CASE NO .:
NORTHGATE BUILDING REVIEW APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS :
~350 Non-Residential Architectural Standards I Northgate Building Review Application Fee .
W Appl icati on completed in full. This application form provided by the City of College Station must be used
-~nd may not be adjusted or altered . Please attach pages if additional information is provided .
~ On e (1) copy of building elevations to scale for all buildings , showing material and color applications .
[8] A list of building materials for all facades and screening .
[8] Co lor sampl es for all build in gs or list colors to be used from the approved color palette .
[8] The attac hed Northgate Building Rev ie w checklist with all items checked off or a brief explanation as to
why they are not checked off.
Date of Opti onal Pre application Conference December 21 , 2011 -------'---------------------~
NA ME OF PROJECT Northpoint Crossing Phase II
ADDRESS Northpoint Lane, College Station , TX 77840
LEGAL DES CRIPTI ON (Lot , Block, Subdivis ion ) Lot 2 and 3, Block 1, Northpoint Crossing Subdivision
APPLICANT/PROJE CT MANAGER'S INFORMATION (Primary contact for the project):
Name Mitc hell & Morgan , LLP CIO Veronica Morgan , PE
Street Address 511 University Drive East, Suite 204
E-mail v@mitchellandmorgan .com
City Colleg e Station State Te x as Zip Code _7_7_84_0 _____ _
Phone Numb er 97 9-2 60-6963 Fax Number 979-260-3564
----------------~
PRO PER TY OWNER'S INFORMATION:
Name Wood ridg e College Station I, C!O Rick Arambulo E-mail rick@woodridgecapital .com
St reet Address 19 99 Ave nue of the Stars, Suite 2850
City Los Angeles State California Zip Code _9_00_6_7 _____ _
Phone Nu mber 31 0-824-2200 Fax Number 310-824-7931
----------------~
ARC HITE CT , ENGINEE R, or OTHER CONTACT INFORMATION :
Name Hum phreys & Partners Architects, L.P. clo Bobby Finta
Stree t Add ress 53 39 Alpha Road, Suite 300
E-mail bobby@humphreys.com
C ity Dalla s state Te xas Zip Code 75240 --------
972-70 1-9636 Fax Number 972-701-9639
pplic ant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
orrect.
Date 4/1v/f1
10/10 Page 1 of 2
CITY or: Cou .r.c r'. STAT I ON
Hom ' of Texas A&M U11i vmir.y •
10/10
NORTHGATE BUILDING REVIEW MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
Refer to UDO Section 5.6. Design Districts, B. Northgate Districts (NG)
lg] She et size -24 " x 36 " (minimum).
lg] Tit le block to include :
lg] Name , address , location , and legal description
lg] Name , address , and telephone number of applicant
lg] Name , address , and telephone number of developer/owner (if differs from applicant)
lg] Nam e , address , and telephone number of architect/engineer (if differs from applicant)
lg] Date of submittal
lg] Scale should be largest standard engineering scale possible on sheet.
lg] List of colors from the City of College Station Northgate color palette to be utilized or proposed
equivalents with color samples .
lg] List of materials to be utilized .
lg] Elevations of each building and screening structure . Show placement of materials and colors
on the facades and identify public entrances .
Include the following dimensions:
lg] Total vertical square footage including openings (for each fac;ade separately)
lg] Total vertical square footage of each building material (for each fac;ade separately)
lg] Total vertical square footage of each color (for each fac;ade separately)
lg] Total vertical square footage of transparency between zero and eight feet (0-8') above ground
leve l (for each non-residential fac;ade)
lg] Graphic representation and/or description of existing buildings in building plot to show material ,
color , and architectural harmony.
Print Form Page 2 of 2
Molly Hitchcock
From:
Sent:
To:
Michael Sm it h (michael@humphreys .c om]
Monday , April 28 , 2014 11 :3 8 AM
v@mitchellandmorgan.com
Cc: Will Quintanilla ; Molly Hitchcock
Subject: RE: NRA -NC Building V -URGENT
On the Building V East elevation we have stringcourses, balconies extended from the building face, porches, and
column s.
All of those elements were on the origina l elevations submittal.
Michael
From: Veronica Morgan [mailto:v@mitchellandmorqan.com]
Sent: Monday, April 28, 2014 11:09 AM
To: Michael Smith
Cc: Will Quintanilla; Molly Hitchcock
Subject: Re: NRA -NC Building V -URGENT
no but here it is ...
On Mon, Apr 28, 2014 at 11:02 AM, Michael Smith <michael @ humphreys.com> wrote :
Was there supposed to be an attachment?
From: Veronica Morgan [mailto:v@mitchellandmorqan.com]
Sent: Monday, April 28, 2014 11:00 AM
To: Will Quintanilla; Michael Smith
Cc: Molly Hitchcock
Subject: NRA -NC Building V -URGENT
Guys
look at comment #2 from staff - I dont see (and neither does staff) the east elevation for Bldg 5 and how the
architectural elements have been added.
please respond ASAP ...
thanks
Veronica
1
Veronica JB Morgan, PE
Managing Partner
Mitchell & Morgan , LLP
PLEASE MAKE NOTE OF OUR NEW ADDRESS
3204 Earl Rudder Fwy S .
College Station , TX 77845
( 0) 979-260-6963
Veronica JB Morgan, PE
Managing Partner
Mitchell & Morgan, LLP
PLEASE MAKE NOTE OF OUR NEW ADDRESS
3204 Earl Rudder Fwy S .
College Station , TX 77845
( 0) 979-260-6963
2
MITCHELL 511 University Drive East,
Suite 204 Letter Of Transmittal
MM College Station , TX 77840
(979) 260-6963 Date: 4/25/2014 Job: 1172
MORGAN
(979) 260-3564 Fax
info@mitchellandmorgan.com
www.mitchellandmorgan.com Attention: Jason Schuber
To: City of College Station Re: North point Crossing Phase II
We are sending you: [ii Attached D Under separate cover via _____ the following:
D Drawings
D Letter
D Plans
D Order
D Prints D Samples
Item Date #of Copies Description
1
2
3
4/25/2014
4/24/2014
4/25/2014
Transmitted as checked below:
1
1
1
COCS Transmittal Letter
Revised set of Elevations
Response to Staff Comments #1
D Specifications
D For approval D Approved as noted D Resubmit. ___ copies for approval
D For your use D Approved as submitted DD Submit copies for distribution
~ As requested DD Returned for corrections Retum ____ corrected copies
LXI For review Other ____________ _
Remarks:
Please see attached revised elevations for Phase II from Humphreys and Partners
If you have any questions or comments, please contact us at 260-696:
Copy to: File Signed:
-------------~
KP
Jason Schubert, AICP
City of College Station
P.O. Box 9960
College Station , Texas 77842
MITCHELL
MM
MORGAN
RE: Northpoint Crossing Ph II (NG) Northgate Building Review
Dear Jason ,
Attached please find the following :
• One ( 1) revised set of elevation drawings .
PLANNING
STAFF REVIEW COMMENTS NO. 1
Northpoint Crossing Ph II (NG) -Northgate Building Review
14-00900081
April 25 , 2014
1. Fo r the Building IV North Elevation on Sheet A4 .18 , the percentage of brick is below the
minimum 25% required for the first 28 feet of the building . Also , it appears the percentage of
fiber cement panels exceeds the maximum 75% allowable when considering the entire
elevation . Please revise .
Response: As discussed over the phone, the calculations for the North elevation of
Building IV have been included with the East elevation of Building IV due to the
location and geometry of that particular part of the building.
2 . Ident ify the two different types of architectural features utilized for each 40-foot section along
the Building IV East Elevation and Building V East Elevation . As specified by Unified
Development Ordinance Section 12-5 .8.B.4 .c Architectural Relief, the list of features that
qualify are : canopies , permanent decorative awnings , hood/drip molding over windows ,
corn ices , corbelling , quoining , stringcourses , pilasters , columns , pillars , arcades , bay/orie l
w indows , balconies that extend from the building , recessed entries , st oops , and porches .
Rev ise and/or identify as needed , noting that only those elements in the first 28 feet above
ground leve l may be counted.
Response: Previously the East elevation of Building IV had stringcourses along it's
entirety. We have added pilasters and an arch corbel at 6 locations where the brick
rises to the second story along the units on the face of the garage. This is meant to
mimic the white brick arches at the retail in phase 1 and clubhouse entry in phase 2.
3. Please note that some of the partial elevations fo r the Building IV East Elevat ion do no t
meet the minimum 25% brick indiv idually but when combined together they meet the
requ ireme nt.
3204 EARL RUDDER FWY . S. • COLLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979 .260 .3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBD IVISIONS
mfo@m1tchellandmorgan com • www m1tchellandmorgan com
1
CIT\' OF COi J J ·.GE ST.\T ION
Hom~ ofTe.uu Ad-M Univmiry •
April 14 , 2014
1101 Texas Avenue, P.O . Box 9960
College Station , Texas 77842
Phone 979.764.3570 I Fax 979 .764 .3496
MEMORANDUM
TO : Veronica Morgan , Mitchell & Morgan, LLP , via; V@mitchellandmorgan .com
FROM : Jason Schubert , AICP, Principal Planner
SUBJECT: Northpoint Crossing Ph II (NG) Northgate Building Review
Staff reviewed the above-mentioned Northgate Building Review submittal as requested . The
following page is a list of staff review comments detailing items that need to be addressed .
Please address the comments and submit the following information for further staff review :
Transmittal letter with response comments attached ; and
__ One (1) revised set of elevation drawings .
Please note that this application will expire in 90 days from the date of this memo , if the
applicant has not provided written response comments and revised documents to the
Admin istrator that seek to address the staff review comments contained herein . If you have any
questions or need additional information, please call me at 979.764.3570 .
Attachments : Staff review comments
pc: Rick Arambulo , Woodridge College Station, via; rick@woodridgecapital.com
Bobby Finta , Humphreys & Partners Architects , LP , via ; bobby@humphreys .com
P&DS Project No . 14-00900081
Response: Noted and appreciated.
4 . On Sheet A4.29 , the Building V South Elevation does not appear to have 54.5% brick in the
first 28 feet. Please verify the calculations and revise as necessary.
Response: The calculations have been corrected for the South elevation.
I ou have any questions or comments , please feel free to call our office at 979-260-6963.
, PE , CFM
Cc: File
2
PLANNING
STAFF REVIEW COMMENTS NO. 1
Northpoint Crossing Ph II (NG) -Northgate Building Review
14-00900081
1. For the Building IV North Elevation on Sheet A4 .18 , the percentage of brick is below the
min imum 25% required for the first 28 feet of the building . Also , it appears the percentage of
fiber cement panels exceeds the maximum 75% allowable when considering the entire
elevation . Please revise .
2 . Identify the two different types of architectural features utilized for each 40-foot section along
the Building IV East Elevation and Building V East Elevation . As specified by Unified
Development Ordinance Section 12-5 .8.B.4.c Architectural Relief, the list of features that
qualify are : canopies , permanent decorative awnings, hood/drip molding over windows ,
cornices , corbelling , quoining , stringcourses , pilasters , columns , pillars , arcades , bay/oriel
windows , balconies that extend from the building , recessed entries , stoops , and porches .
Revise and/or identify as needed, noting that only those elements in the first 28 feet above
ground level may be counted .
3. Please note that some of the partial elevations for the Building IV East Elevation do not
meet the minimum 25% brick individually but when combined together they meet the
requirement.
4 . On Sheet A4 .29 , the Building V South Elevation does not appear to have 54 .5% brick in the
first 28 feet. Please verify the calculations and revise as necessary .
Reviewed by : Jason Schubert Date : April 14 , 2014
DATE :
TO :
FROM :
SUBJECT:
April 7, 2014
C ITY OF C OLLEGE STATION
Home of Texas A&M University •
MEMORANDUM
Veronica Morgan , Mitchell & Morgan , LLP , via ; V@mitchellandmorgan .com
Jason Schubert , AICP , Principal Planner
NORTHPOINT CROSSING PH II (NG)
Thank you for the submittal of your NORTHGATE BUILDING REVIEW application . I have been
assigned to review this project and it is anticipated that the review will be completed and any
staff comments returned to you on or before Monday , April 14, 2014 . If you have questions in
the meantime , please feel free to contact me .
PC : Rick Arambulo , Woodr idge College Station , via ; rick@woodridgecapital.com
Bobby Finta , Humphreys & Partners Architects , LP , via; bobby@humphreys .com
P&DS Project No . 14-00900081