HomeMy WebLinkAbout50 Development Permit 525 CSISD SidewalksFILE NOTE
Date: December 11, 1995
To: DDP File -CSISD Sidewalks
From: Steve Homeyer ~
Graduate Engineer
I spoke with David Mays with Cheatham and Associates this morning about
the construction of sidewalks at South Knoll, Southwood Valley and College
Hills Elementary schools. David asked whether or not we would want a
predesign meeting for this construction. He said they were planning to
follow the existing paths that constitute trails with a proposed width of 8 -10
feet. I told him that we would not require a meeting for this but would
require him to provide us with something that would quantify the amount of
runoff that would be generated by this new construction and what impacts
it would have on the surrounding system. He also said that at one of the
schools, a new parking area would be built and I told him for that kind of
construction, we would need to see a full drainage report.
cc: Veronica Morgan
FILE NOTE
Date: December 11, 1995
To: DDP File -CSISD Sidewalks
From: Steve Homeyer ~
Graduate Engineer
I spoke with David Mays with Cheatham and Associates this morning about
the construction of sidewalks at South Knoll, Southwood Valley and College
Hills Elementary schools. David asked whether or not we would want a
predesign meeting for this construction. He said they were planning to
follow the existing paths that constitute trails with a proposed width of 8-10
feet. I told him that we would not require a meeting for this but would
require him to provide us with something that would quantify the amount of
runoff that would be generated by this new construction and what impacts
it would have on the surrounding system. He also said that at one of the
schools, a new parking area would be built and I told him for that kind of
construction, we would need to see a full drainage report.
cc: Veronica Morgan