HomeMy WebLinkAbout7 DP Steeplechase Ph. 5 00-500047 2400 Pintail 06-0600Item
No.
1
2
3
4
5
6
7
8
9
10
II
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
__ ,,,,,,, 37
---i~ OF /~ ' I~ --<,.?-••••••••• -t-s!t 8 .$0 ...... ~ ..... )
~ ... · ~ ·. ·~ Pt< • ·:\ • * I! ./r : • ~
>_"'•••••c.••••"•••••••rv••"••'l'••• ••,.••1~
1v~!CHAEL f~. McC.i.U 1t: ~ ~· .. 11·~··~(·· ............ li.~ .............. .:. l ,. "r-/. \,'"'"1 ~ ,..,r .. -, .... .,. . \. ..
Steeplechase Subdivision, Phase 5
Engineer's Estimate
Revised July 17, 2000
Description Unit Quantity
Pavin2 Construction
Mobilization Lump Sum I
Earthwork C.Y. 2,530
1.5" HMAC Surface Course S.Y. 1,994
6" Lime Stabilized Subgrade S.Y. 3,911
Extra Lime Ton 30
6" Crushed Limestone Base S .Y . 1,994
Concrete apron S.Y. 1,354
Type III Curb and Gutter L.F. 1,473
4" Sidewalk S.F. 3,733
Estimated
Unit Price
5,000.00
3.50
4 .00
3 .00
80.00
5.50
33.50
6 .50
2.50
Paving Subtotal
Draina2e System Construction
18" Reinf. Concrete Pipe, Str. Backfill L.F. 31 31.00
24" Reinf. Concrete Pipe, Str. Backfill L.F. 268 36.50
5' Curb inlet EACH 2 2500.00
Remove plug & connect to 24" RCP EACH 1 200.00
Silt Fence L.F. 1,160 2 .00
Inlet Protection EACH 4 25.00
Trench Safety (storm drain) L.F. 299 0 .50
Drainage System Subtotal
Water System Construction
6" PVC Water Line, Str. Backfill L.F. 318 22.00
6" PVC Water Line, Non-Str. Backfill L.F. 792 15.50
Fire Hydrant Assembly EACH l 1800.00
6" Gate Valve EACH l 400 .00
6"x 13" Anchor Coupling EACH l 100.00
6"x 45 degree bend EACH 4 100.00
6"x 1.5" tapped tee EACH l 150.00
Remove plug & connect to existing pipe EACH 2 200.00
1.5" Water Ser. >I 0 ft (avg. = 37 ft .) EACH 9 700.00
1.5" Water Ser. <10 ft (avg.= 9 ft .) EACH 2 450 .00
l" Water Ser. >I 0 ft (avg. = 50 ft.) EACH I 550.00
Trench Safety (water line) L.F. 710 1.00
Water System Subtotal
Sewer System C o nstructio n
6" PVC, D-3034, Str. Backfill L.F. 709 34.00
6" PVC, D-3034, Non-Str. Backfill L.F. 314 16.50
6" PVC, D-2241, Str. Backfill L.F . 10 35.50
6" PVC, D-2241, Non-Str. Backfill L.F. IO 17.50
Standard Manhole, 0-6 ft. deep EACH l 1100.00
Standard Manhole, 6-8 ft. deep EACH 4 1300 .00
Connect to existing manhole EACH 1 400 .00
4" Sewer Service::;:: 10 ft. (avg.= 7 ft.) EACH 7 200.00
4" Sewer Service> l 0 ~~Vrr&W E JJ~ R 12 750.00
4" Sewer Service Type . I l 750.00
Trench Safety (sewer line) (' r'\ I\ An I I I\ N..i ~ ,.-1,043 1.00 .. -'-/IV I ' ...,,'l\J l... Sewer System Subtotal
Total cJMJn.~ttb -'®a t
Total
5,000.00
8,855.00
7,976.00
11,733 .00
2,400.00
10,967.00
45,359.00
9 ,574 .50
9,332.50
111,197.00
961.00
9,782.00
5,000 .00
200 .00
2,320 .00
100.00
149.50
18,512.50
6,996 .00
12,276.00
1,800.00
400.00
100.00
400.00
150.00
400.00
6,300.00
900.00
550.00
710.00
30,982.00
24,106.00
5,181.00
355.00
175.00
1,100.00
5,200.00
400.00
1,400.00
9,000.00
750.00
1,043.00
48,710.00
209,401.50 ·))· '} (.!..·'Ji;"' CO LL EGE STATIO N ~ (""\ n,... ..)'_, t...,i.·S..,. J ' a..,.:: .. ". v• ' • 611
"'"""' ",. ··r .. ,.,< .. • .. ., .. :!I f:stceplc/p5/exceVestima 'i°~"~' :.:··,:· .'~~Tf." ....... ·;.< , .. · ,..:.;,
~~--~j;J1;:11 '':~~ ENGINEERING
--' .. (>~ 7/17/~
te and proposa l
Item
No.
l
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2 7
2 8
29
30
31
32
33
34
35
36
M! ...
_,, .... ,,,,, 3 7
-."\~OF /~·'lr~ ~?-••••••••• --r.., ~ '41: •s·. "I ) ~· . ~ . ... . • '*fl~
I • ~!... c••t•..1 ••r., ... .,., •• ci••1'••• ,,..;i ... rJ!
CHA EL n. fA r;Ci~U 1E: ~ ··~,~~ ... • ..... ;~:.:,""',":.:" ...... ( :~".:;..";_.i
.. !\. ~ s..~ J ~i· lJ .. ,...... ./., ,1 ·/:;
Steeplechase Subdivision, Phase 5
Engineer's Estimate
Revised July 17, 2000
Description Unit Quantity
Paving Construction
Mobilization Lump Sum I
Earthwork C.Y. 2,530
1.5 " HMAC Surfuce Course S.Y. 1,994
6" Lime Stabilized Subgrade S.Y . 3,9 11
Extra Lime Ton 30
6" Crushed Limestone Base S.Y . 1,994
Concrete apron S.Y. 1,354
Type III Curb a nd Gutter L.F. 1,473
4" Sidewalk S.F. 3,733
Estimated
Unit Price
5,000 .00
3.50
4 .00
3.00
80.00
5.50
33.50
6.50
2.50
Paving Subtotal
Drainage System Construction
18" Reinf Concrete Pipe, Str. Backfill L.F. 31 31.00
24" Reinf Concrete Pipe, Str. Backfill L.F . 268 36 .50
5' Curb inlet EACH 2 25 00 .00
Remove plug & connect to 24" RCP EACH 1 200.00
Silt Fence L.F. 1,160 2.00
Inlet Protection EACH 4 25.00
Trench Safety (storm drain) L.F . 299 0.50
Drainage System Subtotal
Water System Construction
6" PVC Water Line, Str. Backfill L.F. 3 18 22.00
6" PVC Water Line, Non-Str. Backfill L.F. 792 15.50
Fire Hydrant Assembly EACH 1 1800 .00
6" Gate Valve EACH 1 400.00
6"x 13" Anchor Coupling EACH l 100 .00
6"x 45 degree bend EACH 4 100 .00
6"x 1.5" tapped tee EACH l 150.00
Remove plug & connect to existing pipe EACH 2 200.00
1.5" Water Ser.> 10 ft (avg.= 37 ft .) EACH 9 700.00
1.5" Water Ser. <l 0 ft (avg.= 9 ft.) EACH 2 450 .00
l" Water Ser.> 10 ft (avg.= 50 ft.) EACH 1 550.00
Trench Safety (water line) L.F. 710 1.00
Water System Subtotal
Sewer System Construction
6" PVC, D -3 034, Str. Backfill L.F . 709 34.00
6" PVC, D-3034, Non-Str. Backfill L.F. 3 14 16 .5 0
6" PVC, D-2241 , Str. Backfill L.F. 10 35.50
6" PVC, D-2241, Non-Str. Backfill L.F . 10 17.50
Standard Manhole, 0-6 ft . deep EACH 1 1100.00
Standard Manhole, 6-8 ft . deep EACH 4 1300.00
Connect to existing manhole EACH I 400.00
4" Sewer Service :S 10 ft. (avg.= 7 ft.) EACH 7 200.00
4" Sewer Service > 10 ft . (avg. = 46 ft.) EACH 12 750.00
4" Sewer Service Type HI (R ~ViE "' 'FEG .F 1
I 750.00 r1R 1,043 Trench Safety (sewer line) 1.00
-----. -. _ ..Sewer System Subtotal
t 'e'o\JJYJ t:' I L~ l \Iv C To"tal o ruction Cost
II II n "' _,1'11'11'1
\JVL. I.I V £.UUU
Total
5,000.00
8,855 .00
7,976.00
11 ,733.00
2,400.00
10 ,967.00
45,359 .00
9,574 .50
9,332 .50
111,197.00
961.00
9,782.00
5,000.00
200.00
2,320.00
100 .00
149.50
18 ,5 12.5 0
6,996.00
12,2 76 .00
1,800 .00
400.00
100.00
400.00
150.00
400.00
6,300.00
900.00
550.00
710.00
30,982.00
24,106.00
5,181.00
355.00
175.00
1,100.00
5,200.00
400.00
1,400.00
9,000.00
750.00
1,043.00
48,710.00
209,401.50
,/) • { •• ·,, .... r!' .~ .... ~~·~:r-.·~'"-' ~rr.~-~; ( ...... -.i;,
COLLEGE STATION
fsteeple/pS/excel/estima
li,';,.J;~/; ·' ... ~/!:,~
~dy~ " " /i 0 ENGINEERING ~ . 7 17 oo
te and proposal
ENGINEERING REVIEW
COMMENTS No. 1
STEEPLECHASE SUBDIVISION PHASE FIVE
Final Plat
1. The plat adheres to the master development plan for Steeplechase dated
July 1998 and is acceptable as submitted.
Proposed Street and Utility Improvements
1. I quickly looked over the preliminary documents on Friday and everything
seemed ok. I will make a more detailed review this week.
Drainage Report
1.The drainage design for phase five was performed in the analysis for phases
one, two, and three. The supplemental data and drainage letter analysis
submitted are acceptable.
Reviewed by: Te~ Date: 06120100
ENGINEERlNG GOMMENTS 2
Proposed Street and Utility Improvements
~Sheet 1-show existing water line as 8". ~ Sheet 2-west side-show station at end of sidewalk.
~Sheet S-1-Typ. 28' Pvt. Section-Note on left side-illegible
4. The final submittal should be sealed by a Registered Professional Engineer.
Engineer's Estimate
/. !¢af'for drainage should be $18,512.50 .
J<"Add 4" service to lots 1 and 2.( Type Ill).
Reviewed by: Te~ Date : 06/22/00
ENGINEERING REVIEW
COMMENTS No. 1
STEEPLECHASE SUBDIVISION PHASE FIVE
Final Plat
1. The plat adheres to the master development plan for Steeplechase dated
July 1998 and is acceptable as submitted.
Proposed Street and Utility Improvements
1. I quickly looked over the preliminary documents on Friday and everything
seemed ok. I will make a more detailed review this week.
Drainage Report
1.The drainage design for phase five was performed in the analysis for phases
one, two, and three. The supplemental data and drainage letter analysis
submitted are acceptable.
Reviewed by: Ted M:.yo~
-=::::::-..::-·:;) ~ f r
Date: 06120100
.. ,
~ Qj-S::x:xJ'f 7
~fM
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION 3
Application is hereby made for the following development specific sire/waterway alterations:
ACKNOWLEDGMENTS:
I. John Puncum, General Partner . ~owner. hereby acknowledge or affirm that
BRAZOS TRIAD LAND DEVEIDPMENT PARTNERSHIP, LTD.
The information and conclusions contained in the above plans and supporting documents comply with the current requirements of
the City of College Station. Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards.
As a condition of approval of this permit application. I agree to construct the improvements proposed in this application according to
these documents and the requirements of Chapter 13 of the College Station City Code.
Property Owner(s) Contractor
CERTIFICATIONS: (for proposed alterations within designated flood haz.ard areas.)
A. L certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the l 00 year storm.
Engineer Date
B. L certify that the finished floor elevation of the lowest floor, including any
>asement. of any residential structure, proposed as part of this application is at or above the base flood elevation established in the
latest Federal Insurance Administration Flood Haz.ard Study and maps. as amended.
Engineer Date .. ~-· · . . . . ..:-~~~''O~'~~,~~
C . L Michael R. McClure, P .E. . certify that the alterations or development covered by this ~. • ••cre••:!°-1151 ~O
diminish the flood-Qil)'ing capacity of the waterway adjoining or crossing this permitted site and that such atl~~ns ~-9~. * 1~
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerninf. • ... .of..~~~-;~
floodwa~s and of fl y fringes l MI CH Ac:L Fl. McCLU.-::: ~ • f;e 1te ••t•t¥•f•QO •Q4i e O'l.tllll ,;l .. ,c;.q9 l ~J0"111 * fl~ ~'°&\ 3' 'f'..:J.O 0.rd-J ,, t., ~ !"~ ~.a o;,;.t~0 ·-~~.0.-0 ~!J.:i; ----------..----/i. L!_ •A •Qa\.:j/~7~';"'"Q) ~"'·"'
En . r D te i. > ~a e() ll"'•~..:~.t;.-~ .. ~ .....
a " "''O tv/U. f .:.} "'
~:'I .,,
D . L do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval:----------------------------
· n accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
• .rom construction. erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the
above named project. All of the applicable codes and ordinances of the City of College Station shall apply.
FINAL PLAT APPLICATION
FNLPAPP.DOC 3f25/99
3 of3
,
~ FOR OFFICE USE ONLY
-d P&Z CASE NO.: 5;~
DATE SUBMITTED:
FINAL PLAT APPLICATION
(check one) Minor __ Amending XX Final __ Vacating __ Replat
The following items must be submitted by an established filing deadline date for P & Z Commission consideration .
M1NIMUM SUBMITTAL REQUIREMENTS:
XX Filing Fee of$200.00 .
xx Development Permit Application Fee of $100.00 (if applicable).
_xx_ Infrastructure Inspection Fee of $300.00 (applicable if any public infrastructure is being constructed.).
_xx_ Application completed in full.
___xx_ Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
__ One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
XX Paid tax certificates from City of College Station, Brazos County and College Station I.S.D .
XX A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
XX Two (2)copies of public infrastructure plans associated with this plat (if applicable).
APPLICATION DATA
NAME OF SUBDIVISION STEEPLECHASE, PHASE FIVE
SPECIFIED LOCATION OF PROPOSED SUBDMSION Bounded by Navarro Drive to the northwest,
Steeplechase Phase Six to the southwest, Southwood valley Section 23 to the south east and
West Ridge Subdv. to the northeast
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name Brazos Triad Land Development Partnership, Ltd. Attn: Mr. John Duncum, Gen. Partn
Street Address 301 North Earl Rudder Freeway City Bryan, TX
Zip Code ------State TX 77802 E-Mail Address -------------
Phone Nwnber 823-8111 Fax Nwnber 776-3089 ------------------------------
PROPER1Y OWNER'S INFORMATION:
Name Same as above
Street Address -----------------City --------------
State Zip Code ______ E-Mail Address ·-------------
Phone Nwnber Fax Nwnber ------------------------------
ARCIDTECT OR ENGINEER'S INFORMATION:
Name McCLURE ENGINEERING, INC.
Street Address 1 008 Woodcreek. Ori ve
State _TX~--Zip Code 77845
City College Station
E-Mail Address rncclure@tca.net
693-2554 Phone Nwnber 693-3838 Fax Nwnber _ __:..:_________ -------------------
FINAL PLAT APPLICATION
FNLPAPP .DOC 3r2S/99
l of3
'fOTALACRES OF SUBDIVISION 7 .558 Ac.R-O-W ACREAGE 1 .27 Ac. TOTAL# OF LOTS 35 -----
NUMBER OF LOTS BY ZONING DISTRICT R-1 I 35 _ ___;/ __ _ ___;/ __
AVERAGE ACREAGE OF EACH RESIDENTIAL LOT BY ZONING DISTRICT:
R-1 I 0. 18 Ac. I ----/ --__ ! __
FLOODPLAIN ACREAGE none
PARKLAND DEDICATION ACREAGE _____ OR FEE AMOUNT ____ _
A STATEMENT ADDRESSING ANY DIFFERENCES BE1WEEN THE FINAL PLAT AND APPROVED MASTER
DEVELOPMENT PLAN AND/OR PRELIMINARY PLAT (IF APPLICABLE):
REQUESTED VARIANCES TO SUBDMSION REGULA TIO NS & REASON FOR SAME _______ _
REQUESTEDOVERSIZEPARTICWATION _____________________ _
TOTAL LINEAR FOOTAGE OF PROPOSED:
_9_._97_...r._.F __ STREETS
928 L.F. SIDEWALKS
1042 L.F. SANITARY SEWER LINES -----
1100 L.F. WATERLINES
0 CHANNELS
299 L.F. STORM SEWERS
BIKE LANES I PA TirS -~---
NOTE: DIGITAL COPY OF PLAT (IF APPLICABLE) MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, correct and complete. The undersigned hereby requests approval by the City of College Station
of the above identified final plat.
FINAL PLAT AP PUCA TION
FNLPAPP .DOC 3n5/99
Date
2 of)
McCLURE ENGINEERING, INC. ______ __
June 1, 2000 p
Mr. Ted Mayo, P .E .
Assistant City Engineer
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: Steeplechase Phase 5 Drainage Analysis
Dear Mr. Mayo:
Detention requirements and storm sewer design for Steeplechase Phase 5 were analyzed during the development of
Phases 1, 2 , and 3 . The report titled Drainage Report for Steeplechase Subdivision dated November 1998 and revised February
1999 developed the preliminary storm sewer design parameters for Steeplechase Phase 5.
A1 ~ ~etailed design of Phase 5 matches the original design assumptions for the drainage report with the exception of
changing the si ze of a storm sewer between inlets I and 2. The original study assumed a 24" RCP would be required, but an
18" RCP is appropriate. I have enclosed the revised Exhibit "C-3 " that reflects this change.
Should you have any questions or need additional information, please advise.
Sffiettek~
Steven C. Franks, PE
Des ign Engineer
Enclosure
1008 Woodcreek Drive , Suite 103 •College Station, Texas 77845
(979) 693-3838 •FAX (979) 693-2554 •email: mcclure@tca .net
e
0 < -~ u 0 z ~ ....
00 ~ ~ ~ ~ < = ~ ~ .~ ~ 0 0 fl}
~ ~ ~
~ ~ ~ ~
# # Ac. min yr
1 2 0.8 8.2 10
2 4 1.3 8.3 10
3 4 0.3 5.0 10
4 8 2.4 9.4 10
5 6 0.4 5.0 10
6 7 0.8 5.3 10
7 8 1.2 6.0 10
8 10 3.5 9.5 10
9 10 0.4 5.0 10
10 12 4.4 11.0 10
11 12 0.4 5.2 10
12 13 5.2 12 .0 10
13 14 5.2 12.3 10
14 18 6.4 22 .6 10
15 16 0.9 7.3 10
16 18 1.7 7.4 10
17 18 1.3 16.5 10
18 19 8 9.4 23 .0 10
198 HW 1 9.6 23 .2 10
25 26 0.8 6 .0 10
26 27 1.6 6 .1 10
27 33 1.6 6 .2 10
28 29 0.9 6 .3 10
29 32 1.8 6.4 10
30 32 1.2 16.5 10
318 32 0.3 5.1 10
EXHIBIT C-3
PIPE SIZE CALCULATIONS
STEEPLECHASE SUBDIVISION
= ~ .... = « fl}
~ ~ «
~ .... ~ ~ fl} Q. Q. ~ fl} ~ 0 "O ~ ~ ~ Q. 00 .... "O -fl} ....
~ ~ ~ = = .... ~ .~ ...... fl} « c,..,
"O ~ .:, ~ 0 ~ ....
~ ~ 0 "O 0 0 0 .... = --i,;;J ~ <~ z ~ ~
cfs cfs # cfs O/o "
7.2 9 .0 1 9.0 0.84
12.4 15.5 1 15.5 0.54
3.0 3.7 1 3.7 0.38
20 .9 20.9 1 20 .9 0.30
4 .5 5.7 1 5.7 0.89
9.0 11 .2 1 11 .2 0.58
12 .0 15.0 1 15 .0 1.03
30.9 30 .9 1 30 .9 0.25
4 .5 5.7 1 5.7 0.89
36 .5 36 .5 1 36.5 0.34
4 .1 5.1 1 5.1 0.27
41 .8 41 .8 1 41 .8 0.45
41 .5 41 .5 1 41.5 0.45
37 .2 37 .2 1 37 .2 0.36
8.5 10.7 1 10.7 0.52
16 .5 20.7 1 20 .7 0.96
8.8 11 .0 1 11 .0 1.26
54 .0 54 .0 1 54 .0 0.33
55 .0 55 .0 1 55 .0 0.34
8.1 10.2 1 10 .2 0.47
16.3 20.4 1 20.4 0.94
16.3 16.3 1 16.3 0.32
8.8 11 .0 1 11 .0 0.55
18.5 23 .1 1 23 .1 1.20
8.1 10 .1 1 10.1 1.06
3.5 4.4 1 4.4 0.52
*Includes 25% Flow In crease for pipe sizes <27" dia .
** See Plan & Profile for pipe slope used (Pipe slope >or= Friction slope)
= ~
0 ~ ~ z ~ ~ ~
00 ~
fps '
18 5.1 31
24 4 .9 313
15 3.0 31
30 4 .2 30
15 4 .6 84
21 4 .7 207
21 6 .2 22
36 4.4 397
15 4 .6 31
36 5.2 315
18 2.9 31
36 5.9 80
36 5.9 74
36 5.3 127
21 4.4 31
24 6 .6 22
18 6.2 128
42 5.6 44
42 5.7 222
21 4 .2 31
24 6 .5 24
27 4.1 152
21 4 .6 31
24 7.4 29
18 5.7 136
15 3.5 45
~ e "O ~ ~ = s ~ -~ ~ > @ 8 ~ ~ -~ ~ ~ ~
min min ' '
0 .10 8 .32
1.06 9.38
0.17 5.17
0.12 9.49
0.30 5.30
0.74 6.04
0.06 6.10
1.51 11 .01
0.11 5.11
1.02 12 .02
0.18 5.42
0.23 12.25
0.21 12.46
0.40 23 .02
0.12 7.37
0.06 7.43
0.34 16 .81
0.13 23.15
0.65 23 .80
0.12 6.10
0.06 6.16
0.62 6.78
0.11 6 .39
0.07 6 .46
0.4 0 16 .91
0.21 5.31
6/1/0 0
98 08 -dra.x ls
Exhibit C-3
0 < E-1 u z ~ ~ ~ E-1 ~ < ~ E-1 ~ 0 0 ~ c.I
E-1 E-1 E-1
# # Ac. min
32 33 3 .3 16.9
33 HW2 6 .1 17.3
398 438 0.4 5.4
40 41 0.3 5.4
41 42 1.1 6 .5
42 44 1.3 7 .2
438 44 1.6 8 .6
44 458 3.3 8 .8
458 468 4 .2 9 .3
468 50 4 .9 9.4
47 48 0 .5 5.0
48 50 1.2 6.4
49 50 0 .7 5.0
50 52 6 .8 9 .5
51 52 0.4 5.1
52 54 7.4 9.7
53 54 1.6 7 .8
54 55 9 .0 10.3
55 568 9.0 10.6
568 57 10.2 10.9
57 59 11.1 16.6
58 59 0 .6 5.9
59 60 12 .0 17.0
60 HW3 12.8 17.3
e
"" = .....
00
= t){) ·;;
~
~
yr
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
EXHIBIT C-3
PIPE SIZE CALCULATIONS
STEEPLECHASE SUBDIVISION
= t){) ·;; = «
~ t){) «
~ ·;; ~ ~ c. c. ~ "' ... = "O ~ ~ ~ ~ c. 00 ..... "O "" "' ~ ~ ~ = = ·~ ..... -~ = "' « ...
"O ::t .:. ::t = ::t .....
c.I ~ = "O = c::i = ... = -<~ ~ "" ~~ z ~
cfs cfs # cfs O/o "
22.4 22.4 1 22.4 0.35
40.6 40.6 1 40.6 0.68
3 .9 4 .9 1 4 .9 0.65
3 .7 4 .6 1 4 .6 0.58
10 .9 13.6 1 13.6 0.42
13.2 16.5 1 16.5 0.61
15.1 18.9 1 18.9 0.80
30 .1 30 .1 1 30 .1 0.62
37 .2 37 .2 1 37.2 0.57
43.4 43.4 1 43 .4 0.49
5.1 6 .3 1 6 .3 0.42
12 .3 15.4 1 15.4 0.53
7 .5 9.4 1 9 .4 0.41
59 .9 59 .9 1 59 .9 0.41
3.8 4 .8 1 4 .8 0.64
64.7 64 .7 1 64.7 0.48
100 22 .3 22 .3 1 22 .3 0.60
10 77.1 77 .1 1 77 .1 0.68
10 75 .9 75 .9 1 75 .9 0.32
10 84 .9 84 .9 1 84.9 0.40
10 76 .3 76 .3 1 76.3 0.32
10 6 .0 7 .6 1 7.6 0.60
10 81 .2 81 .2 1 81 .2 0.37
10 85 .9 85 .9 1 85 .9 0.41
*I ncludes 25 % Flow Increase for pipe sizes <27" dia .
•• See Plan & Profile for pipe slope used (P ipe slope >or= Fr iction slope)
== E-1 ~ ~ ~ z ~ ~ ~
00 ~
fp s '
30 4 .6 107
33 6 .8 108
15 4 .0 127
15 3.7 84
24 4 .3 199
24 5.2 65
24 6 .0 60
30 6 .1 208
33 6 .3 31
36 6 .1 27
18 3 .6 291
24 4 .9 230
21 3.9 277
42 6 .2 81
15 3.9 31
42 6 .7 227
27 5.6 178
42 8 .0 183
48 6.0 88
48 6 .8 142
48 6 .1 162
18 4 .3 202
48 6.5 132
48 6 .8 70
~ e "O
E::: = ~ ~ ~ > @ 8 ~
"" c.I ~ E-1 E-1
min min '
0.39 17.30
0.26 17.56
0.53 5.96
0.37 5.73
0.77 7.22
0.21 7.42
0.17 8.76
0.57 9.32
0 .08 9.41
0.07 9.48
1.35 6 .35
0.78 7.14
1.18 6 .18
0.22 9.70
0.13 5.26
0.56 10.26
0 .53 8.35
0 .38 10.64
0 .24 10.88
0 .35 11 .23
0.45 17.00
0 .79 6 .66
0 .34 17.34
0 .17 17.52
6/1/00
9808-dra .xls
Exhibit C-3
~
~
'