HomeMy WebLinkAbout79 Development Permit 646 Covenant Family Church-""-&. -•
Pastor Danny Green
Covenant Family Church
4010 Harvey Road
College Station, Tx. 77845
Dear Pastor Green :
August 1, 1999
The Harvey Hillsides Architectural Control Committee met again on August 1, 1999 and
considered your letter of July 12, 1999 with the accompanying site plan and drainage
report." The Committee approves the plan as submitted contingent on meeting the
following three conditions :
1. The improvements, i.e. parking lots and buildings, made on lots 22, 23, 28 and
29, Block 1, Harvey Hillsides shall not increase the runoff to the channel downstream and,
hence, shall in no way impact the downstream landowners .
2 . The drivethru in front of the church shall be closed to through traffic so that all
traffic created by the new parking lots in lots 22, 23 and 29 will enter and exit via
Highway 30.
3. A screening consisting of evergreen shrubs, trees, etc. shall be erected along
Marci Lane and along the property lines dividing the church from lots 25, 26, 27 and l 9b.
We trust that these conditions will be met; feel free to call on me or any committee
member if we can answer any questions .
Since~, _,... r~-=b ··
Konrad Eugster,
Harvey Hillsides Control Committee
cc : Committee members : C . Conant
D. Hejtmancik
W . Hoke
W . Jordan
J . Vilas
M. Westhusin
/.-·
Pastor Green
Covenant Family Church
College Station, Texas
Dear Pastor Green and Covenant Family Church,
i'l'llP-vT );J.!i Al (7GP/J/5 1-1Et..TTt'l1#fl-J'S
~171./7 6/ t A-vn v7 r 1 '11 9'
July 9, 1999
The Harvey Hillsides Architectural Control Committee met on July 8, 1999 and reviewed
the plans you submitted for your church's proposed parking addition, structure relocation, and
structure addition and remodeling. The committee unanimously agreed that you need to provide
us with more complete plans, plats, and supporting documentation as to your plans. We are
considering ultimate approval of your project subject to the following stipulations and
conditions.
We understand your request is for us to consider and approve a multi-faceted building
proposal. Our stipulations and concerns are as follows :
1. You wish to expand and remodel your existing large building and it's parking lots
which were approved by this committee November 6, 1994. Approval of these plans allowed
you to build as per plat presented to this committee. This request showed a driveway entrance
off of Hwy 30, a rear picnic/park area and a future sanctuary up front. These were not completed
as approved. In order for us to consider your current application, we request that you include
this omitted driveway in your current building project. You may request permission to relocate
it further west to better serve your current needs. The current proposed driveway entrance off of
Hwy 30 is to also be completed at this time. We request you also inform us as to the type of
finish materials you propose for the remodeling of the exterior of your existing large building
and for the new covered drive area . These proposed building embellishments as per your
drawing do indeed reflect your desire to upgrade your facilities to one more fitting with the
general layout and design or our area.
2. You propose relocating your two current smaller building to the rear of the property.
Please inform us via the revised plat of your entire property showing properly respected setback
requirements of 25 feet from any lot line and 50 feet from any roadway. Please also indicate
your proposed orientation of these structures with regard to entrances and exits. On August 18,
1987 this committee approved the construction of the initial structure as presented per plans .
This plan showed the structure facing the Hwy and included two entrances off of Hwy 30 and no
access off of Marci Lane . Please correct this at this time by permanently closing the Marci Lane
access and constructing or planting an effective screening of your facility from adjoining single
famil y re sidences.
3 . You are requesting permission to construct arking facilities as per your plans and to
reroute the existing creek. A s referenced in your prior approval, you were asked to address the
drainage problems along Marci Lane. Due to the scope and magnitude of this proj e ct it is quite
likely that this proj ect may ind e ed require a adequate water detention pond. Please provide us
with professional drainage studies and the proposed location of any detention pond.
--· ·· ··· -4. ·These-buildings-will require-proper sewage -disposal:-No where on-your plans · is ·thi~
addressed. As you surly know, Brazos County requires a septic tank permit and percolation test
prior to commencement of any construction activities. Please provide us with a copy of this
permit and indicate on your plat where you propose to locate a septic system. If it is your intent
to attach to the city sewage system, you need to apply for sanitary sewer service and the required
request for annexation. Please provide us with copies of these documents. This will of course
make your entire project subject to the rules and regulations of development of the city. These
restrictions among other things will require parking lot modifications to include landscaping. In
addition we ask that you provide effective screening of your property from view of adjoining
residences. Please indicate this screening and revised landscaping plans on your new plat.
Please include measurements of distances of proposed pavement from lot lines to insure
adequate space for effective screening.
We realize these documents and revisions will take time to compile and you are probably
eager to commence construction. To assist you in this end we will again be as prompt as
possible in responding to your revised request. Do bear in mind that construction cannot
commence prior to the approval of your revised plans. Commencement of construction is
defined as the installation of utilities, plumbing, pouring of concrete, installation of any asphalt,
of movement of or modification of any structures.
A copy of this letter will be forwarded for information purposes to the City of College
Station Wastewater Department, and Building and D_evelopment office.
xc: City of College Station
Committee Members
Sincerely,
~,~--&-
Chairman,
Architectural Control Committee
Harvey Hillsides Addition
Drainage Report
for Covenant Family Church
Lots 22 & 23, Block 1
Harvey Hillside Subdivision
1.38 Acres
REVIEWED
\ COMPLIA
JUL 14 1999
J.W. Scott Survey, A-49
College Station, Brazos County, Texa
May 3, 1999
OLLEGE STATION
ENGINEERING
GENERAL LOCATION & DESCRIPTION
The proposed parking area is located on Lots 22 & 23, Block 1, of Harvey Hillside
Subdivision, 1 .38 acres. The proposed parking area is just inside the College Station city
limit line dividing the City of College Station and Brazos County. The entrance to the
proposed parking area is approximately 380 feet northeast of Marcy Lane along Harvey
Road. (See Appendix 1: "General Location Map" for location and surrounding properties).
The 1.38 acres currently consists of short to medium grass and approximately 10
small trees. The run-off currently sheet flows across the tract into the barrow ditch along
Highway 30 and onto lot 24. The proposed improvements consist of a parking lot that will
cover approximately 0.63 acres of the 1.38 acre tract and a storm sewer system. The
storm sewer system will direct the run-off from the parking lot outside the city limits into a
natural channel which flows into a 36" C.M.P. under Marcy Lane. (See Appendix 3: "Site
Plan" for proposed improvements and flow direction).
DRAINAGE BASIN
The proposed parking area site is located in the Carter's Creek drainage basin. This
site is not within the 100 year flood hazard area according to the Flood Insurance Rate
Map #48041CO161 C, Effective Date: July 2, 1992, for Brazos County, Texas and
Incorporated Areas (See Appendix 2: "Flood Plain· Map"). Currently the run-off from the
site drains into the road ditch along Highway 30 and onto lot 24 which enters Carter's
Creek via an unnamed tributary of Carter's Creek.
DRAINAGE DESIGN CRITERIA
The City of College Station Drainage Policy and Design Standards state that
culverts and storm sewer shall be designed to have capacity through the 25-year storm
event, that storage depth in the parking lot shall not exceed 0.83 ft for the design
hydrograph and that velocities in grass-sodded channels shall not exceed 6.0 ft/s. These
standards were used to design the 24" C.M.P. under the proposed drive, the 24" A.D.S.
storm sewer system, grate inlets in the parking lot and for providing erosion control.
The following methods were used in the analysis and design of the drainage
structures. The peak run-off for the pre-and post-developed conditions and the area
draining to the 24" culvert was calculated using the rational method. Manning's equation
was used to size the culvert and storm sewer system via the. computer software Flow
Master. The orifice equation was used to design the grate inlets.
I
DRAINAGE FACILITY DESIGN
The design of the 24" culvert and the storm sewer system was based on pre and
post-developed drainage patterns and run-off calculations. The pre and post-drainage
patterns were delineated (see Appendix 4: "Drainage Areas"). The drainage areas were
divided according to the off-site drainage system receiving the run-off. (See Appendix 5:
"Hydrologic calculations" for run-off calculations including computations for the intensities
and run-off coefficients.)
Pre and Post-Developed Run-off
Drainage areas 1 and 3 represent the pre and post-developed drainage areas,
respectively, for the road ditch along ·Hwy 30 and drainage areas 2 and 4 represent the pre
and post-developed drainage areas, respectively; for the 36" C.M.P. under Marcy Lane.
Calculations for the pre-and post-developed flows were performed for the 2, 5, 10, 25,
50, and 100 year storm events for the above drainage areas. Table 1 below gives a
summary of the pre-and post-developed run-off calculations along with the increase in run -
off due to the proposed improvements. (See Appendix 4: "Pre-and Post-Developed
Drainage Areas" and Appendix 5: "Hydrologic Calculations").
DA 02 Os 010 025 Clso 0100
State 1 (PRE) 13.38 16.50 18.67 21.39 24.26 25.31
Hwy30
3 (POST) 10.99 13.55 15.33 17.57 19.92 20.79
Marcy 2 (PRE) 25.76 32.10 36.55 41.99 47.74 49.86
Lane
4 (POST) 29.25 36.44 41.49 47.67 54.20 56.60
Detention Pond
A detention pond .was not designed for the proposed improvements since the post-
developed run-off within the city limits (drainage area 3) is less than the pre-developed run-
off within the city limits (drainage area 1). This is due to the 24" storm sewer system
discharging the run-off from the improvements outside the city limits into the natural
channel on lot 29, block 1, of Harvey Hillside Subdivision. (Note: Lots 24, 28, and 29,
Block 1, of Harvey Hillside Subdivision are all owned by Covenant Family Church .)
24" C.M.P. Culvert Under Drive
Drainage area 3A represents the drainage area for the 24" C.M.P. culvert under the
proposed drive. The 100 year storm event yields 17 cfs from drainage area 3A (see
Appendix 5: "Hydrologic Calculations"). The full flow capacity of the 24" C.M.P. culvert
at a 2.0 percent slope is 17 cfs (see Appendix 6: "Hydraulic Calculations"). Based on the
above the 24" C.M.P. culvert has capacity through the 100 year storm event. The
maximum velocities in the storm sewer exceed 6.0 ft/s which is the maximum design
velocity for a grass-sodded channel. Erosion protection has been provided on the
downstream end of the 24" A.D.S. storm sewer.
24" A.D.S. Storm Sewer
Drainage area 4B represents the drainage area for the 24" A.D.S. storm sewer
system. The 100 year storm event yields 11 cfs from drainage area 4B (see Appendix 5:
"Hydrologic Calculations"). The full flow capacity for the 24" A.D.S. storm sewer at a 0.8
percent slope is 23 cfs (see Appendix 6: "Hydraulic Calculations"). Based on the above
the 24" A.D.S. storm sewer has capacity through the 100 year storm event. The
maximum velocities in the storm sewer exceed 6.0 ft/s which is the maximum design
velocity for a grass-sodded channel. Erosion protection has been provided at the outlet of
the 24" A.D.S. storm sewer.
Storage Depth in Parking Lot
Drainage area 4B represents the drainage area for the two grate inlets in the parking
lot. The first grate inlet has capacity for 6.22 cfs at a 0.20' depth and the second grate
inlet has capacity for 10.95 cfs at a 0.62' depth. (See Appendix 6: "Hydraulic
Calculations" for grate inlet capacity calculations. The capacities for the grate inlets
account for a 25% reduction in area due to possible clogging.) The 100 year storm event
for drainage area 4B generates 10.35 cfs of which 6.22 cfs will flow into the first grate
inlet and the remaining 4.13 cfs will flow into the second grate inlet. Therefore, the
storage depths in the parking lot will ·be below 0.62' for the 100 year storm event which is
less than the maximum storage depth of 0.83 ft for the design hydrograph.
Existing 36" C.M.P. Culvert under Marcy Lane
Drainage area 4 represents the new drainage area for the 36" A.O. S. culvert under
Marcy Lane. The 100 year storm event yields 57 cfs from drainage area 4 (see Appendix
5: "Hydrologic Calculations"). The full flow capacity for the existing 36" A.D.S. culvert at
a 3.56 percent slope is 68 cfs (see Appendix 6: "Hydraulic Calculations"). Based on the
above the existing 36" A.D.S. culvert has capaci~y through the 100 year storm event.
The velocity in the 36" A.D.S. culvert under Marcy Lane prior to the proposed
improvements was 10.55 ft/s. The velocity after the proposed improvements was 10. 78
ft/s. The increase in velocity, 0.23 ft/s, due to the proposed improvements is negligible in
regards to increasing downstream erosion.
Channel Downstream of 36" C.M.P. under Marcy Lane
The channel downstream of the 36" C.M.P. under Marcy Lane was analyzed to see
how the increase in storm runoff would effect the surrounding properties. This was
achieved by analyzing two cross-sections, one at 50' and the other at 100', downstream
of the 36" culvert. (See Appendix 3: "Site Plan" for location of cross-sections.)
The ground surface in the channel is clayey soil with leaf cover, small brush and
little grass. Manning's roughness coefficient used was 0.035. (See Appendix 6:
"Hydraulic Calculations" for Manning's roughness coefficients from the TxDOT Hydraulic
Manual.) The slope of the channel is approximately 1. 7 percent. The chart on the
following page shows that the increase in runoff due to the proposed improvements for the
100 year storm event will not effect the downstream land owners.
I
I
CHANNEL CROSS-SECTIONS
CHANNEL ELEVATIONS VELOCITY WS ELEVATION
(ft) {ft/s) (ft)
Top Flowline PRE POST PRE POST
Section 1 298.1 292.8 3.56 3.64 293.6 294.0
Section 2 295.7 291.0 3.86 3.93 292.6 292.7
• The peak flow from DA 2 was used for pre calculations and from DA 4 for post calculations. See Appendix 6 :
•Hydraulic Calculations• for velocity and elevation calculations .
CONCLUSIONS
All drainage structures comply with the City of College Station Drainage Policy and
Design Standards. The 24" C.M.P. culvert, the 24" A.D.S. storm sewer and the existing
36" C.M.P. culvert all have capacity through the 100 year storm event. Erosion control
has been provided downstream of the 24" C.M.P. culvert and the 24" A .D.S. storm sewer.
The storage depth in the parking lot does not exceed 0.62'. The increase in runoff to the
channel downstream of the 36" C.M.P. culvert does not impact the downstream
landowners.
"I hereby certify this report (plan) for the drainage design of the parking area for
Covenant Family Church -Lots 22 & 23, Block 1, Harvey Hillside Subdivision, 1.38 Acres,
was prepared by me (or under my supervision) in accordance with the provisions of the.
City of College Station Drainage Policy and Design Standards fof the o~~~of." .
'·i"f:-Of r,.. \' 3 #' ~·· ·_ -••••
APPENDICES
1) GENERAL LOCATION MAP -CITY OF COLLEGE STATION BASE MAPS
2) FLOOD INSURANCE RATE MAP -FEMA
3) SITE PLAN -KLING ENGINEERING
4) PRE -AND POST-DEVELOPED DRAINAGE AREAS
5) HYDROLOGIC CALCULATIONS
6) HYDRAULIC CALCULATIONS
APPENDIX 1
GENERAL LOCATION MAP
CITY OF COLLEGE STATION BASE MAPS
SCALE: 1 "=500 '
N O'f E. : C c;:N ~~~NT" t Ni\L °'( L\\u 9.C-\\ O'-NN$
Lt>\~ z:L, l.3, 2...~1 l.8 8. 2.~.
PROJECT
LOCATION
APPENDIX 2
FLOOD INSURANCE RATE MAP
APPENDIX 5
HYDROLOGIC CALCULATIONS
INTENSITY CALCULATIONS
BRAZOS COUNTY
CONSTANTS FOR IDF CURVES
FREQ e b d
2 0.806 65 8.0
5 0.785 76 8.5
10 0.763 80 8.5
25 0.754 89 8.5
50 0.745 98 8.5
100 0.730 96 8 .0
INTENSITY=b/(Tc+d)"e
FREQ
Tc (min) 2 5 10 25 50 100
PRE
1 18 4 .7038 5 .8018 6.5638 7 .5208 8 .5292 8 .8990
2 27 3 .7016 4.6119 5 .2513 6 .0328 6 .8597 7 .1631
POST
3 18 4 .7038 5.8018 6.5638 7.5208 8.5292 8.8990
4 27 3 .7016 4 .6119 5 .2513 6.0328 6 .8597 7.1631
3A 13 5.5873 6.8367 7.6991 8.8050 9 .9669 10.4004
48 10 6 .3265 7.6928 8.6345 9.8615 11.1476 11.6392
Covenant -06/08/99
PEAK FLOW CALCULATIONS
DA TC C-VALUE AREA Q2 QS Q10
PRE
1 18 0.4000 7.11 13.38 16.50 18.67
2 27 0.4000 17.53 25.96 32.34 36.82
POST
3 18 0.4000 5.84 10.99 13.55 15.33
4 27 0.4203 18.80 29.25 36.44 41.49
3A 13 0.4000 3.97 8.87 10.86 12.23
48 10 0.7000 1.27 5.62 6.84 7.68
where: Q = C-Value *Area * I
I -is found in "Intensity Calculations" and corresponds to the
appropriate Tc and frequency.
Covenant -07/01/99
Q25 QSO Q100
21.39 24.26 25.31
42.30 48.10 50.23
17.57 19.92 20.79
47.67 54.20 56.60
13.98 15.83 16.52
8.77 9.91 10.35
APPENDIX 6
HYDRAULIC CALCULATIONS
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Diameter
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Jul 1 , 1999
14:22:52
COVENANT FAMILY -24" CMP @ 2.00o/o SLOPE
Worksheet for Circular Channel
e:\stacy\covenant\covenant.fm2
COVENANT FAMILY -24" CMP @ 2.00% SLOPE
Circular Channel
Manning's Formula
Discharge
0.024
0.020000 ft/ft
2.00 ft
2.00 ft
17.33 ff'/s
3.14 ft2
6.28 ft
0.00 ft
1.50 ft
100.00 %
0.024035 ft/ft
5.52 ft/s
0.47 ft
FULL ft
FULL
18.64 ff'/s
17.33 ff'/s
0.020000 ft/ft
Kling Engi..-ing & Surveying
Hae&tad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project Fife
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Diameter
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Jun 8, 1999
14:43:32
COVENANT -24" A.D.S. STORM SEWER
Worksheet for Circular Channel
e:\stacy\covenant\covenant.fm2
COVENANT -STORM SEWER
Circular Channel
Manning's Formula
Discharge
0.012
0.008000 ft/ft
2.00 ft
2.00 ft
21 .92 ft3/s
3.14 ft2
6.28 ft
0.00 ft
1.67 ft
100.00 %
0.007728 ft/ft
6.98 ft/s
0.76 ft
FULL ft
FULL
23.58 ft3/s
21..92 ft3/s
0.008000 ft/ft
Kling Engineering & Surveying
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
? -.J -t 0 p (Q _.j.-' r/ " fV -0 .J> . b _J 0 0 r ,... ...,., uJ (}I u' ~ I ;"1 ('l r r--uJ tJ ~ ~ .:._./ f) r-0 J b rJ u: ..._.,, 0 0 " -0 J) (}I ~ (}I +Natlonal"Brand 0 fl ,, CfJ 0 rJ _J '-9 0 ,...... c,, vi (/I vl IJ-78l ~JO Siii i· /~).I II 11 H !1 :.;<JUAlll_ 42-3B1 !..c>SHEEISLYl:-(/\St~ SSOUAllE 42-382 100 SHEElS EY[-EA..c:;,(9 5 SQUAB!:; 42-389 200 SI IEF I fi FYF-l" ASF* S SOUAHE '1~-:J!J2 100Hr:C't'CIJ:I> Wllllf Sf;QUAflE 4:?-J!Y.J 2fXl llt:CYCl.l U WHtlr-~ SOUARE M;1JoonU !; A r" [, / i (l> A-' ~ lf) 0 II (' 7 ~ fl -.../ ,, II i "' r-~ c ~ r-.J ._/ f) r-![ 0 -rJ ~ .._...., ~ 0 •I b rJ r--1 c., (/I uJ f'-' r--J -n ,,-U' 0 _; 0 r----r--£!-. y (' ~g ' ~ ..n .... .., ;3 > -1 t r 9 ~ /"' ._/-;:: cP7 £ 0 u. 0 (b -0 ~ ~ ~ ~ ---l 10 ~ ~ -~
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Diameter
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Jun 9 , 1999
15:52:35
COVENANT-EXIST. 36" C.M.P.
Worksheet for Circular Channel
e :\stacy\covenant\covenant.fm2
COVENANT-EXIST. 36" C.M.P.
Circular Channel
Manning's Formula
Discharge
0.024
0.035600 tuft
3.00 ft
3.00 ft
68.16 ft3/s
7.07 ft2
9.42 ft
0.00 ft
2.63 ft
100.00 %
0.032137 tuft
9.64 tus
1.45 ft
FULL ft
FULL
73.32 ft3/s
68, 16 ft3/s
0.035600 ft/ft
Kling Engineering & Surveying
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Diameter
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent FuU
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
FuU Flow Capacity
FuU Flow Slope
Flow is supercritical .
Jul 1, 1999
14:19:44
COVENANT -EXIST. 36'" C.M.P.
Worksheet for Circular Channel
e:\stacy\covenant\covenant.fm2
COVENANT -EXIST. 36" C.M.P .
Circular Channel
Manning's Formula
Channel Depth
0.024
0.035600 ft/ft
3.00 ft
50.23 ft3/s
1.91 ft
4.76 ft2
5.55 ft
2.88 ft
2.31 ft
63.83 %
0.021978 ft/ft
10.55 ft/s
1.73 ft
3.64 ft
1.45
73.32 ft3/s
68.16 ft3/s
0.019332 ft/ft
Kling Engineering & Surveying
H~ Methods, Inc. 37 Brookside Road Waterbury, CT 06708 {203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Diameter
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Flow is supercritical.
Jul 1,1 999
14 :19:56
COVENANT-EXIST. 36" C.M.P.
Worksheet for Circular Channel
e:\stacy\covenant\covenant.fm2
COVENANT-EXIST. 36" C.M.P .
Circular Channel
Manning's Formula
Channel Depth
0.024
0.035600 ft/ft
3.00 ft
56.60 ft3/s
2.09 ft
5.25 ftZ
5.92 ft
2.76 ft
2.« ft
69.56 %
0.024921 ft/ft
10.78 ft/&
1.81 ft
3.89 ft
1.38
73 .32 ft3/s
68.16 fP/s
0.024546 ft/ft
Kling Engw-ing & Surveying
H..tad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1c
Page 1 of 1
TABLE 1
MANNING'S ROUGHNESS COEFFICIENTS
NATURAL STREAM CHANNELS
Minor streams Min. Max.
A. Fairly regular section
I. Some grass, weeds; little or no brush •••••••••• 0.030 0.035
2. Dense growth; depth of flow greater
than weed height•••••••••••••••••••••••••••••••0.035 0.050
3. Some weeds, heavy bank brush ••••••••••••••••••• 0.050 0.070
4. Some weeds, dense bank wi 11.ows ••••••••••••••••• 0.060 0.080
5. For tree branches submerged, Increase
all values above by••••••••••••••••••••••••••••0.010 0.020
B. irregular section, pools, meanders
use IA through 4A, Increase all values by ••••••••• 0.010 0.020
c. Rocky, steep channels, little vegetation
I. Small rocks •••••••••••••••••••••••••••••••••••• 0.040 o.050
2. Large rocks••••••••••••••••••••••••••••••••••••0.050 0.070
Flood plain
A. Pasture, no brush
I. Short grass ••••••• •••••••••• •• · ••••••••••••••••• 0.030 0.035
2. Tall grass••••••••••••••••••~••••••••••••••••••0.035 0.050
B. Cultivated areas
1. No crops•••••••••••••••••••••••••••••••••••••••0.030 0.040
2. Mature row crops•••••••••••••••••••••••••••••••0.035 0.045
3. Mature field crops•••••••••••••••••••••••••••••0.040 0.050
c. Heavy weeds, scattered brush.•.• •••••• •• ••••••••••• 0.050 0.070
D. Wooded••••••••••••••••••••••••••••••••••••••••••••0.075 0.200
These "wooded" coefficients vary depending upon undergrowth,
foliage, and density of vegetation. Instances of "n" values
greater than 0.120 should be carefully Investigated.
Major streams:
The roughness coefficient Is usually less than tor minor
streams of similar description.
LI NED CHANNELS
I. Concrete llned •••••••••••••••••••••••••••••••• 0.012 0.018
2. Concrete rubble•••••••••••••••••••••••••••••••0.017 0.030
UNLINED CHANNELS
I. Earth, straight and unltorm•••••••••••••••••••0.017
2. Winding and slugglsh••••••••••••••••••••••••••0.022
3. Rocky beds, weeds on bank ••••••••••••••••••••• 0.025
4 0 Earth bottom, rubble sldes •••••••••••••••••••• 0.028
5. Rock cuts ••••••••••••••••••••••••••••••.••••••• a .025
BRIDGE DIVISION HYDRAULIC MANUAL
3 -5
0.025
0.030
o.o4o
0.035
o.045
COVENANT -SECTION 1
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
e :\stacy\covenant\covenant. fm2
COVENANT -50' DOWNSTREAM
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 0.016800 ft/ft
Elevation range: 292.79 ft to 298.40 ft.
Station (ft) Elevation (ft)
0.00 298.40
23.56 294 .51
34 .24 293.71
41 .43 292.79
52.08 293 .66
68 .13 294 .46
78.50 298 .12
Discharge 50.23 ff'/s
Results
Wtd. Mannings Coefficient 0.035
Water Surface Elevation 293 .95
Flow Area 14 .11
Wetted Perimeter 27.14
Top Width 27 .03
Depth 1.16
Critical Water Elev. 293.89
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.022601 ft/ft
Velocity 3.56 ft/s
Velocity Head 0.20 ft
Specific Energy 294.15 ft
Froude Number 0.87
Full Flow Capacity 3457 .21 ffl/s
Flow is subcritical.
Kling Engineering & Surveying
End Station
78 .50
Jul 2 , 1999
19:05:19 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.035
FlowMaster v4.1 c
Page 1 of 1
COVENANT -SECTION 1
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
e:\stacy\covenant\covenant.fm2
COVENANT -50' DOWNSTREAM
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 0.016800 ft/ft
Elevation range: 292.79 ft to 298.40 ft.
Station (ft) Elevation (ft)
0.00 298.40
23.56 294.51
34.24 293 .71
41 .43 292.79
52 .08 293.66
68 .13 294.46
78 .50 298.12
Discharge 56.60 ff!/s
Results
Wtd. Mamings Coefficient 0.035
Water Surface Elevation 294 .01
Flow Area 15 .54
Wetted Perimeter 28 .84
Top Width 28.73
Depth 1.22
Critical Water Elev. 293.95
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.022337 ft/ft
Velocity 3.64 ft/s
Velocity Head 0.21 ft
Specific Energy 294.21 ft
Froude Number 0.87
FuU Flow Capacity 3457.21 ff!/s
Flow is subcritical.
Kling Eng"-ing & Surveying
End Station
78.50
Jul 2, 1999
19:05:34 H..tad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.035
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
COVENANT -SECTION 1
Cross Section for Irregular Channel
e :\stacy\covenant\covenant. fm2
COVENANT -50' DOWNSTREAM
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.035
0.016800 Wtt
Water Surface Elevation
Discharge
298.5 (\
298.0
297.5
297.0
296.5
g296.0
c: ~ 295.5
tU > G>
iii 295.0
\
\
\
294.01 ft
56.60 ft3/s
\
\
\
\
\
<;>
I
I
I
I
I
I
J 294.5 ~ ......,. v 294.0
Jul 2, 1999
19:05:45
293.5
293.0
292.5
0.0
I~ 'ilF v
\ / v
10.0 20.0 30.0 40.0 50.0 60.0
Station (ft)
Kling Engw-ing & Surveying
H&Mtad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
70.0 80.0
FlowMaster v4.1 c
Page 1 of 1
COVENANT -SECTION 2
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
e:\stacy\covenant\covenant.fm2
COVENANT -100' DOWNSTREAM
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 0.016800 ft/ft
Elevation range: 291.06 ft to 296 .08 ft.
Station (ft) Elevation (ft)
0.00 296 .08
10.19 293 .07
29 .18 292.28
35 .67 291.06
39 .74 291 .93
47.64 293.45
54 .72 295.73
Discharge 50 .23 ft3/s
Results
Wtd. Mamings Coefficient 0.035
Water Surface Elevation 292.60
Flow Area 13.00
Wetted Perimeter 22.11
Top Width 21 .83
Depth 1.54
Critical Water Elev. 292 .54
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.021743 ft/ft
Velocity 3.86 ft/s
Velocity Head 0.23 ft
Specific Energy 292.84 ft
Froude Number 0.88
FuU Flow Capacity 1853.63 ft3/s
Flow is subcritical .
Kling Engi..-ing & Surveying
End Station
54 .72
Jul 2, 1999
19:06:07 Ha.tad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.035
FlowMaster v4.1 c
Page 1 of 1
COVENANT -SECTION 2
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
e:\stacy\covenant\covenant.fm2
COVENANT -100' DOWNSTREAM
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 0.016800 ft/ft
Elevation range: 291.06 ft to 296.08 ft.
Station (ft) Elevation (ft)
0.00 296.08
10.19
29.18
35.67
39 .74
47 .64
54.72
Discharge
Results
293.07
292.28
291.06
291.93
293.45
295.73
56.60 ft3/s
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
0.035
292.67
14.42
Wetted Perimeter 23.94
Top Width 23.65
Depth 1.61
292.60
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Water Elev.
Critical Slope
Velocity
0.021583 ft/ft
Velocity Head
Specific Energy
Froude Number
Full Flow Capacity
Flow is subcritical.
3.93
0.24
292.91
0.89
1853.63
ft/s
ft
ft
ft3/s
Kling Engi~ & Surveying
End Station
54.72
Jul 2, 1999
19:06:25 Ha.tad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.035
FlowMaster v4.1 c
Page 1of1
COVENANT -SECTION 2
Cross Section for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
e :\stacy\covenant\covenant. fm2
COVENANT -100' DOWNSTREAM
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
296.5
296.
295.
295.
0 )
\ 5
0 \
\
294.
E'
5 \ -294.
c
0 ;; ! 293.
iii
0
\ 5
\
293. 0
292. 5
292. 0
0.035
0.016800 ft/ft
292.67 ft
56.60 ft3/s
"""'-
-............ ~
-............._
~
~ ..
'\
\ I 291. 5 \ v
0
j
I
I
I
J
I
I/
/
I v
291.
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0
Station (ft)
Jul 2, 1999
19:06:35
Kling Engm-ing & Surveying
H&Mtad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaater v4.1c
Page 1of1
ml CITY OF COLLEGE STATION
Building Department .
C{ ~ Q(t1~ d -?~ ~ f'\ 5
\\-0-~ (J-.\f\\-+-e~
&a~S.
DEVELOPMENT PERMIT
PERMIT NO. 646
COVENANT FAMILY CHURCH
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
LOTS 22 & 23 BLOCK 1 HA VEY IDLLSIDE SUBDIVISION
SITE ADDRESS:
4010 HARVEY ROAD
OWNER: COVENANT FAMILY CHURCH
4010 HARVEY ROAD
COLLEGE STATION, TEXAS 77842
DRAINAGE BASIN: CARTER CREEK
TYPE OF DEVELOPMENT: THIS PERMIT IS VALID FOR CONSTRUCTION AS PER
APPROVED CONSTRUCTION PLANS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinecy
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall
be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities.
r by grant this permit for development of an area outside the special flood hazard area. All
de el ipment shall be in accordance with the plans and specifications submitted to and approved by the
Ci ngineer in the development permit application for the above named project and all of the codes
rdinances e Ci , of College Station that apply.
Date 1 l
Contractor Date
Figure XII
Development Permit
City of College Station, Texas
Site Legal Description: Lot 22, Block 1, Harvey Hillside Subdivision, Vol. 264, Pg. 484
Site Owner: Covenant Family Church
Architect/
Engineer: Kling Engineering & Surveying
Address: 4010 Harvey Road, C.S. TX 77842
Telephone No.: (409)774-1269
Address:4103 Texas Ave. Ste212, Bryn 77802
Telephone No.: (409)846-6212
Date Application Filed: _________ Approved: ___________ _
Application is hereby made for the following development specific waterway alterations:
~ Application Fee
D Signed Certifications
D Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
D Site and Construction Plans, with supporting Drainage Report two (2) copies each.
D Other:
~-----------------
ACKNOWLEDGEMENTS:
I, bA.N1~bP.FETJ , design engineer/owner, hereby acknowledge or affirm
that:
The information and conclusions contained in the above plans and supporting documents comply
with the current requirements of the City of College Station, Texas City Code, Chapter 13 and
its associated Drainage Policy and Design Standards .
As a condition of approval of this permit application, I agree to construct the improvements
proposed in this application according to these documents and the requirements of Chapter 13 of
the Colleg ion City
Contractor
u~le
Page 1of2
DATE 3h.i/qc,, P&ZCASENO~~
SITE PLAN REVIEW APPLICAT I O N
MINIMlJM REQ UIREMENTS
__x_ Site plan application completed in full.
-L-$100 .00 application fee . .
_x_ Ten (10) folded copies of site plan which include requirements for site plan proposals as listed on attached
sheet .
_X _ A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they
are not checked off
NAMEOFPROJECT Covenant Family Church proposed parking area
ADDRESS __ 4_0_l_O_H_a_r_v e~y_R_oa_d_,_C_ol_l_e~g_e_S_t_a _t1_·o_n~,_T_e_x_a_s ______________ _
LEGALDESCRIPTION Lot 22, Block 1, Harvey Hillside Subd . Vo l. 264, Pg. 484
0 RESIDENTIAL fXJ C OMMERCIAL
Total Acreage ___ _ Total Acreage 0.6887 Ac.
Housing Units Building Square Feet ---
#Bedrooms::::_ 132 sq. ft. Floodplain Acreage ----#Bedrooms < 132 sq. ft. ___ _
AJ>PLICANT Covenant Family Church PROPERTY OWNER Co Y.enant Eam]]j:'. Cbur:cb
<\DD RESS ~ 0 Box 10152 ADDRE SS same
College Station! TX 77842
>HONE 409LZZ4-l 269 FAX ZZ6-5498 PHONE FAX
I -
>ROIBCT MANA GER ARCIIlTECT OR ENGINEER Kling Engineering
\DD RESS ADDRESS 4103 T~~as 8Y.e.. Ste 212
Sr.van, TX 77802
'HONE FAX PHONE ~09.L 8 46-62l 2 FAX 846-8252
RESENT USE OF PROPERTY Vacant -------------------------
RO POSED USE OF PROPER TY _P~a=r~k~i n~g;>.......<...;8~r~ea'°"-__________________ _
'.URRENT ZONING OF PROPERTY A-0 ------------------------
'ARIAN CE ( S) REQUESTED AND REASON(S ) -----------------
fUMBER OF PARKING SPACES REQUIRED _16_5 __
VMBER~PROVIDED 165
Signature of Owner, Agent or Applicant
------------
Drainage Report
for Covenant Family Church
Lots 22 & 23. Block 1
Harvey Hillside Subdivision
1 .38 Acres
J.W. Scott Survey. A-49
College Station. Brazos County. Texas
May 3. 1999
GENERAL LOCATION & DESCRIPTION
The proposed parking area is located on Lots 22 & 23, Block 1, of Harvey Hillside
Subdivision, 1 .38 acres. The proposed parking area is just inside the College Station city
limit line dividing the City of College Station and Brazos County. The entrance to the
proposed parking area is approximately 380 feet northeast of Marcy Lane along Harvey
Road. (See Appendix 1: "General Location Map" for location and surrounding properties).
The 1.38 acres currently consists of short to medium grass and approximately 10
small trees. The run-off currently sheet flows across the tract into the bar ditch along
Highway 30 and onto lot 24. The proposed improvements consist of a parking lot that will ·
cover approximately 0.63 acres of the 1.38 acre tract and a storm sewer system. The
storm sewer system will direct the run-off from the parking lot outside the city limits into a
natural channel which flows into a 36" C.M.P. under Marcy Lane. (See Appendix 3: "Site
Plan" for proposed improvements and flow direction).
DRAINAGE BASIN
The proposed parking area site is located in the Carter's Creek drainage basin. This
site is not within the 100 year flood hazard area according to the Flood Insurance Rate
Map #48041 C0161 C. Effective Date: July 2, 1992, for Brazos County, Texas and
Incorporated Areas (See Appendix 2: "Flood Plain· Map"). Currently the run-off from the
site drains into the road ditch along Highway 30 and onto lot 24 which enters Carter's
Creek via an unnamed tributary of Carter's Creek.
DRAINAGE DESIGN CRITERIA
The City of College Station Drainage Policy and Design Standards state that
culverts and storm sewer shall be designed to have capacity through the 25-year storm
event. This standard was used to design the 24" C.M.P. under the proposed drive and the
storm sewer system and to show that the existing 36" C.M .P. would meet City Standards
with the additional run-off from the proposed parking lot.
The following methods were used in the analysis and design of the drainage
structures. The peak run-off for the pre-and post-developed conditions and the area
draining to the 18" culvert was calculated using the rational method. Manning's equation
was used to size the culvert and storm sewer system via the computer software Flow
Master.
DRAINAGE FACILITY DESIGN
The design of the 24" culvert and the storm sewer system was based on pre and
post-developed drainage patterns and run-off calculations. The pre and post-drainage
patterns were delineated (see Appendix 4: "Drainage Areas"). The drainage areas were
divided according to the off-site drainage system receiving the run-off. (See Appendix 5:
"Hydrologic calculations" for run-off calculations including computations for the intensities
and run-off coefficients.)
Pre and Post-Developed Run-off
Drainage areas 1 and 3 represent the pre and post-developed drainage areas,
respectively, for the road ditch along Hwy 30 and drainage areas 2 and 4 represent the pre
and post-developed drainage areas , respectively, for the 36" C.M.P. under Marcy Lane.
Calculations for the pre-and post-developed flows were performed for the 2, 5, 10, 25,
50, and 100 year storm events for the above drainage areas. Table 1 below gives a
summary of the pre-and post-developed run-off calculations along with the increase in run-
off due to the proposed improvements. (See Appendix 4: "Pre-and Post-Developed
Drainage Areas" and Appendix 5: "Hydrologic Calculations").
02 Os 010 025 Oso 0100
13.38 16.50 18.67 21.39 24.26 25.31
10.99 13.55 15.33 17.57 19.92 20.79
32.10 36.55 41.99 47.74 49.86
34.44 51.23
Detention Pond
A detention pond was not designed for the proposed improvements since the post-
developed run-off within the city limits (drainage area 3) is less than the pre-developed run -
off within the city limits (drainage area 1 ). This is due to the 24" storm sewer system
discharging the run-off from the improvements outside the city limits into the natural
channel on lot 29, block 1, of Harvey Hillside Subdivision. (Note: Lots 24, 28, and 29,
Block 1, of Harvey Hillside Subdivision are all owned by Covenant Family Church.)
24" C.M.P. Culvert Under Drive
Drainage area 3A represents the drainage area for the 24" C.M.P . culvert under the
proposed drive. The 50 year storm event yields 16 cfs from drainage area 3A (see
Appendix 5: "Hydrologic Calculations"). The full flow capacity of the 24" C.M.P. culvert
at a 2.0 percent slope is 16 cfs (see Appendix 6: "Hydraulic Calculations"). Based on the
above the 24" C.M.P. culvert has capacity through the 50 year storm event.
· w,J,~ uJtf Mks ~ ~ aJ
24"A.D.S.StormSewer / Btw~~~ 21(~
Drainage area 48 represents the drainage area for the 24" A.D.S. storm sewer ~
0 system . The 100 year storm event yields 11 cfs from drainage area 3A (see Appendix 5: ~
"Hydrologic Calculations"). The full flow capacity of the 24" A.D.S. storm sewer at a 0.~8
percent slope is 22 cfs (see Appendix 6: "Hydraulic Calculations"). Based on the above
the 24" A.D.S. storm sewer has capacity through the 100 year storm event. rJ.
Existing 36" C.M.P. Culvert under Marcy Lane -,1 ·it
Drainage area 4 represents the new drainage area for the 36" A.O. S. culvert under ~(
Marcy Lane. The 100 year storm event yields 54 cfs from drainage area 4 (see Appendix
5: "Hydrologic Calculations"). The full flow capacity of the existing 36" A.D.S. culvert at
a 3.56 percent slope is 68 cfs (see Appendix 6: "Hydraulic Calculations"). Based on the
above the existing 36" A.D.S. culvert has capacity through the 100 year storm event.
CONCLUSIONS
The 24" C.M.P. culvert, the 24" A.D.S. storm sewer and the existing 36" A.D.S.
culvert comply with the City of College Station Drainage Policy and Design Standards,
providing capacity through the 25-year storm event. Detention facility was not designed
for this site.
"I hereby certify this report (plan) for the drainage design of the parking area for
Covenant Family Church -Lots 22 & 23, Block 1, Harvey Hillside Subdivision, 1.38 Acres,
was prepared by me (or under my supervision) in accordance with the provisions of the
City of College Station Drainage Policy and Design Standards for the owners thereof."
PEAK FLOW CALCULATIONS
DA TC C-VALUE AREA Q2 QS Q10 Q25 QSO Q100
PRE
1 18 0.4000 7.ti 13.38 16 .50 18.67 21.39 24 .26 25.31
2 27 0.4000 /17.4 J( 25 .76 32 .10 36 .55 41 .99 47 .74 49 .86
POST .._____..........,
3 18 o A.llnn s.a4 \ 10.99 13.55 15 .33 17 .57 19.92 20.79
4 27 I -0.4000), I( 18.67 ~ 27 .64 ' 34.44 39.22 45.05 51.23 53.49
3A 13 U ~4000 I/ "3:-9 7 'l-a .87 10.86 12.23 13 .98 15.83 16.52
48 10 0.7000 } 1.27 5~2 6.84 7.68 8.77 9 .91 10 .35
where: Q = C-Value • rea • 1 /a '~
I -is found in Intensity Calcula ons" an orresponds to the
appropriate c and frequency . 7 l 7, S ~t' I, ll 7 .
I
\7.S~?
-
Covenant -06/08/99
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Flow is subcritical.
Jun 8 , 1999
13:16:11
COVENANT FAMILY -24" CMP @ 2.00% SLOPE
Worksheet for Circular Channel
e:\stacy\covenant\covenant.fm2
COVENANT FAMILY -24" CMP @ 2.00% SLOPE
Circular Channel
Manning's Formula
Discharge
15.80
2.53
4 .19
1.73
1.43
2.11
0.91
ffl/s
ft2
ft
ft
ft
%
ft
18.64 ffl/s
17.33 ffl/s
0.016630 ft/ft
Kl ing Engineering & Surveying
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Diameter
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
COVENANT -24" A.D.S. STORM SEWER
Worksheet for Circular Channel
e :\stacy\covenant\covenant. fm2
COVENANT -STORM SEWER
Circular Channel
Manning 's Formula
Discharge
0.012
0.008000 ft/ft
2.00 ft
2.00 ft
21.92 ft3/s
3.14 ft2
6.28 ft
0.00 ft
1.67 ft
100.00 %
~
FULL ft
FULL
23.58 ft3/s
21 -.92 ft3/s
0.008000 ft/ft
Kling Engineering & Surveying Jun 8 ,1999
14:43:32 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Diameter
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Jun 9 ,1 999
15:52:35
COVENANT-EXIST. 36" C.M.P.
Worksheet for Circular Channel
e :\stacy\covenant\covenant. fm2
COVENANT-EXIST. 36" C.M .P .
Circular Channel
Manning's Formula
Discharge
0.024
0.035600 ft/ft
3.00 ft
3.00 ft
68.16
7.07
9.42
0.00
2.63
100.00 %
0.032137 ft/ft
9.64 ft/s
1.45 ft
FULL ft
FULL
73.32 ft3/s
68 .. 16 ft3/s
0.035600 ft/ft
Kling Engineering & Surveying
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1of1
----~-------------
. .
Form 1058 (Rev. 4-94)
DHTl 122508
Exhaust previous versions.
To:
Permit to Construct Access Driveway Facilities
on Highway Right of Way
Hwy. __ _ Permit No. __ _
Control __ _ Section
The Texas Department of Transportation. hereinafter called the State. hereby authorizes Covenant Family Chu r ch
-------------, hereinafter called the Grantee. to (re) construct an access driveway on the highway
rightofway(lbµttinghighwayn9. 30 in Brazos County.located Aoorox .380' North
tne centerline l ntersect1on ofHwy Jb arid Marcy Lane.
Subject to the following:
1. The Grantee is responsible for all costs associated with the construction of this access driveway.
2. Design of facilities shall be as follows and/or as shown on sketch:
see attached site plan and plan/profile
All construction and materials shall be subject to inspection an~· approval by the State.
3. Maintenance of facilities constructed hereunder shall be the responsibility of the Grantee. and the State reserves the
right to require any changes, maintenance or repairs as may be necessary to provide protection of l ife or property on or
adjacent to the highway. Changes in design will be made only with approval of the State.
4 . The Grantee shall hold harmless the State and its duly appointed agents and employees against any action for personal
injury or property damage sustained by reason of the exercise <,>f this permit
5. The Grantee shall not erect any sign on or extending over any.portion of the highway right of way, and vehicle service
fixtures such as service pumps,. vendor stands, or tanks shall be located at least twelve ( 12) feet from the right-of-way
line to ensure that any vehicle services from these fixtures will be off the highway.
6 . This permit will become null and void if the above-referenced driveway facilities are not constructed within six (6)
months from the issuance date of this permit.
7 . The Grantee will contact the State's representative telephone
( ) at least twenty-four (24) hours prior to beginning the work authorized by this permit.
Texas Department of Transportation
Date of Issuance-------------------
District Engineer
The undersigned hereby agrees to comply with the terms and conditions set forth in this permit for construction of an access
driveway on the highway right of way.
Signed:------------------
Date: --------------------
', ..
313
312
311
310
309
308
307
306
305
COVENANT FAMILY CHURCH
DRIVEWAY PROFILE
I
"' ~ ~-_-I --+-
"' I ""
34
46 47
\
35
48
I
•·i
JUNE 1111111
36 37 38
----
49 50 51
! ,I I
-----------1----------------1---------------!----------------i---------------l--------------+----------··+--····------+----------+----------J--------+--------+------------1--313
-0+40 -0+20 0+00 0+20
KUNG ENGINEERING & SURVEYING
BR YAN, TEXAS
0+40 0+60
M
t Jl .
~ (j)'
Jl ~ )<
/1 -0
t.f\
c)l_ ('.l -c a
I/ ll v ~f >< I .ur f}l_ ~ ,,,
C-
...I>
(;;'
-....
Excerpt from Local Government Code
CHAPTER42 . EXTRATERRITORIAL JURISDICTION OF MUNICIPAL~~~4 ~.
SUBCHAPTERA. GENERAL PROVISIONS u .. A j~~llh l~ ·nw 1V I f
Sec . 42 .001. Purpose of Extraterritorial Jurisdiction . ~~)
extraterritorial jurisdiction of municipalities to promote and protect the general health, safety, . (.Ai-. ii
The legislature declares it the policy of the state to designate certain areas as the II uJ.t ta~ ~
and welfare of persons residing in and adjacent to the municipalities . ,;.,-h . .,, W)1I
E re c· ' D . 0 d. ~C&:.. ~. xcerpt 1rom 1ty s ramage r mance ~ ~ ~ ~Ua
SECTION 1: PURPOSE AND AUTHORl1Y tu~~
A. AUTHORl1Y .J; ~-
~ \{ -CA.S:~.
This chapter is adopted under the authority of the constitution and laws of the State of ~~
Texas , including particularly Chapter 231, Acts of the 40th Legislature, Regular Session,~ (a.(.,
as heretofore or hereafter amendea, compiled as Article 974a, V .A .C.S ., the provisions oftt, .. n L
Section 4 of the Municipal Annexation Act as heretofore or hereafter amended, compiled ~.
as Article 970a, V .A.C.S., and in Article 1175;.. V.A.C .S., as heretofore or hereafter ~~
amended, and pursuant to the provisions of the \-barter of the City of College Station, A"~ ...Jr.r.Ii:a cl}
Texas . <.l.)U'o-,...----0
(Ordinance No . 1728 of October 22, 1987) .~~~· ~~ uiJ-l ~
PURPOSE ~at1~
It is the purpose of this chapter to protect, maintain, and enhance the public health, safety, ~ ~
B .
pubhc and private losses due to flooding , erosion, and sedimentation. L°>• ,.f • •
and genera[ welfare by establishing minimum requirements and procedures to control the ~ ~
adverse impacts associated with the increased storm water flows generated by 1,, 111 ..., ~ • _. •
development. It is also the purpose of this chapter to enhance the public health, safety ~~
and welfare by furthering the goals and objectives of the City of College Station ~ LJJi>M
Comprehensive Plan and all of its elements. The following objectives wilr minimize~CJ..t'
)J.J"V". l.v
SECTION 3: GENERAL PROVISIONS AND APPLICABILI1Y <lN..ci. ~ a.-:
A. LANDSTOWIIlCHTHISCHAPTERAPPLIES ~~. ~
This chapter shall apply to all lands within the corporate limits and the extraterri~rit ~ ~
jurisdiction of the City of College Station, Texas as adjusted from time to time by the ~~
action of the City Council. U 0 ·
Excerpt from City's Subdivision Regulations
SECTION 13 : SPECIAL CONDITIONS IN AREA OF
EXTRATERRITORIAL JURISDICTION
General
The requirements of this chapter shall apply to subdivisions in the area of extraterritorial
jurisdiction, with the following modifications:
Drainage
Drainage may be by surface channels .