HomeMy WebLinkAbout37 Development Permit 99-311 Henton Linclon Subd. 900 Univ. Dr. E.DEVELOPMENT PERMIT
PERMIT NO. 595
Henton-Lincoln Subdi v is ion
FOR AREAS OUTSLDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Hent on-Linco ln S ubdi vis ion
OWNER:
Dav id Scamard o
l 11 FM 28 l8
Bryan, Tx 77840
779-7209
DRAINAGE BASIN:
Burton Creek
TYPE OF DEVELOPMENT:
SITE ADDRESS:
930 Uni vers ity Dri ve Eas t
This permit is valid for s ubdivi sion site improveme nts as shown on the approved plan s dated 1217/99.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden
and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition , placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent
properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or
sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before
any operations of this permit can begin.
In accordance with Chapter 1'3 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities.
I hereby grant this permit' for development of an area outs ide the special flood hazard area. All development shall
be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
Date
Date
Contractor Date
ProjectNamc: !l~J~-L11z~I~ ~bL.
RoviewDate: ;J~ m
Rrnewer: /; ' G
Drainage Reports
Location
jf Primary drainage system identified ft Surrounding developments shown
,ft Local &trccts, drainage systems shown
Description
~ Acreage of project
)'I/ Land cover described
ii"/Primary/secondary systems within property shown
,£1' General description ·
Df!inage Basins
,fl/~ to FIRMs if applicable
J2f ~ndary system flow patterns and impact of development on existing system
p Proposed pathways to Primary system shown or described
Design Criteria
0 /Any deviation from standards being requested?
,Z Discussion of site constraints and capacities (streets, existing structures, etc .)
0 Discussion of any applicable previous drainage studies and how this plan will affect it
Hxdrologic Criteria 4' Rai.nfall/runotf calculation method described and calculations provided
}:'.I , Detention discharge I storage calculation method I calculations
fo( Storm n:cwreocc intervals used
0 Discussion of other drainage facility design criteria used if not referenced in Standards
H~daulic Criteria
ji{ Identify capacity of systems used ~ Specify velocities at critical points in system .if Identify detention I retention outlet and routing
0 Discussion of other drainage facility design criteria used not referenced in Standards
Drainage Facility Design f Diicu&s drainage paUcms I flows (pre vs. post) ~ Arc they draining water onto another property owner? -if so , is it where the water flowed before? and is it not
more than what flowed there before? and no faster than it flowed before?
0 D~ erosion control measures employed ~ D~ detention pond design (sideslope, low flow channels, outlet works, freeboard, emergency spillway)
0 D~ maintenance access and responsibilities
Conclusions
j? Verify c:ompliancc with DPDS (signed and sealed certification)
% Explain effectiveness of improvements with regard to controlling discharges of S -100 year storm by
a) Detaining
b) Accommodating runoff in existing I proposed casements or ROW discharging into primary system
c) Combination ofa & b
9a(12
Project Name:. __________ _
Review Date: __________ _
Reviewer: ___________ _
Drainage Reports(cont.)
~endicg
Rcfercru::cs (all criteria and technical information used)
~ Hy_9rologic computations
~,, Land use assumptions for adjacent property
Z Minor/major storm nmo1f at specific points
.Q/ Historic/fully developed runoff specific points
~ Hydrographs at critical points
~ Hycµaullc computations
Z Culvert capacities (headwater and tailwater assumptions)
~ Storm sewer capacities
;;r" SUcct capacities
d Storm inlet capacities (inlet control rating)
0 Open channel design
.if Detention area I volume capacity I outlet capacity
Attached Drawings ;a;:: Location map with drainage patterns
..el Floodplain map if any
,.2( Drainage plan with topo (existing and proposed with arrows if needed)
.La" Details of outlet structures
10 ol'l2
Project Name: __________ _
Review Dare: __________ ~
Reviewer: ___________ ~
DEVELOPMENIPERMIT
1. Application Fee ($100)
2. Application
3. Erosion Control Plan
4. EPA/NOI (> S acres)
S. Public Infrastrudurc IDspection Fee ($300)
6. Drainage Report
7. HOA Covenants for mainrenancc of detention/retention ponds
8. Easements Dedicated (separare instrument)
9. TXDOT permits issued
10. Engineer's Fstimates
(1-4 nceessaI)' for rough grading/clearing ....... all others nceessaI)' for full permit)
11 afl2
'
\.
Project Name: __________ _
Review Date:, __________ _
Reviewer: ___________ ~
TXDOT PERMIT CHECKLIST
0 Permit signed (Utility or Driveway) by owner
0 Set or excerpts of construction plans of what is proposed within ROW
0 Traffic Control Plan (TMUfCD)
0 Drainage Calculations (if applicable)
For City Uae
O Sign permits
0 · Attach cover letter
0 Submit in triplicate to TxDOT
12 oll2
LOOK IN
CONFIDENTIAL
BINDER FOR
OTHER
SUPPORTING
MATERIAL
. .\ .... , ..
FOR OFFICE USE 0
P&ZCASENO.:~
DATE SUBlWITEJ>:~
Minor
FINAL PLAT APPLICATION
Amen din --' Ymal __ Vacatinc
The following items must be submitted by an established filing deadline date for P & Z Commission consideration.
MINIMUM SUB.MITTAL REQUIREMENTS:
_x_Filing Fee of$200.00.
__ Development Permit Application Fee ofSI00.00 (if applicable).
_X_ Inftastructure Inspection Fee of$300.00 (applicable if any public infrastructure is being constructed.).
_X_ Application completed in full.
~Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
JUA One (I) copy of the approved Preliminary Plat and/or one (I) Master Plan (if applicable).
Paid tax certificates from City of College Station, Brazos County and College Station I.S.D . LA copy of the attached checklist with all items clieclced off or a brief explanation as to why they are not .
__ Two (2)copies of public infrastructure plans associated with this plat (if applicable).
APPLICATION DATA
3 ,
NAME OF SUBDMSION __ H_e_n_t_on_ .. _L_i_n_co_l_n ___________________ _
SPECIFIEDLOCATIONOFPROPOSEDSUBDMSION 1000' East along University Drive from the
intersection of University Drive and East Tarrow
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name David Scarmardo -Sahara Realty Group, LTD.
Street Address 111 FM 2818 City Bryan
E-Mail Address State TX Zip Code 77805 -----------
Phone Number ( 409) 779-7209 Fax Number ---------------
PROPERlY OWNER'S INFORMATION:
Name David Scarmardo -Sahara Realty Group, LTD.
Street Address 111 FM 2818 City Bryan
E-Mail Address State n: Zip Code _7_7_8_05 __ _ -----------
PhoneNumber (409)779-7209 Fax Number ---------------
ARCIIlTECT OR ENGINEER'S INFORMATION:
Name Kling Engineering & Surveying
Street Address _4_1_0_3_T_;e;.;..x;,,;;,;.a..:..s ....;.A-'-'v~e..:.... _;S;...;;.u;..;_i ~te:::...-=2=1-=-2 ____ City Bryan
State TX Zip Code _7_7_8_02___ E-Mail Address _k_l _i n-"g_@_tc_a_._ne_t _____ _
PhoneNurnber (409)846-6212 FaxNumber (409)846-8252 ----------
FINALPlAT APPLICATION
FNLPAPP.DOC 3flS/99
I of3
TOTAL ACRES OF SUBDMSION 16 . 8 R-0-W ACREAGE N/ A TOTAL # OF L OTS 8
NUMBER OF LOTS BY ZONING DISTRICT 7 I CB 1 dete nti on -----
----'/ CB _---'/
AVERAGE ACREAGE OF EACH RESIDENTIAL LOT BY ZONING DISTRICT:
I I I I ----
FLOODPLAIN ACREAGE _N"'-'/A._,,_. __
PARKLAND DEDICATION ACREAGE OR FEE AMOUNT ----------
A STATEMENT ADDRESSING ANY DIFFERENCES BE'IWEEN nm FINAL PLAT AND APPROVED MASTER
DEVELOPMENT PLAN AND/OR PRELIMINARY PLAT (IF APPLICABLE):
Th i s is a replat
REQUESTED VARIANCES TO SUBDMSION REGULATIONS & REASON FOR SAME ______ _
~Q{\L
REQUESTED OVERSIZE PARTICIPATION Wo n.e_ --""-------='"'"-------------------
TOTAL LINEAR FOOTAGE OF PROPOSED:
STREETS -----SIDEWALKS -----_____ SANITARYSEWERLINES
_____ WATERLINES
_____ CHANNELS
STORM SEWERS -----BIKE LANES I PATHS -----
NOTE: DIGITAL COPY OF PLAT (IF APPLICABLE) MUST BE SUBMITIED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attache1
hereto are true, correct and complete. The undersigned hereby requests approval by the City of College Statio1
of the above identified fl lat.
FINAL PLAT APPLICATION
FNLPAPP.DOC 3/2S/99
-Date
2 of 3
FOR OFFICE USE ONLY
CASE NO.: q ~ .%
DATE SUBMIITED: Io I
DEVELOPMENT PERMIT qq -~( J
MINIMUM SUBMIITAL REQUIREMENTS
~ $100.00 Development Permit Application Fee.
__ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
__ Notice oflntent (N.O .I.) if disturbed area is greater than 5 acres.
ot enton u 1v1s1on, cres, o ume , ' LEGALDESCRIPTioN-and Lot 2, Block 1, One Lincoln Place, 9.03 Acres, Volume Page 17 5
'1 o o ~1<JtsLf1 6 f APPLICANT (Primary Contact for the Project): ll · ·
Name D.W.S . I nc.
Street Address 111 FM 2818 City Bryan
E-Mail Address State Texas Zip Code _7_7_8_0_5 __ _ -------------
Phone Number (409) 779-7209 Fax N urn be r (409) 822-1763
PROPERTY OWNER'S INFORMATION:
Name same as above
Street Address -----------------City --------------
State Zip Code ------E-Mail Address -------------
Phone Number Fax Number ----------------------------~
ARCIIlTECT OR ENGINEER'S INFORMATION:
Name Kling Engfoeering and Surveying
Street Address 4103 Texas Avenue, Suite 212 City _B_r_y_a_n __________ _
State Texas ZipCode 77802 E-MailAddress kling@tca.net -------------
Phone Number ( 409) 846-6212 Fax Number ( 409) 846-8252 ------------------
Application is hereby made for the following development specific site/waterway alterations:
The:·appl i cation is for private drives and public water, sanitary sewer, electricity,
and gas and private storm sewer and detention pond.
ACKNOWLEDGMENTS:
I, David Scamardo design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the current
requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design
Standards.
DEVELOPMENT PERMIT
DPERMIT.DOC 3/24/99
s pem1it applic tion, I agree to construct the improvements proposed in this application
and the requi~ ents of Chapter 13 of the College Station City Code.
Contractor
l of2
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Firm: Kling Engineering & Surveying
Address : 4103 Texas Ave. Suite 212
Bryan, TX 77802
Date: Gcio W \~1 \~'J<j
Phone: ( 409 )846-6212
Fax: (409)846-8252
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
0 Master Development Plan
0 Preliminary Plat
0 Final Plat
0 FEMA CLOMA/CLOMR/LOMNLOMR
0 Site Plan
0 Grading Plan
0 Landscape Plan
0 Irrigation Plan
0 Building Construction Documents
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ D Redlines .
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
.\II infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
~ Waterline Construction Documents w/ 0 Redlines
fil Sewerline Construction Documents w/D Redlines
0 Drainage Construction Do~ments w/ D Redlines
~ Street Construction Documents w/ 0 Redlines
0 Easement application with metes & bounds decsription
0 Drainage Letter or Report w/ 0 Redlines
0 Fire Flow Analysis w/ 0 Redlines
Special Instructions:
D Development Permit App.
D Conditional Use Permit
D Rezoning Application'·"
D Variance Request
D Other -Please specify
D TxDOT Driveway Permit
D TxDOT Utility Permit
D Other -Please specify
%ca o\., s>e -+w 2 C\\\ r u·w ~ Qm h ~" J:)'( o & .-i ~ }.)x>.Dh'>.>s .. ~: b: M
TRANSMITTAL LElTER
TRANSMIT.DOC 03123/99
By @ q.'30 1 ofl
1 2.1 AC
2 4862 SY
3 101 TON
4 5581 SY
5 621 CY
6 561 CY
Clear and Grub 30' Access Easement and 15' Utility
Easement either side of proposed roads complete
for Dollars
and Cents per acre.
Furnish and Install Reinforced Concrete Street Section to
include Curb and Gutter complete and in place
for Dollars
and Cents per square yard.
'Type A' Lime for 6" depth of subgrade, assume 7% lime/unit
wt of subgrade-supplied
for Dollars
and Cents per ton .
Lime Treatment-Lime Treated Sub-grade (density control
compacted to 95% Mod .) for a compacted depth of 6"
complete and in place
for Dollars
and Cents per square yard .
Excavation -Roadway-Complete
for Dollars
and Cents per cubic yard .
Fill -Roadway-compacted to 95% Modified Proctor (ASTM
D-1557) of maximum density complete and in place
for
and
Dollars
Cents per cubic yard .
STREET -SUB-TOTAL 1
(Items 1-6)
$4,200 .00 $8 ,820.00
$35 .00 $170 , 170.00
$100 .00 $10 ,100.00
$1.50 $8 ,371.50
$2.00 $1 ,242.00
$2.50 $1 ,402 .50
$200, 106.00
7 374 LF Furnish and Install 24" R.C .P. Storm Sewer Main complete
and in place
for Dollars $42.00 $15,708.00
and Cents per linear foot.
8 200 LF Furnish and Install 36" R.C.P. Storm Sewer Main complete
and in place
for Dollars $60 .00 $12,000.00
and Cents per linear foot.
9 201 LF Furnish and Install 42" R.C.P. Storm Sewer Main complete
and in place
for Dollars $77 .00 $15 ,477 .00
and Cents per linear foot.
10 207 LF Furnish and Install 48" R.C .P. Storm Sewer Ma in complete
and in place
for Dollars $85 .00 $17,595.00
and Cents per linear foot.
11 102 LF Furnish and Install 24" R.C.P. Storm Sewer Service Line Lead
complete and in place
for Dollars $36.00 $3 ,672.00
and Cents per linear foot.
12 106 LF Furnish and Install 36" R.C.P. Storm Sewer Service Line Lead
complete and in place
for Dollars $42 .00 $4 ,452.00
and Cents per linear foot.
13 2 EA Furnish and Install Grate Inlet Box -standard Depth-4 '-6 '
complete and in place
for Dollars $2 ,500.00 $5 ,000 .00
and Cents per each .
14 4 EA Furnish and Install Grate Inlet Box-Extra Depth-8'-10'
complete and in place
for Dollars $5,500.00 $22,000.00
and Cents per each.
15 1 EA Furnish and Install Curb Inlet Box -Extra Depth-8'-10'
complete and in place
for Dollars $7 ,000 .00 $7 ,000 .00
and Cents per each .
16 1 EA Furnish and Install Headwall complete and in place
for Dollars $8,000 .00 $8,000.00
and Cents per each.
17 53 LF Furnish and Install Railing on top of Headwall complete and
in place
for Dollars $50 .00 $2,650.00
and Cents per each .
STORM SEWER -SUB-TOTAL 2: $113,554.00
ITEMS (7-17)
18 294 LF 14, Pressure Class 200) -Standard Depth-4'-6' Bury
complete and in place
for Dollars $38.00 $11,172.00
and Cents per linear foot.
19 755 LF 14, Pressure Class 200) -Extra Depth-6'-8' Bury complete
and in place
for Dollars $40.00 $30,200.00
and Cents per linear foot.
20 80 LF 14, Pressure Class 200) -Extra Depth-8'-10' Bury complete
and in place
for Dollars $42.00 $3,360.00
and Cents per linear foot.
21 so LF 14, Pressure Class 200) -Extra Depth-10'-12' Bury complete
and in place
for Dollars $44.00 $2,200.00
and Cents per linear foot.
22 95 LF 14, Pressure Class 200) -Extra Depth-12'-14' Bury complete
and in place
for Dollars $46.00 $4,370.00
and Cents per linear foot.
23 91 LF 14, Pressure Class 200) -standard Depth-4'-6' Bury
complete and in place
for Dollars $30.00 $2,730.00
and Cents per linear foot.
24 100 LF 14, Pressure Class 200) -Extra Depth-6'-8' Bury complete
and in place
for Dollars $32 .00 $3,200.00
and Cents per linear foot.
25 35 LF 14, Pressure Class 200) -Extra Depth-12'-14' Bury complete
and in place
for Dollars $38.00 $1,330.00
and Cents per linear foot.
26 30 LF Furnish and Install 12" D.l.P . Water Main (Pressure Class
350, restrained joint) -standard Depth-4'-6' Bury complete
and in place
for Dollars $36.00 $1,080.00
and Cents per linear foot.
27 20 LF Furnish and Install 12" D.l.P. Water Main (Pressure Class
350, push-on joint) -Extra Depth-12'-14' Bury complete and
in place
for Dollars $42 .00 $840.00
and Cents per linear foot.
28 30 LF Furnish and Install 3/8" thick Steel Casing coated inside and
out w/ tar based mastic for 12" D.l.P . encasement complete
and in place
for Dollars $50 .00 $1 ,500.00
and Cents per linear foot.
29 1 EA Furnish and Install 12" M.J. 22-1/2 Bend to include all
necessary thrust blocking complete and in place
for Dollars $1 ,100.00 $1 ,100.00
and Cents per each.
30 3 EA Furn ish and Install 12" M.J. 45 Bend to include all necessary
thrust blocking complete and in place
for Dollars $1 ,100.00 $3 ,300 .00
and Cents per each .
31 1 EA Furnish and Install 12" x 12" M .J. Tee to include all necessary
thrust blocking complete and in place
for Dollars $1 ,800 .00 $1 ,800.00
and Cents per each .
32 4 EA Furnish and Install 12" x 8" M .J . Tee to include all necessary
thrust blocking complete and in place
for Dollars $1 ,100.00 $4 ,400.00
and Cents per each .
33 4 EA Furnish and Install 8" M.J. 45 BEND to include all necessary
thrust blocking complete and in place
f or Dollars $700 .00 $2 ,800 .00
and Cents per each .
34 1 EA Furnish and Install 12" Tapping Sleeve and Valve for Wet
Connection complete and in place
for Dollars $3 ,500 .00 $3 ,500.00
and Cents per each .
35 2 EA Furnish and Install Std. City of College Station Fire Hydrant
w/appurtenances including all necessary tees , valves and
blocking complete and in place
for Dollars $2,000.00 $4 ,000.00
and Cents per each.
36 2
37 2
EA Furnish and Install 12" Gate Valve and Valve Box complete
and in place
for Dollars
and ___________ Cents per each .
EA Furnish and Install 2" Blow-off Valve comp lete and in place
for Dollars
and ___________ Cents per each .
WATER LINE -SUB-TOTAL 3
ltems(18-37)
$2,000.00 $4 ,000 .00
$450.00 $900 .00
$87,782.00
38 167 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26 ,
ASTM 2211, CLASS 160) -Standard Depth-4'-6' Bury
complete and in place
for Dollars $35 .00 $5,845.00
and Cents per linear foot.
39 150 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26,
ASTM 2211, CLASS 160) -Extra Depth-6'-8' Bury complete
and in place
for Dollars $37 .00 $5,550 .00
and Cents per linear foot.
40 400 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26,
ASTM 2211, CLASS 160) -Extra Depth-12'-14' Bury
complete and in place
for Dollars $43 .00 $17 ,200.00
and Cents per linear foot.
41 110 LF Furnish and Install 6" PVC Sanitary Sewer Service (SOR 26,
ASTM 2211 , CLASS 160) -Standard Depth-4'-6' Bury
complete and in place
for Dollars $28 .00 $3 ,080 .00
and Cents per linear foot.
42 32 LF Furnish and Install 6" PVC Sanitary Sewer Service (SOR 26,
ASTM 2211, CLASS 160) -Extra Depth-6'-8' Bury complete
and in place
for Dollars $30.00 $960 .00
and Cents per linear foot.
43 62 LF Furnish and Install 6" PVC Sanitary Sewer Service (SOR 26,
ASTM 2211 , CLASS 160) -Extra Depth-10'-12' Bury
complete and in place
for Dollars $34 .00 $2,108.00
and Cents per linear foot.
44 1 LF Furnish and Install Standard City of College Station Manhole
-Standard Depth-4'-6' complete and in place
for Dollars $2,200 .00 $2 ,200 .00
and Cents per linear foot.
45 3 LF Furnish and Install Standard City of College Station Manhole
-Extra Depth-10'-12' complete and in place
for Dollars $5 ,000 .00 $15 ,000.00
and Cents per linear foot.
46 3 EA Furnish and Install Standard City of College Station 6" D.l.P.
Drop Connection complete and in place
for Dollars $600 .00 $1,800 .00
and Cents per each .
47 1 EA Furnish and Install Standard City of College Station 8" D.l.P .
Drop Connection complete and in place
for Dollars $800 .00 $800.00
and Cents per each.
48 1 EA Tie 8" Sanitary Sewer Main to Existing Manhole complete and
in place
for Dollars $650 .00 $650 .00
and Cents per each.
49 1 EA Tie 6" Sanitary Sewer Service to Existing Manhole w/ 6" D.l.P.
drop connection complete and in place
for Dollars $1,500 .00 $1 ,500.00
and Cents per each.
SANITARY SEWER LINE -SUB-TOTAL 4: $56,693.00
Items (38-49)
50 1.8
51 30
52 129
53 193
54 3433
55 8885
56 34
57 1
AC Clear and Grub Detention Pond and Surrounding Area as
shown on sheet DP-1 not to include area within 30' Access
Easement and 15' Utility Easements complete
for Dollars
and Cents per acre.
SY Furnish and Install 4' wide x 3' depth Concrete Flume
complete and in place
for Dollars
and Cents per square yard.
SY Furnish and Install 4' wide x 1' depth Concrete Flume
complete and in place
for Dollars
and Cents per square yard.
LF Furnish and Install Retaining Wall complete and in place
for Dollars
and Cents per linear foot.
SY Furnish and Install Solid Sod Within Limits of Detention Pond
complete and in place
for Dollars
and Cents per square yard .
SY Furnish and Install Seeding In Disturbed Area Surrounding
Detention Pond as shown on sheet DP-1
for Dollars
and Cents per square yard.
SY Furnish and Install 12" Diameter Limestone Rock Rubble
Rip-Rap Grouted in Place (2 -5' x 30' Strips) complete and in
place
for Dollars
and Cents per square yard .
LS Earthwork: Excavating, Grading and Shaping, Compaction
with density control and Finish Grading for Detention Pond
and Surrounding Area as shown on sheet DP-1 not to include
area within 30' Access Easement and 15' Utility Easements
complete
for Dollars
and Cents per lump sum.
$4,200 .00 $7 ,560.00
$9 .00 $270 .00
$9 .00 $1, 161.00
$200 .00 $38 ,600.00
$6 .00 $20,598 .00
$0 .20 $1 ,777.00
$37.00 $1,258.00
$11,500.00 $11 ,500 .00
58 193 LF Furnish and Install Railing on top of Retaining Wall complete
and in place
for Dollars
and Cents per linear foot.
DETENTION POND -SUB-TOTAL 5
(Items 50-58)
$50.00 $9 ,650 .00
$92,374.00
59 1
60 1
61 1
62 3458
63 1
64 1
65 1
66 856
67 1670
LS Provide Construction Staking to include Layout, Cut/Fill and
all other forms of surveying services necessary to complete
the Work. Layout Cut/Fill staking and calculation must be
conducted under the authority of and certified by a Registered
Professional Surveyor or Engineer complete
for Dollars
and Cents per lump sum .
LS Provide Contractor red-lines As-Bu ilt Drawings within 7 days
of project completion and closeout complete
fo r Dollars
and Cents per lump sum .
LS Furnish and Install all necessary Barricades , Signs and Traffic
Control Devices complete and in place
for Dollars
and Cents per lump sum .
LF Furnish and Install all necessary Trench Safety complete and
in place
for Dollars
and Cents per linear foot.
-LS striping and delineations and 'yellow' lane striping and
delineations complete and in place for the sum of
for Dollars
and Cents per lump sum.
LS Pavement Markings -Raised, Reflectorized provided in
boulevard transition area complete and in place
for Dollars
and Cents per lump sum.
.
LS Control Measures (Silt Fencing and Inlet Protection w/Gravel
Filled Permeable Bags) complete and in place
for Dollars
and Cents per lump sum.
LF Furnish and Install Schedule 40 PVC 4" Irrigation and
Electrical Conduit complete and in place
for Dollars
and Cents per linear foot.
LF Furnish and Install GTE 2-4" Schedule #40 PVC Conduit
complete and in place
for Dollars
and Cents per linear foot.
$12,000.00 $12 ,000 .00
$200.00 $200 .00
$500 .00 $500 .00
$1.00 $3,458.00
$1,200 .00 $1 ,200 .00
$500.00 $500 .00
$1,000 .00 $1 ,000 .00
$12 .00 $10 ,272.00
$12.00 $20 ,040.00
68 1640 LF
69 1670 LF
70 27 EA
71 3 EA
72 1 EA
Furnish and Install Electrical 2-4" Gray Scedule #40 PVC
Conduit @ 4' min . bury from finished grade with pull string tied
at both ends of conduit and capped and a 6" wide "CAUTION"
tape placed at least 2' above top of conduit complete and in
place
for Dollars
and Cents per linear foot.
Furnish and Install TCA 2-2" Schedule #40 PVC Conduit
complete and in place
for Dollars
and Cents per linear foot.
Install Street Light furnished by owner complete and in place
for Dollars
and Cents each .
Install 4' x 8' x 4' deep Electrical Pull Box complete and in plac
for Dollars
and Cents each .
Furnish and Install Transformer Pad and Meter Pole complete
and in place
for
and
Dollars
Cents each .
INCIDENTALS -SUB-TOTAL 6
Items (61-72)
$12 .00 $19 ,680.00
$8 .00 $13 ,360.00
$150 .00 $4 ,050.00
$400.00 $1 ,200.00
$150 .00 $150.00
$87,610.00
CONTINGENCY
TOTAL COST
$63,811.90
$701,930.90
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Finn: Kling Engineering & Surveving
Address : 4103 Texas Ave . Suite 212
Bryan, TX 77 802
~'\'(\~u--a\, \~~~
Date : \<lu.i e:.yr\\o
Phone : (409)846-6212
Fax: (409)846-8252
We are transmitting the following for Development Services to review and comment : (Check all that apply.):
D Master Development Plan
D Preliminary Plat
D Final Plat
0 FEMA CLOMNCLOMR/LOMNLOMR
D Site Plan
0 Grading Plan
0 Landscape Plan
0 Irrigation Plan
0 Build ing Construction Documents
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines .
D Development Permit App.
D Conditional Use Permit
D Rezoning Application -."
0 Variance Request
· D Other -Please specify
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
.\II infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Waterline Construction Documents w/ 0 Redlines
D Sewerline Construction Documents w/O Redlines
D Drainage Construction Doc~ments w/ 0 Redlines
D Street Construction Documents w/ 0 Redlines
D Easement application with metes & bounds decsription
0 Drainage Letter or Report w/ D Redlines
0 Fire Flow Analysis w/ D Redlines
Special Instructions :
TRANSMITI AL LE1TER
TRANSMIT.DOC 03123/99
D TxDOT Driveway Permit
D TxDOT Utility Permit
~ Other -Please specify
GJ C..C?'j C>S\ \'UC?T tt>o,"e A CJD ~ ~
@C..O?~o\ C.hec.,\C 6hl)l.0\\\3 \:>0.'-1'~ ~ \X>-'6 \f\\ro.~in~duc.
~~
® E..n<()1ne.ex-',:s E:-E>-\\~-e_
® ~ ~5 ct ~\e>-1\S -le 'o-e..
~~f'\~ Yor o..~pro-.tN\
\J\,\\\ out ~
l ofl
0
DWS DEVELOPMENT INC. B-96
P .O. BOX 4508 (409) ne-7209
BRYAN, rxneoa
ARST NATIONAL BANK
88-230/1131
PAY TO THE ORDEROF~_a.C~ity~ouf~C4owll~eg~e~Stuawti~oun~~~~~~~~~~~~~~~~~~~__1
'City of College Station
P .O. Box 9973
3024
8125/98
College Station, TX 77842-9973 ~ /J
1
• ~
MEMo._-"U=n=iv=e=rs=ity,_V..:...;i=ll=ag=e________ ( (CM! /!!l#f a/.
11• 0 0 3 0 2 t.11• I: l l 3 l 0 2 3 0 3 I: 118 3 0 9 3 t. 'i111 8 0 l
DWS DEVELOPMENT INC.
City of College Station
08/25/98
First National Bank University Village
Bill#
3024
8/25/98
400 .00
400.00
DATE:
FACSIMILE COVER
SHEET
I I .
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 South Texas Avenue, P. 0 . Box 9960
College Station, Texas 77842
Phone (409) 764-3570 Fax (409) 764-3496
#PAGES INCLUDING COVER _ __.(_
If you did not receive a complete fax, please call our office immediately for a new transmittal.
TO : · Sf!icc... A:;,..,~
COMPANY: . ~kt,·,.,3 ~"'5'~eevi':3
DEPARTMENT: ___ ·-----------------~
PHONE: ft/' Czt2. FAX: l~~ -ol-S""'L
D Please Comment
-EPA .&!OT
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Firm : Kling Engineering & Surveying
Address: 4103 Texas Ave. Suite 212
Bryan, TX 77802
Date: \\\cNe..m'be.r 3 1 \'jW
Phone: (409)846-6212
Fax: (409)846-8252
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
0 Master Development Plan
0 Preliminary Plat
0 Final Plat
0 FEMA CLOMNCLOMRJLOMA/LOMR
0 Site Plan
D Grading Plan
D Landscape Plan
D Irrigation Plan
D Building Construction Documents
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines
w/ D Redlines .
INFRASTRUCTURE A~'D ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete sei
The following are included in the complete set:
~ Waterline Construction Documents w/ ~ Redlines
Isa Sewerline Construction Documents w/~ Redlines
~ Drainage Construction Do~ments
~ Street Construction Documents
w/ 0 Redlines
Wltil Redlines
0 Easement application with metes & bounds decsription
t2I Drainage Letter or Report w/ D Redlines
D Fire Flow Analysis w/ D Redlines
Special Instructions:
~ .
D Development Permit App .
D Conditional Use Permit
D Rezoning Application -."
D Variance Request
D Other -Please specify
D TxDOT Driveway Permit
D TxDOT Utility Permit
D Other -Please specify
'J\_.\l C.rsp.~s-.\>...r-AH X\~)>D ~/\ ~S\~).".Q... l ~~>-&ll.<J ~lS D );,) CJ...,~
TRANSMrIT AL LElTER
TRANSMIT.DOC 03123/99
1 ofl
11/15/99 16:27 '0'409 764 3496 DEVELOPME T SVCS
TRANSMISSION OK
TX/RX NO.
CONNECTION TEL
CONNECTION ID
START TIME
USAGE TIME
PAGES
RESULT
*************************** *** ACTIVITY REPORT ***
***************************
9796
9p8468252
KLING ENGR
11 /15 16:26
00 '43
2
OK
~001
·'
I
Fonn 1058 (Rev. 4·94)
OHTl 122508
Exhaust previous versions.
Permit to Construct Access Driveway Facilities
on Highway Right of Way
To: Henton-Lincoln Development
David scarmardo
Hwy. FM 60 Permit No. __ _
Control O 5 o 6 Section 01
c/o City of College Station
P .O.Box 9960,College Station,Texas 77842 DWS Inc .,
The Texas Department of Transportation, hereinafter called the State, hereby authorizes ------------
----------------. , hereinafter called the Grantee, to (re) construct an access driv~way .on the .highway
right of way abutting highway no. FM 60 in Brazos County, located l n 11 ne Wl tfi
entrance to State Fann
Subject to the following:
1. The Grantee is responsible for all costs associated with the construction of this access driveway.
2. Design of facilities shall be as follows and/or as shown on sketch:
see sketch ·
All construction and materials shall be subject to inspection and approval by the State.
3. Maintenance of facilities constructed hereunder shall be the responsibility of the Grantee, and the State reserves the
right to require any changes, maintenance or repairs as may be necessary to provide protection of life or property on or
adjacent to the highway. Changes in design will be made only with approval of the State.
4. The Grantee shall hold harmless the State and its duly appointed agents and employees against any action for personal
injury or property damage sustained by reason of the exercise of this permit.
5. The Grantee shall not erect any sign on or extending over any portion of the highway right of way, and vehicle service
fixtures such as service pumps, vendor stands, or tanks shall be located at least twelve (12) feet from the right-of-way
line to ensure that any vehicle services from these fixtures will be off the highway.
6 . This permit will become null and void if the above-referenced driveway facilities are not constructed within six (6)
months from the issuance date of this permit.
7. The Grantee will contact the State's representative Mr · Ne a 1 Munn telephone
( 4 o 9) 7 7 a - a o s 4 at least twenty-four (24) hours prior to beginning the work authorized by this permit.
NOTE: SEE ATTACHMENT
Texas Department of Transportation
Date of Issuance S e p t e m b e r 2 9 , l 9 9 8
Pa tr i ck T . W i l l 9istriiFEagini:? E . Are a Eng ir
ion of an access