HomeMy WebLinkAbout34 Development Permit 487 Peace Luthren Church ImprovementsDEVELOPMENT PERMIT
PERMIT NO. 487
PEACE LUTIIERAN CHURCH IMPROVEMENTS
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Southwood Valley Section 10-A Block 36
OWNER:
Peace Lutheran Church
2201 Rio Grande
College Station, Texas 77845
693-4403
DRAINAGE BASIN:
Bee Creek Tributary "B"
TYPE OF DEVELOPMENT:
SITE ADDRESS:
2201 Rio Grande
This permit is valid for site construction as shown on the approved construction documents.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work .
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area. All
development shall be in accordance with the plans and specifications submitted to and approved by the
City Engineer in the development permit application for the above named project and all of the codes and
or~nances o Cit): C lege Station that apply.
Date
Contractor Date
•'
J ~
' . •' . . '
,. :.
I DRAINAGE ANALYSIS FOR
PROPOSED IMPROVEMENTS
PEACE LUTHERAN CHURCH
2201 RIO GRANDE DRIVE
COLLEGE STATION,
BRAZOS COUNTY,
TEXAS
APPROVED FOR
CONSTRUCTION
AUG 1 5 1997
COLLEGE STATION
Et;J<jlNEERING
11/ V /7 /
.tV . t ~.t/.A?~-
1 7
AUGUST, 1997
Submitted By: -
Michael G. Hester, P.E .
Hester Engineering company
7607 Eas t mark Drive, Suite 253-B
College station, TX 77840
(409)693-1100 fX:(409)693-1075
CERTIFICATION
I hereby certify that this report and accompanying
drainage plan for the drainage design was prepared by me in
accordance with the provisions of the Cities Drainage Policy
and Design Standards for the owners thereof.
PEACE LUTHERAN CHURCH ·CERTIFICATION
INTRODUCTION:
DRAINAGE ANALYSIS
PROPOSED IMPROVEMENTS
PEACE LUTHERAN CHURCH
2201 RIO GRANDE BOULEVARD
COLLEGE STATION1.., TEXAS
AUGUST, 1991
Peace Lutheran Church is an existing church complex located
at the northeast corner of Rio Grande Boulevard and Airline Drive
in College Station, Texas_ The legal description is Southwood
Valley Section 10-A Block 36. The tract is recorded in the Brazos
County Deed Records, Volume 404, Page 789. The site zoning is R-6
and a conditional use permit for the improvements has been
submitted. The proposed improvements consist of additional class
rooms (3625 square feet) that will be connected to the existing
church structure. This report includes the future development of
an additional 3575 square feet which brings the ultimate
development to 7200 square feet (0.17 acres).
The architect preparing the site and grading plan is Mr. Jim
Holster, AIA, Holster & Associates, 7607 Eastmark, Suite 200,
College Station, TX 77840 (409) 693-3179. The contact person for
the church is Mr. Charles Coble at (409)693-4403.
EXISTING DRAINAGE BASIN DESCRIPTION:
The church site is a portion of a 21.2 acres drainage basin
which drains to Bee Creek Tributary 11 B 11 • The terrain slopes in a
southwest direction to an open ditch along F.M. 2818 . From there
it travels along F.M. 2818 to Bee Creek Tributary B, Basin
Reference No. 5, Regulatory Channel Reach No. I which is a
primary drainage system with no "Special Drainage Basin and
Channel Reach Design Standards" per the College Station "DRAINAGE
POLICY AND DESIGN STANDARD", other than the elevation of lowest
PEACE LUTHERAN CHURCH -PAGE 1 OF 3 PAGES
habital floor is Base Flood plus 2 feet (page 11) -The latest
Federal Emergency Management Agency Flood Insurance Rate Maps
show that no portion of the site is in the regulatory 100-year
flood plain.
PROPOSED DRAINAGE:
The improvements will route the runoff in the same direction
to the open ditch along F.M. 2818 and to Bee Creek Tributary B.
Detention is not required by ordinance nor planned for the site
because the runoff generated by the improvements will be
maintained in the open ditch section along F.M. 2818 and will not
increase the level of the water surf ace elevation of Bee Creek
Tributary B.
DRAINAGE CALCULATIONS:
A cross section of the open ditch along F.M. 2818 was
evaluated to determine any significant change in the water
surface elevation due to the proposed ultimate improvements. The
ultimate improvement QlOO storm water flow increased 0.24 cubic
feet per second (cfs) from 106.97 cfs to 107.21 cfs and did not
raise the water surface along the F.M. 2818 open ditch and
therefore will not have an impact upon any downstream property
owners.
The QlOO ultimate discharge for Bee Creek Tributary B at
river station 0.63 is 4936 cfs. This information was taken from
College Stations "DRAINAGE SYSTEM ANALYSIS", Table III-6, page
PEACE LUTHERAN CHURCH -PAGE 2 OF 3 PAGES
32. Adding an additional 0.24 cfs to this flow will not increase
the water surface elevation.
Predevelopment discharges for the 100 year storm for the
analysis were determined using the Haestead Methods Quick TR -
55 rational method for computing runoff hydrographs. Detailed
calculations are contained in PREDEVELOPMENT CONDITIONS.
Post-development discharges were determined utilizing the
same hydrography methodology. Detailed calculations are contained
in POSTDEVELOPMENT CONDITIONS.
CONCLUSION:
This project is in compliance with the City's Stormwater
Design Standards.
PEACE LUTHERAN CHURCH -PAGE 3 OF 3 PAGES
t
Nt::s N
/
)
PE/r.CE UJrt1EK/tN
Ct1UKC/1
L-OC,A,T/O N t1 ,A,P
PEltCE LUTHER ltN CHURCH
2201KIO6Klr.NDE
COL-L-E6E 5Tlr.T/ONJ TEX,A,5
lr.U6U5TJ /99/
PR'EP/tR'ED e>Y:
t1E5/ER' ENGINEERING COHP/tNY
7007 Elt5/HltR'/:.. DR'!l/E, 5UllE 2'55-e>
COLLEGE 51 It/ION, rx 1184-0
<4-09)059-1100 FX:<4-09)095-10!'5
ef'?ail: hec2000caol.cof'?
DRAINAGE MAPS
PEACE LUTHERAN CHURCH
' t?RAINAal:: ARl::A MPP
PfACf L-UfHf RAN CH URCH
2201 1<10 aRANor:: BL-VD.
COL-L-E:Ci l:: 51 A fl ON,
BRAZOS CO UNIY, f'[::XA5
AUC1U51, 1991
5CAL.c;: I 11-'?00'
PRE:P ,ARI;!? l?Y:
Ht::5-rt:R t::NulNt::t::RINCi COMP.ANY
1601 fA5fWRK l?Rl\lf , 5Ulff 2?~-1?
COL.l-fc.if 5fA110N, fl< 77840
C 409) 6~9-1100 PX :C 409) 6~9-101 ?
email: hec2000@aol.com
I
N
~
x
k ~269.0
fr
&
269.7 .QJ
Subs t ati on
~6 .0
x --'x 275 .6
'
t?RAINMI:: AReA WP
Pl::AG'.: L.UIHl::RAN CHURCH
~ 2201 RIO CiRANt?I:: BL. Vt?.
286 ·3 COL.L.l::Cil:: 5fA110N,
BRAZ05 COUNIY, fl::XA5
.AU'.AU5f, 1991
P!<fPMt? BY:
1::5-n::R l::NCilNl::l::RINCi COMPANY
1601 E:A5fMARK t?RIVE'.. 5Ulre 2?:?-B
COL.L-E:ut:: 5fA110N. 1X 11840
C 409) 6:?9-ll CX> FX:C 409) 6:?9 -101?
email : r..c2CX>O@aol.com
•
PREDEVELOPMENT CONDITIONS
PEACE LUTHERAN CHURCH
• Quick TR-55 Ver.5.44
Executed: 07:27:58
S/N:l315430080
08-11-1997
PEACE LUTHERAN CHURCH
2201 RIO GRANDE BLVD.
PREDEVELOPMENT CONDITIONS (21.2 ACRES)
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs, C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
Descr.
OVERALL
Runoff
IC'
0.700
Area
acres
21.20
Tc
(min)
Wtd.
'C'
26.70 0.700
RETURN FREQUENCY = 100 years
'C' adjustment, k = 1
Adj. 'C' = Wtd.'C' x 1
Adj. I
'C' in/hr
0.700 7.208
Total
acres
21.20
Peak Q
(cfs)
106.97
POSTDEVELOPMENT CONDITIONS
PEACE LUTHERAN CHURCH
Quick TR-55 Ver.5.44
Executed: 07:30:57
S/N:1315430080
08-11-1997
PEACE LUTHERAN CHURCH
2201 RIO GRANDE BLVD.
POST DEVELOPMENT CONDITIONS (21.2 ACRES)
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs, C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
Descr.
Runoff
IC'
OVERALL 0.700
IMPROVEMENTS
0.900
Area
acres
21.03
0.17
Tc
(min)
Wtd.
'C'
26.70 0.702
RETURN FREQUENCY = 100 years
'C' adjustment, k = 1
Adj. 'C' = Wtd.'C' x 1
========================= ========
Adj. I
'C' in/hr
0.702 7.208
Total
acres
21.20
Peak Q
(cfs)
107.21
F.M. 2818 OPEN DITCH
CROSS SECTION CALCULATIONS
PEACE LUTHERAN CHURCH
PEACE LUTHERAN CHURCH PREDEVELOPMENT
Worksheet for Irregular Channel
Project Description
Project File c :\haestad\fmw\peace .fm2
Worksheet PEACE LUTHERAN CHURCH
Flow Element
Method
Solve Fo r
Irregular Channel
Manning's Formula
Water Elevation
Input Data
Channel Slope 0.010000 ft/ft
Elevation range : 274 .00 ft to 280 .00 ft .
Station (ft) Elevation (ft) Start Station
0 .00 0.00 280 .00
20 .00 278 .00
39 .00 276 .00
48 .00 274.00
57 .00 274 .00
125 .00 274 .50
198 .00 276 .00
260 .00 278 .00
342 .00 280 .00
Discharge 106.97 cf s
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
0.040
274 .78 ft
46 .26 ft 2
94 .18 ft
94.09 ft
0.78 ft
274.61 ft
0.032629 ft/ft
2.31 ft/s
0.08 ft
274 .86 ft
0.58
End Station
342 .00
Roughness
0.040
08/11/97
07:49 :50AM Haestad Methods , Inc . 37 Brookside Road Waterbury , CT 06708 (203) 755 -1666
FlowMas ter v5 .13
Page 1 of 1
PEACE LUTHERAN CHURCH POST DEVELOPMENT
Worksheet for Irregular Channel
Project Description
Project File c :\haestad\fmw\peace.fm2
Worksheet PEACE LUTHERAN CHURCH
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 0.010000 ft/ft
Elevation range : 274.00 ft to 280.00 ft .
Station (ft) Elevation (ft) Start Station
0.00 0.00 280.00
20 .00 278 .00
39 .00 276 .00
48 .00 274 .00
57 .00 274.00
125.00 274.50
198 .00 276 .00
260 .00 278 .00
342 .00 280 .00
Discha rge 107.21 cf s
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
0.040
274.78 ft
46 .33 ft2
94 .22 ft
94.13 ft
0.78 ft
274 .61 ft
0.032615 tuft
2.31 fUs
0.08 ft
274 .86 ft
0.58
End Station
342 .00
Roughness
0.040
08 /11/97
07:50 :46AM Haestad Methods , Inc . 37 Brooks ide Road Waterbury , CT 06708 (203) 755 -1666
FlowMaster v5.13
Pag e 1 of 1
Project Description
F.M. 2818 OPEN DITCH SECTION
Cross Section for Irregular Channel
Project File c:\haestad\fmw\peace .fm2
Worksheet PEACE LUTHERAN CHURCH
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
0.040
0. 01 0000 ft/ft
Water Surface Elevation
Discharge
274 .78 ft
107.21 cfs
280 . -------------T-------------,--------------r-------------,--------------r-------------T-----------,
I I I I I I I
I I I I I I I
I I I I I I I
I I I I I I I
----------t-------------~--------------~-------------i--------------~-------------------------~
I I I I I I I
I I I I I I I
I I I I I I I
I I I I I I I
278 .0 -------~-------------~--------------~-------------~--------------~-----------~-------------~ I I I I I I I g I I I I I I
-I I I I I I
I I I I I I
§ 277 .0 -----~-------------~--------------~-------------~------------~-------------!-------------~ :P I I I I I I I ro I I I I I I I ~ 276 .0 ----------__ j _____________ J ______________ l------------: ______________ l-------------1-------------J
08/11/97
09 :25 :31 AM
I I I I I I I
I I I I I I I
I I I I I I I
I I I I I I I
275 .0 ------------t-------------~--------------------------~--------------~-------------+-------------~
W I : : : :
I I I I
I I I I
274 .0'-----------------~--....::;;;;.... ____ __..__ __________ ....._ __________ __. ____________ ....._ __________ _.. __________ ___,
0.0 50 .0 100 .0 150 .0 200 .0 250 .0
Station (ft)
Haestad Methods , Inc. 37 Broo ks ide Road Waterbury , CT 06708 (203 ) 755 -1666
300 .0 350 .0
FlowMaster v5 .13
Page 1of 1
/ r
ACCOUNT NO ·-------------------
CITY OF COLLEGE STATION 3 9 914 7 ~:::=--~---1...L---. 1f\l "
F
·..,_
Figure Xll
Dev elopment Permit
City of College Station, Texas
Site Legal ~cription ~ ~, ~C:f, lo-A ~ 3G
Site Owne . Zk.c Lin~ Ctdur'2-Ct.-!-Address (2'2o\ ~ ~ C .';,
Telephone: ~""'t "'!::> -L:14o3
Architect/~ Se Engineer :~ V:
Date Application Filed : C;?• \ \ :"11
l'9o 1. ~r-rrr--f'Kf2-V-§ 26 "$ • B
Addr~ss : C . S. . :tp. '7'7 t54o
Telephone No : G°i\ ~ .-t l(!:n.?
' Address : -------------
Telephone No : ----------
Approved : ------------
Application is hereby made fc?r the following development specific waterway alterations :
o~E'"
-@ Application Fee
"\:] Signed Certifications
-@ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
---6:1 Site and Construction Plans, with supporting Drainage Report two (2) copies each.
D Other: ------------------------------
>"ACKNOWLEDGMENTS :
I, '/Vi. ~l:zt1...lf k (., · HEST~1~esign engineer/owner, hereby acknowledge or affirm that:
The information and conclusions cl ntained in the above plans and supporting documents comply
with the current requirements of the City of College Station, Texas City° Code, Chapter 13 and its
associated Drainage Policy and Design Standards .
As a condition of approval of this permit application, I agree to construct the improvements
proposed in this application according to these documents and the requirements of Chapter 13 of
the College Station City Code.
Property Owner(s) Contractor
Figure XU Continued
CERTlFlCATIONS : (for proposed alterations within designated flood hazard areas.)
A . I, \AA ~ t=brrtn--, certify that. any nonresidential structure on or proposed
part of this application is designated to prevent damage to the structure or its
offlo?{1ing from the 100 year stonn .
. f& ~G. ~v_'·_tl_~~l ~~~~~
Date
-
B . l , certify that the finished floor elevation of the lowest
floor, including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the latest Federal Insurance Administration
Flood Hazard Study and maps, as amended .
· Engineer Date
C . I, V'A, ~I.. Gr ~ify that the alterations or development covered by
this permit shall not diminish the flood-c rying capacity of the waterway adjoining or crossing
this permitted site and that such alterations or development are consistent with requirements of
the City of C e Station City Code, Chapter 13 concerning encroachments of flood ways and of
floo wa~ fr. ng
Pc
Conditions o_r comments as part of approval : --------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development. All development shall be in accordance with the plans
and specifications submitted to and approved by the City Engineer for the above named project .
All of the applicable codes and ordinances of the City of College Station shall apply .