HomeMy WebLinkAbout14-74DEVELOPMENT PERMIT PERMIT NO . 14-74 CrTY Of COLLEGE ST,\T IO N Pl.umili! <f l>tw/gpmml .,,,.,,,:ira FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Dominik Dr from Texas Av to Munson Texas@ Park Pl, Westridge , San Pedro 2014 CDBG Sidewalk Projects DATE OF ISSUE: 04/17/14 OWNER: City of College Station 1101 Texas Avenue College Station , Texas 77842 SITE ADDRESS: Various DRAINAGE BASIN: Wolf Pen Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3. The perm it wil l expire if no significant work is progressing within 24 months of issuance . 4 . Other perm its may have been required to fulfill local , state and federal requirements . Construction w ill be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor's responsibility to implement measures that will meet City , State , and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federa l Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Cond itions: TCEQ PHASE II Rules IN EFFECT l ,_~~~:.i.±r-.........,..P...---1i~l-'--'-'-'"'-~="'-'""'o'""~------' the Contractor, hereby agree to comply with all conditions herein . ~id --== Date T t q,A.1 '-l~is-\oa.4'> x--\.texJ .. e.xsCM.e_ V<ri-hc. corv\ Phone number E-mail I hereby grant this permit for development. Contact~ J'~ '1 '1 '1-ti514 , the Public Works Ins ctor assigned to this project 24 hours prior to beQi1111i g construction for scheduling required Inspections . City Eng ineer/Representative Date Kling Engineering & -;surveying A DIVISION OF ~CIVIL ENolrmERll"iG CONSULTAl"iTS TEXAS FIRM REGISTRATION ~UMBERS ENGINEERING F-2.2.14 &-SURVEYING 100410 SAN ANTONIO • LAREDO BRYAN I COLLEGE STATION City of College Station 2014 CDBG Sidewalk Project Engineer's Estimate of Construction Cost March 11, 2014 Item No. 1 2 Mobilization Traffic Control Description 3 Stormwater Pollution Prevention Plan 4 Remove Existing Concrete (curb & gutter) 5 _Remove Existi~~ Concrete (all flatwork) 6 ST 1-01 Concrete Curb and Gutter 7 Concrete Sidewalk 8 Concrete Pavement (5" driveway w /monolithic curb) 9 'Ambulatory Ramp (all types) Unit EA EA EA LF SF LF SF SF EA LF Unit Price $ 2,000.00 $ 800.00 $ 600.00 $ 10.00 $ 3.00 $ 12 .00 $ 4.50 $ 5 .00 $ 750.00 $ 15 .00 Quantity Total Cost (all sites) 5 10,000 4,000 3,000 1,310 10 . }'xDOT TyP~ C 1 Curb . -------.1.. -- 5 5 131 17,443 125 26,643 9,502 38 205 33 484 2 60 12 108 52 ,328 1,500 119,894 47,509 28,500 3,075 11 Dowel to existing sidewalk or driveway 12 Saw cut existing concrete 13 Sidewalk drain 14 TxDOT Type F2 Curb (H=24") w /masonry facia l? _TxDOT T_ype F3 Curb (H=60") w/masonry facia 16 SW 1-01 Pedestrian Guardrail 17 Remove exisitng headwall strucuture (West Ridge) 18 Remove & replace headwall for 66" RCP w /dissaptor blocks) 19 Concrete channel lining 20 Rock rip-rap 21 •Repair and paint existing handrail 22 Relocate fire hydrant 23 Adjust manhole lid 24 Adjust water valve box 25 Adjust sewer clean-out 26 Adjust water meter box 27 Match & reconnect wooden w 28 Remove stumps and/or trees 29 Relocate signs/obstructions 30 111 PVC Electrical Conduit ( 31 Bermuda Grass Sod $ 1,000.00 i $ 15.00 i $ 750.00 LF I $ 130.00 $ 175.00 EA LF EA LF LF LS LS SF SF LS EA EA EA EA EA EA EA EA LF SY ·~·~·-·~ ¥~ $ 100.00 $ 500.00 $15,000.00 $ 4.00 . $ 8.00 ' - $ 500 .00 $ 1,500.00 $ 250.00 $ 200.00 I $ 200.00 $ 150.00 $ 500.00 $ 500.00 $ 150.00 $ 10.00 $ 5 .00 115 410 1 1 2 12 1 4 12 50 1,925 33,000 7,260 1,500 7,800 2,100 10,800 500 15,000 460 3,280 500 1,500 500 2,400 200 150 2,000 500 1,800 500 9,625 Estimated Construction Cost $372,491 Kling Engineering & surveying A DIVIS tOl"'f 0 1" C IVIL '.l!NGI NBBRINO CONSU L T A NTS TEXAS FIRM REGI S TRATION NUMBER S ENGINEERING F-2214 8c' SURVEYING 100410 SAN ANTONIO • LAREDO BRYAN I COLLEGE STATION City of Co ll ege Station 2014 CDBG Sidewalk Project Texas to George Bush Engineer's Estimate of Construction Cost March 11, 20 14 Item Description Unit Unit Price No. 1 Mobilization EA $ 2,000.00 2 Traffic Control EA $ 800.00 3 Stormwater Pollution Prevention Plan EA $ 600 .00 5 Remove Existing Concrete (all flatwork) SF $ 3.00 7 Concrete Sidewalk SF $ 4 .50 8 Concrete Pavement (5" driveway w/mono lithlc curb) SF $ 5.00 9 Ambulatory Ramp (all types) EA , $ 750.00 10 TxDOT Type C 1 Curb LF $ 15.00 11 Dowel to existing sidewalk or driveway EA $ 1,000.00 12 Saw cut existing concrete LF $ 15 .00 13 Sidewalk drain T EA ~ $ 750.00 ; 22 ·Relocate fire hydrant EA $ 1,500 .00 23 .Adjust manhole lid EA $ 250 .00 24 Adjust water valve box EA $ 200.00 25 _A~just sewer clean-out EA $ 200 .00 29 Relocate signs/obstructions EA $ 150.00 31 Bermuda Grass Sod SY $ 5.00 Quantity (all sites) 1 911 3 ,983 911 8 60 8 8 1 I 2 4 400 Estimated Construction Cost Total Cost 2 ,00 0 80 0 600 2,732 17 ,924 4,554 6 ,000 900 8,000 120 750 1,500 250 400 200 - 60 0 2,000 $49,330 Kling Engine~ring & Surveyi~g A , DIVJSIOl"'I OF CfVlL ENOINEeRJNCi CQNSUL TAl"ITS TEXAS FIRM REGISTRATION NUMBERS ENGINEERING F-2214 & SURVEYING 100410 SAN ANTONIO • LAREDO BRYAN I COLLEGE STATION City of College Station 2014 CDBG Sidewalk Project George Bush to Stallings Engineer's Estimate of Construction Cost March 11, 2014 Item Description Unit , Unit Price No . !Mobilization EA $ 2,000.00 2 I 'Traffic Control EA $ 800.00 3 Stormwater Pollution Prevention Plan EA ' $ 600.00 4 Remove Existing Concrete (curb & gutter) LF $ 10.00 5 Remove Existing Concrete (all flatwork) SF $ 3.00 ~.~. 6 ST 1-01 Concrete Curb and Gutter LF $ 12.00 7 Concrete Sidewalk SF $ 4 .50 I Quantity ' (all sites) I 1 1 106 4,239 ~ 100 7,165 8 Concrete Pavement (5" driveway w /monolithic curb) SF $ 5 .00 ! 2 ,102 , 9 Ambulatory Ramp (all types) EA $ 750.00 11 1 10 TxDOT Type C 1 Curb ' LF $ 15 .00 105 - 11 Dowel to existing sidewalk or driveway EA $ 1,000 .00 5 12 Saw cut existing concrete LF $ 15.00 8 16 SW 1-01 Pedestrian Guardrail LF $ 100.00 36 18 Remove & replace headwall for 66" RCP w /dissaptor blocks) LS $15,000.00 l 19 ~oncrete chailllel lining SF $ 4 .00 ! 115 h•·• 20 . Rock rip-rap ' SF $ 8.00 410 1 24 : Adjust water valve box EA $ 200 .00 l' 29 1 Relocate signs/obstructions EA $ 150.00 2 31 Bermuda Grass Sod SY $ 5.00 635 , Estimated Construction Cost Total Cost 2,000 800 600 1,060 12,718 1,200 32 ,244 10,511 9,000 1,575 5,000 120 3,600 15 ,000 460 3,280 200 300 3,175 $102,843 Kling Engineering & Surveying A DIVIStOl"i 01" CfVlL ~NOINl!r.Rll"iO CON.'!>ULTANTS TEXAS FIRM REGISTRATION NUMBER S ENGINEERING F-2214 8c SURVEYING. 100410 SAN ANTONIO • LAREDO BRYAN I COLLEGE STATION City of College Station 2014 CDBG Sidewalk Project Stallings to Munson Engineer's Estimate of Construction Cost March 11 , 2014 Item Description : Unit Unit Price No. Mobilization EA $ 2,000.00 2 Traffic Control EA $ 800.00 3 Stormwater Pollution Prevention Plan I EA $ 600 .00 4 Remove Existing Concrete (curb & gutter) LF $ 10.00 5 Remove Existing Concrete (all flatwork) SF $ 3.00 6 ST 1-01 Concrete Curb and Gutter LF $ 12.00 7 Concrete Sidewalk SF $ 4.50 8 Concrete Pavement (5" driveway w/monolithic curb) SF $ 5.00 9 Ambulatory Ramp (all types) EA 1 $ 750 .00 11 Dowel to existing sidewalk or driveway EA · $ 1,000.00 12 Saw cut existing concrete LF $ 15 .00 14 TxDOT Type F2 Curb (H=24") w/masonry facia LF $ 130 .00 15 TxDOT Type F3 Curb (H =60") w/masonry facia LF $ 175.00 16 SW 1-01 Pedestrian Guardrail LF $ 100.00 23 Adjust manhole lid EA $ 250.00 24 Adjust water valve box EA $ 200.00 26 Adjust water meter box EA $ 150.00 27 Match & reconnect wooden walkways EA $ 500 .00 28 Remove stumps and/or trees EA I $ 500.00 29 Relocate signs/obstructions EA $ 150.00 30 1" PVC Electrical Conduit (30" deep, structural backfill) LF $ 10.00 31 Bermuda Grass Sod , SY $ 5.00 Quantity Total · (all sites) Cost 2,000 800 I 600 25 250 876 2,627 25 300 6,487 , 29,190 737 · 3,685 10 7 ,500 6 6,000 10 150 60 7,800 12 1 2,100 72 7,200 1 250 2 400 150 4 2,000 I 500 5 750 50 500 430 1 2,150 Estimated C onstruction Cost $76,902 ~EOF~~ 'O~ ••••••• ,, ···*·.~· 'I..·· ·•. •• . . *' ............ ~ *~ K~·········· .. ' ··a:·······M·.~ .J •• 65923 ···: ...... ~~//.9~NS~~·~~o/ ' \S's • •• • • • (')" .f" ~r;: I A ~ --~Jn. utt/ j{Iing ,Engineering & Su:n{ey-ng " ' A DIVlSIOl"l Of' CJ;VIL ENGU"ffiERll"iQ CONSULTANTS ' !. 1 ' '\_ TEXAS FIRM REGI S TRATION 'NUMBER S ENG,INEERING F i..2:2 14 '&SURVEYING ' f004·10 SAN ANTONIO • LAREDO BRYAN I COLLEGE STATION City of College Station 2014 CDBG Sidewalk Project Park Place @ Texas Avenue Engineer's Estimate of Construction Cost March 11, 2014 Item No. Description Quantity : Unit 1 Unit Price i (all sites) , 2 Mobilization Traffic Control 3 Stormwater Pollution Prevention Plan 7 1Concrete Sidewalk 10 'TxDOT Type Cl Curb 11 ~Dowel to existing sidewalk or driveway 12 Saw cut existing concrete 21 'Repair & repaint existing handrail 24 ,Adjust water valve box 29 ·Relocate si~~/obs~ructions 31 Bermuda Grass Sod EA $ 2,000.00 ! 1 ' EA $ 800.00 EA $ 600.00 SF $ 4.50 LF $ 15 .00 ' ··· ··-· EA -. $1~00-0."oa· · LF $ 15 .00 · LF I $ 500 .00 EA $ 200 .00 EA $ 150.00 1 SY $ 5.00 , I: llT ' 40 ! ·r-· 21 8 10 Total Cost 2,000 800 600 525 600 2,000 120 500 200 150 50 Estimated Construction Cost $7,545 Kling ·Engineering & Surveying A D JVISIOl"i 01" ClVlL ENGINl!ERING CON.,"iULTANTS l TEXAS FIRM REGI S TRATION NUMBER S E~GINEERING F-2.2 14 Be SURVEYING. 1004 t 0 SAN ANTONIO • LAREDO BR YAN I COLLEGE STATION City of College Station 2014 CDBG Sidewalk Project Westridge & San Pedro Engineer's Estimate of Construction Cost March 1, 2014 Item Description Unit Unit Price · Quantity No. (all sites) 'Mobilization EA $ 2,000.00 I' 2 Traffic Control EA $ 800 .00 1 3 Stormwater Pollution Prevention Plan EA $ 600.00 5 ,Remove Existing Concrete (all flatwork) SF $ 3.00 11,417 7 Concrete Sidewalk SF , $ 4.50 i 8,891 "·.,~ .. 8 :Concrete Pavement (5" driveway w /monolithic curb) SF $ 5.00 5,752 9 Ambulatory Ramp (all types) EA $ 750.00 8 11 Dowel to existing sidewalk or driveway EA $ 1,000 .00 12 12 Saw cut existing concrete LF $ 15 .00 450 i 13 Sidewalk drain EA $ 750.00 17 Remove exisitng headwall strucuture (West Ridge) LS $ 500.00 I 24 Adjust water valve box EA I $ 200 .00 . 6 31 !Bermuda Grass Sod SY $ 5.00 450 1 Estimated Construction Cost Total Cost 2 ,000 800 600 34,251 40,011 28,760 6,000 12,000 6,750 750 500 1,200 2,250 $135,871 DATE : TO : FROM : CITY OF C OLI.EGE STATTON Home of Texa s A&M University • MEMORANDUM April 1, 2014 Charles Michalewicz , via: cmichalewicz@cstx .gov / Jason Schubert , AICP Principal Planner SUBJECT: 2014 CDBG SIDEWALK PROJECT (DP) Thank you for the submittal of your DEVELOPMENT PERMIT application. I have been assigned to review this project and it is anticipated that the review will be completed and any staff comments returned to you on or before Tuesday , April 8, 2014. If you have questions in the meantime , please feel free to contact us . PC : Civil Engineering Consultants -Kent Laza , via : klaza@cectexas .com / P&DS Project No . 14-00900074 Planning & Development S ervices l' 0 BOX 9%0 • l lO l TEXAS AVENUE ·CO LL EGE STATI ON ·TEXAS • 77842 TEL 979.764.3570 ·FAX. 9 79.764 . .3496 C ITY OF C o u .EGE STATI ON Home of Texas A&M University • DEVELOPMENT PERMIT APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: D $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). D Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report . D Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Date of Optional Preapplication or Stormwater Management Conference SPECIAL FLOOD HAZARD AREA? 0Yes ~o (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT 2014 CDBG Sidewalk Project ADDRESS Locations on south side of Dominik Dr. from Texas Ave. to Munson, Corner of Texas Ave and Park Place, lij LEGAL DESCRIPTION (Lot , Block, Subdivision) APPLICANT I PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Charles Michalewicz E-mail cmichalewicz@cstx.gov Street Address 1207 Texas Ave ----------------------------------- City College Station State Texas Zip Code _7_78_4_0 ____ _ Phone Number 979-764-3786 Fax Number 979-764-3785 ---------------- PROPERTY OWNER'S INFORMATION : Name City of College Station Street Address 1101 Texas Ave City College Station E-mail _____________ _ State _TX ________ Zip Code _7_7_84_0 ____ _ Phone Number 979-764-3570 Fax Number ---------------- ARCHITECT OR ENGINEER 'S INFORMATION : Name Civil Engineering Consultants-Kent Laza E-mail klaza@cectexas .com Street Address 4101 South Texas Ave City Bryan State TX Zip Code _7_78_0_2 ____ _ Phone Number 979-846-6212 Fax Number 979-846-8252 ---------------- 10/10 Page 1 of 4 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued . 2 . The permit may be revoked if any false statements are made he.rein . 3. If revoked , all work must cease until permit is re-issued . 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6 . Other permits may be required to fulfill local , state , and federal requirements . Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project , it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications , and Standard Details . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12 . Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE . Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation , including detention ponds , proposed as part of the project will be constructed first in the construction sequence . 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP . Design will n'!t preclude comppance with TPPES : i.e., project over 10 acres may requireasedimentationbasin . This f'ojec+ ivivtJIVt>S les1 fhCfn lf>ne ce c re~ 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 4 . I, THE ENGINEER , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE[;VELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURjX . I I !J ~.a 3fa/./,20J'f Engineer Date 10/10 Page 2 of 4 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill /Grading Permits, and Clearing Only Permits:* A I, //e 11 f l q 2 !1 certify , as demonstrated in the attached drainage stud1 that the ,,/, alterations or development covered by this permit , shall not: If jrc;i/r.ajc:; s· ~ud lf /J 0 evf-f ie ch a/) -e 5 fo +ne f..JCl ~re //0 I..; (i) increasetheBaseFloodelevation ; e./e:J.+/.Pn wa.S nof. C.011duc i-t:I (ii) create additional areas of Special Flood Hazard Area ; ~f' f-h 1 '5 ? r OJ-e cf· ;{l_ (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11 .3a of Chapter 13 Code of Ordinances . Engine/~i= L~ I I Date In itial D * If a platting-status exemption to this requirement is asserted , provide written justification under separate letter in lieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading ~;;its: B. I, , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: (II /11- C. I, ________________ , certify that the construction , improvement , or fill covered by this permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 10/10 Page 3 of 4 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: !J/R D. I, , certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor , including all utilities , ductwork and any basement , at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates w ill be provided with elevations certified du ri ng construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: fl) /ff E. I, , certify that all new construction or any substantial improvement of any commercial , industrial , or other non-resident ial structure are designed to have the lowest floor, includ ing a ll utilities , ductwork and basements , elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure w ith its attendant utility , ductwork , basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities , ductwork , basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation , and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction . Engineer I Surveyor Date Conditions or comments as part of approval : Print Form ) 10/1 O Page 4 of 4 SUMMARY OF HYDRAULIC ANALYSIS FOR Dominik Drive Culvert at Puryear Drive College Station, Texas As part of City of College Station 2014 CDBG Sidewalk Project Contract #13-413 February 2014 Prepared by: Civil Engineering Consultants 4101 S. Tex as Avenue Bryan, Tex as 77802 (979) 846-6212 3/zs/Xi General Information and Background In December 2013 , the City of College Station retained Civil Engineering Consultants to prepare plans and specifications for the 2014 CDBG Sidewalk Project. Part of the scope of that project included the replacement of the storm drain culvert on Dominik Drive near its intersection with Puryear Drive. The size of this replacement culvert was shown to be a 4 'x 3 ' reinforced concrete box culvert in preliminary cost estimates. It was later determined that this size was an estimate only and that an analysis was needed to determine the appropriate size. A change order to the project was issued to conduct this analysis and make a recommendation on the size of this culvert based on current design guidelines. The report that follows is a summary of that analysis . Drainage Basis Hydraulic and Hydrologic Characteristics The drainage basin for the Dominik Drive culvert is shown on Exhibit A. It is located north of Dominik Drive in the portion of College Station known as College Hills Estates in the Eastgate area. It encompasses an area of 87.5 acres. The entire basin has been fully developed for decades as a low density , single-family residential area . It includes a linear park known as Thomas Park in the center along the drainage channel. The basin is drained by a tributary of Wolf Pen Creek that crosses Dominik Drive near Puryear Drive . The existing culvert is a 66" RCP . Drainage Basin Parameters Drainage Area: Flo w Path Length Natural Chann el Avg. Slope Pa vement A vg. Slope Applicable Exhibit: 87.5 acres 3566/t 2345/t 0.94% 1221 ft 1.31% Exhibit A -Dominik Drive Crossing Drainage Area Flowrate Computation Parameters Pipe Materials: RCP Manning's n Valu e: 0 .013 Runoff Coefficients : CN = 84 (soil Type D, pasture) % impervious cover= 38% (low density residential) (taken from Table C-7 of BCS Drainage D esign Guidelines) Tim e of Concentration : v (natural channel)= 2 ft/sec v (pavement)= 8 ft/sec (taken from Table C-4 of BCS Drainage Design Guidelin es) Tc (natural channel) = 23.45 ft @ 2 ft/sec = 1175.5 sec = 19.5 minutes Tc (pavement) = 1221 ft@ 8 ft/sec= 152 .6 sec = 2 .5 minutes Total = 22 minutes Design Storm Event: Dominik Drive is shown as a 2-lane Major Collector on the 2009 Thoroughfare Plan . Culv erts for Major Collectors are required to pass the 100 year storm event. Hydrology Software: HEC-HMS v. 3 .5 Computed flowrate (100 year storm)= 437.7 cfs Applicable Exhibit: Exhibit B -HEC-HMS output for 100-yr simulation Culvert Size Calculation The culvert size was computed using the Culvert Calculator option in AutoCAD 2009 w/ Land Desktop Companion Culvert Calculator. The results are shown in Exhibit C. The result is 2-66 " RCP culverts which allow the 100 year runoff to pass without overtopping the roadway. With this culvert design, water will rise to within about 5" of the centerline elevation, but still allow traffic to pass along the middle of the street. Notice on Exhibit C that the computed velocity of water leaving the pipe exceeds 20 ft/sec. Applicable Exhibit: Exhibit C -Culvert Calculator Output File Conclusion and Recommendation From the analysis described above, we conclude that the minimum culvert design required for the Dominik Drive crossing to meet current city standards is two 66" RCP pipes. While this design is able to pass the volume of water coming to it without overtopping the roadway, it yields a velocity in excess of 20 ft/sec which requires energy dissipation devices and erosion protection immediately downstream of the culvert. Larger culvert sizes could be considered to reduce the velocity coming out of the pipes. At the same time that this analysis was being prepared, the Public Works Department of the City of College Station conducted a review of flooding reports in the drainage basin upstream of this crossing . That review found no reports of significant flooding in this area. Since this area is fully developed and redevelopment to a higher density is unlikely, we conclude that the existing culvert is functioning adequately and with proper maintenance will likely continue to do so for the foreseeable future . Adding a second pipe to the existing structure would provide little or no additional benefit for the cost associated with its construction. The recommendation from this analysis is to not add the second 66" RCP, but instead replace the headwall structure on the downstream side of the crossing and replace it with one that accommodates the 6' sidewalk being planned on that side of the street. The addition of channel lining and erosion protection immediately downstream of the culvert is also recommended. ' Drainage Area for Culvert 87.5 ac DOMINIK DRIVE CROSSING DRAINAGE AREA Project: Start of Run : End of Run : Compute Time : Hydro logic Element Thomas Park Exhibit B HEC-HMS Output Summary Dominik Culvert Simulation 01 Jan2014, 00 :01 02Jan2014,00 :ll 03Feb2014, 17 :36 :18 Drainage Area {Ml2) 0 .137 Run : Basin Model : Meteorologic Model : Control Specifications : Peak Discharge (CFS) 437.7 100 year Existing 100 year 24 hr Time of Peak Volume {IN) 01Jan2014, 12 :21 9 .96 ,' .. Exhibit C Culvert Calculator from AutoCAD 2009 Land Desktop Companion Entered Data: Shape . . . . . . . . . . . . . . . . . . . . . . . . . . . Circular Number of Barrels . . . . .. .. . . . . . . . 2 Solving for ........... .......... Headwater Chart Number . . . .. . .. . . . . . .. ... . . 1 Scale Number .. . . . . .. .. .. .. . .. . . . 1 Chart Description ............... CONCRETE PIPE CULVERT; NO BEVELED RING ENTRANCE Scale Description ............... SQUARE EDGE ENTRANCE WITH HEADWALL Overtopping . . . . . . . . . . . . . . . . . . . . . Off Flowrate ........................ 437.7000 cfs Manning's n ..................... 0.0130 Roadway Elevation ............... 298.9500 ft Inlet Elevation ................. 291.5000 ft Outlet Elevation ................ 289.9000 ft Diameter ........................ 66.0000 in Length .......................... 68.0000 ft Entrance Loss ................... 0.5000 Tailw ater ....................... 5.0000 ft Computed Results : Headwater ....................... 298.5701 ft Inlet Control Slope ........................... 0 .0235 ft/ft Velocity ........................ 20 .7996 fps Messages : Inlet head > Outlet head. Computing Inlet Control headwater. *Note: Using 2-66" RCP culverts allows water to build up to an elevation of 298.57 feet , which is slightly lower than the centerline elevation of Dominik Drive at 298.95 . \