HomeMy WebLinkAbout55 Eckerd's 00-4 2411 Texas Ave. S.,
Date: October 23, 2000
To: Amanda Hudec, Accountins\) ~ f
From: Bob Mosley, City EngineerW
Subject: Completed Infrastructure from Private Development
By the attached letter of completion for the Eckard's development, we have accepted the
following improvements to the City of College Station infrastructure.
Water:
6-inch PVC Fireline
(C900 CL 150)
110 linear feet
Based upon our previous meeting, Development Services has begun providing us
engineering estimates with the private development plans. This will allow us to identify
the cost of the infrastructure in the future . We do not have the engineering estimates for
this project. This memo provides a record of the infrastructure acceptance . However, the
engineering cost estimates for this infrastructure will be required from Development
Services.
c : Natalie Ruiz, Development Coordinator
Jerry Jones, Engineering Technician
Missy Green, Staff Assistant
LETTER OF COMPLETION
CITY ENGINEER /{) ·-/2 -c:J D
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
,.-,. // I! RE: COMPLETION OF _c_u...e.._~V-c.l--'--'-,J--
{r/' H re fh e Oh t7
Dear Sir:
The purpose of our l e tte r i s to r e que s t tha t the following listed improveme nts b e a pprove d
and acce p te d a s b e ing cons tructe d under city inspection and completed according to plans
and. specifications as approved and required by the City of College Station, Texas . This
approval and acceptance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work. This approval and acceptance by the
City of the improvements listed below does hereby void the letter of guarantee for the
listed improvements on the above reference project.
The one year warranty is herby affirmed and agreed to by~ ~and
by their sub-contractors as indicated by signatures below .
7
WORK COMPLETED \
II I . h Fire 1ne. lt'J-12-o0
Owner:~£.~·(l~h_e_r'--/""'---=S'-----
Address: ;2./.// /
Ct 2. Tex
'
T~u>5 /?J/c
77<?rS-
DATE
Contractor:
Address: IC/'!?
Signatu~&:::~ Signatureo ~ 4
~ to -I Z--oi)
ACCEPTANCE & AP PROV AL
City Engineer
eby ENGINEERS inc.
land plannin g, civil design & construction management
November 9 , 1999
City of College Station
Reference : Eckerd Drug Store
Southwest Parkway@ Texas Parkway
Dear Sirs:
This letter is in regards to the existing and proposed drainage conditions for the proposed Eckerd
Drug Store . Please find enclosed a drawing of the existing and proposed drainage areas and a
tabulation of the existing and proposed 5-yr flows of each area.
The site is 60,166 SF and is currently developed as an office building with parking facilities . The
existing impervious area of the site is 47656 SF and is divided into four drainage areas. The
proposed development is a retail building with parking facilities . The proposed impervious area of
the site is 52130 SF.
We have designed the proposed development to approximate the existing drainage pattern . As
shown on the drainage area maps and flow calculations, the proposed areas and flows draining to
each area is approximately the same as the existing areas and flows. Although each of the areas has
a slight increase in impervious area, the increased 5-yr. flows to each area are negligible and we
believe the amount of increase is therefore insignificant and should not require any mitigation.
Feel free to call me if you have any questions or comments.
Very Truly Yours,
Eby Engineers, Inc.
/~--1<
Dennis R . Eby, P.E., President
2180 North Loop West, Suite l 00 Houston , Texas 77018 713 /957 ·0788
15'
15' 15'
145'-8" EXT .
PROPOSED BUILDIHG
'h
¢=
'h
"' ~~i ==C>
~
N
POLLUTION PREVENTION PLAN
NOlE: CONTRACTOR TO CONSTRUCT SILT FENCING
AROUND PERIMElER OF SllE AND AT DRIVEWAYS AS
REQUIRED TO PREVENT DEBRIS FROM CONSTRUCTION ,
EROSION & SEDIMENTATION FROM LEAVING SI TE
LEGEND
~ FILTER FABRI C BARRIER
I
I 1----
1
I I 1----
1
I l----
12·1 20·
I 1----~ .__ __
••
30!5.78
~ 24·~
L..NE
TlftJ
DIM:
9'
20 ' ~ 24'~ 18' i I L..NE I ~ 1lftJ
DM
w t;P<'
ECKERD DRUG STORE
SOUTHWEST PKWY. AT TEXAS AVE
COLLEGE STATION. TEXAS
ebJ INGINllBS lao. .
-----------
FIL .TER FABRIC FENCE
1. SET POSTS AT
REQUIRED SPACING
3. STAKE 11LTER I/ATER/AL TO
STAKES AND EXTEND n-INTO
THB TRENCH.
FLO'lf
EXTENSION OF FABRIC
INTO TRENCH.
GENERAL NOTES;
2. EXCAVATE A 4•x4• TRENCH UPSLOPE
ALONG THE UNE OF STAKES.
4. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
ALTERNATE V-TRENCH
EXTENSION OF FABRIC
INTO TRENCH.
1. POSTS TO BE SET AT 3-l'OOT JIAXIJIUll SPACING. IF FACTORY
PREA SSEJIBISD FENCE rJTH SUPPORT NE7TING IS USED.
SPACING OF POST llA Y BE INCREASED TO 8 FEET llAXJJIUJI.
x-@-x
SYMBOL
2. rtHEN rro SEC1'/0NS OF 17LTER CLOTH ADJOIN EACH OTHER 7JJ,f ;,'IJ/1Jf BE OVERLAPPED fJ INCHES AT THE POSTS. ITEM 4211
FILTER FABRIC FENCE
708-1
4211 -4/4
---
HYDROLOGICAL IMPACT ANAYLSIS
PROPOSED ECKERD DRUG STORE
TEXAS AVENUE AT SOUTHWEST PARKWAY
DRAINAGE
AREA
LANDSCAPING
ACREAGE (C = .15)
FLOW TO SOUTHWEST PARKWAY
AREAA
EXISTING 0.05
PROPOSED 0.00
AREAB
EXISTING
PROPOSED
AREAC
EXISTING
PROPOSED
FLOW TO TEXAS AVENUE
AREAD
EXISTING
PROPOSED
0.02
0.03
0 .09
0 .08
0.12
0.07
IMPERVIOUS
ACREAGE (C=.9)
0.47
0 .51
0 .34
0 .36
0.01
0.03
0 .28
0 .31
3.02
3.04
2 .13
2 .22
0 .17
0.29
1.83
1.93
0.03
0.10
0.12
0.10
j A
t
-+ B ~ 3
'\ I
EiID 2
"-.. EfID 3
0
TEXAS AVENUE (STATE HIGHWAY NO. 6)
EXISTING DEVELOPMENT
TOTAL SITE: 60, 166 SQ. FT.
IMPERVIOUS AREA: 47,656 SQ. FT.
IMP ER VIOUS PERCENTAGE: 79%
ffiQQj =AREA (ACRES ~ SURF ACES CFS
A
--+ LANDSCA P E=2253
0
c
--+
CONCRETE =2 0493
i 8
LAN D SCAP E =9 0 8
~ CONC RE TE= 14 753
(
Q. c
~ LANDSCAP E=4 0 37
~ CONC RE TE=380
§ D
LANDSCAP E= 5 324
CONCRETE=12018
ECKERD DRUG STORE
SOUTHWEST PKWY. AT TEXAS AVE.
COLLEGE STATION, TEXAS
---=-='bl ENGINEERS inc.
2180 Narth Loop WNI. 8ulte 100 Houela\ Teua 77018
----------------------------------· Phone (713) 957~ Fu (713) 957-0788
0
0
A 0
t
\J
B
D 0
ffim
~
I
0
0 --+
EiID 9
c
A
LANDSCAPE=O
CONCRETE= 21999
B
LANDSCAPE= 1213
~ CONCRETE=15682
c
~ LANDSCAPE=36 15
< CONCRETE=1226 Q.
~ D ~ LANDSCAPE=3082 ----------r------J ~ CONCRETE=13349
.--------....__..._,.... D C7
\ ~ 0 ! D \ 0 ,~
n n n L __ _J L __ _J L_l_ _ _J L __ _J
TEXAS AVENUE (STATE HIGHWAY NO. 6)
PROPOSED DEVELOPMENT
TOTAL SITE : 60,166 SQ. FT.
IMPERVIOUS AREA : 52, 130 SQ . FT.
IMPERVIOUS PERCENTAGE: 87%
~ =AREA (ACRES ~ SURFACES CFS
--+
f/J
ECKERD DRUG STORE
SOUTHWEST PKWY. AT TEXAS AVE.
COLLEGE STATION, TEXAS
2180 North Loop W•t. 8ulte 100 ~ Texu 77018 Ir ebJ. ENGINEERS inc. ")
----------------------------------'-~ (713) 8157-<>788 Fax (713) 8157--0788 ,J
Project Name: Uk~ c/£
:::~_==?::.?:z~===~=CJ====
Public/Private Storm Sewer
~ l ~erall plan layout of drainage facilities (can be shown on street plan) showing casements
;JA 0 If separate instrument casements are needed -do not approve until we get them recorded
AJA 0 Plan and profile for all storm sewers
~A o TXDOT permits needed? ~ A)t2-1;>~a1vL~~ ~
Storm Sewer/Culverts {_ r;?"t' tH ,ck,Jl . J)"' vt .A /(_ ~
Ji! Sealed and Signed
0 Engineers Estimatec
! Pipe material (RCP "" storm, RCPorCMP = culvert) ( I _if 7 ()
t<J Pipe sizes labeled (see pg.47 DPDS) tJ~ keAI r ~ S r ~'1' (l.'f ~
.0 Siu/Location sufficient for overall City oeeds/masterplan I I -1 f
M o Depth(mincover) ~ -+o ~e 1~r1 ~4-.,
g/r O Dcpth(exces&vc) ( I ,J j ~f'eJ.
Ari'C O All utilities in plan & profile w/sizes and type 'f'>" o-f o~ t /1 f)~ I (
M4D Private vs. Public line distinction /) J
,A/iq 0 Street grades -existing and proposed (centerline, right and I wn in profile~~ J 1 « 8'f' ~ ' q..
.(.l+D Flowlines (specified/labeled) . /] -IJ_ I I 1 ((
.(J,4-0 Conflicts with other utilities shown I IL S. r ~ ~I~ ft).. ,.r-1" ~ T'
/A o Labels on all major items in plan & profile (
1 ~ -b 0-~ W .
AJA.D Located within drainage easement or right-of-way (specify width) ~
)44 0 Easement width adequate per DPDS -----
,i/A-o Stationing mown
0 Outfall location (if open. is rip-rap needed per design calcs)
D
0
o Does it match drainage report (sizes, inlets, etc)
Hydraulic Grade Linc (on plan or in drainage report)
'/Y~ Junction Boxes/Manholes/Inlets
0 Lines end in JBIMH
0 JB/Manhole spacing (see pg 47 DPDS)
0 JB/Manholes accessible from public ROW/easement
0 JB/Manholes at change of alignment, grade or size
0 Drops through inlet/manhole/JB (see pg 48 DPDS)
0 Cwb inlets shown and labeled (referenced to drainage report)
l!£l!ill
0 Standard Details noted or included (referenced as city of CS Standard Details)
D Details for all non-standard items (included/ok) (not on CS Std. detail sheet)
0 Emtwtment details (specify option)
o Trench safety if deeper than s•
0 Erosion control notes
0 Culverts (SET)
0 Inlet/I-Box or manhole details (manhole access)
7alll
Public/Private Storm Sewer (cont.)
Channels
O ~ sections with side slopes -meets DPDS
0 Channel Liner -per DPDS
O Longitudinal slope (0.4% min.)
0 Rip Rap oceded?
Details
0 Standard Details noted or included (referenced as city of
0 Details for all non-standard items (include/ok) (not on C
0 Erosion control notes
Detention S m
O Side slopes
0 Bottom slopes
0 Grading plan
0 Low tlow flume
0 Outlet Structure shown -rresponds to drainag report
0 Inlet Structure shown -nds to ~ge report
0 Emergency spillway -correspo to · ge report
Standard Details)
Std. detail sheet)
0 Rip Rap if high velocities exist at · et r outlet -length/width/size/details
0 Flowlines at inlet and outlet
0 Complies with drainage report
0
0
0 Erosion
· noted or inclu referenced as city of CS Standard Details)
non-standard items (in ded/ok) (not on CS Std. detail sheet)
I notes
0 Inlc~t&tl_ lltturc
0 Outlet dn1il'J111M
The following items L varlan!:rl; ID the College Slation drainage standards:
lall2
.... ! /)j,.'
Project Name:_ ... k..~t.~~----------
Drainage Reports
Location
0 Primary drainage system identified
0 Surrounding developments shown
0 Local streets, drainage systems shown
Description
0 Acreage of project
D Land cover described
0 Primary/secondary systems within property shown
0 Geocral description
Drainage Basins
D ~to FIRMs if applicable
Review Date: ~ / 2/ I (72
Reviewer: f'. Q£
0 Secondary system flow patterns and impact of development on existing system
0 Proposed pathways to Primary system shown or described
Design Criteria
0 Any deviation from standards being requested?
0 Discussion of site constraints and capacities (streets, existing structures, etc.)
0 Discussion of any applicable previous drainage studies and how this plan will affect it
Hydrologic Criteria
0 Ra.infall/runoff calculation method described and calculations provided
0 Detention discharge I storage calculation method I calculations
0 Storm recurrence iDtcrva1s used
0 Discussion of other drainage facility design criteria used if not referenced in Standards
Hydaulic Criteria
0 Identify capacity of systems used
0 Specify velocities at critical points in system
0 Identify detention I retention outlet and routing
0 Discussion of other drainage facility design criteria used not referenced in Standards
Drainage Facility Design
0 Discuss drainage pattcma I flows (pre w. post)
0 Ase they draining water onto another property owner? -if so, is it where the water fiowcd before? and is it not
more than what flowed there before? and oo faster than it flowed before?
0 Discuss erosion control measures employed
0 Discuss detention pond design (sideslope, low flow channels, outlet works, freeboard, emergency spillway)
0 Di.saw mainteoa.nce access and responsibilities
Conclusions
0 Verify compliance with DPDS (signed and sealed certification)
0 Explain effectiveness of improvements with regard to controlling discharges of S -100 year storm by
a) Detaining
b) Acx:ommodating runoff in existing I proposed casements or ROW discharging into primary system
c) Combination ofa & b
9al'l 2
. .
Drainage Reports(cont.)
A open dices
0 References (all criteria and technical information
0 Hydrologic computations
0 Land use assumptions for adjacent prope
0 Minor/major storm runoff at specific ts
0 Historic/fully developed runoff spcx; · c points
0 Hydrographs at critical points
0 Hydraulic computations
0 Culvert capacities (head
0 Storm sewer capacities
0 Street capacities
0 Storm inlet capaciti (inlet control rating)
0 Open channel des·
0 Detention area l olumc capacity I outlet capacity
·th drainage patterns
ProjectNamc:_.....:..~----J_s._I' __ _
Review Date:._9...:....~-?--.1-/ ~_....2%~--Rcviewer:~i..._, (~J,_~~-...--
10 oll2
DEVELOPMENT PERMIT
PERMIT NO. 00-4
ECKERD'S
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Brentwood Section 4
Lot 3R-1
DATE OF ISSUE: 1-14-00
OWNER:
Bruce Shelby
1800 Bering Drive # 495
Houston, Texas 77057
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2411 Texas Avenue South
DRAINAGE BASIN:
Bee Creek
VALID FOR 12 MONTHS
CONTRACTOR:
Full permit as per approved construction plans.
SPECIAL CONDITIONS: No work may be conducted in the Texas Avenue Right-of-Way
until TXDOT issues the permit for the proposed utility work.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden
and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition , placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent
properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or
sedimentation resulting from the permitted work .
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before
any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction , erosion, and sedimentation shall not be deposited in city streets , or existin g
drainage facilities .
I hereby grant this permit ford
be in accordance with the
development permit appli
--.,.__, e S tion that apply.
Contractor
opment of an area outside the special flood hazard area . All development shall
d specifications submitted to and approved by the City Engineer in the
above named project and all of the codes and ordinances of the City of
Date
Date
Date
FOR OFFICE USE ONLY
CASENO. q -.J..J ()
DATE SUBMITTED
00-5Jamz+
SITE PLAN APPLICATION
MINThflJM SUBl\flTTAL REQUIREMENTS
V Site plan application completed in full.
~ $100.00 Application Fee.
, USl00.00 Development Perinit Application Fee. -=-$300.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public
waterline, sewerline, sidewalk, street or drainage facilities is invol~)
. Ten(lO)foldedcopiesofsiteplan. (3 ,./ pt-e.,(imina.,(lf /t.!Arl lUJ J
__ A copy of the attached site plan checklist with all items cbecked off or a brief explanation as to why they are not
checked off.
APPLICATION DATA
NAME OF PROJECT College Station -Eckerd Drug Store
ADDRESS Texas Avenue-Hwy 6 & Southwest Parkway
LEGAL DESCRIPTION Brentwood Section 4, Sub-Division Vol 1810, Pg. 2 83, Lot 3R-l
l.'tt. ~c..., c ~\2-; p(J..>$ f~r. Vol .{'f-, I r~ .£7$"' c.c..~ l'i" <f!> 3<7'S0> G(J.J..3c_ ro
APPLICANf (Primary Contact for the Project): f+ r f!.. 60 fl l\J tf;. I ?r ~
Name~P_h_il_l_ip~R-iv_e_r_s~~~~~~~~~=8~/u!.£b~.;;;__s/t-'-"'-'J~~'-"T--~~~5~o~q~~~//~4~4_,_~
StreetAddress 1800 Bering Drive, #495 City Roust~
State Texas Zip Code _77_0_5_7____ E-Mail Address -------------
Phone Nwnber (713) 974-1777 # Fax.Nwnber (713) 9 75-2 899
PROPER1Y OWNER'S INFORMATION:
Name Shek Chak Hui
StreetAddress 2411 B Texas Avenue South City College Station
State Texas Zip Code _77_8_4_0 __ _ '&MailAddress ------------
PhoneNwnber (409) 693-2957 Fax.Nwnber (409) 696-4198
ARCIDTECT OR ENGINEER'S INFORMATION:
Name AIG, Inc. (Scopt Fischer)
StreetAddress 1521 North cooper Street, Ste #600 City Arlington
State Texas Zip Code 76011
PhoneNumber (817) 265-2415
E-Mail Address ------------
Fax Nwnber (817) 277-0571
OlHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.)
Name CStation SE, 1. P.
StreetAddress 1800 Bering, Suite 495
State Texas Zip Code 7705 7
PhooeNwnber (713) 974-1777
sm Pl.AN APPLICATION
SITE.APP .IX>C OJn5~
City Houston
E-Mail Address ------------
Fax.Nwnber __ <_1_1_3_)_9_7_5_-_28_9_9 _________ _
l of3
Sent By: Shelby Estus Re alty Group, In; 713 975 2899; Jan-14-00 9:51;
Shelby~~ Estus
REALTY GROUP, INC.
1800 Bering, Suite 495
Houston, Texas 77057
(713) 974-1777
FAX (713) 975-2899
FAX COVER SHEET
Page 1
TO: (~~ ~/ FAX: (J.!oi) 1&lf-3qq~
Date: -------
Number of Pages (Including cover): __ zc;_· ___ _
~I Original To Follow ~ Original Will Not Follow
FROM: BRUCE S. SHELBY
DIRECT PHONE: (713) 975-2833 Ext. 103
E-Mail: bshelby@shelbyestus.com
RE:
Comments: ~ 11= ~J
!
l
Sent By: Shelby Est us Realty Group, In; 713 975 2899; Jan -1 4 -00 9:5 1 ; Page 2 /5
eby ENGINEERS inc.
land planninA, civil design• conslruction man111emcnt
November 9, 1999
City of College Station
Reference: Eckerd Drug Store
Southwest Parkway @Texas Parkway
Dear Sirs :
This Jetter is in regards to the existing and proposed drainage conditions for the proposed Eckerd
Drug Store. Please find enclosed a drawing of the existing and proposed drainage areas and a
tabulation of the existing and proposed 5-yr flows of each area.
Tite site is 60 , 166 SF and is currently developed as an office building with parking fac ilities . The
existing impervious area of the site is 47656 SF and is divided into four .drainage areas. The
proposed development is a retail building with parking facilities. The proposed imperv ious area of
the site is 52130 SF .
We have designed the proposed development co approximate the exiscing drainage pattern . As
shown on the drainage area maps and flow calculations, the proposed areas and flows draining to
each area is approximately the same as the existing areas and flows. Alihough each of the areas ha s
a slight inc:rease in impervious area, the increased 5-yr . flows to eac:h area are negligible and we
believe the amount of increase is therefore insignificant and should not requ ire any mitigation.
Feel free to call me if you have any questions or comments .
Very Truly Yours,
Eby Engineers , Inc .
/~-
Denn is R. Eby , P .E., President
2180Norm~oopWe st ,Sui1e 100 Houstor>. Tem~770 1 8 713/957 ·0788
sent By : Shelby Estus Re alty Gr oup , I n ; 713 97 5 2899;
• ..........
HYDROLOGICAL IMPACT ANAYLSIS
PROPOSED ECKERD DRUG STORE
TEXAS AVENUE AT SOUTHWEST PARKWAY
DRAINAGE
~
bANDSCAP!~
ACREAGE <C = .15>
FLOW TO SOUTHWEST PARKWAY
AREA A
EXISTING 0.05
PROPOSED 0.00
AREAS
EXISTING
PROPOSED
AREAC
EXISTING
PROPOSED
FLQW TO TEXAS AYENUE
AREAD
EXISTING
PROPOSED
0 .02
0 .03
0 .09
0 .08
0 .12
0 .07
lMPERYIOUS
ACREAGE (Cc .9l
0.47
0 .51
0.34
0.36
0.01
0 .03
0.28
0 .31
Ja n -14-0 0 9 :51 i
· ... ___ /
3.02
3 .04
2 .13
2.22
0 .17
0 .29
1 .83
1 .93
Pag e 3 /5
0 .03
0 .10
0.12
0 .10
·-·-
jA
f
B ~ J
' /'
E!ID 2
~ EEID J
0
TEXAS AVENl.E (STATI! HIQHWAY NO. tt)
EXISTING DEVELOPMENT
TOTAL SITE: 60, 166 SQ . •T
IMPERVl OUS AREA : 47,656 SQ . FT.
i MPERVlOUS PERCENTAGE : 79%
~ =AREA ACRES ~ SURFAv S FS
A
---+ LANDSCAPE=2253 ~
".: CONCRETE= 20 493
i B
LANOSCAPE=908
~ CONCRETE=14753
< c c 4.
~ LANDSCAPE= 4037
CONCRE TE=J80 ~ I 7 0
--. LANDSCAPE= 5324
CONCR::TE=12018
ECKERD . DRUG STORE ·
SOOTliWEST PKWY. AT TEXAS AVE.
COLLEGE STATION , TEXAS
-~tbJ.DGINDBSbac.
21IO NmOI i.o. ..._ ... IDO Hllllilll\ Tuu 11011
------------------------------------,._ ,,..,..,.... .... (1\IJ-~
(
I
\.
en CD
:::J
r+
tD
'< ..
en
:::T
CD
I-'
CT
'<
rn
(/)
r+ c
(/)
:0
CD
Ol
I-'
r+
'<
G) ,
0 c
-0
H
:::J
-..J .....
w
CD
-..J
lJ1
I\)
CX>
CD
CD
(._
Ol
:::J
' .....
0
0
CD
lJ1 .....
IJ
Ol
(.()
CD
~ --lJl
0
0 A D
!
\J
B
D 0
~
q;ff}
I
0
----------,_ ____ _,
r----------..._...-~o C7
' ~ I D \ 0 I • ~ 0 • n n n L __ _J L __ _J L_L _ _j L __ _J
TEXAS AVENUE (STATE Hklt-fWAY NO. 8 )
PROPOSED DEVELOPMENT
TOTAL SITE : 60.166 SQ . -FT.
lt-APERVlOUS .AREA : 52, 130 SQ _ FT.
IMP~RVIOUS PERCENTAGE : 87%
~ =AREA (ACRES ~ SURFACES crs
c
0 A
LAN O SCAPE=O
CONCRETE= 21999
8
L ANDSCAPE= 1213
CONCRETE=l 5682
c
LANDSCAPE=3615
CONCRETE=1226
D
LANOSCAPE=3082
CONCRETE=13349
ECKERD DRUG STORE . . ..... -. . . . . . . . . . . . . . . . . . . . . . . . . ..... .
SOUTliWEST PKWY. AT TEXAS AVE
COLLEGE STATION. 1EXAS
en
CD
::i
.-+
(Jl
"<
en
::T
CD
I-' rr
"<
m
(/)
.-+
c
(/)
:D
CD
!»
I-'
r+
"<
G> ...,
0 c
-0 -
H
::i -·
--.J
~
w
CD
--.J
l11
I\)
CD
CD
CD -·
L
!»
::i
' ~
0
0
-0
!» co
CD
l11 -...
l11
Sent By: Shelby Estus Realty Group, Inj
s ent By : EBY ENGINEERS, INC j
713 975 2899j
713 957 0789 ;
Sent By : Shelby Estus Realty Group, Ini 713 975 289Q;
To : DENNIS E8Y At : 97139570719
Y•"' I lr4 ., •••
Jan-14-00 10:57 ;
Jan-14 ·00 :10:35AM j
Jan -14 · 00 t 0: 38;
Pa ge 2 /2
Page 1 11
Page.: 1 /1
1C1 ou:
stJPPL'IMENTAL DEVELOPMENT *9.ERMrr INPORMA TION ·
.... 0.: :
;,, w'a.·l?!.':.:~~.;.ht,-n~~:t~'r sc,.,;.::.,~•'";'"";•
•tr: =• sn za•1 I · • ., .. a.,..ra.a.-Q!Ja.,O.,.uaa a, ' ·•If __ ,. ...... , t • : . :
I -~/1'1/0 0 ,..._ n.:F I
D • ...
le wMaa..,.IJfltlGCltlflO I I a lf•Qlrfl-...... . ............... MN ... 'Cs,...._.. ... ..... , 1111 ... ~ ...... S . I-·... '
l__,_..._,._....,_. 'J m Mii 7 1ar11111Mlllllll ~ 11 ..... ~ ... % ,. T.eie..,.; h•
... JC IP:AtfllrsQJ'• lllrm._ ............ AlltldlDW' ............ :.a r rat .. Cllf9'~ .......... ..,. .
April 13, 2000
Jeff Tondre , PE
City of College Station
Building Inspections Department
1101 Texas Avenue
College Station , Texas 77840
Shelby~~ Estus
REALTY GROUP, INC .
RE: Eckerd Drug Store-2411 Texas Avenue South
Dear Jeff:
Please find enclosed three (3) original signed applications. Randy Grones at
TXDOT said you also need to sign the application and deliver the originals
to TXDOT . We appreciate your help with this request.
Sincerely yours ,
~
Bruce S. Shelby
Chief Executive Officer
BSS /nrs
Enclosures
Writer's Emai l Address:
bsl1elb v@shelbyestus.com
1800 Bering , Suite 495 ¢·Houston , Texas 77057 ¢· (713) 974-1777 ¢· FAX (713) 975-2899 ¢• www .shelbyestus .com