HomeMy WebLinkAbout47 Development Permit 655 Gateway FuelsLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: DATE: 3-15-00 RE: COMPLETION OF12" Waterline Gateway Center -Premier Bnilders -/-uC:L ~ The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any sub-contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. . The one year warranty is Elliott ~onstruction, Inc. indicated by signatures below. WORK COMPLETED r hereby affirmed and agreed to by and by their sub-contractors as DATE i ...... 1 ....... 2_11 _Jwu..J,a..._..t._...e...._r ....... 11..._.' n.....,,e~_· _{ q_~_' ~...:....·__:.10 1 ~ ZCS LF '2..-25-00 Owner:Gateway Fuels ,LLC Address: 804 Earl Rudder Fwy. Contractor:Ell iott Construction, Inc. Address: P.O. Box 510 Wellborn, TX 77881 Signature:--~~~~ ..... 10112192<1( PI310I01 CITY OF COLLEGE STATION Purchase Order Inquiry 3/07/00 14:14:02 P.O. Nl'mber Change nbr Status Type Date Vendor Bldg ... Buyer Confirm by Ship via F.O.B .. Freight Contract nbr 000354 1 Date 11/29/99 3 AWAITING RECEIPT P PURCHASE ORDER 11/23/99 15644 HANSEN MARKETING GROUP DS DEVELOPMENT SERVICES JAMES POLASEK Terms : Discount Nbr days disc due 0.00% Net Requisition Nbr : By 0000013196 Date DEBORAH GRACE JPOLASEK INC Ordered .. Invoiced Liquidated Balance Last rec'd : 0/00/00 Last inv'd : 0/00/00 11/17/99 JAP Freight amt Adjustment Deliver by Sales tax Addt'l tax Discount User ID . Date posted Acct nbr 9624.51 .00 .00 9624.51 9/29/00 0.00% 0.00% 0.00% F2=Items F3=Exit F8=Remarks F21=Requisition X-ref F9=Invoices Fl2=Cancel JPOLASEK 11/23/99 23891119731000 Project : WTOOOB Fl3=Vendor inquiry .. , City of College Station Attn.: Jeff Tondre April 14, 2000 Attached is an invoice for the 12" water line at our new store at University and By.pass 6. The invoice is for $35,050.00. The City agreed to pay a fixed amount of $9,654.51 plus approximately $1, 700.00. Please remit the total amount to Gateway Fuels, L.L.C. Please address the letter to • Hansen Marketing Ray Hansen 2405 Texas Ave. South, Ste. 308 College Station, Texas 77840 ---·--···---·-· --.. ( Se nt 8y : Premier B ~i l de rs; ,~H-26 -ee 12 :ee ~~ 409 1396 6544 ; f;~I.. ICITf CCHST Apr -14 -00 9:27; 6'Je"P eT L ELLIOTT CON8TRUCTION:1 INC. P.O. IOX 110 WILLIOM , TX . 1'111 OF'flCI (.al) ll0-7071 Ml C.-) _. 1111 llOllLI (eol) ••tl01 NIMllR IUILDMI ,,0. IOX 4012 VICTORIA. TX . 17lm RI: llD ON 1. 1 I AC . TRACT LOT S IL.OCK t TMe CIATIWAY 1r WATIR l•T .11 • PINAL !'TUii DA~SCRIPIT.ON UNIT , iuu ,_., su.1\lf IA z 1 z• ~ W/$PACUI I l.tXC ~lT' LJ 3 Z4• 90..r 6 CA.9r ""' ~-• ,,. t!IOM IA i ,,. 'WCI lA • J9'l H"1:11tANT I.Motl. tA ., •r• ,,t>ea •DI.au [& I 11• IW WI IT'Alll.illt IACK,ILL lf ' 1f•TfP u 10 12XG l(£ EA 11 'i~ ~Pl Wll'ttJ ST -.ino IACIU~l L1 ti 1!11 0 U~ F!Ot CKAlllWaE OIPta 11 EA 11 Ir ..,.~\ill! (~T .. n~ST Ml) fA OU4N11Tl UNIT ~t 1 IU00.00 11J S!0.00 '10 t115.00 0 l400'10 1 . $150.GD 1 NOD0.00 0 115000 IQ sc.oo 1 •1111.0 .00 I ·ll-40.00 15 . MOO l . 150000 z H?'Sacl - ··------~ T'QT~ Page 2 /3 ,. • 01 &MOlJllT "''°°"°° HlmCIC 11 Z,15').CI) IQ.QC S15QUI S2 OOOCQ ID.ell S.UOO.a) aJ&O.w IMO.CO 11 .tOOCD t1,000CO susom IH.050-00 'Pd. '2_. ' 0 . 0 J e._~ ~ll ~'°' DEVELOPMENT PERMIT PERMIT NO. 655 GA T EWA Y FUELS FOR AREAS O UTS LD E THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Lot 3 Block 1 -Gateway University Drive & State Highway 6 OWNER: Hansen Marketing Group Inc. 2405 Texas Avenue South, STE 308 College Station, Texas 77840 DRAINAGE BASIN: Burton Creek TYPE OF DEVELOPMENT: TIDS PERMIT IS VALID FOR CONSTRUCTION AS PER APPROVED SITE PLAN/CONSTRUCTION PLANS. Work or staging for the construction of the waterline within the University Drive R.O.W. may not start until approval is received from TxDOT. The Contractor shall take all necessary precautions to prevent si lt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinan ces of the City of College Station, measures sha ll be taken to insure that debris from construction, erosio n, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this p ermit for development of an area ou ts ide the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the de velopm ent permit application for the above nam ed project and all of the codes and ordin nces of the City of College Station that apply. ~ Date Owner/ Agent Date Contractor Date '6·~.( CITY OF COLLEGE STATION ~ ~ DEVELOPMENT SERVICES DEPARTMENT Post Office Box 9960 1101 Texas Avenue College Station. Texas 77842-0960 October 20, 1999 Texas Department of Transportation ATTN: Mr. Patrick Williams, P.E. --------1300 N-;-Texas Avenue ----Bryan, Texas 77803 RE: Utility Permits ------------fo-r Gate,vay Fuels FM 60 @ East Bypass Dear Mr. Williams: (409) 764-3570 Please find enclosed three copies of the utility (water) permits for the above referenced project. The applicant is proposing a 12" PVC water line crossing University Drive across from the Scott & White Medical Center. The line will be encased in a 20" schedule 40 steel pipe. This crossing will tie into the existing 16" waterline south of University Drive, and will be extended to the west by Gateway Phase I (under separate permit). Driveway Permits have previously been approved for this site. A traffic control plan is not included. Included with this letter is one copy of the applicant's construction plans. The plans have received preliminary approval by the city pending your review. Please return two signed copies of the permit for our distribution. Please review at your earliest convenience and if you have any questions feel free to contact me at 409-764-3570 SJ~~rely, -;J /e~? <- Acting Asst. City Engineer xc: N atalie Ruiz, Development Coordinator TxDOT Utility Permit File encl. Fo m1 I 023 fo r (3) Con stru ction Pl ans (I ) o :\group\de v_serv\txdot\~'CfBe~ify in Partnership with You· DEVELOPMENT PERMIT PERMIT NO. 655 GATEWAY FUELS FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 3 Block 1 -Gateway OWNER: Hansen Marketing Group Inc. 2405 Texas Avenue South, STE 308 College Station, Texas 77840 DRAINAGE BASIN: Burton Creek SITE ADDRESS: University Drive & State Highway 6 TYPE OF DEVELOPMENT: TIDS PERMIT IS VALID FOR CONSTRUCTION AS PER APPROVED CONSTRUCTION PLANS. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, ero sion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. A ll development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the ve/o ent permit application for the abo ve named project and all of th e codes -.. and ordinances of th i of o//ege Station th at apply. 9-\-C\3 Date Date Contractor Date ._ ( / / ENGINEER'S COST ESTIMATE The Gateway, (Lot 3, Block One) PROPOSED WATER LINE Il\1PROVEMENTS -~·~·':-\vf·'-· ;. ·' ;~"'~~~::~,::,·fri4' :~~XOVERSl@iXRjJ;[Glg~'T!ON ;RE°<::!tlJEST:<~ •. / >· . ... ,~ :.?,:O;_·~.t-! "' t,,•,.._..,,;· ... -,'ft<..7f.F:t -i; ~ . ..:;;-..• ·· ;!.~;;.:..,:.,r~;! ,,.,_ ~~~·,-.":>. ,.it'-.\: ;?,.a-~P., ~"·· . ..,...J.~~l-•> •• _ .;;,_'i,,."'~-,..;.• • . . . 1 12" PVC Water Line (C900, Class 200) w/Class "D" 104 LF $26.00 Embedment Highway Bore w/20" Steel Encasement (SCH-40) & 2 12" D .l.P . w/Field Locking Gaskets & Casing 110 LF $200.00 Spacers 3 16" x 12" (MJ) Tapping Valve & Sleeve 1 EA $2,000.00 4 Valves. Fittings, Blocking & Appurtenances 1 LS $3,800.00 5 Standard Fire Hydrant (Type 2) w/Gate Valve, 1 EA $2 ,000.00 Fittings & Appurtenances 6 Trench Safety, Sheeting & Shoring 40 LF $10.00 7 Traffic Control 1 LS $700.00 8 Erosion Control & Revegetation 1 LS $500.00 9 Cement Stabilized Sand 60 LF $18 .00 ES Tl MA TED CONSTRUCTION COST = (10%) CONTINGENCIES= This engineer's estimate was prepared in our office, at the date shown, and is released for the purpose of public infrastructure cost projections . if~ hfJi•I!fJ MC \'iCIPAL DEVELOPYIENT GROUP 255 l TEXA S AVENCE SOCTH. STE . A COLLEGE ST.HIO:-;. TEXA S 7784 0 Ph : (4 0 9 )693-53 5 9 FAX : (409)593 -424 3 E-m a il : md gc s @g le .n e t 000394-e.01-67(319 9) GRAND TOTAL= Date ' . ';~~~~--> ~~:~~ $2,704.00 $22 ,000.00 $2 ,000.00 $3,800.00 $2,000.00 $400.00 $700.00 $500 .00 $1,080.00 $35,184.00 $3,518.00 $38,702.00 ~'~ $• •-.~#!~~ I !'" Drainage Report For The Gateway Center Hwy. 6 & University Drive College Station, Te x as August 1999 Developer: Gateway Fuels, L.L.C. 2405 Texas Ave . South College Station, TX 77840 Prepared By: TEXCON General Contractors 1 707 Graham Rd . College Station, TX 77845 409/690-7711 ASll lit BROWNE ENGINEERING1 INC. Eni;neers and Consultants P.O. Box 10838, College Station, Texas 77842 August18, 1999 Jeff Tondre , EIT Graduate Engineer City of College Station P.O. Box 9960 409-694-2123 Fax: 409-694-3694 College Station , TX 77842 Re: Check of Drainage Report for Gateway Fuels Site I have reviewed the drainage report that was provided to me on Friday, August 13th on the above referenced project. The report included the items called for on the attached checklist. The only concern Vl.()Uld be the protection of the slope created by the fill of the site along the west and north sides of the site just off the subject property. I am also concerned that the drainage construction sheets are not signed and sealed . Sincerely, ·4az. &.Ash Ash & Browne Engineering , Inc Project Name: &a-1 ~ -/;e/s Review Date: ~ I & i 199? Reviewer :, ____________ _ Drainage Reports Location Ji Primary drainage .-ystem identified ~ Surrounding developments shown /-' Local sucets, drainage systems shown ~ ~ ~~ofproject )d, Land cover described J¥ Primary/secondary systems within property shown j/ General description Drainage Basins ,g R.cfcrcDccs to FIRMs if applicable ~ Secondary system flow patterns and impact of development on existing system 'ji Proposed pathways to Primary system shown or described Design Criteria )}() 0 Any deviation from standards being requested? A Discussion of site constraints and capacities (streets, existing structures, etc.) ~ Discussion of any applicable previous drainage studies and how this plan will affect it H:vdrologic Criteria A,, Rainfall/runoff calculation method described and calculations provided ~ Detention discharge I storage calculation method I calculations ,ci; Storm n:currencc i.ntcrva1s used ~ Discussion of other drainage facility design criteria used if not referenced in Standards Hvdaulic Criteria ){ Identify capacity of systems used ~ Specify velocities at critical points in system '!£ Identify detention I retention outlet and routing ff Discussion of other drainage facility design criteria used not referenced in Standards Drainage Facility Design A Diicms drainage paUcrna I flows (pre vs. post) ~ Aic they draining water onto another property owner? -if so, is it where the water flowed before? and is it not more than what flowed there before? and no faster than it flowed before? 0 l)iscuss erosion control measures employed }f; Discuss detention pond design (sideslope, low flow channels, outlet works, freeboard, emergency spillway) )'J Disaw maintenance access and responsibilities Conclusions fti Verify compliance with DPDS (signed and sealed certification) 'j Explain effectiveness of improvements with regard to controlling discharges of S -100 year storm by a) Detaining b) A.coommodating runoff in existing I proposed casements or ROW discharging into primal)' system c) Combination of a & b 9at'l2 Project Name: __________ _ Review Date:. ___________ _ Reviewer: ____________ _ Drainage Reports(cont.) Aopendices t References (all criteria and technical information used) JI HY,drologic computations i Land use assumptions for adjacent property ~ Minor/major storm runoff at specific points ~ Historic/fully developed runoff specific points 'r/ Hydrographs at critical points ,ff HY.drauliC computations ft Culvert capacities (headwater and tailwater assumptions) _t Storm sewer capacities '!, Street capacities ~ Storm inlet capacities (inlet control rating) p , Open channel design y Detention area I volume capacity I outlet capacity Attached Drawings j( Location map with drainage patterns t Floodplain map if any ~ Drainage plan with topo (existing and proposed with arrows if needed) YJ Details of outlet structures 10 ol'12 Project Name: __________ _ Review Date: __________ _ Reviewer: __________ _ DEVELOPMENIPERMIT 1. Application Fee ($100) 2. Application 3. Erosion Control Plan 4. EPA/NOI (> 5 acres) 5. Public Infrastructure Inspection Fee ($300) 6. Drainage Report 7. HOA Covenants for maintenance of detention/retention ponds 8. Easements Dedicated (separate instrument) 9. TXDOT permits issued 10. Engineer's F.stimatcs (1-4 necessary for rough grading/clearing ....... all others necessary for full permit) 11 ot'l2 '·--· Project Name: __________ _ Review Date:, __________ _ Reviewer: ___________ ~ TXDOT PERMIT CHECKLIST 0 Permit signed (Utility or Driveway) by owner 0 Set or excerpts of construction plans of what is proposed within ROW 0 Traffic Control Plan (1MUI'CD) 0 Drainage Calculations (if applicable) For City Uae O Sign permits 0 Attach cover letter 0 Submit in triplicate to TxDOT 12ot'12 General Contractors Di v. of CDS Enterpri ses, In c. 17 07 Gra ham Rd. • Co ll ege Station, TX 77845 • 409-690-7711 • Fax: 409-690-9797 August 12 , 1999 Jeff Tondre Development Services City of College Station 1101 Texas Ave . South College Station, TX 77842 RE: The Gateway Center -College Station , Texas Dear Mr. Tondre: Enclosed are two copies of the drainage report and the drainage construction plans for the Gateway Center project for your review . If you have an y questions or need additional information, please do not hesitate to give me a call at ( 409) 690-7711 . Sincerely Yours , Joe Schultz, P .E . Ci v il Engineer Enclosures Drainage Report For The Gateway Center Hwy. 6 & University Drive College Station, Te xas August 1999 Developer: Gateway Fuels, L.L.C. 2405 Texas Ave. South College Station, TX 77840 Prepared By: TEXCON General Contractors 1 707 Graham Rd. College Station, TX 77845 4091690-7711 CERTIFICATION I, Joseph P . Schultz, Licensed Professional Engineer No. 65889 , State of Texas, certify that this report for the drainage design for The Gateway Center, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners hereof. S-tb-'f'l INTRODUCTION DRAINAGE REPORT THE GATEWAY CENTER The purpose of this report is to provide the hydrological effects of the construction of the Gateway Center and to show that the detention facility proposed for this site will control the runoff in such a manner so as to hav e no downstream impact. GENERAL LOCATION AND DESCRIPTION The 1.15 acre tract is located on the northwest comer of the intersection of State Highway 6 and University Drive. The site is wooded w ith the vegetation primarily consisting of oak trees and yaupons . The ex isting ground elev ations range from elevation 268 to elevation 277 . The slope of the existing ground ranges from 2 to 10%. The general location of the project site is as shown on a portion of the Bryan East , USGS Quadrangle map . This map is included as Appendix 1. FLOOD HAZARD INFORMATION: The project site is located in the Burton Creek Drainage Basin. The site is located in a Zone X Area according to the Flood Insurance Rate Maps prepared by the Federal Emergency Management Agency for Brazos County, Texas and incorporated areas dated July 2, 1992 , panel number 48041COl42C . A Zone X Area is in an area of a 500-yr flood , areas of 100-year flood with average depths less than 1 foot or with drainage areas less than 1 square mile and areas protected by levees from 100-year flood . A copy of a portion of this map showing the project site is included as Appendix 2 . The final plat for this property graphically represented the 100-year floodplain based on a base flood elevation of 268 .5 and a topography survey . The 100-year flood plain line shown on Exhibit 1 and 2 is also based on a B.F.E. of 268 .5 and a recent topographical survey of the property DEVELOPMENT DRAINAGE PATTERNS: The storm water runoff from the site prior to development generally flowed toward the north boundary of the tract and into an existing drainage adjacent to the northwest comer of the tract. Burton Creek is approximately 2,000 ft from the project site and Carter 's Creek is located approximately 2,800 ft downstream of the project site . After development of the project, the storm water runoff from the site will be captured by a storm sewer system and be released into the existing drainage at the northwest comer of the tract. In addition to the 1.15 acre tract , runoff from the University Drive and SH 6 Frontage Road right-of-ways will enter the site due to the existing roadways being higher than the proposed site . Also , there is a 15 ' wide slope easement around the north and west boundaries of the tract which will be utilized for construction of the slopes of the fill material placed to raise grade to the design grades of project. Including this area, the total area for which runoff is to be controlled is 1. 76 acres. Exhibit 1 shows the drainage area boundary for the pre-development drainage area boundary. The site has 4 post- development drainage areas , which are shown on Exhibit 2 . The runoff from Areas 201 , 202, and 203 is controlled by grate inlets, which allow the runoff to enter the storm sewer system. Area 204 is the 15 ' slope easement area and the post-development runoff for this area is allowed to leave the site without being controlled. The post-development run-off will be controlled and released at the pre-development peak runoff rates by detaining the runoff in 3 areas of the parking lot. The design criteria and results of the storm sewer system and detention facility design are included in subsequent sections of this report. DRAINAGE DESIGN CRITERIA The design parameters for the storm sewer and detention facility are as follows: • The Rational Method is utilized to determine peak storm water runoff rates for the detention facility and storm sewer design . • Design Storm Frequency Detention Facility 5, 10, 25, 50, and 100-year storm events • Runoff Coefficients (Table III-I -Drainage Policy and Design Standards) -Wooded Area -Grass Area -Impervious Area -Landscaped Area Pre-Development -Area 101 -1.76 acres Existing Conditions -Grass -0.43 acres -C=0.50 Wooded Area -1.33 acres -C=0.30 Composite C=(0.43/1. 76)*0.50+(1 .33 /1. 76)*0.30=0.35 Post-Develo2ment Area, Acres Grass Landscaped Impervious Area No . C =0.50 C=0.75 C=0 .90 201 0.31 0.05 0.38 202 0.05 0 .02 0.41 203 0.00 0.00 0.38 Total 0.36 0 .07 1.17 Composite C=(0.36/1.60)*0.50+(0 .07 /1 .60)*0. 75+(1 . l 7 /1.60)*0.90=0 .80 Area 204 -Landscaped Area -0.16 acres -C=0.75 C =0 .30 C=0.50 C=0.90 C=0 .75 • Rainfall Intensity values are from the Intensity -Duration -Frequency Curves for the City of College Station (Figure III -I -Drainage Policy and Design Standards) Storm Event 5 yr. 10 yr. Rainfall Intensity (in/hr) 7.7 8.3 25 yr. 50 yr. 100 yr. • Time of Concentration 9.8 11.1 12 .6 The pre-development time of concentration, Tc , was calculated as follows : Overland or Sheet flow -180'@ 5.6 % Velocity = v = 2 .0 fps Tt = 180 ' I 2 .0 fps= 90 sec Concentrated flow -150'@ 2% V = 1.5 fps Tt = 150 ' I 1.5 fps = 100 sec Tc = 90 sec+ 100 sec= 190 sec = 3.2 min. A minimum time of concentration of 10 minutes was used for the pre-development and post-development runoff calculations for this site. DETENTION FACILITY DESIGN The peak runoff rates for the post-development condition will be reduced to the peak rates for the pre-de v elopment conditions by temporarily impounding the runoff in the parking and driveway areas. The project site consists of 4 drainage sub-basins as shown on Exhibit 2. Areas 201 , 202, 203 each drain into grate inlets located in low points in the parking lot. Area 204 drains offsite and is not controlled. The parking lot elevations and the grate inlets are designed to provide the necessary storage and outflow to reduce the post development peak runoff rates to the pre-development rates . The calculation of the detention storage volume is shown in Appendix C , Sheet C-1. The rating curve for the discharge through the grate inlet is pro v id ed in Appendix C, Sheet C-2 . Since area 204 runoff cannot be controlled, the runoff from Areas 201 , 202 , and 203 must be reduced to the pre-development runoff rates for the total area minus the post- development runoff for area 204. These allowable peak flows for Areas 201 , 202, and 203 are shown in Table 1. The required storage volume was determined by graphing the post-development and pre-development hydrographs and determining the difference between the 2 graphs. The peak flow rate was assumed to occur at a time equal to the time of concentration, Tc, and the storm duration to be equal to 3 time Tc, or 30 minutes. A graphical representation of the storage volume is provided as Figure 1. The detention volume necessary to provide storage for the 100-yr storm event was estimated to be approximately 8 ,910 cubic feet. This volume occurs at an elevation of 276 .64 or a depth of water of 0 .79 feet. TABLE 1 Pre I Post Development Peak Flows Allowable Post Storm Pre Development Post Development Post Development Post Development Development Peak Event Peak Flows Peak Flows Peak Flows Peak Flows Flows w/o ut detention w/o ut detention Total Area Total Area Area 204 Areas 201 , 202 , 203 Areas 201 , 202 , 203 cfs cf s cfs cfs cfs 5 yea r 4 .7 10 .8 0 .9 9 .9 3 .8 10 year 5 .1 11.7 1.0 10 .7 4 .1 2 5 y ea r 6 .0 13 .8 1.2 12 .6 4 .8 50 yea r 6 .8 15.6 1.3 14 .3 5 .5 100 y ear 7 .8 17 .7 1.5 16 .2 6.3 20 18 16 14 ,....... 12 tf.l IL4 u '-" ~ 10 0 ~ IL4 8 6 4 2 PRE AND POST DEVELOPMENT HYDROGRAPHS FOR THE 100 YEAR STORM EVENT VOLUME OF DETENTION STORAGE AREA BETWEEN HYDROGRAPHS = 8,910 CUBIC FEET 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 TIME (MINUTES) FIGURE 1 The determination of the post-development peak runoff from areas 201, 202, and 203 was determined by a Storage-Routing Analysis based on the Continuity Equation as follows : (Il+l2)+((2sl/dt)-01)=((2s2/dt)+02). The time interval, dt, used was Tc/10 . The Storage Routing Analysis for each storm is presented in tabular form in Appendix D . The peak runoff rates are also summarized in Table 2. Figures 2 through 6 show the runoffhydrographs for each storm event. As shown in Table 2 and Figures 2 through 6 , the peak runoff has been reduced for the post development condition to a rate equal to or less than the pre-development runoff. The values shown in the Post Development Peak Flows column for the total area of the development do not equal the sum of the peak flows for Area 204 and Areas 201 , 202 , and 203 because of the difference in time in which these peak flows occur. Appendix E contains the Post Development hydrographs in tabular form for each storm event for Area 204 and Areas 201 , 202, and 203 and the sum of these hydro graphs which is the peak flow which leaves the proposed site. STORM SEWER DESIGN The storm sewer piping for this project has been selected to be 18" RCP meeting the requirements of ASTM C-76, Class Ill, pipe. The grate inlet and junction boxes will b e either cast-in-place concrete or pre-cast. The grate inlets limit the flow into the storm sewer piping so smaller diameter piping could be used to adequately convey the runoff from the site. However, to reduce the possibility of clogging from debris and for future maintenance consideration the 18" diameter pipe was selected . The proposed slope of the storm sewer pipe is to be 1 %. Even during low flow conditions , this slope will result in a velocity that will exceed 2.0 fps and prevent sediment build-up in the pipe. The maximum flow in the storm sewer pipe will occur in Pipe No . 5, which discharges into the existing drainage channel. The flow will be 5.7 cfs and will result in a velocity of 5.7 fps based on Manning 's Equation. Rock riprap will be used to line the outlet channel bottom and sides to prevent erosion. CONCLUSIONS The construction of this project will significantly increase the storm water runoff from this site. The detention facility will adequately reduce the peak post-development runoff to less than the pre-development runoff for each storm event, including the 100- year storm. No flood damage to downstream landowners is expected as a result of this development. The detention facility is designed to handle the runoff from the 100-year storm with the maximum depth of water in the parking lot being 0 .77 feet. If the grate inlets were to become clogged, the water depth would increase to 0.85 ' before the water would begin flowing over the curb around the parking lot. This will prevent the water storage depth from becoming excessive and causing damage to vehicles or other facilities on the project site. Development of the adjacent property should not occur in such a manner as to eliminate this outlet for emergency overflow from the parking lot. TABLE 2 Pre I Post Development Peak Flows Storm Pre Development Peak Post Development Post Development Post Development Event Flows Peak Flows Peak Flows Peak Flows With Detention With Detention Total Area Area 204 Areas 201 , 202 , 203 Total Area cfs cf s cfs cfs 5 year 4 .7 0 .9 3.9 4.4 10 year 5 .1 1.0 4 .0 4 .6 25 year 6 .0 1.2 4 .3 4.9 50 year 6.8 1.3 4 .5 5.3 100 year 7.8 1.5 4 .7 5 .7 -II) -u - Runoff Hydrograph 5-Year Storm Event 8 .00 -·-----1------..._----------------------------------< M ~ ~ m ~ M ~ ~ m ~ M ~ ~ m ~ M ~ ~ m ~ M ~ ~ ~ N N N N N M M M M M ~ ~ ~ ~ ~ ~ ~ ~ ~ Time (minutes) -+--Post Development for Area 204 --Post Development with Detent ion for Areas 201 , 202 , and 203 ------Post Development with Detention for Total Area -x-Post Development for Total Area ------Pre Development for Total Area Figure 2 -8.00 "' -~ ~ .52 LL 6.00 Runoff Hydrograph 10-Year Storm Event Time (minutes) -+-Post Development for Area 204 -Post Development with Detention for Areas 201, 202, and 203 ------Post Development with Detention for Total Area ~Post Development for Total Area ------Pre Development for Total Area Figure 3 16 .00 14 .00 12 .00 10 .00 Ci) -~ 8 .00 ~ 0 u:: 6 .00 4.00 2 .00 0 .00 Runoff Hydrograph 25-Year Storm Event Time (minutes) -+-Post Development for Area 204 --Post Development with Detention for Areas 201 , 202, and 203 -.-Post Development with Detention for Total Area ~Post Development for Total Area --+--Pre Development for Total Area Figure 4 18 .00 16 .00 14 .00 12 .00 - en 10 .00 -~ ~ 0 8 .00 u:: 6 .00 4 .00 2 .00 0.00 Runoff Hydrograph 50-Year Storm Event Time (minutes) -+--Post Development for Area 204 -Post Development with Detention for Areas 201 , 202 , and 203 --.-Post Development with Detention for Total Area --+--Post Development for Total Area -+--Pre Development for Total Area ~---- Figure 5 20.00 18 .00 16 .00 14 .00 12.00 en .... (J -10 .00 5: .2 LL 8.00 6 .00 4 .00 2.00 0 .00 -q-,.._ 0 ("') <O O'l N l{) N N Runoff Hydrograph 100-Year Storm Event a:> ..--q-f'-0 ("') <O O'l N lD a:> ..--q-f'-0 ("') <O N ("') ("') ("') -q-~ -q--q-l{) l{) l{) <O <O <O ,.._ ,.._ ,.._ Time (minutes) ·----------. ----J -+-Post Development for Area 204 -Post Development with Detention for Areas 201 , 202 , and 203 ---.-Post Development with Detention for Total Area -----Post Development for Total Area ~Pre Development for Total Area Figure 6 Appendix A General Location Map Appendix C Detention Facility Design Characteristics C" ~ QI E :::s 0 > QI Cl co ... 0 .... en c 0 :;:: c QI .... QI c 12000 10000 4000 2000 0 0.00 Elevation 275.85 276 .00 276 .25 276 .50 276 .75 Detention Storage 0.20 0.40 0.60 Depth (ft) Detention Storage Depth vs . Volume De~th, H Area, A 0.80 I-Depth Vs . Volume I 1.00 ft . sf. Volume , V cf. Cumulative Volume, cf. 0.00 0.00 0 .00 0 0 .15 3671 .00 184 .00 184 0.40 11390 .00 1794 .00 1978 0 .65 18469 .00 3697 .00 5675 0 .90 27304 .00 5686 .00 11361 Volume= H/3(A1 +A2+(A1 *A2)1/2) C-1 Depth vs. Discharge Discharge, Q Elevation Depth cf s 275 .85 0.00 0.00 276 .00 0 .15 2 .05 276 .25 0.40 3 .35 276 .50 0 .65 4 .27 276 .75 0 .90 5.03 Rating Curve For Outlet Control Structures -Depth vs. 6.00 :ti' 5.00 c: 0 (.) Cll (/) ... 4 .00 Cll Q. .... Cll Cll u.. 3 .00 (.) :ci :I ~ 2 .00 Cll Cl ... ca ..c: (.) 1 .00 IA 0 0.00 0.00 0 .20 Q , cfs = 4 .82 Ag(y)"1/2 Ag = 2(0 .3)+1 (0 .5) = 1.1 sf Discharge I-Depth vs . Discharge I 0.40 0 .60 0.80 1.00 Depth (Feet) Ag = Grate Open Area, sf. y = Depth of Water, ft . 2 -12"x12" Neenah R -4441 Heavy Duty Grates (Open Area= 0 .3 sf) 1 -14"x14" Neenah R -4511 Heavy Duty Grate (Open Area= 0 .5 sf) C-2 Appendix D Storage Routing Analysis 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Inflow ~ 0 .00 0 .99 1.98 2.98 3.97 4 .96 5.95 6 .94 7 .94 8.93 9 .92 9.42 8 .93 8.43 7 .94 7.44 6 .94 6.45 5 .95 5.46 4 .96 4.46 3.97 3.47 2 .98 2.48 1.98 1.49 0 .99 0 .50 0 .00 0.00 0.00 0 .00 0 .00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 Storage Routing Analysis Areas 201,202, and 203 5-Year Storm Event Outflow J..1±1.2_ ~ 0 .00 ~ 2s/t+O ~ Depth (ft.) Elevation 0 .00 0.00 0.00 0 .00 275 .80 0.99 0.49 0 .99 2.98 1.73 3.47 4 .96 3 .34 6 .69 6 .94 6.09 10.28 8.93 10 .63 15 .02 10 .91 16 .87 21 .54 12 .90 24 .75 29 .77 14.88 34 .19 39 .63 16 .86 45 .13 51.06 18 .85 57 .50 63 .98 19 .34 70 .04 76.85 18 .35 81.41 88.39 17 .36 91 .63 98 .77 16 .37 100 .72 108 .00 15 .38 108 .70 116 .10 14 .38 115 .59 123 .09 13 .39 121.40 128 .98 12.40 126 .14 133.80 11.41 129 .84 137.55 10.42 132 .50 140.25 9.42 134 .15 141 .93 8.43 134 .80 142 .58 7.44 134.45 142.24 6.45 133 .14 140.90 5.46 130 .87 138.60 4.46 127 .66 135.33 3.47 123 .51 131.13 2.48 118.45 125.99 1.49 112.49 119 .94 0 .50 105 .64 112.98 0 .00 98.40 105.64 0 .00 91 .27 98.40 0 .00 84 .24 91 .27 0 .00 77.32 84.24 0 .00 70 .50 77.32 0 .00 63 .78 70 .50 0.00 57 .31 63.78 0 .00 51 .12 57 .31 0 .00 45.20 51.12 0.00 39 .52 45.20 0 .00 34.09 39 .52 D-1 0 .25 0.87 1.68 2.09 2.20 2.33 2.51 2 .72 2.96 3.24 3.41 3.49 3 .57 3.64 3.70 3.75 3.79 3 .83 3 .86 3 .88 3.89 3 .89 3 .89 3 .88 3 .86 3 .84 3 .81 3 .77 3 .73 3.67 3.62 3.57 3.51 3.46 3.41 3 .36 3 .23 3 .10 2.96 2.84 2 .72 0 .00 275 .80 0 .03 275 .83 0 .10 275 .90 0 .16 275 .96 0 .17 275 .97 0 .19 275 .99 0 .22 276 .02 0 .26 276 .06 0 .31 276 .11 0 .37 276 .17 0.41 276.21 0.43 276 .23 0.45 276 .25 0.47 276 .27 0.49 276 .29 0 .50 276 .30 0.51 276 .31 0 .52 276 .32 0 .53 276 .33 0 .53 276.33 0 .54 276.34 0 .54 276 .34 0.54 276.34 0 .54 276 .34 0 .53 275 .80 0 .52 276 .32 0.52 276 .32 0 .51 276 .31 0.49 276 .29 0 .48 276 .28 0.47 276 .27 0.45 276 .25 0.44 276 .24 0.43 276 .23 0.41 276.21 0.40 276 .20 0 .37 276 .17 0 .34 276 .14 0 .31 276 .11 0 .29 276 .09 0.26 276 .06 Storage Routing Analysis Areas 201,202, and 203 5-Year Storm Event Ii.mJt. IDflQW 11±12._ Q1.1tflQW .(minJ {lli). {lli). ~ .2..sLt±.Q {lli). Depth (ft.) ElevatiQD 42 0.00 0.00 28.89 34.09 2.60 0.24 276.04 43 0.00 0.00 23.90 28.89 2.49 0.22 276.02 44 0.00 0.00 19.14 23.90 2.38 0.20 276.00 45 0.00 0.00 14.57 19.14 2.28 0.19 275.99 46 0.00 0.00 10.20 14.57 2.19 0.17 275.97 47 0.00 0.00 6.01 10.20 2.09 0.16 275.96 48 0.00 0.00 3.00 6.01 1.51 0.08 275.88 49 0.00 0.00 1.50 3.00 0.75 0.02 275.82 50 0.00 0.00 0.75 1.50 0.37 0.00 275.80 51 0.00 0.00 0.37 0.75 0.19 0.00 275.80 52 0.00 0.00 0.19 0.37 0.09 0.00 275.80 53 0.00 0.00 0.09 0.19 0.05 0.00 275.80 54 0.00 0.00 0.05 0.09 0.02 0.00 275.80 55 0.00 0.00 0.02 0.05 0.01 0.00 275.80 56 0.00 0.00 0.01 0.02 0.01 0.00 275.80 57 0.00 0.00 0.01 0.01 0.00 0.00 275.80 58 0.00 0.00 0.00 0.01 0.00 0.00 275.80 59 0.00 0.00 0.00 0.00 0.00 0.00 275.80 60 0.00 0.00 0.00 0.00 0.00 0.00 275.80 D-2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Inflow ~ 0.00 1.07 2.14 3 .20 4 .27 5 .34 6.4 1 7.48 8 .54 9 .61 10 .68 10.15 9 .61 9 .08 8 .54 8 .01 7.48 6.94 6.41 5.87 5 .34 4 .81 4 .27 3 .74 3 .20 2 .67 2 .14 1 .60 1.07 0 .53 0.00 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 Storage Routing Analysis Areas 201,202, and 203 10-Year Storm Event Outflow 11±l2 0 .00 2filt:Q 2fil1±Q ~ Depth (ft.) Elevation 0.00 0 .00 0 .00 0 .00 275 .80 1 .07 0 .53 1 .07 3 .20 1 .86 3 .74 5 .34 3.59 7.20 7.48 6 .85 11 .07 9 .61 12 .01 16.46 11 .75 18 .99 23 .75 13 .88 27.72 32 .88 16.02 38 .13 43 .74 18 .16 50.14 56.29 20 .29 63.71 70.43 20.83 77 .61 84 .54 19.76 90 .26 97 .37 18 .69 101 .66 108 .95 17 .62 111 .84 119 .28 16 .55 120.82 128 .39 15.49 128 .61 136 .30 14.42 135.24 143 .03 13 .35 140 .71 148 .59 12 .28 145.05 152.99 11 .21 148.28 156 .27 10 .15 150.40 158.42 9 .08 151.44 159.48 8 .01 151.42 159.45 6 .94 150.34 158 .36 5 .87 148.22 156 .21 4 .81 145.09 153 .03 3 .74 140.95 148 .83 2 .67 135.82 143.62 1 .60 129.71 137.42 0 .53 122.64 130.24 0 .00 115.15 122.64 0 .00 107.77 115 .15 0 .00 100.50 107 .77 0 .00 93.34 100 .50 0 .00 86.28 93 .34 0 .00 79.33 86 .28 0 .00 72.48 79.33 0 .00 65.73 72.48 0 .00 59.18 65 .73 0 .00 52.91 59 .18 0 .00 46.91 52 .91 D-3 0.27 0 .94 1 .81 2 .11 2 .23 2 .38 2 .58 2 .81 3.07 3 .36 3.46 3.56 3 .64 3.72 3.79 3 .85 3 .90 3 .94 3 .97 3 .99 4 .01 4.02 4 .02 4 .01 3 .99 3 .97 3 .94 3.90 3 .85 3 .80 3 .75 3.69 3.64 3 .58 3 .53 3.48 3.42 3 .37 3 .27 3.14 3 .00 0 .00 275.80 0 .03 275 .83 0 .12 275 .92 0 .16 275 .96 0 .18 275 .98 0 .20 276 .00 0 .24 276 .04 0 .28 276 .08 0 .34 276 .14 0.40 276.20 0.43 276 .23 0.45 276 .25 0.47 276 .27 0.49 276.29 0 .51 276 .31 0 .53 276 .33 0 .54 276 .34 0.55 276 .35 0.56 276 .36 0.57 276 .37 0 .57 276 .37 0 .57 276 .37 0 .57 276 .37 0.57 276 .37 0.57 276 .37 0 .56 276 .36 0.55 276 .35 0 .54 276 .34 0 .53 276 .33 0 .51 276 .31 0.50 276 .30 0.48 276 .28 0.47 276.27 0.46 276 .26 0.44 276 .24 0.43 276 .23 0.42 276 .22 0.40 276 .20 0 .38 276.18 0 .35 276 .15 0 .32 276 .12 Storage Routing Analysis Areas 201,202, and 203 10-Year Storm Event ~ lafl2w OutflQW (IninJ .(lli). 1.1±.lZ hlt:.Q 2lilt+Q .(lli). Depth (ft.) Eleyati2a 42 0.00 0.00 41.16 46.91 2.87 0.29 276.09 43 0.00 0.00 35.66 41.16 2.75 0.27 276.07 44 0.00 0.00 30.39 35.66 2.63 0.25 276.05 45 0.00 0.00 25.34 30.39 2.52 0.23 276.03 46 0.00 0.00 20.51 25.34 2.42 0.21 276.01 47 0.00 0.00 15.89 20.51 2.31 0.19 275.99 48 0.00 0.00 11.46 15.89 2.21 0.17 275.97 49 0.00 0.00 7.22 11.46 2.12 0.16 275.96 50 0.00 0.00 3.60 7.22 1.81 0.12 275.92 51 0.00 0.00 1.80 3.60 0.90 0.03 275.83 52 0.00 0.00 0.90 1.80 0.45 0.01 275.81 53 0.00 0.00 0.45 0.90 0.22 0.00 275.80 54 0.00 0.00 0.22 0.45 0.11 0.00 275.80 55 0.00 0.00 0.11 0.22 0.06 0.00 275.80 56 0.00 0.00 0.06 0.11 0.03 0.00 275.80 57 0.00 0.00 0.03 0.06 0.01 0.00 275.80 58 0.00 0.00 0.01 0.03 0.01 0.00 275.80 59 0.00 0.00 0.01 0.01 0.00 0.00 275.80 60 0.00 0.00 0.00 0.01 0.00 0.00 275.80 D-4 TuruL {m.inJ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Inflow ~ 0 .00 1.26 2 .52 3 .79 5.05 6 .31 7 .57 8 .83 10 .10 11.36 12 .62 11 .99 11 .36 10 .73 10 .10 9.47 8 .83 8 .20 7.57 6 .94 6 .31 5 .68 5 .05 4.42 3.79 3.16 2 .52 1.89 1.26 0.63 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 Storage Routing Analysis Areas 201,202, and 203 25-Year Storm Event Outflow 11.±.12._ ~ 0 .00 ~ 2s/t+O ~ Depth (ft) Elevation 0 .00 0 .00 0.00 0 .00 275.8 1.26 0 .63 1.26 3 .79 2 .20 4.42 6 .31 4.40 8 .51 8.83 8 .92 13 .23 11 .36 15 .66 20.28 13.88 24 .53 29.54 16.41 35.45 40.94 18 .93 48 .31 54.38 21.45 63 .04 69.76 23 .98 80 .06 87 .02 24 .61 97.44 104.67 23 .35 113 .33 120.79 22.09 127 .73 135.41 20.82 140 .68 148 .55 19.56 152 .19 160.24 18.30 162 .29 170.49 17 .04 171 .00 179.33 15.78 178.33 186.77 14.51 184.31 192 .84 13 .25 188 .99 197.56 11 .99 192.38 200 .98 10 .73 194.49 203 .11 9.47 195 .33 203.96 8.20 194.91 203.53 6.94 193 .25 201 .85 5 .68 190 .34 198.93 4.42 186 .21 194.76 3.16 180 .88 189.36 1.89 174.40 182.78 0.63 166.76 175.03 0.00 158 .61 166.76 0 .00 150 .59 158.61 0 .00 142.69 150 .59 0.00 134 .90 142.69 0 .00 127 .23 134.90 0 .00 119 .67 127.23 0 .00 112 .22 119.67 0 .00 104.88 112.22 0 .00 97.66 104.88 0 .00 90.54 97.66 0 .00 83 .52 90.54 D-5 0 .32 1.11 2 .06 2 .16 2 .31 2 .50 2 .75 3.03 3.36 3.48 3 .61 3.73 3.84 3.94 4.02 4 .10 4.17 4.22 4 .27 4.29 4 .30 4.31 4.31 4.31 4.30 4 .29 4 .28 4 .24 4.19 4 .13 4 .07 4 .01 3.95 3.89 3.84 3 .78 3.72 3.67 3.61 3 .56 3 .51 0 .00 275 .80 0 .04 275.84 0 .15 275 .95 0 .17 275.97 0 .19 275.99 0 .22 276 .02 0 .27 276.07 0 .33 276.13 0.40 276.20 0.43 276 .23 0.46 276.26 0 .50 276.30 0 .52 276.32 0 .55 276 .35 0 .58 276 .38 0 .60 276.40 0.62 276.42 0 .63 276.43 0 .65 276.45 0 .65 276.45 0.66 276.46 0 .66 276.46 0 .66 276.46 0 .66 276.46 0.66 276.46 0.66 276.46 0 .65 276.45 0 .64 276.44 0.62 276.42 0 .61 276.41 0 .59 276.39 0 .57 276 .37 0 .56 276.36 0.54 276 .34 0.52 276 .32 0 .51 276 .31 0.49 276 .29 0.48 276 .28 0.46 276 .26 0.45 276 .25 0.44 276 .24 Storage Routing Analysis Areas 201,202, and 203 25-Year Storm Event TuM.. lafl!:!W 11.±1..2._ Outflow {min.). ~ ~ ~ 2slt+Q ~ Depth (ft) Eleyatioa 42 0.00 0.00 76.61 83.52 3.46 0.42 276.22 43 0.00 0.00 69.80 76.61 3.40 0.41 276.21 44 0.00 0.00 63.09 69.80 3.35 0.40 276.20 45 0.00 0.00 56.66 63.09 3.22 0.37 276.17 46 0.00 0.00 50.49 56.66 3.08 0.34 276.14 47 0.00 0.00 44.59 50.49 2.95 0.31 276.11 48 0.00 0.00 38.94 44.59 2.82 0.28 276.08 49 0.00 0.00 33.53 38.94 2.70 0.26 276.06 50 0.00 0.00 28.36 33.53 2.59 0.24 276.04 51 0.00 0.00 23.40 28.36 2.48 0.22 276.02 52 0.00 0.00 18.65 23.40 2.37 0.20 276.00 53 0.00 0.00 14.10 18.65 2.27 0.18 275.98 54 0.00 0.00 9.75 14.10 2.18 0.17 275.97 55 0.00 0.00 5.58 9.75 2.08 0.15 275.95 56 0.00 0.00 2.79 5.58 1.40 0.07 275.87 57 0.00 0.00 1.39 2.79 0.70 0.02 275.82 58 0.00 0.00 0.69 1.39 0.35 0.00 275.80 59 0.00 0.00 0.35 0.69 0.17 0.00 275.80 60 0.00 0.00 0.17 0.35 0.09 0.00 275.80 61 0.00 0.00 0.09 0.17 0.04 0.00 275.80 62 0.00 0.00 0.04 0.09 0.02 0.00 275.80 63 0.00 0.00 0.02 0.04 0.01 0.00 275.80 64 0.00 0.00 0.01 0.02 0.01 0.00 275.80 65 0.00 0.00 0.01 0.01 0.00 0.00 275.80 66 0.00 0.00 0.00 0.01 0.00 0.00 275.80 67 0.00 0.00 0.00 0.00 0.00 0.00 275.80 68 0.00 0.00 0.00 0.00 0.00 0.00 275.80 69 0.00 0.00 0.00 0.00 0.00 0.00 275.80 70 0.00 0.00 0.00 0.00 0.00 0.00 275.80 D-6 I.i.m.e... {minj 0 1 2 3 4 5 6 7 8 9 10 1 1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Inflow ~ 0 .00 1.43 2 .86 4 .29 5.72 7 .15 8 .58 10 .01 11.44 12 .87 14 .30 13 .59 12 .87 12 .16 11.44 10.73 10.01 9 .30 8 .58 7 .87 7.15 6.44 5.72 5 .01 4 .29 3 .58 2 .86 2 .15 1.43 0 .72 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 Storage Routing Analysis Areas 201,202, and 203 50-Year Storm Event Outflow J.1.±J.2 ~ 2s/t+O ~ Depth (ft.) Elevation 0 .00 0 .00 0 .00 0 .00 0 .00 275.80 1.43 0 .71 1.43 4 .29 2.50 5 .00 7.15 5.48 9 .65 10 .01 11 .08 15.49 12 .87 19 .18 23 .95 15.73 29 .67 34 .91 18.59 42.46 48 .26 21.45 57.44 63 .91 24 .31 74.86 81 .75 27.17 94.85 102.03 27.89 115.24 122 .73 26.46 133.92 141 .69 25.03 150.92 158 .95 23.60 166 .25 174.51 22.17 179.95 188.42 20 .74 192 .09 200 .69 19.31 202 .71 211 .39 17.88 211 .83 220 .59 16.45 219.46 228 .27 15 .02 225 .60 234.4 7 13.59 230 .28 239 .19 12 .16 233 .51 242.44 10 .73 235 .29 244 .23 9 .30 235.63 244 .58 7.87 234 .56 243 .50 6 .44 232 .07 240 .99 5.01 228.19 237 .08 3.58 222.92 231 .76 2 .15 216.27 225 .06 0 .72 208 .26 216 .98 0.00 199.60 208.26 0 .00 191 .01 199.60 0 .00 182 .51 191 .01 0.00 174 .13 182 .51 0 .00 165 .87 174.13 0.00 157 .74 165 .87 0 .00 149.73 157.74 0.00 141.84 149.73 0.00 134 .06 141 .84 0 .00 126.40 134 .06 0.00 118.86 126.40 0 -7 0 .36 1.25 2 .08 2 .21 2 .39 2 .62 2 .90 3 .24 3.44 3 .59 3 .75 3 .89 4 .01 4 .13 4 .23 4.30 4 .34 4.38 4.41 4.43 4.45 4.47 4.47 4.47 4.47 4.46 4.44 4.42 4.40 4 .36 4 .33 4 .29 4 .25 4 .19 4 .13 4 .07 4 .01 3 .95 3 .89 3 .83 3 .77 0 .00 275 .80 0 .06 275.86 0 .15 275 .95 0 .17 275.97 0 .20 276 .00 0 .24 276 .04 0 .30 276 .10 0 .37 276 .17 0.42 276 .22 0.46 276 .26 0 .50 276 .30 0.54 276.34 0 .57 276 .37 0 .61 276.41 0 .64 276.44 0 .66 276.46 0 .67 276.47 0 .68 276.48 0 .69 276.49 0 .70 276.50 0 .71 276.51 0 .71 276 .51 0 .71 276.51 0 .71 276.51 0 .71 276 .51 0 .71 276 .51 0.70 276 .50 0.70 276 .50 0 .69 276.49 0.68 276.48 0 .67 276 .47 0 .66 276.46 0 .64 276.44 0 .62 276.42 0 .61 276.41 0 .59 276 .39 0 .57 276.37 0 .55 276.35 0 .54 276 .34 0 .52 276 .32 0 .51 276 .31 Storage Routing Analysis Areas 201,202, and 203 50-Year Storm Event IirM_ IDflQW OutflQW {minj ~ 11±12. 2-s&Q 2filt±Q ~ Depth (ft.) ElevatiQD 42 0 .00 0.00 111.42 118 .86 3.72 0.49 276 .29 43 0 .00 0 .00 104 .10 1 11.42 3 .66 0.48 276 .28 44 0 .00 0.00 96 .88 104 .10 3.61 0.46 276 .26 45 0 .00 0 .00 89 .77 96 .88 3.55 0.45 276 .25 46 0.00 0 .00 82 .77 89 .77 3 .50 0.44 276 .24 47 0 .00 0 .00 75 .87 82 .77 3.45 0.42 276 .22 48 0 .00 0 .00 69 .07 75 .87 3.40 0.41 276.21 49 0.00 0 .00 62 .38 69 .07 3.35 0.40 276.20 50 0 .00 0 .00 55.97 62 .38 3 .20 0 .36 276 .16 51 0 .00 0 .00 49 .84 55 .97 3 .07 0 .33 276 .13 52 0 .00 0 .00 43 .97 49 .84 2 .94 0 .31 276 .11 53 0.00 0.00 38 .34 43 .97 2 .81 0 .28 276 .08 54 0 .00 0.00 32.96 38 .34 2 .69 0 .26 276.06 55 0 .00 0 .00 27 .81 32 .96 2 .58 0 .24 276 .04 56 0 .00 0 .00 22 .87 27 .81 2.47 0 .22 276 .02 57 0 .00 0 .00 18 .15 22 .87 2 .36 0 .20 276 .00 58 0 .00 0 .00 13 .62 18 .15 2 .26 0 .18 275 .98 59 0 .00 0 .00 9 .29 13 .62 2 .17 0 .17 275 .97 60 0.00 0 .00 5 .14 9 .29 2 .07 0 .15 275 .95 0 -8 ~ {minj 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Inflow (ill} 0 .00 1 .62 3 .25 4 .87 6.49 8 .12 9 .74 11 .36 12.98 14 .61 16 .23 15.42 14 .61 13.80 12.98 12 .17 11.36 10 .55 9.74 8 .93 8.11 7 .30 6.49 5.68 4.87 4 .06 3.25 2.43 1.62 0.81 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 Storage Routing Analysis Areas 201,202, and 203 100-Year Storm Event Outflow J.1.±.12_ ~ 0 .00 ~ 2s/t+O .(00 Depth (ft.) Elevation 0 .00 0.00 0 .00 0 .00 275 .80 1 .62 0 .81 1.62 4 .87 2 .83 5 .68 8 .12 6.73 10 .95 11 .36 13 .57 18 .09 14 .61 23 .22 28 .18 17 .85 35 .58 41 .08 21 .10 50 .51 56 .68 24.35 68 .08 74 .86 27 .59 88 .58 95 .67 30 .84 111.97 119.41 31 .65 135 .82 143.62 30 .03 157 .71 165.84 28.40 177 .68 186.11 26 . 78 195 .83 204.46 25 .16 212.23 220 .99 23 .53 226 .89 235 .76 21 .91 239 .81 248 .80 20 .29 251 .03 260 .10 18 .66 260 .54 269 .69 17 .04 268 .37 277 .59 15.42 274 .53 283.79 13.80 279 .03 288 .33 12 .17 281 .88 291.20 10 .55 283 .10 292.43 8.93 282 .70 292 .02 7 .30 280 .69 290 .00 5.68 277 .09 286.37 4.06 271 .90 281 .15 2.43 265 .15 274 .34 0 .81 256 .85 265 .96 0 .00 247 .80 256 .85 0 .00 238 .82 247 .80 0 .00 229 .92 238 .82 0 .00 221 .09 229 .92 0 .00 212.33 221 .09 0 .00 203 .64 212 .33 0.00 195.02 203 .64 0.00 186.46 195.02 0 .00 178.03 186.46 0.00 169.72 178.03 0 .00 161.53 169.72 D-9 0.41 1.42 2 .11 2 .26 2.48 2 .75 3 .08 3 .39 3 .55 3 .72 3 .90 4 .07 4 .22 4 .31 4 .38 4.44 4.49 4 .54 4 .57 4 .61 4 .63 4 .65 4.66 4.67 4 .66 4 .66 4 .64 4 .62 4 .59 4.56 4 .52 4.49 4.45 4.42 4 .38 4 .35 4 .31 4 .28 4 .22 4 .16 4 .09 0 .01 275 .81 0 .07 275.87 0 .16 275 .96 0 .18 275 .98 0.22 276 .02 0.27 276 .07 0 .34 276 .14 0.41 276 .21 0.45 276 .25 0.49 276 .29 0.54 276 .34 0 .59 276.39 0 .63 276.43 0.66 276.46 0 .68 276.48 0 .70 276.50 0 .72 276 .52 0 .73 276.53 0 .74 276.54 0 .75 276.55 0 .76 276 .56 0.77 276 .57 0 .77 276 .57 0 .77 276 .57 0 .77 276 .57 0 .77 276.57 0.77 276.57 0.76 276.56 0.75 276 .55 0 .74 276 .54 0 .73 276.53 0 .72 276 .52 0 .70 276 .50 0.69 276.49 0 .68 276.48 0 .67 276.47 0.66 276.46 0.65 276.45 0.63 276.43 0 .61 276.41 0 .60 276.40 IirM.. {min.} 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 lnfl.2.w ~ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Storage Routing Analysis Areas 201,202, and 203 100-Year Storm Event Outflow 11±12_ ~ 0.00 2.sLt:Q 2s/t+O ~ Depth (ft.) Elevation 153.46 161.53 4.03 0.58 276.38 0.00 145.51 0.00 137.68 0.00 129.97 0.00 122.37 0.00 114.88 0.00 107.51 0.00 100.24 0.00 93.08 0.00 86.03 0.00 79.08 0.00 72.24 0.00 65.49 0.00 58.95 0.00 52.69 0.00 46.70 0.00 40.96 0.00 35.46 0.00 30.20 0.00 25.17 0.00 20.34 0.00 15.73 0.00 11.31 0.00 7.07 0.00 3.53 0.00 1.76 0.00 0.88 0.00 0.44 0.00 0.22 0.00 0.11 0.00 0.05 0.00 0.03 0.00 0.01 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 153.46 145.51 137.68 129.97 122.37 114.88 107.51 100.24 93.08 86.03 79.08 72.24 65.49 58.95 52.69 46.70 40.96 35.46 30.20 25.17 20.34 15.73 11.31 7.07 3.53 1.76 0.88 0.44 0.22 0.11 0.05 0.03 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 D-10 3.97 3.91 3.86 3.80 3.74 3.69 3.63 3.58 3.53 3.47 3.42 3.37 3.27 3.13 3.00 2.87 2.75 2.63 2.52 2.41 2.31 2.21 2.12 1.77 0.88 0.44 0.22 0.11 0.05 0.03 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.56 276.36 0.55 276.35 0.53 276.33 0.51 276.31 0.50 276.30 0.48 276.28 0.47 276.27 0.46 276.26 0.44 276.24 0.43 276.23 0.42 276.22 0.40 276.20 0.38 276.18 0.35 276.15 0.32 276.12 0.29 276.09 0.27 276.07 0.25 276.05 0.23 276.03 0.21 276.01 0.19 275.99 0.17 275.97 0.16 275.96 0.11 275.91 0.03 275.83 0.01 275.81 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 0.00 275.80 Storage Routing Analysis Areas 201,202, and 203 100-Year Storm Event Ii.nN.. IDflQW 11.±1.2._ OutflQW (minJ ~ ~ ~ 2slt+Q ~ Depth (ft.) ElevatiQD 84 0.00 0.00 0.00 0.00 0.00 0.00 275.80 85 0.00 0.00 0.00 0.00 0.00 0.00 275.80 86 0.00 0.00 0.00 0.00 0.00 0.00 275.80 87 0.00 0.00 0.00 0.00 0.00 0.00 275.80 88 0.00 0.00 0.00 0.00 0.00 0.00 275.80 89 0.00 0.00 0.00 0.00 0.00 0.00 275.80 90 0.00 0.00 0.00 0.00 0.00 0.00 275.80 D-11 Appendix E Determination of Total Runoff Post-Development Condition Determination of Total Runoff Post Development Condition 5-Year Storm Event Ar~a 204 B!.!DQff Ar~a~ 201, 202, aad ~ 203 QutflQW (~f~) I2tal (~fs) 0.00 0.00 0.00 0.09 0.25 0.34 0.18 0.87 1.05 0.28 1.68 1.95 0.37 2.09 2.46 0.46 2.20 2.66 0.55 2.33 2.89 0.64 2.51 3.15 0.74 2.72 3.46 0.83 2.96 3.79 0.92 3.24 4.16 0.87 3.41 4.28 0.83 3.49 4.32 0.78 3.57 4.35 0.74 3.64 4.37 0.69 3.70 4.39 0.64 3.75 4.39 0.60 3.79 4.39 0.55 3.83 4.38 0.51 3.86 4.36 0.46 3.88 4.34 0.41 3.89 4.30 0.37 3.89 4.26 0.32 3.89 4.21 0.28 3.88 4.16 0.23 3.86 4.09 0.18 3.84 4.02 0.14 3.81 3.95 0.09 3.77 3.86 0.05 3.73 3.77 0.00 3.67 3.67 0.00 3.62 3.62 0.00 3.57 3.57 0.00 3.51 3.51 0.00 3.46 3.46 0.00 3.41 3.41 0.00 3.36 3.36 0.00 3.23 3.23 0.00 3.10 3.10 0.00 2.96 2.96 0.00 2.84 2.84 E-1 Determination of Total Runoff Post Development Condition 5-Year Storm Event AB~iil 20~ B!.!DQff A[~iil~ 20:1, 202, aad ~ 203 QutflQW (~f~) I2tal (~fs) 0.00 2.72 2.72 0.00 2.60 2.60 0.00 2.49 2.49 0.00 2.38 2.38 0.00 2.28 2.28 0.00 2.19 2.19 0.00 2.09 2.09 0.00 1.51 1.51 0.00 0.75 0.75 0.00 0.37 0.37 0.00 0.19 0.19 0.00 0.09 0.09 0.00 0.05 0.05 0.00 0.02 0.02 0.00 0.01 0.01 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E-2 Determination of Total Runoff Post Development Condition 10-Year Storm Event Anrn 2!M BUDQff A[ea~ 2Q1, 2Q2, am:! ~ 2Q3 QUtflQW h~f~} IQtal {~fsl 0.00 0.00 0.00 0.10 0.27 0.37 0.20 0.94 1.14 0.30 1.81 2.11 0.40 2.11 2.51 0.50 2.23 2.73 0.60 2.38 2.98 0.70 2.58 3.28 0.80 2.81 3.61 0.90 3.07 3.97 1.00 3.36 4.36 0.95 3.46 4.41 0.90 3.56 4.46 0.85 3.64 4.49 0.80 3.72 4.52 0.75 3.79 4.54 0.70 3.85 4.55 0.65 3.90 4.55 0.60 3.94 4.54 0.55 3.97 4.52 0.50 3.99 4.49 0.45 4.01 4.46 0.40 4.02 4.42 0.35 4.02 4.37 0.30 4.01 4.31 0.25 3.99 4.24 0.20 3.97 4.17 0.15 3.94 4.09 0.10 3.90 4.00 0.05 3.85 3.90 0.00 3.80 3.80 0.00 3.75 3.75 0.00 3.69 3.69 0.00 3.64 3.64 0.00 3.58 3.58 0.00 3.53 3.53 0.00 3.48 3.48 0.00 3.42 3.42 0.00 3.37 3.37 0.00 3.27 3.27 0.00 3.14 3.14 E-3 Determination of Total Runoff Post Development Condition 10-Year Storm Event Arna 2Q~ BUOQff Ar~a~ 2Q'.I, 2Q2, aod ~ 2Q3 QytflQW (kf~) IQtal (kfs) 0.00 3.00 3.00 0.00 2.87 2.87 0.00 2.75 2.75 0.00 2.63 2.63 0.00 2.52 2.52 0.00 2.42 2.42 0.00 2.31 2.31 0.00 2.21 2.21 0.00 2.12 2.12 0.00 1.81 1.81 0.00 0.90 0.90 0.00 0.45 0.45 0.00 0.22 0.22 0.00 0.11 0.11 0.00 0.06 0.06 0.00 0.03 0.03 0.00 0.01 0.01 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 E-4 Determination of Total Runoff Post Development Condition 25-Year Storm Event Acea 2Q~ B!.!DQff Acea~ 2Q1, 2Q2, aad ~ 2Q3 QutflQW (kf~) I!2tal {kfs} 0.00 0.00 0.00 0.12 0.32 0.43 0.24 1.11 1.34 0.35 2.06 2.41 0.47 2.16 2.63 0.59 2.31 2.90 0.71 2.50 3.21 0.83 2.75 3.57 0.94 3.03 3.98 1.06 3.36 4.42 1.18 3.48 4.66 1.12 3.61 4.73 1.06 3.73 4.79 1.00 3.84 4.84 0.94 3.94 4.88 0.89 4.02 4.91 0.83 4.10 4.93 0.77 4.17 4.93 0.71 4.22 4.93 0.65 4.27 4.91 0.59 4.29 4.88 0.53 4.30 4.83 0.47 4.31 4.78 0.41 4.31 4.72 0.35 4.31 4.66 0.30 4.30 4.60 0.24 4.29 4.53 0.18 4.28 4.45 0.12 4.24 4.36 0.06 4.19 4.25 0.00 4.13 4.13 0.00 4.07 4.07 0.00 4.01 4.01 0.00 3.95 3.95 0.00 3.89 3.89 0.00 3.84 3.84 0.00 3.78 3.78 0.00 3.72 3.72 0.00 3.67 3.67 0.00 3.61 3.61 0.00 3.56 3.56 E-5 Determination of Total Runoff Post Development Condition 25-Year Storm Event A[eil 2!M Bum~ff A[eil~ 201, 202. and ~ 2Q3 Quttl2w (~f~) I2tal (~fs) 0.00 3.51 3.51 0.00 3.46 3.46 0.00 3.40 3.40 0.00 3.35 3.35 0.00 3.22 3.22 0.00 3.08 3.08 0.00 2.95 2.95 0.00 2.82 2.82 0.00 2.70 2.70 0.00 2.59 2.59 0.00 2.48 2.48 0.00 2.37 2.37 0.00 2.27 2.27 0.00 2.18 2.18 0.00 2.08 2.08 0.00 1.40 1.40 0.00 0.70 0.70 0.00 0.35 0.35 0.00 0.17 0.17 0.00 0.09 0.09 0.00 0.04 0.04 E-6 Determination of Total Runoff Post Development Condition 50-Year Storm Event Anrn 2!M Bl.IDQff A[eSls 2Q:I, 202. Sim! (llil 2QJ Qutfl!2w {~fs} I!2l'11 {~fs) 0.00 0.00 0.00 0.12 0.36 0.48 0.24 1.25 1.49 0.35 2.08 2.44 0.47 2.21 2.68 0.59 2.39 2.98 0.71 2.62 3.33 0.83 2.90 3.73 0.94 3.24 4.18 1.06 3.44 4.50 1.18 3.59 4.77 1.26 3.75 5.01 1.20 3.89 5.09 1.14 4.01 5.16 1.08 4.13 5.21 1.02 4.23 5.26 0.97 4.30 5.26 0.91 4.34 5.25 0.85 4.38 5.23 0.79 4.41 5.20 0.73 4.43 5.16 0.67 4.45 5.12 0.61 4.47 5.08 0.55 4.47 5.02 0.49 4.47 4.97 0.43 4.47 4.90 0.38 4.46 4.83 0.32 4.44 4.76 0.26 4.42 4.68 0.20 4.40 4.59 0.14 4.36 4.50 0.00 4.33 4.33 0.00 4.29 4.29 0.00 4.25 4.25 0.00 4.19 4.19 0.00 4.13 4.13 0.00 4.07 4.07 0.00 4.01 4.01 0.00 3.95 3.95 0.00 3.89 3.89 0.00 3.83 3.83 E-7 Determination of Total Runoff Post Development Condition 50-Year Storm Event Ar~a 20~ BUDQff Ar~a~ 201. 202. aad {rul 203 Quttl2:w (~f~) I2tal (~fsl 0.00 3.77 3.77 0.00 3.72 3.72 0.00 3.66 3.66 0.00 3.61 3.61 0.00 3.55 3.55 0.00 3.50 3.50 0.00 3.45 3.45 0.00 3.40 3.40 0.00 3.35 3.35 0.00 3.20 3.20 0.00 3.07 3.07 0.00 2.94 2.94 0.00 2.81 2.81 0.00 2.69 2.69 0.00 2.58 2.58 0.00 2.47 2.47 0.00 2.36 2.36 0.00 2.26 2.26 0.00 2.17 2.17 0.00 2.07 2.07 0.00 1.29 1.29 E-8 Determination of Total Runoff Post Development Condition 100-Year Storm Event Area 20!1: B1.1a2ff Area~ 20::1, 202. am! ~ 203 01.1tfl2w (cfs) I2tal (~fs) 0.00 0.00 0.00 0.12 0.41 0.52 0.24 1.42 1.66 0.35 2.11 2.46 0.47 2.26 2.73 0.59 2.48 3.07 0.71 2.75 3.46 0.83 3.08 3.91 0.94 3.39 4.34 1.06 3.55 4.61 1.18 3.72 4.90 1.51 3.90 5.41 1.45 4.07 5.52 1.39 4.22 5.61 1.33 4.31 5.65 1.27 4.38 5.65 1.22 4.44 5.65 1.16 4.49 5.65 1.10 4.54 5.63 1.04 4.57 5.61 0.98 4.61 5.59 0.92 4.63 5.55 0.86 4.65 5.51 0.80 4.66 5.46 0.74 4.67 5.41 0.68 4.66 5.35 0.63 4.66 5.28 0.57 4.64 5.21 0.51 4.62 5.13 0.45 4.59 5.04 0.39 4.56 4.95 0.00 4.52 4.52 0.00 4.49 4.49 0.00 4.45 4.45 0.00 4.42 4.42 0.00 4.38 4.38 0.00 4.35 4.35 0.00 4.31 4.31 0.00 4.28 4.28 0.00 4.22 4.22 0.00 4.16 4.16 0.00 4.09 4.09 E-9 Determination of Total Runoff Post Development Condition 100-Year Storm Event A[ea 20~ R!.!OQff A[ea~ 201, 202. aod !llil 20J QytflQW (kf~) IQtal (kfs) 0.00 4.03 4.03 0.00 3.97 3.97 0.00 3.91 3.91 0.00 3.86 3.86 0.00 3.80 3.80 0.00 3.74 3.74 0.00 3.69 3.69 0.00 3.63 3.63 0.00 3.58 3.58 0.00 3.53 3.53 0.00 3.47 3.47 0.00 3.42 3.42 0.00 3.37 3.37 0.00 3.27 3.27 0.00 3.13 3.13 0.00 3.00 3.00 0.00 2.87 2.87 0.00 2.75 2.75 0.00 2.63 2.63 0.00 2.52 2.52 E-10 CI TY, CO LLE GE STAT I ON TEL NO. Sep 01,99 8 :2 7 P.03 ~~1rr ·\SrtJ •' ( t l l t t t,' •, ·1 ' , '~. f\ DA~mi= I 80-+ SH (o fuJ+h DEVELOPMENT PERMIT / MINIMUM SUBMJ1TAL REQUIREMENTS , vSJ00,00 Development Permit Application Pee. · : ~ralnage and erosion control plan, with supporting Dralmtge Report two (2) coplts each. ~~ otice oflntcnt (N.0.1.) if d.1$turbed area i& greater than 5 acres. LEOALDBSCRIPTION l. I 4C0 W"'rc ~ r "fr,d -R_1ch 0 rJ L..c..rk /....e1o5w\e + /1--~ APPIJCANT(PrimaryCootactfortheProjcct): L.ol-3 1 Bloc.I<. Ot\~, :-rhe G,o.~w"-/ Name ~('c.~ier ~u.;\J.....rs -L-h.orl~s Te.7{0/ , Stroot Address b t I "Z.. u,S . H:,.,~ 5'1 t\Jv±:h City _ _z.v_..;.:_c..._~_r(-"c.'------- s~ \ i: Zip Code . 11 '1 0 ~ E-Mail Addrti8 & ---------~ Phor:acNumber 3b I -~?e -~oo4 faxNumber ______ __._......._ __ .......:.-~- PR.OPBRTY OWNE R'S IN FORMATION: Name G~lecwc-'1 F~ .. ls ,i L. L. C. , StTcctAdd res s "2-4-o S -r(' "°' S Ave. . .Sb .... ~ City C.Ollc5e 'Jf1..ft~ .... S~ -r f... Zip Code 7 7 S cf-o E-Mail Add~s ~--_._~------ Pb(w.te Numb er 4-0"9,.. f, ~ 0 -17 't-4 Fax Number ____________ .. _____________ _ ARcmrBCT OR ENGINEER'S INFORMAUON: Name lt %, c.o"" & e\'\vc.( Lo...,{roJ-re -Josef A f. {e,.~ ... {f.~ . , .. , _ _,., Stroc:tAddress l]<:)J C... .. coh.Gfto\ {:r,oJ --·· City ._ Co/l~~c ffJ.-'001 -- Stam T'l. ZipCocfo "77'l>45 &Maif~s -l-e~'""'<!.+c.a.."C!f. PhooeNumbor 4~, -b9u -77 ti Fax Number 4o ,_ b 9o-&J7. '11 Applioatioo is bcroby made for the fbll~ dcYdopmcnt specific siWwa.ttrway altert\tions: . ~t>"" Sf~1o11d;,.,. e.+ f4 f;o..kwa 'f C o""'+v o..+ AJ lAJ Uf'l\~ or A~WLEDG~: ; ~=~~.design~, hoteby~ora111nntMt: The information and oanclusions oontainod in the above plan." and supportins doeumc:nu comply with the wrrcmt requirements of the City of College Station, Texas City Code, Chapter 13 and its associated l>niinagc Policy andl)cmaa Standards . k a coodition of approval of this pennit applicatiou. l agree to constnrot the improvements proJ)oscd in this appli<ation according to these documents and the requirements of Ota ter 13 of tho Col ege Station City Code. 'ropcrty Owner(s) l ora CITY, COL LEGE STATION TEL NO. ,.,. CERTIFl£?ATIONSi (for proposed alterations within dooignatoo flood hazard areas.) Se p 0 1. 99 \ I 1 ! . 8 :2 7 P.0 4 A. I. j o S ~ k P. .S~.J fl, certify that s.ny nonresidential structure on or pro~ to _ ~~~ ... £this application is dA;ignated to prevent damage to the structure or its contents u a sosult of ffoodii&~ ·l ~~ Dl1D ill-f -r.-·· ·· .. O' 't. /----,· l 1!• .. •• * '~ ....... __ _,, wj) ,~.: .... ~~ I · &] -z -7 1 ~ ... josEPH 0 P0 ... SC0H0U0LTZ°'1 -;;:::z::z:i-.-.J>Tlr-ll~~~__!.__--.-----Date ·l···································I ~~ !,~ .... ~ 65889 /&~ .••. 0 •~T(2 <(.,_<;)• ~ 111 ; A~ ··.91STE~··· ..... ~ # i ' s ········ ~'\JJ B. I. certify that the finished floor elevation of the lowest ~r. / ~ __ _ bucmc:ot, of any residontial structure~ proposed as part of this application is at or above die b~ Bood c~ establlshcd in tho latest Federal Insurance Administration f1ood Hazard Study and maps, as amended. ~ Date C. r. P. ~~ ... /~fy that the alterati ons or devclopMeUt covered byjthis permit shall not diminish 1bt flood-ca • capadty of the waterway adjoining or crossing this permitted site ID<l that such alterations or deYdopmmt are consistent with requirements of lhe City of CoUoge Station City Code. Chapter ~ 3 ooncemin,g "of flood .... ,..~ !norwar friog<:s . , ~ R .. ~ q,.Z-99 ..,.............,...., Date I . L do certify that the proposed alterations do mot raise~the kvcl of tho l 00 year '-. __ .tfuod I.bow elevation mablished in the latest Federal lnsuranoe Admin.i$lration Flood Haz:iud StflY· I I ! Date Ccaditioas ot comments as part of approval:_~~-~--~~--------,.--------- I I . Jn acoordanoe with Charter J 3 of the Code of Ordinances of the City of Colleg6 Station, meuu..J. lhaU be taken to ~ that debris from constroction, erosion, and sedimentation shall not be deposited in city strocts, or~~ drainaao &ci1iti(!ll . AU development shall be in accordance with the plans and srcciflcntions submitted to and ap~ by the City ~r b dlC above tJamCd prajec:t.._ All of the o.ppl~ble ~and ordinanc.aJ of the City of C.olleBC 8t',atioo .iwi "P)Jly. ! I DATZSUB~J/-1q45 qq _) ,q CUtl FINAL PLAT APPLICATION (check one) Minor _Amending Final _Vacating __ Replat The follo\J/illg items must be submitted by an established filing deadline date for P & Z C-Ommission consideration. MINIMUM SUBMITTAL REQUIREMENTS: / Filing Fee of $200.00. N/A Development Permit Application Fee of Sl00.00 (if applicable). v Infrastructure Inspection Fee of S3 00. 00 (applicable if any public infrastructure is being constructed .). /_.<\pplication completed in full. _/_~Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.) __ One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable). 7Paid tax certificates from City of College Station, Brazos C-Ounty and College Station LS .D. 1/7 A copy of the attached checklist \X.<1th all items checked off or a brief explanation as to -.,i,-b.y they are not __ Two (2)copies of public infrastructure plans associated with this plat (if applicable). APPLICATION DATA NAi\.fE OF SUBDMSION Q-p.;1 E.Wftl': LJ:;.1 3 bbCC.¥.. 0~£. SPECIFIED LOCATION OF PROPOSED SUBDMSION A-r. 11-n:.. I N\ce$£(\1 c~ Of lJNNEl?.Pl!'i' Orz.1vE. q. Cr\4-ra H 1 c..,HNA~ ~. (s) f fuul'f-\Beil..lN'O :fgeN---rA~£-~ADJ APPLICANT/PROJECT ~.l.i~AGER'S INFORMATION (Primary Contact for the Project): Name MBsN A . Mi::_c <.ALF Street Address 2?S\ IE..XA:';:> A'1E. Scvif.\ 1 S-te.. A City Co t..L.£gE SY\11 t:lN Seate Ix. Zip Code 778L..! O E-Mail Address TY"\O a,Ctfz @ a, te . ne i: Phone Number ('-10'1) loci3-5'b'5<1 ...; u Fax Number (tiD9J lo'1r::,-Yz.'13 PROPERTY OWNER'S INFOR!-vfATION: Name ~DN Cowe: I '6e:e:1 Nl4££i...gg, , -:I"Nc.. S ueet Address "4514:, '?c::51' [)p, ~ f I.Ac. E. . Ste . Z'bo ; Seate l'l<. Zip Code 17'07..I E-Mail Address ------------ Phone Number {-r1~) "355-6:6'5 ARCHITECT OR ENGINEER'S INFOR!-vfATION : Fa.'<: Number (7!';) 8]'2.-S-Z.<C \ ~ame i?Al'V1'££.. A'b A ffl..ICAl'-\"1 / ftZ.001l.~I 'f'f\A4'\AG\f~ City ------------- s ~.,,-~ ----Z ip Code ____ _ E-Mail Address ------------ P~,o ne Numba __________ Fa.x 1'."wTlber ----------------- r.:-.:.-'l.. ?'._~_-:-.-'..PPUC.-\TIO:-..- F:<L?.-._:;? =·-:.r: 3 2~ '/""; 1 of:; SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific waterway alterations: ACKNOWLEDGMENTS: I,----------------' design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these docume nts and the requirements of Chapter 13 of the College Station City Code . Property Owner(s) Contractor CERTIFICATIONS: (for proposed alterations within designated flood haz.ard areas.) A. I, f\/o&nf 9> /2rt!2-D £ L l-J fl:; certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. ~ f3 , ~ a. !Uif'/3, Jr?lt: Engineer ~ ~ 7 B. I, tJJ\.. , certify that the finished floor elevation of the lowest floo r, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended. NA ~-N~~~~ Engineer Date C. I, ."I OFl-YI+ 8 f3f!f<Df£ l:b J"& certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes. 11;;r:!JB. ~ ~ IU~;~/91CZ Engineer ~ rfFiJ ./ D. I, '<N/A , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Haz.ard Study. ~A AJM ----"'-------Engineer Date Conditions or c..>mments as part of approval:---------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. SITE PLAN APPLICATION SITEAPP 04/13/99 4of3 Bu f/'T oq CJ of '?i/.z. P'vf( DP sJ ~ ~ ~ r;~ a-A.. ~ fJcrt: P~~ ~ ~(£:; 15 /07 '9 9 1 2:36 FAX 409 693 42 4 3 M D G 1 2 3 4 s 6 7 e ENGINEER'S COST ESTIMATE The Gateway, (Lot 3, Block One) PROPOSED WATER LINE IMPROVEI\tENTS Proposed 8" Water Une (C900, Class200) w/Class "40 L.F. $18.00 'D' Embedme nt Highway Bore w/16" Steel Encasement (Sch 40) & 110 L.F . $140 .00 S" 0.1.P . w/Field Locking Gaskets & casin g spacers 1 e"x 8" (MJ) Tapp ing Valve & Sleeve 1 EA . $1,500.00 S" Gate Valve, Box & Thrust Bl ocking 2 EA. $75 0.00 B"x Sfl (MJ) Cross w!Thrust Blocking 1 EA. $750.00 8" (MJ} Plug w/Thrust Blocking 2 EA. $450.00 Standard Fire Hydrant (Type 2} wtGate Valve, 1 EA. $2,000.00 Fitt i ngs & Appurtena nces Trench Safety, Sheeting & Shoring 4 0 L.F . $10.00 - $720.00 $15,400.00 $1,500 .00 $1 ,500.00 $750.00 $900 .00 $2 ,000.00 $400.00 ESTIMATED CONSTRUCTION COST• $23,170.00 This engineer's estimate was prepared in our office ,at the date sh own, and Is released for the purpose of public lnfastructu re cost projections. !{mBil..Mt!. North 8 . Bardell , Jr .• P.E. 60873 ~l h!a•*il MU NICIPAL DE VELOPMENT GROUP 255 1 TEXAS AVENi.JE SOUTH , STE . A COLLEGE STATJO N . TEXAS 77840 P h (4 0 9)693-5359 F'AX : (409 )693 -4243 E-mail : mdgcs@gte .ne l. 00030 0-31 64 Efl.l1rl COit Eat.xis CONTINGENCIES • $2,830.00 GRAN O TOTAL• $28,000 .00 Dae ~002 0'1 /08 /99 13 : u DE VELOPMENT svcs .. _. ~001 -------~-----·- COLLEGE STATION P. 0 . Box ~9tm • 1101 T•>eaa Aven~ • Coll9gfJ Station , TX 770~ Mr. by HanleG Hwa~Group ~5 Taaa A~ Soutb, Ste. 308 Colleg9 Station. Teas 77840 Dear Mt. HaDMn: Tel: 409 764 3500 The &ml plat tor the Gateway SubdiYislon Lot 3, Block 1 was approved by the Plaonina IDd Zoning Commillioa on Thunday, 1uly 1. 1999. The Plarulin1 and Zonina Commiulon is the final approval body for 9Ubdiviaioo plats iD the City of Co!Mp Station. The follows it a list of hem that need to be completed: Noa oftM J!mal lJli ../ Provide an ~s estimate for the propoaed public wam-line ..med by a registered profelsioaal ,..neer. (Staff will review the estimate to eusure that the costs are ~ witll rtceat developmem costs.) The foDowbtg are your two opuom in de&Jiaa with the water line: Poat a fllllDCiaJ guarautee u outlined in the City•• SubdMJion ResuJatlom in the amouat of the approved engineer's estimate; OR. CoulnM::t tb8 Wiler line. Cogruction g[th! W@LQ; { Prior to inuance of the dewlopment permit and approving the co~on plans for the watw line, the following items must be compl«ed: 'i.. Developanent permit application cornpJeted in full. Erosion control plaa If you have my quesdons or if I can be of f\uther a.salstauce. J>letse do not hesitate to call me at 7(;4..3570. Development Coor=ator Cc: Plannlnc CAio f'Jlt Cbril Smitlmman via fax lm4-2201 Hom• of Texas A&M Un iversity