Loading...
HomeMy WebLinkAbout50 Development Permit 525 CSISD SidewalksFILE NOTE Date: December 11, 1995 To: DDP File -CSISD Sidewalks From: Steve Homeyer ~ Graduate Engineer I spoke with David Mays with Cheatham and Associates this morning about the construction of sidewalks at South Knoll, Southwood Valley and College Hills Elementary schools. David asked whether or not we would want a predesign meeting for this construction. He said they were planning to follow the existing paths that constitute trails with a proposed width of 8 -10 feet. I told him that we would not require a meeting for this but would require him to provide us with something that would quantify the amount of runoff that would be generated by this new construction and what impacts it would have on the surrounding system. He also said that at one of the schools, a new parking area would be built and I told him for that kind of construction, we would need to see a full drainage report. cc: Veronica Morgan FILE NOTE Date: December 11, 1995 To: DDP File -CSISD Sidewalks From: Steve Homeyer ~ Graduate Engineer I spoke with David Mays with Cheatham and Associates this morning about the construction of sidewalks at South Knoll, Southwood Valley and College Hills Elementary schools. David asked whether or not we would want a predesign meeting for this construction. He said they were planning to follow the existing paths that constitute trails with a proposed width of 8-10 feet. I told him that we would not require a meeting for this but would require him to provide us with something that would quantify the amount of runoff that would be generated by this new construction and what impacts it would have on the surrounding system. He also said that at one of the schools, a new parking area would be built and I told him for that kind of construction, we would need to see a full drainage report. cc: Veronica Morgan