydrographs Appendix C ..... ..... ..... ..... ..... ..... ' ' ' ' ' ' \ ' ' .... --0 .00 ...,.....J....4-L..L..L...1.+L.J..J....L+U...U.+u-u.+1.J....L..J..µ.LILI...j-1...LJ....L.,...... ....... """'"1 ............................................................... *"""' ................................. ~ ....... """'"l ............ '-'-4.1..J...U..! 0 10 20 30 40 so 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development SOyr - -Post Development SOyr 100 Year Pre & Post Development Hydrographs Appendix C ..... ..... ..... ..... ..... ..... ..... ' ' ' ' ' ' ' \ ' ..... .... - 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 Time (min) -Pre Development lOOyr - -Post Development lOOyr Appendix D -Technical Design Summary SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY The Cities of Bryan and College Station both require storm drainage design to follow these Unified Stormwater Design Guidelines. Paragraph C2 of Section Ill (Administration) requires submittal of a drainage report in support of the drainage plan (stormwater management plan) proposed in connection with land development projects, both site projects and subdivisions. That report may be submitted as a traditional prose report, complete with applicable maps, graphs , tables and drawings, or it may take the form of a "Technical Design Summary". The format and content for such a summary report shall be in substantial conformance with the description in this Appendix to those Guidelines. In either format the report must answer the questions (affirmative or negative) and provide, at minimum, the information prescribed in the "Technical Design Summary" in this Appendix. The Stormwater Management Technical Design Summary Report shall include several parts as listed below. The information called for in each part must be provided as applicable. In addition· to the requirements for the Executive Summary, this Appendix includes several pages detailing the requirements for a Technical Design Summary Report as forms to be completed. These are provided so that they may be copied and completed or scanned and digitized. In addition, electronic versions of the report forms may be obtained from the City. Requirements for the means (medium) of submittal are the same as for a conventional report as detailed in Section Ill of these Guidelines. Note: Part 1 -Executive Summary must accompany any drainage report required to be provided in connection with any land development project , regardless of the format chosen for said report. Note: Parts 2 through 6 are to be provided via the forms provided in this Appendix. Brief statements should be included in the forms as requested, but additional information should be attached as necessary. Part 1 -Executive Summary Report Part 2 -Project Administration Part 3 -Project Characteristics Part 4 -Drainage Concept and Design Parameters Part 5 -Plans and Specifications Part 6 -Conclusions and Attestation STORMWATER MANAGEMENT TECHNICAL DESIGN SUMMARY REPORT Part 1 -Executive Summary This is to be a brief prose report that must address each of the seven areas listed below. Ideally it will include one or more paragraphs about each item. 1. Name, address, and contact information of the engineer submitting the report, and of the land owner and developer (or applicant if not the owner or developer). The date of submittal should also be included. 2. Identification of the size and general nature of the proposed project, including any proposed project phases . This paragraph should also include reference to STORMWATER DESIGN GUIDELINES Effective Feb r uary 2007 Page 1 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY applications that are in process with either City:, plat(s), site plans, zoning requests, or clearing/grading permits , as well as reference to any application numbers or codes assigned by the City to such request. 3. The location of the project should be described . This should identify the Named Regulatory Watershed(s) in which it is located, how the entire project area is situated therein , whether the property straddles a watershed or basin divide, the approximate acreage in each basin, and whether its position in the Watershed dictates use of detention design. The approximate proportion of the property in the city limits and within the ET J is to be identified , including whether the property straddles city jurisdictional lines. If any portion of the property is in floodplains as described in Flood Insurance Rate Maps published by FEMA that should be disclosed. 4. The hydrologic characteristics of the property are to be described in broad terms: existing land cover; how and where stormwater drains to and from neighboring properties; ponds or wetland areas that tend to detain or store stormwater; existing creeks , channels, and swales crossing or serving the property; all existing drainage easements (or ROW) on the property, or on neighboring properties if they service runoff to or from the property. 5. The general plan for managing stormwater in the entire project area must be outlined to include the approximate size, and extent of use, of any of the following features: storm drains coupled with streets; detention I retention facilities ; buried conveyance conduit independent of streets; swales or channels; bridges or culverts; outfalls to principal watercourses or their tributaries; and treatment(s) of existing watercourses. Also, any plans for reclaiming land within floodplain areas must be outlined. 6. Coordination and permitting of stormwater matters must be addressed . This is to include any specialized coordination that has occurred or is planned with other entities (local, state , or federal). This may include agencies such as Brazos County government, the Brazos River Authority , the Texas A&M University System, the Texas Department of Transportation, the Texas Commission for Environmental Quality, the US Army Corps -of Engineers, the US Environmental Protection Agency, et al. Mention must be made of any permits , agreements , or understandings that pertain to the project. 7. Reference is to be made to the full drainage report (or the Technical Design Summary Report) which the executive summary represents. The principal elements of the main report (and its length), including any maps , drawings or construction documents, should be itemized. An example statement might be: "One __ ,_-page drainage report dated one set of construction drawings (_sheets) dated , and a ___ -page specifications document dated comprise the drainage report for this project." STORMWATER DESIGN GUIDELINES Effective February 2007 . Page 2 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 2 -Project Administration I Start (Page 2.1) ': .-. , .. _. .. ,:.·· ····Engineering and ·Desigri Professionals lnfQrmatio!'l · · ;;, .. '~~·· ,. 'l;'4., Eng ineering F i rm Name and Address: Jurisdiction S chultz Engineering, LLC City: Bryan P.O. Box 11995 ./ College Station Colleg e Station, Tx 77842 Date of Submittal: Lead Engineer's Name and Contact lnfo .(phone , e-mail, fax): Other: Jo seph P. Schultz, PE email: joeschultz84@verizon.net Phone: 764-3900 fax: 764-3910 Supporting Engineering I Consulting Firm(s): Other contacts: n/a . ' ... : Developer l Own~rJ ~pplicant lnforina~ion .. ' . , :·.··fr.~ ;;, : . J<'.: : . ... Developer I Applicant Name and Address: Phone and e-mail: D WS Development, Inc. 979-229-5118 P.O. Box 4508 david@dwsdevelopmenlcom B ryan, Texas 77805 Property Owner(s) if not Developer I Applicant (&address): Phone and e-mail : Charles & Ma ry Turn er -32 70 Rock Prairie Road, College Station, 1 979. 764.296 7 -diamondt33 75@y ahoo. . ' • : . -~ • . "l i' ~')~roj~ctldentifica~ion .· "'~-.: __ _· :S ~:'"';· ,,_" ."·~~~,~.,"·:, .... ?' ... :;:-: ~~-': ~ Development Name: Equinox Subdivision, Phase 1 Is subject property a site project, a single-phase subdivision , or part of a multi-phase subdivision? M ulti-Phase Subdivision If multi-phase , subject property is phase 1 of 2 Legal description of subject property (phase) or Project Area: (see Section II , Paragraph B-3a) A 000 701 , CRAWFORD BURNETT (/CL), TRACT 182.1, 21.8501 A CRES If subject property (phase) is second or later phase of a project, describe general status of all earlier phases. For most recent earlier phase Include submittal and review dates. General Location of Project Area, or subject property (phase): 3270 Rock Prairie Road We st approx imately 700 feet west of th e intersection between Keef er Loop and Rock Prairie Road Wesl In City Limits? Extraterritorial Jurisdiction (acreage): Bryan: acres. Bryan : College Station: College Station : 9.269 acres. Acreage Outside ET J: STORMWATER DESIGN GUIDELINES Effecti ve February 2007 Page 3 of 26 APPENDIX. D : TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Roadways abutting or within Project Area or Abutting tracts, platted land, or built subject property: developments: Rock Prairie Road Towers Parkway Sophies Lane Kate Lane Diamond T Storage Buena Vida Subdivision Barracks II Subdivision Named Regulatory Watercourse(s) & Watershed(s): Tributary Basin(s): Bee Creek Bee Creek Final Plat File#: NIA Date : -----------Preliminary Plat File #: ___ _ Name: Status and Vol/Pg: submitted with this project File#: ----- Zon ing Type: Townhouse Existing or Proposed? Existing Case Code: ----- Case Date Status: Zoning Type: Gen Sub Existing or Proposed? Existing Case Code: ____ _ Case Date Status: Preliminary Report Required? NIA Submittal Date _____ Review Date ____ _ Review Comments Addressed? Yes __ No__ In Writing? __ _ When? ----- Compliance With Preliminary Drainage Report. Briefly describe (or attach documentation explaining) any deviation(s) from provisions· of Preliminary Drainage Report, if any . STORMWATER DESIGN GUIDELINES Effective February 2007 Page 4 of 26 APPENDIX. D : TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 2 -Project Administration j Continued (page 2.3) ,, ':;:. ;f c;~t " .. Coorqi11ation Fo'f-Ffroj~ct or Subject Propef-ty (or Phase )'. ·. ' . ~-.,·ce:·''•5"1rc?~ Note: For any Coordination of stormwater matters indicated below, attach documentation describing and substantiating any agreements, understand ings, contracts , or approvals. Coordination With Other Departments of Jurisdiction City (Bryan or Dept. Contact: Date: Subject: College Sta ti on}f------+-------+-------+--------------1 Coordination With Non-jurisdiction City Needed? Yes __ No__:/_ Coordination with Brazos County Needed? Yes __ No_:[_ Coordination wi t h TxDOT Needed? Yes __ No_:[_ Coordination wi t h TAMUS Needed?. Yes No ./ Summarize need(s) & actions taken (include contacts & dates): Summarize need(s) & actions taken (include contacts & dates): Summarize need(s) & actions taken (include contacts & dates): Summarize need(s) & actions taken (i nclude contacts & dates): As t o stormwater management, are pennits required for the proposed work from any of the entities listed below? If so , summarize status of efforts toward that objective in spaces below. Entity PAermittedd'?: Status of Actions (include dates) pprove . US Anny Crops of Engineers No ./ Yes _ US Environmental Protection Agency No ./ Yes_ Texas Comm ission on Environmental Quality No Yes ./ Brazos River A uthority No_:/__ Yes _ General Permit 150000 STORMWATER DESIGN GUIDELINES Effective February 2007 It will be filed by the Construction Contra ctor. Page 5 of 26 APPENDIX. D : TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -Property Characteristics I Start (Page 3.1) Existing: Land proposed for development currently used, including extent of impervious cover? Currently vacant. Proposed development is residential subdivision. High density. Impervious cover= 65% Site Development Project (select all applicable) Subdivision Development Project Describe Nature and Size of Proposed Project __ Redevelopment of one platted lot, or two or more adjoining platted lots. __ Building on a single platted lot of undeveloped land. __ Building on two or more platted adjoining lots of undeveloped land. __ Building on a single lot, or adjoining lots, where proposed plat will not form a new street (but may include ROW dedication to existing streets). __ Other (explain): __ Construction of streets and utilities to serve one or more platted lots. __:!._Construction of streets and utilities to serve one or more proposed lots on lands represented by pending plats. Site projects: building use(s), approximate floor space, impervious cover ratio . Subdivisions: number of lots by general type of use, linear feet of streets and drainage easements or ROW. 51 lots Approximately 2525' of streets 3.02ac.ROW Is any work planned on land that is not platted If yes, explain: or on land for which platting is not pending? ./ No Yes Is any part of subject property abutting a Named Regulatory Watercourse I N ./ y (Section II, Paragraph B1) or a tributary thereof? 0 --es -- Is any part of subject property in floodplain I No ./ Yes Rate Ma 48041C0305-F area of a FEMA-regulated watercourse? ----P ----- Encroachment(s) into Floodplain areas planned? No ./ Yes __ Encroachment purpose(s): __ Building site(s) __ Road crossing(s) __ Utility crossing(s) __ Other (explain): NIA If floodplain areas not shown on Rate Maps, has work been done toward amending the FEMA- approved Flood Study to define allowable encroachments in proposed areas? Explain. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 6 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -ProQert~ Characteristics I Continued (Page 3.2) '• ::,~''.'.5I. ~ ~"' ,r, - . Hy:drologic Attrib~t~s of Subje~t Propertyi (or Pha~ef , .. ·'. "'iL~. · Has an earlier hydrologic analysis been done for larger area including subject property? Yes Reference the study (&date) here, and attach copy if not already in City files. -- Is the stormwater management plan for the property !n substantial conformance with the earlier study? Yes - - No --If not, explain how it differs. No If subject property is not part of multi-phase project, describe stormwater management plan for the property in Part 4 . _L_ If property is part of multi-phase project, provide overview of stormwater management plan for Project Area here. In Part 4 describe how plan for subject property will comply therewith. See Attached Drainage Report Do existing topographic features on subject property store or detain runoff? __:!__No --Yes Describe them (include approximate size, volume, outfall, model, etc). Any known drainage or flooding problems in areas near subject property? __:!__No --Yes Identify: Based on location of study property in a watershed , is Type 1 Detention (flood control) needed? (see Table B-1 in Appendix B) _{__ Detention is required. --Need must be evaluated . __ Detention not required. What decision has been reached? By whom? If the need for How was determination made? Type 1 Detention must be evaluated : STORMWATER DESIGN GUIDELINES Effective February 2007 Page 7 of 26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -Property Characteristics I Continued (Page 13.3) .. ~r .·~Hydrologl~ Attributes ~fSubj~~t erop~,rty'(or ·~~ase)(contiou,ed):;~ ~;. .. ·· "··~ Does subject property straddle a Watershed or Basin divide? No _:f__ Yes If yes , describe sol its below. In Part 4 describe desiqn concept for handling this. Watershed or Basin Larger acreage Lesser acreage Bee Creek x Above-Project Areas(Section II, Paragraph B3-a) Does Project Area (project or phase) receive runoff from upland areas? _{_No Yes Size(s) of area(s) in acres : 1) 2) 3) 4) __ _ Flow Characteristics (each instance) (overland sheet, shallow concentrated, recognizable concentrated section(s), small creek (non-regulatory), regulatory Watercourse or tributary); Flow determination : Outline hydrologic methods and assumptions: Rational Equation. Does storm runoff drain from public easements or ROW onto or across subject property? _:[_No __ Yes If yes , describe facilities in easement or ROW: Are changes in runoff characteristics subject to change in future? Explain Conveyance Pathways (Section II, Paragraph C2) Must runoff from study property drain across lower properties before reaching a Regulatory Watercourse or tributary? No ./ Yes Describe length and characteristics of each conveyance pathway(s). Include ownership of property(ies ). Refer to Attached Drainage Report STORMWATER DESIGN GUIDELINES Effective February 2007 Page 8 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -Proj;!ert~ Characteristics I Continued (Page 3.4) «·. , ...... ) · Hydrologic: Attri~utes· ~f Subjec-.t P'fope·rty · (or ~Hi~e) ( continyed) · · 'iii-.. ~.'.'..~': Conveyance Pathways (continued) Do drainage · If yes, for what part of length? 0 % Created by?__.{_ plat, or easements __ instrument. If instrument(s), describe their provisions. exist for any part of Drainage from this site will be conveyed via public right of way and/or existing pathway(s)? storm sewer pipe in easement _{_ No Yes -- Where runoff must cross lower properties, describe characteristics of abutting lower property(ies). (Existing watercourses? Easement or Consent aquired?) Refer to attached drainage report. Pathway Areas Describe any built br improved drainage facilities existing near the property (culverts , bridges, lined channels, buried conduit, swales, detention ponds, etc). Existing roadside ditch along Rock Prairie Road West, Existing curb and gutter and storm sewer system for Buena Vida Subdivision, Existing storm sewer system for Barracks II Section IOI. Nearby Drainage Do any of these have hydrologic or hydraulic influence on proposed stormwater Facilities design? No _:/_ Yes If yes, explain: -- limit proposed runoff flows to pre-development conditions STORMWATER DESIGN GUIDELINES Effective February 2007 Page 9 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Start (Page 4.1) I-' ·." ,. ·:"'-"• ... ,, .. "' •. • .. ··,.. .. ..,,., '•. "<• ·' , •'':F· _,, .. -~·"'· :" i • ., .•. ' ':~'' .. ~: .. '· , Storniwater Mali'!9~rne~t Cof:lceJ>t ··. , ' .: •. ,. .• ,. ·•1.1r• -,,;rr· :•r., ,. Discharge(s) From Upland Area(s) If runoff is to be received from upland areas, what design drainage features will be used to accommodate it and insure it is not blocked by future development? Describe for each area, flow section, or discharge point. NIA Discharge(s) To Lower Property(ies) (Section II, Paragraph E1) Does project include drainage features (existing or future) proposed to become public via platting? __L No --Yes Separate Instrument? _ -No -_Yes Per Guidelines reference above, how will __ Establishing Easements (Scenario 1 ). runoff be discharged to neighboring __ Pre-development Release (Scenario 2) property(ies)? _./_ Combination of the two Scenarios Scenario 1: If easements are proposed, describe where needed, and provide status of actions on each. (Attached Exhibit# ) refer to final plat for easements proposed Scenario 2: Provide general description of how release(s) will be managed to pre-development conditions (detention, sheet flow, partially concentrated, etc.). (Attached Exhibit# C ) Detention Ponds and reduction in drainage area. Com bi nation: If combination is proposed, explain how discharge will differ from pre- development conditions at the property line for each area (or point) of release. The discharge will be less than pre-development conditions. If Scenario 2, or Combination are to be used , has proposed design been coord inated with owner(s) of receiving property(ies)? No __L Yes Explain and provide documentation . The discharge will be less than pre-development conditions and adjacent land owners will be contacted prior to work in recorded easements. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 10 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.2) , •,Jr\ •. ·~ . •· .. S.tormwaterManagement goncept (&on,tinuedf :·-.,. . '""'~ · ·i~ ~ '.:i~·:, Within Project Area Of Multi-Phase Project Will project result in shifting runoff between Basins or Identify gaining Basins or Watersheds and acres shifting: 1--~~~~~~~~~~~~~~~~~~~~~~~~~---1 between Watersheds? What design and mitigation is used to compensate for increased runoff from gaining basin or watershed? I No Yes How will runoff from Project Area be mitigated to pre- development conditions? Select any or all of 1, 2, and/or 3, and explain below. 1. __ With facility(ies) involving other development projects. 2. _L Establishing features to serve overall Project Area. 3 . _L On phase (or site) project basis within Project Area . 1. Shared facility (type & location of facility; design drainage area served; relationship to size of Project Area): (Attached Exhibit #B ) There are two proposed detention ponds, one adjacent to Rock Prairie Road and one adjacent to Barracks II Section JOI 2. For Overall Project Area (type & location of facilities): (Attached Exhibit #B ) The two proposed detention ponds will in full build-out serve the entire development 3 . By ohase (or site) project: Describe planned mitigation measures for phases (or sites) in subsequent questions of this Part. t'-· -0 <I> en c: (1) ffi >-a: en c: Cl ·u; (1) 0 Oz -ro Jil ~ <( Are aquatic echosystems proposed? __ No project(s)? __ Yes In which phase(s) or Are other Best Management Practices for reducing stormwater pollutants proposed? __ No ~Yes Summarize type of BMP and extent of use : Silt fences, construction exits If design of any runoff-handling facilities deviate from provisions of B-CS Technical Specifications, check type facility(ies) and explain in later questions. __ Detention elements __ Conduit elements __ Channel features __ Swales __ Ditches __ Inlets __ Valley gutters __ Outfalls __ Culvert features __ Bridges Other STORMWATER DESIGN GUIDELINES Effective February 2007 Page 11of26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.3) , ,,o':'·; ·· · , :-., '·· -~ siorrli.water M'anagertie.nt c<lpcept )J?!Jtfnued )"',2; :~·~~:·'· "" ~-. ~; ~ :. Within Project Area Of Multi-Phase Project (continued) Will Project Area include bridge(s) or culvert(s)? __ No____:!._ Yes Identify type and general size and In which phase(s). A box culvert will be installed in the existing Rock Prairie Road roadside ditch at the Tower's Parkway Connection to Rock Prairie Road If detention/retention serves (will serve) overall Project Area, describe how it relates to subject phase or site project (physical location, conveyance pathway(s), construction sequence): Two detention ponds are proposed on site, refer to Exhibit B and the attached drainage report for detailed information. Within Or Serving Subject Property (Phase, or Site) If property part of larger Project Area, is design in substantial conformance with earlier analysis and report for larger area? _:!___Yes No, then summarize the difference(s): . , Identify whether each of the types of drainage features listed below are included, extent of use, and general characteristics. C'-· "'C a> en en a> ::J >-en ~ I .g 0 'iii z ~,/I .... <l'. Typical shape? I Surfaces? Steepest side slopes: Usual front slopes: Usual back slopes: Flow line slopes: least. ____ _ Typical distance from travelway: typical greatest ___ _ (Attached Exhibit # ) Are longitudinal culvert ends in compliance with B-CS Standard Specifications? ___ Yes No, then explain: At intersections or otherwise, do valley gutters cross arterial or collector streets? ./ No __ Yes lfyesexplain: Are valley gutters proposed to cross any street away from an intersection? __ No ./ Yes Explain: (number of locations?) A valley gutter is proposed mid block on Sophies Lane to provide cross drainage where storm sewer inlets and pipes can not be used due to grading issues. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 12 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.4) . .~ ~.·~?·:,. -~-.. · · · · s,tormwa!e'r , Mana9eme~fConcept {~,o nti~ued) . · ;_:~~i · · ·;;r';~. '7,~~~;:,~ Within Or Serving Subject Property (Phase, or Site) (continued) C'-• -c 5l (/) :::J Q) E >- 2 ./I ~ en c -~ ~ Gutter line slopes: Least 0.80 Usual 0.80 Greatest 0.80 Are inlets recessed on arterial and collector streets? _L_ Yes identify where and why. __ No If "no", Will inlets capture 10-year design stormflow to prevent flooding of intersections (arterial with arterial or collector)? _L_ Yes __ No If no, explain where and why not. Will inlet size and placement prevent exceeding allowable water spread for 10-year design storm throughout site (or phase)? _ ./ _Yes __ No If no, explain. Sag curves: Are inlets placed at low points? _L_ Yes __ No Are inlets and conduit sized to prevent 100-year stormflow from ponding at greater than 24 inches? _L_ Yes __ No Explain "no" answers. Will 100-yr stormflow be contained in combination of ROW and buried conduit on whole length of all streets? __L_ Yes __ No If no, describe where and why. Do designs for curb, gutter, and inlets comply with B-CS Technical Specifications? ./ Yes __ No If not, describe difference(s) and attach justification . Are any 12-inch laterals used? _L_ No used . __ Yes Identify length(s) and where Pipe runs between system I Typical 50' Longest 150' access _points (feet): ~----""'""'-'----- Are junction boxes used at each bend? _L Yes and why. __ No If not , explain where -c_§ I 1------------------------,------------t en Are downstream soffits at or below upstream soffits? Least amount that hydraulic .!!!. Yes ./ No __ If not, explain where and why: grade line is below gutter line (system-wide): STORMWATER DESIGN GUIDELINES Effective February 2007 Page 13 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.5) . ;-, -, • .,.,.. ~~·;~· ~;' .~;·· .• ·•L • > , •. • ' • ' ". ,,-,,, . /i-\~,.'J'~' ~ ,..,. ~::~tormwater' ~anagement,<;oncept (co,9~hiued). >' ::~,:i:t±,~~ ' y .... ~, "· '1.", --.· }:';. Within Or Serving Subject Property (Phase ; or Site) (continued) -Describe watercourse(s), or system(s) receiving system discharge(s) below Cl) (include design discharge velocity, and angle between converging flow lines). Q) (.) c 1) Watercourse (or system), velocity, and angle? co -Cl) .!;;;; Storm sewer system drains into proposed drainage channel Q) L.. -o al E 2) Watercourse (or system), velocity, and angle? ::i L.. c 0 ·---c . o.8 0 c .._...- ~ E a> a> E 3) Watercourse (or system), velocity, and angle? -co ~ ~Cl) Cl) Q) ::i c 32 0 ·-> e! e -0 a. E-For each outfall above , what measures are taken to prevent erosion or scour of L.. Q) 0 Q) receiving and all facilities at juncture? -..c Cl) Cl) Q) 1) rock rip rap is proposed at the storm sewer outfalls. -e! co 2) a. Q) Cl) c 3) _£. Are swale(s) situated along property lines between properties? ~No --Yes Number of instances: For each instance answer the following questions. Surface treatments (including low-flow flumes if any): grass lined and concrete flumes in low flow areas ~· Cl) -Q) ~Cl) -Q) Flow line slopes (minimum and maximum): Cl)>-c 1.1%-1.4% ~ I -0 0 5l z Outfall characteristics for each (velocity, convergent angle, & end treatment). ::i iv'I Outfalls into the detention pond 2 Cl) Q) L.. Will 100-year design storm runoff be contained within easement(s) or platted drainage <( ROW in all instances? _L_ Yes --No If "no" explain: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 14 of 26 APPENDIX. D : TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.6) . .·<: '·.-' :: · · . ''~ storiliwater M~hiigement concipt(c~~ti ... r.ued);f ~~~'i"' , ! ,, W''y\f '· .; ···''·'•; "'·-/ ' ·"' ., •. . ' ... _, :·-; ,., .. ' . ~-. .. _,. ~' ". ·~·')'¥)>', . Within Or Serving Subject Property (Phase, or Site) (continued) en Q) ..r::. .B i5 Q) -0 ·c;; -0 ro & Are roadside ditches used? 1-_ No __ Yes If so, provide the following: Is 25-year flow contained with 6 inches of freeboard throughout ? __ Yes __ No Are top of banks separated from road shoulders 2 feet or more? __ Yes __ No Are all ditch sections trapezoidal and at least 1.5 feet deep? __ Yes __ No For any "no" answers provide location(s) and explain: If conduit is beneath a swale, provide the following information (each instance). Instance 1 Describe general location, approximate length : Is 100-year design flow contained in conduit/swale combination? If "no" explain: Yes No l w 0 ~ t--S-pa_c_e_f_o_r_1-00---y-ea_r_s-to-rm~-flo_w_? ___ R_O_W~~~~E-a_s_e_m_e-nt~~~-W~id_t_h~~~~~~ z 00 1-=-.!:..::..::..::_:..::.:......:..::.,=...!...::..=:-=.::.:.:.:.:..:...:.:..::..:.:...:........:,,.:.=...:...:....:====:........:==.:.:.:.:..::..::..:====-_.:.::..:.:..:::.:..::========:__j c: Swale Surface type , minimum Conduit Type and size, minimum and maximum 1 I ~ and maximum slopes: slopes, design storm: 0 .+:i ~ '5 t--~~--~~~~~~~~~~~~~~-..,-~~~~~~~~~~~--t a; 16 Inlets Describe how conduit is loaded (from streets/storm drains , inlets by type): c: >. c: c: ~ ro (.) .... c: .E Q) c: a. 0 0 :;:::; .,._ ro Access Describe how maintenance access is provided (to swale , into conduit): ~ E ~ .E .£ t--~~~~=:-~....--~~-,-.,.--~~~~~~-,-~~~~~~~~~~~--i .£ Q) Instance 2 Describe general location, approximate length: -o E Q) ro ~ en en ~ t--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---i c: .._, Is 100-year design flow contained in conduit/swale combination? __ Yes __ No E -~ If "no " explain : ~ a. :0 Q) t--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~---i E ~ ~S~pa=c=e~f=o~r~1~00~-~y~ea=r~s=to=r~m..:...:.:.flo~w~?~-~R~O~W.:...:....:====:........:E=a=s~e~m~e~nt:.====--W.:..:...:.id=t~h-=========-~ 8 en ~ 2 -5 ~ c: ro Swale Surface type , minimum and maximum slopes: Conduit Type and size, minimum and maximum slopes, design storm: 0 a. t--~~~~~~~~~~--'~~~~~~~~~~~~~~~~~~---l ~ ~ Inlets Describe how conduit is loaded (from streets/storm drains, inlets by type): ~~ en ~ <C Access Describe how ma intenance access is provided (to swale, into conduit): STORMWATER DESIGN GUIDELINES Effective February 2007 Page 15 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 ' SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.7) ···'"~;·t;'.;\;: ,. , ., $~ormwate~.~~nag'ement Con'cept {co'~4n.uedt ~•~,~-:.~+JJ-:, ~ ,,.;·\~:;;. Within Or Serving Subject Property {Phase, or Site) {continued) c '(ii Ci. E >< 2 LU If "yes" provide the following information for each instance: Instance 1 Describe general location, approximate length, surfacing: Channel 1: Outflow of Pipe 101 Hydro mulch seeding is proposed. -t--~~~~~~~~~~~~~~~~--,--~~~~~~~~~~~~----l :g vi Is 100-year design flow contained in swale? _L_ Yes __ No Is swale wholly c a> within drainage ROW? __ Yes _L__ No Explain "no" answers: .;;1 r~~h_e_p_r_op_e~rry~w_il~l-ha_v~e_a_b_w_n_k_et_e_a_se_m_e_n_l~~~~~~~~~~~~~~~~----i u Access Describe how maintenance access is provide: ~ 0 =s z 1 I r~-h_e_p_r_op_e_rry~w_u_z_ha_v_e_a_b_w_n_k_e_te_a_se_m_e_n_l~~~~~~~~~~~~~~~~--l Instance 2 Describe general location, approximate length , surfacing: "O Q) '§ ~ Channel 2: Outflow of Pipe 202 Hydromulch seeding is proposed. .0 c -Q) 6 E £ Q) t---:-:,-,:-~---:---:~-:-~~~~,--,--~-:--:-~...,.-~~~~-,-,-~~~~~~~----i '§: ~ Is 100-year design flow contained in swale? _L_ Yes __ No Is swale wholly oo ~ within drainage ROW? __ Yes ./ No Explain "no" answers : ~ 0 ~ ~ The properry has a blanket easement. ·-c:: Access Describe how maintenance access is provided: $: .2 J5 :::l c. The properry will have a blanket easement. Instance 3, 4. etc. If swales are used in more than two instances, attach sheet providing all above informati on for each instance. "New" channels: Will any area(s) of concentrated flow be channelized (deepened, widened , or straightened) or otherwise altered? _L_ No __ Yes If only slightly . ~h§lp_ed, see. "Swales" in this Part. If crec;iting side banks, provide information below. W ill desi~rfr~pHcate natural channel? __ Yes __ No If "no", for each instance describe section shape & area, flow line slope (min. & max.), surfaces , and 100-year design flow, and amount of freeboard: Instance 1: Instance 2: Instance 3: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 16 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Rev ised August 2012 . SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.8) .. -~tormwater Manageme-~tct>ncept (t~~ti~uE!dl : · ». ·x~; 1 : .. · ~ •. '!.~ ,;... "'-'· .. '·-'.'· ~ '· .•... >· '· Within Or Serving Subject Property (Phase, or Site) (continued) Existing channels {small creeks}: Are these used? _L_ No --Yes If "yes" provide the information below. Will small creeks and their floodplains remain undisturbed? __ Yes No How many disturbance instances? Identify each planned location : For each location , describe length and general type of proposed improvement (including floodplain changes): ' For each location, describe section shape & area , flow line slope (min. & max.), surfaces, and 100-year design flow . --0 Q) :::::J c :;:; Watercourses {and tributaries): Aside from fringe changes, are Regulatory c 0 Watercourses proposed to be altered? _L_ No Yes Explain below. ~ --en c Submit full report describing proposed changes to Regulatory Watercourses. Address Q) existing and proposed section size and shape, surfaces, alignment, flow line changes , E Q) length affected , and capacity, and provide full documentation of analysis procedures > 0 and data. Is full report submitted? Yes No If "no" explain: ._ --c.. E - 03 c c ct! All Proposed Channel Work: For all proposed channel work , provide information ..r:::. (.) requested in next three boxes. If design is to replicate natural channel, identify location and length here, and describe design in Special Design section of this Part of Report. NIA W ill 100-year flow be contained with one foot of freeboard? _L Yes --No If not, identify location and explain: Are ROW I easements sized to contain channel and required maintenance space? _L Yes --No If not, identify location(s) and explain: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 17 of 26 APPENDIX. D : TECH . DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.9) If ,1'].,,)' ."; ' . -··-. ' "" .,. :, ··:;~~· . . ~tormwat~r· Managelnef'\t'C,(>nce pf{cob~!n ued)·-_ ·-.. :' -.. -~-.> " .. , . Within Or Serving Subject Property (Phase, or Site) (continued) How many facilities for subject property project? 2 For each provide info . below. For each dry-type facilitiy: Facility 1 Facility 2 Acres served & design volume+ 10% 3.54 33,071 cf 6.14 43,426 100-yr volume: free flow & plugged 16,101 cf 21,066 cf 28,430 30,582 Design discharge (10 yr & 25 yr) 6.15 6.46 3.55 3.74 Spillway crest at 100-yrWSE? __:[_yes --no _{_yes --no Berms 6 inches above plugged WSE? __:[_yes --no _{_yes --no Explain any "no" answers: en Q) >- 11 For each facility what is 25-yr design Q, and design of outlet structure? Facility 1 : 6.46 cfs -proposed 15" outfall pipe 0 z Facility 2: 3. 74 cfs -Proposed Concrete Riser with Narrow Weir Slot I Do outlets and spillways discharge into a public facility in easement or ROW? Facility 1: _L Yes No Facility 2: ./ Yes No ----C'-· If "no" explain: "O Q) en 0 a. 0 ..... Cl. For each, what is velocity of 25-yr design discharge at outlet? & at spillway? en Q) Facility 1: 5.26 & N IA Facility 2: 2.12 & N IA E ·u Are energy dissipation measures used? __:[_ No Yes Describe type and co --u.. location: c: .Q -~ Q) 0 Q) For each, is spillway surface treatment other than concrete? Yes or no , and describe: ..... <( Facility 1: Grass lined overflow spillway Facility 2: Grass lined overflow spillway For each, what measures are taken to prevent erosion or scour at receiving facility? Facility 1: Concrete safety end treatment Facility 2: Discharges directly into existing storm sewer sy~tem If berms are used give heights, slopes and surface treatments of sides. Facility 1: 4H: 1 V side slopes, grass slopes Facility 2: 4H: 1 V side slopes, grass slopes STORMWATER DESIGN GUIDELINES Effective February 2007 Page 18 of 26 APPENDI X . D : TECH . DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPEND IX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concel;!t and Design Parameters I Continued (Page 4.10) .. ·t ; A • ' :•• ' 0 • ·~ ' ,___'.'.> •;.;,. ~~ • • 0 • 0 .. ~},:"' < ' 0 ~ \ • . , ' .''):f;\ ; . S,t~rlT!wat~r M!lnagerrlent ~oricept·J9~£1tiriued) ~, ' ,, . .-, .. . . . .... , .. . "'-• ... ~;: . • . >f -:.~·"-· Within Or Serving Subject Property (Phase, or Site) (continued) Do structures comply with B-CS Specifications? Yes or no, and explain if "no": Facility 1; (/) Yes ~ :: :c- (,) Q.l ro ~ Facility 2 : u. c c:;::; Yes 0 c :.p 0 c (,) <Ll--For additional facilities provide all same information on a separate sheet. Q.l 0 Are parking areas to be used for detention? __!{__ No --Yes What is maximum depth due to required design storm? Roadside Ditches: Will culverts serve access driveways at roadside ditches? --No --Yes If "yes", provide information in next two boxes. Will 25-yr. flow pass without flowing over driveway in all cases? --Yes --No W ithout causing flowing or standing water on public roadway? --Yes --No Designs & materials comply with B-CS Technical Specifications? __ Yes --No Explain any "no" answers: C'-· (/) Ol c '(ii Are culverts parallel to public roadway alignment? __ Yes No Explain : (/) 0 --.... (/) ~ (,) Q.l Q.l -ro >- > I ·;:: Creeks at Private Drives: Do private driveways, drives, or streets cross drainage a. -ways that serve Above-Project areas or are in public easements/ ROW? ro "C 0 No Yes If "yes" provide information be lo w . Q.l z ----~.ti How many instances? Describe location and provide information below. Q.l Location 1: > :; (,) ~ Location 2 : <( Location 3: For each location enter value for: 1 2 3 Design year passing without toping travelway? Water depth on travelway at 25-year flow? Water depth on travelway at 100-year flow? For more instances describe location and same information on separate sheet. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 1~ of 26 APPENDIX . D : TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters J Continued (Page 4.11) ' .. -' ~\;: >·.· •• ,• ... '··'·· s~orm~ater Managert)en~ Cjincepf(c~.J~.i.~ued) ;.' ~~~~;:.q:~f .. ,~ ·': »t:·:;z:~'" Within Or Serving Subject Property (Phase, or Site) (continued) Named RegulatoD£ Watercourses {&Tributaries}: Are culverts proposed on these facilities? _L_ No __ Yes, then provide full report documenting assumptions, criteria, analysis, computer programs, and study findings that support proposed design(s). Is report provided? __ Yes --No If "no", explain: -Arterial or Major Collector Streets: Will culverts serve these types of roadways? a> Q) _. _No _:f,_ Yes How many instances? 1 For each identify the ..c Cf) location and provide the information below. Q) (/) "§ Instance 1: Proposed culvert crossing at Towers Parkway where it meets Rock Prairie a> ro >-c. ii~ Instance 2: Instance 3: c: 0 ~ Yes or No for the 100-year design flow: 1 2 3 o ro z E I~ Headwater WSE 1 foot below lowest curb top? Spread of headwater within ROW or easement? E C'-· ro Is velocity limited per conditions (Table C-11 )? Cf) Cf) g>-c Explain any "no" answer(s): ·-c: ~ ro 0 c: t>-g >-ro ro u ::= .Q -c Q) ro ..c Minor Collector or Local Streets: Will culverts serve these types of streets? e ·c u u No Yes How many instances? for each identify the ·-Cf) -----Q) .g -c location and provide the information below: c. Q) -c. Instance 1: ro .?;- -c >. Instance 2: Q) c: en ro :::J ..... Instance 3: Cf) 0 t::: Cf) Q) Q) For each instance enter value, or "yes" I "no" for: ~ u 1 2 3 :::J c: u ro Design yr. headwater WSE 1 ft. below curb top? Q) Ci.i ..... c: <C-100-yr. max. depth at street crown 2 feet or less? Q) ..... 0 Product of velocity (fps) & depth at crown (ft)= ? E ..... g Is velocity limited per conditions (Table C-11 )? Limit of down stream analysis (feet)? Explain any "no" answers: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 20 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 SECTI O N IX APPENDIX D -TECHNICAL DESIGN SUMM ARY Part 4 -Drainage Co n ce~t a nd Desig n Pa rameters I Continued (Page 4.12) ·. ~ .• . ,.-: . ,, • . ':> " . . ., . . . -,·.,.. . ·• . ~.~t .. · .S to r m w~ter M~n a.g ement \q o n ce pt (continued)' :,.·&:~~-,2. ·~ · .. ,g . Within O r Serving Subject Property (Phase, or Site) (c o ntinued) All Proposed Cu lverts: For all proposed culvert facilities (except driveway/roadside ditch intersects) provide information requested in next eight boxes. Do culverts and travelways intersect at 90 degrees? ~Yes __ No If not, identify location(s) and intersect angle(s), and justify the design(s): Does drainage wa y alignment change within or near limits of culvert and surfaced approaches thereto? _.:!._ No --Yes If "yes" identify location(s), describe change(s), and justification: Are flumes or conduit to discharge into cu lvert barrel(s)? _1__ No __ Yes If yes, identify location(s) and provide justification: -Are flumes or conduit to discharge into or near surfaced approaches to culvert ends? "O _L No Yes If "yes" identify location(s), descri be outfall design treatment(s): a.> --::::l c: :;:::; c: 0 ~ (/) t a.> Is scour/erosion protection provided to ensure long term stability of culvert structural > 3 () components, and surfacing at culvert ends? _1__ Yes __ No If "no" Identify locations and provide justification(s): Will 100-yr flow and spread of backwater be fully conta ined in street ROW, and/or drainage easements/ ROW? _.:!._Yes --No if not, why not? Do appreciable hydraulic effects of any culvert extend downstream or upstream to neighboring land(s) not encompassed in subject property? _1__ No --Yes If "yes" describe location(s) and m itigation measures: Are all culvert designs and materials in compliance with B-CS Tech . Specifications? _L Yes --No If not, explain in Special Desi gn Section of this Part. STORM WATER DES IGN GUIDELINES Effective February 20 07 Page 21of26 APPE NDIX . D: TECH. DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters I Continued (Page 4.13) .o•;' "' Stormwate~Management Concept (continuedf .:> -~ ~ . .• .... ,' <~t/ .. -" ...... '· ~Jiix:''1.< , . , . , Z, • ·""' .. v~ .• . • ,;: _,,, ',.,; '' Within Or Serving Subject Property (Phase, or Site) (continued) Is a bridge included in plans for subject property project? _L_ No --Yes If ''y es" provide the following information. Name(s) and functional classification of the roadway(s)? What drainage way(s) is to be crossed? -en Q) Cl "O ·;:: ClJ A full report supporting all aspects of the proposed bridge(s) (structural, geotechnical , hydrologic, and hydraulic factors) must accompany this summary report. Is the report provided? --Yes --No If "no" explain : Is a Stormwater Provide a general description of planned techniques: ~ Pollution Prevention Construction Exits, Sediment Pond, Silt Fence, Revegetation, Rock "'ffi Plan (SW3P) riprap and inlet protection ~ a established for .... project construction? Q) -ro $.: --No _L Yes Special Designs -Non-Traditional Methods Are any non-traditional methods (aquatic echosystems, wetland-type detention, natural stream replication, BMPs for water quality, etc.) proposed for any aspect of subject property project? _L_ No --Yes If "yes" list general type and location below. Provide full report about the proposed special design(s) including rationale for use and expected benefits. Report must substantiate that stormwater management objectives will not be compromised, and that maintenance cost will not exceed those of traditional design solution(s). Is report provided? --Yes --No If "n o" explain: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 22 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concel;!t and Design Parameters I Continued (Page 4.14) . ·'' :<·. '. ··, · >· .. StormwaterJ\llaiiagei:nent C,onc~pt (s;ontinued) · ·' . " +'.~;:st~( ,· .. )·•:. '.i. .. -·,_,. , 'f'!. , ,.-,. . • -;o;· •\'. • • Within Or Serving Subject Property (Phase, or Site) (continued) Special Designs -Deviation From B-CS Technical Specifications If any design(s) or material(s) of traditional runoff-handling facilities deviate from provisions of B-CS Technical Specifications, check type facility(ies) and explain by specific detail element. --Detention elements __ Drain system elements --Channel features --Culvert features __ 'Swales --Ditches --Inlets --Outfalls __L_ Valley gutters __ Bridges (explain in bridge report) In table below briefly identify specific element, justification for deviation(s). Specific Detail Element Justification for Deviation (attach additional sheets if needed) 1) Va lley Gu tter for mid block drainage Low Flow in area of valley gutter and lack of elevation for curb inlets 2) 3) 4) 5) Have elements been coordinated with the City Engineer or her/his designee? For each item above provide "yes" or "no", action date, and staff name: 1) 2) 3) 4) 5) '.;.-.";"<' " ... ':<~'. :]'-",·~1.:·: •· -,~.-~Design param~ters ,~Nc~P·" .. . .•• . ' :'I' •. . ·'2 .. ,, I °" ' ... ·. ;; , . : . ,,,;_,, ~->.;, ·,,;~,,;.,'.'--: Hydrology Is a map(s) showing all Design Drainage Areas provided? --1.._ Yes --No Briefly summarize the range of applications made of the Rational Formula: Pipe Design, Inlet Design, Detention Pond Design and Gutter Depth Check What is the size and location of largest Design Drainage Area to which the Rational Formula has been applied? 6.14 acres STORMWATER DESIGN GUIDELINES Effective February 2007 Location (or identifier): 220 Page 23 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.15) 1.c :., . "•,,\ .. ·· ... _Des l~;rt P.arCimete~s (cprit} nuedf'· ;;'.,' ..•. ·.~. :J,;1;~· ~~ '';,: t~· . \i! :-.,, : . ~ .. ,.' .... ,,;.;· _;: Hydrology (continued) In making determinations for time of concentration, was segment analysis used? No ./ Yes In approximately what percent of Design Drainage Areas? 100 % As to intensity-duration-frequen cy and rain depth criteria for determin ing runoff flows, were any criteria other than those provided in these Guidelines used? __!/__ No __ Yes If "yes" identify type of data, source(s), and where applied: ' For each of the stormwater management features listed below identify the storm return frequencies (yea r) analyzed (or checked), and tha t used as the bas is for design . Feature Analysis Year(s) Design Year Storm drain syste m for arterial and collector streets NIA NIA Storm drain system for local streets JO & JOO JO Open channels JO & JOO JO Swale/buried conduit combination in lieu of channel NIA NIA Swales JO & JOO 100 Roadside ditches and culverts serving them NIA NIA Detention facilities: spillway crest and its outfall 2, JO, 25, 50, JOO JOO Detention facilities: outlet and conveyance structure(s) 2, JO, 25, 50, JOO JOO Detention facilities: volume when outlet plugged JOO JOO Culverts serving private drives or streets NIA NIA Culverts serving pub lic roadways JOO JO Bridges: provide in bridge report. NIA NIA Hydraulics What is the range of design flow velocities as outlined below? Design flow velocities; Gutters Conduit Culverts Swales Channels Hig hest (feet per second) --- -- Lowe.st (feet per second) - ---. - Streets and Storm Drain Systems Provide the summary information outlined below: Roughness coefficients used: For street gutters: O.OJ8 For conduit type(s) RCP HDPE Coefficients: 0.013 0.013 STORMWATER DESIGN GUIDELINES Effective February 2007 Page 24 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised Augu st 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.16) ' ' "" ~~'. ' ''f . ' _\;. '{ • '. ' ' '~ . ~ ". • ' ' ' .,_;, ~_, .. f0'i ' :...(;:"': . '.t 'i;. . ... •' .: ,.,;>; ,; · Design Parameters ·(c.ontin~eCt)jJ; .;<•', ·.· ' ·-;' ·,;t'. ,:>'); :,c ':, ...... Hydraulics (continued) Street and Storm Drain Systems (continued) For the following, are assumptions other than allowable per Guidelines? Inlet coefficients? _L No Yes Head and friction losses _L No Yes ---- Explain any "yes" answer: In conduit is velocity generally increased in the downstream direction? _L Ye.s --No Are elevation drops provided at inlets, manholes, and junction boxes? _L Yes --No Explain any "no" answers : Are hydraulic grade lines calculated and shown for design storm? _L Yes --No For 100-year flow conditions? _L Yes --No Explain any "no" answers: What tailwater conditions were assumed at outfall point(s) of the storm drain system? Identify each location and explain: Free Discharge Open Channels If a HEC analysis is utilized , does it follow Sec Vl.F.5 .a? __ Yes __ No Outside of straight sections , is flow regime within limits of sub-critical flow? __ Yes __ No If "no" list locations and explain : Culverts If plan sheets do not provide the following for each culvert, describe it here. For each design discharge, will operation be outlet (barrel) control or inlet control? Entrance, friction and exit losses: Bridges Provide all in bridge report STORMWATER DESIGN GUIDELINES Effective February 2007 Page 25 of 26 APPENDIX. D : TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D-TECHNICAL DESIGN SUMMARY Computer Software What computer software has been used in the analysis and assessment of stormwater management needs and/or the development of facility designs proposed for subject property project? List them below, being sure to identify the software name and version , the date of the version, any applicable patches and the publisher Excel spreadsheets, Autodesk Civil 3D Storm Sewer A nalysis and Hydrojlow Part 5 -Plans and Specifications Requirements for submittal of construction drawings and specifications do not differ due to use of a Technical Design Summary Report. See Section Ill, Paragraph C3. Add any concluding information here: . . . . . . The storm sewer system and detention facilities are design ed in accordance with the BCS Drainage Design Guidelines. -Attestation Provide attestation to the accuracy and completeness of the foregoing 6 Parts of this Technical Desi n Summa Draina e Report b si nin and sealin below. "This report (plan) for the drainage design of the development named in Part 8 was prepared by me (or under my supervision) in accordance with provisions of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits required by any and all state and federal regulatory agencies for the proposed drainage improvements have been issued or all under applicable general per'll...~'~lto.~\ -"""""\'C. OF ;r...:.\' (Affix Se ~"-'?--0 .,ooooo••o '-':.!' ~ti es:t' C.J e~ Oo ~ ~ P ,l' '\,OI ~ !f* .. •o _._D,. pt;*: ~~~t l,ffoa•bob.,heti••••~c:cooeesceaooe/f '!l~T ~ JOSEPH P. SCH!Jl 17 ;, State of Texas PE No. ~ ) e E, 1 7 .-((-/a 1JJ~:;··SSBS0S 0000-;~r$J f if, A'-•0'/:Q/ ~.-~<:?o• ~!'$' STORMWATER DESIGN GUIDELINES Effective February 2007 Page 26 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 vr DEVELOPMENT REVIEW EQUINOX SUBDIVISION PH 1 Case : 14-181 FINAL PLAT Zoning Districts R E RS GS R-1B D T Rural Estate Restricted Suburban General Suburban Single Family Residential Duplex Townhouse R-4 R-6 MHP 0 SC GC Cl BP vr DEVELOPMENT REVIEW Multi-Farnliy High Density Multi-Family Manufactured Horne Park Office Suburban Commercial General Commercial Commercial-Industrial Business Park BPI NAP C-3 M-1 M-2 C-U R&D P-MUD Business Park Industrial Natural Areas Protected Light Commercial Light Industrial Heavy Industrial College and University Research and Development Planned Mixed-Use Develo rnent EQUINOX SUBDIVISION PH 1 Case : 14-181 2R POD WPC NG-1 NG-2 NG -3 OV ROD KO 1 Planned Development District Wolf Pen Creek Dev. Corridor Core Northgate Transitional Northgate Residential Northgate Corridor Overlay Redevelopment District Krenek Ta Overta FINAL PLAT N · 1 · :i Scale: 1 Inch= 200 Feet ! /' Area : 9.221 Acres (401 ,687.50 Square Feet) 14-181 FINAL PLAT EQUINOXPHl BLKl LTS l-17 ;BLK2LTS 1-20;BLK3LTS l-9;BLK4LTS 1-5 ACRES 9.223 Area : 9.221 Acres (401,687.50 Square Feet) Perimeter: 2900 .033 Feet Gap = 0.083 (North 37° 59' 55" East) CLOSED 7-22-2014 BR L N47°44'50"W 871.91' 2 . N42°15'10"E 115 .00' 3. S47°44'50"E 50.50' 4. N42 °13'48"E 50.00' 5. S47°44'50"E 12 .02' 9. N42 °10'12"E 50' 6. N87 °15'10"E Ch35.36' Rad25 .00' lO . S47 °44'50"E 29.07 ' 7. N42 °15'10"E 176.50' 11. N42 °15'10 "E 115.51' 8. N02 °44'50"W Ch35 .36' Rad25 .00'l12. S47 °49'48"E 461.01' GAP error cannot be greater than 0.10 (See SOP for Exceptions) 13. s42°20·1o"W 155 .63' 17 . 14 . S47°49'48"E 159 .95' 15. N42 °2 0'10"E 5.63' 16. S47 °49'48"E 160.52'