HomeMy WebLinkAbout57 Development Permit 514 George Bush LibraryPost Office Box 9960 1101 Texas Avenue February 1, 1996 Ray Robertson, P .E . Robertson Engineering 4103 S. Texas Avenue Suite 211 Bryan, Texas 77802 Dear Mr. Robertson : College Station, Texas 77842-9960 ( 409) 764-3500 The City has reviewed the proposed changes to the Bush Presidential Library driveway and finds the slight change in the location acceptable, and the redesign an improvement over the previous design . This letter serves as-the-City's notice of approval of the plans as submitted. Sincerely, Edwin Hard, AICP Transportation Planner _ cc: Veronica Morgan, Assistant City Engineer Home of Texas A&M University ~-~ r Cl~~o<?c:B5~! .I .EG1~1~!~Te!~N ~ College Station , Texas 77842-9960 February 1, 1996 Patrick T. Williams , P.E. Area Engineer Texas Department of Transportation 1300 N . Texas Avenue Bryan, Texas 77803-2760 Dear Mr. Williams : (409) 764-3500 -- / (b• The City has reviewed the proposed changes to the Bush Presidential Library driveway and finds the slight change-itt-the location acceptable , and the redesign an improvem6Rt over the previous design . This letter serves as the City's notice of approval of the plans as submitted. Sincerely, Edwin Hard, AICP Transportation Planner cc : Veronica Morgan, Assistant City Engineer Home of Texas A&M University 08-31-1994 0 9=10AM FROM TO 14k1':f (b454 ':;lb r . >::.J .1. .. CIVIL ENGINEERS, INC. Facsimile Cover Sheet To: Veronica Morgan Company: City of College Station Phone: (409) 764-3570 Fax: (409) 764-3496 From: Alisa Acheson Company: WSBC Phone: 621-5653 x 135 Fax: 621-1138 Date: August 31, 1994 Page s i ncluding this cover page: 3 Comments: Attached is a confirmation of our telephone conversation yesterday. If I have misunderstood anything discussed, please call me. A l so attached is an explanation of two proposed cal culation methodol ogies that I am unsure of the City of College Station's position with respect to. Pl ease read through what I am proposing to ensure that you agree that we are headed in the right direction. Once again, please call me with any comments. 08-31-1994 09 =10RM FROM TO WsBc ~ENGINEERS, INC. COMMUNICATION CONFIRMATION -TELEPHONE CALL PROJECT: TO: PHONE NO.: FROM: DATE: Bush Drive Veronica Morgan , City of College Station (409) 764-3570 Jeff Collins , Alisa Acheson August 30, 1994 -4:25 pm The Following Is a Confirmation Of The Above-Noted Telephone Call . l Acheso n proposed a methodology for sizing the culverts .tlld pe rfonning a sui table hydraulic analysis for the three waterway crossings alo ng the George Bush Drive project. The proposed methodology is to perform a HE C update anal ysis for the modeled tributary to White Creek (and size the culverts based on the City of College Station's manual criteria) and to perform an an al ysis usirt g culvert equations for the two unmodeled White Creek tributari es (an d size th e culverts based on manual criteria). Morgan agreed that this is an appropriate manner to perform the analysis. 2 . Acheson requested more information concerning methodologies to ca lculate tailwater accepted by the City of College Station . Morgan said she would fax them to Acheson 3 . Morgan wan t ed to stress that the City of College Station wanted to wo rk with us on the project. If the City's criteria increased either the consultant workload or the project cost considerably, College Station would be agreeable to negotiate the criteria . Morgan felt that the City's criteria woul d probably be along the same order of magnitude as TxDOT' s criteria in terms of hydraulic requirements, especial ly in lieu of the project's location with respect to the Ge0rge Bush Library site. 08-31-1994 09 =11RM FROM . ~· IU ..L.""'TU -/ I'-' ''--" , .-- In addition, I would like to propose a modification of the recommended methodology for calculation of the stream tailwater elevation and flow at the crossings for the two unmodeled waterways (part of the secondary drainage system). The culvert equations will still be used. • I propose using normal depth to calculate the tailwater elevation at th~ crossings (as opposed to the standard step method re~ommended in the criteria). This would eliminate the n e d for a modeling effort to create a HECw2 for the long stretches unmodeled stream downstream of the two urtmodeled cro ings, or alternately, days of hand calculations to simulate the HECw2 calculations. • I propose using the rational method to calcu~ate flows at the waterway crossings. As I do not have a copy of Section of College Station manual, I am unsure of the recommen methodologies to calculate flows for the secondary syste rational method is commonly used to determine flows in development projects, such as this one. I will assume that these are acceptable methodologies unless otherwise from you. TOTRL P.03 I Texas Department of Transportation P.O . BOX 3249 •BRYAN , TE XAS 77 805-3249 • (4 09 ) 77 8-216 5 October 13, 1994 Ms. Veronica Morgan , P. E. Assistant City Engineer City of College Station P. 0. Box 9960 College Station, Texas 77842-0960 Dear Ms. Morgan: We have reviewed the entrance to the proposed George Bush Presidential Library which will intersect with FM 2347 and offer the following comments: 1 ) Due to the geometry of the driveway , all future proposals to pl ace driveways across FM 2347 from the entrance should be denied. A drive across FM 2347 could present an operational problem. 2) Right turns from FM 2347 shou l d yield to the left turns to prevent traffic from stacking into FM 2347. 3) The radii for the right turns should be designed to properly handle traffic. 4) The grades for the entrance should be coordinated with the design schematic for FM 2347. 5) Median openings given to driveways in close proximity to the entrance should not be given median openings. Operational problems could result if openings are g ranted. Thank you for the opportunity to review this location. If you should have any questions , please call. PTW/bja Sincerely , Patrick T. Williams, P. E. Area Engineer ECENED O C1 \ 7 19S't An Equal Opportunity Empl oyer