HomeMy WebLinkAbout22 Heat Transfer Research 00-56 150 VentureLETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: 9-Id--J.ooo
oA-e RE' COMPLETION OF [,)w:<'.I'-~
Ar U.e.A?r T &A-tJSEU-$ cte...
Dear Sir:
The purpose of our l etter is to request that the following listed improvements be approved
and accepted as being constructed under city inspection and completed according to plans
and specifications as approved and required by the City of College Station, Texas. This
approval and acceptance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work. This approval and acceptance by the
City of the improvements listed below does hereby void the l etter of guarantee for the
listed improvements on the above reference project.
The one year warranty is herby affirmed and agreed to by b."-sCJb,.>'2cJ ~ S:Z:, and
by their sub-contractors as indicated by signatures b elow.
WORK COMPLETED \i:
Jf3o LF S" W.frep.__ l°N£,
I 2o lF lo v. tfJ IFTe/l-l"'JJ£
.L g4 h~-&;pl
Owner: ~e..A-r TflA1J:SFeg.
Address: §Ou f..(;:'5{:;qtd. Jef.J_~
C&~c -S@l@!,1 ,k zzg-15
Signature: ~ 'll/, {;¥
/
ACCEPTANCE & APPROVAL
DATE
e, -3{ -Zooo
8 -.3i-2crO
Contractor: °B~'f IW ~tlSrR.Ll<:JtvJ
Address: f:o · 4-o~ 7
'CA'2->JArJ,(k /?~:i
Signature: ~~
~ Representative
~.~ City Engineer
Date: December 6, 2000
To: Amanda Hudec, Accounting\\ ~
From: Bob Mosley, City Engineer ~ 1\
Subject: Completed Infrastructure from Private Development
By the attached letter of completion for the Heat Transfer site development, we have
accepted the following improvements to the City of College Station infrastructure.
Water:
6-inch PVC main
(AWWA, C 900) DR 14
8-inch PVC main
(AWWA, C 900) DR 14
Fire Hydrant, Type I
The infrastructure listed above totals $ 21,831.00 .
c: Natalie Ruiz, Development Coordinator
Vernon Wright, Engineering Technician
Missy Green, Staff Assistant
120 linear feet
subtotal: $5,080.00
430 linear feet
subtotal: $14,951.00
1 each
subtotal: $1,800.00
/ LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
DATE: 9-/~ -:J.ooo
RE: COMPLETION OF lU(Fre_p.._ ~
ff U.<LJ¥r T&MJSEft. 5~ter
The purpose of our l e tter is to request that the following listed improveme n t s b e approved
and accepted as being constructed under city inspection and completed according to plans
and specifications as approved and required by the City of College Station, Texas . This
approval and acceptance by the City is requeste d in order that we may fin a lize any sub -
contracts and to affirm their warranty on the work. This approval and acce ptance by the
City of the improvements listed below does here by void the letter of guarantee for the
listed improvements on the above reference project.
The one year warranty is herby affirmed and agreed to by b.c:.sc.tf,J~'cJ e,,,.,,, SL, and
by their sub-contractors as indicated by signatures below .
WORK COMPLETED \·
t.f3o LF S « tJ~~ ~
'2o {E lo v. !IJm-GtL l?Je
L M h'U-fi:vl,
Owner: ~ eAT Tt'lAtJS feg_
Address: /5PC les ·r::i::ud /J.j~
C&~c: _s@fiM1 /k zz8'15°
Signature: ~ ~ ~ 'ff/ ~ ~~
ACCEPTANCE & APPROVAL
DATE
8 -.31-za:o
Contractor: 131!-'flW ~tJSrR.11.CitvJ
Address: r-'o · 4-o"D 7
'CA~JArJ,T;C 77e;o:r
Signature: ~e~
~ R eprese1ttatiue
~.~ City Engineer
, .~&../ U.l/ UV .l.l; vV 2 3 4 5 6 7 B 9 10 u-~I~ IU'i' V'i'o:JU __ ..!J_.t;, v_c.Lun1.1.c.1' i ;:, v \,;:, 433 I LF I Furnish ind l~ 8" PVC Waterline (Alf.fWA C.SOO, OR 14, Pnt55Ure Ciasa 200) at -4'·5' Bury complete •nd lri plae& 1 2 1 110 for •• . . ... • . . . ... .. • . . . . . . .• . . . .. .. . . • • . . . . .• .. . ... . .. . • •• • . .. . . . . . .•.• .................... .. . Doll..!"$ and ......................................................................................... Cents rier linoal foot EA IWet Tap to •xlsting 12" watanine-to ln¢lucle tapping .teeve and a• gate v:atve wi1h box eomplet. end in J)lace for ........................................................................................... Oollar'G and .................................................... -.................................... Cents each. EA IFurrilsh and lnstaU 8"x6" M.J. Tee to ilclude aU necessary thrust blocking complete and In place for .. .. ... . .. •. . .. . . • . . . .. ... .•. ... .............. . . .... .. . .. .................. .... . .. . ........ Dollars and ......................................................................................... Cents each. EA I Furnish and lnsbill 8" M.J. Plug to iiclude all 0009S$ary tmm blocking complete and in place for ........................................................................................... Dollars and ................................ , ..................... , .................................. Cents each. EA I Furnish and Install 6" Gat. Valve with box complete and in plaee for ............. ,., ................... , ..................... , •...• , ........................... Dollars and ......................................................................................... Cents each. EA I Furnish and Install 6"x6" M.J. Tee to include all necessary thrU$t blocking for ........................................................................................... Dollars and ......................................................................................... Cents eaoh. EA I Furnish and lnstan ~ M.J. Plug to Include all neces,.ary thl'\J$t blocking for . .. ............ .. . . ..•.. ... ........... .. . .. . . . .. . . .. . .. .•. . • .. ... . .• . . . .. . .. . .. .. . .. . . .. •. . Dollars and ............................. ·····-···" ................................................. Cents each. EA I Furnl6h and Install 2" Blowoff Vat'le with vault complete and in place for ........................................................................................... Dollars and ......................................................................................... Cants each. EA I Fuml$h and lnstaH Stal'ldard Fire Hydrant & appurtenances complete and in place for ........................................................................................... DoUars and •.... , ........... _ ...................................................................... Cents each. Furnish and lnwtall e• PVC Watal'line (AWWA C-900, DR H, Pressure LF !Class 200) at-4'-S' Bury eornploto and ln place for .................................... , . . . . ... . .. . .. . . . . . . . . . . . . .. . . ... . ... . .. .. .. .. .... ... .. Dollans and ......................................................................................... Centi P9l' Hneal foot. WATERLINE -SUB-TOTAL: ··, ''-. lgJ VU..l .00 9,526.00 I./ 500.00 3.S00.00 I/ 350.00 .00 ,,.. 150.00 150.00 475.00 475.00 300.00 300. 150.00 .OI 380.00 380.C .00 1.800. 20.00 2.20C 18.981
, '\ .J.'I V.J./ VU
08/04/00 . -
11 0.28
j_J_. Jj_
11 : 08 'U409 846 8252 KLING ENGR ~~~ COCS VOLK /MORGAN
AC Preparation or Easement Areas I Clearing & Grubbing
complete
tor·······-······-·····-·········--········ ............................................ OollaJ'S
lgJUUZ
~003
i--~+-~~~+-~-+:a~nd~ .. -~--~-·~··~···~·-~···~··=···~ .. ~ .. ·~···~"~"·~-·~ ... ~ ... ~ .. ~ ... ~ .. ~ ... ~ .. ~···~ ... ~ .. ~ .. -~ .. =···~--~···~···~··=···~--~-·~C~eM:!!.9,t::::~B~~~e~.~~~~t-_l!~~~+-~~--'ll.l.:l~~v·
12
13 1
14
15
LS Temporary Erosion Conlrol -to lnolude lnltlal tnsta•atlon , ccntlnuou1 maintenance
. and removal complete
for ............................................................. __ ....................... oonan
and ....... -............... ·-···---................................................ Cents lum sum..
l.S Provide Payment and Performance Bond for total prlee of the ProJ•cl
for ........................................................................................... DoDars
and ....................................................................................... -Cents tum sum .
LS Provide Contractor red-lined As-Built Drawing, wHtiln 7 ~ys QI project completlon
(or ··········-············"··-· .. ········•·········· ....................................... Dollars
and ......................................................................................... Cents tum .um.
LS Provlc!e Construction staking to Include LAyout, CuVFill and alt othar forma of
surveying services necessary to complete the Work
for ........................................................................................... Doll11111
and _ ........................... , ........................................................... Cents lum sum .
SUMMARY:
INCIDENTALS· SUB-TOTAL:
WATERLINE -SUB-TOTAL:
INCIDENTALS· SUB-TOTAL:
TOTAL:
15% CONTINGENCY:
$2,850.00
$18,981.00
$2,850.00
$21,831.00
$3,274.65
./
~-,
COLLEGE STATION
DEVELOPMENT PERMIT
PERMIT NO. 500056
DP-HEAT TRANSFER RESEARCH , INC.
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE
SITE LEGAL DESCRIPTION:
DATE OF ISSUE: August 3, 2000
OWNER:
COLLEGE STATION, CITY OF
ATTN: ACCOUNTING DEPARTMENT
COLLEGE ST A TION, TX 77842
SITE ADDRESS:
150 VENTURE DR
DRAINAGE BASIN:
VALID FOR 3 MONTHS
CONTRACTOR:
BRYAN CONSTRUCTION, DA YID RITTER
1400 EARL RUDDER FWY
BRYAN, TEXAS
TYPE OF DEVELOPMENT: Clearing & Grading Only
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans.
All trees must be barricaded, as shown on plans , prior to any construction . Any trees not barricaded will not count
towards landscaping points . Barricades must be 1' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Date
~-4-?-oe>o
Date
I
\
\.
}3~7 FOR OFFICE USE ONLY
CASE NO. ;>;
DATE SUBMITI'ED
SITE PLAN APPLICATION
MINIMUM SUBMITIAL REQUIREMENTS
Site plan application completed in full .
$100 .00 Application Fee .
$100 .00 Development Pennit Application Fee.
$300.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public
waterline, sewerline, sidewalk, street or drainage facilities is involved.)
Ten (10) folded copies of site plan.
A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not
checked off.
APPLICATION DATA
:~~:p=J~~~~p.'Neof;p.
LEGAL .DESCRIPTION ~~~r::____
APPLICANT (Primary Contact for the Project):
Name .... \. ~J .. LA)MPloN
StreetAddress .f/D"3 '$.TX. M'f!. ~JFZOZ City _E)"""-'-f;J_,,_/A:'-'-'--N ___ ____;,_ __ _
State T)l Zip Code 7 78oZ E-Mail Address uerr 6 T)lc.>/BE.R.. C()'f's
Phone Number 91q-3qlo--37Jf FaxNumber 474 ... 8'4to-~71u
PROPER1Y OWNER'S INFORMATION:
Name Qk]Qe:.~ Q Be:-y'~ C0i30) rrTf?-.r:.
StreetAddress /6X> ~fl fl<.PJY. ~ID'City ..._yq.h--=-=·'----------
State r"' Zip Code ']lblf 6 E-Mail Address GPB e, ttn.r. . NP/
Phone Number °/1 er -<%0--toZZZ Fax Number '31 <] ... UD -&311
ARCHITECT OR ENGINEER'S INFORMATION:
Name ~. f?f".BTC C?LJMP-rCJN CGOMPTOH f AS~)
Street Address 2fio?> ? . IX. AV£. ?Te CXJ6 City _f§;~X~~-"--N"--------
State Tu Zip Code 1 "]c5 Oo E-Mail Address t;>g.e;r[ ~ IX uiB~ . ca
Phone Number °J 19"' Uta -311 / Fax Number 91 ~ -g4/a ... ~7] 0
OTIIER CONTACTS (Please specify type of contact, i .e. project manager, potential buyer, local contact, etc.)
Name Pl\VID f?l~ L BR.YAN CDIJ5mJcxiotJ <:C).)
Street Address J4c:o .t==Ag.t. WWt:t. ew'/. City --~=-i.#.-<~L.:.J~l-..1.--------
State Jj. Zip Code H~0 E-Mail Address -----------
Phone Number G\1<3 -J 7/o"' ~ Fax Number '"f]q _. 77!e,. C,,(!)6)C,
SITEPLANAPPUCATION +Jr-;1-/41'l ~ J._~0 -~~4-3
SITEAPP .DOC 03n5/99 f'Y\1 le.£ (11\lf\rtffr
l of3
+f.ut /II tlmSjiA RM.
/" . .. SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific waterway alterations:
ACKNOWLEDGMENTS: ~ ~~
I, QMD B11l!lft. ~~~ deagn cugineer/owner, hereby acknowledge or affirm that:
The infonnation and conclusions contained in the above plans and supporting documents comply with the current requirements of
the City of College Station. Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards.
As a condition of approval of this perrnit application. I agree to construct the improvements proposed in this application according to
thr.se documents and the requirements of Chapter 13 of the College Station City Code.
~~e_f~~ BR/~AI ~~~~ eo.
P roperty Owner(s) Contractor
C E R TIFICATIO NS: (for proposed alterations within designated flood hazard areas.)
A. I, ""..At:> /4rr6tf. , certify that any no nresiden tial structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its co ntents as a r esult of flooding from the 100 year storm.
~q--D a te
B. L r::;;?AJ •(J fl<ffef!Vl , certify that the fini shed floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is a t or above the base flood elevation established in the
la test Fede ral Insurance Administration Flood Haz.ard Study and maps, as amended..
~ l('-3. z,t-
~ftee-~~~ Date
C. I, t:?Ai/lp ~~ , certify that the alterations or development covered by this permit shall not
diminish the fiood~g capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code , Chapter 13 concerning encroachments of
floodways and of flood way fringes .
. Q ..///~~ ~~~ Date
D . I, °'1'4.0 ~~ . do certify tha t the proposed alteratio ns do not raise the level of the 100 year
fl ood above elevation established in the la test Fede ral Insurance Administrati o n Flood Hazard Study.
~ r.3.21-
~gineer c:;~" D ate
Conditions or comments as part of approval:------------·---------------
ln accordance with Chapter 13 of the Code of Ordinances of the City of Colleg e Station, measures shall be taken to insure tha t debri s
from construction., erosion, and sedimentation shaII not be d e po si ted in c ity streets, or existing drainage facilities .
i he reby grant this permit for developmenl All deve lo pment shal l be in a ccordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project . All of the applicable codes and ordinances of the City of College
Station shall apply.
SITE PLAN APPLICATION
S !TEAPP.DOC 03/2999
3 of3
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4103 Texas Avenue, Suite 212
Bryan, Texas 77802
Memo:
B.J. Kling, P.E., R.P.L.S.
S.M. Kling, R.P.L.S.
To: City of College Station
Telephone 409/84tHi212
Fax 409/846-8252
Development Services -Engineering Dept.
c/o Ted Mayo
From: Fred Pain~
Post Office Box 4234
Bryan, Texas 77805
July 21, 2000
~dPJ '7'~1,...ov
Re: Lot 1, Block 3 of The Business Center at College Station, Phase One
Heat Transfer Research Inc.
Drainage Letter
Dear Ted,
The primary drainage basin for this site is the Alum Creek drainage basin . The
drainage design for the subject tract is to be in accordance with prior subdivision
drainage development criteria. Specifically, this and adjacent tracts are to develop
without detention. This was verified June 12, 2000 by City Official, Jeff Tondre.
Additionally verified was the ability of the downstream bridge crossing Lakeway Drive to
handle full development runoff from the Business Center (refer to June 12, 2000 fax
memo for documentation). No further hydrologic or hydraulic analysis is to be
performed . Runoff from the site will enter the existing creek channel as shown on the
site grading plan and proceed to the adjacent Alum Creek.
,;,
-ro: .JF=NN~~ ~Yeh : ,
rt:ot-4' e>~ CV'llAPrnrJ. AJA. ·. J , · ~JJi~ lJ.Je "f?.E, ju A ~,·~ · ttt;~y 7 t-~ ~~n .. H~ ~M fff-Vvv 8~0W / AS ~Ul~vi J6. 'P6%16~. I~ F1Ll0
~ ffoYV\ ~MLr /C.uJA)I::, w(LO ~ ·C,OYVVtrJU, SC>tJ11J ANP
wte-EJdi>N~fRr~Gu ~ ~ A ut>"-1~~WPnl ~'JC?f~. P~b
A 'DIM(.. ~o . 'R.I~ ~rtA f/?-'/AN (,e)AJ~cnotJ · W/L{) ~e. ~J-1Atll.}~
I'-' fD ~ -~ . 8'/ 'rt;~ A-..;;~ tJJJLi{ F~Y-.
1. Sheet C-1 Site Utility Plan -Add note, to ~now 8" sanitary sewer and manhole as
existing . ( WHe "O'f ~t.JM--'f ~~)
2. Sheet G1 .1: Grading Plan-Add details for 3' wide concrete .Jchannel anct_ grate
inlets/concrete culverts (2). Doti~ (B'/ ~ C:UMP7DH zi ~~oc.)
3. Sheet D1 .1: Silt Fence-Extend fence along southeast side approximately 250'. -i::oNe;
--4. Need plan/profile sheet for sanitary sewer in public easemel)t wlth details -i.e .,
grades, slopes, sizes , lengths, flowlines; show manhole details. ( 1"11~ M 0('.'.;t.-~E..J
5. Need trench safety detail sheet. ft::.NPI~ (~INC:, ClN Pn?riu)
6. Need to submit dra~age letter/repqrt ~alyzing pre vs . post development peak
flows, etc. i::::t>Ne=:: Le?luMtf f.l.;lU'.q)
7 . No pavement details shown. ~e:. '. (CUMPTON .J ~soc...)
8. All documents ~ontaining engineering, details must be seated by a Registere~
Professional Engineer (Texas). ~DJ~ ( qf;~ ~ Ol!l OF 10wN)
9. Need sealed engineer's estimate for all public infrastructyze.
~DiH~ ( "9ro~T /<UkX:::, our o'F-10 WN)
Reviewed by: Ted Mayo Date : 07/10/00
ELECTRICAL
1. Developer responsible for installing conduit per city spec and design . '(~/ . "'
2. Developer responsible for pouring Transformer pad per city spec and design . g:,Nt:;-:(_n=e=;_
3. Developer responsible for providing ease,meQ!s to cover all primary electric lines and
equipment. ,Vb'Ne ~ ( ~-ru~.r ~~)
4 . Developer needs to coordinate with City of College Station Electrical Divisio~on '.
where to stub conduit up at proposed 200 Amp Junction Box location. P'Ne~ ll~S/
5. Developer needs to provide Electric Load Information ASAP ~Ne. ~ ( Tt::.i:::..s.\
' ...:> I :J \ -r~-~ ~~Y @.J TUM ~'i ~Ntq11..JU,f.zAJei c;uvc~
Reviewed by: Jennifer Reeves Date: July 20, 2000
NOTE: Any changes made to the plans , that have not been requested by the City of
College Station, must be explained in your next transmittal letter and "bubbled " on your
plans . Any additional changes on these plans that have not been pointed out to the City,
will constitute a completely new review.
J :\PZTEXT\PZ033 73 . D OC Pa ge 2 o f1