HomeMy WebLinkAbout49 Master Drainage Plan South HamptonMASTER DRAINAGE PLAN
FOR
SOUTH HAMPTON
PHASES ONE thru SEVEN
52.14 ACRE DEVELOPMENT
COLLEGE STATION, BRAZOS COUNTY, TEXAS
JANUARY, 1998
REVISED: FEBRUARY, 1998
REVISED: JUNE, 1998
MUNICIPAL DEVELOPMENT GROUP
~ I lI''~ I •T~ 2551 TEXAS AVENUE. SOUTH, STE . A
l j .A.~ I COLLEGE STATION, TEXAS 77840
Ph: (409)693 -5359 Fx: (409) 693 -4243
Consulting Engineers · Environmental· Surveyors· Planners
TABLE OF CONTENTS
DRAINAGE REPORT
PROJECT S1Jl\11\.1AR Y ................................................................................................ 3
DRAINAGE AREA DESCRIPTIONS .......................................................................... 3
DESIGN CONSTRAITS ............................................................................................... 4
DRAINAGE CALCULATIONS ................................................................................... 5
RESULTS ..................................................................................................................... 6
CONCLUSIONS ......................................................................................................... 10
ATTACHMENTS
SECTION #1 -DRAINAGE & PHASE STRUCTURE MAPS
SECTION #2 -DRAINAGE AREAS EVALUATION
SECTION #3 -CURB & GUTTER FLOW CALCUATIONS
SECTION #4 -CHANNEL FLOW CALCULATIONS
SECTION #5 -CUL VERT FLOW CALCULATIONS
SECTION #6 -STORM INLETS FLOW CALCULATIONS
SECTION #7 -EXISTING TxDOT CALCULATIONS
SECTION #8 -ST AND ARD DETAILS
Drainage Report - 2
PROJECT SUMMARY
Th is report outlines the master drainage plan for the South Hampton, Phase One thru
Seven, 52 .14 acre development . The subject development site is situated on the west side
of State Highway No . 6 approximately 1.5 miles south of the State Highway No . 6 and
Greens Prairie Road intersection .
The site is currently vacant with heavy timber and native grasses and weeds . The natural
drainage of the site is generally to the northeast of the development site to a ditch in
TxDOT right-of-way . Thence, 1,400 linear feet to an existing TxDOT box culvert that is
a part of the confluence of Alum Creek. This site is in the secondary drainage system of
the Alum Creek primary system .
The drainage calculations are presented in six basic sections :
I. Drainage Areas Maps -General drainage area maps .
II . Drainage Areas Evaluation -Calculations for the amount of runoff for each
drainag e area with post-development conditions of the development site .
III . Curb & Gutter Flow Calculations -Calculations for the depth , velocity and other
condit ions in the residential streets .
I V . Channel Flow Calculations -Calculations for the depth , velocity and other
conditions in the proposed drainage channels.
V. Culvert Flow Calculations -Calculations for the size requirements, velocity and
other conditions in the proposed drainage structures .
VI . Storm Inlet Flow Calculations -Calculations for the size requirements and other
conditions in the proposed drainage inlets.
VII . Exist ing TxDOT Calculations -Calculations to verify that the existing TxDOT
structures can pass the post-development discharge.
VIII . Standard details -Standard details for proposed drainage structures .
Drainage Report • 3
DRAINAGE AREA DESCRIPTIONS
There will be several minor drainage areas considered for the evaluation of this site .
Each drainage area shall be evaluated for the selected rainfall events . From the
calculated runoff volumes, adequate ditch channels, curb sections and drainage structures
will be sized .
DESIGN CONSTRAINTS
I. Street Curb & Gutter Flow Constraints -The proposed residential streets will be
designed in accordance with the Stormwater Management Plan for the City of
College Station . Velocities shall be maintained from a maximum of 10 feet per
second to a minimum velocity at 0.4%. The runoff for residential streets shall be
contained within the curb for the 10-year rainfall event and within the public
right-of-way for the 100-year rainfall event. The runoff for collector streets shall
be contained within the curb for the 10-year rainfall event with a 12 foot clear
traffic lane and , within the public right-of-way for the 100-year rainfall event. All
proposed residential streets will have a 28 ' back-to-back curb & gutter section
within a 50 ' right-of-way. All proposed collector streets will have a 39 ' back-to-
back curb & gutter section with sidewalks within a 60 ' right-of-way .
II . Channel Flow Constraints -The proposed open channels will be designed m
accordance with the Stormwater Management Plan for the City of College
Station . Channel capacities shall contain the 25-year rainfall event. Pending on
the maximum velocity in the channel, the surface of the proposed channel shall be
as shown on Table VII-2 , page 60 of the Drainage Policy and Design Standards .
These velocities will be the maximum allowed during the 25-year rainfall event.
A minimum velocity of 2 .5 ft/sec shall be maintained in all the open channels .
Channels shall be designed to have a freeboard of 0 .2 times the depth of the
channel or a minimum of 0 .5 feet in depth during the 100-year rainfall event. The
100-year rainfall event shall be contained within the drainage easement.
Minimum drainage easement widths will be 20 ' for all side and back drainage
Drainage Report - 4
channels. The main drainage channel between Phase One and Phase Five shall
have a easement width of the design storm top width, plus 5' and 15'. All
drainage easements prohibit the following : The construction of fences through or
along the easement; placing of structures within the easement ; the alteration of
shape ; configuration of surface treatment of the open channel. All improved
drainage channels shall be constructed with a concrete pilot channel, sized to
carry 1/3 of the 5-year rainfall event.
III. Culvert Flow Constraints -The proposed culverts will be designed in accordance
with the Stormwater Management Plan for the City of College Station. Culverts
that are on residential streets and in the secondary drainage system shall have a
capacity that will pass the 10-year rainfall event. All other culverts that are on
collector streets or larger shall have a capacity that will pass the 25-year rainfall
event. The maximum depth that the upstream end of the culvert can be
surcharged is one-foot below the proposed top-of-curb elevation . Culverts will
have a tailwater elevation equal to the water surface elevation of the channel
immediately downstream of the culvert. The tailwater will correspond with the
channel 's elevation for the 10-year, 25-year or 100-year rainfall event. Maximum
discharge velocities will be as stated on page 65 of the Drainage Policy and
Design Standards. Also , each proposed culvert will be analyzed to ensure
adequate means of passing the 100-year rainfall event without exceed the policies
for discharge carryover for a residential street. Carryover velocities shall be at a
maximum of 6 .0 ft/sec and not have a depth of more than 2 feet.
IV . Storm Inlet Flow Constraints
The proposed storm drain inlets will be designed in accordance with the
Stormwater Management Plan for the City of College Station . Inlets will be sized
to have a capacity for the 10-year rainfall event with a minimum opening width of
5 '. Inlets at culvert structures shall be oversized to accommodate 125% of the
design storm for the roadway. Inlets at low points in the proposed street will be
sized to restrict ponding at the inlet to a maximum of 18" up to the 100-year
rainfall event.
Drainage Report -5
I
DRAINAGE CALCULATIONS
The drainage area calculations are summarized accordingly using the Rational Method :
(Q =CIA) where "Q" is the runoff in cubic feet/second , "C" is the runoff coefficient, "I" is
the storm intensity in inches/hour for each selected frequency , and "A" is the drainage
area in acres . A minimum 10-minute time of concentration for all calculations will be
assumed . The selected frequencies will be 2, 5, 10 , 25 , 50 , 100-year rainfall events.
The curb inlet flow calculations are summarized accordingly using the Modified
Mannings Formula: (Q=3 .0Ly312) where "Q " is the runoff in cubic feet/second , "L" is the
len gt h of the curb opening in feet and "y" is the head on the curb opening during weir
flo w in feet.
Channel and curb & gutter flow calculations were computed using Mannings Formula,
aided by the program FlowMaster v5 .07 . Culvert flow calculations were computed using
Manning 's Formula aided by the program Texas Hydraulics System Design vl.O by
TxDOT .
RESULTS
In Section # 1, "Drainage & Phase Structure Maps", is the mappmg of the primary
drainage system up stream of State Highway No. 6 . This portion of the primary drainage
basin consist of 1,395 acres . The Nantucket Lake serves as a detention facility for this
drainage area. No on-site detention will be necessary since the South Hampton site runoff
discharges into the primary system downstream of Nantucket Lake . With this scenario ,
the South Hampton site peak runoff will have already passed before the drainage basin 's
peak discharge , at the point of discharge .
From the drainage calculations, the following results were determined:
Drainage Report -6
CURB & GUTTER FLOW RESULTS MINIMUM BIB (10 YEAR) CHANNEL STREET ID DRAINAGE SLOPE WIDTH DISCHARGE VELOCITY CURB DEPTH NO. AREA (%} (ft} (cfs} (ft/sec} (ft} 1 B 1.00 28 8.685 3.25 0.31 2 E 1.00 28 10.970 4.10 0.45 3* E 0.50 39 10.970 2.92 0.44 4 F 1.00 28 13.634 4.33 0.48 5* F 0.80 39 13.634 3.67 0.44 6 H 1.60 39 26.814 4.75 0.38 7 M 1.40 39 22.982 4.34 0.37 8 M 1.60 39 22.982 4.56 0.36 9 p 1.75 39 37.553 5.34 0.43 10 T 1.00 28 6.096 3.54 0.36 11 T 1.60 39 6.096 3.89 0.29 12 u 2.00 28 13.399 5.59 0.42 13 y 2.00 28 16.856 5.92 0.46 14 u 3.00 28 13.399 6.50 0.39 15 y 3.00 28 16.856 6.89 0.43 16 u 0.60 39 13.399 3.28 0.46 17 y 0.60 39 16.856 3.48 0.51 18 z 1.00 28 4.670 3.31 0.32 19 x 1.00 28 8.025 3.79 0.40 20 w 1.00 28 19.198 4.71 0.55 21 x 1.00 39 8.025 3.50 0.35 22 w 1.00 39 36.652 5.11 0.61 23 z 1.00 39 4.670 3.05 0.28 Drainage Report • 7
I
CURB & GUTTER FLOW RESULTS
MINIMUM BIB (100 YEAR)
CHANNEL STREET
ID DRAINAGE SLOPE WIDTH DISCHARG CURB DEPTH .O .W. WIDT
NO . AREA % ft cfs ft ft
1 B 1.00 28 11 .707 0 .35 50
2 E 1 .00 28 14.788 0 .50 50
3 E 0 .50 39 14 .788 0 .50 60
4 F 1.00 28 . 18.'379 '"0.54 50
5 F 0 .80 39 18 .379 0 .49 60
6 H 1.60 39 36 .145 0 .43 60
7 M 1.40 39 30.980 0 .42 60
8 M 1.60 39 30.980 0 .41 60
9 p 1.75 39 50.621 0 .48 60
10 T 1.00 28 8 .218 0 .40 50
11 T 1.60 39 8.218 0 .32 60
12 u 2 .00 28 18.062 0 .47 50
13 y 2 .00 28 22.357 .0.51 .50
14 u 3 .00 28 18.062 0 .44 50
15 y 3 .00 28 22.357 0 .47 50
16 u 0 .60 39 18.062 .0.52 60
17 y 0 .60 39 22.357 0.56 60
18 z 1.00 28 6 .295 0 .36 50
19 x 1.00 28 11 .037 0 .45 50
20 w 1.00 28 25.878 0 .61 50
2 1 x 1.00 39 11 .037 0 .40 60
22 w 1.00 39 36 .652 0.61 60
23 z 1.00 39 6 .295 0 .32 60
All the proposed residential streets were designed for the 10-year and 100-year rainfall
event. As shown above, the streets have the capacity to carry the 10-year rainfall event
within the curb & gutter section of the street. Also , most of the proposed street 's curb &
gutte r cross-sections will carry the 100-year rainfall event and all within the 50 ' right-of-
w ay. Items denoted by "*" are designed to accommodate a 12 ' traffic lane during the 10-
year rainfall event. The shaded portions of the above table displays the streets where the
100-year rainfall event is not carried within the curb & gutter but within the provided
right-of-way . Drainage areas with two parts reflect that the street has a grade change .
These areas are clarified on the Drainage Pattern Map .
Drainage Report - 8
~HANNEL FLOW RESULTS
MINIMUM (25 YEAR) I CHANNEL
ID DRAINAGE SLOPE DISCHARG VELOCITY IDE SLOPE
NO. AREA % cf s ft/sec (ft/ft)
1 c 0 .75 26 .425 3 .33 4 to 1
2 D 1.00 17 .749 3 .36 4 to 1
3 G 1.10 49.197 4 .49 4 to 1
4* I 1.50 96.248 5 .96 4 to 1
.6 ~,00 52 ,935. .... 3.21. . .N/A · .>
7 L 1.00 84.243 3 .38 25 to 1
8 L 1 .00 84.243 3 .47 26 to 1
10 Q 1.75 8.486 3 .44 4 to 1
11 s 1 .84 22.932 4 .50 4 to 1
12 v 1.30 37.452 4 .46 4 to 1
13 x 1.00 9 .128 2 .61 4 to 1
CHANNEL FLOW RES UL TS
MINIMUM (100 YEAR )
CHANNEL
ID DRAINAGE SLOPE DISCHARGE TOTAL DEPT H EASEMENT
NO. AREA % (cfs ft (ft)
1 c 0 .75 32 .996 2 .03 20
2 D 1.00 20 .950 1.72 20
3 G 1.10 58 .092 1.76 20
4 I 1.50 113 .636 2 .1·4 20
6 L 1;00 52.935 1.81 80
7 L 1.00 99 .836 1 .20 80
8 L 1.00 99 .836 1 .10 90
10 Q 1.75 10.017 1.34 20
11 s 1.84 27.104 1.20 20
12 v 1.30 44.421 1.54 20
13 x 1.00 10.774 1.49 20
CHANNEL FLOW RES UL TS
MINIMUM PILOT CHANN EL
CHANNEL 1/3 (5 yr)
ID DRAINAGE SLOPE DISCHARGE REQUIRED PROVIDED
NO . AREA % cfs ft (ft)
c 0 .75 7 .242 5 .07 5
2 D 1.00 4 .615 4 .06 4
3 G 1.10 12.726 5 .83 6
4* I 1.50 24.980 7 .08 7
6 L 1,00 NIA NIA ·NIA
7 L 1.00 21.615 7 .24 7
8 L 1.00 21 .615 7 .24 7
10 Q 1.75 2 .205 2 .77 3
11 s 1.84 5 .919 3.97 4
12 v 1.30 9 .694 5 .10 5
13 x 1.00 2 .374 3 .30 3 .5
I Drainage Report -9
The proposed open-channel drainage ditches will be triangular in shape with 4 : I side
slopes . For each drainage area, the corresponding total depth for the channel is shown
above . In this total depth, a 0.5' freeboard is included . Velocities are maintained below
4 .5 ft/sec , which will require all proposed channel to a have a minimum of seeded grass
surfaces . Items denoted by "*" exceed a 4 .5 ft/sec velocity and shall be sodded channel
surfaces . The shaded portion of the above table displays the flows and conditions in the
existing drainage creek.
CUL VERT FLOW RESULTS {10-YEAR}
APPROX. HEADWATER
CULVERT NO . TAILWATER DISCHARGE DISTANCE
ID DRAINAGE SLOPE BARRELS DIAMETER DISCHARGE DEPTH VELOCITY FROM T/C
NO . AREA (%) (Each in) (cfs (ft) (ft/sec) (ft)
1 D 0 .51 1 30 26 .510 1.27 2 .20 1.72
2 F 0.40 1 21 13.634 0 .99 5.67 NIA
3 H 0 .51 1 36 43 .050 1.77 2.43 1.65
5 M 0 .51 1 18 9.600 1.34 5.43 N/A
6 p 0.51 1 30 44.982 1.86 2 .55 1.27
7 R 1.00 1 18 10.236 0 .94 5 .79 NIA
8 T 0 .50 1 27 26.131 1 .33 2 .12 1.3
9 v 0 .70 2 30 83.120 2 .64 2 .62 1.32
10 x 1 .00 1 18 7 .993 0 .85 5 .78 N/A
CUL VERT FLOW RESULTS {100-YEAR}
CARRY-OVER
ID DRAINAGE FLOW VELOCITY DEPTH
NO . AREA (cfs (ft/sec (ft)
1 D 0 .000 0 .00 0 .00
2 F 0 .000 0.00 0 .00 .
3 H 0 .000 0 .00 0 .00
.. 5 N 0 .000 o:oo 0 .00
6 p 2 .890 NIL NIL
7 R 2 .320 NIL NIL
8 T 0 .000 0 .00 0 .00
9 v 0 .000 NIL NIL
10 x 0.000 0 .00 0 .00
The proposed culverts have been analyzed during the I 0-year and I 00-year rainfall event.
Since these are residential streets and not within the primary drainage system , the I 0-year
design is acceptable. Since the proposed culverts will be discharged into a channel that is
Drainage Report -10
man-made with seeded cover, the maximum allowable discharge velocity will be 6 ft/sec .
Culverts were also sized so that the upstream headwater elevation would always be more
than one foot from the proposed street top-of-curb during the 10-year rainfall event. The
shaded portion of the above table displays the culverts that will replace existing TxDOT
culverts .
The discharge velocity was calculated for each culvert at the end of the proposed
headwall . For culvert headwalls that are within the TxDOT right-of-way, a 6 : 1 straight
wingwall slope was used . For culvert headwalls that are on residential streets, a 6 : 1
wingwall slope was used at a 30° flare .
STORM INLET FLOW RESULTS
(10 YEAR) (100 YEAR)
CURB PONDING PONDING
ID DRAINAGE LENGTH FLOW DEPTH FLOW DEPTH
NO . AREA ft cfs) ft cfs) (ft)
1 B 8 8 .685 0 .51 11 .707 0 .62
2 E 8 13 .713 0 .69 18 .485 0 .84
3 H 10 16 .759 0 .68 22 .59 1 0 .83
5 T 6 7 .620 0 .56 10 .273 0 .69
6 u 10 32.597 1.23 54 .925 1 .50
7 x 8 13.832 0 .69 36 .652 1.33
The proposed storm inlets have been analyzed during the 10-year and 100-year rainfall
even t. All curb inlets will have a gutter recessed entrance of 3" in depth . Curb inlets
were sized so that all inlets would be in weir flow during the design storm with minimum
ponding created upstream in the curb section . No curb inlets were surcharged to have
over 18 " of ponding during the 100-year rainfall event.
CONCLUSIONS
Below is a break-down of the drainage structures that will be constructed for each Phase
of the South Hampton Subdivision . Each identification number for curb & gutter,
channels , culverts and curb inlets correspond with the number indicated in the "Results"
'
portion of the drainage report.
Drainage Report -11
SOUTH HAMPTON PHASE DEVELOPMENT
CURB &GUTIER
PHASE STREET OPEN-CHANNEL CULVERT CURB INLET
NO . IDNO. IDNO. IDNO. IDNO.
I 11, 12 , 13, 14, 15, 16,17 7, 8, 11, 12, 13 9 6, 7
II 19,20, 21,22 10
Ill 10, 11, 18, 23 10 8 5
IV 9 6
v 7 , 8 5
VI 3, 5, 6 3 ,4 1, 2 , 3 2 , 3
VII 1, 2 , 4 1 , 2 1
The existing TxDOT drainage structures were analyzed for the increased residential
development runoff and resolved still adequate . See Section VII for these calculations .
Drainage Report -12
SECTION#!
DRAINAGE & PHASE STRUCTURE MAPS
SECTION#2
DRAINAGE AREA EVALUATION
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area A
Drainage Area (A,J =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (D,J =
Veloc ity of Runoff (V ,J =
Coefficient of Runoff (C,J =
-NOTE : Minimum T c allowed = 1 O min .
1.40 acres
860 ft
ft 1.00 l sec
0 .50
2 Y!:A R FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY . RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coeffic ient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evalu ation.xis
96
8
RESULT
T q A) = 14 .3 min .
Rainfall Intensity (1 5) = 6 .521 i%r
.•.•.0 ....•. ·.• .. ·.'".''.'.:.•.•.•.•.•.•.•.•.•.•.•.•.:.:.•.•.·.•.·.•·.•·.••.:.:·:r,.. ,.,.,,,.,.'",.,.,.,.,.,,,,,,,,,,,,,, :)))' :.• :.•.•.••.••.••.••.••.••.il.·•.·•.l.•~.·•. 1~=:.E rn•• ' ~ -·-:-···-:-·-;.·-:···:-:-:-:-:-:-:-:-;-:·:·:···
Rainfall Intensity (1 10) = 7.354 in /hr
::"""'''''''=' \tt: ::::o::::\:rr:::o=:= ::)? ',·'.i, ... i,.·.,,,•·.,', .. •.'.·'.i,.'.i,.'.i, ... i.:.i.:.,·,· .•.•.•,•.•.•.•.s.,•.,·.·.~.:,•.1,•.,·.·,so.•,·.,.•,•.•,'.•,·.•,•.•,•.•,~.·,·.·,:.fi,.·,·.s,'.',·.·,·.• ,•.•,•.:,:.:,•.•,•.•,•· ~=~~it ::::): ::{{{:~ :;::::::=::::::;:;=::;:;::::;:::
Rainfall Intensity (1 25 ) = 8.415 in/hr
lia ?J •••••]t\•w· ::::;:,:)• •••'-~'g~ ]j
Rainfall Intensity (1 50 ) = 9.530 in/hr
:a .a::r:•.:.::•::·:::: •:•·!•·:•·:'::. =:• •:]:::I e •••••••,iwz~t ·e.ri •• • •
Rainfall Intensity (1 100) 9.943 in/hr
:s;1.·a:,·:·:::.:-: ·t.:=••;,;=•\'•r:m·••::.=••••=== .. :•;•·: :=: :.· z~Pl:~ ~:, .=::
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descript ion : Drainage basin for Area B
Drainage Area (A s) =
TIME OF CONCENTRATION CT c)
GIVEN
Maximum Travel Distance (Ds) =
Velocity of Runoff (Vs) =
Coefficient of Runoff (Cs) =
-NOTE : Minimum Tc allowed = 1 O min .
1.05 acres
280 ft
ft 4.00 l sec
0 .95
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coeffi ci ent (b) =
Coefficient (d) =
0 .754
89
8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evalu ation.xis
RESULT
Tq sJ = 1.2 min .
Rainfall Intensity (1 2) = 6 .327 i%r
,:fi•'a••: :: ::: : ::::::t : : ::. ::_;: d:::: ::.:,:•:•••:t::•:•:.]l f:R!ii#f!J:r::::
Rainfall Intensity (1 5) = 7 .693 in/hr
=·itiij·'''''''''''''''·='·=:;::: ............................... = ... ": ..... :::: .. : .... >.'P .. ,,,.,,o ··-·=·:·:-: .. ~~~~~=~~~~~~~~~~~~~~~~~~~~~~~i~ ==========~=~:==~:::::~=~:~:~~~=~~~~~=~~~):;~~~~~~~~~~~~~~~~~~~~~~:~~~~~~~=-==~=~=~~j~jt~:!~:~ .... :~r:~:
Rainfall Intensity (1 10) = 8.635 in/hr
.•.•."=.•.•.•.·.•.·.=_•.•.••_l _••.•.•.•.=.·.•.·.=_•.•.•.•.•.•.·.•.= JJ ...... •: :::::::::::::.. tm:.•~-•-•.•~.=•.$.• .. :.e .... ·•.•-•.:.::_:~.·•.:.1 ... ~.·•.·•.·•.••.••.t ~¥ :::::::::::::·:::::::;:;:, ................................. .
Rainfall Intensity (1 25 ) = 9 .861 in/hr
Jliffi •••••:}'\)): ::: ::::,, ::: ···:•• :. ·••:J.•••••l~l,jj •¢.l t•f
Rainfall Intensity (1 50) = 11 .148 in /hr
]fiij•;it •:·····;·· ...... ,., ... :·:····-:=:::,:.:·:;:.-:: :·;;; 11 8111' •P:t~g •• : .....
Rainfall Intensity (1 100) 11 .639 in/hr
'.•',Q_.·,· .. ,='.·','.',~.·'.·•'.·~.==.·•'.·'.='_.•• .. =.==,== . .=,i= .. ',.' .. ',.' .. ',.'.i,•'.i,='.i, : ::::<•=::::::::=: .••••••••• • • • •• :••f•i1 ~7t.7fCfS??••• : .. ~ ;:;:;:::;:;:;:::::: .:!:~=~=~=~=~ -:-:-:·:·:·:·:·:-:-:-:-:-:-:-:-:-:·:·:-:-:-:-:-:-:·:·:·:·:·:···:·:·:·:···:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·
I
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area C
Drainage Area (Ac) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (De) =
Velocity of Runoff (Ve) =
Coefficient of Runoff (Cc) =
**NOTE : Minimum Tc allowed= 10 min .
2.69 acres
760 ft
ft 1 .00 fsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .785
76
8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8.5
50 YEAR FREQUENCY . RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evalu ation.xis
0 .73
96
8
RESULT
T C(CJ = 12 .7 min .
Rainfall Intensity (1 2) = 5.660 i%r
·:@i.:a : • :::r. : : • :.::::::: .• · 1;61'.i •Y:t§• •t
Rainfall Intensity (1 5) = 6 .921 in /hr
................................ :-:·.·.·:·.·:·.·:::::::·:::·::::;::::::;.·:-.-:-···· ........ ·.·:·:·.·.·:·:·.·:·:·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.· ~:m :::::t: • · :•··~~lli~ F
Rainfall Intensity (1 10) = 7. 791 in /hr
... . ............... ····~···
.
:.•.""'.•.•.:_ .. ·.•.·.:·.:.••.;._:_•.:_•_:=_·.•.•.• •. ·.•.·.:.:.:.•.:_•.:_:.: .. •:.:•.: •• ···: :=:::::: •••:::::::::::::•: •:::::::: • ::_:.1 .. • ...•. o .. _.•.~.·.s .. 67Ucfs < ~ ..... ··.···.··.·.··.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·-:-:-:-:-;-:
Rainfall Intensity (1 25 ) = 8 .909 in /hr
@~:e •t • :::: :::: !:1.~~p~::~:
Rainfall Intensity (1 50) = 10.084 in/hr
:·:·:·:·:·:·.·.·:·:·.·:·:·:·:·:·:·: .::·:::::::::::-.-: · ... ··:-:·:·:·:::::::: :·:·.·:· ... :·:: ·.·:·.·:·.·.·.·.·:·.·:·.·:·.·:·.·.·,·.·:·'.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·. •~a • :: .1 t• ): ·••• :::11~1t~#t! 1
Rainfall Intensity (1 100) 10 .523 in/hr
@~•·Fi •:-::·•:: :::.: ·:.-. :::.;::.:_.:-_:.::=::14~~~1 ::~:••.·•:•
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area D
Drainage Area (A0 ) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (D 0 ) =
Velocity of Runoff (V0 ) =
Coefficient of Runoff (C 0 ) =
-NOTE : Minimum T c allowed = 10 min .
3 .57 acres
540 ft
ft 1.00 fse c
0 .50
2 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY , RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
T c (O) = 9 .0 min .
Rainfall Intensity (1 2) = 6 .327 in /hr ]l•e·: ::::::??•• r::; ·: •. :·:· .•. : •. :.:,:.1:•····:•1·1·;317 ··11~ .••:•
Rainfall Intensity (1 5) = 7 .693 in /hr
·.·.·.·'.·;·,·.·.·.·.-:·.·.·:·.·. ;.;.:-:-:.;.;.;.::::::::: ·.·:·.· ···.··.·.·.·.·.·:·:·:·.·.·.·.·.·.·.·.·.·.·.·:·.·.·.·.·.·.·.·.·.<·.·.·.·.·.·,·.·.·
.•."".• .... :.·.•·"··'" .. '.'.'.:.:.1=.·.•·.·.'··.'.:.:.•.:.• .. •.•:.• ? • ........ • ,,, :.:•.::.•:.••.::.::.::.•:·.•·'···.:.a ... ·.~.M .....••.•.... ~.•.•·.•.••.¢JS.··.···"··········•·.••.••.••.•t ~ .·.·.·.·.·.·.·.·.·.·.·.·.·-:·:-·-:-:-·-:-:-:·:·:-:.:-:·:-:-:-·-·.·.···
Rainfall Intensity (1 10) = 8.635 in /hr
.:@jJF, ·:'.·. :::.':.:,::.: ::: •• ,,:• ::·:•·:··'··1'=~8~l~'f~····
Rainfall Intensity (1 25) = 9 .861 in /hr
···.·: ••• ·.·.·.·.···:·:·:-:-:·.·.·.·:·:·:·· • :::-:::::=:-:=:-:-:-:-::::;. =::::::::;>:::·· ·.·:-;-;-;-:-.·.·.·.·.·.·.'.·.·.·.·.·:·.·.-:·.·.·.·:·:·.·.·,·.-:·.·-:· :g~:a ••••••••••••••••••••·••••••••••••• :: : :: : ::::::. 1z~r.•1 •••¢m•t••
Rainfall Intensity (1 50) = 11 .148 in /hr ·ne •· • :.::::.:-''} ::· . . , .::,:·itsl l tf!i t••
Rainfall Intensity (1 100) 11 .639 in /hr
:@~lefa . :: ::•:•:• • ••••::::• :::~o ~M~~t '
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area E
Drainage Area (AE) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (DE) =
Velocity of Runoff (VE) =
Coefficient of Runoff (CE) =
-NOTE: Minimum T c allowed = 10 min .
1 .40 acres
470 ft
ft 4 .00 lsec
0 .90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coefficient (b) =
Coefficient (d) =
89
8 .5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
TqE) = 2 .0 min.
Rainfall Intensity (1 2) = 6 .327 i%r
·•·•·•···•··•···················· ·:·:·:<·:·:·:·:·:-:·:·:-:-:·:-:· :·:-:···:·.·:::::;:·:·:·. ···.·:·:·:·:·.·:·:-.·:·:·:-::Qi#] ::::::=:: :• n:•tr: //''''' nr1~1ad;t!J
Rainfall Intensity (1 5) = 7 .693 in /hr
:Ri ·a· : i: = :: r : 1t::: : .:::::·::··:::·:·:. :,]]:,:::[!~lt~ m ::rn:J•
Rainfall Intensity (1 10) = 8 .635 in/hr
! .. •.A······.: ...•..•. ·: .. :.::··;_·'·.•.·.•·.=.'.·········•.•.•.'.•.·.•.•.•.•.•.•.•.•.•.•.'.•.•.•.•.•.•.: )(' ::( )::: )jj:Q]QfO cf.$:: } ~.. ·:···:·:·:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·:-:-:-:-:-:·:·:-:-:-:-:-:-:-:-:-:-:-:-:-:-:·:-:·:·:·:·:·
Rainfall Intensity (1 25 ) = 9 .861 i%r
::g§:·a::::t:•::::[i) : r• ··;·•·: :;;·:::::::;••:,,::::::t:J::~~~IB:•l m < ••
Rainfall Intensity (1 50) = 11 .148 in /hr
:-:-;.:.: .. -;. . .;.;.;·:·:·:·.·:-:·. ···············:·:·:·:·:·:·:·.;:·.·:·:·:·:::::·:·.·.·:·:·:······:·:·:·. ·.·:·:·:·:·:·:·· .... ···-:·:·.· •9ia r •••••rt • :=t ·• ::::::11411Mmt : r
Rainfall Intensity (1 100) 11.639 in /hr
•·ljl:a •.:.::r::.:::=:•r::·'.':: :.:::.·;·:,::::.:.:::.:,, ••:::::::::1 11~zn ••m r::•
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area F
Drainage Area (AF) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (DF) =
Velocity of Runoff (VF) =
Coefficient of Runoff (C F) =
-NOTE: Minimum Tc allowed = 1 O min.
2 .61 acres
700 ft
ft 2 .00 lsec
0.60
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
TqF) = 5.8 min .
Rainfall Intensity (1 2) = 6.327 in/hr
::r1·5 :.:•:::::.:•.:-;_:_:.::::.:··: :::J::•::.•,:. ::=··r•••t••J:•••••••••i~il ••F:t!:.:•]]::
Rainfall Intensity (1 5) = 7.693 in /hr
.:,r_:,=_·,•.•.•e_'_ •. '.'.'_•,•.'.·.•.=,•.·.•.· .. = ... •.:,_•.•.=.•·.•.•.=.•.•.•.•.:.: (})/::::=•=•=•==========·=·=·=····=··· .•.:.•.•.•=.'.•.:.•.•.•.•.•.:.::.•.• .:.:.::_,_._ •...•. 2 .•..•..•. ~.•.•_,_:_· ..•. 4.••.•·.7.•=.=.=•.••-~-···········:.·:.•:.•:_::.::.::.••.J ~ ::::::·:::::::::::::::::::::::::::::::::::::::::;::::::
Rainfall Intensity (1 10) = 8.635 in /hr
:•.•,~_=, .. _·,•.•,·.=,=_•=.·.~.•.•.•,•.=,=.',•.',•.=.. =::: • = • •• • •t•x·_••.••.••· •<t••.• ... •,•.•,•.•,•.•,•.•1,·.•,·.·_=.•_3_·.•,·.·_=.•_1.·,·.s.=_·.·.·.=_34_··._=·.·:.·=.:.•.•.·~.=.=_1_··.s_=•.=.••.••.••.••. o: ~v ;:;:;:;:;:::;:;:;:;:::'.:::;:;:;:;:;:::::::::::::·:·:·
Rainfall Intensity (1 25) = 9.861 i%r
••g ·a••·••••••J• ··•• •·••• ••·• ... ·'J •••:::•1!;.~~1··:1!:•••••
Rainfall Intensity (1 50 ) = 11 .148 in/hr aar : :: .,::: ::::::=·====·=·= =· x> .. • ::az ~~q~];t~•t••
Rainfall Intensity (1 100) 11 .639 in/hr
.•,•.a,=_·,•.•,•.·,=.~_·•.•:...._•·.•·.·.·•·.· .. • .. •,•.•,•.•,·.:.·.• .•,•.•,•.•,•.••, .•. •,•.•.• .. •• .,...,...,..., .... ...., ...... ·=·=·=·=·=·=·====•= :::::::::: .•.•.•.•.•.•.•.•.•.•.1.•.=.=_·.•.a.·.·.·.·· .. ~.•.•.a.•.·· .. ·.1 ....... ••.s.•.·.··.·.·· .. •.•.•.•.Cts..'.'.•.'.•.=.·_·.•.=.=_=.=.•.•.•.•.•.•.•.••.••.••.••• :.JY!'tt1. ::;:::::::::::::::::: ::::::::::::::::::::;:::::::::::::::;::;:·
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area G
Drainage Area (AG) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (DG) =
Velocity of Runoff (VG)=
Coefficient of Runoff (CG) =
-NOTE: Minimum Tc allowed= 10 min .
4.44 acres
850 ft
1.00 ft/sec
0 .50
2 YEAR FR.EQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coeffici ent (b) =
Coefficient (d) =
0.785
76
8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e} = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d} = 8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e} = 0.745
Coefficient (b) = 98
Coefficie nt (d) = 8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0 .73
96
8
RESULT
TqG) = 14.2 min.
Rainfall Intensity (1:0 = 5.349 i%r
::ii:a::::::::::-·:,: : ::,: ::=:'::=::::,,::?:::::::::, :::::::t:/:::=:=:,.:;~•::#:t!Y. r:
Rainfall Intensity (1 5) = 6 .559 in /hr
::r.u.a ::: r:·::::_m·::_::::·:.:_:::::::::::::::::::::::::=::::::r::::-::::::=:::::::'::~··~-:;:~:],]
Rainfall Intensity (1 25) = 8 .461 in/hr
::1i::ar::;:;:r:;:::·:::i:::=:::::;:;·:: : :::::: : ::::·:::::::··11~1J.1:: m ::::::::=
Rainfall Intensity (1 50 ) = 9.582 in /hr
::a :·a :·:.:::::.::::l.::::::.:,:::::::::.:::1:,:.:::::·:,:::::.:::.:::l:::::::::::,:::::::::rn:::(i1:~•2i]it$J::::r
Rainfall Intensity (1 100) 9.998 i%r
::1j1.·:a :::.:,:'::::[=::::=::.:::.:::,:.:,:::::,:::::=:,:::::::::::::·:::,:::'::::':::=:::,:::::::::_a ;.m ,:m ::::::::::
SECTION #2-DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area H
Drainage Area (AH) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (D~ =
Velocity of Runoff (VH) =
Coefficient of Runoff (C H) =
-NOTE: Minimum Tc allowed = 1 O min .
3.42 acres
750 ft
ft 4 .00 fsec
0 .90
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coeffic ient (b) = 80
Coeffic ient (d) = 8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coeffic ient (b) =
Coefficient (d) =
2882-025 Drainage Evaluat ion.xi s
0 .73
96
8
RESULT
Tc(H) = 3 .1 min .
Rainfall Intensity (1 5) = 7.693 in /hr
•:11.:a :]··1::· :::::::::.:;::·;;::·j::.:;; :;: •• t:•·:·.·:1:a~1n ~:· ]:
Rainfall Intensity (1 10) = 8.635 in/hr
• ... '."'.•.•.·.·.· .....•... ,_::_~_._:_•_•.=.•········.·················· :::::::ar<::::::r: : · : ••> , Jt::•:::t 2'.6.]i 1\\t: cii • t ~v :-·-:·:·:·:···:·:-·-:·:·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:-:-:-:-:···:-:-
Rainfall Intensity (1 25) = 9 .861 in/hr
.:.•.a.•·.• .. ··:.··.· .. :...'·.".:':.•·_,_•.•·.•.·;.•:··.•·-··· : ::::··; :::/Jrr ::J':::·::;:::, .. ·.•.•.•.•.: .. :.:.•:• .. ·_i.• .. ·.:· ... ·;.o .. · .. :.·:.• .•. ·.1 ... ··.· .. :i ;:::as.tr -s.• ··:·:·.·:·.··=··: ... ··=···· ·.·.·.·.·.·.·.·.·.·.·.·.·. ·.·. ·.·.· ~~~~~~::r~:~~~~~ :·:·:·=·:-:-:-:·=·=·=· =·=·=·=·=·=··. ·.·.· .
Rainfall Intensity (1 50) = 11 .148 in/hr
.
:.•.b;;;;.·:.·· ... _::_:.·:·;.':.·':.,"•.'.•: .•. •·.=.:.··.:.·:.:· .•. ·.•: .• :.:=_:_::_:_•• . .: . .=_•.r.• .. •.• .. •.• .... • .... • .. •.•.•_.:_.:_: .. :_.:.•_.:.:_.:.t_::.·:.:.•.::.• . .:.•.,'.•.'.•.: .. •.: .. •.:.•.: .. • ....... 1 .. •.:.• ...... _;_.:::::_.:.:_.= .• :.•:.•'.•:.='.•:.='.•:.•'.•'.•'.•'.•'::::::rn1.1 ]1 11 nct.i r> ~ :·:·:·:·:·:·:·:·:·:·:·:·:·:-:-:-:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:-:
Rainfall Intensity (1 100) 11 .639 in/hr
:·1~w.·:a:-. .. :.:::::.r.?,;_;1:::::::::,:::.:.:r,:.:.:.::::.;.:.:.:·t.:.::•' ?:1~1g :·m:::::::::,:
I
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area I
Drainage Area (A 1) = 3.64 acres
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D 1) =
Velocity of Runoff (V1) =
Coefficient of Runoff (C 1) =
750 ft
It . 1.00 fsec
0.50
-NOTE: Minimum Tc allowed = 10 min .
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coefficient (b) =
Coefficient (d) =
80
8 .5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coefficient (b) =
Coefficient (d) =
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xi s
RESULT
Tq1i = 12 .5 min .
Rainfall Intensity (1 2) = 5.697 in/hr
:=m:~:·:::r\.·:·::::f·:,:: : :::::= •:,,r:··::::jt;a ~mJir$ZI••::
Rainfall Intensity (1 5) = 6 .964 in/hr
.
:_n_:_·.·_ •. •.·.·_ .. '~_:,_:,: __ =_:_ •. :_·.:·_.:_·.:_=.:_:.i_:_:_:.•_::._:_:_: .. _:.:_:.:.::.•.•• .. '.:.:_:_:_, ::: ::: t :t=:Jj12Viii' as ?: i ~ .·.·.·.·.·.·.·.·.·.·.·.·.·.·.:·····:··-:-·.·-:.;.:-:·:·:·:·:-:-:-:-·-·.
Rainfall Intensity (1 10) = 7.839 in/hr
····.· ............... :;.;:::;.;:;:;:······ ............ ·.·.·
::ljija :::: :,::: ••::.: ,,,,, •M 1~1§§::~m~::•e
Rainfall Intensity (1 25) = 8 .963 in /hr
'_::_a_.·_.·_,_ •... ,_ •. _,_.:..._.=:_:_.':_.'.=_i_:_*= .. '_,'_.:_,' .. '_,'_··:= :::= ==::::::: :::1:1~4.a&as ::: ,
~-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:-:-:-:-:-:-:-:-:-:-:·:·:-:-:-:-:-:-:-:-:-:-:-:·:·:-:-:-:-:-:-:-:-:·······
Rainfall Intensity (1 50 ) = 10 .143 in/hr
:·:·:·:·:·.·:·:·:·.·.·:·:·.· :::;:::::;::::;::::;:;:·:·:·:· ····:·:;:::::::::;:;::;:::::::::::::::::::.:: ......... ·:·:·:·:·:·.·:·:·:·:·:•: .. ···.·.· ...... ..
'.•·_n:_ .. •.·.·.:.·.·.·.·::::'·_·'.'s'_''_' .. • .. •.=.•.-.:.••.··.· .•• .. = .. •.'.•·.''_,:.·.•.•.'.•.•.= :::::::::r ,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,,,,,,,,,,, ':':/:::::1:1 i s11:::cfsttt= ~ ;:::;:;:;:::::::::::::::::::;:;:;:;::
Rainfall Intensity (1 100) 10 .585 in/hr
::1~1-:a]:::-: ::::,,,,;:· • :: ··::•:•::::,=:::=::::••:,:1 1~111m •::
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descri ption : Drainage basin for Area J
Drainage Area (A J) = 25 .56 acres
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D J) =
Velocity of Runoff (VJ) =
Coefficient of Runoff (CJ) =
-NOTE : Minimum Tc allowed = 1 O m in .
1700 ft
ft 1.00 lsec
0 .35
2 '.'C:.AR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coeffic ient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficien t (b) =
Coe ffi c ien t (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficien t (e) = 0.73
Coefficient (b) =
Coeffic ient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
TqJ) = 28 .3 min .
Rainfall Intensity (1 5) = 4.480 in/hr
•.·:·:·:·:·:·.·.·.·:·:·:· :;:;. ::::::;.;::::=:·:=:=:=::::::::;:;:::::::;::::::::=:::::::::::::::::: ·:·:·.·:·:·:·:·:·:·:·:·:·:·:·.·.·:·:·.·:·:·:·:·:·:·:·:·.·.·:·:·.·:·:·.·.·.·,•,•,•,•.•,·,• !9,i :!a :::;::::::::::;:::;: ::: : ::: !!:/ .. ! IQM 22 \Cfi \?
Rainfall Intensity (1 10) = 5 .106 in /hr
=:~~·a ·····=:.···.n:;. f tt:: •::ur f.•.::·•.:::PR~$~::f:ri:•::::·:::
Ra i nfall Intensity (1 50 ) = 6 .674 in;hr :B.'.a =::::-_:::::•i:•:,•,:L:u •=r=::_:.:::::::·:::=:::-r :•• ::11t211 n£ta:n:::
Rainfall Intensity (1 100) 6 .970 in/hr
''A ?'''''''''''''•==·=·===:::::::r=nr==•=•=:::•::;:;=:rt''''''=::::::=:=:•:= '.·,•,.:_,:.=_'_,=,•_,•,•_,•,•_,•,.:_,•,.:_,•,•_,=,.:_,•,•_,•,.:_,s·,=,·_=,·_•,:2·,.·_.·,·~·,•.a,.·,.·_·.',~_·.=,·_·,:e=,',.,.-,•,.•_,•,.•_,-,=,·.•.·•_··:_·=.·=.·.•,• .. •.•.•••.••.:r ·~jjjffl :::::::::=::/\::. :•()( -~·:;>.
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area K
Drainage Area (AK) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (DK) =
Velocity of Runoff (Vt<) =
Coefficient of Runoff (CK) =
-NOTE: Minimum Tc allowed = 10 min.
2.21 acres
600 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
•Coefficient (d) =
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5 .
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
TqK) = 10.0 min .
Rainfall Intensity (1 5) = 7.693 in /hr
··•···•···················· .·.·.·.·.·.·.·.·.·.·.·.·.·.·,·.·.·,·.·.·.··· ::::::::::::·:·: ..... :·.·:·:·.·.·.·.·:·:·: ................. .
:
•.,•n,·,·.,: .. ,:.,·.,~.''.'.•.,•,•.,•,·.,',·.,',·.,',•.,',•.,• .... ,., .. ,.,.,.,.,., .. ,.,.· .,.,.,.,.,,, ·.·.· ...... ,,., ......... a···e:I!:""· .. ·=··.·.·.·.·.-.·.· ~ • ??•??>•• •• • • t ?•• • I t .. ~...w.~• ·~~:;.i., ? •
Rainfall Intensity (1 10) = 8.635 in /hr
.•.•·'.'.·.:M.•.:.'.'.'.''•J .•.•.=.:.:.'.'.•.:.•.•.•.•.•.·.•.•.t?rt' )JJ,::'''''.,,,.,,,, ... ,.,,.,,,.,,,,,,,,,,,,,,,,., ..... •.•.•.•.•.1.·.' ... '.:.l.•.•s.' ... '.·.u.'.'.·.·.:.: ... ·.·.·.:.•.•.•.•.CJi.'.''.' .. ·.s.·'.''.'•·.••.·•.••.••.••.t ~...,. :::::::::::::::::::::::::::::::::;:::;:::::·:·:-:-:-:-
Rainfall Intensity (1 25) = 9.861 in/hr
••!I! •• ::t•ij(J;·:•.:::::::• :::::::.; / :•:::.•::•:ji~ll•··m .. ••·•••.t•
Rainfall Intensity (1 50) = 11 .148 in/hr
••.·"'.:.·•.·:.::::;:;::::::•''.••·.~ .. :· .. :·. : • . \::::::::/: , ,, ,, :r·····:::·::·'::···:···:•ii:as. c.ts: ,, ~ .·.·.·.·.·.·.·.•.·.·.·:•.·.·.·.·.·
Rainfall Intensity (1 100) 11 .639 i%r
:•lil]•~•IJ: j.·:•:·:·.r :•:r •:::t:rx ·::.::f•:·1j,~11 :·m:•:•·:•••::•••
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area L
Drainage Area (A J =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff (VJ=
Coefficient of Runoff (CJ =
-NOTE: Minimum T c allowed = 1 O min .
6 .30 acres
1200 ft
It 2 .00 fsec
0.50
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coe ffi cient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Ev aluat ion .xis
96
8
RESULT
T c (Ll = 10.0 min .
Rainfall Intensity (1 2) = 6 .327 in/hr
::~:·5·.:·f:'\·I:.t::.:::.x·" :<}rtr:: •••••·:·:,:::·•a~lllji!: J:::
Rainfall Intensity (1 10) = 8.635 in /hr
••l i e:·••:•:•:.:;:::· w · • :::::::: ::::=::;:= :::••:•=:i.r~11~:~§•rnr
Rainfall Intensity (1 25) = 9.861 in/hr
.·•· .. · ... ·.· .. ·.·.·.·.· ·.·.· .. · .. · ..... ;.·-····. ···:::;.:-:-: .· ... · ..... · ...... · ... · ...... · .. ·.· .... . lrlff 1~: ;~;ff f ~~~;~;i~~; ~\J rt tr~ /r:;~;:;~;;;;;;;;;;:;:;:;::=: ~~~~1.1~~111.;~~~gj~f ~ ~r:
Rainfall Intensity (1 50) = 11 .148 in/hr
::.•,~., ... ·,•.:,·' .. '"':.'''.":.=.•.•,=.:',.' .. ,•' .. ',•.• ···· :••••'•>::.::··= ·· ., ... :-:::==::::r·1 : m::as ]i i 1m:crl.t:1:: ~ ::::::::;:;::::::::::::::::::::::::: ~:~:~:~:~:::~:;:~~~t; :-:·:·:·:-:-:.:-:-:-:-:·:·:·:·:·:-:-:-:·:· :-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·
Rainfall Intensity (1 100) 11 .639 in/hr
·'a·: ......... ,,, .............................. · ·· ................................... :::::::;:",.,,,,,, ..... ,.·as· :·;ae:.1 ::~ .. ,.,.,.,.,., .~, 35.:a • : ••m:m::m:r : : :: .,, : : :., :}t t ,,,. ~~~<~~~: e:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area M
Drainage Area (AM)= 2.93 acres
TIME OF CONCENTRATION CTJ
GIVEN RESULT
Maximum Travel Distance (OM) =
Velocity of Runoff (VM) =
Coefficient of Runoff (CM) =
-NOTE: Minimum Tc allowed = 10 min.
1100 ft
ft 4 .00 /sec
0.90
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
Tc(M)= 4 .6 min .
Rainfall Intensity (1 2) = 6 .327 in /hr
::r-1 ::5.:]]··:·:·: .<::::.::· ::::::::::,) ::=:::;:=:: t::·:·:.::;::il:i]~~!}t.ti q::::
Rainfall Intensity (1 5) = 7 .693 in /hr
:11..:ffl!fl .:.:-:::r::: =} ··= :::.::::::::::::m:::::::::=::m ao~it.t.::m :::::r
Rainfall Intensity (1 10) = 8.635 in/hr
-l l~'a [[[_[_[:i.[[!:!lllll=·:·:::=:=--::: •• ' =:=···:·· :;;;;; L :: ::::;l~ti#.]i,f~:::::::::/
Rainfall Intensity (1 25) = 9.861 in/h r
• .• •.,a .... = .. · ... z:.• .. '.:=.••.·.·•.· .. · .. · .. = .• •=•••=::: • :ye···=••:=•::=.:=•= : :J::::::a ~m :as :::::J:: ~· .:·:·:·:·:::::·:·:·: :;:;:;:;:;:;::::: ·=·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:··.·.·.·.·.·.·.·.·.·.·.·.·.·.:-:-:·:·:·:·:·:·:·:·:·:·
Rainfall Intensity (1 50) = 11 .148 in/hr
::•a::::::::::::··:==::::r:•:::· :::::::::·:;:::t:::::t:::::··:,::·:a *l:l::!t• :::·:
Rainfall Intensity (1 100) 11.639 i%r
:,sji·e:·:=:.::r :,::::::::::::::rr· ·;:,::==·= :::::::i::::::::::::::i.o~ii.O!:~::m:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descript ion : Dra inage basin for Area P
Drainage Area (A p) =
TIME OF CONCENTRATION CT 0)
GIVEN
Maximum Travel Distance (O p) =
Velocity of Runoff 0f p) =
Coefficient of Runoff (Cp) =
-NOTE : Minimum T c allowed = 10 min .
5 .75 acres
1050 ft
II 2 .00 ls ec
0 .75
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coefficient (d) = 8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coefficient (b) = 80
Coefficient (d) = 8 .5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coefficient (b) = 89
Coefficient (d ) = 8 .5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evalu ation.xis
RESULT
Tc (P ) = 8 .8 min .
Rainfall Intensity (1 2) = 6 .327 in /hr
::m::a:::: • < .: :::::::::·:.:::::::.:.:•r: \r = :=:::: • ••••iit~111:];t!:.:••·· •:
Rainfall Intensity (1 5) = 7 .693 in /hr
·.:.:r.•.·.·.·.:.•n··.·.·.··.•.'.•.•.•.•.•.•.•.=.•.•.·.•.•.•.•.•.•.•:.•.r===· .•..•.. •.•.••.•• .. •.•• .. •.•.:• .. ·.•·.·.• :•:::•?::::::/ , i 33A&i •ets •= ~ ·:·:·:·:·:·:·:·:.:·:·:·:<·>:·:-:·:·:<·:·:·:·:.;.;.:.:.:-:-:-:-:-·-:-:-:-:.:-:-:-:.:.:-:-:-;.:-:-:-:-:-:-:-·-:-:-:-···-:······
Rainfall Intensity (1 10) = 8 .635 in /hr
ll!iij•F, ••::::::]:::::::..:: ••••·••••••·••····= v:::r3~~111 •. :P:t,••·••:••:•:•••
Rainfall Intensity (1 25) = 9 .861 i%r
::1~1 •:::.:•.::·:·::••·••r:::: :::::::::.:-.: ·:·•:::::::J1~11=:::m •••••::•••:
Rainfall Intensity (1 50) = 11 .148 in/hr
.•D.a••·•·•=:•i•:·i•i .. t·:::.: :·::.i i:/@r::::.: :::::•••::::::=::.-.:=:11~11~ !ti •••• .••
Rainfall Intensity (1 100) 11 .639 in /hr
··1~1·1:::·:·:•:.:::::::,:.:=:.==:·:::.:.•:•:==.•::::.==·::::::== .::.:.::.=.•,i9 ~i~'-·•m :•::·•
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area Q
Drainage Area (A o) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (Do) =
Velocity of Runoff (Va)=
Coefficient of Runoff (Ca) =
-NOTE: Minimum Tc allowed = 10 min .
1.73 acres
620 ft
ft 1.00 f sec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coeffi cient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coefficient (b) =
Coefficien t (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coeffic ient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882 -025 Drainage Evalu at ion .xis
0.73
96
8
RESULT
T q a ) = 10 .3 min .
Rainfall Intensity (1 2) = 6 .234 i%r
:
•,•,A,·,·_.,:_.,'_'_'"'•_•_•.:_•,•-= .. =.=,,-,'',-.' .. •_,••,-.'.,'','.•.,••,.'.•,:,•,:_:,._·:,_:•,:_:,:_•,•.•,•.•,•.•,•.•,• .. •,•.•,:_•,•_:,·_:,"=·=:::::,:::::=::,::,.,.::=:=:::::':':•{\:'·':/"_•,•.•,•.:,:_~_.·_.·,.~_•.•=J1,'.'_.·_,_._3_:_'_.·,·.z_:_·_._.,:_.,'.•.•.t_'_:_,_:_fj_·· __ -._S_··_._:·_._:·_ •. •.•.:_._:_ •. _::_ •. _:•_ .. _:_ ••..•• ~ f~{:~=r~=f~{{:f~:f:{::::::::: v. 8
Rainfall Intensity (I s) = 7.586 in /hr
·=n:p:::::::::-:-:-.· .. ;.·-· .·:·-.·.-.·.·.·.-.·:;. :-:·:·:-::;:;:;:::····,:_•,:_:,:_•,:_:_:_• ·:·:·:·:·:·:·:-:-:-.. ;._.,.,, ..... 6 if.'e""'="""""·"·"" '•~••ffltt ::::::::::•:•:':':':':•::::::::::::::::::::\\' ::::::::::::::::::::::::::::, -~ ,:.,:,;.,::~1 :;>.?/':::::
Rainfall Intensity (1 10) = 8.518 in /hr
:'.•_=_A: __ · __ :,:·_-,··_ .. ,'_''·.''·.~.''.'.•·,•·.=,'·.•,'.',• .. •,•.',•.•, •==·=:::/ •••••:t//tt::::'• : :': := _::_::.••.•:.1:.-..:_:~_=1_•• ... 29._: __ .. : .... -.••.••.P-.·•.·:_1_._$_•.•-••.••.••-••. •••• ~w ·.·.·.·.·.·.·.· ..... ·.·.·.·.·.·.·.·.·.·. ~;ff~:~:};:::;:;:;
Rainfall Intensity (1 2s) = 9.730 in /hr
•·•· •.... · •.... · .. ·.··:·:·:·:·:·:·:·:·.·:·:·:·:·:·.·:·;.:-:-:-:-:•;<-:····· •s~a •••••• •••••••• ••'• • •.. :.: 'X:: ::: J1~11t9.m ••t
Rainfall Intensity (I sa ) = 11.000 in /hr
•'g ·~•i::l l ????.? : ?': :••:.:;;·:!,~~~!!Efs'.\'
Rainfall Intensity (1 100) 11 .484 i%r
~~ljl~~er=~~~~~~~i~~;;;1;1~iili!:111~~~i~i~~~~~~~;~;~;;i;i;;:~n;;~;;·=·=~~~~~i(~~~~~~~i~~~~~~~1i1~1i1~j1~~~~~~~~~~ .. -~~~~rr
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Desc ription : Drainage basin for Area R
Drainage Area (A R) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D R) =
Veloc ity of Runoff (VR) =
Coefficient of Runoff (C R) =
-NOTE : Minimum T c allowed = 10 min .
2 .73 acres
840 ft
ft 1.00 f sec
0.50
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coeffi c ient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coeffic ien t (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coeffi ci ent (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coeffic ient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drain age Evalu ation.xis
RESULT
T c(R) = 14 .0 min .
Rainfall Intensity (1 10) = 7.437 in/hr
:1 w··e,·'.::::::::•:.::_:::r··:::·:::: : : .,_:·:·:::.:···::::·:·:·11:g,~~IJ£t~t ,:.;;
Rainfall Intensity (1 25) = 8.508 in/hr
•ill F: : ::,:·r:\:::rr :: :;;;, .. ,... .••: ::.:•-:11 s~1·1 : st!:: ·
Rainfall Intensity (1 50) = 9.635 in /hr
:
:.:,n:_:,'_:,:_:,'_'_'"·.·•.·•"'_•·.·.•,•.•,•.:,·.:,'.',•.:,: •:?::::r•'\ti??'7''''''''''''.,,,,,,,,,,,,,,,,,,_._ •.•..•..•. _.,•.•.·.:.•,•· .• _:.•_:"'·,:_:,1.•,'.·,·.:,1.:,'_.,'_:,l.•,•.2,'_ .. ,_·_:_1..·.·.'_'.1.:.' ... '_:.:.•.:.:.c..'.'.'.:_1.' ... '_s.'_'.'.'.' .. :.::.•.•.: .... •.•.:.:_:.:.:.• ~ =r~:~=::fi:::::: =============::::::::. r~rrrr~
Rainfall Intensity (1 100) 10 .053 i%r
............. :·:·: :·:···:·:·:·:······ :·:·:·:·:·.;.·.·:·:·.· ... -..... :·:··········· .. ·,,:,:~,,.,'.·, .. ·.-.;._·'·_.-oo=.·•· .... =.·•· ... _'',.-,'·,j:,·,.·,·,.·,·,.·,=·,.-,' ·•·•''''''·''' ·:,.,.· :::::=:::::=:::::::::' ,,,,,,, ::::::::::::.•:.•.••.••:.~:.·3· .. ·.·.•:'a·~'."'.·•.•.•:.~.:.•:.•:.t'::::= ~.. t ::::::::::::: :::{{\. ::i :-:-:-!f -.. :~~~:-:·:··· .. :·····
SECTION #2-DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area 5
Drainage Area (AR) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D 5 ) =
Velocity of Runoff 0/5 ) =
Coefficient of Runoff (C 5 ) =
-NOTE: Minimum T c allowed = 10 min .
5 .52 acres
900 ft
ft 1 .00 fsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coeffic ient (b) =
Coeffic ient (d) =
76
8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8 .5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) = 96
Coefficient (d) = 8
2882 -025 Drainage Eva luation.xi s
RESULT
Tc(Sl = 15.0 min.
Rainfall Intensity (1 2) = 5.192 in/hr
:
r,•,n_','_:,•_:,'_'_•,,,•_••_•_:,•_•,•_'.,•_'.,•. ,,,,, ''' ' ''''}''' 'I\••?•J?(/ ::::ttliill _'·_1_=·_='_1 _:_••-.•_t_'=:_1_=-_5_==_==_·:.••-••-••-••.••.••.••-• ~ -:-:·:::::::::::::::::::·:·:···:::;:;:::::::::::::::::::::::;:::;:::::::~::
Rainfall Intensity (1 5) = 6 .376 in /hr
:_-'_•n __ · __ -___ .-_-' __ -_'_'."''_-''_·'_,•_i_;_=.-·_,' __ '_,'.'_,'_•_:_'_•'_•'_•'_!_•'.='_•'_;_•'_,.,.,._,,_;_,:_;_,:_,:_,'_i_i_:'_,'_;_,'_:_,'_!_,'_!_i_:'_;_;_;_i_,:_;;_•_••·-;:: ••• r : :::: ::1•7]78\as ?: ~ -·-:-:-:-·-:-:-:-:-:-:-:·:·:·:·:·:·:·:·:·:·:·:-;.:-:-:-:-:-:·:·:·:·:·.·
Rainfall Intensity (1 10) = 7 .194 i%r
•,-'_,n,:'_.·,·_.=,.-_ .• ,'_',·'•_;, __ ,._~_''_'.•,•·_=,:·_.-,:-_.-,:-_._-_.,_.-,•,_•-,•'_•,:_:_:'_•-_•'_•'_.,_····••wr::· ::::::::'-•• ·• ,--=.:.::•;;;:::m:r· @2010.i.ih~tit? ~w :-:·:·:·:·:·:·:·::::::::::::;:;:;:;:;:::::::·:-: :-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·:·:-:·:·:.:·.·:·.·:-:·.·=··.·
Rainfall Intensity (1 25 ) = 8 .234 in/hr
•fli,ffi r··•••• •• • :,,_·:.•o::=::::r·::·:::::.:::.:::::·:: ••••t~~~!!1 .:m ••• t
Rainfall Intensity (1 100) 9 .732 in/hr
·:•.·.·:·.·.·:-:·:·:<·:·:·.·:·:·:·:·:·:·: ·:·:·::::::::::::.::::::::::::::::::::::::::::::::::::::::: .·:· .·:· ..... :·: ...............•.............. ••Ril:aJ:: ii · :; •:, ,,,,,, ····•• : ::~~~~~::!JS :::::
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area U
Drainage Area (A u) =
TIME OF CONCENTRATION CT 0)
GIVEN
Maximum Travel Distance (Du) =
Velocity of Runoff (Vu) =
Coefficient of Runoff (Cu) =
**NOTE : Minimum Tc allowed = 1 O min .
1.71 acres
900 ft
It 4 .00 lsec
0.90
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coeffic ient (d) = 8
2882-025 Drainage Evaluation .xis
RESULT
Tq ui = 3.8 min .
Rainfall Intensity (1 2) = 6 .327 in/hr
·:························· ......... ·.·.·.·.·.···:········· .................... ··: .......... ·.·.·.·.·.
==n './a • =•=======•=====·=·'''· , .. ,., .. ,.,.,.,.,.,.,.,.,., ....................... •:::::::::::::::::\• .. a .=.••a. ·;f=.• ·., •. ·.:=.••• .. "ri=«. ~ ...... ,.. •.••.••.•.•.•.•.•.• ··~\:,:,: ::::::::::•:•:::::::::;:::::::'//()\.::;::::::::::;::::::::: :;#. •:!'!: ... ~!~ .........
Rainfall Intensity (1 5) = 7.693 in /hr :li:a:·::::: :::.+ ...... ... : :i1:::1 ~~.~i1:·m ::::::
Rainfall Intensity (1 10) = 8.635 in /hr
:@ij#, jf ii ::::::·:·] . :::: .:::::·::.::...::.::1:~~1,1;:~t~J[ l
Rainfall Intensity (1 25 ) = 9.861 in /hr
:·Pil :a••:·•::::::: ::::::::::::::::=::::::: r:m:r .:::•• ,:.:11~'=1 :m:::::::
Rainfall Intensity (1 50) = 11 .148 in /hr
R :a:::::::.:.f::.•:: ',f'i[f,::·:::··. :.:::::::::::::. .• = ::: :·:1•z~iii!:~t~11:
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descript ion : Drainage basin for Area T
Drainage Area (AT) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (OT) =
Velocity of Runoff (VT) =
Coefficient of Runoff (CT) =
-NOTE: Minimum T c allowed= 10 min.
0 .78 acres
400 ft
It 4.00 /sec
0.90
~YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) = 65
Coeffi cient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) =
Coefficient (d) =
76
8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .763
Coefficient (b) =
Coefficient (d) =
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coeffi cient (d) =
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
Tcm = 1 .7 min .
Rainfall Intensity (Ii) = 6 .327 in/hr
:m •1 •.:.r·:=]•:•:,:::·:r.: .•• :i:.::::: == :::::::::=··::r·::: :::.•.11~~1·=:m:~t ::
Rainfall Intensity (1 5) = 7 .693 in/hr
:•.=",=,=.·,•.•,=.·,=.'~.•=.•.•.,•,•.,•.= .. =:==.=·,=.,··:=:::::.:::::.••.••.••.: =· .... ,.,.,,,.,.,.,,,. ... · ........ :··.-=:=:::•·:: .. ••.••.•.•.•.•.••.•.•.•.•.•.s· ..::..==·=.•iiiii=.• .. 1===·.•.•.•.•.•.~.=:.::.:.•.•.:.J ~ :::::::::::::::::::::;:;:;::.;.~=::tt~~~~~t:::~··=::;:;:;::.::;:;:;:;:;:~:~:~:~:~:;.;.·-·.·.·.·. ~0 ~·.,,
Rainfall Intensity (1 10) = 8 .635 in /hr
:!~i ffl :=::·•.: :,•::::·-:::•_::::::.:. • •? '-./: -:_::::;,;; '";;;::;:,:;:::~~il •#.f~C J:
Rainfall Intensity (1 25) = 9 .861 in/hr
. ·:·:·:·:·:·:-:·:·:·:·:·:·:·:·:·:·:·:·:::::;:;:::::;:::;::;:=:::=:;:;:;:;:;: ·••••<••••t?.:.:.:.·\::.•• ...... •:.:· .•.•.•. • .. :,• .. :•1=.·.·.·,=.·,··~·,•·.•,il!i.·,=.·.·,=~=·=·=,:.··11··,.·.·.,·.=·=·.=·:~,'.',•.',•.=,·.·,•.','.'.','.:•,:,•.,•,•,:,:·, •. ,•.•.•.·.·.•.=.•:,:•.· ]Ii}~!:: ,.,.,.,.,.,.,::::::::::::::::.:.:.: :•:•:=:•\·====================== -~·:;,.
Rainfall Intensity (1 50) = 11 .148 in/hr
................................... ·.:·:·:·:··:·:·:·:·:·.-:·:·:·:·:·:·:·:·:·:·:·:·:·:·.·:·.·:·:·:·. ·.·:· ·.·.= .... ,·.':.' .. =·'.,·' .. ,·'.,·' .. ,.='=··,·.•,·,=.~.·.=.·.··.· .• =.=.'.".'.·.=.·.=.·.·.·.·.·.=...=.=·=:=···..,¥4>: :,·.:,n .. ,.·.:.·,.·.·s:=.==.=••i.=•.•.•.:.• ... • ... ··.,···•.· ,,,)\):\::::::••::/::::'•'' ·================= .. =i =: u :f.:==• "'''"" ~ ·.·.·.·.·.-.:::::::;:;:;:;:;:;:::;:;:;:;:;:::;
Rainfall Intensity (1 100) 11 .639 in/hr
:=1~1.:i:.::::•::,::•:::1•::.:.it•·•.:]:.:.: .=::::::·:.:::.:.:::.:::•r:·;:::::·••·::••::1~111:.:·m.:·::::::::::•
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area V
Drainage Area (A v)=
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (D v) =
Veloc ity of Runoff (Vv) =
Coefficient of Runoff (Cv) =
-NOTE: Minimum Tc allowed= 10 min .
1 .52 acres
250 ft
ft 1 .00 f sec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) =
Coefficient (d ) =
76
8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coeffi cient (d) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8 .5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evalu ation.xis
96
8
RESULT
T C(V) = 4 .2 min.
Rainfall Intensity (1 2) = 6 .327 in/hr
::m ,_a ·::;,:r::'=:::'''':,:::·:::::,:·''::::·:-:•••··•••••m••:,'_ •:::,•:•:•i::::•:•:i~m:•:•cf.id:•':::•
Rainfall Intensity (I s)= 7 .693 in /hr
.
:_._A:_ •... _ •. : .. _'_ •. " .. '.'·.: .. ·.•.•.• ...•.•..•.•.. :.,·.=.•·.=.•·.· ::=:: ::· > <? ::: : t _:_:.:_:.•.•.•.:.:_:_•'_ .. :_:.•.:.•.:· t •s~iR • Et$<•:: ~ .·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·-:-:-:·:-:-:·:·.•.·: -:-:-:-:-·-:-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·:·:·:·:···:-:-:-:-:·:···
Rainfall Intensity (1 2s) = 9 .86 1 in/hr
-.• m .. •.•-·•·_.a _,••#:_ .•.. r :••, ::::: ::, ,,,,, = •<•,=7~ss7asttt ~.. ·:·:·:·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·:·:-:-:-:-:-:-:-:·:·: -:-:-:-:-:-:-:-:-:·:·:·:·,·:·.·:·.·.· ·:···:-:-:-:-:-:-:-:-.-·-.·:·.·:·.·:·
Rainfall Intensity (I sa ) = 11 .148 in /hr .:a =a ':.:.:::·:·:-:_:.:::.:.:::,:,:.:.:::::,::>':j .:::::.:::::::::,_: :,:·•'::,:•••··1~11·:~1!:: ,;::
Rainfall Intensity (1 100) 11 .639 in /hr
'.•'.=a_.·.·_ .•. _ .. _·'_ •. '_i _t..r_,'.i_:·.•_.·.:.'_.'_.'_.:::::(·=:::::::=::::.:,,,,,,,,,,,,,.,.,. ..• ,,,,,,,,,,,,,:):::,,::':'•::=::::•'•·=· .'•.·.•.•.•.:,.=_•·.:.·.•.1.·_·.,_·.·-~-·-·.s..·_,_·.·_:.1_:.·_·.•.s.'_·_._·.·_:.•.:.• .. as.'.'.'.·.•.'.·_··.·.·· .. _ •. '_ .. •.•-'.•.•.•.•.' .,.,.
>f :¥.¥. ~:~:~:::::: :::::;:::; :;: ;:;:;:::;:;:-: .;. : . :-·.·.·.· ...
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area W
Drainage Area (Aw) = 2 .94 acres
TIME OF CONCENTRATION CTJ
GIVEN RESULT
Maximum Travel Distance (Dw) =
Velocity of Runoff 0/w) =
Coefficient of Runoff (Cw) =
-NOTE: Minimum Tc allowed = 1 O min.
880 ft
ft 2.00 fsec
0.75
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coefficient (d) = 8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evalu ation.xi s
96
8
T CfY'/) = 7.3 min .
Rainfall Intensity (1 2) = 6.327 i%r
:•m •·a ••=•·•·•••••=:·:·r·,-:-:=:::·:.1.•.:,•''.:.•::::: •• •• ::::c]:• •••••••'=•!8g1: :P:1!:•] •
Rainfall Intensity (1 5) = 7 .693 in/hr
::li•:a ·:•.•••••• ···:::_:It:::::::· :· • :::r::::• ::::: 1}iHD.4 ••as • ::•
Rainfall Intensity (1 10) = 8.635 in/hr
•:gj~•a:••::::mr :: ::, ,· ; ;;: ;.:: : •:••:1,~11 ::it~< :::
Rainfall Intensity (1 25) = 9.861 in/hr
'.•'.m .. = .. · ... :· . .-.··.=_.:.._.::_.•=_.::_.=.==_:=_.=_J: .. '.=' .. '.=' .. '.='.•'.:'.•'.i.i_i_:'.:'.•'.:'.='.:'.•'.:'..•'.:'.•'.:'.•'.:'.•'.:'.:'.:'.•'.:'.•'.:'.i_:'.::_i .. •.:'_:._:.•·.i.•'.:'.•'.:'.•'.: < \'? ::::· \H ~926\Cf:S ==== ~9. :·:·:·:·:·:·:·:·:·:·:·:·.;:::;.;:;:;:;:::::·.·, :-·-:·:-:·:·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·····
Rainfall Intensity (1 50 ) = 11 .148 in/hr
.. •.:n:_·.'.•_:·_ .. ·_=:::c=::_•:.=.=.:.•·.: .. =.·.:·.·•-•·.•.•.•.•.• < ::.r ::: · · :t•t•:J21 ut.B •t.tsr <• ~ ::::::::::::::;:;::::::::::::::::::: ~~~~~~~~~~~~~f~~~ :-:·:·:·:·:·:·.·.·.·.·.·.·.· :·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-:-:.:-:-:·:·:·:·:·:···=·
Rainfall Intensity (1 100) 11.639 in/hr
··1~w •ffi••••t•• :::••:: .. :.:,:_:·::::=:·::=:•.:.::•·==••••:•::.r 11~17:1•••Pm tt:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area X
Drainage Area (Ax) =
TIME OF CONCENTRATION CT c)
GIVEN
Maximum Travel D istance (O x) =
Velocity of Runoff (Vx) =
Coefficient of Runoff (C x) =
**NOTE : Minimum T c allowed = 1 O min .
1.02 acres
800 ft
4.00 ft/sec
0 .90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coeffic ient (d) = 8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coeffic ient (b) = 80
Coefficient (d) = 8 .5
25 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coe ffi c ient (b) =
Coeffic ient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coe ffi c ient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coeffi cient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
T C(X) = 3 .3 min .
Rainfall Intensity (I s) = 7 .693 in /hr
.
•.• n·············· .•. '.>'.•.•.:.•.~.•.•.•.····· ::: r: =:••••••')(:tr.··· ••J jfafi1 :i$.Jf ~ ·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:-:-:=:-:·:-:
Rainfall Intensity (1 10) = 8 .635 in /hr
.:•.•.n.:.•·.·.·.• ... =.••.:=.'•'.l .••.•.•.·.= ... =.•.·.•.•. •• • • • :.. . •• tt •• •t r9H c.ti k• t ~w -:-:-:-:-:-:-:-:-:-:·:·:·:·:·:·:-:-:-:-:-:-:-:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·.·:·.·.·.·.·,·,·:·.·,·.·.·,·:-:-:·.·:·.·.
Rainfall Intensity (1 2s) = 9 .861 in/hr
·.: .•. b ....•.•.•..•. ~.-".-".-".·'.' . .=.•'.i= .. '.,'.· .• = .. · /\ ,. :::::::::t :rr •:: .. •.'•.••.•.•.•.•.•.:.•.•.•.•.•.•.••.•.•.s.· .. · .. ·.=.··.~.·· .. 1 ... ·.· •. 1:1 :~ •t 'i'.9. :-:-:-:-;.:-:-;.:-:-:-:-:.;-:-:·:·:-;.;.;.·.·.·.·.·
Rainfall Intensity (I sa ) = 11 .148 in/hr
•••a•:j•::J••••••· ••• :•:::: :J •:,:::•·i••1Pf:~~~J;r~]>·
Rainfall Intensity (1 100) 11 .639 i%r
:•liW#l ::::tit:::::•:•[i:ff !••••.:.:·:.::::,;:;::=•::.: •• ::.: 1ii •i •i•'P~il!·•~tt :
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area Y
Drainage Area (A y) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D y) =
Velocity of Runoff (Vy) =
Coefficient of Runoff (C y) =
**NOTE : Minimum Tc allowed = 10 min .
2 .54 acres
1050 ft
ft 2.00 ls ec
0 .75
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY . RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .785
76
8 .5
10 YEAR FREQUENCY . RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY . RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Eval u ation.xis
96
8
RESULT
Tc M = 8 .8 min .
Rainfall Intensity (1 2) = 6 .327 in /hr
::r1:5::::•1=:= .i t)=··_,::.:.:r=::.:::.:=:.:,::::::ai~111:·1P:1•21t
Rainfall Intensity (1 5) = 7 .693 in /hr
:@i -:a . :i::=:::: '.: !?!•1:} !: : =::J 11 ~7l7:¢fi.?• '
Rainfall Intensity (1 10) = 8 .635 in /hr
:r1~e-:· r=r ::::: :J:: ::: •r::: mi glfiHmt :
Rainfall Intensity (1 25 ) = 9.861 in /hr
.•,•.a,·.,•.·,:_,·=....==.==·.·=·.·.=,•·.•.=.····=···=···= : :::::\}'}:;:::: ::)' :····r::: •: • :::1illi943: as ) ~.. ::~:~:~:~:~:~:~:~:~:~=~=~=~=~=~=~=~=~=~:~=~=~=~=~=~=~=~=~=~:~:~;; ::::::::: ·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·'.·:·:·:·:·:·:·:·:·:·:
Rainfall Intensity (1 50) = 11 .148 in /hr
.·.·.·.· .. ·.· ........... ·.············:·:·.·:·:-.·:·:·:·: .-... ·:::··.... ..... . ... .
:'.:,n:_.,·_.,:_.,·.·_=,=.=s=.==.==.•.•,•.=,•.•,•.•,• =·=·=·=·=·=·=·=·=·=·=···===········ ·=·····=··· .. =·=·================ :::::m:.•:.:.::.•:.2.·.·.1.·.·:.1.:1.•.·.1.·.:.•a .·•.••.••.c.=·_:fi ... i .':.•. t? ~ ~~=~=~=~=~=~=~~~=~~~~~~~~~~~=~:~\~;=~~=~ :=·::::::: .:.:. : ... ·.·.·. ·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.· ... · .·.· ....... ·.·.·.·.·.·.· ·.·.•. ·. ·.·.•.·
Rainfall Intensity (1 100) 11 .639 in/hr
.•.a.=_· .. ·_J _L _'.'.=.:.:.=.=:.••.•.••.':_::_::.•:.••.•'.••.•:.•:rnr ==:r:::=::>=t===_,=_=_=_::_:=_,==_,:=.====:::t:ii]B.7 •!.d$•. )t :~w. :·:·:·:·:=:.:·:=::;.::;:;:;
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area Z
Drainage Area (Az) =
TIME OF CONCENTRATION CT 0)
GIVEN
Maximum Travel Distance (Dz) =
Velocity of Runoff (Vz) =
Coefficient of Runoff (Cz) =
**NOTE : Minimum Tc allowed = 10 min.
0 .60 acres
400 ft
ft 4 .00 f sec
0.90
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE {Q)
Coefficient (e) = 0 .785
Coefficient (b) =
Coefficient (d) =
76
8 .5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient ( e) =
Coefficient (b) =
Coeffic ient (d) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q}
Coefficient (e) = 0 .754
Coeffic ient (b) = 89
Coefficient (d) = 8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coeffic ient (e) = 0 .745
Coefficient (b) = 98
Coeffic ient (d) = 8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
.96
8
RESULT
Tcczi = 1.7 min .
Rainfall Intensity (1 2) = , 6 .327 i%r
::m :.fi:::':1=::::==:=::::1::::1••·:·r=·:: J:<::,:L ''::':<::.:•.1~1n:atsJ::m
Rainfall Intensity (1 5) = 7 .693 in/hr :m:a ::. =::·r: \:::::::: :; ,:: :: :: j:::,:::::t:]:~~~!~::as.n:n:
Rainfall Intensity (1 10) = 8 .635 in/hr
.•.•,n,=,·,:_=,:_=,=_=,=•.==_='_i_'_:,•,=,=,.=,=,.=,=,:, .................... ',·'.·',·' .. =,.::::::: >> :::, :•J i]no a:ts : = ~v ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~{~~~~ ::::·:·:::·:::::::::::::::::::. :·:·:·:·:·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:-:-
Rainfall Intensity (1 25 ) = 9 .861 in/hr
:11::::;•1:•::•::=:::1:1:=::::•::••::.::::: ::::t:: =: : : :: : •• ·s ~a• as : ::
Rainfall Intensity (1 50) = 11 .148 in /hr
•m :e ·•·;r=:::::::=::::.::::=::?:'::t:::•.=:::;:,;,: :••:•:::::r•:::::::::::1im •:P:t.~:r:-:
Rainfall Intensity (1 100) 11 .639 i%r
·.·.·,·,·,·,·.·.·,·.·.·.·.·.·.·.·.·.·.·······································'·•'•'•'•'•'•'•'•'•'• ·.·.•,•,·,•,·,·.·.·.·.·.·.·.·,·.·.·.·.·.·.·.· .. · .. ·.·.·.·.· .... · .... Riim tilI!Il: :::: :::= t:::: ::::::···::1~2&•:~:_,;::;
SECTION#J
CURB & GUTTER FLOW CALCULATIONS
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c :\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #1 (AREA 8)(10 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.0000 %
Water Surface Elevation
Discharge
294 .81 ft
8.685 cfs
I I I I I I I I I I
296.
~ 295.8
'-' 295 .6
---,---------r--------,---------r--------,---------r--------,---------r --------,---------,
c 295.4
.Q 295.2
iii 295.0
~ 294 .8
---------~--------~---------~--------~---------~--------·---------~--------·---------! I I I I I I I I I -----r--------,---------r--------,.---------r--------,.---------r--------,.---------
--------~-------~--------•---------~--------·---------L--------•---------L--------~--1 I I I I I ------,.---------r--------------r--------,.--------------,. ---------, --L --------~ ---------1
iii 294.6 -- - --- - -,. - - - - - ----r -I I I --,---------,. ---------,
294 .4'--~~~~..L.-~~~~-'-~~~~-'-~~~~-'-~~~~_,_~~~~-'-~~~~-'-~~~~-'-~~~~-'-~~~~-'
0 .0 5 .0 10.0
Notes :
' Collects Runoff from Drainage Basisn : B
Dis charges into Drainage Basin: C
Discharges into Structure Type : Open Chann el
15.0 20 .0 25 .0
Station (ft)
Municipal Development Group
30 .0 35.0
02119/98
08:37:09AM Haestad M ethods, Inc . 37 Broo kside R oad W aterbury, CT 06708 (203) 755-1666
40.0 45.0 50 .0
FlowMaster v5 .07
Page 1 of 1
SECTION #3 -CURB & GUTIER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 ra.fm2
l.D . #1 (AREA 8)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 294 .50 ft to 296 .00 ft.
Station (ft) Elevation (ft)
0.00 296 .00
11 .00 295 .00
11 .50 295 .00
11 .50 294 .50
25 .00 295 .00
38.50 294 .50
38 .50 295 .00
39 .00 295 .00
50 .00 295.25
Discharge 8.685 cfs
Results
Wtd. Mannings Coefficient 0 .013
Water Surface Elevation 294 .81
Flow Area 2.67
Wetted Perimeter 17 .63
Top Width 16 .99
Height 0.31
Critical Depth 294 .86
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004563 ft/ft
Velocity 3.25 ft/s
Velocity Head 0.16 ft
Specific Energy 294.98 ft
Froude Number 1.44
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
50 .00
02/19/98
08 :37:33AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1of1
-
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #1 (AREA 8)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.0000 %
294 .85 ft
11 .707 cfs
Water Surface Elevation
Discharge
I I I I I I I I I I
296.
£ 295.8
.......,295 .6
---,---------r--------,---------r--------,---------r--------,---------r--------,---------,
c 295.4
.Q 295.2
iii 295.0
QJ> 294.8
---------~--------~---------~--------~---------~--------~---------~--------~---------· I I I I I I I I I -----r--------,---------r--------,---------r--------,---------r--------,---------
--------~-------~--------~---------~--------~---------~--------~---------~--------~--! I I I I I I ------'T---------r-------------r--------,--------------, ---------,
--L - - - - - - - -.1 - - - - - - - -_I
I I W 294.6 --------'T---------r-I I I
--,-- - - -- - - -"T -- -- - - - --, ---------r--------'T---------r--------
294 .4~~~~~~~~~~~~~~~......_~~~~--'--~~~~--'--~~~~~~~~~~~~~~~~~~~~~~~~~
0 .0 5 .0 10.0
Notes:
Collects Runoff from Drainage Basisn : 8
Discharges into Drainage Basin : C
Discharges into Structure Type : Open Channel
15.0 20.0 25.0
Station (ft)
Munic ipal D eve lopment Group
30 .0 35 .0
02/19/98
08:37 :57 AM Haestad M ethods, Inc . 37 Broo k s ide Road W aterbu ry, CT 06708 (203) 755-1666
40 .0 45 .0 50.0
FlowMaster v5.07
Page 1 of 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 ra . fm2
l.D. #1 (AREA 8)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 294 .50 ft to 296.00 ft.
Station (ft) Elevation (ft)
0.00 296 .00
11 .00 295 .00
11 .50 295 .00
11 .50 294 .50
25 .00 295 .00
38 .50 294 .50
38 .50 295.00
39 .00 295 .00
50 .00 295 .25
Discharge 11 .707 cfs
Results
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 294 .85
Flow Area 3.34
Wetted Perimeter 19 .72
Top Width 19 .00
Height 0.35
Critical Depth 294 .91
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004385 ft/ft
Velocity 3.50 ft/s
Velocity Head 0.19 ft
Specific Energy 295.04 ft
Froude Number 1.47
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
50.00
02119/98
08:38:17 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Work.sheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #2 (AREA E) (10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0 .000000 H : V
27 .000000 H : V
10.970 cfs
0 .45 ft
2 .68 ft2
12 .48 ft
12.02 ft
0.53 ft
0.004033 ft/ft
4.10 ft/s
0 .26 ft
0 .71 ft
1.53
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin: G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Sconset Cove
Municipal Development Group 06/09/98
02:50:44 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Work.sheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #2 (AREA E) (100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
14 .788 cfs
0 .50 ft
3.35 ft2
13.96 ft
13 .45 ft
0.60 ft
0 .003875 ft/ft
4.41 ft/s
0.30 ft
0.80 ft
1.56
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin : G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Sconset Cove
Municipal Development Group 06/09/98
02:51 :25 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #3 (AREA E)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
0.5000 %
0 .000000 H : V
38 .000000 H : V
10 .970 cfs
0.44 ft
3 .76 ft2
17 .36 ft
16 .91 ft
0.46 ft
0 .004161 ft/ft
2.92 ft/s
0 .13 ft
0 .58 ft
1.09
Collects Runoff from Drainage Basin : E
Discharges into Drainage Basin: G
Discharges into Structure Type : Culvert
Runoff on Southwest Side of Wayfarer Lane
Note: 12' Clear Lane Provided -Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane .
07/01/98
08:26:49AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Work.sheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #3 (AREA E)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.5000 %
0.000000 H : V
38 .000000 H : V
14 .788 cfs
0.50 ft
4.71 ft2
19.42 ft
18.91 ft
0.52 ft
0.003999 ft/ft
3.14 ft/s
0.15 ft
0 .65 ft
1.11
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin : G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Wayfaer Lane.
07101/98
08:27:20AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
VelocitY Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTIER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #4 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.0000 %
0.000000 H: V
27 .000000 H : V
13 .634 cfs
0 .48 ft
3 .15 ft2
13 .54 ft
13 .05 ft
0.58 ft
0 .003918 ft/ft
4.33 ft/s
0.29 ft
0.77 ft
1.55
Collects Runoff from Drainage Basin : F
Discharges into Dra inage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on Northeast Side of Sconset Cove.
Municipal Development Group 06/09/98
03 :00:35 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMa ster v5 .07
Pa ge 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #4 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
18.379 cfs
0 .54 ft
3.94 ft2
15 .14 ft
14 .59 ft
0.65 ft
0.003765 ft/ft
4.66 ft/s
0.34 ft
0.88 ft
1.58
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin : TxDOT R.O .W.
Discharges into Structure Type : Culvert
Runoff on Northeast Side of Sconset Cove .
Note : There will be a minimum 3" cut from the TIC to to daylight. Therefore , overflow of the 100-yr flood will be
maintained with in the R.O.W and shall be shown on the construction documents for South Hampton , Phase Seven .
06/09/98
03 :0 1 :39 PM
Munic ipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Pa ge 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is sueercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #5 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.013
0.8000 %
0 .000000 H : V
38.000000 H : V
13 .634 cfs
0 .44 ft
3.71 ft2
17 .25 ft
16 .80 ft
0.50 ft
0.004043 ft/ft
3.67 ft/s
0.21 ft
0.65 ft
1.38
Collects Runoff from Drainage Basin : F
Discharges into Drainage Basin: TxDOT R.O .W.
Discharges into Structure Type: Culvert
Note : 12" Clear Lane Provided -Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane .
06/09/98
03 :10 :14 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Veloc ity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Work.sheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #5 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
0 .8000 %
0.000000 H : V
38 .000000 H : V
18 .379 cfs
0.49 ft
4 .64 ft2
19 .29 ft
18 .79 ft
0.57 ft
0.003885 ft/ft
3.96 ft/s
0.24 ft
0.74 ft
1.40
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin : TxDOT R.O .W.
Discharges into Structure Type : Culvert
Note : Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane .
0610919 8
03:12:25 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Pa ge 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 ra.fm2
1.D . #5 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
0.000000 H : V
38.000000 H : V
18.379 cfs
0.49 ft
4 .64 ft2
19 .29 ft
18 .79 ft
0.57 ft
0.003885 ft/ft
3.96 ft/s
0.24 ft
0.74 ft
1.40
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R .O .W .
Discharges into Structure Type : Culvert
02/19/98
09:51 :12 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
-
06/11 /98
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . tl6 (AREA H)(10 YR)
Irregular Channel
Manning 's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
295.63 ft
26 .814 cfs
e 295.9 1
---- ----:-- - - - - --:-- - - - - -~ - - - -- --~ -- -- -- -1 -------+ -------r-- -- - - - -r------- -r -------
'"""295.8 ~--~'·~·------~-------~-------.. -------.!-------~-------~-------~-------~
c 29s . 7 ---+ -------r-------r ------
.Q 295.6 --- - --_,_ -- -- -- _,_ 1----P--.-..---t----~ ... _ ... _~_ ----.. -------
iU 295.5 -- - -- --:-- - --- --:--- - - -~ ---- - --{ - - --- - -+ -----
~ 295.4 - -- - - --:-- - - - - --:-- - -~ - - - -- - -~ -- -- -- -~ - - - ----~ -- - - ---~ - -- -
ijj 295 .3 -------,--------,----.-------,-------,-------,-------r -------r -------r-
-L --- - - - -~ - - - - - --1
I I I --r-------r-------,
295 .2'--~~~-'-~~~-'-~~~--'-~~~--'~~~~'--~~~-'-~~~-'-~~~-'-~~~--''--~~~"'--~~~-'-~~~-'
0 .0 5 .0 10.0
Notes:
Collects Runoff from Drainage Basin : H
Discharges into Drainage Basin : I
15.0
Discharges into Structure Type : Open Chann el
20 .0 25 .0 30 .0
Station (ft)
M unic ipal Development Grou p
35 .0 40 .0 45 .0 50 .0 55 .0 60 .0
11 :23:43 AM Ha••stad M ethods , Inc . 3 7 Brookside R oad W at e r b ury, CT 06708 (203) 755-1666
FlowMaster v5 .0 7
Page 1 of 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . "#6 (AREA H)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevation range: 295 .25 ft to 296 .00 ft.
Station (ft) Elevation (ft)
0 .00 296 .00
10.50 295.75
11 .00 295.75
11 .00 295.25
30 .00 295 .75
49 .00 295.25
49 .50 295 .75
60.00 296.00
Discharge 26 .814 cfs
Results
Wtd. M·annings Coefficient 0.013
Water Surface Elevation 295 .63
Flow Area 5.65
Wetted Perimeter 30 .05
Top Width 29.50
Height 0.38
Critical Depth 295.75
ft
ft2
ft
ft
ft
ft
Start Station
0.00
10 .50
Critical Slope 0.004017 ft/ft
Velocity 4.75 ft/s
Velocity Head 0.35 ft
Specific Energy 295 .98 ft
Froude Number 1.91
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
10 .50
60.00
06/11 /98
11 :24:06 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . tl6 (AREA H)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
295.68 ft
36.145 cfs
£295.9
'-" 295.8
c 295.7
I I I I I I I I I I
-------~-------~-------,-------,-------,-------y-------y-------r-------r-------
-~--~·~------~-------4 -------~-------4-------~-------~-------~-------L.
.Q 295.6 - - - - - --:-- - - - - --:-a; 295.5 - - - ----,--- --- --,-
Q)> 295.4 - - -- --_,_ - - -- --_,_
I I w 295.3 -------,--------,--
---~-------~-------~-------i-------L-----L. --- ----L ----- --1
1 I I I I I I I -1-------,-------,-------;-------y-------T-------r---r-------r -------,
295 .2'--~~~-'--~~~-'-~~~~~~~--'~~~~...._~~~-'-~~~-'--~~~_._~~~---''--~~~...__~~~-'-~~~-'
0 .0 5 .0 10.0
Notes:
Collects Runoff from Drainage Basin : H
Discharges into Drainage Basin : I
15.0
Discharges into Structure Type : Open Chann d
20.0 25 .0 30.0
Station (ft)
Municipal Deve lopment Group
35 .0 40 .0
06/11/98
11 :24:42 AM Haestad M ethods , Inc. 3 7 Brook s ide Road W ate r bury, C T 06708 (203) 75 5 -1666
45 .0 50.0 55.0 60.0
FlowMaster v5.07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #6 (AREA H)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevation range: 295 .25 ft to 296.00 ft.
Station (ft) Elevation (ft)
0.00 296 .00
10 .50 295.75
11 .00
11 .00
30 .00
49 .00
49 .50
60 .00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
295 .75
295.25
295 .75
295.25
295 .75
296 .00
36 .145 cfs
0.013
295 .68
7.07
33.61
32 .99
0.43
295 .81
ft
ft2
ft
ft
ft
ft
Start Station
0.00
10 .50
Critical Slope 0.004619 ft/ft
Velocity 5.11 ft/s
Velocity Head 0.41 ft
Specific Energy 296.08 ft
Froude Number 1.95
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
10.50
60 .00
06/11 /98
11 :24 :59AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0 .030
0.013
FlowMaster v5 .07
Page 1of1
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #7 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.4000 %
275 .62 ft
22 .982 cfs
¢? 275.9
'-' 275.8
c: 275 .7
I I I I I I I I I I
-------~-------~-------,--------------.-------.-------1-------,-------,-------,-------
~-------~-------4--------------~-------~-------~-------~-------~-------I I I I
-------~------~------~-------,-------
.Q 275.6 -- --- --1--- - - - --·-~ 275.5 -- - - - --:--- - --- -:-
-,-------.-------~--~ .................. ~~~ ....... ~-....... ~-1 -L. - - -----L-- - - ---_,
I I I -r -------r -------,
-L - - - ----L --- -- --1
I I I --r-------r -------, Q)> 275.4 - - - ---_,_ -- -- --_,_
I I iii 275.3 - - - - - --,---- ----,--I I I I I
-1-------,-------,-------~-------r-------r -------r-
275 .2~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
0 .0 5 .0 10.0 15.0
Notes :
Collects Runoff from Drainage Basin : M
Discharges into Drainage Basin : TxDOT R.O .W .
Discharge into Structure Type : Open Channel
20.0 25 .0 30 .0
Station (ft)
Munic ipal Development Group
3 5 .0 40.0
06/1 1/98
11 :26:3 2 AM Haes tad M ethods, Inc 3 7 B rookside Road W ate rbury, CT 06708 (203) 7 55-1666
45 .0 50 .0 55 .0 60.0
FlowMaster v5 .0 7
Page 1 o f 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 re . fm2
l.D. #7 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.4000 %
Elevation range: 275.25 ft to 276 .00 ft.
Station (ft) Elevation (ft)
0.00 276 .00
10.50
11 .00
11 .00
30 .00
49 .00
49 .00
49 .50
60.00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
275.75
275 .75
275 .25
275 .75
275 .25
275.75
275.75
275.80
22 .982 cfs
0.013
275 .62
5.30
29 .13
28.37
0.37
275 .72
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004136 ft/ft
Velocity 4.34 ft/s
Velocity Head 0.29 ft
Specific Energy 275 .92 ft
Froude Number 1.77
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
60 .00
06/11 /98
11 :26:54AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 re. fm2
l.D . #7 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.4000 %
275.67 ft
30 .980 cfs
-
~275 .9
....... 275.8
c 275.7
I I I I I I I I I I I
-------~-------~-------,-------,-------,-------y -------y-------r-------r -------r-------
~-------~-------~-------~-------~-------~-------~-------~-------~-------I I I -----------------------r-------r -------
.Q 275.6 -- - - ---·-- - - - - --1--L. ----- - -L-- - --- -_,
iU 275.5
~ 275.4
Ui 275.3
I I - ------.--------,-
-------~ ------~-
I I
-------~------,--
I I I -r --- ----r -------,
---~-------~-------~-------i-------L-----L. --- - - - -L. --- - ---•
1 I I I I I I I -,-------,-------,-------,-------1 -------r-------r---r-------r-------,
275 .2~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~_._~~~--''--~~~~~~~~~~~~
0 .0 5 .0 10.0 15.0
Notes:
Collects Runoff from Drainage Basin : M
Discharges into Dra inage Basin: TxDOT R.O .W.
Discharge into St ructure Type : Open Channel
20 .0 25 0 30.0
Station (ft)
Municip al Deve lopment Group
35 .0 40.0
06/1 1/98
11 :27:4 2 AM Ha e~tad Methods, Inc . 3 7 Brookside Road W ate rbury , CT 0670 8 (20 3) 755-1666
45.0 50 .0 55.0 60.0
FlowMaster v5.0 7
Page 1 of 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #7 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.4000 %
Elevation range : 275 .25 ft to 276 .00 ft.
Station (ft) Elevation (ft)
0.00 276 .00
10 .50 275 .75
11.00 275 .75
11.00 275 .25
30 .00 275 .75
49 .00 275 .25
49 .00 275 .75
49 .50 275 .75
60 .00 275 .80
Discharge 30 .980 cfs
Results
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 275 .67
Flow Area 6.62
Wetted Perimeter 32.58
Top Width 31 .73
Height 0.42
Critical Depth 275 .79
ft
ft2
ft
ft
ft
ft
Start Station
0 .00
Critical Slope 0.004135 ft/ft
Velocity 4.68 ft/s
Velocity Head 0.34 ft
Specific Energy 276.01 ft
Froude Number 1.80
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
60 .00
06/11 /98
11 :28:00AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
06/11/98
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #8 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
265 .61 ft
22.982 cfs
~ 265.9
'-'265.8
c 265.7
I I I I I I
------,-------------r------------~-------------r------------~-----------------------
~-------------~------------~-------------~------------~--------~-------------· I I
~-------------1-------------
.Q 265.6 - - - - - - - - - - --~ _..,. ____ ~---"'!!:91~~ ~"'"'-----~-..... --_,._,_ ------------~ ---- ------ - --1
iii 265 .5 - - - - - --- ----, -
~ 265.4 - - - - - - - - - - - -~ -
Ui 265 .3 ---- -- - ---- - , -
---L------------~-------------L---1 I I --------r------------,-------------r--------
I I I
~-------------1-------------.
-•-------------J. --- - - -- -- - --_,
I I I -~-------------1-------------,
265 .2L-~~~~~--''--~~~~~--'~~~~~~--'~~~~~~--L~~~~~~--L~~~~~~-"-~~~~~~-'
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin : M
Discharges into Drainage Basin : TxDOT R.O .W .
Discharge into Structure Type : Culvert
20 .0 30 .0
Station
40 .0
(ft)
Municipal Development Group
50 .0 60 .0 70 .0
-
11 :29:23 AM Hae stad Methods, Inc . 37 Brookside Road W aterbury, CT 067 08 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #8 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1 .6000 %
Elevation range : 265 .25 ft to 266.00 ft.
Station (ft) Elevation (ft)
0 .00 266.00
10 .50 265 .75
11 .00 265.75
11 .00 265 .25
30 .00 265.75
49 .00 265 .25
49 .00 265.75
49 .50 265.75
70.00 266 .00
Discharge 22.982 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 265 .61
Flow Area 5.04
Wetted Perimeter 28 .41
Top Width 27 .67
Height 0.36
Critical Depth 265 .72
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004136 ft/ft
Velocity 4.56 ft/s
Velocity Head 0.32 ft
Specific Energy 265 .94 ft
Froude Number 1.89
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
70 .00
06/11/98
11 :29:41 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 re . fm2
l.D . #8 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.6000 %
265.66 ft
30 .980 cfs
Water Surface Elevation
Discharge
. .
I I I I I I I ¢? 265.9
'-' 265.8
c: 265.7
.Q 265.6
iii 265.5
~ 265.4 w 265.3
------1-------------r------------~-------------r------------~-----------------------,
~-------------~------------~-------------L ------------~--------~-------------! I I ------..... ~-------------------1-,-------------T - -- - - --- --- --,
~-------------i-------------1 I I I
~-------------r-------------,
---L------------~-------------L ---~-------------i-------------1 I I I I I I --------r------------,-------------r---------~-------------r-------------,
265 .2'--~~~~~--'~~~~~~--'~~~~~~--'~~~~~~-'-~~~~~~-'-~~~~~~--'-~~~~~~-'
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin : M
Discharges into Drainage Basin : TxDO T R.O .W .
Discharge into Structure Type : Culvert
20.0 30.0 40.0 50.0
Station (ft)
Munic ipal Development Group 06/11/98
11 :30:30AM Haestad Methods, Inc. 3 7 Brookside Road Waterbury, CT 06708 (203) 755-1666
60 .0 70.0
FlowMaster v5 .07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #8 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevation range : 265 .25 ft to 266 .00 ft.
Station (ft) Elevation (ft)
0.00 266 .00
10 .50 265 .75
11 .00 265 .75
11 .00 265 .25
30 .00 265 .75
49.00 265 .25
49 .00 265 .75
49 .50 265 .75
70 .00 266 .00
Discharge 30 .980 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 265 .66
Flow Area 6 .30
Wetted Perimeter 31 .77
Top Width 30 .95
Height 0.41
Critical Depth 265.78
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004021 ft/ft
Velocity 4.92 ft/s
Velocity Head 0.38 ft
Specific Energy 266 .03 ft
Froude Number 1.92
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
70 .00
06/11/98
1 1 :30 :46 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.7500 %
261.68 ft
37 .553 cfs
I I I I I I ¢? 261 .9
'-" 261.8
c 261 .7
.Q 261 .6
iii 261 .5
~ 261 .4
[jj 261 .3
------,-------------r------------~-------------r------------~-----------------------
~-------------~------------~-------------~------------~--------~-------------· I I I --,--,-- - - -- -- --- --T ----- --- - -- --,
~-------------~-------------· I I I ,-------------y-------------,
---L------------~-------------L---~-------------~-------------! I I I I I I --------r------------,-------------r---------,-------------y-------------,
261 .2'---~~~~~~_._~~~~~~-'-~~~~~~---'-~~~~~~----'~~~~~~~"--~~~~~~-'-~~~~~~~
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin : P
Discharges into Drainage Basin : Nantucket Dr.
Discharge into Structure Type : Culvert
20.0 30 .0 40 .0 50 .0
Station (ft)
Municipal Development G roup 06/10/98
08:44:44AM Ha<>stad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 70.0
FlowMaster v5 .07
Page 1 of 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.7500 %
Elevation range : 261.25 ft to 262.00 ft.
Station (ft) Elevation (ft)
0.00 262.00
10 .50
11 .00
11 .00
30 .00
49 .00
49 .00
49.50
70 .00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
261 .75
261 .75
261 .25
261 .75
261 .25
261 .75
261 .75
262.00
37.553 cfs
0.013
261 .68
7.04
33 .58
32 .71
0.43
261.83
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.003941 ft/ft
Velocity 5.34 ft/s
Velocity Head 0.44 ft
Specific Energy 262.12 ft
Froude Number 2.03
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
70.00
06/10/98
08:45:06AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.7500 %
261.73 ft
50 .621 cfs
. .
I I I I I I I e 261 .9
~ 261.8
c 261 .7
. Q 261 .6
iii 261 .5
~ 261 .4
iii 261 .3
------,-------------r------------~-------------r------------~-----------------------, 4-------------------------~-------------------------~--------·-------------· I I
~-------------y-------------.
~-------------·-------------· I I I I
- - ----- --- --, -- - --- --- - - --,-- - - --- - - - ---T --- -- - -------,
---L------------~-------------L---~-------------i-------------1 I I I I I I --------r------------,-------------r---------~-------------1--------~----,
261 .2'--~~~~~~....__~~~~~~-'-~~~~~~-'-~~~~~~---'"--~~~~~~...___~~~~~~_..__~~~~~~~
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin : P
Discharges into Drainage Basin : Nantucket Dr.
Discharge into Structure Type : Culvert
20.0 30.0 40.0 50 .0
Station (ft)
Municipal Development Group 06/10/98
08:45:49AM Hae stad Methods, Inc . 3 7 Brookside Road Waterbury, CT 06708 (203 ) 755-1666
60 .0 70 .0
FlowMaster vS .07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #9 (AREA P)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.7500 %
Elevation range: 261.25 ft to 262.00 ft.
Station (ft) Elevation (ft)
0.00 262 .00
10 .50 261 .75
11 .00 261 .75
11 .00 261 .25
30 .00 261 .75
49 .00 261.25
49 .00 261.75
49.50 261.75
70 .00 262 .00
Discharge 50 .621 cfs
Results
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 261.73
Flow Area 8.81
Wetted Perimeter 37 .56
Top Width 36 .58
Height 0.48
Critical Depth 261 .90
ft
ft2
ft
ft
ft
ft
Start Station
0 .00
Critical Slope 0.003810 ft/ft
Velocity 5.75 ft/s
Velocity Head 0.51 ft
Specific Energy 262.24 ft
Froude Number 2.07
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
70 .00
06/1 0/98
08 :46:10AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1of1
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Sdlve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\288~-south hampton\2882r1 rc.fm2
l.D . #10 (AREA T)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
6.096 cfs
0 .36 ft
1.72 ft2
10 .01 ft
9.65 ft
0.42 ft
0 .004362 ft/ft
3.54 ft/s
0.19 ft
0.55 ft
1.48
Collects Runoff from Drainage Basin : T
Discharges into Drainage Basin: V
Discharges into Structure Type : Open Channel
Runoff on East Side of Beacon.
Municipal Development Group 06/10/98
09:02:45AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #10 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
8.218 cfs
0.40 ft
2 .16 ft2
11 .20 ft
10 .79 ft
0.47 ft
0.004191 ft/ft
3.81 ft/s
0.23 ft
0 .63 ft
1.50
Collects Runoff from Drainage Basin: T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on East Side of Beacon.
Municipal Development Group 06/10/98
09:03:28AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #11 (AREA D(10 YR}
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.6000 %
0 .000000 H : V
38.000000 H : V
6.096 cfs
0 .29 ft
1.57 ft2
11 .20 ft
10.91 ft
0.36 ft
0.004500 ft/ft
3 .89 ft/s
0.24 ft
0.52 ft
1.81
Collects Runoff from Drainage Basin : T
Discharges into Drainage Basin: V
Discharges into Structure Type : Open Channel
Runoff on South Side of Cranberry Court.
Municipal Development Group 06/10/98
09:13:19 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
F low Master v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #11 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.6000 %
0.000000 H : V
38 .000000 H : V
8.218 cfs
0 .32 ft
1.96 ft2
12 .53 ft
12 .20 ft
0 .41 ft
0.004324 ft/ft
4.20 ft/s
0.27 ft
0.59 ft
1.85
Collects Runoff from Drainage Basin : T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on South Side of Cranberry Court.
Municipal Development Group 06/1 0/98
09:13 :01 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Fl owMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #12 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2 .0000 %
0.000000 H : V
27 .000000 H : V
13 .399 cfs
0 .42 ft
2 .40 ft2
11.81 ft
11.38 ft
0 .57 ft
0.003927 ft/ft
5.59 ft/s
0.48 ft
0.91 ft
2.14
Collects Runoff from Drainage Basin : U
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Municipal Development Group 06/10/98
09 :57:04AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMast er v5 .07
Page 1 of 1
I
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #12 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
18 .062 cfs
0.47 ft
3.00 ft2
13 .21 ft
12 .73 ft
0.64 ft
0.003774 ft/ft
6 .02 ft/s
0.56 ft
1.03 ft
2 .19
Collects Runoff from Drainage Basin : U
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Munici pal Development Group 06/10/98
09:57:57 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #13 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
2.0000 %
0.000000 H : V
27 .000000 H : V
16 .856 cfs
0.46 ft
2 .85 ft2
12 .87 ft
12.40 ft
0 .63 ft
0 .003809 ft/ft
5.92 ft/s
0.54 ft
1.00 ft
2.18
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on East Side of Windrift Cove.
Municipal Development Group 06/10/98
10:02:08AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1of1
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #13 (AREA Y)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0 .000000 H: V
27 .000000 H : V
22.357 cfs
0 .51 ft
3.52 ft2
14 .31 ft
13 .79 ft
0.70 ft
0.003668 ft/ft
6 .35 ft/s
0.63 ft
1.14 ft
2 .21
Collects Runoff from Drainage Basin : Y
Discharges into Drainage Basin : TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Note: There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O.W. and shall be shown on the construction documents for South Hampton , Phase One .
06/10/98
10:05 :22 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3-CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #14 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
13 .399 cfs
0 .39 ft
2 .06 ft2
10 .95 ft
10.55 ft
0.57 ft
0.003927 ft/ft
6 .50 ft/s
0.66 ft
1.05 ft
2 .59
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove .
Municipal Development Group 06/10/98
10:08:35 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocit)' Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #14 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H: V
27 .000000 H : V
18 .062 cfs
0.44 ft
2 .58 ft2
12 .24 ft
11 .80 ft
0.64 ft
0.003773 ft/ft
7.01 ft/s
0.76 ft
1.20 ft
2.64
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type : Culvert
Runoff on West Side of Windrift Cove .
Municipal Development Group 06/10/98
10:09:19AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #15 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
3.0000 %
0 .000000 H: V
27 .000000 H : V
16 .856 cfs
0 .43 ft
2 .45 ft2
11 .93 ft
11 .50 ft
0.63 ft
0.003809 ft/ft
6 .89 ft/s
0.74 ft
1.16 ft
2.63
Collects Runoff from Drainage Basin : Y
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove .
Municipal Development Group 06/1 0/98
10:09 :55AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #15 (AREA Y)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
22 .357 cfs
0 .47 ft
3 .03 ft2
13 .26 ft
12.78 ft
0.70 ft
0.003668 ft/ft
7.39 ft/s
0.85 ft
1.32 ft
2 .68
Collects Runoff from Drainage Basin : Y
Discharges into Dra inage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on East Side of Windrift Cove .
Municipal Development Group 06/10/98
10:10:33AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Pa ge 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #16 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
0.6000 %
0.000000 H : V
38 .000000 H: V
13 .399 cfs
0.46 ft
4 .08 ft2
18 .08 ft
17 .61 ft
0.50 ft
0 .004052 ft/ft
3.28 ft/s
0.17 ft
0 .63 ft
1.20
Collects Runoff from Drainage Basin : U
Discharges into Drainage Basin : TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Municipal Development Group 06/10/98
10 :12:56 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #16 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
O.Q13
0.6000 %
0.000000 H : V
38 .000000 H : V
18.062 cfs
0.52 ft
5 .11 ft2
20.23 ft
19.70 ft
0.56 ft
0 .003894 ft/ft
3.54 ft/s
0.19 ft
0 .71 ft
1.22
Collects Runoff from Drainage Basin : U
Discharges into Drainage Basin : TxDOT R.O .W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove .
Note : There will be a minimum 3" cut from the TIC to daylight. Therefore , overflow of the 100-yr flood will be
maintained within the R.O.W. and shall be shown on the construction documents for South Hampton , Phase One .
06/10/98
10:15:07 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #17 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38 .000000 H : V
16 .856 cfs
0 .51 ft
4.85 ft2
19 .71 ft
19.20 ft
0.55 ft
0.003930 ft/ft
3.48 ft/s
0 .19 ft
0 .69 ft
1.22
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R .O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove .
Municipal Development Group 06/10/98
10:16:31 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocify Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #17 (AREA Y)(100 YR}
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0 .000000 H : V
38 .000000 H : V
22.357 cfs
0.56 ft
5.99 ft2
21 .91 ft
21.34 ft
0.61 ft
0.003785 ft/ft
3.73 ft/s
0 .22 ft
0.78 ft
1.24
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Note: There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O.W. and shall be shown on the construction documents for South Hampton , Phase One .
06/10/98
10:18:13 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #18 (AREA Z)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
4 .670 cfs
0 .32 ft
1.41 ft2
9.06 ft
8.73 ft
0.38 ft
0.004519 ft/ft
3.31 ft/s
0.17 ft
0.49 ft
1.45
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on West Side of Beacon .
Municipal Development Group 06/10/98
10 :20:51 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #18 (AREA Z)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.0000 %
0.000000 H : V
27 .000000 H : V
6 .295 cfs
0.36 ft
1.77 ft2
10.13 ft
9.76 ft
0 .42 ft
0.004343 ft/ft
3.57 ft/s
0.20 ft
0 .56 ft
1.48
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on West Side of Beacon .
Municipal Development Group 06/10/98
10:21 :34AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #19 {AREA X){10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
8.025 cfs
0.40 ft
2.12 ft2
11.10 ft
10.69 ft
0.47 ft
0 .004205 ft/ft
3.79 ft/s
0 .22 ft
0.62 ft
1.50
Collects Runoff from Drainage Basin: X+Spill Over l.D . #20
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01 /98
08:37:23AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #19 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0 .000000 H : V
27 .000000 H : V
11 .037 cfs
0.45 ft
2 .69 ft2
12 .51 ft
12 .05 ft
0.53 ft
0.004030 ft/ft
4.10 ft/s
0.26 ft
0.71 ft
1.53
Collects Runoff from Drainage Basin : X+Spill Over
l.D .#20
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01 /98
08:38 :24AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #20 (AREA W)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0 .000000 H : V
27 .000000 H : V
19 .198 cfs
0.55 ft
4 .07 ft2
15 .39 ft
14 .83 ft
0.66 ft
0.003743 ft/ft
4.71 ft/s
0 .35 ft
0.89 ft
1.59
Collects Runoff from Drainage Basin : W
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type : Culvert
Assumed that additional flow on Southeast Side will spill over and be carried on the Northwest Side of Ebbtide Cove.
Runoff on Southeast Side of Ebbtide Cove .
Municipal Development Group 06/10/98
10:40:40AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #20 (AREA W)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.0000 %
0.000000 H : V
27 .000000 H : V
25 .878 cfs
0 .61 ft
5.10 ft2
17 .22 ft
16 .59 ft
0.74 ft
0.003597 ft/ft
5.08 ft/s
0.40 ft
1.02 ft
1.61
Collects Runoff from Drainage Basin: W
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type: Culvert
Runoff on Southeast Side of Ebbtide Cove .
Note : There will be a minimum 3" cut from TIC to daylight. Therefore, overflow of the 100-yr flood will be maintained
within the R.O .W . and shall be shown on the construction documents for South Hampton , Phase Two.
06/10/98
10:40 :54AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #21 (AREA X)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38 .000000 H : V
8 .025 cfs
0.35 ft
2.29 ft2
13.56 ft
13 .21 ft
0.41 ft
0.004338 ft/ft
3.50 ft/s
0 .19 ft
0.54 ft
1.48
Collects Runoff from Drainage Basin: X+Spill Over
l.D.#20
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01 /98
08:39:39AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #21 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38 .000000 H : V
11.307 cfs
0 .40 ft
2 .97 ft2
15.42 ft
15 .02 ft
0 .47 ft
0 .004144 ft/ft
3.81 ft/s
0.23 ft
0.62 ft
1.51
Collects Runoff from Drainage Basin: X+Spill Over
l.D .#20
Discharges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01 /98
08:40:24AM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #22 (AREA W)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38 .000000 H : V
36 .652 cfs
0 .61 ft
7.17 ft2
23 .96 ft
23 .34 ft
0.75 ft
0.003543 ft/ft
5.11 ft/s
0.41 ft
1.02 ft
1.63
Collects Runoff from Drainage Basin: W+X
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on Southeast Side of Ebbtide Cove .
Note : There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O .W . and shall be shown on the construction documents for South Hampton , Phase Seven .
06/10/98
10:45:53 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #23 (AREA Z)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38 .000000 H : V
4 .670 cfs
0.28 ft
1.53 ft2
11 .07 ft
10.78 ft
0 .33 ft
0 .004662 ft/ft
3 .05 ft/s
0 .14 ft
0.43 ft
1.43
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on South Side of Cranberry Court.
Note: Assumed majority of runoff to be carried on South Side of Cranberry Court.
Municipal Development Group 06110198
10:49:21 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #23 {AREA Z)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38.000000 H : V
6 .295 cfs
0 .32 ft
1.91 ft2
12.38 ft
12 .06 ft
0.37 ft
0.004481 ft/ft
3.29 ft/s
0.17 ft
0.49 ft
1.46
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type : Curb & Gutter
Runoff on South Side of Cranberry Court.
Note: Assumed majority of runoff to be carried on South Side of Cranberry Court.
Municipal Development Group 06/10/98
10 :50:07 AM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
SECTION#4
CHANNEL FLOW CALCULATIONS
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side S!ope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D . #1 (AREA C)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
0.7500 %
4 .000000 H : V
4.000000 H : V
26.425 cfs
1.41 ft
7.94 ft2
11.62 ft
11 .27 ft
1.22 ft
0 .016097 ft/ft
3.33 ft/s
0.17 ft
1.58 ft
0.70
Collects Runoff from Drainage Basin: A+B+C
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type : Open Channel
02/19/98
01 :08:43 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
.. .f~oj~c~ Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Dep t h
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra.fm2
1.D . #1 (AREA C)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.7500 %
4.000000 H : V
4.000000 H : V
32 .996 cfs
1.53 ft
9.38 ft2
12 .63 ft
12 .25 ft
1.33 ft
0.015628 ft/ft
3.52 ft/s
0.19 ft
1.72 ft
0 .71
Collects Runoff from Drainage Basin : A+B+C
Discharges into Drainage Bas in: TxDOT R.O .W .
Discharges into Structure Type : Open Channel
0 2119/98
01 :14 :57 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaste r v5.0 7
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #1 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0 .013
0.7500 %
4.000000 H : V
4.000000 H : V
7 .242 cfs
0.63 ft
1.61 ft2
5.23 ft
5.07 ft
0.73 ft
0.003592 ft/ft
4.51 ft/s
0.32 ft
0.95 ft
1.41
Collects Runoff from Drainage Basin : A+B+C
Discharges into Drainage Basin : TxDOT R.O .W.
Discharges into Structure Type: Open Channel
06/09/98
03:23:12 PM
Municipal Development Group
Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
__ _!J_r_~J~~!pescription
~~~:-----:-~-:--:-:------~~~~~~~~~~~
Project File c :\projects\000\2882-south hampton\2882r2ra .fm2
Worksheet l.D . #2. (AREA D)(25 YR)
Flow Element Triangular Channel
Method Manning's Formula
Solve Fo r Channel Depth
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discha rge
Results
Depth
Flow A rea
Wetted Perimete r
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is sub critica l.
Notes :
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
17 .749 cfs
1.15 ft
5.29 ft2
9.48 ft
9.20 ft
1.04 ft
0.01697 4 ft/ft
3.36 ft/s
0.18 ft
1.32 ft
0.78
Collects Runoff from Drainage Basin : D
Discharges into Drainage Basin : G
Discha rge into Structure Type : Culvert
Municipal Development Group 0211 9 /98
01 :17:45 PM Haestad Methods, Inc. 37 Brooksid e Road Waterbury, CT 06708 (203) 755-166 6
FlowMast e r v5 .0 7
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D . #2 (AREA D)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
20 .949 cfs
1.22 ft
5.99 ft2
10 .09 ft
9.79 ft
1.11 ft
0.016603 ft/ft
3.50 ft/s
0 .19 ft
1.41 ft
0.79
Collects Runoff from Drainage Basin : D
Discharges into Drainage Basin : G
Discharge into Structure Type : Culvert
02119 /98
01 :18:20 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Veloc ity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #2. PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.0000 %
4.000000 H : V
4.000000 H : V
4 .615 cfs
0.51 ft
1.03 ft2
4.18 ft
4.06 ft
0.61 ft
0.003814 ft/ft
4 .49 ft/s
0.31 ft
0.82 ft
1.57
Collects Runoff from Drainage Bas in : D
Discharges into Dra inage Basin : G
Discharge into Structure Type : Culvert
06/09/98
0 3 :25:34 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 o f 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #3 (AREA G)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.1000 %
4.000000 H : V
4.000000 H : V
49 .197 cfs
1.66 ft
10 .96 ft2
13 .65 ft
13.24 ft
1.57 ft
0 .014817 ft/ft
4.49 ft/s
0.31 ft
1.97 ft
0 .87
Collects Runoff from Drainage Basin: D+E+G
Discharge into Drainage Basin : H
Discharge into Structure Type : Culvert
Municipal Development Group 06/11/98
11 :45:14AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
L0 ft: Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #3 (AREA G}(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.1000 %
4.000000 H : V
4 .000000 H : V
58 .092 cfs
1.76 ft
12.42 ft2
14.53 ft
14.10 ft
1.67 ft
0 .014492 ft/ft
4.68 ft/s
0.34 ft
2.10 ft
0 .88
Collects Runoff from Drainage Basin: D+E+G
Discharge into Drainage Basin: H
Discharge into Structure Type : Culvert
Municipal Development Group 06/11198
11 :45:35 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc .fm2
l.D . #3 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.1000 %
4.000000 H: V
4.000000 H : V
12 .726 cfs
0.73 ft
2.12 ft2
6 .01 ft
5.83 ft
0.91 ft
0.003332 ft/ft
5.99 ft/s
0.56 ft
1.29 ft
1.75
Collects Runoff from Drainage Basin : D+E+G
Discharge into Drainage Basin : H
Discharge into Structure Type: Culvert
Municipal Development Group 06/11 /98'
11 :46:53AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left ~icie Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #4(AREA1)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4 .000000 H : V
4 .000000 H : V
96 .248 cfs
2 .01 ft
16.14 ft 2
16.57 ft
16.07 ft
2 .05 ft
0.013549 ft/ft
5.96 ft/s
0.55 ft
2 .56 ft
1.05
Collect Runoff from Drainage Basin : D+E+G+H+I
Discharge into Drainage Basin : TxDOT R.O.W .
Discharge into Structure Type : Existing Structure
06/11/98
11 :50:21 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
06/11 /98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
1.0. #4 (AREA 1)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H: V
4.000000 H : V
113.636 cfs
2 .1 4 ft
18.28 ft2
17 .63 ft
17 .10 ft
2 .1 9 ft
0.013252 ft/ft
6.22 ft/s
0.60 ft
2.74 ft
1.06
Collect Runoff from Drainage Basin : D+E+G+H+I
Discharge into Drainage Basin : TxDOT R.O.W .
Discharge into Structure Type : Existing Structure
Municipal Development Group
11 :52:11 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimete r
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #4 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.5000 %
4.000000 H: V
4.000000 H : V
24 .980 cfs
0 .89 ft
3 .13 ft2
7 .30 ft
7.08 ft
1.19 ft
0 .003046 ft/ft
7.97 ft/s
0 .99 ft
1.87 ft
2.11
Collect Runoff from Drainage Basin : D+E+G+H+I
Discharge into Drainage Basin: TxDOT R.O.W.
Discharge into Structure Type : Existing Structure
06/11/98
11 :54:06AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
1.D . fl6 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.050
1.0000 %
272 .17 ft
52.935 cfs
-
278 . - - - ---- - ----.... -- - ---- ---- --~ - ---- - - -- - --..... - - - - --- -- -- --.. - - - - -- -- - - ---·-- - - --- -- - -- -'T - - - --- - ------·
£277 .0 -----------~-------------~------------~-------------t------------~-------------+-------------1
'-'276.0 -----------~-------------~--------------------------------
c 275.0 ------~-------------~----------~-------------t------------~-------------+-------------,
~227743 ._oo ----~-------------~-----------~-------------~------------~-------------!-------------:
w --,-------------r----------,-------------r------------~-------------,-------------, ~ 272 .0 w 271 .0
---------~-------------L------------~-------------i-------------1 I I I I I
-,--.,;;-.,;;-;.,;;-:.;-;.,;-;.-;,.--__._,... - -- -- - - - - -- - , ----- - - - - - -- -T - - - - - - - - - - - --,-- - - - - - --- - - -T - - - - - --- - - ---,
270 .0L-~~~~~~-'-~~~~~~-'-~~~~~~-'-~~~~~~--'-~~~~~~~'--~~~~~~-'-~~~~~~~
-10.0 0 .0
Notes:
Collects Runoff from Drainage Basin : J
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
10.0 20.0
Station
30 .0
(ft)
Municipal Development Group
40.0
06/11/98
12:18:42 PM Haestad M ethods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
50.0 60.0
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. "#6 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 270.50 ft to 278.00 ft.
Siation (ft) Elevation (ft)
-10.00 278.00
0 .00 271 .00
5.00 270 .50
10 .00 271 .00
20 .00 276 .00
60.00 276.25
Discharge 52 .935 cfs
Results
Wtd . Mannings Coefficient 0.050
Water Surface Elevation 272.17
Flow Area 16 .49
Wetted Perimeter 14.69
Top Width 14.00
Height 1.67
Critical Depth 271 .69
ft
ft2
ft
ft
ft
ft
Start Station
-10 .00
Critical Slope 0.040603 ft/ft
Velocity 3.21 ft/s
Velocity Head 0.16 ft
Specific Energy 272 .33 ft
Froude Number 0.52
Flow is subcritical.
Municipal Development Group
End Station
60.00
06/11 /98
12:19:03 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.050
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
-SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D . '#6 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
- -
Wtd. Mannings Coefficient
Channel Slope
0 .050
1.0000 %
Water Surface Elevation
Discharge
278.
272 .31 ft
62 .885 cfs
e277.o -----------~-------------~------------~-------------~------------~-------------+-------------'
._,276.0 -----------~-------------~--------------------------------
c 275.0
~ ~~~:g
~ 272.0 w 271 .0
I I I I I I I ------,-------------r----------,-------------r------------~-------------,-------------,
----J-------------~-----------J-------------L------------~-------------&-------------1 I I I I I I I --,-----------r----------,-------------r------------~-------------,-------------,
---------J-------------L------------~-------------&-------------1 I I I I I ..,...-----;.,;-;.:-:_;-;.-;;;.,;.--...,-- - - - - ----- - - , - --- - -- --- - - - r --- - - - - -- - - --,--- - - - - - - - - --T - - - - - --- --- --,
270 .0'--~~~~~--''--~~~~~--L~~~~~~--L~~~~~~-'-~~~~~~-i..~~~~~~-'-~~~~~~~
-10 .0 0 .0
Notes:
Collects Runoff from Drainage Basin : J
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type: Culvert
10.0 20 .0
Station
30 .0
(ft)
Municipal Development Group
40.0
06/11/98
12:19:52 PM Haestad Methods, Inc. 37 Brookside Road Walerbury, CT 06708 (203) 755-1666
50.0 60.0
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Desc ri ption
ProjP.ct File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D . '116 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 270 .50 ft to 278 .00 ft.
Station (ft) Elevation (ft)
-10 .00 278 .00
0 .00
5 .00
10.00
20 .00
60 .00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
271 .00
270 .50
271 .00
276.00
276.25
62 .885 cfs
0.050
272 .31
18 .57
15 .27
14 .50
1.81
271 .80
ft
ft2
ft
ft
ft
ft
Start Station
-10 .00
Critical Depth
Critical Slope
Velocity
0.039522 ft/ft
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
3.39
0.18
272 .49
0.53
ft/s
ft
ft
Municipal Development Group
End Station
60 .00
06/11/98
12:20:07 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0 .050
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4-CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
1.D . #7 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0 .030
1.0000 %
265.13 ft
84.243 cfs
268.0 - --- - --- ---;---- -- - - -- --;--- --- - - -- --;------ - - - - -~ - --- --- - - - -7-- - --- - - - - -~ - - --- - - - --~--~---- - -- --·
e267.5 -----------r----------~-----------~-----------,-----------r-----------r---
~267 .0 -----------1-----------~------------1-----------~-----------.1.--------
c 266.5 -----------~----------~-----------~-----------~-----------! -------~-----------~-----------,
.Q 266. 0 ---- - -- --1------ - --- --1-- - --- -- -- --I - -- --------~ - -- -- --- -.I. -----------L -----------L. - - - - - ------1
i265 .5 -----------r -------~-----------~--------------------}-----------~-----------~-----------: ~ 265.0 - ----------~ --------~ ------ - ----~ -- ----- - ---~ -- - --------~ - ----- -----:
~264 .5 -----------r----------,--------,-----------T-----------r-----------r-----------,
264 .0'--~~~~-L~~~~~_._~~~-==~~~~~~-1...~~~~~-'-~~~~_J,~~~~~-'-~~~~---l
-60 .0 -40 .0 -20 .0
Notes:
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
0 .0 20.0 40.0
Station (ft)
Munic ipal D eve lopme nt Grou p 06/11/98
12:21 :38 PM Haestad M et hods, Inc. 3 7 Brooksid e R oad W ate r b ury, C T 06708 (203) 755-1666
60.0 80.0 100.0
FlowMaster v5 .0 7
Page 1of1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D. #7 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 264 .00 ft to 268.00 ft.
Station (ft) Elevation (ft)
-48 .00 266.00
0.00
30 .00
84 .00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
264.00
266 .00
268.00
84.243 cfs
0.030
265 .13
24 .91
44.14
44 .08
1.13
265 .03
ft
ft2
ft
ft
ft
ft
Start Station
-48 .00
Critical Slope 0.016390 ft/ft
Velocity 3.38 ft/s
Velocity Head 0.18 ft
Specific Energy 265 .31 ft
Froude Number 0.79
Flow is subcritical.
Municipal Development Group
End Station
84 .00
06/11/98
12:21:59 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
1.D. #7 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
265 .20 ft
99.836 cfs
268.0 ----------------------~-----------------------~-----------·-----------p-----------£ 267.5 - -- --------:------- - ----:------------:------------f-----------+-----------l-----I I
-267.0 -----------~----------~-----------~-----------~-----------&-------------------~-----------·
c266.5 -----------~----------~-----------~------------f-----------! I I :
.Q 266 .Q - - - - - - - --'-- - - - - - - - - --I---- ---- - - --J ----- - - - ---.J. - - - --- - - -.1. - - - - - --- - - -L - - - - - - - - - - -L - - - - - - - - - --I iU 265. 5 --- - -- --:--- - - - - --:-- --- - -----I - - - --____ ~ ___________ ~ ___________ ~ __________ -:
~ 265.0 -- - ----- - --~ ---- -- -
jjj 264.5 -- - - - ------,---- - -- - - - --,-- -
-~-----------L-----------L-----------L-----------1 I I I I I
-----~-----------r-----------r-----------r-----------,
264 .0L-~~~~--1~~~~~---1..~~~---=~ ...... ~~~~~-'--~~~~~..1...._~~~~~L-~~~~--1~~~~~_J
-60.0 -40 .0 -20.0
Notes:
Collects Runoff from Drainage Basin : J+L
Discharges into Drainge Basin : TxDOT R.O .W.
Discharges into Structure Type : Culvert
0 .0 20.0
Station (ft)
Municipal Development Group
40.0
06/11/98
12:22:54 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 80 .0 100.0
FlowMasler v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #7 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 264 .00 ft to 268.00 ft .
Staticn (ft) Elevation (ft)
-48 .00 266 .00
0.00
30 .00
84 .00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
264 .00
266 .00
268 .00
99.836 cfs
0 .030
265 .20
28.29
47 .04
46 .97
1.20
265 .10
ft
ft 2
ft
ft
ft
ft
Start Station
-48 .00
Critica l Slope 0.016024 tuft
Velocity 3.53 fUs
Velocity Head 0.19 ft
Specific Energy 265 .40 ft
Froude Number 0.80
Flow is subcritical.
Municipal Development Group
End Station
84 .00
06/11/98
12:23:24 PM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #7 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.0000 %
4.000000 H: V
4 .000000 H : V
21 .615 cfs
0.90 ft
3.27 ft2
7.46 ft
7.24 ft
1.13 ft
0.003105 ft/ft
6.60 ft/s
0.68 ft
1.58 ft
1.73
Collects Runoff from Drainage Basin : J+L
Discharges into Drainage Basin: TxDOT R.O .W .
Discharge into Structure: Existing Structure
06/11 /98
12:24:42 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
-SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
c :\projects\000\2882-south hampton\2882r2rc . fm2
l.D . #8 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.030
1.0000 %
260 .78 ft
84 .243 cfs
Water Surface Elevation
Discharge
262 .0
g261 .5
c:: 261 .0
0
~ 260.5
>
---------~----------~---------
' I I _________ J __________ L _________ J __________ -
I I I I
~260 .0 ---------~----------p---------4----------p ---------4---w I I I ' I
259 .5'--~~~~--'-~~~~~-'-~~~~--'~~~~~-'-~~~~~..__~~~~-'-~~~~~-'-~~~~--'~~~~~~
-60 .0 -50 .0 -40.0
Notes:
Collects Runoff from Drainage Basin : J+L
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
-30 .0 -20 .0
Station
-10.0
(ft)
Municipal Development Group
0 .0
06/11198
12:29:17 PM Haestad M ethods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
10.0 20.0 30.0
FlowMaster v5 .07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc.fm2
1.0 . #8 (AREA L}(25 YR}
Irregular Channel
Manning's Formula
Solve Fo r Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 259 .75 ft to 262 .00 ft .
8t3t!on (ft) Elevation (ft}
-51 .00 262 .00
-6 .00 260 .00
0 .00 259 .75
10 .00
30 .00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Are a
Wetted Perimete r
Top W idth
He ight
260 .00
262.00
84.243 cfs
0.030
260 .78
24 .26
41 .33
41.27
1.03
260 .68
ft
ft 2
ft
ft
ft
ft Critica l Depth
Critica l S lope
Velocity
0 .016195 ft/ft
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
3 .47 ft/s
0 .19 ft
260 .96 ft
0 .80
Start Station
-51.00
Municipal Development Group
End Station
30.00
06/11/98
12:29:47 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0 .030
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
1.D. #8 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
260.85 ft
99.836 cfs
262 .0
g261 .5 I I I I I I
--------~----------r---------~----------1----------~---------1----
' I c: 261 .0 ---------~----------·-----------9----------~---------0 ' I I
~ 260 .5 _________ J __________ L---------~-----------
I I I I
- -- - -_,_ - -- - - _-_ -_ 1 _ - - - - - - --_,_ - - -
I I I > ~ 260.0 w
. I
---------~----------·---------4----------·---------4---
I I I I I
I I
..;;;.;;;..:.::.:,;.;.;.;;.;;.---~ ---- - - -- -9 - -- - ---- --:
259 .5'--~~~~-'-~~~~-L~~~~~..._~~~~--'-~~~~--''--~~~~_._~~~~-L~~~~~..L-~~~~~
-60 .0 -50 .0 -40 .0
Notes :
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin : TxDOT R.O .W.
Discharges into Structure Type: Culvert
-30.0 -20 .0
Station
-10.0
(ft)
Municipal Development Grou p
0 .0
06/11/98
12:31 :54 PM H aestad M ethods , Inc . 3 7 Brookside Road W ate rbu ry, CT 06708 (20 3 ) 755-1666
10.0 20.0 30.0
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #8 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 259 .75 ft to 262.00 ft.
Statio n (ft) Elevation (ft)
-51 .00 262.00
-6 .00 260 .00
0 .00
10 .00
30.00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
259 .75
260 .00
262 .00
99 .836 cfs
0.030
260 .85
27 .50
43 .81
43 .74
1.10
260 .75
ft
ft2
ft
ft
ft
ft
Start Station
-51.00
Critical Slope 0.015810 ft/ft
Velocity 3.63 ft/s
Velocity Head 0.20 ft
Specific Energy 261 .06 ft
Froude Number 0.81
Flow is subcritica l.
Municipal Development Group
End Station
30.00
06/11198
12:32:11 PM Haestad Methods, In c . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
L'.:~ Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Work.sheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #8 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
4 .000000 H : V
4.000000 H : V
21 .615 cfs
0 .90 ft
3.27 ft2
7.46 ft
7.24 ft
1.13 ft
0.003105 ft/ft
6 .60 ft/s
0.68 ft
1.58 ft
1.73
Collects Runoff from Drainage Basin : J+L
Discharges into Drainage Basin : TxDOT R.O .W.
Discharge into Structure : Existing Structure
Municipal Development Group 06/11 /98
12:32:54 PM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra.fm2
1.D. #10 (AREA Q)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
1.7500 %
4 .000000 H: V
4.000000 H : V
8.486 cfs
0 .79 ft
2.47 ft2
6 .47 ft
6 .28 ft
0 .78 ft
0 .018730 ft/ft
3 .44 ft/s
0 .18 ft
0 .97 ft
0 .97
Collects Runoff from Drainage Basin: Q
Discharges into Drainage Basin : Nantuck Dr.
Discharges into Structure Type : Open Channel
Municipal Development Group 02119/98
06:45:33 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
:...eft Sid::: s:cpe
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra.fm2
1.D . #10 (AREA 0)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.7500 %
4.000000 H : V
4.000000 H : V
10 .017 cfs
0 .84 ft
2 .79 ft2
6 .89 ft
6 .68 ft
0 .83 ft
0.018320 ft/ft
3.59 ft/s
0.20 ft
1.04 ft
0.98
Collects Runoff from Drainage Basin: Q
Discharges into Drainage Basin : Nantuck Dr.
Discharges into Structure Type : Open Channel
Municipal Development Group 02/19/98
06:46 :12 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
_J'.lroject Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
1.D. #10 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.7500 %
4.000000 H: V
4 .000000 H: V
2 .205 cfs
0.35 ft
0.48 ft2
2 .85 ft
2 .77 ft
0.45 ft
0.004209 ft/ft
4 .60 ft/s
0.33 ft
0.68 ft
1.95
Collects Runoff from Drainage Basin : Q
Discharges into Drainage Basin : Nantuck Dr.
Discharges into Structure Type : Open Channel
06109198
03:49 :28 PM
Municipal Development Group
Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #11 (AREA S)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.8400 %
4.000000 H : V
4.000000 H : V
22.932 cfs
1.13 ft
5.10 ft2
9 .31 ft
9.03 ft
1.15 ft
0 .016404 ft/ft
4.50 ft/s
0.31 ft
1.44 ft
1.06
Collects Runoff from Drainage Basin : S
Discharges into Drainage Basin : V
Discharge into Structure Type : Culvert
07/01/98
08:49:40AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc .fm2
l.D. #11 (AREA S)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.8400 %
4.000000 H : V
4.000000 H : V
27 .104 cfs
1.20 ft
5.78 ft2
9.91 ft
9.62 ft
1.23 ft
0.016043 ft/ft
4.69 ft/s
0.34 ft
1.54 ft
1.07
Collects Runoff from Drainage Basin : S
Discharges into Drainage Basin : V
Discharge into Structure Type: Culvert
Municipal Development Group 07/01/98
08:50 :03AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
L'C'f! Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimete r
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #11 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.8400 %
4 .000000 H : V
4.000000 H : V
5.919 cfs
0 .50 ft
0 .99 ft2
4.09 ft
3.97 ft
0.67 ft
0.003690 ft/ft
6 .00 ft/s
0 .56 ft
1.06 ft
2 .12
Collects Runoff from Drainage Basin : S
Discharges into Drainage Basin : V
Discharge into Structure Type : Culvert
07/01 /98
08 :50:23AM
Municipal Development Group
Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #12 (AREA V)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
37.452 cfs
1.45 ft
8.39 ft2
11 .94 ft
11 .59 ft
1.40 ft
0 .015366 ft/ft
4 .46 ft/s
0.31 ft
1.76 ft
0.92
Collects Runoff from Drainage Basin : S+ T +V
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Municipal Development Group 06/10/98
11 :38 :19AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
_E~?.ject Descrip~ti-·o_n __________________ _
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimete r
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #12 {AREA V}{100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4 .000000 H : V
4.000000 H : V
44.421 cfs
1.54 ft
9.54 ft2
12.73 ft
12 .35 ft
1.50 ft
0.015021 ft/ft
4.66 ft/s
0.34 ft
1.88 ft
0.93
Collects Runoff from Drainage Basin: S+ T +V
Discharges into Drainage Basin : TxDOT R .O .W .
Discharges into Structure Type: Open Channel
Municipal Development Group 06/10/98
11 :39 :16AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
_i>_t:.?l~ct Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discha r ge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #12 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1 .3000 %
4.000000 H : V
4 .000000 H : V
9.694 cfs
0.64 ft
1.63 ft2
5.26 ft
5.10 ft
0 .82 ft
0 .003455 ft/ft
5 .96 ft/s
0 .55 ft
1.19 ft
1 .86
Collects Runoff from Drainage Basin : S+ T +V
Discharges into Drainage Basin : TxDOT R.O .W.
Discharges into Structure Type : Open Channel
06/10/98
11 :40 :30 AM
Municipal Development Group
Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D . #13 (AREA X)(25 YR)
Triangular Channel
Manning's Formula
Channel De~th
0.030
0.8000 %
4.000000 H : V
4 .000000 H : V
9.128 cfs
0.93 ft
3 .49 ft2
7 .70 ft
7.47 ft
0 .80 ft
0.018549 ft/ft
2 .61 ft/s
0.11 ft
1.04 ft
0.67
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
02119/98
06 :54:52 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra. fm2
l.D . #13 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
0 .8000 %
4 .000000 H : V
4.000000 H : V
10 .774 cfs
0.99 ft
3.95 ft2
8.20 ft
7.95 ft
0.85 ft
0.018142 ft/ft
2 .72 ft/s
0.12 ft
1.11 ft
0.68
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin : TxDOT R .O .W .
Discharges into Structure Type: Open Channel
Municipal Development Group 02119/98
06 :55:25 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
1.D. #13 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
0 .8000 %
4 .000000 H : V
4.000000 H : V
2 .374 cfs
0 .41 ft
0.68 ft2
3.40 ft
3.30 ft
0.47 ft
0.004168 ft/ft
3.50 ft/s
0 .19 ft
0 .60 ft
1.36
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
06/09/98
03:51 :53 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
SECTION#~
CULVERT FLOW CALCULATIONS
Pro ject Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left .Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
1.D. #1 (AREA D)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
26.511 cfs
1.27 ft
6 .48 ft2
10 .49 ft
10.18 ft
1.22 ft
0.016090 ft/ft
4.09 ft/s
0.26 ft
1.53 ft
0.90
Collects Runoff from Drainage Basin : D+E
Discharges into Drainage Basin : G
Discharges into Structure Type : Open-Channel
06109198
03:56:52 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5-CULVERT FLOW
Work.sheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc .fm2
l.D . #1 {AREA D){100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
35 .737 cfs
1.42 ft
8.10 ft2
11 .74 ft
11.39 ft
1.38 ft
0 .015462 ft/ft
4 .41 ft/s
0.30 ft
1.73 ft
0.92
Collects Runoff from Drainage Basin: D+E
Discharges into Drainage Basin : G
Discharges into Structure Type : Open-Channel
Municipal Development Group 06/09/98
03:57:41 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Texas H ydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #1
Shape : !circular
Material : I Concrete
Sp.an : §1.00 ft
Rise : 2 .50 ft
Barrels : 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
26 .51
35 .74
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
Length(L): I 63 .ool ft
Slope(S): I 0 .00511
n : 0 .0120
Ke: 0.20
Entrance Type : 1: 1.5 Beveled Edge I
HW TW BW* V Q Inlet Ctl Outlet Ctl
elevation elevation out over road HW depth HW depth
(ft) (ft) (ft) (ft) (cfs) (ft) (ft)
292 .03 290 .27 1.44 7 .21 0 .00 2 .64 2.72
292 .67 290.42 1.93 7 .28 0 .00 3 .32 3.36
61 9/98
Proj~ct Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritica l.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #2 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
1.3000 %
4.000000 H: V
4.000000 H: V
13.634 cfs
0 .99 ft
3.93 ft2
8.18 ft
7 .93 ft
0.94 ft
0.017582 ft/ft
3.47 ft/s
0.19 ft
1.18 ft
0 .87
Collects Runoff from Drainage Basin : F
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open-Channel
Municipal Development Group 06/09/98
04:05:27 PM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
___ ?roj_ect Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
LP.ft Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #2 (AREA F}(100 YR}
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H: V
4 .000000 H : V
18 .379 cfs
1.11 ft
4 .92 ft2
9.15 ft
8 .87 ft
1.06 ft
0.016896 ft/ft
3.74 ft/s
0.22 ft
1.33 ft
0 .88
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin : TxDOT R.O .W.
Discharges into Structure Type : Open-Channel
06/09/98
04:05:41 PM
Municipal Development Group
Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #2
Shape : I Circular
Material : I Concrete
Sp.an : ~.00 ft
Rise : 1.75 ft
Barrels : 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
13 .63
18 .38
*Backwater (BW = HW -TW -S-L)
C:\PROJECTS\000\2882-S-l \2882T3RC .CL V
Length(L): I 63 . ool ft
Slope(S): I 0 .00401
n: 0 .0120
Ke : 0 .50
Entrance Type : Headwall I
'---~~~~~~~~-
HW TW BW* V Q Inlet Ctl Outlet Ctl
elevation elevation out over road HW depth HW depth
(ft) (ft) (ft) (ft) (cfs) (ft) (ft)
288.74 287.03 1.46 5 .67 0 .00 2.44 2.44
289 .77 287 .15 2 .37 7 .64 0.00 3.47 3 .11
619/98
I
Pro ject Description
Project File
Worksheet
Flow Element
Method
Solve Fo r
Input Data
Mannings Coefficient
Channel Slope
Left S!de Sl ope
Right Side Slope
Discharge
Results
Depth
Flow A rea
Wetted Perimeter
Top Width
Critical Depth
Critica l Slope
Velocity
Velocity Head
Specifi c Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #3 (AREA H)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
1.5000 %
4.000000 H: V
4.000000 H : V
68 .165 cfs
1.77 ft
12.46 ft2
14 .56 ft
14 .12 ft
1.78 ft
0 .014187 ft/ft
5.47 ft/s
0.46 ft
2.23 ft
1.03
Collect s Runoff from Drainage Basin : D+E+G+H
Discharges into Drainage Basin : I
Discharges into Structure Type : Open-Channel
Municipal Development Group 06/1 1/98
0 1 :16:17 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
L:::ft S id~ Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critica l Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
1.D . #3 (AREA H)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4 .000000 H : V
4 .000000 H : V
94 .237 cfs
1.99 ft
15.89 ft2
16 .43 ft
15 .94 ft
2 .03 ft
0.013587 ft/ft
5.93 ft/s
0.55 ft
2 .54 ft
1.05
Collects Runoff from Drainage Basin : D+E+G+H
Discharges into Drainage Basin : I
Discharges into Structure Type : Open-Channel
06/11/98
01 :17 :48 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Texa s H ydrau lic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #3
Shape : I circular
Material : I Concrete
Sp.an : §1.00 ft
Rise : 3 .00 ft
Barrels : 1
Discharge Description
l OYR
lOOYR
Q
total
(cfs)
43 .05
58 .09
*Backwater (BW = HW -TW -S ·L)
C :\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
283 .85 281.92
284 .67 282 .14
Length(L): I 63 .ool ft
Slope(S): I 0 .00511
n : 0 .0120
Ke : 0.20
Entrance Type : 1 : 1. 5 Beveled Edge I
BW* Q Inlet Ctl Outlet Ctl v
out over road HW depth HW depth
(ft) (ft) ( cfs) (ft) (ft)
1.61 8.16 0 .00 3.23 3 .29
2 .20 8 .22 0 .00 4 .09 4 .11
6/11/98
I
I
I
Proj ect Description
Proje ct File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Le ft Si de Slope
Right Side Slope
Discharae
Results
Depth
Flow A rea
Wetted Perimete r
Top W idth
Critical Depth
Critica l Slope
Velocity
Veloc ity Head
Specific Energy
Froude Number
Flow is subcritica l.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #5 (AREA M)(10 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
32.581 cfs
1.34 ft
7.16 ft2
11 .04 ft
10 .71 ft
1.33 ft
0.015654 ft/ft
4.55 ft/s
0.32 ft
1.66 ft
0.98
Collects Runoff from Drainage Basin : K+M
Discha rges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : TxDOT R.O .W.
Municipal Development Group 06/11 /98
02 :17:42 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Veloc ity
Velocity Head
Specific Energy
Froude Numbe r
Flow is subcritica l.
Notes :
SECTION #5 -CULVERT FLOW
Work.sheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #5 (AREA M)(100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.030
1.5000 %
4.000000 H: V
4.000000 H : V
43 .919 cfs
1.50 ft
8.96 ft2
12 .34 ft
11 .97 ft
1.50 ft
0.015043 ft/ft
4.90 ft/s
0.37 ft
1.87 ft
1.00
Collects Runoff f rom Drainage Basin : K+M
Discharges into Dra inage Basin : TxDOT R.O .W .
Discharges into Structure Type : TxDOT R.O .W .
Municipal Development Group 06/11 /98
02:18 :38 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaste r v5 .07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CULVERT FLOW
I.D. #5
Shape : I Circular
Material : !concrete
Sp.an : ~.00 ft
Rise : 1.50 ft
Barrels : 1
Discharge Description
IOYR
100 YR
Q
total
(cfs)
9 .60
12.94
*Backwater (B W = HW -TW -S-L)
C:\PRO JECTS\0 00\288 2-S-l \2882T3RC . CL V
HW TW
elevation elevation
(ft) (ft)
266 .73 265 .55
267 .68 265 .71
Length(L): I 63 .ool ft
Slope(S): I 0 .00491
n: 0.0120
Ke: 0 .50
Entrance Type : Headwall I
'--~~~~~~~~~
BW*
(ft)
0 .88
1.66
v
out
(ft)
5.43
7 .32
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(cfs) (ft) (ft)
0 .00 2 .17 2 .16
0 .00 3 .12 2 .75
6/11/98
I
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
-~!'~j_ect pescrip_ti_·o_n __________________ _
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
c :\projects\000\2882-south hampton\2882r3rc.fm2
l.D. tl6 (AREA P)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0 .5000 %
4 .000000 H: V
4.000000 H: V
44.982 cfs
1.86 ft
13 .78 ft2
15 .30 ft
14 .85 ft
1.51 ft
0.014995 ft/ft
3.27 ft/s
0 .17 ft
2 .02 ft
0.60
Collects Runoff from Drainage Basin: P+Q
Discharges into Drainage Basin : Nantuck Dr.
Discharges into Structure Type : Open Channel
Municipal Development Group 06/10/98
01:34:38 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
LPft ~id e Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. '#6 (AREA P)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.5000 %
4.000000 H : V
4.000000 H : V
60 .638 cfs
2 .08 ft
17 .23 ft2
17.12 ft
16 .61 ft
1.70 ft
0.014410 ft/ft
3.52 ft/s
0.19 ft
2.27 ft
0.61
Collects Runoff from Drainage Basin : P+Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type : Open Channel
06/10198
01 :35:30 PM
Municipal Development Group
Haestad Methods , Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #6
Shape : !circular
Material : I Concrete
Sp.an : §1.00 ft
Rise : 2 .50 ft
Barrels : 1
Length(L): I 69 .ool ft
Slope(S): I 0 .00511
n : 0 .0120
Ke: 0 .20
Entrance Type: 1 : 1. 5 Beveled Edge I
Discharge Description Q HW TW BW* V Q Inlet Ctl Outlet Ctl
total elevation elevation out over road HW depth HW depth
(cfs) (ft) (ft) (ft) (ft) (cfs) (ft) (ft)
IOYR 44 .98 260 .98 258 .26 2 .37 9.16 0.00 4 .16 4 .07
IOOYR 60 .64 261.75 258.48 2 .92 10 .65 8 .38 4 .93 4 .61
*Backwater (BW = HW -TW -S ·L)
C:\PROJECTS\000\2882-S -1 \2882T3RC.CL V 6/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left SidP. Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #7 (AREA R)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H: V
4.000000 H : V
10 .236 cfs
0.94 ft
3.50 ft2
7.71 ft
7.48 ft
0.84 ft
0.018267 ft/ft
2.92 ft/s
0.13 ft
1.07 ft
0 .75
Collects Runoff from Drainage Basin : R
Discharges into Drainage Basin : Nantuck Dr.
Dishcarges into Structure Type : Open-Channel
06/09/98
04:18:13 PM
Municipal Development Group
Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
. __ _Proj~t Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
LP.ft Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc .fm2
l.D . #7 (AREA R)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
1.0000 %
4 .000000 H : V
4.000000 H : V
13 .837 cfs
1.05 ft
4.39 ft2
8.64 ft
8.38 ft
0.94 ft
0 .017547 ft/ft
3.15 ft/s
0 .15 ft
1.20 ft
0 .77
Collects Runoff from Drainage Basin: R
Discharges into Drainage Basin : Nantuck Dr.
Dishcarges into Structure Type : Open-Channel
Municipal Development Group 06109198
04:18:47 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #7
Shape : I Circular
Material : !Aluminum
Sp.an : ~.00 ft
Rise : 1.50 ft
Barrels : 1
Discharge Description Q
lOYR
IOOYR
total
(cfs)
10 .24
13 .84
•Backwater (BW = HW -TW -S ·L)
C:\PROJECTS\000\2882-S-l \2882T3RC .CL V
HW TW
elevation elevation
(ft) (ft)
255 .86 253 .88
256.20 253 .99
Length(L): I 62 .ool ft
Slope(S): I 0 .01001
n : 0 .0149
Ke : 0.50
Entrance Type : Headwall I
'--~~~~~~~~---'
BW*
(ft)
1.36
1.59
v
out
(ft)
5.79
6 .51
Q Inlet Ctl Outlet Ct!
over road HW depth HW depth
(cfs) (ft) (ft)
0 .00 2 .30 2.24
2 .32 2 .64 2.49
61 9/98
Pro ject Description
Project File
Worksheet
Flow Element
Me thod
Solve For
Input Data
Mannings Coefficient
Channel Slope
Le ~ Side Sl ope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Veloc ity H ead
Specific Energy
Froude Number
Flow is subcritica l.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
1.0 . #8 (AREA T)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
1.0000 %
4.000000 H : V
4.000000 H : V
26 .131 cfs
1.33 ft
7 .07 ft2
10 .96 ft
10 .63 ft
1.22 ft
0.016121 ft/ft
3.70 ft/s
0 .21 ft
1.54 ft
0.80
Collects Runoff from Dra inage Basin : S+ T
Discharges into Drainage Basin : V
Discha rges into Structure Type : Open Channel
06/10/98
01 :43:18 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
_ _f.lroject Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #8 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4 .000000 H : V
4.000000 H : V
35 .322 cfs
1.49 ft
8 .86 ft2
12 .27 ft
11 .91 ft
1.37 ft
0 .015486 ft/ft
3.99 ft/s
0.25 ft
1.74 ft
0.81
Collects Runoff from Drainage Basin: S+ T
Discharges into Drainage Basin : V
Discharges into Structure Type : Open Channel
06/10/98
01 :44:00 PM
Municipal Development Group
Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CULVERT FLOW
I.D. #8
Shape : I circular
Material : I concrete
Sp.an: §1.00 ft
Rise : 2 .25 ft
Barrels : 1
Discharge Description
lOYR
100 YR
Q
total
(cfs)
26 .13
35 .32
*Backwater (BW = HW -TW -S ·L)
C:\PROJECTS\000\2882-S-J \2882T3RC .CL V
HW TW
elevation elevation
(ft) (ft)
264 .22 262 .26
265 .08 262.42
Length(L): I 63 .ool ft
Slope(S): I 0 .00501
n: 0 .0120
Ke : 0 .20
Entrance Type : 1: 1. 5 Beveled Edge I
BW* v
out
Q Inlet Ct! Outlet Ct!
over road HW depth HW depth
(ft) (ft) ( cfs) (ft) (ft)
1.65 6 .57 0 .00 2 .86 2.91
2 .35 8 .74 0 .55 3 .77 3 .68
6/10/98
l.D. #9 (AREA V)(10 YR)
P-3
BAY STRE T
-2
WINDRIFT COVE
Project Title : South Hampton Subdivison
c :\projects\000\2882-south hampton\2882t1 ra .stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:34:01 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
258.00
~~ltiii~!S!rITTitft~~~~~-r--~~~~~tc;-:251~~~~~~~~~~~~~rb5~~~57 .00
Pipe: P -4
yp nve : .
O+Clill Invert: 250 . 7!ilff50
Length: 14.00 ft
Section Size : 30 inch
. .
On lnvert~.?M .85 ft
Length : 125:00 ft
Section Size: 30 inch
Pi e : P-1
Up Invert: 255.
256.00
255.00
254.00
253.00
On Invert: 255. oa!1.00
Length: 14.00 f
Section Si e : 2 lleb.00
1+50
Station ft
S29tDID1 Size: 30 i ncl12+50 3+00
M UNICIPAL DEV ELOPM E N T GROU P
P roject T itle : South H a mpto n S u bdivison
c :lproject s\00012882-south hampt on\288211 ra .stm
06/10/98 0 4 :17:31 PM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (2 03) 755-1666
Elevation ft
Project Engineer: RM
Storm C AD v 1 .0
Page 1of1
Node Report Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Area c CA TC Flow Flow Intensity Watershed {cfs) (ft/s) Elevation (acres) (acres) (min) Time Time (in/hr) (CIA) (ft) (min) (min) (cfs) 1-3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 16.586 1.63 258.00 1-2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 35.173 3.74 258.00 1-1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 31.361 10.23 258.00 J-1 N/A NIA NIA NIA 0.02 0.02 0.00 0.000 66.534 6.78 258.00 J-2 NIA NIA NIA NIA 0.30 0.30 0.00 0.000 83.120 8.47 258.00 J-3 NIA NIA NIA NIA 0.55 0.55 0.00 0.000 83.120 8.47 258.00 I Outlet NIA NIA NIA NIA 0.57 0.57 0.00 0.000 NIA 8.47 257.75 Project Title: South Hampton Subdivison c:\projects'D00\2882-south hampton\2882t1 ra.stm MUNICIPAL DEVELOPMENT GROUP 06/10/98 04:12:23 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 {203) 755-1666 Rim Elevation (ft) 258.02 257.41 258.00 258.00 258.00 258.00 257.75 Sump Elevation (ft) 252.00 253.00 255.75 252.53 251.74 250.85 250.65 Project Engineer: RM StormCAD v1 .0 Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity
Node Node (cfs) (ft) Slope Velocity Size (cfs)
(%) (ft/s)
P-7 1-3 J-2 16.586 6 .00 4 .3333 1 .57 48inch 0 .013 299.001
P-6 1-2 J-1 35.173 4 .00 11 .7500 3.44 48inch O.Q13 492.358
P-1 1-1 J-1 31 .361 14.00 1 .7857 10.38 24inch O.Q13 30.229
P-2 J-1 J-2 66.534 112.00 0 .7054 6 .78 30inch 0.013 68.893
P-3 J-2 J-3 83 .120 126.00 0 .7063 8.47 30 inch 0.013 68.942
P-4 J-3 Outlet 83 .120 14.00 0 .7143 8.47 30inch 0 .013 69.328
t ~·
f-1
{N f E LO c.r1 '1'
c:Y -rr-1-(.? vJ1L~ (2..~c..F ....
e.~1-ti
~cJL~
~~
)rrJ'-1
-ft-F-Fi}(l~ {l,f( )
UA'7 :?GLI}
0<'&~ ('
Project T itle : S o uth Hampton Subdivison
c :\projects \00012882-south hampto n\288211 ra .stm MUNICIPAL DEVELOPMENT GROUP
Upstream
Invert
Elevation
(ft)
252.00
253.00
255.75
252.53
251 .74
250.85
06/10/98 0 4 :12:58 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1 666
Downstream Upstream
Invert HGL
Elevation (ft)
(ft)
251 .74 255.02
252.53 255.81
255.50 257.63
251 .74 255.76
250.85 254.85
250.75 253 .39
Project Engineer: RM
StormC AO v1 .0
Page 1 of1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream
Nod e Node (cfs) (ft) Slope Velocity Size (cfs) Invert
{%) {ft/s) Elevation
{ft)
P-7 1-:'l J -2 16.586 6 .00 4 .3333 1.57 48inch 0 .013 299.001 252.00
P-6 1-2 J-1 35.173 4 .00 11 .7500 3.44 48inch 0.013 492.358 253.00
P-1 1-1 J-1 31 .361 14.00 1 .7857 10.38 24inch 0.013 30.229 255.75
P-2 J-1 J-2 66.534 112.00 0 .7054 6 .78 30inch 0 .013 68.893 252.53
P-3 J-2 J-3 83.120 126.00 0 .7063 8 .47 30inch 0.013 68.942 251 .74
P-4 J-3 Outlet 83.120 14.00 0 .7143 8 .47 30inch 0 .013 69.328 250.85
I
Project Title : South Hampton Subdivison
c :\projects\00012882-south hampton\288211 ra .stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:12:58 PM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 {203) 755-1666
Downstream Upstream
Invert HGL
Elevation (ft)
(ft)
251 .74 255 .02
252.53 255.81
255 .50 257.63
251 .74 255.76
250.85 254 .85
250.75 253.39
Project Engineer : RM
StormCAD v1 .0
Page 1 of 1
I
I
I
I
I
l.D. #9 (AREA V)(100 YR)
P-3
BAY STRE T
-2
WINDRIFT COVE
Project Title : South Hampton Subdivison
c :\projects\000\2882-south hampton\288211 ra .stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:33:48 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
258.00
ll!rnn-l"l!llf'5'""""1~~~+:-:-~~~~~---t~~~~~H"-'-'-t-"":>::'::!~~~~~-+-~~~~~~-HJJL.l.L._H-"~~~l.L,,-ljl 257.00
ft
256.00
255.00
254.00
253.00
~:i::~========~==:::~-:;:~~========~~~:::::::=::=::~~~~~~~~~~~~~~252.00 5ft
~1 .00
L__nP~ip~e":vP~-~4,_,,c:n--m::-..~~-tf&-fjflYi~.~~.f4-ff-~~-'-~~~~~~-t-ttnn1tn--t-+'Tf'\ft-iFt--'---'~"'""-"'"-'--'""-"'"'"'-'-..:ro ~OO o+~ 1 ~~~rt ~ 250:7 !ilff50 Dn lnvert1¥M.85 ft 1+50 3 +oo
Length: 14.00 ft Length : 12ff.Oo ft
Section S ize: 30 inch Section S ize: 30 inch Station ft
Project Title: S outh Hampton Subdivison
c :\projects\000\2882-south hampton\288211 ra .stm
06/10/98 0 4 :21 :47 PM
MUNICIPA L DEVELOPMENT GROUP
Haestad Methods, Inc . 37 Brookside Road Wate rbury, CT 06708 (203) 755-1666
Elevation ft
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-3 0 .00 0 .00 0 .00 0 .00 0.00 0.00 0 .00 0 .000 20.357 1.62 258.00
1-2 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .000 50.325 4 .00 258.00
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0.000 44.421 14.14 258.00
J-1 NIA NIA NIA NIA 0 .02 0 .02 0 .00 0.000 94.746 9 .65 258.00
J-2 NIA NIA NIA NIA 0 .21 0.21 0 .00 0 .000 115.103 11.72 258.00
J-3 NIA NIA NIA NIA 0 .39 0 .39 0 .00 0 .000 115.103 11 .72 258.00
Outlet NIA NIA NIA NIA 0 .41 0 .41 0 .00 0.000 NIA 11 .72 257.75
Project Title : South Hampton Subdivison
c :\projects\000\2882-south hampton\288211 ra.stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:22 :14 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim
Elevation
(ft)
258.02
257.41
258.00
258.00
258.00
258.00
257.75
Sump
Elevation
(ft)
252.00
253.00
255.75
252.53
251 .74
250.85
250.65
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream
Nooe Node (cfs) (ft) Slope Velocity Size (cfs) Invert
(%) (ft/s) Elevation
(ft)
P-7 1-3 J-2 20.357 6 .00 4 .3333 1.62 48inch 0 .013 299.001 252.00
P-6 1-2 J-1 50.325 4 .00 11.7500 4 .00 48inch 0 .013 492.358 253.00
P-1 1-1 J-1 44.421 14.00 1 .7857 14.14 24inch 0 .013 30.229 255.75
P-2 J-1 J-2 94.746 112.00 0 .7054 9 .65 30inch 0 .013 68.893 252.53
P-3 J-2 J-3 115.103 126.00 0 .7063 11 .72 30inch 0 .013 68.942 251 .74
P-4 J-3 Outlet 115.103 14.00 0 .7143 11 .72 30inch 0 .013 69.328 250.85
Project Title: South Hampton Subdivison
c :~rojects\000\2882-south hampton\288211 ra .stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:22 :32 PM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Downstream Upstream
Invert HGL
Elevation (ft)
(ft)
251 .74 256.65
252.53 258.00
255.50 258.54
251.74 258.14
250.85 256.33
250.75 253.53
Project Engineer : RM
StormCAD v1 .0
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #10 (AREA X)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .030
1.0000 %
4.000000 H: V
4.000000 H : V
7.993 cfs
0 .85 ft
2.91 ft 2
7 .03 ft
6 .82 ft
0.76 ft
0.018880 ft/ft
2 .75 ft/s
0.12 ft
0.97 ft
0 .74
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type : Open-Channel
06109198
04:21 :53 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
_J.!!?J~~!Descrip~t_io_n~~~~~~~~~~~~~~~~~~~
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimete r
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #10 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4 .000000 H : V
10 .774 cfs
0 .95 ft
3.64 ft2
7.86 ft
7.63 ft
0.85 ft
0 .018143 ft/ft
2.96 ft/s
0.14 ft
1.09 ft
0.76
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin : TxDOT R.O.W.
Discharges into Structure Type : Open-Channel
06109198
04:22:26 PM
Munici pal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SE CTION #5 -CULVERT FLOW
I.D. #10
Shape : I Circular
Material : I Concrete
Sp_an~ft
Rise : 1.50 ft
B arrel s : 1
Discharge Description
lOYR
100 YR
Q
total
(cfs)
7 .99
10 .77
*Backwater (B W = HW -TW -S-L)
C :\PROJECTS\000\2882 -S-l \2882T3RC . CL V
HW TW
elevation -elevation
(ft) (ft)
254.41 253 .05
255 .03 253 .15
Length(L): I 74 .ool ft
Slope(S): I 0 .00501
n : 0 .0120
Ke : 0 .50
Entrance Type : H eadwall I
BW* v Q Inlet Ctl Outlet Ctl
out ove r road HW depth HW depth
(ft) (ft) ( cfs) (ft) (ft)
0.99 5.78 0 .00 1.82 1.8 5
1.51 6 .09 0 .00 2.47 2 .37
6/ 9/98
SECTION#6
STORM INLETS FLOW CALCULATIONS
I
I
I
SECTION #6 -STORM INLET FLOW
l.D . #1 DRAINAGE AREA B
Collects Runoff from Drainage Basin : B
(10 YEAR)
8 .685 cfs
0.31 ft
(100 YEAR)
11.707 cfs
0.35 ft
CALCULATED
y = 0 .69 ft y = 0 .85 ft at L = 5 ft
y = 0 .62 ft y = 0 .75 ft at L = 6 ft
:::::::i'.i::m: :=::::m::m:=]P]~1 :::1:r::::tt :t : =:=:::==::::\\'tir::::::¥::a:::=::::::rn:::::::::::::::::::::::P:~~::]:::::::::ti:::::::::i::::::::::i:J:: 1::~u::g::F :::::]:::rn:::::::::::1[:::::::::::1::1 ]::]:::
y = 0 .44 ft y = 0.53 ft at L = 1 O ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
l.D . #2 DRA INAGE AREA E
Collects Runoff from Dra inage Basin : E
(10 YEAR) (100 YEAR)
0 10 = 10 .970
0 10(125%) = 13 .713
d 1o = 0.36
cf s
cf s
ft
0 100 = 14 .788 cfs
010 0(125%) =
d 100 =
18.485 cfs
0.40 ft
CALCULATED
y = 0 .94 ft y = 1.15 ft at L = 5 ft
y = 0 .83 ft y = 1.02 ft at L = 6 ft
;, :J y:e::: ::::: ::: :::9~~~J:::::::::~;:::::: :,:::.:.:::.:, ::·,\l.::::::::Y:@ ::= ][[::::::::=:=::-::;g~~]]llll:::::.:L::::r£::=·::::::::::::::::1~:iHii : :::=:: ::::::~::c::::::::Jf.,t::t
y= 0 .59 ft y= 0.72 ft atL= 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
Stonn inl et evaluation.xis
I
I
I
I
I
I
SECTION #6 -STORM INLET FLOW
l.D. #3 DRAINAGE AREA H
Collects Runoff from Drainage Basin : H
(10 YEAR) (100 YEAR)
0 10 = 13.407 cf s 0100 = 18 .073 cf s
010(1 25%) = 16 .759 cf s 0100(125 %) = 22 .591 cfs
d 10 = 0 .38 ft d100 = 0.43 ft
CALCULATED
y = 1.08 ft y = 1 .31 ft at L = 5 ft
y= 0 .95 ft y= 1 .16 ft atL= 6 ft
y= 0 .79 ft y= 0.96 ft atL= 8 ft
:: t v:#:: > ... :·::o~ea ··==·:::=n ·:::::=::::: : ti?::== :::::::y:g:r:r:::f:::::::=::::::o~$.a ::1:r:ff.]t::1Jr::::::r::::r::t=::~,mm:i:t:::rrrr:J.0J :t=:t:•t:==::rt
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
l.D . #5 DRAINAGE AREA T
Collects Runoff from Drainage Basin : T
(10 YEAR) (100 YEAR)
0 10 = 6.096 cf s 0100 = 8 .218 cf s
0 10(125 %) = 7 .620 cf s 0100 (125%) = 10 .273 cf s
d 10 = 0.29 ft d 100 = 0 .32 ft
CALCULATED
y= 0.64 ft y= 0 .78 ft atL= 5 ft
......... ·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.-....... ·.·.·.·.·.·.·.·.·.·.·:-:-:-:-:-:-:ft··-·.·-::;::::;;::::::::-:-:-:.·.-....... ·.·.·.·-:-:-:-·-·.·.············.·.·.·-·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.-.·.·.·.·.·.·. ··············.·-: ·······.-.·.·.·,·· ......... ·.·.•.·. ·.·.·.·.·.·.·.·· :¥rm :::::p;s.6 ::: , : :<.:::=:::t::::::y:m: :::=:::::::=:ms~: : :t.l :::::' .. }::::::: :=1!:=1;;::a:]ttt=l=']?:t .::::::~:::::::::
y = 0 .47 ft y = 0 .57 ft at L = 8 ft
y= 0.40 ft y= 0 .49 ft atL= 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
Stonn inl et eval uation.xls
I
I
I
I
I
I
I
I
I
SECTION #6 -STORM INLET FLOW
l.D . '#6 DRAINAGE AREA U
Collects Runoff from Drainage Basin : T+U+W+Z
(10 YEAR) (100 YEAR)
0 10 = 32 .597 cf s 0100 = 43 .940 cf s
0 10(125%) = 40 .746 cf s 0100(125 %) = 54.925 cf s
d 10 = 0 .50 ft d100 = 0.65 ft
CALCULATED
y = 1.95 ft y = 2 .38 ft at L = 5 ft
y = 1 . 72 ft y = 2 .10 ft at L = 6 ft
y=. 1 .42 ft y=. 1 .74 ft atL= 8 ft
::ttM § ::::::: tt::a ~2aw::::::mj ::: ::: ?'::':::;'' t·:::]: M! ::: :: :: :=tt 1~d : :;::J=:n= :: -::::::::1:1t:i:1=:1t:U:#. ::1rt::::11:10::1tIItfi II'
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
l.D. #7 DRAINAGE AREA X
Collects Runoff from Drainage Basin : X
(10 YEAR) (100 YEAR)
0 10 = 13 .832 cfs 0 100 = 36 .652 cfs
0 .44 ft d 100 = 0 .49 ft
CALCULATED
y = 0 .95 ft y = 1 .81 ft at L = 5 ft
y = 0 .84 ft y = 1 .61 ft at L = 6 ft
':·[:·y:§ r:r::=::me9. : tt.:o=:: .. :·. :: :=::::i ii : _,::::::.:::::::i;.~~:: ?::~:.::::::: := ,:::::::·::1~:=µ:a .:::u:::::::::~:::: JJfi :!?
y = 0 .60 ft y= 1 .14 ft atL= 10 ft
d = depth i n curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
Storm inl et evaluation. xi s
SECTION#7
EXISTING TxDOT CALCULATIONS
EA T FRONTAG RD.
Project Title: South Hampton Master Plan
c :\projects\00012882-south hampton\2882t2ra .stm
06111 /98 07:38:46 PM
STRUCTURE: TxDOT 2
(TxDOT 10 YR STORM)
STATE HWY NO. 6
8
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1-1
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
-------
0 +00 ~jmert : 244 . 79 ft
ert: 244 .50 ft
Length : 96 .00 ft
Section Size : 6 x 4 ft
Project Title: South Hampton Master Plan
c :lprojects\000\2882-south hampton\2882t2ra .stm
06111198 07:36:52 PM
1+00
------·-·-
1+50 On Invert~ 79 ft 2 +50 3+00
~ngth : 1 0 .00 ft ~fS i ze : 4 x 4 ft
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods , Inc. 37 Brookside Road Waterbu ry, CT 06708 (203) 755-1666
256 .00
-~54 .00
54-40 ft
: 250 .65 ft
252 .00
250 .00 Elevati on ft
248 .00
246 .00
244 .00
3 +50
Project Engineer: Rabon M etcalf
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet I Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area C CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 143.00 8 .94 254.40
J-1 NIA NIA NIA N/A 0.15 0 .15 0 .00 0 .00 143.00 10.48 255.00
J-2 NIA NIA N/A N/A 0 .43 0 .43 0 .00 0 .00 143.00 6 .29 251.50
Outlet NIA N/A N/A N/A 0 .69 0 .69 0 .00 0 .00 N/A 5.96 250.00
Project Title : South Hampton Master Plan
c :~rojects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
06111198 07:37:32 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 143.00 81 .00 0 .008025 8.94 4x4ft 0 .013 163.83 250.65 250.00 254.76
P-2 J-1 J-2 143.00 160.00 0.032563 9.71 4x4ft 0 .013 330.01 250.00 244.79 253.41
P-3 J-2 Outlet 143.00 96.00 0 .003021 6 .12 6x4ft O.Q13 170.26 244.79 244.50 248.58
Project Title : South Hampton Master Plan Project Engineer: Rabon Metcalf
c :\projects\00012882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11/98 07 :37 :53 PM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
EA T FRONTAG RD .
Project Title: South Hampton Master Plan
c:lprojects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07:40:22 PM
STRUCTURE : TxDOT 2
(TxDOT 50 YR STORM)
STATE HWY NO . 6
8
MUNICIPAL. DEVELOPMENT GROUP
Haestad M ethods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1-1
WE T FRONTA E RD .
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0 +00 lJp Jrwert : 244 .79 ft
DtfffWtert : 244 .50 ft
Length : 96.00 ft
Section S ize: 6 x 4 ft
P roject Title : South Hampton Master Plan
c :\projects\000\2882-south hampton\288212ra .stm
06/11/98 07 :4 1 :12PM
1+00 1+50
. .
On lnvert:j;MJb 79 ft
_i ength : 1 G"o .oo ft
~MifS i z e: 4 x 4 ft
2+50
MUNICIPAL D EVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 {203) 755-1666
im :
um
256 .00
_f!54 .00
54.40 ft
: 250 .65 ft
252 .00
250.00 Elevati on ft
248 .00
246 .00
244 .00
3 +50
Project Engineer: R abon Metc alf
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Rim Sump
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
(ac res) (acres) (min) Time Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (min) (cfs)
1-1 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 190.00 11 .88 254.40 254.40 250.65
J-1 NIA NIA NIA NIA 0 .11 0 .11 0 .00 0 .00 190.00 11 .88 255.00 255.00 250.00
J-2 NIA NIA NIA NIA 0 .34 0 .34 0 .00 0 .00 190.00 7 .92 251 .50 251 .50 244.79
Outlet NIA NIA NIA NIA 0 .54 0 .54 0 .00 0 .00 NIA 7 .92 250.00 250.00 244.50
Project Title : South Hampton Master Plan Project Engineer: Rabon Metcalf
c :lprojects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06111 198 07 :41 :32 PM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 190.00 81 .00 0 .008025 11 .88 4x4ft 0 .013 163.83 250.65 250.00 255.87
P-2 J-1 J-2 190.00 160.00 0 .032563 11 .88 4x4ft 0 .013 330.01 250.00 244.79 254.00
P -3 J-2 Outlet 190.00 96.00 0 .003021 7 .92 6x4ft O.Q13 170.26 244.79 244.50 248.86
Project Title : South Hampton Master Plan Project Engineer : Rabon Metcalf
c :\projects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11/98 07:41 :55 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
EA T FRONTAG RD.
8
Project Title : South Hampton Master Plan
c :lprojects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07:42 :47 PM
STRUCTURE: TxDOT 2
(TxDOT 100 YR STORM)
STATE HWY NO. 6
8
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1-1
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0 +00 l.JD. lolfert: 244 .79 ft
o+iffWrert: 244 .50 ft
Length : 96 .00 ft
Secti on S ize : 6 x 4 ft
Project Title : South Hampton M aster Plan
c :\projects\00012882-south hampton\2882t2ra.stm
06/11198 07:43:25 PM
1+00 1+50
P ipe : P -2
Dn Invert~ 7 9 ft
_l.ength : 160 .00 ft
~-... fS ize : 4 x 4 ft
2+50
MUNICIPAL flEVELOPMENT GROUP
3+00
Haestad Methods. Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im :
um
256 .00
-~54 .00
54.40 ft
: 250 .65 ft
2 52 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3 +50
Project Eng ineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-1 0.00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 0 .00 196.00 12.25 254.40
J-1 NIA NIA NIA NIA 0 .11 0 .11 0 .00 0 .00 196.00 12.25 255.00
J-2 NIA NIA NIA NIA 0 .33 0 .33 0 .00 0 .00 196.00 8 .17 251.50
Outlet NIA NIA NIA NIA 0 .52 0 .52 0 .00 0 .00 NIA 8 .17 250.00
Project Title : South Hampton Master Plan
c :lprojects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
06111198 07 :43:46 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 196.00 81 .00 0 .008025 12.25 4x4ft 0 .013 163.83 250.65 250.00 255.93
P-2 J-1 J-2 196.00 160.00 0 .032563 12.25 4x4ft 0 .013 330.01 250.00 244.79 254 .00
P-3 J-2 Outlet 196.00 96.00 0 .003021 8 .17 6x4ft 0 .013 170.26 244.79 244.50 248.88
Project Title: South Hampton Master Plan Project Engineer: Rabon Metcalf
c :\projects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11/98 07 :44:09 PM Haestad Methods , Inc. 37 Brookside Road Waterbury , CT 06708 (203) 755-1666 Page 1of1
EA T FRONTAG RD.
let
Project Title: South Hampton Master Plan
c :\projects\000\2882-south hampton\2882t2ra .stm
06/11/98 07 :45:17 PM
STRUCTURE: TxDOT 2
POST DEVELOPMENT 10 YR STORM)
STATE HWY NO. 6
8
MUNIC IPAL D E V ELOPM E N "T G ROUP
H aestad M ethods, Inc . 37 Brook side R o ad W ater b ury, CT 06708 (203) 755-1666
-
1-1
8
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
.----------.------------· -----
0 +00 lJp Invert: 244 .79 ft
[)tiffWtert: 244 .50 ft
Length : 96 .00 ft
Section S ize : 6 x 4 ft
1+00
--,----------r-----·
1+50
Pipe : P-2
. .
On lnvert:jM)b 7 9 ft
.i.ength : Hi0.00 ft ~lff16n tS ize : 4 x 4 ft
2 +50
MUNICIPAL D E V E LOPMENT G ROUP
3+00
Project Title: South Hampton Master Plan
c :\projects\000\2882-south hampton\2882t2ra .stm
06/11/98 07:45:51 PM H aestad M ethods, Inc. 37 Brooks ide R o ad Waterbury, CT 0 6 708 (203) 755-1666
im :
um
256 .00
_-f254 .00
54.40 ft
: 250 .65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3 +50
Project Engineer: Rabon Metcalf
StormC AD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Rim Sump
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 168.79 10.55 254.40 254.40 250.65
J-1 NIA NIA NIA NIA 0 .13 0 .13 0 .00 0 .00 168.79 11 .07 255.00 255.00 250.00
J-2 NIA NI A NIA N/A 0.37 0 .37 0 .00 0 .00 168.79 7 .32 251 .50 251 .50 244.79
Outlet NIA N/A NIA N/A 0 .60 0 .60 0 .00 0 .00 N/A 7 .03 250.00 250.00 244.50
Project Title : South Hampton Master Plan Project Engineer: Rabon Metcalf
c :\projects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06111198 07 :46 :15 PM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(Mt) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 168.79 81 .00 0.008025 10.55 4x4ft 0 .013 163.83 250.65 250.00 255.45
P-2 J-1 J-2 168.79 160.00 0 .032563 10.81 4x4ft 0 .013 330.01 250.00 244.79 253.81
P-3 J-2 Outlet 168.79 96.00 0 .003021 7 .18 6x4ft O.Q13 170.26 244 .79 244.50 248.63
Project Title : South Hampton Master Plan
c :lprojects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
06/11/98 07 :46 :33 PM Haestad Methods, Inc. 37 Brookside Road Waterbury , CT 06708 (203) 755-1666
Project Engineer: Rabon Metcal f
StormCAD v1 .0
Page 1 of 1
EA T FRONTAG RD.
8
Project Title: South Hampton Master Plan
c :lprojects\000\2882-south hampton\2882t2ra.stm
06/11198 07:47:22 PM
STRUCTURE : TxDOT2
POST DEVELOPMENT 50 YR STORM)
STATE HWY NO. 6
8
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
1-1
fi
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0 +00 l.Jp lm'ert: 244 .7 9 ft
[)fifffftert: 244 .50 ft
Length : 96 .00 ft
Section Size : 6 x 4 ft
P roject Title: South Hampton Master Plan
c :\projects\000\2882-south hampton\2882t2ra.stm
06/11/98 07 :47 :37 PM
1+00 1+50
Pipe : P -2
Dn Invert :~ 79 ft
1-en.Qth : 160.00 ft ~--. JS ize : 4 x 4 ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im :
um
256 .00
-~54 .00
54.40 ft
: 250 .65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3 +50
Project Engineer: R abon Metcalf
StormCA D v 1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Rim Sump
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 218.77 13.67 254.40 254.40 250 .65
J-1 N/A N/A NIA N/A 0 .10 0 .10 0 .00 0 .00 218.77 13.67 255.00 255.00 250.00
J-2 N/A N/A N/A N/A 0 .29 0.29 0 .00 0 .00 218.77 9 .12 251 .50 251 .50 244.79
Outlet N/A N/A N/A N/A 0 .47 0 .47 0 .00 0 .00 N/A 9 .1 2 250.00 250.00 244.50
Project Title : South Hampton Master Plan Project Engineer: Rabon Metcalf
c:lprojects\00012882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11/98 07:47 :57 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe Report
Pipe Upstream I Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Nod e
1
Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ftfs) Elevation Elevation (ft)
; (ft) (ft)
P-1 1-~ I~:: 218.77 81 .00 0 .008025 13.67 4x4ft 0 .013 163.83 250.65 250.00 256.16
P-2 J-1 218.77 160.00 0 .032563 13.67 4x4ft O.D13 330.01 250.00 244.79 254 .00
P-3 J -2 Outlet 218.77 96.00 0 .003021 9 .12 6x4ft 0 .013 170.26 244.79 244.50 248.98
Project Title : South Hampton Master Plan Project Engineer : Rabon Metcalf
c :\projects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11 /98 07 :48:13 PM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
EA T FRONTAG RD.
Project Title: South Hampton Master Plan
c :lprojects\000\2882-south hampton\2882t2ra .s tm
06/11/98 07:48:38 PM
STRUCTURE : TxDOT 2
POST DEVELOPMENT 100 YR ST• RM)
STATE HWY NO. 6
8
MUNIC IPAL DEVE LOPM E NT G ROUP
Haestad Methods , Inc . 37 B rooksid e R oad Waterbury, CT 06708 (203) 755-1666
1-1
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0 +00 lJp Uulert: 244 .79 ft
otifffftert: 244 .50 ft
Length : 96 .00 ft
Secti on S ize : 6 x 4 ft
Project Title: South Hampton Master Plan
c:lprojects\00012882-south hamptonl2882t2ra.stm
06/11198 07:49:24 PM
1+00 1+50 Dn Invert~ 79 ft
.L..ength : 1 So.co ft ~~~ize : 4 x 4 ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
256 .00
-~54 .00
54 .40 ft
: 250 .65 ft
252 .00
250 .00 Elevation ft
248.00
246 .00
244 .00
3+50
Project Engineer: Rabon Metca lf
StormC A D v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge
Area c CA TC Flow Flow Intensity Watershed (cfs)
(acres) (acres) (min) Time Time (in/hr) (CIA)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 228.42
J-1 NIA NIA NIA NIA 0 .09 0 .09 0 .00 0 .00 228.42
J-2 NIA NIA NIA NIA 0 .28 0 .28 0 .00 0 .00 228.42
Outlet NIA NIA NIA NIA 0.45 0 .45 0 .00 0 .00 NIA
Project Title : South Hampton Master Plan
c :\projects\00012882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
ity Veloc
(ft/ s)
4 .28
4 .28
9 .52
9 .52
Ground
Elevation
(ft)
254.40
255.00
251 .50
250.00
06111198 07 :49:52 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
-
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Project Engineer : Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
I (ft) (ft)
P-1 !-1 J -1 228.42 81 .00 0 .008025 14.28 4x4ft 0.013 163.83 250.65 250.00 256.26
P-2 J-1 J-2 228.42 160.00 0 .032563 14.28 4x4ft 0 .013 330.01 250.00 244.79 254.00
P-3 J-2 Outlet 228.42 96.00 0 .003021 9 .52 6x4ft 0 .013 170.26 244.79 244.50 249.02
Project Title : South Hampton Master Plan Project Engineer : Rabon Metcalf
c:lprojects\000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11 /98 07 :50 :10 PM Haestad Methods , Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
SECTION #7 -EXISTING TxDOT CALCULATIONS
TxDOT#l: (CAPACITY)
PER TxDOT DRAINAGE AREA MAP:
O po) =
0 (50) =
0 (100) =
100 cfs
130 cfs
136 cfs
POST DEVELOPMENT RUNOFF:
Drainage Area 0 (10) 0(50)
D 15.541 20.064
E 10.970 14 .163
F 13 .634 17 .603
G 16 .535 21 .425
!-{ 26.814 34 .619
I 14.365 18.589
TOTAL: 71.348 92.236
OK: Q(TxDOT) > Q(POST)
2882-025 Existing TxDOT Structures.xis
0(100).
20.949
14.788
18 .379
22.355
36.145
19.399
96 .278
TxDOT #2: (CAP A CITY)
PER TxDOT DRAINAGE AREA MAP :
0(10) =
0(50) =
0(100) =
143 cfs
190 cfs
196 cfs
POST DEVELOPMENT RUNOFF :
Drainage Area 0(10) 0(50)
J 46.063 60 .211
K 9 .599 12 .393
L 27.412 35.391
M 22.982 29.672
s 20.035 25.978
T 6.096 7.871
u 13 .399 17.299
v 6 .617 8.543
y 16 .586 21 .413
0(100)
62 .885
12 .939
36 .951
30.980
27 .104
8.218
18.062
8.919
22 .357
TOTAL: 168 .789 218 .771 228 .415
NOT OK: Q(TxDOT) < Q(POST)
SEE FOLLOWING CALCULATIONS FOR
ACTUAL CAPACITY OF TxDOT STRUCTURE
TxDOT#2STRUCTURE
SUMMARY TABLE
Depth
Runoff Exit of
Year Q Velocity Ponding
cfs ft/sec ft
EXISTING TxDOT CONDITIONS
10 143 5.96 0.36
50 190 7.92 1.47
100 196 8.17 1.53
POST-DEVELOPMENT CONDITIONS
10 168.789 7.03 1.05
50 218.771 9.12 1.76
100 228 .415 9.52 1.87
OK: PONDING(ALLOW) > PONDING(REQD)
NOTE : TxDOT BERM IN DOWNSTREAM
DITCH OF INLET STRUCTURE WILL ALLOW
A PONDING DEPTH EQUAL TO 2.60 ft .
SECTION#8
STANDARD DETAILS
- -
6"
15"
·1 .. •
"
" . 4 ·.o • • . . . . ;. -. . . . "'
" . . . #4 BAR LONGITUDINAL .· ~ •· ..
t'l ·. · • /.(TYPICAL) · · u · . " . .i -.· :•--· • .------
~,...._.,.-_ -~-. • <! .: . : • • " • . .; • • " • <!. .
-· 3 t:I .·· " .. •· 4., . ·. . . . .
24" 3"
GUTTER DRAIN
TYPICAL CURB &: GUTTER SECTIONS
N.T .S.
::::.:
<( a:
aJ rn rn
lD
(""\j
c: ro -:>
c:
0 :::;:
c
0 .......
+-' u
QJ
UJI
+-'
QJ
QJ
'-+-'
UJI
rn
rrJI
+-' c
QJ
E
QJ
> ro
0.. -UJ
LJ
0
LJ -UJ
_J
1--i
<(
f-w
Cl -en
+-' u
QJ
0
'-0.. -LJ
GRADE EXISTING
GROUND TO STREET
1·-0· -1-+--l 2·-0·
NOTE: FlNISH CROWN SHAU. BE
1• ABOVE T/C.
39'-0"
1 1/2" HW.C
T'8C" SJRE'.ET SECDQN
(39' STREET SECTION)
PROPOSED 6' WIDE CONCRETE
SIDEWALK (BOTH SIDES)
SEE DETAIL
CONCRETE CURB & CUTTER
SEE DETAIL
CIJ m
01 ........
lD ru
c co
J
c
0
::E:
co
(_ ........
D
lD
(T)
CIJ ru -c
0
.µ
a.
E co :r:
.c .µ
::::l
0
Cf)
I ru
CIJ
CIJ ru -0
0
0 -(/)
.µ
u
Q)
0
(_
0... -u
GRADE EXISTING
GROUND TO STREET
1·-o·-~i-..-1 2·-0·
8" COMPACTED SUBCRADE
NOTE : FINISH CROWN SHALL BE
SAME ELEVATION AS T/C.
28'-0"
1 1/2" HMAC
TmCAl. STREET SECTION
(28' STREET SECTION)
CONCRETE CURB & CUTTER
SEE DETAIL
I
3"
3'-0"
18"
...
. 4 •
. q
'"1 . . "'
.. 4 .. • d . ~. 4
4 '!' .. 4 ··
•. --+-
• •• q ..•••
. . "'· d q .
. 4 . •4 . "1 4 .
#4 BARS @ 18" O.C.
TYPICAL CONCRETE VALLEY GUTIER
(CROSS-SECTION)
CD
01
01
ru ru
tD ru
c: co
~
c:
0
::E:
co
(_ -"O
tD en
CD ru -c
0
+-'
0..
E co :::c
.c
+-'
::J
0
Cf)
I ru
CD
CD ru -0
0
0 -en
+-' u
Cll
0
(_
0.. -u
LIN E OF NORMAL
CURB & GUTIER \
~f )
#4 BARS 0 18" O.C.
/13 BARS 0 18" 0 .C.
LAP 6" (MIN )
5 •
/14 BAR, 1
.
<.O
I I ,-_J 7'-0 "
\_ BL OCK OUT FOR
EXTENSION WHERE
REQUIRED
f4 BARS 0 12 "
O.C.E.W. (ALL SIDES )
PROFJLE VIEW
.
<.O
RIN G & COVER
•.
(/) w
~
#4 BARS @ 12" O.C.E.W.
2'-6"
TYPICAL RECES$ED CURB INLET
N.T.S.
5 '-0" (MIN)
11 '-o· (MIN)
PLAN VIEW
0
I
i-.
COVER
0
I
"N
:::::;:
<(
0:
CD
01
01 .....,
C> ru
tD ru
c co
-::i
c
0 ::a:
co
'-
"Cl
tD
(T)
CD ru -c
0
+-'
Cl.
E co :c
.c
+-'
:::J
0
CJ)
I ru
CD rn ru -0
0
0 -U)
+-' u
(lJ
0
'-Cl.. -LJ
TOP OF CURB
.
I')
I 6 " •
INLET THR OAT
4 .00%
VARIE S
PROFILE VIEW
<D
#4 BAR S @
.• d
CONNECT TO
lYPI CAL RE CESSED
CURB INLET
2'-6"
PLAN VIEW
CURB INLET EXTENSION
N .T.S .
co
01
01 ........
0 ru
lD
(\J
c
IO
-:i
c
0
:::?:
IO
(_ ........
"O
lD
r'1
CD ru -c
0
_µ
Q_
E
IO :r:
.c
_µ
:::J
0
UJ
I ru
CD
CD ru -0
0
0 -UJ
_µ
u
Q)
·~
0
(_
a_ -u
FL OF
DITCH
+
0
0
<.D
I
6"
H
GRADE, SIZE
& TYPE AS
~---++-_._.~.._..--sHOWN ON -
PLANS
4'-0"
ELEVATION VIEW
I
I
I
I
I
I
I N I .--
~ -+-
I o
I o
I
I
I
I
I
I
GRADE, SIZE
& TYPE AS
SHOWN ON
PLANS
PLAN VIEW
CONCRETE HEADWALL w /WINGWALLS
0
(3o· FLARE)
EASEMENT WIDTH VARIES
(20' MIN.)
EXISTING GROUND
PROPOSED GRADE
,,---.....
x
~ -.-----~~~~~~-~------------
CONCRETE PILOT CHANNEL
SEE DETAIL, THIS SHEET
STANDARD OPEN CHANNEL
(CROSS-SECTION)
-- - --
PROPOSED GRADE VAIR ES
(SEEDED) .5' 1 .5'
CONCRETE PILOT CHANNEL
(NTS)
L -~
, BRAZOS COUNTY ,~
MU NICIPAL DEVELOPME T GROCP
i I ~'j I •I 2551 TEXAS AVENliE . SOGTH , STE . A
• !. ~ _ _ COLLEGE STATION , TEXAS 77840
I ~~ Ph: (409)693-5359 Fx : (409) 693-4243 !
y-,:;; 11 '1 \ . )
'· d /. \ Consulting Engineers · Environmental· Surveyors· Planners)
·.
J
I
TABLE OF CONTENTS
DRAINAGE REPORT
PROJECT SlJMMAR Y ................................................................................................ 3
DRAINAGE AREA DESCRIPTIONS .......................................................................... 3
DESIGN CO NSTRAITS ............................................................................................... 4
DRAINAGE CALCULATIONS ................................................................................... 5
RESULTS ..................................................................................................................... 6
CONCLUSIONS ......................................................................................................... 10
ATTACHMENTS
SECTION #1 -DRAINAGE & PHASE STRUCTURE MAPS
SECTION #2 -DRAINAGE AREAS EVALUATION
SECTION #3 -CURB & GUTTER FLOW CALCUATIONS
SECTION #4 -CHANNEL FLOW CALCULATIONS
SECTION #5 -CUL VERT FLOW CALCULATI ONS
SECTION #6 -STORM INLETS FLOW CALCULATIONS
SECTION #7 -EXISTING TxDOT CALCULATIONS
SECTION #8-STANDARD DETAILS
Drainage Report - 2
I
I
PROJECT SUMMARY
Thi s report outlines the master drainage plan for the South Hampton, Phase One thru
Seven, 52 .14 acre development. The subject development site is situated on the west side
of State Highway No. 6 approximately 1.5 miles south of the State Highway No . 6 and
Green s Prairie Road intersection .
The site is currently vacant with heavy timber and native grasses and weeds . The natural
drainage of the site is generally to the northeast of the development site to a ditch in
TxDOT right-of-way. Thence , 1,400 linear feet to an existing TxDOT box culvert that is
a part of the confluence of Alum Creek. This site is in the secondary drainage system of
the Alum Creek primary system .
The drainage calculations are presented in six basic sections :
I. Drainage Areas Maps -General drainage area maps .
II. Drainage Areas Evaluation -Calculations for the amount of runoff for each
drainage area with post-development cond itions of the development site .
III. Curb & Gutter Flow Calculations -Calculations for the depth, velocit y and other
conditions in the residential streets .
IV. Channel Flow Calculations -Calculations for the depth, velocity and othe r
conditions in the proposed drainage channels .
V . Cul v ert Flow Calculations -Calculations for the size requirements, velocity and
other conditions in the proposed drainage structures .
VI. Storm Inlet Flow Calculations -Calculations for the size requirements and other
conditions in the proposed drainage inlets .
VII. E xi sting TxDOT Calculations -Calculations to verify that the exist ing TxDOT
structures can pass the post-development discharge .
VIII. Standard details -Standard details for proposed drainage structures .
Drainage Report -3
I
I
DRAINAGE AREA DESCRIPTIONS
There will be several minor drainage areas considered for the evaluation of this site .
Each drainage area shall be evaluated for the selected rainfall events. From the
calculated runoff volumes , adequate ditch channels, curb sections and drainage structures
will be sized .
DESIGN CONSTRAINTS
L Street Curb & Gutter Flow Constraints -The proposed residential streets will be
designed in accordance with the Stormwater Management Plan for the City of
College Station . Velocities shall be maintained from a maximum of 10 feet per
second to a minimum velocity at 0.4%. The runoff for residential streets shall be
contained within the curb for the 10-year rainfall event and within the public
right-of-way for the 100-year rainfall event . The runoff for collector streets ,shall
be contained within the curb for the 10-year rainfall event with a 12 foot clear
traffic lane and , within the public right-of-way for the 100-year rainfall event. All
proposed residential streets will have a 28 ' back-to-back curb & gutter section
within a 50 ' right-of-way . All proposed collector streets will have a 39 ' back-to-
back curb & gutter section with sidewalks within a 60 ' right-of-way .
II. Channel Flow Constraints -The proposed open channels will be designed m
accordance with the Stormwater Management Plan for the City of College
Station. Channel capacities shall contain the 25-year rainfall event. Pending on
the maximum velocity in the channel, the surface of the proposed channel shall be
as shown on Table VII-2 , page 60 of the Drainage Policy and Design Standards.
These velocities will be the maximum allowed during the 25-year rainfall event.
A minimum velocity of 2 .5 ft/sec shall be maintained in all the open channels .
Channels shall be designed to have a freeboard of 0.2 times the depth of the
channel or a minimum of 0 .5 feet in depth during the 100-year rainfall event. The
100-year rainfall event shall be contained within the drainage easement.
Minimum drainage easement widths will be 20' for all side and back drainage
Drainag~ Re port - 4
I
I
I
I
I
I
I
III.
IV.
channels . The main drainage channel between Phase One and Phase Five shall
have a easement width of the design storm top width, plus 5' and 15 '. All
drainage easements prohibit the following : The construction of fences through or
along the easement ; placing of structures within the easement; the alteration of
shape ; configuration of surface treatment of the open channel. All improved
drainage channels shall be constructed with a concrete pilot channel , sized to
carry 1/3 of the 5-year rainfall event.
Culvert Flow Constraints -The proposed culverts will be designed in accordance
with the Stormwater Management Plan for the City of College Station . Culverts
that are on residential streets and in the secondary drainage system shall have a
capacity that will pass the 10-year rainfall event. All other culverts that are on
collector streets or larger shall have a capacity that will pass the 25-year rainfall
event. The maximum depth that the upstream end of the culvert can be
surcharged is one-foot below the proposed top-of-curb elevation . Culverts will
have a tailwater elevation equal to the water surface elevation of the ch~nnel
immediately downstream of the culvert . The tailwater will correspond with the
channel's elevation for the 10-year, 25-year or 100-year rainfall event. Maximum
discharge velocities will be as stated on page 65 of the Drainage Policy and
Design Standards . Also , each proposed culvert will be analyzed to ensure
adequate means of passing the 100-year rainfall event without exceed the policies
for discharge carryover for a residential street . Carryover velocities shall be at a
maximum of 6 .0 ft/sec and not have a depth of more than 2 feet.
Storm Inlet Flow Constraints
The proposed storm drain inlets will be designed in accordance with the
Stormwater Management Plan for the City of College Station . Inlets will be sized
to have a capacity for the 10-year rainfall event with a minimum opening width of
5 '. Inlets at culvert structures shall be oversized to accommodate 125% of the
design storm for the roadway . Inlets at low points in the proposed street will be
sized to restrict ponding at the inlet to a maximum of 18 " up to the 100-year
rainfall event.
Drainage Re port - 5
I
I
I
I
I
DRAINAGE CALCULATIONS
The drainage area calculations are summarized accordingly using the Rational Method :
(Q=CIA) where "Q" is the runoff in cubic feet/second , "C" is the runoff coefficient, 'T ' is
the storm intensity in inches/hour for each selected frequency, and "A" is the drainage
area in acres . A minimum 10-minute time of concentration for all calculations w ill be
assumed . The selected frequencies will be 2, 5, 10 , 25 , 50 , 100-year rainfall events .
The curb inlet flow calculations are summarized accordingly using the Modified
M annings Formula: (Q=3 .0Ly312) where "Q" is the runoff in cubic feet/second, "L" is the
length of the curb opening in feet and "y" is the head on the curb opening during weir
flow in feet .
Channel and curb & gutter flow calculations were computed using Mannings Formula,
aided by the program FlowMaster v5 .07 . Culvert flow calculations were computed ~sing
Manning 's Formula aided by the program Texas Hydraulics System Design vl.O by
TxDOT .
RESULTS
In Section # 1, "Drainage & Phase Structure Maps", is the mapping of the pnmary
drainage system up stream of State Highway No . 6 . This portion of the primary drainage
ba sin consist of 1,395 acres . The Nantucket Lake serves as a detention facilit y for this
drainage area. No on-site detention will be necessary since the South Hampton site runoff
discharges into the primary system downstream of Nantucket Lake. With this scenario ,
the South Hampton site peak runoff will have already passed before the drainage basin 's
peak discharge, at the point of discharge .
From the drainage calculations, the following results were determined :
Drainage Report -6
CURB & GUTTER FLOW RESULTS MINIMUM B/B (10 YEAR) CHANNEL STREET ID DRAINAGE SLOPE WIDTH DISCHARGE VELOCITY CURB DEPTH NO. AREA (%) (ft) (cfs) (fUsec) (ft) I 1 B 1.00 28 8.685 3.25 0.31 2 E 1.00 28 10.970 4.10 0.45 3* E 0.50 39 10.970 2.92 0.44 4 F 1.00 28 13.634 4.33 0.48 5* F 0.80 39 13.634 3.67 0.44 6 H 1.60 39 26.814 4.75 0.38 I 7 M 1.40 39 22.982 4.34 0.37 8 M 1.60 39 22.982 4.56 0.36 9 p 1.75 39 37.553 5.34 0.43 10 T 1.00 28 6.096 3.54 0.36 11 T 1.60 39 6.096 3.89 0.29 12 u 2.00 28 13.399 5.59 0.42 13 y 2.00 28 16.856 5.92 0.46 14 u 3.00 28 13.399 6.50 0.39 I 15 y 3.00 28 16.856 6.89 0.43 16 u 0.60 39 13.399 3.28 0.46 17 y 0.60 39 16.856 3.48 0.51 I 18 z 1.00 28 4.670 3.31 0.32 19 x 1.00 28 7.993 3.79 0.40 20 w 1.00 28 19.198 4.71 0.55 21 x 1.00 39 7.993 3.49 0.35 .; I 22 w 1.00 39 36.652 5.11 0.61 I 23 z 1.00 39 4.670 3.05 0.28 I I Drainage Report -7 I
I
I
I
I
I
I
I
I
I
I
CURB & GUTTER FLOW RESULTS
MINIMUM BIB (100 YEAR)
CHANNEL STREET
ID DRAINAGE SLOPE WIDTH OISCHARG CURB DEPTH .O.W. WIOT
NO . AREA (%) (ft) (cfs) (ft) (ft)
B 1.00 28 11 .707 0 .35 50
2 E 1.00 28 14.788 0 .50 50
3 E 0.50 39 14.7 88 0 .50 60
4 F 1.00 28 18.379 .· o.54 50
5 F 0 .80 39 18.379 0 .49 60
6 H 1.60 39 36.145 0.43 60
7 M 1.40 39 30.980 0.42 60
8 M 1.60 39 30.980 0 .41 60
9 p 1.75 39 50.621 0 .48 60
10 T 1.00 28 8 .218 0.40 50
11 T 1.60 39 8 .218 0 .32 60
12 u 2 .00 28 18.062 0.47 50
13 2 ,00 22.357 0;51 H 50
14 3.00 18.062 0 .44 50
15 y 3.00 28 22.357 0.47 50
J6 u. 0.60 :39 18.062 •0 .52 . 60
17 y 0 .60 39 22.357 0 .56 '' 60
18 z 1.00 28 6.295 0 .36 50
19 x 1.00 28 10.774 0 .44 50
20 w 1.00 28 -. :" 25.878 0:61 '' 50
21 x 1.00 39 10.774 0 .39 60
22 w f ob 39 . 36.652 . 0,6 1' 60
23 z 1.00 39 6 .295 0 .32 60
All the proposed residential streets were designed for the 10-year and 100-year rainfall
event. As shown abo ve, the streets have the capacity to carry the 10-year rainfall event
w ithin the curb & gutter section of the street. Also , most of the proposed street's curb &
gutter cross-sections will carry the 100-year rainfall event and all within the 50 ' right-of-
way. Items denoted by "*" are designed to accommodate a 12 ' traffic lane during the 10-
y ear rainfall event. The shaded portions of the abo v e table displays the streets where the
100-year rainfall event is not carried within the curb & gutter but within the provided
r ight-of-way . Drainage areas with two parts reflect that the street has a grade change .
These areas are clarified on the Drainage Pattern M ap .
Drain age Report - 8
I
-J e:. \...\S\ ~&w -r~
~ t:.~ C. \Cz \f r-z '--oc:... -t..-Y '"t
(\A4-f'.S6'S°~U... S lo PC 6N
0~N -r~ ~ -6"°b \-+/s
CHANNEL FLOW RES UL TS
(l~~~G:(C MINIMUM (25 YEAR)
( 0~'=7~-V<..'\~ CHANNEL
ID DRAINAGE SLOPE DISCHARG VELOCITY
NO . AREA (%) (cfs) (ft/sec)
1 c 0 .75 26.425 3 .33
2 D 1 .00 17.749 3 .36
3 G 1 .10 49.197 4 .49
4* I 1.50 96 .248 5 .96
6 L 1.00 52.935 3.21
7 L 1 .00 84 .243 3 .38
8 L 1 .00 84.243 3.47
10 Q 1 .75 8.486 3 .44
11 s 2 .20 22.932 4 .81
12 v 1.30 37.452 4.46
13 x 1.00 9 .128 2.61
CHANNEL FLOW RESULTS
MINIMUM (1 00 YEAR)
CHANNEL
ID DRAINAGE SLOPE DISCHARGE TOTAL DEPTH
NO . AREA (%) (cfs) (ft)
1 c 0.75 32.996 2 .03
2 D 1 .00 20.950 1 .72
3 G 1.10 58.092 1 .76
4* I 1.50 113 .636 2.14
6 L 1.00 52.935 1'.81
7 L 1.00 99.836 1 .20
8 L 1.00 99 .836 1 .10
10 Q 1 .75 10.017 1 .34
11 s 2 .20 27.104 1 .16
12 v 1.30 44 .421 1 .54
13 x 1.00 10.774 1.49
CHANNEL FLOW RES UL TS
~-'V1· #=-}) ~
Ct.'-?= ( 0~
I
IDE SLOPE
(ft/ft)
4 to 1
4 to 1
4 to 1
4 to 1
NIA
25 to 1
26 to 1
4 to 1
4 to 1
4 to 1
4 to 1
EASEMENT
(ft)
20
20
20 .•
20
80
80
90
20
20
20
20
MINIMUM PILOT CHANNEL
CHANNEL 1/3 (5 yr)
ID DRAINAGE SLOPE DISCHARGE REQUIRED PROVIDED
NO. AREA (%) (cfs) (ft) (ft)
1 c 0.75 7.242 5 .07 5
2 D 1.00 4 .615 4 .06 4
3 G 1 .10 12.726 5 .83 6
4* I 1 .50 24.980 7 .08 7
6 L 1 .00 N/A NIA NIA
7 L 1 .00 21 .615 7.24 7
8 L 1.00 21 .615 7.24 7
10 Q 1.75 2 .205 2 .77 3
11 s 2.20 5 .919 3 .84 4
12 v 1 .30 9 .694 5.10 5
13 x 1.00 2 .374 3.30 3 .5
Drainage Report - 9
I
I
The proposed open-channel drainage ditches will be triangular in shape with 4 : 1 side
slopes. For each drainage area, the corresponding total depth for the channel is shown
above . In this total depth, a 0.5' freeboard is included . Velocities are maintained below
4 .5 ft/sec , which will require all proposed channel to a have a minimum of seeded grass
surfaces . Items denoted by "*" exceed a 4.5 ft/sec velocity and shall be sodded channel
surfaces. The shaded portion of the above table displays the flows and conditions in the
existing drainage creek.
CULVERT FLOW RESULTS (10-YEAR}
APPROX. HEADWATER
CULVERT NO . TAILWATER DISCHARGE DISTANCE
ID DRAINAGE SLOPE BARRELS DIAMETER DISCHARGE DEPTH VELOCITY FROM TIC
NO . AREA (%) (Each) (in) (cfs) (ft) (ft/sec ) (ft)
1 D 0.51 1 30 26.510 1.27 2 .20 1.72
2 F 0.40 1 21 13.634 0 .99 5.67 NIA
3 H 0.51 1 36 43.050 1.77 2.43 1.65
5 M 0.51 1 18 9 .600 1.34 5.43 NIA
6 p 0.51 1 30 44.982 1.86 2 .55 1.27
7 R 1.00 1 18 10.236 0 .94 5.79 N/A
8 T 0.50 1 27 26 .131 1 .33 2 .12 1.3
9 v 0.70 2 30 83.120 2 .64 2 .62 1.32
10 x 1.00 18 7 .993 0.85 5.78 N/A
CUL VERT FLOW RESULTS (100-YEAR}
CARRY-OVER
ID DRAINAGE FLOW VELOCITY DEPTH
NO . AREA (cfs) (ft/sec) (ft)
1 D 0.000 0 .00 0 .00
2 F 0 .000 0 .00 0 .00
3 H 0 .000 0 .00 0.00
5 N 0 .000 0 .00 0 .00
6 p 2 .890 NIL NIL
7 R 2 .320 NIL NIL
8 T 0 .000 0 .00 0 .00
9 v 0 .000 N IL NIL
10 x 0 .000 0 .00 0 .00
The proposed culverts have been analyzed during the 10-year and 100-year rainfall event.
Since these are residential streets and not within the primary drainage system, the 10-year
design is acceptable . Since the proposed culverts w ill be discharged into a channel that is
Drainage Repon • I 0
-
I
man-made with seeded cover, the maximum allowable discharge velocity will be 6 ft/sec .
Culverts were also sized so that the upstream headwater elevation would always be more
than one foot from the proposed street top-of-curb during the 10-year rainfall event. The
shaded portion of the above table displays the culverts that will replace existing TxDOT
culverts .
The discharge velocity was calculated for each culvert at the end of the proposed
headwall. For culvert headwalls that are within the TxDOT right-of-way, a 6: 1 straight
wingwall slope was used . For culvert headwalls that are on residential streets, a 6 : 1
wingwall slope was used at a 30° flare .
STORM INLET FLOW RESULTS
(10 YEAR) (100 YEAR)
CURB PONDING PONDING
~
~~~
ID DRAINAGE LENGTH FLOW DEPTH FLOW DEPTH .r (j,r/ci NO . AREA (ft) (cfs) (ft ) (cfs) (ft)
1 B 8 8.685 0 .51 11 .707 0 .62 ·e~ ~. 2 E 8 13. 713 0 .69 18.485 0 .84 J' ~!;)~~ 3 H 10 16 .759 0 .68 22.591 0 .83
rl 5 T 6 7 .620 0 .56 10.273 0 .69
6 u 10 32.597 1.23 54.925 1.50
7 x 8 13 .832 0.69 36.652 1.33
The proposed storm inlets have been analyzed during the 10-year and 100-year rainfall
event. All curb inlets will have a gutter recessed entrance of 3" in depth . Curb inlets
were sized so that all inlets would be in weir flow during the design storm with minimum
ponding created upstream in the curb section . No curb inlets were surcharged to have
over 18 " of ponding during the 100-year rainfall event.
CONCLUSIONS
Below is a break-down of the drainage structures t hat will be constructed for each Phase
of the South Hampton Subdivision . Each ident ification number for curb & gutter,
channels, culverts and curb inlets correspond with the number indicated in the "Results "
portion of the drainage report .
Drainage Report -l l
I
I
I
SOUTH HAMPTON PHASE DEVELOPMENT
CURB & GUTTER
PHASE STREET OPEN-CHANNEL CULVERT CURB INLET
NO. IDNO. IDNO. IDNO. IDNO.
I 11, 12 , 13 ,14, 15, 16 , 17 7 , 8, 11 , 12, 13 9 6,7
II 19 , 2 0, 21 , 22 10
I l l 10, 11 , 18 , 23 10 8 5
IV 9 6
v 7, 8 5
VI 3 , 5, 6 3, 4 1, 2 , 3 2 , 3
VII 1, 2, 4 1, 2 1
The existing TxDOT drainage structures were analyzed for the increased residential
dev elopment runoff and resolved still adequate . See Section VII for these calcu lat ions .
Drainage R~port -12
SECTION #1
DRAINAGE & PHASE STRUCTURE MAPS
SECTION #2
DRAINAGE AREA EVALUATION
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area A
Drainage Area (A,J =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff (VJ =
Coefficient of Runoff (C J =
**NOTE: Minimum Tc allowed = 10 min .
1.40 acres
860 ft
It 1.00 lsec
0.50
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coe f ficient (d) = 8
288 2-0 2 5 Drainage E\·a lu ati on .xls
RESULT
Tc(AJ = 14 .3 min .
Rainfall Intensity (I i) =
Rainfall Intensity (1 5) =
Rainfall Intensity (1 10) =
Rainfall Intensity (1 25) = 8.415 in/hr
m~.a •I :::: :::: : . ::.:· :•::· ~~~M :Qi:::::,::
Rainfall Intensity (1 50 ) =
Rainfall Intensity (1 10 0) 9.943 in/hr
.:.•.a ... ' ... •.•.'.·.~.••.•.l....'.'.:.•:.•.•.·.•.~.•.•.•.•.•.•.•.:.• .. •.•.•.•.:.•.:.:.:.•.•.•.:.:.: ':: ,, , : : ::::/ · t:Jrna :es ::: :: :.Jv.v. :=:=:·:=::::::::::::;:;:;:::::::::::::::::::: •••·.·•·.·.·.·.·.·.·.·•·.·.·.·.·.·.··•·•·• ·.·.·.·.·.·.·-·.·
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area B
Drainage Area (As) = 1.05 acres
TIME OF CONCENTRATION <Tc)
GIVEN RESULT
Maximum Travel Distance (Os) = 280 ft T q s) = 1.2 min .
Velocity of Runoff <Vs) = fl I 4.00 fsec
Coefficient of Runoff (Cs) = 0 .95
I **NOTE: Minimum T c allowed = 10 min .
2 YEAR FREQUENCY, RATE OF DISCHARGE {Q)
Coefficient (e) = 0.806 Rainfall Intensity (1 2) = 6 .327 in /hr
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY, RA TE OF DISCHARGE {Q)
Coefficient (e) = 0 .785 Rainfall Intensity (1 5) = 7.693 in/hr
I
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE {Q)
Coefficient (e) = 0 .763 Rainfall Intensity (1 10) = 8.635 in/hr
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE {Q)
Coefficient (e) = 0.754 Rainfall Intensity (1 25) = 9.861 in/hr
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE {Q)
Coefficient (e) = 0 .745 Rainfall Intensity (1 50) = 11 .148 in /hr
Coefficient (b) = 98
Coefficient (d) = 8 .5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Co efficient (e) = 0 .73 Rainfall Intensity (1 100) 11.639 in/hr
Co efficient (b) = 96
Coef ficient (d) = 8
I
2882-0 ::5 Drainage Ern luation.xls
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area C
Drainage Area (Ac) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (De) =
Ve loci ty of Runoff (Ve) =
Coefficient of Runoff (Cc) =
*"'NOTE : Minimum Tc allowed = 10 min .
2.69 acres
760 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient {d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
C oeffi cient (d) =
2882-0 25 Drainage Eval uation.xis
0.73
96
8
RESULT
T qq = 12 .7 min .
Rainfall Intensity (Iv =
Rainfall Intensity (1 5) = 6.921 in/hr
• ... ,"".·',' .. •,:.•,·.·','."'.•'.'.•,• .. ·,1= ... :.'..',.= .. · :. • •t = ,,,, :=••= = r > .... •=.••.••.••.••.•.•.'.'·.·=.,• .. 9.· .. · ...... ~.•.•.a .•. · .. · .•. a .. · .. ·.:a ..... , •. =,•.•,•.m,·.·.·.·.·,·.·,.,·.·,·· .. ··.•.•.·.•,=.=.•.•.•.•.•.•.••.•.•.••.:.• ~ ::::::::::::::::::::::;:::·:·:·:·:·:·····:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:····
Rainfall Intensity (1 10) = 7.791 in/hr
::l#ij ffi·•··• ,,J<•••••> •• ,: ......... •• .::1 92~~'r::t.tS:•• ..
Rainfall Intensity (1 25 ) = 8.909 in/hr
•lleH:-:·:::·::.:; =: :: •••:::,,::•?:• t~~oQ•M.~m::m
Rainfall Intensity (1 50) = 10 .084 in/hr
:a :a :: •·.f' .:.:: .:: ..• :: •::= •• ,•.:• ·• :=::::.1~8~1~·£t!t::•=••=
Rainfall Intensity (1 100) 10 .523 in/hr
•9~~5 · ···=· •::,,,:::· =t:::: ••: : .: ..==·.~$.~t1 •·=~: :=:::
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area D
Dra in age Area (A0 ) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (D 0 ) =
Velocity of Runoff (V0 ) =
Coefficient of Runoff (C 0 ) =
**NOTE: Minimum T c allowed = 10 min .
3 .57 acres
540 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficie nt (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY , RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .7 63
Coefficient (b) = 80
Coefficie nt (d) = 8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficie nt (e) =
Coe ffici ent (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coeffici ent (b) =
Coefficie nt (d) =
0 .745
98
8 .5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Co efficie nt (b) =
Coefficient (d) =
288 2-0 :5 Drai n ag~ EYaluati on .xls
0 .73
96
8
RESULT
T q o) = 9 .0 min .
Rainfall Intensity (1:0 = 6 .327 in/hr
·:@i:5.:·••r• r=···· =•:>:•:t::=• • •••11 J ~~?!•:#f.~:::::••.•:•:::
Rainfall Intensity (1 5) = 7 .693 in/hr
.:,•."',·.•,•.:,•c_','.'_••.•.•,•.•,~.•,•.•,·.=,• ,:;::, •== =: =: =•=• =.=• :m :t~t$4& .•.•..•..•.•... _· .. :.:.~.=.=_=•.· .. :.=·_:•.•.•.::.•:.•.f ~ ::::::::::::::::::::::;:::·:·:·:<·>:·:·:.:-:·:-:.;.;.;.;.:·:·:·:.:·:·:·:-·-·.·.···
Rainfall Intensity (1 25 ) = 9 .86 1 in/hr
:•,.,'a,=_·,:_:,:·_·,=~_·•.••.·•.•.•,•·,•,;:,·,•,=,•,=,•.· .• ,•,•·,: ·=====·=·==•=• ·=·=·=·=·=·====•=•==·=·=·=·........ r::::.:• .. •=.' t •."'_=··• .. 1"· _J i7_.,_ ... _, .... s .••.•:.:;;:z·= .::::.•:::::•
:49. ;;;;:;:;{::::~;~:~~:::·;:;.;.:-:~~;~;~~~;~;;;;;;;;;;:; .·.·.·.·.·.·.·.·.·.·.-}: ...... ::;:~:~. ~I:;)
Rainfall Intensity (1 50 ) = 11 .148 in /hr
.•.•.:n=_=_ .. •.:.:_•.'.•c:•_••.•••o:_:•_•.•.•.=.·.•.•-•.•.•.•.•.•.: ... •.•.•. ·= .• ·.•.•.•.•.•.•.•.•.•.•.•.• . .-=-=·_;_.••••••••••:•:· , ,,, • •• ••• fa..om:64 ctsf >• • :~ .·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.;.·.:·:·:···:···:·:-:-:-:·:·:-:-:-:·:-:-:-:-:-:-:-:-:-:·:·:-:····
Rainfall Intensity (1 ,00) 11 .639 in /hr
, , <' =t:::= ·•• • 2ot M~&as :=:::• ·.·.·.·.·.·.·.·.·.· .. · ... ·.·.·.·. ·".·:-.·:·:·:·:-:· • .. •_•·.a.•=.•_.:_=_.=.·.··.·.~.•.L._••.•.·.·•.•.• .. • .. •.=.·.· .. ·_.' .. =_.• .. •.• .. •.•.•.•.•.:: ·JV'V.. :::·:::::·:·:;::::::-:::::-::::::::::::;:·::::·:=:::::.::·:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area E
Drainage Area (AE) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DE) =
Ve locity of Runoff (VE) =
Coefficient of Runoff (CJ =
**NOTE: Minimum Tc allowed = 1 O min .
1.40 acres
470 ft
ft 4 .00 lsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficie nt (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficie nt (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-0 2~ Drainage Evaluation.xis
0.73
96
8
RESULT
T q E) = 2.0 min .
Rainfall Intensity (Ii) = 6 .327 in/hr
•iia·:::::::m :. ,,_ :'':::::: .:;':: :: ·•~•~Q~•#t$\:1
Rainfall Intensity (1 5) =
Rainfall Intensity (1 10) = 8.635 'nlhr
:Q4ii•ffi :· • •?•• :: : : ::rn:rr: .:. • f!p~~'t~·ffsi?
Rainfall Intensity (1 25) = 9.861 in/hr
'.•·.• .. a,· .. '.,.:', ... ',~_.::_•_•••_.'.",i_ •. ,~_., •. '.' .. '_.',.'."':•:::•••': ::: :::::.:: •: :: ..,. , , • ••:::•• .•.•.•.1.·.·.·.2 .. ·.·.·.·.: .•. •.•.s.·.' ... ' ... zs:.:.'.·.·.:_·.:·.·•.••.m.''.:'.'' .. ·.:·_·'.'' .':.:.::: •
""""" :::::::::::: :=:·:=::::;:::::;:;:::;:;:: ·:-:-:-:-:-:-:·:-:-:-:·:-:-: :;:;:;:;:;:;:: .
Rainfall Intensity (1 50) = in/ 11.1 48 hr
Rainfall Intensity (1 100) 11.639 in/hr
,Qj~§ii.i•'.i•fi,j.i,·i•i :@?,} L !i 1ajzi:~k:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area F
Drainage Area (A F) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (OF) =
Velocity of Runoff (VF) =
Coefficient of Runoff (CF) =
**NOTE : Minimum Tc allowed= 10 min .
2 .61 acres
700 ft
ft 2 .00 f sec
0.60
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d ) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d ) =
288 2-0 ::S Dra in age E,·aluati on.xls
0.73
96
8
RESULT
TC(F) = 5.8 min .
Rainfall Intensity (1 :0 = 6 .327 in/hr
:•.:,n.'.,'.:,•.:,'.'.':::•.••.•.•,•.~,·.:.,'.•,•.'.·.•.•,•.•,•.•.• .. •.·.•.•,•.•,•.•.:.'.•,•.•,•.•,•.•,•.•·,•.•,•.•,•.•,•.•,•.•.•.•.•.•.•.•.••.••.••.• ,,,,,,,, ,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,, :::::::9~9s.o:mtrsr::::::::::::: ~ :::::;:;::::::::::::::=::::::::::::::;:::;::::::::::·:-····:·:·:·:·:·:·:·:·:·:·:·:-:-:-:-:-:-:.:-:·:·:·:·:·:-:-:<·'.·:···
Rainfall Intensity (1 5) =
Rainfall Intensity (1 10) =
Rainfall Intensity (1 25 ) = 9 .861 in/hr
sf~a•••:•.•i ••:.: • • ••• •t•• ::: ts ]stz•Cf$ ... •••'
Rainfall Intensity (1 50 ) = 1 1.148 'n/hr
-
:.•_n.'.•_:_._:_·_'_c:•.••.•:';_••'_'-•_:_'=_·-•-•.'.•_' ''' :: : ::::: ,, , : : / 171:6b3ihfs ft:: ~ ::::;:;:;:;:;:;:;:;:-:·:-:-:·:::·:;:;:;::::::::::=::::::::::::::::::::::::::::.:-:-:·:-:-:-:-:--.·.;.:-:-;-:-:·:.:·:·:·:·:·:·:.:-:-:-:-:-:-:-:-:-:-:-·-·.·.·.·.·
Rainfall Intensity (1 100) 11 .639 'n/hr
B'.i ¥.rH:\ t .:::• •• .. •t::•_•,••f t~~~i~:~• •••H
I
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area G
Drainage Area (AG) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (DG) =
Velocity of Runoff (VG) =
Coeffi cient of Runoff (C G) =
**NOTE : Minimum Tc allowed = 1 O min .
4.44 acres
850 ft
ft 1.00 fsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d} =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coeffi cient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d} = 8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2 882-0 25 Dra mage Eva luation .xi s
0.73
96
8
RESULT
TqG) = 14 .2 min.
Rainfall Intensity (Ii) = 5.349 in/hr
::9.i:a :::::.:.:::::::::i::r:::::]::r : .::··,:.::::::::r;;::::j::::::: io ~$~:::st!]:':,:.:=::
Rainfall Intensity (1 5) = 6.559 in/hr
::~::5 :::.::::::::1:::::.:::::::=:::::,:::::.-::=: ::-::·:::::::t''::::::::::: :,:1~m :M$.:::::,:::r:
Rainfall Intensity (1 10) = 7.395 in/hr
:~ij :a :·:r:::rr ::=::::::::,, : =:::::::::=::::::::-:::?· ::.=: :1.:~~~~§::~tt::::::::·:::::
Rainfall Intensity (1 25 ) = 8.461 in/hr
:gg:ffi ),[: ..... :::.:::::.:· .:,::·.·:.':::.':::::·: ·::.,·:: ;;::::::.::rn:1~~!¥:·:E 1:::
Rainfall Intensity (1 50) = 9.582 in/hr
·:a a·:i:::i::::::::.:::::::.::::::r ·:::::·:.:,:.::,: :.:·:.:-:.:.:·:.:::.:::.:,::::;f1i'-2S ef.$\:]f
Rainfall Intensity (1 100) 9.998 in/hr
::@~m ·a::::::::.::i:,::Ir:::.::: ::::.:: :=:=:. ::·:: :·:~~ass:::as=::u:·
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area H
Drainage Area (AH) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DH) =
Velocity of Runoff (VH) =
Coefficient of Runoff (CH) =
**NOTE: Minimum Tc allowed = 10 min.
3.42 acres
750 ft
ft 4 .00 fsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
28 82-0 :.: Drainage Evaluat io n.xis
96
8
RESULT
T C(H) = 3.1 min.
Rainfall Intensity (Ii) = 6.327 in/hr
·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.· .. ·•·•· .. · .. · ··:·:·.·:·:·:·:·:·:·;·:·.·:·:·.·:·:·:·:·:·.·:·.·:·: .... ·.·.·····-·.·.·.-.·.·.· ... ·.-..... -....... ·•·.·.· .. ·•·.·•· .
. :.='.rl .. · ........... ··.= .. ~.··= .. =.='.•.==.•• .. •· .. = .. ·.·•.:•.: .•. : ..•. • .• · =··:::: ::: •t?• •::== t 19ill64.• .. z.·.• .. •.==.·.•.•.•.~.•.•.·.:.fi ....•. s.•.·.·.·.•.:.:.•.•.•.•.••.•.•.•.•.r :.,;.. :-:-:-:-:-:-:-:-:-:-:-:·:··-:-:-:-:-:·:·:·:·:·:·:·:-:-:·:·: -:·····:-:-:-:-:-:-:-:-:-:·:·:·:-:-:-:-:-
Rainfall Intensity (1 5) = 7.693 in/hr
.li::a :.::•:r::.=.:•::::r=::.•::•.:.•.• •••• : ·.:. :. • = tt•·~~1~J~:::::r:::
Rainfall Intensity (1 10) = 8.635 in/hr
••~ij·a :::.:::·:.::;:::::::;::: : = = • =•·=:::=: ••••••••••t·•:~isl1~·:£f.sH ::::
Rainfall Intensity (1 25) = 9.861 in/hr
•·s1=:a:·:•:.:::.:·:.::1=:••:.::••:•:·::•::::•·:::·•••.:••••• • •••·•·•· ].:.~98?~•·•m::::.r•·•·•
Rainfall Intensity (1 50) = 11 .148 in/hr
:•.:.n..•·.···=···=··=.·"•.••.•··}·.··.•.•.•.=.•.:.·.·.= ... ·=·······=···=·······=··•=•·.·=····· ·=·= =·· .... •••sif161:s::::at.$: r :~ ::=:::::::;:::::;:::::::::::;:::::::::::;:::; .·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.··=·=·:·;·:·:·:·:·:
Rainfall Intensity (1 100) 11 .639 in/hr
:s j #.:•ar::::::: :::::::::•::.:::•:.::: ••• • • • ••••••••n:·•·:•::::•··~~~it,s?m n ·•·
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descri ption: Drainage basin for Area I
Dra i nage Area (A 1) =
TIME OF CONCENTRATION CTc)
GIVEN
Maxi mum Travel Distance (D 1) =
Veloc it y of Runoff (V1) =
Coe ffi cient of Runoff (C 1) =
**NOTE: Minimum Tc allowed = 10 min .
3 .64 acres
750 ft
ft 1 .00 fs ec
0 .50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coe ffi c ient (b) =
Co effi c ient (d) =
65
8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
C oeffi c ient (b) =
Co effi c ie nt (d) =
0 .785
76
8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Co effi c ient (e) =
C oeffi cient (b) =
C oeffi c ient (d ) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coe ffi c ient (e) = 0 .754
C o effi c ient (b) = 89
C oeffi c ient (d) = 8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
C oeffi c ient (e) = 0.745
C oeffi cient (b) = 98
C oeffi c ient (d) = 8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
C oeffici ent (e) =
C oeffi cient (b) =
C oeffici ent (d ) =
2 8 82 -02." Dra in age Evaluation .xi s
0 .73
96
8
RESULT
T q 1J = 12 .5 min.
Rainfall In t ensity (1 2) = 5 .697 in/hr
.tii•a•:.:i::if ::::::w:::.':::::··:::::::::.:,::::::::::::.:=: '::fJ!9~4\li '!t~J::t:
Rainfall Intensity (1 5) = 6 .964 i%r
·~·:a::ll:':'=:::r::: ·.:··::?:: ::: • : :a~~iMi''m::::::r
Rainfall Intensity (1 10) = 7 .839 in/hr
·;·· ........... · .. ·.·.;.;-;·:·:·:·:·:-:.:·:-.·:·:·:·:·:•.·:·:·:·:·.·:·:·:· ···-:···· ... · .. · . ·.· :::::::;:. :~i 5: •:::::r:r:::: :: :r:: •t t rt tt /'1!~!i:P:::£rs>=::::
Rainfall Intensity (1 25 ) =
·a::'·;·,.,.,.,.,,,.,.,.,.,.,_ .. ,r :::: : , ::r:r:: :::: :::'-:-:::: ::::1s;tzs'•d$.?fr
:4.'lli'. :·:·:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·:·:·:·:·:·:-:-:-:-:-:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:-:-:-:
Rainfall Intensity (1 50) = 10.143 in /hr
:'R ia ::::::,•,•:•::::•.:::·:·:,:·r:::::::::::::•:==':•:::· ;•, ,,,, :: n1a]s 1~·-:it~fr::::r
Rainfall Intensity (1 100) 10.585 'n l hr
.
'.',•,Q·_._ ..•. :.•_·.'.:._•-. :_::_:::,:,:,·,··,·,',','.•_,•,•·,•·,•,:,•,•.•.',=",•,•,•,•,•,•,•,•.• ... ,•,•,•,•,•,•,•,•,••,.•.--,•·,•: -.·.··:·:·:':·:':':':·:-..-:·:·:·:::::·:::::::.::: .. ':':':':it9···:::311:a=':'~:·:::.,.,.,.,.,. ··~ :::::::::::::::::::::::::::::::::::::::::::::::::::: \?{ .. f .:~~J~~;;:>,:)}(:
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area J
Drainage Area (AJ) = 25 .56 acres
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DJ) =
Veloc ity of Runoff (VJ) =
Coefficient of Runoff (C J) =
**NOTE: Minimum T c allowed = 10 min .
1700 ft
ft 1.00 fsec
0.35
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coe fficie nt (b) = 65
Coe ffici ent (d) = 8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coe ffici ent (e) = 0.785
Coe fficie nt (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coeffici ent (e) =
Coe ffici ent (b) =
Coe ffici ent (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coe fficie nt (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY , RA TE OF DISCHARGE (Q)
Coe fficie nt (e) = 0.73
Coe fficie nt (b) = 96
Coefficient (d) = 8
28 82-0 25 Dra inage Ev aluati on.xis
RESULT
Tq J) = 28 .3 min .
Rainfall Intensity (Ii) = 3.592 in/hr
::Ii:@::::::::· :?:?:::::::::=:-:.:::': :·: :: tt:: 1J:r:1:32~~!ffe =ci~ki?
Rainfall Intensity (1 5) = 4.480 in/hr
::"a:::,:-:_::::::::=:f:t::::f :-:.:=: ·:::::=::::::=;·::.:_::::-:::1m~1 :m::::·::.:.:::;
Rainfall Intensity (1 10) = 5.106 in/hr
:gjj:a::::: ::::::::=:f::.::::::::: ::. : :::=:=::: ::::::: ::~~9a~:st$;=:]:::::::
Rainfall Inte nsity (1 25) =
Rainfall Intensity (1 50 ) = 6.67 4 in/hr ::g :a :,:·::::=::.:::::::::::::::::: :,:: : · :::=:::::: ::f.P:~?~1 ::£t~::_::J:I
Rainfall Intensity (1 100) 6.970 in/hr
g~~:~::::=:: ::j::_::':::i::=:'::·· ·::_:.::}::{:::::::· ::~]i~:::~:--:::::::::
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area K
Drainage Area (AJ =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff (VJ =
Coefficient of Runoff (CJ =
**NOTE: Minimum Tc allowed = 10 min .
2.21 acres
600 ft
ft 1.00 fsec
0.50
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882 -0 25 Drai nage Eva luati on .xl s
96
8
RESULT
TqK) = 10 .0 min .
Rainfall Intensity (Ii) =
Rainfall Intensity (1 5) = 7.693 in/hr
.. . ··.·.·.·.·.·.·.·•·.· ... ·.·.· .. ·.·.·.·.·.·.·.· ... ·.·•·.·.·.·. ············•· ::,:r;:,=,·.·,•_:,:.,·.=.=•~•_•_••,:,•,~,·,•,·,•,·,: •.••.••.••.••-••.••-••.• •=•=<·.,/'•'•'•':•,=,=,::· if?t.:.•:.:o.:::r _e: "'::_:_~_-= .. _ =)? ~ ~f}ft {f\. .·.·:·.·.·.·:-~:/:t:::;._ .. ·.·.·.·.·.··· .. V \RS:rA:. \.:I~
Rainfall Intensity (1 10) = 8.635 in/hr
.:~ij•.a.=.:.:.:.:.::.:.ir::r.:.::.:.::••]::: <t :.:r :,:::::.:·:~~~~•£!%::•:.:::::::::
Rainfall Intensity (1 50) = 11 .148 '°/hr
::•a·•::·:•'.::•::• , ·rn: •••. ,:,:·:.;.:::::=, =:: :•.rn:1 ~~~3::::ats::::r::
Rainfall Intensity (1 100) 11 .639 in/hr
·-.. ·······:·:·:·:-;.;-:-:·:·:·:·:·:·:·:·.·:·:·:·:·:·:·.·:·:·:·.·;·:·.·.·:·.·.·:·:·:·.·:·:···:·.·:· ..... · .............................. ····· .•.•.a ... =.-.: ..... ==•=.~.·=•=.•.•.•.•.:.:.:.:.:.:: .. •.•·.•.•.•.•.•.•• .. •.•.:.• <·=·=·================•==·=·=.,...... .•.•.•.•.:.•.•.•.•.•-• << ••::: 12isas :=cts. .., .. :.J :v.Y. ~=~=~=~:;:~=~=~=~=~=~=~=~{{:~=~=~ ·.·. ·.·.·.· .· .·. ·. ·.· .· .· .... ·.· ... ·. ·.·. ·.·. ·.·.·. ·.· ..... :·:· ··:·:·:· :·:·:·:· =·=·=· ......
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area L
Drainage Area (AJ =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff (VJ =
Coeffici ent of Runoff (CJ =
**NOTE: Minimum Tc allowed = 10 min .
6 .30 acres
1200 ft
2 .00 ft/sec
0 .50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coeffici ent (e) =
Coefficie nt (b) =
Coefficient (d) =
0 .7 45
98
8 .5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient {d) =
2882-025 Drainage Evalu ation.xis
0 .73
96
8
RESULT
T C(L) = 10 .0 min .
Rainfall Intensity (I i) = 6.327 in/hr
:•i2r g=t:l ttr u:r•:::::x::•: .,::: :tr • i:Jt:fa_'o_ •. ·.· .. •.·.~··.•.o ...... ss ....... •=.: .. ,·.:'.••.P.'..~.$ .. •.•••.:.•.:.:.::.::_:i.•i-.•• ·:·:-:-:-:-:-:-:-:-:·:·:·:·:-:
Rainfall Intensity (1 5) = 7 .693 in/hr
'lia:::-::•••.•=::•·1::· ::::: ·· •··::: •••t••t•••,•·•~43..2.§.••~··•••
Rainfall Intensity (1 10) = 8 .635 in/hr
·:~~ 5· =::.: :,;:: :=:•::\::.:., .,·t ·.: :: ••::::•:,:::::.:·•=@!Ji1~:-:£f.~J••t:t
Rainfall Intensity (1 25) = 9 .861 in/hr
.•.•.a.• .. •.·.•-.•~.··.•:=_··.·.·.•.•.~.•.:.·.: ... :.•.:_•_•.•.•.•.•·.•·.:·.: .•. •.:=:t:r=::::=::: J:: • • • ::::::• •• ••••ata-0a ets/t•:::: ':M"'iJI. ::::::::::::::::::·:·:-:-·-·.·.· .•.•• ······.···.·.·.·.·.·.··.·.·.·.·.·.·.·.·.·.·.·.:·'.·:··-·.;.·.:-:-:-:-:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-
Rainfall Intensity (1 50) = 11.148 in/hr
:•·.1 :·•::::.:.:::_::::..::::1it:f ::::,:•: ::··•.':r···•::.3.s]®-1 ·~r~·:::::
Rainfall Intensity (1 100) 11.639 'n/hr
.. · .... ·.· .. ·•·•·•·.· .. ·:·.·:·.·.·.·.·.·.·.·:····:·:·: ..... · ... · ... · .. · ............. -......... .
. •,•.a,·.·,.·,·.,:.:.·_=•_=~.=.•_''.·.=•_•.•,•.•,~-•,:·_.,:_•,:.•,•.•.'.·.•,•.•,'.•,•.r,.-.•,•.•,•.:,:_:.:_.•.·.·.•.:_,. •=•=•=•=•=•=====•,'=?==:::=:=•=====:===..======•===•====== .••.••·.••.•3.·.·.s.· .·~.•·:.ss.·.···· .. ·.:,1_·,·_.•_.•.•.•,•.m,=·_.'·.•·.·_:·_=·.=·:_:_:_•:.:•.•:.> :+:v.v. :::::::::::::::::::::;:::::::;:::::::::::::::::::;:;:;:;:::;: .
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area M
Dra in age Area (AM) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (OM) =
Ve locity of Runoff (VM) =
Coefficient of Runoff (C M) =
**NOTE: Minimum Tc allowed = 10 min .
2.93 acres
1100 ft
ft 4.00 f sec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Co efficie nt (e) =
Coe ffici ent (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coeffi c ie nt (d) =
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficie nt (b) =
Coe fficie nt (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coeffici ent (b) =
Coe ffici ent (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coe ffici ent (b) =
Coefficie nt (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coeffici ent (e) = 0.73
Coeffi cie nt (b) =
Coe fficie nt (d) =
2882 -0 25 Dra inage Evalu at io n.xi s
96
8
RESULT
T c(M J = 4.6 min.
Rainfall Intensity (I i) = 6.327 in/hr
·~•a :::.:.:•:·;.;•::I::::.:•:::::;•·;.] :::·:.::::: :•: :. it:: i':J:::1~~!!:!i £f$1 t ·
Rainfall Intensity (1 5) = 7.693 in/hr
·~·ffl r::;·it:.·;· ::: .. f ::•: : :t•t:~at!i~:f:n
Rainfall Intensity (1 10) = 8.635 in/hr
.
•.•_n_._: __ ·.·.•.·.•·.··•.:-•. ~.··.•.:_:l= __ ·.•.•.:.··.•.·.•.:.•.•.:.:_:_:·.:.•_:·_:·_:_•.:.:::: ''' ,,,,.'' · • :::::• • • ::tfJ:: ••••Z2D9&2:: tf~f :r: ~.WO :·:·:·:·:·:-:-:-:-·.··:·:-:-:-:-:·:···:·:···:···:·:·:·····:·:·:·:···:-:-:-:-:-:-:·:·:·:·:·.····-·.··.·
Rainfall Intensity (1 25 ) = 9.861 in/hr
·s~a ·••:ttt•:::=• · ,., •.• _ .• ,,.·,···•t·•···•••••••••·~~•••:~; •t
Rainfall Intensity (1 50 ) = 11 .148 in/hr
•·...-.·•·•·•·•·•·•·•·•·•·•·•·•·•·.·•·•·•·.·.·•·•·•·•·•·•············ ··.·•·•·•·•:•:•:•:•:•:•:•;•:;:•;•:• .. :•:•:•:·:•·.:.•.•.•.·.•~ft.·.· .. :.••.~.·:::··· •. ·>i'..•.•.·.~.::•:.~_~:_ ................ .
..•.• _('\_._: .. :.·.·.·.·e;·_·'.·'·.··.·.•.:.:=_ •.•.••....•.•. ;:;:,:,::;.; •••••••• ••••• ,,_,._,_:_,_ •.•••••••.... •·.·.•.•.•.•.•.•.•.•.•.•.•········· ~ Q .t40 ""'"" ~ .·.·.·.·.·.·-:-·-:-:-:-:-:-:-:-:-:-:-:-:-·-·.·.···
Rainfall Intensity (1 100) 11 .639 in/hr
•:s~i i a :••:•tl·•·······:.::· .. ,,. a::::::{{)\J :3q~!m:pf5••@••{
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage bas in for Area P
D ra in age Area (A p) =
TIME OF CONCENTRATION CTc)
GIVEN
Maxi mum Travel Distance (O p) =
Ve locity of Runoff (Vp) =
Coe ffi c ient of Runoff (C p) =
**NOTE : Min i mum Tc allowed= 10 min .
5 .75 acres
1050 ft
2 .00 ft/sec
0 .75
2 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Co effi c ient (e) = 0 .806
Coe ffi cient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coe ffi cient (b) =
Co efficient (d) =
0 .785
76
8 .5
10 YEAR FREQUENCY , RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coe ffi cient (b) =
Co effi c ient (d) =
0.763
80
8 .5
25 YEAR FREQUENCY , RATE OF DISCHARGE (Q)
Coe ffi cient (e) =
Coefficient (b) =
Coe ffi cient (d) =
0.754
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coe ffi cient (b) =
Coe ffi cient (d) =
0.745
98
8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
C oeffi cient (e) =
C oefficient (b) =
Co effici ent (d) =
2 88 2-02 5 Drainage Evalu ati on.xJs
0 .73
96
8
RESULT
T q P) = 8 .8 min .
Rainfall Intensity (I v = 6 .327 in/hr
-~:e,:::·::1::::=::.rn = =: :;·m·.=::m:=:r:rnrnt1:rl21~s11:arg :::m:;::
Rainfall Intensity (1 5) = 7.693 in/hr
~=:a:=:::::::-:.::-:=_:_:.:::_:_:::::::::::,:::::::::::::::::=:· :::::::==:::-:·:_:$i]l~:::m :t::
Rainfall Intensity (1 10) = 8 .635 in/hr
::.; :::::: :~7~§.~~:e¥$ :rt
Rainfall Intensity (1 25 ) = 9 .861 in /hr
:sa a::: :·:_:··::-.::·:= =:::·=-: :::::··:·:::.:::. : r:::·:::::::.tm~111·:~ ::t:.:::
Rainfall Intensity (1 50 ) = 11 .148 in/hr n ·=:: ··=::·==·=····=···:···::=··=· ::: ::::r ,:::::: ,r-:-:~~~a.~::prs::::r:::
Rainfall Intensity (1 100) 11 .639 in/hr
:·9~~::a:-:=:::::·=:_:-:·:::r=·::rn::::: ::: ::::::=:::: }::soill igl '~' J':
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area Q
Dra inage Area (Ao) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (Do) =
Velocity of Runoff (Va) =
Coefficient of Runoff (Ca) =
**NOTE: Minimum T c allowed= 10 min.
1.73 acres
620 ft
tt 1.00 fsec
0.50
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .806
65
8
5 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8.5
25 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882 -0 25 Drainage haluati on.xl s
96
8
RESULT
T qa) = 10 .3 min .
Rainfall Intensity (I i) = 6 .234 in/hr
.,,,,,,,,,,,,,,,,,,,,,,,,,.,.,.,.... .•.•.•.•.•.•? •• ? •.•s·: ·.•.••,':.1_•_·.·_,•',"l_:_,·,-,:,"'_·,:_,•,:,•,•_ .. •,•,t,',•_',•_·.',~_-,',:..,'_',._',•,•,•,•,•,•,•,•• .• .. •-.•.•.• ~=r~::{{:f~:::;:~:}:::: ~'11=:= ~
Rainfall Intensity (1 5) = 7.586 in/hr
.:_r_._ •. :_:.•_'w.·_ .. •_••_··.·.•-.•.=.•.·.'_ .. '_ •. :_'.:_ •. •.:.•.•.:_: '' ''\(•) • • •• t•••••t.ff_:_::_••.•.•.•.•.•.•• .. •-.·:_:_·,_'•.s ......... ~_:_:_s ... _ .. _•.•.1 __ ·._·,_a_._·._,_·•.•.•.a.• __ ':_·'_•_··s. Jt:: ~ .·.·.·.·.·.··:-:-:.··:·:·:·:-·-:·:·:-:-:-;.:-:-:-:·:·:·:·:-:.:-:-:·:· .
Rainfall Intensity (1 10) = 8.518 in/hr
.~ij5 •••t:r::rnt11• :::•:::::•?· •••Dt~4~¢r$·•·::.
Rainfall Intensity (1 25 ) = 9.730 in/hr
',•',.-,Q·, ... _,_ .. _ .. ,-_',~_:•_•··.···.·'.,.,i, .. ,~,·-:··.'.,•',_' .. ',,.,•',•',i,•',.'•'•••'•'':<':':':':'''•'''''''''' ............... , .. ,,,,,,,,,,,., ,•.•,•.•,•.•,•.•·,:·.•.'.·.•,•.•,•.•,•.•,•.•,,:.•,•.•,a.·_·_._·.·.~-•.'-.4_ •. ,_·_-,•.as:_·.·_·_,_ •. ·_·.·_·_:_•.:_•.•_ets.,'_'.•_'.•_',·_·,•.'_._,_•_•,•.:.•_:·.•.•,•.•,•.•,•.•,•.•,•.•,•
".4.9. ~=~=~=~=~=~=~=~=~=~=~=~=~ :::::: :: :::::::::::::::::::::;::::::::::::::
Rainfall Intensity (1 50 ) = 11 .000 in/hr
.•.•_h_•_-.•.•.•.•_<"<.•.~-••-••.lft _• .. •_ .. :_:.•.:.:_:.•.•-•.•.•.:.:_:.:_:.•.•.•.•-•.•.• .. •.·.·.• .•. •.•-• .•. •.• •} :•••• s .sllisgs.Jn:s>? ~ ·:·:-:·:·:-:·:-:·:··-:.:·Y·:·:·:·:.:-:·:·:·:·:·>"·>:·:·:·:·:<·:-;-;.;.;.;.;.;.;.;.;.;.·.·.·.····
Rainfall Intensity (1 100) 11.484 in/hr
•.a_ .. ·_.:·._:· .. ~.'•''.£-.':''.:•_.~_-_·_:_::_:•.: .• •.• : itt::··r • • ••• ..... •·•• •t10~011: im ?• t :.J~ ······················.··.·.·.···.·.·.· .. ·.··.··.·.·.·.·.·.·.·.··:·:·:·:·:-:-:-:-:-
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area R
Drainage Area (AR) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (DR) =
Velocity of Runoff (VR) =
Coefficient of Runoff (CR) =
**NOTE : Minimum Tc allowed = 10 min .
2 .73 acres
840 ft
ft 1.00 fsec
0.50
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coeffic ient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY , RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2 88 2 -025 Drain age EY a luati on.xl s
0.73
96
8
RESULT
T C(R) = 14 .0 min .
Rainfall Intensity (1 5) = 6.597 in/hr
.•.•.~.·.: ... •.·.·.·.·~.··.··.•.• .. • .. ~.•.•.•.·.•.•.•.•.•.•.•.··.•.•.•.•.• .·.· ..... ,..... · ··.·.·.·. •silloh!•Ci$.tr:.: ~ ~~~~~~~~~~ i~~r~~~~~~~~~r~~~ .~.;.:.;.~.;.;:~:d{t~~~~t:::;:;:;:;:; .-.·.· .. ·.·.·.·.·.·.·.:·=-:·.·=·=·:·=·=-:·:·=·=-=-:·=·=·=·=·=·:·.
Rainfall Intensity (1 10) = 7.437 in/hr
• .• :.i.A= .. · .... ·•.•.·.·.·.·.·¥•.,. .• ·.=.·.·· . .= . .= . .= .. • . .=.• .• • .• • .• •.:= .• • .• • .• •.; . .=.,..:.:•.:•.:= .• ' .•. .=.;.:·r:·:·· • .,. •::::: :••:10.· .. ·.·.·~.·.2.· .. · .. ·.l$ ....•........ •.:·.·.•.•.:c..· ... ".:.·.fi .. · .. s .. ·.·.·.·.:.:.•.·.•.•.•.:.:.•.•.•.•.•.•.•. ~...,. :::::::::::=:::::::::::::::::::::;:::::::::::::::::::::;:;:
Rainfall Intensity (1 25) = 8.508 in/hr
-·:·:·;·:·:·.·:·:·:·:·:·:·:·:·:·:·:-:·:·:·:·.·:·.·: .-.-... -.. ·.-.... ·········· .................. . J~R ffi ••••• t r : •: :ff i:i:::£ .. :• ·:.:. 11Yr1l Bm ::? !
Rainfall Intensity (1 50) = 9.635 'n/hr
•:H;:;::::::::~:/\I:/•\:•••:• ......... ::::::::::::::::::::::::::::::::::::::•• t\.:.::.·1·· .. :;.:.•:~.~ .... ·1.·.·····.·.• .. • ..•. :.:·.;,,..·.·.•.· •. •."'.· .• ···.~.·.•.·.• ••. •.·::• ..•.•. •.•.•.•·.•.•·.• .• •.• .• • :·~·sr:ttrtr ••••·•••·•••rr•••••t••••• ....... ~."'~ .. ,...,.
Rainfall Intensity (1 100) 10 .053 in/hr
··A:····......... ·.·:·:·:·.· .::·:::::::::;:;::::::·:·:\{ .... . .. ::*=3··0:37··~··· .=:.::.• 8JWrt :r:r:: •·•r.i:••••· •••t ~Q:· )\:.:1~r·
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descri ption : Drainage bas in for Area S
Drainage Area (A R) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (Ds) =
Velo city of Runoff <Vs) =
Coefficie nt of Runoff (C s) =
**NOTE: Minimum Tc allowed = 10 min .
5.52 acres
900 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficie nt (b) = 76
Coe fficie nt (d) = 8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coe fficien t (e) =
Coe fficie nt (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficie nt (e) = 0.754
Coefficient (b) =
Coefficie nt (d) =
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficie nt (e) = 0.745
Coeffic ien t (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficien t (e) = 0.73
Coefficient (b) = 96
Coe fficient (d) = 8
2882-025 Dra in age Eva lu at io n.xis
RESULT
T qs) = 15 .0 min .
Rainfall Intensity (I i)= 5.192 in/hr
.'§#. ~r.:ir:m::::::::,:::::::::r=::::=::::: :=:,::::::::.·::: ::::: ::: 14~1~1=.=.¢.r~ <t
Rainfall Intensity (1 10) = 7 .194 i%r
.
•.•.0'.·.•_:_._:_._,_ .. :,_=•_l_••.•.: •. =.• ... : .•. : .•. :.•.•.•.•• iii:::_:_:.·_ .. ·_,_._,_•_•.•.•.•.:@ ==:::::::.? :::::.::::· ••J•••:•:fill Joss ::c.tlr •F: :~...,. ·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:-:-:-·.·,·.·.·.·.·
Rainfall Intensity (1 25 ) = 8.234 in/hr
.. ·.·.·.·.·.·.·.-..... ·.·,·.·.·.·.······ ·:·:·:.:·:·:·:·:·:·:-:-:.;•:············ .·.·.·.-.•, .. -.. · .. ·.•,• ... · ............... ·,· .. -.. •s~a :r:tt•i• : J,,: ::r::i:· ··~~!:~•!9.fS =::
Rainfall Intensity (1 50 ) = 9.328 in/hr
:•n •·a·• ,,,::ii••=• :::: :·:: : •::: :::,,. :::~.~1i:'i?r~•:::•:t:.
Rainfall Intens ity (1 100) 9.732 in/hr
•·s j ii!i:tI.ii::= '' . ::::= :_, .•. , :•.:::·•': ·:::;it~1!!:•,~•:r:t
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area U
Drainage Area (Au) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (D u) =
Velocity of Runoff (Vu) =
Coefficient of Runoff (C u) =
**NOTE: Minimum Tc allowed = 10 min.
1 .71 acres
900 ft
ft 4 .00 fsec
0 .90
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .785
76
8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b ) =
Coefficient (d) =
0.763
80
8 .5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coe ffici ent (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .745
Coefficient (b) =
Coefficient (d) =
98
8 .5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2 8 82-025 Drainage Evaluation .xis
0 .73
96
8
RESULT
T C(U) = 3 .8 min.
Rainfall Intensity (1 2) = 6 .327 1%r
... Qi .... ·-:-:-· ·=== .. -: -:-:-:.; <·>=· =<·: • :·:·:·:·:·:::::=·=· -:·.;:·:-;·=· .-. ••· ::=:=:·.. -~-·-~-=·.•.•.~-·-~-·-~-·-~-·-~-·-~=· -~-~-~:.'.~-~-~=~-~-~s·.=· ·.·.-~.~~_6_-·;_~.:~=.·.~-~-~-"".::::.1_~·::===.~.~.i.~_:.~.~-~-~.r.~.t.~:.=_j_~
.•.•.•.·.·.·.•.·.· .. ·=.·=· .. •·.:.=.=.·.•.·.•.:.•.•.•.•·.•.•.•.•.•.•.•.•.:.•.:.•.•.•.•.•.= .•.•.•.•.•.•.:.•.•.•.:.•.: Q i:vo "''""' :-:-:-:-:-:-:·:·:::·:::;:·:;:;:;.;::: :-:-:-:-:-:-:-:-:-:-:·:·:·:· ·.·.·.·.·.·,·.·:·:-:
Rainfall Intensity (1 5) = 7 .693 in/hr
.•.•.• .. a,·_.,•.·,:_,~_·_••.•.•,•.•,~.:,•.•,•.•,•.•.•.••.•,•.•,•.•,•.•,•.:•, :::r J: •·: -:,:.::·•·.:•\\fl•• ::11t aaa .CtS:_:.=.=.=.•.·.:·.:_:.=.•.= .. _•• ... •.:: ..•. :.: .. :.· •. : 9. :::::::::::;:;:;::::::: :-:-:-:-·-:·:·:·:-:-:-:.:-:-:·:-:-;.:-···-:-·-·.·.
Rainfall Intensity (1 10) = 8 .635 in/hr
.:.:_n_:_ •. :_ •. ·.•.·.···.··.h_••.•.•.•.'-.~.-.•.•.•.•.•.•.•.•.•.•.•.•.•.•.•.•.:·.•.:.•.•.• ,:: •<t_,:_••.==.··_,._.=_,' .. '.='.·'.i . .= .• r ,, ,,,., ••• 13~d~••~irS.tJ ~""'" .·.·.;.·-:·:··-:-:-:-:-:-:-:·:·:·:·:·:··.·.·.·.··.
Rainfall Intensity (1 25 ) = 9.861 in/hr
.•,•.a,=_·,•.•,•.·,=~_·•.··.••.•.•,•.•,~-•,•.•,•.=,•·,•.•,•.•,•.•,•.•,•.•.=.=.•,•.•,• =••• • = • • •r:· •:•:••r:•= :.... 1s~3.sfoffi' r::: :4-9. ::::::::::::::::::::::::::::::: :::::::::::::::::;::::::=:::::
Rainfall Intensity (1 50 ) = 11 .148 in/hr
•a•f•t•:·:r :,:::::•.::::::: •::: = ....... ••·•••••: '::1::r~?.~:·£r~•·•1:.:.:
Rainfall Intensity (1 100) 11 .639 in/hr
91&'§:,:·•.••:•··· ::•.:.:: ··············:•:•.:.::••=&. ·•=•1!~P:~M$.•:••:t
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area T
Dra i nage Area (AT) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (OT) =
Velocity of Runoff (VT) =
Coefficient of Runoff (CT) =
**NOTE: Minimum Tc allowed = 1 O min .
0.78 acres
400 ft
ft 4.00 fsec
0.90
2 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2 88 2 -025 Drainage Ev alu ati on.xi s
RESULT
T C(T) = 1.7 min .
Rainfall Intensity (Ii}= 6.327 i%r
• .. • .. '.A .. '.:.•.:.'.'.'?c .. •.:.= ..•. ' .. ' ... '' .. •. \.i.i.i.\tt · .... •.•.•,•• ............... •.•.•,•.•.• t• : : : ,.:(: :: \4.J J.67.•.•.•.•.•.c.'.:.=.:.'.fi ... $.j)_i······ ~ ::::::::::::::::::;:::;:::::;.·.·.·.··:·:·:-:·:··-:-:-:·:·:-:-:-:·:·:·:·:
Rainfall Intensity (1 5) = 7.693 in/hr
=_=_n.•·-•·_=_::~ .• ·.=i:. =.=_,=_=_.:·_:•'_••-••_•r.:=.=.••_.:=_J_•••.:=.= .• ===·•••·········••'•(•t..::? xt· .••.•_··.•_•-•_•-••-•-•-•-•-•.•.:.•_•_•-•_•_s_: __ :_._:.A.•.•-•• .. ·.·_:ai :asr·:-:.n ~ :·:-:-:-:-:-:-:-:-:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-·-·.; ·:·:·:·:·:·:-:-:-;.:-:·.·.·.·:·.·.·.·.·.·.·
Rainfall Intensity (1 10) = 8.635 in/hr
:•.,•,n,=.·.:.•.:_=.=.•,•,·~·',= ... •·,._,•,=,•,=,•,=_,•.,•.-.•.=•,•.=·=·.=·,•·. ==::::::J• •••• ,•,•,•,•., .. ,•.,• .. ·.:,.-,.·,•,•,•,•,•,•,• • :::=:.:: . •? ,•· .• _•_•,•_•,•-~ .... _ ..... _0 ..... =·.~.=.=_'"'_-=.•,•.•,• .... ·=-:~ ..... ~ •. :_._••.••.=.r· .. ~w ;.-; /:f}~{:\:::: :::::~:~:~:?: .. =?::?:=~·-· V ;;J.:Q: ~·~
Rainfall Intensity (1 25 ) = 9.861 in/hr
•B •a[li·:'""•"· ====.:••••Yi(\\•. =·~~~1_~··:::7
Rainfall Intensity (1 50 ) = 11 .148 in/hr
·•B F:.!•:•!i:l:f't :::::•:•:,::•:>::: :I: = ::· .. ··@~~71·•·£t~•••••?:::
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
I Description : Drainage basin for Area V
Drainage Area (Av) = 1.52 acres
I TIME OF CONCENTRATION <Tc)
GIVEN RESULT
Maxi mum Travel Distance (D v) = 250 ft T C(V) = 4 .2 min .
Velocity of Runoff (Vv) = ft 1.00 f sec
Coefficient of Runoff (C v) = 0.50
**NOTE : Minimum Tc allowed = 1 O min .
2 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806 Rainfall Intensity (1 2) = 6 .327 in/hr
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0 .785 Rainfall Intensity (1 5) = 7.693 in/hr
Coefficient (b) = 76
Coefficient (d) = 8 .5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .763 Rainfall Intensity (1 10) = 8.635 in/hr
Coeffi cient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754 Rainfall Intensity (1 25 ) = 9.861 in/hr
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.745 Rainfall Intensity (1 50) = 11 .148 i%r
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .73 Rainfall Intensity (1 100) 11 .639 in/hr
I Coefficient (b) = 96
Coefficient (d) = 8
2882-0 25 Drainage EY a luati on.xls
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area W
Dra i nage Area (Aw) = 2.94 acres
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (Ow) =
Velocity of Runoff <Vw) =
Coefficient of Runoff (Cw) =
**NOTE: Minimum Tc allowed= 10 min .
880 ft
ft 2.00 fsec
0.75
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coe fficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-0 2~ Drainag~ Eva luati on.xis
96
8
RESULT
T CryJ) = 7.3 min .
Rainfall Intensity (l z) = 6.327 in/hr
··················· •'••'•' .·.···:·:·:·:·:·········:·:·.·:::·:·:·.·:-:·.·. ···=·· ·.·.·· .· .. ·.··.··-:·:················ :@£5 :'t:;:;;:::::;:''''' ::::=:::::::::rn :t'if:~~!:~];f~Jtm
Rainfall Intensity (1 5) = 7.693 in/hr
~::g :::t: : ':.:.::<::::,:,,.':/::: :::::::::,::·":: :,:r:Jtp;n ~~::m::t:
Rainfall Intensity (1 10) = 8.635 i%r
:~J.:e ::: ... ::,;:::::::::::::::·::='':::: ::: 1:1 st1·~:j;tsv:::
Rainfall Intensity (1 25 ) = 9.861 in/hr
11:1r r'7,,,,,·: ·:::.::::· ,.,].:::::::::::::::::-:::: 61 ~i~ m::::::::
Rainfall Intensity (1 50 ) = 11 .148 in /hr
·:me:::::::::::::,:.:: . ::::: : L:::', ,, :: i~~r~i '*fs t
SECTION #2-DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area X
Drainage Area (Ax) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (Ox) =
Velocity of Runoff (Vx) =
Coefficient of Runoff (Cx) =
**NOTE: Minimum Tc allowed = 1 O min .
1.02 acres
800 ft
ft 4.00 fsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-0 25 Drainage Evaluat ion.xis
0.73
96
8
RESULT
T c(Xl = 3.3 min .
Rainfall Intensity (Ii) = 6.327 in/hr
.·····~·•.•.:.•.:.•.=.•~.:.·.• .•. :.=.:.'.•.:.:.•.•.•.•·Jc=··1J ,, = : •• rr ·\:::=:·· •• ···•••:sllias.6::¢rgr:--: : "' :::::;:;:;:::;:;:::;:;:=:::: .·.·.·.·.·.·.·.·-:-:-:-:-:-:-:-:-:·:-:-:-:-:-:-:-:-:.:-:·:·:·:·:·: -:·:·:·:·:-:-:--:-:-:-:-:-:-:-:-:·
Rainfall Intensity (1 5) = 7.693 in/hr
•.~Ff ··::::::: :::::••::i]i\/·;::::r ::::.:·,,, .·:•: 1a21:m•••tr•
Rainfall Intensity (1 10 ) = 8.635 in/hr
.·.·.·.-.·.·.·.·.·······-·.····:··· ·:-.·:·.·.·:·:;:;:·:·:·:·: ··-:-.· .... ·... ·.·:·.
:
•·.:n,.· .. ·, ... ,·.·.· .. ·,=··.=•'.·••'.i..:•'.·.•.:.=".'-..... ·· .. =,.· .. =,.·.:=,.·.•,:.:·,:·.:',:.•,= ::::••\ ·==•=: tt\: ·=·======:::::============·=·==·· ..... · <=n993t cfst .:.• .. =.••.: .. = ~.w. :·:·:·:·:··-:-:-:-:-:-:-:-:-:-:-:-: ::::::::::::::::::::;:;::::::
Rainfall Intensity (1 50) = 11 .148 'n/hr
:.:·:·.n: .. ·.··.··.··.·.'.'."'··.··.}•· ... •.:•.·.'.=.·= .. ·.: .. ·.: ... =•.:•.:'.•'.='.•·.:.•.:.=.:.= =:::::::::::::::::::: ·•=•=•=•=)t:x=:=:::::•r= .•.•.•:.·.=.•.•.•.•.•.•.•.• .... •.•.·.•.1.•.·.··"·:.o.·.·.·.•.= .•. :.•.3.·.·.·.·.=.1.•.· ... 9' .... •.·.•.=.:.•.•.•.µ.:.•.=.•.•.~.· ... s ... =.·.== ... : .•. •.•. ??' ~ ::::::::;:;::::::::::::::::::::::::::::::::::::::::::::::::::::::
Rainfall Intensity (1 100) 11 .639 in/hr
Q.jj;'•a = :,;;;: .. : •. =. •<· •••::::::::rr toJt=ta.¢.e.•••••••m
!
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Descript ion : Drainage basin for Area Y
Drainage Area (Ay) =
TIME OF CONCENTRATION CT c)
GIVEN
Maximum Travel Distance (D y) =
Velocity of Runoff (Vy) =
Coe ffi cient of Runoff (C y) =
**NOTE : Minimum Tc allowed = 10 min .
2.54 acres
1050 ft
fl 2 .00 fsec
0.75
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coeffic ient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coe ffici ent (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Co efficie nt (d) =
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Co effici ent (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coe ffici ent (b) =
C oeffici ent (d) =
28 8 2-0 2 ~ Drainage E,·aluati on .xl s
0.73
96
8
RESULT
T cM = 8.8 min .
Rainfall Intensity (1 5) = 7.693 in/hr
····:·:· ·.·.·.·:;. ::::::::::::: ::;.;:::;:;:;:;.;:;:;:;.;:::::;:;.·:·.·.···.·.········ ·.·.·.·.·>.·.·.·.·.··.·.··.·.·.·.·.·.·.·:-:-.-: ·:·.·.·.·.·. •.:~:~····=··· .. ·.············ :.·:.·:.· .·:.·:.·:.·:.·:.·:.·:.·:.·:.·:.<.<.·:.·:.·:.·:.·:.<.·:.<.·:.·:.·:·.:.·:.·:.·:.·:.·:.·:.·:.·:.·:.·:.·:·.:.·:.·:.·:.·:.·:.·:. 4: .... '°.A··.·,·,.''.·.'·.:.'',".·.:,':',".,,,'~:'.·.,,·,' ... ',:,•·,:','-...:.·,.·,·,.· .. ··,.· .• ,.,.,.•,•,•.:.'.·.•,•.•,•.•,•.' ,.;~::.:-:·:-:··... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :J:':hl::f ::t :: \<I:;)
Rainfall Intensity (1 10) = 8.635 in/hr
:-:····-· .. ·.· .. ·.·.•,•,·,•,•.·.,·.-....... ···:-:·:-:-:-:;:;:-:-.·:·:·:·:-. .;· ·.• .···.·.-.·.·.·.·.·.·.·.·.·.·.·;•,•.·:·.·.·.·.·.·:·:·>.·.·.·.·.·.·:·:·.
·.•.•.0 ... ·.·.•.·.·.·.•'.•'.''.1..'•.•.•.•.=.•.•.•.•.·.························•.t.•.•.•.•· ... ,,,,,,,,,,,,,,,,,,,,,,,,,, .'.•·.•.•.•.•.•.:.:.:.:.:.•.•.•.•.• ?.•:.::'.••. ' M6iliSSS. ¢fsf ~v ·.·.·.·.·.·,·.·.··:·:-·-:·····:·:···:·:···:-:.:-:-:-:-:-:
Rainfall Intensity (1 25 ) = 9.861 in/hr
·.•·.o: ... • .. •.·.• ... ·~.···.••.·•.•.•.r.r.= .. · .. ·.:.,.•·.•.•.•.•· .• ·.··.·.···:,.:.•::.:•.•.••.:•.•·., :·· ::::•• ...... ,... <•••1:a:;943\as .,...,. '-'-9. :::::::.:::::::::·:·:::·:::;:::·:::;:::;:::::::: .·.·.·.·.·.·-·.·.·--:··.;.;.·.:·:·:.:·>:·:-:-:-:-:-:<·:·:·:·:-:-:-·-·.·.·.··
Rainfall Intensity (1 50 ) = 11 .148 in/hr
.
····A··········.·.·.·;::::.::.::;.::···'.'.=.•········································'·: •tt. • : • ) • •:: •••••• t1 GH3fa:tsr ..... ~ -:-:-:-:-·.:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:.:·:·:·:·:·:·:·:·:·:·:·:-:-:-:-:-:·:·:·.·.·.·.·.·.·.·.·-·=·=·=··-·
Rainfall Intensity (1 100) 11 .639 in/hr
:;A_::::=::::::::::::::::::: //:~.:~./::::: :-.-:-:-:•.-.-:-:·.·.:-:=: -:.:-:-:-:~->~e:~-:-.~---·.·.·.·.·.·.·
•sH®Ff • •• • •• •:••• •• > : t:t~ri<'~~~·•:•• J
I
I
I
I
I
I
I
I
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area Z
Drainage Area (Az.) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (Dz.) =
Velocity of Runoff (Vz) =
Coefficient of Runoff (Cz) =
**NOTE : Minimum T c allowed = 1 O min .
0.60 acres
400 ft
ft 4 .00 fsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficie nt (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8 .5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficie nt (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficie nt (b) =
Coefficie nt (d) =
2882-02.: Dra inage Evaluation.xis
0.73
96
8
RESULT
T qz) = 1.7 min .
Rainfall Intensity (Ii) = 6.327 in /hr
.m·a.1.::-::.::1:.::::.r ••@• t:• 1•:·.•18•~·•¢.ts;: rt
Rainfall Intensity (Is) =
Rainfall Intensity (1 10) = 8.635 in/hr
• ::•:J.J (ij'.qj~f~f ?
Rainfall Intensity (1 2s) = 9.861 in/hr
•_.-.·.·_a_· __ .•,·_:,_·,~.•.=•.••.•_•,.=_,=,•·_-,·· .. _= .. ·_.=,.•_,•,. ••=::::::::: ·=·=·=·=·=·=·=·=·=·'=>=:::=======·=-=---=.==.•=.• ._••.••-••-••.••.•.•-•.•.•.•.•.•.•.•,•·_ •. -.•.•,••.·,•.•,•.•,•-.•,••.s,·_·,=.·,•.~,••.=,3_•,=·.,-.•,34_·,·_·,=_•_•._=,·_·,=_ .. ,••.=,•_as,•_=,•_=,=_=_=_-.•_=_•_=_•_·_:_:.•_•.•-_•_•_:_•.••-••-••-= :.&..~ ::;:;:;:::::::::::::::::::::::::::::;:;:::;:;::::::;:;::::
Rainfall Intensity (I sa ) = 11 .148 in/hr
:R·a , • ••• • • • ••t• •·• • • · s ~~ ¢.t¥•t••
Rainfall Intensity (1 100 ) 11.639 in/hr
==~============·=~ =================== •-••.••.••.=•.=•.'•.•=.••.::::•.=.••.::::_••.••.••.••.••.:.-_•·.'•_.••.•=_·_••.••.==_.=•.·,== .. ••. _,=_,=_,=_,=_,=·.=·,···:·.· __ ,=_,=_,=_,=_.='.====··.=•_,'.·,'s,=.·.=.-,•~·--.•_•_·2•.·.·.·,=.=,~.,-.·,·.·.·,=_·,=.·,·.·,'·.,•.•,_,•,•=,·.= .• ·.=,·_=,=_·,=,=,=·.·,•,=_,•_,• __ ,•_,•_,:.=•,:•.= •. _,:_,• __ ,•_,•,=_,•,•.,••
.:_:.w_ .. _:.·.· .. ·"'·.· ...... ·.· .. ·.·_·._:.=.=-.·.:.·_:.·.: .'.'.:.'·.:_:_:_:_;_:_: .. '-_:_:_;_:_:·.=.:'. ~ "I:;) :.JW: :::::::::::;:::::::::::::;:;:::::::::::::::::::::::::·:-:;.
SECTION #3
CURB & GUTTER FLOW CALCULATIONS
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
-
Sc~ END -Scot0serc-0\jt
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
c :\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #1 (AREA 8)(10 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd . Mannings Coefficient
Channel Slope
0.013
1.0000 %
Wate r Surface Elevation
Discharge
294.81 ft
8.685 cfs
I I I I I I I I I I
296.
2 295.8
'-" 295 .6
---,---------r--------,---------r--------,---------r--------,---------r--------,---------,
c 295.4
.Q 295 .2
n; 295 .o
---------L--------4---------L--------4---------L--------4 ---------L --------4---------1
I I I I I I I I I -----r--------,---------r--------,---------r--------,---------r--------,---------
-L--------.l ---------L--------.l---------L--------.l---------L--------.l--
1 I I I I I I -------r---------r--------------r ---------r------- - - -- ---"T --- - -----,
~ 2 94. 8 -r---:-~::::::::::=---:--~-:"":-:-=_ ----.l ----------1----- - - --.J. - -- ------·
I I w 294.6 ---------r---------,----1--- - -----., - - - - - - - --1
294.4~~~~----"~~~~~~~~~~"--~~~~-'-~~~~-'-~~~~-'-~~~~-'-~~~~----'-~~~~--'-~~~~-'
0 .0 5.0 10.0
Notes:
Collects Runoff from Drainage Basisn : 8
Discharges into Drainage Basin : C
Discharges into Structure Type : Open Channel
15.0 20.0 25 .0
Station {ft)
M unicipal Deve lopment G roup
30.0 35 .0
02/1 9/98
08 :37:09 AM Haest ad M eth ods, Inc . 37 B roo k s ide Road W ate rbury, CT 06708 (203) 755-1666
40 .0 45 .0 50.0
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
')o~ 8 D -Scok)5ef (~a~
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\00 0\2882 -south hampton\2882r1 ra.fm2
1.0. #1 (AREA 8)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 294.50 ft to 296 .00 ft .
Station (ft) Elevation (ft)
0 .00 296 .00
11 .00 295.00
11.50 295 .00
11 .50 294 .50
25 .00 295 .00
38 .50 294 .50
38 .50 295.00
39 .00 295 .00
50 .00 295 .25
Discharge 8 .685 cfs
Resu lts
Wtd . Mannings Coefficient 0.013
Water Surface E l evation 294 .81
Flow Area 2.67
Wetted Perimete r 17 .63
Top Width 16 .99
Height 0.31
Critica l Depth 294 .86
ft
ft2
ft
ft
ft
ft
Start Station
0 .00
Critical Slope 0.004563 tuft
Velocity 3.25 tus
V e lo city Head 0.16 ft
Specific Energy 294.98 ft
Froude Number 1.44
Flow is supercritical.
Flow is divided .
Munici p al Development Group
End Station
50 .00
02/19/98
08 :3 7 :33 AM H aestad M ethod s, Inc . 37 Brookside Road Waterbury , CT 0670 8 (203) 7 55-1 666
Roughness
0.013
Fl owMaster v5.07
Pa ge 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
SJ~ -BND -~.o~SBT Ce:> (f:
c:\projects\000\2882-south hampton\2882r1 ra.fm2
l.D . #1 (AREA 8)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd . Mannings Coefficient
Channel Slope
0.013
1.0000 %
294 .85 ft
11 .707 cfs
Water Surface Elevation
Discharge
I I I I I I I I I I
296 .
2 295 .8
'-" 295.6
---,---------r--------,---------r--------,---------r --------,---------r--------,---------,
---------L--------4---------L--------4---------L--------4---------L--------4---------1
c 295.4 I I I I I I I I I I --------,-------r--------,---------r--------,---------r--------,---------r--------,---------
.Q 295 .2 -L--------J---------L--------J---------L--------J---------L--------J--
-+-' I I I I ~ ~~~: ~ -F~~~~~~~~=--~~:-:~~~-=-~-~-~-;.-~-~-~,-~-~=~=~===~-~:~=~"l~. ~=~=~=~=;.;=~={--:-= = = = = = = = ~ = = = = = = = = :: w 294.6 ---------r---------,----,----------r---------,
294 .4'--~~~-L~~~~--'-~~~~-'-~~~~-'---~~~~--'-~~~~-'-~~~~"'--~~~-..J'--~~~--1.~~~~-'
0 .0 5.0 10.0
Notes :
Collects Runoff from Drainage Basisn : B
Discharges into Drai nage Basin : C
Discharges into Structure Type : Open Channel
15.0 20 .0 25 .0
Station (ft)
.•.
Municip al Develo pment Group
30 .0 35.0
02/19/98
08 :3 7 :5 7 .AM H aestad M ethods, Inc . 37 B rooks ide R oad W ate rbury, CT 0 6 708 (203 ) 755-1 666
40 .0 45 .0 50 .0
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
SECTION #3 -CURB & GUTTE R FLOW
Worksheet for Irregular Cha n nel
~~,J ~\).,. ')C~tv~ (o'\/£
Project Description
Proje ct File
Worksheet
Flow Element
Method
c :\projects\0 00 \2882-south hampton\2882r1 ra.fm2
1.0 . #1 (AREA 8)(100 YR)
Irregular Channel
Man ning's For mula
Solve For W ater Elevati on
Input Data
Channel Slope 1.00 00 %
Elevation ra nge : 294 .50 ft to 296 .00 ft .
Station (ft) Elevation (ft)
0 .00 296 .00
11.00 295 .00
11 .50 295 .00
11 .50 294 .50
25.00 295 .00
38 .50 294 .50
38 .50 295 .00
39 .00 295 .00
50 .00 295 .25
Discharge 11.707 cfs
Resul ts
Wtd . Mannings Coefficient 0.013
Wate r Surface Elevation 294 .85
Flow Area 3.34
Wetted Perimeter 19.72
Top Width 19 .00
Height 0.35
Critic a l Depth 294.91
ft
ft2
ft
ft
ft
ft
Start Station
0 .00
Criti cal Slope 0.004385 ft/ft
Velocity 3.50 ft/s
Ve loc ity Head 0.19 ft
Specific Energy 295.04 ft
Froud e Number 1.47
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
50 .00
02/19/98
08 :38 :17 AM Haestad Methods , Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.013
Fl owMast er v5 .07
Page 1 o f 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
1 1 ~ Sc.uN?01 cc i:.
c:\projects\000\2882-south hampton\2882r1 rc .fm2
l.D. #2 (AREA E) (10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0 .013
1.0000 %
0.000000 H : V
27 .000000 H : V
10 .970 cfs
0.45 ft
2 .68 ft2
12.48 ft
12.02 ft
0.53 ft
0.004033 ft/ft
4 .10 ft/s
0.26 ft
0.71 ft
1.53
Collects Runoff from Drainage Basin : E
Discharges into Drainage Basin: G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Sconset Cove
Municipal Development Group 06/09/98
02:50 :44 PM Haestad Methods, In c. 37 Brookside Road Waterbu ry, C T 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right S ide Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Ve locity
Ve loc ity Head
Specific Energy
Froude Number
Flow is supercritical.
No t es :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #2 (AREA E) (100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
14 .788 cfs
0.50 ft
3.35 ft2
13 .96 ft
13.45 ft
0.60 ft
0.003875 tuft
4.41 tus
0.30 ft
0.80 ft
1.56
Collects Runoff from Drainage Basin : E
Discharges into Drainage Basin : G
Discharges into Structure Type : Culvert
Runoff on Southwest Side of Sconset Cove V'
Munici pal Deve lo pment Group 06/09/98
02:51 :25 PM Haestad Methods , Inc. 37 Brooks ide R oad W aterbu ry , CT 06708 (203) 755-1666
FlowMast er v5 .0 7
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Ve locity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #3 (AREA E)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.5000 %
0.000000 H : V
38.000000 H: V
10 .970 cfs
0.44 ft
3.76 ft2
17.36 ft
16.91 ft
0.46 ft
0.004161 ft/ft
2.92 ft/s
0.13 ft
0.58 ft
1.09
Collects Runoff from Drainage Basin : E
Discharges into Drai age Basin : G
Discharges into Structure Type : Culvert
J!S 7,
Runoff on Sotrt:he.\st Si e of Wayfarer Lane
Note : 12' Clear Lane Provided -Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane .
06109198
02:58:39 PM
Munic ipa l D eve lopment G roup
Haestad Methods, Inc. 37 Broo ks id e Road Wate rbury, CT 06708 (2 03) 755-166 6
FlowMast er v5 .07
Page 1 o f 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right S ide Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critica l Depth
Critica l Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #3 (AREA E)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.5000 %
0.000000 H : V
38 .000000 H : V
14.788 cfs
0.50 ft
4.71 ft2
19 .42 ft
18 .91 ft
0.52 ft
0.003999 ft/ft
3.14 ft/s
0.15 ft
0.65 ft
1.11
Collects Runoff from Drainage Basin : E
Discharges into Drainage Basin: G
Discharges into Structure Type : Culvert
Runoff on Southeast Side of Wayfaer Lane .
Municipal Development Group 06109198
02 :59 :22 PM Haestad Methods, Inc. 37 Broo ks id e Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Pag e 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right S ide Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Ve locity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #4 (AREA F)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
13 .634 cfs /
0.48 ft
3.15 ft2
13.54 ft
13 .05 ft
0.58 ft
0.003918 ft/ft
4.33 ft/s
0.29 ft
0.77 ft
1.55
Collects Runoff from Drainage Basin : F
Discharges into Dra inage Basin : TxDOT R.O.W.
Discharges into Structure Type : Culvert
Runoff on Northeast Side of Sconset Cove .
Municipal D eve lopment G ro up 0610 9198
03 :00 :35 PM H aestad M ethods , Inc . 37 B ro o ksid e R oad W aterbury, C T 0 6708 (203) 7 5 5-1666
FlowMaster v5 .07
Page 1 o f 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channe l Slope
Left S ide Slope
Right S ide Slope
Discharge
Results
Depth
Flow Area
W etted Perimete r
Top W idth
Critica l Depth
Critical Slope
Ve locity
Ve loc ity Head
Spe ci fic Energy
Fro u de Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #4 (AREA F)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
18 .379 cfs
0.54 ft
3.94 ft2
15 .14 ft
14.59 ft
0.65 ft
0.003765 ft/ft
4.66 ft/s
0.34 ft
0.88 ft
1.58
Colle cts Runoff from Drainage Basin : F
Discharges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type : Culvert
Runoff on Northeast Side of Sconset Cove .
Note : Th ere will be a minimum 3" cut from the TIC to to daylight. Therefore , overflow of the 100 -yr flood will be
mainta ined with in the R.O .W and shall be shown on the construction documents for South Hampt on , Phase Seven .
06109198
03:01 :39 P M
Munic ipal Development G roup
Haestad Methods, In c . 37 B rooks ide Road W aterbu ry , CT 0 6708 (203) 75 5-1666
FlowMast er vS.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right S ide Slope
Discha rge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Criti c al Slope
Velocity
Velocity Head
Spe ci fic Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #5 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
0.000000 H : V
38 .000000 H: V
13 .634 cfs
0.44 ft
3.71 ft2
17 .25 ft
16 .80 ft
0.50 ft
0.004043 ft/ft
3.67 ft/s
0.21 ft
0.65 ft
1.38
Colle cts Runoff from Drainage Bas in: F
Discharges into Drainage Bas in: TxDOT R.O .W.
Disc harges into Structure Type : Culvert
Note · 12"f I ear Lane Provided -Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane.
06109198
03 :10:14 PM
\t~
Munici pal Development G ro up
Haestad Methods, Inc. 37 Broo kside Road W aterbu ry , CT 0 6708 (203) 755-1666
FlowM ast er v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Spec ifi c Energy
Froude Number
Flow is supercritica l.
Note s:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #5 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
0.000000 H: V
38.000000 H : V
18 .379 cfs
0.49 ft
4.64 ft2
19.29 ft
18 .79 ft
0.57 ft
0.003885 tuft
3.96 fUs
0.24 ft
0.74 ft
1.40
Collects Runoff from Drainage Basin: F
Discharges into Drainage Bas in: TxDOT R.O .W .
Disch arges into Structure Type: Culvert
No te : Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane .
Municipal Deve lopment Group 06109198
03:12:25 P M Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of1
I
Project Descri ption
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Sl ope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Ve locity
Ve locity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CUR B & GUTTER FLOW
W orksheet for Trian g ular C h an n el
c:\projects\0 00\2882-south hampto n\2882r1 ra.fm2
l.D. #5 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
0.000000 H: V
38 .000000 H : V
18 .379 cfs
0.49 ft
4.64 ft2
19 .29 ft
18 .79 ft
0.57 ft
0.003885 ft/ft
3.96 ft/s
0.24 ft
0.74 ft
1.40
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin : Tx DOT R.O.W .
Discharges into Structure Type : Culvert
02119 /98
09:5 1 :12 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbu ry , CT 06708 (203) 755-1666
.•
FlowMaster v5 .07
Page 1 of 1
06/11/98
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #6 (AREA H)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0 .013
1.6000 %
295.63 ft
26 .814 cfs
~295 .9 -------~-------~-------~-------~-------~-------+-------+-------~-------~-------
~295 .8 ~ ------~-------4 -------4-------~-------~-------~-------~-------~
C 295 .7 I
.Q 295 .6 ---- - --:-- --- ---:-m 295 _5 ----- --,-- - - - - --,-
~ 295.4 - - - ----:-- -- ----:-- - -~ ----- - -~ - - - -- --~ - - - --- -~ ------ -~ --- -m 295.3 -------r------~---,-------,-------,-------,-------y-------r-------r-
295 .2'--~~~-'--~~~-'-~~~--'-~~~--L~~~~'--~~~_._~~~-'-~~~--'-~~~~'--~~~-'-~~~_._~~~-'
0 .0 5 .0 10.0 15.0 20.0 25 .0 30.0 35.0 40.0 45 .0 50.0 55 .0 60.0
Notes :
Collects Runoff from Drainage Basin : H
Discharges into Drainage Basin : I
Discha rges into Structure Type : Open Channel
Station (ft)
Munic ipal Development Group
11 :23:43 AM Haestad M ethods, Inc . 3 7 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Pro j ect Description
Project File
Worksheet
Flow E lement
Method
c:\projects\000\2882-south hampton\2882r1 re. fm2
l.D . '1#3 (AREA H)(10 YR)
Irregular Channel
Manning 's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevati on range : 295 .25 ft to 296 .00 ft .
Stati on (ft) Elevation (ft)
0.00 296 .00
10 .50 295 .75
11 .00 295.75
11.00 295 .25
30 .00 295.75
49 .00 295 .25
49 .50 295 .75
60 .00 296.00
Dis ch arge 26 .814 cfs
Results
Wtd . Mannings Coefficient 0.013
Wat er Surface E l evation 295 .63
Flow Area 5.65
W etted Perimete r 30.05
Top W idth 29.50
He ight 0.38
Critica l Depth 295 .75
ft
ft2
ft
ft
ft
ft
Start Station
0.00
10 .50
Criti ca l Slope 0.004017 ft/ft
Ve loc ity 4.75 ft/s
Ve locity Head 0.35 ft
Sp ecifi c Energy 295 .98 ft
Froude Number 1.91
Flow is supercritica l.
Flo w is divided .
M unici pa l Deve lo pm ent Group
End Station
10 .50
60 .00
06/11 /98
11 :2 4 :06 A M Haestad Methods . Inc. 3 7 Broo ks ide Road W aterbu ry . CT 0 6708 (203) 755-1 666
Roughness
0.030
0.013
FlowMaster v5 .07
Page 1 of 1
--
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
--
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #B (AREA H)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
295 .68 ft
36.145 cfs
~ 295.9
'-' 295.8
I I I I I I I I I
-------~-------~-------1-------1-------1-------1-------r-------r-------r-------
-1--- ----~ - --- ----l -- - - - --.j ---- -- -" -- -- ---.j. - - -----.j. -- --- - -I---- - - --I-
C 295.7 1
I ------------
~ ~~~:~ = = = = = = =:= = = = = = = =:=
_______ .J. _______ _
I I I -----,-------,-------T -----I I I I -------r------r-------r -------,
(!)> 295.4 -- - - - --1-- - - - - --1-
1 I w 295.3 -------,--------,--
---J-------~-------~-------L -------L----1 I I I I -,-------,-------,-------,-------T-------r-------r-
- L - -- -- --L --- - - --1
I I I --r-------r-------,
295.2'--~~~-'--~~~--'-~~~-'-~~~--'~~~~...__~~~-'-~~~_.._~~~--'~~~~...._~~~-'-~~~-'-~~~-'
0 .0 5.0 10.0
Notes :
Collects Runoff from Drainage Basin : H
Discharges into Drainage Basin : I
15.0
Discharges into Structure Type : Open Channel
20.0 25 .0 30.0
Station (ft)
Municipal Development Group
35 .0 40 .0
06/11/98
11 :2 4 :4 2 AM H aestad M eth ods, Inc. 3 7 Brookside Road Wate rbury , C T 06708 (203) 755-1666
45 .0 50.0 55.0 60.0
FlowMaster v5 .07
Page 1of1
I
I
I
I
I
Project Description
Project File
Work.sheet
Flow Element
Method
Solve For
Input Data
Channel Slope
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. "#6 (AREA H)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
1.6000 %
Elevation range : 295 .25 ft to 296.00 ft.
Station {ft) Elevation (ft) Start Station
0.00
10.50
0.00 296 .00
10.50 295.75
11.00 295 .75
11.00 295.25
30.00 295 .75
49 .00 295 .25
49 .50 295.75
60 .00 296 .00
Discharge 36 .145 cfs
Results
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 295.68 ft
Flow Area 7.07 ft2
Wetted Perimeter 33.61 ft
Top Width 32.99 ft
Height 0.43 ft
Critical Depth 295 .81 ft
Critical Slope 0.004619 ft/ft
Velocity 5.11 ft/s
Velocity Head 0.41 ft
Specific Energy 296.08 ft
Froude Number 1.95
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
10.50
60.00
06/11/98
11 :24:59 AM Haestad M ethods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #7 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0 .013
1.4000 %
275.62 ft
22.982 cfs
E' 275.9
'-" 275.8
c 275.7
.Q 275.6
I I I I I I I I I I
-------~-------~-------,-------1-------1-------i-------r-------r-------r-------r-------
_,_ - --- - --1--- -----1---- - ---I -- - -----I --- - - - -... - - ---- -I-- - --- - -I----- ---I-- - - - - - -
I I I I I I I I -- - -- --,------ --,---- ---,--------, - - -- ---1 -- -- - -i --- - ---r - --- - - - r -- -- - -r - -- ----.------ --
------_,_ ------_,_ -L. - - - --- -L - - - - - --1
I I I - r -- - --- - r --- ----, <0 275.5 ---------------:-
---~-------J _______ J _______ i-------L----
1 I I I I -,-------,-------,-------,-------y-------y-------y-
-L - ---- --L - ------1
I I I --r-------r-------, Q)> 275.4 --- - - --1-------_,_
I I w 275.3 -------,--------,--
275 .2'--~~__.J'--~~~'--~~~"--~~~..___~~~-'-~~~...._~~~-'-~~~_,,_~~~-'--~~~-'-~~~-'-~~~-'
0 .0 5 .0 10.0 15.0
Notes :
Collects Runoff from Drainage Basin : M
Di sc harges into Drainage Basin : TxDOT R.O.W .
Di scharge into Structure Type : Open Channel
20 .0 25 .0 30.0
Station (ft)
Municipa l Develo pment Gro up
35 .0 40.0
0 6/11/98
11 :26 :32 AM H aest ad M et hods, Inc 3 7 Brook s ide Road W ate rbury , CT 0 6 708 (203) 755-1666
45 .0 50 .0 55 .0 60 .0
FlowMas ter v5 .07
P ag e 1 o f 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Cha n nel
Project Description
Project File
Worksheet
Fl ow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #7 (AREA M)(10 YR)
Irregular Channel
Manning 's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.4000 %
Elevation range : 275 .25 ft to 276 .00 ft .
Station (ft) Elevation (ft)
0.00 276 .00
10.50
11 .00
11 .00
30 .00
49.00
49 .00
49.50
60 .00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
275 .75
275 .75
275.25
275.75
275.25
275 .75
275 .75
275 .80
22 .982 cfs
0.013
275 .62
5.30
29 .13
28 .37
0.37
275.72
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004136 ft/ft
Velocity 4.34 ft/s
Velocity Head 0.29 ft
Spec ific Energy 275 .92 ft
Froude Number 1.77
Flow is supercritica l.
Flow is divided .
Munici pa l Development G ro up
End Station
60 .00
06/11 /98
11 :26 :54 A M H ae s tad Met hods, In c . 37 Brookside Road Waterbu ry, C T 06708 (203 ) 755-1666
Roughness
0.013
Fl owMaster v5 .07
Pag e 1 of 1
06/11/98
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc .fm2
l.D. #7 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.4000 %
275 .67 ft
30.980 cfs
£ 275 .9
...,,, 275 .8
I I I I I I I I I I
-------~-------,-------,-------,-------1-------y-------r-------r-------r-------r-------
-•-------~-------~-------~-------~-------+-------~-------~-------L-------I I I I I c 275 .7 -----------------------r-------r-------,
.Q 275 .6 - --- ---:----- - --:-ro 275 .5 -------,--------i-
~ 275.4 --- - - --:------ --:-w 275.3 -------,--------,- -
___ J _______ J -------~-------~-------L----
1 I I I I -,-------,-------,-------,-------y-------r-------r-
-L.. --- - - --L-- - - - ---1
I I I - r -- --- - - r -- - - ---,
- L - -- -- - - L - - - - - --1
I I I --r-------r-------,
275 .2'--~~~.L-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.L-~~~~~~~~
0 .0 5.0 10.0 15.0
Notes :
Collects Runoff from Drainage Basin : M
Discharges into Drainage Basin : TxDOT R.O .W .
Discharge into Structure Type: Open Channel
20 .0 25.0 30.0
Station (ft)
Munic ipal Development Group
35.0 40 .0 45 .0 50 .0 55 .0 60 .0
11 :27:42 AM Haestad M ethods , Inc . 37 Broo k s id e Road Wate rbury, C T 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
06/11/98
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Descri ption
Project File
Worksheet
Flow Element
Method
c:\projects\0 00 \2 882-so uth hampton\2882r1 re . fm2
l.D . #7 (AREA M)(100 YR)
Irregular Channel
Manni ng's Fo r mula
Solve For Water Elevation
Input Data
Channel Slope 1.4000 %
Elevation range : 275.25 ft to 276.00 ft .
Station (ft) Elevation {ft)
0 .00 276 .00
1 0.50 275 .75
1 1.00 275 .75
11 .00 275 .25
30 .00 275 .75
49 .00 275.25
49 .00 275.75
49.50 275.75
60.00 275 .80
Discharge 30.980 cfs
Results
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 275.67
Flow Area 6 .62
Wetted Perimeter 32.58
Top Width 31.73
Height 0.42
Critica l Depth 275.79
ft
ft2
ft
ft
ft
ft
Start Station
0.0 0
Critica l Slope 0.004135 ft/ft
Ve locity 4 .68 ft/s
Velocity Head 0.34 ft
Specific Energy 276 .01 ft
Froude Number 1.80
Flow is supercritical.
Flow is divided .
Municipal Deve lo pment Group
End Station
60.00
11 :28 :00 AM Haestad Methods , In c. 37 Brook s ide Roa d Waterbury, CT 067 0 8 (203) 7 55-1666
Roughness
0.013
FlowMast er vS.07
Page 1 o f 1
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 re . fm2
1.D . #8 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
265 .61 ft
22.982 cfs
I I I I I I £ 265 .9
._, 265 .8
- - - - - -I -- - -- --- - ----I - -- ----------, - -- ---- - - - ---T ---- - - - --- - --,-- - --- --- - -- --- - - - - - - - -,
c 265 .7
.Q 265 .6 co 265 .5
~ 265.4 w 265.3
-l ---- ------ - --I-- ---- ----- - --l - - - --------- -~ --- - -- - - -- ---1--------... -- -- -- - - -- - --1
I I
-1---- - -- -- --- -T - -- - -- -- - -- --
~-r---.,.~------1 -1-------------J. _ ----- -------1
I I I
-i-- - - ---- - - ---T - - - - - - - --- - --1
_,_ - - - - - - --- ---.1 - - - - - - - - - - - --•
I I I I I I - - - - - - -- r - ----- - - ----1--- ---- - -- ---r - ---------i----- ------- -T -- --: -- -- - - - --1
265 .2'--~~~~~~'--~~~~~--''--~~~~~--'~~~~~~--'~~~~~~--'~~~~~~--'~~~~~~--'
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin: M
Discharges into Drainage Basin : TxDOT R .O .W .
Discharge into Structure Type : Culvert
20.0 30 .0 40 .0 50 .0
Station (ft)
Municipal Development Group 06/11/98
11 :29 :23 AM Haestad M ethods , Inc . 37 Brookside R oad W aterbury, CT 06708 (203) 7 55-1666
60 .0 70 .0
FlowMaster v5 .07
Page 1 of 1
I
I
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channe l
Project Description
Project File
Wor ksheet
Flow E lement
Method
c :\projects\0 00 \2 88 2-south hampto n\28 82r1 rc.fm2
l.D . #8 (AREA M)(10 YR)
Irregular Channel
Manning 's Formula
Solve Fo r Water Elevation
Input Data
Channe l Slope 1.6000 %
Elevation ra ng e : 265 .25 ft to 266 .00 ft .
Stati on (ft) Elevation (ft)
0.00 266 .00
10.50 265 .75
11.00 265 .75
11.00 265 .25
30 .00 265 .75
49 .00 265 .25
49 .00 265 .75
49 .50 265.75
70.00 266 .00
Disc harge 22 .982 cfs
Resu lts
Wtd . Mann ings Coefficient 0.013
Water Surface Elevation 265 .61
Flow Area 5.04
Wetted Perimeter 28 .41
Top W idth 27 .67
Height 0.36
Criti ca l Depth 265 .72
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Criti ca l S lope 0.004136 ft/ft
Velo c ity 4.56 ft/s
Ve locity Head 0.32 ft
Spe cifi c Energy 265 .94 ft
Fro u de Number 1.89
Flow is supercritica l.
Flow is divided .
Munici pa l Development Group
End Stati on
70 .00
06/11/98
11 :29:41 AM Haestad Met hods, Inc. 37 Broo kside Road W aterbury, CT 0 6708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #8 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
265 .66 ft
30.980 cfs
I I I I I I £ 265 .9
......, 265 .8
- - - ---I ---- - - - ------1-- -- ---- -----, - - --- --- -- - --I -- -- -- - -- -- --,-- --- -- - - - - --- - - - ---- --,
c 265.7
.Q 265 .6
-ro 265 .5
~ 265.4 w 265 .3
-l ---- ---------I----------- - --1-------------" ----------- -_,_ -------.j. -------------1
I --..... =----.i...;~------t -1 -------------1-- - - ---------
~-------------i-------------1 I I I
~-------------y-------------1
~-------------i-------------1 I I I I I I -- --- - - - r -- - - - ---- ---1-- - - - - - - - ----r --- - - -----i-- --- -- -- - ---T - -------- - - --1
265 .2'--~~~~~~-'-~~~~~~-'-~~~~~~-'-~~~~~~--''--~~~~~~-'-~~~~~~-'-~~~~~~~
0 .0 10.0
Notes :
Collects Runoff from Drainage Basin : M
Discharges into Drainage Basin : TxDOT R.O .W .
Discharge into Structure Type: Culvert
20.0 30 .0 40.0 50.0
Station (ft)
M u n icipal D ev elo pment G roup 06/11 /98
11 :30 :30 AM H aestad M ethods, Inc. 3 7 Brook side R oad W at e rbu ry , CT 0 6 7 08 (203) 7 5 5 -1666
60.0 70 .0
FlowMaste r v5.07
P ag e 1 of 1
I
I
I
I
I
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Cha n nel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #8 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevation ra nge : 265 .25 ft to 266 .00 ft .
Station (ft) Elevation (ft)
0.00 266 .00
10.50 265 .75
11 .00 265 .75
11 .00 265 .25
30 .00 265.75
49.00 265 .25
49 .00 265 .75
49 .50 265.75
70 .00 266 .00
Discharge 30 .980 cfs
Resutts
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 265.66
Flow Area 6 .30
Wetted Perimeter 31.77
Top Width 30 .95
Height 0.41
Critical Depth 265 .78
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004021 tuft
Velocity 4.92 tus
Velocity Head 0.38 ft
Specific Energy 266 .03 ft
Froude Number 1.92
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
70 .00
06/11 /98
11 :30 :46 AM Haestad Methods, In c . 37 Brookside Road Waterbu ry , CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1of1
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #9 (AREA P)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.7500 %
261.68 ft
37.553 cfs
£ 261 .9
'-' 261 .8
c 261 .7
.Q 261 .6
-ro 261 .5
~ 261 .4 w 261 .3
I I I I I I
------1-------------r------------~-------------r-------------1-----------------------
-l --- - - - - - ---- -I-- - - - - - - - -----1---- --- - - - - - -I---- --- - -- - - --I--- --- - - -J. --- - - - - ------1
I
............ ~----..... --~;m..;;;.;;;..;;.;;;.;;;.;;;..;;;,,;;~-1---- --- - --- --, - - ----- - - -- - -
_,_ -- - - -- --- ---J.. - - - - -- - - - - - --1
I I I -,------- - --- -- T --- - - - - -- -- --1
---L------------~-------------L---_,_ - - - -- - -- - - --J. -- - - - --- - - - --1
1 I I I I I --------r------------,-------------r----------,-- - - - - -- -- - - - T -- --- ----- - --,
261 .2'--~~~~~--'~~~~~~--'~~~~~~--'~~~~~~--'~~~~~~--'~~~~~~-'-~~~~~~--'
0 .0 10.0
Notes :
Collects Runoff from Drainage Basin: P
Discharges into Drainage Basin : Nantucket Dr .
Discharge into Structure Type : Culvert
20.0 30 .0 40.0 50 .0
Station (ft)
Municipal Development Group 06/10/98
0 8 :44:44 AM Haestad Methods. Inc . 37 Brookside Road W ate rbury, CT 06708 (203) 755-1666
60 .0 70 .0
FlowMaster v5 .07
Page 1 of 1
I
I
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.7500 %
Elevation range : 261.25 ft to 262 .00 ft.
Station (ft) Elevation (ft)
0.00 262 .00
10 .50 261.75
11 .00 261 .75
11.00 261 .25
30 .00 261 .75
49 .00 261 .25
49.00 261 .75
49 .50 261 .75
70.00 262 .00
Dischar~e 37.553 cfs
Results
Wtd . Mannings Coefficient 0.013
Water Surface Elevation 261.68
Flow Area 7 .04
Wetted Perimeter 33.58
Top Width 32 .71
Height 0.43
Critical Depth 261.83
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.003941 tuft
Veloc ity 5.34 fUs
Velocity Head 0.44 ft
Specific Energy 262 .12 ft
Froude Number 2.03
Flow is supercritical.
Flow is divided .
Municipal Development Group
End Station
70 .00
06/10/98
08 :45 :06 AM Haestad M ethods, In c . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
-
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #9 (AREA P)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.7500 %
261.73 ft
50.621 cfs
Water Surface Elevation
Discharge
I I I I I I ~ 261 .9
'-' 261 .8
c 261 .7
.Q 261 .6
-ro 261.5
~ 261.4 w 261 .3
- --- - -, -- - -- - --- - - - -, ---- - - -- - - - --,---- ----- - ---r - - -- - - - - - - ---,---- -- - - ------- -- - - - - --,
~-------------_______ .. _____________ I
I -,-- -- --- ---- --T -- - - - -- -- ----I
-1-- --- -- -- - - --.. - - - - - - - - - - ---1
I I I
-1-- --- - - - - - - - -T - - - - --- - -----1
-1-- - - -- - - - -- --.. - - - - - --- - - - --1
I I I I I I - - - - - - -- r - - - - - - - - - - - -1-- - - - - - - - - - - -r - - - - - - - ---1-- - - - - - - - - - - -T - - - - - - - - - ----1
261 .2~~~~~~~~~~~~~~-'-~~~~~~-'-~~~~~~---''--~~~~~~_._~~~~~~-'-~~~~~~~
0 .0 10.0
Notes :
Collects Runoff from Drainage Basin : P
Discharges into Drainage Basin : Nantucket Dr.
Discharge into Structure Type : Culvert
20.0 30.0 40 .0 50.0
Station (ft)
.•.
Municip a l D evelo pme nt G roup 06/10/9 8
08 :4 5 :4 9 AM Haest ad M eth ods, Inc . 3 7 Srook s ide R oad W at erbu ry , CT 067 0 8 (203) 755-1666
60.0 70 .0
Fl owMaster v5 .07
Page 1 o f1
I
I
I
I
I
I
I
I
I
I
I
I
SECTION #3 -CURB & GUTTER FLOW
Works heet for Irregular C h annel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000 \2882-south hampton\2882r1 re. fm 2
1.D . #9 (AREA P)(100 YR)
Irregular Channel
Mann ing's Formula
Solve For W ater Elevation
Input Data
Channel S lope 1.75 00 %
Elevation ra nge : 261.25 ft to 262 .00 ft .
St ati on (ft) Elevation (ft)
0.00 262 .00
10 .50 261 .75
11.00 261 .75
11.00 261 .25
30.00 261 .75
49 .00 261 .25
49 .00 261 .75
49 .50 261 .75
70 .00 262.00
Disc h arge 50 .621 cfs
Resu lts
Wtd. Manni ngs Coefficient 0.013
Water Surface Elevation 261 .73
Flow Area 8.81
Wetted Perimeter 37 .56
Top Width 36 .58
Heig ht 0.48
Crttica l Depth 261.90
ft
ft 2
ft
ft
ft
ft
Start Station
0.00
Crttica l Slope 0.003810 tuft
Velocity 5.75 fUs
Ve locity Head 0.51 ft
Specific Energy 262 .24 ft
Froude Number 2.07
Flow is supercrttical.
Flow is divided .
Municipal Deve lo p ment Group
End Stati on
70 .00
06/10/98
08:46 :10 A M Haestad Methods , Inc. 3 7 Brookside Road Waterb u ry, C T 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specifi c Energy
Froude Number
Flow is sueercritical.
No t es :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #10 (AREA T)(10 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
6.096 cfs
0.36 ft
1.72 ft2
10.01 ft
9.65 ft
0.42 ft
0.004362 ft/ft
3.54 ft/s
0.19 ft
0.55 ft
1.48
Collects Runoff from Drainage Basin : T
Discharges into Drainage Basin : V
Discharges into Structure Type : Open Channel
Runoff on East Side of Beacon .
Munic ipal Development Group 06/10/98
09 :02:45AM Haestad Methods, In c . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMast e r v5 .07
Page 1 of 1
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Inp ut Da t a
Mann ings Coefficient
Channel Slope
Left S i de Sl ope
Righ t Side Slope
Disc h ar~e
Results
Depth
Flow Area
Wetted Perimete r
Top Width
Critical Depth
C riti c al Slope
Velocity
Velocity Head
Specific Ene rgy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
W orksheet for Tri a ngular Channel
c:\p rojects\000 \2882-south hampto n\2882r1 re . f m2
1.D. #10 (A REA T){100 YR)
Triangular Cha nnel
Manning's Formula
Channel Depth
0.013
1.00 00 %
0.00000 0 H : V
27 .000 000 H : V
8.218 cfs
0.40 ft
2.16 ft2
11.20 ft
10 .79 ft
0.47 ft
0.004 191 ft/ft
3.81 ft/s
0.23 ft
0.63 ft
1.50
Collects Runoff from Drainage Basin : T
Discharges into Drainage Bas in: V
Disc harges into Structure Type : Open Channel
Runo ff on East Side of Beacon .
Munic ipal Deve lopme nt G roup 06/10/98
09 :03:2 8 AM Haes tad M et hods, Inc . 37 Brookside Road W aterb ury, CT 067 08 (203) 7 55-1666
FlowMast er v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specifi c Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #11 (AREA T)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.6000 %
0.000000 H : V
38 .000000 H : V
6.096 cfs
0.29 ft
1.57 ft2
11.20 ft
10.91 ft
0.36 ft
0.004500 ft/ft
3.89 ft/s
0.24 ft
0.52 ft
1.81
Collects Runoff from Drainage Basin : T
Discharges into Drainage Basin : V
Discharges into Structure Type : Open Channel
Runoff on South Side of Cranberry Court.
Municipal Development Group 06/10/98
09 :13:19 AM Haestad Methods, Inc. 37 B rookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #11 (AREA D(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.6000 %
0.000000 H : V
38 .000000 H : V
8.218 cfs
0.32 ft
1.96 ft2
12 .53 ft
12 .20 ft
0.41 ft
0.004324 ft/ft
4.20 ft/s
0.27 ft
0.59 ft
1.85
Collects Runoff from Drainage Basin : T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on South Side of Cranberry Court.
Municipal Development Group 06/10/98
09 :13:01 A M Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1of1
I
I
I
I
I
Pro j ect Description
Project File
Worksheet
Flow Element
Method
Solv e For
Input Data
Mann ings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharge
Results
Dep th
Flow Area
Wetted Perimeter
Top W idth
Critica l Depth
C riti ca l Slope
Veloc ity
Ve loc ity Head
Spe cifi c Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 re. fm2
l.D. #12 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
13 .399 cfs
0.42 ft
2.40 ff
11 .81 ft
11 .38 ft
0.57 ft
0.003927 ft/ft
5.59 ft/s
0.48 ft
0.91 ft
2.14
Coll ects Runoff from Drainage Bas in: U
Discharges into Drainage Basin : TxDOT R.O .W .
Disc h arges into Structure Type : Culvert
Runo ff on West S ide of Windrift Cove.
Munic ipa l Develo pm ent Group 06/10/98
09 :57:0 4AM Haestad Methods, Inc. 37 Brookside Road W aterbu ry, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
I
I
I
I
Project Description
Proj ect File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide S lope
Right Side Slope
Discharge
Resu lts
Depth
Flow Area
W etted Perimet er
Top W idth
Critical Depth
Critical Slope
Velocity
V elocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular C h annel
c :\projects\0 00\2882-south hampton\2882r1 rc.fm2
l.D . #12 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
18 .062 cfs
0.47 ft
3.00 ft2
13 .21 ft
12 .73 ft
0.64 ft
0.003774 ft/ft
6 .02 ft/s
0.56 ft
1.03 ft
2.19
Colle cts Runoff from Drainage Basin : U
Discharges into Drainage Bas in : TxDOT R.O.W .
D ischa rges into Structure Type : Culvert
Ru n off on West Side of Windrift Cove.
Munic i pa l D evelo pment Group 06/10/98
09 :57:57 AM H aestad Methods, Inc. 37 B rookside Road W aterbu ry , CT 06708 (203) 755-1666
Flow Maste r v5 .07
Page 1 of 1
I
I
I
I
I
I
Project Description
Project File
W orksheet
Flow E lement
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velo ci ty Head
Specifi c Energy
Froude Number
Flow is supe rcritical.
No t es :
SECTION #3 -CURB & GUTTER FLOW
W orksheet for Tria ngular C h annel
c:\projects\0 00 \2882-s outh hampton\2882r1 rc.fm2
l.D . #13 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.0000 00 H : V
27 .000000 H : V
16.856 cfs
0.46 ft
2.85 ft2
12.87 ft
12 .40 ft
0.63 ft
0.003809 ft/ft
5.92 ft/s
0.54 ft
1.00 ft
2.18
Collects Runoff from Drainage Basin : Y
Discharges into Drainage Basin : TxDOT R.O .W .
Discha rges into Structure Type : Culvert
Runoff on East S ide of Windrift Cove .
Municipa l Deve lo pment G r oup 06/10 /98
10:0 2 :08 A M Haestad Met hods, Inc . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc .fm2
1.D . #13 (AREA Y)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
22 .357 cfs
0.51 ft
3.52 ft2
14 .31 ft
13 .79 ft
0.70 ft
0.003668 ft/ft
6.35 ft/s
0.63 ft
1.14 ft
2.21
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type : Culvert
Runoff on East Side of Windrift Cove .
Note : There will be a minimum 3" cut from the TIC to daylight. Therefore , overflow of the 100-yr flood will be
maintained within the R.O .W . and shall be shown on the construction documents for South Hampton , Phase One .
06/10/98
10:05 :2 2 AM
Municipal Development Group
H ae stad Methods , In c. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .0 7
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc .fm2
l.D . #14 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
13 .399 cfs
0.39 ft
2.06 ft2
10 .95 ft
10 .55 ft
0.57 ft
0.003927 ft/ft
6.50 ft/s
0.66 ft
1.05 ft
2.59
Collects Runoff from Drainage Basin : U
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on West Side of Windrift Cove .
Municipal Development Group 06/10198
10:0 8 :35 A M Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #14 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
18 .062 cfs
0.44 ft
2.58 ft2
12.24 ft
11.80 ft
0.64 ft
0.003773 ftfft
7.01 ftfs
0.76 ft
1.20 ft
2.64
Collect s Runoff from Drainage Basin : U
Discharges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type : Culvert
Runoff on West Side of Windrift Cove .
Municipal Development G ro up 06/1 0/9 8
10 :09 :19 AM Ha estad M ethods , Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .0 7
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critic al Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #15 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
16 .856 cfs
0.43 ft
2.45 ft2
11.93 ft
11 .50 ft
0.63 ft
0.003809 ft/ft
6.89 ft/s
0.74 ft
1.16 ft
2.63
Collects Runoff from Drainage Basin : Y
Discharges into Drainage Basin : TxDOT R.O.W.
Discha rge s into Structure Type : Culvert
Runoff on East Side of Windrift Cove .
Municipal Development Group 06/10/98
10:09:55 AM Haesta d Methods, Inc. 37 B rookside Road Waterbu ry, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 o f 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right S ide Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
No tes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #15 (AREA Y)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
22 .357 cfs
0.47 ft
3.03 ft2
13 .26 ft
12 .78 ft
0.70 ft
0.003668 ft/ft
7.39 ft/s
0.85 ft
1.32 ft
2.68
Collects Runoff from Drainage Basin : Y
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on East Side of Wind ri ft Cove.
Municipal Development Group 06/10/98
10:10:33 A M Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMast er v5.07
Pa ge 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow E lement
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left Side Slope
Righ t Side Slop e
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velo ci ty Head
Specific Energy
Froude Number
Flow is supercritical.
No tes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #16 (AREA U)(10 YR)
Triangular Channel
Mann ing 's Formula
Channe l Depth
0.013
0.6000 %
0.000000 H : V
38 .000000 H : V
13.399 cfs
0.46 ft
4.08 ft 2
18 .08 ft
17 .61 ft
0.50 ft
0.004052 ftfft
3.28 ftfs
0.17 ft
0.63 ft
1.20
Collects Runoff from Drainage Basin : U
Discharges into Drainage Basin : TxDOT R.O .W .
Disc harges into Structure Type : Culvert
Runo ff on West Side of Windrift Cove .
M u ni cipal Develo p ment Group 06/10/98
10:12:56 AM Haestad Methods , Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
.•
FlowMaste r v5 .07
Page 1 of 1
I
Project Description
Pro ject File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channe l Slope
Left S ide Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #16 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38 .000000 H : V
18.062 cfs
0.52 ft
5.11 ft2
20 .23 ft
19 .70 ft
0.56 ft
0.003894 ft/ft
3.54 ft/s
0.19 ft
0.71 ft
1.22
Co llects Runoff from Drainage Basin: U
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runo ff on West Side of Windrift Cove .
No te : The re will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O .W . and shall be shown on the construction documents for South Hampton , Phase One .
06/10 /98
10:15 :0 7 AM
Municipal Development G roup
Haestad Methods , Inc . 37 Brookside R oad Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 o f 1
Pro j ect Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann in gs Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharge
Resu lts
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
Veloc ity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #17 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38.000000 H : V
16 .856 cfs
0.51 ft
4 .85 ft2
19.71 ft
19.20 ft
0.55 ft
0.003930 tuft
3.48 fUs
0.19 ft
0.69 ft
1.22
Collects Runoff from Drainage Basin : Y
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type : Culvert
Runo ff on East Side of Windrift Cove .
Municipal Development Group 06/10/98
10:16:31 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Proj ect Description
Project File
Worksheet
Flow E lement
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Resu lts
Depth
Flow A rea
W etted Perimeter
Top W idth
Critical Depth
Critica l Slope
Velocity
Ve loc ity Head
Spe cifi c Energy
Froude Number
Flow is supercritica l.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #17 (AREA Y)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38 .000000 H : V
22 .357 cfs
0.56 ft
5.99 ft2
21 .91 ft
21 .34 ft
0.61 ft
0.003785 ft/ft
3.73 ft/s
0.22 ft
0.78 ft
1.24
Collect s Runoff from Drainage Bas in: Y
Discharges into Drainage Bas in: TxDOT R.O .W.
Disc harges into Structure Type : Culvert
Runo ff on East Side of Windrift Cove .
No te : T here will be a minimum 3" cut from the T/C to daylight. Therefore , overflow of the 100 -yr fl ood will be
ma inta ined within the R.O.W . and shall be shown on the construction documents for South Hampton , Phase One .
06/10/98
10:18:13AM
Munic ipal Deve lopme n t Group
Haestad Method s . In c. 37 Brookside Road W aterbury, C T 06708 (20 3) 755-1666
FlowMaste r v5 .07
Page 1 of1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #18 (AREA Z)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
4.670 cfs
0.32 ft
1.41 ft2
9.06 ft
8.73 ft
0.38 ft
0.004519 ft/ft
3.31 ft/s
0.17 ft
0.49 ft
1.45
Collects Runoff from Drainage Basin : Z
Discharges into Drainage Basin : W
Discharges into Structure Type : Curb & Gutter
Runoff on West Side of Beacon .
Municipal Development Group 06/10198
10 :20 :51 AM Ha esta d Methods, Inc. 37 Brookside Road W aterbu ry , CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Dischar~e
Resu lts
Dep th
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Criti c al Slope
Velocity
Ve loci ty Head
Spe cifi c Energy
Froude Number
Flow is sueercritical.
No t es :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #18 (AREA Z)(100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
6.295 cfs
0.36 ft
1.77 ft2
10 .13 ft
9.76 ft
0.42 ft
0.004343 ft/ft
3.57 ft/s
0.20 ft
0.56 ft
1.48
Collects Runoff from Drainage Basin : Z
Disch arges into Drainage Bas in: W
Disc harges into Structure Type : Curb & Gutter
Runoff on West Side of Beacon .
Mun icipal Development G ro up 06/10/98
10:21 :34AM Haes tad M ethods, Inc. 37 Brookside Road W a t erbury, C T 06708 (203) 755-1666
FlowMaster v5 .07
Page 1of1
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
V elocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #19 (AREA X)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
7.993 cfs
0.40 ft
2.11 ft2
11 .08 ft
10 .68 ft
0.47 ft
0.004207 ft/ft
3.79 ft/s
0.22 ft
0.62 ft
1.50
Collects Runoff from Drainage Basin: X
Discharges into Drainage Bas in: TxDOT R.O .W.
Discharges into Structure Type : Open Channel
Runoff on Northwest Side of Ebbtide Cove .
Municipal Development Group 06/10/98
10:40 :14AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #19 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
10 .774 cfs
0.44 ft
2 .64 ft2
12.39 ft
11 .94 ft
0.52 ft
0.004043 tuft
4.08 tus
0.26 ft
0.70 ft
1.53
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Runoff on Northwest Side of Ebbtide Cove .
Municipal Development Group 06/10/98
10:40:2 8 AM Haestad Methods, In c . 37 Broo kside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Proj ect Description
Proj ect File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Ve locity Head
Specifi c Energy
Froude Number
Flow is supercritical.
No tes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #20 (AREA W)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
19.198 cfs
0.55 ft
4.07 ft2
15 .39 ft
14 .83 ft
0.66 ft
0.003743 tuft
4.71 fUs
0.35 ft
0.89 ft
1.59
Collects Runoff from Drainage Basin: W
Di sc harges into Drainage Basin : TxDOT R.O .W .
Ru noff on Southeast Side of Ebbtide Cove .
Municipal Deve lop m ent Group 06/10/98
10:40:40 AM Haestad Methods, Inc. 37 Brookside Roa d Waterbu ry , CT 06708 (203) 755-1666
FlowMast er vS.07
Page 1 of 1
I
I
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve Fo r
Input Data
Mann ings Coefficient
Channel Slope
Left S ide Slope
Right S ide Slope
Discharge
Results
Depth
Flow A rea
Wetted Perimete r
Top W idth
Criti cal Depth
Critical Slope
Velocity
Velocity Head
Spec ific Energy
Froud e Number
Flow is supercritical.
No te s :
SECTION #3 -CURB & GUTTER FLOW
W orksheet for Tria n gular C h annel
c :\p rojects\0 00 \2882 -south hampton\2882r1 rc.fm2
l.D. #20 (AREA W)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
25.878 cfs
0.61 ft
5.10 ft2
17.22 ft
16 .59 ft
0.74 ft
0.003597 ft/ft
5.08 ft/s
0.40 ft
1.02 ft
1.61
Coll e ct s Runoff from Drainage Basin : W
D ischarges into Drainage Bas in : TxDOT R.O.W.
Discharges into Structure Type : Culvert
Runo ff on Southeast Side of Ebbtide Cove .
No te : There will be a min imum 3" cut from TIC to daylight. Therefore , overflow of the 100-yr flood will be ma inta ined
with in the R.O .W . and shall be shown on the construction documents for South Hampton , Phase Two .
06/10/98
10:40 :54AM
Munic ipal Deve lopme n t Group
Haestad Methods , In c. 37 Broo ks ide Roa d W aterbury, C T 06708 (203) 755-1666
FlowM ast er v5 .07
Page 1 of 1
I
Proj ect Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Spec ific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r1 rc.fm2
l.D . #21 (AREA X)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38 .000000 H : V
7.993 cfs
0.35 ft
2.29 ft2
13 .54 ft
13 .19 ft
0.41 ft
0.004341 ft/ft
3.49 ft/s
0.19 ft
0.54 ft
1.48
Collects Runoff from Drainage Basin : X
Discharges into Drainage Basin: TxDOT R.O .W.
Discharges into Structure Type : Open Channel
Runoff on Northwest Side of Ebbtide Cove .
Munic ipa l Development Group 06/10/98
10:42:11 AM Haestad Methods, In c. 37 Brookside Road W aterbu ry , CT 06708 (203) 755-1666
FlowMaster v5 .07
Pag e 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D . #21 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38.000000 H: V
10 .774 cfs
0.39 ft
2.86 ft2
15 .14 ft
14 .75 ft
0.46 ft
0.004171 ft/ft
3.76 ft/s
0.22 ft
0.61 ft
1.51
Collects Runoff from Drainage Basin: X
Discharges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type : Open Channel
Runoff on Northwest Side of Ebbtide Cove .
Municipal Development Group 06/10/98
10 :42:54 AM Haestad Methods, Inc. 37 Broo kside Road W at erbu ry, CT 06708 (203) 7 55-1666
Fl owMaster v5 .07
Page 1 o f 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #22 (AREA W)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
38 .000000 H: V
36 .652 cfs
0.61 ft
7.17 ft2
23 .96 ft
23 .34 ft
0.75 ft
0.003543 fUft
5.11 fUs
0.41 ft
1.02 ft
1.63
Collects Runoff from Drainage Basin : W+X
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
Runoff on Southeast Side of Ebbtide Cove .
Note : There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
ma intai ned within the R.O.W. and shall be shown on the construction documents for South Hampton , Phase Seven .
06/10198
10:45 :53AM
Municipal Development Group
Haestad Methods , Inc. 37 Brookside Road Waterbury , CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1of 1
I
I
Project Description
Project File
Worksheet
Flow Eleme nt
Method
Solve For
Input Data
Mannings Coefficient
Channel Slop e
Left Side Slop e
Right Side S lope
Dischar~e
Results
Depth
Flow Area
W etted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is su~ercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular C h annel
c:\projects\000 \2 882-south hampton\2 882r1 re. f m2
l.D. #23 (AREA Z)(10 YR)
Triangular Channel
Manning's Formula
Channel De~th
0.013
1.0000 %
0.0 00000 H : V
38.0000 00 H : V
4.670 cfs
0.28 ft
1.53 ft2
11.07 ft
10 .78 ft
0.33 ft
0.004662 tuft
3.05 tus
0.14 ft
0.43 ft
1.43
Collects Runoff from Drainage Basin : Z
Discharges into Drainage Basin : W
Discharges into Structure Type : Curb & Gutter
Runoff on South Side of Cranberry Court.
Note : Assumed majority of runoff to be carried on South Side of Cranberry Court.
06/10/98
10:4 9 :2 1 AM
Municipal Development Group
Haestad M et hods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Pa ge 1 o f 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Ve loc ity Head
Specific Energy
Froude Number
Flow is sueercritical.
Notes :
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l .D. #23 (AREA Z)(100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.013
1.0000 %
0.000000 H : V
38.000000 H : V
6.295 cfs
0.32 ft
1.91 ft2
12.38 ft
12.06 ft
0.37 ft
0.004481 ft/ft
3.29 ft/s
0.17 ft
0.49 ft
1.46
Collects Runoff from Drainage Basin : Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on South Side of Cranberry Court.
Note : Assumed majority of runoff to be carried on South Side of Cranberry Court.
Municipal Development Group 06/10/98
10:50 :07 AM Haestad Methods, Inc. 37 Brookside Road Waterbu ry, CT 06708 (203) 755-1666
Fl owMaste r v5 .07
Page 1of1
SECTION#4 ·.
CHANNEL FLOW CALCULATIONS
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
V elocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra.fm2
l.D. #1 (AREA C)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.7 500 %
4.000000 H : V
4.000000 H : V
26.425 cfs
1.41 ft
7.94 ft2
11 .62 ft
11.27 ft
1.22 ft
0.016097 ft/ft
3.33 ft/s
0.17 ft
1.58 ft
0.70
Collects Runoff from Drainage Basin : A+B+C
Dis ch arges into Drainage Basin : TxDOT R.O .W .
Disc harges into Structure Type : Open Channel
Municipal Development Group 02/19/98
01 :08 :43 PM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critic al Depth
Critical Slope
Veloc ity
Velocity Head
Spec ifi c Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra. fm2
l.D . #1 (AREA C)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.7500 %
4.000000 H : V
4.000000 H : V
32 .996 cfs
1.53 ft
9.38 ft2
12 .63 ft
12 .25 ft
1.33 ft
0.015628 ft/ft
3.52 ft/s
0.19 ft
1.72 ft
0.71
Collects Runoff from Drainage Basin : A+B+C
Discharges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type: Open Channel
Municipal Develo pm ent Group 02119/98
01 :14:57 PM Haestad Methods, Inc . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4-CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #1 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.7500 %
4.000000 H : V
4.000000 H : V
7.242 cfs
0.63 ft
1.61 ft2
5.23 ft
5.07 ft
0.73 ft
0.003592 ft/ft
4.51 ft/s
0.32 ft
0.95 ft
1.41
Collects Runoff from Drainage Basin : A+B+C
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Municipal Development Group 0610919 8
03 :23 :12 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
0211 9/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right S ide Slope
Discharge
Results
Depth
Flow A r ea
Wetted Perimete r
Top W idth
Critica l Depth
C riti ca l Slope
V el o city
Velocity Head
Sp eci fic Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4-CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra .fm2
l.D . #2 (AREA D)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4 .000000 H : V
4 .000000 H : V
17 .749 cfs
1.15 ft
5.29 ft2
9.48 ft
9 .20 ft
1.04 ft
0 .0 169 7 4 ft/ft
3 .36 ft/s
0.18 ft
1.32 ft
0.78
Coll ects Runoff from Drainage Basin : D
D isc harges into Drainage Basin : G
Dis ch arge into Structure Type : Culvert
Municipal Developm ent G roup
01 :17:45 PM Haestad Methods, Inc . 37 Brookside Road W aterbu ry , C T 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
D isch ar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
V el o ci ty Head
Specifi c Energy
Froude Number
F low is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Wo rksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra . fm2
l.D. #2 (AREA D)(100 YR)
Triangular Channel
Manning 's Formula
Channel De~th
0.030
1.0000 %
4.000000 H : V
4 .000000 H : V
2 0 .949 cfs
1.22 ft
5.99 ft2
10.09 ft
9.79 ft
1.11 ft
0 .016603 tuft
3 .50 fUs
0 .19 ft
1.41 ft
0 .79
Collects Runoff from Drainage Basin: D
Discharges into Drainage Basin : G
Discharge into Structure Type: Culvert
02119/98
01 :18:20 PM
Municipal Development Group
Haestad Methods, In c . 37 Brookside R oad W aterbury, CT 06708 (203) 755-1666
•
Flo wMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Ele ment
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critica l Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc . fm2
l.D . #2. PILOT CHANNEL
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
4.000000 H : V
4.000000 H : V
4.615 cfs
0.51 ft
1.03 ft2
4.18 ft
4.06 ft
0.61 ft
0.003814 ft/ft
4.49 ft/s
0.31 ft
0.82 ft
1.57
Collects Runoff from Drainage Basin : D
Discharges into Drainage Basin : G
Disc harge into Structure Type : Culvert
Municipal Development Group 06109198
03:25 :3 4 PM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
06/11/98
11 :45:14 AM
SECTI ON #4 -CHANNE L F LOW
Worksheet for Tri angular Channel
Municipal Development Group
Haestad Methods, Inc . 37 B rookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Proj ect Description
Proj ect Fil e
Worksheet
Flow Element
Method
Solve Fo r
Input Data
Mannings Coefficient
Channe l Slope
Left Side Slope
Right Side Slope
Discharge
Resu lts
Depth
Flow Area
Wetted Perimete r
Top W idth
Criti ca l Depth
Cri ti ca l Slope
Velo ci ty
Ve loci ty Head
Specific Energy
Froude Number
Flow is subcritica l.
No t es :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #3 (AREA G)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.1000 %
4.000000 H : V
4.000000 H : V
58 .092 cfs
1.76 ft
12.42 ft2
14 .53 ft
14 .10 ft
1.67 ft
0.014492 ft/ft
4.68 ft/s
0.34 ft
2.10 ft
0.88
Co ll ects Runoff from Drainage Bas in: D+E+G
Discha rge into Dra inage Basin : H
Discha rge into Structure Type : Culvert
Municipal Deve lo pm ent Group 06/1 1/98
11 :45 :35 AM Haestad Methods, Inc. 37 Brookside Road W aterbury, C T 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\00 0\2882 -south hampton\2882r2rc .fm2
l.D. #3 PILOT C HANNEL
Tria ngular Channel
Ma nning's Formula
Channel Depth
0.013
1.1000 %
4.000000 H : V
4.000000 H : V
12 .726 cfs
0.73 ft
2.12 ft2
6.01 ft
5.83 ft
0.91 ft
0.003332 tuft
5.99 tus
0.56 ft
1.29 ft
1.75
Collect s Runoff from Drainage Basin : D+E+G
Discharge into Drainage Basin : H
Discharge into Structure Type : Culvert
Munici pa l Deve lopment Group 06/11 /98
11 :46 :5 3 A M H aes tad Met hods, Inc. 37 Broo kside Road W a t erbu ry, CT 00708 (203) 7 55-1666
F lowMast er v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
No t es :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #4 (AREA 1)(25 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
96 .248 cfs
2.01 ft
16.14 ft2
16 .57 ft
16 .07 ft
2.05 ft
0.013549 ft/ft
5.96 ft/s
0.55 ft
2.56 ft
1.05
Collect Runoff from Drainage Basin : D+E+G+H+I
Discharge into Drainage Basin : TxDOT R.O .W .
Discharge into Structure Type : Existing Structure
Municip al Development Gro up 06/11/98
11 :50 :21 AM Haestad Methods, Inc . 37 B roo ksi d e Ro ad W aterbu ry , C T 06708 (203) 755-1666
Flow Master v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow E lement
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discharg e
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
C rttic al Depth
Crtti ca l Slope
Velocity
Ve locity Head
Specific Energy
Froude Number
Flow is supercritica l.
No t es :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
1.D . #4 (AREA 1)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
113 .636 cfs
2.14 ft
18 .28 ft2
17 .63 ft
17 .10 ft
2.19 ft
0.013252 ft/ft
6.22 ft/s
0.60 ft
2.74 ft
1.06
Collect Runoff from Drainage Basin : D+E +G+H+I
Disc h arge into Drainage Bas in: TxDOT R.O .W .
Discha rge into Structure Type : Existing Structure
M u ni cipal Deve lopment Group 06/11 /98
1 1:52:11 A M Haestad Methods, Inc . 37 Broo kside Road W aterbury, CT 0670 8 (203) 755-1666
F lowMaster v5 .07
Pa ge 1 of 1
I
I
Project Description
Proj ect Fil e
Worksheet
Flow Element
Method
Solve Fo r
Input Data
Mannings Coefficient
Channe l Slope
Left S ide Slope
Right S ide Slope
Discharge
Results
Depth
Flow Area
Wetted Perimete r
Top W idth
C riti ca l Depth
Critical Slope
Velocity
Ve loc ity Head
Spe cifi c Energy
Froude Number
Flow is supercritica l.
No t es :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D. #4 PILOT CHANNEL
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.5000 %
4.000000 H : V
4.000000 H : V
24 .980 cfs
0.89 ft
3.13 ft2
7.30 ft
7.08 ft
1.19 ft
0.003046 ft/ft
7.97 ft/s
0.99 ft
1.87 ft
2.11
Co ll ect Runoff from Drainage Basin : D+E+G+H+I
Dis c ha rge into Drainage Basin : TxDOT R.O.W .
Discharge into Structure Type : Existing Structure
Munici pal Deve lopment Group 06/11 /9 8
11:54 :06 A M Haestad Methods, In c . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster vS .0 7
Page 1 of1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r2rc .fm2
1.D. #6 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.050
1.0000 %
272 .17 ft
52.935 cfs
Water Surface Elevation
Discharge
278 .
E277 .o -----------~-------------~------------~-------------~------------~-------------+-------------
'-"276.o -----------J-------------~--------------------------------
c 275 .0
.Q 274.0
Cil 273 .0
~ 272 .0 w 271 .0
I I I I I I ---- - --, - ---------- --1 -------- - --,-- --- -- ------I -- - - -- -------,-- - - - - - - - - - - -T - - - --- - - - - ---,
----J-------------~-----------J-------------L------------~-------------~-------------1 I I I I I I I - -., ----- --- - - - - - r --- -- - --- -., --- -- --- - - - - - r - - - - - ---- ----,---- - - - - - - - --r - ------ - -- - --,
-- - - - - - - -_J_ - - - -- --- --- -J.. - --- - --- ----_,_ -- -- - - - - - - - -.L - - - - - - --- - - --•
I I I I I t-....,.;;..;;;..;.;;:..;,;--..----r--- - - - - - -- - -.,------- - - - ---r -- - - - - - - - - - --,------- - - - - - -r - --- - - --- - - --,
270 .0'--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~_...~~~~~~--'
-10.0 0 .0
Notes :
Collects Runoff from Drainage Basin : J
Discharges into Drainge Basin : TxDOT R.O.W.
Discharges into Structure Type: Culvert
10.0 20.0
Station
30 .0
(ft)
Municipal Development Group
40 .0
06/11/98
12 :18:42 PM Haestad M ethods , Inc . 37 Brooks ide Road Waterbury, CT 06708 (203) 755-1666
50.0 60 .0
FlowMaster v5 .07
Page 1 of 1
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc .fm2
l.D . '116 (AREA L)(25 YR)
Irregular Channel
Man ning's Formula
S olve For Water Elevati on
Input Data
Channel Slope 1.0000 %
Elevation range: 270 .50 ft to 278 .00 ft .
Station (ft) Elevation (ft)
-10 .00 278 .00
0.00
5.00
10.00
20 .00
60 .00
Discharge
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top W idth
Height
Critical Depth
271 .00
270.50
271 .00
276 .00
276.25
52 .935 cfs
0.050
272 .17
16 .49
14 .69
14 .00
1.67
271.69
ft
ft2
ft
ft
ft
ft
Start Stati on
-10 .00
Critical Slope 0.040603 ft/ft
Velocity 3.21 ft/s
Ve locity Head 0.16 ft
Specifi c Energy 272 .33 ft
Froude Number 0.52
Flow is subcritical.
Municipal Development Group
End Station
60.00
06/11 /98
12:1 9:03 PM Haesta d Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.050
FlowMaster v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
1.D. #6 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
-
Wtd. Mannings Coefficient
Channel Slope
0.050
1.0000 %
Water Surface Elevation
Discharge
272 .31 ft
62 .885 cfs
278.
£277.0
.._, 276 .0
c 275 .0
.Q 274.0
-ro 273.o
~ 272 .0 w 271 .0
I I I I I I -----------,-------------r------------,-------------r------------~-------------i-------------
-----------~-------------~--------------------------------1 I I I I I I -------, -------------r -----------,-------------r -------------,-------------T - -- ------- - --,
----J-------------~-----------J-------------L------------~-------------i-------------1 I I I I I I I --,-------------r-----------,-------------r------------~-------------,-------------,
---------J-------------L------------~-------------i-------------1 I I I I I -r--;,,,;o.;;,.;;..:,;.-,----1 -- -------- - - , -- - - --- ----- -r - - - - -- --- - - --,--- - - - - - ---- -T -- - - --- - - - - - -,
270.0'--~~~~~--''--~~~~~--'~~~~~~--'~~~~~~--'~~~~~~--'-~~~~~~--'-~~~~~~-'
-10 .0 0 .0
Notes:
Collects Runoff from Drainage Basin : J
Discharges into Drainge Basin : TxDOT R.O.W.
Discharges into Structure Type : Culvert
10.0 20.0
Station
30.0
(ft}
Munic ipal Development Group
40.0
06/11/98
12 :19:52 PM Haestad Methods, Inc . 3 7 Brookside R oad W ate r bury, C T 06708 (203) 755-1666
50.0 60.0
FlowMasler v5 .07
Page 1of1
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D . "#6 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 270.50 ft to 278.00 ft .
Station (ft) Elevation (ft)
-10 .00 278.00
0 .00 271.00
5.00 270 .50
10 .00 271 .00
20 .00 276 .00
60 .00 276 .25
Discharge 62 .885 cfs
Results
Wtd . Mannings Coefficient 0.050
Water Surface Elevation 272 .31
Flow Area 18 .57
Wetted Perimeter 15 .27
Top Width 14 .50
Height 1.81
Criti ca l Depth 271.80
ft
ft2
ft
ft
ft
ft
Start Station
-10 .00
Critical Slope 0.039522 ft/ft
Velocity 3.39 ft/s
Velocity Head 0.18 ft
Specific Energy 272 .49 ft
Froude Number 0.53
Flow is subcritica l.
Municipal Develo p ment Group
End Station
60.00
06/11 /98
12:20 :07 PM Haestad M ethods . Inc. 37 Broo kside Roa d W aterb u ry, CT 0 6 708 (20 3) 755-1666
Roughness
0.050
FlowMaster v5 .07
Page 1 of1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
-- -
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc .fm2
1.D . #7 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
265.13 ft
84 .243 cfs
268 .0 ----------------------~-----------------------·-----------·-----------p------------~267 .5 -----------~----------~-----------~-----------~-----------+-----------~----
.__, 267 . 0 -----------1-- - - -- - -- - --1 ------- --- --1-----------.+ - - - ---- -- - -.j. --- - ----
c 266.5 -- - - -------·:---- --- -----:------ --- ---:--- ----- - --1-----------.!. I I I -------r-----------,-----------1
.Q 266 .0 --- ------~----------~------------1------------+-----I I I ----.i.-----------L-----------L-----------1 I I I I ---------r -----------r-----------r-----------1 -------~--~~~~'---~~~~ ...... -_-.-.. ___________ .j. ___________ L-----------L-----------1
I I I I I
-----~-----------r-----------r-----------r-----------1
ro 265 .5
~ 265 .0 w 264 .5
264 .0L-~~~~--l~~~~~--'-~~~~~~~~~~~__J_~~~~~-L..~~~~~_J_~~~~~J__~~~~__J
-60 .0 -40 .0 -20 .0
Notes:
Collects Runoff from Drainage Basin : J+L
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
0.0 20 .0 40.0
Station (ft)
Munic ipal Development Group 06/11/98
12 :2 1 :38 PM Haestad M eth ods , Inc. 37 Brookside Road W ate rbury, C T 06708 (203) 755-1666
60.0 80.0 100.0
FlowMaster v5 .07
Page 1of1
I
SECTION #4-CHANNEL FLOW
Worksheet for Irregular Channel
Proj ect Description
Project Fil e
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampt on\2882r2rc .fm2
l.D . #7 (AREA L)(25 YR)
Irregular Channel
Manning 's Formu la
Solve For Water Elevati on
Input Data
Channe l Slope 1.0000 %
Elevation range : 264.00 ft to 268.0 0 ft .
Station (ft) Elevation (ft)
-48 .00 266 .00
0.00
30 .00
84 .00
Discharg e
Results
Wtd . Mannings Coefficient
Water Surface E levation
Flow Area
Wetted Perimete r
Top W idth
He ight
Critical Depth
264 .00
266 .00
268.00
84 .243 cfs
0.030
265.13
24 .91
44 .14
44 .08
1.13
265.03
ft
ft2
ft
ft
ft
ft
Start Station
-48 .00
Critical Slope 0.016390 ft/ft
Ve locity 3.38 ft/s
Velocity Head 0.18 ft
Specific Energy 265 .31 ft
Froude Number 0.79
Flow is subcritica l.
Municipal Deve lo p ment Grou p
End Station
84 .00
06/11/98
12:21 :59 PM Haestad Methods . Inc. 37 Brookside Roa d W aterb u ry, C T 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
-
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
1.D . #7 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
265 .20 ft
99 .836 cfs
268 .0 ----------------------~-----------------------·-----------------------p------------£ 267 .5 -- - -- ------:-- - -- ---- - --:--- ----- ----:-- ---- - - ----f - - - -- - - --- -+-----------l--- --
..._, 267 .0 ----- - -- ---1--- -- - --- ---1------ --- - ---l-- ---- -- ---~ - -- ---- --- -.j. - --- ----
c 266.5 I I I I I I
-----------r----------------------~-----------,-------------------r-----------r-----------,
-~ ~~~:~ _ _ _ _ _ _ ---'------- - - ---1-- --- - ---- --J --- -- -- -- - -..l - - --- ----L - --- - ----- -L -- - - ---- - --L.. - ----- -- - --1
I I I I ---------r-----------r-----------r-----------,
~ 265 .0 - - - ---- - - --~ --· -- ---w 264 .5 --- -- ------1---- - ---- - --,---
-~-----------L-----------L -----------L-----------1
I I I I I
-----,------~----r-----------r-----------r-----------,
264.0L-~~~~-L~~~~~J_~~~-==~~=--~~~--1...~~~~~..J_~~~~__JL-~~~~--1...~~~~~
-60 .0 -40 .0 -20 .0
Notes :
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
0 .0 20.0 40.0
Stati on (ft)
M unicipal Development Group 06/11/98
12:22:5 4 PM Haestad M et hods, Inc. 37 Brookside Road Wate rbury, CT 06708 (203) 755-1666
60 .0 80.0 100.0
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #7 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Wat er Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 264 .00 ft to 268 .00 ft.
Station (ft) Elevation (ft)
-48 .00 266 .00
0.00
30.00
84 .00
Discharge
Results
Wtd . Mann ings Coefficient
Wat er Surface Elevation
Flow Area
W etted Perimeter
Top W idth
He ight
Criti ca l Depth
264.00
266 .00
268 .00
99 .836 cfs
0.030
265.20
28 .29
47.04
46 .97
1.20
265 .10
ft
ft2
ft
ft
ft
ft
Start Station
-48 .00
Criti cal Slope 0.016024 ft/ft
Veloc ity 3.53 ft/s
Ve locity Head 0.19 ft
Specific Energy 265 .40 ft
Froude Number 0.80
Flow is subcritical.
M unicipal Develo pment G rou p
End Station
84.00
06/11 /98
12:23:24 PM Haestad Methods, Inc. 37 Brookside Roa d W aterbury, C T 06708 (203) 755-1666
Roughness
0.030
FlowMast er v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve Fo r
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
Velocity
Ve loci ty Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4-CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D. #7 PILOT CHANNEL
Triangular Channel
Manning 's Formula
Channel Depth
0.013
1.0000 %
4.000000 H : V
4.000000 H : V
21 .615 cfs
0.90 ft
3.27 ft2
7.46 ft
7.24 ft
1.13 ft
0. 0031 05 ft/ft
6.60 ft/s
0.68 ft
1.58 ft
1.73
Collects Runoff from Drainage Basin : J+L
Discharges into Drainage Bas in: TxDOT R.O .W .
Discharge into Structure : Existing Structure
Munic ipal Development G roup 06/11 /98
12:24:42 PM Haestad Methods, Inc. 37 B roo k si d e R oad W aterbu ry , CT 067 0 8 (203) 755-1666
Flow Master v5 .07
Pag e 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
1.D . #8 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
262 .0 --------
0.030
1.0000 %
260.78 ft
84 .243 cfs
I
g261 .5 I I I I I I
--------~----------r---------~----------1----------~---------1----
' I I I c 261 .0 0 I I I
~260.5 ---------~----------~---------~----------,-
I I _____ J _______ ~ __ J __________ L ________ J __________ 1
I I I I I
> I I I I I
~ 260.0 ---------~----------~---------4----------~---------4---w 259 .5'--~~~~-'-~~~~-'-~~~~~-'-~~~~-'-~~~~~'--~~~~-'-~~~~__J~~~~~..l.-~~~~_J
-60 .0 -50.0 -40.0
Notes:
Collects Runoff from Drainage Basin : J+l
Discharges into Drainge Basin : TxDOT R.O .W .
Discharges into Structure Type: Culvert
-30 .0 -20.0
Station
-10.0
(ft)
Munic ipal Development Group
0 .0
06/11/98
12:29 :17 PM Haestad M ethods, Inc. 37 Brookside R oad W aterbury, CT 06708 (203) 755-1666
10.0 20.0 30.0
FlowMaster v5 .07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D . #8 (AREA L)(25 YR)
Irregular Channel
Manning 's Formula
Solv e Fo r Water Elevati on
Input Data
Channe l Slope 1.0000 %
Elevation range : 259 .75 ft to 262.00 ft.
Sta ti on (ft) Elevation (ft)
-5 1.00 262 .00
-6 .00 260 .00
0 .00 259 .75
10 .00 260 .00
30 .00 262.00
Discharge 84.243 cfs
Resu lts
Wtd . Mannings Coefficient 0.030
Wat er Surface Elevation 260 .78
Flow Area 24.26
Wetted Peri mete r 41 .33
Top W idth 41 .27
He igh t 1.03
Critical Depth 260 .68
ft
ft2
ft
ft
ft
ft
Start Station
-51 .00
C riti ca l Slope 0.016195 ft/ft
Velocity 3.47 ft/s
Velocity Head 0.19 ft
Specifi c Energy 260.96 ft
Froude Number 0.80
Flow is subcritica l.
Municipal Development Group
End Station
30 .00
06/1 1/98
12 :29 :47 P M Haestad Methods, Inc. 37 Brookside Road W at erbury, CT 06708 (203) 7 55-1666
Roughness
0.030
Flow Master v5 .07
Page 1 o f 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c :\projects\000\2882 -south hampton\2882r2rc .fm2
l.D. #8 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
260.85 ft
99 .836 cfs
-
262 .0 ------------------·--------------------·--------------------·----------~---------·---------
I -------------------,----------------------------------------------
I c 261 .0 --~----------~------------------1 0 I I I I I
~ 260.5 --- -- --- -~ --- -- - - ---~ - - ----- ---:-- -- - -- - - -I -- - - - -_1_ - - - - - _-_ --l - -- - - - - --_1_ - - -- --- -l - --- --- - -_I
I I I I I > ~260 .0 ---------~----------~---------4----------~---------4---w I
I
:..:;,,:..:,::..;.,;.;.;..:.;;..;.--~---------~----------1
259 .5'--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-'
-60 .0 -50.0 -40 .0
Notes :
Collects Runoff from Drainage Basin : J+L
Discharges into Dra in ge Basin : TxDOT R.O .W .
Discharges into Structure Type : Culvert
-30 .0 -20.0
Station
-10.0
(ft)
Municipal Development Group
0 .0
06/11/98
12 :31 :54 PM Haestad M ethods, In c . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
10.0 20 .0 30.0
FlowMaster v5.07
Page 1 of 1
I
I
SECTION #4 -CHANNEL FLOW
W orksheet for Irregu lar Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
1.D . #8 (AREA L)(100 YR)
Irregular Channel
Manning 's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.000 0 %
Elevation range : 259 .75 ft to 262 .00 ft .
Station (ft) Elevation (ft)
-51 .00 262 .00
-6 .00 260 .00
0.00
10.00
30 .00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimete r
Top Width
Height
Critica l Depth
259 .75
260 .00
262 .00
99 .836 cfs
0.030
260.85
27 .50
43 .81
43 .74
1.10
260 .75
ft
ft2
ft
ft
ft
ft
Start Station
-51.00
Critical Slope 0.015810 ft/ft
Velocity 3.63 ft/s
Velocity Head 0.20 ft
Specific Energy 261 .06 ft
Froude Number 0.81
Flow is subcritical.
Munic ipal Deve lopment G roup
End Station
30 .00
06/11/98
12:32:11 PM Haestad Methods, Inc . 37 Broo ksid e Road Waterbury, CT 0 6708 (203) 755-1 666
Roughness
0.030
Flow M aster v5.07
Pag e 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Si de Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc . fm2
l.D . #8 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
4.000000 H : V
4.000000 H : V
21.615 cfs
0.90 ft
3.27 ft2
7.46 ft
7.24 ft
1.13 ft
0.003105 ft/ft
6.60 ft/s
0.68 ft
1.58 ft
1.73
Collects Runoff from Drainage Basin : J+L
Discharges into Drainage Basin : TxDOT R.O .W.
Discharge into Structure : Existing Structure
Municipal Development Group 06/11/98
12:32:54 PM Haestad Methods, Inc. 37 Brookside Roa d W aterb ury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Pag e 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Sl ope
Left S ide Slope
Right Side Slope
Discharse
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Ve locity Head
Spe cifi c Energy
Froude Nu m ber
Flow is subcritica l.
Notes:
SECTION #4 -CHANNEL FLOW
W orksheet for Tria n gular Cha n nel
c :\projects\000\2882-south hampton\2882r2ra. fm2
l.D . #10 (AREA 0)(25 YR)
Triangular Channel
Manning 's Formula
Channel Deeth
0.030
1.7500 %
4.000000 H : V
4 .000000 H : V
8.486 cfs
0.79 ft
2.47 ft2
6.47 ft
6.28 ft
0.78 ft
0 .018730 ft/ft
3.44 ft/s
0 .18 ft
0 .97 ft
0 .97
Colle cts Runoff from Drainage Basin : Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type : Open Channel
Municipal Development Group 02119/98
06 :45 :33 PM Haestad Methods , Inc. 37 Brookside Road W aterbu ry , C T 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
W etted Perimete r
Top Width
Criti cal Depth
C ri tical Slope
Velocity
V el oc ity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra.fm2
l.D . #10 (AREA Q)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.7500 %
4.000000 H : V
4.000000 H : V
10 .017 cfs
0.84 ft
2.79 ft2
6.89 ft
6 .68 ft
0.83 ft
0.018320 ft/ft
3.59 ft/s
0.20 ft
1.04 ft
0.98
Coll ec ts Runoff from Drainage Basin : Q
D ischarges into D rainage Basin : Nantuck Dr.
Discharges into Structure Type : Open Channel
Munici pal Dev e lopment Group 02/19/98
06 :46 :12 PM Haestad Methods, Inc. 37 B rookside Road W aterbury, C T 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
C riti ca l Slope
V e loc ity
V el ocity Head
Specific Energy
Froude Number
Flow is supercritical.
No t es :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #10 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.7500 %
4.000000 H : V
4.000000 H : V
2.205 cfs
0.35 ft
0 .48 ft2
2.85 ft
2.77 ft
0.45 ft
0.004209 ft/ft
4 .60 ft/s
0.33 ft
0 .68 ft
1.95
C o llects Runoff from Drainage Basin : Q
Di s charges into Drainage Basin : Nantuck Dr.
Discharges into Structure Type : Open Channel
Municipal Develo pment Group 06109198
03:49 :28 PM Haestad Methods , In c . 37 B ro oksid e Road W aterbury, CT 06708 (20 3 ) 755-1666
Flow Master v5 .0 7
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critica l Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4-CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south ha mpton\2882r2rc. fm2
l.D . #11 (AREA S)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
2.2000 %
4.000000 H : V
4.000000 H : V
22 .932 cfs
1.09 ft
4.77 ft2
9.00 ft
8.73 ft
1.15 ft
0.016405 ftfft
4.81 ftfs
0.36 ft
1.45 ft
1.15
Collects Runoff from Drainage Basin : S
Discharges into Drainage Basin : V
Discharge into Structure Type : Culvert
Munic ipal Develop ment Group 06/10/98
11 :35:10AM Haestad Methods, Inc. 3 7 Broo k side Road W aterbu ry , CT 0 6 708 (20 3) 755-1666
Flow Master v5 .07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Notes :
SECTIO N #4 -CHAN NEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc.fm2
l.D . #11 (ARE A S)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
2.2000 %
4.000000 H : V
4.000000 H : V
27.104 cfs
1.16 ft
5.41 ft2
9.59 ft
9.30 ft
1.23 ft
0.016043 tuft
5.01 fUs
0.39 ft
1.55 ft
1.16
Collects Runoff from Drainage Basin : S
Discharges into Drainage Basin: V
Discharge into Structure Type : Culvert
Municipal Developme n t G roup 06/10/98
11 :35 :42 AM Haestad Methods, Inc. 3 7 Brookside Road W aterbu ry , CT 06708 (2 03) 755-1666
Flow Master v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channe l Slope
Left Side Slope
Right S ide Slope
Dischar~e
Results
Depth
Flow A r ea
Wetted Perimeter
Top W idth
Critica l Depth
Critical Slope
Velocity
Velocity H ead
Specific Energy
Froude Number
Flow is sueercritica l.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #11 PIL OT CHANNEL
Triangular Channel
Manning 's Formula
Cha nnel Deeth
0.013
2 .2000 %
4 .000000 H : V
4 .000000 H : V
5.919 cfs
0 .48 ft
0.92 ft2
3.96 ft
3.84 ft
0.67 ft
0.003690 ft/ft
6 .42 ft/s
0.64 ft
1.12 ft
2.31
Colle cts Runoff from Drainage Basin: S
Discharges into Drainage Basin : V
Discha r ge into Structure Type : Culvert
Municipal Develo pm ent Group 06 /10/9 8
11 :37 :0 5 A M Ha estad M ethods , In c . 37 B roo ks ide Road W aterbu ry , C T 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4-CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D . #12 (AREA V)(25 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
37 .452 cfs
1.45 ft
8.39 ft2
11 .94 ft
11.59 ft
1.40 ft
0.015366 ft/ft
4.46 ft/s
0.31 ft
1.76 ft
0.92
Collects Runoff from Drainage Basin : S+ T +V
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
06/10/98
11 :38:19AM
Munic ipal Development Group
Haestad Methods , In c . 37 B rookside Road W aterbu ry, CT 06708 (20 3) 755-1666
•
FlowMaster v5 .07
Page 1 of 1
I
06/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
C riti cal Depth
Critica l Slope
V eloc ity
V eloc ity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2rc .fm2
l.D . #12 (AREA V)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
44 .421 cfs
1.54 ft
9.54 ft2
12 .73 ft
12 .35 ft
1.50 ft
0.015021 tuft
4.66 fUs
0.34 ft
1.88 ft
0.93
Collect s Runoff from Drainage Basin : S+ T +V
Discha rges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Municipal Developm ent Group
11 :39 :16 AM Haestad Methods , Inc . 37 Brooks id e Road Waterbu ry , CT 06708 (203) 755-1 666
FlowMaster v5 .07
Pag e 1 of1
Project Description
Project Fil e
Worksheet
Flow E lement
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left S ide Slope
R ight Side S lope
Discharge
Resu lts
Depth
Flow Area
Wette d Perimete r
Top W idth
C riti ca l Depth
Criti ca l Slope
Ve lo city
Velo ci ty Head
Spe cifi c Energy
Froude Number
Flow is supercritica l.
Note s :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\pro j ects\000\2882-south hampton\2882r2rc.fm2
l.D . #12 PILOT CHAN N EL
Triangular Channel
Manning's Formula
Cha nn el Depth
0.013
1.3000 %
4.000000 H : V
4.000000 H : V
9.694 cfs
0.64 ft
1.63 ft2
5.26 ft
5.10 ft
0.82 ft
0.003455 ft/ft
5.96 ft/s
0.55 ft
1.19 ft
1.86
Colle cts Runoff from Drainage Basin : S+ T +V
Discharges into Drainage Basin : TxDOT R.O .W .
Disch arges into Structure Type : Open Channel
Municipal Development Group 06110198
11 :40:30 AM Haestad Methods, Inc . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
Pro j ect Description
Proje ct File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Sl ope
Right Side S lope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
V elocity Head
Spe cific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra .fm2
l.D . #13 (AREA X)(25 YR)
Triangular Channel
Manning's Formula
Channel DeEth
0.030
0.8000 %
4.000000 H : V
4.000000 H : V
9.128 cfs
0.93 ft
3.49 ft2
7.70 ft
7.47 ft
0.80 ft
0.018549 ft/ft
2.61 ft/s
0.11 ft
1.04 ft
0.67
Collects Runoff from Drainage Basin : X
Disch arges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Municipal Development G r oup 0 2/19/98
06 :54:5 2 PM Haestad Methods, Inc. 37 Broo k side Road W aterbury, CT 06708 (203) 755-1666
F lowMaster v5 .07
Page 1of1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
No te s :
SECTION #4-CHANNEL FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r2ra.fm2
1.D . #13 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.8000 %
4.000000 H : V
4.000000 H : V
10.774 cfs
0.99 ft
3.95 ft2
8.20 ft
7.95 ft
0.85 ft
0.018142 ft/ft
2 .72 ft/s
0.12 ft
1.11 ft
0.68
Collects Runoff from Drainage Basin : X
Dis c harges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Munic ipal D eve lo pm ent G r o up 02119/98
06 :55 :25 PM Haestad Methods, In c. 37 Brooks ide R oa d W aterbury, CT 06708 (20 3) 7 5 5-1 666
F lowMaster v5 .07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. #13 PILOT CHANNEL
Triangular Channel
Manning 's Formula
Channel Depth
0.013
0.8000 %
4.000000 H : V
4.000000 H : V
2.374 cfs
0.41 ft
0.68 ft2
3.40 ft
3.30 ft
0.47 ft
0.004168 ft/ft
3.50 ft/s
0.19 ft
0.60 ft
1.36
Collects Runoff from Drainage Basin: X
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open Channel
Municipal D evelopment Group 06/09/98
0 3 :51 :53 PM Haestad Methods, Inc. 37 Brookside Road Waterbu ry, CT 06708 (203) 755-1666
FlowMaster v5 .0 7
Page 1 of 1
·• .
SECTION #5
CUL VERT FLOW CALCULATIONS
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right S ide Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc .fm2
l.D. #1 (AREA D)(10 YR)
Triangular Channel
Manning's Formula
Channel De~th
0.030
1.3 000 %
4.000000 H : V
4.000000 H : V
26 .511 cfs
1.27 ft
6.48 ft2
10 .49 ft
10.18 ft
1.22 ft
0.016090 ft/ft
4.09 ft/s
0.26 ft
1.53 ft
0.90
Collects Runoff from Drainage Basin : D+E
Discharges into Drainage Basin : G
Discharges into Structure Type : Open-Channel
Municipal Development Group 06109198
03 :5 6 :52 P M Haestad Methods, Inc. 37 Brookside Road Waterbu ry, CT 06708 (203) 755-1666
F lowMaster v5 .07
Page 1 of 1
Project Description
Proj ect File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Discha rge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritica l.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc .fm2
l.D. #1 (AREA D)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
35.737 cfs
1.42 ft
8.10 ft2
11.74 ft
11 .39 ft
1.38 ft
0.015462 ft/ft
4.41 ft/s
0.30 ft
1.73 ft
0.92
Collects Runoff from Drainage Basin : D+E
Discharges into Dra inage Basin : G
Discharges into Structure Type : Open-Channel
Munici pal D evelo pment Group 06109198
03 :57:41 PM Haestad M ethods , Inc. 37 Brookside Road W aterbury , CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of1
I
I
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #1
Shap e : I Circular
Material : !concrete
Sp.an : B .00 ft
Rise : 2 .50 ft
Barrels: 1
Discharge Description
lOYR
100 YR
Q
total
(cfs)
26 .51
35 .74
*Backwater (BW = HW -1W -S·L)
C :\PR OJECTS\0 00\28 82-S-l \2882T3RC.CL V
Length(L): I 63 .ool ft
Slope(S): I 0 .00511
n: 0.0120
Ke: 0.20
Entrance Type: 1: 1.5 Beveled Edge I
HW TW BW* Q Inlet Ctl Outlet Ctl
elevation elevation
v
out over road HW depth HW depth
(ft) (ft) (ft) (ft) ( cfs) (ft) (ft)
292.03 290 .27 1.44 7 .21 0 .00 2 .64 2 .72
292 .67 290.42 1.93 7 .28 0 .00 3 .32 3 .36
61 9/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc. fm2
1.D . #2 (AREA F)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
13 .634 cfs
0.99 ft
3.93 ft2
8.18 ft
7.93 ft
0.94 ft
0.017582 ft/ft
3.47 ft/s
0.19 ft
1.18 ft
0.87
Collects Runoff from Drainage Basin : F
Discha rges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type : Open-Channel
Municipal Deve lopment Group 06109198
04:05 :27 PM Haestad Meth ods , In c. 37 Brookside Road W aterbury, CT 06708 (20 3) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channe l Slope
Left Side Slope
Right Side Slope
Discharge
Resu lts
Depth
Flow Area
Wetted Perimete r
Top W idth
Critical Depth
C riti cal Slope
Ve locity
Velocity Head
Sp ecifi c Energy
Froude Number
Flow is subcritica l.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882 -south hampton\2882r3rc.fm2
l .D. #2 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
18 .379 cfs
1.11 ft
4.92 ft2
9.15 ft
8.87 ft
1.06 ft
0.016896 ft/ft
3.74 ft/s
0.22 ft
1 .33 ft
0.88
Co ll ects Runoff from Drainage Basin : F
Discharges into Drainage Bas in: TxDOT R.O.W .
Disc harges into Structure Type : Open -Channel
Municipa l Development G rou p 06109198
04 :05:41 PM Haes tad M etho ds , Inc. 37 B roo kside Ro ad W aterb u ry , CT 0 6 7 0 8 (203) 7 55-1666
Fl ow Maste r v5 .07
Page 1 of 1
I Texas Hydraulic System Culvert Design
I
I
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
l.D. #2
Shape: I Circular
Material : I Concrete
Sp.an : §1.00 ft
Rise: 1.75 ft
Barrels : 1
Discharge Description Q
lOYR
100 YR
total
(cfs)
13 .63
18 .38
*Bac!Gvater (BW = HW -TW -S·L )
C:\PROJECTS\000\28 82-S-l \288 2T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
288 .74 287 .03
289 .77 287 .15
Length(L): I 63.ool ft
Slope(S): I 0 .00401
n: 0 .0120
Ke: 0.50 -------.
Entrance Type: Headwall I --------'
BW* v Q Inlet Ctl Outlet Ct!
out over road HW depth HW depth
(ft) (ft) (cfs) (ft) (ft)
1.46 5 .67 0.00 2.44 2.44
2 .37 7.64 0.00 3.47 3 .11
61 9/98
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W idth
Critical Depth
Critica l Slope
Velocity
Velocity Head
Spec ifi c Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc .fm2
l.D . #3 (AREA H)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
68.165 cfs
1.77 ft
12.46 ft2
14 .56 ft
14 .12 ft
1.78 ft
0.014187 ft/ft
5.47 ft/s
0.46 ft
2.23 ft
1.03
Co llects Runoff from Drainage Basin : D+E+G+H
Discharges into Drainage Basin : I
Discharges into Structure Type : Open -Channel
Municipal Development Group 06/11 /98
0 1 :16:17PM Haestad Methods, Inc. 37 Brookside Road Waterbury , CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critica l Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #3 (AREA H)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
94 .237 cfs
1.99 ft
15 .89 ft2
16 .43 ft
15.94 ft
2.03 ft
0.013587 ft/ft
5.93 ft/s
0.55 ft
2.54 ft
1.05
Collects Runoff from Drainage Basin: D+E+G+H
Discharges into Drainage Basin: I
Discharges into Structure Type : Open-Channel
Municipal Development Group 06/11 /98
01 :17:48 PM Haestad Methods, In c . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1of 1
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
l.D. #3
Shape : I Circular
Material : I Concrete
Sp.an : ~.00 ft
Rise : 3 .00 ft
Barrels : 1
Discharge Description
lOYR
100 YR
Q
total
(cfs)
43 .05
58 .09
*Backwater (BW = HW -TW -S·L)
C :\PROJECTS\00 0\2882-S-l \28 82T3RC .CL V
HW TW
elevation elevation
(ft) (ft)
283 .85 281.92
284 .67 282 .14
Length(L): I 63 .ool ft
Slope(S): I 0 .00511
n : 0 .0120
Ke : 0.20
Entrance Type : 1: 1. 5 Beveled Edge I
BW* Q Inlet Ct! Outlet Ctl v
out over road HW depth HW depth
(ft) (ft) (cfs) (ft) (ft)
1.61 8 .16 0 .00 3.23 3 .29
2 .20 8 .22 0 .00 4 .09 4 .11
6111/98
Project Description
Proj ect File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings C oefficient
Channel Slope
Left Side S lo pe
Right S ide Slope
Disc har ge
Results
Depth
Flow Area
Wetted Perimete r
Top W idth
Critica l Depth
C riti ca l Slope
Ve locity
Ve locity Head
Specific Energy
Froude Number
Flow is subcritica l.
No t es :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Ch a nnel
c:\projects\000\2882-south hampto n\2882r3rc .f m2
l.D . #5 (AREA M)(10 YR)
Triangular Channe l
Manning 's Formula
Channel Depth
0.030
1.5000 %
4.000 000 H : V
4.000000 H : V
32.581 cfs
1.34 ft
7.16 ft2
11.04 ft
10 .71 ft
1.33 ft
0.015654 ft/ft
4.55 ft/s
0.32 ft
1.66 ft
0.98
Co ll ects Runoff from Drainage Basin : K+M
Discha rges in to Drainage Bas in: TxDOT R.O .W .
Discha rges into Structure Type : TxDOT R.O .W .
06/11/98
02:17:42 PM
Municipal Develo pm ent Grou p
Haest ad Methods, Inc. 37 B rookside Road W aterbury, C T 0 6708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
1.D . #5 (AREA M)(100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
43 .919 cfs
1.50 ft
8.96 ft2
12 .34 ft
11 .97 ft
1.50 ft
0.015043 ft/ft
4.90 ft/s
0.37 ft
1.87 ft
1.00
Collects Runoff from Drainage Basin : K+M
Discharges into Drainage Basin : TxDOT R.O.W .
Discharges into Structure Type : TxDOT R.O.W.
Municipal Development Group 06/11 /98
02:18 :38 P M Haestad Methods , In c . 37 Brookside Road Waterbury, CT 06708 (203) 755-166 6
Fl owMaster v5 .07
Page 1 o f 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CULVERT FLOW
I.D. #5
Shape: I Circular
Material: I Concrete
Sp.an : ~.00 ft
Rise: 1.50 ft
Barrels : 1
Discharge Description
lOYR
100 YR
Q
total
(cfs)
9.60
12 .94
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\0 00\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
266 .73 265 .55
267.68 265 .71
Length(L): I 63 . ool ft
Slope(S): I 0.00491
n: 0.0120
Ke: 0.50
Entrance Type: Headwall I
'---~~~~~~~~--'
BW*
(ft)
0 .88
1.66
v
out
(ft)
5.43
7 .32
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
( cfs) (ft) (ft)
0 .00 2 .17 2 .16
0 .00 3.12 2.75
6/1 1/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc ity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc .fm2
l.D . '#8 (AREA P)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
0.5000 %
4.000000 H : V
4.000000 H : V
44 .982 cfs
1.86 ft
13 .78 ft2
15 .30 ft
14 .85 ft
1.51 ft
0.014995 tuft
3.27 tus
0.17 ft
2.02 ft
0.60
Collects Runoff from Drainage Basin : P+Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type : Open Channel
Municipal Development Group 06/10/98
01 :34:38 PM Haestad M ethods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
Project Description
Proj ect File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left S ide Slope
Righ t S ide Slope
Discharge
Results
Dep th
Flow A rea
Wetted Perimeter
Top W idth
C ritic al Depth
C ritical Slope
V elo city
V el ocity Head
Sp ec ifi c Energy
Fro ud e Numbe r
Flow is subcritical.
No tes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc .fm2
1.D . 116 (AREA P)(100 YR)
Triangu lar Channel
Manning 's Formula
Channe l Depth
0.030
0.5000 %
4.000000 H : V
4.000000 H : V
60.638 cfs
2.08 ft
17 .23 ft2
17 .12 ft
16 .61 ft
1.70 ft
0.014410 ft/ft
3.52 ft/s
0.19 ft
2.27 ft
0.61
Co ll ects Runoff from Drainage Basin : P+Q
Disch arges into Drainage Basin: Nantuck Dr.
Disch arges into Structure Type : Open Channel
Munic ipal Deve lo pm ent G ro up 06110198
01 :35 :30 PM Haestad Methods, Inc . 37 B rookside Road W aterbu ry, C T 06708 (203) 755-1666
FlowMaster v5 .0 7
Page 1 of1
I
Texas Hydraulic System Culvert De sign
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
l.D. #6
Shape : I Circular
Material : I Concrete
Sp.an : §1.00 ft
Rise : 2 .50 ft
Barrels : 1
Discharge Description
lOYR
100 YR
Q
total
(cfs)
44 .98
60.64
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882 T3 RC.CL V
HW TW
elevation elevation
(ft) (ft)
260 .98 258 .26
261.75 258.48
Length(L): I 69 .ool ft
Slope(S): I 0.00511
n: 0 .0120
Ke: 0.20
Entrance Type: 1: 1.5 Beveled Edge I
BW* Q Inlet Ctl Outlet Ctl v
out over road HW depth HW depth
(ft) (ft) (cfs) (ft) (ft)
2 .37 9 .16 0 .00 4 .16 4.07
2 .92 10 .65 8.38 4 .93 4 .61
6/10/98
I
I
Notes :
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
Coll ects Runoff from Drainage Basin : R
Disc harges into Drainage Ba sin : Nantuck Dr .
Dish ca rges into Structure Type : Open-Channel
06109198
04:18:13 PM
Munic ipal Deve lo pment Group
Haestad Methods, In c . 37 B roo kside Roa d W aterbu ry , CT 06708 (20 3) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
I
I
I
I
I
Proj ect Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left S ide Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wette d Perimete r
Top Width
Critica l Depth
Critical Slope
V elocity
Velo city Head
Spe c ific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #7 (AREA R)(100 YR)
Triangular Channel
Mann ing's Formula
Channel De~th
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
13 .837 cfs
1.05 ft
4.39 ft2
8.64 ft
8.38 ft
0.94 ft
0.01754 7 ft/ft
3.15 ft/s
0.15 ft
1.20 ft
0.77
Coll ects Runoff from Drainage Basin : R
Discharges into Drainage Basin : Nantuck Dr.
Dishcarges into Structure Type : Open-Channel
Municipal D eve lopme n t G roup 06109198
04:18:47 PM H a estad Method s, In c. 37 Brooksid e R oa d W aterbu ry, CT 067 0 8 (203) 755-1666
FlowMaster v5 .07
Page 1 of 1
I
Texas Hydrauli c System Culvert De sign
SOUTH HAMPTON
000025-2 882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #7
Shape : I Circular
M aterial : I Aluminum
Sp.an : §1.00 ft
Rise : 1.50 ft
Barrels: 1
Discharg e Description Q
lOYR
100 YR
total
(cfs)
10 .24
13 .84
*Backwater (BW = HW -TW -S·L)
C:\PROJE CTS\00 0\2882-S-l \2882T3RC.C L V
HW TW
elevation ele vation
(ft) (ft)
255 .86 253 .88
256 .20 2 53 .99
Length(L): I 62 .ool ft
Slope(S): I 0 .01001
n : 0 .0149
Ke: 0.50
Entrance Type: Headwall I
'--~~~~~~~~~
BW*
(ft )
1.36
1.59
v
out
(ft)
5 .79
6 .51
Q Inlet Ctl Outlet Ctl
ov er road HW depth HW depth
( cfs) (ft ) (ft)
0 .00 2.30 2 .24
2 .32 2.64 2.49
61 9/98
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critica l Slope
Velocity
Ve locity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D . #8 (AREA T)(10 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
26 .131 cfs
1.33 ft
7.07 ft2
10.96 ft
10.63 ft
1.22 ft
0.016121 ft/ft
3.70 ft/s
0.21 ft
1.54 ft
0.80
Collects Runoff from Drainage Basin : S+ T
Discharges into Drainage Bas in: V
Discharges into Structure Type: Open Channel
06/10/98
01:43 :1 8 P M
Municipal Development Group
Haestad Methods, Inc . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
.•
FlowMaster v5 .07
Page 1 of1
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann ings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharlile
Resu lts
Dep th
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc ity
Velocity Head
Specifi c Energy
Fro ude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc .fm2
l.D . #8 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel De~th
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
35 .322 cfs
1.49 ft
8.86 ft2
12 .27 ft
11 .91 ft
1.37 ft
0.015486 tuft
3.99 fUs
0.25 ft
1.74 ft
0.81
Collect s Runoff from Drainage Basin : S+ T
Discharges into Drainage Bas in: V
Discharges into Structure Type : Open Channel
Mun icipal Deve lopment Group 06/10/98
0 1 :44:00 P M Haestad Method s , In c . 3 7 Broo ks ide Road W aterbu ry , CT 0 67 0 8 (203) 755-1666
Flow Mast er v5.07
Page 1 of 1
T exas H ydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
l.D. #8
Shape: I Circular
Material : l Concrete
Sp.an: §1.00 ft
Rise: 2 .25 ft
Barrels: 1
Length(L): I 63 .ool ft
Slope(S): I 0 .00501
n : 0 .0120
Ke : 0 .20
Entrance Type : 1: 1.5 Beveled Edge I
Discharge Description Q HW TW BW* V Q Inlet Ct! Outlet Ct!
total elevation elevation out over road HW depth HW depth
( cfs) (ft) (ft) (ft) (ft) ( cfs) (ft) (ft)
lOYR 26 .13 264 .22 262 .26 1.65 6 .57 0 .00 2.86 2 .91
100 YR 35.32 265 .08 262.42 2.35 8.74 0 .55 3 .77 3 .68
*Backwater (BW = HW -TW -S-L)
C:\P ROJECT S\000\2882-S-l \2882T3RC.CL V 6/10/98
I
I
~.@utlet
l.D . #9 (AREA V)(10 YR)
I
P-3
BAY STRE T
-2
WINDRIFT COVE
Project Title: South Hampton Subdivison
c:lprojects\000\2882-south hampton\2882!1 ra .stm MUNIC IPAL DEVELOPMENT GRO U P
06110198 04:34:01 PM Haestad Methods, In c. 37 Brookside Road Waterbu ry, CT 06708 (203) 755-1666
Project Eng inee r : RM
StormCAD v1 .0
Page 1 of 1
-
,...--!-~UtlE
·im:-~ : R.85 ft um1
-
1-·--· --··=-..;. ----
Pipe: P-4
invert: LoU .tso n O+~ Invert: 250. 7!ilff50
Length : 14.00 ft
Section Size : 30 inch
June
f;im
c urr
-
. ·-· ----
-----------·-·-----··-----.
Pipe: P<
-l:J.f3-l-AV.:.-: :: ...... • ":
On lnvert1 .¥M.85 ft
Length : 120:00 ft
Section Size: 30 inch
---
tion: J-2
?<;Ann ft
p :251 .74ft
-
I .. ., .. ,>l 11• tetJl:t1
'Im · ill~flPRR nn 1t
UI~~ ~ GlJ!D\P:52Ef6 . 7 )
--
Pine: P-1
-
258.00
257 .00
ft
256.00
255.00
254.00
253.00
252 .00
P pe: P-2 ~p :n~~rt: ~~~-~ 5 ft
O'J!1 .00 -·----··--····----·---uo-1nvert:-25:CS3 tt----L~n3ih~4 .00 f
On Invert. 251 .74 ft Section Size: 24
1+50
Station ft
L :mylh . 112.0u 1 l
Si~ Size: 30 inch2+50
.•.
MUN ICIPA L DEV ELO PM E N T GROU P
lfflb.00
3+00
Projec t Tit le: Sout h Hami:;t on S ubdivison
c:\projec ts\000\2882-s out h hampton\288211 ra .stm
0 6 /10/98 04:17:3 1 PM Haestad M ethods, Inc. 3 7 Bro okside Road W at erbury, CT 06708 (203) 755-1666
Elevation ft
Projec t E n gineer: RM
St ormC AD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) E levation
(acres) (acres) (m in) Time T ime (in/hr) (CIA) (ft)
(min) (min ) (cfs)
1-3 0 .00 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .000 16.586 1 .63 258.00
1-2 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .000 35.173 3 .74 258.00
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .000 31 .361 10.23 258.00
J-1 N/A N/A N/A N/A 0 .02 0 .02 0 .00 0 .000 66.534 6 .78 258.00
J-2 N/A N/A N /A N/A 0 .30 0 .30 0 .00 0 .000 83.120 8 .47 258.00
J-3 N/A N/A N /A NIA 0.55 0 .55 0 .00 0 .000 83.120 8 .47 258.00
Outl et N/A N/A N/A N/A 0.57 0 .5 7 0 .00 0 .000 N/A 8 .47 257.75
Proje ct Title : South Ha m pton Su bdiviso n
c :lprojects \00012882-south hampton\288211 ra.stm MUNI C IPA L DEVELO PMENT G ROUP
06/10/98 04:12:23 PM Haestad Methods , Inc. 37 Brooks ide Road Waterbury, C T 06708 (203) 755-1 666
Rim Sump
Elevation Eleva ti on
(ft) (ft)
258.02 252.00
257.41 253 .00
258.00 255.7 5
258.00 252.53
258.00 251 .74
258.00 250.85
257.75 250.65
Project Engi nee r: RM
StormCAD v1 .0
Page 1 of 1
1.D . #9 (AREA V)(100 YR)
BAY STRE T
-2
r .@utlet
P-3
·dr~ 1-3
!
WINDRIFT COVE
Project T itl e: South Hampton Subdivison
c :\projects\000\2882-south hampton\2882t1 ra .stm MUNICIPAL DE V ELOPMENT GRO UP
06/10/98 04:33:48 PM Haestad Methods, Inc . 37 Brookside Road Waterbu ry, CT 06708 (203) 755-1666
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
----~~~t ~utle
1111. '.~': R .85 ft um1
---------~v
__I ---·· -·----
Pipe : P -4
invert: 250 .B::i n O+~ Invert: 250. 7!ilffi0
Length : 14.00 ft
Section Size : 30 inch
----·-
Uurn
;i:; im
>" tlIT ----------
-------------· --
Pipe : P -'
!...!r:HAve~ : 25 o1 • 7 A &~
On lnvert1 ~.85 ft
Length : 12.6':00 ft
Section Size: 30 inch
./
tion : J-2 Uur-ie1 1otetJl:tl ----?"\ROnf~ IJ::·im · s;.g. flWft nn ft
258 .00
257.00
ft
256.00
-p:-251 .74 ft
I
I
I:: urn1 Gl6<p.:52El!ti . 7 ')
-1--
Pioe: P -1
p . p 2 Up Invert: 255.1
255.00
254.00
253 .00
252 .00
--.. .. pe. -~rt-2.Q5 ,~
5 ft
~1.00 -·------up lnvert :~52 ~53 tt --Length : 1'4 .0 0 f
Dn Invert. 251.J~ ft Section Size: 2·~
1+50
Station ft
L...:11glh . 112:{)u IL
Sli?~ Size: 30 incl12+50
MUNI CIP A L DEV ELOPM ENT GROU P
lre'b.00
3+00
Projec t Title : South H ampton Subdivison
c:lprojec ts\000\2882-south hampton\28821 1 ra .stm
06/10/9 8 04:21 :47 PM H aestad M ethod s. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Elevation ft
Project Engineer: RM
StormCAD v1 .0
Page 1of1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-3 0 .00 0 .00 0.00 0.00 0 .00 0 .00 0 .00 0 .000 20.357 1 .62 258.00
1-2 0 .00 0 .00 0.00 0.00 0 .00 0 .00 0.00 0.000 50.325 4 .00 258.00
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .000 44.421 14.14 258.00
J-1 NIA NIA NIA NIA 0 .02 0.02 0 .00 0 .000 94.746 9 .65 258.00
J-2 NIA NIA NIA NIA 0 .21 0 .21 0 .00 0 .000 115.103 11 .72 258.00
J-3 NIA NIA NIA NIA 0 .39 0 .39 0 .00 0 .000 115.103 11 .72 258.00
Outlet N I A NIA NIA NIA 0 .41 0.41 0 .00 0 .000 NIA 11 .72 257.75
I
Project T itl e : South Hampton Subdivison
c :\projects\000\2882-south hampto n \2 88211 ra.stm MUNICIPAL DEVELOPMENT G ROUP
I 06/10/98 04:22:14 PM Haestad Methods , In c . 37 Brookside Roa d W aterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
258.02 252.00
257.41 253.00
258.00 255 .75
258.00
258 .00
258.00
257.75
252.53
251 .74
250.85
250.65
Projec t Eng inee r : RM
St ormC AD v1 .0
Page 1 of1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert
(%) (ft/s) Elevation
(ft)
P-7 1-3 J-2 20.357 6 .00 4 .3333 1 .62 48 inch 0 .013 299.001 252.00
P-6 1-2 J -1 50.325 4 .00 11 .7500 4 .00 48inch 0 .013 492.358 253.00
P-1 1-1 J-1 44.421 14.00 1 .7857 14.14 24inch 0 .013 30.229 255.75
P-2 J-1 J-2 94.746 112.00 0 .7054 9 .65 30 inch 0 .013 68.893 252.53
P-3 J-2 J-3 115.103 126.00 0.7063 11 .72 30 inch 0 .013 68.942 251 .74
P-4 J-3 Outlet 115.103 14.00 0 .7143 11.72 30inch 0.013 69.328 250.85
Project Title: South Hampton Subdivison
c :\p rojects\00012882-south hampton\2882!1 ra.stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:22:32 PM Haestad Methods, In c. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Downstream Upstream
Invert HGL
Elevation (ft)
(ft)
251.74 256.65
252.53 258.00
255.50 258.54
251 .74 258.14
250.85 256.33
250.75 253.53
Project Engineer: RM
StormCAD v 1 .0
Pag e 1 of 1
I
I
I
I
I
I
Proj ect Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Sl ope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critica l Slope
Velocity
Velocity Head
Specific Energy
Froude Numbe r
Flow is subcritica l.
No t es:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular C h annel
c:\projects\000 \2882-south hampton\2 882r3rc. f m2
l.D . #10 (AREA X)(10 YR )
Triangular Channel
Manning 's Formula
Cha nnel De~th
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
7.993 cfs
0.85 ft
2.91 ft 2
7.03 ft
6.82 ft
0.76 ft
0.018880 ft/ft
2.75 ft/s
0.12 ft
0.97 ft
0.74
Co ll ects Runoff from Drainage Basin : X
Discharges into Drainage Basin : TxDOT R.O .W .
Discharges into Structure Type : Open-Channel
Munic ipal D eve lopment G ro up 06/09/98
04:21 :53 PM Haestad Methods , Inc. 37 Brooks ide R oad W aterbury, C T 06708 (203) 755-1666
Flow Master v 5.07
P age 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Righ t Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc ity
Veloc ity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes :
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c :\projects\000\2882-south hampton\2882r3rc .fm2
1.D . #10 (AREAX)(100 YR)
Triangular Channel
Manning 's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
10.774 cfs
0.95 ft
3.64 ft2
7.86 ft
7.63 ft
0.85 ft
0.018143 ft/ft
2.96 ft/s
0.14 ft
1.09 ft
0.76
Collects Runoff from Drainage Basin : X
Dis ch arges into Drainage Basin : TxDOT R.O .W .
Dis ch arges into Structure Type : Open-Channel
Mun icipal Develo pm ent Group 0610919 8
04:22 :26 PM Haestad Methods , In c . 37 Brook:side Roa d W aterbu ry, C T 06708 (203) 755-166 6
FlowMa ster v5 .07
Page 1 of 1
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
l.D. #10
Shape: I Circular
Material: I Concrete
Sp.an : §1.00 ft
Rise : 1.50 ft
Barrels: 1
Discharge Description Q HW TW
total elevation elevation
Length(L): I 74 .ool ft
Slope(S): I 0 .00501
n : 0 .0120
Ke: 0 .50
Entrance Type: Headwall I
'--~~~~~~~~~
BW* v Q Inlet Ct! Outlet Ct!
out over road HW depth HW depth
( cfs) (ft) (ft) (ft) (ft) (cfs) (ft) (ft)
lOYR 7.99 254.41 253 .05 0 .99 5 .78 0 .00 1.82 1.85
100 YR 10 .77 255 .03 253 .15 1.51 6 .09 0 .00 2.47 2 .37
*Backwater (BW = HW -TW -S·L)
C :\PROJECTS\000\2882-S-l \2882T3RC .CL V 61 9/98
SECTION #6
STORM INLETS FLOW CALCULATIONS
SECTION #6 -STORM INLET FLOW
1.D . #1 DRAINAGE AREA B
(10 YEAR)
8 .685 cfs
0 .31 ft
0 100 =
d 100 =
(100 YEAR)
11 .707 cfs
0.35 ft
CALCULATED
y = 0 .69 ft y = 0.85 ft at L = 5 ft
y= 0.62 ft y= 0.75 ft atL= 6 ft
r::=v#It:r :, .::9s§lf::::m::tr: j;:J:::::::::::: .~ri= ::: ::::: ::g~~t :::tt,i:t:t:::=r:: ::::::::: :~f:~m~::::::, ::r ::atr::: ff.t::
y= 0.44 ft y= 0.53 ft atL= 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
l.D . #2 DRAINAGE AREA E
(10 YEAR) (100 YEAR)
0 10 = 1o.970 cfs 0 100 = 14 .788 cfs
0 10(125 %) = 13.713 cfs 0 100(125%) = 18.485 cfs
d 1o = 0.36 ft d 100 = 0.40 ft
CALCULATED
y = 0 .94 ft y = 1.15 ft at L = 5 ft
y = 0 .83 ft y = 1.02 ft at L = 6 ft
: :·:y,:F.:::::::: ::: :::: =P:s §~:::::::::::ift::: :t::·:::::::::lf'.:::::t:, :¥:a:::: ::::::t'::::::::9s~t::irt :::::tt::: :1::::::~u4:::a:::::, :r,::_::,1,::::::::::::::: n ::::
y= 0.59 ft y= 0.72 ft atL= 10 ft
d = depth in curb at g iven discharge
y = we i r flow depth i nt o curb inlet ( max depth = d + 3 " for depressed gutter)
Note: Grayed portion is the selected curb inlet length .
l.D . #3 DRAINAGE AREA H
(10 YEAR) (100 YEAR)
13 .407 cfs 0 100 = 18 .073 cfs
0 10 (125 %) = 16 .759 cfs 0100 (125%) = 22 .591 cfs
d 10 = 0 .38 ft d100 = 0.43 ft
CALCULATED
y= 1.08 ft y= 1.31 ft
y= 0 .95 ft y= 1.16 ft
y = 0.79 ft y = 0.96 ft
'.; :¥¥1, ::: :pill ~~: nrr: ::::::: ::::::::::::,,::::::&¥::::: :::r::::])~~$ rnrnn :::1rn:r:
d = depth in curb at given discharge
at L =
at L =
at L =
t : :::~t:ifa§)
y = weir flow depth i nto curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed port ion is the selected curb inlet length .
Sto nn inl et eva luati on.xis
5 ft
6 ft
8 ft
,, :=:aq:rn:: :mac::
SECTION #6 -STORM INLET FLOW
1.D . #5 DRAINAGE AREA T
(10 YEAR)
0 10 =
0 10(125 %) =
d 10 =
6.096 cfs
7 .620 cfs
0 .29 ft
(100 YEAR)
0 100 =
0100 (125%) =
d 100 =
8 .218 cfs
10 .273 cfs
0 .32 ft
CALCULATED
y= 0.64 ft y= 0.78 ft atL= 5 ft
:'.t:::;j :e:::: :: :J, :::: P~~: :i:lttl.''':':' =:. ::::::::}:: :: :i :a:r= ? : : : .. P~~~::: .. :::~:.::::.::::::.:::::::::::::·:] :: ::::!f tfa;r n urr ::,:g::::)::f:]~ :r
y=
y=
0.47 ft y=
y=
0 .57 ft at L = 8 ft
0.40 ft 0 .49 ft atL= 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
l.D. 1#5 DRAINAGE ARE~
(10 YEAR) (100 YEAR)
0 10 = 32 .597 cfs 0 100 = 43.940 cf s
0 10(125 %) = 40 .746 cfs 0 100 (125%) = 54.925 cfs
d 10 = 0 .50 ft d 100 = 0 .65 ft
CALCULATED
y= y= 2 .38 ft at L =
y= y= 2 .10 ft at L =
= 1 .74 ft at L =
d = depth in curb at given discharge
y =weir flow depth into curb inlet (max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length .
l.D . #7 DRAINAGE AREA X
(10 YEAR) (100 YEAR)
13 .832 cfs 36.652 cfs
0 .44 ft 0 .49 ft
CALCULATED
y= 0 .95 ft
y = 0 .60 ft
d = depth i n curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note : Grayed portion is the selected curb inlet length.
Storm inlet evalu ation.x.l s
5 ft
6 ft
8 ft
SECTION #7
EXISTING TxDOT CALCULATIONS
I
I
SECTION #7 -EXISTING TxDOT CALCULATIONS
TxDOT#l: (CAPACITY)
PER TxDOT DRAINAGE AREA MAP:
0 (1 0) =
0 (5 0) =
0 (100) =
100 cfs
130 cfs
136 cfs
POST DEVELOPMENT RUNOFF :
Drainage Area 0 (10) 0 (50)
D 1 S.S41 20 .064
E 10.970 14 .163
F 13 .634 17 .603
G 16 .S3S 21.42S
H 26 .814 34 .619
I 14.36S 18 .S89
TOTAL: 71 .348 92 .236
OK: Q(TxDOT) > Q(POST)
2882-025 Existing Tx DOT Stru ctures .x is
0 (100)
20 .949
14 .788
18 .379
22 .3SS
36 .14S
19 .399
96 .278
TxDOT #2: (CAPACITY)
PER TxDOT DRAINAGE AREA MAP :
0 (10) =
0 (50) =
0 (100 ) =
143 cfs
190 cfs
196 cf s
POST DEVELOPMENT RUNOFF :
Drainage Area 0 (10) 0 (50 )
J 46 .06 3 60 .2 1 1
K 9 .S99 12 .393
L 27 .412 3S .391
M 22 .982 29 .6 72
s 20 .03S 2S .978
T 6.096 7 .87 1
u 13.399 17 .299
v 6 .617 8 .S43
y 16 .S86 21 .4 13
TOTAL: 168 .789 218 .771
NOT OK: Q(TxDOT) < Q (POST)
Q(100)
62 .88S
12 .939
36 .9S1
30 .980
27.104
8 .218
18 .062
8 .919
22.3S7
228 .41S
SEE FOLLOWING CALCULATION& FOR
ACTUAL CAPACITY OF TxDOT ST RUCTURE
TxDOT #2 STR UCTURE
SUMMARY TABLE
Depth
Runoff Exit of
Year o V eloci ty Pond i ng
(cfs) (ft/s ec) (ft)
EXISTING TxDOT CONDI TI ONS
10 143 S.96 0 .36
so 190 7 .92 1.47
100 196 8 .17 1 .S3
POST-DEVELOPMENT COND ITIONS
10 168 .789 7 .03 1 .0S
so 218 .771 9 .12 1 .76
100 228 .41S 9 .S2 1 .87
OK: PONDING (ALLOWJ > PONDING (REQD )
NOTE: TxDOT BERM IN DOWNSTREAM
DITCH OF INLET STRUCTURE W ILL A LLOW
A PONDING DEPTH EQUAL TO 2 .60 ft .
-
EA T FRONTAG RD.
8
let
Project Title : S outh Hampton Master Plan
c :\projects\00012882-south hampton\2882t2ra.s tm
06/11/98 07:38:46 PM
-
STRUCTURE: TxDOT2
(TxDOT 10 YR STORM)
STATE HWY NO. 6
8
MUNIC IPAL DEVELOPME NT GROUP
Haestad M ethods. Inc. 37 Arookside Road W aterbury, CT 06708 (203) 755-1666
-
1-1
8
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
S tormCAD v1 .0
P age 1 of 1
-
256 .00
-____ j_ _______ _J_ _______ _J ________ ~,,_.=::::::::::::::::::::=:=::J:FJ:i~n~c~ti~o~n~:~-~~~==~::~==~ leF.--~54 .00
~-------·~i ..... ~~----~----~
0+00 LJ.p Jnvert : 244 .79 ft
DtilttVert: 244 .50 ft
Length : 96 .00 ft
Section Size : 6 x 4 ft
1+00
ump : 250 .00 ft im : 54 .40 ft
um : 250 .65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
Pipe : P -2 -~----• ... p-lnve . 0:-0H-•----~-------~------~ 244 .00
1+50 On Invert :~ 79 ft 2+50 3+00 3+50
J,.ength : 160.00 ft
~OOBn fSize : 4 x 4 ft
MUNICIPAL DEVELOPMENT GROUP
Project Title: South Hamr:;ton Master Plan
c :lprojects\000\2882-south hampto n\2882t2ra.stm
06/11 /9& 07 :36 :52 PM Haestad M ethods, Inc. 37 Brookside Road W aterbu ry, CT 06708 (203) 755-1666
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC F low Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA} (ft)
(m in) (m in) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 143.00 8 .94 254.40
J -1 N IA NIA NIA NIA 0 .15 0 .15 0 .00 0 .00 143.00 10.48 255.00
J -2 NIA NIA NIA NIA 0 .43 0 .43 0 .00 0 .00 143.00 6 .29 251 .50
Outlet NIA NIA NIA NIA 0.69 0 .69 0 .00 0 .00 NIA 5 .96 250.00
Project Titl e : South Ha m pton M aster Plan
c :lprojects\00012882-south hampton \2 882t2ra .stm MUNICIPAL DEVELOPME NT GROUP
06/11 /98 07 :37:32 PM Hae stad Met hods , Inc . 37 Brooks ide Road W aterbu ry , CT 06708 (203) 755-1666
Rim Sump
Elevation Elevati on
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Projec t Engin eer : Rabon Metcalf
Storm CAD v1 .0
Page 1 of 1
I
Pipe Re p ort
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 143.00 81 .00 0 .008025 8 .94 4x4ft 0 .013 163.83 250.65 250.00 254.76
P-2 J-1 J -2 143.00 160.00 0 .032563 9 .71 4x4ft 0.013 330.01 250.00 244.79 253.41
P-3 J-2 Outlet 143.00 96.00 0 .0030 21 6 .12 6x4ft 0 .013 170.26 244.79 244.50 248.58
Project Title : South Hampton Master Plan
c :\projects\00012882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
06/11 /98 07:37:53 PM Haestad Meth ods , Inc . 37 Brooksid e Road W aterbury, CT 06708 (203) 755-1666
Project Engineer : Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
--
EA T FRONTAG RD .
8
let
Project Title: South Hampton Master Plan
c :\projects\00012882-south hampton\2882t2ra.stm
06/11/96 07:40:22 PM
-
STRUCTURE: TxDOT2
(TxDOT 50 YR STORM)
STATE HWY NO. 6
8
MUNICIPAL. DEVELOPMENT GROUP
-
Haestad M ethods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
-
1-1
8
WE T FRONTA E RD .
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
-- -
256 .00
le : _-j254 .00
im : 54.40 ft
um : 250 .65 ft
252.00
250 .00 Elevation ft
248 .00
246.00
LIL-------+t---·----Pipe: P -2
~~~~~~~~~·~p~e~·~P~-3~~-~~~~~~~-~~~~~-~~~p--inve . &:ee-tt-·~~~~~~~~~~~~~~~~~~~~
lJp Invert: 244. 79 ft 1 +00 1 +50 On lnvert:-<i.+.+. 79 ft
244 .00
Dttlrnlert: 244 .50 ft .-uu
Length : 96 .00 ft ~= i7~~~~ ~ 4 ft
Section Size : 6 x 4 ft
0+00 2+50 3+00
MUNICIPAL DEVELOPMENT GROUP
Project Title : South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra .stm
06/11/96 07 :41 :12 PM Haestad M eth ods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
Node Report
Node Inlet In let Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed {cfs) {ft/s) Elevation
(acres) (acres) (min) Time T ime {in/hr) {CIA) {ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 190.00 11 .88 254.40
J-1 NIA NIA NIA NIA 0.11 0 .11 0 .00 0 .00 190.00 11 .88 255.00
J-2 NIA NIA NIA NIA 0 .34 0 .34 0 .00 0 .00 190.00 7.92 251 .50
Outlet NIA NIA NIA NIA 0 .54 0 .54 0 .00 0 .00 NIA 7 .92 250.00
I
I
I
Project Title: South Hampton Master Plan
c :\projects \000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
I 06 /11 /98 07:41 :32 PM Haestad Methods , Inc . 37 Brooksid e Road Waterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Project Eng in eer: Rabon Metca lf
StormCAO v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 190.00 81 .00 0 .008025 11 .88 4x4ft 0.013 163.83 250.65 250.00 255.87
P-2 J-1 J-2 190.00 160.00 0 .032563 11 .88 4x4ft 0.013 330.01 250.00 244 .79 254.00
P-3 J-2 Outlet 190.00 96.00 0 .003021 7.92 6x4ft 0 .013 170.26 244.79 244.50 248.86
.•
Project Title : South Hampton Master Plan
c :\projects\00012882-south hamptonl2882t2ra .stm MUNICIPAL DEVELOPMENT GROUP
06/11 /98 07:41 :55 PM Haestad Methods, Inc. 37 Brookside Road Wa terbury, CT 06708 (203) 755-1666
Project Engineer: Rabon M etcal(
StormCAD v1 .0
Page 1 of 1
EA T FRONTAG RD .
8
let
Project Title : South Hampton Master Plan
c :\projects\000\2882-south hampton\2882t2ra.stm
0 6 /11 /9 8 07:42 :47 PM
-
STRUCTURE : TxDOT2
(TxDOT 1 00 YR STORM )
STATE HWY NO. 6
8
MUNICIPAL DEVELOPMENT GROUP
H aestad M ethod s, Inc . 37 Brooks ide R oad Waterbury, CT 06708 (203 ) 755-1666
1-1
WE T FRONTA E RD .
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0+00 lJP. }rwert: 244 . 79 ft
otflttVert: 244 .50 ft
Length : 96 .00 ft
Section Size : 6 x 4 ft
Project Title : South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07 :43 :25 PM
1+00
--
Pipe : P -2
~~~~~~Hp-tnve .25fr:6AO~ft1--~~---"-~~~~~~~~~~~~~~~
1+50 On Invert :~ 79 ft
Length : 160 .00 ft
~OOBr, fSize : 4 x 4 ft
..
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad M eth ods , Inc . 37 Brookside Road W at e rbu ry , CT 06708 (203) 755-1666
256 .00
_-j254 .00
54 .40 ft
: 250 .65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3+50
Project Engineer : Rabon M etcalf
StormCAD v1 .0
Page 1of1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Rim Sump
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation E levation Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 196.00 12.25 254.40 254.40 250.65
J-1 NIA NIA NIA NIA 0 .11 0 .11 0 .00 0 .00 196.00 12.25 255.00 255 .00 250.00
J-2 NIA NIA NIA NIA 0 .33 0 .33 0 .00 0 .00 196.00 8.17 251 .50 251 .50 244.7 9
Outlet NIA NIA NIA NIA 0 .52 0 .52 0 .00 0 .00 NIA 8 .17 250.00 250.00 244.50
I
Projec t Titl e : South Ha mpton M as ter Plan Pro ject Eng in eer : Rabo n Metc alf
c :lprojects\000\2882-so uth hampto n\2882t2 ra.s tm MUNICIPAL DEVE LOPM E N T G RO U P StormCA D v1 .0
06/11 /98 07:43:46 PM Haesta d Met hods, In c . 37 Brooksid e Ro ad W aterbury , CT 06708 (203) 755-1666 Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocit y Size (cfs) Invert Invert HGL
(ftlft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 196.00 81.00 0.0080 25 12.25 4 x 4 ft 0 .013 163.83 250.65 250 .00 255.93
P-2 J-1 J-2 196.00 160.00 0 .032563 12.25 4x4ft 0 .013 330.01 250.00 244.79 254.00
P-3 J-2 Outlet 196.00 96.00 0.003021 8.17 6x4ft 0 .013 170.26 244.79 244.50 248.88
I
P roj ect Title: S o uth Hampton Master Plan Project Engineer: Rabon Metcalf
c :lprojec ts\000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11 /98 07:44:09 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
EA T FRONTAG RD.
let
Project Title : South Hampton Master Plan
c :\projects\000\2882-south hampton\2882t2ra .stm
06/11/9 8 07:45:17 PM
- --
STRUCTURE : TxDOT 2
POST DEVELOPMENT 10 YR STORM)
STATE HWY NO. 6
8
MUNICIPAL DEVELOPM E NT GROUP
Haestad M ethods, Inc . 37 9roo ks ide R oad Wate rbury, CT 06708 (203) 755-1666
1-1
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 o f 1
-
le :
im :
Pipe: P-2
'--~~~~~~~_llJ1~-'-.;:,.,~~~~-"-~~~~~~~--''--~~-~~~p--1nve . e:ee-ft--~-·~~~~~~~~~~~~~~~~~~
l.JP. Jrwert : 244 .79 ft 1 +00 1+50 On lnvert:...n.+.t.79 ft oti llHt ert: 2 44 . 5 0 ft ..:!'l"t1V
Length: 96 .00 ft ~= i7~~~~ ~ 4 ft
Section S ize: 6 x 4 ft
0 +00 2+50 3 +00
MU N ICI P A L DEVELOPMENT GROUP
Project Title : S out h Hampt on M aste r P lan
c:\projects\00012882-south hampton\2882t2ra .stm
06/11 /98 07:45 :51 PM Haestad M ethods, Inc . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
256 .00
-1254 .00
54.40 ft
: 250 .65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3 +50
Project Engineer: R abon M etcalf
S torm C A D v 1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (mi n ) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 168.79 10.55 254.40
J -1 NIA NIA NIA NIA 0 .13 0 .13 0 .00 0.00 16 8 .79 11 .0 7 255.00
J -2 NIA NIA NIA NIA 0 .37 0.37 0 .00 0.00 168.79 7 .32 251 .50
Outlet NIA NIA NIA NIA 0 .60 0 .60 0 .00 0 .00 NIA 7 .03 250.00
I
Project Title : S outh Hampton Master Plan
c :\projects \00012882-south hamptonl2882t2ra.stm MUNICIPAL DEVELOPMENT GRO U P
06/11 /98 07:46 :15 PM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Project Engineer: Rabon Metca lf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Sect ion Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 168.79 8 1 .00 0 .0080 25 10.55 4x4ft 0 .013 163.83 250.65 250.00 255.45
P -2 J-1 J-2 168.79 160.00 0 .032563 10.81 4x4ft 0 .013 330.01 250.00 244.79 253.81
P-3 J -2 Outlet 168.79 96.00 0 .0030 21 7 .18 6x4ft 0 .013 170.26 244.79 244.50 248.63
I
I
I
I
I
I
I
Project Titl e : South Hampton M aster Plan Projec t Eng inee r : Rabo n Metcalf
c :\projects \000\2882-south hampton\2882t2ra .stm MUNI C IPA L D EVE LOPM ENT GROUP Storm CAD v1 .0
I 06/11 /98 07:46 :33 PM Haestad Methods, Inc. 37 Brookside Roa d W aterbury, CT 06708 (203) 755-1666 Page 1 of 1
----
EA T FRON T AG RD .
8
Project Titl e: South Hampton Master Plan
c :\projects\00012882-south hampton\2882t2ra.stm
0 6/11/98 07 :47 :22 PM
--
STRUC T URE : TxDOT2
POST DEVELOPM E N T 50 YR STORM)
STATE HWY NO . 6
8
-..
M U NIC IPAL DEVELOPMENT GROU P
Haestad Methods, Inc . 37 Brookside Road Waterbury , CT 06708 (203) 755-1666
- - -
1-1
8
WE T FRONTA E RD .
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
-
~-------·~Jle.:._ -----------
0+00 ~mt=~~ ~!!:~~ ~ 1 +00
Length : 96 .00 ft
Section Size : 6 x 4 ft
--
le :
Pipe : P-2
---l::Jp-lnve . 250:00-ft-----· --------~-------
1 +50 On Inv ert :~ 79 ft 2+50
Length: 160 .00 ft
~~ fSize : 4 x 4 ft
MUNICIPAL DEVELOPMENT GROUP
3+00
Project Title : South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm
06 /11/g~ 07:47:37 PM Haestad M ethods, Inc . 37 Brookside Road W aterbury , CT 06708 (203) 755-1666
256 .00
-~54 .00
54.40 ft
: 250.65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Rim Sump
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 2 18 .77 13.67 254.40 254.40 250.65
J-1 N/A N/A N/A N/A 0 .10 0 .10 0 .00 0.00 218.77 13.67 255.00 255.00 250.00
J -2 N/A N/A N/A N/A 0 .29 0 .29 0 .00 0 .00 218.77 9 .12 251 .50 251 .50 244.79
Outlet N/A N/A N/A N/A 0.47 0.47 0 .00 0 .00 N/A 9 .12 250.00 250.00 244.50
I
I
I Project Title: South Hampton Master Plan Project Engineer: Rabon Metcalf
c:lprojects\000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11/98 07:47:57 PM Haestad Methods, In c . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
I P-1 1-1 J-1 218.77 81 .00 0.008025 13.67 4 x 4 ft 0 .013 163.83 250.65 250.00 256.16
P-2 J-1 J-2 218.77 160.00 0.032563 13.67 4x4ft 0 .013 330.01 250.00 244.79 254.00
P-3 J-2 Outlet 218.77 96.00 0 .003021 9 .12 6x4ft 0 .013 170.26 244.79 244.50 248.98
I
Project Title : South Hampton Master Plan Project Engineer: Rabon Metcalf
c:lprojects\000\2882-south hampton\2882t2ra .stm MUNICIPAL DEVELOPMENT GRO UP StormCAD v1 .0
06/11/98 07:48 :13 PM Haestad Methods , Inc . 37 Brookside Road W aterbury, CT 06708 (203) 755-1666 Page 1 of 1
-
EA T FRONTAG RD.
let
Project Title: South Hampton Master Plan
c :\projects\000\2882-south hampton\2882t2ra.stm
06/11/98 07:48:38 PM
- --
STRUCTURE : TxDOT2
POST DEVELOPMENT 100 YR ST RM)
STATE HWY NO . 6
B
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road W aterbury , CT 06708 (203) 755-1666
-
1-1
8
WE T FRONTA E RD .
Project Engineer: Rabon M etcalf
Storm C AD v1 .0
Page 1 of 1
---
2 +50 3+00
·pe_:_P-3 Pipe : P -2
~------·l..JP.~ Invert: 244 .79 ft ·~------~------+-•p-lnve . 25&:00 ft
0+00 otil»Vert: 244 _50 ft 1 +00 1 +50 Dn Invert :~ 79 ft
Length : 96 .00 ft ~=if~~~~ ~ 4 ft
Section Size : 6 x 4 ft
.•.
MUNICIPAL DEVELOPMENT GROUP
Project Title : South Hampton Master Plan
c:\projec ts\00012882-south hamptonl2882t2ra.stm
06/11 /9 & 07 :4 9 :24 PM Hae stad Metho d s, Inc . 37 Brooks ide Road Waterbury, CT 06708 (203) 755-1666
let:
im :
um
-
256 .00
-1254.00
54 .40 ft
: 250 .65 ft
252 .00
250 .00 Elevation ft
248 .00
246 .00
244 .00
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground Rim Sump
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
(acres) (acres) (min) Time T ime (in/hr) (CIA) (ft) (ft) (ft)
(min) (min) (cfs)
1-1 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 0 .00 228.42 14.28 254.40 254.40 250.65
J-1 NIA NIA NIA NIA 0 .09 0 .09 0 .00 0 .00 228.42 14.28 255.00 255.00 250.00
J-2 NIA NIA NIA NI A 0 .28 0 .28 0 .00 0 .00 228.42 9 .52 251 .50 251 .50 244.79
Outlet NIA NIA NIA NIA 0 .45 0 .45 0.00 0 .00 NIA 9 .52 250.00 250.00 244.50
I
Project Title : South Ha mpton Master Plan Project Engineer: Rabon Metcalf
c :\projects \000\2882-south hampto n\2882t2ra.st m MUNICIPAL DEVELOPMENT G RO U P StormCAO v1 .0
06/11 /98 07:49 :52 PM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Node Node (cfs) (ft) Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
P-1 1-1 J-1 228.42 81 .00 0 .008025 14.28 4x4ft 0 .013 163.83 250.65 250 .00 256.26
P-2 J-1 J-2 228.42 160.00 0 .032563 14.28 4x4ft 0 .013 330.01 250.00 244.79 254.00
P-3 J-2 Outlet 228.42 96.00 0 .003021 9 .52 6x4ft 0 .013 170.26 244.79 244.50 249.02
I
I
I
Project Title : South Hampton Master Plan Project Engineer : Rabon Metcalf
c:lprojects \000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP StormCAD v1 .0
06/11 /98 07:50 :10 PM Haestad Methods , In c . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
SECTION #8
STANDARD DETAILS
-- --
6"
15"
. _4
-N
. . . . 4
. 4 -~ .d., . . -..
..-.. #4 BAR LONGITUDINAL ..
10
4
/ (TYPICAL) ., " .i -
4
• -.,
--.----1~. 4 .. " <l
., 4 • ~ 4 4
<!3" 4 "' " 4 ~ 4 ..
4 ....
24"
3"
GUTTER DRAIN
..
TYPICAL CURB &: GUTTER SECTIONS
N.T.S.
::::.::
<( a:
CD rn rn
[\J
LO
C\J
c co
-:>
c
0 :::;::
0
~· .j.J
u
OJ
ml
4 -'
OJ
cu
(_
4-'
Ull
rn
ml
4-' c
O J
E
OJ
> co o_ -(f)
LJ
Cl
LJ -(fl
_J .......
<(
f-w
D -(f)
4-'
u
OJ
0
(_
0
/
I l
-
NOTE: FINISH CROWN SHAU. BE
1 • ABOVE T /C.
39'-0"
1 1/2" HMAC
JYPICAL STREET SECTION
(39' STREET SECTION)
-
PROPOSED 6' WIDE CONCRCTE
SIDEWAU< {BOTH SIDES)
SEE DETAIL
CONCRETE CURB & GUTIER
SEE DETAIL
::E
<(
0:
CD m m
lD
("\J
c ro
J
c
0
::E
ro c_
-.--<
D
lD
[T)
CD ru -c
0
I J
Cl_
E ro
I
.c
.µ
::J
0
CJ)
I ru en en ru ---0
0
Cl -If)
.µ
u
CJ
0 c_
o_ -u
GRAD E EXISTING
GROUND TO SffiEET
1 • -o· -+--'---' 2·-0·
6" C0t.4PACTEO SUBGRAOE
NOJT : FINISli CRO WN SHALL BE
SAME ELEVATION AS T/C.
2a·-o·
1 1/2" HMAC
TYPICAi, STREET $£CDQN
(28' STREET SECTlON)
CONCRETE CURB & GUTTER
SEE DETAIL
I
3 '-0"
18"
3.. F"° -:: .. -. ~.. :-.:i -:-.. --:-~"':";'-----...-1-~~===-. ·!>. · · ·
...
4 -~ .. ·.
-1--"--· ·,_· ......... ••. l -·. . .·i..~ : . 4. 4 ·"' .. 4 . '~ ·~ .. ·:4-. "'tl" --+--4'*'·.· ..• · .,·~ .... ~'--.··. .d . .• . .... _.•:..,~ .. 4 -~--z ~ ~ ....
. : 4 . . . • . . .• · . .d .. .
#4 BARS @ 18" O.C.
TYPICAL CONCRETE VALLEY GUTIER
(CROSS-SECTION)
co