Ho me o/Texas A&M University " SITE PLAN APPLICATION
GENERAL
STAFF
D
D
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee. \"\ l~ ( Cht SbJ
$350 Non-Residential Architectural Standards I Northgate Building Review Application Fee (if applicable). Y) ( tt..
O $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is
1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is> $600 , the balance is
due prior to the issuance of any plans or development permit). V) ( 4__.
~ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered .
D
D
D
Six (6) folded copies of site plan .
One (1) folded copy of the landscape plan . hjCA....
One (1) copy of the following for Non-Residential Architectural Standards building review or Northgate
Building Review (if applicable). Y\ I~
D Building elevations to scale for all buildings .
D
D
D
A list of building materials for all facade and screening .
Color samples for all buildings or list colors to be used from the approved color palette .
Electronic copy of Site Plan e-mailed to csuelectdesign@cstx .gov.
O Two (2) copies of the grading , drainage, and erosion control plans with supporting drainage report. n. I"-.
O Two (2) copies of the Public infrastructure plans and supporting documents (if appl icable). Y1 ( °'--.,
0 Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable). Y) ( CL.
O The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off. h l °'--'
Date of Optional Preapplication or Stormwater Management Conference .:...;N.;;...;./'A-'------------------
NAME OF PROJECT Security Vestibules at Various Campuses-Pebble Creek Elementary
ADDRESS 200 Parkview Drive, College Station , TX 77845
LEGAL DESCRIPTION (Lot , Block, Subdivision) 14 .872 acre tract at Lot A, Pebble Creek Subdivision , Sec/Ph SA
APPLICANT/PRO~ECT MANAGER'St INFORMATION (Primary contact for the proje.ct): ~ •
Name \A.Ll ~SL~ I~ E-m~il h\fum.i ~llP v\lc6.Vll-'.\ I .J.{(,f s. ca""
StreetAddress ')1.15 "fi.'.Ll~ W~ ~ I Su_d{ 1;\i
City \1QL ~ State 15/ Zip Code 110:1 Q
Phone Number '2/bl. u)'"'\ L ·1.:;:,oq Fax Number Y ~l· lo]\· 2-2 l "?
PROPERTY OWNER'S INFORMATION :
Name College Station ISO -Theo Rouse , Representative E-mail _tri_o_us_e_.:@=--cs_is_d_._ori....::.g ___________ _
Street Address 2000 Welsh A venue
City College Station State TX Zip Code _7_78_4_0 ____ _
Phone Number 979 .694 .5634 Fax Number 979 .694 .5612
---------------~
Rev ised 4/14 Page 1 of 11
ARCHITECT OR ENGINEER'S INFOR
Name Kenneth R Hutchens
Street Address 7915 FM 1960 W, Suite 214
E-mail khutchens@vlkarchitects .com
City Houston State TX Zip Code _7_70_7_0 ____ _
Phone Number 281 .671.2300 Fax Number 281 .671 .2313
~~--------------~
OTHER CONTACTS (Please specify type of contact):
Name
Street Address
City State
Phone Number Fax Number
Current zoning _c.O_-_O-'---ff1_·c_e _________________________________ _
Present use of property _E--'le_m_e'-n-'t"'--ary.....__S_c_h_o_o_I __________________________ _
Proposed use of property =E.:....:le:..:...m:..:...e::..:.n.:....:t=ary.....__S::....c::..:.h.:....:o'-"o"'--1 __________________________ _
Number of parking spaces required No Change Number of parking spaces proposed No Change
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
I Yes
IX No
If yes , provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name :
City Project Number (in known):
Date I Timeframe when submitted :
Revised 4/14 Page 2of11
MUL Tl-FAMILY RESIDENTIAL
Total Acreage
Floodplain Acreage ____ _
Housing Units
___ # of 1 Bedroom Units
# of 2 Bedroom Units ---
#of 3 Bedroom Units ---
# of 4 Bedroom Units ---
FOR 2 BEDROOM UNITS ONLY
#Bedrooms= 132 sq . ft .
---
# Bedrooms < 132 sq . ft. ---
PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
# of Multi-Family Dwelling Units
# of acres in floodplain
# of acres in detention
#of acres in greenways
Date dedication approved by Parks &
____ Recreation Advisory Board
COMMERCIAL
Total Acreage
Building Square Feet ___ _
Floodplain Acreage ____ _
* Projects that were vested prior to January 1, 2008 , per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information .
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
Signature and title \Im\~
Revised 4/14 Page 3of1 1
VLK IARCHITECTS
TRANSMITTAL
Project: College Station ISO -Security Vestibule at Pebble Creek Elementary School
To : City of College Station
1101 Texas Avenue
College Stat ion , TX 77840
979 .764.3570
FOR YOUR:
D APPROVAL D SIGNATURE D REVIEW I COMMENT D INFORMATION I FILES
PARTIES
THE FOLLOWING :
Copies Date Description
6 4/25/14 Full size site plan drawings
4/25/14 Site Plan Application
COMMENTS :
COPIES TO : File
Architect's 1376 .00
Project No .:
Date : April 25 , 2014
D DISTRIBUTION TO
D
D
0
D
0 By : Ben Lamons
Member American Institute of Architects. 7915 F.M. 1960 West Suite 214 · Houston Texas 77070
Ph 281.671.2300 ·Fax 281 .671.2313 • www.vlkarchitects.com
,.
DATE:
TO :
FROM :
SUBJECT:
June 9 , 2014
C ITY OF C ou.EGE STATION
Home of Texas A&M University •
MEMORANDUM
Melissa Fleming , via ; mflrm ing@vlkarchitects .co
Jason Schubert , AICP , Principal Planner
CSISD PEBBLE CREEK ELEMENTARY SECURITY VESTIBULE (SP)
Staff rev iewed the above -ment ioned site plan as requested . The following page is a list of staff
review comments detailing items that need to be addressed . Please address the comments and
subm it the follow ing information for further staff review :
City of College Station Transmittal Letter ; and
Eight (8) complete sets of site civil construction documents (sheets A1 .01A &
A2 .01A) for the proposed development for stamp ing/approval (one set will be
returned to you , please submit additional copies if you want more than one
approved set).
Please note that this application will expire in 90 days from the date of this memo , if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein . If there are
comments that you are not address ing with the revised site plan , please attach a letter
explaining the details . If you have any questions or need additional information , please contact
Jason Schubert at 979 . 764 .3570 .
Attachments : Staff Review Comments
PC : Theo Rouse , College Station ISD , via ; trouse@cs isd .org /
P&DS Project No . 14-00900111
Planning & Development Ser11ices
P.O. BOX 9%0 • 1101 TEXAS AVENUE · COLLEGE STA flON ·TEXAS · 77 842
TEL. •J7<J 764 .. ~57 0 ·FAX . 979.764 .. 14%
cstx .gov/devservices
STAFF REVIEW COMMENTS NO. 1
Project: CSISD Pebble Creek Elementary Security Vestibule 14 -00900111
PLANNING
1. No comments .
Reviewed by : Jason Schubert Date: June 9, 2014
ENGINEERING COMMENTS NO. 1
1. FYI ... Due to the scale , we are not requiring specific erosion control measures to be
specified on the minor site plan . The contractor will need to add erosion control on -site as
needed .
Rev iewed by : Erika Bridges Date : June 6 , 2014
FIRE
1. I have talked to the contractor and CSISD about all the schools that are doing construction
this summer. At no time will the occupants have to travel more than the allowed distances to
exit the buildings . No one (student or CSISD employees) is allowed in construction areas
Rev iewed by : Steve Smith Date : May 1, 2014
SANITATION
1. San itation is ok with this project .
Reviewed by : Wally Urrutia Date : June 6 , 2014
Kelli Schlicher
From:
Sent:
To:
Raymond Olson
Monday , April 28 , 2014 1 :38 PM
Kelli Schlicher
Subject: RE : Pebble Creek Elementary School
We are okay, Steve Smith is working with the schools on the scheduling . Waiting on plans from building.
Raymond Olson
Deputy Fire Marshal
College Station Fire Department
rolson@cstx.gov
979-764-3402
Fax 979-764-3403
From: Kelli Schlicher
Sent: Monday, April 28, 2014 1:19 PM
To: Wally Urrutia; Raymond Olson
Subject: Pebble Creek Elementary School
Wally and Raymond,
Pebble Creek Elementary School is adding a security vestibule to their campus and I wanted to ensure y'all didn 't have
any comments or issues. Please see the attached and respond with approval and/or comments .
Thank you,
Kelli Schlicher '10
Planning Technician
Planning & Development Services
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Station, TX 77842
Office: (979) 764-3584
Fax: (979) 764 -3496
www.cstx.gov
City of College Station
Home of Texas A&M University ®
CITY or: C ouJ ~GE STAT IO
Homr ofTfXllJ A&M U,,itlfflifJ'
1
DEVELOPMENT PERMIT
PERMIT NO. 14-111
CIT Y Of COLLEG E ST,\TION
Jll.i•1l'li~cf[l.-.,"l1ipmm1 5.-rri.·o
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
CSISD Pebble Creek Elementary -
Security Vestibules
DATE OF ISSUE: 6/13/14
OWNER:
College Station ISO (c/o Theo Rouse)
2000 Welsh Avenue
College Station , TX 77840
SITE ADDRESS:
200 Parkview Drive
DRAINAGE BASIN:
Alum Creek
VALID FOR 24 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized .
,• ·.,..,.
2. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re-
issued .
3. The permit will expire if no significant work is progressing within 24 months of issuance .
4 . Other permits may have been required to fulfill local , state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits . ·
5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project.
6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing
drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor 's responsibility to implement measures that will meet City , State, and Federal requirements .
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy .
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance w ith the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil ,
solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited .
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations
that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically
requested and approved will be allowed .
10 . Special Conditions :
1 ,_3\~e~n_,_,e,'-'-"g._._7Z-'---"'a;:..:._;_fV\._\....,r_.e~'Z-=-----' the Contractor, hereby agree to comply with all conditions herein.
con la ,~,Z~ Date
f'ro,..-.. ·, f'c:z..(2c:, l~J. or3
Phone number E-mail
I hereby grant this permit for development. Contact w eA ~ ·:r1·1-lofn I ' the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
~f;WJ.~ City Engineer/Represent~ Oat
Erika Bridges, EIT , CFM
Graduate Civil Engineer
Planning and Development Services
1101 Texas Avenue
College Station , TX 77842
MITCHELL
MM
MORGAN
Re: Pebble Creek Elementary School Security Vestibule Drainage
Dear Erika,
May 30 , 2014
The purpose of this drainage letter is to analyze existing and proposed conditions of drainage
for the construction of a new security vestibule for the Pebble Creek Elementary School. The
construction of this vestibule will also enable additional area grading to help alleviate drainage
ponding in the adjacent yard area. This letter will utilize the existing design calculations and
show the impact of the increased impervious area to the proposed site location .
Pebble Creek Elementary School is located at the corner of Parkview Drive and Lakeway Drive
in College Station , TX.
As shown on the attached sheet C3 , "Drainage Area Map ," of the original Pebble Creek
Elementary School construction plans , the drainage areas affected by the vestibule addition are
Drainage areas "A ", "G ", and "H". On the attached sheet P1 , Proposed Drainage Area Map ,
subareas G1 , H1 , H2, and H3 will be taken out of the total area of drainage area "A ". Subarea
G1 will be added to drainage area "G " and renamed "G-MOD", and subareas H1-H3 will be
added to drainage area "H " and renamed "H-MOD ". Subarea H2 is an area that does not drain
as originally intended as part of Drainage Area "A ". A grate inlet is proposed to pick the runoff
from this subarea and add it to Drainage Area "H". Subarea H3 already has been modified with
the addition of a grate inlet cast on top of Storm Drain B, with this area graded to drain
previously to the proposed construction of the vestibule . This area was added to Drainage Area
"H" as well .
The addition of subareas H2 and H3 to H-MOD modified the C number from 0.9 to 0 .79 , due to
those areas being undeveloped . The addition of G1 to G-MOD did not change the C number of
0.9.
As expected, the loss of area in drainage area "A" decreased the flow(Q) of that drainage area ,
while the increased areas of G-MOD and H-MOD increased the 100-year flow by 0 .3 cfs .
Below is a chart showing the existing and proposed drainage calculations with the above
mentioned modifications :
3204 EARL RUDDER FWY. S. • COLLEGE STATION, TX 77845 • T 979 .260 .6963 • F 979.260 .3564
CIVIL ENGINEERING • HYD RAULI CS • HYDROLOG Y • UTILITIE S • STR EET S • SITE PLANS • SUBD IVIS ION S
1nfo@m1tchellandmorgan com • www m1tchellandmorgan com
UJ 0
(!) ~ ~< ~~ (!) = ~~ = ~ ()
= Lll = = u = Lll = = ~~ Lll 0 N Lll .... O< I-!!! .... !::i !!! .... 0 0 0 0
NO. min In/Hr In/Hr In/Hr In/Hr In/Hr AC. cfs cfs cfs cfs cfs
A 10.0 6 .7 7.8 9.2 0.55 4.35 16.0 18.7 22.0 24.6 27.3
B 10.0 6 .7 7.8 9.2 4 .07 16.4 25.2 27.8
10.0 9.2 10.3 11.4 0.70 0.83 3.9 4.5 5.3 6.0 6.6
(!)
10.3 11.4 0.47 0.66 2.1 2.4 2.9 3.2 z 9.2
~ E 10.0 6.7 7.8 9.2 10.3 11.4 0.77 0.45 2.3 2.7 3.2 3.6 4.0
~ F 10.0 6.7 7.8 9.2 10.3 11.4 0.87 1.40 8.2 9.5 11.2 12.5 13.9
G 10.0 6.7 7.8 9.2 10.3 11 .4 0.90 0.70 4 .2 5.8 6.5 7.2
H 10.0 6.7 7.8 9.2 10.3 11.4 0.90 L02 L4 9.5 10.5
10.0 6.7 7.8 9.2 10.3 11.4 0.50 2.56 8.6 10.0 11.8 13.2 14.6
A-MOD 10.0 6.7 7.8 9.2 10.3 11.4 0.55 4.15 15.3 17.8 23.5 26.0
B 10.0 6.7 7.8 9.2 10.3 11.4 0.60 4 .07 16.4 19.0 25.2 27.8
0 c 10.0 6.7 7.8 9.2 10.3 11.4 0.70 0.83 3.9 4.5 5.3 6.0 6.6
UJ D 10.0 6.7 7.8 9.2 10.3 11.4 0.47 0.66 2.4 3.5 C/l
~ E 10.0 6.7 7 .8 9.2 10.3 11.4 0.77 0.45 2.3 3.2 4.0
0 F 10.0 6.7 7.8 9.2 10.3 11.4 0.87 1.40 8.2 13.9 ~ G-MOD 10.0 6.7 7.8 9.2 10.3 11.4 0.90 0.73 5.1 6.0 6.8 7.5
H-MOD 10.0 6.7 7.8 9.2 10.3 11.4 0.79 L19 7.4 L7 9.7 10.8
10.0 6.7 7.8 9.2 10.3 11.4 0.50 2.56 8.6 10.0 11.8 13.2 14.6
The original storm drain design for the Pebble Creek Elementary School allowed for capturing
the entirety of the 100-year storm . These calculations are shown on the attached sheet C4 ,
"Storm Drain Profile ". In fact, the design allowed Storm Drain "B", which carries the runoff for
drainage area "H", to carry a maximum of 12.6 cfs . Storm Drain "C" is designed to carry a
maximum of 9 cfs for drainage area "G". Below is a chart showing the existing, proposed and
maximum designed flows for each storm drain line:
'ti 'ti
Cl GI GI
Cll c c o= .!?c:i ·::;=
.!! = Q.= ~ Cll = )( .... 0 .... Q) ....
WO 0:: 0 :JOO
50-B 10.5 I 10.8 12.6
50-C 7.2 7.5 9.0
The original design allowed for more flow than the 100-yr design storm flows . The existing
storm drain system can easily handle the additional flow created by the proposed construction
of the security vestibule and additional grading at the Pebble Creek Elementary School. If you
have any questions or comments , please feel free to call our office at 979-260-6963 .
~:~
James T. Batenhorst, PE
Civil Engineer
Cc : File
Melissa Fleming , VLK Architects
Attachments: P1 , C3 & C4
.................. ,,,,,,
--·:'\~OF r~ \\~ --'\.,... ........ :..t ..... . ,r~ .. ···*··· ........ \$1'1' ,:,. .. · ··. ii IL
"' •• •• "'I ,... . ... 1. " .... : ................................. ~
~ .. 4~J;.S . .T •. M~~~ ~-o: ·i ~ ·~ ~\ 93631 .: I ~1.:a ·· ··I.ii, .-,L. ~··.~(.CENS~?.··~§',/ .,,,~~~~~·~~~~,
~' ~~--ro11
1Xf:~ F-144'3>
x --x --x
Exist Storm Drain "C"
to Remain
r-x ---x ---x ---x I CONSTRUCTION AREA TO
~ __.------;;-BE FENCED. COORDINATE I I EXACT LOCATION w I OWNER
7.2 LF of 10• PVC
0 1.0% slope
See sheet "AJ.01A " for
downspout details.
Ex ist Storm Drain "C"
to be Removed
Exist Storm Drain "B"
to be Removed
EXISTING
PEBBLE CREEK
ELEMENTARY SCHOOL
(63,820 SF)
AREA OF ADDITION (1,680 SF)
FINISH FLOOR TO MATCH EXISTING
''II' 11'.1!11 ,,.P.· >If I
C ITY OF C oll.EGE S TATION
Homt of Texas A&M University •
FOR OFFICE USE ONLY
CAS E NO .: /£1 . 'I I
DATE SUBMITTED : ~ • J · f'i
TIME: l\_...-=~ ~_0 _____ _
STAFF: ~
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your subm itta l.
0 New Project Submitta l
O Incomplete Project Submittal -documents needed to complete an application . Case No .:
lg] Existing Project Submittal. Case No .:
Project Name Pebble Creek Elementary School Vestibule
Contact Name James Batenhorst, PE
~--------
Phone Number......;9_7-'-9-"-2'-'-6-'-0......;-6""""9-'-6""""3 _______ _
We are transm itting the following for Planning & Development Services to review and comment (check all that apply):
0 Comprehensive Plan Amendment 0 Non-Residential Architectural Standards
0 Rezoning Application 0 Irrigation Plan
0 Conditiona l Use Permit 0 Variance Request
0 Preliminary Plan 0 Development Permit
0 Fi nal Plat 0 Development Exaction Appeal
0 Development Plat 0 FEMA CLOMA/CLOMR/LOMA/LOMR
0 Site Plan 0 Grading Plan
0 Special District Site Plan 0 Other -Please specify below
0 Special District Building I Sign
0 Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The follow ing are included in the complete set:
0 Comprehensive Plan Amendment 0 Waterline Construction Documents
0 TxDOT Driveway Perm it 0 Sewerline Construction Documents
0 TxDOT Util ity Permit 0 Street Construction Documents
lg] Drainage Letter or Report 0 Easement Application
0 Fire Flow Analysis 0 Other -Please specify
Special Instructions:
10/10 Print Form
MITCHELL
MM
MORGAN
To: City of College Station
3204 Earl Rudder Fwy S
College Station, TX 77845
(979) 260-6963 Phone
(979) 260-3564 Fax
info@mitchellandmorgan.com
www.mitchellandmorgan.com
Letter Of Transmittal
Date: 06/02/2014 Job: 1442
Attention: Erika Bridges, EIT, CFM
Re: Pebble Creek Elementary Vestibule
We are sending you: [i] Attached D Under separate cover via the following:
D Drawings D Plans D Prints D Samples D Specifications
D Letter D Order D Other
Item Date # of Copies Description
1 5/30/2014 1 Drainage Letter
Transmitted as checked below:
D For approval D Approved as noted D Resubmit ___ copies for approval
D For your use D Approved as submitted D Submit copies for distribution
D As requested D Returned for corrections D Return corrected copies
[X) For review D Other ____________ _
Remarks :
Please see attached for the hard copy of the drainage letter that I emailed to you on
Friday, May 30, 2014. Thanks.
If you have any questions or comments, please contact us at 979-260-6963.
Copy to: _F_il..;..e _____________ Signed: James Batenhorst , PE