Loading...
HomeMy WebLinkAbout73 Development Permit 535 Westfield52.019 ACRES ROBERT STEVENSON SURVEY, A-54 COLLEGE STATION, BRAZOS COUNTY, TEXAS JANUARY 1999 Prepared By RILEY ENGINEERING COMPANY 7182 Riley Road Bryan, Texas 77808 (409) 589-2457 DRAINAGE REPORT for WESTFIELD ADDITION 52.019 ACRES ROBERT STEVENSON SURVEY, A-54 COLLEGE STATION, BRAZOS COUNTY, TEXAS JANUARY 1999 Prepared By RILEY ENGINEERING COMPANY 7182 Riley Road Bryan, Texas 77808 (409) 589-2457 TABLE OF CONTENTS DESCRIPTION PAGE NO. INTRODUCTION....................................................................................... 3 GENERAL LOCATION & DESCRIPTION............................................... 3 PRIMARY DRAINAGE BASIN DESCRIPTION....................................... 5 DRAINAGE DESIGN CRITERIA.............................................................. 6 SUMMARY................................................................................................ 8 RECOMENDATION.... ................. .... ........... .... .... ................... ..... ... . ......... .. 8 100-YEAR FLOOD PLAIN & MORRIS SON HYDROLOGY STUDY....... 8 CONCLUSION........................................................................................... 9 EXHIBIT DESCRIPTION LICK CREEK DRAINAGE BASIN............................................................ "A" WESTFIELD ADDITION SITE DRAINAGE MAP ................................... "B " FLOOD INSURANCE RATE MAP REFERENCE ..................................... "C" 100-YEAR FLOOD HAZARD AREA, PHASE 1....................................... "D " MAP OF PROPOSED DETENTION FOR PHASE 2 & 3.......................... "E'' MORRISS ON 100-YEAR STUDY WITH HEC-2 DATA.......................... "F" 2 INTRODUCTION: DRAINAGE REPORT WESTFIELD ADDITION This drainage report is for WESTFIELD ADDITION, a proposed Addition to the City of College Station, Brazos County, Texas, and is prepared to accomplish the desired drainage objectives per the City of College Station Drainage Policy and Design St.andards ("DPDS"), being primarily the reduction of flood damage . GENERAL LOCATION AND DESCRIPTION: The area of study is WESTFIELD ADDITION, a proposed Subdivision to the City of College Station, Texas, comprised of 52 .019 Acres of land (the "Subject Site") which is located on the south side of Graham Road between the intersection of Victoria A venue and the site of the new College Station Independent School District's (C .S.I.S .D . 's) Intermediate School. The South Fork of Lick Creek flows through the site , entering the property at its western border approximately 1600 feet south of the Graham Road ROW Line and meandering across the property to exit at its eastern border approximately 1900 feet south of the Graham Road ROW 3 Line, thereby dividing the 52 acres with some 38 Acres being located north of the Creek and some 14 acres being located south of the Creek. The property immediately adjacent to the east ofthis property is owned by C .S.I .S .D . and is being developed with a new Intermediate School and with plans to develop a new Elementary School and Park. The property immediately adjacent to the south of this property was owned by Lick Creek Farm & Ranch, Inc . and remains as native pasture land . The majority of the property immediately adjacent to the west is also native pasture land with no current plans of development and consists of the 100 acre tract owned by Mr. Carroll and the rural acreage tracts of the Bald Prairie Subdivision which will currently remain as rural residential. There is a 1 acre tract immediately adjacent and west of this tract at the comer of Victoria and Graham Road which is already developed as an office building. The drainage of the adjacent tracts of land will not have any effect on this development as they will drain naturally to their existing drainage channels . Just Immediately southeast of this Tract (south of the School tract) is the proposed Alexandria Subdivision which proposes a detention area which could serve the entire region . The majority of the property has been cleared and slopes toward the Creek at an average of about 2% or less . The Creek and adjacent creek area · contain the wooded portion of this tract with sparse growth farther away from the main channel. The existing natural drainage is for the water to sheet flow across the pasture land from both the north and the south and drain into the South Fork of Lick Creek. 4 The proposed WESTFIELD ADDITION will be developed with approximately 220 lots as single- family residential home sites and with a 1.5 Acre tract at the northwest corner of this 52 acre tract which will be at the corner of Graham Road and Victoria and which has been designated as C-3 Commercial. PRIMARY DRAINAGE BASIN DESCRIPTION: The South Fork of Lick Creek, which flows through the site, is part of the Primary Drainage Basin as outlined by the City of College Station Stormwater Management Plan . The Stormwater Management Plan identifies the Lick Creek Drainage Basin which is shown in Exhibit "A". Additionally, Exhibit "B" shows the portion of the Lick Creek Drainage Basin which passes through Westfield Addition . Exhibit "C" shows the portion of Lick Creek through the Subject Site designated as Zone X from the FEMA FIRM Community Panel #48041-C-0205. The area under development, being Phase 1 of Westfield Addition, has been more conservatively modeled by Mr. Ronald W . Morrisson, P .E . of MORRISSON HYDROLOGY ENGINEERING, INC . showing graphically the extent of the 100-year flood area by cross-sections developed through Phase 1 as shown in Exhibit "D". Sheet flows through the developed lots will be collected in the proposed streets and conveyed to storm drainage inlets . From the inlets the storm drain system will convey the flows to Lick Creek. Earlier developed downstream areas along the Creek, called Spring-brook and Cypress Meadows, 5 which are located along the primary drainage basin of Lick Creek were developed with no detention. Lots adjacent to the Creek will each have a minimum slab elevation calculated by adding at least three (3) feet to the base WESTFIELD ADDITION Study elevations . Topographic information used was the data gathered for the City of College Station shown as the 2-foot contour maps which were prepared by WILLIAMS-STACKHOUSE , INC., of 2118 Mannix Drive , San Antonio , Texas 78217, under Contract to the City of Coillege Station, the data being from aerial flight in February/March of 1994 . Additional confirmation was obtained with on the ground surveying . The initial development consists of Phase 1 which consists of approximately 13 . 5 Acres of land , of which approximately 10 . 0 Acres are the developed lots and streets, and some 3 . 5 Acres is the Park Area. The slab elevations will be provided for lots 5, 6 and 7, of Block 4, Phase 1. No construction is planned in the creek area that will significantly affect the flow carrying capacity of the creek. DRAINAGE DESIGN CRITERIA: All drainage design is in accordance with the City of College Station Drainage Policy and Design Standards . The design for storm inlets and storm drains is the 10-year event. Flow calculations for all drainage areas are based on the rational method . The following table summarizes the flows : 6 1-5 1-10 C(Natl C(Dev) 0-5(N) 0-5(D) 0-lO(N) 0-lO(D) 1 13 .5 Ac 6.2 7.4 2 13 .0 Ac . 6 .2 7.4 3 14 .5 Ac . 6 .2 7.4 4 11 .0 Ac . 6 .2 7.4 0.35 0.60 29 .30 50 .22 34 .97 59 .94 0.35 0.60 28 .21 48 .36 33 .67 57 .72 0.35 0.60 31.47 53 .94 37 .56 64.38 0.35 0.60 23 .87 40 .92 28.49 48 .84 Tot. 52 .0 Ac. 112 .85 193.44 134 .69 230 .88 1-25 1-100 C(Nat) CIDev) Q-25(N) 0-25(D) 0-lOO(N) 0-lOO(D) 1 13 .5 Ac 8 .8 11.00 0.35 0.60 41.58 71.28 51.98 89 .10 2 13 .0 Ac . 8.8 11.00 0 .35 0.60 40.04 68.64 50 .05 85 .80 3 14 .5 Ac . 8.8 11.00 0.35 0.60 44 .66 76 .56 55 .83 95 .70 4 11.0 Ac. 8 .8 11.00 0.35 0.60 33 .88 58 .08 42 .35 72.60 Tot. 52 .0 Ac . 160 .16 274 .56 200 .21 343 .20 Both the Rainfall Intensities (I numbers) and the Coefficients (C numbers) were taken from the City of College Station Drainage Policy and Design Standards ("DPDS "). In the event of extreme flood flows in excess of the capacity of the storm drainage system, the flows will drain naturally to the creek along the streets and provided drainage easements . This will minimize property damage . 7 SUMMARY OF NATURAL DRAINAGE AND DEVELOPED DRAINAGE LOADS: 0-lOO(Nat) 0-lOO(Dev) 0-1 OO(Excess) PHASE 1: 51.98 cfs 89.10 cfs 37.12 cfs PHASE 2: 50.05 cfs 85.80 cfs 35.75 cfs PHASE 3: 55.83 cfs 95.70 cfs 39.87 cfs PHASE 4: 42.35 cfs 72.60 cfs 30.25 cfs TOTALS: 200.21 cfs 343.20 cfs 142.99 cfs RECOMENDATIONS: It is our recommendation that the flow from Phase 1 be allowed with no detention. It is our recommendation that flow from Phase 2 be totally detained to provide a detention of 85 .80 cfs. It is our recommendation that Phase 3 be detained to provide a detention of 57 .20 cfs It is not necessary to detain 38 .50 cfs . It is our recommendation that Phase 4 be allowed with no detention . The total excess flow due to development is 143 cfs . We will provide detention for 143 cfs (Phase 2 & Phase 3). See Exhibit "E " showing proposed location of detention area for both Phase 2 & 3 . Until the detention area is completed with Phase 2, the flows generated with Phase 1 will not have any significant impact on the downstream flows . 100-YEAR FLOOD PLAIN & MORRISSON HYDROLOGY STUDY MORRISSON HYDROLOGY ENGINEERING, INC ., is preparing a study for Phase 2 and Phase 3 detention to be submitted at that time and which will also address the creek crossing and 8 any control of flow which may be required . The proposed detention area for Phase 2 and 3 will be just immediately adjacent and west of the street crossing and just north of the Creek. MORRISSON HYDROLOGY ENGINEERING, INC ., did make a study to determine the 100- year Flood Plain through Phase 1, of the development. The modeling was done utilizing the available City of College Station topographic maps and utilizing the U. S. Army Corps of Engineers ' HEC-2 Computer Program . The data of the HEC-2 Program as well as the cross- sections showing the 100-year Flood Plain is shown in Exhibit "F". The results obtained by this study was the basis of showing the extent of the 100-year Flood Plain shown on the Plat of Phase 1 shown in Exhibit "D". CONCLUSIONS: This subdivision meets the requirements as stated in the City of College Station Drainage Pol icy and design Standards . 9 EXHIBIT "F" liY. I S'I I NC com> I'I I OtllO HEC-2 1"A'JS:R £UR.'°.:\.C1' 'PROiILiG U . ~. 1'.RK'l COlli'S O'f' lll'GI!IEEl' HYJ:>Rot.oorc EtlCINSSRING Cli.!l? Vereioh ~ ~09 86COND STREET, SUITi D .. TIME oe:29 :24 • ('16) 754i-110f, • x x lOC!:TJJ.X XX..'t.U: T.XXXX x x x Y. .x x x l(. x x x x lDOOWt.'C :y_v_v_~ x xx.v.r.z lOtXXY. x x x x :r. x x x x x x x x XX>:.lDOtX X."CO'-'\'. TJJ_v_u J>XISTING CONDITIONS 27JAN99 PAGB l TH:IS 11,~ EXECUTSO 27JJ\.N99 08 :251 ,24 ******•••••~w•••****•*•*••••·~~·••••• HBC-2 l'!AXBR 8!JRFAC6 PROPILBS VQreion •. ,.2: Mooy :USll ······················~·······~······ Tl COLLBas STATION EXISTING C01'1PITION LICK CR.86K T2 c;RAHAK ROAD lN'l'JiRM80IATE SCHOOL TllOD YEAR. Jl ICHSCJ< lNQ NINV IOIR S~'l' KBTRIC HVINS Q WSBL PQ 0 2 0 0 .0075 0 0 0 268 J2 NPROP I PLOT l?R11'V8 XSBC'll' XSBCH FN ALLOC IBW CHNIH I TRACE '1 0 -1 J) Vlll.!\BLB COO BS POR SUMMARY PRIN';l'OtJT 38 1 43 42 4 5 3 54 26 QT l H25 NC . OS .OS . 05 .;I. .3 lO, 1 H HS 1100 c;R 290 572 288 6"3 286 7St 2117 ,1 819 286 945 GR 282 984 281 1000 282 1ooe 2Bl .3 l.042 284 1082 GR 286 1100 2ea 1181 289 .;z 12'0 :no 1377 Xl 2 12 906 1055 H O 111 135 GR 290 61S 2951.l 687 288 792 286 906 284 929 GR 2112 5191 281 1000 282 1010 284 l.034 28E; lOSS c;R 2aa 1098 290 123S Xl 3 .u 958 lO!H 129 14' lBO c;R 290 '173 289 .:i. 863 288 9)8 2B6 ,59 20 775 GR :a2 51lll 281 1000 2a2 100, 28t 1014 <!66 1094 GR 288 1155 290 1)84 Xl 4 l3 ll31 1045 ·'2 105 75 GR 2510 7H 2851 .9 79B 288 ,15 21!6 931 284 '71 GR 282 994 291 1000 282 • 1007 2114 1012 2Bfi 1045 GR 286 .7 110) 288 1197 2$0 12'0 X:i_ 5 12 51651 1073 12~ SS 12e GR HO en 288 95~ 28~ ,69 2e4 780 222 ,513 GR .2Rl 1000 282 1004 284 10011 284.4 1044 286 1073 GR 488 1123 290 1255 EXISTING CONPITION~ 27JJ\N9!1' 08:2,:24 PAC'll • Xl .. 1<1 93~ 102~ 166 7S Hl <;:;< 290 817 2ae 906 28~ 9:1~ 2&4' !>31 29.2 993 GR .281 1000 ~82 1002 28<! 1012 286 1022 289 1043 GR 288 :i.o:n ,,0 1181 X.;J. 7 10 ,sz 10•0 161 108 1112 GR 290 808 289.5 870 28B 94). 286 ,53 284 990 GR 283 1000 284 1005 286 104' 2118 1055 290 1086 X1 8 12 928 1053 12' u;i ll' GR 292 798 290 898 288 914 286 ne 285.5 956 GR 2114 988 2B3 1000 284 100, 286 1053 288 1112 GR 290 11.40 291. .• l2U Xl 9 12 968 1018 80 '6 115 GR 292 808 no 860 2ee 87' 286 'DO 285.7 ,3, GR .286 968 l84 9)10 28) 1000 214 1005 286 lOl.8 GR 288 1025 Ho 1055 Xl 10 11 983 1020 110 149 143 GR 292 792 290 ,09 2BS 'H 286 5183 2!14 5190 GR 283 1000 281 1011 ;28S 1020 .288 1038 290 1049 GR 292 1070 Xl 11 12 9eO 1020 1,0 280 290 Gil. 2!12 BGO no 892 288 915 287.8 ,so 286 980 GR 284 ,,0 283 1000 284 1005 286 1020 21!8 1030 GR 290 1060 292 10'8 Xl 12 14 ,,0 10;1.5 190 140 HO GR .294 828 292 870 2,0 B7S 288 ,,0 284 9~5 GR 283 1000 284 1005 266 1010 2e.e 10l.S 290 1035 GR 292 1060 293.S 1080 2512 10~8 29:2 1125 EXISTING CONt>ITIONa PAGE THIS RUN 2."tECVTB D ~7JAN 99 08 :lil ;l4 REC-2 WATBR SURFACE PROFILES 4.6 .2 ; May 1991 NO'l'B-ASTERISK (:t) AT L~~-OF CROSS-SECTION troMBBR INDICATES MESS~Q~ IN SUMMARY OF ERRORS LIST Al{ S!JMl'tARY PRINTOtrr SBCNO CW.SBL Q .llL!UN TOPWID 85TA 11~.ST VCH 1 .000 285 .41 1425 .DO l81. oo Hl .511 9.!:0 .77 109 4.68 4 .41 2 .000 2U.19 1 .. 2s .oo 281 .00 16"4 ,08 895 .05 1D59 .13 ).42 ),ODO 286 .8 7 1425.DO 281. 00 171 .3S ,H .27 ll.20 . 62 3 .'1 4 .000 287 .22 14 2 5 .. 00 2 e1 .oo 218.!17 ll21. 28 l.H0 .25 l . 76 5 .000 287 .62 1425.oo 281 .00 154 .9) 958 .4ll llll ... 2 ).72 6.000 288 .0l H2S.OO 2n .oo 193 .78 905 .09 lO U,88 3 .8 5 7 .000 288.52 14;2 5 .00 283 .DO 147 .35 316 .27 1063 ,62 3 .7 8 8 .000 288 .Bll 1425 .00 ,283 .00 217 . t6 9 06 .!)2 1124.38 2 .44 ll ,000 288 .llll 1425 .00 283.DO 110. J e 863.55 ],OJ,,92 3 .3 3 .. 10.000 28'.17 1425 .00 ,283 ,00 121 .Dl 923 . 45 1044 .46 5 .45 ~ 11 , ODO 2,0.DS 1425 .DO 2113 '00 10 .65 89 1. 2 5 1060.B!) 3 .1!8 .. ],2 .000 290 .2ll 1425 .oo 283 .DO 164 . '"· BH .26 1038 .70 6 .95 i lo; FINAL ON-SITE DRAINAGE ANALYSIS for PHASE 1 -WESTFIELD ADDITION 15.189 ACRES ROBERT STEVENSON LEAGUE, A-54 COLLEGE STATION, BRAZOS COUNTY, TEXAS MAY 1999 PREPARED BY: RILEY ENGINEERING COMPANY 7182 Riley Road, Bryan, Texas 77808 '. FINAL ON-SITE DRAINAGE ANALYSIS for PHASE 1 -WESTFIELD ADDITION 15.189 ACRES ROBERT STEVENSON LEAGUE, A-54 COLLEGE STATION, BRAZOS COUNTY, TEXAS MAY 1999 PREPARED BY: INTRODUCTION FINAL ON-SITE DRAINAGE ANALYSIS For WESTFIELD ADDITION -PHASE 1 College Station, Brazos County, Texas *Revised May, 1999 * Westfield Addition -Phase 1 is located on South Graham Road adjacent and to the west of the New College Station ISD Intermediate School in the City of College Station, Brazos County, Texas . This site consists of the Lot portion of Phase 1 which is to be divided into 58 Lots and contains 10 .96 acres ofland. This Report of the On-Site Drainage Analysis for Phase 1, Westfield Addition, is in addition to previous reports submitted to the City, one being the Drainage Report for all of Westfield Addition and the Morrison Hydrology Report to which reference is made . DRAINAGE PARAMETERS Westfield Addition -Phase 1 fronts 280 feet on Graham Road and is 1, 705 feet in depth. Currently Graham Road is being rehabilitated by the City of College Station as a Capital Improvements Project. This will include widening of the road and building curbs , gutters and drainage structures and storm sewer. The land slopes gently away from Graham Road at approximately a negative (-) 1. 0% slope . There is no drainage run-off from any other area which impacts this tract, nor does this tract 's drainage run-off impact on any other adjacent property. Phase 1 will consist of the construction of Westfield Drive which for the first 660 feet will be a 60 ft . right-of-way with a 39 ft . street, thereafter it will become a 50 ft . right-of-way with a 28 ft . street with a tum around cul-de-sac . The drainage area of 10 .96 acres is divided into 6 major drainage areas as shown on the attached Map . The Drainage parameters used for this Analysis is based on the following : Design Frequency :..................................... Ten (10) Years Minimum Time of Concentration ................ Ten (10) Minutes Minimum Inlet Length ................................ Five (5) Feet Maximum Gutter Depression ...................... Si x ( 6) Inches Maximum Depth ofFlow ............................ Six (6) Inches All drainage design is in accordance with the City Drainage Policy and Design Standards. The flow calculations are based on the Rational Method . RUN-OFF CALCULATIONS The entire drainage area of 10 .96 acres is divided into 6 major drainage areas A through F . Each area is further subdivided based on different flowing patterns . The Run-off Calculations are based on the use of the "Rational Method" as a means of determining the discharge as expressed by the formula Q =CIA, where Q is the peak discharge rate in cfs (Q/10 being the peak discharge for a 10 year storm event), C is the run-off coefficient which varies with land use, I is the rainfall intensity based on the time of concentration from the most remote point and average velocity for the various existing conditions, and A is the area of the basin. The run-off coefficient utilized was 0 .50 for the residential developed areas and 0.95 for pavement areas . The rainfall intensity was based on a minimum 10 minute time of concentration and using the formula 80/(Tc + 8.5) 0 .763 , 1 Oyear frequency was calculated to be 8.63 inches per hour . The Runoff Calculations for Westfield Addition -Phase 1 are summarized in the following Tables . Table IA contains the calculations of the various drainage areas based on the attached Drainage Map and together with the use of the appropriate Runoff Coefficient , a Total value of CA was computed . Table IB contains the calculations of the total Q/10 which is the flow in cfs applicable to each Drainage Areas . TABLE 1-A CALCULATION OF CA Drainage Runoff Co-eff. Runoff Co-eff. Area No . Drainage Area Calculation Resident. =O . 50 Pavement=0 .95 Total CA A-1 30 X 647 .5' = 19 ,425 S.F . 0.4459 Ac . --0 --0.4236 0 .4236 A-2 30 x 125 .0 3,750 S.F. 0 .0861 Ac. --0 --0 .0818 0.0818 A-3 110 X635.0 = 69,850 S.F . = 1.6035 Ac . 0 .8018 -0 --0 .8018 Total A 2.1355 Ac . 0 .8018 0 .5054 1.3072 B-1 30 x 670 .5 20,125 S.F. = 0 .4732 Ac . --0-0.4400 0.4400 B-2 110 x 690 .0 75 ,900 S.F. = 1.7424 Ac . 0.8712 --0 --0 .8712 Total B 2.2056 Ac . 0.8712 0.4400 1.3112 C-1 25 x 622 .5 = 15,562.5 S.F. = 0 .3573 Ac -0--0 .3394 0 .3394 C-2 115 x 622.5 = 71,587.5 S.F . = 1.6434 Ac . 0.8217 --0 --0 .8217 Total C 2 .000 Ac. 0.8217 0 .3394 l.1611 D-1 30 x 125 .0 = 3,750.0 S.F . = 0 .0861 Ac . --0 -0 .0818 0 .0818 D-2 25 x 597.5 = 14,937.5 S.F. = 0 .3429 Ac . --0 -0 .3258 0 .3258 D-3 25 x 127 .5 = 3,187.5 S.F . = 0 .0732 Ac . --0 --0 .0695 0 .0695 D-4 115 x 570 .0 = 65 .550 .0 S.F . = 1.5048 Ac . 0.7524 --0 --0.7524 TotalD 2.0070 Ac . 0 .7524 0.4771 1.2295 E-1 25 x 127 .5 = 3, 187 .5 S.F . = 0 .0732 Ac. --0 --0 .0695 0.0695 E-2 25 x 407 .5 = 10,187 .5 S.F. = 0 .2339 Ac . --0 --0 .2222 0 .2222 E-3 115 x 395 .0 = 45 ,425 .0 S.F. = 1.0428 Ac . 0 .5214 --0 --0 .5214 Total E 1.3499 Ac . 0 .5214 0 .2917 0 .8131 F-1 25 x 392 .5 = 9,812 .5 S.F . = 0 .2253 Ac . --0 --0 .2140 0 .2140 F-2 115 x 392.5 = 45 ,137 .5 S.F . = 1.0362 Ac . 0.5181 --0 -0 .5181 Total F 1.2615 Ac . 0.5181 0.2140 0 .7321 Total All Areas 10 .960 Ac . 4.2866 2 .2676 6 .5542 TABLE 1-B CALCULATION OF 0/10 Drainage Time of Concentration Area No. Drainage Ana CA _L _ __y__ Tic Time Int 1110 Total 0/10 A-1 0 .4459 Ac . 0 .4236 660 1.4 7.86 min. 10 min. 8 .63 3 .66 A-2 0 .0861 Ac . 0 .0818 140 1.4 1.67 min. IO min. 8 .63 0 .71 A-3 1.6035 Ac. 0 .8018 770 1.2 10 .69 min. 10 .6 9 m . 8 .39 6 .73 Total A 2.1355 Ac . 1.3072 11.10 B-1 0.4732 Ac. 0.4400 720 1.4 8.57 min. 10 min. 8 .63 3 .80 B-2 1.7424 Ac. 0.8712 800 1.2 11.11 min. 11.11 m . 8 .26 7.20 TotalB 2 .2056 Ac . 1.3112 1 1.00 C-1 0.3573 Ac 0 .3394 650 1.4 7 .74 min. 10 min. 8 .63 2 .93 C-2 1.6434 Ac . 0.8217 738 1.2 10 .24 min. 10 .24 m. 8.55 7.03 Total C 2 .000 Ac . 1.1611 9 .96 D-1 0 .0861 Ac . 0 .0818 140 1.4 1.67 min. 10 min. 8.63 0 .71 D-2 0 .3429 Ac . 0.3258 625 1.4 7.44 min. 10 min. 8 .63 2.96 D-3 0.0732 Ac . 0 .0695 140 1.4 1.67 min. 10 min. 8 .63 0 .60 D-4 1.5048 Ac . 0 .7524 685 1.2 9.51 min. 10 min. 8 .63 6.49 Total D 2 .0070 Ac . 1.2295 10 .76 E-1 0 .0732 Ac . 0 .0695 140 1.4 1.67 min. 10 min. 8 .63 0 .60 E-2 0 .2339 Ac . 0 .2222 445 1.4 5 .30 min. 10 min. 8 .63 2.01 E-3 1.0428 Ac . 0 .5214 510 1.2 7 .08 min. 10 min . 8 .63 4 .50 Total E 1.3499 Ac . 0 .8131 7.11 F-1 0 .2253 Ac. 0 .2140 405 1.4 4 .82 min. 10 min . 8 .63 1.85 F-2 1.0362 Ac . 0.5181 510 1.2 7 .08 min. 10 min. 8 .63 4 .50 Total F 1.2615 Ac . 0 .7321 6 .35 Total All Areas 10 .960 Ac. 4 .2866 2.2676 6.5542 56 .27 TABLE2 INLET SIZING Inlet No. Total CA Total Q/a Description Capt./L .F . LReg . _L_. 1 A = 2.1355 Ac . 11.10 Rec . on Grade 1.2 cfs/ft. 9 .25 ft. 10 ft . 2 A = 2.2056 Ac . 11.00 Rec . on Grade 1.2 cfs/ft. 9 .17 ft . 10 ft . 3 A = 2.0070 Ac. 10.76 Rec . on Grade 1.2 cfs/ft 8 .97 ft. 10 ft . 4 A= 2.000 Ac . 9 .96 Rec . on Grade 1.2 cfs/ft. 8 .30 ft . 10 ft . 5 A= 1.2615 Ac . 6 .35 Rec . on Grade 1.2 cfs/ft. 5.30 ft . 10 ft. 6 A= 1.3499 Ac . 7 .11 Rec . on Grade 1.2 cfs/ft. 5 .93 ft. 10 ft. PIPE SIZE COMPUTATIO NS From To Inlet Inlet Total CA Total 0 . Slope% Pipe Size Velocity Capacity 1 2 2 .1355 Ac. 11.10 cfs -1.66% 18 " 7 .3 ft/s 14 cfs 3 4 2 .0070 Ac . 10 .76 cfs -1.22% 18 " 7 .3 ft/s 14 cfs 6 5 1.3499 Ac . 7.11 cfs -1.22% 18 " 7 .3 ft/s ~4 cfs 2 4 4 .3411 Ac . 22 .10 cfs -1 .28% 24 " 8 .3 ft/s 28 cfs 4 5 8.4111 Ac . 42 .82 cfs -0 .75% 30" 8 .2 ft/s 44 cfs 6 Chan . 10 .960 Ac . 56 .27 cfs -2 .01% 30 " 11.7 ft/s 62 cfs INLE T CALCULATIONS Tabl e 2 summarizes the calculations for the design of the inlets . There are six inlets to be constructed in Phase 1, Westfield Addition . Each are to be 5 ft . inlets with 5 ft . extensions . Each inlet is able to capture all of the calculated runoff for a 10 year storm event without contributing any substantial excess or carry-over. The inlets placed as shown will capture sufficient storm runoff from a 1 Oyear storm event so as not to create excessive ponding in the street for such storm event. STORM SEWER CALCULATIONS Table 2 summarizes the calculations for the design of the pipe size used for this Project. The storm sewer pipe beginning at each of the three (3) inlets on the west side of Westfield Drive must be capable of handling the anticipated flows for each of the respective areas being drained . Those are shown in Table 2. Each pipe size will have to be 18" RCP which should be sufficient to handle the 1 Oyear storm runoff for each respective area and carry-over, if any . The storm sewer main placed on the east side of Westfield Drive should be of sufficient size and slope to handle the runoff from its three (3) respective inlets on the east side of Westfield Drive as well as the added contribution of the three (3) inlets and 18 " pipe from the west side of Westfield drive . The beginning of the storm sewer main at Inlet #2 on the east side is to be sized with a 24" RCP pipe . This is sufficient to handle the runoff from Areas A & B from Graham Road to Harvest Drive . Further down at Inlet #4 , the storm sewer main size changes to 30" RCP pipe . This size is sufficient to handle all of the runoff from Areas A, B , C & D . At Inlet #5 , the storm sewer pipe continues as a 30" RCP pipe and is sufficient to handle all of Phase 1, Westfield Addition to the proposed open channel. CONCLUSIONS This subdivision meets the requirements as stated in the City of College Station Drainage Policy and Design Standards. Hydrologic Analysis Study For a Portion of the South Fork Lick Creek Tributary Through the Westfield Addition City of College Station, Texas By : Morrison Hydrology Engineering, Inc. 210 Anwld Ave. Arlington, Texas 76010 (817) 461-0321 Fax (817) 274-1338 Morrison Hydrology Engineering, Inc. South Fork Lick Cre.ek Tributary Page-I Table of Contents Introduction Existing Condition Hydrologic Analysis Proposed Condition Hydrologic Analysis Existing Condition Hydraulic Analysis Proposed Condition Hydraulic Analysis Summary Appendices 1. Existing Condition Hydrologic analysis • Watershed .Map • Existing Condition HECI Computer model 2 . Proposed Condition Hydrologic analysis • Proposed Condition HECl model 3 . Existing Condition HEC2 model. • Floodplain Delineation 4 . Proposed Condition HEC2 model. • Floodplain Delineation • Cross Section Plots Morrison Hydrology Engineering, Inc. South Fork Lick Creek Tributary Page-2 Introduction Purpose The purpose of this study is to determine the existing, and final developed condition flows and I 00-year floodplain elevations through the Westfield Addition development. The final or proposed condition must show that the final flows are less than or equal to the existing condition flows . Area Description The upper watershed of Lick Creek is largely undeveloped with natural vegetation (trees, brush and natural grasses). The area is relatively flat with generally less than a 1% slope. The soils are generally clay and silt-day. The annual rainfall in Brazos County is 39. l inches. FEMA Infonnation The Westfield Addition Site is located in an area of the FEMA map that has no floodplain shown. The area has not been previously studied by FEMA so there is no FEMA data available. Existing Condition Hydrologic Analysis Appendix l contains the HECl analysis of the watershed completed for this study. The time of concentration was detennined by the TR55 SCS method. Proposed (Developed) Condition Hydrologic Analysis The Proposed Condition consists of 52 acres of development on the Westfield site. This changes the SCS curve number, but does not affect the time of concentration The result of this development increases the peak discharge. In order to offset this increase a detention facility was designed. This detention facility consists of slightly undersizing a culvert (3-8x6 RCB) and widening the area upstream of the culvert. The result of this detention reduces the I 00-year peak discharge to offset development of the site as shown below: Existing Condition 100-Y ear flow 1220 cfs Proposed Condition 100-Y ear flow 1198 cfs Existing Condition Hydraulic Analysis The City of College Station topographic map was obtained and used to determine cross sections through the area of the project. These sections were input into the HEC2 computer model (see appendix 3). The result of this computer model is shown plotted on floodplain delineation. The results are shown in table 1. Proposed Condition Hydraulic Analysis Using the existing condition as a base the following changes were made: Section 12 was widened to transition into the proposed culvert Side slopes are 4 : 1 and the bottom is at elevation 284 . Section 13 is the downstream side of the proposed culvert. This section is widened to fit the culvert. Morrison Hydrology Engineering, Inc. South Fork Lick Creek Tributary Page-3 3-8x6 RCB culvert was added The Downstream flowline is at elevation 284 ' and the upstream flowline is at elevation 286 '. The top of road for this culvert is at elevation 294 '. Section 14 is the upstream side of the proposed culvert. This section is widened to fit the culvert. Section 15 is widened and regraded to a 4 : l side slope. 1be top of the section is filled to allow the proposed development. Section 16 is not altered except to fill the left overbanks to allow the proposed development. No other changes were made. Summary This report has provided a hydrologic analysis that demonstrates that the proposed project does not result in an increased flow. This meets the City of College Station policy of "no increase" in flows as a result of development. COMPARISON BETWEEN EXISTING AND PROPOSED 100 YEAR FLOOD LEVELS EXISTING CONDITION PROPOSED CONDITION SEC . FLOOD a VEL. SEC. FLOOD a VEL. DIFF. NO . LEVEL NO . LEVEL 8 287.42 1220 3.67 8 287.42 1220 3 .67 0 9 287.88 1220 4.42 9 287 .88 1220 4 .42 0 10 288.31 1220 7 .13 10 288.31 1220 7 .13 0 11 289.4 1220 5.39 11 289 .4 1220 5 .39 0 12 290 .44 1220 4 .87 12 290.24 1220 3 .66 -0 .2 13 290 .34 1220 9 .42 13 289 .97 1220 6 .81 -0 .37 14 291.47 1220 2 .58 14 292.88 1220 5 .91 1.41 *INCREASE CONTAINED ON OWNER'S PROPERTY 15 291 .08 1220 8 .71 15 293.48 1220 1.92 2 .4 *INCREASE CONTAINED ON OWNER'S PROPERTY 16 292 .56 1220 5 .52 16 293 .28 1220 6 .4 0 .72 *INCREASE CONTAINED ON OWNER'S PROPERTY 17 293.2 1220 4 .76 17 294 .09 1220 3.4 0 .89 *INCREASE CONTAINED ON OWNER'S PROPERTY 18 293 .52 1220 3 .66 18 294 .21 1220 2 .93 0 .69 *INCREASE CONTAINED ON OWNER'S PROPERTY 19 293 .68 1220 6 .52 19 294 .29 1220 4 .99 0 .61 *INCREASE CONTAINED ON OWNER'S PROPERTY 20 295 .82 1220 5.24 20 295 .59 1220 5.68 -0 .23 Figure General Location Map 4 • • .. Brazos EXISTING CONDITIONS **************************************~ * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * U.S . ARMY CORPS OP ENGINEERS * MAY 1991 HYDROLOGIC ENGINEERING CENTE VERSION 4 . O . lE * 609 SECOND STREET Lahey F77L-EM /32 version 5 .01 DAVIS, CALIFORNIA 95616 Dodson & Associates , Inc . (916) 551-1748 RUN DATE 10/02/99 TIME 17 :24:20 * ***************************************** *************************************** x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xxxx x xxxxx x x x x x x x x x x x x x x xxxxxxx xxxxx xxx THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OP HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB, AND HEClKW. THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED PROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE . THE DEFINITION OP -AMSKK-ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP Bl. THIS IS THE PORTRAN77 VERSION NEW OPTIONS : DAMBRBAK OUTFLOW SUBMERGENCE , SINGLE BVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DSS :RBAD TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE :GREEN AND AMPT INFILTRATION KINEMATIC WAVB: NEW FINITE DIFFERENCE ALGORITHM LINB 1 2 3 4 s 6 7 8 9 10 11 12 13 14 lS 16 17 18 19 20 BXISTING CONDITIONS HBC-1 INPUT ID ....... 1 ....... 2 ....... 3 ....... 4 ....... S ....... 6 ....... 7 ....... 8 ....... 9 ...... l 0 ID ID ID ID CITY OF COLLBGB STATION WBSTFIBLD ADDITION BXISTING CONDITION MORRISON HYDROLOGY BNGINBBRING 100 YBAR FILB : LCHlBX * ==================================================================== * ==================================================================== IT IO 10 s ARBAl 0 0 14S KK KM KO HYDROGRAPH FROM ARBAl 0 0 0 l * BASIN ARBA .. BA 314 .4906 acres * !NI .LOSS SCS CN * ======== LS 0 .. LAG .. 81. s CP 640 us .s 0 .72 RAINFALL DATA 2 YEAR * PH SO 10 YBAR * PH 10 2S YBAR * PH 4 SO YEAR * PH 2 100 YEAR PH 1 * SOO YBAR * PH .2 .. ROUT 0 0 0 0 0 0 .S3 l. lS .66 1. 4S .7S 1. 64 .82 1. 8 .89 1. 9S .96 2 .1 KK KM ROUTE HYDROGRAPHTHRU ARBAl 21 2 .2 3.0 3 .49 3 .87 4 .2S 4 .63 KO 0 0 O 0 21 * CHANNEL ROUTING USING NORMAL DEPTH STORAGE RS 1 STOR -l * NLOB NCH NROB RC .OS .OS .OS .. RX Xl 792 X2 944 LOB 983 RY 292 288 286 * FROM HEC2 STORAGE RUN .. .. .. .. .. .. .. .. .. .. .. SECT CWSEL 10.000 10.000 10 .000 10.000 10 .000 10 .000 10.000 10 .000 10 .000 20 .000 20 .000 20 .000 20 .000 20 .000 20 .000 20.000 20.000 20 .000 28S .9S 286 .SS 287 .21 287 .70 288 .11 288 .47 288 .78 288.93 289 .07 292.19 293 .07 294 .00 294 .62 29S .09 29S .47 29S .79 29S.93 296.06 XLCH SLOPE 4000 . 007S TOE TOE 99S 283 Q 100 .00 200 .00 400 .00 600 .00 800.00 1000 .00 1200 .00 1300 .00 1400 .00 100 .00 200 .00 400.00 600 .00 800 .00 1000 .00 1200 .00 1300 .00 1400 .00 lOOS 283 STOR 1 . 71 3.04 S.07 6 .6S 8 .01 9 .24 10 .39 10 .9S 11.49 3 .0S S.23 8 .88 11. 92 14 .62 17 .10 19 .41 20 .S2 21 .61 1 2 .6 3.9 4.6 S .2 S .6 6 1 ROB 1020 286 2.8 4 .3 5.1 S .6 6.3 7 X7 1038 288 1. 71 3 .04 S .07 6.6S 8 .01 9 .24 10 .39 10 .95 11.49 3 .3 5 .2 6 .2 7 7 .4 7 .8 XS 1070 292 1. 34 2.19 3 .81 5 .27 6.61 7.86 9.02 9.57 10 .12 3.8 6.2 7 .S 8 .4 9 .5 10 .6 4.5 7 .2 8.8 9 .8 11 12 .2 PAGB 1 LINE 21 22 23 24 25 26 EXISTING CONDITIONS HEC -l INPUT ID ....... l ....... 2 .....•. 3 .•..... 4 ....•.. 5 ..•.... 6 ....... 7 ....... 8 ....... 9 ...... l O KK KM RS SV SQ zz ROUT HEC2 STORAGE ROUTING THROUGH THE PROJECT AREA Enter Modified Puls Storage Routing Data: l STOR -l Enter Storage-Discharge Data for Storage Routing Computations : 0 l.34 2.19 3 .81 5 .27 6 .61 7 .86 9 .02 9 .57 0 lOO 200 400 600 800 1000 1200 1300 l0 .l2 l400 PAGE 2 BXISTING CONDITIONS *************************************** * * * * * FLOOD HYDROGRAPH PACKAGB (HBC-1) * MAY 1991 VBRSION 4 .0 .lB * Lahey F77L-BM /32 ve rsion 5.01 * Dodson & Associates , Inc . * RUN DATB 10 /02 /99 TIMB 17:24 :2 0 * CITY OF COLLBGB STATION WBSTFIBLD ADDITION BXISTING CONDITION 6 IO IT MORRISON HYDROLOGY BNGINBBRING 100 YBAR OUTPUT CONTROL VARIABLBS IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL o. HYDROGRAPH PLOT SCALB HYDROGRAPH TIMB DATA PILB : LCHlBX NMIN 10 MINUTBS IN COMPUTATION INTBRVAL IDATB l 0 STARTING DATB ITIMB 0000 STARTING TIMB NQ 145 NUMB BR OP HYDROGRAPH NDDATB 2 0 BNDING DATB NDTIMB 0000 BNDING TIMB ICBNT 19 CBNTURY MARK COMPUTATION INTBRVAL TOTAL TIMB BASB 0 .17 HOURS 24 .00 HOURS BNGLISH UNITS DRAINAGB ARBA PRBCIPITATION DBPTH LBNGTH , BLBVATION PLOW STORAGB VOLUMB SURFACB ARBA TBMPBRATURB SQUARB MILBS INCHBS PBBT CUBIC PBBT PBR SBCOND ACRB-FBBT A CR BS DBGRBBS PAHRBNHBIT ORDINATBS * U.S . ARMY CORPS OF BNGINBB RS HYDROLOGIC BNGINBBRING CBNTB 609 SBCOND STRBBT DAVIS , CALIFORNIA 95616 (916 ) 551 -1748 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * *** 7 KK 9 KO * ARBAl * * * *************• OUTPUT CONTROL IPRNT I PLOT QSCAL IP NCH !OUT ISAVl ISAV2 TIMI NT VARIABLBS 5 PRINT CONTROL 0 PLOT CONTROL o. HYDROGRAPH PLOT SCALB 1 PUNCH COMPUTBD HYDROGRAPH 21 SAVB HYDROGRAPH ON THIS UNIT 1 FIRST ORDINATB PUNCHBD OR SAVBD 14 5 LAST ORDINATB PUNCHBD OR SAVBD 0.167 TIMB INTBRVAL IN HOURS BXISTING CONDITIONS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * 14 KK 16 KO ************** * * ROUT * '*'**********• ... .,, OUTPUT CONTROL VARIABLBS IPRNT I PLOT QSCAL IPNCH IOUT ISAVl ISAV2 TI MINT 5 PRINT CONTROL 0 PLOT CONTROL 0. HYOROGRAPH PLOT SCALB 0 PUNCH COMPUTBD HYDROGRAPH 21 SAVB HYDROGRAPH ON THIS UNIT l FIRST ORDINATB PUNCHBD OR SAVBD 145 LAST ORDINATB PUNCHBD OR SAVBD 0 .167 TIMB INTBRVAL IN HOURS FLOW TIMB IN PBAK TIMB OF OPBRATION STATION FLOW PBAK HYDROGRAPH AT ARBAl 1340 . 12 .6 7 ROUTBD TO ROUT 1226 . 12.83 ROUTBD TO ROUT 1220. 12 .83 *** NORMAL BND OF HBC-1 *** BXISTING CONDITIONS RUNOFF SUMMARY IN CUBIC FBBT PBR SBCOND HOURS, ARBA IN SQUARB MILBS AVBRAGB FLOW FOR MAXIMUM PBRIOD 6-HOUR 24-HOUR 72-HOUR 348 . 11 3 . 113 . 348 . 113 . 113 . 34 7. 112. 112 . BASIN ARBA 0 .49 0 .49 0 .49 MAXIMUM STAGS 288 .27 TIMB OF MAX STAGE 12 .83 PROPOSED CONDITIONS * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U .S. ARMY CORPS OF ENGINEERS * MAY 1991 * HYDROLOGIC ENGINEERING CENTB * VERSION 4 .0.lE 609 SECOND STREET Lahey F77L-EM/32 version 5 .01 * * DAVIS, CALIFORNIA 95616 Dodson & Associates, Inc . * (916) 551-1748 RUN DATE 10 /03 /99 TIME 12 :12 :52 * *************************************** x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xxxx x xxxxx x x x x x x x x x x x x x x xxxxxxx xxxxx xxx THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HECl (JAN 73), HEClGS, HEClDB, AND HEClKW . THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE . THE DEFINITION OF -AMSKK-ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81 . THIS IS THE FORTRAN77 VERSION NBW OPTIONS : DAMBRBAK OUTFLOW SUBMERGENCE , SINGLE BVBNT DAMAGE CALCULATION, DSS :WRITE STAGE FREQUENCY , DSS:RBAD TIME SERIES AT DESIRED CALCULATION INTERVAL KINEMATIC WAVB : NBW FINITE DIFFERENCE ALGORITHM LOSS RATE:GREEN AND AMPT INFILTRATION LINE l 2 3 4 5 6 7 8 9 1 0 11 12 13 14 15 16 1 7 18 19 20 PROPOSED CONDITIONS HEC-1 INPUT ID ....... l ....... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... 8 ....... 9 ...... l 0 CITY OF COLLEGE STATION WITH WESTFIELD DEVELOPED ID ID ID ID WESTFIELD ADDITION ENTIRE SUBDIVISION DEVELOPED EXISTING ELSEWHERE MORRISON HYDROLOGY ENGINEERING 100 YEAR FILE: LCHlPR ... ==================================================================== IT IO Kl< 10 5 AREAl 0 0 145 KM HYDROGRAPH FROM ARBAl KO 0 O 0 l * BASIN AREA 314 acres BA .4906 * !NI .LOSS SCS CN ... ~======= LS 0 82 .6 LAG CP 640 us .5 0 . 72 RAINFALL DATA 2 YEAR * PH 50 10 YBAR * PH 10 25 YEAR * PH 4 * 50 YEAR * PH 2 100 YEAR PH l * 500 YEAR * PH .2 ROUT 0 0 0 0 0 0 .53 1.15 .66 l .4S .7S 1. 64 .82 1. 8 .89 l .9S .96 2 .1 2 1 1 2 .2 2 .6 3 .0 3 .9 3 .49 4 .6 3.87 S .2 4 .25 s . 6 4 .63 6 Kl< KM KO ROUTE HYDROGRAPHTHRU AREAl 0 0 0 0 21 l * CHANNEL ROUTING USING NORMAL DEPTH STORAGE RS l STOR -1 * RC * RX RY NLOB .OS Xl 792 292 NCH .OS X2 944 288 NROB .OS LOB 983 286 * FROM HEC2 STORAGE RUN SECT CWSEL * 10.000 28S.9S * * * * * * * * 10 .000 10 .000 10 .000 10 .000 10 .000 10 .000 10.000 1 0.000 20 .000 20 .000 20 .000 20 .000 20 .000 20 .000 20 .000 20 .000 20 .000 286 .SS 287.21 287 .70 288 .11 288.47 288 .78 288.93 289 .0 7 XLCH 4000 TOE 99S 283 Q 100 .00 200 .00 400 .00 600 .00 800 .00 1000.00 1200 .00 1300.00 1400 .00 100 .0 200 .0 400 .0 600 .0 800.0 1000 .0 1200 .0 1300 .0 1400 . 0 SLOPB .007S TOB lOOS 283 STOR 1 .71 3 .04 S.07 6 .6S 8 .01 9 .24 10 .39 10 .9S 1 1.49 ROB 1020 286 3 .43 S .6S 9 .26 1 2.3S lS .23 18 .03 20 .88 22 .2S 24 .36 2 .8 4 .3 S .l S .6 6 .3 7 X7 1038 288 1 .71 3 .04 S .07 6 .6S 8 .01 9 .2 4 10 .39 10 .9S 11 .49 3.3 S .2 6.2 7 7.4 7.8 XS 1070 292 1 . 72 2.61 4 .19 S .7 7 .22 8 .79 10 .49 11.3 1 2.8 7 3 .8 6 .2 7 .S 8 .4 9.S 10 .6 4 .S 7.2 8 .8 9.8 11 12.2 PAGE l LINB 21 22 23 24 25 26 PROPOSED CONDITIONS HBC-1 INPUT ID ....... 1 ....... 2 ..•.... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... 8 ....... 9 ...... 10 KK KM RS SV SQ zz ROUT HBC2 STORAGE ROUTING THROUGH THE PROJECT AREA Bnter Modified Puls Storage Routing Data: 1 STOR -1 Enter Storage-Discharge Data for Storage Routing Computations: 0 1 .72 2.61 4 .19 5 .7 7.22 8 .79 10.49 0 100 200 400 600 800 1000 1200 11.3 1300 12 .87 1400 PAGB 2 * * * PROPOSED CONDITIONS * FLOOD HYDROGRAPH PACKAGE (HEC-1) * U.S . ARMY CORP S OP ENGINEERS MAY 1991 * HYDROLOGIC ENGINEERING CENTE VERSION 4 .0.lE * 609 SECOND STREET Lahey P7 7L-EM /32 v ersion 5 .01 DAVIS, CALIFORNIA 95616 Dodson & Associates , Inc. (91 6) 5 51-1748 RUN DATE 10 /03 /99 TIME 12:12 :52 CITY OP COLLEGE STATION WITH WESTFIELD DEVELOPED WESTFIELD ADDITION ENTIRE SUBDIVISION DEVELOPED EXISTING ELSEWHERE 6 IO IT MORRISON HYDROLOGY ENGINEERING 100 YBAR PILE: OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL o. HYDROGRAPH PLOT SCALE HYDROGRAPH TIME DATA NMIN 10 MINUTES IN COMPUTATION INTERVAL ID ATE l 0 STARTING DATE ITIME 0000 STARTING TIME NQ 145 NUMBER OP HYDROGRAPH ND DATE 2 0 ENDING DATE NDTIME 0000 ENDING TIME I CENT 19 CENTURY MARK COMPUTATION INTERVAL TOTAL TIME BASE 0.17 HOURS 24 .00 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION PLOW STORAGE VOLUME SURFACE AREA TEMPERATURE SQUARE MILBS INCHES FEET CUBIC FEET PER SECOND ACRE-FEET ACRES DEGREBS FAHRENHEIT ORDINATES LCHlPR *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * 'lr****W******** * 7 Kl< ARBAl * * **•*******•*** 9 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL o. HYDROGRAPH PLOT SCALE IPNCH l PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAVl l FIRST ORDINATE PUNCHBD OR SAVED ISAV2 145 LAST ORDINATE PUNCHED OR SAVED TI MINT 0 .167 TIME INTBRVAL IN HOURS PROPOSED CONDITIONS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * **'************ 14 KK ROUT * ************** 16 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL 0 . HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVB HYDROGRAPH ON THIS UNIT ISAVl l FIRST ORDINATE PUNCHED OR SAVBD ISAV2 145 LAST ORDINATE PUNCHED OR SAVBD TIMINT 0 .167 TIMS INTERVAL IN HOURS OPBRATION STATION HYDROGRAPH AT ARB Al ROUTBD TO ROUT ROUTBD TO ROUT *** NORMAL BND OF HBC-1 *** PBAK FLOW 1356 . 1241. 1212. PROPOSBD CONDITIONS RUNOFF SUMMARY FLOW IN CUBIC FBBT PBR SBCOND TIMB IN HOURS, ARBA IN SQUARB MILBS TIMB OF PBAK 12.67 12 .83 12.83 AVBRAGB FLOW FOR MAXIMUM PBRIOD 6-HOUR 24-HOUR 72-HOUR 352 . 115 . 115 . 352 . 114. 114. 352 . 114 . 114 . BASIN AREA 0 .49 0 .49 0 .49 MAXIMUM STAGB 288.2 9 TIMB OF MAX STAGE 1 2.8 3 ******************************************** *************************************** * * * HEC-2 WATER SURFACE PROFILES Versio n 4 .6 .2 ; May 1991 RUN DATE 020CT99 TIME * * * 21 :25 :58 ******************************************** *************************************** x x x EXISTING CONDITION HEC2 MODEL x xxxxxxx xxxxx x x x x x x x xxxxxxx xxxx x xxxxx x x x x x x x x x x x xxxxxxx xxxxx U .S . ARMY COR PS OF ENGINEERS HYDROLOGIC ENGINEERING CENTER 609 SECOND STREET, SUITE D DAVIS, CALIFORNIA 95616 -4 68 7 (916 ) 756-1104 xxxxx x x x xxxxx x x xxxxxxx EXISTING CONDITION HEC2 MODEL 020CT99 21:2S:S8 PAGE l THIS RUN EXECUTED 020CT99 21 :2S:S8 ************************************* HEC-2 WATER SURFACE PROFILES Version 4 .6.2; May 1991 ************************************* Tl COLLEGE STATION EXISTING CONDITION SOUTH FORK LICK CREEK TRIBUTARY T2 WESTFIELD ADDITION T3 100 YEAR FILE : SFLCTEX Jl I CHECK INQ NINV IDIR STRT METRIC HVINS Q WSEL FQ 0 2 0 0 .0044 0 0 0 288 J2 NPROF I PLOT PRFVS XSECV XSECH FN AL LDC IBW CHNIM I TRACE -1 0 -1 J3 VARIABLE CODES FOR SUMMARY PRINTOUT 38 l 43 42 4 S3 S4 26 QT l 1220 NC .OS .OS .OS .l .3 Xl 8 12 928 10S3 126 122 139 GR 292 798 290 898 288 914 286 928 28S .S 9S6 GR 284 988 283 1000 284 1006 286 10S3 288 1112 GR 290 1140 291.4 1219 Xl 9 12 968 1018 80 96 llS GR 292 808 290 860 288 879 286 900 28S.7 939 GR 286 968 284 990 283 1000 284 lOOS 286 1018 GR 288 102S 290 lOSS Xl 10 10 98S 1020 120 160 110 GR 292 790 290 910 288 9SO 286 98S 284 990 GR 284 1010 286 1020 288 1040 290 lOSO 292 1070 Xl 11 12 990 lOlS 80 140 120 GR 294 S80 292 9SO 290 970 288 980 286 990 GR 284 99S 284 1010 286 lOlS 288 1070 290 1090 GR 292 1120 294 1310 Xl 12 11 990 lOlS 200 160 330 GR 294 8SO 292 880 290 898 288 990 284 99S GR 284 lOOS 286 1010 288 lOlS 290 1110 292 1220 GR 294 1310 EXISTING CONDITION HEC2 MODEL 020CT99 21:25 :58 PAGE 2 Xl 13 15 994 1008 40 40 40 GR 294 750 292 855 290 920 288 990 286 994 GR 284 998 284 1005 286 1008 290 1010 292 1020 GR 293 .5 1045 292 1070 292 1150 294 1240 296 1340 Xl 14 11 960 1050 60 60 80 GR 294 850 292 905 290 938 288 960 286 995 GR 286 1005 288 1050 290 1060 292 1080 294 1250 GR 296 1335 Xl 15 11 990 1010 50 105 70 GR 294 89 0 292 940 290 975 288 990 286 995 GR 286 1005 288 1010 290 1030 292 1055 294 1150 GR 296 1290 Xl 16 10 985 1010 140 110 130 GR 294 800 292 888 290 985 288 990 286 995 GR 286 1003 290 1010 292 1035 294 1050 296 1320 Xl 17 9 990 1015 150 140 180 GR 294 848 292 915 290 990 286 995 286 1002 GR 288 1010 290 1015 292 1025 294 1035 Xl 18 12 968 1012 80 120 110 GR 297.4 790 296 865 294 940 292 960 290 968 GR 288 990 288 1010 290 1012 292 1070 294 1095 GR 296 1150 298 1340 Xl 19 11 975 1025 155 100 130 GR 298 760 296 890 294 910 292 975 290 990 GR 288 1000 290 1005 292 1025 294 1040 296 1100 GR 298 1220 Xl 20 12 940 1 _025 200 220 220 GR 300 670 298 865 296 940 294 970 292 985 GR 290 995 290 1008 292 1010 294 1020 296 1025 GR 298 1160 300 1270 EXISTING CONDITION HBC2 MODEL 020CT99 21 :2S:S8 PAGB 3 SECNO DEPTH CWSE L CRIWS WSELK BG HV HL OLOSS L-BANK BLBV Q QLOB QCH QROB ALOB ACH AROB VOL TWA R-BANK BLEV TIME VLOB VCH VROB XNL XNCH XNR WTN BLMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TOPWID BNDST *PROF 1 CCHV= .100 CEHV= .300 *SECNO 8 .000 8.000 4.42 287.42 .00 288 .00 287.62 .20 .0 0 .oo 286 .00 1220 .0 11. l 1161.9 47 .0 7.1 316 .9 29 .9 .o .o 286.00 .00 l.S6 3.67 l.S 7 .oso .o so .o so .000 283 .00 918 .04 .004413 126 . 139 . 122. 0 0 s .00 176.94 1094 .98 *SECNO 9 .000 9.000 4 .88 287 .88 .oo .oo 288 .11 .24 .48 .01 286.00 1220.0 474.4 734 .2 11 .4 1S6 .2 166 .3 6 .2 .8 .4 286 .00 .01 3 .04 4 .42 1. 86 .oso .oso .oso .000 283 .00 880 .31 . 004492 80 . llS . 96 . 2 0 0 .00 144 .26 1024 .S6 *SBCNO 10.000 3302 WARNING : CONVEYANCE CHANGB OUTS IDB OF ACCEPTABLE RANGE, KRATIO = .68 10 .000 4.31 288.31 .00 .00 288.97 .66 .73 .13 2 86 .00 1220 .0 160 .S 968 .3 91. 2 46.7 13S .8 26.4 1. s .7 286 .00 .01 3 .44 7 .13 3 .46 .oso .o so .oso .000 284 .00 943.84 . 0096S6 120. 110 . 160 . 2 0 0 .00 97.70 1041.S4 *SECNO 11. 000 3302 WARNING : CONVBYANCE CHANGE OUTSIDE OF ACCEPTABLB RANGE, KRATIO = 1. SS 11 .000 S .40 289.40 .00 .00 289. 72 .32 . 71 .03 286 .00 1220.0 87 .0 673 .7 4S9 .3 28.9 12S .O 141. 8 2 .2 1. 0 286 .00 .02 3.01 5 .39 3.24 .oso .oso .oso .000 284 .00 973 .00 .004006 80 . 120. 140 . 2 0 0 .00 110 .99 1084 .00 *SECNO 12 .000 12.000 6.44 290 .44 .00 .00 290 .66 .23 .93 .01 288.00 1220 .0 28S .8 636.S 297 .7 132 .4 130.8 141. 0 4.1 1 .8 288.00 .0 4 2.16 4.87 2 .11 .oso .oso .oso .000 284 .00 894.13 .003302 200. 330. 160. 2 0 0 .00 239.SS 1133 . 67 EXISTING CONDITION HBC2 MODEL 02 0CT99 21:2S :S8 PAGE 4 SBCNO DEPTH CWSBL CRIWS WSBLK BG HV HL OLOSS L-BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA R-BANK ELEV TIME VLOB VCH VROB XNL XNC H XNR WTN ELM IN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC !CONT CORAR TOPWID END ST *SBCNO 13 .000 3301 HV CHANGED MORE THAN HVINS 368S 20 TRIALS ATTEMPTED WSBL,CWSBL 3693 PROBABLE MINIMUM SPECIFIC ENERGY 3720 CRITICAL DEPTH ASSUMED 13 .000 6.34 290.34 290 .34 . 00 291.30 .96 .22 .22 286 .00 1220 .0 434.8 770.2 lS.O 109.2 81. 8 s.o 4 .4 1. 9 2 86 .00 .04 3 .98 9 .42 3 .02 .oso .os o .oso .000 284.00 908.90 . 010S3S 40 . 40. 40 . 20 s 0 .00 102.81 1011 . 71 *SECNO 14.000 3301 HV CHANGED MORE THAN HVINS 3302 WARNING : CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE, KRATIO = 3 .2S 14 .000 S .47 291.47 . 00 .00 291.S6 .09 .17 .09 288 .00 1220 .0 106 .1 1064 .1 49 .8 72.0 411 .9 3S .4 s .o 2.1 288.00 .OS 1.47 2 .S8 1. 41 .oso .o so .o so .000 286 .00 913 .82 . 000996 60 . 80 . 60 . 2 0 0 .00 160 .83 1074. 6S *SBCNO lS.000 3301 HV CHANGED MORE THAN HVINS 3302 WARNING : CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE, KRATIO = .29 lS.000 S .08 291 .08 .00 .00 291 .97 .89 .17 .24 288 .00 1220 .0 186.3 798.4 23S.3 41. 6 91.7 49 .1 S .6 2.4 288.00 .OS 4.48 8 .71 4.80 .oso .oso .oso .000 286 .00 9S6.01 .011847 so . 70 . lOS. 4 0 0 .00 87 .S6 1043.S7 *SBCNO 16 .000 3301 HV CHANGED MORE THAN HVINS BXISTING CONDITION HBC2 MOD BL 020CT99 21:2S :S8 PAGB s SBCNO DBPTH CWSBL CRIWS WSBLK BG HV HL OLOSS L-BANK BLBV Q QLOB QCH QROB ALOB ACH AROB VO L TWA R-BANK BLBV TIMB VLOB VCH VROB XNL XNCH XNR WTN BLMIN SSTA SLOPB XLOBL XLCH XLOBR I TRIAL IDC I CONT CORAR TOPWID BNDST 3302 WARNING : CONVBYANCB CHANGB OUTS IDB OF ACCBPTABLB RANGB, KRATIO = 1. 68 1 6 .000 6.S6 292.S6 .00 .00 292.88 .32 .86 .06 290 .00 1220.0 399 .6 718 . 2 102.3 1S8 .7 130 .1 40 .3 6.3 2 .7 290 .0 0 .06 2 .S2 S.S2 2 .S4 .oso .oso .oso .000 286 .00 863.19 . 004204 140. 130. 110 . 3 0 0 .0 0 176.04 1039 .23 *SBCNO 17 .000 17 .000 7 .20 293.20 .00 .00 293 .44 .24 .SS .01 290 .00 1220 .0 4 S 8.4 700.8 60 .8 189 .9 147.2 2S .7 7 .6 3 .3 290 .00 .07 2.41 4 .76 2.36 .oso .oso .oso .0 00 286 .00 874 .S7 .002680 lSO . 180 . 140. 2 0 0 .00 1S6 .47 1031.04 *SBCNO 18 .000 18 .000 S .S 2 293 .S2 .oo .oo 293.68 .16 .23 .01 290 .00 1220 .0 S8 .9 801.1 360 .1 31. 0 219 .0 160.8 a .s 3 .7 290 .00 .oa i. as 3.66 2 .24 .oso .o so .050 .000 288 .00 944.78 .001833 80 . 110. 120 . 2 0 0 .00 144 .25 1089.03 *SECNO 19 .000 3302 WARNING : CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE, KRATIO = .43 19 .000 5.68 293 .68 .00 .00 294 .27 .59 .46 .13 292 .00 1220 .0 122 .0 1070.0 28.0 45.9 164.0 10 .6 9.4 4 .1 292 .00 .09 2 .66 6.52 2 .64 .0 50 .050 .050 .000 288 .00 920 .39 . 010100 lSS . 130. 100. 2 0 0 .oo 117. 21 1037 .60 *SECNO 20.000 20.000 S .82 29S.82 .oo .0 0 296.24 .43 1. 95 .02 296 .00 1220 .0 .0 1220 .0 .o .0 232.7 .0 10 .6 4.5 296 .00 .10 .00 S .24 .00 .000 .050 .0 00 .000 290.00 942 .76 .007946 200 . 220. 220. 3 0 0 .00 81 .78 1024 .S4 EXISTING CONDITION HBC2 MODBL 020CT99 21:25 :58 PAGB 6 THIS RUN BXBCUTBD 020CT99 21:25 :58 HBC-2 WATBR SURFACB PROFILBS Version 4 .6.2; May 1991 NOTB-ASTBRISK (*) AT LBFT OF CROSS-SBCTION NUMBBR INDICATBS MBSSAGB IN SUMMARY OF BRRORS LIST 100 YBAR SUMMARY PRINTOUT SBCNO CWSBL Q BLMIN TOPWID SSTA BNDST VCH 8 .000 287 .42 1220 .00 283 .00 176 .94 918.04 1094 .98 3 .67 9.000 287 .88 1220.00 283.00 144.26 880.31 1024 .56 4 .42 10.000 288.31 1220 .00 284 .00 97 .70 943.84 1041.54 7 .13 * 11.000 289.40 1220.00 284 .00 110.99 973 .00 1084 .00 5 .39 12 .000 290 .44 1220 .00 284.00 239.55 894.13 1133 .67 4 .87 * 13.000 290 .34 1220.00 284 .00 102.81 908.90 1011 .71 9 .42 14.000 291.47 1220.00 286 .00 160.83 913 .82 10 7 4 .65 2.58 * 15 .000 291.08 1220.00 286 .00 87.56 956.01 1043.57 8 .71 * 16.000 292 .56 1220.00 286 .00 176.04 863.19 1039 .23 5 .52 17.000 293.20 1220 .00 286 .00 156 .47 874.57 1031.04 4.76 18 .000 293 .52 1220.00 288 .00 144.25 944.78 1089 .03 3.66 * 19 .000 293 .68 1220.00 288 .00 117.21 920.39 1037. 60 6.52 20.000 295.82 1220.00 290 .00 81.78 942 .76 1024. 54 5.24 EXISTING CONDITION HEC2 MODEL 020CT99 21 :25 :58 PAGB 7 SUMMARY OF ERRORS AND SPECIAL NOTES WARNING SECNO= 10 .000 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE WARNING SECNO = 11 . 000 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE CAUTION SECNO= 13 .000 PROFILE= 1 CRITICAL DEPTH ASSUMED CAUTION SECNO= 13 . 000 PROFILE= 1 PROBABLE MINIMUM SPECIFIC ENERGY CAUTION SBCNO= 13 .000 PROFILE= 1 20 TRIALS ATTEMPTED TO BALANCE WSEL WARNING SECNO= 14 . 000 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE WARNING SECNO= 15 .000 PROFILE= 1 CONVEYANCE CHANGE OUTS IDB ACCEPTABLE RANGE WARNING SECNO= 16 .000 PROFILE= 1 CONVEYANCE CHANGE OUTS IDB ACCEPTABLE RANGE WARNING SECNO= 19 .000 PROFILE= 1 CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE ·-·---·--·--······---,----------·--·----····--·--·---·---··-------·---ICO YEAR---·-----·---·-·---·------·---·----·-·--·--·----·-----·-------·--1 31 0 __ ,_1 ___ ---·-------------· -·-· ----·---·---··--~------___::~s ffc tlon.:_ <a 4:0 :_o:__. __ ---------~-------·----------·-·--------·---____ 1 ! I 'I I i I I 1 I ~ i I I ~ 1' I EXISTING CONDITIONS I \./ATER SURFACE PROFILES i ~ I 1 I • ,I 1 I I i Jil I ! 1 I ~ 11 j ll ! i 1 I I i i I I ! I 28<t-j----,-·-----,------,----,--,----, ,----------i-----,-----,-----,...-----1 I o 300 '°° 900 1200 1500 1eoo 2100 I I Cha.rwwl L.ngth <ft) I 1nv .... =t========-·;::::-~=-=~~~:~~=--· --==-~=~==-=-:--=-:=---~)] ******************************************** *************************************** * HEC-2 WATER SURFACE PROFILES * * * Version RUN DATE 4.6.2; May 1991 030CT99 TIME * * * * 12 :0 8 :57 * x x x PROPOSED CONDITION HEC2 MODEL x xxxxxxx xxxxx x x x x x x x xxxxxxx xxxx x xxxxx x x x x x x x x x x x xxxxxxx xxxxx * U.S . ARMY CORPS OF ENGINEERS HYDROLOGIC BNGINBBRING CENTER 609 SECOND STREET, SUITS D * DAVIS, CALIFORNIA 95616-4687 (916 ) 756-1104 xxxxx x x x xxxxx x x xxxxxxx PROPOSED CONDITION HEC2 MODEL 030CT99 12:08 :S7 PAGE 1 THIS RUN BXBCUTED 030CT99 12 :08 :S7 HEC-2 WATER SURFACE PROFILBS Version 4 .6.2; May 1991 Tl COLLBGE STATION DBVELOPB CONDITION SOUTH FORK LICK CREEK TRIBUTARY T2 WBSTFIELD ADDITION T3 100 YBAR FILE : SFLCTPR Jl ICHBCK INQ NINV IDIR STRT METRIC HVINS Q WSEL FQ 0 2 0 0 .0044 0 0 0 288 J2 NPROF I PLOT PRFVS XSECV XSECH FN AL LDC IEW CHNIM I TRACE -1 0 -1 J3 VARIABLE CODES FOR SUMMARY PRINTOUT 38 1 43 42 4 S3 S4 26 QT 1 1220 NC .OS .O S .OS .1 .3 Xl 8 12 928 10S3 126 122 139 GR 292 798 290 898 288 914 286 928 28S.S 9S6 GR 284 988 283 1000 284 1006 286 10S3 288 1112 GR 290 1140 291. 4 1219 Xl 9 12 968 1018 80 96 llS GR 292 808 290 860 288 879 2 86 900 28S.7 939 GR 286 968 284 990 283 1000 284 lOOS 286 1018 GR 288 102S 290 lOSS Xl 10 10 98S 1020 120 160 110 GR 292 790 290 910 288 9SO 286 98S 284 990 GR 284 1010 286 1020 288 1040 290 lOSO 292 1070 Xl 11 12 990 lOlS 80 140 120 GR 294 S80 292 9SO 290 970 288 980 286 99 0 GR 284 99S 284 1010 286 lOlS 288 1070 290 1090 GR 292 1120 294 1310 PROPOSED CONDITIONS==================================================== widEN CHANNEL AND STRAIGHTEN . Xl 12 10 977 1023 200 160 330 GR 294 8SO 292 880 290 898 288 977 284 98S GR 284 lOlS 288 1023 290 1110 292 1220 294 1310 PROPOSED CO NDITIONS ==================================================== Reshape channel to fit culvert. PROPOSBD CONDITION HBC2 MOD BL 030CT99 12 :08 :57 PAGB 2 Xl 13 13 985 1015 40 40 40 X3 10 294 294 GR 294 750 292 855 290 920 288 985 284 98S GR 284 101S 290 101S 292 1020 292 104S 292 1070 GR 292 llSO 294 1240 296 1340 PROPOSBD CONDITIONS==================================================== 3-8X6 RCB DSFL=284 USFL=286 Reshape channel to fit culvert. Culvert sized to provide detention . SC 3.012 .s 2 .63 0 6 8 60 8.1 286 284 PROPOSED CO NDITIONS==================================================== Reshape channel to fit culvert . Xl 14 4 98S lOlS 60 60 80 X2 0 0 2 292 294 X3 10 294 294 BT -6 98S 294 294 98S 294 286 98S 294 292 BT 1015 294 292 lOlS 294 286 lOlS 294 294 GR 294 98S 286 98S 286 lOlS 294 lOlS 14 11 98S lOlS 60 60 80 0 0 2 292 294 10 294 294 -12 8SO 294 294 90S 294 292 938 294 290 960 294 288 98S 294 286 98S 294 292 101S 294 292 101S 294 286 lOSO 294 288 1060 294 290 1080 294 292 1250 294 294 294 8SO 292 90S 290 938 288 960 286 98S 286 lOlS 288 lOSO 290 1060 292 1080 294 12SO 296 133S PROPOSBD CONDITIONS======•============================================= widBN THB SBCTION IN ORDBR TO PROVIDB DBTBNTION FILL IN OVBRBANKS Xl 15 6 918 1037 so lOS 70 GR 294 890 294 918 292 926 286 9SO 28 6 1005 GR 294 1037 lS 11 990 1010 so lOS 70 294 890 292 940 290 97S 288 990 286 99S 286 lOOS 288 1010 290 1030 292 lOSS 294 llSO 296 1290 FILL ON LBFT OVBRBANKS Xl 16 10 98S 1010 140 110 130 GR 294 800 294 969 290 98S 288 990 286 99S GR 286 1003 290 1010 292 103S 294 lOSO 296 1320 PROPOSBD CONDITION HBC2 MODBL 030CT99 12 :08 :5 7 PAGB 3 Xl 1 7 9 990 1015 150 140 180 GR 294 848 292 915 290 990 286 995 286 1002 GR 288 1010 290 1015 292 1025 294 1035 Xl 18 12 968 1012 80 120 110 GR 297 .4 790 296 865 294 940 292 960 29 0 968 GR 288 990 288 1010 290 1012 292 10 7 0 294 1095 GR 296 1150 298 1340 Xl 19 11 975 1025 155 100 130 GR 298 760 296 890 294 910 292 975 290 990 GR 288 1000 290 1005 292 1025 294 1040 296 1100 GR 298 1220 Xl 20 12 940 1025 200 220 220 GR 300 670 298 865 296 940 294 970 292 985 GR 290 995 290 1008 292 1010 294 1020 296 1025 GR 298 1160 300 1270 PROPOSBO CONDITION HBC2 MOD BL 030CT99 12:08:57 PAGB 4 SBCNO DBPTH CWSBL CRIWS WSBLK BG HV HL CLOSS L-BANK BLBV Q QLOB QCH QROB ALOB ACH AROB VOL TWA R-BANK BLB V TIMB VLOB VCH VROB XNL XNCH XNR WTN BLMIN SSTA SLOPB XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TOPWIO BNDST *PROF 1 CCHV= .100 CBHV= .300 *SBCNO 8 .000 8 .000 4.42 287 .42 .oo 288.00 287 .62 .20 .00 .00 286.00 1220 .0 11.1 1161.9 47.0 7.1 316.9 29 .9 . 0 .0 286 .00 .00 1. 56 3.67 1.57 .050 .050 .050 .coo 283.00 918 .04 . 004413 126. 139. 122 . 0 0 5 .00 176 .94 1094.98 *SBCNO 9.000 9 .000 4 .88 287 .88 .00 .00 288 .11 .24 .48 .01 286.00 1220 .0 474.4 734.2 11. 4 156 .2 166.3 6 .2 . 8 .4 286.00 .01 3 .04 4.42 1 .86 .050 .050 .050 .000 283.00 880 .31 . 004492 80 . 115 . 96. 2 0 0 .00 144 .26 1024 .56 *SBCNO 10 .000 3302 WARNING : CONVBYANCB CHAN GB OUTS IDB OF ACCBPTABLB RANGB, !<RATIO = . 68 10 .000 4 .31 288.31 .00 .00 288.97 .66 .73 .13 286 .0 0 1220 .0 160.5 968.3 91 .2 46 .7 135.8 26 .4 1. 5 .7 286.00 .01 3 .44 7.13 3 .46 .050 .050 .050 .000 284.00 943 .84 .009656 120. 110 . 160 . 2 0 0 .00 97 .70 1041.54 *SBCNO 11 .000 3302 WARNING : CONVBYANCB CHAN GB OUTS IDB OF ACCBPTABLB RANGB, !<RATIO = 1. 55 11 .000 5.40 289 .40 .00 .00 289.72 .32 . 71 .03 286.00 1220.0 87.0 673.7 459 .3 28 .9 125.0 141 .8 2 .2 1. 0 286.00 .0 2 3 .01 5 .39 3 .24 .050 .050 .050 .000 284.00 973 .00 .004006 80 . 120 . 140 . 2 0 0 .oo 110 . 99 1084 .00 *SBCNO 12 .000 3302 WARNING : CONVBYANCB CHANGB OUTSIDE OF ACCBPTABLE RANGE, !<RATIO = 1. 57 12.000 6 . 24 290.24 .oo .oo 290 .41 .17 .67 .02 288.00 1220 .0 135 .7 934.4 149.9 98 .1 255.0 109.4 4 .4 1. 8 288 .00 .04 1. 38 3.66 1 .37 .050 .050 .050 .000 284 .00 895 .85 .001635 200 . 330 . 160 . 3 0 0 . 00 227.30 1123 .15 PROPOSED CONDITION HBC2 MODBL 030CT99 12 :08 :57 SllCNO DllPTH CWSBL CRIWS WSBLK BG HV HL Q QLOB QCH QROB ALOB ACH AROB VOL TIMS VLOB VCH VROB XNL XNCH XNR WTN SLOPS XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR *SllCNO 13 .000 3301 HV CHANGED MORB THAN HVINS 3302 WARNING : CONV!lYANCB CHANGE OUTSIDE OF ACCBPTABLB RANGB, !<RATIO .48 3495 OV!lRBANK ARBA ASSUMED NON-BFFBCTIVB, BLLllA= 294 .00 BLRBA= 13. 000 5 .97 289 .97 .oo .oo 290.69 . 72 1220 .0 .0 1220.0 .0 .0 179 .2 .0 .05 .00 6 .81 .00 .000 .050 .000 .007095 40 . 40 . 40 . 2 0 0 SPECIAL CULVERT SC CUNO CUNV BNTLC COFQ RDLBN RISS SPAN 3 .012 .so 2.63 .oo 6 .00 8 .00 CHART 8 -BOX CULVERT WITH FLARED WINGWALLS; NO INLBT TOP BDGB BBV!lL SCALB l -WINGWALLS FLARED 30 TO 75 DBGRBBS *SBCNO 14.000 SPECIAL CULVERT OUTLET CONTROL BGIC = 292 .910 BGOC = 293.418 PCWSB= 289 .971 BLTRD= 294 .000 SPECIAL CULV!lRT BGIC BGOC H4 QWBIR QCULV VCH ACULV 292 .91 293 .42 2 . 73 0 . 1220. 5 .910 144.0 3495 OVBRBANK ARBA ASSUMED NON-BFP!lCTIVll , BLLBA= 294.00 BLRBA= 14.000 6 .88 292 .88 .00 .00 293 .42 .54 1220 .0 .o 1220 .0 .0 .0 206 .4 .0 .05 .00 5 .91 .00 .000 .050 .000 . 004998 60 . BO. 60 . 2 0 0 *SBCNO 15 .000 294 .00 .12 4 .7 .000 .oo CULVLN 60 .00 BLTRD 294 .00 294 .00 2 .73 5 .1 .000 .00 CLOSS TWA BLf1IN TO PW ID .17 1.9 284.00 30 .00 CHRT B WBIRLN 0 . .00 2 .0 286 .00 30 .00 L-BANK R-BANK SSTA llNDST 2 88 .0 0 290 .00 985 .00 1015 .00 SCL l 294 .00 294 .00 985 .00 1015 .00 PAGll 5 BL!l V BLllV BLCHU BLCHD 286 .00 284.00 PROPOSED CONDITION HBC2 MOD BL 030CT99 12 :08:S7 PAGB 6 SBCNO DBPTH CWSBL CRIWS WSBL K BG HV HL OLOSS L-BANK BLBV Q QLOB QCH QROB ALOB ACH AROB VOL TWA R-BANK BLBV TIMB VLOB VCH VROB XNL XNCH XNR WTN BLMIN SSTA SLOPB XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TOPWID BNDST 3302 WARNING : CONVBYANCB CHANGB OUTSIDE OF ACCBPTABLE RANGE , KRATIO = 3.39 lS.000 7 .48 293.48 .00 .00 293.S4 .06 .07 .OS 294 .00 1220 .0 .0 1220 .0 . 0 .o 63S .S .0 S .8 2 .1 294.00 .06 .00 l. 92 .00 .000 .oso .000 .000 286.00 920. 07 . 000436 so . 70 . lOS. 2 0 0 .00 114 . 86 1034.93 *SECNO 16 .000 3302 WARNING: CONVBYANCB CHANGE OUTSIDE OF ACCEPTABLE RANGE, KRATIO = .30 16 .000 7 .28 293 .28 .00 .00 293.81 .S3 .13 .14 290.00 1220.0 60.3 947.9 211. 8 21 .6 148 .l 63 .3 7 .0 2 .4 290.00 .07 2.80 6 .40 3.3S .oso .oso .oso .000 286 .00 971.87 . 0047S6 140 . 130. 110. 3 0 0 .00 72. 76 1044 .62 *SBCNO 17 .000 3280 CROSS SECTION 1 7.00 EXTENDED .09 FBET 3302 WARNING : CONVEYANCE CHANGE OUTSIDE OF ACCBPTABLB RANGB, KRATIO = 2.04 17 .000 8 .09 294 .09 .0 0 .00 294 .20 .11 .34 .04 290.00 1220.0 S68 .4 S7S .7 76.0 304 .l 169 .l 41 .7 8 .4 2.8 290 .00 . 08 1.87 3 .40 l. 82 .oso .oso .oso .000 286.00 848.00 . 001138 lSO . 180. 140 . 2 0 0 .00 187 .00 103S .OO *SBCNO 18 .000 18.000 6.21 294 .21 .00 .00 294 .31 .10 .11 .00 290 .00 1220.0 77 .l 731.S 411.4 S0 .7 249.2 217 .0 9.6 3. 2 290.00 .10 l. S2 2.93 l. 90 .oso .oso .oso .000 288 .00 932.13 .000993 80. 110. 120 . 2 0 0 .00 168.64 1100.77 *SBCNO 19 .000 3302 WARNING : CONVBYANCB CHANGB OUTS IDB OF ACCBFTABLB RANGB, KRATIO = .46 19 .0 00 6.29 294 .29 .oo .00 294.62 .33 .24 .07 292.00 1220.0 202.7 970.l 47.2 84 .3 194 .S 20.6 10.8 3.7 292.00 .10 2.41 4.99 2.29 .oso .oso .oso .00 0 288 .00 907.10 . 004 7 03 lSS . 130 . 100 . 2 0 0 .00 141.61 1048.70 PROPOSED CONDITION HBC2 MODEL 030CT99 12 :08 :S7 PAGE 7 SllCNO DBPTH CWSBL CRIWS WSBLK BG HV HL CLOSS L-BANK BLBV Q QLOB QCH QROB ALOB ACH AROB VOL TWA R-BANK BLBV TIME VLOB VCH VROB XNL XNCH XNR WTN BLMIN SSTA SLOPE XLOBL XLCH XLOBR I TRIAL !DC !CONT CORAR TOPWID BNDST *SBCNO 20 .000 3302 WARNING : CONVBYANC!l CHANGE OUTS IDB OF ACCEPTABLE RANGE, KRATIO = .70 20.000 S .S9 29S .S9 .00 .00 296 .09 .so 1.43 .OS 296.0 0 1220 .0 .0 1220 .0 . 0 .o 21S .O .o 12 .1 4 .2 296.00 .11 .00 S.68 .00 .000 .oso .000 .000 290 .00 946 .08 . 009698 200 . 220. 220. 3 0 0 . 00 77.90 1023 .99 PROPO SED CONDITION HEC2 MODEL 030CT99 12 :08 :57 PAGE 8 THIS RUN EXECUTED 030CT99 12 :08:58 ************************************* HEC -2 WATER SURFACE PROFILES Version 4 .6 .2; May 1991 NOTE-ASTERISK (*) AT LEPT OF CROSS -SECTION NUMBBR INDICATES MBSSAGB IN SUMMARY OF ERRORS LIST 100 YBAR SUMMARY PRINTOUT SBCNO CWSEL Q BLMIN TOPWID SSTA END ST VCH 8 .000 287 .42 1220 .00 283.00 176 .94 918.04 1094 .98 3 .67 9.000 287.88 1220 .00 283 .00 144.26 880 .31 1024.56 4.42 10 .000 288.31 1220.00 284.00 97.70 943.84 1041.54 7.13 11 .000 289 .40 1220 .00 284.00 110 .99 973.00 1084 .00 5 .39 12.000 290.24 1220 .00 284 .00 227.30 895.85 1123 .15 3.66 13.000 289 .97 1220.00 284 .00 30 .00 985 .00 1015 .00 6.81 14 .000 292 .88 1220 .00 286 .00 30 .00 985 .00 1015.00 5 .91 * 15 .000 293 .48 1220.00 286 .00 114. 86 920 .07 1034. 93 1. 92 * 16 .000 293 .28 1220.00 286 .00 72 .76 971 .87 1044 .62 6 .40 * 17 .000 294 .09 1220 .00 286 .00 187.00 848.00 1035.00 3 .40 18 .000 294 .21 1220 .00 288.00 168.64 932 .13 1100 . 77 2 .93 * 19 .000 294 .29 1220 .00 288.00 141 .6 1 907.10 1048 .70 4.99 * 20.000 295.59 1220.00 290.00 77. 90 946.08 1023.99 5 .68 I PROPOSBD CONDITION HBC2 MODBL 030CT99 12:08 :5 7 PAGB 9 SUMMARY OF BRRORS AND SPBCIAL NOTBS WARNING SBCNO: 10.000 PROFILB: l CONVBYANCB CHANGB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO: 11 .0 00 PROF I LB: l CONVBYANCB CHAN GB OUTS IDB ACCBPTABLB RANGB WARNING SllCNO: 12 .000 PROFILB: l CONVBYANCB CHANGB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO: 13 . 000 PROFILB: l CONVBYANCB CHAN GB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO: 15 .00 0 PROFILB: l CONVBYANCB CHAN GB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO: 16 .000 PROF I LB: l CONVBYANCB CHANGB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO: 17 .000 PROFILB: 1 CONVBYANCB CHAN GB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO : 19 .000 PROF I LB: 1 CONVBYANCB CHANGB OUTS IDB ACCBPTABLB RANGB WARNING SBCNO: 20 .000 PROFILB: 1 CONVBYANCB CHANGB OUTS IDB ACCBPTABLB RANGB 100 YEAR Cr·n ss-Sectlon 12 ------------------1 ----·--·--------------·---------------------, I I I I 30S-· I ~ I ~ I I J ~~ ! I ~ I I i 1 1 I ~~ I I I I II I i 1 I I -l --~-~---~---,------;~~---~-~--·----;-z;;---~--:;;;;·--~~i I L_-_-_---v-m:·-1 ---------~~ ~tk»1 e !.~~_:~----· _____ · _···~=~-====~-=====~/ RDPDSED CDND. I i!ll:I XISTING -CDND . I l I I I l I ~---~--~-·--..-----y ·---·,----.-·--·--,---~ ~ -~ ~ ~ ~ ~ 1~1 ~ s~---fD --e -.. ::~=---~--------~=:--==~~==--=-=--~==i l 100 YEAR Cra5s:-Sectlon t • 3 10-----------·-----· -·------------------ 2 ,,____,...__XISTING CPND. ----clilSEl. I IDhnk• ----;cvsa 1 • IDG YEAR Cross-Section 1:1 --------··------------------·--------------------------------~ 100 YEAR Crass-Sec-tlon 16 :.r---------------------------------------------------------------·--·-------------- :100---- /RDPDSED CDND . 29 T----LXISTING COND . IJlrllU'la (f1;) ----<:lt'SEL l e1c1n1c. -----··------···--·----·-···-----·--····-····--·--·--·----;OOY[i.R'-----····--------·-·--···-·-·-------··---··-·-·-··-----.. ·-····-··-----1 I I 1!90 -i i ! I I I i ., I l 211:1 --j I -j I 2&0-,-----,------, 700 800 ·--·--------·----~-·------------------·-----·-·-·----·-1 ! I I ! I I i I I I I I I I I I I I I -··---.-----·-.-----r-------,--·--i----------,----··-;-··--· -·-·-,--· -·-,-----·-.---·-·--J i 900 !DOG 1100 !200 l:IC 1400 ! i Jbtlll'1C• (ft) i i;:-;=:~~ ·1 ·-=::-==--~=--=:::=-%~ s.c~-=--=-~~~--=:-==~~~~~~:=:~=~--=--=--·__ :.:---=-~=~::=-~-~=;;_··-~=~:~~--===~--=-=u .-------------------·----··-----------·----------------.. ·--···-··--··-·---··-·-·---·--, !CO YF.Af.I Cross -Se ct ions <8 't o l -4 ) I I I 3101---------------------·--·------------ .. I '~l I I ;rnc -~ i i i I ~ I I J I I 2~ I 1 I !~--r ~ I ' I i ---------·-------------------------------.-----1 PROPOSED CONDITION ~ATER SURFACE PROFILES I I I i I i I I I i ~----.------T-----,-----y --------,--------1 --------,------·-·----.---·--r -·-·-~·---,------.--------1 I I I 0 30G 600 90CI 1200 1:50CI 1600 2 100 ----·------------------------------ii --· -. -.. ·::==--:-.:::..~--==--=--:=:=--=="·~-::-.. .I CITY OF COLLEGE STATION *** CUSTO MER RECEIPT *** OPER: MRODGERS CT DRAWER: 1 DATE: 12/30/98 00 RECEIPT: 0004822 DESCRIPTION QTY A"OUNT TP TM FILING FEE/DS/BI 1 $400.00 *B7 CA JOHN SZABUNIEWICZ-PD CASH DEV PERMIT WESTFIELD ADDITION MR TENDER DETAIL CA $400.00 DATE: 12130/98 TOTAL CASH Al'IOUNT TENDERED THANK YOU TIME: 9:47:55 $400.00 $400.00 I ~­ I . , i. \ I I I I ' ' I ,, I ' I ' ' Hydraulic and Hydrologic Analysis In Support of a Letter of Map Revision For a Portion of Lick Creek Through the Graham Road Intermediate School Tract City of Colleg~ Station, Texas Date: March 2, 1998 By: Monison Hydrology Engineering, Inc. 210 Amold Ave. ArU11gton, TtxlU 76010 (117) 461-0311 Fax (817) 274-1338 I I I I, I f f r r --Morrison Hydrology Engineering, Inc. Page-I Table of Contents Introduction Hydrologic Analysis Hydraulic Analysis Existing Condition Summary Tables 1. Summary Table Existing conditioos 100-Y ear f1ood Elevations Figures 1. Gene.ral Location Map 2 . Project Area Location Map 3 . FEMA Floodplain Map 4. Plotted Hydrograph of the 100 year peak discharge Appendices 1. Hydrologic analysis • Watershed Map • Existing Condition HECl Computer model 2. Existing Conditioo Hydraulic Analysis • HEC2 models • Water Surface Profiles • Cross Sections 3. Floodplain Delineatioo 4. FEMA Forms [ I [ t [ Morrison Hydrology Engineering, Inc. Page-2 Introduction Purpose The purpose of this study is to determine the 100-year floodplain delineation and elevation. This requires a detailed study of the site to determine the existing conditim floodplain; available data was used from the city 2-foot topographic maps to establish geometry and on site inspection was used to establish physical parameters. This report is intended to be submitted to the City and to the Federal Emergency Management Agency {FEMA) for approval as a Letter of Map Revision. Area Description The upper watershed of Lick Creek is largely undeveloped with natural vegetation (trees, brush and natural grasses). The area is relatively flat with generally less than a 1 % slope. The soils are generally clay and silt-clay. The annual rainfall in Brazos County is 39.1 inches. The general area is shown in figure l and the project area in figure 2. FEMA Information The Graham Road School Site is located in an area of the FEMA map that has no floodplain shown . The area has not been previously studied by FEMA so there is no FEMA data available. The location of the site and resulting floodplain is shown in figure 3. Hydrologic Analysis This study was completed using the Corps of Engineers Heel Computer Methodology. The U.S. Army Corps of Engineers HECl computer program is the most widely accepted method of computing nmoff hydrographs for complex stream systems. The irogram can be used for the design of detention basins, drainage channels, c:r other drainage structures. The program also has the capability of analyzing reservoirs and performing optimiz.ation and other specialized fimctims. The most commonly used features of the HECl computer program are as follows: 1. 2. 3. 4. 5. 6. Computing a complete rainfull distribution for storms ranging from S minutes. To 10 days in duration. Performing infiltratioo loss computatims using any of several methods, including the capability of considering the impervious cover within the watershed. Generating a complete mit hydrograph for the watershed Using the computed rainfall excess and unit hydrograph to determine a complete nmoff hydrograph for the watershed Routing the computed hydrograph downstream through a stream channel to evaluate the effects of travel time and tempaary storage of the hydrograph Combining hydrographs from different watersheds HECI models a single rainfall event, ~ contrast to progiams, which can model lmg series (up to several ~~)of precipitation and nmoff continuously. As such, HECl seeks to convert the precipitaticn, which is mput by the user into a time history of the nmotf. e.g. a bydrograpll. The conversioo is accomplished by modeling to a greater <r lcs.ser degree each of the major processes of the sur&ce portion of the hydrologic cycle. 1800 1500 1200 " CJ) ~ u v 900 3 0 .... ~ 600 300 Morrison Hydrology Engineerl11g, Im:. Page-3 . The National Oceanic and Atmospheric Administraticn (NOAA) Technical Paper 40 and HYDRO 35 were used to determine the rain£ill intensity data shown below, which was used for the HECI raintall intensity data: HYDRO 35 data: FREQ. 5 MIN 15 MIN 60 MIN 2 YR 0.53 1.15 2.2 100 YR 0.89 1.95 4.25 TP 40 data and conversions from HYDRO 3S for up to 60 minutes. TP-40 VALUES Freq. 5min lSmin lHR 2HR 3HR 6HR 12HR 24HR 1 YR 2.1 2.3 2.7 3.1 3.S 2YR O.S3 1.15 2.2 2.6 2.8 3.3 3.8 4.5 5YR 0.60 1.32 2.66 3.3S 3.7 4.4 5.2 6.1 tOYR 0.66 1.45 3.0 3.9 4.3 5.2 6.2 7.2 25YR 0.1S 1.64 3.5 4.6 5.1 6.2 1.5 8.8 SOYR 0.82 1.80 3.9 S.2 S.6 7 8.4 9.8 lOOYR 0.89 l.9S 4.25 S.6 6.3 7.4 9.S 11 SOO YR•0.96 2.10 4.63 6 7 7.8 10.6 12.2 • Estimated by linear interpolaticn A watershed map is included in appendix 1. The Soil Conservation Service Curve Number was determined using land use and soil type for existing conditions. The time of concentratioo was · determined using the Soil Conservatioo Service Technical Report No. SS method for small watersheds. Calculations for these are included in appendix 1. The flow was routed through the channel portion of the watershed mly. . The result showed the following Hydrograph: CITY OF' Coll999 Station Texas GRAHAM ROAD INTERMEDIATE SCHOCL EXISTING CONDITION Morrisoll Hydrology Englneerlng,Inc. Pagt-1 Hydraulic Analysis The hydraulic analysis for this rep<rt is based on the Ccrps of Engineers HEC2 Computer Model. The HEC2 program is intended for calculating water surface profiles for steady gradually varied flow in natural or man made channels. Both subcritical and superaitical flow profiles can be calculated. The effects of various obstructions such as bridges, culverts, weirs, and structures in the floodplain may be considered in the computatims. The computational sroce<ture is based on the solutioo of the one dimensional energy equatim with energy loss due to friction evaluated with Manning's equatioo. Using city topographic maps, aoss sections were determined and input into the HEC2 model. The resulting floodplain for the existing conditions HEC2 models arc discussed below. Existing Condition This study determined the floodplains for the upper reach of Lick Creek. The roughness value determined for this stream was based on site observation . The stream has significant tmdcrbrush and would result in a .OS roughness value. The ov~ have less brush. but higher grass, so the same value was used. A tabulation of the resulting floodplain data is shown below: Summary Table 1 Summary of 100-year Flood Elevations and Data Cross Section Number 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000 9.000 10.000 100-Year Flood Elev. Ft 285.41 286.19 286.87 287.22 287.62 288.01 288.52 288.89 288.99 289 .17 Discharge CFS 1425.00 1425.00 1425.00 1425.00 1425.00 1425 .00 1425.00 1425.00 1425 .00 1425.00 Floodplain width 143.91 164.08 171.35 218.97 154.93 193.78 147.35 217.46 170 .38 121.01. This report has determined the I 00-year flood elevation for the area shown and may be submitted to FEMA for approval as a Letter of Map Revision . I I Figure 1 General Location Map Brazos • 2 4 • NO SCALE Figure 2 Project Location Map I I I ~· i i ~ I ·-I ' ·1 I i • Brarns County Ur.incorporated Areas 481195 ZONE X ' ' C} 0-o-<-City of College Stati <- <9~ 480083 ~o C'o< \S'~(<'; 7' ~)'; ~o C'on, v-i-~ ,,.. ' I • SCS TR55 METHOD TO COMPUTE TIME OF CONCENTRENTRATION (ad/l#tff bNed on experience end englnffrlng fudgementJ PROJECT Graham Road Intermediate School -lOGATION College Station, Texas DATE 2198 COND. Existing Condition BY: R. MORRISON WSHED NAME 1 SHEET FLOW: N VALUE (SEE BELOV\ 0.23199 n value Conc.,grawel,asphalt,bare sou Grass Short Prairie Grass dense Grass bermuda Woods Light Underbrush woods Dense underbrush n value% Land use 0.011 0 0.15 0 0.024 0 0.41 0 0.4 0 0 .08 0 based on information for Imperviousness from Corps of Engineers Land Use % Cone % Grass n value % land use Low D. Residential 25 75 0.21275 13.5 Med . D. Residential 41 59 0.16971 0 High D. Residential 47 53 0 .15357 O Multifamily 70 30 0.0917 0 Mobile Hom me Park 20 80 0.2262 0 C.B.D. 95 5 0.024-45 0 Strip Commercial 90 1 O 0.0379 O Shopping Center 95 .5 0.024-45 O lnstutional-Schools 40 60 0.1724 O Industrial 90 1 O 0.0379 O Highway ROW 35 65 0.18585 1.5 Public Utilities 60 40 0.1186 O Vacant urban land and 6 84 0.23586 85 Parks Other 0 0 0 0 INCN 0 0 0 0 0 0 INCN 0.028721 0 0 0 0 0 0 0 0 0 0.002788 0 0.200481 0 TOTNVAl..UE TOTAL 100 0.23199 LENGTH 2 YR 24 HOUR PRECIF SLOPE SHALLOW CONCENTRATED FLOW 300 FT. 4.5 IN . 0.007 FT/FT 1=PAVED 2=UNPAVEC 2 LENGTH 3000 FT MAX300' FROM TP40 0.006667 SLOPE 0.019 FT/FT 0.018667 COMPUTED VELOCITY FROM FIGURE 3.1= 2.220281 CHAN NEL FLOW XSEC T AREA WETTED PERIMETER SLOPE MANNINGS N COMPUTED VELOCITY LENGTH 435 SQ FT 130.6244 FT 0.0075 FT/FT 0.05 4000 FT TOPWIDTH BOTTOM DEPTH 0.0075 5.755384 130 15 6 SUM MARY: AcljlJIUld scs Melhod Seleded WATERSHED NUMBER Tc(H,.) Tc(Hra) Tc(Hra) SHEET FLOW 15 Min Max 0.25 0.715361 0.25 SHALLOW FLOW 2 fps Min 0.416667 0.375328 0.38 CHANNEL FLOW 0.193056 0.193056 0.2 Total 0.859723 1.28374-4 0.83 I I I f I BY: RONAlDW. MORRISON, P.E. .----DATE: 2198 PROJECT Grahmn Road Intermediate School a.JENT: Waterllled: Eldltlng(E), PropOMd School (PS), Fully Dev.loped School Sit. (FS), Fully Oneloped School Plus S~ Development (K~) Chealhlln ins Associate& ' Mlngtoo, T81CBS CURVE NUMBER CALCULATION SOILA SOILS SOILC SOILO PAVED LAKE CURVE NO 39 61 74 80 98 100 ESTIMATED COMPARISON AVERAGE BASIN TOT AREA PERCENT AREA SOIL OVERALL RUNOFF NAME ACRES SOILA SOILB SOILC SOILO LAKE CN CN COEFF . E 365 0 0 0 100 0 80 81.4994 0.33675 PS 365 0 0 0 100 0 80 82.8854 0.38075 FS 365 0 0 0 100 0 80 87.5474 0.52875 FSS 365 0 0 0 100 0 80 87.7958 0.54075 LANO USE IMPERVIOUSNESS PERCENTAGE CALCUlATION l»IOUSE %1MPERV. CLANOUSE %1MPERV. c SINGLE FAMILY 1 1/4ACRE 38 0.5 COMM. & BUSINESS 85 0.8 SINGLE FAMILY 2 1/3ACRE 30 0.5 INOUSTRIAL 72 0.7 SINGLE FAMILY 3 1/2ACRE 25 0.5 OPEN SPACE 2 0.3 SINGLE FAMILY 4 1 ACRE 20 0.35 LAKES ROADS 100 0.95 J.fJL Tl FAMILY 1/8ACRE 65 0.75 BASIN TOT AREA PERCENT AREA ROADS& COMB NAME (sq. mi.) SF1 SF2 SF3 SF4 MF C&B IND OS LAKEIMPERV E 365 13.5 0 0 0 0 0 0 85 1.5 8.33 PS 365 13.5 0 0 0 0 0 11 74 1.5 16.03 FS 365 13.5 0 0 0 0 0 48 37 1.5 41 .93 FSS 36!5 13.5 0 6 0 0 0 48 31 1.5 43.31 ... IIISTIIG COIDITIOHS 100 Ylli ttttttttttttttttttttttttttttttttttttttttt ttttttttttttttttttttttttttttttttttttttt t t t t t FLOOD BYDiOGRAPB PACIAGI IBIC-11 t t U.S. Al.JI! COiPS OF-iHGIHBBi t t MAY 1991 t t BYDROLOGIC llGillBRIIG CEHT t t VUSIOH 4.0.11 t 609 SICOID STillT t t Lahey F77L-EM/32 version 5.01 t t t DAVIS, CALIFORIIA 95616 t t Dodson ' Associates, Inc. t t 1916) 551-1748 t RUI DAT! t 03/01/98 TIMI 18:27:'2 t t ttttttttttttttttttttttttttttttttttttttttt ttttttttttttttttttttttttttttt~ttttttttt I I IllllII I I I I I I WIIII WI I I I I I I I I llIIW III II I I I I I I I IIW I II I IIIII I I I III THIS PROGRAM RIPLACIS ALL PllVIOUS VliSIOIS OF HIC-1 IiOii AS BICl (JAi 73), HIClGS, HIClDB, AID BBClIW. THI DIFIIITIOHS OP VAiIABLIS -RTIMP-lHll -iTIOR-RAVI CBAIGED FROM THOSE USED WITH THI 1973-STYLI IHPUT STRUCTURE TBB DIFIIITIOH OF -AMSII-01 RM-CARD WAS CllliGID VITH iBVISIOHS DATID 28 SIP 81. THIS IS THI FOiTRAH77 VIRSIOI IEi OPTIONS: DAMBllAI OUTFLOW SUBMERGllCI L SIHGLI IVINT DAMAGE CALCULATIOl,UDSS:IRITI STAGE FRIQUIRCY, DSS:RIAD TIMI SIRIIS lT DISIRID CALCULATI01 IITIRVAL LOSS RATl:Gllll AID A11PT IIPILTRATIOI IIIBMATIC WAVI: llV PIIITI DIPPIRilCI ALGOilTBX . ' :... ~ BIISTIBG COIDITIOIS 100 YIAl RIC ·l IIPIJl LIRE ID ....... 1 ....... 2 .---::-: ... 3 ....... 4 ....... 5 ....... 6 ....... 7 .....•. 8. ~ ..... 9 ...... 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 · 20 21 CITY OP College Station Texas GlABAM iOAD IRTBiMBDIATB SCHOOL BIISTIHG COIDITIOR ID ID ID ID t KOiiISOB HYDiOLOGY BRGIBIBiIBG 100 YBAi PILl:CSTlTIOI ===========================================•=================•====== ==================================================================== t t IT IO 10 5 0 0 145 II lllll IK HYDiOGlAPH FiOK llBAl 0 0 0 IO 0 t BlSIB lUl t 365 acres BA .5703 * III.LOSS SCS CH t ::::::s: ====== LS 0 81.5 t LAG CP 640 t === ====== us .s 0.72 t lAIRFlLL DATA t 2 Ylll * PH 50 0 .53 1.15 t 10 Ylli t PH 10 0 .66 1.45 t 25 Ylli * PR 4 0 . 75 1.64 t 50 Ylli * PH 2 0 .82 1.8 t 100 YIAl PR 1 0 .89 1.95 t 500 !Ill * PH .2 0 .96 2.1 t II iOUT 21 1 2 .2 2.6 3.0 3.9 3.0 4.6 3.87 S.l 4 .25 5.6 4.63 6 IK iOUTI RYDiOGlAPHTllU Wll IO 0 0 0 0 21 1 * ClllBDL iOtrrlBG USIIG RODAL DIPTR STOUGI iS 1 STOi -1 2.8 3 .3 4.3 5.2 5.1 6.2 5.6 7 6.3 7.4 7 7.8 * !LOB ICH liOB ILCH SLOPI iC .OS .05 .05 4000 .0075 * 11 12 LOB TOB TOI iOB 17 18 ii 792 944 983 995 1005 1020 1038 1070 iY 292 288 286 283 283 286 288 292 u 3.8 6 .2 7.5 8 .4 9.5 10.6 4.5 7.2 8.8 9.8 11 12 .2 PAGE l .: IIISTIRG CORDITIOIS 100 YEAR ttttttttttttttttttttttttttttttttttttttttt ttttttttttttttttttttttttttttttttttttttt FLOOD HYDROGllPB PACIAGI IHIC-1) t MAY 1991 t VIRSIOI 4.0.11 t t Lahey F77L-IM/32 version 5.01 Dodson ' Associates, Inc. * t RUI DATI 03/01/98 TIKI 18:27:42 t t ttttttttttttttttttttttttttttttttttttttttt ttttttttttttttttttttttttttttttttttttttt CITY OF College Station Texas GRAlllJI ROAD IITiRMIDIATI SCHOOL IIISTIIG COIDITIOI MORRISOR HYDROLOGY llGilliRIIG 100 YIAR FILl:CSTATIOI 6 IO OUTPUT COITROL VARilBLIS IT ', IPRIT 5 PRllT CORTROL !PLOT 0 PLOT COITROL QSCAL 0. HYDROGllPB PLOT SCALB BYDROGllPH TIMB DATA IMII 10 IDATI 1 0 ITIMI 0000 10 145 IDDATK 2 0 RDTIMI 0000 ICllT 19 COMPUTlTIOI IITllVAL TOTAL TIMI BlSi MllUTIS II COMPUTATIOI IRTIRVAL STARTIIG DATI STARTIIG TIMI IUMB!i or HYDROGllPH ORDIIATBS BIDIIG DATE BIDIRG TIMI CllTUiY WI 0.17 HOURS 24.00 HOURS llGLISH UIITS DlAillGi Wl PRBCIPITlTIOI DIPTB LllGTB, ILIVlTIOI ·FLOI STOUGI VOLUMI SURFACE AUA TiMPUATUU SOUAU MIL!S IICHBS FllT CUBIC PBIT PIR SICOID lCRl·FllT ACilS DBGUIS FAHRllBIIT t * U.S. AlMY CORPS OF BRGIHIBR * HYDROLOGIC BIGIRBIRIIG CIHT * 609 SECORD STiiiT DAVIS, CALIFORIIA 95616 t 19161 551-1748 t *** ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt *** ttt ttt ttt ttt ttt ttt ttt ttt *** ttt ttt ttt *** *** ttt *** ttt ttt ttt tttttttttttttt t t 7 II t ARi!l t t t tttttttttttttt 9 IO OUTPUT COITROL VARIABLES IPilT 5 PlIIT COITROL !PLOT 0 PLOT COITROL OSCAL 0. HYDlOGllPll PLOT SCALI IPICH 0 PUICll COMPUTED BYDROGRAPH IOUT 21 SAVI HYDROGllPH 01 THIS UIIT ISlVl 1 PliST ORDIIATI PUICHID OR SAVED ISAV2 145 LAST ORDIIATI PUICHBD OR SAVID TIMIIT 0.167 TIMI IITIRVAL II HOURS ... I IIISTIBG COiDITIOIS 100 Ylll ttt ttt ttt ttt -ttt ttt ttj __t tt ttJ_ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt ttt tttttttttttttt t t 14 II * lOUT * t t tttttttttttttt 16 IO OUTPUT COITlOL VAiIABLIS IPlHT 5 PiIRT CORTiOL !PLOT 0 PLOT CORTiOL QSCAL 0. RYDiOGiAPH PLOT SCALI IPRCH 0 PURCH COMPUTED HYDiOGllAPH !OUT 21 SAVI HYDiOGllPH OB THIS UIIT ISAVl l FliST OiDIRATI PUHCHID Oi SAVED ISAV2 145 LAST OiDIIATI PUHCRID Oi SlVID TIMIBT 0.167 TIMI IiTliVAL IR ROUlS 4 . • ~ ·j ~ -. ' ., OPlilTIOI STlTIOI BYDiOGilPB AT lilll iOUTID TO iOUT ttt IOi.MlL llD or lllC-1 *** IIISTIIG COIDITIOIS 100 Ylli iUIOrr SUMMliY JLOI II CUBIC JllT Pli S!COID TIMI II BOUiS, ~11-Il-SQUli!-Mih!S Pill TIMI or AV!ilGI PLOI POi MlIIMUM PliIOD PLOW Pill 6-BOUi. 2!-BOUi 72-BOUi 1557. 12.67 405. 132. 132. 1425. 12.83 404. 131. 131. BASii MAIIMUM TIMI or Aill STAGE MAI STAG! 0.57 0.57 288.56 12.83 I I --1- I I I I I I I· EIISTIHG COliDITIOH 100 YEAR tttttttttttttttttttttttttttttttttttttttttttt ttttttttttttttttttttttttttttttttttttttt t HEC-2 WATER SURFACE PROFILES t t t * Version t t t 4.6.2; May 1991 t t t t * RUN DATE OlMAi98 TIME 19:30:26 t t tttttttttttJtttttttttttttttttttttttttttttttt ttttttttttttttttttttttttttttttttttttttt I I IIIIIII I I I I I I IIIIIII IIII I I I I I I I I IIIIIII llIII ' I I I I I I I III II II III III II I I I II III I I II II III t U.S. AiMY_!ORP~ OF ENGINEERS t HYDROLOGIC ERGIIEERIHG CEHTE t 609 SECOND STREET, SUITE D t DAVIS, CALIFORNIA 95616-4687 t (916) 756-1104 I ,-IIISTIRG CORDITIOR 100 till ,. 01Mll98 19:30:26 PlGI 1 f THIS lUI IIICtJTID 01Mll98 19:30:26 ttttttttttttttttttttttttttttttttttttt f HIC-2 llTll SUi.FlCI PlOFILIS Version 4.6.2· M'af 1991 · tttttttttttttttt,tttt ttttttttttttttt I Tl COLLIGI STATIOI IIISTIIG CORDITIOI LICI ClllI T2 GRARAM ROAD IITllJllDilTI SCHOOL Tl 100 YBll FIL!: CSTlT I Jl ICHICI IIQ -IIIV IDil STlT MITiIC BVIIS Q ISIL PO 0 2 0 0 .0075 0 0 0 288 I J2 IPiOP I PLOT PlnS IS BCV ISICH Pl AL LDC IBI CHHIM ITUCI -1 0 -1 I J3 VllllBLI CODIS POl SUMXllY PlIITOUT 38 1 u 42 4 53 54 26 I ie 1 1425 .OS .05 .05 .1 .3 I1 1 H 945 1100 Gi 290 572 288 643 286 754 287.1 819 286 945 I Gl 282 984 281 1000 282 1008 283.3 1042 284 1082 Gil 286 1100 288 1181 289.2 1260 290 1377 I1 2 12 906 1055 140 111 135 Gil 290 615 289.1 687 288 792 286 906 284 929 I Gl 282 991 281 1000 282 1010 284 lOH 286 1055 Gi 288 1098 290 1235 I1 3 12 958 1094 129 146 180 I Gl 290 773 289.1 863 288 938 286 958 284 975 Gil 282 991 281 1000 282 1009 284 1014 286 1094 Gl 288 1155 290 1384 I1 4 13 931 1045 42 105 75 I Gil 290 754 289 .9 798 288 915 286 931 284 971 GR 282 994 281 1000 282 1007 284 1012 286 1045 GR 286.7 1103 288 1197 290 1290 I I1 5 12 969 1073 126 55 128 GR 290 879 289 956 286 969 284 980 282 993 Gil 281 1000 282 1004 284 1008 284.4 lOH 286 1073 GR 288 1123 290 1255 I -I I I I I 01MAi98 19:30:26 ,. Il 6 12 Gi 290 817 GR 281 1000 I Gi 288 1098 X1 7 10 Gi 290 . 808 Gi 283 1000 I I1 8 12 Gi 292 798 GR 284 988 I GR 290 1140 Il 9 12 GR 292 808 Gi 286 968 I Gi 288 1025 Il 10 11 GR 292 792 I Gi 283 1000 Gi 292 1070 I I I I I I I -· I I I I 932 288 282 290 953 289.5 284 928 290 283 291.4 968 290 284 290 983 290 284 1023 . 906 1002 1184 1049 870 1005 1053 898 1000 1219 1018 860 990 1055 1020 90·9 1011 IIISTIIG COIDITIOI 100 Ylli , 166 75 286 932 284 1012 181 108 288 9U 286 1049 126 122 288 914 284 1006 80 96 288 879 283 1000 . 110 149 288 9U 286 1020 PlGB 2 -Ul 284 981 282 993 286 1023 288 1043 182 286 953 28' 990 288 1055 290 1088 139 286 928 285.5 956 286 1053 288 1112 115 286 900 285.7 939 284 1005 286 1018 143 286 983 284 990 288 1038 290 1049 I BIISTIIG CORDITIOI 100 Till ' Ollli98 19:3G:26 PAGB 3 - ' · SICKO DEPTH CllSIL CR.IVS llSiLI EG HY BL OLOSS L·BAII BLBV ~IM! iLOB ~CH ~ROB ALOB lCB AROB VOL TVA l·BARI IL!V LOB CB iOB IllL llCB Iii iTI BLMI!l SSTA SLOP! I LO BL ILCH ILOBl ITUAL IDC !COIT cow TOPllID !IDST I *PlOF 1 CCBV= .100 CIHV= .300 I *SICIO 1. 000 1.000 4.41 285 .41 .00 288 .00 285. 71 .30 .00 .00 286.00 1425. 0 .0 1425.0 .0 .0 323.5 .0 .0 .0 286.00 .00 .00 4.41 .00 .000 .050 .000 .000 281.00 950.77 I • 007487 o. 0. 0. 0 0 5 .00 143.91 1094.68 *SICIO 2.000 I 3302 llAllIIG: COIVIYAIC! CHAiGI OUTSIDI or lCC!PTABLI lAIGI, IllTIO = l.49 2.000 5.19 286 .19 .00 .00 286.38 .18 .65 .01 286 .00 1425.0 .4 1424.5 .1 1.1 416.1 .4 1.1 .5 286.00 I .01 .36 3.42 .36 .050 .050 .050 .000 281. 00 895.05 .003385 140. 135. 111. 2 0 0 .00 164.08 1059.13 *SIC!lO 3.000 ~ 3.000 5.87 286 .87 .00 .00 287 .11 .23 .72 .02 , 286.00 1425.0 4.5 1406.8 13 . 7 3.8 359.7 11.6 2.8 1.1 286.00 .02 1.18 3 .91 1.18 .050 .050 .050 .000 281.00 949.27 . 00(769 129. 180. 146. 2 0 0 .00 171.35 1120.62 I *SICllO 4.000 4.000 6 .22 287.22 .00 .00 287.42 .21 .31 .00 286.00 1425 .0 7.5 1329. 9 87.6 5.9 . 354.0 59.8 3.5 1.5 286.00 I .03 1.26 3. 76 1.47 .050 .050 .050 .000 281.00 921.28 .003556 42. 75. 105. 2 0 0 .00 218.97 1140 .25 ' *S!CllO 5.000 5.000 6.62 287.62 .00 .00 287 .82 .21 .40 .00 286.00 1425.0 11.8 1367.5 45.7 8.5 367 .6 32.7 4.6 2.0 286.00 .04 1.39 3.72 1.40 .050 .050 .050 .000 281.00 958.0 .002947 126. 128. 55 . 2 0 0 .00 154.93 1113 .42 I *SIC!iO 6.000 6.000 7.01 288.01 .00 .oo 288 .23 .22 .40 .00 286.00 I 1425. 0 42.4 1350.0 32.7 26.5 350.4 21.5 5.9 2.4 286.00 .OS 1.60 3.85 1.52 .050 .050 .050 .000 281.00 905.09 .002822 166. 141. 75 . l 0 0 .00 193.78 1098.88 I I I " I I r I I l I I I I I I ,. I I f r Olllllif SB(]J ~IK! SLOE! *SECRO 7.GU 7 .COi 1425J .06 .002790 *SECIO 8. 000 3302 lillIJG: 8.000 1425.0 .08 • 001062 *SECIO 9.000 9.000 U25.0 .09 .001732 *SECHO 10.000 3302 URIIIG: 10.000 U25.0 .10 .003996 BIISTIIG COIDITIOI 100 !Ill 19:30:26 PAGE 4 ~!PTH CWSEL CRillS WSBLI BG RV -BL-OLOSS L~BAII BLEV ~OB ~CH ~ROB ALOB ACH AROB VOL TIA R·BAII BLBV OB CH ROB IRL IRCH IIR 1111 BLllII SSTA ILOBL ILCH ILOBR ITlIAL IDC I CORT COlli TO PW ID BIDST 5.52 288 .52 . .00 .00 288. 74 .21 .51 .00 286.00 41. 7 1363. 6 19.7 24. 7 360.7 11.4 7.5 3.1 286.00 1.69 3.78 1. 73 .050 .050 .050 .000 283.00 916.27 181. 182. 108. 2 0 0 .00 14 7 .35 1063.62 CORVEYAICE CHARGE OUTSIDE OP ACCEPTABLE iAIGi, IllTIO = 1.62 5.89 288.89 .00 .00 288.97 .08 .22 .01 286.00 40.5 1217 .2 167.3 29.5 499.6 116. 7 ' g .2 3.6 286.00 1.37 2.44 1.43 .050 .050 .050 .000 283.00 906.92 126 • 139. 122. 0 0 0 .00 217.46 1124.38 5.99 288.99 .00 .00 289.13 .13 .u .02 286.00 653.3 739.3 32.4 260.5 222.2 21.4 10.S 4.1 286.00 2.51 3.33 1.52 .050 .050 .050 .000 283.00 869.55 80. 115. 96. 2 0 0 .00 170 .38 1039 .92 CORViYAICB CllliGB OUTSIDE OP lCCiPTABLi RAIGB, IllTIO = .66 6.17 289.17 .01 .00 289 .53 .37 .33 .07 286.00 283.0 1014. 2 127.8 96.9 185.9 42 .9 11.8 4.5 286.00 2.92 -5.45 2 .98 .050 .050 .050 .000 283.00 923.45 110. 143. 149. 1 0 0 .o~ 121.01 1044.46 I BIISTIIG COIDITIOI 100 !Ill i 01Mli98 19:30:26 PAGB 5 1· THIS RUH BIICUTBD 01MA198 19:30:26 ttttttttttttttttttttttttttttttttttttt HIC-2 IATll SUlFACi PlOFILIS I version 4.6.2· Mar 1991 tttttttttttttttt,tttt ttttttttttttttt i IOTI-ASTllISI (*) AT LEFT OF ClOSS-SICTIOH IUMBBl IIDICATIS MESSAGE II SUMMAlY OF lllOlS LIST i 100 YIAl SUMMllY PlIITOUT I SICIO CISBL Q ILXII TOPWID SSTA BIDST VCR 1.000 285.41 1425.00 281.00 143.91 950.77 1094.68 4.41 I t 2.000 286 .19 1425. 00 281.00 164.08 895.05 1059 .13 3 .42 3.000 286.87 1425.00 281.00 171.35 949 .27 1120. 62 3 .91 4.000 287 .22 1425.00 281.00 218.97 921.28 1140.25 3.76 I 5.000 287.62 1425.00 281. 00 154.93 958.49 1113.42 3. 72 6.000 288.01 1425.00 281.00 193. 78 905.09 1098 .88 3.85 I 7.000 288.52 1425.00 283.00 147.35 916 .27 1063. 62 3. 78 t 8.000 288.89 1425.00 283.00 217.46 906.92 1124.38 2.44 I 9.000 288.99 1425 .00 283.00 170.38 869.55 1039.92 3.33 t 10.00~ 289 .17 1425.00 283.00 121.01 923.45 1044 .46 5.45 I I I I I I r I I . ,_ ,. I. ,. I I I I I ' I IIISTIIG COIDITIOI 100 YIAl 01MA198 19:30:26 SOMMAlY or lllOlS ARD SPECIAL IOTIS If WIBG SICRO= If WIJlG SICIO: If WIIG SICiO= 2.000 PlOFILI= 1 COIVIYARCE CRAIG! OUTSIDE ACCEPTABLE lliGI 8.000 PlOFILI= 1 COIVIYAICI CH!IGI OUTSIDE ACCIPTABLI i!IGB 10.000 PlOFILI= 1 COIVIY!ICE CB!IGI OUTSIDE ACCIPTlBLI i!IG! PAGI 6 WATER DISTRIBtlTICJN SYSTEM ANALYSIS --- WESTFIELD ADDITION PHASE ONE COLLEGE STATION, BRAZOS COUNTY, TEXAS MARCH, 1999 Submitted By: Michael G. Hester, P.E. Hester Engineering company _ 7607 Eastmark Drive, suite 253-B College station, TX 77840 C409) 693-1100 fX:C409)693-107 5 .... :: WATER DISTRIBUTION SYSTEM ANALYSIS WESTFIELD ADDITION, PHASE ONE BRAZOS COUNTY, COLLEGE STATION, TX MARCH, 1999 INTRODUCTION: The proposed site is located along the south side of Graham Road between Victoria Drive and Schaffer Road. The legal description is Westfield Addition, Phase One, Robert Stevenson Survey A-54. The proposed improvements include pavement, drainage and utility improvements for 58 single family residential homes . The site consists of grassland with numerous oak trees. The terrain slopes in a southerly direction toward the south fork of Lick Creek at approximately 1 percent. The site is zoned residential and is being developed by Mr. John Szabunicwicz, Westfield Addition, Ltd. 1004 Shady Drive, College Station, TX 77840, 409.694.8925. The proposed water system will connect to an existing 12" waterline along Graham Road. The subdivision was modeled using the Haestead Methods "Cybernet" program and scenarios were prepared placing fire flow demands at each proposed fire hydrants. The maximum daily demand generated by the dwelling units was added to the fire flow demand. The results of the analysis has been included in this report . WESTFIELD ADDITION, PHASE ONE· WATER SYSTEM ANALYSIS· PAGE 1OF2 PAGES ANALYSIS: -PVC water line pipe with a roughness coefficient of 150 -Fire flows of 750 gpm -6" minimum waterline size -Maximum water line velocities during a fire flow simulation were held at 12 feet per second. -Minimum residual pressures at 20 p.s.i. MAXIMUM DAILY FLOW CALCULATIONS: (1 D.U.)*(2.7 PEOPLE/D.U.)*(100 GPCD)*(l DAY/1440 MIN.)= 0.18 GPM Maximum daily flow for a section of waterline = 0.18 gpm times the number of lots. CONCLUSION In conclusion the proposed system can provide a f ireflow demand of 750 gpm at each fire hydrant with velocities remaining below 12 feet/second and residual pressures greater than 20 psi. WESTFIELD ADDITION, PHASE ONE· WATER SYSTEM ANALYSIS· PAGE 2 OF 2 PAGES 51 X-fl~ HYDRANf Sf A11C PRl::55U~ = 91 P51 NO. Q-0?9 fl?Ol.O 400' 120' Wf5ff lf~t7 At7t7~11~0N PHASi:: ON!:: WAfeR t715fRIBU110N 5Y5feM ANAL-Y515 COlll::ul:: 5f A110N, BRAZOS COUNIY, 1f XA5 MAJ<CH I ? I 1999 SCAL-1::: Nf 5 PRt;P ARl::t? BY: Hl::51fR l::NCilNl::l::RINu COMP ANY 1601 l::A5fMARK t/RIW, 5Ul-rf 2??-B COlll::Cil:: 5f A110N, IX 71840 409.69?.llOO fX:409.69?.107? !::MAil: Hl::C2001 @AOl .COM 440' fH :f:t:? fl291.? 6 I ''ff!:: fl,290.6 J60 10 ..!70 > J -..., ..... : l) \ ~-i )., : < i ) ~ ·1 { j ( . l ~ j J i f I .) , ;, _,,i !: / ' . 0 -~J :~. \}· o.; ::·. 1' ,.. ' ' ...~~'-\ \ ( ."\ .................. ' / j ·" .··, ' ,, ., I i -~) : .. i ! _.. j· t ' /' ************************************************ SUMMARY 0 F 0 R I G I N A L DAT A ************************************************ CyberNet Version 2.18. Copyright 1991,92 Haestad Methods Inc. Run Description: Basic Network Drawing: WESTFIEL p I p E L I N E DAT A STATUS CODE: xx -CLOSED PIPE BN -BOUNDARY NODE PU -PUMP CV -CHECK VALVE RV -REGULATING VALVE LINE PIPE NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS NUMBER #1 #2 (ft) (in) COEFF. COEFF. BND-HGL (ft) ------------------------------------------------------------------------------- 10-BN 0 10 20 10 20 30 20 30 40 30 40 50 40 50 60 50 60 70 60 70 J U N C T I 0 N N 0 D E JUNCTION NUMBER 10-1 20-1 30-1 40-1 50-1 60-1 70-1 JUNCTION TITLE 12"X6"TEE AT FH #1 6 11 TEE AT HA FH#2 FH#3 TEE AT FLOWE FH#4 400.0 240.0 395.0 125.0 440.0 60.0 445.0 DAT A EXTERNAL DEMAND (gpm) 0.00 1.44 3.96 2.52 7.38 7.74 750.00 12.0 150.00 2.00 6.0 150.00 2.00 6.0 150.00 0.30 6.0 150.00 0.50 6.0 150.00 0.30 6.0 150.00 0.30 6.0 150.00 0.50 JUNCTION ELEVATION CONNECTING PIPES (ft) 302.50 10 20 303.50 20 30 299.50 30 40 297.50 40 50 291. 50 50 60 290.60 60 70 287.50 70 511.21 +-----------------------------------------------+ ~MAXIMUM DIMENSIONS Number of pipes ....... ....... .. . .. . .. 25 Number of pumps . . . . . . . . . . . . . . . . . . . . . . 10 Number junction nodes................. 25 Flow meters . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Boundary nodes ..... .. . . ..... .. . . . . ... 10 Variable storage tanks . ....... .. .. . .. 10 Pressure switches . . . . . . . . . . . . . . . . . . . . 10 Regulating Valves..................... 10 Items for limited output ... . . .. . .. . .. 25 limit for non-consecutive numbering .. 270 +-----------------------------------------------+ Cybernet version 2.18. SN: 1132184437-25 Extended Description: U N I T S S P E C I F I E D FLOWRATE ............ =gallons/minute HEAD (HGL) . . . . . . . . . . = feet PRESSURE ............ = psig 0 U T P U T 0 P T I 0 N DAT A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT s y s T E M c 0 N F I GU RA T I 0 N NUMBER OF PIPES ................... (p) = 7 NUMBER OF JUNCTION NODES .......... ( j ) 7 NUMBER OF PRIMARY LOOPS ........... ( 1) 0 NUMBER OF BOUNDARY NODES .......... ( f) = 1 NUMBER OF SUPPLY ZONES ....•....•.. ( z) = 1 ************************************* S ~ M U L A T I 0 N R E S U L T S ************************************* The results are obtained after 2 trials with an accuracy= 0.00000 S I M U L A T I 0 N D E S C R I P T I 0 N CyberNet Version 2.18. Copyright 1991,92 Haestad Methods Inc. Run Description: Basic Network Drawing: WESTFIEL P I P E L I N E R E S U L T S STATUS CODE: PIPE NUMBER 10-BN 20 30 ~o 50 60 70 J U N C T JUNCTION NUMBER I XX -CLOSED PIPE CV -CHECK VALVE BN -BOUNDARY NODE RV -REGULATING VALVE NODE NOS. FLOWRATE HEAD LOSS (ft) PUMP HEAD (ft) #1 #2 (gpm) 0 10 773.04 0.48 0.00 10 20 773.04 8.48 0.00 20 30 771. 60 13.90 0.00 30 40 767.64 4.36 0.00 40 50 765 .12 15.25 0.00 50 60 757.74 2.04 0.00 60 70 750.00 14.86 0.00 0 N N 0 D E R E s U L T S JUNCTION EXTERNAL HYDRAULIC JUNCTION TITLE DEMAND GRADE ELEVATION (gpm) (ft) (ft) PU -PUMP LINE TK -STORAGE TANK MINOR LOSS (ft) 0.15 2.39 0.36 0.59 0.35 0.34 0.56 LINE VELO. (ft/s) 2.19 8 .77 8 .75 8.71 8 .68 8.60 8.51 PRESSURE HEAD (ft) HL/ 1000 (ft/ft) 1.21 35.32 35.20 34.86 34.65 34.03 33.39 JUNCTION PRESSURE (psi) ------------------------------------------------------------------------------ 10-1 12 11 X6 11 TEE AT 0.00 510.58 3 0 2.50 208.08 20-1 FH #1 1.44 499.71 3 0 3 .50 196.21 30-1 6" TEE AT HA 3.96 485.45 299.50 185.95 40-1 FH#2 2.52 480.51 297.50 183.01 50-1 FH#3 7.38 464.91 291.50 173.41 60-1 TEE AT FLOWE 7.74 462.52 290.60 171. 92 70-1 FH#4 750.00 447.10 287.50 159 .60 SUMMARY 0 F I N F L 0 W S AND 0 U T F L 0 W S (+) INFLOWS INTO THE SYSTEM FROM BOUNDARY NODES (-) OUTFLOWS FROM THE SYSTEM INTO BOUNDARY NODES PIPE FLOWRATE NUMBER (gpm) -------------------- 10 773.04 NET SYSTEM INFLOW = 773.04 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 773.04 **** CYBERNET SIMULATION COMPLETED **** DATE: 3/15/1999 TIME: 14:43:13 90.17 85.03 80.58 79.30 75.14 74 .50 69.16 CyberNet Version 2 .18 . Copyright 1991,92 Run Descr lption=--Basic Network Drawing: WESTFIEL Regular Simulation -Case = 1 TRIAL NUMBER = 1 ACCURACY TRIAL NUMBER = 2 ACCURACY 0.57993 0.00000 Haestad Methods Inc. The results are obtained after 2 trials with an accuracy = 0.00000 **** CYBERNET SIMULATION COMPLETED **** • . .. Flow Test Report Date j Z -2 · 97 Time (: 1 '7 A.M <!!}jJ Test made by: /l L ~ ,/·wg.Jp y ToJl..;pyp Location: Purpose of test : Representative : Witness: ~ c fu:>l'J ( AL-~-nq!. 2 \ ~ .. Flow hydrant number._Q_-_O~z_9 ___ Nozzle size_: __ /_~; __ _ Pitot reading : _ 7_o_. _._P_...~_,_/ __ G.P.M. : Static hydrant number : Q -O S-0 '._~tatic: q I . P.S.I. Residual : 9 0 P .S.I. .. ··--------Remarks: .-. ----------------------~ . S =c Jt;;.-1~u "-J t cu~ 1 c:c .... l;J E: S: T f-~ L E LD ~ c\.d \. ~-l OV'\ 1 U D ~: ~ff4-ef't7-S -·. ~ ~, ~~'7 -74S7 I tDC>4 SV1 D OL.\ C .S. t-ZCO L{-o fvG -) (~o ELLIOTT CONSTRUCTION, IN ~s P .O. BOX 510 WELLBORN, TX. 77881 OFFICE ( 409) 690-7071 FAX (409) 690-7152 MOBILE (409) ~5-4901 WESTFIELD ADDl'l'.LUN r-ttA~c J.: c.L.Lioc 1... '-UH"' ....... ~~~-~··, -··-. -- 2.. DRAINAGE CONSTRUCTION: I 18" RCP (C'l 6, CL.III) ..••••....•............• L.F. 80 2 S' R~ Concrete Inlet. ... --.......... Ea. 1 3 24" RCP (C'76, CL.III). ______ ·-········· L.F. 675 4 S' Recessed Concrete Inlet. ___ .. _ •.••. : Ea. 1 ·S 2T' RQ> (C'76, CL.III)·--····-·-LF. 400 6 S' Recessed Concrete Inlet Ea. 1 7 3Q" RQ> (C'76, ci.m) L.F. 20 8 Trench Safetv Storm Drain ................. LF. 1175 Total. ....•....... ·-···-··· ·----- 3. SEWER LINE CON'STRUCITON': 1 2 3 4 6" PVC (SDR-26, D3034X6'-8' depth) Standard S~Manhole (<8' depth) Trench Safety Sewer System .. . __ 4'" Service Lines ITvoe ID 56' Avg ...... LF. Ea. LF. Ea. . 2000 4 2000 30 s 28, 00 s 2000.00 s 32, so s 2000.00 s 38.00 s 2000.00 s 46.70 s 1.50 s 14.00 s1290.oo s 1.00 s 655.00 s 2240.QO s 4000.00 s 21937.50 s 2000.00 s 15200.00 s 2000.00 s 934.00 s 1762.50 s 50,074.00 s 2800'0 , 00 s 4800.00 s 2000.00 s1965o.oo Total .••••..•••.••...•.••... ·--··-···-···-··-·-··········--·-·····-·---···--··--··---------------S 5 4 • 4 5 O . O 0 '· 'WATER LINE CON'STRUCITON': l 6'" PVC (C900, CL.200) .•. _ ••...........• L.F. 1 Connect to Existing 12" Line .. _ •....••..• Ea. 3 Fire Hydrants (3) .........•..•...•...•........... Ea. 4 o MJ Gate Valve ..... ·-······················· Ea. s 6" x 6" Hydrant Ts ... ·-····-··············· Ea. 6 6" x 6" Line Ts._·--······---··-···· Ea. 7 l 1/2" Co s . (50' pper ervlce ) Avg ........ Ea. 8 Trench Saferv Water Line·--··-····-·-·-··· L .F . 1885 1 3 s 3 2 30 18S"5 s 12 .• 00 s1600.oo s1800.oo s 400.00 s 200.00 s 200.00 s 700.00 s 7R 522620.00 s 1600.00 s 5400.00 s 2000.00 s 600.00 s 400.00 s21000 .oo s 500.00 Total ................................................ ·-··-···························-····································· s 5 4 , 1 2 0 • 0 0 S. DETENTION: I. Dclenlion Area ................................. . Ea . s TOTAL BID PRICE OF ON-SITE CQNSTRUCTION ......................... - ... s 158, 644 . 00 ... Pr i ce will remain the same,as long as the price for materials _,,,__.._ __ .._,_,,._ ._.__ --~n f=l"'lr Ph ::.c:oc:? 1 .::in n ·4 . _/ .. ELLIOTT CONSTRUCilON, INC. P.O. BOX 510 WELLBORN, TX. 77881 OFFlCE {409) 690-7071 FAX (409) 690-7152 MOBILE (409) ~5-4901 WESTFIELD ADDI°l'.LUN .t't1A~.r:; J.: .r:;J.J.l.O(..l.. \.,.VU~ ........... ---··' 1... DRAINAGE CONSTRUCrTON: 1 18" RCP (Cl6. 0...III) --··-·-LF. 80 s 28. 00 2 S' Rtccsscd Conact.e Inlci Ea. 1 s 2000.00 3 24" RCP (Clo. a...III}. LF . 075 s 32 .so 4 s· Recessed Conacte Inlet . Ea. l s 2000.00 s 21 RCP (Clo, a...III} L.F. 400 s 38. 00 6 s• Rcccsscd Coaactc Inlet Ea. 1 s 2000.00 7 JQ" RO' (Clo, ci:..m) L.F. 20 s 46. 70 g Trench Safctv Storm Drain., .............. L.F. 1175 s 1. so TotaL._ ..... 3. SEWER LlNE CON'STRUCI!ON: --·· . l 6" PVC (SDR-26, D3034X6'-S' depth) L.F. . 2000 s 14.00 2_ Standard &;rWcr Manhole(< g• depth) Ea. 4 S12QO.OO 3 Trench Safety Sewer System L.F. 2000 s 1.00 " 4" Service Lines CTvoe ID 56" Avg ...... Ea. 30 s 655.00 Total--·-···-··------·------·-·---··---··--··--··-··-·- 4. \VA TER LlNE CON'STRUCI!ON: l 6" PVC (C900, Cl..200)----···-··· LF. 1835 s 12 .• 00 2 Connect to E:dsti.ng 12" Llne.._,,·-··· Ea. 1 s160o.oo 3 Fire Hydrants (3) ·--·-······ Ea. 3 s180o.oo 4 6" MJ Gate Valve.. ____________ Ea. 5 s 400.00 s 6" x 6" Hydrant T"s__ __ ··--··· Ea. 3 s 200.00 6 ·6" x 6" Liners. Ea. 1 s 200.00 7 l 112" Co S • (S • Ea. 30 s 700.00 ppcr emce 0) Avg .•.•••.• g Trench Safctv Water Line .................. L.F. 18S5 s =:=R s 2240.QO s 4000.00 s 21937.50 s 2000.00 s 15200.00 s 2000.00 s 934.00 s 1762.50 s 50,074.00 s2800·0 .oo s 4800.00 s 2000.00 s1965o.oo S54.450.00 s 22620. 00 s 1600.00 s 5400.00 s 2000.00 s 600. 00 s 400.00 s21000.oo s 500. 00 Toc.a.1..-··············-·-····-·--···---··-·-·-·-·---·······-·-·················· s 5 4 , 1 2 0 . 0 0 TOTAL BID PRICE OF ON-SITE CONSTRUCTION.--······--····--S 158, 644. 00 -Price will remain the same,as long as the price for materials remains substantially the same, for Phases 2,3, and ·4. ./ _,. ; K.t:LLY BURT DOZErf· + ,/;:·~~~~:·,::. :·.:-·--~>· P.O. Box 4413 Bryan, Texas nsos Office 691-8801 Fax 691-8917 Mobile 759-3101 \VESTFIELD ADDIDON -PHASE 1 '9td- I. DESCRIPTION OF PHASE 1 IMPROVEMENTS:. 1. STREETS: WESTFIELD DRIVE (39•>-- WEsm:ElD DRIVE (28•>-- HARVEST DRIVE (399),_ __ 690 LF. -26.910 S.F. -2.990 S.Y. -1,.280 LF. of Curb & Gutta 1.115 LF. -31,.220 S.F. -3:470 $.:Y. -2,.230 LF. of Curb & Gutta 90LF. -3.SlOS.F. -3®S.Y. -180LF.ofCurb&Gutta FLQW£RMOUNP DR. (28•),,,, 90 L.F. -3.S!O S.F. -390 S.Y. -180 L.F. of Curb & Gutter .... 1.985 LF. -65.lSO S.F. -7,.240 S.Y. -3.870 LF. of Curb & Gutta 2.. DRAINAGE: 80 L.F. of 18" with 2 Inlets 615 L.F. of 24 .. with 1 Inlet 400 L.F. oflT with 1 Inlet 20 L.F. of30 .. 3. SEWER LINE CON-SITE): 2065 L.F. of 6" Sewer Line 30 Service Lines (4 .. -ST Avg.) 4. WATER LINE: 1900 L.F. of 6" Water Line 30 Service Lines (I 112 .. -so• Avg.) II. PHASE 1 CONST.RUCTION COST ESTThfA TES: l. STREET CONSTRUCTION: I Erosion Sedimentation Control... ....... L.S. I 2 qcaring &. Grubbing ....•..•.•..•............ L.S. I .3 Excavation ......................................... C.Y. 2.530 4 Cellulose Fiber Mulch Seeding ........... S.Y. 4.300 s 6" Umc Stabilization Subgradc (S%) S.Y. 7.960 6 Extra Umc. ........................................ Ton 25 .7 6" Flexto.lc Base Crushed Stone .......... S.Y. 7.240 g 1 112" HMAC (Type 0) ...................... S.Y. 7.240 9 Reinforced Concrete Curb & Gutter •.•• L.F. 3.870 10 Reinforced Concrete Sidewalk ............ S.F. 2,720 II Reinforced Concrelc Aprons (4) .......... S .F. 540 s ~'} 00 .Q) s ~500. 00 s LI .~ c.y. s .50 5.y. s ~.oo ~'"J · s 15.00 ~an S '5. 'JS ~~ s 5. ,,s sy s ?. 00 c_,-,: s ~so 5.f. s .3.$0 :5 .~ • s 3000.00 s 3500.00 s //385· 00 s :i.15(). 00 s z3sso .oo s · 18?S.oo s 4f(p30. 00 s t/-1 ro ~o. o. o S ~7<Yjb. 00 s c,eoo.oo .s t89Q.oo . To1al. ...................................... ~ ............ _........................................................................ S /& 5 8BQ. 00 ·i-.