HomeMy WebLinkAbout58 Standard Automatic Fire 00-9 500 Graham Rd.DRAINAGE REPORT
FOR
Standard Automatic Fire Enterprises, Inc.
Lot 2, 0.97 Acre
University Industrial Park Phase II
Robert Stevenson Survey, A-54
College Station, Brazos County, Texas
February 04, 2000
DEVELOPED BY:
Standard Automatic Fire
Enterprises, Inc.
500 Graham Road
College Station, TX 77845
( 409)690-0301
PREPARED BY:
Kling Engineering & Surveying
4103 Texas Avenue, Suite 212
Bryan, TX 77802
Drainage Report
for
Standard Automatic Fire Enterprises, Inc.
Lot 2, 0.97 Acre,
University Industrial Park Phase II
Robert Stevenson Survey, A-54
College Station, Brazos County, Texas
February 04, 2000
GENERAL LOCATION & DESCRIPTION:
The current site is located approximately 500 feet west of the intersection of S.
Graham and Victoria. The site is bound on the north by S. Graham, on the west by Lot 1 B
of the Replat of Lot 1 University Industrial Park, to the south by Donald F. Carrol, Called
100 Acres, Volume 147, Page 514, and to the east by Lynn B. White and David R. White,
Called 1. 00 Acre Tract, Volume 1332, Page 293. (See Appendix 1: "General Location
Map" for location and Appendix 4: "Drainage Areas• for surrounding properties.)
Current improvements on the 0.97 acre tract consist of a building, an asphalt
parking area on the north side of the building and a gravel parking area on the west and
south side of the building. The remainder of the tract is open area with grass cover.
Proposed improvements include expanding the existing building, building a new parking
lot and detention pond.
DRAINAGE BASIN:
The site is located in the Lick Creek drainage basin, which is the primary drainage
way (See Appendix 1: "General Location Map"). The site is not within the 100 year flood
hazard area according to the Flood Insurance Rate Maps 0182C, Community# 481195,
Effective date: July 2, 1992, for Brazos County, Texas and Incorporated areas, (See
Appendix 2: "Flood Plain Map").
Currently the site drains indirectly into a tributary of South Fork Lick Creek via sheet
flow.
DRAINAGE DESIGN CRITERIA:
The City of College Station Drainage Policy and Design Standards state that the
detention pond is to attenuate through the 100 year storm event. This standard was used
to design the detention pond for the site. The purpose of this design is to follow these
principles and provide adequate site drainage, while returning the discharge from the
detention pond to original conditions of sheet flow over a strip of unchanged ground along
the southeast side of the site.
S.A.F .E. -Drainage Report -Page 2
The following methods were used in the analysis and design of the detention pond .
The Rational Method was used to calculate the peak run-off for pre and post-developed
conditions. The Modified Rational Method was used to calculate the in-flow hydrograph
to the detention pond. The detention pond routing was performed using Level Pool
Routing Procedures combined with the appropriate hydraulic equations for the staged
outlet works.
DRAINAGE FACILITY DESIGN:
The design of the detention pond was based on pre and post-developed drainage
patterns and run-off calculations. The pre-developed site only consisted of one drainage
area and the post-developed site consisted of two drainage areas. The post-developed
drainage areas were based on the area where the run-off leaves the site undetained and
the area where the run-off is detained on site . (See Appendix 4: "Drainage Map" for
delineation of post-developed drainage areas and Appendix 5: "Hydrologic Calculations"
for run-off calculations including computations for the intensities and run-off coefficients.)
Detention Pond
The detention pond is located in the parking lot along the south property line. The
outlet works consist of 3-8" PVC pipes with upstream invert at 312.70'. There are no tail
water effects on the outlet works. The berm elevation is 314.00'.
The detention pond was designed so that the post-developed run-off rate, the
outflow from the detention pond plus the run-off from DA 2 (see Appendix 4: "Drainage
Map"), would not exceed the pre-developed run-off rate. The chart below compares the
pre-developed run-off rate and the post-developed run-off rate for the various storm
events. The pond successfully attenuates the 2, 5, 10, 25, 50 and 100 year storm events .
The water surface elevation for the 100 yr storm event is 313 .36 ft leaving 0.64 ft of free
board. (Appendix 5: "Hydrologic Calculations" shows the computations for allowable
outflow, and Appendix 6 : "Hydraulic Calculations" shows the computations for the actual
outflow computed by the Level Pool Routing Procedure.)
Outflow
Pre-Developed
Post-Developed
Q2
cf s
3 .60
3 .16
Q5
cf s
4 .37
3.83
Q10
cf s
4 .91
4.34
Q25
cf s
5 .61
4 .95
Q50 Q100
cfs cfs
6.34 6.62
5 .53 5 .78
S.A.F.E. -Drainage Report -Page 3
CONCLUSIONS:
The detention pond complies with the City of College Station Drainage Policy and
Design Standards. The detention pond will detain through the 100 year storm event.
"I hereby certify that this report (plan) for the drainage design of Standard Automatic
Fire Enterorises. Inc. -0.97 Acres was prepared by me (or under my supervision) in
accordance with the provisions of the City of College Station Drainage Policy and Design
Standards for the owners thereof."
APPENDICES
1) General Location Map (U.S.G.S.) Quad -Part of the Welborn Quadrangle
2) Flood Insurance Rate Map -FEMA
3) Grading Plan -Kling Engineering
4) Drainage Map
5) Hydrologic Calculations
6) Hydraulic Calculations
APPENDIX 1
General Location Map
APPENDIX 5
Hydrologic Calculations
~
INTENSITY CALCULATIONS
BRAZOS COUNTY
CONSTANTS FOR IDF CURVES
FREQ e b d
2 0 .806 65 8.0
5 0 .785 76 8.5
10 0.763 80 8.5
25 0 .754 89 8.5
50 0 .745 98 8.5
100 0 .730 96 8.0
INTENSITY=b/ Tc+d Ae
FREQ
Tc min 2 5 10 25 50 100
PRE
1 10 6.33 7 .69 8 .63 9.86 11 .15 11 .64
POST
2 10 6.33 7.69 8.63 9.86 11 .15 11 .64
3 10 6.33 7.69 8.63 9.86 11 .15 11 .64
HYDROLOGIC CALCULATIONS -PHASE 1
RUN-OFF COEFFICIENT CC-VALUE) CALCULATIONS
C-VALUES
LAND 0.35 IMP 0.90
GRAVEL 0.75
AREA
DA LAND GRAVEL IMP TOTAL C-VALUE
PRE -----
1 0.4745 0.2981 0.1989 0.9715 0.5853
POST -----
2 0.3018 0.0000 0.1760 0.4778 0.5526
3 0.0613 0.0000 0.4399 0.5012 0.8327
where: C = (0 .35 *LAND+ 0.75 *GRAVEL+ 0.90 * IMP)/TOTAL AREA
PEAK FLOW CALCULATIONS
DA TC C-VALUE AREA Q2 QS Q10
PRE - - -
3.598 4 .375 4 .910
1 10 0.59 0.972 3.598 4.375 4.910
POST ---2 .640 3.211 3.604
2 10 0.55 0.478 1.670 2 .031 2 .280
3 10 0.83 0.501 2.640 3.211 3.604
whe re: Q = C-Value *Area * I
I -is found in "Intensity Calculations" and corresponds to the
approp riate Tc and frequency .
MAXIMUM ALLOWABLE OUTFLOW FROM POND*
Q2 QS Q10 Q25 QSO Q100
DA 1 3.ou 4 .37 4 .91 5.61 6 .34 6.02
DA2 1.67 2.03 2.28 2 .60 2 .94 3.07
MAX. 1.93 2.34 2.63 3.00 3.40 3.55
where : MAX.= DA 1 -DA2
Q25 QSO Q100
5.608 6.339 6.619
5.608 6.339 6.619
4.116 4 .653 4.858
2 .604 2 .943 3 .073
4.116 4.653 4 .858
*The maximum allowable outflow from pond is used to create the initial inflow hydrograph for the detention pond .
This calculat ion is also used to qu ickly check the results of the Pond Pack runs to insure that pre-developed
run-off rates will not be exceeded .
POST-DEVELOPED RUN-OFF RA TES
Q2 QS Q10 Q25 Q50 Q100
OUTFLOW* 1.49 1.80 2 .06 2.35 2.59 2.71
POST 3.16 3.83 4.34 4.95 5.53 5.78
*Outflow -is the outflow from the pond as calculated by Pond Pack .
SAFE HYDROLOGIC CALCULATIONS -PHASE
Type ...• Tc Cales
Name ...• TC=10
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Page 1.01
........................................................................ ........................................................................
TIME OF CONCENTRATION CALCULATOR
········································································ ........................................................................
Segment #1: Tc: User Defined
Segment #1 Time: 10.00 min
Total Tc: 10.00 min
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:45:00 Date: 02-26-2000
Type .... C and Area
Name .... RUN4
File •... E:\PROJECTS\SAFE\PONOPACK\SAFE.PPK
Title ..• PHASE 1 -DESIGNED PONO IN PARKING
RATIONAL C COEFFICIENT DATA
Page 2.01
.......................................................................... .........................................................................
PHASE 1 -DESIGNED PONO IN PARKING
Area c x Area
Soil/Surface Description c acres acres
----------------------------------------·-------·· ·---------
GRASS .3500 .061 .021
IMPERVIOUS .9000 .440 .396
IJEIGHTEO c & TOTAL AREA ---> .8330 .501 .417 ......................................................................... ·········································································
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:45:00 Date: 02-26-2000
Type •••• Rational Peak Q's
Name ..•. RUN4
Page 2.02
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
SUMMARY OF RATIONAL METHOD PEAK DISCHARGES
Q = CiA * Units Conversion; ~here Conversion = 43560 I (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
----------------------------
2 YR 2 BRAZOS.IDQ e = .8060 b = 6S.OOOO d = 8.0000
S YR s BRAZOS. IDQ e = .78SO b = 76.0000 d = 8 .SOOO
10 YR 10 BRAZOS. IDQ e = .7630 b = 80.0000 d = 8.SOOO
2S YR 2S BRAZOS. IDQ e = .7540 b = 89.0000 d = 8.SOOO
SO YR so BRAZOS.IDQ e = .74SO b = 98.0000 d = 8.SOOO
100 YR 100 BRAZOS. IDQ e = .7300 b = 96.0000 d = 8.0000
Tc = 10.00 min
-----------------------------
Tag Freq c C adj I c Area Peak Q
(years) factor I final in/hr acres I cfs
1-----------------------------1 ----------
2 YR 2 .833 1.000 I .833 6.326S .S01 I 2.66
S YR s .833 1.000 I .833 7.6928 .S01 I 3.24
0 YR 10 .833 1.000 I .833 8.634S .S01 I 3.63
2S YR 2S .833 1.000 I .833 9.861S .S01 I 4.1S
SO YR so .833 1.000 I .833 11. 1476 .S01 I 4.69
100 YR 100 .833 1.000 I .833 11.6392 .S01 I 4.90
-----------------------------
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:4S:OO Date: 02 -26 -2000
Type •••• Mod. Rational Grand Sl.ITfllary
Name •••• RUN4
File •••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Page 2.03
************************************************************************
************************************************************************
* *
* *
* MOOIFIED RATIONAL METHOD *
* ----Grand Sl.ITfllary For All Storm Frequencies *
* *
* *
************************************************************************
************************************************************************
Q CiA * Units Conversion; Where Conversion 43560 I (12 * 3600)
Area = .501 acres Tc = 10.00 min ............................................................................ ............................................................................
Freq. Adjusted Duration
years 'C' min in/hr
Qpeak Allowable!
cfs cfs I
VOLUMES
Inflow
ac-ft
Storage
ac-ft
------------------------------------------------------1---------------------
2
10
25
so
100
.833
.833
.833
.833
.833
.833
S/N: HOMOL0863131
12.00
12.00
13.00
13.00
13.00
14.00
5 .8114
7.0972
7.6991
8.8050
9.9669
10.0532
KLING ENGINEERING
2.45
2.99
3.24
3. 71
4.19
4.23
1.46 I
i.11 I
1.98 I
2.26 I
2.51 I
2.59 I
Pond Pack Ver: 8-01-98 (61) COflllllte Time: 13:45:00
.040
.049
.058
.066
.075
.082
.017
.021
.023
.027
.031
.033
Date: 02-26-2000
Type .... Mod. Rational Graph Page 2.10
Name .... RUN4 Tag: 2 YR
File ...• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOO
Graphical Slllll18ry for Maxilla.Ill Required Storage ----
Q CiA * Units Conversion; Where Conversion 43560 / C12 * 3600)
**********************************************************************
Q
*
*
RETURN FREQUENCY: 2 yr
'C' Adjustment: 1.000
Allowable Outflow: 1.46 cfs
Required Storage: .017 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inf low: 2.45 cfs *
* .HYG File: SAFE4.HYG HYG 10 2 YR *
**********************************************************************
Td = 12.00 min
/-------Approx. Duration for Max. Storage ------/
Return Freq: 2 yr
C adj.factor:1.000
1
I
x
·I·
I
I
I
I
Tc= 10.00 min
6.3265 in/hr
I
I
I Q 2.66 cfs
I
I
I
Required Storage I
.017 ac -ft I
I
Area = .501 acres
Weighted C
Adjusted C
.833
.833
Td= 12.00 min
5.8114 in/hr
x x x x x x xix x x x x x x x x x x Q 2.45 cfs
I
x
o o o o o o o o o o o o o o o o Q = 1.46 cfs
x o I· Ix CAL low.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
o I I x
'-----------------------1-----------------------------1 ------------
14.52 min 16.03 min T
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01 -98 (61) COOlllJte Time: 13:45:00 Date: 02-26 -2000
Type ..•• Mod. Rational Storm Cales
Name ..•• RUN4 Tag: 2 YR
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MODIFIED RATIONAL METHOD
Sunmary for Single Storm Frequency
Page 2.11
Q = CiA * Units Conversion; ~here Conversion = 43560 / (12 * 3600)
RETURN FREQUENCY: 2 yr 'C' Adjustment = 1.000 Allowable Q = 1.46 cfs
Hydrograph Storm Duration, Td = 12.00 min
Hydrograph File: SAFE4.HYG HYG 10 2 YR
Tc 10.00 min
............................................................................ ............................................................................
~td. Adjusted Duration
'C' 'C' min
Intens.
in/hr
Area
acres
Qpeak I
cts I
VOLUMES
Inflow Storage
ac-ft ac-ft
------------------------------------------------------1---------------------
.833 .833 10.00 6.3265 .501 2.66 I .037 .017
************************************************************ Storage Maxinun
.833 .833 12.00 5.8114 .501 2.45 I .040 .017
****************************************************************************
.833
833
.833
.833
.833
.833
S/N: HOMOL0863131
15.00 5.1923
20.00 4.4310
30.00 3.4642
KLING ENGINEERING
.501
.501
.501
2.18
1.86
1.46
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00
.045
.051
.016
.014
Qpeak < Qallow
Date: 02 -26 -2000
Type .... Mod. Rational Hyg Page 2.12
Name .... RUN4 Tag: 2 YR
File ...• E:\PROJECTS\SAFE\PONDPACK\
MODIFIED RATIONAL METHOD HYDROGRAPH
Q = CiA * Units Conversion; Where Conversion = 43560 I (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
2 YR 2 BRAZOS.IDQ e = .8060 b = 65.0000 d = 8.0000
Tag
2 YR
Td = 12.00 min
Freq c c adj c Area I
(years) factor I final in/hr acres I
l··---------------------------1
2 .833 1.000 I .833 5.8114 .501
-----------------------------
HYG file= E:\PROJECTS\SAFE\PONDPACK\SAFE4.HYG
HYG ID = HYG 10
HYG Tag = 2 YR
Peale Discharge =
Time to Peale
HYG Volune
2.45 cfs
10.00 min
.040 ac·ft
WARNING: Hydrograph truncated on left side.
HYDROGRAPH ORDINATES (cfs)
Output Time increment = 1.33 min
I
Peale Q
cfs
----------
2.45
Time I
min I Time on left represents time for first value in each row.
---------1--------------------------------------------------------------
.69 I
7.34 I
13.99 I
20.64 I
.17
1.80
1.96
.33
.49
2.12
1.63
.01
.82
2.45
1.31
.00
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) COf11>Ute Time: 13:45:00
1.14
2.45
.98
1.47
2.28
.66
Date: 02-26-2000
Type .... Mod. Rational Graph Page 2.16
Name .... RUN4 Tag: 5 YR
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOD
Graphical Slill118ry for Maxi111J11 Required Storage
Q CiA * Units Convers i on; Where Conversion = 43560 / C12 * 3600)
**********************************************************************
* RETURN FREQUENCY: 5 yr
* 'C' Adjustment: 1.000
Allowable Outflow: 1.77 cfs
Required Stor age: .021 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inf low: 2.99 cfs *
* .HYG File: SAFE4.HYG HYG 10 5 YR *
**********************************************************************
Q Td = 12.00 min Return Freq: 5 yr
/-------Approx. Duration for Max. Storage------/ C adj.factor:1.000
I I
I I
I Tc= 10.00 min I
I I = 7.6928 in/hr I Area = .501 acres
I Q = 3.24 cfs I Weighted C .833
I ·I· I Adjusted C = .833
I I I
I I Required Storage I
I .021 ac-ft I Td= 12.00 min
I I I 7.0972 in/hr
I x x x x x x xix x x x x x x x x x x Q 2.99 cfs
I I
I x x
I o o o o o o o o o o o o o o o o Q = 1.77 cfs
I x o I· Ix (Allow.Outflow)
I o I I
I x 0 I NOT TO SCALE I x
I 0 I ============ I
I o I I x
'-----------------------1-----------------------------1------------
14.53 min 16.07 min T
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C001>Ute Time: 13:45:00 Date: 02-26-2000
Type ..•• Mod. Rational Storm Cales
Name ...• RUN4 Tag: 5 YR
File .••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MODIFIED RATIONAL METHOD
Sl.11111ary for Single Storm Frequency
Page 2.17
Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600)
RETURN FREQUENCY: 5 yr 'C' Adjustment= 1.000 Allowable Q = 1.77 cfs
Hydrograph Storm Duration, Td = 12.00 min
Hydrograph File: SAFE4.HYG HYG 10 5 YR
Tc = 10.00 min
............................................................................ .............................................................................
Wtd. Adjusted Duration Intens. Area
'C' 'C' min in/hr acres
Qpeak I
cts I
VOLUMES
Inflow
ac-ft
Storage
ac·ft
·-----------------------------------------------------1---------------------
.833 .833 10.00 7.6928 .501 3.24 I .045 .020
************************************************************ Storage Maxill'-'11
.833 .833 12.00 7.0972 .501 2.99 I .049 .021
****************************************************************************
.833
.833
.833
.833
.833
.833
.833
.833
15.00
20.00
30.00
6.3757
5.4797
4.3274
40.00 3.6100
S/N: HOMOL0863131 KLING ENGINEERING
.501
.501
.501
.501
2.68
2.31
1.82
1.52
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00
.055
.064
.075
.020
.017
.007
Qpeak < Qallow
Date: 02-26-2000
Type ..•. Mod. Rat i onal Hyg Page 2.18
Name .... RUN4 Tag: 5 YR
File ..•• E:\PROJECTS\SAFE\PONDPACK\
MODIFIED RATIONAL METHOD HYDROGRAPH
Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
5 YR 5 BRAZOS. I DQ e = .7850 b = 76.0000 d = 8.5000
Tag
5 YR
Td = 12.00 min
Freq c c adj I c Area
(years) factor I final in/hr acres I
1-----------------------------1
5 .833 1.000 I .833 7.0972 .501
-----------------------------
HYG file= E:\PROJECTS\SAFE\PONDPACK\SAFE4.HYG
HYG ID = HYG 10
HYG Tag = 5 YR
Peak Discharge =
Time to Peak
HYG Volune =
2.99 cfs
10.00 min
.049 ac -ft
WARNING: Hydrograph truncated on left side.
HYDROGRAPH ORDINATES Ccfs)
Output Time increment = 1.33 min
I
Peak Q
cfs
-------·--
2.99
Time I
min I Time on left represents time for first value in each row .
---------1--------------------------------------------------------------
.69 I
7.34 I
13.99 I
20.64 I
.21
2.19
2.39
.41
.60
2.59
1.99
.01
1.00
2.99
1.60
.00
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) Coq:>Ute Time: 13:45:00
1.40 1.80
2.99 2.79
1.20 .80
Date: 02-26-2000
Type .•.. Mod. Rational Graph Page 2.04
Name .... RUN4 Tag: 10 YR
File .••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOO
Graphical SISl'fll8ry for MaxinK.m Required Storage ····
Q CiA * Units Conversion; Where Conversion 43560 I C12 * 3600)
**********************************************************************
* RETURN FREQUENCY: 10 yr
* 'C' Adjustment: 1.000
Allowable Outflow: 1.98 cfs
Required Storage: .023 ac·ft
*
*
*--------------------------------------------------------------------*
* Peak Inf low: 3.24 cfs *
* .HYG File: SAFE4.HYG HYG 10 10 YR *
**********************************************************************
Q Td = 13.00 min
/······· Approx. Duration for Max. Storage ······/
I
I
Tc= 10.00 min I
8.6345 in/hr I
Q 3.63 cfs I
·I· I
I I
I Required Storage I
.023 ac·ft I
I
Return Freq: 10 yr
C adj.factor:1.000
Area = .501 acres
Weighted C .833
Adjusted C .833
Td= 13.00 min
7.6991 in/hr
x x x x x x xix x x x x x x x x x x Q 3.24 cfs
I
x x
o o o o o o o o o o o o o o o o Q = 1.98 cfs
x o I· Ix (Allow.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
o I I x
··················-----1-----------------------------1------------
14.55 min 16.89 min T
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) COflllllte Time: 13:45:00 Date: 02-26-2000
Type ..•. Mod. Rational Storm Cales
Name .... RUN4 Tag: 10 YR
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MODIFIED RATIONAL METHOD
Sl.lllllary for Single Storm Frequency
Page 2.05
Q = CiA * Units Conversion; Where Conversion = 43560 I C12 * 3600)
RETURN FREQUENCY: 10 yr 'C' Adjustment= 1.DDD Allowable Q = 1.98 cfs
Hydrograph Storm Duration, Td = 13.00 min
Hydrograph File: SAFE4.HYG HYG 10 10 YR
Tc = 10.00 min
............................................................................ ............................................................................
Wtd. Adjusted Duration Intens. Area
'C' 'C' min in/hr acres
Qpeak I
cfs I
VOLUMES
Inflow
ac-ft
Storage
ac -ft
------------------------------------------------------1---------------------
.833 .833 10.00 8.6345 .501 3.63 I .050 .023
************************************************************ Storage Maximun
.833 .833 13.00 7.6991 .501 3.24 I .058 .023
****************************************************************************
.833 .833 15.00 7.1939 .501 3.03 .063 .023
833 .833 20.00 6.2093 .501 2.61 .072 .020
.833 .833 30.00 4.9361 .501 2.08 .086 .010
.833 .833 40.00 4. 1387 .501 1.74 Opeak < Oallow
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00 Date: 02-26-2000
Type ...• Mod. Rational Hyg Page 2.06
Name ..•• RUN4 Tag: 10 YR
File ...• E:\PROJECTS\SAFE\PONDPACK\
MODIFIED RATIONAL METHOD HYDROGRAPH
Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
10 YR 10 BRAZOS. IDQ e = .7630 b = 80.0000 d = 8.5000
Tag
10 YR
Td = 13.00 min
Freq c c adj I c Area
(years) factor I final in/hr acres I
1-----------------------------1
10 .833 1.000 I .833 7.6991 .501
-----------------------------
HYG f i le= E:\PROJECTS\SAFE\PONDPACK\SAFE4.HYG
HYG ID = HYG 10
HYG Tag = 10 YR
Peak Discharge =
Time to Peak =
HYG Voli..me
3.24 cfs
10 .00 min
.058 ac-ft
WARNING: Hydrog r aph truncated on left side.
HYDROGRAPH ORDINATES (cfs)
Output Time increment= 1.33 min
I
Peak Q
cfs
----------
3.24
Time I
min I Time on left represents time for first value in each row.
---------1--------------------------------------------------------------
.69 I
7.34 I
13.99 I
20.64 I
.22
2.38
2.92
.76
.65
2.81
2.49
.33
1.09
3.24
2.06
.00
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8 -01-98 (61) COITlJUte Time: 13:45:00
1.52 1.95
3.24 3.24
1.63 1.19
Date: 02 -26-2000
Type ..•. Mod. Rational Graph Page 2. 13
Name .... RUN4 Tag: 25 YR
rile ..•• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MODIFIED RATIONAL METHOD
----Graphical SU1111ary for MaxillLm Required Storage
Q = CiA * Units Conversion; Yhere Conversion = 43560 / (12 * 3600)
**********************************************************************
* RETURN FREQUENCY: 25 yr
* 'C' Adjustment: 1.000
Allowable Outflow: 2.26 cfs
Required Storage: .027 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 3.71 cfs *
* .HYG File: SAFE4.HYG HYG 10 25 YR *
**********************************************************************
Q Td = 13.00 min Return Freq: 25 yr
/-------Approx. Duration for Max. Storage ------/ C adj.factor:1.000
I I
I I
I Tc= 10.00 min I
I = 9.8615 in/hr I Area = .501 acres
I Q = 4.15 cfs I Yeighted C .833
I ·I· I Adjusted C = .833
I I I
I I Required Storage I
I .027 ac-ft I Td= 13.00 min
I I I = 8.8050 in/hr
I xx xx xx xix xx xx xx xx xx Q = 3.71 cfs
I I
I x x
I o o o o o o o o o o o o o o o o Q = 2.26 cfs
I x o I· Ix (Allow.Outflow)
I o I I
I x 0 I NOT TO SCALE I x
I 0 I ============ I
I 0 I I x
'-----------------------1-----------------------------1------------
14.55 min 16.90 min T
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) COIJ1'Ute Time: 13:45:00 Date: 02-26-2000
Type ..•• Mod. Rational Storm Cales
Name .... RUN4 Tag: 25 YR
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOD
SUllllllry for Single Storm Frequency
Page 2.14
Q = CiA * Units Conversion; Where Conversion = 43560 I C12 * 3600)
RETURN FREQUENCY: 25 yr 'C' Adjustment= 1.000 Allowable Q = 2.26 cfs
Hydrograph Storm Duration, Td = 13.00 min
Hydrograph File: SAFE4.HYG HYG 10 25 YR
Tc = 10.00 min
············································································ ............................................................................
Wtd. Adjusted Duration Intens.
'C' 'C' min in/hr
Area
acres
Qpeak I
cts I
VOLUMES
Inflow
ac·ft
Storage
ac·ft
······················································I·····················
.833 .833 10.00 9.8615 .501 4.15 I .057 .026
************************************************************ Storage Maximun
.833 .833 13.00 8.8050 .501 3.71 I .066 .027
****************************************************************************
.833 .833 15.00 8.2339 .501 3.46 .072 .027
.833 .833 20.00 7. 1193 .501 3.00 .083 .024
.833 .833 30.00 5.6748 .501 2.39 .099 .012
.833 .833 40.00 4.7680 .501 2.01 Qpeak < Qallow
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00 Date: 02-26-2000
Type .... Mod. Rational Hyg Page 2.15
Name .... RUN4 Tag: 25 YR
File .••• E:\PROJECTS\SAFE\PONDPACK\
MODIFIED RATIONAL METHOD HYDROGRAPH
Q = CiA * Units Conversion; Where Conversion = 4356D I (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF curve
25 YR 25 BRAZOS.IDQ e = .7540 b = 89.0000 d = 8.5000
Tag
25
Td = 13.00 min
Freq c c adj I c Area
(years) factor I final in/hr acres I
1-----------------------------1
YR 25 .833 1.000 I .833 8.8050 .501
-----------------------------
HYG f i le= E:\PROJECTS\SAFE\PONDPACK\SAFE4.HYG
HYG ID = HYG 10
HYG Tag = 25 YR
Peak Discharge =
Time to Peak
HYG Voli.me
3.71 cfs
10.00 min
.066 ac-ft
WARNING: Hydrograph truncated on left side.
HYDROGRAPH ORDINATES Ccfs)
Ti me I Output Time increment = 1.33 min
I
Peak Q
cfs
-----·-·--
3.71
min I Ti me on left represents time for fir s t value in each row.
---------1--------------------------------------------------------------
.69 I .26 .75 1.24 1.73 2.23
7.34 I 2.72 3.21 3.71 3.71 3.71
13 .99 I 3.34 2.85 2.35 1.86 1.37
20.64 I .87 .38 .oo
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) c~te Time: 13:45:00 Date: 02-26-2000
Type •••• Mod. Rational Graph Page 2.19
Name ..•. RUN4 Tag: SO YR
File .•.• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOO
----Graphical S1i1111ary for Maxi~ Required Storage ---·
Q CiA * Un i ts Conversion; Where Conversion = 43S60 / (12 * 3600)
**********************************************************************
* RETURN FREQUENCY: SO yr
• 'C' Adjustment: 1.000
Allowable Outflow: 2.S1 cfs
Required Storage: .031 ac -ft
•
•
*--------------------------------------------------------------------*
* Peak Inflow: 4.19 cfs •
* .HYG File: SAFE4.HYG HYG 10 SO YR •
**********************************************************************
Q I Td = 13.00 min
/-------Approx. Duration for Max. Storage ------/
Return Freq: SO yr
C adj.factor:1.000
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
x
0
x
x
0
·I ·
I
I
I
I
Tc= 10.00 min
I = 11.1476 in/hr
I
I
I Q = 4.69 cfs
I
I
Required Storage I
.031 ac·ft I
I
Area = .S01 acres
Weighted C .833
Adjusted C = .833
Td= 13.00 min
9.9669 in/hr
x x x x x x xix x x x x x x x x x x Q 4.19 cfs
0
0
I
x
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q = 2.S1 cfs
I·
I
I
I
NOT TO SCALE
============
Ix (Allow.Outflow>
I
I
I
x
I o I I x
'-----------------------1 -----------------------------1------------
14.6S min 17.02 mi n T
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:4S:OO Date: 02-26 -2000
Type .... Mod. Rational Storm Cales
Name ..•. RUN4 Tag: 50 YR
File .••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOO
SUllll8ry for Single Storm Frequency
Page 2.20
Q = CiA * Units Conversion; Where Conversion = 43560 I (12 * 3600)
RETURN FREQUENCY: 50 yr 'C' Adjustment= 1.000 Allowable Q = 2.51 cfs
Hydrograph Storm Duration, Td = 13.00 min
Hydrograph File: SAFE4.HYG HYG 10 50 YR
Tc = 10.00 min
............................................................................ ............................................................................
Wtd. Adjusted Duration Intens. Area
'C' 'C' min in/hr acres
Qpeak I
cts I
VOLUMES
Inflow
ac-ft
Storage
ac-ft
------------------------------------------------------1---------------------
.833 .833 10.00 11.1476 .501 4.69 I .065 .030
************************************************************ Storage Maxi11U11
.833 .833 13.00 9.9669 .501 4.19 I .075 .031
****************************************************************************
.833
833
.833
.833
.833
.833
.833
.833
15.00 9.3278
20.00 8.0792
30.00 6.4574
40.00 5.4369
S/N: HOMOL0863131 KLING ENGINEERING
.501
.501
.501
.501
3.93
3.40
2.72
2.29
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00
.081
.094
.112
.031
.028
.015
Qpeak < Qal low
Date: 02-26-2000
Type ..•. Mod. Rational Hyg Page 2.21
Name .... RUN4 Tag: 50 YR
File •••• E:\PROJECTS\SAFE\PONDPACK\
MODIFIED RATIONAL METHOD HYDROGRAPH
Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600)
Rational Storms: BRAZOS.IDQ RATIONAL
Tag Freq File IDF Curve
50 YR 50 BRAZOS. IDQ e = .7450 b = 98.0000 d = 8.5000
Tag
50 YR
Td = 13.00 min
Freq c c adj I c Area
(years) facto r I final in/hr acres I
l··---------------------------1
50 .833 1.000 I .833 9.9669 .501
-----------------------------
HYG f i le= E:\PROJECTS\SAFE\PONDPACK\SAFE4.HYG
HYG ID = HYG 10
HYG Tag = 50 YR
Peak Discharge =
Time to Peak
HYG Volume
4.19 cfs
10.00 min
.075 ac-ft
WARN I NG: Hydrograph truncated on left side.
HYDROGRAPH ORDINATES (cfs)
Output Time increment = 1.33 min
I
Peak Q
cfs
----------
4.19
Ti me I
mi n I Time on left r epresents time for f i r s t value in each row.
---------1--------------------------------------------------------------
.69 I
1 .34 I
13.99 I
20.64 I
.29
3.08
3.78
.99
.85
3.64
3.22
.43
1.41
4.19
2.66
.00
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8 -01-98 (61) C01J1XJte Time: 13:45:00
1.96
4.19
2.10
2.52
4.19
1.55
Date : 02 -26-2000
Type ..•• Mod. Rational Graph Page 2.07
Name .... RUN4 Tag: 100 YR
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MODIFIED RATIONAL METHOD
Graphical Sllllllary for Maxin-..n Required Storage ·---
Q = CiA * Units Conversion; ~here Conversion 43560 I C12 * 3600)
**********************************************************************
* RETURN FREQUENCY: 100 yr
* 'C' Adjustment: 1.000
* Peak Inflow: 4.23 cfs
Allowable Outflow: 2.59 cfs
Required Storage: .033 ac·ft
* .HYG File : SAFE4.HYG HYG 10 100 YR
*
*
*
*
**********************************************************************
Q Td = 14.00 mi n Return Freq: 100 yr
/-------Approx. Duration for Max. Storage------/ C adj.factor:1.000
I
I
Tc= 10.00 min I
11 .6392 i n/hr I Area= .501 acres
Q 4.90 cfs I ~eighted C .833
·I· I Adjusted C .833
I I
I Required Storage I
.033 ac -ft I Td= 14.00 min
I I I 10.0532 in/hr
x x x x x x xix x x x x x x x x x x Q 4.23 cfs
I
x x
o o o o o o o o o o o o o o o o Q = 2.59 cfs
x o I· Ix (Allow.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
o I I x
-------------·---------1 -----------------------------1------------
14.71 min 17.88 min T
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01 -98 (61) Coq:>Ute Time: 13:45:00 Date: 02 -26 -2000
Type •••• Mod. Rational Storm Cales
Name •••• RUN4 Tag: 100 YR
File •.•• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
MOOIFIED RATIONAL METHOO
Sl.tllllBry for Single Storm Frequency
Page 2.08
Q = CiA * Units Conversion; Where Conversion = 43560 I C12 * 3600)
RETURN FREQUENCY: 100 yr 'C' Adjustment= 1.000 Allowable Q = 2.59 cfs
Hydrograph Storm Duration, Td = 14.00 min
Hydrograph File: SAFE4.HYG HYG 10 100 YR
Tc = 10.00 min
.............................................................................. ............................................................................
Wtd. Adjusted Duration
'C' 'C' min
lntens.
in/hr
Area
acres
Qpeak I
cts I
VOLUMES
Inflow Storage
ac·ft ac-ft
------------------------------------------------------1---------------------
.833 .833 10.00 11.6392 .501 4.90 I .067 .032
************************************************************ Storage Maxi1T1U11
.833 .833 14.00 10.0532 .501 4.23 I .082 .033
****************************************************************************
.833 .833 15.00 9.7322 .501 4.10 .085 .033
833 .833 20.00 8.4304 .501 3.55 .098 .030
.833 .833 30.00 6.7457 .501 2.84 • 117 .017
.833 .833 40.00 5.6881 .501 2.39 Qpeak < Qallow
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00 Date: 02-26-2000
Type .... Mod. Rational Hyg Page 2.09
Name .... RUN4 Tag: 100 YR
File ..•• E:\PROJECTS\SAFE\PONDPACK\
MODIFIED RATIONAL METHOD HYOROGRAPH
Q = CiA * Units Conversion; ~here Conversion = 43560 / (12 * 3600)
Rational Storms: BRAZOS.IOQ RATIONAL
Tag Freq Fi le !OF Curve
100 YR 100 BRAZOS.IOQ e = .7300 b = 96.0000 d = 8.0000
Tag
100 YR
Td = 14.00 min
Freq c c adj I c Area
(years) factor I final in/hr acres I
1-----------------------------1
100 .833 1.000 I .833 10.0532 .501
-----------------------------
HYG file= E:\PROJECTS\SAFE\PONDPACK\SAFE4.HYG
HYG ID HYG 10
HYG Tag = 100 YR
Peak Discharge =
Time to Peak
HYG Volume
4.23 cfs
10.00 min
.082 ac-ft
~ARNING: Hydrograph truncated on left side.
HYDROGRAPH ORDINATES (cfs)
Output Time increment= 1.33 min
I
Peak Q
cfs
----------
4.23
Time I
min I Time on left represents time for first value in each row .
---------1--------------------------------------------------------------
.69 I
1.34 I
13 .99 I
20.64 I
.29
3. 11
4.23
1.42
.86 1.42
3.67 4.23
3.67 3.11
.86 .30
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:45:00
1.98
4.23
2.55
.00
2.54
4.23
1.98
Date: 02 -26-2000
APPENDIX 6
Hydraulic Calculations
Type .... Vol: Elev-Area
Name .... RUN3
File ..•• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Title ... PHASE 1 -POND IN PARKING
Elevation
(ft)
Planimeter
(sq.in)
Area A1+A2+sqrCA1*A2) Volune
312.70
313.00
314.00
(acres)
.0000
.0634
.1718
(acres)
.0000
.0634
.3396
POND VOLUME EQUATIONS
(ac-ft)
.000
.006
.113
Page 1.01
Volune Sl..fll
(ac-ft)
.000
.006
.120
* Incremental volune c~ted by the Conic Method for Reservoir Volunes.
Volune = (1/3) * CEL2-EL1) * (Area1 + Area2 + sq.rt.(Area1*Area2))
where: EL1, EL2 =Lower and upper elevations of the increment
Area1,Area2 =Areas c~ted for EL1, EL2, respectively
Volune =Incremental volune between EL1 and EL2
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8 -01-98 (61) C~te Time: 13:46:44 Date: 02-26-2000
Type .••. Outlet Input Data
Name .... RUN3
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Title ••• PHASE 1 -POND IN PARKING
REQUESTED POND WS ELEVATIONS:
Min. Elev.= 312.70 ft
Increment = .20 ft
Max. Elev.= 314.00 ft
**********************************************
OUTLET CONNECTIVITY
**********************************************
---> Forward Flow Only (Upstream to DnStream)
<---Reverse Flow Only (DnStream to Upstream)
<---> Forward and Reverse Both Allowed
Structure No. Outfall E1 I ft
Orifice-Circular ---> TW 312.700
TW SETUP, OS Channel
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) COflllUte Time: 13:46:44
Page 2.01
E2, ft
314.000
Date: 02-26-2000
Type .... Outlet Input Data
Name .... RUN3
File ..•. E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Title ... PHASE 1 · POND IN PARKING
OUTLET STRUCTURE INPUT DATA
Structure ID
Structure Type = Orifice-Circular
# of Openings
Invert Elev.
Diameter
Orif i ce Coeff.
TW
3
312.70 ft
.6700 ft
.600
Structure ID
Structure Type TW SETUP, OS Channel
------------------------------------
FREE OUTFALL CONDITIONS SPECIFIED
CONVERGENCE TOLERANCES ...
Max i lll.lll Iterations= 30
Min. TW tolerance = .01 ft
Max. TW tolerance .01 ft
Mi n . HW tolerance .01 ft
Max. HW tolerance .01 ft
Min. Q tolerance .10 cfs
Max. Q tolerance .10 cfs
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:46:44
Page 2.02
Date: 02 -26 -2000
t
t
Type .... Individual Outlet Curves
Name ..•. RUN3
Page 2.03
File •..• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Title ••• PHASE 1 -POND IN PARKING
RATING TABLE FOR ONE OUTLET TYPE
Structure ID (Orifice-Circular)
Upstream ID (Pond Water Surface)
ONstream ID = TW (Pond Outfall)
NUMBER OF OPENINGS = 3
EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING
WS Elev,Device Q Tail Water Notes
WS Elev. Q TW Elev Converge
ft cfs ft +/-ft C~tation Messages
--------.... --........ ---------------------------
312.70 .00 Free Outfall Upstream HW & DNstream TW < Inv.El
312.90 .32 Free Outfall CRIT.DEPTH CONTROL Vh= .053ft Der=
CRIT.DEPTH
313.10 1.16 Free Outfall CR IT .DEPTH CONTROL Vh= . 109ft Der=
CRIT .DEPTH
13.30 2.37 Free Outfall CRIT .DEPTH CONTROL Vh= . 180ft Der=
CRIT .DEPTH
313.50 3.47 Free Outfall H =.46
313. 70 4.15 Free Outfall H =.67
313.90 4.73 Free Outfall H =.87
314.00 5.00 Free Outfall H =.96
S/N: HOMOL0863131 KLING ENGINEERING
.146f
.290f
.420f
Type •••• C0il1)0site Rating Curve
ame •••• RUN3
File •••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
Title ••• PHASE 1 -POND IN PARKING
***** COMPOSITE OUTFLOW SUMMARY ****
WS Elev, Total Q Notes
-----·-·----------------Converge -------------------------
Elev. Q TW Elev Error
ft cfs ft +/-ft Contributing Structures
----------------............................................................ ---
312.70 .00 Free Outfall None contributing
312.90 .32 Free Outfall
313.10 1.16 Free Outfall
313.30 2.37 Free Outfall
313.50 3.47 Free Outfall
313. 70 4.15 Free Outfall
313.90 4.73 Free Outfall
314.00 5.00 Free Outfall
S/N: HOMOL0863131 KLING ENGINEERING
Page 2.04
Pond Pack Ver: 8-01-98 (61) COfll'.lllte Time: 13:46:44 Date: 02-26 -2000
Type .... Pond Routing Surmary
Name .... RUN3 Tag: 2 YR
File .... E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\PROJECTS\SAFE\PONDPACK\
Inflow HYG file= SAFE4.HYG -HYG 10 2 YR
Outflow HYG file= NONE STORED -RUN3 OUT 2 YR
Pond Node Data RUN3
Pond Volune Data RUN3
Pond Outlet Data RUN3
No Infiltration
INITIAL CONDITIONS
Starting IJS Elev 312.70 ft
Starting Vo lune .000 ac-ft
Starting Outflow .00 cfs
Starting Infiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment = 1.33 min
INFLOIJ/OUTFLOIJ HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
2.45 cfs
1.49 cfs
313.15 ft
.017 ac-ft
at
at
10.00 min
15.32 min
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .040
-Infiltration= .000
-HYG Vol OUT .040
-Retained Vol .000
Page 3.03
Unrouted Vol -.000 ac-ft (.033% of Inflow Volune)
IJARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:46:44 Date: 02-26-2000
Type .... Pond Routing Sllllllary
Name .... RUN3 Tag: 5 YR
File ..•• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir = E:\PROJECTS\SAFE\PONDPACK\
Inflow HYG file= SAFE4.HYG -HYG 10 5 YR
Outflow HYG file= NONE STORED · RUN3 OUT 5 YR
Pond Node Data RUN3
Pond Volume Data RUN3
Pond Outlet Data RUN3
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 312.70 ft
Starting Volume .000 ac-ft
Starting Outflow .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment 1.33 min
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inf low
Peak Outflow
Peak Elevation
Peak Storage =
MASS BALANCE (ac-ft)
2.99 cfs
1.80 cfs
313.21 ft
.021 ac-ft
+ Initial Vol .000
+ HYG Vol IN .049
-Infiltration= .000
-HYG Vol OUT .049
-Retained Vol .000
at
at
10.00 min
15.32 min
Page 3.05
Unrouted Vol -.000 ac-ft (.031% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) Coq:>Ute Time: 13:46:44 Date: 02-26-2000
Type •••• Pond Routing SU1111ary
Name •••• RUN3 Tag: 10 YR
File •••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\PROJECTS\SAFE\PONDPACK\
Inflow HYG file SAFE4.HYG -HYG 10
Outflow HYG fi Le NONE STORED -RUN3
Pond Node Data RUN3
Pond Vol1.111e Data RUN3
Pond Outlet Data RUN3
No Infiltration
INITIAL CONDITIONS
Starting IJS Elev
Starting Vol1.111e
Start i ng Outflow
Starting Infiltr.
Starting Total Qout=
Time Increment
312.70 ft
.000 ac-ft
.00 cfs
.00 cfs
.00 cfs
1.33 min
INFLOIJ/OUTFLOIJ HYDROGRAPH SUMMARY
Peak I nf low
Peak Outflow
Peak Elevation
Peak Storage =
3.24 cfs
2.06 cfs
313 .25 ft
.025 ac-ft
at
at
10 YR
OUT 10 YR
10.00 min
16.65 min
=====================================================
MASS BALANCE (ac-ft)
+ Initial Vol .000
+ HYG Vol IN .058
-Infiltration= .000
-HYG Vol OUT .058
-Retained Vol .000
Page 3.01
Unrouted Vol -.000 ac-ft (.023% of Inflow Vol1.111e)
WARNING: Inf Low hydrograph truncated on Left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01 -98 (61) Compute Time: 13:46:44 Date: 02 -26-2000
Type .... Pond Routing Sllllll8ry
Name .... RUN3 Tag: 25 YR
File •••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\PROJECTS\SAFE\PONDPACK\
Inflow HYG file SAFE4.HYG · HYG 10
Outflow HYG file NONE STORED · RUN3
Pond Node Data RUN3
Pond Volume Data RUN3
Pond OUtlet Data RUN3
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 312.70 ft
Starting Volume .000 ac·ft
Starting Outflow .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment 1.33 min
INFL~/OUTFL~ HYDROGRAPH SUMMARY
25 YR
OUT 25 YR
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
= 3.71 cfs
2.35 cfs
313.30 ft
.029 ac·ft
at
at
10.00 min
16.65 min
=====================================================
MASS BALANCE (ac·ft)
+ Initial Vol .000
+ HYG Vol IN = .066
· Infiltration= .000
· HYG Vol OUT = .066
· Retained Vol = .000
Page 3.04
Unrouted Vol = ·.000 ac·ft (.020% of Inflow Volume)
WARNING: Inflow hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8·01-98 (61) COflllllte Time: 13:46:44 Date: 02-26-2000
Type .••• Pond Routing Sllllllary
Name .•.. RUN3 Tag: 50 YR
File .••• E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\PROJECTS\SAFE\PONDPACK\
Inflow HYG file= SAFE4.HYG · HYG 10 50 YR
Outflow HYG file= NONE STORED -RUN3 OUT 50 YR
Pond Node Data RUN3
Pond VolYne Data RUN3
Pond Outlet Data RUN3
No Infiltration
INITIAL CONDITIONS
Starting WS Elev
Starting VolYne
Starting Outflow
Starting Infiltr.
Starting Total Qout=
Time Increment
312.70 ft
.000 ac-ft
.00 cfs
.00 cfs
.00 cfs
1.33 min
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
MASS BALANCE (ac·ft)
4.19 cfs
2.59 cfs
313.34 ft
.033 ac-ft
+ Initial Vol .000
+ HYG Vol IN .075
-Infiltration= .000
-HYG Vol OUT = .075
-Retained Vol = .000
at
at
10.00 min
16.65 min
Page 3.06
Unrouted Vol = -.000 ac·ft (.018% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Pond Pack Ver: 8-01-98 (61) C~te Time: 13:46:44 Date: 02-26-2000
Type .... Pond Routing Sl.lllll8ry
Name .... RUN3 Tag: 100 YR
File .••. E:\PROJECTS\SAFE\PONDPACK\SAFE.PPK
LEVEL POOL ROUTING SUMMARY
HYG Dir E:\PROJECTS\SAFE\PONDPACK\
Inflow HYG file= SAFE4.HYG -HYG 10
Outflow HYG file= NONE STORED -RUN3
Pond Node Data RUN3
Pond Volume Data RUN3
Pond Outlet Data RUN3
No Infiltration
INITIAL CONDITIONS
Starting WS Elev 312.70 ft
Starting Volume .000 ac-ft
Starting Outflow .00 cfs
Starting lnfiltr. .00 cfs
Starting Total Qout= .00 cfs
Time Increment 1.33 min
INFLOW/OUTFLOW HYDROGRAPH SUMMARY
100 YR
OUT 100 YR
=====================================================
Peak Inflow
Peak Outflow
Peak Elevation
Peak Storage =
=
MASS BALANCE (ac-ft)
4.23 cfs
2.71 cfs
313.36 ft
.035 ac-ft
+ Initial Vol .000
+ HYG Vol IN .082
-Infiltration= .000
-HYG Vol OUT .082
-Retained Vol .000
at
at
10.00 min
17.98 min
Unrouted Vol -.000 ac-ft (.017% of Inflow Volume)
WARNING: Inf low hydrograph truncated on left side.
S/N: HOMOL0863131 KLING ENGINEERING
Page 3.02
Pond Pack Ver: 8-01-98 (61) Compute Time: 13:46:44 Date: 02-26-2000
~-w
COLLlGl STATION
DEVELOPMENT PERMIT
PERMIT NO. 500009
DP-STANDARD AUTOMATIC FIRE ENTERPRISES
FOR AREAS THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 2, University Industrial Park Ph. II
DATE OF ISSUE: March 24, 2000
OWNER:
RIANS , STEVEN R &
JEFFERY D SOSEBEE
COLLEGE STATION, TX 77845
SITE ADDRESS:
500 GRAHAM RD
DRAINAGE BASIN:
LICK CREEK
VALID FOR 12 MONTHS
CONTRACTOR:
JHW Contractors
Jim Woods
College Station, TX 77840
TYPE OF DEVELOPMENT: Warehouse addition to the existing building and associated parking lot.
SPECIAL CONDITIONS:
All construction must be in accordance with the approved plans.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner
and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion, and sedimentation shall not be deposited in city streets , or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance w"th the plans and specifications submitted to and approved by the City Engineer in the development permit
a plicatio the ed project and all of the codes and ordinances of the City of College Station that apply .
tdro!oo
Date b?/w
Date 7; '
Date
...
FOR omCE u~ ONLY
CASE NO. ():)-'2~
DATE SUBMllTED
SITE PLAN APPLICATION
MINIMUM SUBMITfAL REQUIREMENTS
"v Site plan application completed in full.
~ $100 .00 Application Fee.
~ $100.00 Development Permit Application Fee.
~ $300.00 Public Infrastructure Inspection Fee if applicable. (Ibis fee is payable if construction of a public
waterline, sewerline, sidewalk, street or drainage facilities is involved.)
~Ten (10) folded copies of site plan.
i A copy of the attached site plan checldist with all items checked off or a brief explanation as to why they are not
checked off.
APPLICATION DATA
NAMEOFPROJECT Standard Automatic Fire Enterprises, In c.
ADDRESS 500 Gr ah am Road, College St at io n, TX 77845
LEGAL DESCRIPTION Lot2, University Indu s trial Park, Pha s e I I
APPLICANf (Primary Contact for the Project):
Name Stev e R i ans
StreetAddress __ 5_00"--G_r_a_ha_m_R_o_ad _________ City College Stati on
State TX ZipCode 77845 E-MailAddress sa fei nc @s tartel.n e t
PhoneNwnber 690-0301 FaxNumber 690-6741 -----------------
PROPERlY OWNER'S INFORMATION:
Name Steve R. Rians and Jeffery 0. :So s ebee
Street Address see appl j cant City -------------
State Zip Code _____ E-Mail Address ------------
Phone Nwnber __________ Fax Number ________________ _
ARCIIlTECT OR ENGINEER'S INFORMATION:
Name Kl1ng Engi neering and Survey in g
Street Address 4 10 3 Texas Avenue, Su ite 2 12 City Bryan
State TX ZipCode 77802 E-MailAddress klin g @tca.net -----
PhoneNwnber 84 6-6212 FaxNumber 846-8252 ----------_----=:;....:...=........=;;..=.= ___________ _
OTIIER CONT~CTS (Please specify type of contact, i .e . project manager, potential buyer, local contact, etc.)
Name N A __;_:.L...;..;.. _______________________________ _
StreetAddress ----------------City ------------~
State Z ip Code E-Mail Addres s -------------------
Phone Nwnber Fax Number
SITE PLAN APPLICATION
SITEAPP.DOC OJnS/99
-----------------
l of3
CURRENTZONING M-2 -Heavy Industrial
PRESENT USE OF PROPERlY Office Building and Warehouse
PROPOSED USE OF PROPERlY same as present use
VARIANCE(S) REQUESTED AND REASON(S) _.n .......... ....._ ______________ _
#OF PARKING SPACES REQUIRED __ 2_5 __
0 MULTI-FAMILY RESIDENTIAL
Total Acreage ----
Floodplain Acreage __
Housing Units ----
# of l Bedroom Units
# of 2 Bedroom Units
# of 3 Bedroom Units
# of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
__ # Bedrooms ~ 132 sq. ft.
__ # Bedrooms < 132 sq. ft.
# OF PARKING SPACES PROVIDED 40 ----
l'1 COMMERCIAL
Total Acreage 0.97
ProposecBuilding Square Feet 2795
Floodplain Acreage ___ o __
1he applicant has prep<IIed this application and certifies that the facts stated herein and exhibits attached
hereto are true and co"ect.
~£.~. . -Z -L/--00
Date
•
SITE PLAN APPLICATION 2of3
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
~lication is hereby made for the following development specific waterway alt.erations:
n/a
ACKNOWLEDGMENTS:
1, Jeffery D. Sosebee design engineer/owner, hereby acknowledge or affirm that:
--------------~
The information and conclusions contained in the above plans and supporting documents comply with the current requirements of
the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards.
As a condition of approval of this permit application, I agree to coostruc:t the improvements proposed in this application according to
~.P~~ 13 m~Co8*5mti-Co-~-:-·ty_C_r ___ · ---------
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.)
A. I, certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structwc or its contents as a result of flooding from the 100 year storm.
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the
latest Federal Insurance Administration Flood Ha7.ard Study and maps, as amended.
Engineer Date
C. I, certify that the alt.erations or development covered by this permit shall not
diminish the flood-<:anying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of
floodways and of floodway fringes.
Engineer Date
D. I, do certify that the proposed alt.eratioos do not raise the level of the 100 year
tlood above elevation established in the latest Federal Insurance Administration Flood Ha7.ard Study.
Engineer Date
Conditions or comments as part of approval: ---------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
r hereby grant this permit for development All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College
Station shall apply.
SITE PLAN APPUCA TION
SITEAPP.DOC OJnS/99
3 of3