Loading...
HomeMy WebLinkAbout44 Development Permit 503 Pebble Creek Phase 7DEVELOPMENT PERMIT PERMIT NO . 503 Pebble Creek Phase 7 FOR AREAS INSIDE TIIE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF TIIE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTIONS: Pebble Creek Phase 7 OWNERS: Pebble Creek Dev elopment Co . 4500 Pebble Creek Parkway College Station, Texas 77845 phone: 690-0996 DRAINAGE BASIN: Alum Creek TYPE OF DEVELOPMENT: SITE ADDRESS: This permit is valid for clearing and grubbing of underbrush from the above reference phase. This clearing shall be limited to brush and small trees. This permit is not valid for removal of topsoil or any form of grading. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin . This permit, being temporary, is valid only within sixty (60) days of the date shown below, and is not intended to allow the complete development of the site as proposed . Any work performed after the expiration of this permit is not covered, and is considered unauthorized. All fees associated with this permit have been waived temporarily and will be collected when a full development permit is issued. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances the · o ollege Station that apply. Dare ~ Date October 28, 1997 Mr. Paul Kaspar City Of College Station PO Box 9960 College Station, TX 77842 RE: Pebble Creek Phase 7 Dear Mr. Kaspar, This letter is to request the issuance of a permit to allow the clearing of the centerline for the streets shown on the attached plat. This clearing is necessary to allow the engineer to finish construction drawings. If you have questions concerning this request, please contact me at 690-0992. Sincerely , Pebble Creek Development Co. Davis M. Young En . : Sit