Loading...
HomeMy WebLinkAbout53 West District Maint Shop 00-1 103 Holleman DrI c s MM.II c August 20, 1999 Mr. Jim Holster Holster & Associates Architects 7607 Eastmark Drive, Suite 200 College Station, TX 77845 REVIEWED FOR cn~~PLIANCE JAN 2 7 2000 COLLEGE STATION ENGINEERING ~ ~~'Z.7-Z...0 Re: Supplemental Drainage Evaluation for the Proposed West District Maintenance Building_ College Station, Texas Dear Mr. Holster: In accordance with your request, CSC Engineering & Environmental Consultants, Inc . (CSC) has conducted a review of drainage issues associated with the development of the site of the proposed West District Maintenance Building (the "Site"). The Site is located just east of the Wellborn Road and Holleman Drive intersection in College Station, Texas. Purpose and Scope of Drainage Review Our review was conducted to evaluate the potential net increase of precipitation runoff resulting from the proposed development of the Site by the construction of the West District Maintenance Building and associated paving areas. Specifically, a drainage report was prepared for the Wayne Smith Little League Park which includes the Site and proposed development. The development of the Site considered in that report was limited to the construction of a 3,600 ft2 warehouse structure without ancillary paved areas . However, final development plans for the West District Maintenance Building to be located on the Site will entail the constrnction of a larger warehouse structure (5 ,000 ft 2) and the addition of approximatel y I 0 ,292 ft 2 of support paving . This increase in "imp e rvious area" will result in a slight increase in runoff flows fr o m the Site and is the subject of thi s lett e r . Sources of Information Used in the Drainage Revi e w Our rev ie w of drainage c o nditi o ns at th e Sit e was base d. in pa rt . on in fo rm a ti o n p rov id ed by Holster & Assoc ia tes Archit ec ts regardin g th e prop osed stru c ture and s upport pav in g. a nd in fo rmati o n prese nt ed in th e drain age rep o rt fo r th e W ayne Smith Littl e Lea g ue Park . That drain age re po rt wa s pre pared by Mr. Rick Ro b e rtson , P .E . and is e ntitl ed "Dra inage Re port , Propos ed Wayn e Smith Little Leagu e Park , Coll ege Station, T e xas , Ma y 1997 ." A bri e f description of our evaluati o n of th e pro vid ed information and our conclu s ions reg arding pot e ntial drainage iss ues are prese nt ed in th e foll o wing sec ti o ns of this lett er. Description of Project The propos e d proj e ct will include th e construction of a 5 ,000 ft 2 maintenance building and support paving . The refer e nc ed report subdivided th e area of ir.t e re st into six distinct drainage basins based on topographic features and drainage structures at th e sit e. The drainage basin in which the Sit e was located was designated as basin 4 and consists of an area of approximately 2.37 acres. Runoff flows exit the Site in a northerly direction onto an access road from Holleman Drive and th e n flow in a southerly direction within the curb and gutter channel of the access road to a curb opening on the eastern side of the street 3407 Tabo r Road Brya n . Texas 77808 Phone (4 09) 77 8-281 0 Fa x (409) 778-0 820 .. ,,,. .. c Is I c Mr. Jim Holster Page 2 August 20, 1999 where the flows are routed to a flume and drainage channel. The original proposed project resulted in calculated predevelopment and post development flows of8 .2 and 17.1 cfs , respectively . In addition, two profile models were pre pared by Mr. Robertson for the existing channel configuration and analyzed for discharges from the 10 , 25, 50, and 100-year storm events . The analysis indicated that th e proposed site development would not increase flood elevations upstream or downstream of the proj ect site . Supplemental Evaluation and Analysis The actual anticipated flow from drainage basin 4 based upon the presentl y planned development of the Site was computed consistent with the assumptions and procedures used in the referenced drainage report . The new computations indicate that the post development flow rate from drainage basin 4 will be 18.4 cfs, compared to 17 . l cfs as presented in the original drainage report . This increase in anticipated flow from the project site is due to the increased "impervious" area of 11,692 ft 2 (structure and support paving) compared to the assumptions made in the original drainage report . This increased differential flow rate of 1.3 cfs represents a very nominal increase in runoff compared to the combined contributory area of the project site. In fact, the total flows in the previously referenced drainage channel for the 25-year event were formerly calculated to be approximately 139 cfs . The additional flow of 1.3 cfs is less than 1 percent of the total channel flows. As previousl y discussed, the increased flows from the Site in basin 4 will be directed to th e access road and will flow via the curb and gutter channel to Inlet 5 which is an op e ning in the curb at the top of a flume . Accordingl y, an analysis of Inlet 5 was performed to evaluate capacity issues re lated to the increased flow rate . The anal ys is was consistent with the procedures used in the original drainage report and indicates that the flow depth in the gutter increased from 0.41 ft to 0.43 ft for the 25-year storm . The capacity of the designed curb inlet to handle th e additional incremental flow also appears to be adequate for the proposed development. Conclusion Ba sed on the aforemen ti oned ana lys is and th e proposed de ve lopment as ou tlin ed abo ve . th e calculated incr e me ntal in crease of 1.3 cfs for th e stormwatcr runoff from the Sit e can be accommodated by Inl e t 5 and \\ill not res ult in a sig nifi cant drainag e impact do m1 stream o f th e projec t site . Pl ease contact either of th e und e rsign ed indi v idu a ls at (40 9) 778-281 0 if you ha \e a ny qu est ions or need additi o nal informatio n concerning this matt er. Respectfu ll y. W .R . Cullen , P .E . Senior Engineer WRC:mf