HomeMy WebLinkAbout54 College Hills Missionary Bap. 00-5 712 Churchill St.~-'1
COLllGl !;lATION
DEVELOPMENT PERMIT
PERMIT NO . 500005
DP-COLLEGE HILLS MISSIONARY BAPTIST
F OR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
DATE OF ISSUE: March 20 , 2000
OWNER:
COLLEGE HILLS BAPTIST CHURCH
712 CHURCHILL ST
COLLEGE STATION, TX 77840
979-696-5959
SITE ADDRESS:
712 CHURCHILL ST
DRAINAGE BASIN:
Wolf Pen
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: FULL DEVEOPMENT PERMIT FOR CONSTRUCITON OF PARKING LOT.
SPECIAL CONDITIONS: NIA
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Ow ner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor
shall also insure that any disturbed vegetation be returned to its original condition , pi<icement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heav y
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work .
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage
facilities .
I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans ecifications submitted to and approved by the City Engineer in the development permit
application for the abov roject and all of the codes and ordinances of the City of College Station that apply.
Date
3 -20 .--t70
Date
Contractor Date
~ICWBro1Nn
Edward R. McDow, P.E., R.P.L.S.
Sen ior Engineer
emcdow@kwbes.com
January 17 , 2000
Ms. Bri dgett George
Community Development
City of College Station, Tx
P .O . Box 9960
Coll ege Station, Tx 77841
Re: College Hills Missionary Baptist Church
Propos ed Parking Lot Improvements
Conditional Use Permit, Case #99-731
D ear Ms. George:
KW Brown & Associates, Inc.
50 I Graham Road
College Station, Texas 77845
409•690-9280 • 888•875•0063
Fax:409•690•7310
www.kwbes.com
W e ar e submitting the additional information you requested in your January 13, 2000 M emorandum
for the above referenced project:
1 . T wo sets of construction, site and landscape plans (3 sheets), and
2 . Revised Drainage Report.
If you have any questions , please call me at 690-9280 . Thank you .
Very truly yours ,
K.W. Brown & Associates, Inc.
CL-.P£#~
Ed ward R . McDow, P .E ., R.P .L.S .
Senior Enginee r
cc Mr. Tommy Preston
College Hills Missionary Baptist Church
H :\99CS0004 Co11H illsChParkinglot\bridgett011700 .wpd
Scientists • Engineers • Planners
Burba n k • Co ll ege Sta ti o n • Ho u sto n • V ict oria • Pho en ix • Lo g a n • M ex ico City
zoo ~
•l<WJBrovvn
Edward R. MeDow, fl.Ii., R.P.L.S.
Senior Engineer
emcdow@kwbes.com
January 18, 2000
Ms . Bridgett George
Community Develcpment
City of College Station, Tx
P.O. Box 9960
College Station, Tx 77841
Fax: 764-3496 Voice : 764-3570
Re: College Hills Missionary Baptist Church
Proposed Parking Lot hnprovements
Conditiona l Use Permit, Case #99-731
Drainage Report
Dear Ms . George:
\Ji>1ease substitute the attached page I of the above referenced Drainage .Report into the copy I just
delivered this morning. Jt has a typo .
If you have any questions , please call me at 690-9280 . Thank you .
Very truly yours ,
K.W. Brown & Associates, Inc.
Edward R. McDow, P.E ., R.P .L.S.
Senior Engineer
H:\99CS0004 CollHlllsChPa1klnglot\brldgett011800.wpd
Scientists • Engineers • Planners
Bu r bank • Co ll e~e St at ion • Houston • Victoria • Phoenix • Logan • Mex ico City
NM OMH M}I £9£0 069 6017'7, 00 /!l l/10
Introduction
Drainage Report
for
College Hills Missionary Baptist Church
1.076 Acres in the Richard Carter League, Abstract No. 8
College Station, Texas
prepared by
KW Brown & Associates, Inc.
A hydrologic analysis was performed on two tracts of land (0.4995 acre and 0 .5765 acre
respectively) located in the Richard Carter League, Abstract No. 8, College Station, Texas,
consisting of a total of 1.076 acre of land . The objective of this report is to document the
drainage impacts prior to and subsequent to the development of the property. This drainage report
has been prepared in accordance with current City drainage design standards .
A drainage map accompanying this report illustrates the configuration and topography of the site .
The lot to the south (the larger tract) is currently the site of College Hills Missionary Baptist
Church. The owner is proposing to develop a parking lot both tracts of land. After the parking
lot is built , there will be either pavement or structures covering most of the land . The site sits in
an older area of the community known as College Hills .
The north tract is currently undeveloped land with native grass cover and no trees. The land
slopes generally toward the southeast at 1. 8 percent. The south tract is contains the church
building which, when combined with the sidewalks, covers approximately 22 percent of the tract.
The subject tract does not lie within a designated 100 year flood plain according to FEMA maps.
Methodology
The rational method was used to compute the 5, 10 , 25 , 50, and 100 year storm events in
accordance with City drainage design standards. The rational formula is expressed as:
where Q =
c =
I =
A =
Q=CIA
peak discharge in cubic feet per second (cfs)
runoff coefficient
rainfall intensity in inches per hour
(1)
land area in acres that contributes stormwater runoff that passes through or at a
designated design point.
Table 1 presents a summary of storm runoff calculations for each area within the subject tract.
Under predevelopment conditions the 100 year peak runoff rate is 5.60 cfs. With the construction
of the parking lot , postdevelopment peak runoff rate will be 12.09 cfs . Refer to Table 2. The
KWB /99CS0004/ChB C-sto rm-2. w pd 1 11 17/00
3 Sq.
.... ~
. if'~ !
~
r
I
---W::--
~ ..
;. ,··&
<'
53·-.o-o -~r -·-
I
REMOVE & REPLACE l WITH
NEW CURB &: G
TC
(MATC
0c=3E -c :~aAc~~
~ .. R
TC=JJ0.00 g ""' .
l . ,:, ' -:' ·.
~ ..:1 • •
·~-i-+------7 -
f
I
I
I
_.
l ----~---:----::---·-··' ,, 7 .oo . ,, 23.00 .~--1---H------r-~~~---t-.;_:_:;_~--..;;........~,~--
1 ! •
l !
... ! s{ • .-..
I
I
'l J
j
! ·•' I
I
-~
;
-·-~ TP=~2 TP=328.97 ,.
· · · · . TC•329 ~59'. -·
TC=329.~2
I'
· ~ :, ,-·< ·,. 3~o~oo Sq. Ft .. ·
· ~rc~J2s~sJ · · 96.95 s
-t----j~~~~~-~-., ~===3r:=::::::::==:;;:::=~~~~~c~.329.5G ·"
I
I
r
I
~G~!\ll~ BR . ....,P~:'J2~ ~' . If ,ff >· I
1
\\ \; · ·· \-_-_\_~ ___ ·J_r _1_1_.c::>_\ 1 -==-·
*-·--------··-------
·,
•.
. ,.-.-
' I ...
. ···!· . ' . t .
, ;,·;
~; .
331' •. ·
20.00
\
-~-~·· ~=~1x,9
I ,. ·------, ·\.~
\
=:::::------~~~~-~
~o -. e;.G
134.13 Sq.: Ft.
0 ~·
0
~I
I"')
N
8
aJ
,·· · .. ·. :''. ,, .. "'
.. ·:· •,. J.,':
'.)
--~·-·----·--··-·--··-------·--·· .. ···•· ;.. •. ;:;-----. .-. ...•
I 53.00 ~r
-t-+--
3 .00 REMOVE & REPLACE ) WITH
2.25 NEW CURB & G~
! . '<e'
--=--r;c=JEci.oo --·---,, "' 11 ,r . / . .
... .,. TC=330.00 0 I ~ 0 '
I '
I
7.00 23.00
.,
0 I .. ~I
.•'
TP=328.97
~C=329.52
\
ENGINEERING REVIEW
COMMENTS No. 1
Project: College Hills Missionary Baptist Church
Drainage Report
1. Predevelopment and postdevelopment 100-year peak runoff calculations
discussed on page 1 do not match those shown on pages 2 and 3 .
2. The first sentence on page 3 is incorrect. Storm detention is required in this
area.
Grading Plan
1. See attached. Specs overlap and are unclear. Could be a potential ponding
problem .
Reviewed by: JJ per EA Date : 27-Jan -OO
'
Introduction
Drainage Report
for
College Hills Missionary Baptist Church
1.076 Acres in the Richard Carter League, Abstract No. 8
College Station, Texas
prepared by
KW Brown & Associates, Inc.
A hydrologic analysis was performed on two tracts of land (0.4995 acre and 0.5765 acre
respectively) located in the Richard Carter League, Abstract No. 8, College Station, Texas,
consisting of a total of 1.076 acre of land. The objective of this report is to document the
drainage impacts prior to and subsequent to the development of the property. This drainage report
has been prepared in accordance with current City drainage design standards.
A drainage map accompanying this report illustrates the configuration and topography of the site.
The lot to the south (the larger tract) is currently the site of College Hills Missionary Baptist
Church. The owner is proposing to develop a parking lot both tracts of land. After the parking
lot is built, there will be either pavement or structures covering most of the land. The site sits in
an older area of the community known as College Hills.
The north tract is currently undeveloped land with native grass cover and no trees. The land
slopes generally toward the southeast at 1. 8 percent. The south tract is contains the church
building which, when combined with the sidewalks, covers approximately 22 percent of the tract.
The subject tract does not lie within a designated 100 year flood plain according to FEMA maps.
Methodology
The rational method was used to compute the 5, 10, 25, 50, and 100 year storm events in
accordance with City drainage design standards . The rational formula is expressed as:
where Q
c =
I =
A =
Q=CIA
peak discharge in cubic feet per second (cfs)
runoff coefficient
rainfall intensity in inches per hour
(1)
land area in acres that contributes stormwater runoff that passes through or at a
designated design point.
Table 1 presents a summary of storm runoff calculations for each area within the subject tract.
Under predevelopment conditions the 100 year peak runoff rate is 5.69 cfs. With the construction
of the parking lot, postdevelopment peak runoff rate will be 12.09 cfs. Refer to Table 2. The
KWB /99CS0004/ChBC-stonn-2. wpd 1 1/18 /00
... . ... 1( ). Table 1 -Hydrology for College Hills Baptist Church K.W. Brown Associates, Inc. ---Existing ---Sub-Basin N S Combined Soil Type Undeveloped Bldg Total ---Proposed ---N S Combined Paved Paved w Bldg Total Area Acres 0.4995 0.5765 1.0760 0.4995 0.5765 1.0760 Slope% 1.8 % Impervious 10% c 0.324 V ft/sec 1.1 Flow Path Dist., ft 220 Tc calc 3.33 Tc used 10 I, in/hr 5 yr 7.7 I, in/hr 10 yr 8.2 I, in/hr 25 yr 9.8 I, in/hr 50 yr 11.0 I, in/hr 100 yr 12.5 Q cfs 5 yr 1.25 Q cfs 10 yr 1.33 Q cfs 25 yr 1.59 Q cfs 50 yr 1.78 Q cfs 100 yr 2.02 North -25 Year Storm 5.0 ··p I .. ~ 3.0 I .. ci 2.0 1.0 0.0 v ::---=s 0 5 10 Time, minutes Runoff Volume (Pre-Develop) Runoff Volume (Post-Develop) Required Vol to detain 99CS0004\storm-l.xls 15 20 1.25 35% 0.509 2.2 240 1.82 10 7.7 8.2 9.8 11.0 12.5 2.26 2.41 2.88 3.23 3.67 -Pre •••Post North 741 2,009 1,269 3.51 3.73 4.46 5.01 5.69 6.0 5.0 4.0 ~ 3.0 ci 2.0 1.0 0.0 South 733 cu.ft. 1,318 cu.ft. 586 cu.ft. 1.8 85% 0.879 2.5 220 1.47 10 7.7 8.2 9.8 11.0 12.5 3.38 3.60 4.30 4.83 5.49 I 0 1.25 90% 0.916 2.2 240 1.82 10 7.7 8.2 9.8 11.0 12.5 4.07 7.45 4.33 7.93 5.18 9.48 5.81 10.64 6.60 12.09 South -25 Year Storm .. 2 4 6 8 Time, minutes -Pre • • • Post 10 11/17/99
'-l ....
City's storm water ordinance requires stormwater detention for the proposed parking lot.
Development Plan
Both tracts will be re-graded somewhat in order to allow a portion of the north tract to drain onto
the south tract. Outlets for stormwater will occur at the driveways as shown on the attached
figure.
Summary
The following table summarizes the results of this analysis .
Table 2 -Summary of Results
Pre-Development Peak Post-Development Peak
Storm Frequency, year Flow, cfs Flow , cfs
100 5.69 12 .09
50 5.01 10 .64
25 4.46 9.48
10 3.73 7 .93
5 3.51 7.45
Detention Plan
The proposed north and south parking lots have been designed to serve as detention basins for the
Q25 storms . The north side will generally drain to Churchill Street and released through a 1. 25'
x 0.56' depth (rectangular weir) opening in the curb . The south side will drain from behind the
Church building south, then east to Churchill Street. The outlet will be a 1. 85' x 0. 62' depth
rectangular weir.
KWB /99CS0004/ChB C-stonn-2.wpd 3 11 17/00
~KWBrovvn
Edward R. McDow, P.E., R.P.L.S.
Senior Engineer
emcdow@kwbes.com
January 18 , 2000
Ms . Bridgett George
Community Development
City of College Station, Tx
P .O . Box 9960
College Station, Tx 77841
Fax: 764-3496 Voice : 764-3570
Re : College Hills Missionary Baptist Church
Proposed Parking Lot Improvements
Conditional Use Permit, Case #99-731
Drainage Report
D ear Ms . George:
KW Brown & Associates, Inc.
501 Graham Road
College Station, Texas 77845
409. 690-9280 • 888. 87 5. 0063
ax: 409 • 690 • 7 31 O
Pl ease substitute the attached page 1 of the above referenced Drainage Report into the cop y I just
deliver ed thi s morning . It has a typo .
If you have any questions , please call me at 690-9280 . Thank you .
Very truly yours ,
K.W. Brown & Associates, Inc.
Edward R . McDow, P .E ., R .P.L.S .
Senior Engineer
H :\99CS0004 CollHillsChParkinglotlbridgett011800.wpd
Scientists • Engineers • Planners
Burbank • College Station • Houston • Victoria • Pho e nix • Log a n • Mexico City
Introduction
Drainage Report
for
College Hills Missionary Baptist Church
1.076 Acres in the Richard Carter League, Abstract No. 8
College Station, Texas
prepared by
KW Brown & Associates, Inc.
A hydrologic analysi~: was performed on two tracts of land (0.4995 acre and 0.5765 acre
respectively) located in. the Richard Carter League, Abstract No. 8, College Station, Texas,
consisting of a total of 1.076 acre of land. The objective of this report is to document the
drainage impacts prior t:> and subsequent to the development of the property. This drainage report
has been prepared in accordance with current City drainage design standards.
A drainage map accompanying this report illustrates the configuration and topography of the site.
The lot to the south (the larger tract) is currently the site of College Hills Missionary Baptist
Church. The owner is proposing to develop a parking lot both tracts of land. After the parking
lot is built, there will be either pavement or structures covering most of the land. The site sits in
an older area of the community known as College Hills.
The north tract is curr,~ntly undeveloped land with native grass cover and no trees. The land
slopes generally toward the southeast at 1. 8 percent. The south tract is contains the church
building which, when combined with the sidewalks, covers approximately 22 percent of the tract.
The subject tract does not lie within a designated 100 year flood plain according to FEMA maps.
Methodology
The rational method was used to compute the 5, 10, 25, 50, and 100 year storm events in
accordance with City cfrainage design standards. The rational formula is expressed as:
where Q =
c -
I =
A -
Q=CIA
peak discharge in cubic feet per second (cfs)
runoff coefficient
rainfall intensity in inches per hour
(1)
land area in acres that contributes stormwater runoff that passes through or at a
designated design point.
Table 1 presents a summary of storm runoff calculations for each area within the subject tract.
Under predevelopment conditions the 100 year peak runoff rate is 5.69 cfs. With the construction
of the parking lot, postclevelopment peak runoff rate will be 12.09 cfs. Refer to Table 2. The
K\VB/99CS0004/ChBC-storm-2. wpd 1 1118/00
coo!Pl NMOHH MX £££0 069 60\7.g 9o :z1 00 1 s1 1 10
...
MEMORANDUM
January 28, 2000
TO: Edward McDow, K.W. Brown & Assoc iates, Via fax (
FROM: Bridgette George, Asst. Development Coordinator
SUBJECT: College Hills Missionary Baptist Church -Conditional Use Permit Site Plan
Staff reviewed the above-mentioned construction plans as requested . The fo ll owing
page is a list of staff review comments detailing items that need to be addressed.
Please address the comments and submit the following information for further staff
review and plan approval :
__ Two (2) copies of the revised grading plan.
If you have any questions or need additional information, please call me at 764-3570 .
Attachments: Redlines with staff comments
Staff review comments
cc: College Hills Missionary Baptist Church, 712 Churchill , College Station .TX , 77840
Case file #99 -731
ENGINEERING REVIEW
COMMENTS No. 2
P·roject: College Hills Missionary Baptist Church
Drainage Report
1. OK
2. OK
Grading Plan
1. Still appears to have a potential ponding problem. (See attached)
Reviewed by: JJ per JT Date: 28-Jan -OO
J :\PZTEXnPZ02663. DO C
N 48°1 4'0 .3,, W· 1· 04. 1 7 ~------------·-------·--=-·----~·--.. -----------------------~·-·--------.. ··--·--·---------.. ---6)--------------
o_
,• : ..
·.;..
~·:. .. .. : .
.·.:-..
~~ ·._•. ·-.. .. ···.
;,· .·~ ,..:.._
.{ ... _!",~.·
·; ~~ :\1 '
.~ .. ~.; .'.. . . .
sl.:
'331~50,
I
t
·-I
.• !
r .,,,
20.00
TC-.329~52 -·
.. =329:02 .,
!'· '
" ..._._ --·""
'" .. ":ii,. . ,. .:l ... <
'O " ,..... ~ .....
N
.,
·~
~·.J.
TP=328.97
I 53.00 )
.J.00 !
--P--t-~ REMOVE & REPLACE WITH
2.25 NEW CURB & G~
.. -
JC-330.00 g
~ ;_· r l -·-.·-t-
~
TC=329.52
0
0
.,~
N
01128/00 17:16 '5'409 764 3496 DEVELOPME T SVCS
TRANSMISSION OK
TX /RX NO.
CONNECTION TEL
CONNECTION ID
START TIME
USAGE TIME
PAGES
RESULT
*************************** *** ACTIVITY REPORT ***
***************************
0679
96907310pp161
KW BROWN
01 /28 17:15
01'06
1
OK
~001
CITY OF COLLEGE STATION
PLANNING DIVISION
POST OFFIC E BOX 9960 11 0 1 TEXAS AVENUE
COLLEGE STATION , TEXAS 77842-9960
TELEPHONE: (409) 764-3570
MEMORANDUM
January 13, 2000
TO:
FROM :
SUBJECT:
K.W. Brown & Associates, Inc., Via fax (409) 690-7:~6:.'\o}--'
Bridgette George, Asst. Development Coordinat~ ' ~
College Hills Missionary Baptist Church -Conditional Use Permit Site Plan
Staff reviewed the above-mentioned construction plans as requested . The following
page is a list of staff review comments detailing items that need to be addressed .
Please address the comments and submit the following information for further staff
review and plan approval:
__ Two (2) copies of the revised construction, site and landscape plans.
If you have any questions or need additional information, please call me at 764-3570 .
Attachments : Staff review comments
cc: · College Hills Missionary Baptist Church, 712 Churchill, College Station, TX, 77840
Case file #99-731
ENGINEERING REVIEW
COMMENTS No. 1
Project: College Hills Missionary Baptist Church
Drainage Report
1. Predevelopment and postdevelopment 100-year peak runoff calculations
discussed on page 1 do not match those shown on pages 2 and 3.
2. The first sentence on page 3 is incorrect. Storm detention is required in th is
area .
Grading Plan
1. See attached. Specs overlap and are unclear. Could be a potential ponding
problem .
Reviewed by: JJ per EA Date: 11 -Jan -00
: J :
-'( .. ~:L~·ll~--.
.'·
~
--:-. '·1-·) . . ; .. . ' '
I
/
/
/
I
/
I
(
=329 .59
-------------·-
~---'-.J.00
TP :.::328.9 7 TP=J29.02
360.00 Sq. Ft.
=32 9 .63
\
53.00
TC=330.00 c-.o
TC=32 .45±
(MATCH E ST . TC)
: I !
\ I .. • I
l
_·_.....j ,· ; . I I
23.00 / 6~0:~~0~_-_-_-_,:,.._.o_c
a /. I ~ /' j--c_ GRAD E/
1
dREAK
N I
r
-f
/
I
I
121.t34 Sq.
_/
' I ·rc-=3 29.~ ;01 -----+--+-~/
lex) I 96 .95
I /lo TP°'·32940 l ,~~ .
----------
/
~l/13/00 16 :32 '8'409 764 3496 DEVELOPMENT SVCS
TRANSMISSION OK
TX/RX NO.
CONNECTION TEL
CONNECTION ID
START TIME
USAGE TIME
PAGES
RESULT
*************************** *** ACTIVITY REPORT ***
***************************
0463
KW BROWN
01 /13 16:31
01 '13
3
OK
96907310
14!001