Loading...
HomeMy WebLinkAbout14-82CASE NO.: TIME : STAFF: C ITY OF C OLLEGE STATION Home ofTtxas A&M Univmity • *-"~"-------~ (Check one) 0 Minor ($700) FINAL PLAT APPLICATION 0 Amending ($700) ~nal ($932) 0 Vacating ($932) 0Replat ($932) Is this plat in the ET J? O Yes ~ No Is this plat Commercial D or Residential IZJ / MINIMUM SUBMITI AL REQUIREMENTS: ·~ $700-$932 Final Plat Application Fee (see above). tUf~33 Waiver Request to Subdivision Regulations Fee (if applicable). ~ $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is _,..0tl e prior to the issuance of any plans or development permit). c[8f" Application completed in full. This application form provided by the City of College Station must be used and .1411 ay not be adjusted or altered. Please attach pages if additional information is provided. ~ Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ~ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ~ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ~ _9o py of original deed restrictions/covenants for re plats (if applicable). ~Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, / ~cumbrances , etc. /~ Paid tax certificates from City of College Station, Brazos County and College Station l.S.D. ~ The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such . Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference __ N .... 0_*-------------- NAME OF PROJECT The Barracks II Subdivision Phases 105 & 106 ADDRESS Intersection of Deacon Drive and General Parkway SPECIFIED LOCATION OF PROPOSED PLAT: East Side of Holleman Drive South between Cain Road and Rock Prairie Road APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Heath Phillips E-mail heath_superiorstructures@yahoo.co Street Address P.O . Box 262 ----------------------------------~ City Wellborn Zip Code 77881 ------ Phone Number 979-229-5906 Fax Number 979-703-7903 ---------------- 1/11 Page 1 of9 PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name Heath Phillips Investments, LLC (Heath Phillips, manager) E-mail heath_ superiorstructures@yahoo.co P.O. Box 262 Street Address City Wellborn State Tx Zip Code 77881 ------ Phone Number 979-229-5906 Fax Number 979-703-7903 ----------------- ARCHITECT OR ENGINEER'S INFORMATION : Name Schultz Engineering, LLC -Joe Schultz E-mail ;oeschultz84@verizon.net Street Address 2730 Longmire Drive, Suite A City College Station State TX Zip Code 77845 ------ Phone Number 979. 764 .3900 Fax Number 979. 764 .3910 ----------------~ Do any deed restrictions or covenants exist for this property? l8j Yes D No Is there a temporary blanket easement on this property? If so , please provide the Volume ____ and Page No. __ _ Total No. of Lots 80 ------R-0-W Acreage 4 . 79 Acres Total Acreage 13.14 ---------- Existing Use _v._a_ca_n_t ___________ _ Proposed Use Townhouse Residential Number of Lots By Zoning District 80 I POD Average Acreage Of Each Residential Lot By Zoning District: 0.08 POD ___ , __ _ Floodplain Acreage None ----------------------------------- Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is lim ited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? IX Yes I No If yes , provide information regarding the first approved application and any related subsequent applications (provide add itional sheets if necessary): Project Name: THE BARRACKS II (PP) City Project Number (if known): 14-00900010 Date I Timeframe when submitted : 2/5/14 1/11 Page 2 of9 A statement addressing any differences between the Final Plat and Preliminary Plan (if appl icable): Requested wa iver to subdivision re ulations and reason for same if a plicable ): ...:=;..:;;.t..'--~~~~~~~~~~~~ Regarding the waiver request , explain how : 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land . ..:..___;,_;:_....:;__;_:_~~~~~~~~~~~~ 3. The granting of the waiver will not be detrimental to the public health , safety, or welfare , or inj urious to other property in the area , or to the City in administering subdivision regulations . [M ----.I 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance . r --1 Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. I An alternative pedestrian way or multi-use path has been or will be provided outside the right-of-way ; 2. I The presence of unique or unusual topographic , vegetative , or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan ; 3. I A capital improvement project is imminent that will include construction of the required sidewalk. Imm inent shall mean the project is funded or projected to commence within twelve (12) months ; 4 . r Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5. I When a sidewalk is required along a street where a multi-use path is shown on the Bicycle , Pedestrian , and Greenways Master Plan; 1/11 Page 3 of 9 6. I The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. I The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6, Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: N/A NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Requested Oversize Participation None ~-~----------------------------- Total Linear Footage of Proposed Public: 3408' Streets 6816' Sidewalks 2075' Sanitary Sewer Lines 3397' Water Lines 0 Channels 2998' Storm Sewers 1692' Bike Lanes I Paths --- Parkland Dedication due prior to filing the Final Plat: ACREAGE : D.Sfe No. of acres to be dedicated+$ so,ooo development fee ___ No. of acres in floodplain ___ No. of acres in detention ___ No. of acres in greenways OR FEE IN LIEU OF LAND: __ No. of SF Dwelling Units X $ ---= $ (date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, co"ect, and complete. IF THIS APPL/CAT/ON IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Signature and title Date 1/11 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit m\')y be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required , including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE , AND ACCURATE. --~t~~ -~~0_/1_~~~~- Property Owner(s) Date Engineer Certification: 1/11 1. The project has been designed to ensure that stormwater mitigation, including detention ponds , proposed as part of the project will be constructed first in the construction sequence . 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES : i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City~~ ation, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All devel ifi"ftl~'f~ ~signed in accordance with all applicable codes and ordinances of the City of College Stati ifflp•Stat anCf~li C!I Regulations. 4. I , THE ENGINEER , AGR~ ~AN · TIF\ 1ftl , TALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPM tlf• J • . blGAi ~. ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND Acc TE ~ ••••••••••••••• r~ .. §QJ~.YHL .... ~ ~· "-~, • g 65889 /0 fj ~·.'f.C?ts -rs?;<:;9··~;; ~ -5 r / f ~~~4-U-=--H-~~~?1-~~r.1 0~-.~~~·~.~~-4~v~-~-·~ ''(). f.,.: \-· ~ D t ..;.\ ... ,_:_ .. :~_,;;;,...... a e Page 5 of 9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* certify , as demonstrated in the attached drainage study , that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation ; (ii) create add itional areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities . beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engine er Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Engineer Date Additional certification for Floodway Encroachments: C. I , , certify that the construction , improvement, or fill covered by this perm it shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 1/11 Page 6 of9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer I Surveyor Date Commercial Structures: E. I, ----------------, certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval : 1/11 Page 7 of 9 FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) ~ Drawn on 24" x 36" sheet to scale of 100' per inch. ~ Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. ~ Title Block with the following information: ~ Name and address of subdivider, recorded owner, planner, engineer and surveyor. ~ Proposed name of subdivision . (Subdivision name & street names will be approved through Brazos County 911.) ~ Date of preparation. ~ Engineer's scale in feet. ~ Total area intended to be developed. ~ North Arrow. ~ Subdivision boundary indicated by heavy lines. ~ If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. ~ All applicable certifications based on the type of final plat. ~ Ownership and Dedication ~ Surveyor and/or Engineer ~ City Engineer (and City Planner, if a minor plat) ~ Planning and Zoning Commission (delete if minor plat) ~ Brazos County Clerk lfld-Brazos County Commissioners Court Approval (ET J Plats only) ~ If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. tf/l; If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. ~ Location of the 100-Year Floodplain and floodway, if applicable, according to the most recent available data. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3 .E.2). The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Existing Proposed ~ 1/11 ~ Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O.W . locations and widths. (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan .) Street offsets and/or intersection angles meet ordinance. Page 8 of9 Existing fgJ fgJ fgJ fgJ Proposed fgJ 18] ~ 18] Alleys. Easements. A number or letter to identify each lot or site and each block (numbered sequentially). Parkland dedication/greenbelt area/park linkages. All proposed dedications must be reviewed by the Parks and Recreation Advisory Board and documentation of their recommendation provided prior to being scheduled for P&Z Commission consideration . 18] Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: 18] Street , alley and sidewalk plans , profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). 18] Sewer Design Report. 18] Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision . (Utilities of sufficient size/depth to meet the util ity master plan and any future growth areas.) 18] Water Design Report and/or Fire Flow Report. 18] Water line plan showing fire hydrants , valves , etc. with plan and profile lines showing depth and grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas.) IZ] Storm drainage system plan with contours , street profile , inlets, storm sewer and drainage channels , with profiles and sections. Drainage and runoff areas , and runoff based on 5, 10, 25 , 50 and 100 year rain intensity. Detailed dra inage structure design , channel lining design & detention if used . One sheet must show the overall drainage layout of the subdivision . IZJ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. IZJ Letter of completion for public infrastructure or guarantee I su rety in accordance with UDO Section 8.6. IZJ Drainage Report with a Technical Design Summary. IZJ Erosion Control Plan (must be included in construction plans ). IZ! All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate whe re the separate instrument easements were filed . Separate instrument easements must be provided in recordable form to the City prior to be ing scheduled for P&Z Commission consideration . 18] Are there impact fees associated with this development? IZl Yes D No Impact fees must be paid prior to building permit. IZl Will any construction occur in TxDOT rights-of-way? D Yes 18] No If yes, TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing 1/11 the plat at the Courthouse. 2. If the construction area is greater than 5 acres , EPA Notice of Intent (NOi) must be submitted prior to issuance of a development permit. Print Form Pag e 9 or9 Brazos County Abstract Company ''More Than 140 Years of Title Service" P.O. Box 4704 Phone: (979) 731-1900 3800 Cross Park Drive Bryan, Texas 77805-4704 Fax: (979) 731-1381 Bryan, Texas 77802 BCAC GF NO. BC1401759 Title Report Prepared 3/13/2014 for Heath Phillips Investments, LLC P. 0. Box 262 Wellborn, TX 77881 Dev en Doyen, P .E. 2730 Longmire Drive, Suite A College Station, TX 77845 "Experience Matters" Brazos County Abstract Company ''l11fore Than 140 Years of Title Service" TITLE REPORT Effective Date: March 12, 2014 at 8:00 am GFNO: BC1401759 LEGAL DESCRIPTION: All that certain lot, tract, or parcel of land lying and being situated in Brazos County, Texas, and being situated in the CRAWFORD BURNETT LEAGUE, Abstract No. 7, College Station, Texas, said tract being a portion of the remainder of a called l 08.88 acre tract described by a deed to Heath Phillips lnvestments, LLC recorded in Volume 9627, page 73, Official Records of Brazos County, Texas, said tract being more particularly described by metes and bounds as follows: COMMENCING at a 1/2 inch iron rod found on the southwest line of a called 29 .17 5 acre tract described in a Deed to Heath Phillips Investments, LLC recorded in Volume 11623, page 227 , Official Records of Brazos County, Texas, marking the north corner of THE BARRACKS II SUBDIVISION, Phase 300, according to plat recorded in Volume 11209, page 184, Official Records of Brazos County, Texas for reference a Yi inch iron rod found marking the west corner of said Phase 300 bears: S 42° 14' 17" W for a distance of 1135.25 feet; THENCE S 47° 45' 43" E along the common line of said remainder of 108.88 acre tract and said Phase 300 for a distance of 416.17 feet to the POINT OF BEGINNING of this herein described tract; THENCE through said remainder of 108.88 acre tract and along the northerly lines of future rights-of-way for Deacon Drive West, General Parkway, Tang Cake Drive and a public alley for the following calls: N 42° 14' 17" E for a distance of 67.00 feet to the beginning of a counterclockwise curve having a radius of25.00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of39.27 feet (chord bears: N 87° 14' 17" E -35.36 feet) to the end of said curve; N 42° 14' 17" E for a distance of 21 .50 feet; S 47° 45' 43" E for a distance of 85 .00 feet; S 42° 14' 17" W for a distance of 21.50 feet to the beginning of a counterclockwise curve having a radius of 25 .00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 02° 45' 43" E -35 .36 feet) to the end of said curve; S 47° 45' 43" E for a distance of 65.00 feet to the beginning of a counterclockwise curve having a radius of25.00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: N 87° 14' 17" E-35.36 feet) to the end of said curve; S 47° 45' 43" E for a distance of24.00 feet to the beginning of a counterclockwise curve having a radius of25.00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears : S 02° 45' 43" E -35.36 feet) to the end of said curve; S 47° 45' 43" E for a distance of 65.00 feet to the beginning of a counterclockwise curve having a radius of 25 .00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of39.27 feet (chord bears: N 87° 14' 17" E -35.36 feet) to the end of said curve; N 42° 14' 17" E for a distance of 16.51 feet; S 47° 45' 43" E for a distance of 50.00 feet ; S 42° 14' 17" W for a distance of 16.51 feet to the beginning of a counterclockwise curve having a radius of 25.00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of39.27 feet (chord bears: S 02° 45' 43" E-35.36 feet) to the end of said curve; S 4 7° 45' 43" E for a distance of 190 .00 feet to the beginning of a counterclockwise curve having a radius of25.00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: N 87° 14' 17" E-35.36 feet) to the end of said curve; N 42° 14' 17" E for a distance of 16 .50 feet ; S 47° 45' 43" E for a distance of 50.00 feet; S 42° 14' 17" W for a distance of 16.50 feet to the beginning of a counterclockwise curve having a radius of25 .00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 02° 45' 43" E -35.36 feet) to the end of said curve; S 47° 45' 43" E for a distance of 65 .00 feet to the beginning of a counterclockwise curve having a radius of25 .00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears: N 87° 14' 17" E -35 .36 feet) to the end of said curve; . S 47° 45' 43" E for a distance of 24.00 feet to the beginning of a counterclockwise curve having a radius of25 .00 feet ; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears S 02° 45' 43" E -35.36 feet) to the end of said curve; S 47° 45' 43" E for a distance of 65.00 feet to the beginning of a counterclockwise curve having a radius of 25 .00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: N87°14' 17"E-35.36feet)totheendofsaidcurve; N 42° 14' 17" E for a distance of 139.0 l feet; S 4 7° 45' 43" E for a distance of 67 .00 feet to the beginning of a counterclockwise curve having a radius of 25.00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 02° 45' 43" E -35.36 feet) to the end of said curve; S 47° 45' 43" E for a distance of 253.37 feet to the end of an existing 24.00 foot wide alley as depicted on the plat of The Barracks II Subdivision, Phase 102, recorded in Volume 11646, page 167, Official Records of Brazos County, Texas; THENCE along the common line of said remainder of 108.88 acre tract and said Phase 102 for the following calls: S 42° 14' 17" W across the end of said alley for a distance of 24.00 feet to the beginning of a clockwise curve having a radius of 25 .00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 02° 45' 43" E -35 .36 feet) to the end of said curve on the northwest line of another 24' alley; S 42° 14' 17" W along the northwest line of said alley for a distance of 65 .00 feet to the beginning of a clockwise curve having a radius of 25.00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 87° 14' 17" W -35.36 feet) to the end of said curve on the northeast line of General Parkway (67' R .O.W.); N 47° 45' 43" W along the northeast line of General Parkway for a distance of 111.79 feet; S 42° 14' 17" W across the end of General Parkway, at 67.00 feet pass the north comer of Parkland Area No. 7 as reflected on said plat of The Barracks Il Subdivision, Phase 100 (10570/293), continue on for a total distance of 180.01 feet to an angle point in the northwest line of said Parkland Area No. 7; THENCE along the common line of said remainder of 108.88 acre tract and said Parkland Area No. 7 for the following calls: N 47° 45' 43" W for a distance of3.50 feet; S 42° 14' 17" W, at 36.00 feet pass the west comer of said Parkland Area No. 7, continue on for a total distance of 86.00 feet to the southwest line of Travis Cole Avenue (50' R.O.W.); THENCE S 47° 45' 43" E along the southwest line of Travis Cole Avenue for a distance of 88.00 feet to the beginning of a clockwise curve having a radius of25.00 feet; THENCE along said curve through a central angle of 90° 00' 00" for an arc distance of 39 .27 feet (chord bears: S 02° 45' 43" E-35.36 feet) to the end of said curve on the northwest line of Capps Drive (50' R.O.W.); THENCE S 42° 14' 17" W along the northwest line of Capps Drive for a distance of 171.71 feet to the southwest comer of this herein described tract; THENCE N 47° 45' 43" W through said remainder of 108.88 acre tract for a distance of 613 .00 feet to the southeast line of Parkland Area No. 5 as reflect on said plat of The Barracks Il Subdivision, Phase 100 (10570/293); THENCE along the common line of said remainder of l 08.88 acre tract and said Parkland Area No. 5 for the following calls: N 42° 14' 17" E for a distance of 70. 70 feet to the beginning of a counterclockwise curve having a radius of25.00 feet; Along said curve through a central angle of 90° 00' 00" for an arc distance of 39.27 feet (chord bears: N 02° 45' 43" W -35 .36 feet) to the end of said curve; N 47° 45' 43" W for a distance of 228.00 feet to the beginning of a counterclockwise curve having a radius of 25.00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 87° 14' 17" W -35.36 feet) to the end of said curve; S 42° 14' 17" W for a distance of 107 .00 feet; THENCE through said remainder of 108.88 acre tract for the following calls: N 47° 45' 43" W for a distance of 125.00 feet to the beginning of a clockwise curve having a rad ius of25.00 feet ; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: N 02° 45' 43" W -35 .36 feet) to the end of said curve; N 42° 14' 17" E for a distance of22.00 feet; N 47° 45' 43" W for a distance of 50.00 feet; S 42° 14' 17" W for a distance of 22.00 feet to the beginning of a clockwise curve having a radius of 25 .00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: S 87° 14' 17" W -35 .36 feet) to the end of said curve; N 47° 45' 43 " W for a distance of 50.08 feet to the beginning of a clockwise curve having a radius of 25 .00 feet; Along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears : N 02° 45' 43" W -35.36 feet) to the end of said curve; N 42° 14' 17" E for a distance of 22.00 feet; N 47° 45' 43" W for a distance of 85.00 feet to the southeast line of The Barracks II Subdivision, Phase 300, (plat 11209/184); THENCE N 42° 14' 17" E along the common line of said remainder of 108.88 acre tract and said Phase 300, same being the extension of the northwest line of Deacon Drive West, for a distance of 360.02 feet to the beginning of a counterclockwise curve having a radius of 25 .00 feet ; THENCE along said curve through a central angle of90° 00' 00" for an arc distance of 39.27 feet (chord bears: N 02° 45' 43" W -35 .36 feet) to the POINT OF BEGINNING, containing 13 .931 acres of land, more or less, SAVE AND EXCEPT all of Parkland Areas No . 3 (0.38 acre) and No. 4 (0.41 acre) as reflected on the plat of The Barracks II Subdivision, Phase 100, recorded in Volume 10570, page 293, Official Records of Brazos County, Texas, said Parkland Areas being revised by City of College Station Ordinance No. 2012-3452 and being further revised by a plat of The Barracks TI Subdivision, Phase 101 , recorded in Volume 11191, page 123, Official Records of Brazos County, Texas, for a net total of 13 .137 acres, more or less . NOTE -This Company does not represent that the above acreage or square footage calculations are correct. TITLE APPEARS TO BE VESTED IN: Heath Phillips Investments, LLC by Warranty Deed with Vendor's Lien from Arrenia H. Ellis, Florence H. King, Lewis M . Haupt, ill and Luella H. Trotter, dated May 13 , 2010, recorded in Volume 9627, page 73, Official Records of Brazos County, Texas. SUBJECT TO: LIENS: Deed of Trust, Security Agreement, Fixtures, Financing Statement and Assignment of Rents and Leases dated May 13, 2010, executed by Heath Phillips Investments, LLC to Julius C. Dunlap, Trustee, securing one note of even date payable to American Momentum Bank, in the principal amount of $2,994,200.00, recorded in Volume 9627, page 80, Official Records of Brazos County, Texas, and as modified rearranged and/or extended by instruments recorded in Volume 10220, page 151 and Volume 10470, page 133, Official Records of Brazos County, Texas. (covers 108.88 acres) Deed of Trust, Security Agreement, Fixtures, Financing Statement and Assignment of Rents and Leases dated October 4, 2011, executed by Heath Phillips Investments, LLC to Tom Giesenschlag, Trustee, securing one note of even date payable to Greens Prairie Investors, Ltd., in the principal amount of $2,600,000 .00, recorded in Volume 10364, page 96, Official Records of Brazos County, Texas. (covers 108.88 acres) ABSTRACTS OF JUDGMENTS/FEDERAL AND/OR STATE LIENS: NONE OF RECORD EASEMENTS: Right-of-Way Easement from J . W. Mochas to Sinclair Refining Company, dated September 6, 1947, recorded in Volume 132, page 68, Deed Records of Brazos County, Texas. Right-of-Way Easement from P. D. Gandy et ux to City of Bryan, dated December 22, 1949, recorded in Volume 141, page 392, Deed Records of Brazos County, Texas. Right-of-Way Easement from Arrenia Haupt Ellis et al to Wellborn Special Utility District, dated May 12, 1999, recorded in Volume 3645, page 298, Official Records of Brazos County, Texas. Temporary Construction Easement from Arrenia H. Ellis et al to City of College Station, Texas, dated May 24, 2006, recorded in Volume 7233, page 103, Official Records of Brazos County, Texas. Temporary Blanket Utility Easement from Heath Phillips Investments, LLC to City of College Station, Texas, dated November 1, 2011, recorded in Volume 10420, page 239, Official Records of Brazos County, Texas. OUTSTANDING MINERALS AND/OR ROYAL TIES: Royalty reservation in Deed from S. F. Machos et al to P . D. Gandy, dated October 3, 1949, recorded in Volume 140, page 614, Deed Records of Brazos County, Texas. Title to this reservation has not been traced subsequent to the date of the above-cited instrument. Mineral and groundwater reservation in Deed from Arrenia H. Ellis, et al to Heath Phillips Investments, LLC, dated May 13, 2010, recorded in Volume 9637, page 73, Official Records of Brazos County, Texas. Title to this reservation has not been traced subsequent to the date of the above-cited instrument. OIL & GAS LEASES: Estate created by Oil and Gas Leases from Florence Haupt King et al to Baker Exploration Company, dated December, 1993, recorded in Volume 2020, pages 93, 113, 122 and 140, Official Records of Brazos County, Texas. Title to this lease has not been traced subsequent to the date of the above-cited instrument. Estate created by Oil and Gas Lease from Lewis M. Haupt to Baker Exploration Company, dated January 5, 1994, recorded in Volume 2020, page 146, Official Records of Brazos County, Texas. Title to this lease has not been traced subsequent to the date of the above-cited instrument. Estate created by Memorandums of Oil and Gas Lease(s) from Luella H. Trotter, et al to BRW Land Services, dated December 19, 2012, recorded in Volume 11145, pages 9, 14, and 16, Official Records of Brazos County, Texas. Title to said lease(s) has not been traced subsequent to the date of the above-cited instrument. RESTRICTIONS OF RECORD: Restrictive covenants recorded in Volume 8986, page 115 and Volume 10671, page 145, Official Records of Brazos County, Texas. TAXES/ASSESSMENTS: NONE REQUESTED MISCELLANEOUS: Terms, conditions and stipulations contained in Bill of Sale for Water rights from Haupt Family Partnership to the Haupt Water Partnership, dated December 7, 2000, recorded in Volume 4012, page 288, Official Records of Brazos County, Texas. The terms, conditions and stipulations contained in the Declaration of Covenants, Conditions and Restrictions, executed by Greens Prairie Investors, Ltd., dated March 3, 2009, recorded in Volume 8986, page 115 and amended in Volume 10671, page 145 and management certificate in Volume 9520, page 215, Official Records of Brazos County, Texas. Maintenance charge as set forth in the Declaration of Covenants, Conditions and Restrictions executed by Greens Prairie Investors, Ltd., dated March 3, 2009, recorded in Volume 8986, page 115 and amended in Volume 10671, page 145, Official Records of Brazos County, Texas. All leases, grants, exceptions or reservations of coal, lignite, oil, gas and other minerals, together with all rights, privileges and immunities relating thereto, appearing in the Public Records, whether listed or not. There may be leases, grants, exceptions or reservations of mineral interests that are not listed. . . THIS TITLE REPORT IS ISSUED WITH THE EXPRESS UNDERSTANDING, EVIDENCED BY THE ACCEPTANCE OF SAME THAT THE UNDERSIGNED, Brazos County Abstract Company DOES NOT UNDERTAKE HEREIN TO GIVE OR EXPRESS ANY OPINION AS TO THE VALIDITY OF THE TITLE TO THE PROPERTY ABOVE DESCRIBED, NOR AS TO THE VALIDITY OF ANY OF THE INSTRUMENTS REPORTED HEREIN, INCLUDING THE PURPORTED DEED(S) ESTABLISHING THE RECORD OWNER(S) CITED ABOVE, BUT IS SIMPLY REPORTING BRIEFLY HEREIN AS TO THE INSTRUMENTS FOUND OF RECORD PERTAINING TO SAID PROPERTY, AND IT IS EXPRESSLY UNDERSTOOD AND AGREED THAT THIS TITLE REPORT IS NEITHER A GUARANTY NOR WARRANTY OF THE TITLE. BY ACCEPTANCE OF THIS TITLE REPORT IT IS UNDERSTOOD THAT THE LIABILITY OF THE ISSUER HEREOF IS EXPRESSLY Lll\fiTED TO THE ACTUAL MONET ARY CONSIDERATION PAID FOR SAID REPORT BY Heath Phillips Investments, LLC P. 0. Box 262 Wellborn, TX 77881. THIS SEARCH HAS BEEN LIMITED TO THE ABOVE MATTERS AND THE ABOVE TIME PERIOD; AND WE HA VE NOT SEARCHED FOR, NOR HA VE REFLECTED HEREIN, ANY EXAMINATION AS TOT AX SUITS, SPECIAL ASSESSMENTS, CONFLICTS OR OTHER INSTRUMENTS WHICH MAY AFFECT TITLE TO THE SUBJECT PROPERTY. IF TITLE INSURANCE COVERAGE, WHICH IS NOT PROVIDED BY TIDS REPORT, IS NEEDED, SAID COVERAGE IS AVAILABLE THROUGH THE APPLICABLE PROMULGATED POLICY(IES), AND AT A SPECIFIED RATE PREMIUM. Brazos County Abstract Company Please direct inquiries to: UNANIMOUS WRITTEN CONSENT IN LIEU OF ORGANIZATIONAL MEETING OF SOLE MEMBER OF HEATH PHILLIPS INVESTMENTS, LLC A LIMITED LIABILITY COMPANY The undersigned , be ing the Sole Member named in Heath Phill ips Investments, LLC's (here inafter the "Company") Certificate of Format ion filed with the Secretary of State of Texas , hereby adopts the following resolutions in lieu of an organizational meeting of the Member. CERTIFICATE OF FORMATION RESOLVED , that the acknowledgment of fi li ng issued by the Sec retary of State of Texas , and the certified copy of t he Certificate of Fo rmation f iled on November 23 , 2009 , are accepted and approved in all respects ; and the Secretary is directed to place same in the Company record book . COMPANY AGREEMENT RESOLVED , that the form of the company agreement for regu lati ng and managing Company affa irs subm itted to the undersigned is approved and adopted as the Company Agreement of the Company . RESOLVED , that the secretary is di rected to place the Company Agreement in the Company reco rd book , and maintain a copy of the Company Agreement at the Co mpany's principal office . PRINCIPAL OFFICE RESOLVED , that t he Company's pr incipal office be established and maintained at 4490 Cast legate Dr ive , College Station , Texas 77845 , and that meetings of the Member from time to time may be held e ither at the Company's princ ipal office or at such other place as the Member may select. OFFICERS RESOLVED , that the following persons were nom inated to the office preced ing their na me: UNANIM OUS WRITTEN C ON SENT IN LIEU OF ORGANIZATI ONA L MEETING PAGE 1 OF4 Office Pres ident Secretaryrrreasurer Officeholder Heath Ph illips Heath Phillips MEMBERSHIP INTEREST CERTIFICATES RESOLVED , t hat t he specimen membersh ip interest certificate proposed for use as the Company's cert ificate for membersh ip interest is adopted as the Company's form of Membership Interest Certificate ; and RESOLVED FURTHER, that the specim en Membersh ip Inte rest Certificate be appended to t he min utes of th e meet in g . COMPANY RECORD BOOK RESOLVED, that the Company, through its secretary , shall mainta in and authent icate in the Company record book the appropriate bus iness records , including but not lim ited to originals , cop ies or cert ified copies of the Company's Certificate of Formation , the Acknowledgment of Filing , the Company Agreement , the Membersh ip Interest transfer ledger, minutes of the meetings and of other proceedings of the Members , Managers , and any comm ittee established by the Managers ; and RESOLVED FURTHER, that the secretary is to ma inta in in the Company record book reco rds perta inin g to the issuance and transfe r of Membership Interest In the Membership Inte rest Cert ifi cate stubs and Membership Interest transfer ledger respectively . MEMBERSHIP INTEREST ISSUED RESOLVED , that the Member be , and hereby is , authorized to issue from t ime to time authorized Membership Interests of the Company for money paid , labor done, promissory note , or persona l property or real estate or leases the reof actually acquired and upon such terms as the Mem ber in the Member's d iscretion may determ ine ; and RESOLVED FURTHER , than an offer be issued to the fo ll owing to pu rchase one hundred percent (100 %) of the Membership Interest of the Company in the percentages and for the cons ideration ind icated opposite each name : UNANIMOU S WRITTEN C ONSENT IN LIEU OF ORGANIZATION AL M EET ING PAGE 20F 4 Member's Name Member's Interest Consideration Heath Phillips 100% $1 ,000 .00 RESOLVED , that the Member is authorized to issue additional Membership Interest to appropriately qual ified purchasers . COMMENCING BUSINESS RESOLVED , that cons ideration has been received for the issuance of Membership Interest, and that the Company consequently is able to commence and transact business and to incur indebtedness. ORGANIZATIONAL EXPENSES RESOLVED , that the Company treasurer be and hereby is authorized to pay all charges and expenses incident to or arising out of the organization of and to reimburse any person who has made any d isbursement therefore . · BANK ACCOUNT RESOLVED, that the treasurer be and hereby is authorized to open a bank account on the Company's behalf with any banks the Member deems appropriate. LICENSES AND PERMITS RESOLVED, that Company officers are directed to obtain in the Company's name such other licenses and tax permits as may be required for the conduct of Company business by any federal , state , county, or municipal governmental statute, ordinance , or regulations , and are directed and authorized to do all things necessary or convenient to qualify to transact Company business in compliance with the laws and regulations of any appropriate federal, state, or municipal governmental authority. OTHER STATES RESOLVED , that for the purpose of authorizing the Company to do business in any state , territory or dependency of the United States or any foreign country in which it is necessary or expedient for the Company to transact business, the proper Company officers are hereby authorized to appoint and substitute all necessary agents or attorneys for service of process , to designate and change the location of all necessary statutory offices and to make and file all necessary certificates, reports, powers of attorney and other instruments as may be required by the laws of such state, territory, dependency or country to authorize the Company to transact bus in ess therein . UNANIMOUS WRIITEN CONSENT IN LIEU OF ORGANIZATIONA L MEETING PAGE 30F4 FISCAL YEAR RESOLVED , that the Company fiscal year shall begin on January 1, and end on December 31, subject to change by resolution , as appropriate, at the discretion of the Member. CARRY ON BUSINESS RESOLVED, that the signing of these m inutes shall constitute full consent, confirmation , ratification , adopt io n and approval of the holding of the above meeting , the actions hereby taken, the resolutions herein adopted and waiver of notice of the meeting by the signatories . Dated : November 23 . 2009 ~4 Heath Phillips A true copy of each of the following papers referred to in the foregoing minutes is appended hereto: Specimen Membership Interest Certificate P:\Gentry\Phillips_Heath_lnvestmentsLLC_\Unanimous Written Consent_OrgMtg .doc UNANIM OUS WRITTEN CONSENT IN LIEU OF ORGANIZATIONAL MEETING PAGE40F 4 UNANIMOUS WRIITEN CONSENT IN LIEU OF ORGANIZATIONAL MEETING OF SOLE MEMBER OF SUPERIOR STRUCTURES, LLC A LIMITED LIABILITY COMPANY The undersigned, be ing th e Sole Member named in Superior Structures , LLC's (hereinafter the "Company") Certificate of Formation filed w ith the Secretary of State of Texas , hereby adopts the following resolutions in lieu of an organizational meeting of the Member. CERTIFICATE OF FORMATION RESOLVED , that the acknowledgment of filing issued by the Secretary of State of T exas , and the certified copy of the Certificate of Formation filed on Septembe r 6, 2007 , are accepted and approved in all respects ; and the Secretary is directed to place same in the Company record book. COMPANY AGREEMENT RESOLVED , that the form of the company agreement for regul at ing and manag in g Company affairs submitted to the undersigned is app rove d and adopted as the Company Agreement of the Company . RESOLVED , that the secretary is directed to place the Company Agreement in the Company record book, and maintain a copy of the Company Agreement at th e Company's pr incipal office . PRINCIPAL OFFICE RESOLVED, that the Company's principal office be established and ma intained at 4490 Castlegate Drive , College Station, Texas 77845 , and that meetings of the Member fr om time to time may be held either at the Company's principal office or at such other place as the Member may select. OFFICERS RESOLVED , that the follow ing persons were nominated to the office preceding their name : UNANIMOUS WRITTEN CONSENT IN LIEU OF ORGANIZATIONAL MEETING PAGE 1Of4 Office Preside nt Secretary/Treasurer Officeholder Heath Phill ips Heath Ph illi ps MEMBERSHIP INTEREST CERTIFICATES RESOLVED , that th e spe cim en membersh ip interest c erti fi ca te proposed for use as the .Co m pany's cert ifi cate for membersh ip interest is adopted as the Company's fo r m of Membership Interest Certificate ; and RESOLVED FURTHER, th at the spec im en Me mbershi p Interest Cert ificate be appended to t he minutes of the meeting . COMPANY RECORD BOOK RESOLVED , that the Company, through its secretary, shall maintain and authent icate in the Company reco rd book t he appropriate business records , includ ing but not li mited to origi nals, cop ies or cert ified copies of the Company 's Cert ificate of Formation, the Acknowledgment of Fili ng, the Company Agreement , the Membe rsh ip Interest transfer le dger, minutes of the meetings and of other proceedings of the Members . Managers , and any comm ittee established by the Managers; an d RESOLVED FURTHER, that the secretary is to m aintain in the Company record book records pertain ing to the issuance and transfer of Membersh ip Interest in the Membership Interest Cert ificate stubs and Membership Interest transfer ledger respectively . MEMBERSHIP INTEREST ISSUED RESOLVED , that the Member be, and he reby ls, authorized to issue from time to time aut horized Membership Interests of the Company for money paid, labor done , promissory note , or personal property or real estate or leases thereof actually acquired and upon such terms as the Member in the Member's discretion may determ ine ; and RESOLVED FURTHER , than an offer be issued to the follow ing to purchase one hundred pe rcent (100%) of the Membership Interest of the Company in t he percentages and for the consideration indicated opposite each name : U NANIMO US WRITIEN C ONSENT IN LIE U OF ORGANIZATI ON AL MEET ING PA GE 2 0 F4 Member's Name Member's Interest Consideration Heath Phillips 100% $1 ,000 .00 RESOLVED, that the Member is authorized to issue additional Membership Interest to appropriately qualified purchasers . COMMENCING BUSINESS RESOLVED, that consideration has been received for the issuance of Membership Interest, and that the Company consequently is able to commence and transact business and to incur indebtedness . ORGANIZATIONAL EXPENSES RESOLVED, that the Company t reasurer be and hereby is authorized to pay all charges and expenses incident to or arising out of the organization of and to re imburse any person who has made any disbursement therefore . BANK ACCOUNT RESOLVED, that the treasurer be and hereby is authorized to open a bank account on the Company's behalf with any banks the Member deems appropriate . LICENSES AND PERMITS RESOLVED, that Company officers are directed to obtain in the Company's name such other licenses and tax permit s as may be required for the conduct of Company business by any federal, state, county, or municipal governmental statute , ordinance, or regulations , and are directed and authorized to do all things necessary or conven ient to qualify to transact Company business in compliance with the laws and regulations of any appropriate federal , state , or municipal governmental authority. OTHER STATES RESOLVED , that for the purpose of authorizing the Company to do busin ess in any state , territory or dependency of the United States or any foreign country in which it is necessary or exped ient for the Company to transact business , the proper Company officers are hereby authorized to appoint and substitute all necessary agents or attorneys for service of process, to designate and change the location of all necessary statutory offices and to make and file all necessary certificates, reports, powers of attorney and other instruments as may be required by the laws of such state. territory, dependency or country to authorize the Company to transact business therein. UNANIMOUS WRITTEN CONSENT IN LIEU OF ORGANIZATIONAL MEETING PAGE30F4 FISCAL YEAR RESOLVED, that the Company fiscal year shall begin on January 1, and end on December 31 , subject to change by resolution , as appropriate , at the discretion of the Member . CARRY ON BUSINESS RESOLVED, that the signing of these minutes shall constitute full consent , confirmation, rat ification , adoption and approval of the holding of the above meetin g , th e actions hereby taken . the resolutions herein adopted and waiver of notice of the meeting by the signatories. Dated : September 7, 2007 ~~ Heath Ph illips A true copy of each of the following papers referred to in the forego ing minutes is appended hereto: Specimen Membership Interest Cert ificate P:\Gentry\Phillips_Heath_LLC_ 19097\Unanimous Written Consent_OrgMtg .doc UNANIMOUS WRITTEN CONSENT IN LIEU OF ORGANIZATIONAL MEETING PAGE 4 OF 4 AB Project Reprint Confirmation Page E ABPRJB4814564 Texas Department of Licensing and Regulation Architectural Barriers Project Registration Confirmation Page Tuesda~ May06, 2014 PERSON FILING FORM Name: Eddie Hare Phone: 979-820 -0149 Person Address: 5855 Foste r Road, Bryan, Tx 77807 Ras Number: 00000008 Project Name: The Barracks II Subdivision, Ph 105 106 Project City of College Station Right of Way EABPRJB4814564 Address: Intersection of Deacon Driveand General Parkway College Station , TX 77845 County: Brazos TENANT Contact Name: Phone: Contact Address: BUILDING/FACILITY Name: City of College Station Right of Way FACILITY Owner: City of College Station Phone: 979-764-3570 Owner Address: 1101 Texas Ave ., College Station, TX 77840 Contact Name: Danielle S ingh Phone: Contact Address: Contact Email: dsingh@cstx.gov DESIGN FIRM Name: Schultz Engineering LLC Phone: 979-764-3900 Firm Address: 2730 Longmire , Ste A, Co ll ege Station, TX 77845 Designer Name: Joseph Schult z, PE Emai: joeschultz84@verizon.net Type of License: Engineer License Number: 65889 PROJECT DESCRIPTION Start Date: 05/2014 Completion date: 1212014 Estimated Cost: $137 ,500.00 Type of Work: New Construction Type of Funds: This project is privately funded , on private land for private use . Are the private fonds provided by a tenant? No State Lease No. : Scope of Work: Sidewalks , ramps and crosswalks for a new street Does this building(s) have more than one level? Not a building Are there any elevators, escalators, or platform lifts in this building? Not a building Are there any boiler in this building? Not a bu ilding This AB Project registration Confirmation Page, construction documents, and applicable fees must be submitted in accordance with the Texas Administrative Code Chapter 68, Rule 68.51. If TDLR will be performing the review or inspection services , see Ru le 68 .80. If a RAS will be performing the re\/iew or inspection services , please contact the RAS as they set and collect their own fees, see Rule 68 75 . In accordance w it h Rule 68 52, the owner of a building or facility must also obta in an inspectio n from the department or a registered accessibility specialist not later than the first anniversary of the completion of construction . Request for inspection shall be made by completing the Request for Inspection form and submitting it no later than 30 calendar days after the completion of construction . Y !Jftos://www.tdlr.texas.gov/ ABProjectReg istrationOnline/ ABProjectPri ritCo nfirmation.aspx?strProjNum=EABPRJB4814564[5/6/2014 10: 16:00 AM] EDDIE HARE-ACCESSIBILITY SPECIALIST TDLR/TAS Registered Accessibility Specialist #0008 5855 Foster Road * .Bryan, Texns 77807 (979) 775 -6850 office * (979) 775 -6820 fax * (979) 820 -0149 cell * (877) 381-9685 toll free May 10 ,2014 Danielle Singh City of College Station 1101 Texas Ave. College Station, Texas 77840 Re: The Barracks II Subdivision . Phases l 05 & I 06 EABPRJB4814564 City of College Station Rights of Way@ Intersection of Deacon Drive and General Parkway Colle ge Station , Texas 77845 PLAN REVIEW-COMPLETED Dear Danielle Sin gh; Enclosed are the results of the plan rev iew completed on the referenced facility. Identified on the report are areas of nonconfonnance with accessibility standards adopted by th e Texas Departm ent of Licens ing an d Regulation for the purpose of ensuring compliance with Texas Go vernm en t Code, Chapter 469. Although deficiencies may have been noted, th e reference proje ct may be eligible for Inspection approval if constructed in accordance with the Tex as Accessibilit y Standards . Items which are the respons ibility of the owner should be referred to the appropriate person for action . The building or facility owner must req uest an inspection from the Department, (or a Departm ent authorized provider of inspection serv ices) no .later than thirty (30) days after completion of construction. If the completion date provided on the Project Registration Form is no longer correct, notify this office (in writing) of the revised completion date as soon as possible. This det ermination doe s not address applicability of th e Americans with Di sa bilities Act (ADA), (P.L. 101-3 36) or any other local , state, or federal requirement. For information on the ADA Hotline, (800) 949-4232 , or the United State s Depar tment of Justice at (202) 514-0301. Please reference the Department assigned project number (EA BPRJ #) in all future correspondence pertaining to this project. Sincerely, Eddie Accessibility Specia li st ICC# 1131801 -21 HAS# 0008 Cc: Schultz Engineering Tl/£ REVIEW OF DOCUMENTS AS CONTRA CT DOCUMT:N TS AND FIELD INSPECTIONS. Bl" Tlf/S REGI STER£!! ACCESSSllll/Tr SPECI A l.IST. EDD/£ HART:. FOR THI: TEXAS DEPARTMENT OF L I CENSING AND REGULATION (Tf)L R), AUSTIN. TEXAS. JS BASED ON BEST EFFORTS ENDEAVOR FOLLOWING I NSTRUCTION ,fND CERTI FICATION Br BOT// TDL R AND I C/JO. PIAN REV/Ell' AND I NSPECTION JN NO WA)' WARR~N~S COMPLETE COMPLIANCE TO T/lE TEXAS 1ICCESS/Bf./Tl' S7i1NIJARDS. Tll/S BUSINESS. THE /'IWFESSIONAL. lllS f:t\lf'l .Or!:"I :"!>'. AND CLIENT FOR WllOMTHE REVIEW OR I NSPECTION I S MADE AGREE;.<; TO HOUJ HA/l,\ILESS 1fND INOEMN/fT TllERt:GISTERED ;:~~EJSIBIL TY SPF.Cf..IUST. EDDIE I/ARE. AND THE TDLll Fl/Oil/ AND AGA I NST AN!' L/lfBll./Tr All/SING FROM TJ/£ f'F.RF()f(,\/ANCE OF THE ..... .. TAS 2012 Plan Review for EABPRJB4814564, The Barracks U Subdivisiou, Phases 105 and 106, May 10, 2014 Scope of'\Vork: New sidewalks, curb ramps and cross walks within a new subdivision in the Rights of Way of the City of College Station, Texas. Findings: There are no comments or deficiencies noted from this review of the plans submitted; the reference project may be eligible for Inspection approval if constructed in accordance with the Texas Accessibility Standards. This project meets or exceeds the right of Way section of the Adn1inistrative Rules 68 .102. Public Right-of-Ways Projects. (New section effective Februa1y 1, 2005, 30 TexReg 382; amended effective March 1, 2001, 32 TexReg 884 ; amended effective March 15, 2012, 37 TexReg 677) THE REVIEW OF DOCUMENTS AS CONTRACT DOCUMEN TS ,JN/) FIELD INSNX.,:TJONS. Bl' Tl/IS REGISTERED ,ICCESSS/11L/Tr SPEC/AUST. EDDIE HARE , !-'OR THE Tl~XAS DEl'.IRTMENTDF l.I Cf:NSiN<i AND REGULATION (71)/.R). AUSTIN, TEXAS. t!; JJASED ON BESr EFl'ORTS ENl)l:.'A l'OR FOl.LQIVING INSTRUCTION AND CERTIFICATION Bl'BOT!ITDLR A 1\rD ICBO. PLAN REVIEW AND INSPECTION IN NO WA l' WARRANTS CO.\/Pl.1-:TE COAll'l.!ANCE TO THE TEXAS ACCESS!llUTl' Sli fNDARDS. THIS IJUSINl:.SS. THf: PRO!-'HSSIONA ! .. HIS £,\f PLOYEl:S. ANDCUENT FOR 11'/fO,\f TllE REI !Ell' OR./NSN:CTION IS MADE AGREES TO HOLD HARMLESS AND INDEMNJFJ' Tl/£ REGISTERED ACCf:SSIBILT!' SPECIALIST. EDDIE I/ARE. AND TllE TDLR FRO.II AND AGAINST A.Vr UABIL!TI' ARISING FROM T/fE PF:RFORMANCH OF THI:.. WORK . ' CITY OF COILEGE STAT IO Home o/Texas A&M Univmity • FOR OFFICE USE ONLY CASE NO .: l Lf -6 2- DATE SUBMITTED:® /10/1 y TIME : ID : 00 STAFF : _,/&,........,.S~------- PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER P lease check one of the options below to clearly define the purpose of your submittal. 0 New Proj ect Subm ittal O Incomplete Project Submittal -documents needed to complete an application . Case No .: --------~ ~ Ex isting Project Submittal. Case No.: 14-00900082 Project Name THE BARACKS II SUBDIVISION -Ph 105 & 106 Contact Name JOE SCHULTZ P.E. Phone Number 979 . 764 .3900 ------------~ We are transmitting the following for Planning & Development Services to review and comment (check all that apply): O Comp rehensive Plan Amendment 0 Rezon ing Application D Conditional Use Permit D Prel i minary Plan 0 Final P lat D Development Plat D Site P lan D Specia l D istrict S ite Plan 0 Specia l D istrict Build ing I Sign 0 Landscape Plan D Non-Residential Architectural Standards 0 Irrigation Plan D Variance Request 0 Development Permit 0 Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR 0 Grading Plan ~ Other -Please specify below Engineer's Estimate of Construction Remaining Financial Guarantee INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comp rehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Permit D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire F low Analys is D Other -Please specify Special Instructions : 10/1 0 Print Form :J September 1 7, 2014 Jason Schubert, AICP Principal Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: The Barracks II Subdivsion -Ph 105 & 106-14-00900082 Dear Mr. Schubert: Office: 979 .764 .3900 Fax : 979 .764 .3910 Attached is the Engineer's Estimate for construction remaining for the Barracks II Phase 105 & 106 financial guarantee and the financial guarantee. If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. Deven Doyen, P .E. Civil Engineer P.O . Box 11995 • College Station , Texas 77842 schultzengineeringllc .com Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive , Suite A College Station, Texas 77845 Firm No. 12327 Barracks II Subdivision Phases 105 &106 Enl!ineer's Estimate of Construction Descri ption Unit Estimated Unit Price nuantitv General Items Mobilization, Overhead and Construction Staking LS 1 $ 40,000.00 Topsoil Removal and Replacement, complete in place LS 1 $ 12,000.00 Install End of Street Signs, complete in place EA 2 1 $ 150 .00 Street Name Signs, complete in place EA 7 $ 350.00 Stop Signs, complete in place EA 7 $ 400.00 Pavement Striping and Markings, complete in place LS 1 $ 5,000.00 Erosion & Sediment Control -SWPPP Implementat ion & Maintenance, Silt LS 1 $ 7,500.00 Fence, Construction Exit, Rock Filter Darn, etc., complete in place Hydroseed and Hydromu!ch, complete in place SY 5,240 $ 0.5 0 General Items Subtotal Street Constructioll Items Concrete Pavement Excavation & Grading, complete in place LS 1 $ 60,000 .00 Mixing & incorporation of lime, 6" deep, c omplete in place SY 6,153 $ 2 .10 Mixing & incorporation of lime, 8' deep, complete in place SY 9,376 $ 2 .80 Hydrated Lime, complete in place (27 lb/sy for 6' deep & 36 lb/sy for 8' deep) Ton 252 $ 170.00 6' Reinforced Concrete Pavement w/Curb, complete in place SY 4,033 $ 32 .00 7' Reinforced Concrete Pavement w/Curb, complete in place SY 8,463 $ 35 .00 Reinforced Concrete Pavement -Aprons -6' Thick w/ Monolithic Standard SF Curb, complete in place 4,390 $ 4 .50 Reinforced Concrete Pavement -Alleys -6' Thick, complete in place SF 8,590 $ 3.90 Concrete Sidewalk & Ramps -4" thick, complete in place SF 35,800 $ 3.50 ADA Ramps -Detectable Warning Surfaces, complete in place EA 24 $ 500.00 Street Construction Concrete Pavement Items Subtotal Page lof4 Total %Complete Amount Amount "uanti"' Comnlete ($) Remainirtll ($) $ 40,000.00 95% $ 38,000.00 $ 2,000.00 $ 12,000.00 50% $ 6,000.00 $ 6,000.00 $ 3,150.00 0% $ $ 3,150.00 $ 1,400.00 0% s $ 1,400.00 s 1,600.00 O"/o $ $ 1,600.00 $ 5,000.00 ()'lo $ -$ 5,000.00 $ 7,500.00 80"/o s 6,000.00 $ 1,500.00 $ 2,620.00 O"/o $ $ 2,620.00 $ 73,270.00 Remaining Subtotal $ 23,270.00 $ 60,000.00 95o/, $ 57,000.00 $ 3,000.00 $ 12,921.30 100% $ 12,921.30 $ $ 26,252.80 100% $ 26,252.80 $ $ 42,840.00 100% $ 42,840.00 $ $ 129,056.00 60% $ 77,433 .60 s 51 ,622.40 $ 296,205.00 90% $266,584.50 s 29,620.50 $ 19,755.00 O"/o $ $ 19,755 .00 $ 33 ,501.00 0% $ -$ 33 ,501.00 $ 125,300.00 ()'/, $ $ 125,300.00 $ 12,000.00 O"/o $ $ 12,000.00 s 757,831.10 Remaining Subtotal $ 274,798.90 Barracks II Subdivision Phases 105 &106 Ene:ineer's Estimate of Co nstruction Item Description Unit Estimated Unit Pri ce Total %Complete Amount Amount Ouantitv Oua.ntitv Comolete ( $) Remainin2 ($) Storm Sewer Construction Items 19 36" RCP P ipe, complete in place -Structural Backfill, complete in place LF 603 $ 90.00 $ 54,270.00 IOOolt $ 54,270.00 $ 20 36" HOPE Pipe, complete in place -Structural Backfill, complete in place LF 1,043 $ 80.00 $ 83 ,440.00 100% $ 83 ,440.00 $ 2 1 30" RCP Pipe, complete in place -Structural Backfill. complete in place LF 80 $ 70.00 $ 5,600.00 IOOolt $ 5,600.00 $ 22 30" HOPE Pipe, complete in place -Structural Backfil~ complete in place LF 143 $ 60.00 $ 8,580.00 IQOO/, $ 8,580.00 $ 23 24" RCP Pipe, complete in place -Structural Backfill, complete in place LF 41 4 $ 45 .00 $ 18,630.00 1()()0/, $ 18,630.00 $ - 24 24" HOPE Pipe, complete in place -Structural Backfill, complete in place LF 273 $ 40.00 $ 10,920.00 IQOO/, $ 10,920.00 $ - 25 18" RCP Pi pe, complete in place -Structural Backfill, complete in place LF 425 $ 32.00 $ 13,600.00 1()()0/, $ 13,600 .00 $ 26 18 " HOPE Pipe, complete in place -Structural Backfill, complete in place LF 159 $ 32.00 $ 5,088 .00 I QOO/, $ 5,088.00 $ 27 Curb lnlet -IO' wide, complete in place EA 4 $ 3,500.00 $ 14,000.00 70'/t $ 9,800.00 $ 4,200.00 28 Curb lnlet -IO' x 8', complete in place EA 2 $ 3,750.00 $ 7,500.00 70% $ 5,250.00 $ 2,250.00 29 Curb Inlet -5' wide, complete in place EA 6 $ 2,500.00 $ 15,000.00 70% $ 10,500.00 $ 4,500.00 30 Curb Inlet -5' x 8', complete in place EA 2 $ 2,750.00 $ 5,500.00 70"/, $ 3,850.00 $ 1,650 .00 31 Curb Inlet • I 5' wide, complete in place EA I $ 4,500.00 $ 4,500.00 70'/, $ 3,150.00 $ 1,350.00 32 Alley Gutter Area Inlet -V-4430 complete in place EA 3 $ 3,500.00 $7,000 ()'/, $ s 7,000.00 33 3'x3' Junction Box, complete in place EA I $ 1,500.00 $ 1,500.00 70% $ 1,050.00 $ 450.00 34 8'x4' Junction Box, complete in place EA 2 $ 3,000 .00 $ 6,000.00 70"/, $ 4,200.00 $ 1,800.00 35 8'x8' Junction Box, complete in place EA I $ 3,250.00 $ 3,250.00 70'/, $ 2,275 .00 $ 975 .00 36 TV Testing and Inspection, complete in place LF 2,98 1 $ 2.00 $ 5,962.00 ()'/, $ -$ 5,962.00 37 Rock Riprap, complete in place SY 65 $ 25 .00 $ 1,625 .00 ()"/, $ $ 1,625 .00 38 Concrete Flume, complete in place SF 3,43 3 $ 6 .00 $ 20,598.00 ()'/, $ $ 20,598 .00 Storm Sewer Construction Items Subtotal s 292,563.00 Remaining Subtotal s 52,360.00 Page 2 of 4 Barracks II Subdivision Phases 105 &106 En2ineer's Estimate of Construction Item Description Unit Es timated Unit Price Total %Complete Amount Amount Ouantitv Ouantitv Comdete ($\ Remainin2 1$\ Wate r Construction Items 39 12' C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 546 $ 40.00 $ 21,840.00 100% $ 21 ,840.00 $ 40 16' Casing, complete in place LF 52 $ 80.00 $ 4 ,160.00 100% $ 4,160.00 $ 41 Connect to Existing 12'1 Water Line EA 1 $ 1,000.00 $ 1,000.00 100'/o $ 1,000.00 $ 42 12'>< 6' MJ. Tee, complete in place EA I $ 700.00 $ 700.00 100'/, $ 700.00 $ 43 12'>< 12' M.J . Tee, com plete in place EA I $ 1,000.00 $ 1,000.00 100'/, $ 1,000.00 $ 44 12' " 8' M.J . Tee, complete in place EA 1 $ 800.00 $ 800.00 100'/o $ 800.00 $ 45 12" M.J . Gate Valve, complete in place EA 2 $ 1,850.00 $ 3,700.00 100'/o $ 3,700.00 $ - 46 12" "45' M.J . Bend, complete in place EA 4 $ 650.00 $ 2,600.00 100% $ 2,600.00 $ - 47 4' Blowoff Assembly, complete in place EA 2 $ 2,200.00 $ 4,400.00 80% $ 3,520.00 $ 880.00 48 Waterline Testing LS I $ 1,500.00 $ 1,500.00 0% $ $ 1,5 00.00 49 8' C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 15 16 $ 28.00 $ 42,448 .00 100'/o $ 42,448 .00 $ 50 6' C900 Water Pipe w/tracer wire -Structural Backfill, compl ete in place LF 1330 $ 24.00 $ 31,920.00 100'/o $ 31 ,920.00 $ 51 Connect to Existing 8' W ater Line EA I $ 500.00 $ 500.00 100'/o $ 500.00 $ 52 Connect to Existing 6' W ater Line EA 2 $ 500.00 $ 1,000.00 100'/o $ 1,000.00 $ 53 Fire Hydrant Assembly (w/valve, vert. e><tensio n), complete in place EA 4 $ 3,500.00 $ 14,000.00 90% $ 12,600.00 $ 1,400.00 54 8'x 8' M.J . Tee, comp lete in place EA I $ 600.00 $ 600.00 100'/o $ 600.00 s 55 8'>< 6' M.J . Tee, complete in place EA 3 $ 550.00 $ 1,650.00 100% $ 1,650 .00 $ 56 6'>< 6' M.J. Tee, complete in place EA 2 $ 500.00 $ 1,000.00 100'/o $ 1,000.00 $ 57 8' M.J . Gate Valve, complete in place EA 5 $ 1,050.00 $ 5,250.00 100'/o $ 5,250.00 $ 58 6' M.J . Gate Valve, complete in place EA 3 $ 1,000.00 $ 3,000.00 100'/. $ 3,000.00 $ 59 8' "45° M.J . Bend, com plete in place EA 33 $ 500.00 $ 16,500.00 100'/o $ 16,500.00 $ 60 8' x 11 . 25' M.J. Bend, complete in place EA 2 $ 500.00 $ 1,000.00 100'/o $ 1,000.00 s 61 6' "45° M.J. Bend, complete in place EA 4 $ 450 .00 $ 1,800.00 100'/o $ 1,800.00 $ 62 6' x 11.25° M.J. Bend, complete in place EA 4 $ 450 .00 $ 1,800.00 100°/o $ 1,800.00 $ 63 l ' Water Service,< 15 ft (avg length -2 ft) (8' Line) EA 2 $ 700.00 $ 1,400.00 100°/o $ 1,400.00 $ 64 1.5' Water Service,< 15 ft (avg l ength~ 2 ft )(8' Line) EA 6 $ 750.00 $ 4,500.00 90% $ 4,050.00 $ 450 .00 65 l ' W ater Service,< 15 ft (avg length • 2 ft ) (6' Line) EA 4 $ 650.00 $ 2 ,600.00 90% $ 2,340.00 $ 260.00 66 1.5' Water Service,< 15 ft (avg length = 2 ft ) (6' Line) EA 17 $ 800.00 $ 13 ,600.00 90"/, $ 12,240.00 $ 1,3 60.00 67 1.5' Water Service,> 15 ft (avg length= 48 ft) (6' Line) EA 15 $ 1,200.00 $ 18,000.00 90"/o $ 16,200.00 $ 1,800.00 68 2' Blowoff Assembly, complete in place EA 3 $ 1,000.00 $ 3,000.00 90% $ 2,700.00 $ 300.00 W a ter Construction Items Subtotal s 207,268.00 Rem ai nin g Su btota l s 7,950.00 Page 3 of 4 L . Barracks II Subdivision P hases 105 &106 n21neer s s mate o E • E ti re onstruchon Item Descriptio n Unit Estimated Unit Price Total %Complete Amount Amount Ouantitv Ouantitv Comolete 1$\ Remainino 1$) Sanitary Sewer Construction Items 69 6" PVC Sewer Line -D3034 -Structural Backfill , complete in place LF 696 $ 20.00 $ 13 ,920.00 100'/o $ 13 ,920.00 s 70 6" PVC Sewer Line -ASTM D-2241 -Structural Backfill, complete in place LF 20 $ 22 .00 $ 440.00 100'/o s 440.00 s 71 8" PVC Sewer Line -D3034 -Structural Ba ckfill, complete in pl ace LF 1,393 s 24.00 $ 33 ,432.00 100'/o s 33 ,432.00 s 72 6" Cleanou~ complete in place EA 2 $ 750.00 s 1,500.00 90% s 1,350.00 s 150.00 73 4' Sewer Service-Single (avg. length -4ft), complete in place EA 4 $ 300.00 s 1,200.00 90% s 1,080 .00 s 120.00 74 4' Sewer Service-Do ubl e (avg length-4 ft ), com plete in place EA 19 $ 400.00 s 7,600.00 90% s 6,840.00 s 760 .00 75 4' Sewer Service-Single (avg length-48 ft), complete in place EA 5 s 850.00 $ 4,250.00 90% $ 3,825 .00 $ 425 .00 76 4' Sewer Service-Do uble (avg length-48 ft ), complete in pl ace EA 27 $ 95 0.00 $ 25 ,650.00 90% s 23 ,085 .00 s 2,565 .00 77 Tie-In to Existing 8' PVC Sewer Line, complete in place EA 1 $ 1,000.00 s 1,000.00 100'/o s 1,000.00 s 78 Co ncrete Manhole -4' Dia. -complete in place EA 8 s 2,800 .00 $ 22,400.00 90% s 20,160 .00 s 2,240.00 79 TV Testing and Ins pection, complete in place LF 2,109 s 2.00 s 4,218 .00 O'lo s s 4,218 .00 S1nit1ry Sewer Construction Items Subtotll s 115,610.00 Rem1ining Subtota l s 10,478.00 Remaining Generol ltems Su btotal S 73,270.00 $ 23,270.00 Street Construction Concrete Pav ement Items Subtotal $ 757,831 .10 $ 274,798 .90 Storm Sewer Construction Items Su btotal $ 292,563.00 s 52,360.00 Water Construction Items Sub total S 207,268.00 s 1,400.00 S1nitary Sewer Construction Items Subtotll S 115,610.00 s 1,800.00 50% Additional for Gra" S 3 ,750.00 s 1,310.00 TOTAL CONSTRUCTION! S 1,450,292.10 I s 354,938.90 I Page 4 of 4 October 6 , 2014 Jason Schubert Principal Planner C ity of College Station 1101 Texas Avenue College Station, TX 77840 Re: The Barracks II Subdivsion -Ph 105 & 106-14-00900082 Dear Mr. Schubert: Attached are the following items for the above referenced projest: 1. Mylar original of the Final Plat 2. CAD file of plat on a CD If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. Joe ~ Civil Engineer P.O . Box 11995 • College Station , Texas 77842 sch ul tzengineeringllc.com Office: 979 .764.3900 Fax : 979 .764.3910 ~hultz Eng ineering, LLC May 1, 2014 Jenifer Paz Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: The Barracks II Subdivsion -Ph 105 & 106-14-00900082 Dear Ms. Paz: Office: 979 .764 .3900 Fax: 979 .764.3910 Attached are one (1) 24" x 36 " copy of the revised Final Plat, one (1) 24" x 36" copy of the grading and erosion control plan, thirteen (13) 11" x 17" copies of the revised Final Plat, 2 sets ofrevised construction documents , the revised Engineer's Estimate, and the response to staff comments. If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. Joe hultz , P.E. Civi Engineer P.O . Box 11995 • College Station , Texas 77842 schultzengineeri ngllc.com •...................... _____ , _____ :CITY OF COLI.EGE STAT ION Hom e of Texas A&M University • -_,_____ ~z;::;;a;::;uz ::::&«!M MEMORANDUM DATE : April 9, 2014 TO : Heath Phill ips , via ; heath superiorstructures@yahoo .com t/"' FROM : Jenifer Paz , Staff Planner SUBJECT: THE BARRACKS II PH 105 & 106 (FP) Thank you for the submittal of your FINAL PLAT -RESIDENTIAL application . Danielle Singh and I have been assigned to review this project and it is anticipated that the review will be comp leted and any staff comments returned to you on or before Thursday , April 24 , 2014 . If you have questions in the meantime , please feel free to contact us PC : Joe Schultz , Schultz Engineering LLC , via ; joeschultz84@verizon.net P&DS Project No . 14-00900082 Pl1m11ing & Development Services P.O. BOX 9960 • 11 0 1 TEXAS AVENU E• COLLEGE STAT ION · TEXAS · 77842 TEL 9 7 9 .764.:~5 7 0 ·FAX . 97 9 .7 64 .34% C ITY OF C OLLEGE STATION SCALE: LOCATION: ZONING: APPLICANT: PROJECT MANAGER: RECOMMENDATION: Planning & Z oning Comm ission October 2, 20.14 ,..,,, FINAL PLAT for The Barracks II Phases 105 & 106 14-00900082 80 townhouse lots , 3 common areas , and 0.56 acres of parkland dedication on 13 .14 acres 3100 Travis Cole Avenue , generally located near the intersection of Deacon Drive West and General Parkway POD Planned Development District Heath Phillips , Heath Phillips Investments , LLC Jason Schubert , AICP , Principal Planner jschubert@cstx.gov Staff recommends approval of the Final Plat. Page 1 of 3 •"-1,"- Planning & Zoning Commission Octobe r 2 , 2014 N CX) 0 ' ~ "7 u.i l() > ;.: <t I uJ a.. _J _o -o (/) (/) ~­O> Ci ~ 0:: f- <t 0 co 0 w c;:; :i::: f- s: UJ > w 0:: f-z UJ ~ a.. 0 _J w > UJ Cl Pag e 2 of 3 DEVELOPMENT HISTORY Annexation: Zoning: Preliminary Plat: Site Development: COMMENTS Parkland Dedication: Greenways: Pedestrian Connectivity: Bicycle Connectivity: Impact Fees: REVIEW CRITERIA 2002 A-0 Agricultural Open upon annexation A-0 Agricultural Open to POD Planned Development District (2011 ); POD Planned Development District to POD Planned Development District to revise layout and add additional use (2012); POD Planned Development District to POD Planned Development District to add a 29-acre tract development and revise some of the commercial uses (2014) 2011 , revised in October 2012 and again in February 2014 Phases 100-104, 200 , 201 , and 300 have been filed for record . Final Plat applications have been submitted for Phases 108 and 400 and are currently under review . Neighborhood park land dedication was provided with previous phases and 0 .56 acres of additional parkland is proposed with this Final Plat. The Parks & Recreation Advisory Board recommended to accept the proposed parkland at their October 9, 2012 meeting when the parkland for this development was reconfigured due to US Army Corps of Engineers drainage requirements . Also , as the developer is constructing Neighborhood Park improvements , parkland dedication fees of $50 ,000 (80 lots x $625) for Community Parks are due prior to filing of the Final Plat. N/A Sidewalks are provided on both sides of all streets within the development. Bikes lanes will be provided along Deacon Drive West (Major Collector) and General Parkway (Minor Collector). The subject tract is located within the Steeplechase Sanitary Sewer Impact Fee Area and will be required to pay $357.74/LUE (Living Unit Equivalent) at time of building permit. Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with the Subdivision Requirements contained in the Unified Development Ordinance . STAFF RECOMMENDATIONS Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat Planning & Zoning Commission ,_ October 2 , 2014 Page 3 of 3 City of College Station Administrative Approval for Required Parkland Dedications of Less than Five Acres 1. Applicant Name: _____________ =H ..... ea=t~h~P~h~i=lli~PS~----------------- Address: ___________ ----'-P~·=O"'--. =B=ox'-'--=26=2=--'-Vl/'-'e=ll=b=or~n"---'-T....,X~7~7~8=8..._1 ____________ _ Phone: _____ 9_79_-_22_9_-_5_90_6 _____ _ E-Mail: ____ h_e_at_h_s~up~e_r_io_rs_t_ru_c_tu_r_e_s~@~y~a_h~o ..... o~.c~o_m __ _ 2. Development Name : ____ -=B=-=a=r'"""ra=-=c"--'k=s-'-'ll'"""'S""'u""b""d'"'-iv'-'-is=i=o'""'""n ...... P ...... h,_1.:....:0=-=5,_&=-'1~0=6 ___ _ Project #: __ 1_4_-9_0_0_08_2 __ Development Location: ____________ 3=-1.:....:0:....:0,_T"'"""r'-=a'-'-v=is'-C=-o=l=e ...... A.:...:v-=e'--------------- 3. Dwelling Units: ~Single Family ___ Multi-family Units , located in Neighborhood Park Zone ~15~- _§Q_ Single Family Multi-family Units , located in Community Park Zone B 4. Development Fees and Dedication Requirements: a. Land Dedication or Fee in Lieu of Land (Choose One): Neighborhood Community Single Family : One (1) acre per 117 DU 's 0 .56 ac One (1) acre per 128 DU 's ___ ac = --~0-~56~_ac Multi-family : One (1) acre per 117 DU 's ____ ac One (1) acre per 128 DU 's ___ ac = ______ ac TOTAL = ---=0.=56=----Acres -OR- Fee Paid in Lieu of Land Dedication Neighborhood Community Single Family : @ $274 .00 per DU $ ____ _ @ $250 .00 per DU $ __ 2~0~0~0~0-= $ __ 2=0~0~0~0 __ Multi-family : @$274.00 per DU $ ___ _ @ $250 .00 per DU $ ____ _ = $ ____ _ TOTAL (Neighborhood and Community) = $ _____ _ b. Development Fee: Neighborhood Community Single Fam ily @ $362 .00 per DU $ ___ _ Single Family@ $375.00 per DU $ 30 ,000 = $ 30 ,000 Multi-family @ $362 .00 per DU $ ___ _ Multi -family@ $750 .00 per DU $ __ _ =$ __ _ TOT AL (Neighborhood and Community) = $ 50,000 5. Comments: An additional dedication of 0.56 acres will be made for Neighborhood parkland . Neighborhood Parkland was previously dedication with previous phases ; development of neighborhood park will be completed by the developer. The City of College Station agrees to accept: GRAND TOTAL (Neighborhood and Community) 80 Units x $625 = $ 50 000 Land Dedication _o...., ...... 5 ...... 6 ______ _ Name Date vr PARKS AND RECREATION ADVISORY BOARD AGENDA CITY OF C OLLEGE STAT ION TUESDAY, OCTOBER 9, 2012 BOARD TOUR -5:45PM REGULAR MEETING -7:30PM Stephen C. Beachy Central Park Conference Room College Station, TX 77840 The City Council may or may not attend the Parks & Recreation Advisory Board Tour & Regular Meeting. 1. Call to order and Roll Call. 2. Possible action concerning requests for absences of members. 3 . Hear visitors . 4. Tour and discussion of Parks and recreation facilities. • Leave from Central Park -1000 Krenek Tap Rd ., College Station, TX • Wolf Pen Creek Park -1000 Colgate Dr., College Station, TX • Veterans Park & Athletic Complex -3101 Harvey Road, College Station, TX • University Dog Park -300 Park Road, College Station, TX • Thomas Park -1300 James Parkway, College Station, TX • John Crompton Park -201 Holleman Drive West, College Station, TX • Georgia K. Fitch Park -1100 Balcones, College Station, TX • Creek View Park -1001 Eagle Avenue, College Station , TX • Pebble Creek Park -401 Parkview Street, College Station, TX • Lick Creek Park -3600 East Rock Prairie Road, College Station, TX • Wood Creek Park -9100 Shadowcrest Drive, College Station, TX • Emerald Forest Park -8400 Appomattox, College Station, TX • Return to Central Park -1000 Krenek Tap Rd., College Station, TX -Reconvene for Regular Meeting - 5 . Call to order and Roll Call. 6 . 8. Consideration, possible approval, and discussion of minutes from the meeting of September 11, 2012. Presentation, possible action , and discussion concerning The Barracks II revised preliminary and parkland abandonment. Update on Park Maintenance Standards quarterly report for FY'12. 9. Discussion and possible action concerning revisions to the Parks and Recreation Advisory Board Goals for FY13. The building is wheelchair accessi ble. Handicap parking spaces are available. Any request for sign interpretive services must be made at least 48 hours before the meeting. To make arrangements call (979) 764-3517 or (TDD) 1-800-735-2989. Agendas may be viewed on www.cstx.gov. 10 . Report, possible action, and discussion concerning the current Capital Improvements Program: };;-Capital Improvements and Park Land Dedication Project Lists of October 2012. };;-Dedications of Less than Five Acres • Williams Creek, Phase 6 -Park Zone 6 • Site plan, 717 University Drive -Park Zone 1 11. Presentation , possible action, and discussion on future agenda items : A Board Member may inquire about a subject for which notice has not been given. A statement of specific factual infonnation or the recitation of existing policy may be given. Any deliberation shall be limited to a proposal to place the subject on an agenda for a subsequent meeting. };;-Next Regular Meeting -November 13, 2012 12 . Adjourn. Notice is hereby given that a Board Tour and Regular meeting of the Parks and Recreation Advisory Board of College Station, Texas will be held on the 9th day of October 2012. For the tour to begin at 5:45 p .m. at Stephen C. Beachy Central Park, 1000 Krenek Tap Rd. and the meeting to reconvene at 7:30PM, College Station, Texas , 77840. The fo/fowing subjects will be discussed, to wit: See Agenda. Posted this the 5th day of October, 2012, at 5:00 p .m. f, the undersigned, do hereby certify that the above Notice of Meeting of the Parks and Recreation Advisory Board of the City of College Station, Texas is a true and correct copy of said Notice and that I posted a true and correct copy of said no/ice on the bulletin board at City Hall, 1101 Texas Avenue, in College Station, Texas and on the City's website, www.cstx .gov. The Agenda and Notice are readily accessible to the general pubfic at all times. Said Notice and Agenda were posted on October 5, 2012 at 5 :00 p.m., and remained so posted continuously for at least 72 hours preceding the schedufed time of said meeting. This public notice was removed from the official posting board at the College Station City Half on the fof/owing date and time : Dated this __ day of ______ , 2012. CITY OF COLLEGE STATTON, TEXAS BY:. ST ATE OF TEXAS COUNTY OF BRAZOS Subscribed and sworn to before me on this the ___ day of _____ ~ 2012. DEVELOPMENT REVIEW THE BARRACKS 11PH105-106 3100 TRAVIS COLE AVE . Case : 14 ~082 FINAL PLAT Zoning Districts R -4 R Rural R -6 E Estate MHP RS Rstricted Subu ba.n 0 GS General Suburban SC R-18 Sirvt1le Family Residential GC D Duplex Cl T Townhouse S.P DEVELOPMENT REVIEW Multi-Famliy BPI Business Par Industrial H igh Density Multi-Family tAP N atura l Areas Protected Manufactured' Home Par k C -3 Lg ht Commercial OffiCE M -1 Light I ndustr ial Suburb.an Commercial M -2 Heavy Indus trial General Commercial C -U CollEije and Univ.as ity Commercia~lndustrisl R& D Research and Development Business Par P-M UD Plsnne.O Mixed-U-.e Development THE BARRACKS Iii PH 105-106 3100 TRAVI S COLE AVE . Ca se : 14 -082 POD WPC tiG -1 NG-2 NG -3 ov ROD KO Pls.nned Development Dis !rid Wolf Pen Cree!t Dev. Corridor C cr e Northgate Transitions.I N<M'thg ate Res identi.s.I orthg s.te Corridor Ovaisy Redevelopment District Kren ek Tap Over h;iy FI NAL PLAT Scale: 1 Inch= 300 Fee Area: 13.931 Acres (606,829.40 Square Feet) CLOSED 4-10-2014 BR 14-082 FINAL PLAT THE BARRACKS II SUBDIVISION PH 105 & PH 106 BLK 20, 21, 22, 24 ,26 LIS 1-9, 1-33, 1-13 , 1-16 , 4-12 , 1-3 & COMMON AREAS ACRES 13.14 Area: 13 .931 Acres (606,829.40 Square Feet) Perimeter: 4628.017 Feet Ga12 = 0.024 (North 66° 12' 22" West) GAP error ca1mot be greater than 0.10 (See SOP for Exceptions) 1. N42°14'17"E 360.02' 2. N02°45'43"W Ch35.36 ' Rad 3 . N42°14'17"E 67.00' 4. N87°14'17"E Ch35 .36' Rad2 5 . N42°14'17"E 21.50' 6 . S47 °45'43"E 85.00' 7. S42 °14'17"W 21.50' 8. so2°45'43"E Ch35 .36' Rad2 . 9. S47 °45'43"E 65.00' IO. N87 °14'17"E Ch35.36' Rad 11. S47 °45'43"E 24.00' 12 . so2°45'43"E Ch35.36' Rad : 13 . S47 °4 5'43"E 65.00' 14 . N87 °14'17"E Ch35 .36' Rad 15 . N42 °14'17"E 16.51' 16 . S47 °4 5'43"E 50.00' 17 . S42 °14 '17"W 16.51 ' 18 . so2°4 5'43"E Ch35.36' Rad 19 . S47 °45'43"E 190 .00' 20. N87 °14'17 "E Ch35 .36 ' Rad 21. N42 °14'1 7"E 16 .50' 22 . S47 °45'43"E 50.00' 23. S42 °14'17"W 16.50' 24 . so2°45'43"E Ch35.36' Rad: 25 . S47 °45'43"E 65.00' 26. N87 °14'17"E Ch35 .36' Rad 27 . S47°45'43 "E 24.00' 28. so2°45'43"E Ch35.36 ' Rad: 29. S47°45'43"E 65.00' 30. N87 °14'17"E Ch35.36' Rad 31. N42 °14'17"E 139.01' 32 . S47°45'43"E 67 .00' 33. so2°45 '43"E Ch35 .36' Rad: 34 . S47 °45'43"E 253.37' 35. S42 °14'17"W 24 .00' 36. so2°45'43"E Ch35.36' Rad: 37. S42 °14'17"W 65 .00' 38 . S87 °14'17"W Ch35 .36' Rae 39 . N47 °45'43"W 111.79' 40. S42 °14'17"W 180 .01' 41. N47 °45'43"W 3.50' 42 . S42 °14'17"W 86.00' 43. S47 °45'4 3"E 88.00' 44 . so2°45'43"E Ch35.36' Rad 45. S42 °14'17"W 171.71 ' 46. N47 °45'43"W 613 .00' 47. N42 °14'17"E 70 .70' 48. N02 °4 5'43"W Ch35 .36' Ra• 49 . N47 °45 '43"W 228.00' 50. S87 °14 '17"W Ch35 .36' Rae 51. S42 °14 '17"W 107 .00' 52. N47 °45'43"W 125 .00' 53 . N02 °45'43"W Ch35 .36' Ra 1 54 . N42 °14 '17"E 22.00' 55 . N47 °45'43"W 50.00' 56 . S42 °14'17"W 22 .00' 57 . S87 °14'17"W Ch35 .36' Rae 58 . N47 °45'43"W 50.08' 59 . N02 °45'43"W Ch35.36 ' Ra1 60. N42 °14'17"E 22.00' 61. N47 °45'43"W 85.00' LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: DATE: f2c;/ :Z C/-jO/t/ RE : COMPLETION OF J3At?/l/lc/c"S J[.. 72'--u/Ofi ·7;0~---·. P/±-B:< The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void t he letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by 6/?E:E.ivs fJ?//$"/lt:E .:z:;..;v£,5 T0/l .5.. and by their subcontractors as indicated by signatures below. WORK COMPLETED "~ d<IA<h .. -d~IA~~ LC,)cJt&. WARRANTY DATE -··C?d g0-;~l C2c7 ;2 0-/,f Owner: 11/?f Contractor: G.ALhV! /?wu,w ~~ P.hon~ Num~ert"g;t?~2',-:-~-947~~-~t -;'~~J?~9~1~u ·~-~~~:~. :~'2--6.S.-r'fl:-~~-t't. Address: L/~90 cA.stZEGAf:E}Jll.Address: '~f<;o cds1?£ &AJ7 011. CC/6-G!&E c57/IT.£<JJ tY c;zu..EGf ,S/A'/-7.0:) Z7ITS ;/)( .7/'i?~f "i7:d ) Signature:~~ ~ Revised 1131/07 t,LJY PLAT FILED ··-· 3°"8fTE ESMTS Al.ID . -~ 1IMP BLANKET ElllT .... ~llOOTMP UMTS• ... SOP: Filing of Final Plats -Letters ~f Completion , / Engineering Inspector/D~te: ,I'6(."'fl Y'f ;~-) o-2-Pi -1r Project Engineer/Date: ~'1 e,llQ S \ '1f\\ I b l=<-1 / /4 DP Number: \ J.f-'t1__ I 04/23/14 Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written confirmation from the following contacts before forwarding Letter of Completion to development review engineer: 0'rosion/Drainage: Donnie Willis (0: 764-6375, C: 229-7632) </' CS Water Services -General: Charles "Butch" Willis (0: 764-3435, C: 777 -1202) • Water -coordinate fire flow analyses (or the design engineer for non-city utilities) and confirm test results meets min requirements with the dev review engineer (specific hydrants to test, if simultaneous, and min allowable flow) • Sanitary o CS Water Service -Liftstation: Doug Wallace (0: 764-6333) o CS Electric and Streetlights: Gilbert Martinez (0: 764-6255) o CS Public Works -Traffic Signs/Markings): Lee Robinson (0: 764-3695) ~ BTU Electric and Streetlights: Sonia Creda (0: 821-5770) John Fontinoe or Randy Trimble (0: 821-5728) ,,.C...-onfirm with development review engineer that service agreement is in place with BTU ¢"' Non-City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson Creek SUD, etc) confirm with development review engineer that infrastructure is complete and for outstanding issues, o Digital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file o Record Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the following attestation: "I, General Contractor for development, certify that the improvements shown on this sheet were actually built, and that said improvements are shown substantially hereon. I hereby certify that to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any are stated correctly hereon." General Contractor /Record Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including Private Detention Facilities with the following attestations: "I hereby attest that I am familiar with the approved drainage plan and associated construction drawings and furthermore, attest that the drainage facilities have been constructed within dimensional tolerances prescribed by the Bryan & College station Unified Stormwater Design Guidelines and in accordance with the approved construction plans or amendments thereto approved by the City of College Station ." (affix seal) Licensed Professional Engineer State of Texas No. ___ _ "I certify that the subdivision improvements shown on this sheet were actually built, and that said improvements are substantially as shown hereon. I further certify, to the best of my knowledge, that the materials of construction and sizes of manufactured items, if any, are stated correctly hereon." General Contractor Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings, inspector to: ~file one set of Record Drawings in Public Works files, and ~forward one set of Record Drawings to Jeffery Speed (CSU) Inspectors should forward Letters of Completion to the development review engineer that reviewed and stamped the construction plans after confirming: / the date on the Letter of Completion Warranty should reflect the date when all associated punchlist items are completed, and /the Owner is shall be listed as the one affirming the one-year warranty Development review engineer to: o add Dev Permit Number to Letter of Completion o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar is ready to be filed), all necessary easements (including offsite) have been filed, and blanket easement issues are resolved, and o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the plat it may have been filed ahead of construction.) Deborah Grace-Rosier {Planning) to file the Final Plat utilizes a coversheet to confirm: o infrastructure is accepted by Letter of Completion -or-Surety is provided and acceptable, o signed and notarized mylar of final plat, o parkland dedication has been paid, o digital file of final plat is provided, o a current paid tax certificate has been submitted, o sidewalk fee in lieu paid (if applicable), and Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been filed, we have all necessary easements, etc -and then forward the Letter of Completion to Alan Gibbs (City Engineer) for final signature. Carol (Sr. Asst. City Engineer) to: o enter the engineer's estimate and Letter of Completion date into Inspection List o forward hard original of finalized Letter of Completion to Crystal (P&DS). Crystal to: verify o signatures on the Letter of Completion, o forward scanned copy of Letter of Completion and associated Engineers Estimate to the owner, developer, contractor, Terry Boriskie (Building), Ben Mccarty (Building), Chris Haver (Building), carol Thompson (Accounting), Kristina Keller (Accounting), Courtney Kennedy (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Charles "Butch" Willis (CSU), carol Cotter (Engineering), Alan Gibbs (Engineering), Erika Bridges (Engineering), Danielle Singh (Engineering), Gilbert Martinez (Electric) and Deborah Grace- Rosier (Planning). Kristina Keller will forward to Diane Broadhurst (CSU) after her review. o if don't have email addresses, mail copies to the owner and contractor, and o place the original in Development Permit file. Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file. Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No.12327 Barracks II Subdivision Phases 105 &106 E ' Er t re t r ngmeer s s 1ma e o ODS rue IOD Description Unit General Items Mobilization , Overhead and Construction Staking LS Topsoil Removal and Replacement, complete in place LS Install End of Street Signs, complete in place EA Street Name Signs, comp lete in place EA Stop Signs , complete in place EA Pavement Striping and Markings, complete in place LS Erosion & Sediment Control -SWPPP Implementation & Maintenance, Silt Fence , LS Construction Exit, Rock Filter Dam , etc ., complete in place Hydroseed and Hydromulch , complete in place SY St reet Construction Items Co ncrete Pavement Excavation & Grading, complete in place LS Mixing & incorporation of lime , 6" deep, complete in place SY Mixing & incorporation of lime, 8" deep, complete in place SY Hydrated Lime, complete in place (27 lb/sy for 6" deep & 36 lb/sy for 8" deep) To n 6" Reinforced Concrete Pavement w/Curb, complete in place SY 7" Reinforced Concrete Pavemen t w/Curb, complete in place SY Reinfo rced Concrete Pavement -Aprons -6" Thick w/ Monolithic Standard Curb, SF complete in place Reinforced Concrete Pavement - All eys -6" Thick, comp lete in place SF Concrete Sidewalk & Ramps -4" thick, complete in place SF ADA Ramps -Detectable Warning Surfaces, complete in place EA Estimated Unit Price Quantity I $ 40,000.00 1 $ 12 ,000.00 21 $ 150.00 7 $ 350.00 7 $ 400 .00 1 $ 5,000.00 1 $ 7,500 .00 5,2 40 $ 0.50 General Items S ubtota l 1 $ 60,000 .00 6,153 $ 2.10 9,376 $ 2.80 252 $ 170 .00 4,033 $ 32 .00 8,463 $ 35 .00 4,390 $ 4.50 8,590 $ 3.90 35 ,800 $ 3.50 24 $ 500 .00 Street Construction Concrete Pave ment Items Subtotal Page 1of4 Total $ 40 ,000 .00 $ 12 ,000 .00 $ 3,150 .00 $ 1,400 .00 $ 1,600.00 $ 5,000 .00 $ 7,500 .00 $ 2,620 .00 $ 73,270.00 $ 60,000 .00 $ 12 ,921.30 $ 26,252 .80 $ 42,840 .00 $ 129,056 .00 $ 296,205 .00 $ 19 ,755 .00 $ 33,501.00 $ 125,300 .00 $ 12 ,000 .00 $ 757 ,831.10 I Barracks II S ubdivision Phases 105 &106 E ' Er t re t r nemeer s s 1ma e o ons rue 100 Item Description Unit Estimated Unit Price Total Ouantitv Sto rm Sewer Construction Items 19 36" RCP Pipe, complete in place -Structural Backfill , complete in place LF 603 $ 90 .00 $ 54,270 .00 20 36" HDPE Pipe, complete in place -Structural Backfill , complete in place LF 1,043 $ 80.00 $ 83 ,440 .00 21 30" RCP Pipe, complete in place -Structural Backfill, complete in place LF 80 $ 70 .00 $ 5,600 .00 22 30" HDPE Pipe, complete in place -Structural Backfill , complete in place LF 143 $ 60 .00 $ 8,580.00 22 24" RCP Pipe, complete in place -Structural Backfill, complete in place LF 414 $ 45 .00 $ 18,630 .00 23 24" HDPE Pipe, complete in place -Structural Backfill, complete in place LF 273 $ 40 .00 $ 10 ,920 .00 24 18" RCP Pipe, complete in place -Structural Backfill, complete in place LF 425 $ 32 .00 $ 13 ,600 .00 25 18" HDPE Pipe, complete in place -Structural Backfill, complete in place LF 159 $ 32 .00 $ 5,088 .00 26 Curb Inlet -10' wide, complete in place EA 4 $ 3,500 .00 $ 14,000 .00 27 Curb Inlet -IO' x 8', complete in place EA 2 $ 3,750.00 $ 7,500 .00 28 Curb Inlet -5' wide, complete in place EA 6 $ 2,500.00 $ 15 ,000.00 29 Curb Inlet - 5' x 8', complete in place EA 2 $ 2,750 .00 $ 5,500 .00 30 Curb Inlet -15' wide, complete in place EA I $ 4,500 .00 $ 4,500.00 31 Alley Gutter Area Inlet -V-4430 complete in place EA 3 $ 3,500 .00 $7 ,000 32 3'x3' Junction Box, complete in place EA I $ 1,500.00 $ 1,500.00 33 8'x4' Junction Box, complete in place EA 2 $ 3,000.00 $ 6,000 .00 34 8'x8' Junction Box, complete in place EA 1 $ 3,250.00 $ 3,250.00 35 TV Testing and Inspection, complete in place LF 2,981 $ 2 .00 $ 5,962 .00 36 Rock Riprap, complete in place SY 65 $ 25 .00 $ 1,625 .00 37 Concrete Flume, complete in place SF 3,433 $ 6.00 $ 20,598.00 Storm Sewe r Construction Items Subtotal s 292,563.00 Page 2 of 4 I Barracks II Subdivision Phases 105 &106 E • Er t re t r ngmeer s s 1ma e o ODS rue IOD Item Description Unit Estim ated Unit Price Total Ouantitv Water Construction Items 38 12" C900 Water Pipe w/tracer w ire -Structural Backfill , complete in place LF 546 $ 40.00 $ 21 ,840.00 39 16" Casing, complete in place LF 52 $ 80.00 $ 4,160 .00 40 Connect to Ex ist ing 12" Water Line EA I $ 1,000.00 $ 1,000 .00 41 12 "x 6" M.J . Tee, complete in place EA 1 $ 700.00 $ 700 .00 42 12"x 12" M .J . Tee, complete in place EA I $ 1,000.00 $ 1,000.00 43 12 " x 8" M.J . Tee, complete in place EA I $ 800 .00 $ 800.00 44 12" M.J . Gate Valve, complete in place EA 2 $ 1,850 .00 $ 3,700.00 45 12 " x 45° M .J . Bend, complete in place EA 4 $ 650.00 $ 2,600.00 46 4" Blowoff A ssembly , complete in place EA 2 $ 2,200 .00 $ 4,400.00 47 Waterline Testing LS I $ 1,500.00 $ 1,500.00 48 8 " C 900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 1516 $ 28 .00 $ 42 ,448 .00 49 6 " C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 1330 $ 24 .00 $ 31 ,920.00 50 Connect to Exi sting 8" Water Line EA I $ 500.00 $ 500.00 51 Connect to Exi sting 6" Water Line EA 2 $ 500.00 $ 1,000 .00 52 Fire Hydrant Assembly (w/valve, vert. extension), complete in place EA 4 $ 3,500.00 $ 14,000.00 53 8"x 8 11 M .J. Tee, complete in place EA I $ 600.00 $ 600.00 54 8 "x 6 11 M.J. Tee, complete in place EA 3 $ 550 .00 s 1,650.00 55 6"x 611 M.J . Tee, complete in place EA 2 $ 500.00 $ 1,000.00 56 8 11 M.J . Gate Valve, complete in place EA 5 $ 1,050.00 $ 5,250.00 57 611 M.J . Gate Valve, complete in place EA 3 $ 1,000.00 $ 3,000.00 58 8" x 45° M.J. Bend, complete in place EA 33 $ 500.00 $ 16 ,500.00 59 8 11 x 11.25° M .J . Bend, complete in place EA 2 $ 500.00 $ 1,000.00 60 6 11 x 45° M.J . Bend, complete in place EA 4 $ 450.00 $ 1,800.00 61 611 x 11 .25° M.J. Bend, complete in place EA 4 s 450.00 $ 1,800.00 62 I " Water Service,< 15 ft (avg length = 2 ft) (8" Line) EA 2 $ 700.00 s 1,400 .00 63 1.5" Water Service,< 15 ft (avg length= 2 ft) (8 11 Line) EA 6 $ 750.00 $ 4,500.00 64 1" Water Service,< 15 ft (avg length= 2 ft) (6" Line) EA 4 $ 650.00 s 2,600 .00 65 1.5" Water Service,< 15 ft (avg length = 2 ft) (6" Line) EA 17 s 800 .00 $ 13 ,600 .00 66 1.5" Water Service,> 15 ft (avg length= 48 ft) (6" Line) EA 15 $ 1,200.00 $ 18,000.00 67 2" Blowoff Assembly, complete in place EA 3 $ 1,000.00 $ 3,000.00 Water Construction Items Subtotal $ 207,268.00 Page 3 of 4 ' ' t I Item 68 69 70 7 1 72 73 74 75 76 77 78 • Barracks II Subdivision Phases 105 &106 E ' E f t fC t f ngmeer s s 1ma e o ODS rue IOD Description Unit Estim ated Uni t Price Total Ouantitv Sanitary Sewer Construction Items 6" PV C Sewer Line -D3034 -Stru ctu ral Bac kfi ll , co mpl ete in pl ace LF 696 $ 20.00 $ 13,920.00 6 " PV C Sewer Li ne -ASTM D-22 41 -Structural Bac kfill , complete in pl ac e LF 20 $ 22 .00 $ 440.0 0 8" PVC Sewer Li ne -D3034 -Stru ctural Bac kfi ll , co mpl ete in pl ace LF 1,3 93 $ 24 .00 $ 33 ,432 .00 6" C leanout, co mpl ete in place EA 2 $ 750 .00 $ 1,500 .00 4" Sewer Service-Sin gle (avg. lengt h = 4ft), co mplete in place EA 4 $ 300.00 $ 1,200 .00 4" Sewer Serv ice-Double (avg length = 4 ft ), complete in place EA 19 $ 40 0 .00 $ 7,600 .00 4" Sewer Service-S in gle (avg length = 48 ft ), complete in place EA 5 $ 850.00 $ 4,2 50.00 4 " Sewer Service-Double (avg length = 48 ft), complete in place EA 27 $ 950 .00 $ 25,650.00 Tie-In to Exi sti ng 8" PV C Sewer Lin e, compl ete in pl ace EA I $ 1,000 .00 $ 1,000.00 Concrete Manhole -4' Di a. -co mpl ete in pl ace EA 8 $ 2,800 .00 $ 22 ,400 .00 TV Test ing and Inspection, complete in pl ace LF 2,109 $ 2.00 $ 4,2 18 .00 Sanitary Sewer Construction Items Subtotal $ 115,610.00 General Items Subtotal $ 73,270.00 Street Construction Concrete Pavement Items Subtotal $ 757 ,831.10 Storm Sewer Construction Items Subtotal $ 292 ,563.00 Water Construction Items Subtotal $ 207,268.00 Sanitary Sewer Construction Items Subtotal $ 115,610.00 TOTAL CONSTRUCTION $ 1,446,542.10 P-12327 SCHULTZ ENGINEERING. LLC. Page 4 of 4 DEVELOPMENT PERMIT PERMIT NO. DP 14-82 CITY OF COLU:GE STAllON P/11111JJirt, & l>m::lo/mmt .Sn.>im FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: The Barracks 11 Section 105 & 106 DATE OF ISSUE: 5/22/2014 OWNER: Heath Phillips Investments , LLC 3302 General Parkway College Station, Tx 77845 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: Terminus of Deacon Dr. DRAINAGE BASIN: Bee Creek Trib. "B" VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4 . Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City , State , and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents, asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Conditions :*** TCEQ PHASE II RULES IN EFFECT*** I, ________________ , the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact / 51 ~ f:'o1 1~ , the Public Works Inspector assigned to this project 24 hours pr ior to beginning construction for scheduling required Inspections. V4L I-5 /2z //<I Date1 I Drainage Report for The Barracks II Subdivision Phases 105 & 106 College Station, Texas April 2014 Owner/Dev eloper: Heath Phillips Investments , LLC 3302 General Parkway College Station, TX 77845 Prepared By: Schultz Engineering, LLC - TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 Drainage Report -Executive Summary The Barracks II Subdivision, Phases 105 & 106 College Station, Texas ENGINEER SCHULTZ ENGINEERING, LLC. P.O . Box 11995 College Station, Texas 77842 Phone: (979) 764-3900 Fax: (979) 764-3910 O\VNERIDEVELOPER Heath Phillips Investments, LLC 3302 General Parkway College Station, TX 77845 Phone: (979) 690-5000 GENERAL DESCRIPTION AND LOCATION This project consists of the development of Phases 105 & 106 of the Barracks II Subdivision in College Station. Phases 105 & 106 are townhouse residential developments , which will include the construction of utility and roadway infrastructure. Location : Description : • Area : • Proposed Land Use : • #of Lots: • Existing Land Use : • Land Description : Primary Drainage Facility: Flood H azard Information: FEMAFIRM: Floodplain: Phases 105 & 106 are located northeast of Phases 103 & 104 and north of Phase 102 of the Barracks II Development. The Barracks II Subdivision is a 108-acre development located midway between Rock Prairie Road and Cain Road in south College Station. It is bounded on the west by Holleman Drive South and on the east by Old Wellborn Road. 13.14 Acres Townhouse Residential 80 lots Vacant The terrain slopes generally towards the north. Tributary B.3 of Bee Creek #48041 C0305F, Dated April 2 , 2014 None of this phase of the development lies within the floodplain. HYDROLOGIC CHARACTERISTICS The existing site is cleared. The elevations range from 309 to 295, sloping generally in a northerly direction. The runoff will be directed to the roadways and the proposed storm sewer system & concrete flumes will discharge into the existing stream and the existing detention facilities on Lot 1, Block 28 Phase 300 of The Barracks II Subdivision. Ultimately, this runoff flows into Tributary B .3 of Bee Creek. GENERAL STORMWATER PLAN The drainage plan for this development will involve the installation of storm sewer pipes and inlets , which will collect and convey the runoff into the existing storm sewer system and then to the existing detention pond. This development will also involve the installation of concrete flumes along Travis Cole A venue, which will collect and convey the runoff into the existing stream and then to the existing detention pond. The runoff that is collected by the existing detention ponds will be discharged into tributary B.3 of Bee Creek. The detention pond analysis and design for this phase is covered under the drainage report titled, "The Barracks Detention Facility Design City of College Station, Texas, Dated July 2012" prepared by Kimley-Hom and as modified in September 2013 by a revised design prepared by Kimley-Hom. COORDINATION & STORMWATER PERMITTING This project has a Notice of Intent filed with the Texas Commission for Environmental Quality. No other permits are anticipated for this project. DRAINAGE DESIGN General Information : Street Design: Tc Methodology: Tc Minimum: D esign Storm Event: Pipe Materials: Manning 's n Values: Runoff Coefficients: Design Constraints: Stormwater runoff from Phases 105 & 106 of the subdivision will be collected by a storm sewer system and will ultimately discharge into tributary B3 of Bee Creek or into the existing stormwater detention pond. The location of the drainage areas for evaluation of the gutter depth check, inlet sizing, pipe evaluation and channel sizing are shown on Exhibit A & B. Refer to Exhibit B for the locations of the inlets, storm sewer pipes and concrete flumes. Armored Avenue: Standard Cross-Section (3% cross-slope, 27' B-B Residential Roadway) Lay down curb and gutter on residential streets Travis Cole Avenue: Street Cross-Section (2% full cross-slope, 27" B-B) Lay down curb and gutter General Parkway & Tang Cake Drive: Collector Street Cross-Section (3% cross-slope, 38' B-B) Standard Curb and gutter Deacon Drive West: Collector Street Cross-Section (3% cross-slope, 48' B-B) Standard Curb and gutter Concrete Pavement Standard recessed curb inlets (5', 10', & 15 ' in length) TR55 10 Minutes 10 year design storm & 100 year analysis for residential and collector streets & storm sewer Class III RCP, Profile Gasket in accordance with ASTM C443 , ASTM C76 and Corrugated HDPE Storm Sewer Pipe with smooth interior 0.013 for pipes 0.018 for Streets 0.75 for developed lots 0.45 for undeveloped land Max. water depth in gutter: 4.5 " or 0.375' for the 10 year design storm for residential and collector streets Design Software: D esign Results: Detention Analysis: Applicable Exhibits: CONCLUSION Min. pipe flow velocity: 2.5 fps Max. pipe flow velocity: 15 fps 100-yr storm runoff maintained within the ROW (3" above curb) 25% reduction of cross-sectional area of pipes less than 24" in diameter Min. l ' freeboard for the 10 year design storm depth of flow Excel Spreadsheets, Hydraflow Express Extension for AutoCAD Civil 3D 2013, & Autodesk Civil 3D Storm Sewer Analysis. ·The software was used to compute pipe capacities, flow rates and velocities, compute hydraulic grade line elevations, headwater elevations , gutter depth & inlet sizing . The requirement for a 25% reduction in cross sectional area of pipes 24" in diameter or less is achieved by using internal pipe diameters that are less than the standard diameter. The 24" diameter pipe areas were reduced by 25% and a 20.6" diameter pipe was used in the analysis and the 18" diameter pipe areas were reduced by 25% and a 15 .6" diameter pipe was used in the analysis. The data presented in the Appendices indicates the gutter depth, inlet sizing , pipe sizes and channel sizing is in accordance with the requirements of and the City of College Station. The stormwater runoff from the Barracks II Subdivision was previously studied and detention ponds were designed for the entire development including this phase. See the drainage report titled, "The Barracks Detention Facility Design City of College Station, Texas, Dated July 2012" and as modified in September 2013 by a revised design prepared by Kirnley-. Exhibit A -Drainage Area Map Exhibit B -Drainage Plan Appendix Al -Drainage Area Summary Appendix A2 -Tc Calculations Appendix Bl -Depth of Flow in Gutter Appendix B2 -Storm Sewer Inlet Summary Appendix Cl -Storm Sewer Pipe Summary Appendix C2 -Concrete Flume Summary Appendix D -Technical Design Summary The storm sewer, inlets & channel drainage system for Phases 105 & 106 of the Barracks II Subdivision will function within the requirements and restrictions of the BCS Design Guidelines. CERTIFICATION I, Joseph P . Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for The Barracks II, Phases 105 & 106, was prepared by me in accordance with the requirements of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits required by any and all state and federal regulatory agencies for the proposed drainage improvements have been issued. EXHIBIT A DRAINAGE AREA MAP APPENDIX Al DRAINAGE AREA SUMMARY APPENDIXA1 Barracks II Phases 105 & 106 ea Summa~ Drain age Ar Area# The Ra11onal Method : Q=CIA Q =Flow (els) A= Area (acres) C = Runoff Coeff. 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 118 119 120 121 122 123 124 125 126 127 128 129 130 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 I = Rainfall Intensity (in/hr) Brazos County: Area, A c le (acres) (min) 2.52 0.55 27.0 0.47 0.75 10 .0 0.21 0.75 10.0 0.43 0.75 10 .0 0.29 0.75 10.0 0.08 0.75 10.0 0.08 0.75 10.0 1.22 0.65 25 .0 0.4 7 0.75 10.0 0.45 0.75 10 .0 0.37 0.75 10.0 0.48 0.75 10.0 0.66 0.75 10.0 0.23 0.75 10 .0 0.22 0.75 10.0 0.84 0.75 10 .0 0.29 0.75 10.0 0.42 0.75 10 .0 0.39 0.75 10.0 0.97 0.75 10.0 0.28 0.75 10.0 0.27 0.75 10.0 0.59 0.75 10.0 0.43 0.75 10.0 0.1 9 0.75 10.0 0.65 0.75 13.0 0.06 0.75 10.0 0.54 0.65 16.0 0.45 0.75 10.0 0.47 0.75 10.0 0.23 0.75 10 .0 0.39 0.65 10.0 0.37 0.75 10.0 0.19 0.65 10 .0 0.11 0.75 10 .0 0.20 0.75 10.0 0.35 0.75 10 .0 0.53 0.75 10.0 0.23 0.75 10 .0 0.30 0.75 10 .0 0.16 0.75 10 .0 0.28 0.75 10.0 0.05 0.75 10.0 0.33 0.75 10.0 0.29 0.75 10.0 0.02 0.75 10.0 0.4 2 0.75 10 .0 0.02 0.75 10.0 0.37 0.75 10.0 0.12 0.75 10.0 I = b I (le+d)" le= Time of concentration (min) 10 year storm b = 80 d = 8.5 e = 0.763 10 year storm 100 year storm 1,, (In/hr) 5.251 8.635 8.635 8.635 8.635 8.635 8.635 5.489 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 7.699 8.635 6.969 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 8.635 = c;i,i (Cfs) 7.28 ~3.04 1.36 2'l8 1.88 ,o.52 .; 0.52 4.35 ':!', 3.04 h 2.9f . 2.40 3.11 ' ;; 4.27 1.49 1.42 ;5.44. ·"· 1.88 " 2.72 ,. 2.53 ' 6.28 ., :' 1.81 1.75 3.82 ,.. 2.78 ;,, -1.23 ,. 3.75 0.39 ,{ 2.45 2.91 .~ "' 3.04 1.49 '•' 2.19 '' 2.40 ' 1.07 , .0.-71 : " f>1.Jil· 2.27 3.43 ,; 1.49 .,, 1.94 1.04 1.81 0.32 .. 2.14 .1.81i. 0.13' •.· 2.72 0.13 '''. 2.40 0.78 ,.': 1, = u1v•so) L =Length (fl 1,,. (In/hr) 7.163 11 .639 11 .639 11 .639 11.639 11.639 11 .639 7.477 11.639 11.639 11.639 11 .639 11 .639 11.639 11 .639 11 .639 11 .639 11.639 11 .639 11 .639 11.639 11.639 11 .639 11 .639 11.639 10.400 11 .639 9.434 11 .639 11.639 11 .639 11.639 11 .639 11 .639 11 .63 9 11.639 11.639 11 .639 11.639 11 .639 11 .639 11 .639 11 .639 11.639 11 .639 11 .639 11 .639 11 .639 11.639 11 .639 V = Veloclty (ft/sec) JOO vear storm b = 96 d = 8.0 e = 0.730 a1iio (ds) •. 9.93 4.10 1.83 •1 3.75 2.53 '} -0.70 - o.7o 5.93 4.10 > 3.93 3.23 4.19 ,. 5.78 " 2.01 1.92 7.33 · 2.53 ." 3.67 3.40 8.47 2.44 • 2.36 5.15 3.75 1.66 5.07 0.52 3.31 3.93 4.10 • 2.01,fr 2.95 3.23 1.44 I 0.96 1.75 3.06 ., . 4.63 2.01 - 2.82 ' 1.40 2.44 0.44 ·2.ee • •'2.53'• 0.17 ° 3.67 .. o.1i >. -3.23 '°1.05 APPENDIXA2 Tc CALCULATIONS T _, = lime of concentration for sheet flow (hr) L = length (ft) n = Manning 's roughness P2 = 2-yr rainfall intensity (in/hr) for Brazos Co.= 4 .5 in/hr S = slope (Ml) Sheet Flow Drainage Length Slope T"'"' Area# ft % min . 101 0.21'" 200 ~ ·" 2 • 21 108 ,,.\W.24 ., 175 1 25 127 '0.24 '' ~ 75 " 13 129 0.24 1 00 16 Length ft V•" 280 .;..., . AppendixA2 TIME OF CONCENTRATION COMPUTATIONS Barrac ks II .Phases 105 & 106 Concent rated Flow Slope Velocity % ft/sec 2 '1.0 ""'" o.p '"'"'•· ... !E> 0.0 0.0 - T R-55 M ethod MINIMUM Tc= 10 MINUTES V_.. =water velocity in ditch (ft/sec) S = slope of ditch (ft/ft) v, ... "' =water velocity in gutter (ft/sec) S = slope of gutter (ft/ft) Gutte r Flow -1 T ...,,._. Length Slope Velocity min ft % ft/sec 5 ". 0.0 0 '! ~;r ·. ,:,.,.,;; : '4 0.0 .> 0 : •'":'" .'0.0 0 ''"··'. 0.0 T - min 0 0 0 0 Length ft "' 284 ,•.50 50 100 f T =travel time throug h ditch or gutter (min) L = length of travel path (ft) V = velocity (fVsec) Gutter Flow -2 Slope Velocity T-Total % fVsec min min 1.25 \~ 3:0 ;• 2 27 C· ">'' 1'·.'.· .~ '-'''0 •3.0 Gt!. 0 25 "' 1 . 3.0 0 13 3.0 16 Tc Design min ' 27 '"'"''25 •13 16 APPENDIX Bl DEPTH OF FLOW IN GUTTER APPENDIXB1 Barracks II Phases 105 & 106 Depth of Flow in Gutter (Refer to Exhibit B for Gutter Locations} Gutter/Inlet location S104A S105A 8105 8 S107A S108A $1088 S109A S110A S111A 8 111 B $114A 8117 A 511 8A 9119A 5119 B 5120A $120 B 5125A 5126A 81268 S 127A 5 127 B T201 A T201 B T203A T203B T204A T204 B T205A T205B T206A T206 B A /vea I (acres) 104 0.430 106 0.080 105 0.290 108 1.220 113 0.660 111 0.370 109 0.470 108 1.220 110 0.450 115 0.220 114 0.230 11 7 0.280 118 0.290 122 0.280 119 0.420 120 0.390 123 0.270 126 0.190 128 0.060 125 0.430 127 0.650 129 0.540 209 0.530 210 0.230 207 0.200 208 0.350 205 0.190 206 0.110 203 0.390 204 0.370 201 0.470 202 0.230 nansverse <Crown> slooe rtvm 27 street • 0.0300 38 street • 0.0300 0.75 0.75 0.75 0.65 0.75 0.75 0.75 0,65 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0 .75 0.75 0.75 0.65 0.75 0.75 0.75 0.75 0.65 0.7 5 0.65 0.75 0.75 0.75 Slope (tuft) 0.0080 0.0080 0.0080 0.0183 0 .0060 0.0115 0.0115 0.0115 0.0115 0.0060 0.0060 0.0080 0.0080 0.0060 0.0080 0.0080 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0240 0.0060 0.0293 0.0100 0.0060 0.0110 0.0100 0.0334 0.0060 .. (min) 10.000 10.000 10.000 25.000 10.000 10.000 10.000 25.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 13.000 16.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 Straight Crown Flow (Solve d to find actual depth of flow in gutter yl : Q • 0.56• (z/n)• s '12 • y0 c> y= (Q/ (0.56"' (z/n) • 5 112)},,. n • Roughness Coefficient • 0.018 S • StreeVGutter Slope (ft/R) y • Depth of now at Inlet (ft) z • Reciprocal of crown slope: 2T street.. 33 1,. (in/hr) 6.327 6 .327 8.327 3.881 6.327 6.327 6.327 3.881 6 .327 6 .327 6.327 6.327 6.327 8.327 6 .327 6 .327 6.327 6.327 6 .327 6.327 5.587 5.017 6.327 6.327 6.327 6.327 6.327 6.327 6.327 6 .327 6 .327 6 .327 a., (cfs) 2.78 0.52 1.88 4.35 4.27 2.40 3.04 4 .35 2.91 1.42 1.49 1.81 1.88 1.81 2.n 2.53 1.75 1.23 0.39 2.78 3.75 2.45 3.43 1.49 1.30 2.27 1.07 0.71 2.19 2.40 3.04 1.49 10..year storm 011 +bypass l---''"'-T"'"'---1 (els) (ft) (In) 0.269 3.22 0.143 1.72 0.232 2.78 0.272 3.26 4.27 0.333 3.99 4.87 0.309 3.71 0.259 3.11 0.297 3.56 3.47 0.272 3.27 1.61 0.231 0.224 2.69 0.229 2 .74 0.232 2.78 1.81 0.241 2.90 2.72 0.266 3.19 2.53 0 .259 3.11 1.75 0.238 2.88 0.209 2.50 0.135 1.63 0.283 3.40 3.88 0.320 3.84 2.45 0.270 3.24 0.307 3.68 0.173 2.07 0.213 2.55 0.195 2.34 0 .180 2.16 0 .170 2.04 0 .231 2.n 0.243 2.92 0.212 2.55 0.224 2.69 Standard Curb-1Q..yr storm max design depth-4.5" v (fps) 2.32 1.52 2.10 3.53 2.31 1.50 2.71 2.97 2.35 1.50 1.78 2.08 2.10 1.87 2.30 2.26 1.85 1.70 1.27 2 .08 2.20 2.01 2.19 2.99 1.n 3.58 1.98 1.48 2.45 2.43 4.05 1.78 Barracks II Phases 105 & 106 Depth of Flow in Gutter (Refer to Exhibit B for Gutter Locations) S104A 104 0.430 S105A 106 0.080 51058 105 0.200 S107A 108 1.220 S108A 113 0.660 5108 B 111 0.370 5109A 109 0,470 8110A 108 1.220 8111A 110 0.450 5111 8 11 5 0.220 S114A 114 0.230 S 117A 117 0.280 S118A 118 0.290 S119A 122 0.280 8 11 98 119 0.420 S120A 120 0.390 51208 123 0.270 S125A 126 0.190 S126A 128 0.060 51268 125 0.430 S127A 127 0.650 $1278 129 0.540 T201 A 209 0.530 1201 B 210 0.230 T203A 207 0.200 T203B 208 0.350 T204A 205 0.190 T204 B 206 0.110 T205A 203 0.390 T205 B 204 0.370 T206A 201 0.470 T206B 202 0.230 Transverse (Crown> s lope (ft/ft) 27 street • 0 .0300 38 street = 0 .0300 c 0.75 0.75 0.75 0.65 0.75 0.75 0.75 0.65 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.65 0.75 0.75 0.75 0.75 0.65 0.75 0.65 D.75 0.75 0.75 Slope (ft/ft) 0.0080 0.0080 0.0060 0.0183 0.0060 0.0115 0.0115 0.0115 0.0115 0.0060 0.0060 0.0060 0.0080 0.0060 0 .0080 0.0080 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0060 0.0240 0.0060 0,0293 0.0100 0.0060 0.0110 0.01<>0 0.0334 0.0060 {min) 10.000 10.000 10.000 25.000 10.000 10.000 10.000 25.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 13.000 16.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 Stra ight Crown Flow {Solved to find actual depth of flow In gutter yl· Q • 0 .56 • (z/n) • s 112 • ym o:> y={Q/ (O.S&• (z/n)• S 112)}w n •Roughness Coerticient • 0.018 S • StreeVGutter S lope (ft/ft) y • Depth of now at inlet (ft) z • Reciprocal of crown s lope: 2Tstreet• 33 '·· {infhr) 11.639 11.639 11 .639 7.4n 11 .639 11 .639 11 .639 7.4n 11.639 11.639 11.639 11 .639 11 .639 11 .639 11 .639 11.639 11.639 11.639 11.639 11 .639 10.400 9.434 11.639 11 .639 n .639 11 .639 11 .639 11 .639 11 .639 11 .639 11 .639 11 .639 APPENOIXB1 100-year stOfm a,. 0 1" + bypass y,.. Allowable >--lfl_) _~-1;-.,--t Depth (cfs) (els) 3.75 0.300 3.60 8" 0.70 0.160 1.92 8" 2.53 0,259 3.11 8" 5,93 0.305 3.66 8" 5.76 5.76 a.Jn 4.47 8" 3.23 7.18 0.358 4.29 8" 4.10 0.290 3.48 8" 5.93 0.333 4 .00 8" 3.93 5.13 0.315 U.78 8" 1.92 2.31 0.264 3.17 8" 2.01 0.251 3.01 8" 2.44 0.256 3.07 8" 2.53 0.259 3.11 8" 2.44 2.44 0.270 3.24 8" 3.67 3.67 0.298 3.57 8" 3.40 3.41 0.290 3.48 8" 2.36 2.36 0.266 3,20 8" 1.66 0.233 2.80 8" 0.52 0.151 1.82 8" 3.75 0.317 3.80 8" 5.07 5.32 0.361 4.34 8" 3.31 3.31 0.302 3.63 8" 4.63 0.343 4.11 8" 2.01 0.193 2.32 8" 1.75 0.238 2.86 8" 3.06 0.218 2.62 8" 1.44 0.201 2.41 8" 0.96 0.190 2.28 8" 2.95 0.259 3.10 8" 3.23 0.272 3ZT 8" 4.10 0.238 2.85 8" 2.01 0.251 3.01 8" v (fps) 2.50 1.64 2.26 3.82 2.49 1.51 2.92 3.21 2.37 1.65 1.92 2.24 2.26 2.01 2.48 2.43 1.99 1.83 1.37 2.24 2.33 2.17 2.36 3.22 1.85 3.86 2.13 1.59 2.65 2.61 4.36 1.92 Top of Curb 304.67 305.12 305.12 304.70 303.74 303.74 305.36 305.38 303.74 303.74 304.29 303.35 303.35 301 .98 301 .98 301 .98 301.98 302.05 301 .52 301 .52 301 .52 301.52 302.63 302.63 302.91 302.91 304.06 304.06 304.32 304.32 304.35 304.35 100-year storm Gutter Gutter ROW Freeboard FL Runoff, Elev. Elev. ft. 304.17 304.47 304.90 0.43 304.62 304.78 305.35 0.57 304.62 304.88 305.35 0.47 304.20 304.51 304 .93 0.42 303.24 303.61 303.97 0.36 303.24 303.60 303.97 0.37 304.86 305.15 305.59 0.44 304.86 305.19 305.59 0.40 303.24 303.56 303.97 0.41 303.24 303.50 303.97 0.47 303.79 304.04 304.52 0.48 302.85 303.11 303.58 0.47 302.85 303.11 303.58 0.47 301.48 301 .75 302.21 0.46 301 .48 301 .78 302.21 0.43 301 .48 301.n 302.21 0.44 301.48 301.75 302.21 0.46 301 .55 301 .78 302.28 0.50 301.02 301 .17 301 .75 0.58 301 .02 301 .34 301 .75 0.41 301 .02 301 .38 301 .75 0.37 301.02 301.32 301.75 0.43 302.13 302.47 302.86 0.39 302.13 302.32 302.86 0.54 302.41 302.65 303.14 0.49 302.41 302.G3 303.14 0.51 303.56 303.76 304.29 0.53 303.56 303.75 304.29 0.54 303,82 304.08 304,55 0.47 303.82 304.00 304.55 0.46 303.85 304.09 304.58 0.49 303.85 304.10 304.56 0.48 STAFF REVIEW COMMENTS N0.1 Project: The Barracks Ii Ph 105 & 106 (FP) (14-00900082) PLANNING 1. Rename "Approval of Planning & Zoning Commission " to "Certificate of Planning & Zoning Commission " 2. Add Volume & Page for Phase 103 & 104. 3. Community Parkland dedication and development fees of $50 ,000 (80 lots x $625) will be due prior to filing of the final plat. Reviewed by : Jenifer Paz Date : March 17 , 2014 ENGINEERING COMMENTS NO. 1 1. Please show the Private Drainage Easements across Parkland Tract 8 adjacent to this plat. 2 . Please add a note stating that this site lies within the Steeplechase Sanitary Sewer Impact Fee Area . 3. Lines surrounding parkland that has already been dedicated should be the bold property boundary line . Also , please add the hatching for the parks to your legend . 4 . The drainage easements between the lots and through parkland tract 9 should be private . 5. Please add a note stating that the private drainage easements will be maintained by the HOA. 6. The property line on block 20 between lots 5 & 6 is not labeled . Construction Plan Comments 7 . The street sign located south of the Deacon/General Parkway intersection should be located on the west side for a future stop sign along General Parkway . 8. Stop bars are only necessary at intersections with Minor Collectors and larger; the stop bar at the intersection of Travis Cole and Armored Avenue can be removed . 9. The raised pavement markers along the 8" white stripe should be Type 11-C-R. 10 . Please provide a detail for backfill for HOPE pipes . 11 . Please provide steel casing for the 8" water line crossing under Deacon Drive . 12. FYI-there may be additional sidewalk ramps required for street crossings . We will send any comments regarding the crossings separately . Reviewed by : Danielle Singh Date : March 24 , 2014 ADDRESSING 1. Addresses for this project will be verified and distributed after the final plat has been approved and filed at the Brazos County Courthouse . 2 . The proposed street names have been preliminarily approved and will be re-verified prior to filing any plats to ensure no duplicate street names are being created within Brazos County . 3. Block Ranges : 3100 Airborne Ave@ 3100 Travis Cole Ave 3200 Travis Cole Ave 3300 Travis Cole Ave @ 200 Armored Ave 3400 General Pkwy @ 100 Tang Cake Dr Reviewed by : Robin Krause , Permit Technician Date : March 14 , 2014 CITY OF C OLLEG E STAT! Home a/Texas A&M University• MEMORANDUM March 24 , 2014 / TO : Heath Phillips , via ; heath superiorstructures@yahoo .com V FROM : Jenifer Paz , Staff Planner SUBJECT: THE BARRACKS II PH 105 & 106 (FP) Staff reviewed the above-mentioned final plat as requested . The following page is a list of staff review comments detailing items that need to be addressed . If all comments have been addressed and the following information submitted , your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers , 1101 Texas Avenue . One (1) 24 "x36 " copy of the revised final plat ; One (1) 24 "x36 " grading and erosion control plan; Thirteen (13) 11 "x17 " copies of the revised final plat ; Parkland Dedication in the amount of $50 ,000 must be submitted prior to the filing of the final plat ; One ( 1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to : pdsdigitalsubmittal@cstx .gov . Upon receipt of the required documents for the Planning & Zoning meeting , your project will be considered formally filed with the City of College Station . Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Comm ission meet ing . Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid . Once your item has been scheduled for the P&Z meeting , the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting . http ://www .cstx .gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979 .764 .3570 . Attachments : Staff Review Comments / PC : Joe Schultz , Schultz Engineering LLC , via ; joeschultz84@verizon .ne tV P&DS Proj ect No . 14-00900082 Planning & De velopment Servi.ces P.O. BOX 9%0 • 110 I TEXAS .AVENUE • COLLEGE STAT ION • TEXAS • 77 842 TEL 979.764.35 70 ·FAX. 979.7 6 4.34 % cstx.gov/devservices .. RESPONSE TO STAFF REVIEW COMMENTS NO. 1 Project: The Barracks Ii Ph 105 & 106 (FP) (14-00900082) PLANNING ~- 12 · Rename "App roval of Planning & Zoning Commission " to "Certificate of Planning & Zoning Commission" The certification title has been changed. Add Volume & Page for Phase 103 & 104. The Volume and Page for Phase 103 & 104 has been added to the plat. 3. Community Parkland ded ication and development fees of $50,000 (80 lots x $625) will be due prior to fil ing of the final plat. Noted. ;ENGINEERING COMMENTS NO. 1 I 1. Please show the Private Drainage Easements across Parkland Tract 8 adjacent to this plat. J The Private Drainage Easements across Parkland Tract 8 have been added to the plat . ./2. Ple ase add a note stating that this site lies within the Steeplechase Sanitary Sewer Impact Fee Area . Note #9 has been added to the Plat. j 3. Lines surround ing parkland that has already been dedicated should be the bold property boundary line . Also , please add the hatching for the parks to your legend. Parkland hatches have been added to the Legend and existing parkland boundaries within / 105and106 are shown as a bold line. h . The drainage easements between the lots and through parkland tract 9 should be private. Drainage Easements have been revised to Private. /5. Please add a note stating that the private drainage easements will be maintained by the HOA. / Note #10 has been added to the plat. 6. The property line on block 20 between lots 5 & 6 is not labeled. The property line between Lots 5&6, Block 20 has been labeled. onstructi on Plan Comments The street sign located south of the Deacon/General Parkway intersection should be located on the west side for a future stop sign along General Parkway. j The sign located south of Deacon/General intersections has been relocated. 8. Stop bars are only necessary at intersections with Minor Collectors and larger; the stop bar at the intersection of Travis Cole and Armored Avenue can be removed. / The stop bar at Travis Cole and Armored Avenue has been removed. V 9. The raised pavement markers along the 8" white stripe should be Type 11-C-R. / The ca/louts for raised pavement markers along the 8" white stripe have been revised. v'10 . Please provide a detail for backfill for HOPE pipes . A backfill detail for HDPE pipe has been added to sheet 12 of 26. }),1. Please provide steel casing for the 8" water line crossing under Deacon Drive . / Steel Casing has been added to the water crossing under Deacon Drive. v' 12. FYI -there may be additional sidewalk ramps required for street crossings. We w ill send any comments regarding the crossings separately. ADA ramps have been added to cross General Parkway south of the Tang Cake intersection. ,. . ADDRESSING 1. Addresses for this project will be verified and distributed after the final plat has been approved and filed at the Brazos County Courthouse. Noted. 2 . The proposed street names have been preliminarily approved and will be re-verified prior to filing any plats to ensure no duplicate street names are being created within Brazos County. Noted. 3. Block Ranges : 3100 Airborne Ave @ 3100 Travis Cole Ave 3200 Travis Cole Ave 3300 Travis Cole Ave @ 200 Armored Ave 3400 General Pkwy @ 100 Tang Cake Dr The Signage Plan has been updated with this information. Please note the following changes to the plans: Inlets 117, 118, 119 & 123 have been changed to 5' inlets and storm pipes 201 & 202 have been changed to 18" HOPE pipes due to the excess capacity that is available in the previous design for these structures. The 12" Cross at the intersection of Deacon Drive and General Parkway has been changed to a 12"x8" Tee. An additional 12" Tee was located across General Parkway to better provide water access to the future phase 401. A Fire Hydrant (#4) was added at the 90 degree turn in Travis Cole Avenue. This was to better provide fire hydrant access to the townhomes. Sewer line S-4 was moved to the other side of the townhomes on block 26. This was so that any future buildings in phase 400 placed at the building setback wouldn't be too close to sewer line S-4. All of these changes are reflected in the revised Engineer's Estimate attached to this submittal. APPENDIXB2 STORM SEWER INLET SUMMARY APPENDIXB2 Barracks II Phases 105 & 106 Storm Sewer Inlets in Sump - Design Analys i s In let Area# Inlet Type Q10 010 010 Q100 0100 0100* No . cfs ft. in . cfs ft. in . S105 106 10 0.5 2 0.072 0.86 0.70 0.087 1.05 S108 113 15 6.75 0.303 3.63 9.7 1 0.386 4 .63 S111 110 10 3.66 0.264 3.16 5.52 0.347 4 .16 S119 122 10 1.81 0.165 1.98 2.44 0.202 2.42 S 120 120 10 2.53 0.206 2.47 3.41 0.252 3.02 S126 128 10 0.39 0.059 0.71 0.52 0.072 0.87 S127 127 10 3.86 0.273 3.28 5.32 0.339 4 .06 T201 209 5 3.43 0.401 4 .82 4.63 0.490 5.88 T203 207 10 1.30 0.132 1.58 1.75 0.161 1.93 T204 205 10 1.07 0.116 1.39 1.44 0.142 1.70 T205 203 10 2.19 0.187 2 .25 2.95 0.229 2 .74 T206 201 10 3.04 0.233 2.80 4 .10 0.285 3.42 *ROW elevation is 8" above gutter line so 100-yr storm runoff is contained within ROW Assume 10% clogging for design AppendlxB2 Grate Inlet Design Summary Grate A c tual Des i gn Ag 10-Y ear Storm 100-Yea r Storm Inlet Grate Ag Cont rlbut Clogging Cal c ulatec Number Size i ng Area A., 0 10 Depth, y 0 100 Depth, y (ft') % 1tt21 (c fs) (ft) (in) (cfs) (ft) (in) S101 V-4430 Gutter Inlet 1.84 102 25 1.38 3.04 0.21 2.51 4 .10 0.38 4.56 S103 V-4430 Gutter In let 1.84 103 25 1.38 1.36 0.04 0.50 1.83 0.08 0.91 S104 V-4430 Gutter Inlet 1.84 104 25 1.38 2.78 0.18 2.10 3.75 0.32 3.82 APPENDIX 82 Barracks II Phases 105 & 106 Storm Sewer Inlets on Grade -Design Ana lysis Inlet Length Street 010 L 10 , ft. Bypass 0100 L 100, ft. Bypass No . ft. Slope cfs Desifi!n cfs cfs Design cfs S107 5 1.83% 4.35 16.88 2 .31 5.93 19.52 3.48 S109 10 1.15% 3.04 12.41 0 .16 4 .1 0 14.28 0.47 S110 10 1.15% 4.35 14.68 0.56 5.93 16.98 1.20 S114 5 0.60% 1.49 7.30 0.19 2.01 8.40 0.39 S117 10 0 .80 % 1.81 8 .73 0 .00 2.44 10.04 0 .00 S118 10 0.80% 1.88 8 .87 a.ob 2 .53 10 .21 0.00 S 125 5 0.60% 1.23 6 .67 0.10 1.66 7.68 0.25 Assume 10% clogging for design Se= Sx + (a/w )* Eo Eo= Ow/O = 1 -[ 1 - W /T]2·67 L=Kc*Q047*S0·3*(1 /(n *Se) )0·6 W = Width of Depressed Gutter (ft) = 2 Sx=Cross flow of Road Surface 0.03 T=Total Spread of water in gutter (ft) 12 .5 a=Gutter depression depth (ft}= 0 .33 n=Manning's Roughness Coefficient= 0 .018 Kc= 0 .6 Ow=Flow in w idth , W E=Efficiency of inlet or percentage of interception S=Longitudinal Slope Li=Curb opening le ngth Se= Sx + (a/w)* Eo 0.091412 Eo= Ow/O = 1 - [ 1 - W /T]2·67 0.372194 APPENDIX Cl STORM SEWER PIPE SUMMARY APPENDIXC1 Barracks II Phases 105 & 106 Storm Sewer Pipe Design Analysis (10 yr Storm) HG10 Depth Pipe Pipe Pipe Pipe No . Size Length Slope (inches) (feet) (%) Nonnal Deplh Surcharged Q10 V10 Depth HG10 V10 (els) (fps) (feet) Slope (fps) Downstream Top Pipe Structure Elev. FL Upslream Top Pipe HG10 Structure Elev. FL Elev. Below Gutter (feet) 101 18 80.1 0.30 3 .02 3.49 0.82 0.08% 1.71 5 103 30 5.03 302.00 5101 305.27 302.24 303 .18 1.61 102 24 13.5 0.30 7.27 3.57 1.44 0.10% 2.32 5103 305.03 301 .50 5 102 305.47 301 .55 303 .11 1.86 103 24 160.8 0.3 0 7 .92 4.43 1.26 0.12% 2.52 <---- 5 104 304.67 300.92 ~ 305.03 301.404 302.83 1.70 104 30 38.0 0.30 9 .67 3.33 1.74 0.06% 1.97 5105 305.12 300.21 5 104 304.67 300.322 302.08 2.09 105 30 93.5 0.30 11 .83 3.41 1.87 0.08% 2.41 5107 304.70 299.83 5 105 305 .12 300 .11 301.94 2.68 107 30 48.7 0.30 12.29 3.51 1.99 0.09% 2.50 5108 303.74 299.58 5107 304 .70 299 .73 301.73 2.47 108 30 42.0 0.30 14 .39 4.12 2.01 0.12% 2.93 5111 303.74 299.35 5108 303 .74 299.48 301.55 1.69 109 18 42.0 0.30 3.02 3.50 0.81 0.08% 1.71 5110 305.36 301 .05 5109 305.36 301 .17 302.09 2.77 110 24 197.4 0.30 5.42 4.03 1.31 0.06% 1.73 5111 303.74 299 .85 51 10 305.36 300.45 301 .61 3.25 111 36 93 .5 0.30 27.07 4.42 2.46 0 .16'Yo 3.83 5114 304.29 298 .47 5111 303.74 298 .75 301 .31 1.93 112 24 87.0 0.30 3.08 3.33 8 .93 0.02% 0.98 5114 304.29 299 .97 5112 303.99 300.24 301 .03 2.46 114 38 198.5 0.30 30.92 5.56 2.31 0.21 % 4.38 5 118 303.35 297 .78 5114 304.29 298 .37 300.84 2.95 115 24 31 .9 0.30 5.38 3.40 1.11 0.06% 1.71 5116 303.99 299.63 5115 303.16 299 .73 300.94 1.72 116 24 43.2 0.30 5.34 3.89 0.99 0.06% 1.70 5117 303.35 299.40 5116 303.99 299 .53 300.85 2.84 117 24 42.2 0.30 7 .10 4.25 1.25 0.10% 2.26 5118 303.35 298.78 5117 303.35 298 .9 300.24 2.61 118 2-36 172.0 0.30 38.28 3.51 2.40 0.33% 5.42 5120 301.98 297.16 5118 303 .35 297.875 299.94 2.91 11 9 18 42.2 0.3 0 4.45 3.96 1.11 0.18% 2.52 5 120 301 .98 298.66 5 119 301 .98 298.79 299.9 9 1.49 120 2-36 66.5 0.30 45.46 3.65 2.61 0.46% 6.43 5122 302.52 296.86 5 120 301 .98 297 .06 299.69 1.79 121 24 110.2 0.30 6.12 3.90 1.50 0.07% 1.95 5122 302.52 297.86 5121 302.24 298.19 299.61 2.13 122 2-38 127.7 0.30 50.54 3 .85 2.69 0.57% 7.15 5 125 302.05 296.38 5 122 302.52 296.76 299.44 2.58 123 18 96.4 0.30 3.77 3.71 1.17 0.13% 2.13 5 125 302.05 297.88 51 23 301 .80 298.17 299.31 1.99 125 2-36 91 .9 0.30 54 .63 4.02 2.76 0.67% 7.73 5127 301 .52 296.00 5 125 302.05 296.28 299 .08 2.47 126 18 52.2 0.30 3.06 3.46 1.18 0.08% 1.73 5127 301 .52 297.50 5126 301 .52 297.66 298.81 2.21 127 2-36 91 .7 0.30 60.21 4.49 2.70 0.81 % 8.52 5 129 301 .39 295.62 51 27 301 .52 295.9 298.71 2.31 128 18 112.0 0.30 2.86 3.42 1.01 0.07% 1.62 5 129 301 .39 297.12 5 128 301 .01 297.46 298.38 2.13 129 2-36 109.3 0.30 62.55 5.00 2.48 0.88% ass-5130 300.03 295.20 5 129 301 .39 295.82 298.22 2.67 130 2-38 32.3 0.30 62.55 5.79 2.14 0.88% 8 .85 OUT 298 .00 295.00 5130 300.03 295.1 297.57 1.98 201 24 142.3 1.00 4.90 5.10 0.74 0.05% 1.56 T202 304 .04 296.47 T201 302.63 297.9 298.81 3.52 202 24 18 .6 1.00 4.89 4 .95 0.76 0.05% 1.56 TOUT 292 .20 296 .20 T202 304.04 296.37 297.24 6.30 Notes 1. Friction losses and minor losses for 18" diameter pipe are computed as for a 15.6" diameter pipe which represents a 25% reduction in pipe flow area . 2. Friction losses and minor losses for 24" diameter pipe are computed as for a 20.8" diameter pipe which represents a 25% reduction in pipe flow area . APPENDIX C1 Barracks II Phas es 105 & 106 Storm Sewer Pi pe Design Analysis (100 yr Storm) Pipe Pipe Pipe Pipe No . Size Length Slope {Inches) (feet) (%) Nonnal Depth Surcharged 0100 V100 Depth HG100 V100 (els) (fps) (feet) Slope (fps) Downstream Top Pipe S tructure Elev. FL 101 18 80.10 0.30 4 .37 3 .50 1.30 0 .17% 2.47 5103 305.03 302.00 102 24 13.50 0.30 9.91 4.28 1.72 0.19% ~ 5103 305.03 301 .50 103 24 160.80 0.30 10.89 5.12 1.72 0.23% 3 .47 5104 304 .67 300.92 1D4 30 38.00 ~ 18.10 3.69 2.50 0.19% 3 .69 5105 305.12 300.21 ----105 30 93 .50 0.30 18.98 3 .87 2.50 0.21% 3 .87 5107 304.70 299 .83 107 30 48.70 0.30 19.85 4.04 2.50 0.23% 4.05 5108 303.74 299.58 ----108 30 42.00 0.30 20.51 4.20 2.50 0.25% 4.18 5111 303.74 299.35 109 18 42.00 0.30 6 .10 4.59 1.30 0.34% 3.45 5110 305.36 ~ 110 24 197.40 0.30 8.54 4.13 1.72 0.14% 2.72 5111 303 .74 299.85 111 36 93.50 0.30 33 .83 4.79 3.00 0.26% 4.79 5114 304.29 298.47 112 24 87.00 0.30 4.20 3.37 1.72 0.03 % 1.34 5114 304.29 299 .97 114 38 198.50 0.30 38.22 5.73 3.00 0.33% 5 .41 5118 303 .35 297.78 __ 1_15 __ 24 31 .90 0.30 7.37 3.49 1.72 0.11% 2.35 5116 303.99 299 .63 116 24 43.20 0.30 7.72 3.93 1.72 0.12% 2.46 5117 303.35 299 .40 117 24 42.20 0.30 10.92 4.72 1.72 0.23% 3.48 5118 303.35 298.78 118 2-36 172.00 0.30 50 .01 3.64 3.00 0.56% 7.08 5120 301 .98 297.16 119 18 42.20 0.30 5.75 4.36 1.30 0.30% 3.26 5 120 301 .98 298.66 120 2-36 66.50 0.30 57 .49 4 .07 3.00 0.74% 8.14 5122 302.52 296 .86 12 1 24 110.20 0.30 8.41 4.00 1.72 0.14,,o 2.6 8 5122 302.52 297.86 122 2-36 127.70 0.30 65.22 4.61 3.00 0.95% 9 .23 5125 302.05 296.38 123 18 96.40 0.30 5 .16 3.89 1.30 0.24% 2.92 5125 302.05 297.88 125 2-36 91 .90 0.30 71 .43 5.05 3.00 1.14% 10.11 5127 301 .52 296.00 126 18 52.20 0.30 5.24 3.95 1.30 0.25% 2.97 5127 301 .52 297.50 __ 1_27 __ 2-36 91.70 0.30 78.65 5.56 3.00 1.38% 11 .13 5129 301 .39 295:62 128 18 11 2.00 0.30 3 .91 3.50 1.30 0.14% 2.21 ------------5129 301 .39 297.12 129 2-36 109.30 0.30 82.21 5.84 2.95 1.51 % 11 .64 5130 300.03 295.20 130 2-36 32 .30 0.30 82.17 6 .44 2.54 1.51% 11 .63 OUT 298.00 295.00 201 24 142.30 1.00 6 .6 0 5.35 0.91 0.08% 2.10 T202 304.04 296.47 202 24 16.60 1.00 6.60 5.34 0.90 0.08% 2.10 TOUT 292.20 296.20 Notes 1. Friction losses and minor losses for 16" diameter pipe are computed as for a 15.6" diameter pipe which represents a 25% reduction in pipe flow area . 2. Friction lo sses and minor losses for 24" diameter pipe are computed as for a 20.B" diameter pipe which represents a 25% reduction in pipe flow area . Ups tream Top Pipe Structure Elev. FL 5101 305.27 302.24 5102 30 5.47 301 .55 5103 305.03 301.404 5104 304.67 300.322 5105 305.12 300.11 5107 304.70 299.73 5108 303 .74 299.48 5 109 305.36 301.17 5110 305.36 300.45 51 11 303.74 298.75 5112 303.99 300.24 5114 304 .29 298.37 5115 303.16 299.73 5116 303.99 299.53 5117 303.35 298.9 5118 303.35 297.675 5119 301.98 298.79 5120 301 .98 297.06 5121 302.24 298 .19 5122 302.52 296 .76 5123 301 .80 298.17 5125 302.05 296.28 5126 301 .52 297.66 5127 301 .52 295.9 5128 301 .01 297.46 5129 301 .39 295.62 5130 300.03 295.1 T201 302 .63 297 .9 T202 304 .04 296.37 HG10 0 Elev. 305.57 305.43 305.21 304 .67 305.20 304.32 303.10 305.11 305.35 302.98 303.99 303 .26 303 .03 302.84 302.73 302.93 301 .76 301.27 301 .36 300.94 300.95 300.35 300.75 299.70 299.43 298.95 300.03 298.76 297.41 HGiOO Dep th Below ROW {reet) 0.03 0.37 0.15 0.33 0.25 0.71 0.97 0.58 1.09 0.33 1.36 0.46 1.48 0.95 0.55 1.04 1.21 1.91 1.18 2.03 1.10 2.15 1.91 2.77 0.33 4.20 6 .96 APPENDIXC2 CONCRETE FLUME SUMMARY Barracks II Phases 105 & 106 AppendixC2 Proposed Flume Analysis Concrete Flume Summary Drainage Storm (yr) Areas 25 207 ,208 100 207 ,208 25 207, 208, 2J5 JOO 207 , 208 , 2J5 Storm (yr) Drainage Areas 25 205 ,206 JOO 205 ,206 25 205, 206, 2J6 100 205 , 206, 216 .. Drainage Storm (yr) Areas 25 203 ,204 JOO 203 ,204 25 203, 204, 218 JOO 203 , 204, 2J8 Drainage Storm (yr) Areas 25 20J , 202 100 201 , 202 25 20J , 202, 220 JOO 20J, 202 , 220 Q (cfs) 3.56 4 .80 5 .70 7.68 Q (cfs) 1.78 2.40 3 .66 4 .93 Q (cfs) 4 .58 6 .J8 7.30 9 .85 Q (c fs) 4.53 6 .JJ 6 .93 9.34 FLUME203 Bottom Width Flume Slope Depth (ft) {ft) (ft/ft) Flume203A 0.5 5.0 0 .020 0.5 5.0 0 .020 Flume203 B 0 .5 5 .0 0 .008 0 .5 5.0 0 .008 FLUME204 Bottom Width Flume Slope Depth (ft) (ft) (ft/ft) Flume204A 0 .5 5 .0 0 .020 0 .5 5 .0 0 .020 Flume204B 0.5 5 .0 0 .008 0.5 5.0 0.008 FLUME'205 Bottom Width Flume Slope Depth (ft) (ft) (ft/ft) Flume205A 0 .5 5 .0 0 .02 0 0 .5 5 .0 0 .020 Flume205 B 0.5 5 .0 0.008 0 .5 5 .0 0 .008 FLUME206 Bottom Width Flume Slope Depth (ft) (ft) (ft/ft) . ' Flume206A 0.5 5 .0 0 .020 0.5 5.0 0 .020 Flume206 B 0 .5 5.0 0 .0 08 0 .5 5 .0 0 .008 Velocity Flow · Freeboard to Manning's n Top of Concrete (ft/s). Depth (ft) Curb (ft) 0 .018 3 .56 0 .20 0.30 0.Dl8 . 4 .00 0 .24 0 .26 0 .018 3.26 0.35 O.J5 O.OJ8 3.66 0 .42 0.08 Velocity Flow Freeboard to Manning's n Top of Concrete . (ft/s) Depth (ft) Curb (ft) O.O J8 2.74 O.J3 0.37 O.O J 8 3 .00 O.J6 0.34 O.OJ8 2.71 0.27 0 .23 0.0 18 3 .08 0.32 0 .18 ' Velocity Flow Freeboard to Manning's n Top of Concrete (ft/s) Depth (ft) Curb (ft) O.OJ8 3 .98 0 .23 0 .27 0 .01 8 4.41 0 .28 0 .22 0 .018 3.56 0 .41 0 .09 0 .018 4 .02 0.49 0 .0 1 Velocity Flow Freeboard to Manning's n Top of Concrete (ft/s) Depth (ft) Curb (ft) O.OJ8 3 .94 0.23 0 .2 7 O.O J8 4.53 0 .27 0 .23 O.Dl8 3.55 0.39 0.1 J 0.018 3 .9 7 0.47 0.03 APPENDIXD TECHNICAL DESIGN SUMMARY SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY The Cities of Bryan and College Station both require storm drainage design to follow these Unified Stormwater Design Guidelines. Paragraph C2 of Section Ill (Administration) requires submittal of a drainage report in support of the drainage plan (stOrmwater management plan) proposed in connection with land development projects , both site projects and subdivisions . That report may be submitted as a traditional prose report, complete with applicable maps, graphs , tables and drawings , or it may take the form of a "Technical Design Summary". The format and content for such a summary report shall be in substantial conformance with the description in th is Appendix to those Guidelines. In either format the report must answer the questions (affirmative or negative) and provide, at minimum, the information prescribed in the "Techn ical Design Summary" in this Appendix . The Stormwater Management Technical Design Summary Report shall include several parts as lis ted below. The information called for in each part must be provided as applicable . In addition to the requirements for the Executive Summary, this Appendix includes several pages detailing the requirements for a Technical Design Summary Report as forms to be completed . These are provided so that they may be copied and completed or scanned and digitized . In addition , electronic versions of the report forms may be obtained from the City. Requirements for the means (medium) of submittal are the same as for a conventional report as detailed in Section Ill of these Guidelines. Note: Part 1 -Executive Summary must accompany any drainage report required to be provided in connection with any land development project , regardless of the format chosen for said report. Note: Parts 2 through 6 are to be provided via the forms provided in this Appendix. Brief statements should be included in the forms as requested, but additional information should be attached as necessary. Part 1 -Executive Summary Report Part 2 -Project Administration Part 3 -Project Characteristics Part 4 -Drainage Concept and Design Parameters Part 5 -Plans and Specifications Part 6 -Conclusions and Attestation STORMWATER MANAGEMENT TECHNICAL DESIGN SUMMARY REPORT Part 1 -Executive Summary This is to be a brief prose report that must address each of the seven areas listed below. Ideally it will include one or more paragraphs about each item. 1. Name , address, and contact information of the engineer submitting the report, and of the land owner and developer (or applicant if not the owner or developer). The date of submittal should also be included . 2 . Identification of the size and general nature of the proposed project, including any proposed project phases. This paragraph should also include reference to STORMWATER DESIGN GUIDELINES Effective February 2007 Page 1of26 APPENDIX. D: TECH. DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPENDIX D-TECHNICAL DESIGN SUMMARY applications that are in process with either City: plat(s), site plans, zoning requests , or clearing/grad ing permits, as well as reference to any application numbers or codes assigned by the City to such request. 3. The location of the project should be described . This should identify the Named Regulatory Watershed(s) in which it is loca ted, how the entire project area is situated therein, whether the property stradd les a watershed or basin divide , the approxima te acreage in each basin , and whether its position in the Watershed dictates use of detention design . The approximate proportion of the property in the city limits and within the ET J is to be identified , including whether the property straddles city jurisdictional lines. If any portion of the property is in floodplains as described in Flood Insurance Rate Maps published by FEMA that should be disclosed . 4. The hydrologic characteristics of the property are to be described in broad terms: existing land cover ; how and where stormwater drains to and from neighboring properties; ponds or wetland areas that tend to detain or store stormwater; ex isting creeks , channels, and swales crossing or serv ing the property; all existing dra inage easements (or ROW) on the property, or on neighboring properties if they serv ice runoff to or from the property. 5. The general plan for managing stormwater in the entire project area must be outlined to include the approximate size, and extent of use , of any of the following features : storm drains coupled with streets ; detention I retention facilit ies; buried conveyance conduit independent of streets; swales or channels ; bridges or culverts; outfalls to principal watercourses or their tributaries; and treatment(s) of ex isting watercourses. Also, any plans for reclaiming land within floodplain areas must be outlined. 6. Coordination and permitting of stormwater matters must be addressed . Th is is to include any specialized coordination that has occurred or is planned wi th other entities (local , state , or federal). This may include agencies such as Brazos County government, the Brazos River Authority , the Texas A&M University System , the Texas Department of Transportation , the Texas Commission for Environmental Quality, the US Army Corps of Engineers, the US Environmental Protection Agency, et al. Mention must be made of any permits , agreements , or understandings that pertain to the project. 7. Reference is to be made to the full drainage report (or the Technical Design Summary Report) which the executive summary represents . The principal elements of the main report (and its length), including any maps, draw ings or construction documents, should be itemized . An example statement might be : "One __ -page drainage report dated one set of construction drawings ( sheets) dated , and a ___ -page specifications document dated ____ comprise the drainage report for this project." STORMWATER DES IGN GUIDELINES Effective February 2007 Page 2 of26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 2 -Project Administration I Start (Page 2.1) .,. Engineering and Design Professionals Information · ~ . Engineering Firm Name and Address: Jurisdiction Schultz Engineering, LLC City: Bryan P.O. Box 11995 ./ College Station College Station, Tx 77842 Date of Submittal: March2013 Lead Engineer's Name and Contact lnfo.(phone , e-mail, fax): Other: Joseph P. Schultz, PE email: joeschultz84@verizon.net Phone: 764-3900 fax: 764-3910 Supporting Engineering I Consulting Firm(s): Other contacts : n!a .... . Developer I Owner I Applicant Information . , .. Developer I Applicant Name and Address: Phone and e-mail : Heath Phillips Investments, LLC 979-690-5000 3302 General Parkway College Station, TX 77845 Property Owner(s) if not Developer I Applicant (&address): Phone and e-mail : -. ~ _,,, :r. . .,,. --7··;."". -Project Identification Development Name: The Barracks II Subdivision, Phases 105 & 106 Is subject property a site project , a single-phase subdivision , or part of a multi-phase subdivision? Multi-Phase Subdivision If multi-phase, subject property is phase 6 of 13 Legal description of subject property (phase) or Project Area: (see Section II , Paragraph B-3a) Crawford Burnett League, A-7 If subject property (phase) is second or later phase of a project , describe general status of all earlier phases . For most recent earlier phase Include submittal and review dates. Housing construction is complete and on-going in the previous phases (Sections 103, 104 & 300) General Location of Project Area, or subject property (phase): Between Old Welborn Road and Holleman Dr. South, North of Rock Prairie Road West and South of Cain Rd. In City Limits? Extraterritorial Jurisdiction (acreage): Bryan : acres. Bryan: College Station: College Station : 13·14 acres. Acreage Outside ET J: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 3 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 2 -Project Administration I Continued (page 2.2) Project Identification {continued) .. ~ Roadways abutting or within Project Area or Abutting tracts, platted land, or built subject property: developments: Old Wellborn Rd. The Barracks Section 102, 103, 104 & 300 Holleman Drive South Named Regulatory Watercourse(s) & Watershed(s): Tributary Basin(s): Bee Creek Trib B.3 ... • ,. 0 Plat Information For Ptoj~ct or Subject Property {or Phase)_ '•, Preliminary Plat File#: 14-oo9oooio Final Plat File#: NIA Date: April 2014 Name: THE BARRACKS II (PP) Status and Vol/Pg : submitted with this project If two plats, second name: File#: Status: Date: . ·'' .Zoning fnforniation For Project or Subject Property {or Phase) , ,r···· . :, •. ? • ' ' ' • ' ' ·':. ' ! .,,.. ~ Zoning Type: PDD Existing or Proposed? Existing Case Code: Case Date Status: Zoning Type: Existing or Proposed? Case Code: Case Date Status: . • ' ·-t'· .J-· • ' ; ,.'""' .' .. , [ •. · Stormwater Management Planning For Project qr ·subject Property {or Phase) .~ . . . . ~ Planning Conference(s) & Date(s): Participants: NIA Preliminary Report Required? NIA Submittal Date Review Date Review Comments Addressed? Yes --No --In Writing? When? Compliance With Preliminary Drainage Report. Briefly describe (or attach documentation explaining) any deviation(s) from provisions of Preliminary Drainage Report, if any. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 4 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 2 -Project Administration I Continued (page 2 .3) . •· •.· Coordination For Project or Subj~ct. P~operty ·(or Phas~)' ,,: .. .. {~: . :.· .· ,,,, ... . ''· •: .. ... . . . . . ' Note: For any Coordination of stormwater matters indicated below, attach documentation describing and substantiating any agreements , understandings, contracts , or approvals. Coord ination Dept. Contact: Date : Subject: With Other Depart ments of Jurisdiction City (Bryan or College Station) Coord ina t ion W it h Summ.arize need(s) & actions taken (include contacts & dates): Non-jurisdiction City Needed? Yes No ./ -- -- Coord i nation with Summarize need(s) & actions taken (include contacts & dates): Brazos County Needed? Yes --No _L Coord ination with Summarize need(s) & actions taken (include contacts & dates): TxDOT Needed? Yes No ./ -- Coord ination wi t h Summarize need(s) & actions taken (include contacts & dates): TAMUS Needed? Yes No ./ -- ' . .. , Pern:iits For Project "9 r~subjefa ~roperfy."(<?r Phase)\·:::·.:~ ·:: -.·· ;-.:~··· :. . ~ , , \,;,• "'' ~-"''"" '- As to stormwater management, are permits requ ired for the proposed work from any of the entities listed below? If so , summarize status of efforts toward that objective in spaces below. Entity Permitted or Approved? US Army Crops of P ermitted Engineers No Yes ./ -- US Environmental Protection Agency No ./ Yes - Texas Commission on Approved Environmental Quality No Yes ./ ---- Brazos River Author ity No _:[__ Yes - STORMWATER DES IGN GUIDELINES Effective February 2007 Status of Actions (include dates) Permit approved. NOi for entire Subdivision Page 5 of26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -ProQert~ Characteristics I Start (Page 3.1) Nature. and .Scope of Proposed Work .. Existing: Land proposed for development currently used , including extent of impervious cover? Proposed development is residential subdivision. High density. Impervious co ver = 75% Site __ Redevelopment of one platted lot, or two or more adjoining platted lots. Development __ Building on a single platted lot of undeveloped land . Project __ Building on two or more platted adjoining lots of undeveloped land . (select all __ Building on a single lot, or adjoining lots, where proposed plat will not form applicable) a new street (but may include ROW dedication to existing streets). __ Other (explain): Subdivision __ Construction of streets and utilities to serve one or more platted lots. Development _!__ Construction of streets and utilities to serve one or more proposed lots on Project lands represented by pending plats. Site projects: bu ilding use(s), approximate floor space , impervious cover ratio. Describe Subdivisions: number of lots by general type of use, linear feet of streets and Nature and drainage easements or ROW. Size of 80 lots. Approximately 3333' of Streets. Pro~osed Project 4.79ac. -ROW Is any work planned on land that is not platted If yes, explain : or on land for which platting is not pending? ./ No Yes ---- FEMA Floodplains ". . "',;~'. " .c i r:; .. '· ' Is any part of subject property abutting a Named Regulatory Watercourse I No __ Yes_!_ (Section II, Paragraph B 1) or a tributary thereof? Is any part of subject property in floodplain I No_{_ Yes Rate Map area of a FEMA-regulated watercourse? -- Encroachment(s) Encroachment purpose(s): __ Building site(s) __ Road crossing(s) into Floodplain areas planned? __ Utility crossing(s) __ Other (explain): No ./ -- Yes -- If floodplain areas not shown on Rate Maps, has work been done toward amending the FEMA- approved Flood Study to define allowable encroachments in proposed areas? Explain. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 6 of 26 APPENDIX . D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -Pro~ert~ Characteristics I Continued (Page 3.2) ... Hydrologic Attributes of Subject PropertY (or Phase) • i .... Has an earlier hydrologic analysis been done for larger area including subject property? Yes Reference the study (&date) here , and attach copy if not already in City files. ./ Kimley-Horn Study (July 2012 & Revised September 2013) -Analyzed downstream flooding --potential and detention pond design. Is the stormwater management plan for the property in substantial conformance with the earlier study? Yes -./ -No --If not, explain how it differs. No If subject property is not part of multi-phase project , describe stormwater management plan for the property in Part 4. --If property is part of multi-phase project , provide overview of stormwater management plan for Project Area here . In Part 4 describe how plan for subject property will comply therewith. Do existing topographic features on subject property store or detain runoff? ~No --Yes Describe them (include approximate size, volume, outfall , model, etc). Any known drainage or flooding problems in areas near subject property? __ No ,/ Yes Identify: The area around Cain Road and Old Wellborn Road. Based on location of study property in a watershed, is Type 1 Detention (flood control) needed? (see Table B-1 in Appendix B) Already Provided in previous phase _!__Detention is required. --Need must be evaluated. __ Detention not required . What decision has been reached? By whom? If the need for How was determination made? Type 1 Detention must be evaluated: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 7 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -Pro~ert~ Characteristics I Continued (Page 3.3) '' Hydrologic Attri~utes .of Subject Property (or~Pha,se) (contiri~ed) Does subject property straddle a Watershed or Basin divide? _.:[__No --Yes If yes, describe splits below. In Part 4 describe design concept for handling this. Watershed or Basin Larger acreage Lesser acreage Above-Project Areas(Section 11, Paragraph 83-a) Does Project Area (project or phase) receive runoff from upland areas? __ No _:[_ Yes Size(s) of area(s) in acres: 1) 2.52 2) 3) 4) Flow Characteristics (each instance) (overland sheet, shallow concentrated, recognizable concentrated section(s), small creek (non -regulatory), regulatory Watercourse or tributary); Each instance is overland sheet flow and shallow concentrated flow. Flow determination: Outline hydrologic methods and assumptions: Rational Equation. C-values 0. 75 for Developed Lot Areas, 0.65 for Developed Park Areas, 0.45 for Undeveloped Areas Does storm runoff drain from public easements or ROW onto or across subject property? ./ No --Yes If yes, describe facilities in easement or ROW : Are changes in runoff characteristics subject to change in future? Explain Yes. As adjoining tracts develop and install detention ponds, their outflows will be conveyed through this tract by the proposed storm sewer. Conveyance Pathways (Section II, Paragraph C2) Must runoff from study property drain across lower properties before reaching a Regulatory Watercourse or tributary? ./ No Yes Describe length and characteristics of each conveyance pathway(s). Include ownership of property(ies ). STORMWATER DESIGN GUIDELINES Effective February 2007 Page 8 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 3 -Property Characteristics I Continued (Page 3.4) , Hydrologic Attribut.es ofSubj~ct Property (or Phase) (continued) Conveyance Pathways (continued) Do drainage If yes , for what part of length? % Created by?_£_ plat, or easements __ instrument. If instrument(s), describe their provisions. exist for any Drainage easements convey drainage from Travis Cole Avenue to the existing drainage pathway. part of pathway(s)? No -- ~Yes Pathway Areas Nearby Where runoff must cross lower properties, describe characteristics of abutting lower property(ies). (Existing watercourses? Easement or Consent aquired?) Existing watercourse crosses the downstream properties. See Kimley Horn Report Describe any built or improved drainage facilities existing near the property (culverts, bridges , lined channels, buried conduit, swales , detention ponds , etc). Detention Ponds constructed with previous phases. Drainage f--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Facilities Do any of these have hydrologic or hydraulic influence on proposed stormwater design? __ No _L Yes If yes , explain: See Kimley Horn Report, Phase 100 Report by Phillips Engineering and Phases 101 -104 & 300 Report by Goodwin-Lasiter, Inc. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 9 of 26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters I Start (Page 4.1) .. S~ormwater Management Concept . ·.• -.. ;;,. '"· Discharge{s) From Upland Area{s) If runoff is to be received from upland areas, what design drainage features will be used to accommodate it and insure it is not blocked by future development? Describe for each area, flow section , or discharge point. Runoff from upland areas will be captured in publicly owned storm drain systems as the subdivision develops. Discharge{s) To Lower Property{ies) (Section II, Paragraph E1) Does project include drainage features (existing or future) proposed to become public via platting? --No __:f_ Yes Separate Instrument? ./ No -Yes Per Guidelines reference above, how will __ Establishing Easements (Scenario 1) runoff be discharged to neighboring ~ Pre-development Release (Scenario 2) property(ies)? Combination of the two Scenarios -- Scenario 1: If easements are proposed, describe where needed, and provide status of actions on each . (Attached Exhibit# ) Scenario 2: Provide general description of how release(s) will be managed to pre-development conditions (detention, sheet flow, partially concentrated , etc.). (Attached Exhibit# ) Detention Pond. Combination: If combination is proposed, explain how discharge will differ from pre- development conditions at the property line for each area (or point) of release. If Scenario 2 , or Combination are to be used , has proposed design been coordinated with owner(s) of receiving property(ies)? documentation. STORMWATER DESIGN GUIDELINES Effective February 2007 ./ No Page 10 of 26 --Yes Expla in and provide APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.2) Stormwa~er IVianage,_ment (:oncept (continued) .,_ · •. • ,. ,. • .• 1 Within Project Area Of Multi-Phase Project Identify gaining Basins or Watersheds and acres shifting: - Will project resu lt i n shifting runoff between Basins or between 1-:-::W-::-h-a-,-t _,.de-s-,-ig-n-an-d-,--m-,-it.,--ig-a--,-tio-n---,--is_u_s-ed-:--to_c_o_m_p_e_n_s_at_e_,f_o_r i-n-cr_e_a-se_d_r_u_n-off----1 Watersheds? from gaining basin or watershed? ./ No Yes How will runoff from Project Area be mitigated to pre- development conditions? Select any or all of 1, 2, and /or 3, and explain below. 1. __ With facility(ies) i nvolving other development projects. 2 . _{_Establ ishing features to serve overall Project Area . 3. _{_On phase (or site) project basis within Project A rea . 1. Shared facil ity (type & location of facility; design drainage area served ; relationship to size of Project Area): (Attached Exhibit# ) 2. For Overall Project Area (type & location of facilities): (Attached Exhibit #A ) E xisting detention ponds will s erve the proposed de velopm ent 3. By phase (or site) project: Describe planned mitigation measures for phases (or sites) in subsequent questions of this Part. ('· "O Q) [/) c:: Q) ffi >- 0::: [/) c:: Cl ·u; Q) 0 Oz ro J.t l ~ <( Are aquatic echosystems proposed? __ No project(s)? __ Yes In which phase(s) or Are other Best Management Practices for reducing stormwater pollutants proposed? __ No ____{__Yes Summarize type of BMP and extent of use: Silt f ences, construction exits, rock check dams, seeding and ero sion matting. If design of any runoff-handling facilities deviate from provisions of B-CS Technical Specifications , check type facility(ies) and explain in later questions. __ Detention elements __ Conduit elements __ Channel features __ Swales __ Ditches __ Inlets __ Valley gutters __ Outfalls __ Culvert features __ Bridges Other STORMWATER DESIGN GUIDELINES Effective February 2007 Page 11 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.3) Stormwater Management Concept (cbntinued) ' -: .. ~· -.; f"' . Within Project Area Of Multi-Phase Project (continued) Will Project Area include bridge(s) or culvert(s)? ~No __ Yes Identify type and general size and In which phase(s). If detention/retention serves (will serve) overall Project Area, describe how it relates to subject phase or site project (physical location, conveyance pathway(s), construction sequence): The detention ponds constructed with the previous phases will serve this phase. Runoff will enter the pond through the underground storm drains. Within Or Serving Subject Property (Phase, or Site) If property part of larger Project Area, is design in substantial conformance with earlier analysis and report for larger area? ___:!__Yes No, then summarize the difference(s): Identify whether each of the types of drainage features listed below are included, extent of use, and general characteristics. C'-· -0 Q) II) ~ Q) II) >- i I ~ 0 "(jj z ~ "' -< Typical shape? I Surfaces? Steepest side slopes: Usual front slopes: Usual back slopes: Flow line slopes: least. ____ _ Typical distance from travelway: typical greatest ___ _ (Attached Exhibit # ) Are longitudinal culvert ends in compliance with B-CS Standard Specifications? ___ Yes No, then explain: At intersections or otherwise, do valley gutters cross arterial or collector streets? ./ No __ Yes lfyesexplain: Are valley gutters proposed to cross any street away from an intersection? ./ No __ Yes Explain: (number of locations?) STORMWATER DESIGN GUIDELINES Effective February 2007 Page 12 of 26 APPENDIX . D: TECH. DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.4) .· Stormwater Management Concept (continued) .. ' Within Or Serving Subject Property (Phase, or Site) (continued) C'-· "C a> en en a> :J >- E 2. .t i ~ en c ·-0 ~z Gutter line slopes: Least 0.60 Usual 0.60 Greatest 3.5 Are inlets recessed on arterial and collector streets? _:!._Yes iden t ify where and why. __ No lf "no ", Will inlets capture 10-year design stormflow to prevent flooding of intersections (arterial with arterial or collector)? _:!._ Yes __ No If no, exp lain where and why not. Will inlet size and placement prevent exceeding allowable wa ter spread for 10-year design storm throughout site (or phase)? __.f__ Yes __ No If no , explain . Sag curves : Are inlets placed at low po ints? _:!._Yes __ No Are inlets and condu it sized to prevent 100-year stormflow from ponding at greater than 24 inches? ~Yes __ No Explain "no " answers. Will 100-yr stormflow be contained in combination of ROW and buried conduit on whole length of all streets? ~Yes __ No If no , describe where and why . Do designs for curb, gutter, and inlets comply with 8-CS Technical Specifications? ./ Yes __ No If not, descr ibe diffe rence(s) and attach justification . Are any 12-inch laterals used? ~No used . __ Yes Identify length(s) and where Pipe runs between system I Typical 50' Longest 199 access points (feet): ----- ----- Are junction boxes used at each bend? ./ Yes __ No If not, explain where and why . "C_§ I ~------------------.--,------,--,-:--..,-;-----:----::----1 Are downstream soffits at or below upst ream soffits? Least amount that hydraulic ~ Yes ./ No __ If not, explain where and why: grade line is below gutter line (system-wide): STORMWATER DESIGN GUIDELINES Effective February 2007 Page 13 of 26 1.05' APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.5) -" Stormwater Management Concept (continued) . ~ ·~. . .. Within Or Serving Subject Property (Phase, or Site) (continued) U) Cl> (.) c ~ c ~ ......... 0 ~E ::::l L.. -~ .E c . 0 .E (.) c ._,. ·- E <DE Cl> -C'IJ CJ) CJ) ~Cl> c:2 ·-> ~ e " a. Ea; .9 ~ Cf) CJ) Cl> -~ C'IJ a. Cl> CJ) Describe watercourse(s), or system(s) receiving system discharge(s) below (include design discharge velocity, and angle between converging flow lines). 1) Watercourse (or system), velocity, and angle? Bee Creek Trib B.3 @ 0°, < 2 fps 2) Watercourse (or system), velocity, and angle? 3) Watercourse (or system), velocity, and angle? For each outfall above, what measures are taken to prevent erosion or scour of receiving and all facilities at juncture? 1) Outfall from this development will occur into downstream pipes from prev. phases 2) c _£. 3) C:-· CJ) -Cl> ~CJ) -Cl> CJ)>- ! I ~ 0 CJ)Z ::::l iv11 CJ) ~ <:t: Are swale(s) situated along property lines between properties? _!__No __ Yes Number of instances: For each instance answer the following questions. Surface treatments (including low-flow flumes if any): Flow line slopes (minimum and maximum): Outfall characteristics for each (velocity, convergent angle, & end treatment). Will 100-year design storm runoff be contained within easement(s) or platted drainage ROW in all instances? __ Yes __ No If "no" explain: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 14 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Pag e 4 .6) ~ * •. 'w. ' St9rm_water Management Concept {con.tinued) " With in Or Serving Subject Property {Phase, or Site) {continued) Cl) (].) .c .B i:5 (].) "C ·u; "C co 0 0::: Cl) (].) >- Are roadside ditches used? ___:/__No __ Yes If so, provide the following : Is 25-year flow contained with 6 inches of freeboard throughout? __ Yes __ No Are top of banks separated from road shoulders 2 feet or more? __ Yes __ No Are all ditch sections trapezoidal and at least 1.5 feet deep? __ Yes __ No For any "no" answers provide location(s) and explain : If condu it is beneath a swale , provide the following information (each instance). Instance 1 · Descr ibe general location , approximate length : Is 100-year design flow contained in conduit/swale combination? If "no " explain : Yes No lj c r-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 0 co Space for 100-year storm flow? ROW Easement Width z t5 l'I ~ 0 :;::; C'-· Cl) Qi c c co .c :0 "C co >. c co (..) L.. c .2 (].) c a. 0 0 :;::; ...... co ~ § -~ .2 c .!; (].) -c E (].) co ~ Cl) Cl)~ § ·:;: :;::; e ~ a. Swale Surface type , minimum and maximum slopes : Conduit Type and size, minimum and maximum slopes, design storm: Inlets Describe how conduit is loaded (from streets/storm drains , inlets by type): Access Describe how maintenance access is prov ided (to swale , into conduit): Instance 2 Describe general location , approximate length: Is 100-year design flow contained in conduit/swale combinat ion? If "no " explain: Yes No ~ ~ ~S~pa_c_e_f_o_r_1_0_0--y-e-ar_s_t_o-rm~fl-ow~?-R~O-W~~~~E-as_e_m_e_n_t~~~-W~id-th~~~~~~ 0 .c (..) Cl) -2 ~ ~ c co Swa le Surface type, minimum and maximum slopes: Conduit Type and size , minimum and maximum slopes, design storm: 0 a. 1---~~~~~~~~~~~-'---~-,-,-~~~--.,.~~~--,-------,---,----.,.~~-,---~~~ ~ 5l Inlets Describe how conduit is loaded (from streets/storm drains, inlets by type): 1 E, ~ 1---~~~~~~~~~~~~~~~~~~~~~--.,.~~~----,,-,-,.---~~~ <( Access Describe how maintenance access is provided (to swale , into conduit): STORMWATER DESIGN GUIDELINES Effective February 2007 Page 15 of 26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters I Continued (Page 4. 7) Stormwater Maragement Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) c "ffi 0.. E x e UJ ._ If "yes" provide the following information for each instance: Instance 1 Describe general location , approximate length, surfacing: ~ en Is 100-year design flow contained in swale? __ Yes __ No Is swale wholly c >-a> within drainage ROW? ___ Yes ___ No Explain "no" answers: .; I t--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ u Access Describe how maintenance access is provide: ~ 0 '§ z ~./I r-:----.,..~~-=--=-~-:-:---~~-----:--:----,,---~~-----:~~,.--~~~~~~~~~~~~ '"' Instance 2 Describe general location , approximate length, surfacing : Q) ·;:: C'· :J (/) .0 c -Q) 5 E £. Q) -(/) ·3 co Q) (/) .._ Q) 0 1~ 0:: ~ -~ :0 C'· "'C :J a. c Q) (/) co 0 -a. a. 0 x .._ UJ a. (/) (/) -Q) c >-Q) E I Q) > 0 .._ a. E 0 z Qi .;J c c co £. () Is 100-year design flow contained in swale? __ Yes __ No Is swale wholly within drainage ROW? __ Yes __ No Explain "no" answers: Access Describe how maintenance access is provided: Instance 3. 4. etc. If swales are used in more than two instances, attach sheet providing all above information for each instance. "New" channels: Will any area(s) of concentrated flow be channelized (deepened, widened, or straightened) or otherwise altered? __ No __ Yes If only slightly shaped, see "Swales" in this Part. If creating side banks, provide information below. Will design replicate natural channel? __ Yes __ No If "no", for each instance describe section shape & area, flow line slope (min . & max.), surfaces, and 100-year design flow, and amount of freeboard: Instance 1: Instance 2: Instance 3: · STORMWATER DESIGN GUIDELINES Effective February 2007 Page 16 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters I Continued (Page 4.8) Stormwater Management Concept .{continued) . Within Or Serving Subject Property (Phase, or Site) (continued) Existing channels {small creeks}: Are these used? ~ No --Yes If "yes" provide the information below. Will small creeks and their floodplains remain undisturbed? __ Yes No How many disturbance instances? Identify each planned location : For each location, describe length and general type of proposed improvement (including floodpla in changes): For each location , describe section shape & area , flow line slope (min . & max.), surfaces , and 100-year design flow . ........ "O Q) ::J c :;::; Watercourses {and tributaries}: Aside from fringe changes , are Regulatory c 0 Watercourses proposed to be altered? ~No Yes Expla in below. (..) --- fl') -Submit full report describing proposed changes to Regulatory Watercourses. Address c Q) existing and proposed section size and shape, surfaces, alignment, flow line changes, E Q) length affected , and capacity , and prov ide full docu.mentation of analysis procedures > 0 and data . Is full report submitted? Yes No If "no " explain: .... --c.. E - Q) c c Ctl All Proposed Channel Work: For all proposed channel wo rk , provide information .J:: (..) requested in next three boxes. If design is to rep licate natural channel , identify location and length here , and describe design in Special Design section of this Part of Report . Will 100-year flow be contained with one foot of freeboard? Yes --No If -- not , identify location and explain: Are ROW I easements sized to contain channel and required maintenance space? --Yes --No If not, identify location(s) and explain: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 17 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters I Continued (Page 4.9) Stormwater Management Concept (continued) '' , "· ' , , ' ,,, ' Within Or Serving Subject Property (Phase, or Site) (continued) How many facilities for subject property project? For each provide info. below. For each dry-type facilitiy: Facility 1 Facility 2 Acres served & design volume + 10% 100-yr volume: free flow & plugged Design discharge (10 yr & 25 yr) Spillway crest at 100-yr WSE? __ yes --no __ yes --no Berms 6 inches above plugged WSE? __ yes --no __ yes --no Explain any "n o " answers: C/) Q) >- I For each facility what is 25-yr design Q , and design of outlet structure? Faci lity 1: 0 z Facility 2 : ~1 Do outlets and spillways discharge into a public facility in easement or ROW? Facility 1: __ Yes No Facility 2: Yes No ------ C"· If "no" explain: "O Q) C/) 0 a. 0 .... c.. For each, what is velocity of 25-yr design discharge at outlet? & at spillway? C/) Q) Facility 1: & Faci lity 2: & ~ '(3 Are energy dissipation measures used? No Yes Describe type and ro --u. location: c .Q c Q) -Q) 0 Q) For each, is spillway surface treatment other than concrete? Yes or no, and describe: .... <t: Facility 1: Faci lity 2: For each, what measures are taken to prevent erosion or scour at receiving facility? Facility 1: Facility 2: If berms are used give heights, slopes and surface treatments of sides. Facility 1: Facility 2: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 18 of 26 APPENDIX. D: TECH . DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce12t and Design Parameters J Continued (Page 4.10) ' , .. Stormwater Management Concept {continued) .. ) Within Or Serving Subject Property (Phase, or Site) (continued) Do structures comply with B-CS Specifications? Yes or no , and explain if "no": (/) Facility 1; (!) ~ =:c ~ (!) Facility 2: IJ.. ::::l c c~ 0 c ~ 0 c u (!)--For additional facilities provide all same information on a separate sheet. (!) 0 Are parking areas to be used for detention? __ No --Yes What is maximum depth due to required design storm? Roadside Ditches: Will culverts serve access driveways at roadside ditches? --No --Yes If "yes", provide information in next two boxes . Will 25-yr. flow pass without flowing over driveway in all cases? --Yes --No Without causing flowing or standing water on public roadway? --Yes --No Designs & materials comply with B-CS Technical Specifications? __ Yes --No Explain any "no" answers : C'-· (/) O'l c ·u; Are culverts parallel to public roadway alignment? __ Yes No Explain : (/) 0 --L. (/) () (!) (!) ->-Cll I > ·;:: Creeks at Private Drives: Do private driveways, drives, or streets cross drainage 0. -ways that serve Above-Project areas or are in public easements/ ROW? Cll "O 0 No Yes If "yes" provide information below. (!) z ----~.ti How many instances? Describe location and provide information below. (!) Location 1: ~ ::::l u (!) Location 2 : L. ~ Location 3 : For each location enter value for: 1 2 3 Design year passing without toping travelway? Water depth on travelway at 25-year flow? Water depth on travelway at 100-year flow? For more instances describe location and same information on separate sheet. STORMWATER DESIGN GUIDELINES Effective February 2007 Page 19 of 26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D-TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters I Continued (Page 4.11) : StOrmwater Management Concept (continued) •; r ,,, ,, Within Or Serving Subject Property (Phase, or Site) (continued) Named RegulatoQl Watercourses {&Tributaries}: Are culverts proposed on these facilities? No __ Yes, then provide full report documenting assumptions, criteria , analysis, computer programs, and study findings that support proposed design(s). Is report provided? __ Yes --No If "no", explain: ........ Arterial or Major Collector Streets: Will culverts serve these types of roadways? -(l) (l) No Yes How many instances? For each identify the ~ Cl) ---- (l) location and provide the information below. -Cl) co Instance 1: (l) .... >-~ I~ Instance 2: Instance 3: c 0 :;; Yes or No for the 100-year design flow: 1 2 3 0 co z E ~1 ~ Headwater WSE 1 foot below lowest curb top? Spread of headwater within ROW or easement? E C'-· co Is velocity limited per conditions (Table C-11 )? Cl) Cl) ~"C Explain any "no" answer(s): ·-c ~co 0 c .... 0 (,) :;; >.co co (,) s: _Q "C (l) co ..0 Minor Collector or Local Streets: Will culverts serve these types of streets? 0 ·-........ (,) (,) No Yes How many instances? for each identify the ·-Cl) -(l) -----g "C location and provide the information below: 0. (l) -0. co~ Instance 1: "C >. Instance 2: (l) c Cl) co ::J-Instance 3: Cl) 0 t Cl) (l) (l) For each instance enter value, or "yes" I "no" for: 1 2 3 ~ (,) ::Jc (,) co Design yr. headwater WSE 1 ft. below curb top? -(l) Cl) .... c <{ ·-100-yr. max. depth at street crown 2 feet or less? (l) .... 0 Product of velocity (fps) & depth at crown (ft)= ? E .... Is velocity limited per conditions (Table C-11 )? g Limit of down stream analysis (feet)? Explain any "no" answers: STORMWATER DESIGN GUIDELINES Effective February 2007 Page 20 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.12) "· . ' i, :f:J .~ . Stormwater Management Concept (coriti'nued) . .( Within Or Serving Subject Property (Phase, or Site) (continued) All Proposed Culverts: For all proposed culvert facil ities (except drivew ay/roadside ditch intersects) provide information requested in next eight boxes. Do cu lverts and travelways intersect at 90 degrees? Yes No If not , ----iden ti fy location(s) and intersect angle(s ), and justify t he design(s): Does dra i nage way alignment change within or near limits of culvert and surfaced approaches thereto? __ No --Yes If "yes" identify location(s), describe change(s), and j ustification : Are flumes or conduit to discharge into culvert barrel(s)? __ No __ Yes If yes , iden ti fy location(s) and prov ide justification : -Are fl umes or conduit to discharge into or near surfaced approaches to cu lvert ends? " No Yes If "yes" identify location(s), describe outfall design t reatme nt(s): Q) ----::::J c :.;:; c 0 ~ en t Q) Is scour/erosion protection provided to ensure long term stab ili ty of culvert structural ~ ::::J components, and surfacing at culvert ends? __ Yes __ No If "no" Identify () locations and provide justification(s): Will 100-yr flow and spread of backwater be fully contained in street ROW , and/or dra inage easements/ ROW? __ Yes --No if not , why not? Do appreciable hydraulic effects of any culvert ex tend downstream or upstream to neighboring land(s) not encompassed in subject property? --No --Yes If "yes" describe location(s) and mitigation measures: Are all culvert designs and materials in compliance with 8-CS Tech . Specifications? Yes --No If not , explain in Special Design Section of this Part . -- STORMWATER DESIGN GUIDELINES Effective February 2007 Page 21of26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters l Continued (Page 4.13) ., Stormwater Management Concept (cor.itinued) ; ·e . . - Within Or Serving Subject Property (Phase, or Site) (continued) Is a bridge included in plans for subject property project? _L No --Yes If "yes" provide the following information . Name(s) and functional classification of the roadway(s)? What drainage way(s) is to be crossed? ~ a> Ol 'O ·c Ill A full report supporting all aspects of the proposed bridge(s) (structural, geotechn ical , hydrologic, and hydraulic factors) must accompany this summary report . Is the report prov ided? --Yes --No If "no" explain : Is a Stormwater Provide a general description of planned techniques: >. Pollution Prevention ro ck riprap, silt fence ins tallation and inlet protection :!: ro Plan (SW3P) :J a estab li shed for L. project construction? Q) -ro s: --No _L_ Yes Special Designs -Non-Traditional Methods Are any non-traditional methods (aquatic echosystems , wetland-type detention , natural stream rep li cation , BMPs for water quality, etc.) proposed for any aspect of subject property proj ect? _L No --Yes If "yes" list general type and location below. Provide full report about the proposed special design(s) including rationale for use and expected benefits . Report must substantiate that stormwater management objectives w ill not be compromised , and that maintenance cost will not exceed those of traditional design so lution(s). Is report provided? STORMWATER DESIGN GUIDELINES Effective February 2007 Yes ---- Page 22 of 26 No If "no" explain : APPENDIX . D: TECH . DESIGN SUMMARY As Rev ised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.14) .. . . --Stormwater Management Concept (continued) ' . ,. Within Or Serving Subject Property (Phase, or Site) (continued) Special Designs -Deviation From B-CS Technical Specifications If any design(s) or material(s) of traditional runoff-handling facilities deviate from provisions of B-CS Technical Specifications , check type facility(ies) and explain by specific detail element. --Detention elements __ Drain system elements --Channel features --Culvert features --Swales --Ditches --Inlets __ Outfalls __ Valley gutters __ Bridges (explain in bridge report) In table below briefly identify specific element, justification for deviation(s). Specific Detail Element Justification for Deviation (attach additional sheets if needed) 1) 2) 3) 4) 5) Have elements been coordinated with the City Engineer or her/his designee? For each item above provide "yes" or "no", action date, and staff name: 1) 2) 3) 4) 5) , Design Parameters ( ~ . .-. . ,, . . .... :, ... ¥<'' .) ... _i:'i, tf. ' ,,t.~ _. ~ < '•,C ·' '·-· 'ii:L . .'t·.'•. Hydrology Is a map(s) showing all Design Drainage Areas provided? _L__ Yes --No Briefly summarize the range of applications made of the Rational Formula : Pipe Design, Inlet Design and Gutter Depth Check What is the size and location of largest Design Drainage Area to which the Rational Formula has been applied? 2.52 acres STORMWATER DESIGN GUIDELINES Effective February 2007 Location (or identifier): 101 Page 23 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D-TECHNICAL DESIGN SUMMARY Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.15) Qesign · Parameters (continued);: ·~ ... L ·< ' ~..: - Hydrology (continued) In making determinations for time of concentration, was segment ana lysis used? No ./ Yes In approximately what percent of Design Dra inage Areas? JOO % As to intensity-duration-frequency and rain depth criteria for determining runoff flows, were any criteria other than those provided in these Guidelines used? __.:f__ No __ Yes If "yes" identify type of data , source(s), and where applied: For each of the stormwater management features listed below identify the storm return frequencies (year) analyzed (or checked), and that used as the basis for design . Feature Analysis Year(s) Design Year Storm drain system for arterial and collector streets JO & JOO JO Storm drain system for local streets JO & 100 JO Open channels NIA NIA Swale/buried conduit combination in lieu of channel NIA NIA Swales NIA NIA Roadside ditches and culverts serving them NIA NIA Detention facilities: spillway crest and its outfall NIA NIA Detention facilities: outlet and conveyance structure(s) NIA NIA Detention facilities: volume when outlet plugged NIA NIA Culverts serving private drives or streets NIA NIA Culverts serving public roadways NIA NIA Bridges: prov id e in bridge report. NIA NIA Hydraulics What is the range of design flow velocities as outlined below? Design flow velocities; Gutters Conduit Culverts Swales Channels Highest (feet per second) 4.05 8.85 NIA NIA NIA Lowest (feet per seco nd) 1.27 1.56 NIA NIA NIA Streets and Storm Drain Systems Provide the summary information outlined below: Roughness coefficients used: For conduit type(s) RCP STORMWATER DESIGN GUIDELINES Effective February 2007 For street gutters: HDPE Page 24 of 26 O.OJ8 Coefficients: 0.013 0.013 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage ConceQt and Design Parameters I Continued (Page 4 .16) .... Design Parameters (continued) ,, .. '1:' ' : . ~ ' · . Hydraulics {continued) Street and Storm Drain Systems (continued) For the following , are assumptions other than allowable per Guidelines? Inlet coefficients? ./ No Yes Head and friction losses ./ No Yes ---- Explain any "yes" answer: In conduit is velocity generally increased in the downstream direction? _:L Yes --No Are elevation drops provided at inlets, manholes, and junction boxes? _:L Yes --No Explain any "no " answers: Are hydraulic grade lines calculated and shown for design storm? ./ Yes --No For 100-year flow conditions? _:L Yes --No Explain any "no " answers : What tailwater conditions were assumed at outfall point(s) of the storm drain system? Identify each location and explain: Yes, the storm drain system was designed taking into account a tail water o/295.0'. Open Channels If a HEC analysis is utilized, does it follow Sec Vl.F .5.a? __ Yes __ No Outside of straight sections, is flow regime within limits of sub-critical flow? __ Yes __ No If "no" list locations and explain : Culverts If plan sheets do not provide the following for each culvert , describe it here. For each design discharge, will operation be outlet (barrel) control or inlet control? Entrance, friction and exit losses: Bridges Provide all in bridge report STORMWATER DESIGN GUIDELINES Effective February 2007 Page 25 of 26 APPENDIX. D: TECH. DESIGN SUMMARY As Revised August 2012 SECTION IX APPENDIX D -TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters Continued (Page 4.17) . < Design Para.meters (conthiued}' ;: . Computer Software What computer software has been used in the ana lysis and assessment of stormwater management needs and/or the development of facil ity designs proposed for subject property project ? List them below, be ing sure to identify the software name and version , the date of the version , any app licable patches and the publisher Excel spreadsh eets, A utodesk Ci vil 3D Storm S ewer A naly sis and H y drojlow Part 5 -Plans and Specifications Requ irements for submittal of construction drawings and specifications do not differ due to use of a Technical Design Summary Report . See Section Ill , Paragraph C3 . : , ,' t -~. Conclusions ;•, . ' ·',,·I' . Add any concluding information here : . . . . . . Th e storm sewer system and detention faczl1ti es are desig n ed in accordance with the BCS Drainag e Des ig n Guidelines. , ;· Attestation : < Provide attestation to the accuracy and completeness of the foregoing 6 Parts of this Technical Des i n Summa Draina e Re art b si nin and sealin be low. State of Texas PE No .. __.b.c... .. _)_B_o_({) _Cf_ STORMWATER DESIGN GUIDELINES Effective February 2007 Page 26 of 26 APPENDIX . D: TECH. DESIGN SUMMARY As Revised August 2012 Item I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Barracks II Subdivision Phases 105 &106 E ' E f t fC t f n2meer s s 1ma e o ons rue ion Description Unit General Items Mobilizat ion, Overhe ad and Cons tru ction Staking LS Topsoil Removal and Replacement, complete in place LS Insta ll End of Street Signs , complete in place EA Street Name Signs , complete in place EA Stop Signs , complete in place EA Paveme nt Striping and Markings, co mpl ete in place LS Erosion & Sediment Control -SWPP P Implementation & Maintenance , Silt Fence, LS Co nstru ction Exit, Rock Filter Dam, etc ., complete in place Hydroseed and Hydromulch , complete in place SY Street Construction Iteois Concrete Pavement Excavatio n & Grading, complete in place LS Mixing & incorporation of lime, 6" deep , complete in place SY Mixing & incorporation of lime, 8" deep, co mpl ete in place SY Hy drated Lime, co mplete in place (27 lb/s y for 6" deep & 36 lb/sy for 8" deep) Ton 6" Reinfor ced Co ncrete Pavement w/Curb, complete in place SY 7" Reinforced Conc rete Pavement w/Curb, comp lete in place SY Reinforced Concrete Pavement -Aprons -6" Thick w/ Monolithic Standard Curb, SF co mpl ete in place Re inforc ed Concrete Pavemen t -Alleys -6" Thick, complete in place SF Concrete Sidewalk & Ramp s -4" thick, complete in place SF ADA Ramp s -Detectable Warning Surfaces, complete in place EA Estimated Unit Price Ouantitv I $ 40 ,000 .00 I $ 12,000 .00 2 1 $ 150 .00 7 $ 350 .00 7 $ 400 .00 1 $ 5,000 .00 l $ 7,500 .00 5,240 $ 0.50 General Items Subtotal l $ 60,000.00 6,153 s 2.10 9,3 76 $ 2.80 252 $ 170 .0 0 4,033 $ 32.00 8,463 $ 35 .00 4,39 0 $ 4.50 8,590 $ 3.90 35,800 $ 3.50 24 $ 500 .00 Street Construction Concrete Pavement Items Subtotal Page 1of4 Total $ 40 ,000 .00 $ 12,000 .00 $ 3,150 .00 $ 1,400 .00 $ 1,6 00 .00 $ 5,0 00 .00 $ 7,50 0.00 $ 2,620.00 $ 73,270.00 $ 60 ,000 .00 $ 12,921.30 s 26,252 .80 $ 42,840 .00 $ 129 ,056.0 0 $ 296,205 .00 $ 19,755 .00 $ 33,501.00 $ 125 ,3 00 .00 s 12,000 .00 $ 757,831.10 Barracks II Subdivision Phases 105 &106 E ' E . fC ngmeer s shmate o onstruchon Item Description Unit Estimated Uni t Price Total Ouantitv Storm Sewer Construction Items 19 36" RCP Pipe, complete in place -Structural Backfill, complete in place LF 603 $ 90 .00 $ 54,270.00 20 36" HOPE Pipe, comp lete in place -Structural Backfill, complete in place LF 1,043 $ 80 .00 $ 83,440.00 21 30" RCP Pipe, com plete in place -Structural Backfill, complete in place LF 80 $ 70 .00 $ 5,600.00 22 30" HOPE Pipe, complete in place -Structural Backfill , complete in place LF 143 $ 60 .00 $ 8,580.00 22 24" RCP Pipe, complete in place -Structural Backfill, complete in place LF 414 $ 45 .00 $ 18 ,630.00 23 24" HOPE Pipe, complete in place -Structural Backfill, complete in place LF 273 $ 40 .00 $ 10,920.00 24 18" RCP Pipe, comp lete in place -Structural Backfill, complete in place LF 425 $ 32 .00 $ 13,600.00 25 18" HOPE Pipe, complete in place -Structural Backfill, complete in place LF 159 $ 32 .00 $ 5,088.00 26 Curb Inlet -IO' wide, complete in place EA 4 $ 3,500 .00 $ 14 ,000 .00 27 Curb Inlet -IO' x 8', complete in place EA 2 $ 3,750 .00 $ 7,500 .00 28 Curb Inlet -5' wide, complete in place EA 6 $ 2,500 .00 $ 15 ,000.00 29 Curb Inlet -5' x 8', complete in place EA 2 $ 2,750 .00 $ 5,500.00 30 Curb Inlet -15' wide, complete in place EA 1 $ 4,500 .00 $ 4,500.00 3 1 Alley Gutter Area Inlet -V-4430 complete in place EA 3 $ 3,500 .00 $7,000 32 3'x3' Junction Box, complete in place EA I $ 1,500 .00 $ 1,500.00 33 8'x4' Junction Box, complete in place EA 2 $ 3,000 .00 $ 6,000.00 34 8'x8' Junction Box, complete in place EA I $ 3,250.00 $ 3,250.00 35 TV Testing and Inspection, complete in place LF 2,981 $ 2.00 $ 5,962 .00 36 Rock Riprap, comp lete in place SY 65 $ 25 .00 $ 1,625 .00 37 Concrete Flume, complete in place SF 3,433 $ 6.00 $ 20,598 .00 Storm Sewer Construction Items Subtotal $ 292,563.00 Page 2 of 4 I Barracks II Subdivision Phases 105 &106 E ' Er t re t r ngmeer s s 1ma e o ons rue 100 Item Description Unit Esti mated Unit Price Total Quantity Water Construction Items 38 12" C900 Water Pipe w/tracer wi re -Structural Backfill, complete in place LF 546 $ 40.00 $ 21,840.00 39 16" Casing, complete in place LF 52 $ 80 .00 $ 4,160.00 40 Connect to Existing 12" Water Line EA 1 $ 1,000.00 $ 1,000.00 41 12"x 6" M.J . Tee, complete in place EA 1 $ 700.00 $ 700.00 42 12"x 12" M .J. Tee, complete in place EA 1 $ 1,000.00 $ 1,000.00 43 12" x 8" M.J . Tee, complete in place EA 1 $ 800.00 $ 800 .00 44 12" M.J . Gate Valve, complete in place EA 2 $ 1,850.00 $ 3,700.00 45 12" x 45° M.J . Bend, complete in place EA 4 $ 650.00 $ 2,600.00 46 4" Blowoff Assembly, complete in place EA 2 $ 2,200.00 $ 4,400.00 47 Waterline Testing LS 1 $ 1,500 .00 $ 1,500.00 48 8" C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 1516 $ 28 .00 $ 42,448.00 49 6" C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 1330 $ 24 .00 $ 31 ,920 .00 50 Connect to Existing 8" Water Line EA 1 $ 500.00 $ 500.00 51 Connect to Existing 6" Water Line EA 2 $ 500.00 $ 1,000.00 52 Fire Hydrant Assembly (w/valve, vert. extension), complete in place EA 4 $ 3,500.00 $ 14 ,000.00 53 8"x 8" M.J . Tee, complete in place EA 1 $ 600.00 $ 600.00 54 8"x 6" M.J . Tee, complete in place EA 3 $ 550.00 $ 1,650 .00 55 6"x 6" M.J . Tee, complete in place EA 2 $ 500.00 $ 1,000.00 56 8"M.J . Gate Valve, complete in place EA 5 $ 1,050 .00 $ 5,250 .00 57 6" M.J. Gate Valve, complete in place EA 3 $ 1,000.00 $ 3,000 .00 58 8" x 45° M.J . Bend, complete in place EA 33 $ 500.00 $ 16 ,500.00 59 8" x 11.25° M.J. Bend, complete in place EA 2 $ 500.00 $ 1,000.00 60 6" x 45 ° M.J. Bend, complete in place EA 4 $ 450 .00 $ 1,800.00 61 6" x 11.25° M.J . Bend, complete in place EA 4 $ 450.00 $ 1,800.00 62 I" Water Service,< 15 ft (avg length= 2 ft) (8" Line) EA 2 $ 700 .00 $ 1,400.00 63 1.5" Water Service,< 15 ft (avg length= 2 ft) (8" Line) EA 6 $ 750 .00 $ 4,500 .00 64 I" Water Service,< 15 ft (avg length = 2 ft) (6" Line) EA 4 $ 650.00 $ 2,600 .00 65 1.5" Water Service,< 15 ft (avg length = 2 ft) (6" Line) EA 17 $ 800.00 $ 13 ,600 .00 66 1.5" Water Service,> 15 ft (avg length= 48 ft) (6" Line) EA 15 $ 1,200.00 $ 18,000.00 67 2" Blowoff Assembly, complete in place EA 3 $ 1,000 .00 $ 3,000 .00 Water Construction Items Subtotal $ 207,268.00 Page 3 of 4 " Item 68 69 70 71 72 73 74 75 76 77 78 Barracks II Subdivision Phases 105 &106 E E · t re t r n2meer s shma e o ODS rue IOD Description Unit Estimated Unit Price Total Ouantitv Sanitary Sewer Construction Items 6" PVC Sewer Line -D3034 -Structural Backfill, complete in place LF 696 $ 20.00 $ 13,920.00 6" PVC Sewer Line -ASTM D-2241 -Structural Backfill, complete in place LF 20 $ 22 .00 $ 440.00 8" PVC Sewer Line -D3034 -Structural Backfill, complete in place LF 1,393 $ 24.00 $ 33 ,432 .00 6" Cleanout, com plete in place EA 2 $ 750.00 $ 1,500 .00 4" Sewer Service-Single (avg. length= 4ft), complete in place EA 4 $ 300 .00 $ 1,200.00 4" Sewer Service-Double (avg length= 4 ft), complete in place EA 19 $ 400 .00 $ 7,600.00 4" Sewer Service-Single (avg length= 48 ft), complete in place EA 5 $ 850.00 $ 4,250 .00 4" Sewer Service-Double (avg length= 48 ft), complete in place EA 27 $ 950 .00 $ 25,650 .00 Tie-In to Existing 8" PVC Sewer Line, complete in place EA 1 $ 1,000.00 $ 1,000 .00 Concrete Manhole -4' Dia -complete in place EA 8 $ 2,800.00 $ 22,400.00 TV Testing and Inspection, complete in place LF 2,109 $ 2.00 $ 4,218.00 Sanitary Sewe r Construction Items Subtotal $ 115 ,610.00 General Items Subtotal $ 73,270.00 Street Construction Concrete Pavement Items Subtotal $ 757,831.10 Storm Sewer Construction Items Su btotal $ 292,563.00 Water Construction Items Subtotal $ 207,268.00 Sanitary Sewer Con struction Items Subtotal $ 115,610.00 TOTAL CONSTRUCTION $ 1,446,542.10 F-12327 SCHULTt ENG!NEEalNG1 LLC. Page 4 of 4 AB Project Reprint Confirmation Page EABPRJB4814564 Texas Department of Licensing and Regulation Architectural Barriers Project Registration Confirmation Page Tuesday, May 06, 2014 PERSON FILING FORM Name: Edd ie Ha re Phone: 979-820-0149 Person Address: 5855 Foste r Road, Bryan , Tx 77807 Ras Number: 00000008 Project Name: The Barracks II Subdivision , Ph 105 106 Project City of Co ll ege Station Right of Way EABPRJB4814564 Address: Intersection of Deacon Driveand General Parkway College Station , TX 77845 County: Brazos TENANT Contact Name: Phone: Contact Address: BUILDING/FACILITY Name: City of College Station Right of Way FACILITY Owner: City of College Station Phone: 979 -764 -3570 Owner Address: 1101 Te xas Ave ., College Station , TX 77840 Contact Name: Danielle Singh Phone: Contact Address: Contact Email: dsingh@cstx .gov DESIGN FIRM Name: Schultz Engineering LLC Phone: 979-764 -3900 Firm Address: 2730 Longmire , Ste A , College Station, TX 77845 Designer Name: Joseph Schultz , PE Emai: joeschultz84@verizon .net Type of License: Engineer License Number: 65889 PROJECT DESCRIPTION Start Date: 05 /2014 Completion date: 12/2014 Estimated Cost: $137 ,500 .00 Type of Work: New Construction Type of Funds: This project is privately funded , on private land for private use. Are the private funds provided by a tenant? No State Lease No. : Scope of Work: Sidewalks , ramps and crosswalks for a new street Does this building(s) have more than one level? Not a building Are there any elevators, escalators, or platform lifts in this building? Not a building Are there any boiler in this building? Not a building This AB Project registration Confirmation Page , construction documents , and applicable fees must be submitted in accordance w it h the Texas Administrative Code Chapter 68 , Rule 68 51 . lfTDLR will be performing the review or inspection services , see Rule 68 80 . If a RAS will be performing the review or inspection services , please contact the RAS as they set and collect the ir own fees , see Rule 68 75 . In accordance w ith Rule 68 52 , the owner of a building or fac ility must also obta in an inspection from the department or a registered access ibility specialist not later than the first anniversary of the completion of construction . Request for inspection shall be made by completing the Request for Inspection form and submitting it no later than 30 ca lendar days after the completion of const ruct ion. https ://www .tdlr.texas .gov/ ABProjectRegistrationOnline/ ABProjectPrintConfirmation .aspx?strProjNum=EABPRJB4814564[5/6/2014 10 : 16: 00 AM] EDDIE HARE-ACCESSIBILITY SPECIALIST TDLR/T AS Registered Accessibility Specialist #0008 5855 Foster Road * Bryan, Texas 77807 (979) 775-6850 office * (979) 775-6820 fa x * (979) 820-0149 cell * (877) 381 -9685 toll free May 10 , 2 01 4 Danielle Singh City of College Station 1101 Texas Ave. College Station, Texas 77840 Re: Th e Barrack s II S u bdi v is io n . Phases I 05 & I 06 EABPRJB4814564 City of Co ll ege Station Ri g ht s of W ay @ ln te rsection of Deacon Dri ve a nd G e neral Parkway Co ll ege Stati o n, T e xas 778 45 PLAN REVIEW-CO M PL E TED Dea r Dani e ll e S in g h ; Encl o sed a re the res ul ts of th e pl a n rev iew co mpl ete d o n th e re fe re nce d fa c ilit y . Id entifi ed o n th e re port a re area s of noncon forma nce w ith ac cess ibility st a nd a rd s ad o pted by th e T exas D e partm e nt o f Li cen s in g a nd Reg ul atio n for the purpose of en s urin g compli a nce w ith T exas G overnm e nt Cod e , C hapte r 4 6 9 . A lt houg h d efic ienci es may have been noted , th e re fer en ce proje ct m ay be e li g ibl e for In s pection a pprova l if constru cted in ac corda nce w ith th e Texa s A ccess ibility St a nd a rd s. It e m s whi c h a re th e re s po ns ib ili ty of th e ow ner sh o uld be referred to t he a ppropri ate p ers on fo r ac tion. The building or facility owner must request an inspection from the Department, (or a De partment a uth ori z ed prov id e r of in s p ection se rv ices) no later than thirty (30) days after completion of construction. If the completion date provided on the Project Registration Form is no longer correct, notify this office (in w ritin g ) of the revised completion date as soon as possible. Th is d et e rm ination d oes not a ddress a pplica bility of th e A m e ric an s w ith Di sa bil iti es Ac t (A DA), (P .L. I 01 -336) o r a ny oth e r loca l, s tate, o r fe d era l require m e nt. Fo r in for m a ti o n on t he ADA Ho tlin e, (8 00 ) 94 9 -4232 , o r th e Uni t ed Stat es De partm e nt o f Ju s ti ce a t (2 0 2) 5 14 -030 I . Please reference the Department assigned project number (EA BPRJ #) in all future correspondence p e r t aining to t his p roj ect . Si ncere ly, Eddi e Access ib ili ty Spec ia lis t ICC# 1131801-21 RAS# 0008 Cc: Schultz E ngi neerin g THE REVIEW OF DOCUMENTS AS CON TR ACT DOCUMEN TS AND FI ELD INS PEC TI ONS. BY TH IS REG IS TERED ACCESSSIBL!TY SPECI ALIST. EDD IE HARE. FO R THE TEXAS DEPARTM EN T OF LICENSING AN D REGU LA TI ON (TD LR). AUS TI N. TEXAS. IS BASED ON BES T EFFORTS ENDEAVOR FOL LOWING INS TR UC TI ON AND CE R TI FICA TION BY BOTH TDL R AND ICBO PL AN REV IEW AND INS PEC TION IN NO WA)' WA RR AN TS COMPLE TE COMP LIANCE TO TH E TEXAS ACCESS/BL/T Y STANDA RDS. TH IS BUS INESS. TH E PR OFESS IONA L. HIS EMPLO>EES. AND CLI EN T FO R WHOM TH E REVIEW OR INS PEC TI ON IS MADE AGREES TO HOLD HARMLESS AND INDEMN IFY TH E REG IS TERED ACCESSIBILTY SPECI ALIS T. ED DIE HARE. AND THE TDLR FR OM AND AGA INS T AN Y LI ABILI TY ARISING FROM TH E PERFO RMA NCE OF THE WO RK TAS 2012 Plan Review for EABPRJB4814564, The Barracks II Subdivision, Phases 105 and 106, May 10, 2014 Scope of Work: New sidewalks, curb ramps and cross walks within a new subdivision in the Rights of Way of the City of College Station , Texas. Findings: There are no comments or deficiencies noted from thi s rev iew of the plans s ubmitted; the reference project may be eligible for Inspection approval if con structed in accordance with the Texas Acces s ibility Standards. This project meets or exceeds the right of Way section of the Administrative Rules 68 .102 . Publ ic Right-of-Ways Projects . (New section effective February 1, 2005, 30 Tex Reg 382 ; amended effective Ma rch 1, 2007, 32 TexReg 884 ; amended effective March 15, 2012, 37 TexReg 677) TH E REVIEW OF DOCUMEN TS AS CON TR AC T DO CU ME N TS AND FIELD INSPEC TIO NS. BY TJ-f!S REG IS TE RED ACCESSS IBUTl' SPECI ALIS T. EDD IE HARE. FOR TH E TEXA S DEPARTMtN T OF LIC ENS ING AND REGULA TI ON (TDL R). AUS TI N. TEXA S. IS BAS ED ON BES T EFFO RTS EN DEAVO R FOLLOWING INS TR UC TI ON AND CER T/FI CA TI ON B Y BOTH TDL R AND IC BO PLA N RE VIEW AND INS PE C TI ON IN NOWAY WA RR AN TS COMPLE TE COMP LIANCE TO TH E TEXAS ACCESS/Bl/TY S TAN DARDS. TH IS BUS INESS. TH E PROFESSIONA L. HIS EM PLO l'EES. AND CLI EN T FO R WHO M TH E REVIEW OR INSPEC TI ON IS MADE AGREES TO HOLD HARML ESS AN D INDEMNIFY TH E REG IS TERED ACCESS /BIL TY SPECIALIS T. EDD IE HARE. AND TH E TDLR FROM AND AGA INS T AN Y LIABILITY ARIS ING FR OM TJ-f E PERFO RMANC E OF TH E WORK . . Sewer System Report for The Barracks II Subdivision Section Phases 105 & 106 College Station, Texas April 2014 Prepared By: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 F-12327 SCHULTZ ENGINEERING, LLC. GENERAL INFORMATION The Barracks II Subdivision is a 108-acre development in the area generally bounded by Wellborn Road on the east, Holleman Drive South on the west, Cain Road to the north and Rock Prairie Road to the south. It is zoned PDD and is comprised of a mixture of residential and commercial land uses as shown on Exhibit A . There are 425 residential lots planned for the site and 25.3 acres of commercial property. The area surrounding the site is generally undeveloped, with the exception of three residential developments adjoining the tract on the south. The majority of the area between Cain Road and Rock Prairie Road is described as General Suburban in the City's Comprehensive Plan, which implies that it is likely to develop in a similar manner as The Barracks II Subdivision Phases 100-104, 200 and 300 have been completed or are under construction. Phases 105 & 106 are unchanged from the Preliminary Plat and will add 80 new lots. Sewer service to the area is provided by 18" and 12" lines running along Old Wellborn Road and along the south property line of The Barracks II Subdivision. These lines will be the primary outfall for this development, but they are also intended to serve other adjoining tracts in the same sewer basin. These adjoining areas are identified as: CSISD Tract -23.50 acres Mayo Tract -24.99 acres Turner Tract (partial)-15.08 acres Barger Tract (partial) -18.06 acres All four of these tracts are presently zoned R. None of these tracts affect this portion of the Sewer System . Design Criteria: P rimary S ewer Outfall SJ & S2: Phases 105 & 106 {Travis Cole Ave .) -8" sewer line at existing terminus of Travis Cole Ave (Discharges into existing 12" along Deacon Drive West). Primary Se wer Outfall SJ & S4: Phases 105 & 106 (Tang Cake Drive)-Existing 12" sewer line along Old Wellborn Road Domestic Demand: Avg. Pop Density: Average Flow: Peaking Factor: Commercial Demand: Avg. Pop Density: Average Flow: Peaking Factor: Pipe: Applicable Exhibits: 2.67 people per lot 100 gpd/cap or 267 gpd per lot 4 30 people per acre 50 gpd/cap or 1500 gpd per acre 4 PVC 03034 SOR 26 Exhibit A & B -Sewer Exhibit Exhibit C -Sanitary Sewer Analysis Spreadsheet Conclusion: The sewer system shown in Exhibits A & B has been laid out using the criteria in the Bryan/College Station Design Guidelines and TCEQ. It is analyzed assuming peak flow conditions when this portion of the subdivision is fully developed. The spreadsheet in Exhibit C shows all lines depicted in Exhibits A & B to be capable of carrying the flows that come to them under these conditions. This analysis will be used as the basis for all subsequent sewer line designs in the subdivision. The system will function as intended as long as the line sizes and slopes are equal to or greater than those shown herein. It should be noted that any significant additional flow from off-site sources will likely exceed the capacity of several lines, so careful study is advised of any changes to the contributing area. Line Contributing Flows ... .. "; » "; "; .... e == u ·o c 0 ~ rn .., 0 z c ; <( ... .. .. .., E ~~ .... "" -e ·E .. ::> .. 0 0 "ii 0. Q e ., .... 10: z ci:: 0 .s 0 .. e From To c u z c;; c .. e .., .. = ... e .Cl';; 267 1200 1500 1050 "" ·c c. GPDper GPO per GPO per GPDpei ~ = ::> 0 0 10: u Lot Acre Acre Acre MH# MH# !.<>ts Acres Acres I Acres GPO GPO C02 MH7 5 0 0 0 1,335 -MH7 MH4 12 0 0 0 3,204 1,335 MH4 MH3 30 0 0 0 8,010 4,539 MH3 MH2 9 0 0 0 2,403 12,549 MH2 MHl 3 0 0 0 801 14,952 MHI EXMHI 12 0 0 0 3,204 15,753 Exhibit C The Barracks II Phases 105 106 Sewer Analysis Spreadsheet Sewer Lines Sl S2 Flow Calculations Peaking Peak Avenge Daily Flows Infiltration Size Material (ADF) (10%ADF) Factor Flows GPO CFS CFS CFS (m.) 1,335 0.0021 0.0002 4.00 0.008 6 03034 4,539 0.0070 0.0007 4.00 0.029 6 03034 12,549 0.0194 0.0019 4.00 0.080 8 03034 14,952 0.0231 0.0023 4.00 0.095 8 03034 15,753 0.0244 0.0024 4.00 0.100 8 03034 18,957 0.0293 0.0029 4.00 0.120 8 03034 Page I of I Mannings n 0.013 0.013 0.013 0.013 0.013 0.013 Pipe Calculations Min. Actual Slope Inside Manning Pipe Peak Design for Es:isting Friction Slope Slope Flow Diameter Slope Peak or Designed Peak Flows Check Depth Flows Systems Inches 'Vo % % Inches 5.793 0.346 0.80 0.80 OK 0.75 5.793 0.533 0.80 0.80 OK 1.13 7.754 0.402 0.55 0.55 OK 1.83 7.754 0.430 0.55 0.55 OK 1.95 7.754 0.444 0.55 0.55 OK 1.99 7.754 0.340 0.55 0.40 OK 2.33 Line Contributing Flows ~ .. -; ;... -; -; ... e :: u ·u = 0 0 ~ ~ < .... 0 ;z: -= .. .. .. ., ~ ii:~ ... ~-e :: .. ;J .. 0 0 "ti ..,c e ~ ... Ii: ;z: 0 0 From To ~ = u .s ;z: .. e (ii = • e ., .. :s .... 267 1200 1500 1050 e .I:>~ ~ ·c c. GPDper GPDper GPDper GPDpet ii: = ;J 0 0 Ii: u Lot Acre Acre Acre MH# MH# Lots J Acres Acres Acres GPO GPO C03 MH6 8 0 0 0 2,136 -C04 MH6 5 0 0 0 1,335 MH6 MH5 17 0 4.91 0 26,634 3,471 • Exhibit C The Barracks II Phases 105 106 Sewer Analysis Spreadsheet Sewer Lines S3 S4 Flow Calculations Average Daily Flows Infiltration Peaking Peak Size Material (ADF) (10% ADF) Factor Flows GPO CFS CFS CFS (m.) 2,136 0.0033 0.0003 4.00 0.014 6 03034 1,335 0.0021 0.0002 4.00 0.008 6 03034 30,105 0.0466 0.0047 4.00 0.191 8 03034 .• ,, Page I of I Mannings n 0.013 0.013 0.013 Pipe Calculations Min. Actual Slope Manning Pipe Peak Inside Design for Existing Friction Slope Slope Flow Diameter Slope Peak or Designed Peak Flows Check Depth Flows Systems Inches ~. % % Inches 5.793 0.471 0.80 0.80 OK 0.85 5.793 0.346 0.80 0.80 OK 0.75 7.754 0.470 0.55 0.55 OK 2.70 ~hultz Engineering, LLC April 3, 2014 Alan Gibbs, P .E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards -The Barracks II Subdivision Phases 105 & 106 Dear Mr. Gibbs: Office : 979 .764 .3900 Fax : 979 .764 .3910 The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above-referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual except that Sewer Line S-1, shown on Sheet 24, has a slope of 0.40% to match the existing pipe stub. No other alternate design or construction methodology was used . I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B/CS Standard Details. Sincerely, J~:.~ Civil Engineer F-12327 SCHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station , Texas 77842 schultzengineeringllc .com .. ' Water System Report for The Barracks II Subdivision Phases 105 & 106 College Station, Texas April2014 Prepared Bv: TBPE Firm Registration No . 12327 2730 Longmire, Suite A College Station, Texas 77845 979.764.3900 General Information Location: General Note : Land Use: Phases 105 & 106 are located northeast of Phases 103 & 104 of the Barracks II Development. The Barracks II Subdivision is a 108-acre development located midway between Rock Prairie Road and Cain Road in south College Station. It is bounded on the west by Holleman Drive South and on the east by Old Wellborn Road. The water lines to serve these 80 residential lots will be a 6" along Travis Cole Avenue, an 8" line along General Parkway, an 8" along Tang Cake Drive, an 8" along public alley 1 and a 12" line along Deacon Drive West. These lines will create loops in the system along Deacon Drive West, Capps Drive, and General Parkway. These lines will connect to existing waterlines along Deacon Drive West (12"), Capps Drive (6"), Travis Cole Avenue (6"), and General Parkway (8"), all constructed in previous phases. Single family residential Design Criteria/ Analysis Primary Water Supply: Existing 12" water line along Deacon Drive West and Existing 8" waterline along Capps Drive. Existing System Pressure Tests: Flow Hydrant -See Appendix A Flowrate: 1,190 gpm Static Pressure: 7 5 psi Residual Pressure: 55 psi Exh ibits: Exhibit A -Water Layout Appendix A -Hydrant Flow Test Results Appendix B -WaterCAD Analysis Summary-Domestic Demand Appendix C -WaterCAD Analysis Summary-Fire Flow Demand @FHl Appendix D -WaterCAD Analysis Summary -Fire Flow Demand @ FH2 Fire Flow: Domestic Use 1,000 gpm for Single Family Residential 1.5 gpm per lot for Single Family Residential Phases 105 & 106-80 Lots= 120 gpm Total Domestic Demand= 120 gpm The proposed 12'', 8" & 6" waterlines are in accordance with the BCS Water Design Guidelines. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, (1120 gpm) which produced the lowest pressure in the system. Conclusion Summary of Calculations Pressure 70.5 Domestic Demand Min. Velocity Max 1.6 Pressure 57 .9 Domestic Demand & Fire Min. Hydrant 1 Velocity Max 4 .4 Pressure 57.3 Domestic Demand & Fire Min. Hydrant 2 Velocity Max 5.3 Pressure 52.9 Domestic Demand & Fire Min. Hydrant 3 Velocity Max 6 .4 The minimum pressure (52.9 psi) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number 3 . The Max Velocity for this system occurs at the same demand when the velocity in Pipe P-14 has a velocity of 6.4 fps . All of these pressures exceeds the 20 psi and 35 psi minimum pressure requirements, respectively. The maximum pipe velocities are less than 12 fps . The proposed 12", 8" and 6" water lines meet or exceed all of the design criteria for the City of College Station and the Wellborn Special Utility District. It will provide adequate water pressure, flowrate and velocity for both domestic and fire flow demands . Appendix A SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT 9-19-2013 Date: Water System Owner: _Wellborn SUD __________________ _ The Barracks II Subdivision Development Project: Papa Bear Drive & Towers Parkway Flow Test Location : --------------------------- Nozzle size (in .): _2 .5 __ 60 Pitot Reading (psi): __ _ 1300 Flowrate (gpm): ___ _ Discharge Coeff: (c) = 0.90 Flowrate Formula: Q=29 .84cd 2p 112 c = discharge coeff. d =orifice size (in) P = pitot pressure (psi) Hayes Lane and Papa Bear Drive Pressure Gauge Location : --------------------------- 75 Static Pressure (psi): 65 Residual Pressure (psi): 3265 Computed Discharge at 20 psi Residual Pressure: QR= _____ _ Note: The flow test and report were prepared in accordance with NFPA 291. Joe Schultz Report Prepared by: Ricky Flores Others Present: Clenden Adams -Wellborn SUD_ _Britt Curless. _______ _ Pipe Number EX-P-1 EX-P-2 EX-P-3 EX-P-4 P-1 EX-P-8 EX-P-10 EX-P-12 EX-P-13 P-12 P-8 P-7 P-6 P-5 P-2 P-3 EX-P-7 EX-P-6 EX-P-5 EX-P-9 EX-P-11 P-14 P-13 EX-P-14 P-10 P-11 P-4 P-9 P-RES Length (ft) 641 736 337 95 368 230 431 153 226 343 418 298 9 398 100 31 613 618 180 254 159 547 691 96 48 43 40 48 29 Appendix B WaterCAD Analysis Summary Pipe Analysis -Domestic Demand Size (in) Material Hazen-Williams C 8 PVC 150 8 PVC 150 12 PVC 150 12 PVC 150 12 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 12 PVC 150 12 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 12 PVC 150 8 PVC 150 12 PVC 150 WaterCAD Analysis Summary Junction Analysis -Domestic Demand Juncuon Junction Elevation Demand Pressure (psi) (gpm) EX-J-1 306.89 14 70.6 EX-J-2 306.58 69 70.7 EX-J-3 302 26 72.9 EX-J-4 302.5 0 72.6 J-1 302.38 0 72.6 J-2 302.15 0 72.7 J-3 301.66 32 72.9 EX-J-8 307.8 48 70.2 EX-J-11 307.6 17 70.2 EX-J-13 306.7 0 70.6 J-12 305.69 18 71.1 J-9 305.41 0 71.2 J-8 303.76 0 71.9 J-7 302.7 0 72.4 FH-2 302.66 0 72.4 FH-1 301.84 0 72.9 EX-J-7 305.6 44 71.1 EX-J-6 304.31 0 71.8 J-14 307 50 70.5 FH-3 304.86 39 71.4 J-13 304.56 35 71.6 J-10 302.84 63 72.3 J-11 304.36 63 71.6 J-4 301.64 0 72.9 J-15 305.59 32 71.1 Flow (gpm) Velocity (ft/s) -71 0.46 -163 1.04 358 1.02 205 0.58 205 0.58 58 0.37 48 0.3 2 0.01 2 0.01 -16 0.1 -48 0.3 -111 0.71 -174 1.11 -174 1.11 32 0.09 32 0.09 -38 0.43 -59 0.67 -153 0.98 22 0.14 29 0.33 -20 0.23 -59 0.67 -94 1.07 -63 0.71 -63 0.71 0 0 32 0.2 547 1.55 . . Pipe Number EX-P-1 EX-P-2 EX-P -3 EX -P-4 P-1 EX-P -8 EX-P-10 EX-P-12 EX-P-13 P-12 P-8 P-7 P-6 P-5 P-2 P-3 EX-P -7 EX-P-6 EX-P-5 EX-P-9 EX -P-11 P-14 P-13 EX -P-14 P-10 P-11 P-4 P-9 P-RES Append ixC WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-1) Length (ft) Size (i n) Material Hazen- Will iamsC 641 8 PVC 150 736 8 PVC 150 337 12 PVC 150 95 12 PVC 150 368 12 PVC 150 230 8 PVC 150 431 8 PVC 150 153 8 PVC 150 226 8 PVC 150 343 8 PVC 150 418 8 PVC 150 298 8 PVC 150 9 8 PVC 150 398 8 PVC 150 100 12 PVC 150 31 12 PVC 150 613 6 PVC 150 618 6 PVC 150 180 8 PVC 150 254 8 PVC 150 159 6 PVC 150 547 6 PVC 150 691 6 PVC 150 96 6 PVC 150 48 6 PVC 150 43 6 PVC 150 40 12 PVC 150 48 8 PVC 150 29 12 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-1) JUnCtlOI Junction Elevation Demand Pressure (gpm) (psi) EX-J-1 306 .89 14 58 .3 EX-J-2 306.58 69 58 .6 EX-J -3 302 26 61 EX-J-4 302 .5 0 60.4 J-1 302 .38 0 60.4 J-2 302 .15 0 60.1 J-3 301.66 32 60 .3 EX-J-8 307 .8 48 57.9 EX-J-11 307.6 17 57 .9 EX-J-13 306 .7 0 58 .3 J-12 305 .69 18 58.7 J-9 305.41 0 58 .8 J-8 303.76 0 59 .4 J-7 302.7 0 59 .9 FH-2 302 .66 0 59 .9 FH -1 301.84 1,000 60 .2 EX-J-7 305 .6 44 59 EX-J -6 304 .31 0 59 .6 J-14 307 so 58 .2 FH-3 304 .86 39 59 .l J-13 304 .56 35 59.4 J-10 302 .84 63 59 .8 J-11 304.36 63 59 .2 J-4 301.64 0 60.4 J-15 305.59 32 58 .7 Flow(gpm) -148 -29 8 1223 1,064 1,064 134 164 143 143 125 94 31 -32 -32 1032 32 -77 -40 -159 81 4 -45 -84 -119 -63 -63 0 32 1547 Velocity (ft/s) 0.94 1.9 3.47 3.02 3 .02 0 .86 1.05 0.91 0.91 0 .8 0.6 0.2 0.21 0 .21 2.93 0.09 0.88 0.46 1.02 0.52 0.05 0.51 0.96 1.35 0.71 0.71 0 0.2 4.39 . Pipe Number EX-P-1 EX-P-2 EX-P-3 EX-P-4 P-1 EX-P-8 EX-P-10 EX-P-12 EX-P-13 P-12 P-8 P-7 P-6 P-5 P-2 P-3 EX-P-7 EX-P-6 EX-P-5 EX-P-9 EX-P-11 P-14 P-13 EX-P-14 P-10 P-11 P-4 P-9 P-RES Appendix D WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-2) Length (ft) Size (in) Material Hazen-WilliamsC 641 8 PVC 150 736 8 PVC 150 337 12 PVC 150 95 12 PVC 150 368 12 PVC 150 230 8 PVC 150 431 8 PVC 150 153 8 PVC 150 226 8 PVC 150 343 8 PVC 150 418 8 PVC 150 298 8 PVC 150 9 8 PVC 150 398 8 PVC 150 100 12 PVC 150 31 12 PVC 150 613 6 PVC 150 618 6 PVC 150 180 8 PVC 150 254 8 PVC 150 159 6 PVC 150 547 6 PVC 150 691 6 PVC 150 96 6 PVC 150 48 6 PVC 150 43 6 PVC 150 40 12 PVC 150 48 8 PVC 150 29 12 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-2) Ju.,~rnJFJ Junction Elevation Demand Pressure (gpm) (psi) EX-J-1 306.89 14 58 EX-J-2 306.58 69 58.4 EX-J-3 302 26 61 EX-J-4 302.5 0 60.5 J-1 302.38 0 60.S J-2 302.15 0 60.3 J-3 301.66 32 60.5 EX-J-8 307.8 48 57.5 EX-J-11 307.6 17 57.3 EX-J-13 306.7 0 57.S J-12 305.69 18 57.8 J-9 305.41 0 57.6 J-8 303.76 0 58.1 J-7 302.7 0 58.4 FH-2 302.66 1,000 58.4 FH-1 301.84 0 60.S EX-J-7 305.6 44 58.8 EX-J-6 304.31 0 59.6 J-14 307 so 57.6 FH-3 304.86 39 58.7 J-13 304.56 35 59.4 J-10 302.84 63 58.3 J-11 304.36 63 57.8 J-4 301.64 0 60.5 J-15 305.59 32 57.5 Flow (gpm) -236 -371 1150 857 857 222 304 350 350 332 300 237 174 -826 32 32 -130 -107 -293 66 -62 -112 -151 -186 -63 -63 0 32 1547 Velocity (ft/s) 1.5 2.37 3.26 2.43 2.43 1.42 1.94 2.23 2.23 2.12 1.92 1.52 1.11 5.27 0.09 0.09 1.47 1.21 1.87 0.42 0.71 1.27 1.71 2.11 0.71 0.71 0 0.2 4.39 . " . Pipe Number EX-P-1 EX-P-2 EX-P-3 EX-P-4 P-1 EX-P-8 EX-P-10 EX-P-12 EX-P-13 P-12 P-8 P-7 P-6 P-5 P-2 P-3 EX-P-7 EX-P-6 EX-P-5 EX-P-9 EX-P-11 P-14 P-13 EX-P-14 P-10 P-11 P-4 P-9 P-RES Appendix E WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-3) Length (ft) Size (in) Material Hazen-WilliamsC 641 8 PVC 150 736 8 PVC 150 337 12 PVC 150 95 12 PVC 150 368 12 PVC 150 230 8 PVC 150 431 8 PVC 150 153 8 PVC 150 226 8 PVC 150 343 8 PVC 150 418 8 PVC 150 298 8 PVC 150 9 8 PVC 150 398 8 PVC 150 100 12 PVC 150 31 12 PVC 150 613 6 PVC 150 618 6 PVC 150 180 8 PVC 150 254 8 PVC 150 159 6 PVC 150 547 6 PVC 150 691 6 PVC 150 96 6 PVC 150 48 6 PVC 150 43 6 PVC 150 40 12 PVC 150 48 8 PVC 150 29 12 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-3) JUll~"v' Junction Elevation Demand Pressure (gpm) (psi) EX-J-1 306.89 14 57.7 EX-J-2 306.58 69 58.l EX-J-3 302 26 61 EX-J-4 302.S 0 60.S J-1 302.38 0 60.S J-2 302.15 0 60.6 J-3 301.66 32 60.8 EX-J-8 307.8 48 57.2 EX-J-11 307.6 17 56.9 EX-J-13 306.7 0 57.4 J-12 305.69 18 57.9 J-9 305.41 0 58.2 J-8 303.76 0 59.1 J-7 302.7 0 59.8 FH-2 302.66 0 59.9 FH-1 301.84 0 60.7 EX-J-7 305.6 44 58.S EX-J-6 304.31 0 59.2 J-14 307 so 55.8 FH-3 304.86 1,039 52.9 J-13 304.56 35 58.3 J-10 302.84 63 59.8 J-11 304.36 63 58.9 J-4 301.64 0 60.8 J-15 305.59 32 58.1 Flow (gpm) -260 -432 1089 442 442 246 339 -235 -235 -253 -285 -348 -411 -411 32 32 -141 -81 -647 103 558 509 -530 -565 -63 -63 0 32 1547 Velocity (ft/s) 1.66 2.76 3.09 1.26 1.26 1.57 2.16 1.5 1.5 1.62 1.82 2.22 2.62 2.62 0.09 0.09 1.6 0.92 4.13 0.66 6.33 5.77 6.02 6.42 0.71 0.71 0 0.2 4.39 CASE NO.: TIME: STAFF: CITY oF Coll.EGE STATI ON Home o/T= A&M Univmity 0 T-J'ib,,L------~ FINAL PLAT APPLICATION (Check one) 0 Minor ($700) 0 Amending ($700) '~nal ($932) 0 Vacating ($932) 0Replat ($932) Is this plat in the ETJ? D Yes ~No Is this plat Commercial D or Residential IZJ / MINIMUM SUBMITTAL REQUIREMENTS: -~ $700-$932 Final Plat Application Fee (see above). 17i~33 Waiver Request to Subdivision Regulations Fee (if applicable). ~ $600 (m inimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is ,;i{le prior to the issuance of any plans or development permit). d8f Application completed in full. This application form provided by the City of College Station must be used and /hay not be adjusted or altered. Please attach pages if additional information is provided. ~ Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) lg] Two (2) copies of the grading , drainage , and erosion control plans with supporting drainage report . ~ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). ~ _9opy of original deed restrictions/covenants for re plats (if applicable). ~Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current with in ninety (90) days. The report must include applicable information such as ownership , liens , / ~cumbrances, etc . /~ Paid tax certificates from City of College Station , Brazos County and College Station l.S.D. lg] The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete . If the mylar is submitted with the final plat application , it shall be considered a submittal for the preliminary plan project and processed and reviewed as such . Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference __ N-+0-*-------------- NAME OF PROJECT The Ba"acks II Subdivision Phases 105 & 106 ADDRESS Intersection of Deacon Drive and General Parkway SPECIFIED LOCATION OF PROPOSED PLAT: East Side of Holleman Drive South between Cain Road and Rock Prairie Road APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Heath Phillips E-mail heath_superiorstructures@yahoo.co St reet Address P. 0. Box 262 ----------------------------------~ City Wellborn Zip Code 77881 ------ Phone Number 979-229-5906 Fax Number 979-703-7903 ---------------- 1/11 Page 1of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified . Please attach an additiona l sheet for multiple owners): Name Heath Phillips Investments, LLC (Heath Phillips, manager) E-mail heath_ superiorstruct ures@yahoo.co Street Address City Wellborn P.O. Box 262 State Tx Zip Code 77881 ------ Phone Number 979-229-5906 Fax Number 979-703-7903 ---------------~ ARCHITECT OR ENGINEER'S INFORMATION : Name Schultz Engineering, LLC -Joe Schultz E-mail ;oeschultz84@verizon.net Street Address 2730 Longmire Drive, Suite A City College Station State TX Zip Code 77845 ------ Phone Number 979.764.3900 Fax Number 979.764.3910 ----------------- Do any deed restrictions or covenants exist for this property? ~Yes O No Is there a temporary blanket easement on this property? If so , please prov ide the Volume ____ and Page No . __ _ Total Acreage _1_3._1_4 _______ _ Total No. of Lots 80 ------R-0-W Acreage 4. 79 Acres Existing Use Vacant -------------~ Proposed Use Townhouse Residential Number of Lots By Zoning District 80 I POD Average Acreage Of Each Residential Lot By Zoning District: 0.08 POD ___ , __ _ _ __ , __ _ Floodplain Acreage None ----------------------------------- 1 s there Special Flood Haz ard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No Th is information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided i n Chapter 245 of the Texas Local Government Code or other applicable law. Is th is application a continuation of a project that has received prior City platting approval(s) and you are requesting t he appl ication be reviewed under previous ordinance as applicable? IX Ye s ) No If yes , provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : THE BARRACKS II (PP) City Project Number (if known): 14-00900010 Date I Timeframe when submitted : 2/5/14 1/11 Page 2 of9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): VVIA Requested waiver to subdivision r ulations and reason for same if a plicable : Regarding the waiver request , explain how : 1. There are special circumstances or conditions affecting the land involved such that strict appl ication of the subdivision regulations will deprive the applicant of the reasonable use of his land. NIA 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the appl icant. NIA 3. The granting of the waiver will not be detrimental to the public health, safety , or welfare , or inj urious to other property in the area , or to the City in administering subdivision regulations. r 4 . The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. r Fee in lieu of sidewalk construction is being requested because of the following condition (if applicab le): 1. I An alternative pedestrian way or multi-use path has been or w ill be provided outside the right-o f-way ; 2. I The presence of unique or unusual topographic, vegetative , or other natural conditions exist so t hat strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keep ing w ith the purposes and goals of the UDO or the City's comprehensive Plan ; 3. I A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4 . I Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate I rural context; 5. I When a sidewalk is required along a street where a multi-use path is shown on the Bicycle , Pedestrian , and Greenways Master Plan ; 1/1 1 Page 3 of 9 6. I The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. I The proposed development contains frontage on a Freeway I Expressway as designated by Map 6.6, Thoroughfare Plan -Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: N/A NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission . Requested Oversize Participation None -----------------------------~ Total Linear Footage of Proposed Public: 3408' Streets 6816' Sidewalks 2075' Sanitary Sewer Lines 3397' Water Lines 0 Channels 2998' Storm Sewers 1692' Bike Lanes I Paths Parkland Dedication due prior to filing the Final Plat: ACREAGE: (). S <e No. of acres to be dedicated + $ 5 o, Doo development fee ___ No. of acres in floodplain ___ No. of acres in detention ---No. of acres in greenways OR FEE IN LIEU OF LAND : __ No. of SF Dwelling Units X $ = $ -------- {date) Approved by Parks & Recreation Advisory Board ---- NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true , coffect, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Signature and title Date 1/11 Page 4 of9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit m~y be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements . Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required , including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12 . Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. --~t~ -~-0_/1_~~~~- Property Owner( s) Date Engineer Certification: 1/11 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP. Design will not preclude compliance with TPDES : i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City~~tion , Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All devel~fii'ftt~E[~~1~igned in accordance with all applicable codes and ordinances of the City of College Stati<»faA~·S nCf~~~I Regulations. 4. I, THE ENGINEER , AGRf#'J\l"~ AN TIF\ Tiflt-T ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPM ~-• . ~A,;lt>ij, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACC TE ~•oo":o o~uoeo.~ar.: •• §.QJ~.l}L]~96 .}i~ ~-0 .... a~~mr, : <.<;·!>: ~~·{~,~:~~<{?0~~~1· ~ -5 .-11 ---;4--U-=---i+---~~·s..· ~~~.i-c-.%r.=.~f""'-,1.:;.·~·i_,.;.,~:..;;;'~-.....:'.~::.:.fr~~:~~::;.~;,::/ Date Page 5 of 9 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* certify, as demonstrated in the attached drainage study , that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond t he floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) increase Base Flood velocities . beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances. Engineer Date Initial D * If a platting-status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction , improvement, or fill covered by this ~~~~~~~~~~~~~~~ permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 1/11 Page 6 of 9 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, . certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction. Engineer I Surveyor Date Commercial Structures: E. I, ----------------. certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. Engineer I Surveyor Date Conditions or comments as part of approval: 1/11 Page 7 of9 FINAL PLAT MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: (Requirements based on field survey and marked by monuments and markers.) lZI Drawn on 24" x 36" sheet to scale of 100' per inch. IB'l Vicinity map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. [gl Title Block with the following information : lZI Name and address of subdivider, recorded owner, planner, engineer and surveyor. lZI Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) ~ Date of preparation. lZI Engineer's scale in feet. ~ Total area intended to be developed . lZI North Arrow. ~ Subdivision boundary indicated by heavy lines . ~ If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. ~ All applicable certifications based on the type of final plat. ~ Ownership and Dedication ~ Surveyor and/or Engineer ~ City Engineer (and City Planner, if a minor plat) [ZI Planning and Zoning Commission (delete if minor plat) ~ Brazos County Clerk lfl.d-Brazos County Commissioners Court Approval (ET J Plats only) rW-If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. tf/}; If using private septic systems, add a general note on the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by the Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. ~ Location of the 100-Year Floodplain and floodway , if applicable, according to the most recent available data. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. Matches the approved preliminary plan or qualifies as minor amendments (UDO Section 3.3.E.2). The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Existing Proposed ~ 1/11 lZI Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp turn around unless they are shorter than 100 feet. Public and private R.O.W . locations and widths . (All existing and proposed R.O.W.'s sufficient to meet Thoroughfare Plan.) Street offsets and/or intersection angles meet ordinance. Page 8 of9 Existing ~ ~ ~ ~ Proposed ~ ~ ~ ~ Alleys . Easements . A number or letter to identify each lot or site and each block (numbered sequentially). Parkland dedication/greenbelt area/park linkages. All proposed dedications must be rev iewed by the Parks and Recreation Advisory Board and documentation of the ir recommendation provided prior to being scheduled for P&Z Commission consideration . IZ! Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following : lRJ Street, alley and sidewalk plans , profiles and sections. One sheet must show the overall street , alley and/o r sidewalk layout of the subdivision . (may be comb ined with oth er utilities). Sewer Design Report. Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision . (Utilities of sufficient size/depth to meet the utility master plan and any future growth areas .) Water Design Report and/or Fire Flow Report . Water line plan showing fire hydrants , valves , etc. with plan and profile lines showin g depth and grades . One sheet must show the overall water layout of the subdivisio n. (Utilities of sufficient size/depth to meet the utility master plan and any future growt h areas .) Storm drainage system plan with contours, street profile , inlets , storm sewer and drainage channels , with profiles and sections . Drainage and runoff areas , and runoff based on 5 , 10, 25 , 50 and 100 year rain intensity. Detailed drainage structure desig n, channel lining design & detention if used . One sheet must show the overall drainage layout of t he subdivision . l8J Deta iled cost estimates for all public infrastructure listed above sealed by Texas P.E. l8] Letter of completion for public infrastructure or guarantee I surety in accordance with UDO Section 8.6 . l8] Drainage Report with a Technical Design Summary. ~ Eros ion Control Plan (must be included in construction plans). l8J All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed . Separate instrument easements must be provided in recordable form to the City pri or to being scheduled for P&Z Commission consideration . l8] Are there impact fees associated with this development? l8] Yes 0 No Impact fees must be paid prior to building permit. l8] Will any construction occur in TxDOT rights-of-way? 0 Yes lRl No If yes , TxDOT permit must be submitted along with the construction documents. NOTE: 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prio r to filin g the plat at the Courthouse. 2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOi) must be submitted prior to issuance of a development permit. PrintFonri I 1/1 1 Pag e 9 or 9 ~hultz Engineering , LLC November 4, 2014 Jason Schubert, AICP Principal Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: The Barracks II Subdivision -Ph 105 & 106 -14-00900082 Dear Mr. Schubert: Office: 979.764.3900 Fa x : 979.764 .3910 Attached is the revised Engineer's Estimate for construction remaining for the Barracks II Phase 105 & 106 financial guarantee amount. The remaining wo rk is primarily sidewalks and drainage flumes which will be completed with the townhome construction. A financial guarantee in the amount of $354,938 .90 was provided. The attached estimate is in the amount of $74 ,349.00. The Developer, Heath Phillips Investments, LLC , requests a release of the difference in the estimates , $280 ,589 .90. If you have any questions , please do not hesitate to call. Sincerely, Schultz Engineering, LLC. JoeS~ Civil Engineer P.O . Box 11995 • College Station , Texas 77842 sch ul tzengineeri ng ll c.com Item I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No . 12327 Ba rra cks II S ubdivis ion Phases 105 &106 E E r t r e t r n2meer s s 1m a e o OD S rue 100 Description Unit Est imated Unit Price Ouantitv G e nera l Items Mobilizat ion, Overhead and Construct ion Staking LS I $ 40,000.00 Topsoil Removal and Replacement, complete in place LS I $ 12,000.00 Install End of Street Signs, complete in place EA 21 $ 150.00 Street Name Signs, complete in place EA 7 $ 350.00 Stop Signs, complete in place EA 7 $ 400.00 Pavement Striping and Markings, complete in place LS I $ 5,000.00 Erosion & Sediment Control -SWPPP Implementation & Maintenance, Silt LS I $ 7,500.00 Fence, Construction Exit, Rock Filter Darn, etc .. complete in place Hydroseed and Hydromulch, complete in place SY 5,240 $ 0.50 General Items Subtotal Street Construction It ems Concrete Pavement Excavation & Grading , complete in place LS I $ 60,000.00 Mixing & incorporation of lime, 6' deep, complete in place SY 6,153 $ 2.10 Mixing & incorporation of lime, 8" deep, complete in place SY 9,376 $ 2.80 Hydrated Lime, complete in place (27 lb/sy fo r 6" deep & 36 lb/sy fo r 8' dee p) Ton 252 $ 170.00 6" Reinforced Concrete Pavement w/Curb, complete in place SY 4,033 $ 32.00 7' Reinforced Concrete Pavement w/Curb, complete in place SY 8,463 $ 35 .00 Reinforced Concrete Pavement -Aprons -6' Thick w/ Monolithic Standard SF 4,390 $ 4 .50 Curb, complete in place Reinforced Concrete Pavement -Alleys • 6' Thick. complete in place SF 8,590 $ 3.90 Concrete Sidewalk & Ramps -4" thick. compl ete in place SF 35,800 $ 3.50 ADA Ramps -Detectable W arning Surfaces, complete in place EA 24 $ 500.00 Str eet Construction Concrete Pavement Items Subtotal Pa ge lof4 Total %Complete Amount Amount Ouantitv Comclete ($) Remainin• ($) $ 40,000.00 100°/o $ 40,000.00 $ $ 12,000.00 100% $ 12,000.00 $ $ 3,150.00 0% $ $ 3,150.00 $ 1,400.00 ()"/, $ $ 1,400.00 $ 1,600.00 ()"/, $ $ 1,600.00 $ 5,000.00 100°/o $ 5,000.00 $ $ 7,500.00 90% $ 6,750.00 $ 750.00 $ 2,620.00 ()"/, $ $ 2,620.00 $ 73 ,2 70.00 Re maining Subtotal $ 9,520.00 $ 60,000.00 9 8% $ 58,800.00 $ 1,200.00 $ 12,921.30 100% $ 12,921.30 $ $ 26,252.80 !()(JO/, $ 26,252 .80 $ $ 42,840.00 100°/o $ 42,840.00 $ $ 129,056.00 100-/o $129,056.00 $ $ 296,205 .00 100-/o $296,205.00 $ $ 19,755 .00 100-/o $ 19,75 5.00 $ . $ 33,501.00 100-/o $ 33,501.00 $ . $ 125,300.00 68~. $ 85 ,204.00 $ 40,096.00 $ 12,000.00 100-/o $ 12,000.00 $ . $ 757,831.10 Remaining Subtot al $ 4 1,296.00 Barracks II S ubdivis ion Phases 105 &106 E E r t r e t r ne:mee r s s 1ma eo ons rue 100 Description Unit Estimated Unit Price Total %Complete Amount Amount Item Ouantitv Ouantitv Comolete ($) Remainini< ($) Storm Sewer Constru ction It e ms 19 36' RCP Pipe , complete in place -Structural Backfill, complete in place LF 603 $ 90.00 $ 54,270.00 100'/o $ 54,270.00 $ 20 36" HOPE Pipe, complete in place -Structural Backfill, co mplete in place LF 1,043 $ 80.00 $ 83 ,440.00 100'/, $ 83 ,440 .00 $ 21 JO ' RCP Pipe, complete in place -Structural Backfill, complete in place LF 80 $ 70.00 $ 5,600.00 100'/, $ 5,600.00 $ 22 JO ' HOPE Pipe, complete in place -Structural Backfill, complete in place LF l4J $ 60.00 $ 8,580.00 100'/o $ 8,580 .00 $ 2J 24" RCP Pipe, comp lete in place -Structural Backfill, complete in place LF 414 $ 45 .00 $ l8,6JO.OO 100'/, $ 18,630.00 $ - 24 24' HOPE Pipe, comp lete in place -Structural Backfill, complete in place LF 273 $ 40.00 $ 10,920.00 lOO'Yo $ 10,920 .00 s 25 18 ' RCP Pipe, complete in place -Structural Backfill, complete in place LF 425 s 32 .00 $ 13,600.00 100'/, $ lJ,600.00 $ - 26 l 8' HOP E Pipe, complete in place -Structural Backfill, complete in place LF 159 $ 32 .00 $ 5,088.00 100'/o $ 5,088.00 s 27 Curb Inlet -1 O' wide, complete in place EA 4 $ J ,500.00 $ 14,000.00 lOO'Yo $ 14,000.00 s - 28 Curb Inlet - l O' x 8', complete in place EA 2 s J,750.00 $ 7,500.00 100'/, $ 7,500.00 $ - 29 Curb Inlet -5' wide, complete in place EA 6 s 2,500.00 $ 15 ,000.00 100'/o $ 15,000.00 $ JO Curb Inlet -5' x 8', complete in place EA 2 $ 2,750.00 $ 5,500.00 IOO'Yo $ 5,500.00 s - 31 Curb Inlet -15' wide, complete in place EA 1 s 4,50000 $ 4,500.00 100"/, $ 4,500.00 s 32 Al ley Gutter Area Inlet -V-44JO complete in place EA J $ J,500.00 $7 ,000 100"/, $ 7,000.00 s JJ 31xJ ' Junction BOK. comp lete in place EA l $ 1,500.00 $ 1,500.00 100"/, $ 1,5 00.00 s 34 8'x4' Junct ion Box, complete in place EA 2 s J,000.00 $ 6,000.00 100"/o $ 6,000.00 s - J5 8'x8' Junction Box, complete in place EA 1 s 3,250.00 s J ,250.00 100'/o $ J ,250.00 $ 36 TV Testing and Inspecti on, complete in place LF 2,98 1 $ 2.00 $ 5,962.00 100'/o $ 5,962.00 $ 37 Rock Riprap, complete in place SY 65 $ 25 .00 $ 1,625 .00 ()"/, $ $ 1,625.00 38 Concrete Flume, complete in place SF J,43J s 6.00 s 20,598 .00 ()"/, $ $ 20,598.00 Storm Sewer C onstructio n Items Subtotal s 292,563 .00 Remain ing Subtola l s 22,223.00 Pa ge 2 of 4 Ba rracks II Subdivision Pha ses 105 &106 E ' E f t f C t f n2meer s s 1ma e o ORS rue IO R Item Desc riptio n Unit Estimated Unit Price Total o/oComplete Amount Amount Ouantitv Ouantitv Comolete ($1 Remainino 1$1 Water Construction Items 39 12' C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 546 s 40.00 $ 21,840 .00 100'/, $ 21 ,840 .00 $ 40 16' Casing, complete in place LF 52 $ 80 .00 $ 4,160.00 100'/o s 4,160.00 $ 41 Connect to Existi ng 12" Water Line EA I s 1,000.00 $ 1,000.00 100'/o $ 1,000 .00 $ 42 l 211x 6" M.J. Tee, comple te in place EA I s 700.00 $ 700.00 100'/o $ 700 .00 $ 43 12 'x 12 ' M.J . Tee, complete in place EA I s 1,000.00 $ 1,000.00 100'/o $ 1,000.00 s 44 12' x 8' M.J . Tee, complete in place EA I $ 800.00 $ 800.00 100'/, $ 800.00 $ 45 12' M.J . Gate Valve, co m plete in place EA 2 $ 1,850.00 $ 3,700.00 )()()'/, s 3,700 .00 $ 46 12' x 45 ° M.J . Bend, complete in place EA 4 s 650.00 s 2,600.00 100'/o $ 2,600.00 s 47 4' Blowoff Assembly, complete in place EA 2 s 2,200.00 $ 4,400.00 100'/o $ 4,400.00 $ 48 Wate rl ine Testing LS I s 1,500.00 $ 1,500.00 100'/o $ 1,500.00 $ 49 8' C900 Water Pipe w/tracer wire -Structura l Backfill, complete in place LF 15 16 $ 28 .00 $ 42,448.00 100'/, $ 42,448.00 $ . 50 6' C900 Water Pipe w/tracer wire -Structural Backfill, complete in place LF 1330 $ 24 .00 $ 31 ,920.00 100'/, $ 31 ,920.00 $ 51 Conn ect to Existing 8" Weter Line EA I $ 500.00 $ 500.00 100% $ 500.00 $ 52 Conn ec t to Existing 6" Water Line EA 2 $ 500.00 $ 1,000.00 IOOY, $ 1,000.00 $ . 53 Fire Hydrant Assembly (w/valve, ve rt . extension), complete in place EA 4 $ 3,500.00 $ 14,000.00 100'/, $ 14,000.00 $ . 54 8'x 8' M.J . Tee, complete in place EA I $ 600.00 $ 600.00 100'/, $ 600.00 $ . 55 S"x 6" M.J . Tee, co mpl ete in place EA 3 $ 55 0.00 $ 1,650.00 100% $ 1,650.00 $ 56 6'x 6' M.J . Tee, com pl ete in place EA 2 $ 500.00 $ 1,000.00 100'/, $ 1,000.00 $ 57 8' M.J . Gate Valve, complete in place EA 5 $ 1,050.00 $ 5,250.00 !()()'/, $ 5,250.00 $ 58 6' M.1. Gate Valve, compl ete in place EA 3 $ 1,000.00 $ 3,000.00 IOOY, $ 3,00000 $ 59 8' x 45° M.J . Bend, compl ete in place EA 33 $ 500.00 $ 16,500.00 100'/. s 16,500.00 $ 60 8' x 11.25° M.1. Bend, complete in place EA 2 $ 500.00 $ 1,000.00 100'/o s 1,000.00 $ 61 6' x 45° M.J . Bend, compl ete in place EA 4 s 450.00 $ 1,800.00 100'/o s 1,800.00 s 62 6' x 11 .25° M.J. Bend , complete in place EA 4 $ 450.00 $ 1,800.00 100'/o $ 1,800.00 $ 63 I ' W ater Service,< 15 ft (avg length-2 ft)(8' Line) EA 2 $ 700.00 $ 1,400.00 100'/o $ 1,400.00 $ . 64 l..S.' Water Service,< 15 ft (avg length -2 ft)(8' Line) EA 6 $ 750.00 $ 4,500.00 )()()'/, $ 4,500.00 $ 65 I ' W ater Service,< 15 ft (avg length -2 ft ) (6' Line) EA 4 $ 650 .00 $ 2,600.00 100'/o $ 2,600.00 $ 66 1.5' W ate r Service,< 15 ft (avg length-2 ft ) (6' Line ) EA 17 $ 800.00 $ 13,600.00 100'/o $ 13,600.00 $ 67 1.5' Water Service,> 15 ft (avg length= 4 8 ft)(6' Line) EA 15 $ 1,200.00 $ 18,000.00 100'/o $ 18,000.00 s 68 2' Blowoff Assembly, complete in place EA 3 $ 1,000.00 $ 3,000.00 !()()'/, $ 3,000.00 $ Water Constr uction Items Su btotal s 207,268.00 Re maining S u btotal $ . Page 3 of 4 Barracks II S ubdivisio n Pha ses 105 &106 E E · r e ngmeer s shmate o on struchon Item Desc rip tion Unit Esti mated Uni t Price Ouantitv Sa nitary Sewer Co nstruction Items 69 6' PVC Sewer Line -D3034 -Structural Backfill, comp lete in place LF 696 $ 20.00 70 6 ' PVC Sewer Li ne -ASTM D-224 1 -Structural Backfi ll , complete in place LF 20 $ 22.00 71 8' PVC Sewer Line -D3034 -Structural Backfill, complete in place LF 1,393 $ 24 .00 72 6' Cleanout, complete in place EA 2 $ 750.00 73 4' Sewer Service-Single (avg. length -4ft), complete in place EA 4 $ 300 .00 74 4' Sewer Service-Do u ble (avg length -4 ft), complete in place EA 19 $ 400 .00 75 4' Sewer Serv ice-S in gle (avg le ngth • 48 ft), complete in place EA 5 $ 850.00 76 4' Sewer Service-Do ubl e (avg length = 48 ft ), complete in place EA 27 $ 950 .00 77 T ie-In to Ei<isting 8' PVC Sewer Line, complete in p lace BA I $ 1,000.00 78 Concrete Manhole -4' Dia. -complete in place BA 8 $ 2,800 .00 79 TV Testing and Ins pec tion, complete in place LF 2,109 $ 2 .00 Sa nitary Sewer Con•tructi on Item• S ubtotal General Item• Subtotal s Street Construction Concrete Pav em e nt ltem1 Subtotal s Storm Sewer Con!ltruction Items Subtotal s Water Con•truction Item• S ubtotal s Sanitary Sewer Construction Items S u btotal s 50% Additio na l for Grau s TOTAL CONSTR UCTIO N! S Page 4 of 4 $ $ $ $ $ $ $ $ $ $ $ s Total %Complete Amount Ouantitv Comnlete I$) 13,920.00 100'1/, $ 13,920.00 440.00 100'/o $ 440.00 33 ,432 .00 100'/o $ 33,432.00 1,500.00 100'/o $ 1,500.00 1,200 .00 100'/, $ 1,200.00 7,600.00 100'/, $ 7,600.00 4,250.00 100% $ 4 ,250.00 25 ,650.00 100'/. $ 25,650 .00 1,000.00 IOO% $ 1,000.00 22,400.00 100'/, $ 22,400.00 4,2 18.00 100'/. $ 4,2 18 .00 115,610.00 Remainins Subtotal Remaining 73,270.00 s 9,520.00 757,831.10 s 41,296.00 292,563.00 s 22,223 .00 207,268.00 s - 115,610.00 s - 3 ,7 50.00 s 1,310.00 74,349.oo I F'-12327 SCHULl'Z ENGINEER!~; LL<:,; Amount Remaininlt ($) $ $ $ $ $ $ $ $ $ $ $ s - DEVELOPMENT PERMIT PERMIT NO. DP 14-82 CITY OJ' CoLLEGE S"Ji\'llON PJa.,,ui"I. & l'>t.1"tlcpml'ffl Smmtt FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: The Barracks II Section 105 & 106 DATE OF ISSUE: 5/22/2014 OWNER: Heath Phillips Investments, LLC 3302 General Parkway College Station , Tx 77845 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: Terminus of Deacon Dr. DRAINAGE BASIN: Bee Creek Trib. "B" VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4. Other perm it s may have been required to fulfill local , state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage fac iliti es . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site , it is the Contractor's responsibility to implement measures that will meet City , State, and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees requ ired to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construct ion shall be in accordance with the stamped approved plans and specifications for the above-named project and al l of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10. Special Con itions : *** TCEQ PHASE II RULES IN EFFECT *** -----==-...11.#.-~ Contractor Signature tJ? <J) .J-J-fl -s=2 0 e:, tf 4r C1@/t{~ rz._12..A 4=.5---Z::wNflt:>tV 't'> • U>IU. E-mail Phone number I hereby grant this perm it for development. Contact {5v<&tJ Koi 't0 , the Public Works lnmzed to !hi~ proz 24 hours prior to beginning construction~ kd/i ed Inspections . City Engineer/Repres tative Date I I