HomeMy WebLinkAbout65 Development Permit 518 Bug Blasters ExpansionFigure XIl
Development Permit
City of College Station, Texas
Site Legal Description: /.or;, /loCJt tJ~
Site Owner: !JoBE/ L/i£
Architect/
Engineer : ~7-~4~
Contractor :
Date Application Filed : ________ _
TI. llD"»1TZetJ
Address : !711 J ~ $/Diss t!5. "'lR. 77Y~
Telephone : IR93 · 3(p5/
Address : #ii ~ t2eR~ l?:;f>J, 7Jt. ?71!oz
Telephone No : ~'~2(,(8'
Address:
~------------Telephone No : _________ _
Approved : __________ ~
Application is hereby made for the following development specific waterway alterations :
D Application Fee
Signed Certifications
D Drainage and erosion control plan, with supporting Drainage Report two (2) copies each .
D Site and Construction Plans, with supporting Drainage Report two (2) copies each .
D Other:
ACKNOWLEDGMENTS :
I, lb11d!t/ 6~reff , design engineer, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supportin g documents comply
with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its
associated Drainage Policy and Design Standards .
As a condition of approval of this permit application , I agree to construct the improvements
proposed in this application according to these documents and the requirements of Chapter 13 of
the College Station City Code.
Property Owner(s) Contractor
.....
.. ,
"
. ·.
' \,
..
Figure XII Continued
CERTIFICATIONS : (for proposed alterations within designated flood hazard areas .)
A I , certify that any nonresidential structure on or proposed
to be on this site as part of this application is designated.to prevent damage to the structure or its
contents as a result of flooding from the 100 year storm.
Engineer Date
B . I, certify that the finished floor elevation of the lowest
floor, including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the latest Federal Insurance Administration
Flood Hazard Study and maps , as amended.
Engineer Date
C . _)<}, Dnetd H2vve,,1/--, certify that the alterations or development covered by
t~s per~t shal~ not dimi ~j~ h¥.!fl'~~~~trrying capacity of the wate:way ad~oining ?r crossing
this p~rrrutted site and ~~t .:~u.c~er-~h~ or developmen~ are consistent with requirements of
the City of College St~'t10.rt C1t w>de , ~~ter 13 concerning encroachments of flood ways and of
fl c.· : :•~
00 way innges . r ·oaNA.Lo .. 6AR:R.Err .... ~ z ................................... f z : .:ct:~ <)/t~~ • . :-v;
••• .s st ......... ~-;.~".:
l\ ... ONAL. ~---.,,,,,,,,,,..,. Date
I, do certify that the proposed alterations do not raise the level
of the 100 year flood above elevation established in the latest Federal Insurance Administration
Flood Hazard Study.
Engineer D ate
Conditions or cornrnents as part of approval : ___________________ _
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion , and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development. All development shall be in accordance with the plans
and specifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the City of College Station shall apply .
DRAINAGE COMPUTATIONS
For
Lot 1, Block One
T.J. Addition
College Station, Brazos County, Texas
Prepared By:
Garrett Engineering
4444 Carter Creek Parkway -Suite 108
Bryan, Texas 77802
Telephone: (409) 846-2688
*May, 1994 *
DRAINAGE COMPUTATIONS
For
Proposed Parking Lot Improvements
To Be Located
Lot 1, Block One
T.J. Addition
College Station, Brazos County, Texas
*M ay, 1994 *
SUMMARY
The proj ect consists of th e construction of parkin g lot improve ments establishing 5 additional 9 foot x 18
foot s paces. The intention of th e data presented here in is to determine th e increase in s to nn water run-off
subseq uent to th e proposed improvrnents to th e s ite. On-site detention facilities may not be req uired based
on conversations wiU1 city e ngi neerin g s taff (B . Mcully & David Pull e n) as a possible detention facility
may be in s tall ed off-site in assoc iation wiU1 U1 e Sebesta Road Rehabilitation Project which could facilitate
th e minute in crease in run-o ff ge ne rated by th e subj ect proj ect.
From the computation s on page 1 based on th e proj ect area of 0.07 acres as shown on the aforementioned
Site & Grading Plan, th e pred evelopm e nt run-off coefficient being assumed at 0.40 and a minimum time
of concentration of 10 minutes the re lative predevelopme nt peak di sc harge rates ("Q") were determined .
The intensities shown on pa ge 1 were take n from "Figure IIl-1 Intensity Duration Frequency Curves For
The City Of College Station"as contained in U1 e "Drainage Policy and Design Standards for the City of
College Station" ass uming sam e minimum time of concentration of 10 minutes. The Rational M e thod was
utilized to compute U1e estimated peak predevelopment di sc harge rates. The equation that re prese nts the
Rational Method is as follows: Q = CIA, where; "Q" is th e peak discharge rate in cubic feet per second.
"C" is th e run-off coefficient, in th e predevelopment condition "C" is assumed to be 0.40, "I" is th e storm
inten s ity in in che p er hour and "A" which is th e area of th e s ite in acres .
From U1e computations on page 2 based on U1 e proj ec t area of 0.07 acres, th e postdevelopm e nt run-off
coefficient being assumed at 0.98 and a minimum tim e of concentration of 10 minutes th e relative
predevelopment peak discharge rates ("Q") were determined. The inten sities s hown on page 1 were taken
from "Figure III-I Tnt ens ity Duration Frequency Curves For The City Of College Station"as contained in
U1 e "Drainage Policy and Design Standards for th e City of College Station" assuming same minimum time
of concentration of 10 minutes. The Rational Me thod was utilized to com pute U1 e es timated peak post
development discharge rates. The equation that repre sents th e R a tional Method is as follows: Q = CIA,
where; "Q" is the peak discharge rate in cubic feet per second . "C" is th e run-off coefficient, in th e post
development condition "C" is assumed to be 0.98, "I" is th e storm inte nsity in inches per hour and "A"
which is th e area of U1e site in acres.
The comparison between peak predevelopm ent discharge rates and post development discharge rates is
include d as an aid to U1 e designer to es tabli sh a preliminary "target" as to the volume necessary in Ule
proposed de tention facility should a detention facility be deem ed necessary. This pre liminary estimate is
arrived at by sim ply dete nninin g U1 e volume generated from Ule differe nce of the predevelopme nt and post
development hydrographs (see pages 5-7 for predevelopme nt and post developme nt hydrographs). Please
note that U1e post developm e nt hydrograph shown on th ese sam e graphs assumes no detention.
Page 3 and page 4 are tabulations of U1 e predevelopme nt hydrograph and th e post development
hydrograph based on th e computations pe rform ed on page 1 and page 2. The post development
hydrogra ph ass um es no detention to facilitate direct comparison in th e pre ' and pos t developm ent
conditions.
The hydrograph s are trian g ular in sha pe and are based on th e standard SCS unit hydro gra ph with tim e to
peak se t equal to th e tim e of concentration a nd th e total time base se t a t 2.67 tim es th e tim e of
concentration. Please note th at a 26.7 minute total stonn event duration was utili zed ex clu siv ely
throu g hout thi s report du e totally to th e small physical s ize of tJ1e proj ect.
Determine Total Pre-Development
Peak Storm Water Discharge Rates
Tributary Ar ea ("A"): 0.07 Acres
Pervious A rea: 0.07 Acres
Impervious Ar ea : 0.00 Acres
Run-Off Co efficient ("Cwt"): 0.40
T ime Of Co ncentration ("T/c "):
Woodland s: Low Elevation:
High Elevation :
Distance (Feet):
Slope (%Grade):
Velocity ("Vw"):
Time :
Pa st ure s: Low Elevation :
High Elevat ion :
Distance (Feet):
S lope (% Grade):
Velocity ("Vp "):
Time :
Pavements : Low Elevation :
High Elevation :
Distance (Feet):
Slope (% Grade):
Velocity ("Vpave"):
Time :
Total Travel Time :
Hourly In te nsity Rates ("I"): 2-Year: 5.20
5-Year: 7.69
10-Yea r: 8.63
25-Y ear : 9.86
50-Y ea r: 11 .15
100-Year: 12.60
Peak Discharge Rate ("O"): 2-Year: 0.15
5-Yea r: 0.22
10-Year: 0 .24
25-Year: 0.28
50-Year: 0.31
100-Year: 0.35
c = 0.40
C= 0.98
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
0.00
0.00
0.00
0.00
0.00 Feet I Second
0.00 Minutes
10 .00 Minutes
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inc hes I Hour
Inches I Hour
Cubic Feet I Second
Cub ic Feet I Seco nd
Cub ic Feet I Second
Cub ic Feet I Seco nd
C ubi c Feet I Seco nd
Cubic Feet I Seco nd
De t ermine Post-development Peak
Storm Water Dischar e No Detention
T ribu tary A rea ("A "): 0.07 Acres
Pervious Area : 0.0 0 Acres
Impervious Area : 0.07 Acres
Run-Off Coefficient ("Cwt"): 0.98
Time Of Co ncentration ("T/c "): 10 Minutes (Min)
Hourly Intensity Rates ("I"): 2-Year : 5.20
5-Year : 7.7 0
10 -Year : 8.60
25 -Year : 9.90
50-Yea r: 11 .2 0
100-Year: 12.60
c = 0.40
C= 0.98
Inches I Hou r
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Inches I Hour
Peak Discharge Rate ("O "): 2-Year: 0.36 Cubic Feet I Second
5-Yea r: 0.53 Cubic Feet I Secon d
10-Year: 0.59 Cubic Feet I Second
25-Year : 0.68 Cubic Feet I Seco nd
50-Year : 0.77 Cubic Feet I Seco nd
100-Year: 0.86 Cubic Feet I Second
Comparison Of Predevelopment And
Post-develo ment Peak Dischar e Rates
Predeve lopment Pos t -Developme nt Inc rease
2-Yea r: 0.15 Ft3 /sec 0.36 Ft3 /sec 0.21 Ft3 /sec
5-Year : 0.22 Ft3 /sec 0.53 Ft3 /sec 0.3 1 Ft3/sec
10-Year: 0.24 Ft3 /sec 0.59 Ft3 /sec 0.35 Ft3 /sec
25-Year: 0.28 Ft3 /sec 0.68 Ft3/sec 0.4 0 Ft3/sec
50-Year: 0.31 Ft3 /sec 0.77 Ft3 /sec 0.46 Ft3/sec
100-Year: 0.35 Ft3/sec 0.86 Ft3 /se c 0.51 Ft3/sec
Prel iminary Determination Of
Detention Pond Volume
2-Year: 0.21 Ft3 /sec x (26.7 Min . x 60 Se c . I 2 ) = 169 Cubic
5-Year: 0.31 Ft3 /sec x (26.7 Min . x 60 Sec . I 2 ) = 251 Cubic
10-Year: 0.35 Ft3 /sec x (26 .7 Min . x 60 Sec . I 2 ) = 279 Cubic
25-Yea r: 0.4 0 Ft3 /sec x (26 .7 Min . x 60 Sec . I 2 ) = 323 Cubic
50 -Yea r: 0.46 Ft3 /sec x (26 .7 Min . x 60 Sec . I 2 ) = 365 Cubic
100-Year: 0.51 Ft3 /sec x (26 .7 Min . x 60 Sec . I 2 ) = 410 Cub ic
Feet
Feet
Feet
Feet
Feet
Feet
Pre-Development Storm Intensity Rates (Inches Per Hour) Time 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year (Minutes) Storm Storm Storm Storm Storm Storm 0 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.02 0.03 0.03 0.04 2 0.03 0.04 0.05 0.06 0.06 0.07 3 0.04 0.06 0.07 0.08 0.09 0.11 4 0.06 0.09 0.10 0.11 0.12 0.14 5 0.07 0.11 0.12 0.14 0.16 0.18 6 0.09 0.13 0.15 0.17 0.19 0.21 7 0.10 0.15 0.17 0.19 0.22 0.25 8 0.12 0.17 0.19 0.22 0.25 0.28 9 0.13 0.19 0.22 0.25 0.28 0.32 [ ---" -~ ._..... ___ ... -Peak=> 10 0.15 0.22 Q.2.i__ 0.2§ _ _0.}1 0.35 -N ----11 0.14 0.20 0.23 0.26 0.29 0.33 12 0.13 0.19 0.21 0.24 0.27 0.31 13 0.12 0.18 0.20 0.23 0.26 0.29 14 0.11 0.16 0.18 0.21 0.24 0.27 15 0.10 0.15 0.17 0.19 0.22 0.25 16 0.09 0.14 0.15 0.18 0.20 0.23 17 0.08 0.13 0.14 0.16 0.18 0.20 18 0.08 0.11 0.13 0.14 0.16 0.18 19 0.07 0.10 0.11 0.13 0.14 0.16 20 0.06 0.09 0.10 0.11 0.13 0.14 21 0.05 0.07 0.08 0.09 0.11 0.12 22 0.04 0.06 0.07 0.08 0.09 0.10 23 0.03 0.05 0.05 0.06 0.07 0.08 24 0.02 0.03 0.04 0.04 0.05 0.06 25 0.01 0.02 0.02 0.03 0.03 0.04 26 0.01 0.01 0.01 0.01 0.01 0.01 27 0.00 0.00 0.00 0.00 0.00 0.00
Post-Development Storm Intensity Rates (Inches Per Hour) Time 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year (Minutes) Storm Storm Storm Storm Storm Storm 0 0.00 0.00 0.00 0.00 0.00 0.00 1 0.04 0.05 0.06 0.07 0.08 0.09 2 0.07 0.11 0.12 0.14 0.15 0.17 3 0.11 0.16 0.18 0.20 0.23 0.26 4 0.14 0.21 0.24 0.27 0.31 0.35 5 0.18 0.26 0.29 0.34 0.38 0.43 6 0.21 0.32 0.35 0.41 0.46 0.52 7 0.25 0.37 0.41 0.48 0.54 0.61 8 0.29 0.42 0.47 0.54 0.61 0.69 9 0.32 0.48 0.53 0.61 0.69 0.78 r -------... -Peak=> 10 0.36 0.53 0.59 0.68 0.77 0.86 -. . --11 0.34 0.50 0.55 0.64 0.72 0.81 12 0.31 0.46 0.52 0.60 0.68 0.76 13 0.29 0.43 0.48 0.56 0.63 0.71 14 0.27 0.40 0.45 0.52 0.58 0.66 15 0.25 0.37 0.41 0.48 0.54 0.61 16 0.23 0.34 0.38 0.44 0.49 0.55 17 0.21 0.31 0.34 0.39 0.45 0.50 18 0.19 0.28 0.31 0.35 0.40 0.45 19 0.16 0.24 0.27 0.31 0.35 0.40 20 0.14 0.21 0.24 0.27 0.31 0.35 21 0.12 0.18 0.20 0.23 0.26 0.30 22 0.10 0.15 0.17 0.19 0.22 0.24 23 0.08 0.12 0.13 0.15 0.17 0.19 24 0.06 0.09 0.10 0.11 0.12 0.14 25 0.04 0.05 0.06 0.07 0.08 0.09 26 0.01 0.02 0.02 0.03 0.03 0.04 27 0.00 0.00 0.00 0.00 0.00 0.00 )"
.....
Cl>
Q.. -Cl>
Cl>
a;
Q..
Qi
Cl>
~
Total Pre -Development Hydrograph Vs . Total Post -
Development Hydrograph For 2 -Year Storm Event
0 .35 ------+-----l"w-----+------+-----+--------i
0 .30 -----+---------If---------+-----+-----+------<
.2 B 0 .25 ...-------t--_,__----1r-----~-------t-----t------i
.0 c: 8 8 0 .2 0 ------+;------1r-------t-------t-----+-------i
....., Cl>
~ (j) 0 .15 1----~~-------:::J<::-----t-----""it-----t------i
0
.t::.
0
II)
0
0 . 10 1"---F---t----,..,.c;.._---+----=-t-.::::----t-----"'o..------t-------1
0 .05 +-_,_-----::.,.,.C--+-----11------t------t=,,,._=--~-+------1
0 .00 ~---..... -----1~---+----...... ----~ .... --....
0 5 10 15 20 25 3(
Time (Minutes)
---Pre-Development Hydrograph ----Total Post-Development Hydrograph
0 .60
0 .50
Total Pre -Development Vs. Total Post-Development (No
Detention) Peak Discharge Rates 5-Year Storm Event
~,.... 0 .40
·-'U .0 c: 8 8 0 .30
....., Cl>
Cl> (j) 0 .20 Ol .....
0
.t::. 0 .10 0
II)
0
0 .00
0 5
Pre-Development Hydrograph
10 15 20 25 30
Ti me (M inutes)
----Po st-D evelopment Outfl ow Hydrograph
Wi t hout Detention
0 .60 ....
Cl> a.. 0 .50 -Cl>
Cl>
~,..... 0.40
·-'O ..0 c 8 8 0 .30
..._, Cl>
Cl> (/) 0 .20 0) ....
0 s::. 0 .10 0
U)
0
0 .00
0
Total Pre-Development Vs. Total Post-Development (No
Detention) Peak Discharge Rates 10-Year Storm Event
5 10 15 20 25
Time (Minutes)
30
---Pre-Development Hydrograph ----Post-Development Outflow Hydrograph
With out Detention
0 .70 ....
Cl> a.. -0 .60
Cl>
Cl> 0 .50 LL.
0,.....
·-'O ..0 c 0 .40
:J 0 u 0 0 .30 ..._, Cl>
Cl> (/)
0)
0 .20 ....
0 s::.
0 0 .10 U)
0
0.00
0
Total Pre-Development Vs. Total Post-Development (No
Detention) Peak Discharge Rates 25-Year Storm Event
5 10 15 20 25
Time (Minutes)
30
Pre-Development Hydrograph ----Post-Development Outflow Hydrograph
Without Detention
')
0.80 -Q)
0 .70 0.. -Q) 0 .60 Q) .....
. 2 B o .50
.0 c 8 8 0 .40
...., Q)
Q) Cl) 0 .30
O'> -0 .20 0
.&;
0 0 .10 "' 0
0.00
0.90 -Q) 0 .80 0.. -Q) 0 .70 Q)
~ ...... 0 .60
·-'O .g c 0.50 u 0 0 .40 ...., 0
Q) ~
O'> 0 .30 -0 0 .20 .&;
0
"' 0 .10 0
0 .00
0
Total Pre-Development Vs. Total Post-Development (No
Detention) Peak Discharge Rates 50-Year Storm Event
5 10 15 20 25
Time (Minutes)
30
Pre-Development Hydrograph ----Post-D evelopm e nt Outfl ow Hydrogra p h
With out Detention
0
Total Pre-Development Vs. Total Post-Development (No
Detention) Peak Discharge Rates 100-Year Storm Event
5 10 15 20 25
Time (Minutes)
30
---Pre-Development Hydrograph Post -Developm e nt Outflow Hydrograph
With out Detention