HomeMy WebLinkAbout77 Regency South 1816 Brothers Blvd 00-77Engineer's Estimate
For
Sanitary Sewer Improvements
To
A Replat Of
A 1.51 Acre Tract
Being
Block 1 -Regency South
College Station, Brazos County, Texas
* December, 2000 *
s "t s t
1.
2 .
3.
4 .
5 .
6" Diameter SDR 26-3034 P.V.C . 284 l.F. $14.00 $3,976.00
Sanitary Sewer Line (0'-5' Depth)
Tie Into Exist i ng Sanitary Sewer 1 L.S . $350.00 $350.00
Manhole
Standard Sanitary Sewer Manhole 2 EA . $1,400.00 $2 ,800.00
(0'-8' Depth)
4" Diameter P.V.C . Service Line 5 L.F . $10.00 $50.00
.
Stub -Out
4 " Plug 1 EA . $25 .00 $25.00
Total Estimated Cost For Sanitary Sewer Improvements: $7,201.00
F E
REVIEWED FOR
co~~PI I At\ICE
JAN 0 3 2001
COLLEGE STATION . I
ENGINEERING ~~\J
•Garrett Engineering• 4444 Carter Creek Parkway Su ite 108 •Bryan, Texas 77802 •Telephone: (979) 846-2688 •
1.
2.
3.
Engineer's Estimate
For
Drainage Imp rovements
To
A Replat Of
A 1.51 Acre Tract
College Station, Brazos Co unty, Texas
• December, 2000 •
4" Thick Reinforced Concrete Channel Lining 369 S.F.
With #6 -6" x 6" Welded Wire Mesh
Reinforcement -3000 P.S .I. Concrete (28-Day
Strength)
Channel Excavation ("In-Place" Quantity) 27 C .Y.
TCS #018 Limestone Rock Rubble Rip -Rap 167 S.Y.
Or Approved Equal
$2.50 $922.50
$3 .50 $94.50
$25 .00 $4, 175.00
T otal Estimat ed Cost Fo r Drainage Improvem ents: $5, 192.00
F
REVIEWED FOR
cn~APf IAl\JCE
JAN 0 3 2001
COLLEGE s I A .. ENGINEER1N~v)~
\
•r
.•
c1 •I
I
Engineer's Estimate
· For
Drainage Improvements
To
A Replat Of
A 1.51 Acre Tract
Being
Block 1 -Regency South
College Station, Brazos County, Texas
D . el t
1. 4 " Thick Reinforced Concrete
Channel Lining w/#6 -6X6"
Welded wi re mesh Reinforcement
(3000 P.S.I. Concrete 28-Day
Strength)
2 . Channel Excavation
("In -Place· Quantity)
3 . TCS #018 Limestone
Rock Rubble Rip -Rap
* December, 2000 *
1142
27
91
S.F. $2.50
C.Y. $3 .50
S.Y. $25 .00
u Improvements:
11
"'060
oO '-J
$2 ,855 .00
$94 .50
$2 ,2 75.00
br -/i I \(Jl I r/ ) i o " 'if r>1 "f'/ /
'eJ'
*Ga rrett Engineeri ng* 4444 Carter Creek Parkway Su ite 108 *Bryan . Te xas 77802 *Teleph one : (979) 846 -2688 "
«W
COLllGl STA.TION
DEVELOPMENT PERMIT
PERMIT NO . 500077
DP-REGENCY SOUTH
FOR AREAS IN THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
DATE OF ISSUE:
OWNER:
TYPE OF DEVELOPMENT: RESIDENTIAL
SPECIAL CONDITIONS:
SITE ADDRESS:
1816 BROTHERS BL VD
DRAINAGE BASIN:
CARTER CREEK
VALID FOR 6 MONTHS
CONTRACTOR:
GLENN THOMAS
All construction must be in compliance with the approved construction plans.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetat:-::1
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
I hereby grant this permit for development of an area in the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Date / j
Owner/ Agent/ Contractor Date
1.
2 .
3.
I
Engineer's Estimate
For
Drainage Improvements
To
A Replat Of
A 1.51 Acre Tract
College Station, Brazos County, Texas
• December, 2000 •
4" Thick Re i nforced Concrete Channel Lining 369 S .F.
With #6 -6 " x 6 " Welded Wire Mesh
Reinforcement -3000 P.S.I. Concrete (28-Day
Strength)
Channel Excavation ("In-Place" Quantity) 27 C.Y.
TCS #018 Limestone Rock Rubble Rip-R ap 167 S.Y .
Or Approved Equal
$2 .50 $922.50
$3.50 $94.50
$25.00 $4, 175 .00
Total Estimated Cost For Drainage Improvements: $5, 192.00
REVIEWED FOR
C0~!1PI IAl\ICE
JAN 0 3 2001
COLLEGE SIA I iUl\I j
ENGINEERING ~ \
~~··
r
. ' .
Engineer's Estimate
For
Sanitary Sewer Improvements
To
A Replat Of
A 1.51 Acre Tract
Being
Block 1 -Regency South
College Station , Brazos County, Texas
*December, 2000 *
s •t s I t
~ i ~ r~~!)"t'~o •;J.~ ~I~;) ~I 'I" :.it 'I:~""' 1
O ~ ' I>" 'I" ~ j
1 I~ I ·~lllJ I •I 1 ~'i" ' lji1'' I~~ 4
; """°'~!~! ';-..,.l 1~1;:~ t::1;~1~tl t' ~ :~:~ l~r ~~~~~ :~,. ~ '"', ~::! ~~~~ :.: II : r"~°''~~~~1 ,f17:'~r~r:; ~(:r;,~ir:.:~~~
1111~lijNtil1~ ·Vt·lt l(.1 ,~~~·1i...!111 ~A·•"''' I I 1 ) '~ ,, '1' 1'1 ,. Lltt ':fiit·~1~ .. ~;'!' r \, ,14(1:'-· 'ill \N11ilt 1'-1 :·1 lt.i~ ~1.1 .... r~~.u !II '.r 11 I, ! 1,1·1 ~ .. 1·1i·~H1 ·~~!, ""~1·(·~
k.. .. '.J'i.~?.~~··:·:\f'.~~'ilq:,j'.~2,•1<' ", 1
1: ,' l ,' 'r ~·1 ,. '•,' 9 • 1 L ·~.1 ~l;;rJ.~:~~1~~1~:1~u~11 1~11 111:;i~1w1!1~~b~L1~r.:"J1 ··~-~:.'i 11 ~ ~ ,,111,h~~i,i.,::1;·:1~~.~4Jh.~~b·~!'l(~1~
1.
2 .
3 .
4 .
5 .
6" Diameter SOR 26·3034 P.V.C . 284 L.F . $14.00 $3 ,976.00
Sanitary Sewer Line (0'-5' Depth)
Tie Into Existing Sanitary Sewer 1 L.S . $350.00 $350.00
Manhole
Standard Sanitary Sewer Manhole 2 EA . $1,400.00 $2,800.00
(0 '·8' Depth)
4" Diameter P.V.C . Service Line 5 L.F . $10.00 $50.00
Stub-Out
4 " Plug 1 EA. $25 .00 $25 .00
Total Estimated Cost For Sanitary Sewer Improvements: $7,201.00
REVIEWED FOR
co~nPI IAl\JCE
JAN 0 3 2001
COLLEGE STATION .\. I
ENGINEERING~~ \J
*Garrett Eng ineering* 4444 Carter Creek Parkway Suite 108 *Bryan , Texas 77802 *Telephone : (979) 846·2688 *
DRAINAGE COMPUTATIONS
For
Replat Block 1-Regency South
1.51 Acre Tract
College Station, Brazos County, Texas
Prepared for
Glenn Thomas
11 10 12th Man Circle
College Station, Texas 77845
Telephone: (979) 690-7117
Prepared by:
Garrett Engineering
REV\EWED FOR
CO~APL\ANCE
JAN 0 3 2001
COLLEGE STA'fl~~\\J
ENG\NEER\NGI"\" .,
4444 Carter Creek Parkway -Suite 108
Bryan, Texas 77802
Telephone: (979) 846-2688
*December, 2000 *
Garrett Engi.-ring -444-4 Caner CrMk Parkway Suite 108 -8fyan. Tex11 77802 -Telephone: 1409) 848-2688 -Fax : 1409) 848-3094 -Paga 1
~ .
.. '\
-----· --------------------------
---------------------------------------------------
·~/LU Eo·s
----------+-'---9!--------
;!;fif'k
(~) ?..-10'0 %. u
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Left Side Slope
Right Side Slope
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
FULL FLOW CAPACITY OF 'V'-CHANNEL
Worksheet for Triangular Channel
c:\haestad\academic\fmw\regency _. fm2
FULL FLOW CAPACITY OF 'V'-CHANNEL
Triangular Channel
Manning 's Fonnula
Discharge
0.013
0.005000 ft/ft
1.50 ft
6.000000 H : V
6.000000 H : V
89 .25 cf s
13 .50 ft2
18.25 ft
18 .00 ft
1.69 ft
0.002653 ft/ft
6.61 ft/s
0.68 ft
2.18 ft
1.35
Academic Edition 12/14/00
10 :05:37 AM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Fl owMaster v5 .17
P age 1 of 1
12/14/00
Table
Rating Table for Triangular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\haestad\academic\fmw\regency _. fm2
FULL FLOW CAPACITY OF 'V'-CHANNEL
Triangular Channel
Solve For
Constant Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Input Data
Minimum
Depth 0.00
Rating Table
Manning's Formula
Discharge
0.013
0.005000 ft/ft
6.000000 H : V
6.000000 H : V
Maximum
Depth Discharge Velocity
~ftl ~cfsl ~ft/sl
0.00 0.00 0.00
0.01 0.14e-3 0.23
0.02 0.89e-3 0.37
0.03 0.26e-2 0.49
0.04 0.01 0.59
0.05 0.01 0.68
0.06 0.02 0.77
0.07 0.03 0.86
0.08 0.04 0.94
0.09 0.05 1.01
0.10 0.07 1.09
0.11 0.08 1.16
0.12 0.11 1.23
0.13 0.13 1.29
0.14 0.16 1.36
0.15 0.19 1.42
0.16 0.23 1.49
0.17 0.27 1.55
0.18 0.31 1.61
0.19 0.36 1.67
0.20 0.41 1.73
0.21 0.47 1.78
0.22 0.53 1.84
Increment
0.01 ft
Academic Edition
10 :0 7 :44 AM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.1 7
Page 1 of 4
Table Rating Table for Triangular Channel Rating Table Depth Discharge Velocity (ft) (cfs) (ft/s) 0.23 0.60 1.89 0.24 0.67 1.95 0.25 0.75 2.00 0.26 0.83 2.06 0.27 0.92 2.11 0.28 1.02 2.16 0.29 1.12 2.21 0.30 1.22 2.26 0.31 1.33 2.31 0.32 1.45 2.36 0.33 1.57 2.41 0.34 1.70 2.46 0.35 1.84 2.51 0.36 1.99 2.55 0.37 2.14 2.60 0.38 2.29 2.65 0.39 2.46 2.69 0.40 2.63 2.74 0.41 2.81 2.78 0.42 2.99 2.83 0.43 3.19 2.87 0.44 3.39 2.92 0.45 3.60 2.96 0.46 3.82 3.01 0.47 4.04 3.05 0.48 4.28 3.09 0.49 4.52 3.14 0.50 4.77 3.18 0.51 5.03 3.22 0.52 5.29 3.26 0.53 5.57 3.30 0.54 5.85 3.35 0.55 6.15 3.39 0.56 6.45 3.43 0.57 6.76 3.47 0.58 7.08 3.51 0.59 7.41 3.55 0.60 7.75 3.59 0.61 8.10 3.63 0.62 8.46 3.67 0.63 8.83 3.71 0.64 9.21 3.75 0.65 9.60 3.79 0.66 10.00 3.82 12/14/00 Academic Edition 10:07:44AM Haestad Methcxls, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster vS.17 Page 2 of 4
Table Rating Table for Triangular Channel Rating Table Depth Discharge Velocity (ft) -~s) (ft/s) 0.67 10.40 3.86 0.68 10.82 3.90 0.69 11.25 3.94 0.70 11.69 3.98 0.71 12.14 4.02 0.72 12.61 4.05 0.73 13.08 4.09 0.74 13.56 4.13 0.75 14.06 4.16 0.76 14.56 4.20 0.77 15.08 4.24 0.78 15.61 4.28 0.79 16.15 4.31 0.80 16.70 4.35 0.81 17.26 4.38 0.82 17.83 4.42 0.83 18.42 4.46 0.84 19.02 4.49 0.85 19.63 4.53 0.86 20.25 4.56 0.87 20.88 4.60 0.88 21.53 4.63 0.89 22.19 4.67 0.90 22.86 4.70 0.91 23.54 4.74 0.92 24.24 4.77 0.93 24.95 4.81 0.94 25.67 4.84 0.95 26.40 4.88 0.96 27.15 4.91 0.97 27.91 4.94 0.98 28.68 4.98 0.99 29.47 5.01 1.00 30.27 5.05 1.01 31.09 5.08 1.02 31.91 5.11 1.03 32.75 5.15 1.04 33.61 5.18 1.05 34.48 5.21 1.06 35.36 5.25 1.07 36.26 5.28 1.08 37.17 5.31 1.09 38.09 5.34 1.10 39.03 5.38 12/14100 Academic Edition 10:07:44AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.17 Page 3 of 4
Table Rating Table for Triangular Channel Rating Table 12114/00 10:07:44AM Depth Discharge Velocity (ft) (cfs) (ft/s) 1.11 39.98 5.41 1.12 40.95 5.44 1.13 41.94 5.47 1.14 42.93 5.51 1.15 43.94 5.54 1.16 44.97 5.57 1.17 46.01 5.60 1.18 47.07 5.63 1.19 48.14 5.67 1.20 49.22 5.70 1.21 50.33 5.73 1.22 51.44 5.76 1.23 52.58 5.79 1.24 53.72 5.82 1.25 54.89 5.85 1.26 56.06 5.89 1.27 57.26 5.92 1.28 58.47 5.95 1.29 59.70 5.98 1.30 60.94 6.01 1.31 62.20 6.04 1.32 63.47 6.07 1.33 64.76 6.10 1.34 66.07 6.13 1.35 67.39 6.16 1.36 68.73 6.19 1.37 70.08 6.22 1.38 71.46 6.25 1.39 72.85 6.28 1.40 74.25 6.31 1.41 75.68 6.34 1.42 77.11 6.37 1.43 78.57 6.40 1.44 80.05 6.43 1.45 81.54 6.46 1.46 83.04 6.49 1.47 84.57 6.52 1.48 86.11 6.55 1.49 87.67 6.58 1.50 89.25 6.61 Academic Edition Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.17 Page4 of 4
90.0
80 .0
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Constant Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Input Data
Minimum
Depth 0.00
FLOW CAPACITY OF "V''-CHANNEL
Plotted Curves for Triangular Channel
c:\haestad\academic\fmw\regency_.fm2
FUL FLOW CAPACITY OF "V"-CHANNEL
Triangular Channel
Manning's Formula
Discharge
0.013
0.005000 ft/ft
6.000000 H : V
6.000000 H : V
Maximum Increment
0.01 ft
Discharge vs Depth
I
I
/
I 70.0
60.0 -(/) -~50 .0
Q)
e
llJ -fi 40.0
(/)
0
30.0
20.0
10.0
0 .0
0.0
12114/00
10:16:57 AM
0 .2
~ v ---0.4 0 .6
/
/
/
v
0 .8
Depth (ft)
Academic Edition
1 .0
I
/
1.2
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1.4 1 .6
FlowMaster v5.17
Page 1 of 1
. . ..
I.
--· ,, .. · . ) ..
-'""' ,.\•f
•Ir•' ..
4. ... , •• . . , , ...
..
·r ·
•' ·'· .. "
' '
·~ ( I.
' ... . ·~'
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
DESIGN DEPTH OF FLOW IN "V'-CHANNEL
Worksheet for Triangular Channel
c:\haestad\academic\fmw\regency_. fm2
FULL FLOW CAPACITY OF 'V'-CHANNEL
Triangular Channel
Manning 's Formula
Channel Depth
0.013
0. 005000 fVft
6.000000 H : V
6. 000000 H : V
20.00 cfs
0.86 ft
4.40 ft2
10.41 ft
10 .27 ft
0.93 ft
0.003239 ft/ft
4.55 ft/s
0.32 ft
1.18 ft
1.23
Academic Edition 12/14/00
10 :10 :27 AM Haestad Methods . Inc. 37 Brookside Road Waterbury, CT 06708 (20 3) 755-1666
Fla.vMaster v5 .17
Page 1of1
•
DRAINAGE COMPUTATIONS
For
A Replat Of A 1.51 Acre Reserve Tract
Block 1, Regency South
College Statio11 , Brazos County, Texas
Pr epare d for
Mr. Glenn Thomas
111 O 12th Man Circle
College Station, Texas 77845
Prerare d by :
Garrett Engineering
4444 Carter Creek Parkway -Suite 108
Bryan, Texas 77802
Telephone: (409 ) 846-2688
*November, 2000 *
Garrett Engineering . 4444 Carter C reek Parkway Suite 108· Bryan . Texas 771!1J2 ·Telephone: (409) 846-2688 ·Fax: (409) 846-3094
~\-00
9:3~
•
Drainage Computations
For
A Replat Of A 1.51 Acre Tract
Block 1, Regency South
College Station, Brazos County, Texas
Computations contained herewith are provided to first determine the existing peak storm
water discharge rates from the subject tract and second determine the impact on the
discharge as a function of developing the subject property based on the requested zoning
and the associated changes in run-off coefficients.
Jeff Tondre indicated in July, 1998 (when the subject project was initiated) that if the
impact area was less than one (1) acre, he would not be expecting to see storm water
detention incorporated with this project. The total project area is 1.51 acres, howeve r
approximately 0.75 acres will remain undeveloped grass areas which yields an impacted
area of approximately 0.76 acres. Based on this realization Steve Beachy with the Parks
Department was contacted to determine if anticipated storm water discharge would be
allowed to sheet drain across the City Park lying immediately downstream from th e
subject tract. Mr. Beachy indicated that he did not have a problem with said scenario and
thus the assumption to allow storm water discharge to exit the subject site unmetered from
was arrived at.
A rectangular flume with a four foot -four inch (4'-4") wide bottom is proposed to direct
the anticipated storm water discharge from the existing cul-de-sac area to the east
boundary line of the subject tract where same flume will terminate with a twenty-four
(24") inch toewall. Limestone rock rubble rip-rap will be placed a same termination point
to dissipate the discharge energy and armor the existing natural ground to minimize
erosion in the vicinity of said end of flume. The flume depth was set at nine inches (0.75')
and the lon gitudinal gradient was set at 0.50%. The geometry provided will allow for
satisfactory conveyance of the storm water discharge as generated by the 2, 5, 10, 25, 50
and 100-year storm events.
The flume was designed based on the total area tributary to the proposed flume and sam e
area was derived from City of College Station topographic maps and actual on-the-ground
observations. Said tributary area was determined to be approximately 2.09 acres.
Comparisons of pre and post development conditions peak storm water discharge rates as
well as hyd ographs (tabular and graphical) are included for City Staff review and
consideration .
Vicinity Map n. t.s .
•
•
Determine Total Current Conaition •· Peak Storm Water Discharge Rates
Trib utary Area ("A "): 1.51 Acres
Pervious Area : 1.35 Acres
Impervious Area: 0.16 Acres
Run-Off Coefficient ("Cwt"): 0.36
Time Of Concentration ("Tic "):
Woodlands: Low Elevation :
High Elevation:
Distance (Feet):
Slope (%Grade):
Velocity ("Vw "):
T ime:
Pastures: Low Elevation:
High Elevation :
Distance (Feet):
Slope (%Grade):
Veloc ity ("Vp"):
Time :
Pavements: Low Elevation :
High Elevation:
Distance (Feet):
Slope (%Grade):
Velocity ("Vpave"):
Time :
Total Travel Time:
Hourly Intensity Rates ("I"): 2-Year: 6.33
5-Year: 7.69
10-Year: 8.63
25-Year: 9.86
50 -Year: 11.15
100-Year: 12 .63
Peak Discharge Rate ("Q "): 2 -Year: 3.47
5-Year: 4 .22
10-Year: 4 .74
25-Year : 5.41
50 -Year: 6.12
100-Year: 6.93
C= 0.30
C= 0.90
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
10.00 Minutes
Inches I Hour
Inches I Hour
Inc.hes I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Gorrell Engine91ng . 4444 Cort er C reek P<rkwcry Suite 108 • B<yo n . T exos 7711)2 ·Telephone : (409) 846-2688 • Fox: (409) 846-3094
-
Determine Post-development Peak
Storm Water Discharge (No Detention}
Tributary Area ("A"): 1.51 Acres
Pervious Area: 0.75 Acres
Impervious Area : 0 .76 Acres
Run-Off Coefficient ("Cwt"): 0.60
C= 0 .30
C= 0.90
Time Of Concentration ("T/c"): 10 Minutes
Hourly Intensity Rates ("I"): 2-Year: 6.33 Inches I Hour ..
5-Year: 7.69 Inches I Hour
10-Year: 8.63 Inches I Hour
25-Year: 9.86 Inches I Hour
50-Year: 11.15 Inches I Hour
100-Year: 12 .63 Inches I Hour
Peak Discharge Rate ("Q"): 2-Year: 5.75 Cubic Feet I Second
5-Year: 6.99 Cubic Feet I Second
10-Year: 7.85 Cubic Feet I Second
25-Year: 8.96 Cubic Feet I Second
50-Year: 10.13 Cubic Feet I Second
100-Year: 11.48 Cubic Feet I Second
Comparison Of Predevelopment And
Post-development Peak Discharge Rates
Predevelopment Post-Development Increase
2-Year: 3 .47 Ft3/sec 5. 75 Ft3/sec 2 .28 Ft3/sec
5-Year: 4 .22 Ft3/sec 6.99 Ft3/sec 2. 77 Ft3/sec
10-Year: 4. 7 4 Ft3/sec 7.85 Ft3/sec 3.11 Ft3/sec
25-Year: 5.41 Ft3/sec 8 .96 Ft3/sec 3 .55 Ft3/sec
50-Year: 6.12 Ft3/sec 10.13 Ft3/sec 4 .01 Ft3/sec
100-Year: 6.93 Ft3/sec 11.48 Ft3/sec 4.55 Ft3/sec
Gorrell Englnee<ing. 4444 Corte< Creek Pe<kw cry Suite 108 • B<yon . Texas 7711J2 ·Telephone: (409) 846-21188 ·Fox: (409) 846-3094
,.. Time (Minutes) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Current Condition (Predevelopinent) Inflow Hydrograph Ordinates (Cubic Feet per Second) 2-Year Storm 0.00 0.35 0.69 1.04 1.39 1.74 2.08 2.43 2.78 3.13 3.47 3.30 3.13 2.95 2.78 2.60 2.43 2.26 2.08 1.91 1.74 1.56 1.39 1.22 1.04 0.87 0.69 0.52 0.35 0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5-Year Storm 0.00 0.42 0.84 1.27 1.69 2.11 2.53 2.96 3.38 3.80 4.22 4.01 3.80 3.59 3.38 3.17 2.96 2.75 2.53 2.32 2.11 1.90 1.69 1.48 1.27 1.06 0.84 0.63 0.42 0.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10-Year 25-Year Storm Storm 0.00 0.00 0.47 0.54 0.95 1.08 1.42 1.62 1.90 2.17 2.37 2.71 2.84 3.25 3.32 3.79 3.79 4.33 4.27 4.87 4.74 5.41 4.50 5.14 4.27 '4.87 4.03 4.60 3.79 4.33 3.56 4.06 3.32 3.79 3.08 3.52 2.84 3.25 2.61 2.98 2.37 2.71 2.13 2.44 1.90 2.17 1.66 1.89 1.42 1.62 1.19 1.35 0.95 1.08 0.71 0.81 0.47 0.54 0.24 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SO-Year 100-Year Storm Storm ·o.oo o.oo 0.61 0.69 1.22 1.39 1.84 2.08 2.45 2.77 3.06 3.47 3.67 4.16 4.28 4.85 4.90 5.55 5.51 6.24 6.12 6.93 5.81 6.59 5.51 6.24 5.20 5.89 4.90 5.55 4.59 5.20 4.28 4.85 3.98 4.51 3.67 4.16 3.37 3.81 3.06 3.47 2.75 3.12 2.45 2.77 2.14 2.43 1.84 2.08 1.53 1.73 1.22 1.39 0.92 1.04 0.61 0.69 0.31 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Gooen Engineering. 444'1 Co~er Creek Porkwcry Suite Joa· Bryon. Texas 77002 ·Telephone: (409) 846-2688 ·Fax: (409) 846-3094
46 0.00 0.00 0.00 0.00 0.00 0.00 47 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 49 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 51 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 54 0.00 0.00 0.00 0.00 0.00 0.00 55 0.00 0.00 0.00 0.00 0.00 0.00 56 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 Garrett Engineering. 444<1 Corter Creek Parkway SUie 108-Bryon. Texas 77ll02 -Telephone: (409) 841>2688 -Fax: (409) 841>3094 ...
46 0.00 0.00 0.00 0.00 0.00 0.00 47 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 49 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 51 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 54 0.00 0.00 0.00 0.00 0.00 0.00 55 0.00 0.00 0.00 0.00 0.00 0.00 56 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 Garett Englneerng -4444 Corter Creek PcrkwCl'{ Suite 108 • Blyon. Texas 77002-Telephone: (4'.)9) 846-2688 -Fox: (409) 846-3094 -
-
......
1J c:
0
0
<I>
Cl) ...
<I> a.. -<I>
<I>
LL.
'O :a
:I u .....
<I>
C) ...
0 .s::.
0
Cl'I
i5
6.00
5 .00
4.00
3 .00
2 .00
1.00
0 .00
("\
Total Current Development Vs. Total Post-Development
(No Detention) Peak -Discharge Rates 2-Year Storm Event
.....,......--Curr ent Development Hydrograph ---Tot al Post-Development Hydrograph
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 5-Year Storm Event
Q; a.. 6 .00 ----#-+~~---+-----+-----+-------,f-------i
Qi £ 5 .00 ------+--~--!------+-----+----~"-------~
0 ......
·-1J 4 00 .__-1---A-'o..---~f------+-------1-----+-----l .0 c: .
:I 0
() 0
..... <I> 3 .00 --+-~--+---"'r---+-"lr-----+------+-----1-------i
<I> Cl)
~ 0 2 .00 --+--+-----+--------~--+------+-----1-------i
.s::.
0 '3 1.00
0 .00 +-----+-----+-----'1----+-----+-----t
0 10 20
Current Development Hydrograph
30 40 50 60
Time (Minutes)
---Post -Development Outflow Hydrograph
Wit h o ut Detention
Gooelt Eng ineering-4444 Cort er C reek Pcwkwoy Suit e 108 -Bryo n . T exos 778'2 -Telej::tlone: (409) 84<>-~ ·Fox: (409) 84<>-3094
•
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 10-Year Storm Event
~ 7 ,00._----#-+~~---+----~-----+-~---+------l
ll..
Qi 6.00._ __ _,_-+-~r----+----~-----+-----+------l
Q) .......
. 2 u 5.00
.0 c 8 8 4 .00 ___ _..,__.,._.. __________ __.>------+-----+---------<
....... Q)
~ V> 3.00
0 '5 2 .00
Cl) c 1.00+-#+----+-----+----"....-~-----+-----+------l
0 .00 +-----+----~---..... -----.----+-----1
0 10 20
---Current Development Hydrograph
30 . 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
Wit ho ut Detention
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 25-Year Storm Event
1.00 +-1-?------+-----+---~.--lf-------+-----+--------l
0 .00 .... ----1-----+------'l~----+-----+------t
0 10 20
Current Development Hydrograph
30 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
Wit h out Detention
G<wrett Engineering. 4444 Corter C reek Pcrlcw oy Suite 108 ·&yo n . Texas 77002 ·Telephone: (409) 846-2688 ·Fox: (409) 846-3094
•
..... u c:
0
0
Cl>
U) ...
Cl>
0... -Cl>
Cl>
1£.. ..
0
:0
:::J
() ......,
Cl>
CJ) ...
0 .s::.
0
I/)
0
-Cl>
Cl>
1£..
12.00
10.00
8 .00
6.00
4 .00
2 .00
0 .00
12 .00
10 .00
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 50-Year Storm Event
Current Development Hydrograph ---Post -Development Outflow Hydrograph
Wit·hout Detention
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 100-Year Storm
Event
0 ..... ·-u 8 .00 ..0 c:
:::J 0
() 0 6 .00 ......, Cl>
Cl> U)
CJ) ... ... Cl> 4 .00 0 0... .s::.
0
I/) 2.00 0
0 .00
0 10 20
---Current Development Hydrograph
30 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
Without Detention
Garett Engineering. 4444 Corte< Creel< Pcwkwoy SUie 108. B<yon . T exos 77802 • T&lephone : (409) 841>-2688 • Fox: (409) 841>-3094
-
Determine Total Peak Flow To
Proposed Flume
Tributary Area ("A"): 2 .09 Acres
Pervious Area: 1.04 Acres
Impervious Area : 1.05 Acres
Run-Off Coefficient ("Cwt "): 0 .60
Time Of Concentration ("T/c "):
Woodlands: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vw"):
Time :
Pastures: Low Elevation:
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vp"):
Time :
Pavements: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vpave "):
Time:
Total Travel Time:
Hourly Intensity Rates ("I"): 2-Year: 6 .33
5-Year: 7.69
10-Year: 8.63
25-Year: 9.86
50-Year: 11.15
100-Year: 12 .63
Peak Discharge Rate ("Q"): 2-Year: 7.95
5-Year: 9.67
10-Year: 10.85
25-Year : 12.40
50-Year : 14.01
100-Year : 15.88
C= 0.30
C= 0.90
0.00
0.00
0 .00
0 .00
0 .00 Feet I Second
0.00 Minutes
0 .00
0.00
0.00
0 .00
0.00 Feet I Second
0 .00 Minutes
0.00
0.00
0 .00
0.00
0.00 Feet I Second
0.00 Minutes
10.00 Minutes
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Gmett Engtne .. ng · 4444 Corter Creek Parkway Suit e 108· Bryon. Texas 77ffJ2 -Telephone: (409) 846-2688 -Fox: (409) 846-3094
-
Project Descrip tion
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Bottom Width
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Veloc ity Head
Specific Energ y
Froude Number
Flow is supercritical.
Full Flow Capacity Of Propo sed Flume
Workshe et for Rectangular Channel
c :\haestad\academic\fmw\gthomas .fm2
Full Flow Capacity Of Proposed Flume
Rectangular Channel
Manning 's Formula
Discharge
0.013
0.005000 ft/ft
0.75 ft
4.33 ft
17 .77 els
3 .25 ft 2
5 .83 ft
4 .33 ft
0 .81 ft
0 .004035 ft/ft
5.47 fUs
o'.47 ft
1 .22 ft
1.11
Acade mi c Edition 11 /01/00
11 :48:41 AM Haestad Me th ods , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666
Fl owMaster v5 .17
Page 1 of t
-
18.0
16.0
14 .0
12 .0
(/) -
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Constant Data
Mannings Coefficient
Channel Slope
Bottom Width
Input Data
Minimum
Depth 0.00
Full Flow Capacity Of Pr o posed Flume
Plotted Curves for Rectangular C h annel
c :\haestad\academic\fmw\gthomas.fm2
Full Flow Capac i ty Of Proposed Flume
Rectangular Ch a nnel
Manning's Formul a
Discharge
0 .013
0 .005000 ft/ft
4 .33 ft
Maximum
0.75
Increment
0 .01 ft
Discharge vs Depth .......... ,,. ........................ , ................ , ................................................................... .
. . . . . . ........................................................................ -................................... .
.......... I' ............... , ............... , ............ , .................. , ................ , .... ..
................ · ............... · .............. · ................ • ................. · ................ -·-............ -· ........ ..
~ 10 .0 ................ ,· ................ ,· .............. ·,· .............. ·.· ............. ·.· .............. ·.· ............ -............. .
(])
Ol .....
ell
..c
(.)
(/)
0
8 .0 ................ \. ............. • ............. •'• ............. ·'· .............. -·-.................................. • .......... .
6 .0 ................................................................ . . . .. ................................................................. . . . . .
4.0 --------' --------·-----. --'· --------·---------·---------· ---------· ----...
. . . . .................................................................................. . . . . . . 2 .0
0.0 ....... ='-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-
o .o
11/01/00
11:53 :0 1 AM
0. 1 0.2 0.3 0.4
Depth {ft)
A cademic Edition
0 .5 0 .6
Haestad M ethods , In c. 37 Bro okside Road W aterbury, CT 06708 (203) 755-1666
0 .7 0.8
FlowM aster v5.17
Page 1 ol 1
-
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Spec i fic Energy
Froude Number
Flow is superc ri ti cal.
Depth Of Flow 2-Year Sto r m Event (Flume)
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gth o mas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Ma nn ing's Formula
Channe l Depth
0.013
0 .005000 ft/ft
4 .33 ft
7 .95 els
0.44 ft
1 .92 ft 2
5 .22 ft
4 .33 ft
0.47 ft
0 .004115 fl/ft
4 .15 ft/s
0.27 ft
0 .71 ft
1.10
Acade mic Edit io n 11 /01/00
01:28 :16 PM Haestad Methods, Inc . 37 Brookside Road Wat erbury , CT 06708 (203) 755 -1666
Fl ow Masl er v5.17
Page 1 of 1
-
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Of Flow 5-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c:\hae s tad\acade m ic\f mw\gthom as. fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0 .013
0 .005000 ft/ft
4 .33 ft
9 .67 els
0.50 ft
2.18 112
5.33 ft
4.33 ft
0 .54 ft
0 .004071 IUft
4.44 I Us
0.31 ft
0.81 ft
1. 11
Academic Edition 11/01/00
01:28:54 PM Haestad Me t hods, Inc. 37 Br ookside Road W aterbury, CT 067 08 (203) 755-1 666
Fl owMaster v5.17
Page 1 of 1
-
Project Descrip tion
Project File
Wo rksheet
Flow Element
Method
Solve For
I npu t Data
Mannings Coefficient
Chann el Slop e
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Crit ica l Depth
Critical Slope
Velocity
Ve l oc i ty Head
Specif i c Energy
Froude Number
Flow is superc ritical.
Depth Flow 10-Year Storm Event (Flume)
Worksheet fo r Rectangular Cha n nel
c :\haestad\academic\fmw\gthomas .fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0.013
0.005000 ft/ft
4.33 ft
10 .85 els
0.54 ft
2.34 ft2
5.41 ft
4.33 ft
0 .58 ft
0.004052 ft/ft
4.63 ft /s
0.33 ft
0.87 ft
1 .11
Ac ad emic Edi t ion 11/0 1/00
01 :29 :32 PM Haest a d Methods , Inc . 37 B rookside Road Wate rbury, CT 067 08 (203) 755-1666
Flow Masler v5 .17
Page 1 of 1
-
1 1/01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc i ty
Velocity Head
Specif ic Energy
Froude Number
Flow is supercritical.
Depth Flow 25-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gthomas .fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0.013
0.005000 ft/ft
4 .33 ft
12.40 cfs
0 .59 ft
2.56 ft 2
5.51 ft
4 .33 ft
0 .63 ft
0 .004037 ft/ft
4 .85 ft/s
0.36 ft
0.96 ft
1.11
Acad e mic Edition
01 :30:00 PM Haestad Me th ods, Inc . 3 7 Brookside Road Waterbu ry, CT 06708 (203) 755 -1666
FlowM aste r v5.17
Page 1 c l 1
-
11 /01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Ch annel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Sl ope
Veloc ity
Veloc ity Head
Spec i f ic Energy
Froude Number
Flow is supercritical.
Depth Flow 50-Year Sto r m Event (F l ume)
Worksheet for Rectangular Channel
c :\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning 's Formula
Channel Depth
0 .013
0.005000 fUft
4 .33 ft
14 .01 els
0 .64 ft
2.77 ft 2
5 .61 ft
4 .33 ft
0 .69 ft
0 .004030 ft /f t
5.05 tus
0.40 ft
1 .04 ft
1.11
Academic Edition
0 1 :30 :20 PM Haestad Me t hods, In c . 37 Brookside Road Wat e rbu ry, CT 06 7 08 (203) 755 -1666
Fl owMasler v5.1 7
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc ity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Flow 100-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c :\haestad\academic\fmw\gthomas .fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0 .013
0 .005000 ft/ft
4 .33 ft
15 .88 els
0.70 ft
3.01 ft 2
5.72 ft
4 .33 ft
0.75 ft
0 .004030 !Ult
5 .27 !Us
0.43 ft
1.13 ft
1.11
Ac ademic Edition 11/01/00
01:30 :42 PM Haestad Methods , Inc . 37 Brookside Road W aterbury, CT 06706 (203) 7 55-1666
Fl owMaste r v5 .17
Pag e 1 a l 1
MEMORANDUM
April 3, 2001
TO: Carl Warren
FROM: Tom Vennoc hi
SUBJECT: Elevation Certificate for Regency South PUD
An Elevation Certificate is necessary for the following lots , as shown on the copy
of the Replat:
Lots 4R, 5R, 6R, ?R, 8R, 9R & 1 OR.
These lots are east of and inter se cted b y th e dotted line denoting the limits of the
100-year flood plain .
The minimum FF elevation of 2 67.50' is a lso show n.
plat is not yet recorded .
FOR OFFICE USE ONLY
P&Z CASE NO.: 1"'Y4i -7 / 2
DATE SUBMIITED: I :::1 I .::lP, IO(J
~
FINAL PLAT APPL !CATION
./"'
/
(check one) Minor _Amending Final _Vacating _Replat
The following items must be submitted by an established filing deadline
~ing Fee of $200.00 .
MINIMUM SUB MITT AL REQ
.:::::::: Development Permit Application Fee of$ l 00.00 (if applicable).
-Infrastructure Inspection Fee of$300.00 (applicable if any public
__ Application completed in full.
date for P & Z Commission consideration.
UIREMENTS:
infrastructure is being constructed .).
be submitted after staff review.) Thirteen (13) folded copies of plat. (A signed mylar original must
,.ll.Jl"L..L One (1) copy of the approved Preliminary Plat and/or one (1) Maste r Plan (if applicable).
and College Station I.S.D. Paid tax certificates from City of College Station, Braz.os County
A copy of the attached checklist with all items checked off or a bn "ef explanation as to why they are not.
1J11 Two (2)copies of public infrastructure plans associated with this p lat (if applicable).
APPLICATION DA TA
NAME OF SUBDMSION Kcietvczy d<!H-'-t._
SPECIFIED LOCATION OF PROPOSED SUBDMSION ---
ntact for the Project): APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Co
Name &4Nrr / /£cut 7Ao111t1:.S ~//§fr sl;/;~. City
·1 Address ~ rAowtd-S@_ fJ. l./t::.1-
Street Address / / I 0
/
I L -I{ Mt\-1\1 C f,
State -Jal\6 Zip Code 17 I CJ 5 E-Mai
Phone N:ffiber (s; JO-7 f / f Fax Number_ ~c,o 7 // &_
PROPERTY OWNER'S INFORMATION:
Name Q L:: 'b'\ ..:l :A"> . --Ck~ A-= 7
Street Address I I \ 0 \ z:\t.. ~ c__ \--City ~cs.
' ·1 Address 71(5 e?_/c.A .. Ile~
~ '(0-7 /)
State T'i Zip Code -Z. ~ ~ 9 5 E-Mai
PhoneNumber ~90 ~ 211 7 FaxNumber_
ARCIIlTECT OR ENGINEER'S INFORMATION:
Name cZ i?xr-c-cl t {; tJ ~ •
Street Address '±444 0 t... ... \-~p C t~k:-ii ID ~City
ail Address State LG':f'\-!> Zip Code E-M
Phone Number 914 ..--~C\-k-'Uo~" Fax Number_
FINAL PLAT APPUCA TION
fNLPAPP.IX>C 4114199
3; (' 1 /Tl\.~
l o(J
-
~·· ~·
"' ,,
,-TOTAL ACRES OF SUBDMSION
NUMBER OF LOTS BY ZONING DISTRICT
\ · 'J '$ R-0-W ACREAGE TOT AL# OF LOTS 13
t 1. , r v v--R"..----, ---.;;;;;;;..____
~ ----..:' --
AVERAGE ARREAGE OF EACH RESIDENTIAL LOT BY ZONING DISTRICT:
.}~ I PDP/'1-I /__ --'--
FLOODPLAIN ACREAGE N 0 ~ ----
PARKLAND DEDICATION ACREAGE OR FEE AMOUNT ----------
A STATEMENT ADDRESSING ANY DIFFERENCES BElWEEN TIIE FINAL PLAT AND APPROVED MASTER
DEVELOPMENT PLAN AND/OR PRELIMINARY PLAT (IF APPLICABLE):
bJ 0 Ne: -tkAi-I -KN l!>W ~ •
REQUESTED VARIANCES TO SUBDIVISION REGULATIONS & REASON FOR SAME _______ _
t-\ D Ill t +t,_ A-_(_ I t( t:¥!W ti .
REQUESTEDOVERSIZEPARTICWATION~~~~N~O~N...._._t.___~1-"-\•~a~+--=.r=---if{,..._~~~-=--a~~~-
NOTE: DIGITAL COPY OF PLAT (IF APPLICABLE) MUST BE SUBMITTED PRIOR TO FILING.
1he applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, correct and complete. 1he undersigned hereby requests approval by the City of College Station
oftl:n:~·~~:~
Signature and Title Date
FINAL PLAT APPUCATION
FNLPAPP.DOC <C/141in
2of'3
979 764 3496
03 /21 /01 10:26 'a'979 764 3496 DEVELOPMENT SVCS
FACSIMILE co·vER SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SER\'ICES
l J 01 Texas Avenue South, PO Box 9960
College Station~ Texas 77842
Phone ( 409)764-3570 I Fax ( 409)764-3496
Date: March 20. 2001 #of pages including cover:--'-'2=---
lfy ou did riot receive. a completefa..t, pleasf! c;al/ our ojflce immediate~y.for a nC'!w transmittal.
TO: Earl --~--~~-----F AX: __ (9 ....... 7_...9r-') 8"'-'4'-=-6--=3 ...... 09 ...... 4 __
FR011: Tho1]1as V . Vennochj Jr. PI-I ON E:_..,...(9'--'-. 7"""'-9-.'--'-) 7.--=<.6_,_4--=3=-57,__,,0:.....-_
COMPANY : _____ ---"C=.i...,ty~of.o--C ........... o ..... ll_eg=---e~· =St=a=ti=o.:.on ________ _
REMARKS: D Urgent D For your review [gj Replay ASAP D FYI
Earl: Pl.cfl.s~ fill out sign and date :caragrapb B. _Ji®ll1l the original to us. JJ1is is
necessary paper.vork for the Qeye!opment Pennit.
Thanks Tom
!41001
~,( 0() ;'_)Ill I J" I :
d ~ .rll!S Srtf; u ' ;>q I ) J{
10 0WJ
{
1 ,., lut ,) l J..)· ..... :d c.14 ~ '1
• '1111: -.It' l.'11' ~p,i-..
}ffitf: f HL 6.:..1).Q, i
9St"[ t>'3l 6.!.
I''! ;:.l XJ .WV.l'·t·lfJ
111•ni 11 H<''H·· r , 1 \'.·JQ
I >
ltl
• 03 /21 /01
979 754 3495
10:32 '6'979 764 3496
DEVELOPME NT SVCS
!41001
CERTIF1CATION$; (for proposed alterations within designated flood hazard areas.)
A. I, -·-certify that any nonresidential stl'Ucture on or proposed to be on this site a.s I-
of this application is desi,gnat.e.d to prevent damage to the structure or its contents as a result of flooding from the 100 ye
stonn.
Engineer Date
In accordance with Chapter 13 of the Code of Ordinances of lhe City of College Station, measures shall be taken to insure
that debris from construction, erosion , and sedimentation sha.11 not be deposited in city streets, or existing drainage facilities .
All development shall be in acco,rdancc with the plans and specifications submitted to and approved by the City Engineer
for the above named projecl , All of the applicable codes and ordinances of the City of College Station shall apply.
01'!.VEU>rM~NT !'ER.MIT
DPERMIT.DOC )/24Jl.>9
2of2
.>I. :::: _s ~ J4' ::;
;'
/
I ""
I
111
I
11
11
I
I
I
Ill
Ill
II I
I
Ill
Ill
Ill
II
II
!I
Ill '
ii
I,
I
11
Ill
ll
.~
I
I
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
DP-
Phone (979) 764-3570 I Fax (979) 764-3496
MEMORANDUM
January 4, 2001
TO:
FROM:
SUBJECT:
Garrett Engineering, Via fax 846-3094 ~
Bridgette George, Assistant Development Review Manager
DP-REGENCY SOUTH (0-500077)
Staff reviewed the above-mentioned construction documents and has no comments.
Please submit the following for the development permit to be issued:
__ $100 Development Permit fee
$300 Infrastructure Inspection fee /'
7
j
__ Three (3) copies of the Erosion Control Plan 'i::.13tJf: I I 7; iJ)
Please call Thomas Vennochi,Jr. or myself if you have any questions.
CC: Glenn Thomas, Via fax 690-7118
Home of Texas A&M University
()0-7(
DP-REGENCY SOUTH (0-500077)
ENGINEERING REVIEW
COMMENTS No. 2
1. The drainage report and drainage updates have been received, reviewed
and stamped approved.
2. The construction documents for the sanitary sewer line have been
received, reviewed and stamped approved.
3. The construction documents for the off-site drainage improvements have
been received, reviewed and stamped approved.
4. The engineer estimates for the sanitary sewer and drainage
improvements have been received, reviewed and stamped approved.
5. For a development permit to be issued an Erosion Control Plan needs to
be submitted and approved.
Reviewed by: Thomas V. Vennochi Jr. Date : 04 JAN 01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans . Any additional changes on these plans that have not
been pointed out to the City of College Station will constitute a completely new
review .
01 /05 /01 12 :34 '5'979 764 3496 DE VELOP MENT SVCS
TR AN SMISSIO N OK
TX /RX 0.
CO NNE CTIO N TE L
CO NNE CTIO N ID
STA RT TIM E
USAGE TIM E
PAGES
RESULT
*************************** *** ACTI VI TY REPOR T ***
***************************
5956
01 /05 12 :33
01 '10
2
OK
96907118
141001
01105 /01 12:32
•
'5'979 764 3496 DEVELOPMENT SVCS
TRANSMISSION OK
TX/RX NO.
CO ECTION TEL
CONNECTION ID
START TIME
USAGE THIE
PAGES
RES ULT
*************************** *** ACTIVITY REPORT ***
***************************
5955
01 /05 12:31
01 '02
2
OK
98463094
141001
(f 'Y IP' J t'l--I ~j)r 0 11-/1'1 ~~J
DRAINAGE COMPUTATIONS
For
Replat Block 1-Regency South
1.51 Acre Tract
College Station, Brazos County, Texas
REVIEWED FOR
C()f\~PIJ ANCE
JAN 0 3 2001
P repared fo r
Glenn Thomas
COLLEGE STATIONA/J
ENGINEERING /\, '
1110 12th Man Circle
College Stat ion , Texas 77845
Telephone : (979) 690-71 17
Prepared by:
Garrett Engineering
4444 Carter Creek Parkway -Suite 108
Bryan, Texas 77802
Telephone : (979) 846-2688
* December, 2000 *
G•rrett Eng ineering -4444 Carter Creek Pa rkway Suite 108 -Bryan . Texas 77802 -Te'8phone: (409) 846-2688 -Fax : (409) 846-3094 -Page 1
·------------· --
(~) ?__.10·0 z. a
..
Project Description
Project File
Worksheet
Flow Element
Method
Solve Fo r
Input Data
Mannings Coefficient
Channel Slope
Depth
Left Side Slope
Right S ide Slope
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
FULL FLOW CAPACITY OF 'V'-CHANNEL
Worksheet for Triangular Channel
c :\haestad\academic\fmw\regency _. fm2
FULL FLOW CAPACITY OF 'V '-CHANNEL
Triangular Channel
Manning's Formula
Discharge
0.013
0.005000 ft/ft
1.50 ft
6.000000 H : V
6.000000 H : V
89.25 cfs
13.50 ft2
18 .25 ft
18 .00 ft
1.69 ft
0.002653 ft/ft
6.61 ft/s
0.68 ft
2.18 ft
1.35
Academic Edition 12114/00
10 :0 5 :37 AM Haestad Methods , Inc. 37 Brookside Road Waterbury, CT 067 08 (203) 755-1 666
FlowMaster v5 .17
P age 1 of 1
12114/00
Table
Rating Table for Triangular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\haestad\academic\fmw\regency _. fm2
FULL FLOW CAPACITY OF 'V'-CHANNEL
Triangular Channel
Manning's Formula
Solve For Discharge
Constant Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Input Data
Minimum
Depth 0.00
Rating Table
0.013
0.005000 ft/ft
6.000000 H : V
6.000000 H : V
Maximum
1.50
Depth Discharge Velocity
(ft) (cfs) (ft/s)
o.op 0.00 0.00
0.01 0.14e-3 0.23
0.02 0 .89e-3 0.37
0.03 0.26e-2 0.49
\
0.04 0.01 0.59
0.05 0.01 0.68
0.06 0.02 0.77
0.07 0.03 0.86
0.08 0.04 0.94
0.09 0.05 1.01
0.10 0.07 1.09
0.11 0.08 1.16
0.12 0.11 1.23
0.13 0.13 1.29
0.14 0.16 1.36
0.15 0.19 1.42
0.16 0.23 1.49
0 .1 7 0.27 1.55
0.18 0.31 1.61
0.19 0.36 1.67
0.20 0.41 1.73
0.21 0.47 1.78
0.22 0.53 1.84
Increment
0.01 ft
Academic Edition
10:07 :44 AM Haestad Meth<Xls , Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5 .17
Page 1 of 4
Table Rating Table for Triangular Channel Rating Table 12/14/00 10:07:44AM Depth Discharge Velocity (ft) (cfs) (ft/s) 0.23 0.60 1.89 0.24 0.67 1.95 0.25 0.75 2.00 0.26 0.83 2.06 0.27 0.92 2.11 0.28 1.02 2.16 0.29 1.12 2.21 0.30 1.22 2.26 0.31 1.33 2.31 0.32 1.45 2.36 0.33 1.57 2.41 0.34 1.70 2.46 0.35 1.84 2.51 0.36 1.99 2.55 0.37 2.14 2.60 0.38 2.29 2.65 0.39 2.46 2.69 0.40 2.63 2.74 0.41 2.81 2.78 0.42 2.99 2.83 0.43 3.19 2.87 0.44 3.39 2.92 0.45 3.60 2.96 0.46 3.82 3.01 0.47 4.04 3.05 0.48 4.28 3.09 0.49 4.52 3.14 0.50 4.77 3.18 0.51 5.03 3.22 0.52 5.29 3.26 0.53 5.57 3.30 0.54 5.85 3.35 0.55 6.15 3.39 0.56 6.45 3.43 0.57 6.76 3.47 0.58 7.08 3.51 0.59 7.41 3.55 0.60 7.75 3.59 0.61 8.10 3.63 0.62 8.46 3.67 0.63 8.83 3.71 0.64 9.21 3.75 0.65 9.60 3.79 0.66 10.00 3.82 Academic Edition Haestad Methods, Inc. 37 Brookside Road Watert>ury, CT 06708 (203) 755-1666 FlovvMaster v5.17 Page 2 of 4
Table Rating Table for Triangular Channel Rating Table 12/14/00 10:07:44AM Depth Discharge Velocity (ft) (cfs) . (ft/s) 0.67 10.40 3.86 0.68 10.82 3.90 0.69 11.25 3.94 0.70 11.69 3.98 0.71 12.14 4.02 0.72 12.61 4.05 0.73 13.08 4.09 0.74 13.56 4.13 0.75 14.06 4.16 0.76 14.56 4.20 0.77 15.08 4.24 0.78 15.61 4.28 0.79 16.15 4.31 0.80 16.70 4.35 0.81 17.26 4.38 0.82 17.83 4.42 0.83 18.42 4.46 0.84 19.02 4.49 0.85 19.63 4.53 0.86 20.25 4.56 0.87 20.88 4.60 0.88 21.53 4.63 0.89 22.19 4.67 0.90 22.86 4.70 0.91 23.54 4.74 0.92 24.24 4.77 0.93 24.95 4.81 0.94 25.67 4.84 0.95 26.40 4.88 0.96 27.15 4.91 0.97 27.91 4.94 0.98 28.68 4.98 0.99 29.47 5.01 1.00 30.27 5.05 1.01 31.09 5.08 1.02 31.91 5.11 1.03 32.75 5.15 1.04 33.61 5.18 1.05 34.48 5.21 1.06 35.36 5.25 1.07 36.26 5.28 1.08 37.17 5.31 1.09 38.09 5.34 1.10 39.03 5.38 Academic Edition Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FICM'Master v5.17 Page 3 of 4
Table Rating Table for Triangular Channel Rating Table 12114/00 10:07:44AM Depth Discharge Velocity (ft) . (cfs) (ft/s) 1.11 39.98 5.41 1.12 40.95 5.44 1.13 41.94 5.47 1.14 42.93 5.51 1.15 43.94 5.54 1.16 44.97 5.57 1.17 46.01 5.60 1.18 47.07 5.63 1.19 48.14 5.67 1.20 49.22 5.70 1.21 50.33 5.73 1.22 51.44 5.76 1.23 52.58 5.79 1.24 53.72 5.82 1.25 54.89 5.85 1.26 56.06 5.89 1.27 57.26 5.92 1.28 58.47 5.95 1.29 59.70 5.98 1.30 60.94 6.01 1.31 62.20 6.04 1.32 63.47 6.07 1.33 64.76 6.10 1.34 66.07 6.13 1.35 67.39 6.16 1.36 68.73 6.19 1.37 70.08 6.22 1.38 71.46 6.25 1.39 72.85 6.28 1.40 74.25 6.31 1.41 75.68 6.34 1.42 77.11 6.37 1.43 78.57 6.40 1.44 80.05 6.43 1.45 81.54 6.46 1.46 83.04 6.49 1.47 84.57 6.52 1.48 86.11 6.55 1.49 87.67 6.58 1.50 89.25 6.61 Academic Edition Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster vs. 17 Page4 of 4
90 .0
80 .0
70 .0
60.0
-II) .....
~50 .0
Q)
E>
(ll
-fi 40 .0
II)
0
30 .0
20.0
10.0
0 .0
0 .0
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Constant Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Input Data
Minimum
Depth 0 .00
FLOW CAPACITY OF 'V'-CHANNEL
Plotted Curves for Triangular Channel
c :\haestad\academic\fmw\regency _.fm2
FUL FLOW CAPACITY OF 'V''-CHANNEL
Triangular Channel
Manning's Formula
Discharge
0.013
0.005000 ft/ft
6 .000000 H : V
6.000000 H : V
Maximum
1.50
i.....----
Increment
0.01 ft
Discharge vs Depth
/ v
/
/
[7
I/
----~
0 .2 0.4 0 .6 0 .8
Depth (ft)
Academic Edition
1.0 1 .2
I
12/14100
10:16:57 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
I v
J
1 .4 1.6
FlowMaster v5 .17
Page 1 of 1
.,
l.
'.
\
. ;
,. ~ ..
,,
.~ ( ..
~-·
t • I· • !
. l
' ·'
Project Description
Project Fife
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
DESIGN DEPTH OF FLOW IN "V'-CHANNEL
Worksheet for Triangular Channel
c :\haestad\academic\fmw\regency _. fm2
FULL FLOW CAPACITY OF 'V'-CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
0. 005000 ft/ft
6.000000 H : V
6.000000 H : V
20 .00 cfs
0.86 ft
4.40 ft2
10.41 ft
10.27 ft
0.93 ft
0.003239 fVft
4 .~5 fVs
\
0.32 ft
1.18 ft
1.23
Academic Edition 12114/00
10 :10:27 AM H aestad Methods . Inc. 37 Brooks ide Road Waterbury, CT 06708 (203} 755-1666
F lowMaster v5 .17
Page 1 of 1
~-DO
3 °3~
DRAINAGE COMPUTATIONS
For
A Replat Of A 1.51 Acre Reserve Tract
Block 1, Regency South
Colleg e Station , Brazos County, Texas
Prepare d for
Mr. Glenn Thomas
111 O 12th Man Circle
College Stat ion, Texas 77845
Prepa red bv:
Garrett Engineering
4444 Carter Creek Parkway -Suite 108
Bryan , Texas 77802
Telephone : (409) 846 -2688
*November, 2000 *
REV\EWEO FOR
CO"~PL\ANCE
J~N 0 3 Z001
COLLEGE STAT\ONJ
E.NGINEERIN1v
Fl LE
Gorell Eng ineering -4444 Corter Creek Parkway Suit e 108-Bryon . T exos 77 ~2 -Telephone: (409) 846-2688 -Fox: (409) 846-3094
-
Drainage Computations
For
A Replat Of A 1.51 Acre Tract
Block 1, Regency South
College Station, Brazos County, Texas
Computations contained herewith are provided to first determine the existing peak storm
water discharge rates from the subject tract and second determine the impact on th e
discharge as a function of developing the subject property based on the requested zoning
and the associated changes in run-off coefficients.
Jeff Tondre indicated in July, 1998 (when the subject project was initiated) that if the
impact area was less than one (1) acre, he would not be expecting to see storm wate r
detention incorporated with this project. The total project area is 1.51 acres, howeve r
approximately 0.75 acres will remain undeveloped grass areas which yields an impacted
area of approximately 0.76 acres. Based on this realization Steve Beachy with the Parks
Department was contacted to determine if anticipated storm water discharge would be
allowed to sheet drain across the City Park lying immediately downstream from th e
subject tract. Mr. Beachy indicated that he did not have a problem with said scenario and
thus the assumption to allow storm water discharge to exit the subject site unmetered from
was arrived at.
A rectangular flume with a four foot -four inch (4'-4") wide bottom is proposed to direct
the anticipated storm water discharge from the existing cul-de-sac area to the east
boundary line of the subject tract where same flume will terminate with a twenty-four
(24") inch toewall. Limestone rock rubble rip-rap will be placed a same termination point
to dissipate the discharge energy and armor the existing natural ground to minimize
erosion in the vicinity of said end of flume. The flume depth was set at nine inches (0.75')
and the longitudinal gradient was set at 0.50%. The geometry provided will allow for
satisfactory conveyance of th e storm water discharge as generated by the 2, 5, 10, 25, 50
and 100-year stonn events.
The flume was designed based on the total area tributary to the proposed flume and sam e
area was derived from City of College Station topographic maps and actual on-the-ground
observations. Said tributary area was determined to be approximately 2.09 acres.
Comparisons of pre and post development conditions peak storm water discharge rates as
well as hydographs (tabular and graphical) are included for City Staff review and
consideration .
Vicinity Map n.t.s.
-
-
Determine Total Current Condition
Peak Storm Water Discharge Rates
Trib utary Area ("A"): 1.S1 Acres
Perv ious Area : 1.3S Acres
Impervious Area : 0.16 Acres
Run-Off Coefficient ("Cwt"): 0.36
Time Of Concentration ("T/c "):
Woodlands: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vw "):
Time :
Pastures: Low Elevation :
High Elevation:
Distance (Feet):
Slope (%Grade):
Velocity ("Vp "):
Time :
Pavements: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vpave"):
Time :
Total Travel Time :
Hourly Intensity Rates ("I"): 2-Year : 6.33
S-Year : 7.69
10-Year: 8.63
2S -Year: 9.86
SO -Year : 11.1 S
100-Year: 12 .63
Peak Discharge Rate ("Q"): 2-Year : 3.47
S-Year : 4 .22
10-Year : 4.74
2S-Year : S.41
SO-Year : 6.12
100-Year: 6.93
C= 0.30
C= 0.90
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
10 .00 Minutes
Inches I Hour
Inches I Hour
Inc.hes I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Garrett Engineering . 4444 Carter C reek Par kway Suite 108 ·Brya n . Texas 7711J2 ·Telephone: (409) 846-2688 ·Fax:(@) 846-3094
-
Determine Post-develogment Peak
Storm Water Disctiarge (No Detention f "
Tributary Area ("A "): 1.51 Acres
Pervious Area: 0.75 Acres
Impervious Area: 0.76 Acres
Run -Off Coefficient ("Cwt"): 0 .60
Time Of Concentration ("Tic"): 10 Mi nutes
Hourly Intensity Rates ("I"): 2-Year : 6.33 ..
5-Year: 7 .69
10-Year : 8.63
25-Year: 9 .86
50-Year: 11.15
100-Year: 12 .63
C = 0.30
C = 0.90
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Peak Discharge Rate ("Q "): 2-Year: 5.75 Cubic Feet I Second
5-Year: 6.99 Cubic Feet I Second
10-Year: 7.85 Cubic Feet I Second
25 -Year : 8.96 Cubic Feet I Second
50-Year: 10.13 Cubic Feet I Second
100-Year: 11.48 Cubic Feet I Second
Comparison Of Predevelopment And
Post-development Peak Discharge Rates
Predevelopment Post-Development Increase
2-Year: 3.47 Ft3/sec 5. 75 Ft3/sec 2.28 Ft3/sec
5-Year: 4 .22 Ft3/sec 6.99 Ft3/sec 2. 77 Ft3/sec
10-Year: 4.74 Ft3/sec 7.85 Ft3/sec 3 .11 Ft3/sec
25 -Year: 5.41 Ft3/sec 8.96 Ft3/sec 3.55 Ft3/sec
50-Year: 6.12 Ft3/sec 10.13 Ft3/sec 4 .01 Ft3/sec
100-Year: 6.93 Ft3/sec 11.48 Ft3/sec 4 .55 Ft3/sec
Garett Englnee<ing. 4444 Corter Creek Pcw kw oy Slite 108 ·Bryon . Texas 771YJ2 ·Telephone: (409) 846-2688 ·Fox: (409) 846-3094
Current Condition (Predevelopinent) Inflow Hydrograph Ordinates (Cubic Feet per Second) Time 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year (Minutes) Storm Storm Storm Storm Storm Storm 0 0.00 0.00 0.00 0.00 ·o.oo 0.00 0.35 0.42 0.47 0.54 0.61 0.69 2 0.69 0.84 0.95 1.08 1.22 1.39 3 1.04 1.27 1.42 1.62 1.84 2.08 4 1.39 1.69 1.90 2.17 2.45 2.77 5 1.74 2.11 2.37 2.71 3.06 3.47 6 2.08 2.53 2.84 3.25 3.67 4.16 7 2.43 2.96 3.32 3.79 4.28 4.85 8 2.78 3.38 3.79 4.33 4.90 5.55 9 3.13 3.80 4.27 4.87 5.51 6.24 10 3.47 4.22 4.74 5.41 6.12 6.93 11 3.30 4.01 4.50 5.14 5.81 6.59 12 3.13 3.80 4.27 '4.87 5.51 6.24 13 2.95 3.59 4.03 4.60 5.20 5.89 14 2.78 3.38 3.79 4.33 4.90 5.55 15 2.60 3.17 3.56 4.06 4.59 5.20 16 2.43 2.96 3.32 3.79 4.28 4.85 17 2.26 2.75 3.08 3.52 3.98 4.51 18 2.08 2.53 2.84 3.25 3.67 4.16 19 1.91 2.32 2.61 2.98 3.37 3.81 20 1.74 2.11 2.37 2.71 3.06 3.47 21 1.56 1.90 2.13 2.44 2.75 3.12 22 1.39 1.69 1.90 2.17 2.45 2.77 23 1.22 1.48 1.66 1.89 2.14 2.43 24 1.04 1.27 1.42 1.62 1.84 2.08 25 0.87 1.06 1.19 1.35 1.53 1.73 26 0.69 0.84 0.95 1.08 1.22 1.39 27 0.52 0.63 0.71 0.81 0.92 1.04 28 0.35 0.42 0.47 0.54 0.61 0.69 29 0.17 0.21 0.24 0.27 0.31 0.35 30 0.00 0.00 0.00 0.00 0.00 0.00 31 0.00 0.00 0.00 0.00 0.00 0.00 32 0.00 0.00 0.00 0.00 0.00 0.00 33 0.00 0.00 0.00 0.00 0.00 0.00 34 0.00 0.00 0.00 0.00 0.00 0.00 35 0.00 0.00 0.00 0.00 0.00 0.00 36 0.00 0.00 0.00 0.00 0.00 0.00 37 0.00 0.00 0.00 0.00 0.00 0.00 38 0.00 0.00 0.00 0.00 0.00 0.00 39 0.00 0.00 0.00 0.00 0.00 0.00 40 0.00 0.00 0.00 0.00 0.00 0.00 41 0.00 0.00 0.00 0.00 0.00 0.00 42 0.00 0.00 0.00 0.00 0.00 0.00 43 0.00 0.00 0.00 0.00 0.00 0.00 44 0.00 0.00 0.00 0.00 0.00 0.00 45 0.00 0.00 0.00 0.00 0.00 0.00 Gooett Englnee<lng. 4444 Corter Creek PCKl<woy Suite 108-Bryon. Texas 77002 -Telephone: (409) 841>-2688 ·Fox: (409) 841>-3094 • -
46 0.00 0.00 0.00 0.00 0.00 0.00 47 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 49 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 51 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 54 0.00 0.00 0.00 0.00 0.00 0.00 55 0.00 0.00 0.00 0.00 0.00 0.00 56 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 Gon< Englne&<ng -4444 Cort&< Creek Porkwoy SUit& 108 -Btyon. T exos 77Sl2 -Telephone: (409) 84b-2688 -Fox: (<01) 84b-3094 -
46 0.00 0.00 0.00 0.00 0.00 0.00 47 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 49 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 51 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 54 0.00 0.00 0.00 0.00 0.00 0.00 55 0.00 0.00 0.00 0.00 0.00 0.00 56 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 Garett Englne9!1ng-4444 Corter Creek Porkwoy SUie 108-Bryon. T exos 77Sl2 -Telephone: (409) 840-2688 -Fox: (409) 840-3094 -
-
......
"C c
0
0
Q)
Cl) ...
Q)
Q... -Q)
Q)
u...
'O :.a
~ u .......
Q)
O> ...
0 .c
0 11'1
i5
6.00
5.00
4.00
3.00
2.00
1.00
0.00
("\
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 2-Year Storm Even t
...,---C urr ent Development Hydrograph ---Total Post-Development Hydrograph
Total Current Development Vs. Total Post -Development
(No Detention) Peak Discharge Rates 5-Year Storm Event
Q;
Q... 6 .00 -----#--+--',.__---+--------+-----+-----1-------i
-;
~ 5 .00 -----l--t---~--+--------+-----+-----1-------i
0 ......
·-"C 4 00 -----..-------+--------+-----+-----1-------i ..0 c . ~ 0 u 0
....... Q) 3 .00---1-_,_-t------~-------+-----+-----r--------i
Q) Cl)
O> 0 2 .00----+----t----------~---+-----+------r-------j
.c
0 i5 1.00
0 .00 .J.----....+-----+-----.:111-----+-----t-----1
0 10 20
---Current Development Hydrograph
30 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
Wit hout Detention
Gorrell Engh<t8fi"19 • 4444 Corter C reel< P0tkway Suit e 10a -Bryon. T exos 7711J2 -Telephone: (409) 846-2688 -Fax: (409) 846-3094
...
Q)
0.. -Q)
Q)
LL.
0 ......
·-'O .0 c:
j 0 u 0
...... Q)
Q) V)
.l]) ...
0
.s:::.
0 "' i5
8.00
7.00
6.00
5.00
4.00
3.00
2.00
l.00
0.00
0
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 10-Year Storm Event
lO 20 30 40 50
Time (Minut es)
60
Current Development Hydrograph ---Post-Development Outflow Hydrograph
Wit hout Detention
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 25-Year Storm Event
9 .00 ------------r-------.----...---------.------,
l.00 ....,.,f------+------+----........-i-----___,i-------+-------<
0 .00 ..,_ ___ ....,. ____ ....., ___ .....,.t-----t------+------t
0 10 20 30 40 50 60
Time (Minutes)
---Current Development Hydrograph ---Post-Development Outflow Hydr o graph
Without Det ention
Gen en Engnee<ing -4444 Corte r C reek Pnrkway Suit e 108 -Bryo n . T exo s 7711J2 -Telephone: (409) 846-2688 -Fox: (409) 846-3094
.....
"O c:
0
0
Q)
V) ....
Q)
Q. -Q)
Q)
LI..
~
0
:0
:J
() ......
Q)
0) ....
0 .c
0 "' 0
-Q)
Q)
LI..
12 .00
10 .00
8.00
6.00
4 .00
2.00
0.00
12 .00
10.00
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 50-Year Storm Event
Current Development Hydrograph ---Post -Development Outflow Hydrograph
Wit h out Detention
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 100-Year Storm
Event
0 .....
·-"O 8 .00 ..0 c:
:J 0
() 0 6 .00 ...... Q)
G> V)
0) .... .... Q) 4.00 0 Q. .c
0
"' 2.00 0
0 .00
0 10 20
---Curre nt Developm ent Hyd rograph
30 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
With o ut Detention
Garrett En<;jlne8!1n\J • 4444 Corter Creek Parkway Suite 108 -Bryon . Texas 77802 ·Telephone: (409) 846-2688 ·Fox: (409) 846-3094
Determine Total Peak Flow To
Proposed Flume
Tributary Area ("A"): 2 .09 Acres
Pervious Area : 1.04 Acres
Impervious Area: 1.05 Acres
Run-Off Coefficient ("Cwt"): 0.60
Time Of Concentration ("T/c "):
Woodlands: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vw"):
Time :
Pastures: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vp"):
Time :
Pavements: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vpave "):
Time :
Total Travel Time :
Hourly Intensity Rates ("I"): 2-Year: 6.33
5-Year: 7.69
10-Year: 8.63
25-Year: 9.86
50-Year : 11 .15
100-Year: 12.63
Peak Discharge Rate ("O"): 2-Year: 7.95
5-Year : 9.67
10-Year: 10.85
25-Year: 12.40
50-Year: 14.01
100-Year: 15 .88
C= 0.30
C= 0.90
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
10 .00 Minutes
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Garrett Englnee<lng • 4444 Corter C reek PO!kway Suite 108 ·Bryon. Texas 77WJ2 ·Telephone: (409) 846-2688 ·Fox: (409) 846-3094
Project Description
Project Fi le
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Bottom Width
Results
Discharge
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritica l.
Full Flow Capacity Of Proposed Flume
Worksheet for Rectangular Channel
c :\haestad\academic\fmw\gthomas.fm2
Full Flow Capac i ty Of Proposed Flume
Rectangular Ch annel
Manning's Formula
Discharge
0.013
0.005000 ft/ft
0.75 ft
4.33 ft
17 .77 els
3.25 112
5.83 ft
4.33 ft
0.81 ft
0.004035 ft /ft
5.47 ft /s
0.47 ft
1.22 ft
1 .11
A cademic Editi o n 1 1/01/00
11:48 :41 AM Haestad Methods, Inc . 37 Brookside Road Waterbury, CT 0 67 08 (203) 75 5-1666
FlowMaster v5.17
Page 1 of 1
-
1 8 .0
1 6 .0
14.0
12 . 0
(/) -
Project Description
Project File
Workshee t
Flow Elem ent
Method
Solve For
Constant Data
Manning s Coefficient
Channel Slope
Bottom Wi dth
Input Data
Minimum
Depth 0.00
Full Flow Capacity Of Proposed Flume
Plotted Curves for Rectangular Channel
c :\hae s tad\acade m ic\f m w\gthom as . fm2
Full Flow Cap acity Of Proposed Flume
Rect angul a r Ch ann el
Mann i ng's Formu la
Discharge
0.013
0 .005000 ft/ft
4.33 ft
Maximum
0.75
Increm e nt
0.01 ft
Di sc ha rg e vs Depth
........ --.... ·-................ · ............... · ................ · ............... · .................. • ............. . . . . . .
............... , ...... -....... , ................ , .............. , ...... -................................. ..
.............. · ................. • .............. • .. -.......... -·---........... • .................. · ................ · -....... .
~ 10 .0 ..... --...................... -.............. ·.· .............. ·.· .............. ·,· ................ , ............... · ........... . ·.
QJ
Ol
~
C1l
.c
()
(/)
0
8 .0 ................ \. ................................................................................ • .. -.......... ·' ......... .
....................................................... . . . ' . .. ·,· .............. ·.· .............. ·,· .............. · ............ . 6 .0
4 .0 ........ ' ........ '• . . . . . . . '· ........ '· ................. ·' ........ •' ...... .
2 .0 . . . . ............................................. -.................................................... . . . . . . .
O .Oi--==~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
0 .0
11/01/00
11:53:01 AM
0 . 1 0 .2 0 .3 0.4
Depth (ft)
Academic Editi o n
0.5 0 .6
Haestad Me t hods, Inc . 37 Bro o kside Road Wa te rbury , CT 06 7 08 (203) 7 55·1666
0 .7 0 .8
Fl owMaste r v5 .17
Pag e 1 o f 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom W i dth
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Wid th
Critical Depth
Critical Slope
Veloc ity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Of Flow 2-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c :\hae stad\academ ic\f m w\gthom as . fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0.013
0.005000 ft/ft
4.33 ft
7.95 els
0.44 ft
1.92 112
5.22 ft
4.33 ft
0.47 ft
0 .004115 ft/ft
4.15 ft/s
0.27 ft
0 .71 ft
1 .10
A cademic Edition 11/01/00
01:26 :16 PM Haestad Me th ods, In c. 37 Brooks ide Road Waterbury, CT 06706 (20 3) 755-1 666
Fl o wM as t e r v5.1 7
Page 1 o f 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical .
Depth Of Flow 5-Year Storm Event (Flume)
Worksheet for Rectangular Cha nn el
c :\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0 .013
0 .005000 fl/ft
4 .33 ft
9 .67 els
0 .50 ft
2.18 ft 2
5.33 ft
4 .33 ft
0.54 ft
0 .004071 fUft
4.44 fl/s
0.31 ft
0 .81 ft
1 .11
A cade mic Edition 11 /0 1/00
0 1:28 :5 4 PM Haestad Me t hods, Inc . 37 B rooks i de Road W ate r bu ry, CT 06 7 08 (203) 7 55 -1 666
Fl o w Master v 5.17
Page 1 of 1
11/01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Ma nnings Coefficient
Channel Slope
Bottom Width
Discharge
Resu lts
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Crit ical Slope
Velocity
Velocity Head
Spec ific Energy
Froude Number
Flow is supercr itical.
Depth Flow 10-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c :\haestad\acade m ic\f m w\gthomas . Im 2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning 's Formula
Channel Depth
0 .013
0.005000 tuft
4 .33 ft
10 .85 els
0.54 ft
2.34 ft 2
5.41 ft
4.33 ft
0 .58 ft
0 .004052 ft/ft
4.63 !Us
0 .33 ft
0 .87 ft
1 .11
A cademic Edition
01 :29:32 PM Haestad Methods, Inc. 37 Brookside Road Wat erbury, CT 06708 (203) 755-1666
Fl owMaster v5.17
Page 1 of 1
-
1 1/0 1/00
Project Description
Project File
Worksheet
F low Element
Method
So lve For
Input Data
Mann i ngs Coefficient
Channel Slope
Bottom Wi dth
Discharg e
Results
Depth
Flow Are a
Wetted Perimeter
Top W i d t h
Critical Depth
Critical Slope
V elocity
Veloc i ty Head
Specific Energ y
Froude Number
Flow is supercritic al.
Depth Flow 25-Year St o rm Event (Flume)
Worksheet f o r Rectangular Channel
c :\hae stad\acade m ic\f mw\gthom as. fm2
Dept h Flow 2-Year Storm Event
Rectangular Ch annel
Manning 's Formula
Chan ne l Depth
0.013
0 .005000 fl/fl
4 .33 fl
12.40 els
0.59 ft
2 .56 ft 2
5 .51 ft
4.33 ft
0 .63 ft
0.004037 fl/ft
4.85 fl/s
0.36 ft
0 .96 ft
1 .11
Acade mic Editi o n
0 1 :30:00 PM Haes tad Methods, Inc . 3 7 Brookside Road W ate r bury , CT 06706 (203) 755 -1666
Fl o wM aster v5.17
Pag e 1 of 1
11/01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc it y
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Flow 50-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gthomas .fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning 's Formula
Channel Depth
0.013
0 .005000 tuft
4.33 ft
14 .01 els
0 .64 ft
2 .77 112
5.61 ft
4 .33 ft
0 .69 ft
0 .004030 ft/ft
5 .05 ft/s
0.40 ft
1 .04 ft
1 .11
Ac ade mi c Edition
01 :30:20 PM Haestad Me th ods, Inc . 37 Brookside Road Wa terbury, CT 06708 (203) 755·1 666
Fl o wMaster v 5 .17
Pag e 1 of 1
1 1/01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mann i ngs Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Veloc it y
Veloc i ty Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Flow 100-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning 's Formula
Channel Depth
0.013
0.005000 fl/ft
4.33 ft
15.88 els
0.70 ft
3 .01 ft 2
5 .72 ft
4 .33 ft
0 .75 ft
0 .004030 ft/ft
5 .27 !Us
0.43 ft
1.13 ft
1.11
Aca d emic Edition
01 :30 :42 PM Haestad Methods, In c. 37 B rook side Roa d Wa te rbury, CT 06 7 08 (203) 755 -16 6 6
Fl owMast e r v5.17
Page 1 of 1
DRAINAGE COMPUTATIONS
For
A Replat Of A 1.51 Acre Reserve Tract
Block 1, Regency South
College Station, Brazos County, Texas .
Prepared for
Mr. Glenn Thomas
1110 12th Man Circle
College Station, Texas 77845
Prepare d bv:
Garrett Engineering
4444 Carter Creek Parkway -Suite 108
Bryan, Texas 77802
Telephone: (409) 846-2688
*November, 2000 *
Garett Eng hee<ing-4444 Corter Creek Prnkwoy Suite 108-Bryan. Texas 771ll2 -Telephone: (409) 84b-2688 -Fox: (409) 84b-3094
Drainage Computations
For
A Replat Of A 1.51 Acre Tract
Block 1, Regency South
College Station, Brazos County, Texas
Computations contained herewith are provided to first determine the existing peak storm
water discharge rates from the subject tract and second determine the impact on the
discharge as a function of developing the subject property based on the requested zoning
and the associated changes in run-off coefficients.
Jeff Tondre indicated in July, 1998 (when the subject project was initiated) that if the
impact area was less than one (1) acre, he would not be expecting to see storm water
detention incorporated with this project. The total project area is 1.51 acres, however
approximately 0.75 acres will remain undeveloped grass areas which yields an impacted
area of approximately 0.76 acres. Based on this realization Steve Beachy with the Parks
Department was contacted to determine if anticipated storm water discharge would be
allowed to sheet drain across the City Park lying immediately downstream from th e
subject tract. Mr. Beachy indicated that he did not have a problem with said scenario and
thus the assumption to allow storm water discharge to exit the subject site unmetered from
was arrived at.
A rectangular flume with a four foot -four inch (4'-4") wide bottom is proposed to direct
the anticipated storm water discharge from the existing cul-de-sac area to the east
boundary line of the subject tract where same flume will terminate with a twenty-four
(24") inch toewall. Limestone rock rubble rip-rap will be placed a same termination point
to dissipate the discharge energy and armor the existing natural ground to minimiz e
erosion in the vicinity of said end of flume. The flume depth was set at nine inches (0. 7 5 ')
and the longitudinal gradient was set at 0.50%. The geometry provided will allow for
satisfactory conveyance of the storm water discharge as generated by the 2, 5, 10, 25, 50
and 100-year stmm events.
The flume was designed based on the total area tributary to the proposed flume and same
area was derived from City of College Station topographic maps and actual on-the-ground
observations. Said tributary area was dete1mined to be approximately 2.09 acres.
Comparisons of pre and post development conditions peak storm water discharge rates as
well as hyd ographs (tabular and graphical) are included for City Staff review and
consideration.
Vicinity Map n.t.s.
Determine Total Current Condition
Peak Storm Water Discharge Rates
Tributary Area ("A"): 1.51 Acres
Pervious Area : 1.35 Acres
Impervious Area: 0.16 Acres
Run-Off Coefficient ("Cwt"): 0.36
Time Of Concentration ("T/c "):
Woodlands: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vw"):
Time :
Pastures: Low Elevation :
High Elevation :
Distance (Feet):
Slope(% Grade):
Velocity ("Vp"):
Time:
Pavements: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vpave"):
Time :
Total Travel T ime:
Hourly Intensity Rates ("I"): 2-Year: 6.33
5-Year: 7.69
10-Year: 8.63
25-Year: 9 .86
50-Year: 11.15
100-Year: 12 .63
Peak Discharge Rate ("Q "): 2-Year: 3.47
5-Year: 4 .22
10-Year: 4.74
25-Year: 5.41
50-Year: 6.12
100-Year: 6.93
C= 0 .30
C= 0 .90
0.00
0.00
0.00
0.00
0.00 Feet I Second
0 .00 Minutes
0.00
0.00
0 .00
0.00
0 .00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0 .00 Minutes
10.00 Minutes
Inches I Hour
Inches I Hour
Inc.hes I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Gorrell Engnee<ing • 4444 Carte1 C 1eek POfkwoy Suite 108 ·Brya n . Texas 7711J2 ·Telephone: (409) 846-268a ·Fax: (409) 846-3094
-
Determin~ Post-development Peak
Storm wa·ter Discharge (No Detention)
Tributary Area ("A"): 1.51 Acres
Pervious Area : 0.75 Acres C= 0.30
C= 0.90 Impervious Area: 0.76 Acres
Run-Off Coefficient ("Cwt"): 0.60
Time Of Concentration ("Tic"): 1 O Minutes
Hourly Intensity Rates ("I "): 2-Year: 6.33 Inches I Hour ..
5-Year: 7.69 Inches I Hour
10-Year: 8.63 Inches I Hour
25-Year: 9.86 Inches I Hour
SO-Year : 11 .15 Inches I Hour
100-Year: 12 .63 Inches I Hour
Peak Discharge Rate ("Q "): 2-Year: 5.75 Cubic Feet I Second
5-Year: 6.99 Cubic Feet I Second
10-Year: 7.85 Cubic Feet I Second
25-Year: 8.96 Cubic Feet I Second
50-Year: 10.13 Cubic Feet I Second
100-Year: 11.48 Cubic Feet I Second
Comparison Of Predevelopment And
Post-development Peak Discharge Rates
Predevelopment Post-Development Increase
2-Year: 3 .47 Ft3/sec 5. 75 Ft3/sec 2.28 Ft3/sec
5-Year: 4 .22 Ft3/sec 6.99 Ft3/sec 2.77 Ft3/sec
10-Year: 4 . 7 4 Ft3 /sec 7.85 Ft3/sec 3.11 Ft3/sec
25-Year: 5.41 Ft3/sec 8.96 Ft3/sec 3.55 Ft3/sec
50-Year: 6.12 Ft3/sec 10 .13 Ft3/sec 4.01 Ft3/sec
100-Year : 6.93 Ft3/sec 11 .48 Ft3/sec 4 .55 Ft3/sec
Gooetl Englnee<lng • 4444 Carter Creek Prnkwcry Suite 10 8-B<yan . Texas 771'J2 ·Telephone: (409) 846-2688 ·Fox: (409) 841>-3094
Current Condition (Predevelopinent) Inflow Hydrograph Ordinates (Cubic Feet per Second) Time 2-Year 5-Year 10-Year 25-Year SO-Year 100-Year (Minutes) Storm Storm Storm Storm Storm Storm 0 0.00 0.00 0.00 0.00 ·o.oo 0.00 1 0.35 0.42 0.47 0.54 0.61 0.69 2 0.69 0.84 0.95 1.08 1.22 1.39 3 1.04 1.27 1.42 1.62 1.84 2.08 4 1.39 1.69 1.90 2.17 2.45 2.77 5 1.74 2.11 2.37 2.71 3.06 3.47 6 2.08 2.53 2.84 3.25 3.67 4.16 7 2.43 2.96 3.32 3.79 4.28 4.85 8 .2.78 3.38 3.79 4.33 4.90 5.55 9 3.13 3.80 4.27 4.87 5.51 6.24 10 3.47 4.22 4.74 5.41 6.12 6.93 11 3.30 4.01 4.50 5.14 5.81 6.59 12 3.13 3.80 4.27 '4.87 5.51 6.24 13 2.95 3.59 4.03 4.60 5.20 5.89 14 2.78 3.38 3.79 4.33 4.90 5.55 15 2.60 3.17 3.56 4.06 4.59 5.20 16 2.43 2.96 3.32 3.79 4.28 4.85 17 2.26 2.75 3.08 3.52 3.98 4.51 18 2.08 2.53 2.84 3.25 3.67 4.16 19 1.91 2.32 2.61 2.98 3.37 3.81 20 1.74 2.11 2.37 2.71 3.06 3.47 21 1.56 1.90 2.13 2.44 2.75 3.12 22 1.39 1.69 1.90 2.17 2.45 2.77 23 1.22 1.48 1.66 1.89 2.14 2.43 24 1.04 1.27 1.42 1.62 1.84 2.08 25 0.87 1.06 1.19 1.35 1.53 1.73 26 0.69 0.84 0.95 1.08 1.22 1.39 27 0.52 0.63 0.71 0.81 0.92 1.04 28 0.35 0.42 0.47 0.54 0.61 0.69 29 0.17 0.21 0.24 0.27 0.31 0.35 30 0.00 0.00 0.00 0.00 0.00 0.00 31 0.00 0.00 0.00 0.00 0.00 0.00 32 0.00 0.00 0.00 0.00 0.00 0.00 33 0.00 0.00 0.00 0.00 0.00 0.00 34 0.00 0.00 0.00 0.00 0.00 0.00 35 0.00 0.00 0.00 0.00 0.00 0.00 36 0.00 0.00 0.00 0.00 0.00 0.00 37 0.00 0.00 0.00 0.00 0.00 0.00 38 0.00 0.00 0.00 0.00 0.00 0.00 39 0.00 0.00 0.00 0.00 0.00 0.00 40 0.00 0.00 0.00 0.00 0.00 0.00 41 0.00 0.00 0.00 0.00 0.00 0.00 42 0.00 0.00 0.00 0.00 0.00 0.00 43 0.00 0.00 0.00 0.00 0.00 0.00 44 0.00 0.00 0.00 0.00 0.00 0.00 45 0.00 0.00 0.00 0.00 0.00 0.00 Garrett Engineering-4444 Corter Creek Parkway Suite 108-Bryon. Texas 77~2-Telephone: (409) 846-2688 -Fox: (409) 846-3094 • •
46 0.00 0.00 0.00 0.00 0.00 0.00 47 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 49 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 51 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 54 0.00 0.00 0.00 0.00 0.00 0.00 55 0.00 0.00 0.00 0.00 0.00 0.00 56 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 Gmen Engineering -4444 Corter Creek Parkway Suite 108 -Bryon, Texas 771!1J2 -Telephone: (409) 846-2688 ·Fox: (409) ~3094 -
-Time (Minutes) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 2-Year Storm 0.00 0.58 1.15 1.73 2.30 2.88 3.45 4.03 4.60 5.18 5.75 5.46 5.18 4.89 4.60 4.31 4.03 3.74 3.45 3.16 2.88 2.59 2.30 2.01 1.73 1.44 1.15 0.86 0.58 0.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Post-Development Inflow Hydrograph Ordinates (Cubic Feet per Second) 5-Year Storm 0.00 0.70 1.40 2.10 2.80 3.50 4.20 4.89 5.59 6.29 6.99 6.64 6.29 5.94 5.59 5.24 4.89 4.55 4.20 3.85 3.50 3.15 2.80 2.45 2.10 1.75 1.40 1.05 0.70 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10-Year 25-Year Storm Storm 0.00 0.00 0.78 0.90 1.57 1.79 2.35 2.69 3.14 3.59 3.92 4.48 4.71 5.38 5.49 6.27 6.28 7.17 7.06 8.07 7.85 8.96 7.46 . 8.52 7.06 8.07 6.67 7.62 6.28 7.17 5.89 6.72 5.49 6.27 5.10 5.83 4.71 5.38 4.32 4.93 3.92 4.48 3.53 4.03 3.14 3.59 2.75 3.14 2.35 2.69 1.96 2.24 1.57 1.79 1.18 1.34 0.78 0.90 0.39 0.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50-Year 1 00-Year Storm Storm 0.00 0.00 1.01 1.15 2.03 2.30 3.04 3.44 4.05 4.59 5.07 5.74 6.08 6.89 7.09 8.04 8.11 9.18 9.12 10.33 10.13 11.48 9.63 10.91 9.12 10.33 8.61 9.76 8.11 9.18 7.60 8.61 7.09 8.04 6.59 7.46 6.08 6.89 5.57 6.31 5.07 5.74 4.56 5.17 4.05 4.59 3.55 4.02 3.04 3.44 2.53 2.87 2.03 2.30 1.52 1.72 1.01 1.15 0.51 0.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 oi5.tt Engnee<ng(1..QQ;orter Creel< Q.~ Suite 108. D,,.OQ.xos 77!02 -0.i®ne: (409) s.JloOO Fax: (409) ~~
46 0.00 0.00 0.00 0.00 0.00 0.00 47 0.00 0.00 0.00 0.00 0.00 0.00 48 0.00 0.00 0.00 0.00 0.00 0.00 49 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 51 0.00 0.00 0.00 0.00 0.00 0.00 52 0.00 0.00 0.00 0.00 0.00 0.00 53 0.00 0.00 0.00 0.00 0.00 0.00 54 0.00 0.00 0.00 0.00 0.00 0.00 55 0.00 0.00 0.00 0.00 0.00 0.00 56 0.00 0.00 0.00 0.00 0.00 0.00 57 0.00 0.00 0.00 0.00 0.00 0.00 58 0.00 0.00 0.00 0.00 0.00 0.00 59 0.00 0.00 0.00 0.00 0.00 0.00 60 0.00 0.00 0.00 0.00 0.00 0.00 Garrett Engineering. 4444 Corter Creek Porkwcry Suite 106-Bryon. Texas 77f!!J2 ·Telephone: (409) 646-2666 -Fox: (409) 646-3094 -
•
......
"O c
0
0
CJ)
Cl) -CJ)
Q. -CJ)
CJ)
LL.
'O
:.0
::J u ........
CJ)
O> -0 ..c:.
0
fl) a
-CJ)
6.00
5.00
4 .00
3.00
2.00
1.00
0.00
("\
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 2-Year Storm Event
....,......--Cur rent Development Hydrograph ---Total Post-Development Hydrograph
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 5-Year Storm Event
.2 5 .oo -----#--+------+-----+-----;--------i----~
0 ......
·-"O 4 00 +----1---1+'...,_--~+-----+-----+------l-----1 .0 c .
::J 0 u 0
........ CJ) 3.00 --"f---r--+-------t-"r----1"-----r-----1--------1
CJ) Cl)
O> 5 2 .00 +--#--+---+--------------+-----+----~1-----~
..c:.
0 i5 1.00
0.00 +-----+----....... ---~-----+----.......t~----.l
0 10 20
---Current Development Hydrograph
30 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
Without Detention
Garr en Engineering· 4444 C o rt Of C reek Parkw ay Slit& 108 • Btyon . T exos 77m -Telephone: (409) 846-2688 ·Fax: (409 ) 846-3094
-
8 .00
... 7.00 GI
0... -6.00 GI
GI u..
0,,...., 5 .00
·-"O ..0 c:
:::J 0 4 .00 u 0 ......, GI
GI en 3 .00 DI ...
0 2 .00 .s::.
0 .,,
a l.00
0 .00
0
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 10-Year Storm Event
10 20 30 40 50
Time (Minutes)
60
---Current Development Hydrograph ---Post-Development Outflow Hydrograph
Without Detention
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 25-Year Storm Event
9 .00 -----...----~---~-----...-----~---~
Qi 8 .00
0...
Qi 7.00
GI
u.. 6 .00 ------+----"ar---+----~-----+-----+-----~
.2 :a .g c: 5.00 +---#---++~--~.-+-------+-----t-----+--------i
u 0
; ~ 4 .00
~ 3.00 .-_,.-r--;----__...,M----"ar-----t------+-----t-----~
.s::.
0 .,, a l.00 ..,.,r----t------+--......... ~1-----+------+-------1
0 .00 +----+----+------..----+-----+------I
0 10 20
Current Development Hydrograph
30 40 50 60
Time (Minutes)
---Post-Development Outflow Hydrograph
Without Detention
Go rell Engineerng -4444 Carter C reek Parkway Suite 108 -B<yo n . Texas 77P!ol2 ·Telephone: (409) 846-2688 -Fox : (409 ) 846-3094
~
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 50-Year Storm Event
c
0 10 .00 +------111,----+------t-----+------+-------;
0
Cl>
(/)
£. 8 .00 ----~~-~r----+------r-------t------r---------j
Qi
Cl> ... ~0 6 .00 ----.r--~'c----~-+------r-------t------r---------1
:0
::::J u ; 4 .00 -----,r--+----t--~...--+-~----r------t------t---------j
O>
0 .c.
0
U) c
---Current Developm ent Hydrograph ---Post -Developm e nt Outflow Hydrograph
With out Detention
12 .00 -Cl> 10 .00 Cl> ...
0 ........ 8 .00 ·-"O .0 c
::::J 0 u 0 6 .00 ......, Cl>
Cl> (/)
O> ... ... Cl> 4 .00 0 0... .c.
0
U) 2.00 c
0 .00
0
Total Current Development Vs. Total Post-Development
(No Detention) Peak Discharge Rates 100-Year Storm
Event
10 20 30 40 50
Time (Minutes)
60
---Current Development Hyd rograph Post -Development Outflow Hydrograph
With out Detention
Gorrelt Engh eering-4444 Corter Creek Pcwkw oy Suit e 108-E!lyon . Texas 7711J2 -Telephone: (409) 84b-2688 -Fox: (409) 84b-:l094
Determine Total Peak Flow To
Proposed Flume
Tributary Area ("A"): 2.09 Acres
Pervious Area : 1.04 Acres
Impervious Area : 1.05 Acres
Run-Off Coefficient ("Cwt"): 0.60
Time Of Concentration ("T/c"):
Woodlands: Low Elevation :
High Elevation:
Distance (Feet):
Slope(% Grade):
Velocity ("Vw "):
Time :
Pastures: Low Elevation :
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vp"):
Time :
Pavements: Low El eva ti on:
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vpave"):
T ime :
Total Travel Time:
Hourly Intensity Rates ("I"): 2-Year : 6 .33
5-Year : 7.69
10-Year: 8.63
25-Year: 9 .86
50-Year : 11.15
100-Year: 12 .63
Peak Discharge Rate ("Q"): 2-Year: 7 .95
5-Year : 9 .67
10-Year: 10.85
25-Yea r: 12.40
50-Year: 14.01
100-Year: 15.88
C= 0 .30
C= 0.90
0 .00
0 .00
0 .00
0 .00
0.00 Feet I Second
0 .00 Minutes
0.00
0.00
0.00
0.00
0 .00 Feet I Second
0.00 Minutes
0.00
0 .00
0.00
0 .00
0.00 Feet I Second
0.00 Minutes
10 .00 Minutes
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Cubic Feet I Second
Gooett Englnee<lng • 4444 Corter Creek P°'kway Suite 108 ·Bryon . Texas 77&J2 ·Telephone : (409) 846-2688 • Fox: (409) 846-3094
Project Description
Project File
Worksheet
Flow Eleme nt
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Depth
Bottom Width
Results
Discharge
Flow Area
Wetted Perimeter
Top Widt h
Critical Depth
Critical Slope
Veloc ity
Vel ocity Head
Specif i c Energy
Froude Number
Flow is supercritical.
Full Flow Capac ity Of Proposed Flume
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gthomas .fm2
Full Flow Capacity Of Proposed Flume
Rectangular Channel
Manning's Formula
Discharge
0.013
0.005000 ft/ft
0.75 ft
4 .33 ft
17.77 els
3.25 ft2
5.83 ft
4 .33 ft
0.81 ft
0.004035 ft/ft
5.47 ft/s
0.47 ft
1.22 ft
1 .11
Acade mic Editi o n 11 /0 1/0 0
11:48:4 1 AM Haesta d Methods, Inc . 3 7 B rookside Road W a te r bu ry, CT 067 08 (203 ) 755-1 666
Fl owMasler v5.17
Page 1 ol 1
(/) -
18.0
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Constant Data
Mann i ngs Coefficient
Channel Slope
Bottom Width
Input Data
Minimum
Depth 0 .00
Full Flow Capacity Of Proposed Flume
Plotted Curves for Rectangular Channel
c :\hae stad\acade m ic\f m w\g thorn as . fm 2
Full Flow Capacity Of Proposed Flume
Rectangular Channel
Manning 's Formula
Discharge
0.013
0.005000 ft/ft
4.33 ft
Maximum
0.75
Increment
0 .01 ft
Discharge vs Depth
16 .0 ........... • ........... · ......... · .......... ' ........... ' ............. · ............ ..
14 .0 ........ , .................. , ................................ .
.·
12 .0 ............... • ................ · ................. • ................. • ................ • ................. • ................. · ......... -- -.
~ 10 .0 ................. · ................ -........... ·,· ............ ·.· ......... ·.· ............. ·,· ............ ·, ....... --.
Q)
Ol
~
C1l
..c
u
(/)
0
8 .0 .............................. '· ............ ·'· .......... ·'· .............. • ................................ ·' ........ --·'
6 .0 .. .. .. . .. .. .. .. .. . .. .. .. .. .. .. . .. .. .. .. . . . . .. .. . .. . . . ........................................................... -- -. . . . . . . .
4 .0 . . . . . . . . • . . . . . . . . .. . . . . . . . .......... '• ................................... .
2.0
:/ : : : : :
/ ........ · .......... · ............. · ............ · ........... : ..... . . . . .
O .Oi.-==~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-
0.0
11/01 /00
11:53:0 1 AM
0 . 1 0.2 0.3 0.4
Depth (ft)
A cadem ic Edition
0.5 0.6
Haes tad Methods, In c. 3 7 Brooks i de Road W aterb ury , CT 06708 (203) 755 ·1 666
0 .7 0.8
Fl owMaster vS.17
Page 1 o f 1
-
Project Description
Project File
Worksheet
Flow E lement
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Wi dth
Critical Depth
Critical Slope
Veloc ity
Veloc i ty Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Of Flow 2-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c :\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning 's Formula
Channel Depth
0.013
0 .005000 ft/ft
4 .33 ft
7 .95 els
0.44 ft
1 .92 ft 2
5 .22 ft
4 .33 ft
0.47 ft
0 .004115 ft /ft
4 .15 fUs
0.27 ft
0.71 ft
1.10
A cademic Edition 11 /01/0 0
01 :28 :16 PM Haestad Methods, In c. 37 Brook side Road Waterbury, CT 06708 (203 ) 755-1 666
Fl owMaster v5 .17
Page 1 of 1
-
Proj ect Descri ption
Pro ject File
Worksheet
Flow Element
Method
Solve For
I nput Da t a
Mann i ng s Coeffic i e n t
Ch ann el Slope
Bottom Wid t h
Disch arge
Resu l ts
Depth
Flow Area
Wetted Perimeter
Top Widt h
Critical Dep t h
Crit i cal Slope
Veloc ity
Ve locity Hea d
Speci f ic Energy
Froud e Number
Flow i s supercritica l.
Dep t h O f Flow 5-Year Storm Event (Flume)
Worksheet for Rec t angular Channel
c :\ha es tad\aca d e m ic\f m w\g th om as . f m 2
Depth Flow 2-Year Storm Event
Rectangular Channel
Ma n ning 's Formul a
Channel Depth
0 .013
0 .005000 ft/ft
4 .33 ft
9 .67 els
0 .50 ft
2.18 ft 2
5 .33 ft
4 .33 ft
0 .54 ft
0 .004071 f t/ft
4.44 ft/s
0.3 1 ft
0 .81 ft
1 .11
Acade mi c Editi o n 1 1/01 /00
01:28 :54 PM Haestad Me th o ds , I nc. 37 Brooksi de Roa d Waterb u ry , CT 06 7 08 (203) 75 5-1 666
Fl owMa st er v5. 17
Page 1 of 1
11/01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critica l Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow i s supercritical.
Depth Flow 10-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning 's Formula
Channel Depth
0.013
0 .005000 ft/ft
4.33 ft
10.85 els
0 .54 ft
2 .34 f t2
5.41 ft
4.33 ft
0.58 ft
0.004052 ft/ft
4 .63 ft/s
0 .33 ft
0 .87 ft
1.11
A ca demic Edition
01 :29 :32 PM Haestad Methods, Inc. 37 Brook side Roa d Waterbury , CT 06708 (203) 755-1666
FlowM aster v5.17
Page 1 of 1
11/01/00
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom W i dth
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top W id t h
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Flow 25-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c :\hae stad\acade m ic\f mw\gthom as. f m2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manni ng 's Formula
Channel Depth
0 .013
0 .005000 fUft
4 .33 ft
12 .40 els
0 .59 ft
2 .56 ft 2
5.51 ft
4.33 ft
0 .63 ft
0 .004037 tuft
4 .85 IVs
0 .36 ft
0 .96 ft
1 .11
Acade mic Ed ition
01 :30:00 PM Haestad Methods, Inc . 3 7 Brookside Roa d W aterbury , CT 06708 (203) 755-1666
FlowM asler v5.17
Page 1 of 1
11/01/00
Project Description
Project File
Wo rksheet
Flow Element
Method
Sol ve For
Input Data
Mannings Coe ff icient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is superc ritical.
Depth Flow 50-Year St o rm Event (Flume)
Worksheet f o r Rectangular Channel
c :\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formu la
Cha nn e l Depth
0.013
0.005000 ft/ft
4.33 ft
14 .01 cfs
0.64 ft
2.77 ft2
5.61 ft
4.33 ft
0.69 ft
0.004030 ft/ft
5.05 ft/s
0.40 ft
1.04 ft
1 .11
Acade mic Edition
01 :30:20 PM Haestad Methods, In c. 37 Brook side Road Waterbury , CT 06708 (203) 755-1 666
FlowMa ster v5.17
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Bottom Width
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Wi dth
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Depth Flow 100-Year Storm Event (Flume)
Worksheet for Rectangular Channel
c:\haestad\academic\fmw\gthomas.fm2
Depth Flow 2-Year Storm Event
Rectangular Channel
Manning's Formula
Channel Depth
0.013
0.005000 ft/ft
4.33 ft
15 .88 els
0.70 ft
3.01 112
5.72 ft
4 .33 ft
0 .75 ft
0 .004030 ft/ft
5 .27 ft/s
0.43 ft
1.13 ft
1.11
Aca de mic Edition 11/0 1/0 0
01 :30:42 PM Hae stad Me th o d s, Inc. 3 7 Brook sid e Road Waterbury , CT 067 08 (203) 755 -1666
FlowM as te r v5.1 7
Page 1 o f 1