Loading...
HomeMy WebLinkAbout53 Development Permit 522 Luther Jones Butler Dev Edsel JonesCITY OF COi J .. EGE STATION Post Office Box 9960 1101 Texas Avenue March 29 , 1996 Bury & Pittman, Inc. Consulting Engineers and Surveyors Attn: Mr. Gregory S. Stnniska, P.E. 3345 Bee Caves Road, Suite 200 Austin, Texas 78746 College Station, Texas 77842-9960 (409) 764-3500 RE: Proposed Multi-Family Development at wther Street and Jones-Butler Road Dear Mr. Strmiska: It has been a pleasure working with you to provide a quality development within the City of College Station. As we discussed during the predevelopment meeting on Monday, March 18, 1996, the developer would be responsible for the construction of Southwest Parkway West and Jones-Butler Road through the property being developed. However, at that time we were unable to indicate what classifications these two streets would have other than what was shown on the Thoroughfare and Transportation Improvement Plan approved by the City Council. Since that meeting, we have determined that Jones-Butler can become the minor arterial and Southwest Parkway the collector. With either classification, city staff will .recommend to the Council that both streets be extended to Luther Street in order to provide for a better transportation system . As for the costs incurred to construct Luther Street, we propose at the present time for the right-of-way to be dedicated as part of this plat with assessments made to abutting property owners when the City constructs the street. The required right-of-way for a Luther is sixty (60) feet and should concur with the Woodway West -Phase I Plat If the development requires access to Luther, then the developer will be responsible for the construction necessary to provide a street section capable of carrying the increased traffic. In addition, access will not be allowed to Luther unless the street meets current City standards. The construction and dedication of right-of-way for Jones-Butler is the responsibility of Mohawk Ltd. due to these parcels being out of the same original parent tract This street will require eighty (80) feet of right-of-way when constructed. As with Luther, access will be denied to Jones-Butler if the street section does nofmeet current City standards. If you have any questions or comments, feel free to contact me at (409) 764-3570. ~~ Steve Homeyer Graduate Engineer cc: Jim Callaway, Asst. Dir. of Development Services Kent Laza, City Engineer Veronica Morgan, Asst. City Engineer Shirley Volk, Development Coordinator David Owen, Intergroup Edsel Jones, Mohawk Ltd . Home of Texas A&M University . -... . ... CITY OF COLLEGE STATION DEVELOPMENT SERVICES FAX TRANSMITTAL DATE : MARCH 29 , 1996 TO : JOHN FREEDMAN PHONE : (512)328-0011 FAX : (512)328-0325 COMP ANY : BURY & PITTMAN, INC . FROM : STEVE HOMEYER PHONE : (409)764-3570 FAX : ( 409)764-3496 COMPANY : ENGINEERING TOTAL NUMBER OF SHEETS : 2 MESSAGE: THIS IS A COPY OF THE LETTER YOU REQUESTED FOR THE MULTI-FAMILY DEVELOPMENT AT LUTHER STREET AND JONES-BUTLER ROAD. -----~t--- -------- ------~ 'I 08 1 04 1 94 09:46 '5'409 764 3452 COLL STA PUB UTL +->-> ENGll'<J:<.tHum,, M·~ r ~!~~.~~96~oLLEGE ~~~~!~~ ~ CollegeStat!on,Texas 77842-0960 DATE: July 25, 1994 TO: Robert Gartner ScanlanKemperBard Companies 2626 Pacwest Center 1211 SW Fifth Avenue Portland, OR 97204 FROM: Samantha Smith ( 409) 764-3500 College Station Public Utilities Department P.0.Box9960 ' College Station, Texas 77842-0960 RE: SITE AT SOUTH CORNER OF HOLLEMAN AND JONES-BUTLER ROAD: AVAILABILITY OF PUBLIC WATER/WASTEWATER -Public water and sanitary sewer mains are available to the subject tract. Your .... ngineer will need to analyze your needs in terms of our mains and their sizes in <:>rder to determine how the property can be adequately served by the exbting mains. 11 r ~at 764-3440 if l can assist you. Sincerely, s~~~ , h ~Smith E: enr:'.J Assistant PfSity