Loading...
HomeMy WebLinkAbout54 College Hills Missionary Bap. 00-5 712 Churchill St.~-'1 COLllGl !;lATION DEVELOPMENT PERMIT PERMIT NO . 500005 DP-COLLEGE HILLS MISSIONARY BAPTIST F OR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: DATE OF ISSUE: March 20 , 2000 OWNER: COLLEGE HILLS BAPTIST CHURCH 712 CHURCHILL ST COLLEGE STATION, TX 77840 979-696-5959 SITE ADDRESS: 712 CHURCHILL ST DRAINAGE BASIN: Wolf Pen VALID FOR 12 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: FULL DEVEOPMENT PERMIT FOR CONSTRUCITON OF PARKING LOT. SPECIAL CONDITIONS: NIA The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Ow ner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor shall also insure that any disturbed vegetation be returned to its original condition , pi<icement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heav y machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work . Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans ecifications submitted to and approved by the City Engineer in the development permit application for the abov roject and all of the codes and ordinances of the City of College Station that apply. Date 3 -20 .--t70 Date Contractor Date ~ICWBro1Nn Edward R. McDow, P.E., R.P.L.S. Sen ior Engineer emcdow@kwbes.com January 17 , 2000 Ms. Bri dgett George Community Development City of College Station, Tx P .O . Box 9960 Coll ege Station, Tx 77841 Re: College Hills Missionary Baptist Church Propos ed Parking Lot Improvements Conditional Use Permit, Case #99-731 D ear Ms. George: KW Brown & Associates, Inc. 50 I Graham Road College Station, Texas 77845 409•690-9280 • 888•875•0063 Fax:409•690•7310 www.kwbes.com W e ar e submitting the additional information you requested in your January 13, 2000 M emorandum for the above referenced project: 1 . T wo sets of construction, site and landscape plans (3 sheets), and 2 . Revised Drainage Report. If you have any questions , please call me at 690-9280 . Thank you . Very truly yours , K.W. Brown & Associates, Inc. CL-.P£#~ Ed ward R . McDow, P .E ., R.P .L.S . Senior Enginee r cc Mr. Tommy Preston College Hills Missionary Baptist Church H :\99CS0004 Co11H illsChParkinglot\bridgett011700 .wpd Scientists • Engineers • Planners Burba n k • Co ll ege Sta ti o n • Ho u sto n • V ict oria • Pho en ix • Lo g a n • M ex ico City zoo ~ •l<WJBrovvn Edward R. MeDow, fl.Ii., R.P.L.S. Senior Engineer emcdow@kwbes.com January 18, 2000 Ms . Bridgett George Community Develcpment City of College Station, Tx P.O. Box 9960 College Station, Tx 77841 Fax: 764-3496 Voice : 764-3570 Re: College Hills Missionary Baptist Church Proposed Parking Lot hnprovements Conditiona l Use Permit, Case #99-731 Drainage Report Dear Ms . George: \Ji>1ease substitute the attached page I of the above referenced Drainage .Report into the copy I just delivered this morning. Jt has a typo . If you have any questions , please call me at 690-9280 . Thank you . Very truly yours , K.W. Brown & Associates, Inc. Edward R. McDow, P.E ., R.P .L.S. Senior Engineer H:\99CS0004 CollHlllsChPa1klnglot\brldgett011800.wpd Scientists • Engineers • Planners Bu r bank • Co ll e~e St at ion • Houston • Victoria • Phoenix • Logan • Mex ico City NM OMH M}I £9£0 069 6017'7, 00 /!l l/10 Introduction Drainage Report for College Hills Missionary Baptist Church 1.076 Acres in the Richard Carter League, Abstract No. 8 College Station, Texas prepared by KW Brown & Associates, Inc. A hydrologic analysis was performed on two tracts of land (0.4995 acre and 0 .5765 acre respectively) located in the Richard Carter League, Abstract No. 8, College Station, Texas, consisting of a total of 1.076 acre of land . The objective of this report is to document the drainage impacts prior to and subsequent to the development of the property. This drainage report has been prepared in accordance with current City drainage design standards . A drainage map accompanying this report illustrates the configuration and topography of the site . The lot to the south (the larger tract) is currently the site of College Hills Missionary Baptist Church. The owner is proposing to develop a parking lot both tracts of land. After the parking lot is built , there will be either pavement or structures covering most of the land . The site sits in an older area of the community known as College Hills . The north tract is currently undeveloped land with native grass cover and no trees. The land slopes generally toward the southeast at 1. 8 percent. The south tract is contains the church building which, when combined with the sidewalks, covers approximately 22 percent of the tract. The subject tract does not lie within a designated 100 year flood plain according to FEMA maps. Methodology The rational method was used to compute the 5, 10 , 25 , 50, and 100 year storm events in accordance with City drainage design standards. The rational formula is expressed as: where Q = c = I = A = Q=CIA peak discharge in cubic feet per second (cfs) runoff coefficient rainfall intensity in inches per hour (1) land area in acres that contributes stormwater runoff that passes through or at a designated design point. Table 1 presents a summary of storm runoff calculations for each area within the subject tract. Under predevelopment conditions the 100 year peak runoff rate is 5.60 cfs. With the construction of the parking lot , postdevelopment peak runoff rate will be 12.09 cfs . Refer to Table 2. The KWB /99CS0004/ChB C-sto rm-2. w pd 1 11 17/00 3 Sq. .... ~ . if'~ ! ~ r I ---W::-- ~ .. ;. ,··& <' 53·-.o-o -~r -·- I REMOVE & REPLACE l WITH NEW CURB &: G TC (MATC 0c=3E -c :~aAc~~ ~ .. R TC=JJ0.00 g ""' . l . ,:, ' -:' ·. ~ ..:1 • • ·~-i-+------7 - f I I I _. l ----~---:----::---·-··' ,, 7 .oo . ,, 23.00 .~--1---H------r-~~~---t-.;_:_:;_~--..;;........~,~-- 1 ! • l ! ... ! s{ • .-.. I I 'l J j ! ·•' I I -~ ; -·-~ TP=~2 TP=328.97 ,. · · · · . TC•329 ~59'. -· TC=329.~2 I' · ~ :, ,-·< ·,. 3~o~oo Sq. Ft .. · · ~rc~J2s~sJ · · 96.95 s -t----j~~~~~-~-., ~===3r:=::::::::==:;;:::=~~~~~c~.329.5G ·" I I r I ~G~!\ll~ BR . ....,P~:'J2~ ~' . If ,ff >· I 1 \\ \; · ·· \-_-_\_~ ___ ·J_r _1_1_.c::>_\ 1 -==-· *-·--------··------- ·, •. . ,.-.- ' I ... . ···!· . ' . t . , ;,·; ~; . 331' •. · 20.00 \ -~-~·· ~=~1x,9 I ,. ·------, ·\.~ \ =:::::------~~~~-~ ~o -. e;.G 134.13 Sq.: Ft. 0 ~· 0 ~I I"') N 8 aJ ,·· · .. ·. :''. ,, .. "' .. ·:· •,. J.,': '.) --~·-·----·--··-·--··-------·--·· .. ···•· ;.. •. ;:;-----. .-. ...• I 53.00 ~r -t-+-- 3 .00 REMOVE & REPLACE ) WITH 2.25 NEW CURB & G~ ! . '<e' --=--r;c=JEci.oo --·---,, "' 11 ,r . / . . ... .,. TC=330.00 0 I ~ 0 ' I ' I 7.00 23.00 ., 0 I .. ~I .•' TP=328.97 ~C=329.52 \ ENGINEERING REVIEW COMMENTS No. 1 Project: College Hills Missionary Baptist Church Drainage Report 1. Predevelopment and postdevelopment 100-year peak runoff calculations discussed on page 1 do not match those shown on pages 2 and 3 . 2. The first sentence on page 3 is incorrect. Storm detention is required in this area. Grading Plan 1. See attached. Specs overlap and are unclear. Could be a potential ponding problem . Reviewed by: JJ per EA Date : 27-Jan -OO ' Introduction Drainage Report for College Hills Missionary Baptist Church 1.076 Acres in the Richard Carter League, Abstract No. 8 College Station, Texas prepared by KW Brown & Associates, Inc. A hydrologic analysis was performed on two tracts of land (0.4995 acre and 0.5765 acre respectively) located in the Richard Carter League, Abstract No. 8, College Station, Texas, consisting of a total of 1.076 acre of land. The objective of this report is to document the drainage impacts prior to and subsequent to the development of the property. This drainage report has been prepared in accordance with current City drainage design standards. A drainage map accompanying this report illustrates the configuration and topography of the site. The lot to the south (the larger tract) is currently the site of College Hills Missionary Baptist Church. The owner is proposing to develop a parking lot both tracts of land. After the parking lot is built, there will be either pavement or structures covering most of the land. The site sits in an older area of the community known as College Hills. The north tract is currently undeveloped land with native grass cover and no trees. The land slopes generally toward the southeast at 1. 8 percent. The south tract is contains the church building which, when combined with the sidewalks, covers approximately 22 percent of the tract. The subject tract does not lie within a designated 100 year flood plain according to FEMA maps. Methodology The rational method was used to compute the 5, 10, 25, 50, and 100 year storm events in accordance with City drainage design standards . The rational formula is expressed as: where Q c = I = A = Q=CIA peak discharge in cubic feet per second (cfs) runoff coefficient rainfall intensity in inches per hour (1) land area in acres that contributes stormwater runoff that passes through or at a designated design point. Table 1 presents a summary of storm runoff calculations for each area within the subject tract. Under predevelopment conditions the 100 year peak runoff rate is 5.69 cfs. With the construction of the parking lot, postdevelopment peak runoff rate will be 12.09 cfs. Refer to Table 2. The KWB /99CS0004/ChBC-stonn-2. wpd 1 1/18 /00 ... . ... 1( ). Table 1 -Hydrology for College Hills Baptist Church K.W. Brown Associates, Inc. ---Existing ---Sub-Basin N S Combined Soil Type Undeveloped Bldg Total ---Proposed ---N S Combined Paved Paved w Bldg Total Area Acres 0.4995 0.5765 1.0760 0.4995 0.5765 1.0760 Slope% 1.8 % Impervious 10% c 0.324 V ft/sec 1.1 Flow Path Dist., ft 220 Tc calc 3.33 Tc used 10 I, in/hr 5 yr 7.7 I, in/hr 10 yr 8.2 I, in/hr 25 yr 9.8 I, in/hr 50 yr 11.0 I, in/hr 100 yr 12.5 Q cfs 5 yr 1.25 Q cfs 10 yr 1.33 Q cfs 25 yr 1.59 Q cfs 50 yr 1.78 Q cfs 100 yr 2.02 North -25 Year Storm 5.0 ··p I .. ~ 3.0 I .. ci 2.0 1.0 0.0 v ::---=s 0 5 10 Time, minutes Runoff Volume (Pre-Develop) Runoff Volume (Post-Develop) Required Vol to detain 99CS0004\storm-l.xls 15 20 1.25 35% 0.509 2.2 240 1.82 10 7.7 8.2 9.8 11.0 12.5 2.26 2.41 2.88 3.23 3.67 -Pre •••Post North 741 2,009 1,269 3.51 3.73 4.46 5.01 5.69 6.0 5.0 4.0 ~ 3.0 ci 2.0 1.0 0.0 South 733 cu.ft. 1,318 cu.ft. 586 cu.ft. 1.8 85% 0.879 2.5 220 1.47 10 7.7 8.2 9.8 11.0 12.5 3.38 3.60 4.30 4.83 5.49 I 0 1.25 90% 0.916 2.2 240 1.82 10 7.7 8.2 9.8 11.0 12.5 4.07 7.45 4.33 7.93 5.18 9.48 5.81 10.64 6.60 12.09 South -25 Year Storm .. 2 4 6 8 Time, minutes -Pre • • • Post 10 11/17/99 '-l .... City's storm water ordinance requires stormwater detention for the proposed parking lot. Development Plan Both tracts will be re-graded somewhat in order to allow a portion of the north tract to drain onto the south tract. Outlets for stormwater will occur at the driveways as shown on the attached figure. Summary The following table summarizes the results of this analysis . Table 2 -Summary of Results Pre-Development Peak Post-Development Peak Storm Frequency, year Flow, cfs Flow , cfs 100 5.69 12 .09 50 5.01 10 .64 25 4.46 9.48 10 3.73 7 .93 5 3.51 7.45 Detention Plan The proposed north and south parking lots have been designed to serve as detention basins for the Q25 storms . The north side will generally drain to Churchill Street and released through a 1. 25' x 0.56' depth (rectangular weir) opening in the curb . The south side will drain from behind the Church building south, then east to Churchill Street. The outlet will be a 1. 85' x 0. 62' depth rectangular weir. KWB /99CS0004/ChB C-stonn-2.wpd 3 11 17/00 ~KWBrovvn Edward R. McDow, P.E., R.P.L.S. Senior Engineer emcdow@kwbes.com January 18 , 2000 Ms . Bridgett George Community Development City of College Station, Tx P .O . Box 9960 College Station, Tx 77841 Fax: 764-3496 Voice : 764-3570 Re : College Hills Missionary Baptist Church Proposed Parking Lot Improvements Conditional Use Permit, Case #99-731 Drainage Report D ear Ms . George: KW Brown & Associates, Inc. 501 Graham Road College Station, Texas 77845 409. 690-9280 • 888. 87 5. 0063 ax: 409 • 690 • 7 31 O Pl ease substitute the attached page 1 of the above referenced Drainage Report into the cop y I just deliver ed thi s morning . It has a typo . If you have any questions , please call me at 690-9280 . Thank you . Very truly yours , K.W. Brown & Associates, Inc. Edward R . McDow, P .E ., R .P.L.S . Senior Engineer H :\99CS0004 CollHillsChParkinglotlbridgett011800.wpd Scientists • Engineers • Planners Burbank • College Station • Houston • Victoria • Pho e nix • Log a n • Mexico City Introduction Drainage Report for College Hills Missionary Baptist Church 1.076 Acres in the Richard Carter League, Abstract No. 8 College Station, Texas prepared by KW Brown & Associates, Inc. A hydrologic analysi~: was performed on two tracts of land (0.4995 acre and 0.5765 acre respectively) located in. the Richard Carter League, Abstract No. 8, College Station, Texas, consisting of a total of 1.076 acre of land. The objective of this report is to document the drainage impacts prior t:> and subsequent to the development of the property. This drainage report has been prepared in accordance with current City drainage design standards. A drainage map accompanying this report illustrates the configuration and topography of the site. The lot to the south (the larger tract) is currently the site of College Hills Missionary Baptist Church. The owner is proposing to develop a parking lot both tracts of land. After the parking lot is built, there will be either pavement or structures covering most of the land. The site sits in an older area of the community known as College Hills. The north tract is curr,~ntly undeveloped land with native grass cover and no trees. The land slopes generally toward the southeast at 1. 8 percent. The south tract is contains the church building which, when combined with the sidewalks, covers approximately 22 percent of the tract. The subject tract does not lie within a designated 100 year flood plain according to FEMA maps. Methodology The rational method was used to compute the 5, 10, 25, 50, and 100 year storm events in accordance with City cfrainage design standards. The rational formula is expressed as: where Q = c - I = A - Q=CIA peak discharge in cubic feet per second (cfs) runoff coefficient rainfall intensity in inches per hour (1) land area in acres that contributes stormwater runoff that passes through or at a designated design point. Table 1 presents a summary of storm runoff calculations for each area within the subject tract. Under predevelopment conditions the 100 year peak runoff rate is 5.69 cfs. With the construction of the parking lot, postclevelopment peak runoff rate will be 12.09 cfs. Refer to Table 2. The K\VB/99CS0004/ChBC-storm-2. wpd 1 1118/00 coo!Pl NMOHH MX £££0 069 60\7.g 9o :z1 00 1 s1 1 10 ... MEMORANDUM January 28, 2000 TO: Edward McDow, K.W. Brown & Assoc iates, Via fax ( FROM: Bridgette George, Asst. Development Coordinator SUBJECT: College Hills Missionary Baptist Church -Conditional Use Permit Site Plan Staff reviewed the above-mentioned construction plans as requested . The fo ll owing page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and plan approval : __ Two (2) copies of the revised grading plan. If you have any questions or need additional information, please call me at 764-3570 . Attachments: Redlines with staff comments Staff review comments cc: College Hills Missionary Baptist Church, 712 Churchill , College Station .TX , 77840 Case file #99 -731 ENGINEERING REVIEW COMMENTS No. 2 P·roject: College Hills Missionary Baptist Church Drainage Report 1. OK 2. OK Grading Plan 1. Still appears to have a potential ponding problem. (See attached) Reviewed by: JJ per JT Date: 28-Jan -OO J :\PZTEXnPZ02663. DO C N 48°1 4'0 .3,, W· 1· 04. 1 7 ~------------·-------·--=-·----~·--.. -----------------------~·-·--------.. ··--·--·---------.. ---6)-------------- o_ ,• : .. ·.;.. ~·:. .. .. : . .·.:-.. ~~ ·._•. ·-.. .. ···. ;,· .·~ ,..:.._ .{ ... _!",~.· ·; ~~ :\1 ' .~ .. ~.; .'.. . . . sl.: '331~50, I t ·-I .• ! r .,,, 20.00 TC-.329~52 -· .. =329:02 ., !'· ' " ..._._ --·"" '" .. ":ii,. . ,. .:l ... < 'O " ,..... ~ ..... N ., ·~ ~·.J. TP=328.97 I 53.00 ) .J.00 ! --P--t-~ REMOVE & REPLACE WITH 2.25 NEW CURB & G~ .. - JC-330.00 g ~ ;_· r l -·-.·-t- ~ TC=329.52 0 0 .,~ N 01128/00 17:16 '5'409 764 3496 DEVELOPME T SVCS TRANSMISSION OK TX /RX NO. CONNECTION TEL CONNECTION ID START TIME USAGE TIME PAGES RESULT *************************** *** ACTIVITY REPORT *** *************************** 0679 96907310pp161 KW BROWN 01 /28 17:15 01'06 1 OK ~001 CITY OF COLLEGE STATION PLANNING DIVISION POST OFFIC E BOX 9960 11 0 1 TEXAS AVENUE COLLEGE STATION , TEXAS 77842-9960 TELEPHONE: (409) 764-3570 MEMORANDUM January 13, 2000 TO: FROM : SUBJECT: K.W. Brown & Associates, Inc., Via fax (409) 690-7:~6:.'\o}--' Bridgette George, Asst. Development Coordinat~ ' ~ College Hills Missionary Baptist Church -Conditional Use Permit Site Plan Staff reviewed the above-mentioned construction plans as requested . The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and submit the following information for further staff review and plan approval: __ Two (2) copies of the revised construction, site and landscape plans. If you have any questions or need additional information, please call me at 764-3570 . Attachments : Staff review comments cc: · College Hills Missionary Baptist Church, 712 Churchill, College Station, TX, 77840 Case file #99-731 ENGINEERING REVIEW COMMENTS No. 1 Project: College Hills Missionary Baptist Church Drainage Report 1. Predevelopment and postdevelopment 100-year peak runoff calculations discussed on page 1 do not match those shown on pages 2 and 3. 2. The first sentence on page 3 is incorrect. Storm detention is required in th is area . Grading Plan 1. See attached. Specs overlap and are unclear. Could be a potential ponding problem . Reviewed by: JJ per EA Date: 11 -Jan -00 : J : -'( .. ~:L~·ll~--. .'· ~ --:-. '·1-·) . . ; .. . ' ' I / / / I / I ( =329 .59 -------------·- ~---'-.J.00 TP :.::328.9 7 TP=J29.02 360.00 Sq. Ft. =32 9 .63 \ 53.00 TC=330.00 c-.o TC=32 .45± (MATCH E ST . TC) : I ! \ I .. • I l _·_.....j ,· ; . I I 23.00 / 6~0:~~0~_-_-_-_,:,.._.o_c a /. I ~ /' j--c_ GRAD E/ 1 dREAK N I r -f / I I 121.t34 Sq. _/ ' I ·rc-=3 29.~ ;01 -----+--+-~/ lex) I 96 .95 I /lo TP°'·32940 l ,~~ . ---------- / ~l/13/00 16 :32 '8'409 764 3496 DEVELOPMENT SVCS TRANSMISSION OK TX/RX NO. CONNECTION TEL CONNECTION ID START TIME USAGE TIME PAGES RESULT *************************** *** ACTIVITY REPORT *** *************************** 0463 KW BROWN 01 /13 16:31 01 '13 3 OK 96907310 14!001