Loading...
HomeMy WebLinkAbout55 Development Permit 624 Hotel Conferece CenterMUNICIPAL DEVELOPMENT GROUP 255 1 Texas A ve. South , S te. A •College Sta ti on , Texas 7784 0 • 4 09-693 -5359 •FAX: 409-693-4 243 •E-mail: mdgcs@gte.n et Eng in eerin g, Surveying , Planning and Environmental C o ns ul ta nts January 15 , 19 99 Bill Riley, Division Manager City of College Station 1601 Graham Road College Station, T X 778 4 5 Re: Hotel/Conference Center -Existing 18" VCP Sewer MDG Job No. 000657-2969 Dear Bill : The abo v e referenced line was video from MH043 (0 .0) to MH020 (565 .0) on October 7, 1998 . Our considered portion of the line is from MH043 to our proposed manhole located at (343 .0). Locations of failure in the line , whether structural our III, was classified as light or moderate . Light failure indicates insignificant root penetrations or minor to hairline cracking . Moderate failure indicates misalign joints, clumps of roots, and continuous cracking in a joint of pipe. Below is a summation of the condition of the existing 18 " VCP sanitary sewer line . STA DESCRIPTION 57 .5 59 .6 110.4 121.7-142.5 153 .3-174.0 195 .0 274.4 284 .0 297.4 343 .0 Moderate cracking at joint, (under Dartmouth St.); Misalign joint, (under Dartmouth St.); Misalign joint, (under Dartmouth St.); Moderate cracking in joints of pipe, (under Dartmouth St.); Moderate cracking in joints of pipe; Light protrusion of roots through pipe joint; Moderate invasion of roots through pipe joint; Moderate invasion of roots through pipe joint; Light protrusion of roots through pipe wall ; Proposed Manhole # l From our review, it is of our opinion that the 18 " VCP sanitary sewer line is useable in its current condition . Only light to moderate cracking or displacement has occurred and therefore minimal VI should occur. In addition the pipe has a minimum of 10 ' of co ver over it. At this depth , the line should be well protected from an y construction loads experienced . Please feel fre e to call me if you ha v e any questions . 000 657-c .14 .doc :VID G-1 .. ... - North B. Bardell, Jr., P.E . RM/tm Cc : Veronica Morgan, City of College Station Rick Ferrara, Richard Ferrara Architects , Inc . 000657-c.14 .doc \IDG · 2 LOOK IN CONFIDENTIAL BINDER FOR OTHER SUPPORTING MATERIAL Figure XII Development Permit City of College Station, Texas Site Owner: ~/..!&t,&Ff.N(.1£ (E..J,n!Q(. l''"{rT'i or-Co1..1..e.6{r-S"f4'11~"" Arch itect/ Engineer : rduNJC tfftL 1Aw8...ofrY!oo fuue Date Application Filed : -------- Address :-~"---------­ Telephone: ----------- Address : Z.951 7tXAs AV'f". 5 . 5te. A Telephone No :~{L/cA) f.lf8-S?:>'S9 Address : -----------~ Telephone No : ---------- Approved : __________ _ Application is hereby made for the following development specific waterway alterations : Gus. Bds1N OF tA.bc...F PEN l'eeo< A1 JHe. SouT/,/ WE.$7 (ot:N 8t oE Application Fee Signed Certifications Drainage and erosion control plan, with supporting Drainage Report two (2) copies each . Site and Construction Plans, with supporting Drainage Report two (2) copies each . Other: ----------------------------~ ACKNOWLEDGMENTS : , des ig n engineer/a~ hereby acknowled ge o r affirm that : The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design St a nd a rds . As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Code. Property Owner(s) Contractor Figure Xll Continued CERTCFICATIONS : (for proposed alterations with in designated flood hazard area s.) A. I , ~€:n·\ e,. iSf\'f.OEU,.~ , certify that: any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm . lf/Hlt;> B _ ~ t ~ .t-~, !fq=-s Engineer ~ Date B . I, ND1'm ~. ~fffil.. J ~-, certify th a t the finished floor elevatio~. of the . lo":est . floor, including any basement , of any residential structure, proposed as part of this application is a t or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . ~-6.~J. I Engineer Date 7 C I, Nol1\.\ ~. ~\.l..1 Jc. , certify that the alterations or development covered by t hi s permit shall not diminish the flood-carry ing capac ity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City o f College Stat ion City Code, Chapter 13 concerning encroachments of flood ways and of flood ;/? frin~7 · "l~-t. ~_j_ ~ Z-?/f"'/"$' Engineer . Date I, Not.i\i\ ~. ~,"Je. , do certify that the proposed alterations do not raise the level of the l 00 year flood above elevation established in the latest Federal Insurance Administration Flood Haza(d Study. n::tfvi3. ~j t 1tv. 2-j 1-N'i? Engineer Date C onditions or c omments as part of approval: ~~~~~~~~~~~~~~~~~~~ In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . -- I hereby grant this permit for de velopment. All de velopment shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . FINAL DRAINAGE REPORT F OR THE HOTEL CONFERENCE CENTER DRAINAGE IMPROVEMENTS COLLE GE STATION, BRAZOS COUNTY, TEXA S OCTOBER, 1998 I l{J I •I~ 2551 TEXAS AVENUE . SOUTH, STE. A l j ~I COLLEGE STATION, TEXAS 77840 Ph : (409)693-5359 Fx: (409) 693-4243 Consulting Engineers · Environmental· Surveyors· Planners TABLE OF CONTENTS 1.0 PROJECT SCOPE ................................................................................................. 4 I . I SITE LOCATION .................................................................................................... 4 I .2 GENERAL DESCRIPTION ..................................................................................... 4 2.0 DRAINAGE BASINS & SUB-BASINS ................................................................. 5 2 . I MAJOR DRAINAGE BASIN DESCRIPTIONS ...................................................... 5 2.2 SUB-DRAINAGE BASIN DESCRIPTIONS ........................................................... 5 3.0 DRAINAGE DESIGN CRITERIA & CONSTRAINTS ....................................... 6 3. I STREET DRAINAGE ............................................................................................. 6 3.2 STORM SEWER INLETS ....................................................................................... 7 3.3 STORM SEWER SYTEMS ..................................................................................... 7 3. 4 OPEN CHANNELS ................................................................................................. 8 3.5 CULVERTS ............................................................................................................. 9 3.6 DETENTION FACILITIES ..................................................................................... 9 4.0 DRAINAGE SYSTEM MODELING .................................................................... 9 4 . I STREET DRAINAGE ........................................................................................... IO 4 .2 STORM SEWER INLETS ..................................................................................... IO 4 .3 STORM SEWER SYSTEMS ................................................................................. IO 4 . 4 OPEN CHANNELS ............................................................................................... I 0 4 .5 CULVERTS ........................................................................................................... I I 4 . 6 DETENTION FACILITIES ......... , ............. : ........ • ............ · ....................................... I I 5.0 EXISTING DRAINAGE CONDITIONS ....... : .................................................... I I 5. I STORM SEWER INLETS ..................................................................................... I2 5.2 STORM SEWER SYSTEMS ................................................................................. 13 6.0 CONCLUDED DRAINAGE IMPROVEMENTS ............................................... I4 6.1 STORM SEWER INLETS ..................................................................................... 14 6.2 STORM SEWER SYSTEMS ................................................................................. 15 6.3 DETENTION FACILITIES ................................................................................... 17 APPENDIX A -EXISTING HYDRAULIC COMPUTATIONS APPENDIX B -PROPOSED HYDRAULIC COMPUTATIONS APPENDIX C -MAPPING I I I I LIST OF TABLES DESCRIPTION PAGE NO. TABLE #1 -Existing Curb Inlet (10-Year) ................................................................... 12 TABLE #2 -Exist . Storm Sewer (10-Year) .................................................................. 13 TABLE #3 -Existing & Proposed Inlets (10-Year) ....................................................... 15 TABLE #4 -Prop . Storm Sewer (10-Year) ................................................................... 16 I I I I Hot el Conferen ce Center Drain age Impro ve m ents 1.0 PROJECT SCOPE Municipa l Developm ent Group This report outlines the drainage improvements for the Hotel Conference Center site and facilities . This drainage report will consist of the requirements necessary for the improvements of this site in accordance with the provisions of the City of College Station Drainage Policy and Design Standards . 1.1 SITE LOCATION The project is located on ·the southwest corner of the intersection of Holleman Drive and Dartmouth Street which both are classified as minor arterial streets. The proposed Hotel Conference Center is located in the special district of the Wolf Pen Creek Development Corridor. Surrounding existing developments immediately adjacent to the project site are ; City of College Station Fire Department station to the west, the Richards Addition to the south and southwest , and Jefferson Ridge to the immediate south . Across Holleman Drive to the north is Wolf Pen Creek and across Darthmouth to the east is the Wolf Pen Creek Park. 1.2 GENERAL DESCRIPTION The subject property , being a 13 .19-acre tract, is currently vacant. This land generally slopes to the northeast with a grade of approximately 6 .55% being fairly uniformly distributed . This site is currently unimproved with native grasses, weeds, and light underbrush and heavily vegetated with large trees. The project site is at the mouth of a sub-drainage basin located within the Wolf Pen Creek watershed , being 49.55-acres. Runoff drains off the site from a double barrel 36" RCP under Holleman Drive and two separate 24" and 33" RCP 's under Dartmouth Street. All drainage structures drain directly into the Wolf Pen Creek. Thence runoff is carried by the confluence of Wolf Pen Creek to Carter Creek. This site is in the Wolf Pen Creek sub-drainage basin, which is a part of the Carter Creek drainage basin . 000657-2969 Drainage Report .d oc Final Drainage Report -4 I I I I Hot el Conferen ce Center Draina ge Improvem ents 2.0 DRAINAGE BASINS & SUB-BASINS 2 .1 MAJOR DRAINAGE BASIN DESCRIPTIONS Muni cipa l Development Group The drainage improvements project site is contained within the drainage- watershed of the Carter 's Creek Drainage Basin . This drainage basin is illustrated on Exhibit #1 -"Carter 's Creek Drainage Basin" located in Appendix C -Mapping. The borders of this drainage basin roughly consist of Rock Prairie Road on the south and west, State Hwy No 30 to the east , and State Hwy No. 21 to the north . The secondary drainage system of Wolf Pen Creek is illustrated on Exhibit #2 -"Wolf Pen Creek Sub -Drainage Basin" located in Appendix C -Mapping . Recentl y, the Wolf Pen Creek sub-drainage basin has been studied for siltation problems and updating of flood data . The problems with siltation within the Wolf Pen Creek watershed was studied and reported by Turner Collie & Braden, Inc ., in their WPC Siltation Study, dated October of 1997 . Also , the WPC has been analyzed to update FEMA, FIRM mapping by Nathan D . Maier Consulting Engineers , Inc . Their flood study of Jul y 1998 has not yet at this time been approved by FEMA, but will be used in reference to all drainage calculations and mapping. 2 .2 SUB-DRAINAGE BASIN DESCRIPTIONS The sub-drainage basin that will determine all drainage calculations will consist of the 13 .19-acre tract and the upstream sub-drainage basin of thi s drainage-way into the Wolf Pen Creek. The conference center sub- drainage basin will be analyzed in two separate drainage configurations . Initially the sub-basin will be examined at the current pre-development conditions . This analysis will provide for accurate pre-development runoff values and current conditions of existing drainage structures . An illustration of the pre-development drainage basin is illustrated on Exhibit #3 -"E xisting Drainage Area Map". Results of these calculat ions are shown in Section 6 .0 . Next, the sub-basin was reconfigured to match 000657-2969 Drainage Report.doc Fina l Drainage Re port -5 I I Hotel Conference Center Draina ge Impro ve m ents Municipal Development Group drainage patterns of the proposed site grading . New coefficients of runoff were established with associated runoff values . From these computations the existing drainage structures were analyzed and on-site storm sewer designed . The new sub-drainage basin is illustrated on Exhibit #4 - "Proposed Drainage Area Map". Results of these calculations are shown in Section 6 .0 . Portions of the project site are located within the 100-year floodplain as shown on the Flood Insurance Rate Map , (FIRM) Map No. 48041C0144 C having an effective date of July 2 , 1992 . Also , some of the floodway extends onto the proposed development site . An excerpt of the FIRM map with the location of the project site is illustrated on Exhibit #4 -"FIRM Map" located in Appendix C -Mapping. As mentioned before in Section 2 .1 the N .D .M . study will ultimately determine the flood parameters for this project. 3.0 DRAINAGE DESIGN CRITERIA & CONSTRAINTS For all development within the City of College Station, there are criteria on the use of which design storms and development conditions for type of drainage improvements . Below, in each type of improvement, the required design constraints are more fully detailed . All drainage improvements shall also be anal yzed during the 100-year rainfall event to insure that no adverse conditions will ex ist. 3 .1 STREET DRAINAGE Street drainage improvements shall be designed in accordance to the City of College Station 's Drainage Policy and Design Standards . Unless otherwise stated, the following constraints shall dictate the design of all street grading and drainage : •!• All proposed streets shall have curb and gutter. 000657-2969 Drainage Report.doc Final Drainage Re port - 6 I I I I I Hot el Conferen ce Ce nter Drainage Improvem ents •!• ·:· ·:· •!• Municipal Development Group Maximum velocity not to exceed 10 ft/sec and minimum slope of 0.4%. Concrete valley gutters shall be placed at all roadway intersections where runoff is carried from one side of the roadway to the other . The 100-year rainfall event shall be confined within the limits of the street right-of-way . All streets permissible spread of water shall be dictated by the 10-year rainfall event. For each class of street, the following conditions will control : };;;> Arterial & Parkway-One clear lane in each direction 24 foot total clearance at center of street. };;;> Collector & Commercial -One clear lane 12 foot total clearance at the center of the street. };;;> Local -Depth of water not to exceed the top of curb or crown , whichever is less . 3 .2 STORM SEWER INLETS Storm sewer inlets shall be designed in accordance to the City of College Station 's Drainage Policy and Design Standards. Unless otherwise stated, the following constraints shall dictate the design of all storm sewer inlets : •!• Inlets on all streets, except for residential , shall be recessed with a minimum 4" depression . •!• Curb openings shall be a minimum length of 5 feet. •!• Inlets with greater than a 5" gutter depression on streets with less than a 1. 00% grade shall be designed in sump conditions . •!• Inlets at bridges and culvert structures shall be oversized to accommodate 125% of the IO-year rainfall event. •!• Ponding at curb inlets shall not exceed 18 " in depth . 3.3 STORM SEWER SYSTEMS Storm sewer system improvements shall be designed in accordance to the City of College Station 's Drainage Policy and Design Standards . Unless otherwise stated, the following constraints shall dictate the design of all storm sewer systems : •!• Minimum velocity allowed is 2.5-ft/sec and maximum velocity allowed is 15 ft/sec during the 10-year rainfall event. •!• When a change in pipe or boxes size is required , the soffit or top respectively will match and a junction box shall be provided for at these points . 000657-2969 Drainage Report .doc Final Drainage Report -7 I I I Hot el Conferen ce Center Drain age Improvem ents Muni cipa l Developm ent Gr oup 3.4 •!• Maximum spacing of manholes shall be 300 feet for pipes of 54 " diameter or smaller . Maximum spacing of manhole shall be 500 feet for pipes greater than 54 " diameter . •!• Minimum storm sewer pipe diameter of 18 ". Short laterals adjacent to inlets may be 12 " in diameter . •!• Conduits of 24" or less shall be designed with the assumption of a 25% reduction in cross-sectional area. •!• At all inlets, manholes, and junction boxes an elevation drop of 0 .1 feet minimum will be necessary . •!• The theoretical hydraulic grade line for the 10-year rainfall event shall be a minimum of 0 .5 feet from the flowline of any curb inlet in the system . •!• The minimum width of any easement for a storm sewer system shall be 15 feet, and the centerline of the storm sewer shall be at least 5 feet from the closest side of the easement. OPEN CHANNELS Open channel improvements shall be designed in accordance to the City of College Station 's Drainage Policy and Design Standards . Unless otherwise stated , the following constraints shall dictate the design of all open channels : •!• Minimum grade shall be 0.4% for earth or vegetative lined channels . •!• Channel capacities shall be dictated by the design storm of the 25-year rainfall event. •!• Low-flow pilot channels shall be required for grass-lined channels with a carrying capacity of 1/3 of the peak discharge of the 5-year rainfall event. •!• Minimum permissible velocity of 2 .5 ft/sec during the 25-year rainfall event. •!• Maximum channel velocities shall be as dictated below : ~ Exposed earth at 3.0 ft/sec . ~ Seeded grass at 4.5 ft/sec . ~ Sodded grass at 6 .0 ft/sec . ~ Impermeable surface at 10 ft/sec . •!• Maximum side slope for grass-lined earth channel is 3 : 1. •!• Channels with trapezoidal cross-section shall have a minimum bottom width of 4 feet . •!• Channel shall have a minimum freeboard of 0 .5 feet. •!• The 100-year rainfall event shall be contained within the channel drainage easement. •!• Minimum drainage easement width shall be the channel 's top width plus 20 feet. 000657-2969 Dra in age Rep ort .doc Final Drainage Rep ort -8 I I Hot el Conferen ce Center Drainag e Improvem ents Municipal Development Group 3 .5 CULVERTS Culverts shall be designed in accordance to the City of College Station 's Drainage Policy and Design Standards . Unless otherwise stated , the following constraints shall dictate the design of culverts : •:• The design discharge for culverts shall be the 25-year rainfall event unless under a residential street in the secondary drainage system . Then the 10-year rainfall event will be the design storm . •:• Maximum headwater elevation shall be one foot less than the top of curb elevation . •:• Maximum overflow into the street shall be 2 feet in depth from the lowest point in the roadway profile . Overflow shall not exceed design conditions for street drainage . •:• The maximum allowable discharge into channels are as follows : ~ Natural channel or seeded cover at 6 .0 ft/sec . ~ Sodded cover at 8.0 ft/sec . ~ Impermeable surface at 15 ft/sec . 3.6 DETENTION Detention shall be designed in accordance to the City of College Station 's Drainage Policy and Design Standards . Unless otherwise stated , the following constraints shall dictate the design of detention basins : •:• Detention facilities shall have the capacity to contain the 100-year rainfall event. •:• Maximum detention basin 's side slope shall be 4 : 1 with vegetative cover and 2 : 1 for non-vegetative cover. •:• Bottom slopes of the detention basin with vegetative cover shall be at a grade of 20 : 1 with low-flow pilot channels . •:• Minimum of 0.5 feet of freeboard during the 100-year rainfall event. •:• Detention facilities other than parking lots and rooftops shall have an increased capacity of 10% to allow for sedimentation. 4.0 DRAINAGE SYSTEM MODELING For all drainage system modeling , the volume of runoff will be calculated. The drainage area calculations are summarized accordingly using the Rational Method : (Q =CIA) where "Q" is the runoff in cubic feet/second , "C" is the runoff coefficient, "I" is the storm intensity in inches/hour for each selected frequency , 00 06 57-2969 Drainage Report.do c Final Drainage Report -9 I I I I I Hotel Co nferenc e Center Drainage Improvem ents Municipal Developme nt Group and "A" is the drainage area in acres . A m1mmum 10-minute time of concentration for all calculations will be assumed . The selected frequencies will be 2, 5, 10 , 25 , 50 , 100-year rainfall events . 4 .1 STREET DRAINAGE Street flow calculations are aided by the program FlowMaster v. 5.7 by Haestad Methods . Within this program basic geometry and characteristics of a proposed or existing curb & gutter street can be defined . From this information, Manning's formula is then used to calculate desired parameters of the street. 4 .2 STORM SEWER INLETS Storm sewer inlets are a part of the storm sewer system evaluation . As mentioned above, this was done with the (TxDOT) hydraulic program WinStorm v . 1.3 . Derivatives of Manning 's formula are used within this program, pending on the geometry of the curb inlet and the condition of flow , to size inlets accordingly to the permissible spread of water on the street. 4 .3 STORM SEWER SYSTEMS Storm sewer system are evaluated with (TxDOT) hydraulic program WinStorm v. 1.3 . Within this program, basic geometry and characteristics of a storm sewer system can be defined . This would include data such as drainage basin calculations, type and configuration of several types of inlet bo xes , and controlling factors of the conveyance system . From this program critical information can be determined about the storm sewer system . 4 .4 OPEN CHANNELS Open channel hydraulic calculations are aided by the program FlowMaster v. 5.7 by Haestad Methods. Within this program, basic geometry and 000657-2 969 Drain age Rep ort .doc Final Drainage Report -10 I I Hot el Conference Center Dra in a ge Impro ve m ents Muni ci pal Development Group characteristics of a proposed or existing channel can be defined . From thi s information, Manning 's formula is then used to calculate des ired parameters of the open channel. 4 .5 CUL VER TS Culverts are evaluated one of two ways : Short, singular culverts are calculated with the Texas Department of Transportation (TxDOT) hydraulic program Culverts v . 1.0 . Within this program, basic geometry and characteristics of a culvert can be defined . This would included data such as tailwater, geometry, and entrance/exit losses . For each culvert investigations will be made in order to det ermine w hether it is inlet or outlet controlled . For longer more complex culvert with bends and grade transitions the program StormCad v. 1.0 by Haestad Methods will be used . 4 .6 DETENTION Detention requirements are determined by graphical means . Tabulations of the pre-development and the post-development hydrographs of the drainage areas are provided . The hydrographs are based on the standard SCS unit hydrograph with time to peak discharge set to equal the time of concentration and the total base time set at 3 . 00 times the time of concentration . 5.0 EXISTING DRAINAGE CONDITIONS The upstream drainage basin for the Hotel Conference Center site consisted of three existing and independent drainage systems . The first is along the southeast side of Holleman Dr. It consist of a series of storm sewer lines and curb inlet s that collect runoff which discharges into the Wolf Pen Creek. The next system is along the west side of Dartmouth St . It collects runoff from the Troy Subdi v ision 000657-2969 Drainage Report.d oc Final Drainage Report -11 Hote l Co nferen ce Center Dra in a ge Improvem ents Muni cipal Development Group and Manuel Dr and discharges runoff through existing storm sewer under Dartmouth and into the Wolf Pen Creek lake . The last system is a smaller portion of Dartmouth that collects a small amount of surface runoff and discharges into the existing box culvert under the intersection of the two streets . Below in each section the existing storm sewer systems were analyzed for current performance . 5 .1 STORM SEWER INLETS Below is a summary of the existing curb inlets and existing conditions during a 10-year rainfall event. The 100-year rainfall event was also analyzed , but is not summarized in this report . For information on this storm event refer to calculation reports in Appendi x A -"E xisting H ydraulic Computations". TABLE #1-EXISTING CURB INLETS (10-YEAR) CURB MAX. OIFF. PONDlNG TOTAL INLET CURB l.D. A1 A2 A3 A4 AS A6 A7 A9 A10 A14 A15 FLOWLINE HGL (FL-HGL) WlDTH DEPTH Q CAPACITY (ft) (ft) (ft) (ft) (ft) (cfs (cfs) EXISTING HOLLEMAN DR. SYSTEM 296 .700 294.241 2.459 18.153 0.46 30 .188 290 .890 287 .779 3.111 16 .657 0.42 23 .873 291.460 289 .065 2 .395 11 .185 0 .28 8.072 281.000 279.045 1.955 18 .114 0 .46 26.610 279 .040 276 .819 2 .221 14 .059 0.36 13 .397 273 .700 271 .014 2 .686 13 .114 0.33 11 .100 273.460 271.770 1.690 13 .074 0.33 11 .040 270.190 267 .089 3.101 13 .350 0.34 7.713 270 .040 266 .600 3.440 9 .649 0.25 3 .175 EXISTING DARTMOUTH ST. SYSTEM #1 270.050 268 .249 1.801 8.704 0.22 6 .029 EXISTING DARTMOUTH ST. SYSTEM #2 267.590 264.394 3 .196 8.350 0.21 3.793 ~ All of the existing curb inlets on the Holleman Dr. system are undersized and therefore have a high carryover Q to the next downstream inlet. This is primaril y evident on the upstream portion . By the time runoff gets to the last few curb openings the 16 .953 14 .940 3.376 13 .788 11.037 9.744 9.710 6 .727 3.175 35 .014 35 .014 000657-2969 Drainage Report.doc Final Drainage Report -12 Hotel Co nference Cent er Drainage Improvements Mu nici pa l Developm ent Group curb inlet system has "caught up " and is properly draining the street. Several of the curb inlets for the Hollman Dr system exceed the maximum allowable ponding width for this classification of street. Maximum poinding width is 8 ' on both sides to provided for a 24 ' clear lane down the middle of the street. Both systems on Dartmouth street are functioning within design criteria. 5.2 STORM SEWER SYSTEMS Below is a summary of the existing storm sewer conveyance element s and existing conditions durin g a 10-year rainfall event. The 100-year rainfall event w as also analyzed , but is not summarized in this report . F o r informat ion on this storm event refer to calculation reports in Appendi x A -"E xisting Hydraulic Computations". TABLE #2 -EXISTING STORM SEWER SYSTEM ( PIPE CONDUIT TOTAL RUN S IZE GRADE VELOCITY Q 1.0 . (in) (%) (ft/sec) lcfs) EXISTING HOLLEMAN DR. SYSTEM 1 21 3.113 12 .88 30 .188 2 24 1.499 9.86 30.188 3 24 1.696 12 .23 37.438 4 18 0.565 4 .76 8.072 5 30 2 .787 9.99 47.787 6 30 1.967 13 .07 64.094 7 33 1.205 11.11 64.271 8 18 1.131 6 .52 6 .344 9 36 0 .722 11.15 76.802 10 36 0 .891 9.72 137.480 EXISTING DARTMOUTH ST. SYSTEM #1 1 33 1.446 7.73 45.892 2 24 3.669 9.18 23.200 3 24 1.053 8.43 23 .200 4 24 5.671 8.95 23.200 5 18 4.844 14 .91 23.200 EXISTING DARTMOUTH ST. SYSTEM #2 1 24 0 .780 1.21 3.793 000657-2969 Drainage Report.doc Final Drainage Report -13 Hotel Conferen ce Center Drainage Impro vements Muni ci pal Development Group All of the three systems were analyzed under inlet control. Therefore, the outlet tailwater is either surcharged or equal to the soffit elevation . For the Holleman Dr system the outlet is surcharged and the tailwater elevation is equal to the creek level at either the 10-year or 100-year rainfall event. For both of the Dartmouth St systems the tailwater elevation is equal to the soffit. The storm sewer system along Holleman Dr is currently operating within the City of College Station design constrains and criteria, but they are surcharged . Both Dartmouth St. systems are operating within the City of College Station design constrains and criteria. 6.0 CONCLUDED DRAINAGE IMPROVEMENTS The proposed drainage system for the Hotel Conference Center project consist of the same three drainage system , but somewhat rerouted to direct runoff to Dartmouth instead of Holleman Dr. 6 .1 STORM SEWER INLETS Below is a summary of the existing and proposed curb inlets and proposed conditions during a 10-year rainfall event . The 100-year rainfall event was also analyzed, but is not summarized in this report. For information on this storm event refer to calculation reports in Appendix B -"Proposed Hydraulic Computations". 000657-2969 Drainage Report.do c Final Drainage Report -14 Hot el Conference Center Drainage Improvements TABLE #3-EXISTING & PROPOSED INLETS (10-YEAR) Muni ci pa l Development Group INLET MAX. DIFF. PONllNG TOTAL INLET INLET FLOWLINE HGL (FL-HGL) WIDTH DEPTH Q CAPACITY 1.0 . ' (ft) (ft) (ft) (ft) ~:. (ft) ;_t Ccfs (cfs) PROPOSED HOLLEMAN DR. SYSTEM A1 296.700 294.241 2.4S9 18 .1S3 0.46 30 .188 16.9S3 A2 290.890 287.779 3.111 16 .6S7 0.42 23 .873 14 .940 A3 291.460 289.0GS 2 .39S 11 .18S 0 .28 8.072 3 .376 A4 281.000 279.04S 1.9SS 18 .114 0.46 26 .610 13 .788 AS 279.040 276.819 2 .221 14.0S9 0 .36 13.397 11 .037 A6 273.700 271 .014 2 .686 13 .114 0 .33 11 .100 9 .744 A7 273.460 271 .770 1.690 13 .074 0 .33 11 .040 9.710 A9 270.190 266.917 3 .273 13 .3SO 0.34 7 .713 6 .727 A10 270.040 266.600 3.440 9 .649 0 .2S 3.17S 3.17S 81 280.720 277.164 3.S56 N/A 0 .37 11.073 17.463 82 277.330 277.637 -0.307 NIA 0 .33 7 .610 14 .188 PROPOSED DARTMOUTH ST. SYSTEM #1 A12 286.160 282.4S2 3.708 NIA 0.38 12 .761 18 .629 A14 270 .0SO 268 .737 1.313 8.704 0 .26 6 .029 3S .014 AB 277 .800 272.1S4 S.646 NIA 0 .76 46.922 2S.103 C1 272 .2SO 269.849 2 .401 NIA 0 .32 6 .697 13.097 C2 274 .030 270.323 3 .707 N/A 0 .28 8.039 6 .7S8 C3 273 .370 270.6S7 2 .713 NIA 0 .3S 9.S79 6 .822 cs 272 .670 270.91S 1.7SS NIA 0 .3S 11.S30 19 .646 C7 276.420 271 .382 S.038 NIA 0 .28 S.792 4.4SS C9 278 .BSO 273 .862 4 .988 N/A 0 .19 1.821 1.398 C 11 279 .000 274 .347 4 .6S3 N/A 0 .17 8.S97 5.546 PROPOSED DARTMOUTH ST. SYSTEM #2 A15 267.590 264.380 3 .210 NIA 0 .12 7.491 13 .097 D1 269.420 264 .895 4 .525 9 .350 0 .35 2 .018 35 .014 6 .2 STORM SEWER SYSTEMS Below is a summary of the proposed storm sewer conveyance elements and proposed conditions during a 10-year rainfall event. The 100-year rainfall event was also analyzed, but is not summarized in this report . For information on this storm event refer to calculation reports in Appendix B -"Proposed Hydraulic Computations". 000657-2969 Drainage Report .doc Final Drainage Re port -15 Hot el Conference Center Drainag e Improvements Municipal Development Group TABLE #4-PROP. STORM SEWER (10-YEAR) PIPE CONDUIT T OTAL RUN SIZE GRADE VELOCITY Q l.D. (in) (%) (ft/sec) Ccfs) PROPOSED HOLLEMAN DR. SYSTEM 1 21 3.113 12 .88 30 .188 2 24 1.499 9.86 30 .188 3 24 1.696 12.23 37 .438 4 18 0.565 4 .76 8.072 5 30 2 .787 9.99 47 .787 6 30 1.967 13 .07 64 .094 7 18 0 .397 4 .31 7.610 8 24 0.406 5.87 18 .426 9 33 1.121 14 .21 82 .255 10 12 0.583 2 .93 2 .042 11 33 1.314 14 .39 83.298 12 12 3.061 10.69 7 .120 13 18 1.131 6 .52 6 .344 14 36 0.722 14 .20 97.772 15 12 1.840 7 .19 2 .740 16 2-36 0.891 7.83 110.749 PROPOSED DARTMOUTH ST . SYSTEM #1 1 2-33 1.446 10 .92 129.697 2 24 3 .669 7 .39 23 .200 3 24 1.053 8.43 23 .200 4 24 5 .671 8.95 23 .200 5 18 4 .844 14.91 23 .200 6 48 0 .250 8.34 102.078 7 48 0 .250 6.65 81.463 8 48 0.250 6 .30 75 .835 9 12 0 .751 4 .49 1.928 10 48 0.250 5.81 68 .258 11 12 0.969 5.60 2 .674 12 42 0.600 7 .15 59 .981 13 42 0.600 7.87 56 .121 14 12 2 .891 7.84 3.215 15 18 0.600 5.24 7.713 16 18 0.642 4 .08 6 .004 17 24 2.583 7.16 19.879 18 18 2 .762 10 .79 12.761 PROPOSED DARTMOUTH ST . SYSTEM #2 1 24 0 .780 3.53 11.093 2 18 1.501 5.20 9.184 3 12 1.640 3.23 1.985 000657-2969 Drainage Report .doc Fina l Drainage Report -16 Hotel Co nferen ce Ce nter Drainage Improvem ent s 6 .3 DETETNION FACILITIES Municipal Development Group The policy of the City of College Station is to encourage the rapid conveyance of stormwater through and out of the city within the primary system as stated on page 8, paragraph 3 of the cities Drainage Policy & Design Standards. This site is on the primary system of Wolf Pen Creek. Therefore, no runoff will be detained on the proposed site and the post- development runoff from the site will be directed to Wolf Pen Creek. This is done in order to keep from stacking peaks of the primary creek and the discharge of runoff off of the site. Justification of no detention to this site was made by the comparison of time of concentration, (Tc). The approximated Tc of.Wolf Pen Creek, to the proposed site, is 3 8 minutes . This Tc assumed an average velocity of 4 .0 ft/sec and 9,000 ft of travel to the project site . The minimum Tc of the site allowed without detention is 10 minutes. With detention, the Tc of the site increases to approximately 20 minutes . Therefore, detention on-site would increase the overall peak of Wolf Pen Creek. 000 65 7-2969 Drainage Report .do c Final Drainage Report -17 APPENDIX A EXISTING HYDRAULIC COMPUTATION 000657-2969 Drainage Report.doc DESCRIPTION APPENDIX A TABLE OF CONTENTS PAGE NO. Existing Holleman Dr. System .................................................................................... A-1 Existing Dartmouth St. System #1 ............................................................................... A-2 Existing Dartmouth St. System #2 ............................................................................... A-3 000657-2969 Drainage Report.doc General Project Information Control: Section: Job: Project: County: Description: Design Frequency: Analysis Frequency: 1 657 2969 Conference Center Brazos Existing Holleman Dr. System 10 100 20-Nov-98 Current File: l :\PROJECTS\600\2969 -H-l \2969EXHD .STM Outlet Identification: A 10 Design Tailwater: 266 .6 Analysis Tailwater: 270 .06 Metric Input: No Metric Output: No Junction Loss Computation: Yes I Runoff Control Data 20-N ov-9 Runoff Coefficient "C": 0 .9 Runoff Coefficient Description: Business Areas Runoff Coefficient "C": 0 .5 Runoff Coefficient Description: Re sidential Runoff Coefficient "C": 0 .65 Runoff Coefficient Description: Industrial Runoff Coefficient "C": 0 .25 Runoff Coefficient Description: Unimproved Areas Runoff Coefficient "C": 0 .3 Runoff Coefficient Description: Landscaped Areas Runoff Coefficient "C": 0 .95 Runoff Coefficient Description: Streets & Parking Areas Minimum Time of Concentration: 10 Intensity "e" Value: 0 Intensity "b" Value: 0 Intensity "d" Value: 0 Drainage Area Data 20-Nov-98 Drainage Drainage Time of Supplied Composite Composite Subarea Drainage Area Area Area Concentration Discharge Runoff Drainage Subarea 1 Subarea 2 Subarea 3 Subarea 4 Subarea 5 Subarea 6 Identification Description Coefficient Area Al Sub -Area 10.00 0.00 0 .3 7 9.50 0.00 0 .00 0.00 0.00 8 .50 1.00 AIO Sub-Area 10.00 0.00 0 .77 0 .28 0 .00 0 .00 0 .00 0.00 0.08 0 .20 A2 Sub-Area 10.00 0 .00 0.56 2.2 l 0 .00 0 .00 0 .00 0.31 1.00 0 .90 A3 Sub-Area 10.00 0 .00 0.80 l.17 0 .00 0 .00 0 .00 0.00 0 .27 0 .90 A4 Sub-Area 10.00 0 .00 0 .47 4.37 0 .00 0 .00 0 .00 2.17 0 .90 1.30 AS Sub-Area 10.00 0 .00 0 .25 0 .27 0 .00 0 .00 0 .00 0 .27 0 .00 0.00 A6 Sub-Area 10.00 0.00 0 .27 3.72 0 .00 0 .00 0 .00 3.60 0 .00 0 .12 A7 Sub -Area 10 .00 0 .00 0 .83 0 .89 0 .00 0 .00 0.00 0 .00 0.17 0 .72 A8 Sub-Area 10.00 0 .00 0 .42 17 .25 0 .00 11.79 0 .00 5.47 0.00 0 .00 A9 Sub-Area 10.00 0 .00 0 .34 2.16 0 .00 0.00 0 .00 1.89 0.00 0 .28 1 Inlet and Junction Data 20-Nov-98 Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Type Elevation Al Existing Inl et Curb on Grade 296 .70 15 .00 0 .00 0 .00 None AIO Existing Inlet Curb on Grade 270 .04 12 .00 0 .00 0 .00 None A2 Existing Inlet Curb on Grade 290 .89 15.00 0 .00 0 .00 None A3 Existing Inlet Curb on Grade 291.46 5 .00 0 .00 0 .00 None A4 Existing F .D . Inlet Cur b on Grade 281.00 12 .00 0 .00 0.00 None A5 Existing Inlet Curb on Grade 279 .04 15 .00 0 .00 0 .00 None A6 Existing Inlet Curb on Grade 273 .70 15 .00 0 .00 0.00 None A7 Existing Inlet Curb on Grade 273.46 15 .00 0 .00 0 .00 None A8 nlet for Ditch sectio Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None A9 None Curb on Grade 270 .19 10 .00 0 .00 0 .00 None JI Junction Box Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None J2 Junction Box Junction/Manhole 0 .00 0.00 0 .00 0 .00 None 1 Inlet Gutter and Carryover Data 20-Nov-98 Inlet ID Longitudinal Transverse Transverse Di stance Ponded Ponded N gutter Percent Carry Over To Allowable Gutter Slope Gutter Gutter for Slope Width Depth value Di scharge Identification Carryover Slope Slope 2 for Sags Al 1.83% 2 .54% 0.00% 0 .00 I l.50 0.00 0.014 0 .00% A2 10 AIO 0 .63% 2.54% 0 .00% 0 .00 11.50 0.00 0 .014 0.00% A2 1.83% 2.54% 0.00% 0.00 11.50 0.00 0 .014 0 .00% A4 10 A3 1.83% 2 .54% 0 .00% 0.00 ll.50 0.00 0 .014 0 .00% A7 10 A4 1.44% 2 .54% 0 .00% 0 .00 l l.50 0 .00 0 .014 0.00% A5 10 A5 1.44% 2.54% 0.00% 0.00 11.50 0.00 0 .014 0 .00% A6 10 A6 1.44% 2.54% 0.00% 0 .00 11.50 0 .00 0.014 0 .00% A9 10 A7 1.44% 2.54% 0 .00% 0 .00 11.50 0 .00 0.014 0.00% A 10 10 A9 0 .63% 2.54% 0.00% 0 .00 11.50 0 .00 0 .014 0 .00% I Conveyance Data 20-Nov-98 Pipe Run Nodes Soffit Elevation Shape Rise Span Number of Length N Value or Identification Upstream Downstream Upstream Downstream Barrels Material Al Jl 294 .3 5 2 93 .51 Circular 1.75 2 27 Concrete 2 JI J2 293 .51 289 .08 Circular 2 2 295 .5 Concrete 3 12 A2 289 .08 288 .6 9 Circular 2 2 1 23 Concrete 4 A3 12 289 .21 289.0 8 Circular 1.5 2 1 23 Concrete 5 A2 A4 288 .74 279.2 Circular 2 .5 2 1 342 .49 Concrete 6 A4 A5 279 .2 276 .84 Circular 2 .5 2 120 Concrete 7 A5 A6 276 .99 271.85 Circular 2.75 2 1 426 .51 Concrete 8 A7 A6 272.46 271.94 Circular 1.5 2 46 Concrete 9 A6 A9 271.2 267 .64 Circular 3 2 1 493 .34 Concrete 10 A9 A 10 266 .75 266 .34 Circular 3 2 2 46 Concrete 11 A8 A9 267 266 .75 Ditch 4 5 4 1 Concrete 1 l 2969EXHD.out WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 1 JOB CONTROL 1 JOB SECTION 657 JOB NUMBER 2969 : CONFERENCE CENTER 10 Year 100 Year PROJECT DESCRIPTION DESIGN FREQUENCY ANALYSYS FREQUENCY MEASUREMENT UNITS: Input ENGLISH Output Runoff Computations I.D. C Value Area Tc Tc Used (acres) (min) (min) A 1 0 .36 8 9. 4 96 10.00 10.00 -LANDSCAPE D AREAS0 .300 8.500 -STREETS & PARKING AREAS0.950 0.996 A 2 0 .558 2 .208 10.00 10.00 -UNIMPROVED AREAS 0 .25 0 0.308 -LANDSCAPE D AREAS 0 .3 00 1.000 -STREETS & PARKING AREAS0.950 0.900 A 3 0 .80 2 1 .1 66 10.00 10.00 -LANDSCAPE D AREAS0.300 0.266 -STREETS & PARKING AREAS0.950 0.900 A 4 0.469 4.369 10.00 10.00 -UNIMPROVED AREAS0.250 2 .16 9 -LANDSCAPED AREAS0.300 0.900 -STREETS & PARKING AREAS0.950 1.300 A 5 0 .250 0 .266 10.00 10.00 -UNIMPROVED AREAS0.250 0.266 A 6 0.272 3.716 10.00 10.00 -UNIMPROVE D AREAS 0 .250 3.59 7 -STREETS & PARKING AREAS0.95 0 0.119 A 7 0 .826 0.88 9 10.00 10.00 -LANDSCAPE D AREAS0.300 0.169 -STREETS & PARKING AREAS0.950 0.720 A 8 0 .421 17.253 10.00 10.00 Page 1 Fri Nov 20 11 :47:23 1998 ENGLISH Intensity Supply Q Total Q (in/hr) (cfs) (cfs) 8.635 0 .00 0 30.188 8.635 0.000 10.638 8.635 0 .0 00 8.072 8.635 0.000 17.677 8.635 0.000 0 .57 4 8.635 0.000 8.741 8.635 0.000 6 .344 8.635 0.000 62.684 2969EXHD.out -RESIDENTIAL0.500 11.786 -UNIMPROVED AREAS0.250 5.467 A 9 0.340 2.164 10.00 10.00 8.635 0.000 6.358 -UNIMPROVED AREAS0.250 1. 885 -STREETS & PARKING AREAS0.950 0.279 A 10 0 . 76 6 0.2 79 10.00 10.00 8.635 0.000 1.845 -LANDSCAPED AREAS0.300 0 .079 -STREETS & PARKING AREAS0.950 0 .200 ------------------------------------------------------------------------------ D WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 2 Fri Nov 20 11:47:24 1998 ------------------------------------------------------------------------------ On-Grade Inlet Configuration Data ------------------------------------------------------------------------------ Inlet I.D. Inlet T y pe Inlet Slopes Length Long. Trans. (f t) (%) (%) Gutter Grate Pond Width Critical n Depr. Length Type Allowed Elev . (ft) (ft) (ft) ------------------------------------------------------------------------------ A 1 CURB 15.000 1. 83 2.54 0.014 0.330 n/a n/a 11. 500 296.7 0 0 A 2 CURB 15.000 1. 83 2.54 0.014 0.330 n/a n/a 11. 500 290.890 A 3 CURB 5.000 1. 83 2.54 0.014 0.330 n/a n/a 11.500 291.460 A 4 CURB 1 2 .00 0 1. 44 2.54 0.014 0.330 n/a n/a 11.500 281. 000 A 5 CURB 15.00 0 1. 44 2.54 0.014 0.330 n/a n/a 11.500 279.040 A 6 CU RB 15.000 1. 44 2.54 0.014 0.330 n/a n/a 11. 500 273.700 A 7 CURB 15.0 00 1. 44 2.54 0.014 0.330 n/a n/a 11. 500 273.460 A 9 CURB 10.0 00 0.63 2.54 0.014 0.330 n/a n/a 11. 500 270.190 A 1 0 CURB 12.000 0.63 2.54 0.014 0.330 n/a n/a 11.500 270.040 D WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 3 Fri Nov 20 11:47:24 1998 On-Grade Inlet Computation Data ------------------------------------------------------------------------------ Inlet Inlet Total Inlet Total To Required Actual Ponded I. D. Type Q Capac i ty Carryover Inlet Length Length Width (cfs) (cfs) (cfs) (ft) (ft) (ft) ------------------------------------------------------------------------------ A 1 CURB 30.188 16.953 13.235 A 2 40.815 15.000 18.153 A 2 CURB 23.873 14.940 8.933 A 4 35.647 15.000 16.657 A 3 CURB 8.072 3.376 4.696 A 7 19.240 5.000 11.185 A 4 CURB 26.610 13.788 12.823 A 5 35.990 12.000 18.114 A 5 CURB 13.397 11. 037 2.360 A 6 24.236 15.000 14.059 A 6 CURB 11.1 0 0 9.744 1. 356 A 9 21.770 15.000 13.114 Page 2 2969EXHD.out A 7 CU RB A 9 CU RB A 1 0 CURB 11.0 4 0 7.71 3 3.17S 9.710 6.727 3.17S 1. 330 0.9B7 0.000 A 10 21.693 14.6BS B.964 lS.000 10.000 12.000 13.074 13.3S O 9.649 0 Win Storm TxDOT STORM DRAIN DESIGN Cumulative Junction Discharge Computations Node I. D. Al J l A2 J 2 A3 A4 AS A6 A7 AB A9 0 Weighted C-Value 0 .3 6B 0 .36 B 0.440 0 .416 O .B02 0 .447 0 .4 44 0 .431 O.B26 0 .42 1 0 .422 Cumulative Drainage Area (acres) 9. 4 9 6 9.496 12.B70 10.66 2 1.166 17 .2 39 17.S OS 22.110 O.BB9 17.2 S3 41.S 2 7 Cumulative Tc (min) 10.00 10.00 10.S7 10.S3 10.00 10.94 11.09 11.73 10.00 10.0 0 1 2 .47 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 4 Intensity (in/hr) B.63S B.63S B.43B B.449 B.63S B.313 B.26S B.064 B.63S B.63S 7.B47 Version 1. 3 Fri Nov 20 11:47:2 4 199B Supplied Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 September Fri Nov 20 Total Discharg e (cfs) 30.lBB 30.lB B 47.7B7 37.43 B B.07 2 64.094 64.2 71 76.B0 2 6.344 62.6B4 137.4B O 1997 PAGE S 11:47:2 4 199B ------------------------------------------------------------------------------ Con v e y an c e Configuration Data ------------------------------------------------------------------------------ Ru n Node I. D. Flow line Elev. I. D . us DS us DS Shape # Span Rise Length Slope n (ft) (ft) (ft) (%) ------------------------------------------------------------------------------ 1 Al Jl 292.600 291. 760 Circ 1 n/a 1. 7SO 27.00 3.113 0.013 2 Jl J 2 291.SlO 2B7.0BO Circ 1 n/a 2.000 29S.SO 1.499 0 .013 3 J 2 A2 2B7.0BO 2B6.690 Circ 1 n/a 2.000 23.00 1.696 0.013 4 A3 J2 2B7.710 2B7.SBO Circ 1 n/a 1. soo 23.00 O.S6S 0.013 s A2 A4 2B6.240 276.700 Circ 1 n/a 2.SOO 342.49 2.7B7 0.013 6 A4 AS 276.700 2 74.340 Circ 1 n/a 2.SOO 120.00 1.967 0.013 7 AS A6 274.240 269.100 Circ 1 n/a 2.7SO 426.Sl 1. 20S 0.013 B A7 A6 270.96 0 270.440 Circ 1 n/a 1. soo 46.00 1.131 0 .01 3 9 A6 A9 26B.200 264.640 Circ 1 n/a 3.000 493.34 0.7 22 0 .01 3 1 0 A9 Al O 263.7SO 263.340 Circ 2 n/a 3.000 46.00 O.B91 0.013 11 AB A9 262.000 261. 7SO Ditch 1 S.920 S.000 1.002S.B20 0. 013 Page 3 2969EXHD.out D Wi n Storm T x DOT STORM DRA IN DESIGN Version 1.3 September 1 9 97 PAGE 6 Fri Nov 20 11:47:2 4 1998 ------------------------------------------------------------------------------ Conv e y a n c e Hy draulic Computa t ions ------------------------------------------------------------------------------ Hyd raulic Gr ade line Depth Velocity J une Run us Elev DS El ev S lope Unif. Actual Unif. Actual Q Cap L os s (%) (f t ) (ft ) (fps) (fps) (cfs) (cfs) (ft ) ------------------------------------------------------------------------------ 1 294 .24 1 293 .385 3.63 1. 641 1. 641 1 2 .89 1 2 .88 30.188 2 7.955 0 .000 2 293 .385 28 8 .9 55 1. 78 1. 875 1. 875 9.87 9.86 30.188 2 7.700 0 .000 3 2 8 8 .955 287.779 2 .74 1. 875 1. 875 1 2 .2 4 12.2 3 37.438 2 9.46 0 0 .000 4 2 8 9 .065 288 .955 0.59 1. 261 1.375 5.09 4.76 8.07 2 7.897 0 .0 00 5 28 7.77 9 27 9.045 1. 36 1. 53 9 2 .345 15.08 9.99 47.787 68.47 0 0 .0 00 6 2 7 9 .0 4 5 2 7 6 .8 1 9 2 .4 4 2 .345 2 .479 13.40 13.0 7 64.0 94 5 7 .5 27 0 .000 7 276 .819 27 1.0 14 1. 4 8 2 .57 9 2 .579 11.11 11.11 64.2 71 58 .0 6 0 0 .000 8 27 1.770 27 1.0 14 0 .36 0.810 0.810 6.5 2 6.5 2 6.3 44 11.1 69 0 .000 9 27 1.014 267 .089 1. 3 3 2 .814 2.8 14 11.15 11.15 76.8 0 2 56.66 0 0 .000 10 267 .089 266 .60 0 1. 0 6 2 .814 3.000 9.98 9.7 2 137.480 1 2 5.9 41 0 .000 1 1 267 .089 267 .089 0 .0 0 0.733 0.733 2 8.6 2 28.6 2 6 2 .684 6 2 .684 0 .0 0 0 DISC HARGE F REQUEN CY = 10 0 TAILWATER = 2 70.06 D WinS t o r m TxDO T STORM DRAIN DESIGN Version 1.3 September 1 9 97 PAGE 7 Fri No v 20 11:47:24 1 998 Ru nof f Compu tat ion s I.D . C Valu e Area Tc Tc Used Intensity Suppl y Q Total Q (ac r es) (min) (min) (in/hr) (cfs) (c fs ) A 1 0.3 6 8 9 .4 96 10.00 1 0 .00 8.635 0.000 3 0 .1 88 -LANDS CA PE D AREAS 0.300 8.500 -STREETS & PARKING AREAS0.950 0.996 A 2 0 .558 2 .2 0 8 10.00 10.00 8.635 0.000 1 0.638 -UN IMP ROVED ARE AS0 .2 50 0.308 -LAN DSCAPED AREA S0 .3 00 1. 000 Page 4 2 969EXHD.out -STREETS & PARKING AREAS0.950 0.900 A 3 0.802 1.166 10.00 10.00 8.635 0.000 8.072 -LANDSCAPED AREAS 0.300 0.266 -STREETS & PARKIN G AREAS 0 .950 0.900 A 4 0.469 4.369 10.00 10.0 0 8.635 0.000 17.677 -UNIMPROVED AREAS0 .250 2.169 -LANDSCAPED AREAS0.300 0.900 -STREETS & PARKING AREAS0.950 1.300 A 5 0.250 0.266 10.00 10.00 8.635 0.000 0.574 -UNIMPROVED AREAS0.250 0.266 A 6 0.272 3.716 10.00 10.00 8.635 0.000 8.741 -UNIMPROVED AREAS0.250 3.597 -STREETS & PARKING AREAS0.950 0.119 A 7 0.826 0.889 10.00 10.00 8.635 0.000 6.344 -LANDSCAPED AREAS0.300 0.169 -STREETS & PARKING AREAS0.950 0.720 A 8 0.421 17.253 10.00 10.0 0 8.635 0.000 6 2 .684 -RESIDENTIAL0.50 0 11.786 -UNIMPROVED AREAS0 .250 5. 467 A 9 0.340 2.164 10.00 10.00 8.635 0.000 6.358 -UNIMPROVED AREAS0.250 1. 885 -STREETS & PARKING AREAS0.950 0.279 A 1 0 0.766 0 .279 10.00 10.0 0 8.635 0.000 1.845 -LANDSC APED AREAS 0 .300 0.079 -STREETS & PARKING AREAS0.950 0.200 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 8 On-Grade Inl et Configuration Data Inlet I. D. A 1 A 2 A 3 A 4 I nl et Type CURB CURB CURB CURB Inlet Slopes Length Long. Trans. (ft) (%) (%) 15.00 0 15.00 0 5.000 1 2.000 1. 83 1. 83 1. 83 1. 44 2.54 2.54 2.54 2.54 Fri Nov 20 11:47:25 1998 Gutter Grate n Depr. Length Type (ft) (ft) 0.014 0.330 n/a 0.014 0.330 n/a 0.014 0.330 n/a 0.014 0.330 n/a Page 5 n/a n/a n/a n/a Pond Width Critical Allowed Elev. (ft) 11.500 11.500 11.500 11. 500 296.700 290.890 291. 460 281.000 2969EXHD.out A 5 CURB 15.0 00 1. 44 2.54 0.014 0.330 n/a n/a 11. 500 279.040 A 6 CURB 15.000 1. 44 2.54 0.014 0.330 n/a n/a 11.500 273.700 A 7 CURB 15.000 1. 44 2 .54 0.014 0.330 n/a n/a 11.500 273 .460 A 9 CURB 10.00 0 0.63 2.54 0.014 0.330 n/a n/a 11.500 270.190 A 10 CURB 12.0 00 0.63 2.54 0.014 0.330 n/a n/a 11. 500 270.040 0 WinStorm TxDOT STORM DRAIN DES IGN Vers ion 1.3 September 1997 PAGE 9 Fri Nov 20 11:47:25 1998 ------------------------------------------------------------------------------ On-Grade Inlet Computation Data ------------------------------------------------------------------------------ Inlet Inlet Total Inlet Total To Required Actual Ponded I. D. Type Q Capacity Carryover Inlet Length Length Width (cfs) (cfs) (cfs) (ft) (ft) (ft) ------------------------------------------------------------------------------ A 1 CURB 30.188 16.953 13.235 A 2 40.815 15.000 18.153 A 2 CURB 23.873 14.940 8.933 A 4 35.647 15.000 16.657 A 3 CURB 8.072 3.376 4.696 A 7 19.240 5.000 11.185 A 4 CURB 26.610 13.78 8 12.823 A 5 35.990 12.000 18.114 A 5 CURB 13.397 11.037 2.360 A 6 24.23 6 15.000 14.05 9 A 6 CURB 11.100 9.744 1.356 A 9 21.770 15.000 13.114 A 7 CURB 11.040 9.710 1. 330 A 10 21.693 15.000 13.074 A 9 CURB 7.713 6.727 0.987 14.685 10.000 13.35 0 A 10 CURB 3.175 3.175 0.000 8.964 12.000 9.649 D WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 10 Fri Nov 20 11:47:25 1998 Cumulat ive Ju nction Discharge Computations ------------------------------------------------------------------------------ Node Weighted Cumulative Cumulative Supplied Total I.D . C-Value Drainage Area Tc Intensity Discharge Discharge (acres) (min) (in/hr) (cfs) (cfs ) ------------------------------------------------------------------------------ Al 0.368 9.496 10.00 8. 635 0.000 30.188 Jl 0.368 9.496 10.00 8.635 0.000 30.188 A2 0.440 12.870 10.57 8.438 0.000 47.787 J2 0.41 6 10.662 10 .5 3 8.449 0.000 37.438 A3 0.802 1.166 10.00 8.635 0.000 8.07 2 A4 0.447 17 .239 10.94 8.313 0.000 64.094 AS 0 .444 17.505 11. 09 8.265 0.000 64.271 A6 0.431 22.110 11.73 8.064 0.000 76.80 2 A7 0 .82 6 0.889 10.00 8.635 0.000 6.344 AS 0.421 17.253 10.00 8.635 0.000 62.684 A9 0 .4 22 41.527 12.47 7.847 0.000 137.480 Page 6 2969EXHD.out 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 11 Fri Nov 20 11:47:2S 1998 Conveyance Co nf iguration Data ------------------------------------------------------------------------------ Run Node I. D. Flow line Elev. I.D. us DS us DS Shape # Span Rise Length Slope n (ft) (ft) (ft) (%) ------------------------------------------------------------------------------ 1 Al Jl 292.600 2 91.760 Circ 1 n/a l.7SO 2 7.00 3.113 0.013 2 Jl J 2 291.SlO 287.080 Circ 1 n/a 2.000 29S.SO 1. 499 0 .013 3 J 2 A2 287.080 2 86.690 Circ 1 n/a 2.000 23.00 1. 696 0.013 4 A3 J2 287.710 287.SBO Circ 1 n/a 1. 500 23.00 O.S6S 0.0 1 3 s A2 A4 286.240 276.700 Circ 1 n/a 2.SOO 342.49 2.787 0.013 6 A4 AS 2 76.700 274.340 Circ 1 n/a 2 .SOO 120.00 1.967 0 .01 3 7 AS A 6 2 74.240 269 .100 Circ 1 n/a 2 .7SO 426.51 1. 20S 0.0 1 3 8 A7 A6 270 .960 2 70.440 Circ 1 n/a 1. soo 46.00 1.1 31 0.013 9 A6 A9 268.200 26 4.640 Circ 1 n/a 3.000 493.34 0.7 22 0 .013 10 A9 AlO 263.7SO 263 .340 Circ 2 n/a 3.000 46.00 0.891 0.013 11 AB A 9 266 .260 266 .010 Ditch 1 S.920 0.740 1.0025.820 0 . 013 0 WinStorm T xDOT STORM DRAIN DESIGN Version 1. 3 September 1997 PAGE 12 Fri No v 20 11:47:2S 1998 Conveyance Hydraulic Computations ------------------------------------------------------------------------------ Hy dra ul ic Grade line Depth Velocity June Run us Elev DS Elev Slope Unif. Actual Unif. Actual Q Cap Loss (%) (ft) (ft) (fps) (fps) (cfs ) (cfs) (f t ) ------------------------------------------------------------------------------ 1 297.84 2 296.862 3.63 1.641 l.7SO 12.89 1 2 .S5 30.188 2 7.9S S 0 .0 00 2 296.862 291.600 1. 78 l .87S 2 .000 9.87 9 .61 30.188 27 .7 00 0.000 3 291 .600 290 .970 2 .74 1. 87S 2 .00 0 1 2 .24 11. 92 37.438 29 .4 60 0 .00 0 4 291.73S 291 .600 O.S 9 1. 26 1 1. soo S.09 4.S7 8.07 2 7.897 0 .00 0 s 290.970 286 .32 0 1. 36 1. S39 2.SOO lS.08 9.74 47.787 68.470 0.000 6 286 .3 20 283.390 2 .44 2.34S 2.SOO 13.40 13.06 64.094 S7.S27 0.000 7 283.390 277.09 1 1. 48 2 .579 2.750 11.11 10.82 64.271 SB.060 0.000 8 277 .2 SB 2 77.091 0.36 0 .810 l.SO O 6.S2 3.S9 6.344 11.169 0 .00 0 9 277.091 270 .S49 1. 33 2 .8 14 3.000 11.15 10.87 76.80 2 56.660 0.000 10 270.S49 270.06 0 1. 06 2 .814 3.000 9 .98 9.72 137.480 125.941 0 .000 11 270.794 27 0 .549 24 .S7 0.733 0.733 28.62 28.6 2 62.684 62.684 0 .000 ------------------------------------------------------------------------------ 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 1 3 Page 7 2969EXHD .out Fri Nov 20 11:47 :2S 1998 Computation Messages *Warning: Ponded width e x ceeds allowable width at inlet *Warning: Capa city of gr ade in let id Al exceed e d. *Warning: Ponded width exceeds allowable width at inlet *Warning : Capacity of grade inlet id A2 exce eded . *Warning : Capacity of grade inlet id A3 exceeded. *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id A4 exceeded . *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacit y of grade inlet id AS exceeded. *Warning : Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id A6 exceeded . *Warning: Pond ed width exceeds allowable width at inlet *Warning: Capacity of grade inlet id A7 exceeded . *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id A9 exceeded . id id id id id id id Al. A2 . A4. AS. A6. A7 . A9 . *Warning: Discharge decreased downstream Junction Jl -previous intensity used *Warning: Decreasing Conduit Size -Downstream Run 10 was adjusted. *Computation: Run 1 -Insufficient Capacity *Computation: Run 2 -Insufficient Capacity *Computation: Run 3 -Insufficient Capacity *Computation: Run 4 -Insufficient Capacity *Computa tion : Run 6 -In sufficient Capacity *Computation: Run 7 -Insufficient Capacity *Computa tion: Run 9 -Insufficient Capacity *Computation: Run 1 0 -Insufficient Capacity *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id Al exceeded. *Warning: Ponded width exceeds allowable width at inlet *Warning : Ca pacity of grade inlet id A2 exceeded. *Wa rning: Capacit y of grade inlet id A3 exceeded. *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id A4 exceeded . *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id AS exceeded . *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of grade inlet id A6 exceeded. *Warning: Ponded width exceeds allowable width at inlet *Warning: Capacity of gra de in le t id A7 exceeded. *Warning: Pond ed width exceeds allowable widt h at inlet *Warning: Capacit y of grade inlet id A9 exceeded . id Al. id A2. id A4. id AS. id A6 . id A7. id A9. *Warning: Discharge decreased downstream Junction Jl -previous intensity used *Warning: Run -1 0 -Upstream Hydraulic Gradeline = 270 .55 -Exceeds Critical Elevation = 2 70.19 *Warning: Run -9 -Upstream Hydraulic Gradeline l evation = 2 73.7 0 *Warning: Run -7 -Upstream Hydraulic Gradeline Page 8 277.09 Exceeds Critical E 28 3 .39 Exceeds Critical E 2969EXHD.out levation = 2 79.04 *Warning: Run -8 Upstream Hydraulic Gradeline 27 7.26 -Exc eeds Cr itical E levation = 2 73.4 6 *Warning: Run -6 Upstream Hydraulic Gradeline 286.32 -Excee ds Critical E levation = 281.00 *Warning: Run -5 -Upstream Hydraulic Gradeline 290.97 -Excee ds Critical E levati on = 290 .89 *W arning: Run -4 -Upstream Hydraulic Gradeline 291.74 -Excee ds Critical E levation = 291.46 *Warning: Run -1 -Upstream Hydraulic Gradeline 297 .84 -Exceeds Critical E levation = 296.70 *Computation : Run 1 -Insufficient Capacit y *Computation: Run 2 -Insufficient Capacity *C omputation : Run 3 -Insufficient Capacity *Computation: Run 4 -Insufficient Capacity *Computation: Run 5 -Pipe Flowing Full *Computation : Ru n 6 -Insufficient Capacit y *Comp uta tion : Run 7 -Insufficient Capacit y *Computation : Run 8 -Pipe Flowing Full *Computation: Run 9 Insufficient Capacity *Computation: Run 10 -Insufficient Capacity NORMAL Completion of WinStorm. Page 9 General Project Information Control: Section: Job: Project: County: Description: Design Frequency: Analysis Frequency: 1 657 2969 Conference Center Brazos Existing Dartmouth St. System # 1 10 100 21-Nov-98 Current File: I :\PROJECTS\600\2969-H-l \2969EXD 1.STM Outlet Identification: Jl Design Tailwater: 267 .76 Analysis Tailwater: 267 .76 Metric Input: No Metric Output: No Junction Loss Computation: No 1 Runoff Control Data 2 1-Nov-9 Runoff Coefficient "C": 0.9 Runoff Coefficient Description: Business Area Runoff Coefficient "C": 0.5 Runoff Coefficient Description: Residential Runoff Coefficient "C": 0 .65 Runoff Coefficient Description: Industrial Runoff Coefficient "C": 0 .25 Runoff Coefficient Description: Unimproved Area Runoff Coefficient "C": 0 .3 Runoff Coefficient Description: Landscaped Area Runoff Coefficient "C": 0 .95 Runoff Coefficient Description: Street & Parking Area Minimum Time of Concentration: 10 Intensity "e" Value: 0 Intensity "b" Value: 0 Intensity "d" Value: 0 -- Drainage Area Data 21-Nov-98 Drainage Drainage Time of Supplied Composite Composite Subarea Drainage Area Area Area Concentration Discharge Runoff Drainage Subarea 1 Subarea 2 Subarea 3 Subarea 4 Subarea 5 Subarea 6 Identification Description Coefficient Area A12 Sub-Area 14 .00 0 .00 0 .38 6 .23 0.00 2 .50 0 .00 3.48 0 .00 0 .25 Al3 TROY Subdivisio 0 .00 23 .20 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 Al4 Sub-Area 10 .00 0 .00 0 .95 0 .74 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 1 -- Inlet and Junction Data 21-Nov-98 Critical Inlet Grate Default Junction Inlet ID Inlet Desc ription Inlet Type Elevation Length Area Soffit Type Elevation Al2 Existing Creek Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None Al3 Existing Inlet Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None Al4 Existing Inlet Curb at Sag 270 .0 5 15 .00 0 .00 0 .00 None Jl Inlet/Outlet Junction/Manhole 269 .71 0 .00 0 .00 0 .00 None J2 Existing J .B . Junction/Manhole 272 .00 0 .00 0 .00 0 .00 None J3 Existing J.B . Junction/Manhole 278 .00 0 .00 0 .00 0 .00 None J4 Existing J.B . Junction/Manhole 288 .00 0 .00 0 .00 0 .00 None 1 Inlet Gutter and Carryover Data 2 1-Nov-98 Inlet ID Longitudinal Transverse Transverse Distance Ponded Ponded N gutter Percent Carry Over To Allowable Gutter Slope Gutter Gutter for Slope Width Depth value Discharge Identification Carryover Slope Slope 2 for Sags Al4 1.00% 2 .54 % 0 .00 % 0 .00 12 .00 0 .00 0 .014 50.00% Al4 1.00% 2 .54 % 0 .00% 0 .00 12 .00 0 .00 0 .014 50.00% 1 Conveyance Data 21-Nov-98 Pipe Run Nodes Soffit Elevation Shape Rise Span Number of Length N Value or Identification Upstream Downstream Upstream Downstream Barrels Material A 14 JI 268 .7 267 .76 Circular 2 .75 2 1 65 Concrete 2 12 A 14 269 .85 268 .75 Circular 2 2 1 30 Concrete 3 13 J2 272 .68 270.89 Circular 2 2 1 170 Concrete 4 14 J3 284 .5 272 .78 Circular 2 2 1 207 Concrete 5 A 13 J4 289 .5 286 .5 Circular 1.5 2 1 62 Concrete 6 A 12 A 14 268 .5 268 .4 Circular 2 .75 2 2 10 Concrete 2969EXD1.out WinStorm TxDOT STORM DRAIN DESIGN JOB CONTROL 1 JOB SECTION 657 JOB NUMB ER 296 9 : CONFERE NCE CENTER 10 Ye ar 10 0 Year Version 1.3 September 1997 PAGE 1 Sat Nov 21 19:31:28 1998 PROJECT DESCRIPTION DESIGN FREQUENCY ANALYSYS FREQUENCY MEASUREMENT UNITS: Input ENGLISH Output ENGLISH Runoff Computations I.D. C Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) A 1 2 0 .378 6.230 14.00 14.00 7.437 0.000 17.532 -RESIDENTIAL 0 .500 2.500 -UNIMPROVED AREA0.250 3.480 -STREET & PARKING AREA0.950 0.250 A 13 0 .000 0.000 0.00 0.00 0.000 23.200 23.2 00 A 14 0 .950 0.735 10.00 10.00 8.635 0.000 6.0 2 9 0 WinStorm Tx DOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 2 Sat Nov 21 19:31:28 1998 Sag Inlet Configuration Data Inlet I.D. Inlet Type Length/ Grate Left Perim. Area Long Slope Right Slope Trans Long Trans Gutter Depth n Depr. Allow (ft) (ft) Critical Elev. (ft) (sf) (%) (%) (%) (%) A 14 CURB 15.000 n /a 1.00 2.54 1.00 2 .54 0.014 0.330 0.500 270.050 0 WinStorm -TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 3 Sat Nov 21 19:31:28 1998 Page 1 I I Sag Inlet Computation Data Inl e t In let I.D. Type A 14 CURB Length/ Grate Pe rim . Area (ft) (sf) 15.00 0 n /a Total Q (cfs) 6.02 9 2969EXD1.out Inlet Total Capacity Head (cfs) (ft) 35 .0 14 0 .257 Ponded Widths Left Right (ft) (ft) 8 .704 8.704 I o I I I I WinStorm TxDOT STORM DRAIN DESIGN Cumu l ative J u nc t ion Di scharge Computations Nod e I. D . J 2 J 3 J4 Al 2 Al3 Al4 0 Weighted C-Va lue 0 .000 0 .000 0 .000 0 .3 7 8 0 .000 0 .439 Cumulative Drainage Area (acres) 0.00 0 0 .00 0 0 .00 0 6.230 0.0 00 6.9 65 WinS t orm Tx DOT STORM DRAIN Con vey an ce Co nfiguration Data Cumulative Tc (min) 10.00 10.00 10.0 0 14.00 0.00 14.04 DESIGN Flowline Elev. Version 1.3 September 1997 PAGE 4 Intensity (in/hr) 8.635 8.635 8.635 7.437 0.000 7.4 2 6 Version 1.3 Sat Nov 21 19:31:2 8 199 8 Supplied Discharge (cfs) 2 3.200 23.200 23.200 0.000 23.2 00 23.200 Total Discharge (cfs) 2 3.20 0 2 3.20 0 23 .200 17.53 2 23 .200 45.8 92 Septemb e r 19 9 7 PAGE 5 Sat Nov 2 1 19:31:28 1 99 8 Run I. D . Nod e I.D. US DS US DS Shape # Span (ft) Rise (ft) Length (ft) Slope (%) n 1 Al4 Jl 265.950 265.010 Circ 1 n/a 2.750 65.00 1. 446 0.0 1 3 2 J 2 Al4 267.850 266.750 Circ 1 n/a 2.000 30.00 3.669 0.0 13 3 J 3 J 2 270.680 268.890 Circ 1 n/a 2.000 170.00 1. 053 0.0 13 4 J4 J3 282.5 00 2 70 .7 8 0 Circ 1 n/a 2.000 207.00 5.67 1 0 .0 13 5 Al3 J4 288 .0 00 2 85.00 0 Ci rc 1 n/a 1. 500 62.00 4.844 0 .0 13 6 Al2 Al4 2 65.750 265.65 0 Ci r c 2 n/a 2.750 10.00 1.00 0 0 .013 0 Win Storm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 6 Sat Nov 21 19:31:2 8 1 99 8 Page 2 2969EXD1.out Conveyance Hydraulic Computations ------------------------------------------------------------------------------ Hydraulic Grade line Depth Velocity June Run us Elev DS Elev Slope Unif. Actual Unif. Actual Q Cap Loss (%) (ft) (ft) (fps) (fps) (cfs) (cfs) (ft) I ------------------------------------------------------------------------------ 1 268.249 267.7 60 0.7 5 1.730 2.750 11.67 7.73 45. 8 92 63.603 0.000 2 268.892 268.249 1. 05 1.042 1.499 14.01 9.18 23.200 43.333 0.000 I 3 272.317 268.892 1. 05 1.637 1.637 8.43 8.43 23 .200 23.214 0.000 4 283.417 272.317 1. 05 0.917 1. 537 16.49 8.95 23.200 53.872 0.000 5 289.235 283.417 4.88 1. 235 1. 235 14.90 14.91 23.200 23.120 0.000 6 268.252 268 .249 0.03 1. 090 2.599 4.00 1. 51 17.532 105.776 0.000 DISCHARGE FREQUENCY = 100 TAILWATER = 267.76 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 7 Sat Nov 21 19:31:28 1998 Runoff Computations I.D. C Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) A 12 0.3 78 6.230 14.00 14.00 7.437 0.000 17.532 -RESIDENTIAL 0.500 2.500 -UNIMPROVED AREA0 .250 3.480 -STREET & PARKING AREA0.950 0.250 A 13 0.000 0.000 0.00 0.00 0.000 23.200 23.200 A 14 0.950 0.735 10.00 10.00 8.635 0.000 6.0 29 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 8 Sat Nov 21 19:31:28 1998 Sag Inlet Configurati on Data Page 3 I I I I I I 2969EXD1.out Inlet Inlet Length/ Grate Left Slope Right Slope Gutter Depth Critical I. D. Type Pe rim. Area Long Trans Long Trans n Depr. Allow Elev. (ft) (sf) (%) (%) (%) (%) (ft) (ft) ------------------------------------------------------------------------------ A 14 CURB 15.000 n/a 1.00 2.54 1.00 2.54 0.014 0 .330 0.500 270.050 D WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 9 Sag Inlet Computation Data Inlet Inle t I.D. Type A 14 CURB D Length/ Grate Perim. Area (ft ) (sf) 15.0 00 n/a Total Q (cfs) 6 .029 Inlet Total Capacity Head (cfs) (ft) 35 .014 0.257 Sat Nov 21 19:31:28 1998 Ponded Widths Left Right (ft) (ft) 8.704 8.704 WinS torm TxDOT STORM DRAIN DESIGN Version 1 .3 September 1997 PAGE 10 Cumulative Junction Discharge Computations Node I.D. D J 2 J3 J4 A12 Al3 A14 Weighted C-Value 0 .000 0 .000 0 .000 0 .378 0 .000 0.439 Cumulative Drainage Area (acres) 0 .000 0.000 0 .000 6 .230 0.000 6 .965 Cumulative Tc (min) 10.00 10.00 10.00 14.00 0.00 14.04 WinStorm TxDOT STORM DRAIN DESIGN Conveyance Configuration Data Flowline Elev. Intensity (in/hr) 8.635 8.635 8.635 7.437 0.000 7.426 Sat Nov 21 19:31:29 1998 Supplied Discharge (cfs) 23 .200 23 .200 23.200 0.000 23.200 23.200 Total Discharge (cfs) 23.200 23.200 23.200 17.53 2 23.200 45.892 Version 1 .3 September 1997 PAGE 11 Sat Nov 21 19:31:29 1998 Run I.D. Node I .D. US DS US DS Shape # Span (ft ) Rise (ft) Length (ft) Slope (%) n Page 4 f I I 2969EXD1.out 1 A14 Jl 265.950 265.010 Circ 1 n/a 2.750 65.00 1. 446 0.013 2 J2 A14 267.850 266.750 Circ 1 n/a 2.000 30.00 3.669 0.013 3 J3 J2 2 70 .680 268.890 Circ 1 n/a 2.000 170.00 1. 053 0.013 4 J4 J3 282 .5 00 270.780 Circ 1 n/a 2.000 207.00 5.671 0 .013 5 A1 3 J4 288 .. 000 285.000 Circ 1 n/a 1. 500 62.00 4.844 0.013 6 Al 2 A14 265.750 265. 650 Circ 2 n/a 2.750 10.00 1.000 0.013 0 WinStorm T x DO T STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 12 Sat Nov 21 19:31:29 1998 Conveyance Hydraulic Computations ------------------------------------------------------------------------------ Hydraulic Grade line Depth Velocity June Run us Elev DS Elev Slope Unif. Actual Unif. Actual Q Cap Loss (%) (ft) (ft) (fps) (fps ) (cfs) (cfs) (ft) ------------------------------------------------------------------------------ 1 268 .2 49 267 .76 0 0.75 1. 730 2.750 11. 67 7.73 45.892 63.603 0.000 2 268 .892 268 .249 1. 05 1. 042 1. 499 14.01 9.18 23.200 43.3 33 0 .000 3 272.317 268.892 1. 05 1.637 1.637 8.43 8.43 23.200 23.214 0 .000 4 283 .4 17 272.317 1. 05 0.917 1. 537 16.49 8.95 23.200 53.87 2 0 .000 5 289.235 283.417 4.88 1. 235 1. 23 5 14.90 14.91 23.200 23 .1 20 0 .000 6 268.252 268 .249 0.03 1. 090 2.599 4.00 1. 51 17.53 2 105.776 0.000 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 13 Sat Nov 2 1 19:31:29 1998 Computation Messages *Comp utat i on: Run 1 -Pipe Flowing Full *Comp utat ion : Ru n 5 -Insufficient Capacity *Computation : Run 1 -Pipe Flowing Full *Computation: Run 5 -Insufficient Capacit y NORMAL Comple tion of WinStorm. Page 5 General Project Information Control: Section: Job: Project: County: Description: Design Frequency: Analysis Frequency: I 657 2969 Conference Center Brazos Existing Dartmouth St. System #2 10 100 20-Nov-98 Current File: I :\PROJECTS\600\2969-H-l \2969EXD2 . STM Outlet Identification: JI Design Tailwater: 264 .38 Analysis Tailwater: 264 .38 Metric Input: No Metric Output: No Junction Loss Computation: Yes 1 Runoff Control Data Runoff Coefficient "C": Runoff Coefficient Description: Runoff Coefficient "C": Runoff Coefficient Description: Runoff Coefficient "C": Runoff Coefficient Description: Runoff Coefficient "C": Runoff Coefficient Description: Runoff Coefficient "C": Runoff Coefficient Description: Runoff Coefficient "C": Runoff Coefficient Description: Minimum Time of Concentration: Intensity "e" Value: Intensity "b" Value: Intensity "d" Value: 0 .9 Business Areas 0 .5 Residential 0 .65 Industrial 0 .25 Unimproved Areas 0 .3 Landscaped Areas 0 .95 Streets & Parking Areas 10 0 0 0 20-Nov-9 Drainage Area Data Drainage Area Drainage Area Identification Description Al5 Sub-Area Time of Supplied Concentration Discharge 10.00 0 .00 Composite Runoff Coefficient 0.43 Composite Drainage Area 1.02 20-Nov-98 Subarea Drainage Area Subarea 1 Subarea 2 Subarea 3 Subarea 4 Subarea 5 Subarea 6 0 .00 0 .00 0 .00 0 .75 0 .00 0 .27 1 Inlet and Junction Data 20-Nov-98 Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Elevation Type Al5 Existing Inlet Curb at Sag 267 .59 15 .00 0 .00 0 .00 None Jl e into Main St ructu Junction/Manhole 0.00 0.00 0 .00 0.00 None 1 Inlet Gutter and Carryover Data 20-Nov-98 Inlet ID Longitudinal Transverse Transverse Distance Ponded Ponded N gutter Percent Carry Over To Allowable Gutter Slope Gutter Gutter for Slope Width Depth value Discharge Identification Carryover Slope Slope 2 for Sags Al5 0 .50% 2.54% 0 .00% 0.00 12 .00 0 .00 0 .014 50 .00% Al5 0 .50% 2.54% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% I Conveyance Data Nodes Soffit Elevation Pipe Run Identification Upstream Downstream Upstream Downstream A 15 JI 264 .39 264 Shape Circular Rise Span 2 2 20-Nov-98 Number of Barrels Length 50 N Value or Material Concrete 2969EXD2.out WinStorm TxD OT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 1 JOB CONTROL 1 JOB SECTION 657 JOB NUMBER 2969 : CONFERENCE CENTER 10 Year 100 Year Fri Nov 20 14:14:57 1998 PROJECT DESCRIPTION DESIGN FREQUENCY ANALYSYS FREQUENCY MEASUREMENT UNITS: Input ENGLISH Output ENGLISH Runoff Computations I.D. C Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs ) A 15 0 .433 1.015 10.00 10.0 0 8.635 0.000 3.793 -UNIMPROVED AREAS0.250 0.750 -STREETS & PARKING AREAS0.950 0.265 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 2 Sag Inlet Configuration Data Inlet I. D. Inlet Type Leng th/ Grate Left Perim. Area Long (ft) (sf) (%) Slope Right Slope Trans Long Trans (%) (%) (%) Fri Nov 20 14:14:57 1998 Gutter Depth n Depr. Allow (ft) (ft) Critical Elev. A 15 CURB 15.000 n/a 0.50 2.54 0.50 2.54 0.014 0.330 0.500 267.590 0 Win Storm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 3 Sag Inlet Computation Data Inlet Inlet I.D. Type Length/ Grate Perim. Area (ft) (sf) Total Q (cfs) Inlet Total Capacity Head (cfs) (ft) Page 1 Fri Nov 20 14:14:57 1998 Ponded Widths Left Right (ft) (ft) 2969EXD2.out ------------------------------------------------------------------------------ A 15 CURB 15.000 n/a 3.793 35.014 0.189 8.350 8.350 ------------------------------------------------------------------------------ 0 WinStorm TxD OT STORM DRA IN DESIGN Version 1.3 September 1997 PAGE 4 Fri Nov 20 14:14:57 1998 ------------------------------------------------------------------------------ Cumulative Junction Discharge Computations Node I.D. Al5 0 Weighted C-Value 0 .433 Cumulative Drainage Area (acres) 1.015 Cumulative Tc (min) 10.00 WinStorm TxDOT STORM DRAIN DESIGN Conveyance Configuration Data Flowline Elev. Intensity (in/hr ) 8.635 Supplied Discharge (cfs) 0.000 Total Discharge (cfs) 3.793 Version 1.3 September 1997 PAGE 5 Fri Nov 20 14:14:57 1998 Run I. D. Node I.D. US DS US DS Shape # Span (ft) Rise (ft) Length (ft) Slope (%) n 1 Al5 Jl 262.390 262.000 Circ 1 n/a 2.000 50.00 0.780 0 .013 0 Win Storm TxDOT STORM DRAIN DESIGN Conveyance Hydraulic Computations Run Hyd rauli c Grade l ine US Elev DS Elev Slope (%) Depth Unif. Actual (ft) (ft) 1 264 .3 94 264 .380 0.03 0 .5 91 2.000 Version 1.3 September 1997 PAGE 6 Fri Nov 20 14:14:57 1998 Velocity Unif. Actual (fps) (fps) 4.88 1.21 Q (cfs) Cap (cfs) June Loss (ft) 3.793 19.980 0.000 DISCHARGE FREQUENCY = 100 TAILWATER = 264.38 Page 2 2969EXD2.out 0 Win Storm Tx DOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 7 Fri Nov 20 14:14:57 1998 Runoff Computations I. D. C Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) A 15 0 .433 1.015 10.00 10.00 8.635 0.000 3.793 -UNIMPROVE D AREAS0.250 0.750 -STREETS & PARKING AREAS0.950 0.265 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 8 Fri Nov 20 14:14:57 1998 Sag Inlet Configuratio n Data Inlet I. D. Inlet Type A 15 CURB 0 WinStorm Length/ Grate Left Perim. Area Long (ft) (sf) (%) Slope Right Slope Trans Long Trans (%) (%) (%) Gutter Depth n Depr. Allow (ft) (ft) Critical Elev. 15.000 n/a 0.50 2.54 0.50 2.54 0.014 0.330 0.500 267.590 TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 9 Fri Nov 20 14:14:57 1998 Sag Inlet Computation Data Inlet Inlet I.D. Type A 15 CURB 0 WinStorm Length/ Grate Perim. Area (ft) (sf) 15.000 n/a Total Q (cfs) 3.793 Inlet Total Capacity Head (cfs) (ft) 35.014 0.189 Ponded Widths Left Right (ft) (ft) 8.350 8.350 TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 10 Fri Nov 20 14:14:57 1998 Page 3 2969EXD2 .out Cumulative Junction Discharge Computations Node I.D. A15 0 Wei gh ted C-Value 0.433 Cumulative Drainage Area (a c res ) 1. 015 Cumulative Tc (min) 1 0.00 WinStorm TxDOT STORM DRAIN DESIGN Conveyance Configuration Data Flowline Elev . Inten s ity (in/hr) 8 .635 Supplied Discharge (cfs) 0.000 Total Discharge (cfs) 3.793 Version 1 .3 September 1997 PAGE 11 Fri Nov 20 14:14:57 1998 Run I.D. Nod e I.D. US DS US DS Shape # Span (ft) Rise (ft) Length (ft) Slope (%) n 1 A15 Jl 262.390 262 .000 Circ 1 n/a 2 .000 50.00 0.780 0.013 0 WinStorm TxDOT STORM DRAIN DESIGN Conveyance Hydraulic Computations Run Hydraulic Gradeline US Elev DS Elev Slope (%) Depth Unif. Actual (ft) (ft) 1 264 .394 264.380 0.03 0 .591 2.000 0 WinStorm TxDOT STORM DRAIN DESIGN Computation Messages *Computation : Run 1 -Pipe Flowing Full *Computation: Run = 1 -Pipe Flowing Full NORMAL Completion of WinStorm . Page 4 Version 1.3 September 1997 PAGE 1 2 Fri Nov 20 14:14:57 1998 Velocity Unif. Actual (fps) (fps) 4.88 1.21 Q (cfs) Cap (cfs) June Loss (ft ) 3 .793 19 .980 0.000 Version 1.3 September 1997 PAGE 13 Fri Nov 20 14:14:57 1998 APPENDIXB PROPOSED HYDRAULIC COMPUTATION 000657-2969 Drainage Report.doc DESCRIP TION APPENDIXB TABLE OF CONTENTS PAGE NO. Proposed H oll e man Dr. Sy stem ................................................................................... B -1 Proposed D artmouth St. System #1 ............................................................................. B-2 Proposed Dartmouth St. System #2 ............................................................................. B -3 000657-2969 Drainage Report .doc General Project Information 20-Nov-98 Control: Section: Job: Project: County: Description: Design Frequency: Analysis Frequency: Current File: Outlet Identification: Design Tailwater: Analysis Tailwater: Metric Input: Metric Output: I 657 2969 Conference Center Brazos Proposed Holleman Dr. System 10 100 I :\PROJECTS\600\2969-H-l\2969PRHD .STM A 10 266.6 270 .06 No No Junction Loss Computation: Yes 1 Runoff Control Data 20-N ov-9 Runoff Coefficient "C": 0 .9 Runoff Coefficient Description: Business Areas Runoff Coefficient "C": 0 .5 Runoff Coefficient Description: Residential Runoff Coefficient "C": 0 .65 Runoff Coefficient Description: Industrial Runoff Coefficient "C": 0 .25 Runoff Coefficient Description: Unimproved Areas Runoff Coefficient "C": 0 .3 Runoff Coefficient Description: Landscaped Areas Runoff Coefficient "C": 0 .95 Runoff Coefficient Description: Streets & Parking Areas Minimum Time of Concentration: 10 Intensity "e" Value: 0 Intensity "b" Value: 0 Intensity "d" Value: 0 Drainage Area Data 20-Nov-98 Drainage Drainage Time of Supplied Composite Composite Subarea Drainage Area Area Area Concentration Discharge Runoff Drainage Subarea 1 Subarea 2 Subarea 3 Subarea 4 Subarea 5 Subarea 6 Identification Description Coefficient Area Al Sub-Area 10.00 0.00 0.37 9.SO 0.00 0.00 0.00 0.00 8.SO 1.00 AlO Sub-Area 10.00 0.00 0.77 0.28 0.00 0.00 0.00 0.00 0.08 0.20 A2 Sub-Area 10.00 0.00 O.S6 2.21 0.00 0.00 0.00 0.31 1.00 0.90 A3 Sub-Area 10.00 0.00 0.80 1.17 0.00 0.00 0.00 0.00 0.27 0.90 A4 Sub-Area 10.00 0.00 0.47 4.37 0.00 0.00 0.00 2.17 0.90 1.30 AS Modified Sub-Are 10.00 0.00 0.88 0.09 0.00 0.00 0.00 0.00 0.01 0.08 A6 Modified Sub-Are 10.00 0.00 0.81 0.38 0.00 0.00 0.00 0.00 0.08 0.30 A7 Sub Area 10.00 0.00 0.83 0.89 0.00 0.00 0.00 0.00 0.17 0.72 A9 Modified Sub-Are 10.00 0.00 0.79 2.01 0.00 0.00 0.00 0.00 0.50 1.51 Bl Proposed Sub-Are 10.00 0.00 0.76 1.69 0.00 0.00 0.00 0.00 0.50 1.19 B2 Proposed Sub-Are 10.00 0.00 0.89 0.99 0.00 0.00 0.00 0.00 0.09 0.90 B3 Proposed Sub-Are 10.00 0.00 0.95 0.25 0.00 0.00 0.00 0.00 0.00 0.25 B4 Proposed Sub-Are 10.00 0.00 0.95 0.87 0.00 0.00 0.00 0.00 0.00 0.00 BS Proposed Sub-Are 10.00 0.00 0.95 0.33 0.00 0.00 0.00 0.00 0.00 0.00 1 - Inlet and Junction Data 20-Nov-98 Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Type Elevation Al Existing Inlet Curb on Grade 296 .70 15.00 0 .00 0 .00 None AlO Existing Inlet Curb on Grade 270 .04 12 .00 0 .00 0 .00 None A2 Existing Inlet Curb on Grade 290.89 15 .00 0 .00 0 .00 None A3 Existing Inlet Curb on Grade 290 .94 5.00 0 .00 0 .00 None A4 Existing F .D . Inlet Curb on Grade 281.00 12 .00 0 .00 0 .00 None A5 Existing Inlet Curb on Grade 279 .04 15 .00 0 .00 0 .00 None A6 Existing Inlet Curb on Grade 273 .70 15.00 0 .00 0.00 None A7 Existing Inlet Curb on Grade 273 .46 15 .00 0 .00 0 .00 None A9 None Curb on Grade 270. I 9 10.00 0.00 0.00 None Bl Proposed Inlet Grate at Sag 0 .00 0 .00 6 .60 0 .00 None B2 Proposed Inlet Grate at Sag 0 .00 0 .00 4 .90 0 .00 None B3 Proposed Inlet Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None B4 Proposed Inlet Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None B5 Proposed Inlet Junction/Manhole 0 .00 0 .00 1.00 0 .00 None JI Junction Box Junction/Manhole 297 .3 7 0 .00 0 .00 0 .00 None I Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Type Elevation J2 Junction Box Junction/Manhole 291.96 0 .00 0 .00 0 .00 None JB] None Junction/Manhole 0 .00 0 .00 0.00 0 .00 None 2 Inlet Gutter and Carryover Data 20-Nov-98 Inlet ID Longitudina1 Transverse Transverse Distance Ponded Ponded N gutter Percent Carry Over To Allowable Gutter Slope Gutter Gutter for Slope Width Depth value Discharge Identification Carryover Slope Slope 2 for Sags Al l.83% 2.54% 0 .00% 0 .00 11.50 0 .00 0 .014 0.00% A2 IO AIO 0 .63% 2.54% 0 .00% 0 .00 11.50 0 .00 0.014 0.00% A2 1.8 3% 2.54% 0.00% 0 .00 11.50 0 .00 0 .014 0 .00% A4 IO A3 1.8 3% 2 .54% 0 .00% 0 .00 11.50 0.00 0 .014 0 .00% A7 IO A4 1.44% 2 .54% 0.00% 0 .00 11.50 0 .00 0 .014 0 .00% A5 10 A5 1.44% 2.54% 0.00% 0 .00 11.50 0 .00 0 .014 0 .00% A6 IO A6 1.44% 2.54% 0 .00% 0 .00 11.50 0 .00 0 .014 0.00% A9 IO A7 1.44% 2.54% 0 .00% 0.00 11.50 0 .00 0 .014 0 .00% A 10 10 A9 0 .63% 2.54% 0 .00% 0 .00 11.50 0 .00 0.014 0 .00% Bl 0 .50% 0 .50% 0 .00% 0 .00 12.00 0 .00 0.014 50 .00% Bl 4 .00% 0 .50% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% B2 0 .50% 3 .71% 0 .00% 0.00 12 .00 0.00 0 .014 50 .00% B2 5 .95% 0 .52% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% I Conveyance Data 20-No v-98 Pipe Run Nodes Soffit Elevation Shape Rise Span Number of Length N Value or Identification Upstream Downstream Upstream Downstream Barrels Material A l JI 294 .35 29 3.5 1 Circu lar 1.75 2 27 Concrete 2 JI J2 293 .51 289 .0 8 Circular 2 2 295 .5 Concrete 3 J2 A2 289 .08 288 .6 9 Circular 2 2 23 Concrete 4 A3 J2 289 .21 289.08 Circular 1.5 2 1 23 Concrete 5 A2 A4 288 .74 279 .2 Circular 2.5 2 34 2 .49 Concrete 6 A4 A5 279 .2 276 .84 Circular 2 .5 2 1 120 Concrete 7 B2 Bl 276 .508 276 .151 Circular 1.5 2 90 Concrete 8 Bl A5 276 .551 276 .34 Circular 2 2 1 52 Concrete 9 A5 JBl 276 .99 274 .3 Circular 2 .75 2 1 240 Concrete 10 B 3 JBl 275 274 .3 Circular 2 1 120 Plastic 11 JBI A6 274 .3 271.85 Circular 2 .75 2 186 .5 Concrete 12 B4 A6 275 271.94 Circular 2 100 Plastic 13 A7 A6 272 .46 271.94 Circular 1.5 2 1 46 Concrete 14 A6 A9 271.2 267 .64 Circular 3 2 493 .34 Concrete 15 B5 A9 275 267 .64 Circular 2 1 400 Plastic 16 A9 A 10 266 .75 266 .34 Circular 3 2 2 46 Concrete I 2969PRHD.out WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 1 JOB CONTROL 1 JOB SECTION 657 JOB NUMBER 2969 PROJECT DESCRIPTION : CONFERENCE CENTER DESIGN FREQUENCY 10 Year ANALYSYS FREQUENCY 100 Year Fri Nov 20 13:49:51 1998 MEASUREMENT UNITS: Input ENGLISH Output ENGLISH Runoff Computations I.D. C Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) A 1 0 .36 8 9 .4 96 10.00 10.00 8.635 0.000 30.188 -LANDSCAPED AREAS0.300 8.500 -STREETS & PARKING AREAS0.950 0.996 B 1 0 .75 8 1.692 10.00 10.00 8.635 0.000 11. 07 3 -LANDSCAPED AREAS0.300 0.500 -STREETS & PARKING AREAS0.950 1.192 A 2 0 .558 2 .208 10.00 10.00 8.635 0.000 10.638 -UNIMPROVED AREAS0.250 0 .3 08 -LANDSCAPED AREAS0.300 1.000 -STREETS & PARKING AREAS0.950 0.900 B 2 0.892 0.988 10.00 10.00 8.635 0.000 7.610 -LANDSCAPED AREAS0.300 0.088 -STREETS & PARKING AREAS0.950 0.900 A 3 0.802 1.166 10.00 10.00 8.635 0.000 8.072 -LANDSCAPED AREAS0.300 0.266 -STREETS & PARKING AREAS0.950 0.900 B 3 0.950 0.249 10.00 10.00 8.635 0.000 2 .04 2 A 4 0.469 4.369 10.00 10.00 8.635 0.000 17.677 -UNIMPROVED AREAS0.250 2.169 -LANDSCAPED AREAS0.300 0.900 -STREETS & PARKING AREAS0.950 1.300 B 4 0.950 0.868 10.00 10.00 8.635 0.000 7.120 A 5 0.884 0.089 10.00 10.00 8.635 0 .0 00 0.680 Page 1 2969PRHD.out -LANDSCAPED AREAS0.300 0.009 -STREETS & PARKING AREAS0.950 0.080 B 5 0.950 0 .3 34 10.0 0 1 0 .00 8 .635 0.000 2.74 0 A 6 0.808 0 .384 10.00 10.00 8 .635 0.000 2 .678 -LANDSCAPED AREAS0 .30 0 0 .084 -STREETS & PARKING AREAS0.950 0.300 A 7 0.826 0.889 10.00 10 .00 8 .635 0.000 6 .344 -LANDSCAPED AREAS0 .300 0 .169 -STREETS & PARKING AREAS0 .950 0.720 A 9 0.788 2 .008 10.00 10.00 8 .635 0 .000 13.665 -LANDSCAPED AREAS0.300 0.500 -STREETS & PARKING AREAS0.950 1 .508 A 1 0 0.766 0.279 10.00 10 .00 8.635 0.000 1.845 -LANDSCAPED AREAS0.300 0.079 -STREETS & PARKING AREAS0.950 0 .200 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 2 Fri Nov 20 13:49:5 2 1998 On-Grade I nlet Configuration Data Inlet I.D. Inlet Type Inlet Slopes Gutter Grate Pond Width Critical Length Long. Trans. n Depr . Length Type Allowed Elev. (ft ) (%) (%) (ft) (ft) (ft) A 1 CURB 15 .00 0 1. 83 2.54 0 .014 0 .330 n/a n/a 11.500 296.700 A 2 CURB 15.000 1. 83 2.54 0 .014 0 .330 n/a n/a 11 .500 290.890 A 3 CURB 5.0 0 0 1. 83 2 .54 0 .014 0 .330 n/a n/a 11.500 290.940 A 4 CURB 12.000 1. 44 2.54 0.014 0 .330 n/a n/a 11.500 281.0 0 0 A 5 CURB 15.000 1. 44 . 2 .54 0 .014 0.330 n/a n/a 11. 500 279.040 A 6 CURB 15.0 00 1.44 2.54 0 .014 0 .330 n/a n/a 11. 500 273.700 A 7 CURB 15.000 1. 44 2.54 0.014 0.330 n/a n/a 11. 500 273.460 A 9 CURB 10.00 0 0 .63 2 .54 0 .014 0.330 n/a n/a 11.500 270.190 A 10 CURB 12.000 0 .63 2.54 0 .014 0 .330 n/a n/a 11.500 270.040 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1 .3 September 1997 PAGE 3 Fri Nov 20 13:49 :52 1998 On -Grade Inlet Computation Data Page 2 2969PRHD.out ------------------------------------------------------------------------------ Inlet Inlet Total Inlet Total To Required Actual Ponded I. D. Type Q Capacity Carryover Inlet Length Length Width (c fs) (cfs) (cfs) (ft) (ft) (ft ) ------------------------------------------------------------------------------ A 1 CURB 30.188 1 6.953 13.235 A 2 40.815 15.000 18.153 A 2 CURB 23.87 3 1 4 .94 0 8.933 A 4 35.647 15.000 16.657 A 3 CURB 8.072 3. 3 7 6 4.6 96 A 7 19.240 5.000 11.185 A 4 CURB 26.610 13.788 12.823 A 5 35.990 12.000 18.114 A 5 CURB 13.502 11.093 2.409 A 6 24.344 15.000 14.098 A 6 CURB 5.087 5.087 0.000 A 9 14.098 15.000 9.846 A 7 CURB 11.040 9.710 1. 330 A 10 21. 693 15.000 13.074 A 9 CURB 13.665 9.602 4.063 20.397 10.000 16.500 A 10 CURB 3.175 3.175 0.000 8.964 12.000 9.649 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1. 3 September 1997 PAGE 4 Fri Nov 20 13:49:5 2 1998 Sag Inlet Configuration Data Inlet I.D. Inlet T y p e Length/ Grate Left Perim. Area Long (f t ) (sf) (%) Slope Right Slope Trans Long Trans (%) (%) (%) Gutter Depth n Depr. Allow (ft) (ft) Critical Elev . B 1 e GRATE 16.000 6.600 4.00 0.50 0.50 0.50 0.014 n/a 0.500 No Valu B 2 e GRATE 13.000 4.900 5.95 0.52 0.50 3.71 0.014 n/a 0.500 No Valu 0 WinStorm Tx DOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 5 Fri Nov 20 13:49:5 2 1998 Sag Inlet Computation Data Inlet Inlet Length/ Grate Total Inlet Total Ponded Widths I. D. Type Pe rim. Area Q Capacity Head Left Right (ft ) (sf) (cfs) (cfs) (ft) (ft) (ft) ----~------------------------------------------------------------------------- B 1 GRATE 16.000 6.600 11.073 17.463 0.369 22.500 33.300 B 2 GRATE 13.000 4.900 7.610 14.188 0.330 17.846 8.615 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 6 Fri Nov 20 13:49:5 2 1998 Page 3 2969PRHD.out Cumulative Junction Discharge Computations Node I. D. JO Al Bl Jl A2 B2 J2 A3 B3 A4 B4 AS BS JS A6 A7 A9 0 Weighted C-Value O.S 03 0.368 0.807 0.368 0.440 0. 892 0.416 0 .8 02 0.950 0 .447 0.9SO 0 . 497 0 .9SO 0 .000 0 .538 0 .8 2 6 0 .564 Cumulative Drainage Area (acres) 20.2S7 9 .4 96 2 .6 80 9.496 12.870 0.988 10.662 1.166 0.249 17.239 0.868 20.008 0.334 0.000 22.398 0.889 24.740 Cumulative Tc (min) 11. 37 10.00 10.34 10.00 10.S7 10.00 10.S3 10.00 10.00 10.94 10.00 11.09 10.00 0.00 11. S9 10.00 12.17 WinStorm TxDOT STORM DRAIN DESIGN Intensity (in/hr) 8.17S 8.63S 8.Sl6 8.63S 8.438 8.63S 8.449 8.63S 8.63S 8.313 8.63S 8.26S 8. 63S 0 .000 8.108 8.63S 7.934 Supplied Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total Discharge (cfs) 83.298 30.188 18.426 30.188 47.787 7.610 37.438 8.072 2.042 64.094 7.120 82.2SS 2 .740 0.000 97.772 6.344 110.749 Version 1.3 September 1997 PAGE 7 Fri Nov 20 13:49:52 1998 ------------------------------------------------------------------------------ Conveyance Configuration Data ------------------------------------------------------------------------------ Run Node I. D . Flow line Elev. I. D. us DS us DS Shape # Span Rise Length Slope n (ft) (ft) (ft) (%) ------------------------------------------------------------------------------ 1 Al Jl 292.600 291.760 Circ 1 n/a 1.750 27 .00 3.113 0.013 2 Jl J2 291.510 287.080 Circ 1 n/a 2 .000 295 .50 1. 499 0 .013 3 J2 A2 287.080 286 .690 Circ 1 n/a 2.000 23 .00 1.696 0.013 4 A3 J2 287 .710 287 .S80 Circ 1 n/a 1. soo 23.00 O.S6S 0.013 s A2 A4 286.240 276.700 Circ 1 n/a 2.SOO 342.49 2 .787 0 .01 3 6 A4 AS 2·76. 700 274 .340 Circ 1 n/a 2.SOO 120.00 1.967 0.013 7 B2 Bl 27S .008 274 .6Sl Circ 1 n/a 1. 500 90.00 0.397 0.013 8 Bl AS 274.SSl 274.340 Circ 1 n/a 2 .000 S2.00 0.406 0.013 9 AS JO 274 .240 271. 5SO Circ 1 n/a 2 .7SO 240.00 1.121 0.013 10 B3 JO 274.000 273.300 Circ 1 n/a 1. 000 120.00 O.S83 0.011 11 JO A6 271. sso 269.100 Circ 1 n/a 2.7SO 186.SO 1. 314 0 .013 12 B4 A6 274 .000 270.940 Circ 1 n/a 1. 000 100.00 3.061 0.011 13 A7 A6 270.960 270.440 Circ 1 n/a 1. soo 46.00 1.131 0 .013 14 A6 A9 268.200 264.640 Circ 1 n/a 3.000 493.34 0.722 0.013 lS BS A9 274.000 266.640 Circ 1 n/a 1 .000 400.00 1. 840 0.011 Page 4 I I 16 0 A9 AlO 2969PRHD.out 263.750 263.340 Circ 2 n/a 3.000 46.00 0.891 0 .013 WinStorm Tx DOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 8 Fri Nov 20 13:49:5 2 1998 ------------------------------------------------------------------------------ Conveyanc e Hy drauli c Computat i ons Run 1 2 3 4 5 6 7 8 9 1 0 11 1 2 1 3 1 4 15 16 Hydraulic Gradeline US Elev DS Elev Slope (%) 294.2 41 293 .385 288.955 289 .06 5 2 87.7 7 9 2 7 9 .0 45 2 77.6 37 2 77.1 64 2 76.8 1 9 274.5 7 8 2 74.129 2 74.791 2 71.77 0 2 7 1 .014 27 4.488 266 .917 293.385 288.955 28 7.779 28 8 .955 2 7 9 .0 45 276.819 2 77.164 2 7 6 .819 2 74.1 2 9 2 74.1 2 9 2 71.014 2 7 1 .0 14 271.0 14 266 .917 2 6 6 .9 17 266 .600 3.63 1. 78 2.74 0 .59 1. 3 6 2.44 0.52 0.66 2.42 0.2 4 2 .48 2 .86 0.36 2 .15 0.4 2 0.6 9 Depth Unif. Actual (ft) (ft) 1. 641 1.875 1. 875 1. 261 1. 539 2.345 1.407 1. 875 2.579 0.578 2.579 0.791 0.810 2.814 0.488 2 .814 1. 641 1. 875 1. 875 1. 375 2 .345 2.479 1. 500 2 .000 2.579 0.829 2.579 0.791 0.810 2 .814 0.488 3.000 Velocity Unif. Actual (fps) (fps) 12.89 9.87 12.24 5.09 15.08 13.40 4.42 6.0 2 14.2 2 4.35 14.40 10.70 6.52 14.2 0 7.17 8.04 12.88 9.86 12.23 4.76 9.99 13.07 4.31 5.87 14.21 2.93 14.39 10.69 6.52 14.20 7.19 7.83 Q (cfs) 30.188 30.188 37.438 8.072 47.787 64.094 7.610 18.426 82.255 2.042 83.298 7.120 6.344 97.77 2 2.740 110.749 Cap (cfs) 27.955 27.700 2 9. 4 60 7.897 68.470 57.5 2 7 6.616 14.411 55.993 3.2 16 60.61 9 7.367 11.169 56.66 0 5.71 2 1 2 5.941 June Loss (ft) 0.000 0.000 0.000 0 .000 0 .0 00 0 .0 00 0 .0 00 0 .0 00 0 .0 00 0 .0 0 0 0 .0 00 0.000 0 .0 00 0 .0 0 0 0 .000 0 .0 00 DI SCH ARGE FREQUENC Y = 100 TAILWATER = 270.06 D WinStorm Tx DOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 9 Fri Nov 20 13:49:52 1 9 98 Run o ff Computations I. D. C Value Are a Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) A 1 0 .368 9.496 10.00 10.00 8.635 0.000 30.188 Page 5 2969PRHD.out -LANDSCAPED AREAS0.300 8.500 -ST REETS & PARKING AREAS0.950 0.996 B 1 0 .758 1.692 10.00 10.0 0 8.635 0.000 11. 073 -LANDSCAPED AREAS 0.300 0.500 -ST REETS & PARKING AREAS0.950 1.19 2 A 2 0.558 2.208 10.00 10.00 8.635 0.000 10.638 -UNIMPROVED AREAS 0 .250 0 .308 -LANDSCAPED AREAS0.300 1.000 -STREETS & PARKING AREAS0.950 0.900 B 2 0 .89 2 0.988 10.00 10.00 8.635 0.000 7.610 -LANDSCAPE D AREAS0.300 0.088 -ST REETS & PARKING AREAS0.950 0.900 A 3 0 .80 2 1.166 10.00 10.0 0 8.635 0.000 8.07 2 -LANDSCAPED AREAS0.3 00 0 .266 -STREETS & PARKING AREAS0.950 0.900 B 3 0 .950 0.249 10.00 10.00 8.635 0.000 2.042 A 4 0 .469 4.369 10.00 10.00 8.635 0.000 17.677 -UNIMPROVED AREAS0.250 2.169 -LANDSCAPED AREAS0.300 0.900 -STREETS & PARKING AREAS0.950 1.300 B 4 0 .950 0 .868 10.00 10.00 8.635 0 .0 00 7.1 20 A 5 0 .884 0 .0 89 10.00 10.00 8.635 0 .00 0 0 .680 -LANDSCAPED AREAS0.300 0 .00 9 -STREETS & PARKING AREAS0.950 0.080 B 5 0 .950 0.334 10.00 10.00 8.635 0.000 2.740 A 6 0 .80 8 0.384 10.00 10.00 8.635 0.000 2.678 -LANDSCAPED AREAS 0 .3 00 0.084 -STREETS & PARKING AREAS0.950 0.300 A 7 0.826 0.889 10.00 10.00 8.635 0.000 6.344 -LANDSCAPED AREAS0.300 0.169 -STREETS & PARKING AREAS0.950 0.720 A 9 0 .78 8 2.008 10.00 10.00 8.635 0.000 13.665 -LANDSCAPED AREAS 0 .300 0.500 -STREETS & PARKING AREAS0.950 1. 508 A 10 0 .7 66 0.279 10.00 10.00 8.635 0.000 1. 845 -LANDSCAPED AREAS0.300 0.079 -STREETS & PARKING AREAS0.950 0.200 Page 6 2969PRHD.out ------------------------------------------------------------------------------ D Win Storm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 10 Fri Nov 20 13:49:53 1998 On-Grade Inlet Configuration Data Inlet I.D. Inlet Type Inlet Slopes Gutter Grate Pond Width Critical Leng th Long. Trans. n Depr. Length Type Allowed Elev. (ft) (%) (%) A 1 CURB 15.000 1. 83 2.54 0.014 A 2 CURB 15.000 1. 83 2.54 0.014 A 3 CURB 5.0 00 1. 83 2.54 0.014 A 4 CURB 12.000 1. 44 2.54 0.014 A 5 CURB 15.0 00 1. 44 2.54 0.014 A 6 CURB 15.0 00 1. 44 2.54 0.014 A 7 CURB 15.0 00 1. 44 2.54 0.014 A 9 CURB 10.0 00 0.63 2.54 0.014 A 10 CURB 12.000 0.63 2.54 0.014 D WinStorrn TxDOT STORM DRAIN DESIGN On-Grade Inlet Computation Data Inlet I. D. A 1 A 2 A 3 A 4 A 5 A 6 A 7 A 9 A 10 D Inlet Type CURB CURB CURB CURB CURB CURB CURB CURB CURB WinStorrn Total Q (cfs) 30.188 23 .873 8.072 26 .61 0 13.50 2 5.087 11.040 13.665 3.175 Inlet Capacity (cfs) 16.953 14.940 3.376 13.788 11.093 5.087 9.710 9.602 3.175 Total Carryover (cfs) 13.235 8.933 4.696 12.823 2.409 0.000 1. 330 4.063 0.000 TxDOT STORM DRAIN DESIGN Sag Inlet Configuration Data (ft) (ft) (ft) 0.330 n/a n/a 11.500 296.700 0.330 n/a n/a 11.500 290.890 0.330 n/a n/a 11.500 290.940 0.330 n/a n/a 11.500 281.000 0.330 n/a n/a 11. 500 279.040 0.330 n/a n/a 11. 500 273.700 0.330 n/a n/a 11.500 273.460 0.330 n/a n/a 11. 500 270.190 0.330 n/a n/a 11.500 270.040 Version 1.3 September 1997 PAGE 11 A A A A A A A To Inlet 2 4 7 5 6 9 10 Fri Nov 20 13:49:53 Required Length (ft) 40.815 35.647 19.240 35.990 24.344 14.098 21. 693 20.397 8.964 Actual Length (ft) 15.000 15.000 5.000 12.000 15.000 15.000 15.000 10.000 12.000 Ponded Width (ft) 18.153 16.657 11.185 18.114 14.098 9.846 13.074 16.500 9.649 1998 Version 1.3 September 1997 PAGE 12 Fri Nov 20 13:49:53 1998 Page 7 2969PRHD.out Inlet Inlet Length/ Grate Left Slope Right Slope Gutter Depth Critical I. D. Type Pe rim. Area Long Trans Leng Trans n Depr. Allow Elev . (ft) (sf) (%) (%) (%) (%) (ft) (ft) ------------------------------------------------------------------------------ B 1 e GRATE 16.000 6.600 4.00 0.50 0.50 0.50 0.014 n/a 0.500 No Valu B 2 e GRATE 13.000 4.900 5.95 0.52 0.50 3.71 0.014 n/a 0.500 No Valu 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 13 Sag Inlet Computation Data Inlet Inlet I.D. Type Leng th/ Grate Perim. Area (ft) (sf) Total Q (cfs) B 1 B 2 GRATE 16.0 00 6.600 11.073 GRATE 13.000 4.90 0 7.610 0 Inlet Total Capacity Head (cfs) (ft) 17.463 0 .369 14.188 0 .330 Fri Nov 20 13:49:53 1998 Ponded Widths Left Right (ft ) (ft) 22.500 33.300 17.846 8.615 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 14 Cumulati ve Junction Discharge Computations Node I. D . JO Al Bl Jl A2 B2 J 2 A3 B3 A4 B4 A5 B5 J5 A6 Weighted C-Value 0 .5 03 0.368 0.807 0.368 0 .44 0 0 .892 0 .416 0.802 0 .950 0 .447 0 .9 50 0 . 497 0.950 0 .000 0 .538 Cumulative Drainage Area (acres) 20 .257 9 .4 96 2 .6 80 9.496 12.870 0 .988 10.66 2 1 166 0 .249 17.239 0.868 20 .008 0.334 0.000 22.398 Cumulative Tc (min ) 11.37 10.00 10.34 10.00 10.57 10.00 10.53 10.00 10.00 10.94 10.00 11. 09 10.00 0.00 11. 59 Page 8 Intensity (in/hr) 8 .175 8.635 8.516 8.635 8.438 8.635 8.449 8.635 8.635 8.313 8.635 8.265 8.635 0.000 8.108 Fri Nov 20 13:49:53 19 98 Supplied Discharge (cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 0.000 0.000 0.000 0.000 Total Discharge (cfs) 83.2 98 30.188 18.426 30.188 47.787 7.610 37.438 8.072 2.042 64.094 7.12 0 82.255 2 .74 0 0.000 97.77 2 A7 A9 D 0 .826 O.S 64 0.889 24.740 2969PRHD.out 10.00 12.17 8.63S 7.934 0.000 0.000 6.344 110.749 WinStorm T x DO T STORM DRAIN DESIGN Version 1.3 September 1997 PAGE lS Fri Nov 20 13:49:S4 1998 Conveyance Configuration Data Run I. D . D 1 2 3 4 s 6 7 8 9 10 11 1 2 13 14 lS 16 Node I.D. US DS Al Jl J2 A3 A2 A4 B2 Bl AS B3 J O B4 A7 A6 BS A9 Jl J2 A2 J2 A4 AS Bl AS JO JO A6 A6 A6 A9 A9 Al O Flowline Elev. US DS Shape # Span Rise (ft) (ft) 292 .6 00 291 .Sl O 287 .080 287 .710 286 .240 276 .7 00 27S .008 27 4.SSl 2 74.240 274 .000 27 1.SS O 274 .000 2 70.96 0 268.200 274 .0 00 263 .7S O 291 .760 Circ 1 28 7.080 Circ 1 286.690 Circ 1 287 .S80 Circ 1 276.700 Circ 1 2 74.340 Circ 1 2 74.6Sl Circ 1 274.340 Circ 1 2 71. SSO Circ 1 2 73.300 Circ 1 269 .100 Circ 1 2 70.940 Circ 1 270 .440 Circ 1 264 .64 0 Circ 1 266 .640 Circ 1 263 .34 0 Circ 2 n/a 1.7SO n/a 2.000 n/a 2 .000 n/a 1. SOO n/a 2.SOO n/a 2 .SOO n/a 1. SOO n/a 2.000 n/a 2.7SO n/a 1. 000 n/a 2.7SO n/a 1. 000 n/a 1. SOO n/a 3.000 n/a 1. 000 n/a 3.000 Length (ft) Slope (%) n 27.00 3.113 0 .013 29S.SO 1.499 0.013 23.00 1.696 0.013 23.00 O.S6S 0 .013 342.49 2 .787 0 .0 1 3 120.00 1.967 0 .013 90.00 0.397 0 .013 S 2 .0 0 0 .4 06 0 .013 2 40.0 0 1.121 0.013 1 20 .0 0 O.S83 0 .011 186.SO 1.314 0 .013 10 0 .00 3.061 0 .011 46.00 1.1 31 0 .0 1 3 493.3 4 0.722 0 .0 1 3 400.0 0 1.84 0 0 .0 11 46.0 0 0.891 0 .0 1 3 Win Storm T xDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 1 6 Fri No v 20 13:49:S4 1998 ------------------------------------------------------------------------------ Conveyance Hydraulic Computations ------------------------------------------------------------------------------ Hydraulic Gradeline Depth Velocity June Run us Elev DS Elev Slope Uni f. Actual Unif. Actual Q Cap Loss ( % ) (ft) (ft) (fps) (fps) (cfs) (cfs) (ft ) ------------------------------------------------------------------------------ 1 30S.864 304.884 3.63 1. 641 1. 750 12.89 12.5S 30.188 27.9SS 0 .000 2 304.884 299 .6 22 1. 78 1. 87S 2.000 9.87 9.61 30.188 27.700 0 .00 0 3 299 .622 298 .992 2.74 1. 87S 2.000 1 2 .24 11. 92 37.438 29.460 0 .0 00 4 299 .7S7 299 .6 22 O.S9 1. 2 61 1. soo 5.09 4.57 8.07 2 7.897 0.000 s 298.992 294 .34 2 1. 36 1. S39 2.SOO 15.08 9.74 47.787 68.470 0 .000 6 294 .342 291. 41 2 2.44 2 .34S 2.SOO 13.40 13.06 64.094 57.527 0 .000 7 292 .230 291. 7S7 0.5 2 1. 407 1. 500 4.42 4.31 7.610 6.616 0 .0 00 8 291. 757 291. 412 0.66 1. 87S 2 .000 6.02 5.87 18.426 14.411 0 .0 00 9 291 .412 28S .606 2 .4 2 2 .S79 2 .750 14.22 13.8S 82.2 55 5S.993 0.000 Page 9 J I 2969PRHD.out 1 0 285 .888 285.606 0.24 0.578 1. 0 00 4.35 2.6 0 2.042 3.2 16 0 .000 11 285 .6 0 6 280 .979 2.48 2 .579 2 .75 0 14.40 14 .0 2 83.298 60.619 0.000 12 283 .83 9 280 .979 2 .86 0.791 1. 000 10.70 9.0 7 7 .120 7.367 0.000 13 281 .1 47 280.9 79 0.36 0.810 1. 5 00 6.5 2 3.59 6.344 11.169 0.000 14 280 .97 9 2 70.377 2 .1 5 2 .814 3.000 14.20 13.83 97.77 2 56.660 0.000 15 2 74.4 88 2 70.377 0.4 2 0.488 1.000 7.17 3.49 2.740 5.71 2 0.000 16 2 70.377 2 70.060 0.69 2.814 3.000 8.04 7.83 110.749 125.941 0.000 ------------------------------------------------------------------------------ 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1. 3 September 1997 PAGE 17 Fri Nov 20 13:49:54 1998 Computation Messag es *Warning: Ponded width e xcee ds allowable width at *Warning: Capac it y of grade inlet id Al exceeded. *Warning: Ponded widt h exceeds allowable width at *Warning: Capacity of grade inlet id A2 e x ceeded. *Warning: Capacity of grade inlet id A3 exceeded. *Warning : Ponded width exceeds allowable width at *Warning: Capacity of grade inlet id A4 exceeded. *Warning: Ponded width exceeds allowable width at *Warning: Capacity of grade inlet id A5 exceeded. *Warning : Ponded width e xcee ds allowable width at *Warning : Cap acit y of grade inlet id A7 exceeded. *Warning: Ponded width exceeds allowable width at *Warning: Capacit y of grade inlet id A9 exceeded. inlet inlet inlet inlet inlet inlet id Al. id A2. id A4. id AS. id A7. id A9. *Warning: Left ponded width exceeds allowable width at inlet id Bl. *Warning : Righ t ponded width exceeds allowable width at inlet id Bl. *Warni ng: Left ponded width e xceed s allowable width at inlet id B2 . *Warn ing: Discharg e decreased downstream Junction Jl -previous intensity used *Comp uta tion : Ru n 1 -Insufficient Capacity *Computation: Run 2 -Insufficient Capacity *Computation : Run 3 -Insufficient Capacit y *Computation : Run 4 -Insufficient Capacit y *Compu ta tion: Run 6 -Insufficient Capacity *Computation: Run 7 -Insufficient Capacity *Computat ion : Ru n 8 -Insu fficient Capacit y *Comput ation: Run 9 -In sufficient Capacity *Computation : Run 11 -Insufficient Capacit y *Computat ion: Run 14 -Insufficient Capacity *Comp utatio n : Run 16 -Pipe Flowing Full *Warning: Po nded width e x ceeds allowable width at inlet id Al. *W arning: Capacity of grade inlet id Al exceeded. *Warn ing: Ponded width exceeds allowable width at inlet id A2 . *Warning: Capac ity of grade inlet id A2 exceeded. *Warning : Capacity of grade inlet id A3 exceeded. *Warning: Ponded widt h exceeds allowable width at inlet id A4. Page 10 I 2969PRHD.out *Warning: Capacity of grade inlet id A4 exceeded. *Warning: Ponded width exceeds allowable width at inlet id AS. *Warning: Capacity of grade inlet id AS exceeded. *Warning: Ponded width exceeds allowable width at inlet id A7. *Warning: Capacity of grade inlet id A7 exceeded. *Warning: Ponded width exceeds allowable width at inlet id A9. *Warning: Capacity of grade inlet id A9 exceeded. *Warning: Left ponded width exceeds allowable width at inlet id Bl. *Warning: Right ponded width exceeds allowable width at inlet id Bl. *Warning: Left ponded width exceeds allowable width at inlet id B2. *Warning: Discharge decreased downstream Junction Jl -previous intensity used *Warning: Run -16 Upstream Hydraulic Gradeline 270.38 -Exceeds Critical Elevation= 270.19 *Warning: Run -14 Elevation= 273.70 *Warning: Run -13 Elevation = 2 73.46 *Warning: Run -9 levation = 279.04 *Warning: Run -6 levation = 2 81.00 *Warning: Run -s levation = 290.89 *Warning: Run -3 levation = 2 91.96 *Warning: Run -4 levation = 290 .94 *Warning: Run -2 levation = 297.37 *Warning: Run -1 levation = 2 96.7 0 *Computation: Run *Computation: Ru n *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation: Run *Computation : Run *Computation: Run *Computation: Run - - - - - - - -Upstream Hydraulic Gradeline -Upstream Hydraulic Gradeline Upstream Hydraulic Gradeline Upstream Hydraulic Gradeline Upstream Hydraulic Grade line Upstream Hydraulic Grade line Upstream Hydraulic Grade line Upstream Hydraulic Grade line Upstream Hydraulic Grade line 1 -Insufficient Capacity 2 -Insufficient Capacity 3 -Insufficient Capacity 4 -Insufficient Capacity S -Pipe Flowing Full 6 -Insufficient Capacity 7 -Insufficient Capacity 8 -Insufficient Capacity 9 -Insufficient Capacity 10 -Pipe Flowing Full 11 -Insufficient Capacity 12 -Pipe Flowing Full 13 -Pipe Flowing Full 14 -Insufficient Capacity lS -Pipe Flowing Full 16 -Pipe Flowing Full NORMAL Completion of WinStorm. Page 11 280.98 -Exceeds Critical 281. lS -Exceeds Critical 291. 41 -Exceeds Critical 294.34 -Exceeds Critical 298.99 -Exceeds Critical 299.62 -Exceeds Critical 299.76 -Exceeds Critical 304.88 -Exceeds Critical 30S.86 -Exceeds Critical E E E E E E E General Project Information 21-N ov-98 Control: Section: Job: Project: County: Description: Design Frequency: Analysis Frequency : Current File: Outlet Identification: Design Tailwater: Analysis Tailwater: Metric Input: Metric Output: 1 657 2969 Conference Center Brazos Proposed Dartmouth St. System # 1 10 100 I :\PROJECTS\600\2969-H~l\2969PRD1 .STM Jl 267 .76 267 .76 No No Junction Loss Computation: No 1 Runoff Control Data 21-N ov-9 Runoff Coefficient "C": 0 .9 Runoff Coefficient Description: Business Area Runoff Coefficient "C": 0.5 I Runoff Coefficient Description: Residential Runoff Coefficient "C": 0 .65 Runoff Coefficient Description: Industrial Runoff Coefficient "C": 0 .25 Runoff Coefficient Description: Unimproved Area Runoff Coefficient "C": 0 .3 Runoff Coefficient Description: Landscaped Area Runoff Coefficient "C": 0 .95 Runoff Coefficient Description: Street & Parking Area Minimum Time of Concentration: 10 Intensity "e" Value: 0 Intensity "b" Value : 0 Intensity "d" Value: 0 Drainage Area Data 21-Nov-98 Drainage Drainage Time of Supplied Composite Composite Subarea Drainage Area Area Area Concentration Discharge Runoff Drainage Subarea l Subarea 2 Subarea 3 Subarea 4 Subarea 5 Subarea 6 Identification Description Coefficient Area Al2 Modified Sub-Are 14.00 0.00 0.54 3.21 0.00 2.96 0.00 0.00 0.00 0.25 Al3 TROY Subdivisio 0.00 23.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Al4 Sub-Area 10.00 0.00 0.95 0.74 0.00 0.00 0.00 0.00 0.00 0.00 A8 Modified Sub-Are 15.00 0.00 0.54 12.05 0.00 9.50 0.00 0.00 1.00 1.55 Cl Proposed Sub-Are 10.00 0.00 0.78 0.54 0.00 0.00 0.00 0.00 0.14 0.40 ClO Proposed Sub-Are 10.00 0.00 0.95 0.73 0.00 0.00 0.00 0.00 0.00 0.00 Cll Proposed Sub-Are 10.00 0.00 0.86 1.15 0.00 0.00 0.00 0.00 0.15 1.00 C2 Proposed Sub-Are 10.00 0.00 0.77 1.20 0.00 0.25 0.00 0.00 0.15 0.80 C3 Proposed Sub-Are 10.00 0.00 0.83 1.15 0.00 0.15 0.00 0.00 0.10 0.90 C4 Proposed Sub-Are 10.00 0.00 0.95 0.24 0.00 0.00 0.00 0.00 0.00 0.00 cs Proposed Sub-Are 10.00 0.00 0.94 0.92 0.00 0.00 0.00 0.00 0.02 0.90 C6 Proposed Sub-Are 10.00 0.00 0.95 0.33 0.00 0.00 0.00 0.00 0.00 0.00 C7 Proposed Sub-Are 10.00 0.00 0.74 0.84 0.00 0.40 0.00 0.00 0.00 0.44 C8 Proposed Sub-Are 10.00 0.00 0.95 0.39 0.00 0.00 0.00 0.00 0.00 0.00 C9 Proposed Sub-Are 10.00 0.00 0.95 0.22 0.00 0.00 0.00 0.00 0.00 0.00 1 -- Inlet and Junction Data 21-Nov-98 Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Type Elevation Al2 None Grate at Sag 0 .00 0 .00 4 .90 0 .00 None Al3 Existing Inlet Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None Al4 Existing Inlet Curb at Sag 270 .05 15 .00 0 .00 0 .00 None A8 Proposed Inlet Grate at Sag 0 .00 0 .00 14 .70 0 .00 None Cl Proposed Inlet Grate at Sag 0.00 0 .00 3.70 0 .00 None CIO Roof drain Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None Cl 1 Proposed Inlet Grate on Grade 0.00 0 .00 0 .00 0 .00 None C2 Proposed Inlet Grate on Grade 0 .00 0 .00 4 .00 0 .00 None C3 Proposed Inlet Grate on Grade 0 .00 0 .00 0.00 0 .00 None C4 Roof drain Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None cs Proposed Inlet Grate at Sag 0 .00 0 .00 9 .80 0 .00 None C6 Roof drain Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None C7 Proposed Inlet Grate on Grade 0 .00 0 .00 0 .00 0 .00 None C8 Roof drain Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None C9 Proposed Inlet Grate on Grade 0 .00 0 .00 0 .00 0 .00 None 1 -- Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Type Elevation JI Inlet/Outlet Junction/Manhole 269 .71 0 .00 0 .00 0 .00 None J2 Existing J.B . Junction/Manhole 272 .00 0 .00 0 .00 0 .00 None J3 Existing J.B. Junction/Manhole 278 .00 0 .00 0 .00 0 .00 None J4 Existing J.B . Junction/Manhole 288 .00 0 .00 0 .00 0 .00 None 2 -- Inlet Gutter. and Carryover Data 21-Nov-98 Inlet ID Longitudinal Transverse Transverse Distance Ponded Ponded N gutter Percent Carry Over To Allowable Gutter Slope Gutter Gutter for Slope Width Depth value Discharge Identification Carryover Slope Slope 2 for Sags Al2 5.00% 5.00% 0 .00% 0 .00 12.00 0 .00 0 .014 50 .00% Al2 2 .78% 1.11% 0 .00% 0.00 12 .00 0.00 0 .014 50 .00% Al4 1.00% 2.54% 0 .00% 0 .00 12 .00 0.00 0 .014 50 .00% Al4 1.00% 2 .54% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% AS 5.00% 5 .00% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% A8 5 .44% 5.00% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% Cl 2 .75% 2 .00% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% Cl 1.61% 2 .98% 0 .00% 0.00 12.00 0.00 0 .014 50 .00% Cll 4 .54% 1.06% 0 .00% 0 .00 20 .00 0 .00 0 .014 0.00% Cl 10 C2 3.13% 3 .l1% 0 .00% 0 .00 20 .00 0 .00 0 .014 0 .00% C3 IO C3 0 .47% 2 .00% 0 .00% 0 .00 20 .00 0 .00 0 .014 0 .00% C5 IO C5 0 .50% 0 .50% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% C5 0.50% 1.00% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% C7 0 .55% 1.84% 0 .00% 0 .00 20 .00 0 .00 0 .014 0 .00% C5 IO C9 0 .50% 2.00% 0 .00% 0 .00 20 .00 0 .00 0 .014 0 .00% C7 10 I - Conveyance Data 21-Nov-98 Pipe Run Nodes Soffit Elevation Shape Rise Span Number of Length N Value or Identification Upstream Downstream Upstream Downstream Barrels Material A 14 JI 268 .7 267 .76 Circular 2 .75 2 2 65 Concrete 2 12 A 14 269 .85 268 .75 Circular 2 2 30 Concrete 3 J3 12 272 .68 270 .89 Circular 2 2 170 Concrete 4 14 J3 284 .5 272 .78 Circular 2 2 207 Concrete 5 A 13 14 289 .5 286 .5 Circular 1:5 2 1 62 Concrete 6 Cl A 14 270 .097 269 .9S Circular 4 2 S8 .75 Concrete 7 C2 Cl 270 .S71 270.197 Circular 4 2 1 149.78 Concrete 8 C3 C2 271.02 270.671 Circular 4 2 1 139 .S2 Concrete 9 C4 C3 271.833 271.12 Circular 1 2 9S Plastic IO cs C3 271.463 271.12 Circular 4 2 136.9S Concrete 11 C6 cs 273 .S 271.S63 Circular 1 2 200 Plastic 12 C7 cs 272 .3 S2 271.S63 Circular 2 1 131.S4 Concrete 13 A8 C7 273 .4SS 272.4S2 Circular 4 2 167 .09 Concrete 14 C8 A8 27S 273 .SSS Circular 2 50 Concrete IS C9 A8 274 .197 273 .SSS Circular 4 2 I06 .9S Concrete 16 c IO C9 275 274 .197 Circular l.S 2 12S Plastic 17 c 11 Cl 275 .292 270 .197 Circular 4 2 197 .28 Concrete 1 Pipe Run Identification 18 Nodes Soffit Elevation Upstream Downstream Upstream Downstream A 12 C 11 28 3 27 5 .392 Shape Ci rcular Rise 4 Span 2 Number of Barrels Length 275 .51 N Value or Material Concrete 2 2969PRD1.out WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 1 JOB CONTROL 1 JOB SECTION 657 JOB NUMBER 2969 : CONFERENCE CENTER 10 Year 100 Year PROJECT DESCRIPTION DESIGN FREQUENCY ANALYSYS FREQUENCY MEASUREMENT UNITS: Input ENGLISH Output Runoff Computations I. D. C Value Area Tc (acres) (min) c 1 0.781 0 .541 10.00 -LANDSCAPED AREA 0 .300 0.141 -STREET & PARKING AREA0.950 0.400 c 2 0 .775 1.202 10 .00 -RESIDENTIAL0.50 0 0.252 -LANDSCAPED AREA0.300 0.150 -STREET & PARKING AREA0.950 0.800 c 3 0.834 1.152 10.00 -RESIDENTIAL0.500 0 .1 52 -LANDSCAPED AREA0.300 0.100 -STREET & PARKING AREA0.950 0.900 c 4 0 .95 0 0.235 10.00 c 5 0 .935 0 .921 10.00 -LANDSCAPED AREA0.300 0.021 -STREET & PARKING AREA0.950 0.900 c 6 0.950 0 .3 26 10.00 c 7 0.737 0.844 -RE SIDENTIAL0 .5 00 0.400 -STREET & PARKING AREA0.950 A 8 0.541 12.050 -RESIDENTIAL0.500 9.500 10.00 0.444 15.00 -LANDSCAPED AREA0.300 1.000 -STREET & PARKING AREA0.950 1.550 Tc Used (min) 10.00 10.00 10.00 10.00 10.00 10.00 10.00 15.00 Page 1 Sat Nov 21 21:49:01 1998 ENGLISH Intensity Supply Q Total Q (in/hr) (cfs) (cfs) 8.635 0 .000 3 .646 8.635 0 .000 8 .039 8.635 0.000 8.298 8.635 0.000 1. 9 28 8.635 0.000 7.437 8.635 0.000 2 .6 74 8.635 0.000 5.369 7.194 0.000 46.922 I 2969PRD1.out c 8 0.950 0.392 10.00 10.00 8.635 0.000 3.215 c 9 0.950 0.222 10.00 10.00 8.635 0.000 1.821 c 10 0.950 0.732 10.00 10.00 8.635 0.000 6.004 c 11 0 .864 1.152 10.00 10.00 8.635 0.000 8 .597 -LANDSCAPED AREA0.300 0.152 -STREET & PARKING AREAO . 950 1.000 A 12 0 .535 3.207 14.00 14.00 7.437 0.000 12.761 -RESIDENTIAL0.500 2.957 -STREET & PARKING AREA0.950 0.250 A 13 0.000 0.000 0.00 0.00 0.000 23.200 23 .200 A 14 0.950 0 .7 35 10.00 10.00 8.635 0.000 6.029 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 2 Sat Nov 21 21 :49:02 1998 On-Grade Inlet Configuration Data Inlet I. D. Inlet Type Inlet Slopes Gutter Grate Pond Width Critical Length Long. Trans. n Depr. Length Type Allowed Elev. (ft) (%) (%) (ft) (f t) (ft) c 2 GRATE 5.000 3.13 3.11 0.014 n/a 5.000 PARAL.20.000 No Value c 3 GRATE 4 .000 0.47 2.00 0.014 n/a 4 .000 PARAL.20.000 No Value c 7 GRATE 4.000 0.55 1. 84 0.014 n/a 4.000 PARAL.20.000 No Value c 9 GRATE 4.000 0.50 2 .00 0.014 n/a 4.000 PARAL.20.000 No Value c 11 GRATE 4.000 4.54 1. 06 0.014 n/a 4.000 PARAL.20.000 No Value 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 3 Sat Nov 21 21 :49:02 1998 On-Grade Inlet Computation Data Inlet I. D. c 2 c 3 Inlet Type GRATE GRATE Total Q (cfs) 8.039 9 .5 79 Inlet Capacity (cfs) 6.758 6.822 Total Carryover (cfs) 1. 281 2.756 To Inlet c 3 c 5 Page 2 Required Length (ft) n/a n/a Actual Length (ft) 5.000 4. 000 Ponded Width (ft) 8.959 17.650 C 7 GRATE C 9 GRATE C 11 GRATE 0 5. 79 2 1. 8 2 1 8.597 4.455 1. 398 5.546 2969PRD1 .out 1. 337 0.423 3.051 c 5 c 7 c 1 n/a n/a n/a 4.000 4.000 4.000 14.978 9.450 16.406 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 4 Sag Inlet Configuration Data Inlet I.D. Inlet Type Length/ Grate Left Perim. Area Long (ft) (sf) (%) Slope Right Slope Trans Long Trans (%) (%) (%) Sat Nov 21 21:49:02 1998 Gutter Depth n Depr. Allow (ft) (ft) Critical Elev. c 1 e GRATE 12.00 0 3.700 1.61 2 .98 2 .7 5 2.00 0.014 n/a 0.500 No Valu c 5 e GRATE 18.0 00 9.800 0 .5 0 1.00 0.50 0.50 0 .014 n/a 0.500 No Valu ·A 8 GRATE 23 .000 14.70 0 5.44 5 .00 5.00 5 .00 0 .014 n/a 0.500 No Valu e A 12 GRATE 18.0 0 0 e 4 .900 2.78 1.11 5.00 5.00 0.014 n/a 0.500 No Valu A 14 CURB 15.000 n/a 1.00 2.54 1.00 2.54 0.014 0.330 0.500 2 7 0 .050 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 5 Sat Nov 21 21:49:0 2 1998 ------------------------------------------------------------------------------ Sag Inle t Computation Data ------------------------------------------------------------------------------ In le t Inlet I.D. Typ e Length/ Grate Perim. Area (ft ) (sf) Total Q (cfs) Inlet Total Capacity Head (cfs) (ft) Ponded Widths Left Right (ft) (ft) ------------------------------------------------------------------------------ c 1 GRATE 1 2 .0 00 3 .700 6 .6 97 13 .097 0.320 7.573 8.650 c 5 GRATE 18.000 9.800 11. 530 19.646 0 .350 22 .000 33.700 A 8 GRATE 23.000 14.700 46.922 25.103 0.759 9.078 9.198 A 1 2 GRATE 18.000 4.900 12.761 18.629 0.375 15.644 5.778 A 14 CURB 15.000 n/a 6.029 35.014 0.257 8.704 8.704 ------------------------------------------------------------------------------ 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 6 Sat Nov 21 21:49:02 1998 ------------------------------------------------------------------------------ Cumulati ve Junction Discharge Computations Page 3 2969PRD1.out ------------------------------------------------------------------------------ Node I.D. Weighted C-Value Cumulative Drainage Area (acres) Cumulative Tc (min) Intensity (in/hr) Supplied Discharge (cfs) Total Discharge (cfs) ------------------------------------------------------------------------------ 0 Cl C2 J2 C3 J3 C4 J4 cs C6 C7 AB CB C9 ClO Cll Al2 Al3 Al4 WinStorm 0.646 0.64B 0.000 0.639 0 .000 0 .9SO 0.000 0.619 0.9SO O.S 92 O.SB 2 0.9SO 0.9 SO 0 .9SO 0 .622 O.S3S 0 .0 00 0 .6SS 22.976 lB.076 0.000 16.B74 0.000 0.23S 0.000 1S.4B7 0.326 14.240 13.396 0.392 0.9S4 0.732 4.3S9 3.207 0 .000 23 .7 11 16.43 16.0S 10.00 lS.69 10.00 10.00 10.00 lS.34 10.00 lS.32 lS.00 10.00 10.3S 10.00 14.43 14.00 0.00 16.SS TxDOT STORM DRAIN DESIGN Conveyance Configuration Data Flowline Elev. 6.B77 6.9S7 B.63S 7.036 B.63S B.63S B.63S 7.llS B.63S 7.121 7.194 B.63S B.Sll B.63S 7.331 7.437 0 .000 6.BS2 0.000 0.000 23 .200 0.000 23.200 0.000 23.200 0.000 0.000 0.000 0.000 0.000 0 .00 0 0.000 0.000 0.000 23 .200 23 .200 102.07B Bl.463 23.200 7S.B3S 23.200 1. 92B 23.200 6B.2SB 2.674 S9.9Bl S6.121 3.21S 7.713 6.004 19.B79 12.761 23.200 129.697 Version 1.3 September 1997 PAGE 7 Sat Nov 21 21 :4 9 :02 199B Run I. D. Node I.D. US DS US DS Shape # Span (ft) Rise (ft) Length (ft) Slope (%) n 1 2 3 4 s 6 7 B 9 1 0 11 1 2 13 14 lS 16 Al4 J 2 J3 J4 A13 Cl C2 C3 C4 cs C6 C7 AB CB C9 ClO Jl A14 J2 J3 J4 A14 Cl C2 C3 C3 cs cs C7 AB AB C9 26S.9SO 267 .B SO 270.6BO 2B2 .S OO 2BB.OOO 266 .0 97 266.S71 267 .0 20 270.833 267.463 272 .SO O 26B.8S2 269 .9SS 274.000 272.697 273.SOO 26S .01 0 Circ 266.7SO Circ 26B .B9 0 Circ 270.7BO Circ 28S.OOO Circ 26S.9SO Circ 266.197 Circ 266.671 Circ 270 .120 Circ 267.120 Circ 270.S63 Circ 268.063 Circ 26B.9S2 Circ 272 .SSS Circ 272.0SS Circ 272.697 Circ Page 4 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2.7SO 2.000 2.000 2.000 1. soo 4.000 4.000 4.000 1.000 4.000 1. 000 3.SOO 3.SOO 1.000 1. soo 1. soo 6S.OO 1.446 0.013 30.00 3.669 0.013 170.00 l.OS3 0.013 207 .00 S.671 0.013 62.00 4.B44 0.013 S8.7S 0.2SO 0 .013 149.78 0.2SO 0 .013 139.S2 0.2SO 0 .013 9S.OO 0.7Sl 0.011 136.9S 0.2SO 0.013 200.00 0.969 0 .011 131.S4 0.600 0 .013 167.09 0.600 0 .013 S0.00 2.B91 0.013 106.9S 0.600 0.013 12S.OO 0.642 0 .011 17 18 0 Cll Al2 Cl Cll 2969PRD1.out 273.292 268.197 Circ 1 281.500 273.892 Circ 1 n/a 2.000 197.28 2.583 0.013 n/a 1.500 275 .51 2.762 0 .013 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 8 Sat Nov 21 21:49:03 1998 Conveyance Hydraulic Computations Run 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Hydraulic Gradeline US Elev DS Elev Slope (%) 268.737 269.053 272 .317 283.417 289 .235 269.849 270 .323 270 .657 271.349 270 .915 273 .085 271 .382 272 .154 2 74.518 273 .862 274.340 274 .347 282.452 267 .760 268 .737 269 .053 272.317 283.417 268 .737 269 .849 270 .3 23 270.657 270.657 270.915 270.915 271.382 272.154 272.154 273.86 2 269 .849 274 .347 1. 50 1. 05 1. 05 1. 05 4.88 0.51 0.32 0.28 0.21 0.23 0.40 0.36 0.31 0.81 0.54 0.23 0.77 1. 48 Depth Unif. Actual (ft) (ft) 2.579 1. 042 1.637 0.917 1. 235 3.752 3.752 3.528 0.516 3.110 0.585 2.303 2 .199 0.518 1.165 0.840 1.055 0.952 2.750 1. 987 1. 637 1. 537 1.235 3.752 3.752 3.652 0.537 3.537 0.585 2.852 2.430 0.518 1.165 1.165 1.652 0.952 Velocity Unif. Actual (fps) (fps) 11. 21 14.01 8.43 16.49 14.90 8.34 6.65 6.46 4.73 6.51 5.61 8.93 8.82 7.82 5.24 5.90 11. 85 10.78 10.92 7.39 8.43 8.95 14.91 8.34 6.65 6.30 4.49 5.81 5.60 7.15 7.87 7.84 5.24 4.08 7.16 10.79 Q (cfs) 129.697 23.200 23.200 23.200 23.200 102.078 81.463 75.835 1. 928 68.258 2.674 59.981 56.1 21 3.215 7.713 6.004 19.879 12.761 Cap (cfs) 127.205 43.333 23.214 53.872 23 .1 20 71.852 71.779 71. 842 3.648 71. 887 4.144 77.921 77.951 6.058 8.139 9.950 36.361 17.459 June Loss (ft) 0.000 0.000 0 .000 0 .000 0 .00 0 0 .000 0 .000 0.000 0 .000 0.000 0 .000 0 .000 0.000 0.000 0.000 0 .000 0 .000 0 .000 ------------------------------------------------------------------------------ DISCHARGE FREQUENCY = 100 TAILWATER = 267.76 ------------------------------------------------------------------------------ 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 9 Sat Nov 21 21:49:03 1998 ------------------------------------------------------------------------------ Runoff Computations ------------------------------------------------------------------------------ I. D. C Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) Page 5 2969PRD1.out ------------------------------------------------------------------------------ c 1 0 .781 0.541 10.00 10.00 8 .635 0.000 3.646 -LANDSCAPED AREA 0 .3 00 0 .141 -STREET & PARKING AREA0.950 0 .400 c 2 0 .7 75 1. 202 10.00 10.0 0 8.635 0.000 8.039 -RESIDENTIAL0 .50 0 0.252 -LANDSCAPE D AREA 0 .300 0 .150 -STREET & PARKING AREA0.950 0.800 c 3 0.834 1.152 10.00 10.00 8.635 0 .000 8.298 -RESIDENTIAL0.5 00 0.152 -LANDSCAPE D AREA 0.300 0.100 -STREET & PARKING AREA0.950 0.900 c 4 0.950 0 .235 10.00 10.00 8.635 0.000 1. 928 c 5 0.935 0 .9 21 10 .00 10.00 8.635 0.000 7.437 -LANDSCAPED AREA 0 .300 0 .021 -S TREET & PARKING AREA0.950 0.900 c 6 0 .950 0 .3 26 10.00 10.00 8.635 0.000 2 .674 c 7 0 .7 37 0 .84 4 10.00 10 .00 8.635 0 .00 0 5.369 -RESIDENTIAL 0 .5 00 0.400 -STRE ET & PARKING AREA0.950 0 .44 4 A 8 .0 .541 1 2 .050 15.00 15.00 7.19 4 0.000 46.922 -RESIDENTIAL0.50 0 9.500 -LANDSCAPED AREA0.300 1. 000 -STREET & PARKING AREA0.950 1.550 c 8 0.950 0.392 10.00 10.00 8.635 0.000 3.215 c 9 0 .950 0.222 10.00 10.00 8.635 0.000 1. 821 c 10 0 .950 0 .7 32 10.00 10.0 0 8.635 0 .000 6.004 c 11 0 .864 1.152 10.00 10.00 8.635 0.000 8.5 97 -LANDSCAPE D AREA 0 .300 0.15 2 -STREET & PAR KING AREA0.950 1. 000 A 12 0.535 3.207 14.00 14.00 7.437 0.000 1 2 .7 61 -RES IDENT IAL0 .50 0 2.957 -STREET & PARKING AREA0.950 0.250 A 13 0 .000 0.000 0.00 0.00 0.000 23.200 23 .200 A 14 0.950 0.735 10.00 10.00 8.635 0.000 6.029 Page 6 2969PRD1.out ------------------------------------------------------------------------------ 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 10 Sat Nov 21 21:49:03 1998 On-Grade Inlet Configuration Data Inlet I.D. Inlet Type Inlet Slopes Gutter Grate Pond Width Critical Length Long. Trans. n Depr. Length Type Allowed Elev. (ft) (%) (%) c 2 GRATE 5.000 3.13 3.11 0.014 c 3 GRATE 4.000 0.47 2.00 0.014 c 7 GRATE 4.000 0.55 1. 84 0.014 c 9 GRATE 4.000 0.50 2 .00 0.014 c 11 GRATE 4.000 4.54 1. 06 0.014 0 WinStorm TxDOT STORM DRAIN DESIGN On-Grade Inlet Computation Data Inlet I.D. c 2 c 3 c 7 c 9 c 11 0 Inlet Type GRATE GRATE GRATE GRATE GRATE WinStorm Total Q (cfs) 8.039 9.579 5.792 1. 821 8. 597 Inlet Capacity (cfs) 6.758 6.822 4.455 1. 398 5.546 Total Carryover (cfs) 1. 281 2 .756 1. 337 0.423 3.051 TxDOT STORM DRAIN DESIGN (ft) (ft) (ft) n/a 5.000 PARAL.20.000 No Value n/a 4.000 PARAL.20.000 No Value n/a 4.000 PARAL.20.000 No Value n/a 4.000 PARAL.20.000 No Value n/a 4.000 PARAL.20.000 No Value Version 1. 3 September 1997 PAGE 11 Sat Nov 21 21:49 :03 1998 To Inlet Required Length (ft) Actual Length (ft) Ponded Width (ft) c 3 n/a 5.000 8.959 c 5 n/a 4.000 17.650 c 5 n/a 4.000 14.978 c 7 n/a 4.000 9.450 c 1 n/a 4.000 16.406 Version 1.3 September 1997 PAGE 12 Sat Nov 21 21:49:03 1998 ------------------------------------------------------------------------------ Sag Inlet Configuration Data ------------------------------------------------------------------------------ Inlet Inlet Length/ Grate Left Slope Right Slope Gutter Depth Critical I. D. Type Pe rim. Area Long Trans Long Trans n Depr. Allow Elev. (ft) (sf) (%) (%) (%) (%) (ft) (ft) ------------------------------------------------------------------------------c 1 GRATE 12.000 3.700 1. 61 2.98 2.75 2.00 0.014 n/a 0.500 No Valu e c 5 GRATE 18.00 0 9.800 0.50 1. 00 0.50 0.50 0.014 n/a 0.500 No Valu e Page 7 2969PRD1.out A 8 GRA T E 2 3 .000 14.7 00 5.44 5.0 0 5.0 0 5.00 0 .014 n/a 0.5 00 No Val u e A 1 2 GRATE 18.0 00 4.90 0 2.78 1.11 5.00 5.00 0 .014 n/a 0 .5 00 No Valu e A 14 CU RB 1 5.000 n/a 1. 00 2 .54 1. 00 2 .54 0 .014 0.330 0.500 2 7 0 .0 50 D WinStorm Tx DOT STORM DRAIN DESIGN Version 1.3 September 19 9 7 PA GE 1 3 Sat No v 2 1 2 1:49:03 1 99 8 Sag Inlet Computation Data ------------------------------------------------------------------------------ In l et In le t Lengt h / Grate Total Inlet Total Ponded Widths I.D. Ty p e P e r im. Area Q Capacity Head Left Right (ft ) (sf ) (cfs) (cfs) (ft) (ft) (ft) ------------------------------------------------------------------------------ c 1 GRATE 1 2 .000 3 .700 6.697 1 3 .097 0.320 7.573 8 .650 c 5 GRATE 18.000 9.8 00 11.53 0 1 9 .646 0 .350 22 .000 33 .7 00 A 8 GRATE 23 .000 14.7 00 46.9 22 2 5.10 3 0 .759 9 .0 78 9 .1 98 A 1 2 GRATE 1 8.000 4 .9 00 1 2 .761 lS.6 2 9 0.375 15 .644 5.77 8 A 14 CURB 15.000 n/a 6.02 9 3 5 .014 0 .2 57 S.7 0 4 S .704 D Win St o r m TxDOT ST ORM DRAIN DESIG N Version 1.3 September 1 99 7 PAGE 14 Sat No v 2 1 2 1:4 9 :04 1 99S ------------------------------------------------------------------------------ Cumul ati ve Ju n c ti o n Discharge Computations ------------------------------------------------------------------------------ Node We i ghted Cumu lative Cumulative Supplied Total I. D. C-Valu e Drainage Area Tc Intensity Discharge Di scharg e (acres ) (min) (in/hr) (cfs ) (cfs ) ------------------------------------------------------------------------------ Cl 0 .646 22 .9 7 6 16.65 6.S31 0 .000 1 0 1.397 C2 0 .648 l S .07 6 16.2 7 6.911 0 .000 S0.9 1 7 J 2 0 .000 0.000 10 .00 S.635 2 3.2 00 2 3.2 0 0 C3 0 .6 3 9 16.S74 15.91 6.9SS 0.000 75.31S J 3 0 .000 0.000 10.00 S .635 23.2 00 2 3.2 00 C4 0 .95 0 0 .235 10.00 S.635 0 .000 1. 9 2 S J4 0 .000 0 .00 0 10.00 S.635 23 .200 2 3.2 00 cs 0 .6 1 9 15 .4S7 15.56 7.066 0.000 67.7S7 C6 0 .950 0.3 26 10.00 S.635 0 .000 2 .674 C7 0 .592 14 .240 15.32 7.1 2 1 0.000 59.9Sl AS 0 .5 S2 13 .396 15 .00 7.194 0.000 56.1 2 1 c s 0 .95 0 0.3 92 10.00 S.635 0.000 3.2 15 C9 0 .950 0 .954 10.35 S.511 0.000 7.71 3 ClO 0 .950 0.73 2 10 .00 S.635 0.000 6.004 Pag e S D Cll A12 A13 A14 0.622 0.535 0.000 0.655 4.359 3.207 0.000 23.711 2969PRD1.out 14.43 14.00 0.00 16.77 7.331 7.437 0.000 6.S07 0.000 0.000 23.200 23.200 19.S79 12.761 23.200 12S.9S7 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 15 Sat Nov 21 21:49:04 199S Conveyance Configuration Data Run I. D. D 1 2 3 4 5 6 7 s 9 10 11 12 13 14 15 16 17 18 Node I.D. US DS Al4 J2 J3 J4 Al3 Cl C2 C3 C4 C5 C6 C7 AS cs C9 ClO Cll Al 2 Jl Al4 J2 J3 J4 Al4 Cl C2 C3 C3 C5 C5 C7 AB AS C9 Cl Cll Flowline Elev. US DS Shape # Span Rise (ft) (ft) 26 5.95 0 2 67.S50 270.680 2S2.500 2S8.000 266 .097 266 .571 267.020 270.S33 267.463 2 72.50 0 26S.S52 269.955 274.000 272.697 273 .500 273 .292 2Sl .500 265.010 Circ 2 266.750 Circ 1 26S.S90 Circ 1 270.7SO Circ 1 2S5.000 Circ 1 26 5.950 Circ 1 266.197 Circ 1 266.671 Circ 1 270.120 Circ 1 267.120 Circ 1 270 .563 Circ 1 268.063 Circ 1 26S .952 Circ 1 272.555 Circ 1 272.055 Circ 1 272.697 Circ 1 26S.197 Circ 1 273.S92 Circ 1 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2.750 2.000 2.000 2.000 1. 500 4.000 4.000 4.000 1. 000 4.000 1. 000 3.500 3.500 1.000 1. 500 1. 500 2.000 1. 500 Length (ft) Slope (%) n 65.00 1.446 0 .013 30.00 3.669 0 .013 170.00 1.053 0.013 207.00 5.671 0.013 62.00 4.S44 0.0 13 5S.75 0.250 0 .013 149.7S 0.250 0 .013 139.52 0.250 0 .013 95.00 0.751 0 .011 136.95 0.250 0 .0 13 200.00 0.969 0.011 131.54 0.600 0.013 167.09 0.600 0 .013 50.00 2.S91 0.013 106.95 0.600 0 .013 125.00 0.64 2 0 .011 197.2S 2.5S3 0 .013 275.51 2.762 0 .013 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 16 Sat Nov 21 21:49:04 199S ------------------------------------------------------------------------------ Conveyance Hydraulic Computations ------------------------------------------------------------------------------ Run Hydraulic Gradeline US Elev DS Elev Slope ( % ) Depth Unif. Actual (ft) (ft) Velocity Unif. Actual (fps) (fps) Q (cfs) Cap (cfs) June Loss (ft) ------------------------------------------------------------------------------ 1 2 3 4 5 26S.727 269 .042 272.317 283.417 2S9 .235 267 .760 26S.727 269.042 272.317 2S3.417 1. 49 1. 05 1. 05 1. 05 4.SS 2.579 1. 042 1.637 0.917 1. 235 2.750 1.977 1.637 1. 537 1. 235 Page 9 11.15 14.01 S.43 16.49 14.90 10.S6 7.40 S.43 S.95 14.91 12S.9S7 23.200 23.200 23.200 23.200 127.205 43.333 23.214 53.S72 23.120 0 .000 0 .000 0.000 0.000 0.000 2969PRD1.out 6 269.849 268 .7 27 o.so 3.7S2 3.7S2 8.28 8.28 101.397 71. 8S2 0.000 7 270 .323 269.849 0 .32 3.7S2 3.7S2 6.61 6.61 80.917 71.779 0 .00 0 8 270.6S2 270.323 0.27 3.486 3.6S2 6.48 6.26 7S.318 71.842 0 .000 9 271.349 270.6S2 0.21 0.516 O.S32 4.73 4.S4 1. 928 3.648 0.000 10 270.90S 270.6S2 0.22 3.090 3.S32 6.Sl S.77 67.787 71. 887 0.000 11 273.08S 270.90S 0.40 O.S8S O.S8S 5.61 S.60 2.674 4.144 0.000 12 271 .37 2 270 .90S 0.36 2.303 2.842 8.93 7.17 S9.981 77.921 0.000 13 272.1S4 271 .37 2 0.31 2.199 2.420 8.82 7.91 56.121 77.9Sl 0.000 14 274.S18 272 .1S4 0.81 0.518 O.S18 7.82 7.84 3.21S 6.0S8 0 .00 0 lS 273.862 272 .1S4 O.S4 1.16S 1.16S S.24 5.24 7.713 8.139 0.000 16 274.340 273 .86 2 0.23 0.840 1.16S S.90 4.08 6.004 9.9SO 0 .000 17 274 .347 269.849 0.77 1. oss 1.6S2 11. 8S 7.16 19.879 36.361 0.000 18 282 .4 S2 274.347 1. 48 0.9S2 0.9S2 10.78 10.79 12.761 17.4S9 0.000 ------------------------------------------------------------------------------ 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1. 3 September 1997 PAGE 17 Sat Nov 21 21:49:04 1998 Computation Messages *Warning: Capacity of grade inlet id C2 exceeded. *Warning: Capacity of grade inlet id C3 exceeded. *Warning: Capacity of grade inlet id C9 exceeded. *Warning : Capacity of grade inlet id Cll exceeded. *Warning: Capacity of grade inlet id C7 exceeded. *Warning : Left ponded width exceeds allowable width at inlet id CS. *Warning : Right ponded width exceeds allowable width at inlet id CS. *Warning : Capacity of sag inlet id A 8 exceeded. *Warning: Left ponded width exceeds allowable width at inlet id A12. *Warning: Decreasing Conduit Size -Downstream Run 1 was adjusted. *Computation: Run 1 Insufficient Capacity *Comp utation: Run 2 -Pipe Flowing Full *Computation : Run S -Insufficient Capacity *Computation: Run 6 -Insufficient Capacity *Computation: Run 7 -Insufficient Capacity *Comp utation: Run 8 -Insufficient Capacity *Warning: Capacity of grade inlet id C2 exceeded. *Warni ng: Capacity of grade inlet id C3 exceeded. *Warning : Capacity of grade inlet id C9 exceeded. *Warning : Capacity of grade inlet id Cll exceeded. *Warni ng: Capacity of grade inlet id C7 exceeded. *Warning: Left p onded width exceeds allowable width at inlet id CS. *Warning: Right ponded width exceeds allowable width at inlet id cs. *Warning: Capacity of sag inlet id A 8 exceeded. *Warning: Left ponded width exceeds allowable width at inlet id A12. *Warning: Decreasing Conduit Size -Downstream Run 1 was adjusted. *Comp utation: Run 1 Insufficient Capacity *Computation: Run = 2 -Pipe Flowing Full Page 10 2969PRD1.out *Computation : Run 5 -Insufficient Capacity *Computation: Run 6 -Insufficient Capacity *Computation: Run 7 -Insufficient Capacity *Computation: Run 8 -Insufficient Capacity NORMAL Completion of WinStorm. Page 11 General Project Information 20-Nov-98 Control: Section: Job: Project: County: Description: Design Frequency: Analysis Frequency: Current File: Outlet Identification: Design Tailwater: Analysis Tailwater: Metric Input: Metric Output: 1 657 2969 Conference Center Brazos Proposed Dartmouth St. System #2 10 100 I :\PROJECTS\600\2969-H-l \2969PRD2 . STM Jl 264 .38 264 .3 8 No No Junction Loss Computation: Yes I Runoff Control Data 20-Nov-9 Runoff Coefficient "C": 0 .9 Runoff Coefficient Description: Business Areas Runoff Coefficient "C": 0 .5 Runoff Coefficient Description: Residential Runoff Coefficient "C": 0 .65 Runoff Coefficient Description: Industrial Runoff Coefficient "C": 0 .25 Runoff Coefficient Description: Unimproved Areas Runoff Coefficient "C": 0 .3 Runoff Coefficient Description: Landscaped Areas Runoff Coefficient "C": 0 .95 Runoff Coefficient Description: Streets & Parking Areas Minimum Time of Concentration: 10 Intensity "e" Value: 0 Intensity "b" Value: 0 Intensity "d" Value : 0 Drainage Area Data 20-N ov-98 Drainage Drainage Time of Supplied Composite Composite Subarea Drainage Area Area Area Concentration Discharge Runoff Drainage Subarea 1 Subarea 2 Subarea 3 Subarea 4 Subarea 5 Subarea 6 Identification Description Coefficient Area Al5 Modified Sub-Are 10.00 0 .00 0 .95 0 .25 0 .00 0 .00 0 .00 0 .75 0 .00 0 .27 DI Proposed Sub-Are 10.00 0 .00 0 .68 1.27 0 .00 0 .00 0.00 0 .00 0 .52 0 .75 D2 Proposed Sub-Are 10.00 0 .00 0 .95 0 .24 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 1 Inlet and Junction Data 20-Nov-98 Critical Inlet Grate Default Junction Inlet ID Inlet Description Inlet Type Elevation Length Area Soffit Elevation Type Al5 Existing Inlet Curb at Sag 267 .59 15 .00 0 .00 0 .00 None DI Grate Inlet Grate at Sag 0.00 0 .00 3 .70 0 .00 None D2 None Junction/Manhole 0 .00 0 .00 0 .00 0 .00 None JI e into Main Structu Junction/Manhole 0 .00 0 .00 0.00 0 .00 None I Inlet Gutter and Carryover Data 20-Nov-98 Inlet ID Longitudinal Transverse Transverse Distance Ponded Ponded N gutter Percent Carry Over To Allowable Gutter Slope Gutter Gutter for Slope Width Depth value Discharge Identification Carryover Slope Slope 2 for Sags Al5 0 .50% 2.54% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% Al5 0 .50% 2.54% 0.00% 0 .00 12 .00 0 .00 0 .014 50 .00% DI I.42% 1.00% 0 .00% 0 .00 12 .00 0 .00 0 .014 50 .00% DI 2 .49% 1.00% 0 .00% 0 .00 I2 .00 0.00 0.014 50 .00% 1 Conveyance Data 20-Nov-98 Pipe Run Nodes Soffit Elevation Shape Rise Span Number of Length N Value or Identification Upstream Downstream Upstream Downstream Barrels Material A 15 Jl 264 .39 264 Circular 2 2 50 Concrete 2 DI A 15 265 .164 264 .39 Circular 4 2 51.58 Concrete 3 D2 Dl 270 265 .164 Circular 2 I 295 Plastic I 2969PRD2.out WinStorm TxDOT STORM DRAIN DESIGN JOB CONTROL 1 JOB SECTION 657 JOB NUMBER 2969 PROJECT DESCRIPTION : CONFERENCE CENTER DESIGN FREQUENCY 10 Year ANALYSYS FREQUENCY 100 Year Version 1.3 September 1997 PAGE 1 Fri Nov 20 14:22:37 1998 MEASUREMENT UNITS: Input ENGLISH Output ENGLISH Runoff Computations I. D. c Value Area Tc Tc Used Intensity Supply Q Total Q (acres) (min) (min) (in/hr) (cfs) (cfs) ------------------------------------------------------------------------------ D 1 0 .685 1.267 10.00 10.00 8.635 0.000 7.491 -LANDSCAPED AREAS 0 .300 0.517 -STREETS & PARKING AREAS0.950 0.750 D 2 0.950 0.242 10.00 10.00 8.635 0.000 1.985 A 15 0 .950 0.246 10.00 10.00 8.635 0.000 2.018 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 2 Fri Nov 20 14:22:37 1998 Sag Inlet Configuration Data Inlet Inlet Length/ Grate Left Slope Right Slope Gutter Depth Critical I. D. Type Pe rim. Area Long Trans Long Trans n Depr. Allow Elev. (ft) (sf) (%) (%) (%) (%) (ft) (ft) ------------------------------------------------------------------------------ D 1 GRATE 12.000 3.700 2.49 1.00 1.42 1.00 0.014 n/a 0.500 No Valu e A 15 CURB 15.000 n/a 0.50 2.54 0.50 2.54 0.014 0.330 0.500 267.590 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 3 Fri Nov 20 14:22:37 1998 Page 1 Sag Inlet Computation Data Inlet Inlet I.D. Typ e Length / Grate Perim. Area (ft) (sf) Total Q (cfs) D 1 GRATE 1 2 .000 3.700 7.491 A 15 CUR B 15.000 n/a 2.018 0 2969PRD2.out Inlet Total Capacity Head (cfs) (ft) 13.097 0.345 35.014 0.124 Ponded Widths Left Right (ft) (ft) 13.900 15.50 0 6.657 6.657 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 4 Cumulati ve J unct ion Discharge Computations Node I.D. 0 Dl D2 A15 Weighted C-Value 0 .7 2 7 0 .950 0 .759 Cumulati ve Drain age Area (acres) 1.509 0 .242 1. 755 Cumula tive T c (min) 10.77 10.0 0 10.8 8 Win Storm TxDOT STORM DRAIN DESIGN Conveyance Co nfiguration Data Flowline Ele v . Intensity (in/hr) 8.369 8.635 8.333 Fri Nov 20 14:22:37 1998 Supplied Discharge (cfs) 0 .00 0 0.000 0.000 Tota l Discharge (cfs) 9.184 1. 985 11.093 Version 1.3 September 1997 PAGE 5 Fri Nov 20 14 :22:37 1998 Run I. D. Node I.D. US DS US DS Shape # Span (ft) Rise (ft) Length (ft) Slop e (%) n 0 1 2 3 A15 Dl D2 Jl A15 Dl 262.390 2 63.664 269 .000 262.000 Circ 1 2 62.890 Circ 1 264.164 Circ 1 n/a 2.000 n/a 1.500 n/a 1. 000 50.00 0.780 0 .013 51.58 1.501 0 .013 295.00 1.640 0 .01 1 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 6 Fri Nov 20 14:22:37 1998 ------------------------------------------------------------------------------ Conveyance Hy draulic Computations ------------------------------------------------------------------------------ Run Hydraulic Gradeline US Elev DS Elev Slope Depth Unif. Actual Page 2 Velocity Unif. Actual Q Cap June Loss 2969PRD2.out (%) (ft) (ft) (fps) (fps) (cfs) (cfs) (ft) ------------------------------------------------------------------------------ 1 264.500 264.380 0.24 1.064 2.000 6.53 3.53 11. 093 19.980 0.000 2 264.895 264.500 0.76 0.937 1. 500 7.92 5.20 9.184 12.868 0.000 3 269.421 264.895 0.22 0.421 0.731 6.35 3.23 1. 985 5.391 0.000 DISCHARGE FREQUENCY = 100 TAILWATER = 264.38 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 7 Fri Nov 20 14:22:37 1998 Runoff Computations I. D. c Value Area Tc Tc Used Intensity Supply Q Total Q (acres ) (min) (min) (in/hr) (cfs) (cfs ) D 1 0 .685 1.267 10.00 10.00 8.635 0.000 7.491 -LANDSCAPED AREAS 0 .300 0.517 -STREETS & PARKING AREAS0.950 0.750 D 2 0 .950 0.24 2 10.00 10.00 8.635 0.000 1.9 8 5 A 15 0 .950 0.2 46 10.00 10.00 8.635 0.000 2.0 18 0 WinStorm Tx DOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 8 Fri Nov 20 14:22:37 1998 ------------------------------------------------------------------------------ Sag Inlet Configuration Data ------------------------------------------------------------------------------ Inlet Inlet Length/ Grate Left Slope Right Slope Gutter Depth Critical I. D. Type Perim. Area Long Trans Long Trans n Depr. Allow Elev. (ft) (sf) (%) (%) (%) (%) (ft) (ft) ------------------------------------------------------------------------------ D 1 GRATE 12.000 3.700 2.49 1. 00 1. 42 1. 00 0.014 n/a 0.500 No Valu e A 15 CURB 15.0 00 n/a 0.50 2.54 0.50 2.54 0.014 0.330 0.500 267.590 Page 3 2969PRD2.out 0 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 9 Sag Inlet Computation Data Inlet Inlet I. D. Type Length/ Grate Perim. Area (ft) (sf) Total Q (cfs) D 1 GRATE 12.000 3.700 7.491 A 15 CURB 15.000 n/a 2.018 0 Inlet Total Capacity Head (cfs) (ft) 13.097 0.345 35.014 0.124 Fri Nov 20 14:22:37 1998 Ponded Widths Left Right (ft) (ft) 13.900 15.500 6.657 6.657 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 10 Cumulative Junction Discharge Computations Node I. D. 0 Dl 02 A15 Weighted C-Value 0.727 0.950 0.759 Cumulative Drainage Area (acres) 1.509 0.242 1.755 Cumulative Tc (min) 10.77 10.00 10.88 Intensity (in/hr) 8.369 8.635 8.333 Fri Nov 20 14:22:37 1998 Supplied Discharge (cfs) 0.000 0.000 0.000 Total Discharge (cfs) 9.184 1.985 11. 093 WinStorm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 11 Conveyance Configuration Data Run I. D. Node I.D. US DS Flowline Elev. US DS Shape # Span (ft) Fri Nov 20 14:22:37 1998 Rise (ft) Length (ft) Slope (%) n ------------------------------------------------------------------------------ 0 1 2 3 A15 Dl D2 WinStorm Jl A15 Dl 262.390 263.664 269.000 262.000 Circ 1 262.890 Circ 1 264.164 Circ 1 n/a n/a n/a 2.000 1. 500 1. 000 50.00 0.780 0.013 51.58 1.501 0.013 295.00 1.640 0.011 TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 12 Fri Nov 20 14:22:37 1998 Page 4 2969PRD2.out Conveyance Hydraulic Computations Run Hydraulic Gradeline US Elev DS Elev Slope (%) 0 1 264.500 2 264.895 3 269.421 264 .380 264 .500 264 .895 0.24 0.76 0.22 Depth Unif. Actual (ft) (ft) 1. 064 0.937 0.421 2.000 1. 500 0.731 Velocity Unif. Actual (fps) (fps) 6.53 7. 92 6 .35 3.53 5.20 3.23 Q (cfs) 11. 093 9.184 1.985 Cap (cfs) 19.980 12.868 5.391 June Loss (ft) 0.000 0.000 0.000 Win Storm TxDOT STORM DRAIN DESIGN Version 1.3 September 1997 PAGE 13 Fri Nov 20 14:22:37 1998 Computation Messages *Warning: Left ponded width exceeds allowable width at inlet id Dl. *Warning: Right ponded width exceeds allowable width at inlet id Dl. *Computation: Run = 1 -Pipe Flowing Full *Computation: Run = 2 -Pipe Flowing Full *Warning: Left ponded width exceeds allowable width at inlet id Dl. *Warning: Right ponded width exceeds allowable width at inlet id Dl. *Computation: Run 1 -Pipe Flowing Full *Computation: Run = 2 -Pipe Flowing Full NORMAL Completion of WinStorm. Page 5 000657-2969 Drainage Report.doc APPENDIXC MAPPING DESCRIPTION APPENDIXC TABLE OF CONTENTS PAGE NO. Exhibit # 1 -Carter 's Creek Drainage Basin ................................................................ C-1 Exhibit #2 -Wolf Pen Creek Sub-Drainage Basin ....................................................... C-2 E xhib it #3 -E xisting Drainage Area Map ................................................................... C-3 E xhibit #4 -Proposed Drainage Area Map .................................................................. C-4 Ex hibit #5 -FIRM Map .............................................................................................. C-5 00 0657-2 969 Drainage Report .doc THIS FORM REPLACES PREVIOUS FORM 3510-6 (8-98) See Reverse for Instructi ons Form Approved . OMS No. 2040-0188 OEPA United States Envi ronmental Protection Agency NP DES Washington, DC 20460 FORM Notice of Intent (NOi) tor Storm Water Discharges Associated with CONSTRUCTION ACTIVITY Under a NPDES General Permit Submissio n of th is Notice of Intent constitutes notice that the party identified in Section I of this form intends to be auth orized by a NPDES permit issued for storm water d isch arges associated with construction activity in the State/Indian Country Land identified in Section II of this form. Submission of this Notice of Intent a lso consti tutes notice th at the party identi fied in Section I of th is form meets the elig ibility requirements in Pa rt l.B. of th e general permit (i ncluding those related to pro tect ion of endangered spec ies determined through the procedures in Addendum A of the general perm it ), understands that continued authorizati on to di sch arge is conti ngent on ma intaining permit el igib ility, and that implementati on of the Storm Water Poll ution Prev ention Plan requ ired under Part IV o f the general permit will beg in at the time the perm ittee commences work on the construction proj ect identified in Secion II below. IN ORDER TO OBTAIN AUTHORIZAT ION, ALL INFORMATION REQUESTED MUST BE INCLUDED ON THIS FORM. SEE INSTRUCTIONS ON BACK OF FORM . I. Owner/Operator (Applicant) Information Nam e : 1 ~i1 1 l 1 J-1 1 A 1 12.it:?i 1 f1 £i!1 ~A£A-1 1A 1 rl ,c ~..J ,1 1/i £,c 171 I I I I Phone: ifll.._g_f/170 /0 1/ 1/1/._ I Address : (./it.I 1S 1 1t:1 1W1 t1 1 l.1 ~1 (J (1'1 f3 1'1,,i i?1"1 1t::1 1£ 13 1 l 1 Status of ~ I I I I I I I I I Owner/Operator: City : IZ i r 1C if-I 1A 1 e, ~,~ c ,N I I I I I I I I I I I I State : 1/i Xi Zip Code : 11610 18l 1-1 I I I I II. Project/Site information I 's th e fac ili ty located on Ind ian Coun try Lands? Proj ect Name : 1 H 1 0 1 7 1 £1 ~1 1 C1 0 1N 1F 1E 1e 16 N1 c £1 1C I Ci Nil I E:if<1 I I I I I I I Yes D No~ ' Project Address/Location: i.:t" 't:!. j7' i f;~ 19€.1C. 1-r11 IQ f...11 (!I 1J./ Q 1L (..,£(YI (J d VJ+e1 /'Ylo urTH 1 i City : IC: 0 1 l.1 L.1 ~1~1 /C:1 1S 1 /1 A'111 1CN1 I I I I I I I I State : !7i X/ Zip Code: r1 1 7i 8 '-/1 0 -I I I I ! Latit ude : ·~1 0 1-;Cv I ~ (j I Long it ude : @1 (g IL1<0ia Q County : 'JIS .f: 1.4e 1D 1Ca i i I I I ' I I I I I I ! Has the S to rm Wa ter Pollut ion P reven ti on P!an (SWPPP ) been prepared? Yes •~ No O Optiona l : A ddress of location of f! Address in Section I above n Ad dress in Secti on II above r.::JOth er address (if kn own) below : SWPPP for viewing SWPPP TT 1£1 XiA-1,2 1 l'7 1Q 1 U1T 11:!.1 6~1£1 ~I ~one : Address : · 2 .S b l I I 1,4-1 \lj ~I ' I I I I I ' '..__1 0~ 1619 3 /5~ 6 1'i i City : {. 0 1l.1t. 1£: Gr 1l 1 6 I :::Z I A r7 I ( '(!) IN I I I I I I i State: 1ZJd Zi p Code : r? 17 18 14 1 C) -1 I I I I Name of Rece iv ing Water: 1 NQ 1 ~1 F1 1fi£1Ni 1 C1 £1 e:1 ~~ I ! I I I I I I I I 1Q 19 : a r 11 tt.. ,CJ ,er , I 0i I I Q1 1 1 '3Q 1 tJe../ I Based on instruction prov ided in Add endum A of the permit, are Monrh Day Year Monrh Day Year there any li sted endangered or threatened species , or designated Es ti mated Constru c ti on Start Da te Es timated Comp letion Date critical habitat in the pro ject area ? Es ti mate cf area to be disturbed (to nearest acre ): I I I I 1L6 1 Yes D No 0 Estimate of U kelihood of Discharge (choose only one): I I have satisfi ed permit el igibility with regard to protecti on of -endangered species through the ind icated section of Part l.B.3 .e.(2) 1. !___ Unli ke ly 3. [j Once per wee k 5. 0 Continual I of the permit (check one or more boxes ): 2 . Lone e per mont h 4. [J Onc e per day (aJO (bJO (c) CJ (dJD Ill. Certification I c ertify u r.cer p enalty of law tha t this docu ment and all att achm ents were prepare d under my d irection or superv isio n in accordance wi th a system de signeo :o assu re t ha t qua lifi ed person nel pro perly gat her and eval uate the in form a ti on s ubm itted . Based on my inquiry of th e pe rson or persons w ho manag e •r.is sy stem , o r thos e pers ons di rec tly respons ible for gathering the information , the information submitt ed is . to the best of my knowledge an d be li ef , t rt.;e . accu rate , and co m plet e. I am awa re th at ther e are signifi ca nt pe na lties for submittin g false inior ma tion . inc!u ding the poss ibility of fine an d im prison1T.ent fo r knowing vi olations . Pr in t Narr :: f<i4 11b ·o "'1 1 1'4£:1 ·C A 1L 1n I I I I I I I ! I I I I I I i I Da te: ! ID 1 Z 1 ~9 1 B 1 Signat u re : \/ ~ I I .-.>(-Ml// /I I ~ E?A Fo rm 35 ~: ·? re placed 351 0-6 (8·98) ~ Instructions -EPA Form 3510-9 Form Approved . OMS No. 2040-0188 SEPA Notice of Intent (NOi) for Storm Water Discharges Associated with Construction Activity to be Covered Under a NPDES Permit Who Must File a Notice of Intent Form Under the provisions of the Clean Water Act, as amended, (33 U .S.C. 1251 et.seq .; the Act), except as provided by Part 1.8.3 the permit, Federal law prohibits discharges of pollutants in storm water from construction activities without a National Pollutant Discharge Elimination System Permit. Operator(s) of construction sites where 5 or more acres are disturbed , smaller sites that are part of a larger common plan of development or sale where there is a cumulative disturbance of at least 5 acres, or any site designated by the Director, must submit an NOi to obtain coverage under an NPDES Storm Water Construction General Permit. II you have questions about whether you need a permit under the NPDES Storm Water program, or if you need information as to whether a particular program is administered by EPA or a State agency, write to or telephone the Notice of Intent Processing Center at (703) 931-3230. Where to File NOi Form NOls must be sent to the following address: Storm Water Notice of Intent (4203) US EPA 401 M . Street, SW Washington, D .C. 20460 Do not send Storm Water Pollution Prevention Plans (SWPPPs) to the above address . For overnight/express delivery of NOls, please include the room number 2104 Northeast Mall and phone number (202) 260-9541 in the address . When to File This form must be filed at least 48 hours before construction begins. Completing the Form OBTAIN AND READ A COPY OF THE APPROPRIATE EPA STORM WATER CONSTRUCTION GENERAL PERMIT FOR YOUR AREA. To complete this form, type or print, using uppercase letters, in the appropriate areas only. Please place each character between the marks (abbreviate if necessary to stay within the number of characters allowed for each item). Use one space for breaks between words, but not for punctuation marks unless they are needed to clarify your response . If you have any questions on this form, call the Notice of Intent Processing Center at (703) 931-3230. Section I. Facility Owner/Operator (Applicant) Information Provide the legal name, mailing address , and telephone number of the person, firm, public organization, or any other entity that meet either of the following two criteria : (1) they have operational control over construction plans and specifications , including the ability to make modifications to those plans and specifications ; or (2) they have the day-to-day operational control of those activities at the project necessary to ensure compliance with SWPPP requirements or other permit conditions. Each person that meets either of these criteria must file this form. Do not use a colloquial name. Correspon- dence for the permit will be sent to this address . Enter the appropriate letter to indicate the legal status of the owner/operator of the proj ect: F = Federal; S = State; M = Public (other than fede ral or state); P = Private . Section II. Project/Site Information Enter the official or legal name and complete street address, including city, county, state , zi p code , and phone number of the project or site . II it lacks a street address , indicate with a general statement the location of the site (e .g., Intersection of State Highways 61 and 34). Complete site information must be provided for permit coverage to be granted . The applicant must also provide the latitude and longitude of the facility in degrees, minutes, and seconds to the nearest 15 seconds . The latitude and longitude of your facility can be located on USGS quadrangle maps. Quadrangle maps can be obtained by calling 1-800 USA MAPS . Longitude and latitude may also be obtained at the Census Bureau Internet site : http ://www.census .gov/cgi-bin/gazetteer. Latitude and longitude for a facility in decimal form must be converted to degrees , minutes and seconds for proper entry on the NOi form . To convert decimal latitude or longitude to degrees , minutes, and seconds , follow the steps in the following example . Convert decimal latitude 45.1234567 to degrees, minutes, and seconds . 1) The numbers to the left of the decimal point are degrees. 2) To obtain minutes, multiply the first lour numbers to the right of the decimal point by 0 .006. 1234 x .006 = 7 .404. 3) The numbers to the left of the decimal point in the result obtained in step 2 are the minutes: 7'. 4) To obtain seconds, multiply the remaining three numbers to the right of the decimal from the result in step 2 by 0 .06: 404 x 0 .06 = 24.24 . Since the numbers to the right of the decimal point are not used, the result is 24". 5) The conversion for 45 .1234 = 45° 7' 24 •. Indicate whether the project is on Indian Country Lands . Indicate ii the Storm Water Pollution Prevention Plan (SWPPP) has been developed. Reier to Part IV of the general permit for informati on on SWPPPs. To be eligible for coverage, a SWPPP must have been prepared. Optional : Provide the address and phone number where the SWPPP can be viewed if different from addresses previously given . Check appropriate box. Enter the name of the closest water body which receives the project's construction storm water discharge . Enter the estimated construction start and completion dates using lour digits for the year (i.e. 05/27/1998). Enter the estimated area to be disturbed including but not limited to: grubbing, excavation, grading, and utilities and infrastructure installation . Indicate to the nearest acre ; if less than 1 acre, enter "1." Note: 1 acre = 43,560 sq . ft. Indicate your best estimate of the likelihood of storm water discharges from the project. EPA recognizes that actual discharges may differ from this estimate due to unforeseen or chance circumstances. Indicate ii there are any listed endangered or threatened species, or designated critical habitat in the project area . Indicate which Part of the permit that the applicant is eligible with regard to protection of endangered or threatened species, or designated critical habitat. Section Ill. Certification Federal Statutes provide for severe penalties for submitting false information on this application form. Federal regulations require this application to be signed as follows: For a corporati on : by a responsible corporate officer, which means : (i) president, secretary, treasurer, or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions, or (ii) the manager of one or more manufacturing, production, or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), ii authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures ; For a partnership or sole proprietorship : by a general partner of the proprietor, or For a municipality, state , federal, or other public facility: by either a principal executive or ranking elected official. An unsigned or undated NOi form will not be granted permit coverage. Paperwork Reduction Act Notice Public reporti ng burden for this application is estimated to average 3 .7 hours . This estimate includes time for reviewing instructions , searching existing data sources , gathering and maintaining the data needed, and completing and reviewing the collection of information . An agency may not conduct or sponsor, and a person is not required to respond to , a collection of information unless it displays a currently valid OMS control number. Send comments regarding the burden estimate, any other aspect of the collection of information, or suggestions for improving this form, including any suggestions which may increase or reduce this burden to : Direc'.or, OPPE Regulatory Information Division (2137), U.S. Environmental Protection Agency. 401 M Street , SW, Washington , D .C . 20460. Include the OMS control number on any correspondence . Do not send the completed form to th is address. A BRIEF GUIDE TO REQUIREMENTS FOR DEVELOPING AND IMPLEMENTING POLLUTION PREVENTION PLANS FOR CONSTRUCTION ACTIVITIES Storm water runoff is part of the natural hydrologic cycle . However, human activities, particularly urbanization, can alter natural drainage patterns and add pollutants to the rainwater and snowmelt that run off the earth's surface and enter our Nation 's rivers , lakes, streams , and coastal waters . In fact, recent studies have shown that storm water runoff is a major source of the pollutants that are damaging our sport and commercial fisheries , restricting swimming , and affecting the navigability of many of our Nation's waters . The States and many municipalities have been taking the initiative to manage storm water discharges more effectively . Recognizing the importance of this problem, the Congress also directed the U.S. Environmental Protection Agency (EPA) to develop a Federal program under the Clean Water Act to regulate certain high priority storm water sources . The issuance of storm water discharge permits under the National Pollutant Discharge Elimination System (NPDES) is a major part of the Agency's efforts to restore and maintain the Nation's water quality . Under NPDES General Permits for Storm Water Discharges From Construction Activities, EPA requires the development and implementation of a pollution prevention plan-designed to reduce pollution at the source , before it can cause environmental problems that cost the public and private sectors in terms of lost resources and the expense of environmental restoration activities . OVERVIEW OF POLLUTION PREVENTION PLAN REQUIREMENTS To walk you through the requirements , the guide is organized according to the phases of the pollution prevention planning and implementation process . A set of work sheets and a model plan at the end of the document are provided to further clarify requirements . As shown on the chart on the following page, pollution prevention planning requirements have been organized to provide you with a step-by-step process for ensuring that pollutants are not making their way into the storm water discharges from your site. The six major phases of the process are (1) site evaluation and design development, (2) assessment, (3) control selection and plan design , (4) certification and notification , (5) construction/implementation, and (6) final stabilization/termination . In addition , all permit holders must meet a number of general requirements, and certain permit holders will have to meet special requirements . This document provides background information on pollution prevention planning requirements for General Permit applicants . At the end of this document we have provided a checklist and sample Pollution Prevent ion Plan . A detailed manual on how to develop and implement your pollution prevention plan is available at a modest cost from the National Technical Information Service . The manual, titled Storm Water Management for Construction Activities : Developing Pollution Prevention Plans and Best Management Practices, provides much more specific information than this brief guide . Instructions for ordering the detailed manual and a listing of other references that you may find useful can be found at the end of this guide . Review Draft Page 1 .. ' Review Draft Full page graphic goes here SIX PHASES FOR DEVELOPING AND IMPLEMENTING A STORM WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION Pagel SITE EVALUATION AND DESIGN DEVELOPMENT PHASE The first phase in a preparing a Storm Water Pollution Prevention Plan for a construction project is to define the characteristics of the site and the type of construction that will be occurring . This phase is broken down into four requirements : (A) collect site information , (8) develop site design, (C) describe construction activity, and (0) prepare pollution prevention site map. (A) Collect Site Information In evaluating your site, you must collect the following existing information: • Site map-The map should be a drawing, preferably to scale and preferably topographic, of the construction site. The best way to obtain a site map is to have your site surveyed by a professional surveyor. Alternatively, topographic maps may be available from your State or local government, or you may use the United States Geological Survey (USGS) topographical maps . Your site map will be used in subsequent steps of the development of your pollution prevention plan . The scale of the map should be small enough so that you can easily distinguish important features such as drainage swales and control measures that will be added later. • Soils information-Soils information should be based on information from your specific site . Sources of soils i nformation could include soil borings or other geotechnical investigations . Soil Conservation Service (SCS) soil surveys may also be used, and SCS surveys typically indicate whether a soil is erodible . • Runoff water quality-Runoff water quality data may sometimes be available from your state or local government, e.g ., the local municipal separate storm sewer authority . You may also be able to obtain runoff water quality information from the U.S. Geological Survey (USGS), State, or local watershed protection agencies . • Name of receiving water-Identify the name and location of the body of water, e.g ., stream , creek, run , wetland , river, lake , bay , ocean, that will receive the runoff from the construction site . If the receiving' water is a tributary include the name of the ultimate receiving body of water if possible . If the site drains into a Municipal Separate Storm Sewer System , identify the system and indicate the receiving water to which the system discharges. This information is usually available from county, State, or USGS maps . (B) Develop Site Plan Design The next step is to develop a site plan design based primarily on the goals and objectives of the proposed facility . There are several pollution prevention principles that you should consider when you develop the site plan for the project: • Disturb the smallest vegetated area possible . • Minimize the amount of cut and fill. • Limit impacts to sensitive areas such as : -Steep and/or unstable slopes -Surface waters , including wetlands -Areas with erodible soils -Existing drainage channels. Review Draft Page3 (C) Describe Construction Activity In preparing your plan, you should (1) describe the purpose or goal of the construction project (e.g., a single family residential development, a multistory office building, or a highway interchange) and (2) list the soil disturbing activities necessary to complete the project. (Soil disturbing activities might include clearing, excavation and stockpiling, rough grading , final or finish grading, preparation for seeding or planting , excavation of trenches , demolition, etc.). (D) Prepare Pollution Prevention Site Map The final step of the site evaluation and design development phase is to combine the information collected so far into a comprehensive pollution prevention site map . The following additional information must be included on the map collected in Step A: • Slopes after grading-Indicate the location and steepness of slopes after grading. • Disturbed areas-Indicate the areas of soil disturbing activities or the total area of the site where soil will be disturbed . Also draw an outline of areas that will not be disturbed . • Drainage patterns/discharge points-Indicate the drainage patterns of the site after the major grading activities and the location of the points where storm water will discharge from the site. -Note the downhill direction the runoff will follow as it flows across the site for the drainage pattern of the site . -Use arrows to indicate which direction runoff will flow in . Show the areas where there will be overland flow and the location of swales or channels . If there is a new or proposed underground storm drain system on the site, this should be indicated on the Storm Water Pollution Prevention Plan site map as well. Review Draft Page4 ASSESSMENT PHASE Once the characteristics of the site and the construction have been defined, the next phase in developing a Storm Water Pollution Prevention Plan is to measure the size of the land disturbance and estimate the impact the project will have on storm water runoff from the site based on information collected in Phase 1. Three things should be done to assess the project: (A) measure the site area, (B) measure the drainage areas , and (C) ca lculate the runoff coefficient. (A) Measure the Site Area The general permit requires that you indicate in the Storm Water Pollution Prevention Plan estimates of the total site area and the area that will be disturbed . If the information is not available from one of these sources , you may measure by using the grid method or by using a planimeter. Planimeters are available from Engineering and Surveyor Supply Stores. (B) Determine the Drainage Areas Determ ine the size of each drainage area for each point where concentrated flow will leave the site . Drainage areas are portions of the site where runoff will flow in one particular direction or to a particular discharge point. These data w ill help you select and design the sediment control and storm water management measures for your proj ect in the next phase of the plan . Use the drainage patterns indicated on the site map to determine the drainage areas . (Drainage areas are not requ ired to be included in the pollution prevention plan .) (C) Calculate the Runoff Coefficient The general permit requ ires that you estimate the development's impact on runoff after construction is complete . Th is is done by estimating a runoff coefficient of the site . The runoff coefficient is an estimate of the fraction of total rainfall that will appear as runoff. (For example , the "c" value of lawn area is 0.2, which ind icates that only 20 percent of the water that falls on grassed areas will end up as surface runoff. In contrast, the "c" value of a paved area can be 0 .9 or higher , indicating that 90 percent of the rain falling on this type of surface will run off.) Review Draft Page5 CONTROL SELECTION/PLAN DESIGN PHASE After you have collected the information and made measurements, the next phase is to design a plan to prevent and control pollution of storm water runoff from your construction site . To complete the Storm Water Pollution Prevention Plan , (A) select erosion and sediment controls, (8) select other controls, (C) select storm water management controls , (D) indicate the location of controls, (E) prepare an inspection and maintenance plan , (F) prepare a description of controls, (G) prepare a sequence of major activities, and (H) incorporate State or local requirements . The following subsections explain how the controls you select should be described in the Storm Water Pollution Prevention Plan . (A) Select Erosion and Sediment Controls The Storm Water Pollution Prevention Plan must include a description of the measures to be used for erosion and sediment controls throughout the construction project. These controls include stabilization measures for disturbed areas and structural controls to divert runoff and remove sediment. Erosion and sediment controls are implemented during the construction period to prevent and/or control the loss of soil from the construction site into the receiving waters . Your selection of the most appropriate erosion and sediment controls depends on a number of factors, but is most dependent on site conditions . The information collected in the site evaluation, design and assessment phases is used to select controls. Some controls are discussed below : • Stabilization-The EPA general permit requires that areas of the construction site that were disturbed in the past but will not be redisturbed for 21 days or more be stabilized by the 14th day after the last disturbance. Stabilization measures include the following : -Temporary seeding-Temporary seeding is the planting of fast-growing grasses to hold down the soil in disturbed areas so that they are less apt to be carried offsite by storm water runoff or wind . -Permanent seeding-Permanent seeding is the use of permanent vegetation (grass, trees, or shrubs) to stabilize the soil by holding soil particles in place. -Mulching-Mulching is the placement of material such as hay, grass, woodchips, straw, or gravel on the soil surface to cover and hold in place disturbed soils . • Structural control measures include the following: -Silt fence-A silt fence is a temporary measure consisting of posts with filter fabric stretched across the posts and sometimes with a wire support fence. The fence is installed along the downslope or sideslope perimeter of a disturbed area. Runoff passes through the openings in the fabric , while sediment is trapped on the uphill side. -Sediment trap-A sediment trap is formed by excavating a pond or by placing an earthen embankment across a low area or drainage swale . It has an outlet or spillway made of large stones or aggregate . The trap retains the runoff long enough to allow the silt to settle out. -Sediment basin-A sediment basin is a settling pond with a controlled water release structure, e.g ., a riser and pipe outlet with a gravel filter, which slows the release of runoff. The basin detains sediment- laden runoff from larger drainage areas long enough for most of the sediment to settle out. The EPA general perm it requires that a sediment basin be installed in any drainage location where more than 10 acres in the upstream basin are disturbed at one time . The sediment basin must provide at least 3,600 cubic feet of storage for every acre of land that drains to it. For drainage locations with 10 or fewer disturbed acres, sediment traps, filter fences , or equivalent measures must be installed along the downhill boundary of the construction site . Review Draft Page6 (B) Select Other Controls In addition to erosion and sediment controls, the Pollution Prevention Plan for your project must address the other potential pollutant sources that may exist on a construction site . They include proper waste disposal, compliance with applicable State or local waste disposal, sanitary sewer or septic system regulations , control of offsite vehicle tracking, and control of allowable non-storm water discharges, as explained in the following bullets : Ensure proper disposal of construction site waste materials . • Treat or dispose of sanitary wastes that are generated onsite in accordance with State or local requirements . Contact the local government or State regulatory agency . • Prevent offsite tracking of sediments and generation of dust. Stabilized construction entrances or vehicle washing racks should be installed at locations where vehicles leave the site . Wiere dust is a problem, implement dust control measures such as irrigation. • Identify and prevent contamination of non-storm water discharges. 'Mlere non-storm water discharges allowed by the general permit exist, they should be identified and steps should be taken to prevent contamination of these discharges . (C) Select Storm Water Management Controls Storm water management controls are constructed to prevent or control pollution of storm water after the construction is completed. The general permit requires that storm water management controls be installed for construction projects where flow rates after construction exceed flow rates before construction . These controls include the following : • Retention pond-A pond that holds runoff in a reservoir without release except by means of evaporation , infiltration, or emergency bypass. • Detention pond-A pond that holds or detains runoff in a basin for a limited time releasing it very slowly allowing most of the sediments to drop out. • Infiltration measures-Measures that allow the percolation of water though the ground surface into subsurface soil. Specific measures include infiltration trenches, basins , and dry wells . • Vegetated swales and natural depressions-Grass-lined ditches or depressions that transport runoff, filter sediments from the runoff, and enhance infiltration of the runoff. Selection of the most appropriate storm water management measures depends upon a number of factors, but most of all upon site conditions . EPA expects that most measures can be designed to remove 80 percent of the total suspended solids from post-construction runoff. 'Mien you select storm water management measures for a development project, consider the impacts of these measures on other environmental media (i.e ., land, air, and ground water). For example , if the water table is unusually high in your area, a retention pond for contaminated storm water could lead to contamination of a ground water source unless special preventive measures are taken . EPA strongly discourages the transfer of pollution from one environmental medium to another and prohibits the adoption of any storm water management practice that results in a violation of other Federal, State, or local environmental laws. In add ition to pollutant removal, the storm water management portion of the plan must address velocity dissipation at discharge locations . Development usually means an increase in speed with which the site will drain because of the addition of paved areas , storm sewers, curbs, gutters , etc. The general permit requires that veloc ity dissipation devices be placed along the length of any outfall where erosive conditions exist. The potential for erosion is Review Draft Page 7 primarily dependent upon the velocity of the storm water discharge and the type of material that lines the channel. One velocity dissipation device is the Riprap outlet protection, which is stone or riprap placed at the discharge point to reduce the speed of concentrated storm water flows . (D) Indicate the Location of Controls on the Site Map Pollution prevention measures must be shown on the pollution prevention site map, including the location of each measure used for erosion and sediment control , storm water management, and other controls . Vvtlen this has been done , the site map is ready to be included in the Pollution Prevention Plan . Note: It may not be feasible to indicate some controls on the site map , e.g., waste control measures . (E) Prepare an Inspection and Maintenance Plan After the Storm Water Pollution Prevention Plan is prepared and the necessary controls are installed, you will be responsible for inspecting and mainta ining them . The general permit requires that you prepare a description of the procedures to maintain the pollution prevention measures onsite . An inspection and maintenance checklist indicati ng each of the control measures proposed for the construction site should be included in the Storm Water Pollution Prevention Plan prior to starting construction . (F) Prepare a Description of Controls Once you have finished planning your construction activities and selected the controls, make a list of each type of control you plan to use on the site . Include a description of each control, describe its purpose, and explain why it is appropriate in this location . The description should also include specific information about the measure such as size , materials , and methods of construction . Read your permit carefully to ensure that your plan includes all of the required controls . (G) Prepare a Sequence of Major Activities You should prepare a sequence of major activities that includes the installation of all the controls , earth disturbing act ivities , all stabilization activities, and the maintenance required for the controls . The sequence should clearly indicate the order in wh ich each of the activities described takes place . Several general principles are helpful in developing the sequence of major activities : • Install downslope and sideslope perimeter controls before the land disturbing activity occurs . • Do not disturb an area unt il it is necessary for construction to proceed . • Cover or stabilize disturbed areas as soon as possible. • Time activities to limit impact from seasonal climate changes or weather events . • Delay construction of infiltration measures until the end of the construction project when upstream dra inage areas have been stab ilized . • Do not remove temporary perimeter controls until after all upstream areas are finally stabilized. (H) Incorporate State or Local Requirements The plan mus t be in compl iance with appl icable State or local storm water management, erosion , and sediment control requ irements . This is done by incorporating the State or local requirements (by reference) into the plan , Review Draft Pages thereby allowing States and localities the flexibility to maintain their existing programs and providing additional authority for enforcement. The State or loca l erosion and sediment control or storm water management program requirements may be ident ical to requirements in the general perm it. Some of them could be different. The Storm Water Pollution Prevention Plan components of an NP DES storm water perm it ensure that a minimum level of pollution prevention is required . Review Draft Page9 CERTIFICATION AND NOTIFICATION PHASE Once the s ite description and controls portion of the Storm Water Pollution Prevent ion Plan have been prepared , you now must (A) certify the pollution prevention plan and (B) subm it a Notice of Intent to the appropriate agency . The checklist provided at the end of this document will be very useful in evaluating whether all the requ i red items are included in your Storm Water Pollution Prevention Plan prior to certify ing the plan or submitting a Notice of In tent. (A) Certify the Pollution Prevention Plan Construction activities often have a number of different short-term contractors and subcontractors com ing onsite duri ng each phase of the project development. The EPA general perm it requires that the contractors and subcontractors responsible for implementing measures in the Pollution Prevention Plan be listed i n the plan and that they sign a certification statement that they understand the permit requirements. This requirement holds each contractor/subcontractor responsible for certain permit conditions . Your plan should identify the Authorized representative . The authorized representative should be someone at or near the top of the management chain , such as the president, vice pres ident, or a general partner, who has been delegated the authority to sign and certify this type of document. In signing the plan, the authorized representative cert ifies that the information is true and assumes liability for the plan . Please note that Section 309 of the Clean Water Act provides for s ign ificant penalties where information is false or the permittee violates , either knowingly or neg l igently , perm it requ irements . (B) Submit a Notice of Intent The General Permit for Storm Water Discharges Associated with Industrial Activ ity from Construction Activit ies requ i res that you subm it a Notice of Intent (NOi) at least 48 hours before construction activit ies begin . The NOi is essentially an applicat ion and contains important information about your site, including site location, owner information , operator (general contractor) information , rece iving water(s), existing NPDES Permit Number (if any), ex isting quantitative data, and a brief description of the project. EPA has developed a one-page form to be used by industrial facilities and construction act iv ities when they subm it NO ls . This form indicates all the information that you are required to provide and must be used in order for the NOi to be processed correctly . NOls for the EPA General Permit will be submitted directly to EPA's central processing center at the fo llowing address : Storm Water Notice of Intent P.O. Box 1251 Newington , VA 22122 The party or parties who have day-to-day responsibilities for site operations, and the party or parties who have control over the designs and specifications necessary to ensure compliance with plan requ i rements and permit condit ions , must subm it an NOi. It is anticipated that there will be projects where more than one entity (e .g ., the owner. developer, or general contractor) will need to submit an NOi so that both of the requirements for an operator are met. In th is case , those persons will become co-permittees . Deadlines-There are different deadl ines for subm itting NO ls depending on whether the construction starts before or after October 1, 1992 . Review Draft Page 10 • Before October 1, 1992-For construction activities that have started before October 1, 1992, and plan to continue beyond this date, the NOi must be submitted on or before October 1, 1992. • After October 1, 1992-lf construction will not begin until after October 1, 1992, a NOi must be postmarked at least 48 hours before construction begins. • The Storm Water Pollution Prevention Plan must be completed prior to the submittal of an NOi. Review Draft Page 11 CONSTRUCTION/ IMPLEMENTATION PHASE Once you have prepared a Storm Water Pollution Prevention Plan and filed a Notice of Intent, you may then start construct ion of the proj ect. However, you have not yet met all requirements of your permit. You should now do the th i ngs that you said you would do in the Storm Water Pollution Prevention Plan : (A) implement the controls , (8) inspect and maintain the controls , (C) maintain records of construction activities , (D) update/change the plan to keep it current, (E) take proper action when there is a reportable quantity spill , and (F) have plans accessible. (A) Implement Controls The first action that should be taken is to construct or perform the controls that were selected for the Storm Water Pollution Prevention Plan . The controls should be constructed or appl ied in accordance with State or local specifications . If there are no State or local specifications for control measures , then the controls should be constructed in accordance with good engineeri ng practices. The controls should be constructed and the stabilization measures should be applied in the order that you indicated in the sequence of major activities . To ensure that controls are adequately implemented, it is important that the work crews who install the measures are experienced and/or adequately trained . Improperly installed controls can have little or no effect and may actually increase the pollution of storm water. It is also important that all other workers on the construction site be made aware of the controls so that they do not inadvertently disturb or remove them . (B) Inspect and Maintain Controls As d iscussed previously , inspection and maintenance of the protective measures that are part of this plan are as important to po ll ution prevention as proper planning , design/selection , and installation . • Inspection-The EPA General Permit requires inspection every 7 days or within 24 hours of a storm of 0.5 inches in depth . All disturbed areas of the site , areas for material storage, and all of the erosion and sediment controls that were identified as part of the plan should be inspected. Controls must be in good operat ing condition until the area they protect has been completely stabilized and the construct ion activity is complete . • Maintenance/repairs-The inspector should note any damages or deficiencies in the control measures on an inspection report form provided for this purpose. These reports document the inspection of the pollution prevention measures. These same forms can be used to request maintenance and repair and to prove that inspection and maintenance were performed . The operator should correct damage or deficiencies as soon as practicable after the inspection , and any changes that may be required to correct deficiencies in the Storm Water Pollution Prevention Plan should be made as soon as practicable after the inspection . (C) Maintain Records of Construction Activities In addition to the inspection and maintenance reports , the operator should keep records of the construction activity on the s ite . In part icular, t he operator should keep a record of the following information: • The dates when major grad i ng activities occur i n a particular area • The dates when co nstruct ion activ ities cease in an area , temporarily or permanently • The dates when an area is stabil ized , temporarily or permanently . Review Draft Page 12 These records can be used to make sure that areas where there is no construction activity will be stab ilized within the required t imeframe. (D) Update/Change the Plan For a construction activity to be in fu ll compliance with its NP DES storm water permit, and for the Storm Water Pollution Prevention Plan to be effect ive, the plan must accurately reflect site features and operations . V'vtlen it does not, the p lan must be changed . The plan must also be changed if the operator observes that it is not effect ive in m in im iz ing pollutant d isc harge from the site . If, at any time during the effective period of the permit , the permitting authority finds that the plan does not meet one or more of the m inimum standards established by the general permit, the permitting authority will notify the perm ittee of requ ired changes necessary to bring the plan up to standard . (E) Report Releases of Reportable Quantities Because construction activities may handle certain hazardous substances over the course of the proj ect, sp ills of these substances in amounts that equal or exceed Reportable Quantity (RQ) levels are a poss ibility . EPA has issued regulat ions that define what reportable quantity leve ls are for o il and hazardous substances . These regulations are found at 40 CFR Part 110 , 40 CFR Part 117 , or 40 CFR Part 302 . If there is a RQ release during the construct ion period , then you must take the following steps : • Notify the National Response Center immediately at (800) 424-8802 ; in Washington , D.C., call (202 ) 426-2675 . • S ubm it a written description of the release to the EPA Reg ional office providing the date and c irc umstances of the release and the steps to be taken to prevent another release . • Mod ify the po ll ut ion preven t ion plan to include the information listed above. (F) Provide for Plan Location and Access The general permit has specific requirements regarding plan location and access. • Plan location-A copy of the Pollution Prevention Plan must be kept at the construction site from the time construction begins until the site is finally stabilized . • Retention of records-Retention of records requ ires that copies of the Storm Water Pollution Prevention Plan and all other reports required by the perm it , as well as all of the data used to complete the NOi be reta ined for 3 years after the completion of final s ite stabil ization . Review Draft Page 13 • Access-Although plans and associated records are not necessarily required to be submitted to the Director, these documents are considered to be "reports" according to Section 308(b) of the Clean Water Act. Upon request , the owner or operator must make these plans available to the Director, or any State or local agency who is approving erosion and sediment control plans, or storm water management plans . If site storm water runoff is discharged to a municipal separate storm sewer system , the plans must be made available upon request to the municipal operator of the system. Review Draft Page 14 -. FINAL STABILIZATION/ TERMINATION PHASE Your permit for discharge of storm water associated with a construction activity will remain in effect until the construction is completed . Typically, the storm water discharge associated with an industrial activity is eliminated when the site is finally stabilized . Wien storm water discharge associated with an industrial activity ceases, the owner/operator of the facility can be relieved of pemnit by submitting a Notice of Termination . Final stabilization-The notice of termination (NOT) cannot be submitted until all construction activities for the project have been completed and all areas are finally stabilized. The permit defines final stabilization as uniform perennial vegetative cover with a density of 70 percent or equivalent measures such as riprap for the areas of the site not covered by permanent structures or pavement. Notice of Termination-The NOT must include the name and address of both the owner and operator, as well as a certification signed by both parties. It will note that construction activities are complete, the site has been finally stabilized, and the site no longer has a discharge associated with an industrial (construction) activity covered under the permit. Wien the permit is terminated, it will relieve the permittees of their responsibility. EPA has developed a one-page NOT form to be submitted to the same address as the NOi. Review Draft Page 15