HomeMy WebLinkAbout25 Devlopment Permit 99-293 Stata Corporation. . . . . . . . . . . . . . -. . . . . . . . . . . . . . . . . .
J:N00lRIPOlRAT£1D
511 University Or. East
Su ite 201
College Statio n, T X n840
Voice 409 260 2635
Fax 400 846 8224
www .arkl tea . com
Principals
Charlie Burris, AIA
cburris@arkitex .com
Chad Grauke, AJA
cgrauke@a rkitex .com
Dr. Elton Abbott, AJA
eabbott@arkitex .com
Mike Tibbetts, AJA
metibb@swbell .net
Austin Office
Voice 5t 2/244 · 7870
Fa x St 212 44 -0237
16 February 2000
Ms Natalie Ruiz
College Station Planning Division
City of College Station
College Station, .TX 77845
Re: A New Building for Stata Corporation
Project Number 9832
Dear Natalie
The following comments are in regards to the "Development Permit Issuance
Checklist" that was received 4 February 2000.
1. The application dated 16 November 1999, was signed.
2. Erosion Control Plan is shown on drawing C-1
3. The Building site is less that 5 acres. IF EPA N.0.1. is required for the future
development, it will be submitted when the future development occurs.
4. The Public Utility Easement for the water line is dedicated by the enclosed (2)
Field Notes and Sketch of Easement from McClure Engineering
5. Sealed Engineers Estimates are enclosed (2).
Should you have any questions, please feel free to call me.
Michael S . Record, AIA
Project Architect
Item
No.
I
2
3
4
5
6
7
8
9
Lot 2 Block 4 (Sta ta Corporation)
Business Center at College Station
College Station, Brazos County
Engineer's Estimate
February, 2000
Description Unit Quantity Unit Price
Water System Construction
6" PVC Water Line, Str. Backfill L.F. 150 20.00
6" PVC Water Line, Non-Str. Backfill L.F. 83 14 .00
Fire Hydrant Assembly EACH 2 1850.00
6"x 90 degree Bend EACH l 300.00
6"x 13" Anchor Coupling EACH 1 110.00
6"x6" Tee EACH l 135 .00
6" x 2" Tapped Tee EACH 2 160.00
Connect to existing pipe EACH 2 100 .00
Trench Safety (water line) L.F. 233 l.00
Water System Subtotal
Total Construction Cost
Page I of I
Total
3,000.00
1,162 .00
3,700 .00
300.00
110.0 0
135 .00
320.00
200.00
233 .00
9,160 .00
$9,160.00
2/16/00
Estimate .xis
Item
No.
I
2
3
4
5
6
7
8
9
Lot 2 Block 4 (Sta ta Corporation)
B u siness Center at C ollege Station
College Station, Brazos Cou nty
Engineer's Estimate
February,2000
Description Unit Quantity Unit Price
Water System Construction
6" PVC Water Line, Str. Backfill L.F. 150 20.00
6" PVC Water Line, Non-Str. Backfill L.F. 83 14 .00
Fire Hydrant Assembly EACH 2 1850 .00
6"x 90 degree Bend EACH 1 300.00
6"x 13" Anchor Coupling EACH I 110.00
6"x 6" Tee EACH I 135 .00
6" x 2" Tapped Tee EACH 2 160 .00
Connect to existing pipe EACH 2 100.00
Trench Safety (water line) L.F. 233 1.00
Water System Subtotal
Total Construction Cost
Page I of I
Total
3,000.00
1,162.00
3,700.00
300.00
110 .00
135 .00
320.00
200.00
233.00
9 160 .00
$9,160.00
2/16/00
Estimate .xis
611 Unlwno~o .. e-1
Softe 201
CoA egt ;:\_,Ofl, TX 77&40
"*• 4(» 290 2636
..... 4al 846 82:!4
.,,w.arlllteK.oom
Principals
Cbarllo Jlurrio, AIA
cb u rr is@arlcit~.0001
Chad Orauke, AIA
cgrs 11ke@orlcit4!.X.CO!ll
!>r. Elti:>n Al>bott, A.IA
<Sbbolt@"~rlcite.x.ro.rt
ll!lb T!bb~tlo, AJA
mctibb@5wbol l.net
PHONE NO. 4098468 2 2 4
13 August 1999
Ms. Kim Foutz
College Station Economic Development
City of College Station
College Station, TX 77845 .
Re: A New Building for Stata Corporation
Project Number 9832
Dear Kim
Aug. 1 3 1 999 1 2 :08PM P2
~1)7.~
In response to Veronica Morgan 's request, This letter is for the "file " regarding the
floodplain .
We recognize that the 100 yr. floodplain for the property will need to be defined and
that a drainage easement will cover this area. This has not been done because the
topographic survey has not bee completed. The easement wm be dedicated as part of
the building permit process . However, there is a finger of the creek that extends on
the property in the North East corner where the future building(s) will be located. It
is my understanding that it has been agreed upon that this area will be filled and th at
the easement will be revised. Is it better to have the current drainage casement shown
for the future work ( +~5 years) to eliminate the need for a revised floodplain later?
Should you have any questions or require additional information, please feel free to
contact me.
Sincerely,
~~
Michael S. Record, AIA
Project Architect
I Kim Fouti -letter to stada?
From:
To :
Date:
Subject:
kim ,
Veronica Morgan
Kim Foutz
5/28/99 11 :55AM
letter to stada?
what i need for the file is something either from you or a letter to stada that says:
*acknowledging the plat requirement to define the 1 OO yr floodplain on the property and provide a drainage
easement to cover that area
*stating why it couldnt be done with the plat (i.e. don t have enough topo at this time )
*stating that it will be dedicated by separate instrument as part of the building permit process (i.e . a c.o . on
the building could not be issued without this be ing filed for record and a b.p. couldnt be issued unti l we
know where the easement will be located )
hope th is helps .. thanks
v
FRO M : A F TE X STU DIO I NC PHONE NO. : 4098468224 Au g. 13 1999 12 :07PM Pl
S11 Ut>IV•"'"Y Dr. E<>ot
$uJt• 201
Coll ege$~ rx ""'°
'All•• ~2Q):;:ol:)~
Pllx w;i~OZM
www.t.r:tlte:r..oorn
Principals
Charlie Burrls1 AIA
<;bu rri~rlcilcx.oo.n
CllMI Oraulce, AIA
C8f3Ukt@arkit~x.~om
or. IE:lton Abbott, AIA
..,bbo<r@ukitcx.com
1111110 Tibbetts, AU
m"'lbb@swboll .net
Austin Office
\/qin 6 t 2/244-7BTO
Faz :u2n•4-023 7
11~w.~~~~~~rn~11
FAX TRANSMITTAL COVER
TO: Kim Foutz
FROM: Mike Record~
PROJECT: Stata Corp.
PAGES (including cover): 02
WITH: CS Economic Development
DATE: 13 August 1999
PROJECT NO: 9832
FAX NUMBER: 764-3481
If you do not receive all of the indica ted pages, please call us immediately at (409) 260-2 635.
Original lo Jollo w in mail: y es Cii)
Kim,
The following letter is in regards to the floodplain for the Stata site. Do you know what the
status of the clearing permit is?
Thank you,
Mike Record, AlA
Project Architect
16 February 2000
Ms Natalie Ruiz
College Station Planning Division
City of College Station
College Station, TX 77845
Re: A New Building for Stata Corporation
Project Number 9832
· · !'. Dear Natalie
The following comments are in regards to the "Development Permit Issuance
~ ~ ~ ~-heckli st" that was received 4 February 2000.
~ The application dated 16 November 1999, was signed.
Erosion Control Plan is shown on drawing C-1 .~.,~~lJ~ : The Building site is less that 5 acres. IF EPA N.O.I. is required for the future
development, it will be submitted when the future development occurs.
511 University Or. East ~
Suite 2~'" ('"
Coll ege Station, TX ns40
The Public Utility Easement for the water line is dedicated by the enclosed (2)
Field Notes and Sketch of Easement from McClure Engin eering
Sealed Engineers Estimates are enclosed (2). Vojce 409 260 ~5.
Fax 400 846 8224
www .ut1tu.com Should you have any questions, please feel free to call me.
Principals
Charlie Burris, AIA
cburris@arkitex.t·om
Chad Grauke, AIA
cgrauke@a rkitex .com
Dr. Elton Abbott, AIA
eabbo11@a rkitex.com
Mike Tibbetts, AIA
metibb@swbel l.net
Austin Office
Voice 51212 44 ·7870
Fa x 512/24 4·0237
Sincerely,
Michael S. Record, AIA
Project Architect
Project Name: BUYJ./.l55 cr~e 1'/-tl!E ,i.7 1-JJL
Review Date: //-22.-J?
Reviewer:_J_,./) .... 8=-----------
Drainage Reports
~ Ef I Primal)' drainage system identified ~Surrounding developments shown
IY Local streets, drainage systems shown
Descriotion
19'; Acreage of project
rr / Land cover described
[J / Primmy/secondary systems within property shown
cf General description
D ~nage Basins ci'J R.cferences to FIRMs if applicable
e1' , Secondary system flow patterns and impact of development on existing system
Proposed pathways to Primal)' system shown or described
D si Criteria
Any deviation from standards being requested? Ht>
rtf /Discussion of site constraints and capacities (streets, existing structures, etc .)
rs/ Discussion of any applicable previous drainage studies and how this plan will affect it
H rolo ·c Criteria
Rainfall/runoff calculation method described and calculations provided
cr / Detention discharge I storage calculation method I calculations
G" / Storm recurreru:c intervals used
rt Discussion of other drainage facility design criteria used if not referenced in Standards
rdaulic Criteria
Identify capacity of systems used :i; Specify velocities at critical points in system
rt / Identify detention I retention outlet and routing
19"' Discussion of other drainage facility design criteria used not referenced in Standards
D6inage Facility Design
d Disaiss drainage patterns I flows (pre vs. post)
HPI D Arc they draining water onto another property owner? -if so, is it where the water flowed before? and is it not
/ more than what flowed there before? and no faster than it flowed before?
ri . Disaiss erosion control measures employed ~ Discuss detention pond design (sideslope, low flow channels, outlet works, freeboard, emergency spillway)
>JA 0 Discuss maintenance access and responsibilities
Co clusions
Verify compliance with DPDS (signed and sealed certification)
0 Explain effectiveness of improvements with regard to controlling discharges of S -100 year storm by
a) Detaining
b) Accommodating runoff in existing I proposed easements or ROW discharging into primaiy system
c) Combination ofa & b
9ofl2
Project Name:,-=.=.:..=::..::..~:..:...:.L=~""'"'(,l/."""'s.£= T r-..OZ:
R.eviewDate: //-zz.-17
R.eviewer:.~J:.:to.[)::::i1i.8 ________ _
Drainage Reports(cont.)
~etndices
~ ~erences (all criteria and technical information used)
19"' Hyqrologic computations
~/Land use assumptions for adjacent property
[Y / Minor/major storm runoff at specific points
IJ _/Historic/fully developed runoff specific points
If' Hydrographs at critical points
lystraullc computations
M' Culvert capacities (headwater and tailwater assumptions)
iii/ Storm sewer capacities
f/A o ,,.8treet capacities
~Storm inlet capacities (inlet control rating)
Q" , Open channel design ID/ Detention area I volume capacity I outlet capacity
Attafbed Drawings
UY' ,tLc>cation map with drainage patterns
IY fioodplain map if any
~Drainage plan with topo (existing and proposed with arrows if needed)
19"' Details of outlet structures
10 oC12
SUBMIT APPLICATION AND THIS
usr CllECICED onr wrre 10
FOLDED corms OF SITE PLAN FOR RE.VIEW
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
1. Sheet size -24" x 36" (minimum).
2.
3.
a
a
a
[J
[J
a
I 4.
~ 5. ~ 6.
'---'~ ~
a
~ ~
cY
A key map (not necessarily to scale).
Title block to include:
Name, address, location, and legal description
Name, address, and telephone number of applicant
Name, address, and telephone number of developer/owner (if differs from applicant)
Name, address, and telephone number of architect/engineer (if differs from applicant)
Date of submittal
Total site area
North arrow.
Scale should be largest standard engineering scale possible on sheet.
Ownership and current zoning of parcel and all abutting parcels .
Existing locations of the following on or adjacent to the subject site:
Streets and sidewalks (R.O .W .).
Driveways (opposite and adjacent per Driveway Ordinance 1961).
Buildings.
Water courses .
Show all easements clearly des ignating as existing and type (utility, access, etc.).
l 00 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site, note if there is
none on the site .
Utilities (noting size and designate as existing) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings, and drainage inlets .
·Meter locations .
Topography (2, max or spot elevations) and other pertinent drainage information . (If
plan has too much information, show drainage on separate sheet.)
Proposed location, type and dimensions of the following .:
Phasing. Each phase must be able to stand alone to meet ordinance requirements .
The gross square footage of all buildings and structures and the proposed use of each . If different uses are
to be located in a single building, show the location and size of the uses within the building. Building
separation is a minimum of 15 feet w/o additional fire protection.
Setbacks . Show building setbacks as outlined in Ordinance 1638 Zoning Ordinance, (Section 7, Table A).
Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned . Minimum parking space
is 9• x 20', or on a perimeter row 9' x 18' with a 2' overhang . Designate number of parking spaces
required by ordinance and provided by proposal .
Handicap parking spaces .
SITE PLAN CHECKLIST
SITE.CK.DOC 03/lS/99
1 of3
NOTE:
D
a
~
~
a
a
a
a
9.
10.
Parking Islands. Raised landscape islands, (6" raised curb) a minimwn of 180 sq. ft . are required at both
ends of every parking row (greenspace area contiguous to the end island maybe applied toward the
required 180 sq. ft.). Additionally, 180 sq. ft . of landscaping for every 15 interior parking spaces must be
provided . All required islands must be landscaped or set with decorative pavers, or stamped dyed concrete
or other decorative materials as approved .
Drives . Minimwn drive aisle width is 23' with bead-in parking or 20' without parking .
Curb cuts. For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts
on the same opposite side of the street to determine separation distances between existing and proposed
curb cuts . Indicate driveway throat length as measured in the Driveway Ordinance. (See Ordinance 1961
for driveway location and design requirements .)
Security gates (show swing path and design specs with colors).
Sidewalks (both public and private). Sidewalks are required at time of development if property bas frontage
on a street shown on the Sidewalk Master Plan or if the review staff determines the necessity. (Refer to
Section 10 .2 of the Zoning Ordinance).
Medians. Show any and all traffic medians to be constructed on site .
Landscape Reserve. A twenty four foot setback from R.O .W . to curb of parking lot is required. Pavement
may encroach into this 24' reserve by up to 1134 square feet if streetscape requirement can still be met. In
no case may the pavement be less than 6' from the property line.
Conunon open spaces sites
Loading docks
Detention ponds
Guardrails
Retaining walls
All required and other types of fences (a 6' privacy fence is required between industrial/commercial and
residential developments as well as between multi -family and single family developments).
Sites for solid waste containers with screening . Locations of dumpsters are accessible but not visible from
streets or residential areas. Gates are discouraged and visual screening is required. (Minimum 12 x 12 pad
required .)
Show all easements clearly designating as proposed and type (utility, access, etc.). If dedicated by separate
instrument list by volume and page.
Utilities (noting size and designate as proposed) within or adjacent to the proposed site, including building
transfonner locations, above ground and underground service connections to buildings .
Meter locations (must be located in public R.O.W. or public utility easement.).
Proposed grading (l' max for proposed or spot elevations) and other pertinent drainage information. (If
plan has too much information, show drainage on separate sheet.)
Show proposed and existing fire hydrants . Fire hydrants must be located on the same side of a major street
as a project, and shall be in a location approved by the City Engineer . Any structure in any zoning district
other than R-1, R-lA, or R-2 must be within 300 feet of a fire hydrant as measured along a public street,
highway or designated fire lane .
Show fire department connections . FDC's should be within 150' of the fire hydrant. In no case shall they
be any further than 300' apart, and they shall be accessible from the parking lot without being blocked by
parked cars or a structure.
Show fire lanes . Fire lanes a minimwn of 20 feet in width with a minimwn height clearance of 14 feet must
be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement
edge of a public street or highway.
Fire hydrants must be operable and accepted by the City, and drives must have an all weather surface as
defined in the Zoning Ordinance Section 9 before a building permit can be issued.
Will building be sprinkled? Yes D No D
If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted.
Wheelstops may be required when cars overhang onto property not owned by the applicant or where
there may be conflict with handicap accessible routes or above ground utilities, signs or other conflicts .
SITE PLAN CHECKLIST
SITECK.DOC 0312Sl99
lof3
·--
. .
~ 11. Show curb and pavement detail . A 6" raised curb is required around all edges of all parts of all paved areas
without exception . (To include island, planting areas, access ways, dwnpster locations, utility pads, etc.)
Cl
CJ
Cl
Cl
Cl
Cl
Cl
12.
• Curb details may be found in the Zoning Ordinance Section 9 and alternatives to those standards must be
approved by the City Engineer. No exception will be made for areas designated as "reserved for future
parking".
IAU>dscape plans as required in Section 11 of the Zoning Ordinance (See Ordinance# 1638.) The
landscaping plan can be shown OD a separate sheet if too much information is on the original site plan.
If requesting protected tree points, then those trees need to be shown appropriately barricaded OD
the landscape plan. Attempt to reduce or eliminate plantings in easements. Include information on the plans
such as:
CJ required point calculations
CJ additional streetscape points required. Streetscape compliance is required on all streets larger than a
residential street.
CJ calculations for # of street trees required and proposed (proposed street tree points will accrue toward total
landscaping points.)
CJ proposed new plantings with points earned
Cl proposed locations of new plantings
Cl screening of parking lots
Cl screening of dwnpsters, detention ponds, transformers, AJC units, loading docks, propane tanks, utility
demarcation point on buildings, or other areas potentially visually offensive.
Cl existing landscaping to remain
CJ show existing trees to be barricaded and barricade plan. Protected points will only be awarded if
barricades are up before the first development permit is issued.
13. Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to
issuance of C.O.) All plans must include irrigation systems for landscaping. Irrigation meters are separate
from the regular water systems for buildings and will be sized by city according to irrigation demands
submitted by applicant and must include backflow prevention protection.
14 .
15.
16 .
17.
18.
19.
Is there any landscaping in TxDOT RO.W.?
If yes, then TxDOT permit must be submitted.
Will there be any utilities in TxDOT RO.W. ?
If yes, then TxDOT permit must be submitted.
Will there be access from a TxDOT RO.W . ?
If yes, then TxDOT permit must be submitted .
Yes CJ No
Yes CJ No
Yes Cl No
The total nwnber of multi-family buildings and units to be constructed on the proposed project site.
The density of dwelling units per acre of the proposed project.
Provide a water and sanitary sewer legend to include water demands (minimum, maximwn and average
demands in gallons per minute) and sewer loadings (maximwn demands in gallons p?y).
Cl 20 . Are there impact fees associated with this development? Yes Cl No ~
NOTE: Signs are to be permitted separately.
SITE PLAN CHECKLIST
SITECK.DOC 03125199
3 o(J
DEVELOPMENT SERVICES
TRANSMITTA_L LETTER
qq_5CD2q3
Name/Finn: M,'k~ ~e-c.ord / 1he Ar~/hx, ~fer/;~, "1c.
I
Date: Z8 Jt/I y Jqqq
;
Address: 511 (I,,,· v e~'it ly-f),, E.. -s 1-e eo1 Phone: ~ 60 -Z:. 6 SS'
Fax : t5 4~ -BZZ.tf
We are transmitting the following for Development Services to review and comment: (Check all that apply .):
D Master Development Plan
D Preliminary Plat
D Final Plat
0 FEMA CLOMNCLOMRJLOMNLOMR
D SitePlan
0 Grading Plan
0 Landscape Plan
0 Irrigation Plan
D Building Construction Documents
w/ 0 Redlines
w/ 0 Redlines
w/ D Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ D Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ D Redlines
~FRASTRUCTURE AND ENGINEERING DOCUMENTS
~ii infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
D Waterline Construction Documents w/ D Redlines
D Sewerline Construction Documents w/D Redlines
D Drainage Construction Documents
D Street Construction Documents
w/ 0 Redlines
w/ D Redlines
D Easement application with metes & bounds decsription
D Drainage Letter or Report w/ D Redlines
D Fire Flow Analysis w/ D Redlines
Special fnstructions :
TRANSMITI AL LETTER
TRANSMIT.DOC 03/23/99
~Development Permit App.
D Conditional Use Permit
D Rezoning Application
D Variance Request
D Other -Please specify
~k ?kt#t ~/ l~lk-o!
j,,-k,-,f
D TxDOT Driveway Permit
D TxDOT Utility Permit
D Other -Please specify
1 ofl
FOR OFFICE USE ONLY
CASE NO.: ____ _
DA TE SUBMITI'ED:
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
/$100.00 Development Permit Application Fee.
__ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
__ Notice of Intent (N.0.1.) if disturbed area is greater than 5 acres.
State TX Zip Code -?7840 E-Mail Address ,d1?t! (63k/Z.Y::!f-'6-"K. C.04-7
PhoneNumber Z{:,o-Z.~~ FaxNumber e/<fG-8Zt:.~ --=::;.....::;_---=___;__~----
PROPERTI OWNER'S INFORMATION: -
Name W,·/1;4'77 4ovld /.:::;+a.-ft:1t Urpe1,;a_l-,'o~
Street Address "7 o Z (/ 4; v e ,..c;/.J y P..., IE . City Co/l-e94 S ./rd1'(JJ.7
State T'X Zip Code "77 e4 O E-Mail Address w 9 of.lk/ (tig~ · ~
Phone Number ~9~-4'6t:o FaxNumber ~~-460 1
.CIBTECT OR ENGINEER'S INFORMATION:
Name (Tl,'ke 1Ze£.,O;-J / 1Ju.4 rk.,-J.fx ~k/,o, /,,c..
Street Address ? II (/'1/ve,,-~i/.>-· D,,. /?., "5fe zo1 City Colle~ ?~..f.1'tl""
State TX Zip Code '7-? e cfo E-Mail Address .h1Sr~g;-/t:1 ·J-6t: .CQ ....
Phone Number 'Z '1o-Z0 ~ Fax Number _ .... f?:::......:...eF_G_-..::::f?'-z,::....::;.z _.:1 _________ _
Application is hereby made for the following development specific site/waterway alterations :
C. /~,.,.,·"75 q .. J ~"'"'J:,b ,-,,5 Jo aa:-047p/,·sh 45~,,-v<y -?~e.a:~c/,~ 1-f!,/t'i-
ACKNOWLEDGMENTS:
I, design engineer/owner, hereby acknowledge or affirm that:
----------~
The information and conclusions contained in the above plans and supporting documents comply with the current
requirements of the City of College Station, Texas City Code , Chapter 13 and its associated Drainage Policy and Design
Standards.
As a condition of approval of this permit application, I agree to construct the improvements proposed in this application
according to these documents and the requirements of Chapter 13 of the College Station City Code.
... 0perty Owner(s)
DEVELOPMENT PERMIT
DPERMIT.DOC 3/24199
Contractor
1 of2
CERTIFICATIONS: {foi:: ~op_Qs_~_~l~@ti_ons within designated flood hazard ~reas .)
\. I, certify that any nonresidential structure on or proposed to be on this site as part
Jf this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
stonn.
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established
in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended .
Engineer Date
C . I, certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirem ents of the City of College Station City Code, Chapter 13 concerning
encroachments of floodways and offloodway fringes .
Engineer Date
D. I, do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval: ---------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities.
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer
for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply.
DEVELOPMENT PERMIT
DPERMIT.DOC 3124/99
2of2
511 University Dr. East
Suite 201
CoUoge Station, TX 77840
Voice 409 260 2635
Fax 400 846 8224
www.arkltu:.oom
Principals
Charlie Burris, AIA
cburris@a rkit ex.com
Chad Grauke, AIA
cgra uke@a rkit ex .com
Dr. Elton Abbott, AIA
eabbott@a rkit ex.com
Mike Tibbetts, AIA
meti bb@swbell.net
Austin Office
Vo ice 5 121244·7870
F•x 51 2 /2 44 ·0237
28 July 1999
Ms. Kim Foutz
College Station Economic Development
City of College Station
College Station, TX 77845
Re : A New Building for Stata Corporation
Project Number 9832
Dear Kim
This letter is to serve as our notice of intent to selectively clear the site and is
accompanies the Development Permit. As we have discussed, the site that Stata Corp
will be developing has dense vegetation. In order to get an accurate topographic and
tree survey , the site will have to be cleared to some extent. We propose to have the site
selectively cleared to remove undergrowth and trees that are less than 2 1/2 inch
caliper. The clearing will occur in the "Developed Area" of the site. A portion of
the site will need to be cleared in the "LAUE". This will be an area approximately
20 feet wide to access the "Developed Area" of the site. Please refer to the attached
preliminary site plan . The Client intends to selectively clear the site and maintain it.
It will not remain in a "cleared" stage but will be an"improved " site .
We are now aware of the Navasota Ladie 's Tresses being located on the site as a result
of our recent conversations and correspondence with you. After the City stakes the
locations of these plants on the site , the clearing crew will be directed to avoid any
disruption to these plants . During the staking process, please make sure that a buffer
zone is provided with enough clearance so that the plants are not disturbed.
Your consideration of the proposed clearing is greatly appreciated. Should you have
any questions or require additional information, please feel free to contact me .
Sincerely ,
~A?:.r/
Michael S. Record , AIA
Project Architect