HomeMy WebLinkAbout59 Development Permit 637 Barkers Heating & CoolingDEVELOPMENT PERMIT
PERMIT NO. 637
BARKER'S HEATING & COOLING
FOR AREAS OUTSIDE TIIB SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF TIIB COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
400 GRAHAM ROAD
OWNER: Thomas Barker
3504 Green Tree
Bryan, Texas 77803
DRAINAGE BASIN: LICK CREEK
TYPE OF DEVELOPMENT: THIS PERMIT IS VALID FOR SITE CONSTRUCTION
ASSOCIATED WITH SITE IMPROVEMENTS FOR BARKER'S HEATING AND COOLING
PER APPROVED PLANS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall
be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All
development shall be in c dance with the plans and specifications submitted to and approved by the
City Engineer in the velop nt permit application for the above named project and all of the codes
---and ordinances of the of Lege Station that apply.
Date
Owner/ Agent Date
Contractor Date
Figure XU
Development Permit
City of College Station, Texas
Site Legal Descri ption : 4o? G~
Site Ownerlb\tOU!'AS ~
Arch i tec~_j_ ( /'
Engineer lil'bJt(Z.. ~f', U'.J.
Contractor:
------------~
Date Applicati on Fil ed : ~ • LO .... q'?(
fu. 0:-if'JT Av. ~ ~ A-G4
Address :~~ Gr~ 1f2a:,
T ele phone: r;tf~ ~~60
Address·:1'1D1 ~~ ~.~ ... [?
T e lephone No : Gft~. l { 00
Ad d ress :
-~~~~~~~~~~~-
Te 1 e phone No : __________ _
Application is here by made for th e fo llowing developm e nt specific waterway alterations :
~IQ~
0 Applica ti o n Fee ~OWN~
0 Signed Ce rtifications NA--
0 Drainage and erosion control plan , with supporting Drainage Report two (2) copies each .
0 Site and Construction Pl ans, with supporting Drainage Report two (2) copies each .
0 Other: -------------------------------
ACKNOWLEDGMENTS :
~.S g, ~esign engineer/owner, hereby acknowledge or affirm that :
The informatio n a nd conclu s ion s contain ed in the above pl a ns and supporting documents comply
with the current requirements o f the City of College St at ion , Texas City Co d e, Chapte r 13 and its
associated Drainage Policy and Des ig n Standards .
As a condition of approval of thi s pe rmit application, I ag ree to constru c t th e improvements
proposed in th is application according to these documents and the requirements of Chapter 13 of
the College St at ion Cit ~
~£~
Property Owner(s) Contractor
·' .. /t ...---------------------
DRAINAGE ANALYSIS FOR
PROPOSED COMMERCIAL
IMPROVEMENTS
BARKER'S HEATING &
COOLING
400 GRAHAM ROAD
COLLEGE STATION, BRAZOS COUNTY,
TEXAS
w
·' ,.
CERTIFICATION
I hereby certify that .this was prepared by me in accordance with
the provisions o f the Cities Drai n a g e Policy and Design Standards for
t h e owner s there o f.
By:
DRAINAGE ANALYSIS CERTIFICATION · BARKER 'S HEATING & COOLING
·' DRAINAGE ANALYSIS
BARKER'S HEATING & COOLING INC.
GRAHAM ROAD
COLLEGE STATION, BRAZOS COUNTY, TEXAS
MARCH, 1999
INTRODUCTION:
The site is located at 4 00 Graham Road and the legal
description is a 0.787 acre, Robert Stevenson Survey A-54. At
present there is an existing 2400 square foot one story
building and the associated infrastructure. The proposed
improvements include a 3000 square foot one story addition to
the existing building. The latest Flood Insurance Rate Maps
(48041C0182C) shows that no portion of the tract is in the
regulatory 100-year flood plain. The site is zoned commercial
and is being improved by Mr. Thomas R. Barker, 3504 Green Tree
Circle, College Station, TX 77845, 409.696.3660.
EXISTING STORM DRAINAGE:
At present storm water sheet flows to the east and south
sides of the 0.787 acre tract and along the east side there is
a drainage swale. From the topographic map provided by the City
and included with this analysis it appears that this swale ends
at the south fence line and the storm runoff is converted to
sheet flow which travels approximately 750 feet across an open
pasture in a southerly direction toward the south fork of Lick
Creek which is designated Drainage Basin No. 8, Regulatory
Channel Reach No. IV and is a primary channel. There are no
special constraints requiring onsite detention nor finished
floor elevation on Lick Creek as listed in the College Station
Drainage Policy and Design Standards, Section D. "Special
Drainage Basin and Channel Reach Design Standard", Page 10.
PROPOSED STORM DRAINAGE:
No changes to the existing drainage pathway are planned
for the development
Predevelopment:
QlOO = 0.3 * 11.64 in/hr. * 0.07 acres = 0.24 cfs
Post Development:
QlOO = 0.9 * 11.64 in/hr. * 0.07 acres 0.73 cfs
Increase in runoff:
0.73 cfs -0.24 cfs = 0.49 cfs
DRAINAGE ANALYSIS· BARKER'S HEATING & COOLING, INC.· PAGE 1of2 PAGES
There is sufficient distance from the proposed building
expansion to the adjacent downstream property to allow th e
increase of 0.49 cfs to convert to sheet flow and not impac t
the downstream properties and therefore no detention is planned
for this site.
CONCLUSION:
This project is in compliance with the City's Stormwater
Design Standards.
DRAINAGE ANALYSIS· BARKER'S HEATING & COOLING, INC.· PAGE 2 of 2 PAGES
I
I
I
I
i
!
I
I
7
·-·-·--·-.
\
' I \\ I
..... ) \ I
-_______________ ___..
..
I
(
\ / I
\'I \I
5. LlRAHAM RD I
DRAINAGE ANALYSIS
BARKER'S HEATING & COOLING INC.
GRAHAM ROAD REVIEWEB FOR
OMPLIANCE COLLEGE STATION, BRAZOS COUNTY, TEXA
MARCH , 1999 MAY 1 81999
INTRODUCTION :
COLLEGE S"l'AflON
The site is located at 400 Graham Road and Erq G ff"feERI~
description is a 0.787 acre , Robert Stevenson Survey A-~4 . At
present there is an existing 2400 square foot one story
building and the associated in frastructure . The proposed
improvements include a 3000 square foot one story expansion to
the existing building and a driveway to access the new
addition . The latest Flood Insurance Rate Maps ( 4 8041C0182C)
shows that no portion of the tract is in the regulatory
100-year flood p l ain . The site is zoned commercial and is being
improved by Mr. Thomas R . Barker , 3504 Green Tree Circle ,
College Station , TX 77845 , 409 .696 .3660.
EXISTING STORM DRAINAGE:
At present storm water sheet flows to the east and south
sides of the 0.787 acre tract and along the east side there is
a drainage swale . From the topographic map provided by the City
and included with this analysis it appears that this swale ends
at the south fence line and the storm runoff is converted to
sheet flow which travels approximately 750 feet across an open
pasture in a southerly direction toward the south fork of Lick
Creek which is designated Drainage Basin No . 8 , Regulatory
Channel Reach No. IV and is a primary c h annel . There are no
special constraints requiring onsite detention nor finished
floor elevation on Lick Creek as listed in the College Station
Drainage Policy and Design Standards , Section D. "Special
Drainage Basin and Channel Reach Design Standard", Page 10 .
PROPOSED STORM DRA INAGE :
The proposed improvements to the site consist of a 3000
square foot building expansion , an 1890 square foot driveway to
the building expansion and an 1800 square foot fire lane , which
increases the impervious area by 0 .15 acres . No changes to the
existing drainage pathway are planned for the development.
Predevelopment :
QlOO = 0 .3 * 11 .64 in/hr . * 0 .15 acres
Post Development:
QlOO = 0 .9 * 11 .64 in/hr. * 0 .15 acres
Increase in runoff :
1 .57 cfs -0 .52 cfs = 1 .05 cfs
0.52 cfs
1.57 cfs
DRAINAGE ANALYSIS -BARKER 'S HEATING & COOLING , INC . -PAGE 1 of2 PAGES
There is sufficient distance from the proposed
improvements to the adjacent downstream property to allow the
increase of 1 .05 cfs to convert to sheet flow and not impact
the downstream properties and therefore n o detention is planned
for this site .
CONCLUSION :
This project is in compliance with the City 's
Stormwater Design Standards .
DRAINAGE ANALYSIS -BARKER 'S HEATING & COOLING , INC . -PAGE 2 of 2 PAGES
~-~ UEVELUYMEN·r ~EKVICE~
TRANSMITTAL LETTER
(OlllC.l '>TAHON
Name/Firm : Municipal Devlopment Group , Bill Koehler Date: April 13, 1999
Address: 255 1 Texas Ave ., Suite Phone: ( 409)693-5359 #226
College Station , TX 77801 Fax: ( 409)693-4243
We are transmitting the following for Development Services to review and comment: (Check all that apply .):
0 Master Development Plan
D Preliminary Plat
D Final Plat
D FEMA CLOMA/CLOMR/LOMNLOMR
D Site Plan
D Grading Plan
D Landscape Plan
D Irrigation Plan
0 Building Construction Documents
w/ D Redlines
w/ D Redlines
w/ 0 Redlines
w/ D Redlines
w/ D Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set :
D Waterline Construction Documents w/ 0 Redlines
0 Sewerline Construction Documents w/O Redlines
D Drainage Construction Documents w/ D Redlines
D Street Construction Documents w/ 0 Redlines
D Easement application with metes & bounds decsription
D Drainage Letter or Report w/ D Redlines
D Fire Flow Analysis w/ D Redlines
Special Instructions:
Attached to each permit application copy are :
S ite Plan , Son ic
Grading Plan, Sonic
Traffic Control Plan , Sonic
TRANSMITI AL LElTER
TRANSMIT.DOC 03n3199
D Development Permit App .
0 Conditional Use Permit
D Rezoning Application
0 Variance Request
D Other -Please specify
W TxDOT Driveway Permit
0 TxDOT Utility Permit
D Other -Please specify
I of I
>
>
HESTER ENGINEERING COMPANY
Civil Engineering Services [Srnuurnw @[? uW&[m~GYJDuu&[S
7607 Eastmark Dr ive Suite 253-B
COLLEGE STATION , TEXAS 77840
PHONE (409) 693-1100 FAX (409) 693-1075
E-mail: hec2000@aol.com
LQ~\
JOB NO.
WE ARE SENDING YOU ----S Attached D Under separate cover via __________ the following items:
COPIES
D Shop drawings
D Copy of letter
DATE NO .
D Prints D Plans
D Change order D
THESE ARE TRANSMITIED as checked below:
D For approval
D For your use
D As requested
D Approved as submitted
D Approved as noted
D Returned for corrections
D Samples D Specifications
D Resubmit ____ copies for approval
D Submit ____ copies for distribution
D Return ____ corrected prints
~ For revie w and comment 0--------------------------~
D FOR BIDS DUE----------------D PRINTS RETURNED AFTER LOAN TO US
REMARKS __________________________________________ _
-