Loading...
HomeMy WebLinkAbout14-111FOR OFFICE USE ONLY CASENO. ~·~ DATE SUBMITTED: • = )\4 TIME '~ CITY or C ou.EGE STATI ON Ho me o/Texas A&M University " SITE PLAN APPLICATION GENERAL STAFF D D MINIMUM SUBMITTAL REQUIREMENTS: $932 Site Plan Application Fee. \"\ l~ ( Cht SbJ $350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable). Y) ( tt.. O $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is> $600 , the balance is due prior to the issuance of any plans or development permit). V) ( 4__. ~ Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered . D D D Six (6) folded copies of site plan . One (1) folded copy of the landscape plan . hjCA.... One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate Building Review (if applicable). Y\ I~ D Building elevations to scale for all buildings . D D D A list of building materials for all facade and screening . Color samples for all buildings or list colors to be used from the approved color palette . Electronic copy of Site Plan e-mailed to csuelectdesign@cstx .gov. O Two (2) copies of the grading , drainage, and erosion control plans with supporting drainage report. n. I"-. O Two (2) copies of the Public infrastructure plans and supporting documents (if appl icable). Y1 ( °'--., 0 Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). Y) ( CL. O The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not check off. h l °'--' Date of Optional Preapplication or Stormwater Management Conference .:...;N.;;...;./'A-'------------------ NAME OF PROJECT Security Vestibules at Various Campuses-Pebble Creek Elementary ADDRESS 200 Parkview Drive, College Station , TX 77845 LEGAL DESCRIPTION (Lot , Block, Subdivision) 14 .872 acre tract at Lot A, Pebble Creek Subdivision , Sec/Ph SA APPLICANT/PRO~ECT MANAGER'St INFORMATION (Primary contact for the proje.ct): ~ • Name \A.Ll ~SL~ I~ E-m~il h\fum.i ~llP v\lc6.Vll-'.\ I .J.{(,f s. ca"" StreetAddress ')1.15 "fi.'.Ll~ W~ ~ I Su_d{ 1;\i City \1QL ~ State 15/ Zip Code 110:1 Q Phone Number '2/bl. u)'"'\ L ·1.:;:,oq Fax Number Y ~l· lo]\· 2-2 l "? PROPERTY OWNER'S INFORMATION : Name College Station ISO -Theo Rouse , Representative E-mail _tri_o_us_e_.:@=--cs_is_d_._ori....::.g ___________ _ Street Address 2000 Welsh A venue City College Station State TX Zip Code _7_78_4_0 ____ _ Phone Number 979 .694 .5634 Fax Number 979 .694 .5612 ---------------~ Rev ised 4/14 Page 1 of 11 ARCHITECT OR ENGINEER'S INFOR Name Kenneth R Hutchens Street Address 7915 FM 1960 W, Suite 214 E-mail khutchens@vlkarchitects .com City Houston State TX Zip Code _7_70_7_0 ____ _ Phone Number 281 .671.2300 Fax Number 281 .671 .2313 ~~--------------~ OTHER CONTACTS (Please specify type of contact): Name Street Address City State Phone Number Fax Number Current zoning _c.O_-_O-'---ff1_·c_e _________________________________ _ Present use of property _E--'le_m_e'-n-'t"'--ary.....__S_c_h_o_o_I __________________________ _ Proposed use of property =E.:....:le:..:...m:..:...e::..:.n.:....:t=ary.....__S::....c::..:.h.:....:o'-"o"'--1 __________________________ _ Number of parking spaces required No Change Number of parking spaces proposed No Change Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes IX No If yes , provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name : City Project Number (in known): Date I Timeframe when submitted : Revised 4/14 Page 2of11 MUL Tl-FAMILY RESIDENTIAL Total Acreage Floodplain Acreage ____ _ Housing Units ___ # of 1 Bedroom Units # of 2 Bedroom Units --- #of 3 Bedroom Units --- # of 4 Bedroom Units --- FOR 2 BEDROOM UNITS ONLY #Bedrooms= 132 sq . ft . --- # Bedrooms < 132 sq . ft. --- PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) # of Multi-Family Dwelling Units # of acres in floodplain # of acres in detention #of acres in greenways Date dedication approved by Parks & ____ Recreation Advisory Board COMMERCIAL Total Acreage Building Square Feet ___ _ Floodplain Acreage ____ _ * Projects that were vested prior to January 1, 2008 , per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information . The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Signature and title \Im\~ Revised 4/14 Page 3of1 1 VLK IARCHITECTS TRANSMITTAL Project: College Station ISO -Security Vestibule at Pebble Creek Elementary School To : City of College Station 1101 Texas Avenue College Stat ion , TX 77840 979 .764.3570 FOR YOUR: D APPROVAL D SIGNATURE D REVIEW I COMMENT D INFORMATION I FILES PARTIES THE FOLLOWING : Copies Date Description 6 4/25/14 Full size site plan drawings 4/25/14 Site Plan Application COMMENTS : COPIES TO : File Architect's 1376 .00 Project No .: Date : April 25 , 2014 D DISTRIBUTION TO D D 0 D 0 By : Ben Lamons Member American Institute of Architects. 7915 F.M. 1960 West Suite 214 · Houston Texas 77070 Ph 281.671.2300 ·Fax 281 .671.2313 • www.vlkarchitects.com ,. DATE: TO : FROM : SUBJECT: June 9 , 2014 C ITY OF C ou.EGE STATION Home of Texas A&M University • MEMORANDUM Melissa Fleming , via ; mflrm ing@vlkarchitects .co Jason Schubert , AICP , Principal Planner CSISD PEBBLE CREEK ELEMENTARY SECURITY VESTIBULE (SP) Staff rev iewed the above -ment ioned site plan as requested . The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and subm it the follow ing information for further staff review : City of College Station Transmittal Letter ; and Eight (8) complete sets of site civil construction documents (sheets A1 .01A & A2 .01A) for the proposed development for stamp ing/approval (one set will be returned to you , please submit additional copies if you want more than one approved set). Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not address ing with the revised site plan , please attach a letter explaining the details . If you have any questions or need additional information , please contact Jason Schubert at 979 . 764 .3570 . Attachments : Staff Review Comments PC : Theo Rouse , College Station ISD , via ; trouse@cs isd .org / P&DS Project No . 14-00900111 Planning & Development Ser11ices P.O. BOX 9%0 • 1101 TEXAS AVENUE · COLLEGE STA flON ·TEXAS · 77 842 TEL. •J7<J 764 .. ~57 0 ·FAX . 979.764 .. 14% cstx .gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: CSISD Pebble Creek Elementary Security Vestibule 14 -00900111 PLANNING 1. No comments . Reviewed by : Jason Schubert Date: June 9, 2014 ENGINEERING COMMENTS NO. 1 1. FYI ... Due to the scale , we are not requiring specific erosion control measures to be specified on the minor site plan . The contractor will need to add erosion control on -site as needed . Rev iewed by : Erika Bridges Date : June 6 , 2014 FIRE 1. I have talked to the contractor and CSISD about all the schools that are doing construction this summer. At no time will the occupants have to travel more than the allowed distances to exit the buildings . No one (student or CSISD employees) is allowed in construction areas Rev iewed by : Steve Smith Date : May 1, 2014 SANITATION 1. San itation is ok with this project . Reviewed by : Wally Urrutia Date : June 6 , 2014 Kelli Schlicher From: Sent: To: Raymond Olson Monday , April 28 , 2014 1 :38 PM Kelli Schlicher Subject: RE : Pebble Creek Elementary School We are okay, Steve Smith is working with the schools on the scheduling . Waiting on plans from building. Raymond Olson Deputy Fire Marshal College Station Fire Department rolson@cstx.gov 979-764-3402 Fax 979-764-3403 From: Kelli Schlicher Sent: Monday, April 28, 2014 1:19 PM To: Wally Urrutia; Raymond Olson Subject: Pebble Creek Elementary School Wally and Raymond, Pebble Creek Elementary School is adding a security vestibule to their campus and I wanted to ensure y'all didn 't have any comments or issues. Please see the attached and respond with approval and/or comments . Thank you, Kelli Schlicher '10 Planning Technician Planning & Development Services City of College Station P.O. Box 9960 1101 Texas Avenue College Station, TX 77842 Office: (979) 764-3584 Fax: (979) 764 -3496 www.cstx.gov City of College Station Home of Texas A&M University ® CITY or: C ouJ ~GE STAT IO Homr ofTfXllJ A&M U,,itlfflifJ' 1 DEVELOPMENT PERMIT PERMIT NO. 14-111 CIT Y Of COLLEG E ST,\TION Jll.i•1l'li~cf[l.-.,"l1ipmm1 5.-rri.·o FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: CSISD Pebble Creek Elementary - Security Vestibules DATE OF ISSUE: 6/13/14 OWNER: College Station ISO (c/o Theo Rouse) 2000 Welsh Avenue College Station , TX 77840 SITE ADDRESS: 200 Parkview Drive DRAINAGE BASIN: Alum Creek VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . ,• ·.,..,. 2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4 . Other permits may have been required to fulfill local , state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits . · 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor 's responsibility to implement measures that will meet City , State, and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance w ith the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Conditions : 1 ,_3\~e~n_,_,e,'-'-"g._._7Z-'---"'a;:..:._;_fV\._\....,r_.e~'Z-=-----' the Contractor, hereby agree to comply with all conditions herein. con la ,~,Z~ Date f'ro,..-.. ·, f'c:z..(2c:, l~J. or3 Phone number E-mail I hereby grant this permit for development. Contact w eA ~ ·:r1·1-lofn I ' the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. ~f;WJ.~ City Engineer/Represent~ Oat Erika Bridges, EIT , CFM Graduate Civil Engineer Planning and Development Services 1101 Texas Avenue College Station , TX 77842 MITCHELL MM MORGAN Re: Pebble Creek Elementary School Security Vestibule Drainage Dear Erika, May 30 , 2014 The purpose of this drainage letter is to analyze existing and proposed conditions of drainage for the construction of a new security vestibule for the Pebble Creek Elementary School. The construction of this vestibule will also enable additional area grading to help alleviate drainage ponding in the adjacent yard area. This letter will utilize the existing design calculations and show the impact of the increased impervious area to the proposed site location . Pebble Creek Elementary School is located at the corner of Parkview Drive and Lakeway Drive in College Station , TX. As shown on the attached sheet C3 , "Drainage Area Map ," of the original Pebble Creek Elementary School construction plans , the drainage areas affected by the vestibule addition are Drainage areas "A ", "G ", and "H". On the attached sheet P1 , Proposed Drainage Area Map , subareas G1 , H1 , H2, and H3 will be taken out of the total area of drainage area "A ". Subarea G1 will be added to drainage area "G " and renamed "G-MOD", and subareas H1-H3 will be added to drainage area "H " and renamed "H-MOD ". Subarea H2 is an area that does not drain as originally intended as part of Drainage Area "A ". A grate inlet is proposed to pick the runoff from this subarea and add it to Drainage Area "H". Subarea H3 already has been modified with the addition of a grate inlet cast on top of Storm Drain B, with this area graded to drain previously to the proposed construction of the vestibule . This area was added to Drainage Area "H" as well . The addition of subareas H2 and H3 to H-MOD modified the C number from 0.9 to 0 .79 , due to those areas being undeveloped . The addition of G1 to G-MOD did not change the C number of 0.9. As expected, the loss of area in drainage area "A" decreased the flow(Q) of that drainage area , while the increased areas of G-MOD and H-MOD increased the 100-year flow by 0 .3 cfs . Below is a chart showing the existing and proposed drainage calculations with the above mentioned modifications : 3204 EARL RUDDER FWY. S. • COLLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979.260 .3564 CIVIL ENGINEERING • HYD RAULI CS • HYDROLOG Y • UTILITIE S • STR EET S • SITE PLANS • SUBD IVIS ION S 1nfo@m1tchellandmorgan com • www m1tchellandmorgan com UJ 0 (!) ~ ~< ~~ (!) = ~~ = ~ () = Lll = = u = Lll = = ~~ Lll 0 N Lll .... O< I-!!! .... !::i !!! .... 0 0 0 0 NO. min In/Hr In/Hr In/Hr In/Hr In/Hr AC. cfs cfs cfs cfs cfs A 10.0 6 .7 7.8 9.2 0.55 4.35 16.0 18.7 22.0 24.6 27.3 B 10.0 6 .7 7.8 9.2 4 .07 16.4 25.2 27.8 10.0 9.2 10.3 11.4 0.70 0.83 3.9 4.5 5.3 6.0 6.6 (!) 10.3 11.4 0.47 0.66 2.1 2.4 2.9 3.2 z 9.2 ~ E 10.0 6.7 7.8 9.2 10.3 11.4 0.77 0.45 2.3 2.7 3.2 3.6 4.0 ~ F 10.0 6.7 7.8 9.2 10.3 11.4 0.87 1.40 8.2 9.5 11.2 12.5 13.9 G 10.0 6.7 7.8 9.2 10.3 11 .4 0.90 0.70 4 .2 5.8 6.5 7.2 H 10.0 6.7 7.8 9.2 10.3 11.4 0.90 L02 L4 9.5 10.5 10.0 6.7 7.8 9.2 10.3 11.4 0.50 2.56 8.6 10.0 11.8 13.2 14.6 A-MOD 10.0 6.7 7.8 9.2 10.3 11.4 0.55 4.15 15.3 17.8 23.5 26.0 B 10.0 6.7 7.8 9.2 10.3 11.4 0.60 4 .07 16.4 19.0 25.2 27.8 0 c 10.0 6.7 7.8 9.2 10.3 11.4 0.70 0.83 3.9 4.5 5.3 6.0 6.6 UJ D 10.0 6.7 7.8 9.2 10.3 11.4 0.47 0.66 2.4 3.5 C/l ~ E 10.0 6.7 7 .8 9.2 10.3 11.4 0.77 0.45 2.3 3.2 4.0 0 F 10.0 6.7 7.8 9.2 10.3 11.4 0.87 1.40 8.2 13.9 ~ G-MOD 10.0 6.7 7.8 9.2 10.3 11.4 0.90 0.73 5.1 6.0 6.8 7.5 H-MOD 10.0 6.7 7.8 9.2 10.3 11.4 0.79 L19 7.4 L7 9.7 10.8 10.0 6.7 7.8 9.2 10.3 11.4 0.50 2.56 8.6 10.0 11.8 13.2 14.6 The original storm drain design for the Pebble Creek Elementary School allowed for capturing the entirety of the 100-year storm . These calculations are shown on the attached sheet C4 , "Storm Drain Profile ". In fact, the design allowed Storm Drain "B", which carries the runoff for drainage area "H", to carry a maximum of 12.6 cfs . Storm Drain "C" is designed to carry a maximum of 9 cfs for drainage area "G". Below is a chart showing the existing, proposed and maximum designed flows for each storm drain line: 'ti 'ti Cl GI GI Cll c c o= .!?c:i ·::;= .!! = Q.= ~ Cll = )( .... 0 .... Q) .... WO 0:: 0 :JOO 50-B 10.5 I 10.8 12.6 50-C 7.2 7.5 9.0 The original design allowed for more flow than the 100-yr design storm flows . The existing storm drain system can easily handle the additional flow created by the proposed construction of the security vestibule and additional grading at the Pebble Creek Elementary School. If you have any questions or comments , please feel free to call our office at 979-260-6963 . ~:~ James T. Batenhorst, PE Civil Engineer Cc : File Melissa Fleming , VLK Architects Attachments: P1 , C3 & C4 .................. ,,,,,, --·:'\~OF r~ \\~ --'\.,... ........ :..t ..... . ,r~ .. ···*··· ........ \$1'1' ,:,. .. · ··. ii IL "' •• •• "'I ,... . ... 1. " .... : ................................. ~ ~ .. 4~J;.S . .T •. M~~~ ~-o: ·i ~ ·~ ~\ 93631 .: I ~1.:a ·· ··I.ii, .-,L. ~··.~(.CENS~?.··~§',/ .,,,~~~~~·~~~~, ~' ~~--ro11 1Xf:~ F-144'3> x --x --x Exist Storm Drain "C" to Remain r-x ---x ---x ---x I CONSTRUCTION AREA TO ~ __.------;;-BE FENCED. COORDINATE I I EXACT LOCATION w I OWNER 7.2 LF of 10• PVC 0 1.0% slope See sheet "AJ.01A " for downspout details. Ex ist Storm Drain "C" to be Removed Exist Storm Drain "B" to be Removed EXISTING PEBBLE CREEK ELEMENTARY SCHOOL (63,820 SF) AREA OF ADDITION (1,680 SF) FINISH FLOOR TO MATCH EXISTING ''II' 11'.1!11 ,,.P.· >If I C ITY OF C oll.EGE S TATION Homt of Texas A&M University • FOR OFFICE USE ONLY CAS E NO .: /£1 . 'I I DATE SUBMITTED : ~ • J · f'i TIME: l\_...-=~ ~_0 _____ _ STAFF: ~ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your subm itta l. 0 New Project Submitta l O Incomplete Project Submittal -documents needed to complete an application . Case No .: lg] Existing Project Submittal. Case No .: Project Name Pebble Creek Elementary School Vestibule Contact Name James Batenhorst, PE ~-------- Phone Number......;9_7-'-9-"-2'-'-6-'-0......;-6""""9-'-6""""3 _______ _ We are transm itting the following for Planning & Development Services to review and comment (check all that apply): 0 Comprehensive Plan Amendment 0 Non-Residential Architectural Standards 0 Rezoning Application 0 Irrigation Plan 0 Conditiona l Use Permit 0 Variance Request 0 Preliminary Plan 0 Development Permit 0 Fi nal Plat 0 Development Exaction Appeal 0 Development Plat 0 FEMA CLOMA/CLOMR/LOMA/LOMR 0 Site Plan 0 Grading Plan 0 Special District Site Plan 0 Other -Please specify below 0 Special District Building I Sign 0 Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The follow ing are included in the complete set: 0 Comprehensive Plan Amendment 0 Waterline Construction Documents 0 TxDOT Driveway Perm it 0 Sewerline Construction Documents 0 TxDOT Util ity Permit 0 Street Construction Documents lg] Drainage Letter or Report 0 Easement Application 0 Fire Flow Analysis 0 Other -Please specify Special Instructions: 10/10 Print Form MITCHELL MM MORGAN To: City of College Station 3204 Earl Rudder Fwy S College Station, TX 77845 (979) 260-6963 Phone (979) 260-3564 Fax info@mitchellandmorgan.com www.mitchellandmorgan.com Letter Of Transmittal Date: 06/02/2014 Job: 1442 Attention: Erika Bridges, EIT, CFM Re: Pebble Creek Elementary Vestibule We are sending you: [i] Attached D Under separate cover via the following: D Drawings D Plans D Prints D Samples D Specifications D Letter D Order D Other Item Date # of Copies Description 1 5/30/2014 1 Drainage Letter Transmitted as checked below: D For approval D Approved as noted D Resubmit ___ copies for approval D For your use D Approved as submitted D Submit copies for distribution D As requested D Returned for corrections D Return corrected copies [X) For review D Other ____________ _ Remarks : Please see attached for the hard copy of the drainage letter that I emailed to you on Friday, May 30, 2014. Thanks. If you have any questions or comments, please contact us at 979-260-6963. Copy to: _F_il..;..e _____________ Signed: James Batenhorst , PE