Please accept this letter as a request for payment in the amount of $374 ,638.00 made
payable to Greens Prairie Investors , LTD for the oversize participation on the 24 " water
line on the proposed Hwy. 40 easement.
Thank you,
/!/~~
Wallace Phillips
Manager
Greens Prairie Investors , LTD
TEX.CON
General Contractors
Dil '. of CDS Enterprises, In c.
1707 Graham Rd. • College Station , TX 77845 • 409-690-7711 • Fax: 409-690-9797
May 25th, 200 I
Re: Castle Gate Subdivision
24" Waterline
To whom it may concern,
This letter is to confirm that Texcon has been paid in full for all material and labor to construct the
24" waterline, running along State Highway 40 right-of-way starting from the City of College Station water
tower at Greens Prairie Road. Total invoices of $738,580 has been paid by Greens Prairie Associates, LLC
to Texcon for construction of this project. The project was approved and accepted by the City of College
Station on May 24, 2001, and a Letter of Completion was submitted by Texcon to the City of College
Station Inspector at that time.
Thank.you,
Ben M. Rush
Project Manager
..
STATE OF TEXAS
COUNTY OF
CONTRACTOR'S AFFIDAVIT OF BILLS PAID
Personally, before me the undersigned authority, on this day appeared CO. G. 5 ti ~
____ , who being duly sworn, on oath, says that he is a duly authorized representative of_
ffi&aJ G,~4 l c~ J t?-a cn,"-=and that au terms of the contract for the construction of:
(Full name of contractor as in contract)
have been satisfactorily completed and that all sums of money due for labor, materials, and
equipment furnished for the purpose of such improvements provided for in the contract, to the
best of my knowledge and belief, have been paid, except such unpaid sums for which cla ims have
been filed under provisions of laws.
(Signature)
\&'CJ t~~/,jciK
(Title)
Sworn to and subscribed before me this 2..S-tk day of __ m_~-~------~--1
A~~-;;·~~1 JOYCE A. A~LEN
{ * ~ • Notary Public , State of Texas
\-.. ~~..1., My Commi4C1¢11 Expim
~~ JAN . 2, aooa
LfoflLfi -~
ota.rv Public in and for
~@=toS County,-Texas
(Seat)
INSTRUCTIONS:
If the contractor is an individual, he shall sign the affidavit. If the Contractor is a
partnership, any partner may sign it. If the contractor is a corporation, a person
authorized by the by-laws or by the Board of Directors shall sign it. If the contractor
is a joint-venture of individuals, any of individuals may sign it. If the contractor is a
joint-venture ~f partnerships or of individuals and partnerships, the affidavit may be
signed by· the individual or any partner of any partnership. If the contractor is a
joint-venture in which a corporation is a party, separate affidavits must be executed
in the name of the joint-venture; one by each corporation and one by each
individual or partnership. Signatures for corporations should be by a duly authorized
officer. If signature is by another, a showing of authority to sign must accompany
the affidavit.
CA-1
11'
..
·1
...
i.
/
-------
-------------------
Page 1 of 2
Agenda Item Cover Sheet
Regular Item
x
Item Submitted By: IT eddy D. Mayo , P.E.
Council Meeting Date: !November 09 , 2000
Agenda Item #
Consent
Item
Workshop
Item
Jim Callaway , Development Services Director
Manager Approval: ·
Item: Presentation, discussion and possible action on a request for oversize
participation in the amount of $374,638.00 for construction of a 24-inch
waterline from the intersection of State Highway 6 and Green's Prairie Road,
west and north along proposed State Highway 40 a distance of 7200-feet. This
line will be constructed with the Final Plat of Castlegate Subdivision Phase 1,
Section 1.
Item Summary: This request for oversize participation is being made in
accordance with Section 9-C of the subdivision regulations. The final plat
requires the extension of water service approximately 7200-feet to and thru
the subdivision. The developer's engineer has submitted an impact analysis,
which shows that a 12-inch waterline would be sufficient to support their
proposed development. City staff has determined that a 24-inch waterline
would better serve the area. The line will be extended by future development to
the north 8500' to Graham Road where it will connect to an existing 16-inch
waterline completing a waterline loop on the southwest side of the City.
The requested oversize represents approximately 28°/o of the $1,340,230
estimated cost of utilities to be included in the construction contract.
Item Background: In December 1998, the City Council approved a Master
Development Plan for the Crowley Development ( 735 acres contiguous to and
north of Greens Prairie Road and west of State Highway 6 ). At that time City
Staff determined that a 24-inch waterline would be required to accommodate
future long term development requirements. A recent upgrade to the City's
water model supports a 24-inch line in this location.
file://O:\GROUP\DEVE _ SER\CVSHT\November 9, 2000\CastlegateOP\CS 1109 .htm 1118/00
I
Page 2 of2
On July 20, 2000 the Planning and Zoning Commission approved a rezoning
request (from AO to PDD-H) for 162.86 acres on the west end of the Crowley
Development. On September 07, 2000 the Planning and Zoning Commission
approved a Master Preliminary Plat for 338.26 acres at the west end of the
Crowley Development. This was designated the Castlegate Subdivision. A final
plat for Castlegate Section 1, Phase 1 is currently scheduled to go before the
Planning and Zoning Commission November 16,2000.
Budgetary and Financial Summary: The total water oversized
participation request is $374,638. There is $50,000 budgeted for
Water Oversized Participation in the Water Capital Projects Fund. It is
recommended that the balance of $324,638 come from the Water
Fund working capital. There is sufficient working capital in the Water
Fund for this request. It is recommended that a budget amendment to
the Water Fund be done to provide this appropriation. A budget
amendment is currently scheduled for January 2001 and this item will
be included in that budget amendment to provide the appropriation for
this project.
Staff Recommendation: Staff recommends the approval of oversize
participation not to exceed the amount of $374,638.00.
Council Action Options: Approve, modify, or deny the request.
Supporting Materials:
1. Letter of request and engineer's cost estimate for oversize participation.
2. Map showing proposed line
file://O:\GROUP\DEVE_SER\CVSHT\November 9, 2000\CastlegateOP\CSl 10 9 .htm 11 /8/00
/ A-0
/
~·~f Cily of c 'SW .011t·11(' ~ l 'l.,\NN I N(' "1)-1 S la.Llon. Texas ' VI S IO N . ·u nDIVISON I CASE: WATEELINE OP
• ·.
Greens Prairie Investors, LLC
By Greens Prairie Associates, LLC (GPA), Its General Partner
5010 Augusta
October 27 , 2000
Mr. Ted Mayo , P .E .
City of College Station
1101 Texas A venue
Co ll ege Station , TX 77842
College Station, Texas 77845
Re : Request for Oversized Participation Contribution by the City of College Station for the Proposed 24-
Inch Diameter Water Main Along the Proposed State Highway 40 Alignment; College Station , Texas
Dear Mr. Mayo :
Please accept thi s letter from Greens Prairie Investors, LLC (GPI) by Greens Prairie Associates, LLC
(GPA), its ge neral partner, developers of the proposed Castle Gate Subdivision , as a request to the City of
College Statio n (City) to participate in the construction costs for the oversized 24-inch diameter water
main proposed to run a lon g State Highway 40 in Co lle ge Station, Texas. As subsequently discussed , the
amount of the oversized participation (includi ng a 10% contingency) is $374,638.
A s documented in the engineering report dated October 9 , 2000 , and prepared by CSC Engineering &
Env ironmenta l Consultants , Inc . (CSC) of Bryan, Texas, and in the subsequent follow-up comment
response letter dated October 25 , 2000 , the size of the water main required for development of the
planned Castle Gate Subdivision is 12 inches in diameter. However, we understand that the needs of the
C ity of Col lege Station dictate that a 24-inch diameter lin e be constructed to support future growth in the
area. The ap proximate construction costs for the 12-inch diameter lin e are presented in the accompanying
Table I and similar costs for the 24-inch line are presented in Tab le 2 . A comparison of the costs of the
two sizes of lin e is presented in Table 3.
The proposed water line will be constructed as part of a single construction contract along with the
utiliti es for the beginning phases of the Castle Gate Subdivision. The construction costs of the "on-site"
subdivi s ion utilities for the first phase of development w ill be approximately $603 , 186. When the "on-
s it e" utility construction cost is added to the $737 ,044 construction cost for the proposed 24-inch water
main , the total construct ion contract amount wil I be approximately $1 ,340,230. Thus, the amount of the
oversized participation request, $374 ,638 , is approximate ly 28 % of the total construction contract cost of
$1 ,340,230 .
GPA appreciates the City 's attention in reviewing the docum ents for the proposed project. Please do not
hesitate to contact me shou ld you have any questions regarding this matter.
Respectfully submitted ,
A/~~~~
Wallace S . Phillips ~
Manager
WP:mf
Attachments
Via Hand Delivery
Table 1. Estimate of Construction Costs for Installation of 12 "0 PVC Water Supply Line Along State Highway 40 Right-of-Way from Existing City of
College Station Water Tower at Greens Prairie Road and State Highway 6 to Proposed Cast le Gate Subdivision
Estimated Extended
Item Description of Estimated Unit Cost Cost
No . Item Q uantity ($/unit) ($) Commen t
1 Mo bi I ization/Demobi I ization 1 EA Lump Sum $5 ,000
I ---__ I -----------~---------I $6 ,460 _ 2_ Con ~ruction Payment & Performance Bond 1 EA Lump Sum Approximately 2% of total construction cost.
3 Provide & Install Tap and Saddle Connection 1 EA Lump Sum $5,000 Existing line must stay active d u r in g tapping operation. This
of Proposed 12"0 PVC to Existing 24"0 item only includes the labor, associated activities , and parts
DIP (tapping equipment, saddle, etc.) associated with the
connection . The materials (tees and values) required at the
connection point are covered in separate line items.
[
4 Wet Bore 12 "0 Beneath Duct Bank 30 LF_I _ _!GO/LF $3,600 --------------
I C karing and Grubbing Along Proposed
,._ __
5 1 EA Lump Sum $15,000
Highway 40 ROW for Pipeline Route
6 Provide & Install 12 "0 PVC C900 CL 200 DR 7,200 LF $23.50/LF $169,200 Majority of pipeline route wil l not be in present or proposed
14 Pipe Along Highway 40 Access Road paved area. Therefore, cost assumes only a small portion of the
line will require structural backfill. Average cover of3.5 ft
( 42"). City of College Station Class B bedding.
7 I Provide & Install 12 "0 DIP Gate Valve (Main 5 EA $1 ,400/EA $7 ,000
Line)
I
8 Provide & Install 12 "0 PVC 22.5 -Bend 6EA $400/EA $2,400
9 Provide & Install 12 "0 PVC 11.25-Bend 3 EA $400/EA $1 ,200
Table I.
Item
No.
10
Continued
Description of
Item
Provide & Install 2 " Air and Vacuum
Assembly
Estimated
Quantity
4EA
Estimated
, Unit Cost
($/unit)
Extended
Cost
($)
$3 ,000/EA I $12,000
Comment
-_I_
Provide & Install 12"0 by 12"0 x 12 "0 Tee 3_E_A_ _11---$-40_o_i_E_A=~+l~-$--1-,2-0_o __ 1-F-o_r _cr_o_s_si-ng_s_o_fState Highway 40 to Castle Gate Subdivision.
Provide & Install 20"0 Steel Encasement Pipe . ~00 !:!:_I $70/LF $56,000 For two water line crossings ofS~te Highw ~ 40 ROW. ___
11
--------------11
12
·-·. I ---·. --------···-·------·-··_I _. ____ _I --·-· __ J _ _L _______ . ·--------·· ·------·-~--13-~-P-ro-v-id~e-&~I-n_M_~_l _1 _2 ·-·0_P_V_C_C_9_00_C_L_2_0_0_~f---8 -40_L_F_+-_$3_5_/_L_F~ic29~00 InM~l~ionshouldincludeCasc~eMabitize~orequiv~e~. DRl4 Pipe in Encasement Pipe Across State
Highway 40 ROW
-
14 Provide & Install 2"0 Blow-Off Riser
Assembly (Plug) ---+------"--'--"'"--
15 Provide & Install 12 "0 DIP Gate Valve (Tee
Connections) '-----···· -----:-·---16 Chlorination and Testing of Completed Lines
17 Filter Fabric Silt Fence
I 8 Stabilization of Construction Exit
19 Reseeding (Broadcast)
Summary of Subtotal Costs
Plus 10% Contingency
GRA D TOTAL FOR 12 "0 PVC TRANSMISSION
LI E ALONG STATE HIGHWAY 40 ROW A D
12"0 PVC CROSSI GLINES TO CASTLE GATE
SUBDIVISION
I Blow-Off and plug fo~ of 12"0 water main at crossings.
I -·· --
Tabl e 2.
Item
No.
I
-I 2 -I
3
-
4 -
---5
6
7
8
9
'.
;
Estimate of "Oversized Line" Con struction Costs for In sta ll ation of 24"0 DIP Water Supp ly Line A lo ng State Highway 40 Right-of-Way from
Ex ist in g City of Co ll ege Station Water Tower at Green s Prairie Road and State Highway 6 and 12 "0 PVC Cross in g Lines to Proposed Castle Gate
Subdivision
Estimated Extended
Description of Estimated Unit Cost Cost
Item Quantity ($/unit) ($) Comment
Mobilization/Demobilization I EA Lump Sum $5 ,000
-------·--· --I ----------------. -
Con struction Payment & Per~rmance Bond -1--TEA -I LuE'lp Su'!! I $13 , 14q_ 2% of total construction cost
1--I -··--------
Provide & Install Connection to Existing 24"0 1 EA L ump Sum $30,000 Existing line must remain in service and temporary
DIP -Tap and Sadd le Existing 24 "0 Pipe connecting line will have to be installed. This item on ly
and Install New 24 "0 DIP Water includes the labor, a ssociated activit ie s, and parts (s leeves, etc.)
Transmi ssion Pipe to Castle Gate associated with the co nn ection . T he material s (tees and valu es)
Subdivision required at the connection point are covered in separate line
items.
Wet Bore 24 "0 Beneath Duct Bank 30 LF I $160/LF $4,800
-=--=1 _ ------------------Clearing and Grubbing Along Proposed I EA Lump Sum $15 ,000
Highway 40 ROW fo r Pipeline Route
Provide & In stall 24 "0 DIP A WWA Cl 50 7 ,200 LF $58.50/LF $421 ,200 Majority of pipeline route will not be in present or proposed
(ANS I A2 I .51) Thickness C la s s 52 with 8 paved area. Therefore, cost assumes on ly a small portion of the
Mil Poly Wrap A long State Highway 40 line will require structural backfill. Average cover of 6.0 ft
ROW (72"). City of Co lle ge Station Class D bedding.
Provide & In stall 24 "0 DIP Butterfly Valve 5 EA $8 ,000 /EA $40,000 One valve at the point of connectio n w ith the exi sting line and
(Main Line) four valves along the water main route .
Provide & Install 24 "0 DIP 22.5 u Bend 6EA $2,000/EA $12,000
Provide & In stall 24 "0 DlP 11.25 Bend 3 EA _ $2,000/EA $6,000 --. ----.
Table 2 . Continued
Item
No.
Description of
Item
Estimated
Quantity
Estimated
Un it Cost
($/unit)
Extended
Cost
($) Comment
----·---. ---·---------------------·----10 Provide & In stall 2 " Air and Vacuum Valve 4 EA $3 ,500/EA $14,000
A~_Se_!!_l_~ly
··-······ .... -·· ._. .... ---··-·
__ 11 __ Provide & In stall 24"0 by 24 "0 x 12"0 Tee _ 3 EA $2,500/EA $7 ,500 For crossings of State Hi g hway 40 to Castle Gate Subdivision. -----------------
---------------------12 ········ Pr().vi~.e_~_l11 S.t(l ll ?Q''.0S t ~e_\f?ll~<l.5.e_f!l~llt pip~ .............. ~QQ~F ....... $70 /~f .................. $5()!.QQQ ........ .f.()E .~~?.~'.l~~r Ji11e_cr()S.S.i11gs ()f?~<.tte . Hi gb"Yay 4Q~Q~: ... .
----------
13 Provid e & In stall 12"0 PVC C900 CL 200 840 LF $35 /LF $29 ,400
14
15
16
17
DR 14 Pipe in Encase ment Pip e Across State
H ighway 40 ROW
Prov ide & In sta ll 2"0 End of Line Blow-Off 4 EA $400/EA $1 ,600 Blow -Off and plu g for end of24"0 line and at cross in gs.
___ Ri ser Assem~y~'-----------1 -----•-----.... -------1 -----------------------n
Prov ide & In sta ll 12 "0 DIP Gate Valve (Tee
Cc:m_11e_~tisms) .
Chlorination a nd testing of completed line s
Filter Fabric Silt Fence
3 EA
I EA
--... J.QQQ _~f
$1,400/EA $4 ,200 Gate valves for water line s crossing to s ubdi v is ion.
Lump Sum $2,500
$2.5 /LF
-----· ·--···------· ·-· . ---··---------· -----···---···--· -· ------·--··------·--
18 Stabilization of Constru ct ion Exit 1 EA Lump Sum $1,200
19 -~e~ec!_i_!!g_(BrO(l~_<?_~st) 4 Acre__s. $1 ,00.Q/Ac~~-$4,000
Summary__ o[§'!J!.total Cos!§ ______ . _________ ---··---·--·-·-~btotal ___ $62_Q,040 __ ------···------·--------·---·······-···-·····-····---··-···-··--·-··--··-·-·-----
P lus 10% Contingency Contingency +$67,004
GRAND TOTAL FOR 24"0 DIP WATE R TRA SM ISS IO N
LINE ALONG STATE HI G HW AY 40 ROW AN D 12 "0 PV C
C RO SS I NG LI NES TO CASTLE GATE SU BDIVI S IO N
$737,044
Table 3.
'Item
No .
I ---
_2_1, _,
3
---1 4
5 I
6
-
7
8
1 ~ --9
Construction Cost Comparison for Installation of 12 "0 PVC and 24"0 DlP Water Supply Lines Along State Highway 40 Right-of-Way from
Existing City of College Station Water Tower at Greens Prairie Road and State Highway 6 to Proposed Castle Gate Subdivision
Extended Extended Difference in
Cost For Cost For Cost
12"0 PVC 24"0 DIP (Added Cost
Description of Water Main Water Main for 24"0 DIP)
Item ($) ($) ($) Commen t
Mo bi I ization/Demobi I ization $5 ,000 $5 ,000 $0 -
Construction Payment & Performance Bond $6,460 $13 ,140 $6,680
------C-· -I .. --
Provide & Install Tap and Saddle Connection $5 ,000 $30 ,000 $25 ,000 Existin g lin e m ust stay active during tappin g operation.
This item only includes the labor, associated activities, and
parts (tapping equipment, saddle, etc.) associated with the
connection. The materials (tees and values) required at the
--.. --
J -, connection poi!_l !_are ~~vered in separate line i ~ms.
Wet Bore Beneath Duct Bank $3 ,600 $4,800 $1,200
I
I
I
Clearing and Grubbing Along Proposed $15,000 $15,000 $0
Highway 40 ROW for Pipe line Route
I
Provide & Install Water Line Along $169,200 $421 ,200 $252 ,000 Majority of pipeline route will not be in present or proposed
Highway 6 Access Road paved area. Therefore, cost assumes only a small portion of
the line will require structural backfill.
I I . I
Provide & Install Gate Valve (Main Line) $7 ,000 $40 ,000 I $33 ,000 I
Provide & Install 22.5° Bend $2 ,400 $12,000 $9,600
---·--------·-
Provide & Install 11.25 Bend $1 ,200 $6 ,000 $4,800
Table 3 . Continued
Extended Extended Difference in . Cost For Cost For Cost
12"0 PVC 24"0 PVC (Added Cost
Item Description of Water Main Water Main For 24"0 DIP)
No. Item ($) ($) ($) Comment
10 I Provide & Install 2" Air and Vacuum Assembly $12 ,000 $14 ,000 $2 ,000 __ , __ ---------I ---------------11 Provide & In stall Tee Connection $1 ,200 $7 ,500 $6 ,300 For cros sings of State Highway 40 to Castle Gate
Subdivision.
12 Steel Encasement Pipe $56 ,000 $56 ,000 $0 For two water line crossings of State Highway 40
ROW. __ ,----L_ __ ,_ ---------13 Provide & Install Waterline Across State $29,400 I $29 ,400 $0 Installation should include Cascade stabilizers or
Hi g hway 40 ROW equivalent.
14 Provide & Install 2 "0 Blow-Off Riser $1 ,600 $1 ,600 $0 Blow-Off and plug for end of water main and two
Assembly (Plug) crossing lines at southern ROW boundary for
State Highway 40.
15 Provide and Install Gate Valve (Crossings) $4 ,200 $4 ,200 $0
16 Chlorination and testing of completed lines $2 ,500 $2 ,500 $0
17 Filter Fabric Silt Fence $2,500 $2 ,500 $0
--18 Stabilization of Construction Ex it I $1 ,200 $1 ,200 $0
I -
19 Reseeding (Broadcast) $4,000 $4 ,000 $0
Summary of Subtotal Costs $329,460 $670,040 $340 ,580
Plus 10% Contingency $32,946 $67 ,004 $34 ,058
GRAND TOTAL $362,406 $737,044 $374,638
. \
da ee
Agenda Item #
lRegular Item
jcon~e nt Item
Workshop Item
Ite m Submitted By : T eddy D . Mayo , P .E.
Council Meeting Date: j Tove mber 09, 2000
Director A pp roval:
City Manager Approval :
Item: Request for oversize participation i n the amount of $374,638 .00 for
con structio n of a 24-in ch waterline from th e intersection of State Highway 6
a nd Green 's Pra i r i e Ro ad, west and north a long propose d State Hi ghway 40
a d istance o f 7 200 -feet. This l i ne will be c onstructed with th e Final Plat of
Castl egate Subdivision Pha se 1 , Se ctio n 1.
Ite m Summa ry: This requ est fo r ove r size pa r ticipation is being m ade i n
accord a nce wi t h Section 9 -C of th e subdivision r egulations. The final pl at
requi re s the e xtension of wa t er service approx imately 7200-feet to and thru
the subdivision. The develop e r's engineer has submitted an impact analysis,
which shows that a 12-inch waterline would be sufficient to support their
proposed development. City staff has determined that a 24-inch waterline
would better se rve the area. The line will be extended by future
develo pment to the north 8500' to Graham Road w here it will con nect to an
ex is tin g 16-inch waterline comple t ing a waterline loop on th e southwest
side of the City.
Item Background : In December 1998, the City Council app roved a Master
Developme nt Plan for the Crowl ey Development ( 735 ac r es contiguous to
and north of Greens Prairie Road and west of State Highway 6 ). At that t i me
City Staff determined that a 24-inch waterline wou ld be require d to
accommodate future long term d evelopment requirements. A recent upgrade
to the City's water model supports a 24 -i nch line in this location.
On July 20, 2000 the Planning and Zoning Comm ission approv ed a rezoning
request (from AO to PDD-H) for 162.86 acres on the west end of t h e
Cro wley Development. On September 07, 2000 the Planning and Zoning
Commission approved a Master Preliminary Plat for 338.26 acre s at the west
end of the Crowley Development. This was designated the Castlegate
Subdivision. A final plat for Castl egate Section 1, Phase 1 is cu rre ntly
scheduled to go before the Plannin g and Zoning Commission November
16,2000.
Budgetary and Financial Summary: Funds are available in the Water
Capital Projects Fund; $50,000 is budgeted for water oversized participation.
The balance will come from existing appropriations in the Wate r Capital
Project Fund.
S taff Recommendation: Staff recommends the approval of oversize
participation not to exceed the amount of $374,638 .00.
Counci l Action Options: App rove, modify, or deny the reque st.
Supporting Ma terial s:
1. Letter of r eque st and eng in eer's cost estim ate for oversize participation .
2. Map showing proposed lin e
" ? ENGINEER'S COST ESTIMATE 18-0ct-OO
CASTLEGATE SUBDIVISION
COLLEGE STATION, TEXAS
SECTION 1, PHASE 1
Item Estimated Unit Estimated
No . Description Quantity Price Cost
Sitework
Castlegate Drive
$12,000.00 ~ 1 Mobilization/Layout 1.0 LS $12,000.00
2 Erosion cntrl/seeding/bale dam/cnst entrance 1 LS $10,000.00 $10,000.00 /
3 Site Preparation 2.0 AC $3,000.00 $6,000.00
4 Topsoil Stripping & Replacement 1,700 CY $4 .00 $6,800.00 ./
5 Excavation/Grading 4,900 CY $3.50 $17,150 .00 .,/
6 Lime Stabilized Subgrade 5,205 SY $3.00 $15,615.00 ./
7 Concrete Laydown Curb 3,000 LF $7.00 $21,000.00 /
8 Base Material -7" depth 4,085 SY $6.50 / $26,552.50 /
9 Asphalt Paving -1 1 /2" depth 4,085 SY $4.25 $17,361.25
10 Special Color Paving 1,080 SF $6.00 ~6,480.00 ./
Subtotal $138,958.75 v
Ravenstone Loop
$10,500.00 ./ 11 Site Preparation 3 .5 AC $3,000.00
12 Topsoil Stripping & Replacement 2,560 CY $4.00 $10,240.00 /
13 Excavation/Grading 6,300 CY $3.50 $22,050.00 .,/'
14 Lime Stabilized Subgrade 9,305 SY $3.00 $27,915.00 /
15 Concrete Laydown Curb 5,870 LF $7.00 $41,090.00 ./
16 Base Material -6" depth 6,190 SY $5.75 $35,592.50 ./
17 Base Material -7" depth 715 SY $6.50 / $4,647.50
18 Asphalt Paving -1 1 /2" depth 6,905 SY $4.25 $29,346.25 /
19 Concrete Apron 3,135 SF $5.00 $15,675.0Q-''
20 ADA Ramps 2 EA $400.00 $800.00./
21 Sidewalks 180 SF $3.00 $540.00/
22 Special Color Paving 525 SF $6.00 ~3, 150.0cY/
Subtotal $201,546.25
Kendal Green
23 Site Preparation 0.2 AC $3,000.00 $600.0CY'
24 Topsoil Stripping & Replacement 300 CY $4.00 $1,200.00/
25 Excavation/Grading 520 CY $3 .50 $1,820.00/
26 Lime Stabilized Subgrade 360 SY $3.00 $1,080.00 ./
27 Concrete Laydown Curb 290 LF $7.00 $2,030.00 /
28 Base Material -7" depth 120 SY $6.50 $780.00/
29 Asphalt Paving - 1 1 /2" depth 120 SY $4.25 $510.00 /
30 Concrete Apron 800 SF $5.00 $4,000.00 /
31 Special Color Paving 525 SF $6.00 ~3,150.00 ·/
Subtotal $15,110.00/
Page 1 of 4
4
" Storm Drainage
Castlegate Drive
32 Drainage Pipe -18" RCP -structural backfill 88 LF $36 .00 $3 ,168 .00
33 Drainage Pipe -18" RCP -non -structural backfill 28 LF $26 .00 $728 .00
34 Drainage Pipe -27" RCP -structural backfill 66 LF $46 .00 $3 ,036 .00
35 Drainage Pipe -27" RCP -non-structural backfill 80 LF $36 .00 $2,880 .00
36 Inlets 5' wide{junction boxes 1 EA $2,400 .00 $2,400 .00
37 Inlets 15' wide 1 EA $4,000 .00 $4 ,000.00
38 Safety End Treatment -18" precast 2 EA $750 .00 $1,500 .00
39 Headwalls -27" RCP 1 EA $1,600 .00 ~1,600 .00
Subtotal $19,312.00
40 Ravenstone Loop
41 Drainage Pipe -18" RCP -structural backfill 27 LF $36 .00 $972.00
42 Drainage Pipe -18" RCP -non-structural backfill 189 LF $26 .00 $4,914 .00
43 Drainage Pipe -24" RCP -structural backfill 24 LF $42 .00 $1,008.00
44 Drainage Pipe -24" RCP -non-structural backfill 153 LF $32 .00 $4,896 .00
45 Drainage Pipe -27" RCP -non -structural backfill 6 LF $36.00 $216 .00
46 Drainage Pipe -30" RCP -structural backfill 185 LF $50.00 $9,250.00
47 Drainage Pipe -30" RCP -non-structural backfill 117 LF $40.00 $4 ,680.00
48 Drainage Pipe -36" RCP -structural backfill 24 LF $60 .00 $1,440 .00
49 Drainage Pipe -36" RCP -non-structural backfill 95 LF $50.00 $4 ,750.00
50 Inlets 5' wide{junction boxes 2 EA $2,400.00 $4,800 .00
5 1 Inlets 1 O' wide 6 EA $3,200.00 $19,200 .00
52 Inlets 15' wide 1 EA $4,000.00 $4 ,000 .00
53 Headwalls -24" RCP 1 EA $1,600.00 $1,600.00
54 Headwalls -36" RCP 2 EA $2,400.00 $4 ,800.00
55 Drainage Channel Excavation 355 CY $4 .00 ~1,420.00
Subtotal $67,946.00
Page 2 of 4
Waterline
W1-1
56 12" p ipe-PVC-Cl 200 (C900)-structural backfill 180 LF $44.00 $7 ,920 .00
57 12" p ipe -PVC -Cl 200 (C900)-non -struc backfill 1,370 LF $30.00 $41, 100.00
58 Gate Valves -12 5 LF $1 ,500 .00 $7,500 .00
59 M .J. Bends 12" 3 EA $500 .00 $1,500 .00
60 M.J . Tees 12" 5 EA $500 .00 $2,500 .00
61 2" Blow off Assembly 1 EA $400.00 $400 .00
62 Water Services (long) 6 EA $800 .00 $4,800 .00
63 Water Services (short) 6 EA $400 .00 $2,400 .00
64 Fire Hydrant Assembly 3 EA $2 ,000 .00 ~6,000 .00
Subtotal $74,120.00
W1-2
65 8" p ipe-PVC-Cl 200 (C900)-non -struc backfill 1, 175 LF $20.00 $23,500.00
66 Gate Valves -8" 4 LF $600.00 $2,400.00
67 M .J . Bends 8" 4 EA $300.00 $1,200.00
68 M.J . Tees 8" 1 EA $300.00 $300.00
69 End cap and marking 1 EA $200.00 $200 .00
70 Water Services (long) 8 EA $800.00 $6,400.00
71 Water Services (short) 6 EA $400.00 $2,400.00
7 2 Fire Hydrant Assembly 1 EA $2 ,000.00 $2,000.00
73 2" Blow off Assembly 2 EA $400.00 ~800.00
Subtotal $39,200.00
W1-3
74 8" pipe-PVC-Cl 200 (C900)-non-struc backfill 983 LF $20.00 $19,660.00
75 Gate Valves -8" 2 LF $600.00 $1,200 .00
76 M.J. Bends 8" 1 EA $300.00 $300.00
77 M.J . Tees 8" 3 EA $300.00 $900 .00
78 Water Services (long) 1 EA $800.00 $800.00
79 Fire Hydrant Assembly 1 EA $2 ,000.00 $2,000.00
80 2" Blow off Assembly 1 EA $400.00 ~400.00
Subtotal $25,260.00
W1-4
81 8" pipe-PVC-Cl 200 (C900)-structural backfill 50 LF $30.00 $1 ,500.00
82 8 " pipe -PVC-Cl 200 (C900)-non -struc backfill 50 LF $20.00 $1,000.00
83 Gate Valves -8" 1 LF $600.00 $600.00
84 M .J . Tees 8" 1 EA $300.00 $300.00
85 2" Blow off Assembly 1 EA $400.00 ~400.00
Subtotal $3,800.00
W1-5
86 8" pipe-PVC-Cl 200 (C900)-structural backfill 50 LF $30.00 $1,500 .00
87 8" pipe-PVC-Cl 200 (C900)-non-struc backfill 50 LF $20.00 $1,000 .00
88 Gate Valves -8" 1 LF $600 .00 $600.00
89 M.J . Bends 8" 1 EA $300 .00 $300.00
90 2" Blow off Assembly 1 EA $400.00 ~400.00
Subtotal $3,800.00
Page 3 of 4
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
Sanitary Sewer
S1-1
8" SOR 26 Pipe -4-8' depth
8" SOR 26 Pipe -8-1 O' depth
8" SOR 26 Pipe -10-12" depth
8" SOR 26 Pipe -12-14" depth
8" SOR 26 Pipe -14-16' depth
8" SOR 26 Pipe -16-18" depth
6" SOR 26 Pipe - 6-8' depth
Tie-in to existing Manhole
Sewer Services
6" Stack Pipe Riser
5' Stub out @ Manhole
Manholes -0-6' depth
Manholes -6-8' depth
Manholes -8-1 O' depth
Manholes -10-12' depth
Manholes -12-14' depth
Manholes -14-16' depth
Manholes -16-18' depth
Manhole Drops
S1-2
110 8" SOR 26 Pipe -4-8' depth
111 6" SOR 26 Pipe -6-8' depth
112 Sewer Services
113 Manholes -0-6' depth
114 Manholes - 6-8' depth
115 Manholes -8-10' depth
S1-3
116 6" SOR 26 Pipe -6-8' depth
117 Sewer Services
118 Manholes -8-1 O' depth
Page 4 of 4
1,081
300
526
890
168
135
900
1
14
3
3
3
1
3
2
1
2
2
1
373
565
11
1
4
2
LF
LF
LF
LF
LF
LF
LF
LF
LS
LS
LS
EA
EA
EA
EA
EA
EA
EA
EA
LF
LF
LS
EA
EA
EA
216 LF
2 LS
2 EA
$20 .00
$22.00
$26.00
$28 .00
$30.00
$32 .00
$20 .00
$300.00
$600 .00
$250.00
$400.00
$1 ,600 .00
$1,800.00
$2,000.00
$2 ,200 .00
$2,400.00
$2,600.00
$2,800.00
$450.00
Subtotal
$20.00
$19.00
$600.00
$1,600 .00
$1,800.00
$2,000.00
Subtotal
$19 .00
$600.00
$2,000.00
Subtotal
Total Sitework
Total Storm Drainage
Total Water
Total Sanitary Sewer
TOTAL CONSTRUCTION
Engineering @ 5%
Contingency @ 5%
TOTAL
$21,620 .00
$6 ,600 .00
$13 ,676 .00
$24,920 .00
$5 ,040 .00
$4,320.00
$18,000 .00
$300.00
$8,400 .00
$750.00
$1,200 .00
$4,800.00
$1,800 .00
$6,000 .00
$4,400.00
$2,400 .00
$5 ,200 .00
$5,600 .00
$450.00
$135,476.00
$7,460 .00
$10,735.00
$6,600.00
$1,600.00
$7,200.00
$4,000.00
. $37,595.00
$4 ,104.00
$1,200.00
$4,000.00
$9,304.00
$355,675.00
$87,258.00
$146, 180.00
$182,375.00
$771,488.00
$38,574.40
$38,574.40
$848,636.80