HomeMy WebLinkAbout30 Development Permit 99-322 Campus Park Ph. 1B 630 Holleman DrDate: October 5, 2000
To : Amanda Hudec, Accounting
From : Bob Mosley, City Enginee~
Subject: Completed Infrastructure from Private Development
By the attached letter of completion for the Campus Park Phases IA, IB and 2
development, we have accepted the following improvements to the City of College
Station infrastructure.
Streets:
28-foot wide pavement
(Townplace Drive)
Sidewalks:
4-foot wide concrete
Storm Sewer:
24-inch diameter RCP
30-inch diameter RCP
4 foot by 2 foot box culvert
5 foot by 5 foot junction box
Sanitary Sewer:
Water:
6-inch PVC sanitary sewer main
(SDR26 3034)
4-foot diameter manholes
6-inch PVC main
(C900 Cl.200)
Fire Hydrant, Type C
321 linear feet
7 44 square feet
subtotal $42,250.00
31 linear feet
24 linear feet
24 linear feet
1 each
subtotal $8,270.00
986 linear feet
6 each
subtotal $59,662.00
292 linear feet
3 each
subtotal $29,660.00
The above added infrastructure totals $139,842.00 . Please note that the above totals
have been adjusted. A revised engineers estimate has been requested from UDG.
c: Natalie Ruiz, Development Coordinator
John Logan Engineering Technician
Missy Green, Staff Assistant
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
RE· COMPLETION OF CAnP//~ PAR Y-
Phc._scJ IA IA{Zc
The purpose of our letter is to request that the following listed
improvements be approved and accepted as being constructed under city
inspection and completed according to plans and specifications as
approved and required by the City of College Station, Texas. This
approval and acceptance by the City is requested in order that we may
finalize any sub-contracts and to affirm their warranty on the work. This
approval and acceptance by the City of the improvements listed below
does hereby void the letter of guarantee for the listed improvements on
the above referenced project.
The one year warranty is
'/3. A -CA-!lf6Y, LLC
indicated by signatures below.
WORK COMPLETED
rowv f L--AU: Pe 1 t.N:=
TOWN ?LA-CE f;'JDEWALI<.
7 . z.S-· <.) 0
E&APPROVAL
~.10112.1924(
hereby affirmed and agreed to by
and by their sub-contractors as
DATE
if«7Jlj.t!/oo
rf!)f 7%1 t/ tJ ()
~ 7 ?l,!1 /()tJ
%1 JA./ I //Jo
Owner: Bt..v11c.E CA1716Y
Address: 8t7.K' 9s1 ?-, c!cu.G(;€f;VJ...
Signature: ~d_~
I
Contractor: 09 .-.l0c-r CJv.-eiLp.e..'363
Address: \->.(!) · ~X:. qc/f£J2-
{),[I~ -s.'Tlo.~ ~ Signature~ ;c:
CAMPUS-PARK SUBDIVISION
PHASE 1-A
PROllAllLE COST ESTIMATI ~
PAVING & SITE IMPROVEMENTS *
1 Excavation (6" depth) CY 15 $2 .50
2 8" Flexible Ba se SY 75 $9 .00
3 Lime Tr ea tment (6" depth) SY 75 $1.50
4 Reinforced Concrete Curb & Gutter LF 55 $8.00
5 Reinforc e d Concret e Pavin g SY 61 $27.00
6 Reinf. Con c rete Handicap Ramp EA 2 $750.00
7 Sawcut, tie and repair at str ee t EA 1 $500.00
ESTIMATED PAVING IMPROVEMENTS
*Does not include paving for individual units
DRAI NAGE IMPROVEMENTS
8 Detention Pond (Earth Work) LS 1 $10,000.00
9 Silt Fencing (Erosion Control) LF 200 $1.25
10 30" RCP LF ~: ':" 29 $45.00
11 4' x 2 ' Box Culvert LF 24 $120.00
12 24" RCP LF 31 $35.00
13 5' x 5' Junction Box EA 1 $2 ,500.00
14 Headwall EA 1 $500.00
ESTIMATED DRAINAGE IMPROVEMENTS
WATER IMPROVEME NTS
LF ., ' 84 $20 .00 --·-# ' 15 6" P.V.C. ~R 3034 Water Line
16 6" M .J. Gate Valve & Box EA 1 $800.00
17 8"x6" Tapping Sleeve w/ valve EA 1 $1,500.00
18 Cement Stabilized Embedment LF ~3 $10 .00
ESTIMATED WATER IMPROVEMENTS
c :\C ostP h aselA . xi s 1 of 2
$37 .50
$675.00
$112.50
$440 .00
$1,647.00
$1,500.00
$500 .00
$4,912.00
$10,000.00
$250 .00
$1 ,305.00
$2,880.00
$1,085.00
$2,500.00
$500.00
$18,520.00 .:} ·' ~. {_ '
-
-$1-,-680 .00
$800.00
$1 ,500 .00
_.$330.00 -.
. $4,310.00
SEWER IMPROVEMENTS
:::Mtln ::m::r::r:::::1:rnr1::1:111P:e$Y.Rnt11mtittttttr:::::::1r::::i::::::: :1:1n1Ntnr:1:: 1rnr:mlioc(::1r'n:tQf.n1rnaq$1rn:n:::m:mm+@P:rP.m$1Wrn
5td!;2.~ v )
19 4" Service taps to Ex 8" (avg 25')
20 6" PVC Sewer Pipe (6'-8' depth)
21 4' Dia. Standard Manhole
22 Tie to Existing Manhole
23 Trench Safety
24 Standard Cleanout
25 4" PVC Sewer Service Line
EA
LF
EA
EA
LF
EA
LF
3
45
$300.00
$35.00
$2,500.00
$500.00
$2.00
$200.00
$28.00
ESTIMATED SEWER IMPROVEMENTS
ESTIMATED PROJECT COST
Contigency (153)
TOTAL PROJECT COST
NOTES CONCERNING OPINIONS OF PROBABLE CONSTRUCTION COST
$900.00
$1L,285;{)0 / )/~ .. u
$7 ,500.00
$500.00
--$+-02-;00 75;2, r.J !)
$200.00
$1,260.00 .
$23r347·.oo :2 J u; ,2
$51,089.00
$7,663.35
$58,752.35
Urban Design Group's (UDG) opinions of probable construction cost provided for herein are made
on the basis of our experience & qualifications and represent our best judgment as an experienced
and qualified professional engineering firm generally familiar with the construction industry and
applic~_ble development regulations. However, since UDG has not obtained approval from the
appropriate jurisdiction and UDG has no control over the cost of labor, materials, equipment or
services furnished by others, or over the Contractor's methods of determining prices, or over
competitive bidding or market conditions, UDG cannot and does not guarantee that proposals,
bids or actual construction cost will not vary from opinions of probable construction cost prepared
by UDG.
/ /. I¥', rc:r
c :\Cost PhaselA.xl s 2 of 2
\ ,. ~
CAMPUS-PARK SUBDIVISION
PHASE 1-B
PROBABLE COST ESTIMATE
PAVING & SI T E IMPROVEMENTS*
--------------------------------·------
1 Excavation (6" dep~l_ _________ CY 5 $2.50 -----2 6" Flexible Base SY 230 $9.00
3 Lime Treatment (6" depth) SY 30 $1.50
4 Reinforced Concrete Curb & Gutter LF 31 $8.00
5 Reinf. Concrete Handicap Ramp EA 2 $750.00
6 Sawcut, tie and repair at street EA 1 $500.00
ESTIMATED PAVING COST
*Does not include paving for individual units
DRAINAGE IMPROVEMENTS
7 Grading/Earthwork CY 605 $2.50
8 Silt Fencing (Erosion Control) LF 200 $1.25
ESTIMATED DRAINAGE COST
WATER IMPROVEMENTS
9 LF $20.00
10 Std. Fire Hydrant Assembly EA $2,000.00
11 6" M.J. Gate Valve & Box EA $800.00
12 Cement Stabilized Embedment LF $10.00
13 12" x 6" Tapping Sleeve w/valve EA 1 $1,600.00
14 6" MJ Bend (22.5 Degree) EA ·1 $250.00
15 6" M.J. Plug EA 1 $250.00
--------
------$12.50
___ $2,070.00
$45.00
$248.00
$1,500.00
$500.00
$4,375.50
$1,512.50
$250.00
$1,762.50
00:00
$2,000.00
$2,400.00
~6-;60
$1,600.00
$250.00
$250.00
ESTIMATED WATER IMPROVEMENTS
c\CostPhaselB 1of2
<ruu.:; J
;2 ,j ,;J ~-,:
SEWER I!viPROVEMENTS
16 4" Service Taps
17 6" PVC Sewer Pipe (6'-8' depth)
18 Cement Stabilized Embedment
19 4' Dia. Standard Manhole
LF
LF
LF
EA
5.S-:J
)")cl
$28.00
$35.00
$10.00
$2,500.00
-$1,9 80;() 0 '.)(
w,000;00 ~"? ;i :r ~'
$.{i,000.00 .S-.>c;(I . v u
$2,500.00
20 Tie to Existing Manhole EA $500.00 $500.00
21 Trench Safety LF
22 Standard Cleanout EA
$2.00
$200.00
$-1,2-0o.eo I I Ou , uiJ
$200.00
/l et / )-,, 1
~· /,,.,,, ._/
ESTIMATED SEWER IMPROVEMENTS $39;380~·
ESTIMATED PROJECT COST
Contigency (150/o)
TOTAL PROJECT COST
NO"tES CONCERNING OPINIONS OF PROBABLE CONSTRUCTION COST
$59,218.00
$8,882.70
$68,100.70
Urban Design Group's (UDG) opinions of probable construction cost provided for herein are made
on the basis of our experience & qualifications and represent our best judgment as an experien_ced
and qualified professional engineering firm generally familiar with the construction indusby and
applicable development regulations. However, since UDG has not obtained approval from the
appropriate jurisdiction and UDG has no control over the cost of labor, materials, equipment or
services furnished by others, or over the Contractor's methods of determining prices, or over
competitive bidding or market conditions, UDG cannot and does not guarantee that proposals,
bids or actual construction cost will not vary from opinions of probable ccinstruction cost prepared
byUDG.
c:\Cost:Phase1B 2of2
CAMPUS-PARK SUBDIVISION
PHASE TWO
PROBABLE COST ESTIMATE
PA YING & SITE IMPROVEMENTS*
1 Excavation (6" depth) CY 914 $2.50
2 2" H.M.A.C. SY 1455 $6.00
3 6" Flexible Base SY 1750 $9.00
4 lime Treatment (6" depth) SY 1750 $1.50
5 Reinforced Concrete Curb & Gutter LF 766 $8.00
6 4" Reinforced Concrete Sidewalk SF '/'-;.;.: -1062 $3.00
7 Reinf. Concrete Handicap Ramp EA 5 $750.00
8 Sawcut, tie and repair at street EA 1 $750.00
ESTIMATED PAVING IMPROVEMENTS
*Does not include paving for individual units
DRAINAGE IMPROVEMENTS
9 Silt Fencing (Erosion Control) LF 330 $1.25
ESTIMATED DRAINAGE IMPROVEMENTS
WATER IMPROVEMENTS
$2,285.00
$8,730.00
$15,750.00
$2,625.00
$6,128.00
$3;-1:86.00 2 3J, dv
.$3,150.00 -·
$750.00
$43,-204~0
--S:--9 .2 ,2)u. Ju
$412.50
$412.50
}NQ~t •Uti@:':ttttttfll•PESY.RlRJlQNillttf:tt:••••=t:mtm:t::t: :tt::::u:N:lmt:rnmm tr•tQ.li¥it:t :t :tUN.lm~~~P:O.$.ll:ill t WtQT.Al@¢()$.[if
C. 9oD (..../,~uu
10 6" P.V.C. SOR 3034 Water Line
11 Std. Fire Hydrant As~embly
12 6" M.J. Gate Valve & Box
13 6" M.J. Bend (11.25 degree)
14 6" M.J. Bend (22.5 degree)
15 6" M.J. Bend (90 degree)
16 Cement Stabilized Embedme·nt
SEWER IMPROVEMENTS
17 4" Service Taps To Existing 6"
18 6" PVC Sewer Pipe (6'-8' depth)
19 Cement Stabilized Embedment
20 Tie to Existing Manhole
21 4" Service Ta s
22 Standard Cleanout
c:\CostPhase2.xls
LF
EA
EA
EA
EA
EA
LF
9
1
2
1
$20.00
$2,000.00
$800.00
$250.00
$250.00
$250.00
$10.00
·ESTIMATED WATER IMPROVEMENTS
EA
LF
LF
EA
LF
EA •
~
12
460
1
$300.00
$35.00
$10.00
$500.00
$28.00
$200.00
ESTIMATED SEWER IMPROVEMENTS
1of2 .
$1~ ... -=.~~ J C)'-f<J,J ~
$2,000.00
$7,200.00
$250.00
$500.00
$250.00
-$3l.,4()(M)O-11 , 1 L? ()
$3,600.00
$3,3-25:00 I 0 rJ • u ~
~00;()0 (.;J ,.)J ' J,
$500.00
$12,880.00 A_
$200.00
•
ESTIMATED PROJECT COST
Contigency (15%)
TOTAL PROJECT COST
NOTES CONCERNING OPINIONS or PROBABLE CONSTRUCTION COST
$101,521.50
$15,228.23
$116,749.73
Urban Design Group's (UDG) opinions of probable construction cost provided for herein are made
on the basis of our experience & qualifications and represent our best judgment as an experienced
and qualified professional engineering firm generally familiar with the construction industry and
applicable development regulations. However, since UDG has not obtained approval from the
appropriate jurisdiction and UDG has no control over the cost of labor, materials, equipment or
services furnished by others, or over the Contractor's methods of determining prices, or over
competitive bidding or market conditions, UDG cannot and does not guarantee that proposals,
bids or actual construction cost will not vary from opinions of probable construction cost prepared
by UDG.
)Z. /k-~4
c:\CostPhase2.xls 2 of 2
CAMPUS-PARK SUBDIVISION
PHASE 1-B
PROBABLE COST ESTIMATE
PAVING & SITE IMPROVEMENTS*
1 Excavation (6" depth) CY 5
2 6" Flexible Base SY 230
3 Lime Treabnent (6" depth) SY 30
4 Reinforced Concrete Curb It Gutter LF 31
5 Reinf. Concrete Handica Ramp EA 2
6 Sawcut, tie and repair at street EA 1
$2.50
$9.00
$1.50
$8.00
$750.00
$500.00
ESTIMATED PAVING COST
*Does not indude paving for individual units
DRAINAGE IMPROVEMENTS
7 Grading/Earthwork CY 605 $2.50
8 Silt Fencing (Erosion Control) LF 200 $1.25
$12.50
$2,070.00
$45.00
$248.00
$1,500.00
$500.00
$4,375.50
$1,512.50
$250.00
ESTIMATED DRAINAGE COST $1,762.50
WATER IMPROVEMENTS
9 6" P.V.C. SDR 3034 Water Line LF 255 $20.00 $5,100.00
10 Std. Fire Hydrant Assembly EA 1 $2,000.00 $2,000.00
11 6" M.J. Gate Valve It Box EA 3 $800.00 $2,400.00
12 Cement Stabilized Embedment LF 210 $10.00 $2,100.00
13 12" x 6" Tappin Sleeve w /valve EA 1 $1,600.00 $1,600.00
14 6" Ml Bend 22.5 Degree) EA 1 $250.00 $250.00
15 6" M.J. Plug EA 1 $250.00 $250.00
ESTIMATED WATER IMPROVEMENTS $13,700.00
c \CostPhase1B lof 2
... ,;
;,
..
.. .
·-'
'. ! '
, .
. ., ,, .....
t .
SE WER IMPROVEMENTS
t•.w rnn::n?;mr:mrnrr o•.·•·· :
16 4" Service Taps
17 6" PVC Sewer Pipe 6'-8' depth
18 Cement Stabilized Embedment
19 4' Dia. Standard Manhole
20 Tie to Existing Manhole
21 Trench Safety
22 Standard Cleanout
LF 285 $28.00
LF 600 $35.00
LF 600 $10.00
EA 1 $2,500.00
EA 1 $500.00
LF 600 $2.00
EA 1 $200.00
ESTIMATED SEWER IMPROVEMENTS
ESTIMATED PROJECT COST
Contigency (150/o)
TOTAL PROJECT COST
NOTES CONCERNING OPINIONS OF PROBABLE CONSTRUCTION COST
$7,980.00
$21,000.00
$6,000.00
$2,500.00
$500.00
$1,200.00
$200.00
$39,380.00
$59,218.00
$8,882.70
$68,100.70
Urban Design Group's (UDG) opinions of probable construction cost provided for herein are made
on the basis of our experience & qualifications and represent our best judgment as an experienced
and qualified professional engineering firm generally familiar with the construction industry and
applicable development regulations. However, since UDG has not obtained approval from the
appropriate jurisdiction and UDG has no control over the cost of labor, materials, equipment or
services furnished by others, or over the Contractor's methods of determining prices, or over
competitive bidding or market conditions, UDG cannot and does not guarantee that proposals,
bids or actual construction cost will not vary from opinions of probable c0nstruction cost prepared
by UDG.
c: \CostPhase1B 2of2
\
c . . '
From:
To:
Date:
Subject:
Eric Johnson <ericudg@txcyber.com>
<jtondre@ci .college-station .tx.us >
1/7/00 11 :31AM
Campus-Park Subdivision
In talking with Ted Mayo yesterday , he said you would need to have an
in-house meeting about resolving the waterline being too close to the
easement and build ing on Lot 20 .
After d iscussing this w ith Blake Cathey , he decided to move the sewer
line so the water line could be relocated further from the easement and
building .
We are currently adj ust ing the plans to reflect th is. We wanted to let
you know about this so you would not waste any staff time having a
meeting regarding this issue.
Eric
Urban Design Group
909 Southwest Parkway East
College Station , TX 77840
(409) 696-9653 Fax: (409) 696-9752
DEVELOPMENT PERMIT
PERMIT NO. 99-500322
Campus Park Phase 1-B
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE
SITE LEGAL DESCRIPTION:
Holleman & Welsh
DATE OF ISSUE: 1/19/2000
OWNER:
Blake Cathey
6345 Smith Road
Bellville, Texas 77418
409-218-1200
TYPE OF DEVELOPMENT:
SPECIAL C O NDITIONS:
F ull P ermit
No n e
SITE ADDRESS:
630 Holleman Dr.
DRAINAGE BASIN:
Bee Creek Trib B
VALID FOR 12 MONTHS
C O NTRACTOR:
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden
and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent
properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or
sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before
any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities.
I hereby grant this permit for development of an area OUTS IDE the special flood hazard area . All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
ollege Stati n that apply.
I -;9 ·-z otJ'
Date
Date
Contractor Date
01 /28 /2000 10:57 5959752 URBAN DESIGN GROUP
. ...__,
CAMPUS-PARK SUBDIVISION
PHASE 1·8
PROBABLE COST ESTIMATE
PA YING & SITE IMPROVEMENTS•
1
2
3
4
5
I
*Doe9 not Include paving for lndlvldual units
DRAINAGE IMPROVEMENTS
7
I
WATER IMPROVEMENTS
• 10
11
12
13
14
15
CY 5 $2.50
SY 230 9.00
SY 30 $1.50
LF 31 $8.00
EA 2 $750.00
l!A 1 $500.00
ESTJMATl!D PAVING COST
CY 605 $2.50
lF 200 1.25
EmMATED DRAINAGE COST
,•
LF 255 20.00
EA 1 000.00
EA 3 $800.00
lF 210 $10.00
EA 1 1600.00
EA 1 250.00
EA 1 $250.00
!STIMAnD WAT!R IMPROVEMENTS
1of2
PAGE 02
$12.50
$2,070.00
$45.00
$248.00
1,500.00
$500.00
$4,375.50
,1,512.50
250.00
$1,762.50
5 100.00
2 000.00
$2,400.00
$2,100.00
1,600.00
250.00
$250.00
$13,700.00
01 /28 /2000 10 :57 6959752
SEWER IMPROVEMENTS
16
17
11
11
20
21
22 Standard aeanaut
URBAN DES IG N GROUP
. : .
LP 215 $28.00
LF 600 $35.00
Lf 600 fl0.00
1 2 500.00
1 $500.00
Lf 600 $2.00
1 $200.00
EST!MATEDSEWERIMPROVEM!NTS
ESTJMATED PROJECT COST
Contigency (15«M.)
TOTAL PROJECT COST
NOIES CONCERNING OPINIONS OP PROBABLE CONSTRUCTION COST
PAG E 03
$8,000.00
500.00
500.00
$1,200.00
$200.00
$39,380.00
$59,218.00
$1,112.70
$68,100.70
Urblln Dellen Group'• (UDG) opinion• of probable conatructlon a>R pravtcled for herein .,. made
an the ba .. 1 of our cxpeirtence • qualltlc:atktM and ,..,,_.,tour Nit Judgment as an experienced
· mid quallfled Pl oht rfONll mgl.....tng flnn generally famlller wtth the construction Industry and
applable davelopmead: regulatk>nl. ttowwer, since UDG ha not obtained approval from the
approprtata jurf9dlctlon and UDG has no control owr the aMt of labor, materials, equipment or
~ fumlmhed by others, or over the Contndor'a methods of detarmlnlng prica, or over
mmplllftive bidding or market mndltlonl, UDG cannot and do8I not guarantee that propoul1,
blcll or lldllel CIDMtrudlon COit wttl not vary from opinions of probable c:an.trud:lon cmt prepared
byUDG.
a\CDllfll I Sii 2af2
01 /28/2000 10 :57 6969752
hone : •09-696-9653
F1x:40&-e9&-9752
Fax
Toe Bridgette George
Pax1 764-3496
Phone1
··=
URB AN DESIGN GROU P PA GE 01
Urban Design Group
from: Susan Sasser
D•te: January 28 , 2000
P•1 .. : 2+covr
CC:
CJ Utpnt 0 For Review D Pl .... Comment CJ Plwe lteply 0 Pl .... Recycle
•COftllllenta: Bridgette,
Here is the Cost Estimate for Phase 1-8 of Campus-Park . If you need anything else , let me know .
Thanks ,
Susan
Public Water Infrastructure
Ge I
Overall utility layout sheet -showing easements (platted or by separate instrument) £~7-~
O If separate instrument easements arc needed -do not approve until we get them recorded
D TXOOT permits needed?
Ji Sc:alcd and Sigilcd AJJD Rngi~rs Estimates
Linet
~pc material ff Pipe si7.es (allowable .... 6,8,12,16,18 -note no 10" approved)
· 0 Depth (4'+) (min.max)
0 Separation distancu (TNRCC) £" All utilities in plan /Jr. profile w/si:n:.s and type
0 Private vs. Public line distinction
0 Wyt:ii not past property line (so meter can be within ROW/easement)
0 Max # of connections for size waterline (TNRCC)
0 Pipe deflection (noted as~ .. degrees, radius -with begin/end curve, not atjt)
ft Grades -existing and proposed (centerline, right and left) shown in profile
0 Full TNRCC compliance
;( Conflicts with other utilities shown
~ Labels on all major items in plan /Jr. profile (crossings)
)'.I SiuJLocation sufficient for overall City needs/masterplan ~ ~~:m=~~~w ;-/~ ?~ 1vt e,,~, bJt (,()w ~ Li ~
~Stationing on all~ and taps !tfo
Y!!m
0 Valve spacing (SOO')
O Valves • system isolation
0 Valves ·at hydrant
0 Backflow prcvcntcr&I and choclc valves uses as ncccssary (@irrigation/fire sprinldcr/pooWhazards)
0 Blowotrs (FH ok: too) @ end of dead end lines
0 Air rdeasc valves at all major high points
Fire Hydrants
0 FU'C hydrant spacing (Coverage)
0 F°U'C hydrant location (rclalivc to cwb)
0 Fire hydlant • detail/type t;pc":i fied
0 F°U'C flow calculations provided
Service Lines
0 Scrvic:c lines • ~ and size specified from main to meter
0 Services provided to all lots to a point beyond sidewalks on both sides of street
I olll
•
Project Name:. _________ _
Review Date : __________ _
Reviewer: ___________ ~
Public Water Infrastructure< cont.)
Details
0 Standard Details noted or included (referenced as city oC CS Standard Details)
O Details for all non-standard items (included/ok) (not on CS Std. detail sheet)
0 All MI valves and fittings
0 Thrust blocking
0 Easement width adequate
0 Embcdmcnt details (specify option)
0 Trench safety if deeper than s•
0 Erosion control notes
The following items arc variaDc::cs to the College Station public waterline standards:
2 ol12
I r>
•
Project Name : _________ _
Review Date:, __________ _
Review er: ___________ _
Public Wastewater Infrastructure
General A' Overall utility layout sheet -showing casements (platted or by separate instrument)
O If separate instrument easements arc needed -do not approve until we get them recorded
0 TXDOT permits needed?
;:( Sealed and Signed /)o o Engineers Estimates
.ii ACS Pipe material
;( Pipe sizes (allowable .... 6,8,10,12,15,18)
D Depth (min cover)
0 Depth (~ve)
0 Separation distances (TNRCC)
_0/ All utilities in plan & profile w/sizcs and type
0 Private vs. Public line distinction
D Wyes not past property line
;r' Grades -existing and proposed (centerline, right and left) shown in profile
D Flowlines (specified/labeled)
0 F~TNR~oo~liancc /
0 Conflicts with other utilities shown (min. I 'clear I except water -see TNRCC) ~ ~ 1~ ;:]· ?
0 Labels on all major items in plan & profile (crossings) l
O Si.uJLocation sufficient for overall City needs/masterplan / ~ 7 /, '1.-L fD
D Lines located inPUFJROW ---------------~
D Stationing on all manholes and services
Manholes
D Liocs cud in MH
D Manhole spacing (max 500')
0 Manhole diameter based Oil depth and line me (4 'vs.5' diam.)
D Manhole covers -"watertight" oovcr if in floodplain
0 Manholes ~ible from public ROW/easement
0 Manholes at change of aligmncnt, grade or si7.c
D Drops through manhole (TNRCC)
Scnicc Lines
D Service lines -materials and me specified from main to cud I
0 Services provided to all lots to a point beyond sidewalks OD both sides 4 ~ ,/1~5 s ~
0 Scrvices ~ 6" enter at manholes
3 ol12
.,,
Project Name:. __________ _
Review Date:. __________ ~
Reviewer.. ___________ ~
Public Wastewater Infrastructure( cont.)
Details
0 Standard Details noted or included (referenced as city of CS Standard Details)
0 Details for all non-standard items (includc/ok) (not on CS Std. detail sheet)
O :Easement width adequate
0 Embcchnr.nt details (specify option)
0 Trench safety if dccpcr than s•
D Erosion c:ontro1 notes
The following items arc varianocs to the College Station public wastewater standards:
··,.
FOR OFFIC E U:i;;~, CAS E NO .: lf -~0
DATE SUBMITfED:
FINAL PLAT APPLICATION
(check one) Minor __ Amending .,/ Final __ Vacating __ Replat
The following items must be submitted by an established filing deadline date for P & Z Commissions consideration.
MINIMUM SUBMITf AL REQUIREMENTS
_./_Filing Fee of$200.00
_./_Development Permit Application Fee of$100.00 (ifapplicable) (submitted previously)
_./_Infrastructure Inspection Fee of $300 .00 (if any public infrastructure is being constructed.)
_ .,/ _ Application completed in full .
_./_Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
_.,/_One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
_.,/_A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
_.,/_Two (2) copies of public infrastructure plans associated with this plat (if applicable).
APPLICATION DATA
NAME OF SUBDIVISION Campus Park Subdivision Phase 1-B
SPECIFIED LOCATION OF PROPOSED SUBDIVISION near southeast corner of Holleman and Welsh
.ADDRESS not available
LEGAL DESCRIPTION 4 .102 acres of the Holleman Addition Volume 778 Page 173
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name Blake Cathey
Street Address 6345 Smith Road C ity College Station
State Texas Zip Code 77418 E-Mail Address bcathey@flash.net
Phone Number (409) 870-5031 Fax Number NIA
PROPERTY OWNER'S INFORMATION:
Name same as above
StreetAddress _______________ ~ __ City ___________ _
State Zip Code ______ E-Mail Address------------
Phone Number Fax Number--------------
ARCHITECT OR ENGINEER'S INFORMATION:
Name Urban Design Group
Street Address 909 Southwest Parkway East, Suite E City College Station
State Texas Zip Code 77840 E-Mail Address udgcs@txcybe r .com
Phone Number (409) 696-9653 Fax Number (409) 696-9752
FINAL PLAT APPLICATION
FNLPAPP .DOC 3125199
I of2
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific site/waterway alte~o~: {}fhn~ /) fl!ric /JIL . I B -~ 3 0 ~ IJl/lWf_
'
I, I ~ l,-· . design engineer/owner, hereby acknowledge or affirm that:
ACKNO~GMENTS: ~
The il nnation and conclusions contained in the above plans and supporting documents comply with the current requirements of
the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards.
As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to
these documents and the requirements of Chapter 13 of the College Station City Code.
Property Owner(s) Contractor
CERTIFICATIONS: (for proposed alterations within designated flood haz.ard areas.)
A. I, certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the I 00 year storm.
Engineer Date
B . I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the
latest Federal Insurance Administration Flood Ha7.ard Study and maps, as amended.
Engineer Date
C. I, certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of
floodways and of floodway fringes.
Engineer Date
D . I, do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Ha7.ard Study.
Engineer Date
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the
above named project. All of the applicable codes and ordinances of the City of College Station shall apply .
FINAL PLAT APPLICATION 3of3
CAMPUS-PARK SUBDIVISION
PHASE 1-B
PROBABLE COST ESTIMATE
PAVING & SITE IMPROVEMENTS*
1 Excavation (6" depth) CY 5 $2.50
2 6" Flexible Base SY 230 $9.00
3 Lime Treatment (6" depth) SY 30 $1.50
4 Reinforced Concrete Curb & Gutter LF 31 $8.00
5 Reinf. Concrete Handicap Ramp EA 2 $750.00
6 Sawcut, tie and repair at street EA 1 $500.00
ESTIMATED PAVING COST
*Does not include paving tor individual units
DRAINAGE IMPROVEMENTS
7 Grading/Earthwork CY 605 $2.50
8 Silt Fencing (Erosion Control) LF 200 $1.25
ESTIMATED DRAINAGE COST
WATER IMPROVEMENTS
$12.50
$2,070.00
$45.00
$248.00
$1,500.00
$500.00
$4,375.50
$1,512.50
$250.00
$1,762.50
Tl\ ;. . U:N IT-.C.O.ST · ·· ·.TQTAC. COST :
9 6" P.V.C. SOR 3034 Water Line LF 255 $20.00 $5,100.00
10 6" M.J. Gate Valve & Box EA 3 $800.00 $2,400.00
11 Cement Stabilized Embedment LF 210 $10.00 $2,100.00
12 12" x 6" Tapping Sleeve w/valve EA 1 $1,600.00 $1,600.00
13 6" MJ Bend (22.5 Degree) EA 1 $250.00 $250.00
14 6" M.J. Plug EA 1 $250.00 $250.00
ESTIMATED WATER IMPROVEMENTS $11,700.00
c:\CostPhaselB 1of2
SEWER IMPROVEMENTS
14 4" Service Taps LF 285 $28.00 $7,980.00
15 6" PVC Sewer Pipe (6'-8' depth) LF 600 $35.00 $21,000.00
16 Cement Stabilized Embedment LF 600 $10.00 $6,000.00
17 4' Dia. Standard Manhole EA 1 $2,500.00 $2,500.00
18 Tie to Existing Manhole EA 1 $500.00 $500.00
19 Trench Safety LF 600 $2.00 $1,200.00
20 Standard Cleanout EA 1 $200.00 $200.00
ESTIMATED SEWER IMPROVEM~NTS $39,180.00
ESTIMATED PROJECT COST $57,018.00
Contigency (153) $8,552.70
TOTAL PROJECT COST $65,570.70
NOTES CONCERNING OPINIONS OF PROBABLE CONSTRUCTION COST
Urban Design Group's (UDG) opinions of probable construction cost provided for herein are made
on the basis of our experience & qualifications and represent our best judgment as an experienced
and qualified professional engineering firm generally familiar with the construction industry and
applicable development regulations. However, since UOG has not obtained approval from the
appropriate jurisdiction and UDG has no control over the cost of labor, materials, equipment or
services furnished by others, or over the Contractor's methods of determining prices, or over
competitive bidding or market conditions, UOG cannot and does not guarantee that proposals,
bids or actual construction cost will not vary from opinions of probable construction cost prepared
by UDG.
I Z · / 6 · '""J<7
c:\CostPhaselB 2 of 2