HomeMy WebLinkAbout38 Development Permit 604 Quality Assurance BrakesDEVELOPMENT PERMIT
PERMIT NO . 604
Quality Assurance Brakes
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 6-12, Block 1 Brentwood Subdivision
OWNER: CCG Venture Partners
14450 T .C. Jester Blvd.
Houston, Texas 77014
(281)893-8331
DRAINAGE BASIN: Wolfpen Creek
SITE ADDRESS:
109 Brentwood Drive
TYPE OF DEVELOPMENT:This permit is valid for the construction of the site for the Quality
Assurance Brakes.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any distwbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction , erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area. All
de opment shall be in accordance with the plans and specifications submitted to and approved by the
ngineer in the development permit application for the above named project and all of the codes and
ances of the ty College Station that apply.
Date
Contractor Date
FOR
BRENTWOOD SUBDIVISION
BLOCK ONE, SECTION ONE, LOTS 6 -12
0.603 ACRES
COLLEGE STATION, BRAZOS COUNTY, TEXAS
AUGUST, 1998
REVISED: SEPTEMBER 11, 1998
REVISED : SEPTEMBER 25, 1998
MUNICIPAL DEVELOPMENT GROUP I l!4 I •I!J 2551 TEXAS AVENUE. SOUTH , STE . A
COLLEGE STATION, TEXAS 77840
Ph : (4 09)69 3-5359 Fx: (4 09) 693 -4243 ~Consu lting Engineers · Environmental · Surveyors· Planner s
Brentwood Subdivision, Section One
Drainage Report
DRAINAGE REPORT
Municipal Development Group
TABLE OF CONTENTS
PROJECT SUMMARY ................................................................................................ 3
DRAINAGE AREA DESCRIPTIONS .......................................................................... 3
DRAINAGE CALCULATIONS ................................................................................... 4
RESULTS ..................................................................................................................... 4
DRAINAGE MAPS & DETAILS
SECTION #1 -DRAINAGE AREA: PRE-DEVELOPMENT
SECTION #2 -DRAINAGE AREA: POST-DEVELOPMENT
SECTION #3 -DRAINAGE AREA HYDROGRAPHS
2987-000 129 Drainage Report.doc Drainage Report -2
Brentwoo d Subdivi sion, Sec tion One
Dra in age Report
PROJECT SUMMARY
Muni cipa l Development Gro up
This report outlines the drainage plan for the Brentwood Subdivision, Section One 0 .603
acres . The subject property site is situated on the north side of Brentwood Drive
approximately 200 linear feet east of the Texas Avenue and Brentwood Drive intersect ion
and adjacent to the existing Dairy Queen. The development is established within B lock
One of Brentwood and consisting of Lots 6 through 12 .
This t ract generally slopes to the south with a grade of approximately 1.33% being fairly
uniformly distributed . The site is currently vacant and unimproved with native grasses,
weeds, small brush and several small trees . The natural drainage of the site is by sheet
flow to the south and on to Brentwood Drive . Runoff is then collected into an exist ing
36" CMP storm sewer drainage structure. This site is in the Bee Creek sub-drainage
basin, which is a part of the Carter Creek drainage basin .
Since the current topography allows the entire property to drain onto Brentwood Driv e
and thence int o the existing storm sewer, which has no unused capacity, it will be
necessary to provide for detention . Detention will provided for the necessary storage of
runoff to ensure that the discharge from the site will be equal to or less than the pre-
development runoff discharge . This design is further illustrated and explained in the
section, "RESULTS ".
DRAINAGE AREA DESCRIPTION
The pre-development drainage area consists of 0 .603 acres of land . The post-
development drainage area will consist of the same site and total acreage , but runoff
coefficients will change due to the development. Impervious areas will be introduced by
t he 3,77 2 square foot building and from the concrete parking area and driveway . The
tot al impe rvi ous area will be 0 .370 acres . Runoff from t he bu ilding ro oftop will be
ch ann eled into the proposed parking lot . F rom there, runoff collected in the parki ng lot
and into the proposed detention pond located at the southwest comer of the property . The
2987-000 129 Drainage Report.doc Drain age Report -3
Brentwood Subdi vision, Section One
Drainage Re port Muni ci pal Development Group
provided detention areas will exceed the required storage amount. The restricting orifice
for discharge will be the proposed grate inlet constructed in-line with the existing storm
sewer.
DRAINAGE CALCULATIONS
The drainage calculations are presented in three basic sections :
I. Drainage Area: Pre-Development -Contains the calculations for the amount of
runoff prior to the development of the site .
II . Drainage Area: Post-Development -Contains the calculations for the amount of
runoff after the proposed development.
ill. Drainage Area : Hydrographs -Graphical representation of the volume of water
that is detained on the site .
The drainage area calculations are summarized accordingly using the Rational Method :
(Q=CIA) where "Q" is the runoff in cubic feet/second , "C" is the runoff coefficient, "I" is
the storm intensity in inches/hour for each selected frequency, and "A" is the drainage
area in acres . We will assume a minimum ten-minute time of concentration for all
calculations. The selected frequencies will be 2, 5, 10, 25, 50 , 100-year rainfall events .
Tabulations of the pre-development and the post-development hydrographs of the
drainage areas are provided . The hydrographs are based on the standard SCS unit
hydrograph with time to peak discharge set to equal the time of concentration and the
total base time set at 3 . 00 times the time of concentration .
Grate flow calculations were determined from the following orifice flow equation (Q =
CA(2gh)112
), where "C" is the orifice coefficient, "A" is free-open area in ft 2 , "g" is
constant at 32.2 ft/sec2
, and "h" is the head , in feet , on the grate.
RESULTS
2987-000129 Drainage Report.do c Drainage Report -4
Brentwood Subdivision, Section One
Drainage Report Municipal Development Group
From the drainage calculations the following results were determined :
+ Detention Calculations : The required detention required during the 100-year rainfall
event has been calculated to be 2,495 ft:3 . Detention provided for in the proposed
parking lot is at 1,028 ft 3
. Therefore, the remaining detention required is equal to
1, 467 ft 3 . Since this detention will be stored in a pond an additional I 0% of volume
will be required for sedimentation to bring the total volume to 1,614 ft 3
. The
detention pond proposed will contain a volume of 1,930 ft 3 allowing for the required
storage and the addition 0.5 ' of freeboard .
+ Proposed Grate Inlet : The proposed detention pond will be drained by a grate inlet
placed inline with the existing 36" CMP storm sewer. The grate inl et will have a
capacity of 2 .265 cfs with one and a half-foot of head during the 100-year rainfall
event. A Neenah grate model R-1879-AlG or approved equal will be used. Once the
grate size and free-open area was determined for the I 00-year event , all other storms
water depth was back calculated with the free-open area and its pre-development
discharge rate. Next the comparison was made between the required calculated depth
and the actual water depth in the detention facilities . As shown all storms (except for
the 2-year) actual water depths were less than the calculated depths . Therefore , the
actual discharge rate during those storms will be less than the pre-development
discharge rate .
2987-000129 Drainage Report.do c Drainage Report -5
Brentwood Subdivision, Section One
Drainage Report
GIVEN
Capacity=
Grav ity , g =
Actual Water Depth =
Capacity=
Gravity, g =
Actual Water Depth =
Capacity=
G ravit y , g =
A ct ual Wate r Depth =
Capacity=
Gravity , g =
Act ua l Water Depth =
Capacity=
G ravity , g =
Actual Water Depth =
Capacity=
Gravity, g =
2987-000129 Drainage Report.doc
Municipal Development Group
GRATE INLET
CALCULATED
(2-YEAR RAINFALL EVENTI
1.231 cfs Depth= 0.44 ft
FT Free-open A rea = 0.38 ft2
32 .2 f sEC
0 .54 ft
-(5-YEAR RAINFALL EVENTI
1.497 cfs Depth= 0.66 ft
FT Free-open Area = 0.38 ft2
32.2 fs EC
0.65 ft
(10-YEAR RAINFALL EVENTI
1.680 cfs Depth= 0.83 ft
FT Free-open Area = 0.38 ft2 32.2 fsEC
0.73 ft
(25-YEAR RAINFALL EVENTI
1.919 cfs Depth= 1.08 ft
FT 32 .2 f sEC Free-open Area = 0.38 ft 2
0.84 ft
~
(50-YEAR RAINFALL EVENTI
2 .169 cfs Depth= 1.38 ft
FT 32.2 f sEC Free-open Area = 0.38 ft2
0.94 ft
-(100-YEAR RAINFALL EVENTI
2 .265 cfs Depth= 1.50 ft
FT 1.Free~e~h .Are~ = o;38 «:.~;·mii'· ..
··-32 .2 f sEC ...
Drainage Re port -6
DRAINAGE MAPS & DETAILS
fENT!ON REQUIREMENTS
~·o VOL. = 2 495 cuft
'JV. VOL. = 2 958 cyft
Porki09 Lot = 1,028 cult •
d = 1,930 cuft
rd > 0 .5 ft
25' Front Building Line
20 LF. EROSION CONTROL
,.,
11
I! I I
PROPOSED 4' CONCRCTE
PILOT CHANNEL SEE
DETAIL THIS SHEET
BRENTWOOD DRIVE
(70' R.0.W .)
ARE4
El<ISTING CURB TO BE
CUT & MATCH EXISTING
PAVEMENT GRADE
\
EXISllNG 8" V.C.P.
SANITARY SEWER
\ 1__ k_ ~---_" _____ i· ___ •• ___ s· ---" -
GRADING Pwt
1"=20'
25' Front Building Line
s·
-II
PROPOSED .-n .'"x 1'2. GRATE
INLET MODEL. ~-:-J.e."l}\-:;..,.A l.Q
AS MANUFACTURED BY
NEENAH OR APPROVED EQUAL .
#4 BARS @ 1
SIDE W
4 .
5'
... 4 ..
~-
. :. ... • : ...
. ·.• ·. ·-..
4 --· . ... -
,.#· .. -
. •. A
....
-4..4 . _.d • . . ..
•.. .d .a .
· ..... 4 . ·• .. ·.
#4 BARS @ 6" O.C.E .W.
TOP & BOTTOM
ELEVATIO N
GRATE INLET DETAIL
N.T.S.
EXISTING 36" CMP
STORM SEWER
@ 1 .09% SLOPE
EXISTING 36" CM P
STORM SEWER
@ 1.093 SLOPE
R-1878 Series Frames Heavy Duty Lids, Grates
These shallow frames are suitable for use in thin or deep con-
crete slabs. All sizes of frames are reversible and can be installed
with flange at base or to p .
S1-1ecify :
1. Catalog number .
2 . To be i nstalled with flange at base or top.
Square Di mensions in in che s
Catalog Number A B c D E F
Solid lid I Open Grate
R-1878-A 1l R-1878-AlG 13 34 x 1334 lY2 12 x 12 14 x 14 18 x 18 4
R-1878-A2l R-1878-A2G 18 x 18 1'h 16 x 16 18V..x1 8 V.. 22 x 22 4
R-1878-A3l R-1878-A3G 20 x 20 l Y2 18 x 18 20'4 x 20 '4 24 x 24 4
R-1878-A4l R-1878-A4G 21Y.x21Y. l Y2 20 x 20 22 x 22 26 x 26 4
R-1878-ASl i R-1 878-ASG 23 Y2 x 23Y2 1 Y2 22x 22 24 x 24 28 x 28 4
R·1878-A6l I R-1878-A6G 25Y. x 25Y. 1 Y2 24 x 24 26 x 26 30 x 30 4
R-1878-A7l , R-1878-A7G 27 Y2 x 27% 1 Y2 26 x 26 28 x 28 32 x 32 4
R-1878-A8l : R-1 878-A8G 29Y2 x 29 Y2 1 Y2 28x 28 2934 x 2934 34 x 34 4
R-1878-A9l I R-1878-A9G 3134 x 3 ]34 l Y2 30 x 3 0 32 x 32 36 x 36 4
R-1878-A 1 Ol *! R-1878-A 1 OG • 37 x 37 1 Y2 36 x 36 37% x 37 Y2 42 x 42 4
Rectangular
R-1878-B 1 l I R-1878-BlG 14 x 20 1% 12x 18 14'4 x 20'4 18 x 24 4
R-l 878-B2l R-1878-B2G 13 Y2 x 25% 1 Y2 12 x 24 13 34 x 2 5 34 18 x 30 4
R-1878-B3l R-1 878-B3G 19Y2 x 25 Y2 1 Y2 18 x 24 19 34 x 2534 24 x 30 4
R-1878-B4l R-1878-B4G 19Y2x3 1Y2 1 Y2 18x 30 20 x 32 24 x 36 4
R-1878-BSl R-1878-BSG 1934 x 37 34 l Y2 18 x 36 20 x 38 24 x 42 4
R-1878-B6l R-1878-86G 25 Y2 x 31 Y2 1 Y2 24 x 3 0 25 34 x 31 34 30 x 36 4
R-1878-B7l R-1878-B7G 25 Y2 x37 Y2 1 Y2 24x 36 26 x 38 30 x 42 4
R-1878-B8l * R-1878-B8G * 25 34 x 4934 1 Y2 24 x 48 26 x 50 30 x 54 4
R-1878-B9l * R-1878-B9G * 3 l34 x 37 34 l Y2 30 x 36 32 x 38 36 x 42 4
R-1878-B 1 Ol * R-1878-B lOG * 3 1V2x49Y2 1% 30x 48 3H4 x 4934 36 x 54 4
*Cover in two pieces.
G
1 x5Y2
1Y.,x4Y.,
1 15/,. x 3:i.il
1Y.x3 Y2
1Y2x6Y2
2Ysx7 Y.,
lx5
l l-fl x5 Y2
l x6:i.il
1Y.x3Y2
Y.x5 Y2
1 x4 Y2
r's x 5
2x5
2x5
1Ysx5
l :i.il x 5
l5!i.x6 '31i•
1:Yax 4 ¥a
1Y2 x 4 :Y.
R-1 879 Series Fra m es Li gh t Du ty Li d s, G ra t es
These sh allow frames ore suitable for use in thin or deep con-
crete slabs. All sizes of frames are reversible and can be ins talled
with flange at base or t op.
Specify :
1. Catalog number.
2 . To be installed with flange at base or t op .
Square Dimensions in inches
Catalog Number A B c D E F
Solid lid Open Grate
R-1879-AlL 'R-1879-AlG 13 34 x 13 34 1 Y2 12 x 12 14 x 14 18 x 18 4
R-1879-A2l R-1879-A2G 18 x 18 1 Y2 16 x 16 18 V..x18 V.. 22 x 22 4
R-1879-A3l R-1879-A3G 20 x 20 1 Y2 18 x 18 20 '!.s x 20 '4 24 x 24 4 --R-1879-A4G 21 Y.x2-1"¥.-Tv; 20X-20 26 x 26 4 R-1879-A4l 22 x 22
R-1 879-A5L R-1879-A5G 23 )/:z x 23V2 1 Y2 22 x 22 24 x 24 28 x 28 4
R-1879-A6L R-1 879-A6G 25 Y. x 25Y. 1 Y2 24 x 24 26 x 26 30 x 30 4
R-1879-A7l R-1 879-A7G 27 V2 x 27 Y:z 1 Y2 26 x 26 28 x 28 3 2 x 32 4
R-1879-A8l R-1 879-A8G 29 Y. x 29Y. 1 Y2 28 x 28 2934 x 2934 34 x 34 4
R-1879-A9L R-1879-A9G 31 Y.x 31Y. 1 Y2 30 x 30 32 x 32 36 x 36 4
R-1879-A 1 OL • R-1 879-AlOG * 37x37 l V2 36 x 36 37% x 37 V2 42 x 42 4
Re ctangular
R-1879-B 1 l I R-1 879-B 1 G 14 x 20 h V2 12 x 18 14 14 x 20 '!.s 18 x 24 4
R-1 879-B2L R-1879-B2G l 3 V2 x 25 % h \2 12 x 24 13 ~· x 25 34 18 x 30 4
R-1879-B3L I R-1879-B3G l 9 V2 x 25 \2 h V2 18 x 24 1934 x 25 34 24 x 30 4
R-1879-B4L R-1879-B4G 19 Y2 x 31 % h y, 18 x 30 20 x 32 24 x 36 4
R-1 879-BSL R-1879-B5G 1934 x 3n• h y, 18 x 36 20 x 38 24 x 42 4
R-1 879-B6L R-1 879-B6G 25 Y2 x 31 Y2 h Y2 24 x 30 25 34 x 3 ]34 30 x 36 4
R-1879-B7l R-1879-B7G 25 34 x 3n4 V2 24 x 36 26 x 38 30 x 42 4
R-1 879-B8L • R-1879-B8G * 2534 x 49l, n Y2 24 x 48 26 x 50 30 x 54 4
R-1879-B9L • R-1 879-B9G * 3 ]34 x 37 3/.i h Y2 30 x 36 32 x 38 36 x 42 4
R-1 879-B 1 OL • R-1879-Bl OG * 31 V2 x 49 V2 n\12 30 x 48 3H4 x 493/.i 36 x 54 4
~cover in two p ieces.
G
1x3
y. x 4 %
Y.x 5
y. x 4
Y.x6V2
lx5
y. x 7 ¥8
1Va x511,.
lx4 Y.
1x4'l's
Y. xS Y:z
¥-x 4 V2
Ysx5 V.
y. x 5
1Yax 5
l x 5 Ya
1 x S Vs
Y.x 5 Ya
l x6 V2
1x5
Wt Lb s
w/ w/
H li d gra te
1 130 115
1 180 170
1 220 210
1 235 220
¥< 2 65 300
y. 330 280
1 370 325
1 415 485
1 470 465
1Y2 790 700
l 185 160
1 220 185
1 245 240
1 285 249
1 365 295
1 385 360
1 460 425
1 510 575
l 500 515
1 695 680
Wt. Lb s.
w/ w/
H lid grate
1 1 15 100
:v. 165 150
:v. 195 185
:v. 200 185
y. 235 255
y. 245 215
y. 290 260
1 340 390
y. 360 310
1 485 445
l 185 160
l 165 180
l 210 195
1 230 215
1 295 310
y. 290 260
~ y. 335 295
l 395 405
l 400 380
1 480 425
R-1878-ASL Manhole
Frame and Solid Lid
'IN4~:b
• ----1 I ~------· -
• Heavy Duty
R-1 878 Sections
R-1879 -B 1 G Catch
Basin Grate and Frame
----·---...; I ~·;·1~ A&H=-:~
I • ' ·----
Light Duty
R-1879 Sect ions
.,
I
i
!
SECTION#!
DRAINAGE AREA
PRE-DEVELOPMENT
SECTION #1 DRAINAGE AREA -PRE-DEVELOPMENT
GENERAL INFORMATION
Description : Drainage area of site before development.
Drainage Area (A PRE) = 0.603 acres
TIME OF CONCENTRATION CTcl
GIVEN
Maxi mum T rave l Distance (D PRE)
Velocity of Runoff (VPRE ) =
Coefficient of Runoff (C pRE) =
215 ft
ft 0.75 f sec
0.32
**NOTE: Minimum Tc allowed = 10 min .
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coeffic ient (e ) = 0 .785
Coeffi cient (b) = 76
Coefficient (d) = 8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coe ffi cient (e ) =
Coe ffi c ient (b) =
Coefficient (d) =
0 .763
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .754
Coefficient (b) = 89
Coefficient (d ) = 8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e ) =
Co effi cient (b) =
Coe ffi c ien t (d) =
0.745
98
8 .5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .73
Coefficient (b) = 96
Coefficient (d ) = 8
2987-000129 Detenti on Facilities Evaluati on.xis
RESULT
Tq PRE) = 4 .8 min.
Rainfall Intensity (1 5) = 7 .693 i%r
llJ.a:•: : tI : :::.::::.•••• ••• I:::.:.::::~:~gi l•l li.:.·:.:
Rainfall Intensity (1 10) = 8 .635 in/hr
:_•_ra.··.:.'_:_•_·.=_=.~.k.•.•.•.=.•.:.:.:.·.•.•• •• • ?• • • • = == = ====•=== • • • ::u11110.ai.s>:: ., "· . . . . . . . . . . . . . . . . . . . . . . . . . . . ~trrr )i/ ·=·=·=·=·=·=·=·=·:·:·:·=<·=·=-=·=·:·:·=·=·=·:·=·:·:-:-:-:·:·=·=<·=·>=·=·=·>=·:
Rainfall Intensity (1 25 ) = 9 .861 in/hr
•.a,.· .. ·,_:,._·,·.=,~_·=.~.··=_:.•.·.'.,',~ .. =,.· .. •,· .. =_ ... ,...,...,...,...,...,.:::::?•?•?•""•=•=•======· .•.•.•.•.•.•.•.•.•,•.•,•.•,•.•,•.•,•.•,•.•,•.•,•.•,•.•,•.•.•.•.•.•,• .•.•.•.•.1.•.·.=_:.~.•.•.1.=_·.=_·.=_1.•.·.=_·.:_1.=_·.=_:.•.•.•.•.•.c.'.=.•.=.1.=.=._·.s.'.'.'.'.:.:_•.•.•.·.J.•• ~Jill ::::::::::::::::::::::::::::::::;:;:;:::::::::::;:;:;:::::;:;.
Rainfall Intensity (1 50 ) = 11 .148 i%r
-l~ij•ffi• ....... •••••·•·•••·•••••••••••••• •••••.• • •:•=••. • •••• g~11~ it~t ?
Rainfall Intensity (1 100) 11 .639 in /hr
=_.=,.a.=,·_=,:_=,=_=,~_:•.·• ..... •·.••.'.".•'.·'.•,.= . .=,• .. ·,.= .. •,.= .. ·,•.:,".",='.••,;_:•.==.• 1n•)( ··•=:::::=•=•=•=•=•=•=•=•=•=•=•=•=::::::::•= .=••.•.•=.'•.'•.·•-••.••.• ... 2i.·.•···.·.·.:.2.•.·····.•.s.•.·.·.·.•.1.=.·.•.·•.•·.•~.··.=·.==.·•.•s.'.'.·.•·•.•= .• :•.•.rn.·=•=• :~ =·=:=:=·=·=:::::::::::::::::::::·:;:;:::::::::::::::::::::::::·:-:-:-
SECTION#2
DRAINAGE AREA
POST-DEVELOPMENT
SECTION #2 DRAINAGE AREA -POST-DEVELOPMENT
GENERAL INFORMATION
Description : Drainage area of site after development
Drainage Area (A1) = 0.370 acres (impervious area)
Drainage Area (A~ = 0.233 acres (landscaped area)
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D 1) =
Velocity of Runoff (V1) =
Coefficient of Runoff (C 1) =
Maximum Travel Distance (D~ =
Velocity of Runoff (V2) =
Coefficient of Runoff (C 2) =
200 ft
ft 3 .00 fsec
0 .88
40 ft
ft 1.00 fsec
0.43
**NOTE: Minimum T c allowed= 10 min.
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8 .5
RESULT
Tc1 = 1 .1 min .
Tc2 = 0.7 min .
T C(POST) = 1.8 min .
Rainfall Intensity (1 2) = 6.327 in/hr
QAREA 1 = 2 .077 cfs
QAREA 2 = 0 .639 cfs
::-.·a.: :·. ::::::::::::::::::::::::::•r J< :•:::::: r ::1~711 :£m •
Rainfall Intensity (Is) = 7 .693 in/hr
QAREA 1 = 2 .526 cfs
QAREA2 = 0 .777 cfs
:,Qi 5::::::: :::::::: • ::::::::::: ... ••:: :: ::• ,: : .. ::1~1i : ~ ••:::•
Rainfall Intensity (1 10) =
QAREA1 =
8.635 in /hr
2 .835 cfs
QAREA 2 = 0 .872 cfs
f#Mit =• •r ::= _:.•=_,_:_:.•=_,=_, '.='.·'.='.·'.='.·'.='.·'.='.·'_,= ... _:= ... •:.:·_,-_, .•.•.•.•.•.•.•.•.•.•.•.•.•.•.:.:_ •. :_ •. •.•'i ii.di a'i t .•.•.•.•.•.•.•.•.•.•.•.•.•.•.•.•.•.•.• :·:·:·:·:·:-:-:-:-:-:-:-:-:-:-:-:-:·:·:·'.•'.•'.•'.•'.•'.•"•"•"•"""
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q) Rainfall Intensity (1 2s) = in/ 9.861 hr
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2987-000129 Detention Facilities Evalu ation.xls
0 .73
96
8
QAREA 1 = 3 .238 cfs
QAREA 2 = 0.996 cfs
·······:··· ·:-:.;·:::::::::::::;:;:::::::::::::·:.;-: ······:::::::::::::::::::···· ............ ··:·····::·······················
.:.:.a.• .. •.·.• .. ~.==.=•.=•.=.•.:.•.•.•·.=.•• ...•.•. •.: = · • • : : ............. • • ••• iU234. tfi ? • • ~.. :::::::::::::::::· ·.·.··.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.·.····
Rainfall Intensity (Isa) = 11.148 in/hr
QAREA 1 = 3 .660 cfs
QAREA 2 = 1 .126 cfs
•:QI# • : :::: :: ::::: : : .:: , : , i~lli •Pti' :::
Rainfall Intensity (1 100)
QAREA 1 =
11.639 i%r
3.821 cfs
QAREA 2 = 1 .176 cfs
·:n :·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·: ~~~~~~~~~~~~~1~1~1~1~1~1~1~j~~~j\/~j~~~~~1.~1.~ :::::::::::::::::::::===========:::j=:='.ft:.ft:i;i ::::~: ::::::::::: $.jk a • , ...... , .... , ............ , ... :: :: : : ., JfiP:''!~ : ~~e. •<
SECTION#J
DRAINAGE AREA HYDROGRAPHS
SECTION #3 -HYDROGRAPHS Chart 4
2-YEAR HYDROGRAPH
Volume Con eyed= 1,337 ft
tS
~-~ ~ 2 --------
u -00.
~
~
1-----
0 10
El Post-Development Im Pre-Development
HYDROGRAPHS Chart 4
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 5
5-YEAR HYDROGRAPH
3.5--------------------.-------------------,--------------------,
2 .5-------
Volume Co
2------
1 .5-----
0 .5
0 10
II Post-Development El Pre-Development
HYDROGRAPHS Chart 5
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 6
10-YEAR HYDROGRAPH
3.5 ---------
3---------
Volume Conve
2 .5-------
~-~~ 2-----u-
rJ)
~
~
1.5----
1---
0 .5
0 10
El Post-Development E1 Pre-Development
HYDROGRAPHS Chart 6
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 7
25-YEAR HYDROGRAPH
4.5...--------------------.-------------------.--------------------.
3 .5 --------
3-------
~ 2 .5------~~~ u-
00. s 2-----
1 .5----
1--
0 .5
0 10
Im Post-Development 8 Pre-Development I
HYDROGRAPHS Chart 7
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 8
50-YEAR HYDROGRAPH
6---------------------.-------------------...,......------------------,
Volume Conveyed 2 ,355 ft3
~-~ ~3------u-
00
~
~
2----
o .............. ......,.......,.......,.....,.....,.-. ...... ....,. ...... ...,....,....,....,....,....,.~~~~,.......,.......,.......,.......,....... ..
0 10
l!I Post-Development E1 Pre-Development
HY DROGRAPHS Chart 8
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 10
100-YEAR HYDROGRAPH
6--------------------..------------------------------------~
Volume Conveyed 2 ,459 ft3
tS
i::i:::_ ~ ct3------u-
VJ.
lo-(
~
2----
1--
0
0 10
•Post-Development Pre-Development
HYDROGRAPHS Chart 10
TIME
(min)
20 30
DRAINAGE REPORT
FOR
BRENTWOOD SUBDIVISION
BLOCK ONE, SECTION ONE, LOTS 6 -12
0.603 ACRES
COLLEGE STATION, BRAZOS COUNTY, TEXAS
AUGUST, 1998
REVISED: SEPTEMBER 11, 1998
; ~ I :'J I •I-= 2551 TEXAS AVENUE . SOUTH, STE. A
• ~-~ • -~ COLLEGE STATION, TEXAS 77840 lillllliillliifElllilfiildlll Ph : (409)693-5359 Fx: (409) 693-4243
: ~ Consulting Engineers · Environmental· Surveyors· Planners
Brentwood Subdivisio n, Section One
Draina ge Report
DRAINAGE REPORT
Municipal Development Group
TABLE OF CONTENTS
PROJECT SUMMARY ................................................................................................ 3
DRAINAGE AREA DESCRIPTIONS .......................................................................... 3
DRAINAGE CALCULATIONS ................................................................................... 4
RESULTS ..................................................................................................................... 4
DRAINAGE MAPS & DETAILS
SECTION #1 -DRAINAGE AREA: PRE-DEVELOPMENT
SECTION #2 -DRAINAGE AREA: POST-DEVELOPMENT
SECTION #3 -DRAINAGE AREA HYDROGRAPHS
2987-000 129 Drainage Report.doc Drainage Repo rt -2
Brentwood Subdivision, Section One
Drainage Report
PROJECT SUMMARY
Municipal Development Group
This report outlines the drainage plan for the Brentwood Subdivision, Section One 0.603
acres . The subject property site is situated on the north side of Brentwood Drive
approximately 200 linear feet east of the Texas Avenue and Brentwood Drive intersection
and adjacent to the existing Dairy Queen . The development is established within Block
One of Brentwood and consisting of Lots 6 through 12 .
This tract generally slopes to the south with a grade of approximately 1.33% being fairly
uniformly distributed . The site is currently vacant and unimproved with native grasses,
weeds, small brush and several small trees . The natural drainage of the site is by sheet
flow to the south and on to Brentwood Drive. Runoff is then collected into an existing
36" CMP storm sewer drainage structure. This site is in the Bee Creek sub-drainage
basin, which is a part of the Carter Creek drainage basin .
Since the current topography allows the entire property to drain onto Brentwood Drive
and thence into the existing storm sewer, which has no unused capacity, it will be
necessary to provide for detention. Detention will provided for the necessary storage of
runoff to ensure that the discharge from the site will be equal to or less than the pre-
development runoff discharge . This design is further illustrated and explained in the
section, "RESULTS".
DRAINAGE AREA DESCRIPTION
The pre-development drainage area consists of 0 .603 acres of land . The post-
development drainage area will consist of the same site and total acreage , but runoff
coefficients will change due to the development . Impervious areas will be introduced by
the 3 , 772 square foot building and from the concrete parking area and driveway . The
total impervious area will be 0 .3 70 acres . Runoff from the building rooftop will be
channeled into the proposed parking lot. From there, runoff collected in the parking lot
and into the proposed detention pond located at the southwest corner of the property . The
2987-000129 Drainage Rep ort .doc Drainage Report -3
Brentwood Subdivision, Section One
Drainage Report Municipal Development Group
provided detention areas will exceed the required storage amount . The restricting orifice
for discharge will be the proposed grate inlet constructed in-line with the existing storm
sewer.
DRAINAGE CALCULATIONS
The drainage calculations are presented in three basic sections :
I. Drainage Area : Pre-Development -Contains the calculations for the amount of
runoff prior to the development of the site .
II. Drainage Area : Post-Development -Contains the calculations for the amount of
runoff after the proposed development.
ill. Drainage Area : Hydrographs -Graphical representation of the volume of water
that is detained on the site .
The drainage area calculations are summarized accordingly using the Rational Method :
(Q=CIA) where "Q" is the runoff in cubic feet/second , "C" is the runoff coefficient, 'T ' is
the storm intensity in inches/hour for each selected frequency, and "A" is the drainage
area in acres . We will assume a minimum ten-minute time of concentration for all
calculations. The selected frequencies will be 2, 5, 10 , 25, 50, 100-year rainfall events .
Tabulations of the pre-development and the post-development hydrographs of the
drainage areas are provided . The hydrographs are based on the standard SCS unit
hydrograph with time to peak discharge set to equal the time of concentration and the
total base time set at 3 . 00 times the time of concentration.
Grate flow calculations were determined from the following orifice flow equation (Q =
CA(2gh)112 ), where "C" is the orifice coefficient, "A" is free-open area in ft:2 , "g" is
constant at 32 .2 ft/sec 2 , and "h" is the head, in feet , on the grate .
RESULTS
2987-000129 Drainage Report.do c Draina ge Report -4
Brentwood Subdi visi on, Section One
Draina ge Re port Muni ci pal Devel opment Group
From the drainage calculations the following results were determined :
;Vo &!_
+ Detention Calculations : The required de tion required during the 100-ye rainfall
event has been calculated to be 2,495 ft:3 . Detention provided for in t
parking lot is at 1,028 ft:3 . Therefo e, the remaining detention requir a is equal to
1,467 ft 3 . Since this detention wi! bek .stored in a pond an additio · 10% of volume
will be required for sedimentation ring the total volume to 1,614 ft 3 . The detention
pond proposed will contain a volume of 1,958 ft 3 allowing for the required storage
and the addition 0 .5 ' of freeboard .
• Proposed Grate Inlet: The proposed detention pond will be drained by a grate inlet
_JIJ'-'_.,_~e existing 36" CMP storm sewer. The grate inlet will have a
Capacity=
Gravity, g =
Capacity=
Gravity, g =
2987-000 129 Drainage Repo rt .d oc
GIVEN
A Neenah grate model R-1879-B2G or
GRATE INLET
CALCULATED
.-'""!,.,,-.~R RAINFALL EVENT)
Depth=
Free·open Area =
INFALL EVENT)
Depth=
Fre~~.e !~:.~~~!.~
0 .72 ft
0 .93 ft2
1.00 ft
0.93tt2"
~;)<
Drainage Report -5
DRAINAGE MAPS & DETAILS
fEl)'JJQN REQUIREMENTS
YD VOL = 2 495 cuft
':N . VOL. = 2 958 cyft
Parking Lot = 1,028
ond = 1,930 cuft
~board > O.~ ft
'ROPOS ED GRATE INLET
iEE DETAll. THiS SHEIT
25' Fron\ Building Line
~-----__,/ j20 L.F . EROSION CONTROL!
_EXISTING 8" V.C.P.
\ SANITARl' SE',;£;<
\ J
-....._.
~
I I
I I
ii
j'tl--.
I ;_tf'7 I .
EX!STING s• V.C.P.
SloWfloRY SEWER LINE
..... \
i I PROPOSED 4 · CONCRETE I PILOT CHA.NNEL SEE
DCTAJL THIS SH EET
' ! !
11
j i,
L,....,J __
--c
BRENTWOOD DRIVE
(70' R.0.W.)
GRAQ!NG PLAN
I 0=20'
AFZE4
I ING U 0 BE
CUT lt. .... .ATCH EX!STI~JG I I PAVEME NT GRADE .
. .
-----~4 .
.... ...
I !
JI. ··~I '
-----_J
\ l•_I
PROPOSED 13"x 25 " GRATE
INLET MODEL R-1879-82G,
AS MANUFACTURED BY
NEENAH OR APPROVED EQUAL.
I ~
#4 BARS @ 1
SIDE W
.•
·oc•w 1 11 ··~--~1
LS If I
I I I I I
5'
• .
....
4 ·. -4 .. . _.a • .
' . .d ~-
. .. · .. _.
TOP ELEV=29 i .00
FL=287.22
L...
... • <I
\\_#4 BAR S @ 6" O.C.E.W.
TOP & BOTTOM
ELEVATION
GRATE INLET DETAIL
N.T.S.
I
I ---~-I
EXISTING 36 " CMP
STORM SEWER
@ 1.093 SLOPE
EXISTING 36 " CMP
STORM SEVIER
@ 1.097. SLOPE
R-1878 Series Frames Heavy Duty Lids, Grates
These shallow fra mes ore suitable for use in thin or deep con -
crete slobs . All sizes of frames ore reversible and con be installed
with fl ange ct base or top .
Sµecify :
1. Catalog number .
2 . To be instc ll ed with flange at base or lop.
Square Dimensions in inches
Catalog Number A I B I c D E F
So li d lid Open Grate
R-1878-A IL R-1878-AIG 13 34 x 13*1 l'h l 12 x 12 1 14 x 14 18 x 18 4
R-1878-A2L R-1878-A2G 18xl8 l l 'h 16xl6 18 '4x 18 14 22 x 22 4
R-1878-A3l R-l 878-A3G 20 x 20 I 'h 18 x 18 I 20'~ x 20 '4 24 x 24 4
R-1878-A4l R-1878-A4G 21y.x2 l y. / 1 v2 , 20 x 20 I 22 x 22 26 x 26 4
R-1878-ASL R-1878-ASG 23 V2 x 23 V2 ll'2 22 x 22 24 x 24 28 x 28 4
R-1878-A6L R-1878-A6G 25 ¥. x 2S Y. 1 \12 24 x 24 I 26 x 26 30 x 30 4
R-1878-A7l R·l 878-A7G 27'12 x 27 % 11 'h 126 x 26 28 x 28 32 x 32 4
R-1878-A8L R-l 878-A8G 29 Y2 x 29 Y2 l 'h 28 x 28 29 3i x 29'1> 34 x 34 4
R-1878-A9L R-1878-A9G 31 ~x3 rn/1v2 30x30 32 x 32 36 x 36 4
R-1878-AIOL.; R-1878-AIOG • 37 x 37 /1 Y2 I 36 x 36 37 \12 x 37 Y2 42 x 42 4
Rectangular
R-1878-B I l R-1878-BlG 14 x 20 I rn 12x 18 , 14'.• x 20 '4 18 x 24 4
R-1878-B2L ; R-I 878-B2G l 3 'h x 25 \12 1'h 12 x 24 1334 x 25 ~ 18 x 30 4
R-1878-B3L : R-1 878-B3G l 9 Y2 x 25 \12 l 'h 18 x 24 19 3• x 25~• 24 x 30 4
R-l 878-B4L i R-1 878-B4G 19 Y2x31'h 1 'h I 18 x 30 I 20 x 32 24 x 36 4
R·I 878-BSL I R-1878-BSG 1934 x 37~• rn 18 x 36 20 x 38 24 x 42 4
R-1878-B6L 'R· 1878-B6G 25 Y2 x 31 \12 rn 24 x 30 2s3• x 31 ~• 30 x 36 4
R-l 878-B7l I R-1 878-B7G 25 V2 x 37 V2 l \12 24 x 36 26 x 38 30 x 42 4
R-1878-B8L • i R-1878-B8G• 25 34 x 49 3i 1!'2 24 x 48 26 x 50 30 x 54 4
R-1 878-B9L. I R-1878-B9G . 3 ]l,4 x 37 3i 1112 30 x 36 32 x 38 36 x 42 4
R-1878-B I OL • j R-1 878-B I OG* 31 \12 x 49 \12 1% 30 x 48 31'• x 49~ 36 x 54 4
G
l xS l.-2
1Y.x4)4
l 1 s;,.x 3~
l V4 x 3 Jti
1V2 x6 Y7
2 Ysx7)4
lxS
l Vsx S Y2
l x6:1/i
l:Y.x 3'12
Y.x5 '12
l x4'12
Va xS
2x5
2x5
l '.}8 x 5
1 ~x5
JS;,. x :i" 3/1 0
l :Ys x 4 Y3
l V2 x ..:.:;,
R-1 879 Series Fr a mes li g h t Duty Lids, Gr ates
Th ese shallo w frames ore suitable for use in t hin or deep con-
cr et e slobs . A ll siz es of frames ore reversible and :on be installed
with flange ct base or top.
Specify :
1. Catalog num ber.
2 . To be insrcll e d with flange at base or top.
Square Dimensio ns in inches
I
Cata log Number A B j c D E F
Solid lid Open Grate
R-1879-A I l . R-1879-AIG 13 3hx1 33<i l Y2 12 x 12 14 x 14 18 x 18 4
R-l 879-A2l ! R-1 879-A2G 18 x 18 1\-2 16 x 16 18 1• x 18 1'. 22 x 22 4
R-1 879-A3l I R-I 879-A3G 20 x 20 1112 18 x 18 20 ~. x 20'4 2 4 x 24 4 --21Y.x2-1°¥.-m 20~20 ~22 x 22 R-I 879-A4l I :: : :;:::;g 26 x 26 4
R-1879-ASL 23 V2 x 23 Vi l V2 22 x 22 24 x 24 28 x 28 4
R-I 879-A6l : R-1 879-A6G 25 Y. x 25Y. 1!'2 24 x 24 26 x 26 30 x 30 4
R-1879-A7l : R-1 879-A7G 2 7 V2 x 27 V2 1!'2 26 x 26 28 x 28 32 x 32 4
R-1879-A8l · R-l 879-A8G 29 Y. x 29 V• 1 '·? 28 x 28 29i; x 29'4 34 x 34 4
R-1879-A9l R-1879-A9G 31Y.x31 Y. l '; 30 x 30 32 x 32 36 x 36 4
R-1 879-A I Ol • R-1879-AlOG• 3 7 x37 1" 36 x 36 37 1 2 x 37 ~'2 42 x 42 4
Rec t angular
R-1879-B 1 l R-1879-81 G 14 x 20 n,' 12 x 18 l4 '.x201; 18 x 24 4
R-1 879-B2l R-1879-B2G 13 V2 x 25 1.: n,, 12 x 24 13'. x 25 3:. 18 x 30 4
R-1 879-B3L R-187 9-83G l 9 V2 x 25 '; ~ 1 : 18 x 24 19'. x 25'; 24 x 30 4
R-1879-B4l R-1879-B4G l 9 V2 x 31 'i , ,, 18 x 30 20 x 32 24 x 36 4
R-1879-85 l R-1879-BSG 19~> x 37'• ,, 18 x 36 20 x 38 2 4 x 42 4
R-1 879-B6l R-1879-B6G 2 5 Y2x31'2 " 24 x 30 25'· x 3 p; 30 x 36 4
R-1 879-B7L R-1879-B7G 25 ~~ x 37'• "'' 24 x 36 26 x 38 30 x 42 4
R-1879-BSL • ; R-1879 -B8G • 25 3 ~ x 49'• h 1; 24 x 48 26 x 50 30 x 54 4
R-1879 -B9l -, R-1 879-B9G" 31 ~ x 37'; n', 30 x 36 32 x 38 36 x 42 4
R-1879-BlO L-R-1879-BIOG• 31 1/2 x 49'2 n'= 30 x 48 3Jl,x4934 36 x 54 4
Cover 1n :w-:
60 NEEN AH ~~ FOUNC~Y COMPA NY ..!..._ ~
G
1x3
y. x 45/3
Y.xS
y. x .!
Y.x6Y2
lxS
Y.x7¥s
1Y3 x5 '/.,
1 x .!.'/,
1 .< ,.,/3
7.J. ..( 5 ~ ... 2
+..:. ,(.::. "'2
~: ... 5 ·~
:h .(5
1/;"5
l X 5 ~I~
1 .(5 .,3
}.:. x 5 ·.-3
ix ~:,2
l x:
Wt. lbs.
w/ w/
H lid grate
l 130 115
l 180 170
l 220 210
l ~ 235 220
:y. 265 300
y. 330 280
l 370 325
l 415 485
1 4 7 0 465
lV2 790 700
l 185 160
l 220 185
l 245 240
l 285 249
l 365 295
1 385 360
l 460 425
l 510 575
l 500 5 15
l 695 680
Wt. lbs.
w/ w/
H li d grate
I 115 100
y. 165 150
y. 195 185
:y. 200 185
y. 235 255
y. 245 215
y. 290 260
1 340 390
:y, 360 310
1 485 445
1 185 160
1 165 180
1 210 195
1 230 215
1 295 310
:y. 290 260
y. 335 295
1 395 405
1 400 380
1 480 425
R· 1878-ASL Manhole
Frame and Solid Lid
-· ' ;&i "" .;,,c ~
o ·~ -------· -
-·---~
• He<1vy Duty
R-1878 Sections
R-1879 -B 1 G Catch
Basin Grate and frame
---·----. _______ , ---
----·--~ 2f:µ:z;~tttt16 .
Light Duty
R-1879 Sections
SECTION#!
DRAINAGE AREA
PRE -DEVELOPMENT
SECTION #1 DRAINAGE AREA -PRE-DEVELOPMENT
GENERAL INFORMATION
Description: Drainage area of site before development.
Dra in age Area (APRIJ = 0 .603 acres
TIME OF CONCENTRATION CTJ
GIVEN
Maxim um Travel Distance (DPRE)
Velocity of Runoff (VPRJ =
Coefficient of Runoff (CpRJ =
215 ft
It 0.75 fsec
0.32
**NOTE: Minimum Tc allowed = 10 min.
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
29 87 -0 001 29 Detention Faciliti es Evalu ation.xis
0.73
96
8
RESULT
T qP RE) = 4.8 min .
Rainfall Intensity (lz) = 6.327 in /hr
,li.!:~r .. ::::_::•f:.II0:::.'::::.:.·:::1:::::=::·-::=•:?.':::::::::::.:::::.::::•:!.:~1Mt~e-.::::::
Rainfall Intensity (1 5) = 7.693 in/hr
:;;2;;: •::::::· :::?:::::::::'·:: .••.••.•.:.:.:.:.•'.:•.:.•.:.:r · :t.i'.i'_,1:'.''_f~_,.,,"_ .. _,,·_.,·..,,:,:_',·_,_._·,,',•'_,,,,="'_, .. ,·',·_a.·,:·_',·.·. ·s.,_.,_ .. · .. '.'.•_,•.•,•,•,•,•,'.·.',•,• }i'\',i;(::::/{{} }{{tf'{ :;:; .. :::·:·:·:·:·:·:·:·:·:·C:~:J:: ow:
Rainfall Intensity (1 10) = 8.635 in/hr
:d;; :· ,.,:,,.,,.,::::::: '•:'': ::::. _:·:: :.:·::_::::::::'_:·:•:,::::;::::·:::::,:::::::1tuo ::·~t~£: ::
Rainfall Intensity (1 25 ) = 9.861 in/hr
····· ·.·.,.,.,.,.,.·.·.·.·.·.·.·.·.· ............. ,.,. __ ,,,., ....... ,.,., ..... _:_·_._ .. ,_ .. _.,_.1'_.,_ ..• ,_··.-~ .. , .. ,_,.._,._, .. _ .. 9,_.,.,_.:a_.,,,.,.s,.,,,,.,,,,,, __ .,,,,,,,,
.. •,•.a,.,·.·,.·,·~.·.'~_''.'·.•,:_:,~_:,:_:_ .. ·.:_ .. · ,,,,,,,,,,,,,.,.,.· ':::''••::::':::::::::::: ,,,,,,,,,,,,,,,,,,,, ,::::,,,,,,,.,. "1':• -, ~~ :::::::·:·::~:~:::: ... :::::::::::::::::::::::::: :;:;:;:::::::::::::::::::::::::::
Rainfall Intensity (1 50) = 11 .148 in/hr
:m~·~:.::i:.r,:::.r.:.:::::::::_:::::•:::::::,::' .. :.:::::•:.:,:.r.:.\:::::_r ,· ::·•::::i~1:ij,:st'-::::::-
Rainfall Intensity (1 100) 11 .639 in/hr
:_9 ~~~·11:.•,_:_:.::::::,::::.:::::::::.:,::::.:-:,:r::::::.:]:•:-: \•:.::,::•::f:?.;~~~r:lit::=:::
SECTION#2
DRAINAGE AREA
POST-DEVELOPMENT
SECTION #2 DRAINAGE AREA -POST-DEVELOPMENT
GENERAL INFORMATION
Description : Drainage area of site after development
Drainage Area (A1) = 0 .370 acres (impervious area)
Drainage Area (A2J = 0.233 acres (landscaped area)
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (D 1) =
Velocity of Runoff (V1) =
Coefficient of Runoff (C 1) =
Maximum Travel Distance (D2J =
Velocity of Runoff (V2) =
Coefficient of Runoff (C2J =
200 ft
ft 3 .00 f sec
0 .88
40 ft
ft 1 .00 fsec
0.43
*"'NOTE : Minimum Tc allowed= 10 min .
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .806
65
8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .785
76
8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8 .5
RESULT
T c1 = 1 .1 min .
TC2 = 0 .7 min .
T q POST) = 1 .8 min .
Rainfall Intensity (12J = 6 .327 in/hr
QAREA 1 = 2 .077 cfs
Q AREA 2 = 0 .639 cfs
::s~::a.:::::::•••]:••:1•::::·::•=rn::::::::J::::•:::1-:::+v. •• .::-:•:::::• .. 1~71~=·-~:::-: .. I
Rainfall Intensity (1 5) = 7 .693 in/hr
Q AREA 1 = 2 .526 cfs
a AREA 2 = 0 . 777 cfs
"ii :.~".:_:·::· ... :.:.·::-.:::·.::.,:···:.:·:::-:::::: =:.:::.:,,::•::1~~~.:1!:.::. :::
Rainfall Intensity (1 10) =
QAREA 1 =
8 .635 in /hr
2 .835 cfs
Q AREA 2 = 0 .872 cfs
•_,·•_,.'_,A=_,·,_:_:.,:_·.=,=,••:='_'•.'.~.'.•.'.·'_,·'_,·'_,i=_,'_,'_,'_,'_,'_,'_,:•:·':.:::=:::::·::•::.• .... :·'.·.·.·'.":"_:':·'.•:f_•.•• .. =.•_.• .. • .. • . .-_:_••.·_:_==:: ·=·==::::=: .. ,. ========:====·=-//_.•fj:_•.:~_·,.,._·_-. ... '~.::.:: .. ;d<: .... s'·'·•_ •. _ •• :_:,_·•.i.i.i.••.• ~v :~;;\;~;~;~;;;~;~;;;;~~~~~~;~;~;~;;;;;~;~;~;~~f~~f========:::!=·~fK~~L:}~!~=-=·=·=·=···=·=····-
Rainfall Intensity (1 25 ) = 9 .861 in/hr
QAREA 1 = 3 .238 cfs
a AREA 2 = 0 . 996 cfs
................... ·············· .·.·.·.·.·.-..... -.·.·.· .. ·.·.· ... ·.·.· ····.·.··················-·.·.·.·.·.·.·.
••si::a ::•::•:••::•:::::r::::::•r:::::::::•:••·=rn:•::•::::r:: :::::=::::r•nmi~at4:9$r::::=:
Rainfall Intensity (1 50) =
Q AREA 1 =
in/ 11 .148 hr
3 .660 cfs
QAREA 2 = 1 . 126 cfs
:m~rir=·: .... : ':•::::.:•::: •:•:=:::: ·=·· .:.:::::]•::::::::!~z1§•!t!:::::1::
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q) Rainfall Intensity (1 100) in/ 11.639 hr
Coefficient (e) = 0. 73 Q AREA 1 = 3 .821 cfs
Coefficient (b ) =
Coefficient (d) =
2987-000129 Detention Faci li ties Evaluatio n.xis
96
8
Q AREA 2 = 1 .176 cfs
.•'.'1_ •... :_:_·.·.·.~.'.•:_0o_•' .. ''.=.•·.''_::_:_•.:_;;;_•_:.:_•·.:_·.•.: =_.:_.:_.'_:·.:•_.:_•_.:.•_ ... ·.:.-.•. < = = ., ,,, • t•::=::::::•::::••iU~t'·m t••:]
:=J.: ·:·:::·:::::::::::::;:::::::::;:::;:;:: •.•·.•.·•·.•.•.·.·.•••.•.•••.••••·
SECTION#3
DRAINAGE AREA HYDROGRAPHS
SECTION #3 -HYDROGRAPHS Chart 4
2-YEAR HYDROGRAPH
3.,._~~~~~~~~~+l ~~~~~~~~~~~~~~~~~~--J
Volume Con eyed= 1,337 ft
0
0 10
El Po st -Development El Pre-Development TTh1E
(min)
HYDROG RAP HS Chart 4
20 30
SECTION #3 -HYDROGRAPBS Chart 5
5-YEAR HYDROGRAPH
3.5....-------------------.------------------_,...------------------,
2 .5 --------
Volume Co
2------
1 .5 -----
1 ---
0 .5
0
0 10
mJ Post-Development EJ Pre-Deve lopment !
HYDROGRAPHS Chart 5
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 6
10-YEAR HYDROGRAPH
0 10
EJ Post-Development EJ Pre-Development
HYDROGRAPHS Chart 6
Tll\'IE
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 7
25-YEAR HYDROGRAPH
0 10
Im Post-Development [J Pre-Development I
HYDROGR.APHS Chart 7
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 8
50-YEAR HYDROGRAPH
6-----------------------------------------.-------------------, !
i 3 Volume Conveyed 1 2,355 ft
2----
0
0 10
El Post-Development El Pre-Development
HY DROGRAPHS Chart 8
T™E
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 9
100-YEAR HYDROGRAPH
6 ,.____ ______ _
s-------
3----
2---
0
0 10
El Pre-Development El Post-Developmen t
HYDROGRAPHS Chart 9
TIME
(min)
20 30
/, De~-H~ P~ s~lJ
JLo-l--\:> '-. } •c ~ ) rl
A-p..t,lk. "l>~~ ~~
e-m~A-1 ~~ rr1v41e,7 miJ,, -WNJ..
?-. C}i~ ~ )111~dVS
AreA-c~~~
DRAINAGE REPORT ~t sh."6 /e.s 5 .
FOR INJf,~ll!>t/$ fl~ ftrVICCJS.
BRENTWOOD SUBDIVISION tJfi/, ~ k.'Jr~
BLOCK ONE, SECTION ONE, LOTS 6 -12 ~Jiow3 1/'\e. °11~~
0.603 ACRES ~' 8' ;~_'•elj
• ~"J. r~IOu(.
~--~~p)~--
COLLEGE STATION, BRAZOS COUNTY, TEXAS J\9
~
AUGUST, 1998 ~ ~o~8/rN48.
'f
; COLLEGE STAT IO N, TEXAS 77840
MUNIC I PAL DEVELO PMENT GROUP
I ~ I~ I •I !' 2551 TEXA.S AVENUE. SOUTH . STE. A
Ph: ( 4 0 9)693-5359 Fx: ( 409) 693-4243 ·. l Consu lt ing Engineers ·Environmental· Surveyors-Planners
DRAINAGE REPORT
FOR
BRENTWOOD SUBDIVISION
BLOCK ONE, SECTION ONE, LOTS 6 -12
0.603 ACRES
COLLEGE STATION, BRAZOS COUNTY, TEXAS
AUGUST, 1998
i · COLLEGE STAT IO N , TEXAS 77840
MUNICIPAL DEVELOPMENT GROUP Id I~~ I •IC:J 2551 TEXAS AVENUE. SOUTH, STE. A
i Ph: ( 409)693-5359 Fx: ( 409) 693-4243
· ' ~Consul ting Engineers · Environmental· Surveyors · Planners
Brentwood Subdivisi on, Sect io n On e
Drainage Rep ort
DRAINAGE REPORT
Munici pal Developm ent Grou p
TABLE OF CONTENTS
PROJECT SUM1\1AR Y ................................................................................................ 3
DRAINAGE AREA DESCRIPTIONS .......................................................................... 3
DRAINAGE CALCULATIONS ................................................................................... 4
RESlJLTS ..................................................................................................................... 4
DRAINAGE MAPS & DETAILS
SECTION #1 -DRAINAGE AREA: PRE-DEVELOPMENT
SE CTION #2 -DRAINAGE AREA: POST-DEVELOPMENT
SE CTION #3 -DRAINAGE AREA HYDROGRAPHS
2987-0001 29 Drainage Report.d oc Drainage Rep ort -2
Brentwood Subdivision, Section One
Drainage Report
PROJECT SUMMARY
Municipal Development Group
This report outlines the drainage plan for the Brentwood Subdivision, Section One 0 .603
acres. The subject property site is situated on the north side of Brentwood Drive
approximately 200 linear feet east of the Texas Avenue and Brentwood Drive intersection
and adjacent to the existing Dairy Queen. The development is established within Block
One of Brentwood and consisting of Lots 6 through 12 .
This tract generally slopes to the south with a grade of approximately 1.33% being fairly
uniformly distributed . The site is currently vacant and unimproved with native grasses ,
weeds, small brush and several small trees . The natural drainage of the site is by sheet
flow to the south and on to Brentwood Drive. Runoff is then collected into an existing
30" CMP storm sewer drainage structure. This site is in the Bee Creek sub-drainage
basin, which is a part of the Carter Creek drainage basin .
Since the current topography allows the entire property to drain onto Brentwood Drive
and thence into the existing storm sewer, which has no unused capacity , it will be
necessary to provide for detention . Detention will provided for the necessary storage of
runoff to ensure that the discharge from the site will be equal to or less than the pre-
development runoff discharge . This design is further illustrated and explained in the
section, "RESULTS".
DRAINAGE AREA DESCRIPTION
The pre-development drainage area consists of 0.603 acres of land . The post-
development drainage area will consist of the same site and total acreage , but runoff
coefficients will change due to the development. Impervious areas will be introduced by
the 3, 750 square foot building and from the concrete parking area and driveway . The
total impervious area will be 0.250 acres . Runoff from the building rooftop will be
channeled into the proposed parking lot. From there, runoff collected in the parking lot
2987-000129 Dra inage Report.do c Drain age Report -3
Brentwood Subdivision, Section One
Draina ge Report Municipal Development Group
will drain across the pavement and into the proposed detention facility located at the
southwest corner of the property .
DRAINAGE CALCULATIONS
The drainage calculations are presented in three basic sections :
I. Drainage Area : Pre-Development -Contains the calculations for the amount of
runoff prior to the development of the site .
II. Drainage Area : Post-Development -Contains the calculations for the amount of
runoff after the proposed development.
III. Drainage Area: Hydrographs -Graphical representation of the volume of water
that is detained on the site .
The drainage area calculations are summarized accordingly using the Rational Method :
(Q=CIA) where "Q" is the runoff in cubic feet/second , "C" is the runoff coefficient, 'T is
the storm intensity in inches/hour for each selected frequency, and "A" is the drainage
area in acres. We will assume a minimum ten-minute time of concentration for all
calculations . The selected frequencies will be 2, 5, 10, 25, 50, 100-year rainfall events .
Tabulations of the pre-development and the post-development hydrographs of the
drainage areas are provided . The hydrographs are based on the standard SCS unit
hydrograph with time to peak discharge set to equal the time of concentration and the
total base time set at 3.00 times the time of concentration.
Grate flow calculations were determined from the following orifice flow equation (Q =
CA(2gh)112), where "C" is the orifice coefficient, "A" is free-open area in ft 2
, "g" is
constant at 32.2 ft/sec 2, and "h" is the head , in feet , on the grate .
RESULTS
From the drainage calculations the following results were determined :
2987-000 129 Draina ge Report .do c Drainage Report -4
Brentwood Subdi visi on, Section One
Drainage Report Municipal Development Group
+ Detention Calculations : The proposed detention pond shall have volume no less than
1,987 ft:3, which is required by the 100-year rainfall event. An additional 10% will be
required to accommodate a decrease in pond storage due to sedimentation. Therefore,
the total required detention volume equals 2, 186 ft3 . As shown on the Grading Plan,
the proposed detention pond is sized at 3, 145 ft3 . This extra volume will allow for a
one-half foot of freeboard during the 100-year rainfall event.
+ Proposed Grate Inlet : The proposed detention pond will be drained by a grate inlet
placed inline with the existing 30" CMP storm sewer. The grate inlet will have a
capacity of 2.25 cfs with one foot of head . A Neenah grate model R-1879-B2G or
approved equal will be used .
Capacity=
Gravity, g =
Capacity=
Gravity, g =
2987-000 129 Drainage Report.do c
GIVEN
GRATE INLET
CALCULATED
(25-YEAR RAINFALL EVENT)
3 .79 cfs Depth=
FT 32 .2 /sE c Free-open Area =
(100-YEAR RAINFALL EVENT)
4.4 7 cfs Depth =
32 .2 FT'sEc Free.~P~~ ,Ar~~)=
0.72 ft
0.93 ft2
1.00 ft
0.93 ft2
Drainage Report -5
DRAINAGE MAPS & DETAILS
#
.·'. -
17 599' ~ . I 't -~<i ---·---·-2~ ~ Public Uta.t>l Easement ! I ...............
~ --t----1 ----: ' . ·--
··1-----;
. .
~.i .---~1
~-~ ____ ...... 293
GR AD I N G PL AN
PROPOSED 13"x 25" GRATE
INLET MODEL R-1879-B2G.
AS MANUFACTURED BY
NEENAH OR APPROVED EQUAL.
6
I·
. . .
4 .
. •
#4 " O.C.E .W.ltl 1 c:: I ~ \
I
I
I
5 '
4 -. • . ... .
. .-. . 4 .
.. . . : . . : • .... . . .
.. _4
_.d .. . . .. ., • ..
ELEV=291 .00
FL=287 .42
...
#4 BARS @ 6" O.C.E.W .
TOP & BOTTO M
ELEVATION
GRATE INLET DETAIL
N.T.S .
EXISTING 36" CMP
STORM SEWER
C 1.09% SLOPE
EXISTING 36" CMP
STORM SEWER
@ 1.097. SLOPE
R-1 878 Series Frames Heavy Duty Lids, Grates
These shall ow fram e s a re suitable fo r use i n thin or d ee p con -
crete sla b s. A l l si zes of frames are revers ibl e an d co n b e installed
with fla nge ct base or top .
Sµe cify :
l . Cata l og number.
2 . To be in s;c ll e d w ith Aange at base or t o p .
Squa r e Dimensi ons in inc hes
Catalog N u mber A B I c D E F
So li d Lid Open Grate
R-1878-A 1l R-1 878-AlG 13 34 x 1334 i 1\"z 1 12 x 12 1 14 x 14 18 x 18 4
R-1878-A2L R·l 878-A2G 18 x1 8 1\"z 16x16 i 1814x1 8 14 22 x 22 4
R-1 878-A3L R-1 878-A3G 20 x 20 Im 18 x 18 120 14 x 20 14 2 4 x 24 4
R-1878-A4L R-l 878-A4G 21Y.x2 1Y,,1Y2 20 x 20 I 22 x 22 2 6 x 26 4
R-1878-ASL R-1878-ASG 2 3 Yix23Y2 1112 22 x 22 24 x 24 28 x 2 8 4
R-1878-A6L R-1878-A6G 2 5 Y. x 2 5Y. I ll'2 24 x 24 r 26 x 26 30 x 30 4
R-1878-A7L R-1 878-A7G 27% x 27% l!"z 26 x 26 1 28 x 28 32 x 32 4
R·1 878-A8L R-1 878-A8G 29 Y2 x 29Y2 r l~ 28 x 28 j 29 34 x 29 34 34 x 34 4
R-1 878-A9L R-1878 -A9G 3 1'4x3P~ 1"2 30 x 30 I 32 x 32 36 x 36 4
R-1 878-AlOL"· R-1878-AlOG" 37 x 37 1\12 36 x 36 i 37 Y2 x 37 Y2 42 x 42 4
Rec t angular
R-1 878-81 L R-1878-BlG 14x20 11',2 1 12x18 1 14 14x 20 14 18 x 24 4
R-18 78-B2L : R-1 878-B2G 13Y2 x 25 Y2 ('' 12 x 24 13 34 x 2534 18 x 30 4
R-1878-B3L : R-1 878-B3G 19% x 25 Y2 . 11/o 18 x 24 19'~ x 2 5"4 24 x 30 4
R-1878-B4L R·l 878-B4G I 19% x 31 y, I 1 \'2 I 18 x 30 I 20 x 32 24 x 36 4
R-1878-85L i R-1 878-BSG 19'4 x 37~~ 1:; 18 x 36 20 x 38 24 x 42 4
R-1878-B6L R-1 878-B6G 2 5% x 31Y2 l "i 24 x 30 25 3', x 3P~ 30 x 36 4
R-1878-B7L ; R-1 878-B7G 25 Yi x 37 Y2 I l "2 24 x 36 1 26 x 38 30 x 42 4
R-1878-B8L • : R-1 878-B8G • 2 534 x 49 3~ '1112 24 x 48 26 x 50 30 x 54 4
R-1 878-B9L • !R-1 878-B9G • 3 1'4x37 3~/1 1 1 30 x 36 32 x 38 36 x 42 4
R-18 78-BlOL · I R-1878-BloG · 31 Y2x49\1,11'2 30 x 48 131'', x 4934 36 x 54 4
•cover in two ;::1 ~ce s.
G
l xS Y2
1Y.x4 Y•
1 15/,. x 341
1Y.x3 )12
1Y2x6 Y2
2~x7 !1•
lxS
1 Yax5 !12
1x6~
1Y.x3 '12
Y.xs :12
1 x4 '/2
~sxS
2x5
2x5
l ~x S
l ~x S
is;,. x 6 ·3;,.
1:Yax4V9
1)Ii x4 Y,
R-1 879 Series Frames Light Duty Lids, Grates
These sh al l cw frames are sui tab le for use i n thin or d eep co n-
crete slabs . ,!. i i si zes of frames a re r ev ers ible and ~on be in st a l led
with fla n g e :::7 base o r to p .
Specify :
1. Cata l og :ium ber.
2 . To b e in s:a ll ed with A a ng e a t bas e or t o p .
Squa re Dime ns ions in inches
I
Catalo g N umber A B i c D E F
So li d Li d Open Grate
R-1 8 79 -A 1 L R-18 79-AlG 13 34 x 13'; 1 ~':z 12 x 12 14 x 14 18 x 18 4
R-18 7 9-A 2 L '. R-1 879-A2G 18 x 18 1'·: 16 x 16 18 1'. x 1 8 1 ~ 22 x 22 4
R-1879-AJL : R-1 879-AJG 20 x 20 112 18 x 18 20 \~ x 20'1. 24 x 24 4 ---------R-1 879-A4L j R-1 879-A4G 2 l:Y.x21 11< E2 2 0 x 20 22 x 22 26 x 26 4
R-1 879-A5L . R-1 879-A5G 23 V2 x 23 l/i l '·i 22 x 22 24 x 24 28 x 28 4
R-18 7 9 -A6L ' R-1 8 79-A6G 25 ¥. x 25¥. 1'· 24 x 2 4 26 x 26 30 x 30 4
R-1 879-A 7 L : R-1 8 79-A7G 27 Y2 x 27 Vi n \'2 26 x 26 28 x 28 32 x 32 4
R-18 7 9 -A8L R-1 879-A8G 29 Y.x29 y4 l ''' 28 x 28 29''.i x 29 " 34 " 34 4
R-18 7 9-A9L R-18 79-A9G 31 Y.x 3l lt, 11': 30 x 30 32 x 32 36 x 36 4
R-1 879-A 1 CL· R-1 8 7 9 -AloG • 37 x37 11,, 36 x 36 37 1·2 x 37 \12 42 x 42 4
Rect angula r
R-1 8 79-B 1 L R-1 879-81G 14" 20 ~I • 12 x 18 14 1• x 20 \~ 18 x 24 4
R-1 8 7 9 -B2 L R-l 87 9 -B2G 13 !fz X 25 1 : I : 12 x 2 4 13 '~ x 25'• 18 x 30 4
R-1879 -BJ L R-187 9 -83G 1 9 ~2 x 2 51 : p 1 : 1 B x 24 19 3, x 25''. 24 x 30 4
R-187 9 -8 4 L R-18 79 -84G 1 9 \2 x 31 1 , r, 18 x 30 20 x 32 24 " 36 4
R-187 9 -BS L R-1879 -BSG 19''4x 37 '• 1 : 18 x 36 20 x 38 24 x 42 4
R-1 879 -86 l ~-1 87 9-B6G 25 Y2 x 3 1'i ': 24 x 30 25l ~x31~'4 30 x 36 4
R-1879 -8 7L R-18 79-87G 25 34x37', ~1 : 24 x 36 26 x 38 30 x 42 4
R-1879 -BS L • R-1 87 9-B8G • 25l ~ x 49 :;.i 1 1 24 x 4 8 26 x 50 30 x 54 4
R-187 9 -B9 L • R-1 87 9 -89G • 31 ~ x 37 ', h1 : 30 x 36 32 x 38 36 x 42 4
R-1 8 7 9 -8 1 O l • R-187 9 -BlOG ' 31 Y2x•9':P': 30 x 4 8 3P ~ x 49~~ 36 x 54 4
Cove r 1n ~ ...... -:: :: -?:~s .
,,..: ·L.,:.·.,.:.,.. ····1' ~ ...... i ~~ •• ( ,,.,_""-.,~ .....
G
1x3
¥ .. Jf. ~513
:y." .3
y. x .!
Y.x6 V2
1"5
¥ .. x7¥s
1 l-3 x 5 '/.,
1 x a,:/ ..
1 x ~113
~-x 5 ·,2
'.¥.:.,( 4'.12
~13 ,( 5 . ~
} .. x =
l /: x 3
1 x 5 -/~
1x5 ·.3
~'.. x 5 A
ix ~:,:z
l x 5
Wt. Lbs .
w/ w/
H lid grate
1 130 1 15
l 180 170
1 220 2 10
1 235 220 :v. 2 6 5 300
y. 33 0 2 80
1 370 325
1 41 5 48 5
1 470 465
1Y2 790 700
1 185 160
1 220 18 5
1 245 240
1 285 249
1 365 295
1 385 360
1 460 425
1 510 575
1 500 515
1 695 680
Wt. Lbs.
w/ w/
H li d grate
1 1 15 100
y. 165 150
y. 195 185
y. 200 185
y. 235 255
y. 245 2 15
y. 290 260
1 340 390
:y. 360 310
l 485 445
1 185 160
1 165 180
1 210 195
1 230 215
1 295 31 0
¥. 290 260
¥· 335 295
1 39 5 405
1 400 380
1 480 425
R-18 7 8-A5L Manhole
Frame and Solid Lid
. _____.;
--------~ ' ---------
~c'1 ==1=i===tt~A==~=:1=__.==\~~;r.~ .. ~: -·---..;
• Heavy Duty
R-1 878 Secti ons
R· 187 9-B 1 G Ca tch
Ba sin G r a t e and fram e
---· -----; -------' -------·---2JF-=-==:ttttlS!
I .
Li ght Duty
R-1 879 Sect i ons
---------------------------------------------------.. ~-.. t<:iio:;;::~~l':·~~~.<41!1:s:.,."!'~~;u:s:..,'-~!%~}<~ .... :\'."'ll«'~-'~'*3~;¥~..,RWl'llll[l!:$Er.!&!llJµ;;;§Qt'9!:, !:!lll'll!Wlllll&ll!ld1Snlll.!!l!J#?.1.p"IP.~.,;~
SECTION#!
DRAINAGE AREA
PRE -DEVELOPMENT
SECTION #1 DRAINAGE AREA -PRE-DEVELOPMENT
GENERAL INFORMATION
Description : Drainage area of site before development.
D rai nage Area (ApRE.) = 0.603 acres
T IME OF CONCENTRATION CTc)
GIVEN
Maximum T ravel Distance (DpRE.)
Ve locity of Runoff (VpR E.) =
Coefficient of Runoff (Cp RE.) =
215 ft
ft 0.75 fsec
0.32
**NOTE: M i nimum Tc allowed = 1 O min .
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e ) =
Coefficient (b) =
Coefficient (d) =
0 .806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e ) =
Coefficient (b ) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e ) = 0 .763
Coe ffi cient (b ) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coeffi cient (d ) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coe ffi cient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e ) = 0 .73
Coefficient (b) = 96
Coe ffi c ient (d) = 8
2987-0001 29 Detention Facilities Evalu at ion .xis
RESULT
T C(PR E) = 4.8 min .
Rainfall Intensity (I i) = 6.32 7 in/hr
J§i:,i:::::::::::::.:::::::::::::::::=::::[_[:l· :: ::·:=:::,::<. '/ ·;? ::::::J.il@M~~t::::t:::::
Rainfall Intensity (1 5) = 7 .. 693 in/hr
:9~:::m::.r1::r::·::::::::::::::.:.:.::·:r·:::::r::r::: ':::::::: ·:::::1s~~:::m·,:::.::··:
Rainfall Intensity (1 10) = 8.635 in/hr
:sjij·::i ::=:::::=t:r.:::·i:·::r.:r ·::::::.::·:.:·::·:·::-.:::::::: :::::1~1P:.::1~·::::::::::::
Rainfall Intensity (1 25 ) = 9.861 in/hr
::g~j :ffi::::: :::::1 :·;·:::·:::::;:::_:::::.:.,:_:·:::-:::,::':::_:::.:;:;I: .[1i%1~i!:fli: ! ... }
Ra infall Intensity (1 100) 11 .639 in/hr
::mjj~ m.:::,,.:::;:::::::::::1::,:::::::::.:::,:::·:.:.:.:=··1::··:::,:.:.:::=-:: ::.~1~::,~t . :::::
SECTION#2
DRAINAGE AREA
POST-DEVELOPMENT
SECTION #2 DRAINAGE AREA -POST-DEVELOPMENT
GENERAL INFORMATION
Description: Drainage area of site after development
Drainage Area (A1) = 0.250 acres (impervious area)
Drainage Area (A2) = 0.363 acres (landscaped area)
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (D 1) =
Velocity of Runoff (V1) =
Coefficient of Runoff (C 1) =
Maximum Travel Distance (D:i) =
Velocity of Runoff (V:i) =
Coefficient of Runoff (C:i) =
200 ft
ft 3 .00 fsec
0 .90
40 ft
ft 1.00 fsec
0.43
**NOTE: Minimum Tc allowed = 1 O min .
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0 .785
Coefficient (b) = 76
Coefficient (d) = 8 .5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8 .5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .754
89
8 .5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0 .745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2987-00 0 l 29 Detent io n Facilities Eva lu ati on.xis
0.73
96
8
RESULT
T c1 = 1.1 min .
0.7 min .
T q POST) = 1.8 min .
Rainfall Intensity (Iv = 6.327 in/hr
Q AREA 1 = 1 .435 cfs
Q AREA 2 = 0 . 996 cfs
·:·:·:·:·:·:·::·:·:·:·: :::::::::::::::;::;::: :;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:;:::::=::::::::: :;::::;::: ·=·=· ·······1···:.;~:: .... ::Si m ::::::::::::& :::::::: ::::t?:.J:::::::: ?:=::::J iJ@ :=~~~::::
fl Rainfall Intensity (1 5) = 7 .693 1
/hr
Q AREA 1 = 1 .745 cfs
Q AREA 2 = 1.211 cfs
.... ·:::·:;:·:·:-:·:::·:· ::::::::: ·::: :·:·:·:·'.·'.· ............ :. ············.··:······· :~,a :::: t::::::r: ,,,,,,,,,,,,,, f::,,,,,s' ·:t'': =:1~~~r1m::::::=::
Rainfall Intensity (1 10) =
Q AREA 1 =
in/ 8 .635 hr
1.959 cfs
QAREA 2 = 1.359 cfs
:lii::a:. ,,,:::::::::::::·:·:::,:.:::::: : : ... r.:-::=:·:.J:.:·::::: :::::::-::,::!*!~!: crsm:m:r
Rainfall Intensity (1 25) =
QAREA 1 =
9 .861 in /hr
2 .237 cfs
QAREA 2 = 1.552 cfS
-~::;;= :::::=::==:=::::::=:=::===::===:=::::==:==::?:=::=:_==;::::=:::::==:=· :·=·::·=·3 :7 391 E&< ::
Rainfall Intensity (1 50) =
Q AREA 1 =
Q AREA2 =
11 .148 in/hr
2 .529 cfs
1.755 cfs
·B.ffi:"=],_l _ji('i;::, :::::::::;=;:; :::= ::::i ,2i4 Mtifl ::r
Rainfall Intensity (1 100) 11 .639 in/hr
Q AREA 1 = 2 .641 cfs
Q AR EA 2 = 1.832 cfs sj*-a :.::::: :::.:::::::::: ::t==, ,)1::t:::::J : ::~~,,t:~·~::m::::
SECTION #3
DRAINAGE AREA HYDROGRAPHS
SECTION #3 -HYDROGRAPHS Chart 4
2-YEAR HYDROGRAPH
Volume Con\feyed = 1,080 ft
~
r.!)
~-~ ~ 2 --------
u -rJ1 ....
~
1----
0
0
I
I
10
El Post-Development El Pre-Development
HY DROGRAPH S Chart 4
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 5
5-YEAR HYDROGRAPH
0 10
mJ Post-Development EJ Pre-Development
HY DROGRAPHS Chart 5
Tll\1E
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 6
10-YEAR HYDROGRAPH
0 10
El Post-Development El Pre-Development
HYDROGRAPHS Chart 6
Tll\ilE
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 7
25-YEAR HYDROGRAPH
2.5
~
~
~-~~ 2 = ~ u-
00. ....
~
1 .5
0 10
Im Post-Development Cl Pre-Development I
HYDROGRAPHS Chart 7
TIME
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 8
50-YEAR HYDROGRAPH
4.5.------------------------------------.--------------------------------------.-----------------------------------.
3 .5 --------
3 ,,._ _____ --j
2 .5------
2-----
1 .5----
1---
0 .5
0
0 10
8 Post-Development D Pre-Development
HY DROGRAPHS Chart 8
1,903 ft 3
T™E
(min)
20 30
SECTION #3 -HYDROGRAPHS Chart 9
100-YEAR HYDROGRAPH
a -----------------------------------------.------------------~ i 3
Volume Con vey ed =11,987 ft
i
7--~~~~~~~-I,__~~~~~~~--+--~~~~~~------<
I
2 -----
1
0 10
8 Pre-Develop ment 8 Post -De velo pment
HYDROGRAPHS Chart 9
T IME
(min)
20 30
1 Figure XU
Development Permit
City of College Station, Texas
Site Legal Description: \?r2.~N~0' ~C.-\li:;:)N 0Nl'.i...) ~~C.'t.. D~E. J l~:51':> (o-l'Z_
Site Owner: CciZ \fru-rv"2.Y.. f'AeJNr"..J?5 1 LLC..
J""C\4N. Kt L \-Z.,
Architect/
Eng ineer : mul\l\C.\'£1\1,,. W\IE.\.tRM@ fu-Jf
Date Application Filed : _______ _
\-\C\)SfT cN I \)C. 7 70 \ Y
Address : 1£1450 l.C.. Jeei1£Jt fu.'Jt/. ~c
Telephone: ( '2..f>\) 8'\3-87'':> I
cs" l"t.. 1-re'1-o
Addr~ss : 25"5 l \'E,'fA:;, F'N£. S, S\e.. A
Telephone No : C:-icrr') <.o'1o-S'!>S°t
Address : ------------
Telephone No :----------
Approved : __________ _
Application is hereby made for the following development specific waterway alterations :
-rmerz.ove.MF....NTS -f t:f;:.v&..oPm;;gr oF-6rCo03 &eFZ.<> oN Be.~-rwcco
_t~ @%;;JN Z?~ CeEFX. 0@1NAu..-e.t>i...i
~ Application Fee ~ Signed Cenifications ~ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
0" Site and Construction Plans, with supporting Drainage Report two (2) copies each.
0 Other: -----------------------------
ACKNOWLEDGME NTS :
I, @e;n..1 B, 63J?QQ,L l Ji?, , design eng ineer/owner, hereby acknowledge or affirm that :
The information and conclusions contained in the above plans and supponing documents comply
w ith the current requ irements of the City of College Station, Texas City Code, Chapter 13 and its
associated Drainage Policy and Design Standards .
As a condition of approval of this permit application, I agree to construct the improvements
proposed in this application according to these documents and the requirements of Chapter 13 of
the College StatioLJCity 11Co~~
~~Ir
Prp0~9L1Jr Contractor
~ ~-----------------------__J
Figure XrI Continued
CERTCFICATIONS : (for proposed alterations within designated flood hazard areas.)
A. I, No~n+ B. &!,eoe.u.,~. , certify that any nonresidential structure on or proposed
to be on this site as part of this application is designated to prevent damage to the structure or its
contents as a result of flooding from the 100 year stonn.
1)-;\ ~ ~' Di Q r: ,..1Ji 1\ If} I If// o ~ ~---,-WU~!./ 1~ Ir-0-::-r . j 7, '17 D
----;.~-----..,~------~~--
Engineer Date -
B . C, No(?.Jt+ 6. ~12t?£LL 1 Jie. , certify that the finished floor elevatio~ of the lowest
floor, including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the latest Federal Insurance Administration
Flood Hazard Study and maps, as amended .
~s:tv13 .·'I~ l
Engineer Date
C I, l\fo~:n.t 13. &mu. .Jt. , certify that the alterations or development covered by
this permit shall not diminish the flo~d-carrying capacity of the waterway adjoining or crossing
this permitted site and that such alterations or deve lopment are consistent with requirements of
the City of College Station City Code, Chapter 13 concerning encroachments of flood ways and of
f1 oodway fringes .
V{L~ fjl ~J!A} ~-
Engineer 1 ~ 7 Date
I, Abl2:rt+ 13 . ~l Jg , do certify that the proposed alterations do not raise the level
of the l 00 year flood abov~ elevation established in the latest Federal Insurance Administration
Flood Hazard Study/]
!f/p-'Tt:f 6 ii);Jf ~'
Engineer /
Conditions or comments as part of approval -------------------
In accordance with Chapter l3 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, a0d sedimentat ion shall
not be deposited in city streets, or existing drainage facilities .
[ hereby grant this permit for development. All d ev elopment shall be in accordance with the plans
and specifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the City of College Station shall appl y.
MUNICIPAL DEVELOPMENT GROUP
2551 Texas Ave. South , Ste. A •College Station , Texas 778 40 • 409-693-5359 •FAX: 409-693-4243 •E-mail: mdgcs@gte .n et
Engineering, Surveying, Planning and Environmental Consultants
January 13 , 1999
0 ~ 1/;w/1ft
r~fid~~J1 J..·w~~ .
Shirley Volk, Development Coordinator
Development Services I
College Stati ~ft'le ""f
~pJ--'7t:O~,t au;,ot,
· ·f c6 ~ ~~ Ur-> ~CJUJ
Re: Q.A.B. -Revised Site Plan
MDG Job No. 000129-2987
Dear Shirley : I ~ oJJ i,J ot µ~--. ~ -. ,\)
As you know, over the last sev eral months Mr. John Kiltz as been attempting to adjust his ·
approved parking lot to accommodate an outdoor quick alignment station . Due to this , the
parking requirements have increased to a total of 36 parking spaces . This number take s into
consideration the square-footag e of the new working bay s . Attached are two revised sets of plans
that reflect the above changes . Please note the following two items .
> The area of impervious cover has decreased from the original site plan . Therefore ,
detention requirements have also decreased . This will gi v e the site 's detention area
more buffer and also decrease the rate of discharge from the pond due to a lower head
on the grate inlet .
> Per the PRC meeting in December the 20 ' access alley east of the building has been
opted to be removed .
Please feel free to call me if you have any questions .
--::.--::.----' --/-~>----_// ·~~/
-Rabon Metcalf, E.I . T.
R.J.Wtm
Cc : John Kiltz , CCG Ventures
Enclosures : (2) Revised Construction Plans
00 0 129-c.06 .d oc ~ID G -1