HomeMy WebLinkAbout67 The Veranda PDD 00-20 Henton Linclon Subd.Bridgette George -Re: The Veranda Page 1
~ '"""'""~..-....-...-..-"""'"'...-----.-..-----------------,,,_-=-=-=="--~~~~~~--"'----'
From:
To:
Date:
Subject:
Bob Mosley
Bridgette George
5/7/01 8:37AM
Re : The Veranda
f)P OD -o21J
No letters of complet ion have been issued for the water & sewer, however, I believe David provided a
cash financial guarantee . There has been some damage to the water and sewer which a listing has been
provided the contractor. There is no public street or drainage .
»>Bridgette George 05/07/01 08:32AM »>
David Scarmardo is requesting full building permits for the duplexes on Monte Carlo off of Lincoln Ave.
Please let me know of any outstanding issues.
Thank you!
Bridgette George :o)
Asst. Development Review Manager
City of College Station
(979) 764-3570
(979) 764-3496 {Fax}
www.ci.college-station .tx.us
.·
Bridgette George -Re : The Veranda
~
From:
To:
Date:
Subject:
John Logan
Bridgette George ; Jon Mies; Tony Michalsky
5/7/01 8:41AM
Re : The Veranda
I have given the Developer a list of repairs to be made for a Letter of completion/ acceptance on the
infrastucture . Since all the streets are private we have no responsibility for those. Here is the list:
Sanitary serwer cleanouts need to brought to grade and concreted, all manholes need to be cleaned out
and piping needs to be removed from the end of line blowoffs on the waterlines and the brass plugs
installed . These are all I have found but I have not done a complete walkthrough because they have not
asked for a letter of completion .
»> Bridgette George 05/07/01 08 :32AM »>
David Scarmardo is requesting full building permits for the duplexes on Monte Carlo off of Lincoln Ave.
Please let me know of any outstanding issues .
Thank you!
Bridgette George :o)
Asst. Development Review Manager
City of College Station
(979) 764-3570
(979) 764-3496 {Fax}
www.ci .colleqe-station.tx.us
CC: Bob Mosley ; Jan Schwartz; Jerry Jones ; Natalie Ruiz ; Vern Wright
Page 1
~-~
COLLEGl STATION
D EVEL OPMENT PERMIT
PERMIT NO. 500020
DP-THE VERANDA
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey, A-8
DATE OF ISSUE: 03/07 /01
OWNER:
David Scarmardo
111FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALIDFOR 12
CONTRACTOR:
TYPE OF DEVELOPMENT: FULL DEVELOPMENT PERMIT
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
MONTHS
All trees must be barricaded , as shown on plans, prior to any construction. Any trees not barricaded will not count
towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets, or ex isting drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the code s and ordinances of the City of College Station that apply.
STAFF REVIEW COMMENTS
No. 3
Project: HENTON-LINCOLN LOT 3 (FP)-FINAL PLAT (0-197)
PLANNING
1.
Reviewed by: Date :
ENGINEERING
1. Final Plat is ok.
2 . Drainage Report is ok.
Reviewed by: Date : 11/29/00
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans . Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1of1
AMENDMENT
TO THE
DRAINAGE REPORT
FOR
The Veranda
3.51 Acres
Richard Carter Survey, A-8
College Station, Brazos County, Texas
November 17, 2000
REVIEWE . F R
~ co~~Pt '""·'CE '
NOV 2 9 2000
COLLEGE SlA 1 n.JN
ENGINEERING
DEVELOPED BY:
Mr. David Scamardo
111F.M.2818
Bryan , Texas 77805
(409) 779-7209
PREPARED BY:
Kling Engineering & Surveying
4103 Texas Avenue , Suite 212
Bryan, TX 77802
(409) 846-6212
PURPOSE:
Amendment to the Drainage Report
for
The Veranda, 3.51 Acres
Richard Carter Survey, A-8
College Station, Brazos County, Texas
November 17, 2000
The purpose of this amendment is to document: 1 ) phased detention pond
design/construction due to site development, 2) drainage patterns for storm water
runoff based on final site layout and grading, 3) attenuation of excess storm water
runoff based on 1 & 2 above.
The Veranda development is part of a larger, planned, mixed use development
originally presented as the "Henton-Lincoln Subdivisionn (refer to Appendix 1 a for
vicinity map). A master drainage plan/report was prepared for this proposed
development and approved by the City of College Station November 15, 1999. This
report will be referred to in this amendment as well as excerpted portions included as
appendices. The detention facility designed is to accommodate the entire subdivision
development which proposes to include two hotels and multiple restaurant and retail
users in addition to The Veranda. Currently, only The Veranda development is in
progress. As such, a "phased• construction of the detention facility was proposed.
DRAINAGE FACILITIES DESIGN:
The ultimate detention pond design remains unchanged. Proposed phased
construction consists of utilization of the existing creek area above the 36" RCP culvert
with minimal modifications. Modifications consist of excavating areas adjacent to the
creek to near plan elevations, constructing a 4' high berm with a 24" RCP culvert as an
outlet device, and lining the downstream section with rock rubble (refer to Appendix 1 b
for schematic). The construction of a concrete pilot channel will be postponed until
further development. Disturbed areas will be seeded for establishment of vegetation .
Ultimate construction of the design pond will occur as Henton-Lincoln project develops.
Detention Requirement:
The pre-development drainage area to the existing 36" RCP was defined in the
November, 1999 report to be 15.026 acres (refer to Appendix 2 -excerpts of
Appendices 4 & 5 of the Nov. '99 report). Allowable release rates from the pond were
determined in the Nov. '99 report to be as follows:
2 yr -19.37 cfs 5 yr -22.32 cfs
25 yr -26.51 cfs 50 yr-29.11 cfs
(refer to table on page 5 of Nov. '99 report)
10 yr -24.17 cfs
100 yr -29.90 cfs
The Veranda -Amendment to the Drainage Report -Page 2
Post development drainage areas were defined for The Veranda based on final site
layout and grading which are graphically depicted in Appendix 3 of this report. There
were minor adjustments to the drainage areas as a result of final plan grades.
The following table summarizes and compares runoff rates leaving the project area for
both existing and post development conditions . Existing conditions runoff rates are
taken from
EXISTING CONDITIONS POST DEVELOPMENT CONDITIONS
STORM Discharge• Cedar Creek 2 Lincoln Total (DA-1)-
RETURN f/36. Condo. Place Discharge
clvUpond Parking lot Channel f/36.
clvUpond
(cfs) (cfs) (cfs) (cfs) (cfs)
2YR 19.37 3 .01 0.89 23.3 11 .09
5YR 22.32 3.66 1.08 27.1 13.05
10YR 24.17 4 .11 1.21 29.5 14.33
25YR 26.51 4.69 1.38 32~6 15.87
50YR 29.11 5 .31 1.56 36.0 17.34
100YR 29.90 5.54 1.63 37.1 17.80
(* refer to Appendix 2 for existing conditions routing calculations)
(-refer to Appendix 4 for post development routing calculations)
(DA-3)
Cedar Creek
Condo.
Parking lot
(cfs)
0 .35
0.43
0.48
0 .54
0.62
0.64
Runoff calculations for pre and post developed conditions can be found in Appendix 4 .
(DA-2 & 4) Total
2 Lincoln
Place
Channel
(cfs) (cfs)
3 .31 14.8
4.03 17.5
4.52 19.3
5 .17 21.6
5.84 23.8
6 .10 24.5
Overall site runoff is calculated to decrease as a result of the phased pond construction .
Runoff to the Lincoln place channel slightly increased from numbers reported in the origina l
drainage report for the Veranda development (less than 1 cfs at the 100 year event).
CONCLUSIONS:
The interim design and phased construction of the detention pond meets site
attenuation requirements . Drainage patterns for the Veranda development remained relat ive ly
unchanged from the original report.
"I hereby certify that this report for the drainage design of The Veranda. 3 .51 Acres was
prepared under my supervision in accordance with the provisions of the City of College Station
Drainage Policy and Design Standards for the owners thereof."
The Veranda -Drainage Report -Page 3
APPENDICES
1 a) Vicinity Map
1 b) Schematic of Phased Pond Construction
2) Excerpts of Appendices 4 & 5 of the November, 1999 Master Drainage Report
3) Post-Development Drainage Areas
4) Post-Development Hydrologic and Routing Calculations
APPENDIX 1a
Vicinity Map
Type •••• Tc Cales
ljame •••• TC=14
File •••• E:\PROJECTS\HENTON\PONDPACK\HENTON.PPK
Title ••• 14 MIN. TIME OF CONCENTRATION
Page 1.01
........................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TIME OF CONCENTRATION CALCULATOR ........................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14 MIN. TIME OF CONCENTRATION
Segment #1: Tc: User Defined
Segment #1 Time: 14.00 min
=====s•===•••=••~••••••••
Total Tc: 14.00 min
=========================
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C()ll'1Jte Time: 17:29:59 Date: 09-20-1999
Type •••• C and Area
Name •••• PRE
.le •••• E:\PROJECTS\HE NTON\PONDPACK\HENTON.PPK
Title ••• PRE·DEVELPED AREA Fla.JING TO 36 11 CULVERT
RATIONAL C COEFFICIENT DA TA
Page 2.01
......................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PRE·DEVELPED AREA Fla.JING TO 36 11 CULVERT
Area C x Area
Soil/Surface Description c acres acres
------------------------------------------------------------
GRASS .3500 15.026 5.259
WEIGHTED c & TOTAL AREA ---> .3500 15.026 5.259 ......................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
S/N: HOMOL0863131 KLI NG ENGINEERING
Pond Pack Ver: 8·01·98 (6 1) C~te Time: 17:29:59 Date: 09·20-1999
Type •••• Rational Peak O's
Name •••• PRE
Page 2.02
.le •••• E:\PROJECTS\HENTON\PONDPACK\HENTON.PPK
SUMMARY OF RATIONAL METHOD PEAK DISCHARGES
Q = CiA * Units Conversion; llhere Conversion = 43560 / (12 * 3600)
Rational Storms: BRAZOS.IOQ RATIONAL
Tag Freq File IDF Curve
----------------------------
2 YR 2 BRAZOS.IOQ e = .8060 b = 65.0000 d = 8.0000
5 YR 5 BRAZOS.IOQ e = .7850 b = 76.0000 d = 8.5000
10 YR 10 BRAZOS. IOQ e = .7630 b = 80.0000 d = 8.5000
25 YR 25 BRAZOS.IOQ e = .7540 b = 89.0000 d = 8.5000
50 YR 50 BRAZOS.IOQ e = .7450 b = 98.0000 d = 8.5000
100 YR 100 BRAZOS.IOQ e = .7300 b = 96.0000 d = 8.0000
Tc = 14.00 min
-----------------------------
Tag Freq c c adj c Area Peak Q
(years) factor I final in/hr acres I cfs
l·····························I ----------
2 YR 2 .350 1.000 I .350 5.3817 15.026 I 28.54
5 YR 5 .350 1.000 I .350 6.5971 15.026 I 34.98
. YR 10 .350 1.000 I .350 7.4366 15.026 I 39.44
_;; YR 25 .350 1.000 I .350 8.5083 15.026 I 45.12
50 YR 50 .350 1.000 I .350 9.6350 15.026 I 51.09
100 YR 100 .350 1.000 I .350 10.0532 15.026 I 53.31
-----------------------------
N: HOMOL0863131 KLING ENGINEERING
Pack Ver: 8·01·98 (61) Carpute Time: 17:29:59 Date: 09·20·1999
Type •••• Mod. Rational Grand SUll'll8ry
Name •••• PRE
.le •••• E:\PROJECTS\HENTON\PONDPACK\HENTON.PPK
Page 2.03
************************************************************************
******************************'"'****************************************
• •
• •
• MODIFIED RATIONAL METHOD •
• ----Grand SUll'll8ry For All Storm Frequencies •
• •
• *
**************************************************************** .. ******
********************************************************************** ..
o = CiA * Units Conversion; ~here Conversion = 43560 / (12 * 3600)
Area = 15.026 acres Tc = 14.00 min ............................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Freq. Adjusted Duration
years 'C' min in/hr
Opeak Allowable!
cfs cfs I
VOLi.MES
Inflow
ac·ft
Storage
ac-ft
------------------------------------------------------1---------------------
2
,J
25
50
100
.350
.350
.350
.350
.350
.350
S/N: HOMOL0863131
14.00
14.00
14.00
15.00
16.00
16.00
5.3817
6.5971
7.4366
8.2339
9.0427
9.4345
28.54
34.98
39.44
43.66
47.95
50.03
KLING ENGINEERING
19.00 I
22.00
24.00
I
I
26.00 I
28.00
29.00
I
I
ond Pack Ver: 8·01-98 (61) C~te Time: 17:29:59
.550
.675
.760
.902
1.057
t. 103
• 184
.251
.298
.370
.449
.473
Date: 09-20-1999
APPENDIX 3
Post-Development Drainage Areas
APPENDIX4
Post-Development
Hydrologic and Routing Calculations
RUN-OFF COEFFICIENT CC-VALUE) CALCULATIONS
C-VALUES
LAND 0 .35 IMP 0 .90
Post-Develooed Conditions
AREA
DA LAND IMP TOTAL C-VALUI
1 0 .805 1.458 2 .263 0 .70
2 0 .232 0 .202 0.435 0.61
3 0.050 0 .042 0.092 0.60
4 0.284 0.179 0.463 0 .56
SI It: 3 .252 0 .67
where : C = (0.35 *LAND+ 0 .90 * IMP)/TOTAL AREA
PEAK FLOW CALCULATIONS
Post-Developed Conditions
DA TC C-VALUE AREA Q2 QS Q10
1 10 0 .70 2 .2627 10.08 12 .26 13 .76
2 10 0.61 0.4348 1.67 2.03 2 .28
3 10 0 .60 0 .0917 0 .35 0 .43 0 .48
4 10 0.56 0.4626 1.65 2 .00 2 .25
TOTAL 13 .75 16.71 18 .76
d' Existina Con 1tions
DA TC C-VALUE AREA Q2 QS Q10
36" clvt 14 0.35 15.0260 28 .29 34 .71 39 .13
Cedar
Creek
Condo. 10 0 .35 1.3600 3 .01 3 .66 4 .11
Two
Lincoln
Place Ditch 10 0 .35 0 .4000 0.89 1.08 1.21
TOTAL 32.19 39.45 44.45
where : Q = C-Value *Area * I
I -is found in •intensity Calculations• and corresponds to the
appropriate Tc and frequency .
Q25 QSO Q100
15 .71 17.76 18 .55
2.60 2 .94 3 .07
0.54 0.62 0.64
2.57 2 .90 3 .03
21 .43 24 .22 25.29
Q25 QSO Q100
44 .75 50.65 52 .85
4 .69 5 .3 1 5 .54
1 .38 1.56 1.63
50 .83 57 .51 60 .02
Type •••• Tc Cales
Name •••• TC=14
Page 1.01
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.pplc
Title ••• 14 MIN. TIME OF CONCENTRATION
........................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TIME OF CONCENTRATION CALCULATOR ........................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14 MIN. TIME OF CONCENTRATION
Segment #1: Tc: User Defined
Segment #1 Ti me: 14.00 min
=========================
Total Tc: 14;00 min
=========================
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8·01·98 (61) C~te Time: 10:38:26 Date: 11 -17-2000
Type •••• C and Area
Name •••• VERANDA
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• PRE-DEVELPED AREA FLOWING TO 36 11 CULVERT_+_ POST
DEVELOPED VERANDA FLOWS
RATIONAL C COEFFICIENT DATA
Page 2.01
......................................................................... .........................................................................
PRE-DEVELPED AREA FLOWING TO 36 11 CULVERT _+_ POST DEVELOPED VERANDA
FLOWS
Area C x Area
Soil/Surface Description c acres acres
----------------------------------------------------·-------
OFF-SITE, GRASSED AREAS .3500 12.764 4.467
LOT 7-THE VERANDA·DA-1, IMPERVIOUS .9000 1.457 1.311
LOT 7-THE VERANDA·DA-1, LANDSCAPED .3500 .805 .282
~EIGHTED C & TOTAL AREA ---> .4033 15.026 6.060 ......................................................................... .........................................................................
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:38:26 Date: 11-17-2000
Type •••• Mod. Rational Grand SLl!lllllry
Name •••• VERANOA ·FINAL
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.pplc
Page 2.02
************************************************************************
************************************************************************
* *
* *
* MODIFIED RATIONAL METHOO *
* ----Grand Siirmary For All Storm Frequencies *
* *
* *
************************************************************************
************************************************************************
Q = CiA * Units Conversion; Where Conversion = 43560 I (12 * 3600)
Area = 15.026 acres Tc = 14.00 min ............................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Freq. Adjusted Duration
years 'C' min in/hr
Qpeak Allowable!
cfs cfs I
VOLUMES
Inflow
ac·ft
Storage
ac·ft
------------------------------------------------------1---------------------
2
5
10
25
so
100
.403
.403
.403
.403
.403
.403
S/N: HOMOL0863131
14.00
14.00
14.00
14.00
14.00
14.00
5.3817
6.5971
7.4366
8.5083
9.6350
10.0532
32.88
40.31
45.44
51.99
58.87
61.43
KLING ENGINEERING
32.70 I
40.20 I
45.20 I
51.80
58.70
I
I
61.20 I
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:38:26
.634
.m
.876
1.003
1.135
1.185
.004
.002
.005
.004
.004
.005
Date: 11-17-2000
Type •••• Rational Peak Q's
Name •••• VERANDA-FINAL
Page 2.03
File .••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
SUMMARY OF RATIONAL METHCX> PEAK DISCHARGES
Q = CiA * Units Conversion; Where Conversion = 43S60 / (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
----------------------------
2 YR 2 BRAZOS. IDQ e = .8060 b = 6S.OOOO d = 8.0000
S YR s BRAZOS. IDQ e = .78SO b = 76.0000 d = 8.SOOO
10 YR 10 BRAZOS.IDQ e = .7630 b = 80.0000 d = 8.SOOO
2S YR 2S BRAZOS.IDQ e = .7540 b = 89.0000 d = 8.SOOO
SO YR so BRAZOS.IDQ e = .74SO b = 98.0000 d = 8.SOOO
100 YR 100 BRAZOS. IDQ e = .7300 b = 96.0000 d = 8.0000
Tc = 14.00 min
-----------------------------
Tag Freq c c adj I c Area I Peak Q
(years) factor I final in/hr acres I cf s
1-----------------------------1 ----------
2 YR 2 .403 1.000 I .403 S.3817 1S.026 I 32.88
S YR s .403 1.000 I .403 6.S971 1S.026 I 40.31
10 YR 10 .403 1.000 I .403 7.4366 1S.026 I 4S.44
2S YR 2S .403 1.000 I .403 8.S083 1S.026 I S1.99
SO YR so .403 1.000 I .403 9.63SO 1S.026 I S8.87
100 YR 100 .403 1.000 I .403 10.0S32 1S.026 I 61.43
-----------------------------
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:38:26 Date: 11-17-2000
Table of Contents
Table of Contents
**************** PONO VOLUMES ****************
Vol: Elev-Area
PRE-DUG OUT SOME 1.01
************** OUTLET STRUCTURES *************
C~site Rating Curve
24"CULVERT • • • • • • • • • • • • • • • • • • • • • • • • • 2.01
outlet Input Data
24 11 CULVERT 2.02
**************** PONO ROUTING ****************
Pond E-V-Q Table
VERANDA FINAL •••••••••••••••••••••• 3.01
Pond Routing Sunnary
VERANDA FINAL 10 YR ••••••••••••• 3.02
VERANDA FINAL 100 YR •••••••••••• 3.03
VERANDA FINAL 2 YR •••••••••••••• 3.04
VERANDA FINAL
VERANDA FINAL
VERANDA FINAL
25 YR ••••••••••••• 3.05
5 YR • • • • • • • • • • • • • • 3.06
50 YR ••••••••••••• 3.07
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C0111XJte Time: 10:42:09 Date: 11-17-2000
Type •••• Vol: Elev-Area
Name •••• PRE-DUG CllT SOME
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.pplc
Title ••• 299.44
Elevation
(ft)
299.44
300.00
301 .00
302.00
303.00
Planimeter
(sq. in>
Area A1+A2+sqr(A1*A2) Volune
(acres) (acres) (ac-ft)
.0000 .0000 .000
.0893 .0893 .017
.3897 .6655 .222
.6200 1.5012 .500
.7142 1.9996 .667
POND VOLUME EQUATIONS
Page 1-. 01
Volune s~
(ac-ft)
.000
.017
.239
.739
1.405
* Incremental volune c~ted by the Conic Method for Reservoir Volunes.
Volune = (1/3) * CEL2 ·EL1) * (Area1 + Area2 + sq .rt.(Area1*Area2))
where: EL1, EL2 =Lower and upper elevations of the increment
Area1,Area2 =Areas c~ted for EL1, EL2, respectively
Volune = Incremental volune between EL1 and EL2
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01 ·98 (61) C~te Time: 10:42:09 Date: 11 -17-2000
Type .••• C~site Rating Curve
Name •••• 24 11 CULVERT
File •••• E:\HAESTAO\PONDPACK\PPK6\VERANDA\HENTON.pplc
Title ••• 24 11 CULVERT
***** COMPOSITE OUTFLOW SUMMARY ****
IJS Elev, Total Q Notes
------------------------Converge -------------------------
Elev. Q TIJ Elev Error
ft cfs ft +/-ft Contributing Structures
------------------------------------------
299.44 .00 Free outfall None contributing
299.64 .15 Free outfall 1
299.84 .59 Free outfall
300.04 1.30 Free outfall
300.24 2.25 Free outfall
300.44 3.43 Free outfall
300.64 4.79 Free outfall
300.84 6.32 Free outfall
301.04 7.99 Free outfall
301.24 9.76 Free OUtfall
301.44 11.62 Free outfall
301.64 13.53 Free OUtfal l
301.84 15.46 Free outfall
302.04 17.27 Free outfall
302.24 18.86 Free outfall
302.44 20.60 Free OUtfal l
302.50 21.09 Free OUtfall 2 +1
302.64 28.48 Free outfall 2 +1
302.84 47.42 Free OUtfal l 2 +1
303.00 67.13 Free OUtfall 2 +1
S/N: HOMOL0863131 KLING ENGINEERING
Page 2.01
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:42:09 Date: 11-17-2000
Type •••• outlet Input Data
Name •••• 24 11 CULVERT
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• 24 11 CULVERT
REQUESTED POND WS ELEVATIONS:
Min. Elev.=
Increment =
Max. Elev.=
299.44 ft
.20 ft
303.00 ft
Page 2.02
**********************************************
OUTLET CONNECTIVITY
**********************************************
---> Forward Flow Only (UpStre11111 to DnStream)
<---Reverse Flow Only (DnStream to UpStream)
<---> Forward and Reverse Both Allowed
Structure No. outfall E1, ft E2, ft
-----------------------------------
Weir-Rectangular 2 ---> TW 302.500 303.000
Culvert-Circular ---> TW 299.440 303.000
TW SETUP, OS Chamel
S/N: HOl40L0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:42:09 Date: 11·17-2000
Type •••• OUtlet Input Data
Name .••• 24"CULVERT
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.pplc
Title ••• 24 11 CULVERT
OUTLET STRUCTURE INPUT DATA
Structure ID
Structure Type
# of Openings
Crest Elev.
Weir Length
Weir Coeff.
= 2
= Weir-Rectangular
=
= 302.50 ft
40.00 ft
= 3.000000
Page 2.03
Weir TW effects (Use adjustment equation)
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01 -98 (61) C~te Time: 10:42:09 Date: 11-17-2000
Type •.•• outlet Input Data
Name •••• 24 11 CULVERT
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• 24 11 CULVERT
ClJTLET STRUCTURE INPUT DATA
Structure ID
Structure Type
No. Barrels
Barrel Diameter
Upstream Invert
Dnstre&111 Invert
Horiz. Length
Barrel Length
Barrel Slope
= 1
= Culvert-Circular
=
2.0000 ft
= 299.44 ft
= 298.54 ft
= 21.44 ft
" 21.46 ft
= .04198 ft/ft
ClJTLET CONTROL DATA •••
Mannings n " .0130
Page 2.04
Ke • .5000 (forward entrance loss)
Kb = .012411 (per ft of full flow)
Kr = 1.0000 (reverse entrance
Hll Convergence = .001 +/-ft
INLET CONTROL DATA .••
Equation form = 2
Inlet Control IC = .5190
Inlet Control M " .6400
Inlet Control c = .02890
Inlet Control y = .9000
T1 ratio CHll/D) = 1.157
T2 ratio (Hll/D) = 1.341
Slope Factor = -.500
Use 1.nsubmerged inlet control Fonn 2 equ. below T1 elev.
Use submerged inlet control Fonn 2 equ. above T2 elev.
loss)
In transition zone between 1.nsubmerged and submerged inlet control,
interpolate between flows at T1 & T2 •••
At T1 Elev= 301.75 ft ---> Flow= 15.55 cfs
At T2 Elev= 302.12 ft ---> Flow= 11.n cfs
= Tll Structure ID
Structure Type = Tll SETUP, OS Channel
FREE ClJTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES •••
MaxilllAll Iterations= 30
Min. Tll tolerance = .01 ft
Max. Tll tolerance = .01 ft
Min. Hll tolerance = .01 ft
Max . Hll tolerance = .01 ft
Type •.•• Pond E·V·Q Table
Name •••• VERANDA FINAL
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• HODEL FLOW THRCXJGH 24 11 CULVERT W/EXISTING CREEK
STORAGE + BERM
LEVEL POOL RCXJTING DATA
HYG Dir • E:\HAESTAD\PONDPACK\PPK6\VERANDA\
Inflow HYG file= PRE·NMR.HYG ·VERANDA FINAL 10 YR
outflow HYG file= DET·CXJT.HYG · DISCHARGE FINAL 10 YR
Pond Node Data = PRE·DUG CXJT
Pond Volune Data = PRE·DUG CXJT SOME
Pond OUtlet Data • 24"CULVERT
No Infiltration
INITIAL CONDITIONS
Starting WS Elev = 299.44 ft
Starting Volune • .000 ac·ft
Starting outflow • .00 cfs
Starting Infiltr. = .00 cfs
Starting Total Qout= .00 cfs
Time Increment • 1.86 min
·levation outflow Storage
ft cfs ac·ft
Area
acres
Inf il t.
cf s
Q Total
cfs
299.44 .00 .000 .0000 .00 .00
299.64 .15 .001 .0114 .00 .15
299.84 .59 .006 .0456 .oo .59
300.04 1.30 .020 .0973 .00 1.30
300.24 2.25 .044 .1421 .00 2.25
300.44 3.43 .078 .1954 .00 3.43
300.64 4.79 .123 .25n .00 4.79
300.84 6.32 • 181 .3274 .00 6.32
301.04 7.99 .254 .3979 .00 7.99
301.24 9.76 .338 .4401 .00 9.76
301.44 11.62 .430 .4845 .oo 11.62
301.64 13.53 .532 .5310 .00 13.53
301.84 15.46 .643 .5796 .00 15.46
302.04 17.27 .764 .6236 .00 17.27
302.24 18.86 .890 .6420 .00 18.86
302.44 20.60 1.021 .6606 .00 20.60
302.50 21.09 1.060 .6663 .00 21.09
302.64 28.48 1.155 .6795 .oo 28.48
302.84 47.42 1.292 .6987 .00 47.42
303.00 67.13 1.405 .7142 .00 67.13
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.01
2S/t + 0
cfs
.oo
.75
5.34
17.23
36.75
64.16
100.75
147.79
206.48
273.65
347.66
428.82
517.40
613.54
713. 91
817.35
848.91
929.85
1056.37
1164.31
Pond Pack Ver: 8·01·98 (61) Coq:x.ite Time: 10:42:09 Date: 11-17-2000
Type •••• Pond Routing Si.nnary
Name •••• VERANDA FINAL Tag: 2 YR
File •••• E:\HAESTAO\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title. • • MOOEL FLOW THRCXJGH 24 11 CULVERT IJ/EX I STING CREEK
STORAGE + BERM
LEVEL POOL RCXJTING SUMMARY
HYG Dir • E:\HAESTAO\PONDPACK\PPK6\VERANDA\
Inflow HYG file= PRE·NMR.HYG • VERANDA FINAL 2 YR
outflow HYG file= DET-Cl.IT.HYG -DISCHARGE FINAL 2 YR
Pond Node Data = PRE-DUG Cl.IT
Pond Voll.Ille Data = PRE·DUG Cl.IT SOME
Pond OUtlet Data = 24 11 CULVERT
No Infiltration
INITIAL CONDITIONS
Starting IJS Elev = 299.44 ft
Starting Voll.Ille =
Starting OUtf low •
Starting Infiltr. =
Starting Total Qout=
Time Increment =
.000 ac-ft
.00 cfs
.00 cfs
.00 cfs
1.86 min
INFLOW/Cl.ITFLOW HYDROGRAPH Sll4MARY
======szasz::ss:z•••=•••••••==•••==•======•==========
Peak Inf low
Peak OUtflow
Peak Elevation
Peak Storage =
..
=
32.87 cfs
11.09 cfs
= 301.38 ft
.403 ac-ft
at
at
14.01 min
23.31 min
========================================··===========
HASS BALANCE (ac -ft)
+ Initial Vol = .000
+ HYG Vol IN = .634
-Infiltration= .000
-HYG Vol OUT = .634
-Retained Vol = .000
Page 3.04
Unrouted Vol = -.000 ac-ft (.002X of Inflow Vol1.111e)
IJARNING: Inf low hydrograph trlil<:ated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C°"""'te Time: 10:42:09 Date: 11-17-2000
Type •••• Pond Routing Sunnary
Name •••• VERANDA FINAL Tag: 5 YR
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• MODEL FLOW THRClJGH 24" CULVERT W/EXISTING CREEK
STORAGE + BERM
LEVEL POOL RClJTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\VERANDA\
Inflow HYG file= PRE-N14R.HYG -VERANDA FINAL 5 YR
outflow HYG file= DET-ClJT.HYG -DISCHARGE FINAL 5 YR
Pond Node Data = PRE-DUG ClJT
Pond Volune Data z PRE-DUG ClJT SOME
Pond OUtlet Data " 24"CULVERT
No Infiltration
INITIAL CONDITIONS
Starting WS Elev • 299.44 ft
Starting Volune " .000 ac:-ft
Starting OUtflow = .00 c:fs
Starting lnfiltr. = .00 c:fs
Starting Total Qout= .00 c:fs
Time Increment = 1.86 min
INFLOW/ClJTFLOW HYDROGRAPH SUMMARY
Peak Inf low
Peak OUtflow
Peak Elevation
Peak Storage =
= 40.29 c:fs
13.05 c:fs
= 301.59 ft
.505 ac:-ft
at
at
14.01 min
23.31 min
=====================================================
MASS BALANCE (ac:-ft)
+ Initial Vol = .000
+ HYG Vol IN = .777
-lnfi l tration = .000
· HYG Vol ClJT .777
· Retained Vol = .000
Page 3.06
Unrouted Vol = -.000 ac:-ft (.001X of Inflow Volune)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOl40L0863131 KLING ENGINEERING
Pond Pac:k Ver: 8-01-98 (61) C~te Time: 10:42:09 Date: 11-17·2000
Type •••• Pond Routing Sllllllllry
Name •••• VERANDA FINAL Tag: 10 YR
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.pplc
Title ••• MODEL FLOW THROUGH 24" CULVERT W/EXISTING CREEK
STORAGE + BERM
LEVEL POOL ROUTING SlMMARY
HYG Dir s E:\HAESTAD\PONDPACK\PPK6\VERANDA\
Inflow HYG file= PRE-NMR.HYG -VERANDA FINAL 10 YR
OUtflow HYG file= DET-OUT.HYG • DISCHARGE FINAL 10 YR
Pond Node Data = PRE-DUG OUT
Pond Volune Data = PRE-DUG OUT SOME
Pond OUtlet Data ,. 24"CULVERT
No Infiltration
INITIAL CONDITIONS
Starting WS Elev = 299.44 ft
Starting Volune z
Starting OUtf low =
Starting lnfiltr. =
Starting Total Qout=
Time Increment =
.000 ac-ft
.00 cfs
.00 cfs
.00 cfs
1.86 min
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
Peak Inf low
Peak outflow
Peak Elevation
Peak Storage =
= 45.42 cfs
14.33 cfs
= 301.n ft
.sn ac-ft
at
at
14.01 min
23.31 min
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol z .000
+ HYG Vol IN = .876
-Infiltration= .000
-HYG Vol OUT = .876
-Retained Vol = .000
Page 3.02
Unrouted Vol = -.000 ac-ft (.001X of Inflow Volune)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:42:09 Date: 11-17-2000
Type •••• Pond Routing Sl.lllllllry
Name .••• VERANDA FINAL Tag: 25 YR
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.pplt
Title ••• MOOEL Fla.I THROUGH 24 11 CULVERT I.I/EXISTING CREEK
STORAGE + BERM
LEVEL POOL ROUTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\VERANDA\
Inflow HYG file = PRE·NMR.HYG -VERANDA FINAL 25 YR
outflow HYG file= DET-OUT.HYG -DISCHARGE FINAL 25 YR
Pond Node Data = PRE-DUG OUT
Pond Volune Data = PRE-DUG OUT SOME
Pond OUtlet Data = 24"CULVERT
No lnfil tration
INITIAL CONDITIONS
Starting I.IS Elev ,. 299.44 ft
Starting Volune " .000 ac-ft
Starting OUtf low .. .00 cfs
Starting lnfiltr. = .00 cfs
Starting Total Qout= .00 cfs
Time Increment = 1.86 min
INFLOW/OUTFLOIJ HYDROGRAPH SUMMARY
======·=···====··=====·=·==·=·=========·================
Peak Inf low
Peak outflow
Peak Elevation
Peak Storage =
=
=
51.97 cfs
15.87 cfs
= 301.89 ft
.669 ac·ft
at
at
14.01 min
23.31 min
=====================================================
MASS BALANCE (ac·ft)
+ Initial Vol =
+ HYG Vol IN ,.
-Infiltration=
-HYG Vol OUT =
-Retained Vol =
.ooo
1.002
.000
1.002
.000
Page 3.05
Unrouted Vol = -.000 ac-ft (.001X of Inflow Voll.Jlle)
IJARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 10:42:09 Date: 11-17-2000
Type •••• Pond Routing SL111118ry
Name •••• VERANDA FINAL Tag: so YR
File •••• E:\HAESTAD\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• MODEL FLOW THRCXJGH 24 11 CULVERT IJ/EXISTING CREEK
STORAGE + BERM
LEVEL POOL ROOTING SUMMARY
HYG Dir = E:\HAESTAD\PONDPACK\PPK6\VERANDA\
Inflow HYG file= PRE-NMR.HYG -VERANDA FINAL SO YR
outflow HYG file= DET·CXJT.HYG -DISCHARGE FINAL SO YR
Pond Node Data = PRE-DUG CXJT
Pond Volune Data = PRE-DUG CXJT SOME
Pond Outlet Data = 24 11 CULVERT
No Infiltration
INITIAL CONDITIONS
Starting IJS Elev = 299.44 ft
Starting Vol1.111e •
Starting OUtflow =
Starting lnfiltr. =
Starting Total Qout=
Time Increment =
.000 ac-ft
.00 cfs
.00 cfs
.00 cfs
1.86 min
INFLOW/CXJTFLOW HYDROGRAPH SUMMARY
=====•==·····==·····=·===·====···==····=======·======
Peak Inflow
Peak OUtflow
Peak Elevation
Peak Storage =
a S8.8S cfs
17.34 cfs
= 302.0S ft
.769 ac -ft
at
at
14.01 min
23.31 min
=====================================================
MASS BALANCE (ac -ft )
+ Initial Vol = .000
+ HYG Vol IN • 1.13S
-Infiltration= .000
-HYG Vol CXJT = 1.13S
-Retained Vol .000
Page 3.07
Unrouted Vol = -.000 ac-ft (.001X of Inflow Volume)
IJARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01 -98 (61) C~te Time: 10:42:09 Date: 11-17-2000
Type •••• Pond Routing Sunnary
Name •••• VERANDA FINAL Tag: 100 YR
File •••• E:\HAESTAO\PONDPACK\PPK6\VERANDA\HENTON.ppk
Title ••• MODEL FLOW THROUGH 24" CULVERT W/EXISTING CREEK
STORAGE + BERM
LEVEL POOL ROUTING SlJlll4ARY
HYG Df r s E:\HAESTAD\PONDPACK\PPK6\VERANDA\
Inflow HYG file= PRE-NMR.HYG -VERANDA FINAL 100 YR
OUtflow HYG file= DET-OUT.HYG -DISCHARGE FINAL 100 YR
Pond Node Data = PRE·DUG OUT
Pond Volune Data = PRE-DUG OUT SOME
Pond outlet Data = 24 11 CULVERT
No Infiltration
INITIAL CONDITIONS
Starting WS Elev ,. 299.44 ft
Starting Volune •
Starting OUtf low ,.
Starting lnfiltr. ,.
Starting Total Qout=
Time Increment =
.DOO ac-ft
.00 cfs
.00 cfs
.00 cfs
1.86 min
INFLOW/OUTFLOW HYDROGRAPH SlJlll4ARY
=====================================================
Peak Inflow
Peak OUtflow
Peak Elevation
Peak Storage =
=
=
61.40 cfs
17.80 cfs
.. 302.11 ft
.806 ac -ft
at
at
14.01 min
23.31 min
==========================================z==========
MASS BALANCE (ac-ft)
+ Initial Vol = .000
+ HYG Vol IN = 1.184
· lnfi l tration = .000
-HYG Vol OUT = 1.184
-Retained Vol = .000
Unrouted Vol = ·.000 ac-ft (.001X of Inflow Volune)
WARNING: Inf low hydrograph trl.llCated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.03
Pond Pack Ver:· 8-01-98 (61) C~te Time: 10:42:09 Date: 11-17-2000
~
( ~'J'~oj~O
---rl "f' --./,,~ i'-ru
~"°7'?7?,A"' ;v'/10'
o /\:)oTG--'
;1,, 5-ero ~· r~v1~
Con{.-k.vc..)_ 2"'-/;=
P-,;71 d n ,-.) o 1-L,,.._,
5,:4-, ,,,,.--, 4 o0 ""~ ,Pit>~.
,_,-/._, cf,_~ ~,,!__ ~
4r~·
No cP"" ~~ A~ v.j; -;., h--
IL I ~/JJP
~-~
COLLEGE STATION
DEVELOPMENT PERMIT
PERMIT NO. 500020
DP-THE VERANDA
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey, A-8
DATE OF ISSUE: 02 /06/01
OWNER:
David Scarmardo
111 FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALIDFOR 12
CONTRACTOR:
TYPE OF DEVELOPMENT: FULL DEVELOPMENT PERMIT
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
MONTHS
All trees must be barricaded , as shown on plans , prior to any construction. Any trees not barricaded will not count
towards landscaping points. Barricades must be l ' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and /or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner
and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy
machinery and /or equipment as well as erosion, siltation or sedimentation resulting from the permitted work .
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Administrator/Representative Date
Owner/ Agent/ Contractor Date
Cf'1
COlllGl ~TATION
DEVELOPMENT PERMIT
PERMIT NO. 500020
DP-THE VERANDA
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey, A-8
DATE OF ISSUE: 01111101
OWNER:
David Scarmardo
111FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALIDFOR 12
CONTRACTOR:
TYPE OF DEVELOPMENT: FULL DEVELOPMENT PERMIT
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
MONTHS
All trees must be barricaded , as shown on plans , prior to any construction. Any trees not barricaded will not count
towards landscaping points . Barricades must be l' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay ba les used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition , placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion , siltation or sedimentation resu lting from the permitted work.
An y trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outs ide the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Administrator/Representative Date
Owner/ Agent/ Contractor Date
.J...J..I UO I UV .1.U • U'f:
217 LF
2 96 LF
3 114 LF
4 322 LF
5 225 LF
6 233 LF
7 22 LF
I\LJ.l 'lj\.J" J;,l ,UJ.l ~.&...i LJ.\..l.J , -, 'i '··"''"''-'~ • ._.._ ........................... . ·u ·., I" O'tU o.:.J.i:. -------------------------
ENGINEER'S ESTIMATE
. FOR
REPLAT OF LOT 3 -HENTON SUBDIVISION
WATER LINE & SANITARY SEWER LINE CONST
November 8, 2000 \€..~
Furnish and Install 12" PVC Water Main (AWWA C-900, DR
14, Pre$Sure Class 200) -Standard Depth-4'-6' Bury
complete and in place
for Dollars
and Cents per linear foot.
Furnish and Install 12" PVC Water Main (AWWA C-900, DR
14, Pressure Class 200} -Extra Depth-6'-8' Bury complete
and in place
for Dollars
and Cents per linear foot.
Furnish and Install 12" PVC Water Main (AWWA C-900, DR
14, Pressure Class 200) -Extra Depth-8'-10' Bury complete
and in place
for Dollars
and Cents per linear foot.
Furnish and Install 8" PVC Water Main (AWWA C-900 , DR 14,
Pressure Class 200) -Standard Depth-4'-6' Bury complete
and In place
for Dollars
and Cents per linear foot.
Furnish and Install 6" PVC Water Main (AWWA C-900, DR 14,
Pressure Class 200) -Standard Depth-4'-6' Bury complete
and in place
for Dollars
and Cents per linear foot.
Furnish and Install 6" PVC Water Main (AWWA C-900, DR 14,
Pressure .Class 200) -Extra Depth-6'-8' Bury complete and in
place
for Dollars
and Cents per linear foot.
Furnish and Install 6" PVC Water Main (AWWA C-900, DR 14,
Pressure Class 200) -Extra Depth ... 8'-10' Bury complete and
in place
for Dollars
and Cents per linear foot.
$29.00 $6,293.00
$31 .00 $2,976.00
$33 .00 $3 ,762.00
$21.25 $6,842 .50
$21 .12 $4,752 .00
$23.00 $5 ,359 .00
$25.00 $550.00
...,..., ......... . ................. ----· -·-· . .L.i./VO /VV
.&.\.L..i .&.l ,U .&. .. U ,U .&.l ,L..iU.&.,.&..I., • • •
U-''"' o .. v o '~"-'----------------------------
8 1 LS Furnish and Install 12" 45 Bend , Valve and Valve Box and 4"
Blow-off Valve as detailed on sheet W-1 In Inset complete and
in place
for Dollars $3,100.00 $3,100.00
and Cents per lump sum.
9 1 EA Furnish and Install Tapping Sleeve and 12" Gate Valve on
Existing 16" Water Line to include all necessary thrust blocking
complete and in place
for Dollars $3,750.00 $3 ,750.00
and Cents per each.
10 1 EA Furnish and Install Tapping Sleeve and 6" Gate Valve on
Existing 16" Water Line to include all necessary thrust blocking
complete and In place
for Dollars $2,542 .00 $2 ,542 .00
and Cents per each .
11 1 EA Furnish and Install 12" x 12" M.J . Tee to Include all necessary
thrust blocking complete and in place
for Dollars $800 .00 $800.00
and Cents per each.
12 4 EA Furnish and Install 12" x 6" M.J . Tee to include all necessary
thrust blocking complete and in place
for Dollars $800.00 $3 ,200.00
and Cents per each .
13 1 EA Furnish and Install 12" x 6" M.J . Reducer to include all
necessary thrust blocking complete and in place
for Dollars $750.00 $750.00
and Cents per each.
14 5 EA Furnish and Install 12" M.J . 45 Bend to include all necessary
thrust blocking complete and in place
for Dollars $750 .00 $3 ,750.00
and Cents per each .
15 1 EA Furnish and Install 12" Gate Valve and Box to Include all
necessary thrust blocking complete and in place
for Dollars $1,500 .00 $1,500.00
and Cents per each .
16 1 EA Furnish and Install 8" M.J . 90 Bend to include all necessary
thrust blocking complete and In place
for Dollars $300 .00 $300 .00
and Cents per each .
--________________ ........
11 /Ul:S /UU
17 2
18 2
19 8
20 6
21 1
22 1
lo:uo KLlNli hNll l NhhK ll ->-H vUv~ v ULl\/ Jll UKu i\l~
EA Furnish and Install 6" M .J. 90 Bend to include all necessary
thrust blocking complete and In place for ________________ .Dollars
and Cents per each.
EA Furnish and Install 6" M.J. 45 Bend to include all necessary
thrust blocking complete and in place
for Dollars
and Cents per each .
EA Furnish and Install 6" Gate Valve and Box to include all
necessa..Y thrust blocking complete and in place
for Dollars
and Cents per each.
EA Furnish and Install M.J. Plug on 6" Line include all necessary
thrust blocking complete and In place for ________________ .Dollars
and Cents per each.
EA Furnish and Install 2" Blow-off Valve on 8" Water Line to
include all necessary thrust blocking complete and in place
for Dollars
and Cents per each.
EA Furnish and Install Std . City of College Station Fire Hydrant
w/appurtenances including all necessary tees, valves and
thrust blocking complete and in place
for ________________ Dollars
and Cents per each .
WATER LINE· SUB-TOTAL 1
Items( 1-22 )
$200.00
$190.00
$500.00
$295.00
$350.00
$1,825.00
$400.00
$380.00
$4,000.00
$1,770.00
$350.00
$1,825.00
$58,951.50
~VVv nLl ~~ n ~~1 n nc n ~n
·-------------~---lti: U I 1 1/UIS /UU
23 101 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26,
ASTM 2241, CLASS 160)-Standard Depth-4'-6' Bury
complete and in place
for Dollars $19 .50 $1,969.50
and Cents per linear foot.
24 442 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26,
ASTM 2241 , CLASS 160) -Extra Depth-6'-8 ' Bury complete
and in place
for Dollars $20.80 $9,193.60
and Cents per linear foot.
25 138 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26,
ASTM 2241, CLASS 160) -Extra Depth-8'-1 O' Bury complete
and In place
for Dollars $23.60 $3,256.80
and Cents per linear foot.
26 86 LF Furnish and Install 12" PVC Sanitary Sewer Main (SOR 26,
ASTM 2241, CLASS 160)-Extra Depth-6'-8' Bury complete
and in place
for Dollars $30.00 $2,580.00
and Cents per linear foot.
27 127 LF Furnish and Install 12" PVC Sanitary Sewer Main (SOR 26,
ASTM 2241, CLASS 160) -Extra Depth-8'-10' Bury complete
and in place
for Dollars $33.00 $4,191 .00
and Cents per linear foot.
28 89 LF Furnish and Install 4" PVC Sanitary Sewer Service (SOR 26,
ASTM 2241, CLASS 160) -Standard Depth-4'-6' Bury
complete and in place
for Dollars $18.00 $1,602 .00
and Cents per linear foot.
29 63 LF Furnish and Install 4" PVC Sanitary Sewer Service {SOR 26 ,
ASTM 2241, CLASS 160) -Extra Depth-6'-8' Bury complete
and In place
for Dollars $20.00 $1 ,260.00
and Cents per linear foot.
30 5 EA Furnish and Install 8" x 4· Wye complete and in place
for Dollars $50.00 $250 .00
and Cents per each.
31 2 EA Furnish and Install 8" x 4" Double Wye complete and in place
for Dollars $75.00 $150.00
and Cents per each.
11 /UIS /UU 115: UIS l\LlNli ~Nlill'i~~Kll'i -+-+-+ 1,,u1,,;, VULI\/ lll UKl.>i\J'i ~UUb
32 3 EA Furnish and Install 4" x 4" Double Wye complete and in place
for Dollars $50.00 $150.00
and Cents per each.
33 1 EA Furnish and Install 12" x 4" Double Wye complete and in place
for Dollars $50.00 $50.00
and Cents per each.
34 3 EA Furnish and Install standard City of College Station Manhole
-Extra Depth-8'-10' complete and In place
for Dollars $1,800.00 $5,400.00
and Cents per each.
35 2 EA Furnish and Install standard City of College Station Manhole
-Extra Depth-10'-12' complete and In place
for Dollars $1,950.00 $3,900.00
and Cents per each.
36 1 EA Furnish and Install Standard City of College Station Manhole in
existing line-Extra Depth-8'-10' complete and in place
for Dollars $2,000.00 $2,000.00
and Cents per each .
37 2 EA Furnish and Install Standard City of College Station 8" 0.1.P .
Drop Connection complete and in place
for Dollars $1,270.00 $2,540.00
and Cents per each.
38 1 EA Furnish and Install Standard City of College Station 4" D .l.P.
Drop Connection complete and In place
for Dollars $1,000.00 $1 ,000 .00
and Cents per each.
39 1 EA Furnish and Install Standard City of College Station 8" D .l.P.
Drop Connection on Existing Manhole complete and in place
for Dollars $1,270.00 $1,270.00
and Cents per each.
40 1 EA Furnish and Install Standard City of College Station 4" 0.1.P.
Drop Connection on Existing Manhole complete and in place
for Dollars $1 ,000.00 $1 ,000.00
and Cents per each.
-..v ."' ...,, ..... ...,, ..........
41 2 EA Tie New sanitary sewer line Into Existing Manhole complete
and in place
for Dollars $700.00 $1,400.00
and Cents per each.
42 156 LF Grout fill and abandon Existing 8" Sanitary Sewer line complete
and in place
for Dollars $10.90 $1,700.40
and Cents per each.
SANITARY SEWER LINE· SUB-TOTAL 2: $44,863.30
Items (23-42)
43 1 LS Provide Contractor red-lines As -Built Drawings within 7 days of
project completion and closeout complete
for Dollars $350.00 $350.00
and Cents per lump sum.
44 1 LS Furnish and Install all necessary Barricades, Signs and Traffic
Control Devices complete and in place
for Dollars $500.00 $500.00
and Cents per lump sum .
45 1321 LF Furnish and Install all necessary Trench Safety complete and
in place
for Dollars $2.50 $3,302.50
and Cents per linear foot.
INCIDENTALS -SUB-TOTAL 3: $4, 162.50
Items (43-45)
.l.l / U(S / UU .l b : .LU
ENGINEER'S ESTIMATE
FOR
REPLA T OF LOT 3 -HENTON SUBDIVISION
WATER LINE & SANITARY SEWER LINE CONSTRUCTION
November 8 , 2000
WATER LINE -SUB-TOTAL 1:
SANITARY SEWER LINE -SUB-TOTAL 2:
INCIDENTALS -SUB-TOTAL 3:
TOTAL:
10% CONTINGENCY:
~vv u
$58,951.60
$44,863.30
$4,152.60
$107,967.30
$10,796.73
$118 ,764.03
Cf W
COLLlGl STATION
DEVELOPMENT PERMIT
PERMIT NO . 500020
DP-THE VERANDA
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey, A-8
DATE OF ISSUE: 12/05/00
OWNER:
David Scarmardo
111 FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALID FOR 4 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: CLEARING AND ROUGH GRADING ONLY
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded , as shown on plans , prior to any construction. Any trees not barricaded will not count
towards landscaping points . Barricades must be 1' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and /or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of an y silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner
and /or Contractor shall be responsible for an y damage to adjacent properties , city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Date
Owner/ Agent/ Contractor Date
SITE PLAN APPLICATION
FORO
CASE NO.
DATE SUBMITI'ED ~~.,,,;,...:;1--1\-
MINIMUM SUBMITTAL REQUIREMENTS
\, Site plan application completed in full.
~ $100.00 Application Fee.
~ $100.00 Development Permit Application Fee.
~ $300.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public
\. waterline, sewerline, sidewalk, street or drainage fucilities is involved.)
~ Ten (10) folded copies of site plan.
~ A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not
checked off.
APPLICATION DATA
NAME OF PROJECT The Veranda
----------------------------~
ADDRESS n/a -"----------------------------------~
LEGAL DESCRIPTION Lot 7 of Henton-Lincoln Subdivision Rep lat
APPLICANT (Primary Contact for the Project):
Name David Scamardo
Street Address _1_1_1 _F_M_· _28_1_8 ___________ City _B_r ...... y_a_n _________ _
State TX Zip Code 77805 E-Mail Address ------------
Phone Nwnber ( 409) 779-7209 Fax Nwnber ( 409) 822-1763
PROPERlY OWNER'S INFORMATION:
Name David Scarmardo
StreetAddress _l_l_l_F_M_28_1_8 ___________ City __.B ...... r-.1-y .... an....__ ________ _
State TX Zip Code 77805 E-Mail Address ------------
Phone N wn be r (409) 779-7209 FaxNwnber (409) 822-1763
ARCIDTECT OR ENGINEER'S INFORMATION:
Name Kling Engineering and Surveying
Street Address 4103 Texas Ave. Suite 212 City Bryan
Zip Code __ 7_7_8_02__ E-Mail Address kl ing@tca.net TX State ----
PhoneNwnber (409) 846-6212 FaxNwnber (409)846-8252 ----------
OTIIER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc .)
Name none
StreetAddress ---------------City-------------
State Zip Code _____ E-Mail Address ------------
Phone Nwnber Fax Number ________________ _
SITE PLAN APPUCA TION
SITEAPP.DOC 0312.5199
1 of3
CURRENTZONING R-4, R-IA -----------
PRES ENT USE OF PROPER1Y va
PROPOSED USE OF PROPER1Y Multi Family and Single Family Dwelling llnits
V ARIANG~)-REQmlSIBD AND-REASON(S)--
FY I: Owner is currently in the process of rezoning property to POD :
#OF PARKING SPACES REQUIRED __ 7_8 _ #OF PARKING SPACES PROVIDED 108
·~ MULTI-FAMILY RESIDENTIAL
Total Acreage 3 · 2 5
Floodplain Acreage 0
Housing Units 28
#of l Bedroom Units
# of 2 Bedroom Units
2 8 # of 3 Bedroom Units
# of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
__ # Bedrooms ~ 132 sq. ft.
__ # Bedrooms < 132 sq. ft.
0 COMMERCIAL
Total Acreage
Building Square Feet ----
Floodplain Acreage ___ _
----
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
eto true and co"ect.
March 13, 2000
Date
SITE PLAN APPLICATION 2of3
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
.\pplication is hereby made for the following development specific waterway alterations:
n/a
ACKNOWLEDGMENTS:
I, David Sca rmard o , design engineer/owner, hereby acknowledge or affirm that:
1be information and conclusions contained in the above plans and supporting documents comply with the current requirements of
the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards.
As condition of approval of · s permit appli ·on, I agree to construct the improvements proposed in this application according to
these and the req · ments of C r 13 of the College Station City Code.
Contractor
CERTIFICATIONS: (for proposed alterations within designated flood ha7.ard areas.)
A. I, certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm.
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the
latest Federal Insurance Administration Flood Ha7.ard Study and maps, as amended.
Engineer Date
C . I, certify that the alterations or development covered by this permit shall not
diminish the flood~ng capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of
floodways and of floodway fringes .
Engineer Date
D . I, do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the lat.est Federal Insurance Administration Flood Ha7.ard Study.
Engineer Date
Conditions or comments as part of approval:---------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
' hereby grant this permit for development All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project All of the applicable codes and ordinances of the City of College
Station shall apply .