HomeMy WebLinkAbout3 Development Permit 465 MWM Corporate Office BuildingDEVELOPMENT PERMIT
PERMIT NO . 465
MWM Corporate Office Building
FOR AREAS OUTSIDE TIJE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF TIJE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Emerald Park Plaza, Block One, Lot 3
OWNER:
M .W .M . Corp.
Jeff McDowell
2114 Southwood Dr.
College Station, Texas 77845
845-4500
DRAINAGE BASIN:
Bee Creek, Segment I
TYPE OF DEVELOPMENT:
SITE ADDRESS:
Not Addressed
This permit is valid for site construction as shown on the approved site plans.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales
used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All
development shall be in accordance with the plans and specifications submitted to and approved by the
City Engineer in the development permit application for the above named project and all of the codes and
ordinances of the C' of ollege Station that apply.
Date
Date l I
•
DRAINAGE ANALYSIS FOR
PROPOSED OFFICE
BUILDING
1601 EMERALD PARKWAY
COLLEGE ST A TION, BRAZOS COUNTY,
TEXAS
MAY, 1997
-.
~PPROVED FO . w7 ~NSTRU~
Submitted By:
Hester Engineering Company
7607 Eastmark Drive, Suite 253-B
College Station, TX 77840
(409)693-1100 fx:(409)693-1075
CERTIFICATION
I hereby certify that this report and accompanying
drainage plan for the drainage design was prepared by me in
accordance with the provisions of the Cities Drainage Policy
and Design Standards for the owners thereof.
P.c.
Engineer No. 69104
PROPOSED OFFICE BUILDING -160 I EMERALD PARKWAY -CERTIFICATION
TABLE OF CONTENTS
DRAINAGE ANALYSIS
INTRODUCTION
EXISTING DRAINAGE BASIN DESCRIPTION
PROPOSED DRAINAGE
DRAINAGE CALCULATIONS
CONCLUSION
DRAINAGE MAPS
PREDEVELOPMENT CONDITIONS
POSTDEVELOPMENT CONDITIONS
GEMSTONE DRIVE CROSS SECTION CALCULATIONS
BEE CREEK CROSS SECTION CALCULATIONS
PROPOSED OFFICE BUILDING -1601 EMERALD PARKWAY -TABLE OF CONTENTS
DRAINAGE ANALYSIS
PROPOSED 12000 S.F. OFFICE BUILDING
1601 EMERALD PARKWAY
COLLEGE STATION, TEXAS
MAY, 1997
INTRODUCTION:
The propose d development is located a l ong the north side of
the 1600 block of Emerald Parkway. The legal description is
Em erald Park Plaza, Block One , Lot 3. The proposed development
includes a 12000 square foot building , parking area and
associated infrastructure. The site is zoned A-P and is being
developed by M.W.M. Corp., 2 114 Southwood Dri ve, College Station ,
TX 77840 , (409)845-4500 , Mr. Jeff McDowell.
EXISTING DRAINAGE BASIN DESCRIPTION:
The drainage area consists of 1. 18 acres of grassland and
the terrain slopes with an average grade of approximately 3 .65%
in a northwesterly direction toward Gemstone Drive. The latest
Federal Emergency Management Agency Flood Insurance Rate Maps
show that no portion of the lot is in the regulatory 100-year
flood plain.
PROPOSED DRAINAGE:
The proposed pavement design will route the runoff along
driveways and onto Gemstone Drive. From there it travels along
Gemstone approximately 500 feet and discharges into Bee Creek
Tributary "A", a primary channel. Detention is not planned for
the site because the runoff generated by the improvements will be
maintained in the curb and gutter section along Gemstone Drive
and will not significantly increase the level of the water
surface e levati on of Bee Creek Tribu tary "A ".
PROP OSED OFFICE BUILDING -1601 EMERALD PARKWAY -PAGE I OF 3 PAGES
DRAINAGE CALCULATIONS:
Gemstone Drive was evaluated to determine the allowable
water surface elevation in the curb and gutter section. It was
determined that with the ultimate development of the subdivision
draining to Gemstone the maximum water surf ace elevation in the
section will not raise above 0. 39 feet (QlO) which is within
acceptable limits required by College Station's Drainage
Ordinance , (See Gemstone Drive Cross Section Calculations).
Bee Creek Tributary
change in water surf ace
"A" was evaluated
elevation due
to
to
determine any
the proposed
improvements to t he 1 .1 8 acre tract. A QlOO postdevelopment
r u noff quantity was determined and added to the existing QlOO
flow in the tributary and there was no significant increase in
the water surface elevation , (0. 01 feet). The QlOO for Bee Creek
Tributary "A" was taken from the Federal Emerge n cy Management
Agency, Flood Insurance Study, Summary of Discharges, Table 2 ,
Page 12. The QlOO at the confluence with the Bee Creek main
channel is 3300 cfs and the QlOO at Texas Avenue is 2500 cfs. The
2700 cfs used in this report is an interpolation between the two,
(see Bee Creek Cross Section Calculations) .
Predevelopme nt discharges for the 2 , 5, 10 , 25 and 100 year
storms for the 1.18 acres site wer e determined using the
Haestead Methods Quick TR-55 rational method for computing
runoff hydrographs. Detailed calculations are contained in
PROPOSED OFFICE BUILDING -160 I EMERALD PARKWAY -PAGE 2 OF 3 PAGES
PREDEVELOPMENT CONDITIONS.
Post-development discharges were determined utilizing the
same hydrography methodology. Detailed calcu lations are contained
in POSTDEVELOPMENT CONDITIONS.
CONCLUSION:
This project is in compliance with the City 's Stormwater
Design Standards .
PROPOSED OFFI CE BUILDING -160 I EMERALD PAR KWAY -PAGE 3 OF 3 PA GES
F .M. 2818
>-s
I
w
f-
<(
f-
(f)
~B E E CREEK
TRIB . "A"
EMERALD
PARK PLAZA c 7,~, ,______._..
t:.MERALO
pp..RKWAY
SITE
LOCATION
ARC
KfY M!\f?
PROP05~D Off~CE: BU~~D~Na
~60~ fMfRAlD PARKWAY
E: ME:RAl D PARK P~AZA
Bl-OCK ONE: J l-01r rHRE:E:
COL.l-rear: 5 trAl~ONJ flfXA5
DRAINAGE MAPS
PROPOSED OFFICE BUILDING -1601 EMERALD PARKWAY
25 4
'/
J
. 254.
200
C ReCt.::Nf fll-l-)
Bt:t: APPROXIMAfr.::
.... cRcttL-OOt? Pl-AIN
-......::::..1::: c~ ','Os
250 5 ~s sc. IF'
VACANf .... ~!\! ..
-
Mf:RRll-l-l-YNCH
60 'ROW-?:>9'B·-B C=0.6?
tc=IOmln. -..(
'lZ-ouJ 010-=CIA
....__ l=8 .6~1n/ hr . f ( _ (-CiE'.MSIONf DR/Ve "' A= 1.7 4 ACRf 5
-
~.?% PAVE:Mt::N-r SL-OPE:: J ?\--. " ; \ 0 10=9.8 cfo \_ \ \\
X-SfM.SWR. {: ~ ~ \__ _ __ _ _ _
1
I
N
Non:::
t?RAINACit:: WIL-L-ONL-Y RUN
t?OWN NORIH 5 1t?t:: Of 5-rRt::e-r .
2 .:7% PAVeMeNr 51.-0Pe ~
~ SCAL-e, I "-100'
1 ,~VLLIW1AT~ -
DRAINAa~ ARfA r-o X -5~M.5WR.
PROP05t:t? O f f 1cr: BU IL-t?INa
1601 t:Mf:RAL-t? PARKWAY
C OL-L-f:CJE: 51Al lON , BRAZOS COUNIY, lfXA5
A
1.74 ACRe5
---------------------------. ----· --------.. --------------
,,
PREDEVELOPMENT CONDITIONS
PROPOSED OFFICE BUILDING -160 I EMERALD PARKWAY
Quick TR-55 Ver.5.44
Executed: 15:28 :01
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY
1.18 ACRES
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs , C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C ' adjustment factor for each return frequency
Subarea
De scr.
Runoff
IC'
PERVIOUS 0.450
IMPERVIOUS 0.900
Area
acres
1.13
0.05
Tc
(min)
Wtd.
I C '
10.00 0.469
RETURN FREQUENCY = 2 years
'C' adjustment , k = 1
Adj . 'C' = Wtd.'C' x 1
========================= ========
Adj. I
'C ' in/hr
0.469 6 .300
Total
acres
1 .18
Peak Q
(cfs)
3.49
Quick TR-55 Ver.5.44
Executed : 15:28 :01
S /N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY
1.18 ACRES
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs, C=Weighted Runoff Coefficient , I=in/hour, A=acres
adj = 'C ' adjustment factor for each return frequency
Subarea
Descr.
PERVIOUS
Runoff
'C '
0.450
IMPERVIOUS 0.900
Area
acres
1.13
0.05
Tc
(min)
Wtd .
IC '
10.00 0 .469
RE TURN FREQUENCY = 5 years
'C' adjustment, k = 1
Adj . 'C ' = Wtd.'C ' x 1
========================= ========
Adj . I
'C ' in/hr
0.469 7 .690
Total
acres
1.18
Peak Q
(cfs)
4 .26
Quick TR-55 Ver .5.44
Executed: 15:28:01
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY
1.18 ACRES
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs, C=Weighted Runoff Coefficient , I=in/hour , A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
Descr.
Runoff
IC'
PERVIOUS 0 .450
IMPERV I OUS 0 .900
Area
acres
1.13
0 .05
Tc
(min)
Wtd.
IC'
10 .00 0.469
RETURN FREQUENCY = 10 years
'C' adjustment, k = 1
Adj . 'C' = Wtd. 'C' x 1
========================= ========
Adj. I
'C' in/hr
0.469 8 .630
Total
acres
1.18
Peak Q
(cfs)
4.78
Quick TR-55 Ver.5.44
Executed: 15:28 :01
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY
1 .18 ACRES
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs , C=Weighted Runoff Coefficient , I=in/hour, A=acres
adj = 'C ' adjustment factor for each return frequency
RETURN FREQUENCY = 25
'C' adjustment, k = 1
Adj. 'C' = Wtd .'C' x 1
years
Subarea
Descr.
Runoff
'C '
PERVIOUS 0 .450
IMPERVIOUS 0.900
Area
acres
1 .13
0 .05
I
Tc
(min)
Wtd.
IC'
10.00 0 .469
=========================
Adj. I
'C ' in/hr
0 .469 9 .860
Total
acres
1.18
Peak Q
(cfs)
5 .46
Quick TR-55 Ver .5.44
Executed: 15:28:01
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY
1 .18 ACRES
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs , C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
Descr.
Runoff
IC'
PERVIOUS 0.450
IMPERVI OUS 0.900
Area
acres
1.13
0.05
Tc
(min)
Wtd.
IC '
10.00 0 .469
RETURN FREQUENCY = 100 years
'C' adjustment, k = 1
Adj. 'C' = Wtd.'C' x 1
========================= ========
Adj . I
'C ' in/hr
0.469 11.640
Total
acres
1.18
Peak Q
(cfs)
6.44
,.
POSTDEVELOPMENT CONDITIONS
PROPOSED OFFICE BUILDING -160 I EMERALD PARKWAY
Quick TR-55 Ver .5.44
Executed : 15 :3 1:0 6
S/N :l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY 1.18 ACRES
POST DEVELOPMENT CONDITIONS
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs , C=Weighted Runoff Coefficient, I=in/hour , A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
Descr.
Runoff
I C'
COMMERCIAL 0.650
Area
acres
1.18
Tc
(min)
Wtd.
'C'
10.00 0 .650
RETURN FREQUENCY = 2 years
'C ' adjustment, k = 1
Adj . 'C' = Wtd.'C' x 1
=========================!========
Adj. I Total Peak Q
'C' in/hr acres (cfs)
0 .650 6 .300 1 .18 4.83
]) VJ. p <U-~. Lf (o d-
ft? er~~ ? /(-Pl itZ-A-Slv~ ~
Vri,~ Desb"~1
5, ?:>0fs
Quick TR-55 Ver.5.44
Executed: 15 :31 :06
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY 1.18 ACRES
POST DEVELOPMENT CONDITIONS
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where : Q=cfs, C=Weighted Runoff Coefficient, I=in/hour , A=acres
adj = 'C ' adjustment factor for each return frequency
Subarea
Descr.
Runoff
I C'
COMMERCIAL 0.650
Area
acres
1.18
Tc
(min)
Wtd .
'C '
10.00 0 .650
RE TU RN FREQUENCY = 5 years
'C ' adjustment, k = 1
Adj . 'C ' = Wtd.'C' x 1
========================= ========
Adj. I
'C' in/hr
0 .650 7.690
Total
acres
1.18
Peak Q
(cfs)
5.90
Quick TR-5 5 Ver.5.44
Executed: 15 :31:06
S/N:l315430080
05-06-1997
PROPO SED OFFICE BUILDING
16 01 EMERALD PARKWAY 1.18 ACRES
POST DEVELOPMENT CONDITIONS
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs , C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
Descr.
Runoff
'C '
COMMERCIAL 0.650
Area
acres
1.18
Tc
(min)
Wtd.
IC'
10 .00 0 .650
RETURN FREQUENCY = 10 years
'C ' adjustment, k = 1
Adj. 'C' = Wtd.'C' x 1
Adj. I
'C' in/hr
0 .650 8.630
Total
acres
1.18
Peak Q
(cfs)
6 .62
Quick TR-55 Ver.5.44
Executed: 15:31:06
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
1601 EMERALD PARKWAY 1 .18 ACRES
POST DEVELOPMENT CONDITIONS
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Wh ere : Q=cfs, C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C' adjustment factor for each return frequency
Subarea
De scr.
Runoff
'C'
COMM ERCIAL 0 .650
Area
acres
1.18
Tc
(min)
Wtd .
IC '
10.00 0.650
RETURN FREQUENCY = 25 years
'C ' adjustment, k = 1
Adj. 'C' = Wtd.'C' x 1
========================= ========
Adj. I
'C' in/hr
0.650 9.860
Total
acres
1 .18
Peak Q
(c fs )
7.56
Quick TR-55 Ver.5 .44
Executed: 15 :31:06
S/N:l315430080
05-06-1997
PROPOSED OFFICE BUILDING
16 01 EMERALD PARKWAY 1.18 ACRES
POST DEVELOPMENT CONDITIONS
* * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * *
Q = adj * C * I * A
Where: Q=cfs, C=Weighted Runoff Coefficient, I=in/hour, A=acres
adj = 'C ' adjustment factor for each return frequency
Subarea
Descr.
Runoff
I C'
Area
acres
CO MMERCIAL 0 .650 1.18
Tc
(min)
Wtd .
IC '
RETURN FREQUENCY = 1 00 years
'C ' adjustment , k = 1
Adj . 'C ' = Wtd.'C' x 1
========================= ========
Adj. I
'C' in/hr
Total
acres
Peak Q
(cfs)
10.00 0.650 0.650 11 .640 1.18 8.93
Rs1 ~"
l\Loo
~ 1flv
G\ L UlJ
,.
GEMSTONE DRIVE CROSS SECTION
CALCULATIONS
PROPOSED OFFICE BUILDING -1601 EMERALD PARKWAY
GEMSTONE CROSS SECTION
Rating Table for Irregular Channel
Project Descript ion
Project File c :\haestad\fmw\mwm .fm2
Worksheet GEMSTONE SECTION
Flow Element
Method
Solve For
Irregular Channel
Manning 's Formula
Water Elevation
-s+-re~t
ur"'c(11 .
~CuL~LLOr-.._s
Constant Data -~ Q
1
"
___,,,D....,..is_c...,...h-a-rg_e _ ___,,9-.8,.....,0-c""""f-s--~ -~0
Input Data
Channel Slope
Rating Table
Channel
Slope
(ft/ft)
Minimum
0 .015000
Wtd . Mannings
Coefficient
Maximum Increment
0.023000 0 .008000 ft/ft
Water Surface
Elevation
(ft )
Velocity
(ft/s)
0 .015000 ~ 0.018 253 .89 3 .33
0.023000 ) 0 .018 253 .86 3 .91
05107197
08 :53 :30 AM
l~
Haestad Methods , Inc. 37 Brookside Road W ate rbury , CT 06708 (203) 755-1666
FlowMaster v5.13
Page 1 0~1
GEMSTONE DRIVE CROSS SECTION
Worksheet for Irregular Channel
Project Description
Project File c:\haestad\fmw\mwm.fm2
Worksheet GEMSTONE SECTION
Flow E lement
Method
Solve For
Input Data
Irregular Channel
Manning's Formula
Water Elevation
Channel Slope 0.015000 ft/ft .<;#----
Elevat ion range : 253 .50 ft to 255 .00 ft .
Station (ft) Elevation (ft)
0.00 255 .00
10.50 254 .00
1 1 .00 254 .00
1 1 .00 253 .50
30 .50 254 .00
Start Station
0 .00
10.50
End Station
10 .50
30 .50
~D_i_sc_h_a~rg~e~~~~~~~-9_.8_0~~-cf_s~~<:::.::_~-,~~~
Results
Wtd. Mannings Coefficient 0.018
Water Surface Elevation 253 .89 ft
Flow A rea 2 .94 ft2
Wetted Perimeter 15 .54 ft
Top W idth 15 .14 ft
He ight 0 .39 ~~d~~ Critical Depth 253 .94 ,---,.
.ct:: ~s-itnG
Roughness
0 .030
0 .018
G2 c_....,12.~
Critica l Slope 0 .008120 ft/ft tore_ l' S o(o SL<:J~ Velocity 3 .33 ft/s
Velocity Head 0 .17 ft ~ ::-Specific Energy 254 .06 ft cO' ~.q FT
Froude Number 1.33 @ Flow is supercritical. ~lO -q.b CFS -
05107197
08 :54 :16 A M Haes tad Methods , In c . 37 Brooksi de Road Waterbury , CT 06 708 (203) 755-1666
Flo wM as te r v 5.13
Page 1 of 1
GEMSTONE CROSS SECTION
Cross Section for Irregular Channel
Project Description
Project File c :\haestad\fmw\mwm .fm2
Worksheet GEMSTONE SECTION
Flow Element Irregular Channe l
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
0 .018
0 .015000 ft/ft
Water Surface Elevation
Discharge
253.89 ft
9.80 cfs
255 .
254 .8
254 .6
g 254.4
§ 254.2 ~ >
Q) w 254 .0
253 .8
253 .6
-------------1-------------1--------------r-------------,--------------r-------------T-------------1
I I I I I I I
I I I I I I I
I I I I I I I ------------~-------------~--------------~-------------~--------------~-------------+-------------~ I I I I I I I
I I I I I I I
I I I I I I I
-~-------------J--------------L-------------~--------------L-------------L-------------J I I I I I I I
I I I I I I
I I I I I I
I I I I I I ---------;--------------r-------------,--------------r-------------r-------------1
I I I I I I
I I I I I I
I I I I I I I
-------------~------------~--------------~-------------~--------------~-------------+-------------~ I I I I I I I
I I I I I I I
I' I I I I I I -------------~-------------J -----------L-------------~--------------L------------------------J I I I I I I
I I I I I I
: : I y I I I : -------------,-------------,-------------r-------------,-----------r-------------r-------------1
I I I I I
I I I I I I
I I I I I I I
-------------~-------------~--------------~--------------~-------------+-------------~ I I I I I I
I I I I I I
I I I I I I
253.4'---~~~~~---L~~~~~~-L-~~~~~~..._~~~~~---"L--~~~~~-L~~~~~~-'-~~~~~---'
0 5107197
08 :54 :31 AM
0 .0 5.0
,.
10 .0 15 .0 20 .0 25 .0
Stat ion (ft )
Hae st ad Met hods , In c . 37 Brooksi de Roa d W at erbury , CT 067 08 (203 ) 755 -1 666
30 .0 35 .0
FlowMaster v5 .13
Pag e 1 of 1
BEE CREEK CROSS SECTION CALCULATIONS
c AN '1 com PAI?. F-
H-y 'D /2hVL-1 C C~f-C f.
/o UP& be.~>~
~ :;J'l:;~~J
PROPOSED OFFICE BUILDING -1601 EMERALD PARKWAY
BEE CREEK CROSS SECTION PREDEVELOPMENT
Worksheet for Irregular Channel
Project Description
Project File c :\haestad\fmw\mwm.fm2
Worksheet BEE CREEK TRIB "A" SECTION
Flow Element
Method
Solve For
Input Data
Irregular Channel
Manning's Formula
Water Elevation
Channel Slope 0.007500 tuft
Elevation range : 241 .50 ft to 256 .00 ft .
Station (ft)
0.00
37 .00
52 .00
65 .00
108 .00
129 .00
14_8 .00
153 .00
175 .00
176 .00
178 .00
185 .00
202 .00
436 .00
455 .00
494 .00
Discharge
Results
Elevation (ft)
253.70
252 .00
250 .00
248 .00
246 .00
244 .00
242 .00
241 .50
241 .50
244 .00
246.00
248 .00
250 .00
252.00
254 .00
256 .00
2,700.00
Wtd . Mannings Coefficient 0.060
Water Surface Elevation 248 .99
Flow Area 520 .09
Wetted Perimeter 138 .11
. Top Width 134.90
Height 7.49
Critical Depth 246.89
Start Station
0 .00
52 .00
202.00
cf s
ft
ft2
ft
ft
ft
ft
Critical Slope 0.037953 tuft
Velocity 5.19 tus
Velocity Head 0.42 ft
Specific Energy 249.41 ft
Froude Number 0.47
Flow is subcritical.
End Station
52 .00
202 .00
494 .00
Roughness
0.030
0.060
0 .030
05106197
07 :44 :34 PM Haestad Methods , Inc . 37 Brookside Road Wate rb ury , CT 06 708 (203) 755 -1666
Flow Master v5 .13
Pa ge 1 of 1
;
BEE CREEK CROSS SECTION PRE DEVELOPMENT
Rating Table for Irregular Channel
Project Description
Project File c :\haestad\fmw\mwm .fm2
Worksheet BEE CREEK TRIB "A" SECTION
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Constant Data
Channel Slope 0 .007500 ft/ft
Input Data
Minimum Maximum Increment
Discharge 500 .00 2,700 .00 250 .00 cfs
Rating Table
Water Surface
Discharge Wtd . Mannings Elevation Velocity
(cfs) Coefficient (ft) (ft/s)
500 .00 0 .060 244 .93 3.69
750 .00 0 .060 245 .70 4 .10
1,000 .00 0 .060 246.40 4 .28
1,250 .00 0 .060 246.99 4 .38
1,500.00 0 .060 247.47 4 .50
1,750.00 0 .060 247 .88 4 .62
2 ,000.00 0.060 248 .21 4 .77
2 ,250 .00 0 .060 248 .51 4.93
2 ,500 .00 0 .060 248 .78 5.08
2 ,750.00 0 .060 249 .04 5.22
'E::tx: a2tx:K
tbc DEV
05106197
07:46 :14 PM Haestad Meth ods, Inc. 37 Brookside Road Waterbury , CT 06708 (2 03) 755-1666
FlowMaster v5 .13
Page 1 of 1
BEE CREEK CROSS SECTION PRE DEVELOPMENT
Cross Section for Irregular Channel
Project Description
Project File c:\haestad\fmw\mwm.fm2
Worksheet BEE CREEK TRIS "A" SECTION
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
0.060
0.007500 ft/ft ~ ~ tf2__12..t'::
Water Surface Elevation
Discharge
248.99 ft ~ ,-;rr--~
2 ,700 .00 cfs --LQ,,
256 .0
254 .
252.0
2 250 .0 -
c 2 248.0
(iJ
> (lJ w 246 .0
244 .0
242 .0
\0
---------r---------r---------r---------r---------7---------7---------,---------,---------,--------
1 I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
---------~---------~---------r---------~---------•---------•---------~---------~---------~ -------~ I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
--r---------r. ---------r.---------[r~-~-~-~-~-~-~-~-~-~1~-~-~-~-~-~-~-~-;-~:~-~-~-~-~-~-~-~-~-~:=-~-~-~-~-~-~-~-~-~~:-~-~-~-~~-1---------1
I I I I I --------r---------r---------------7---------7---------,---------,---------,---------1
I I I I I I I I I
: I y I I : : : : : : ---------r--------r---------r--------r---------~---------~---------~---------~---------~---------~
I I I I I I I I I I
I I I I I I I I I I I' I I I I I I I I I
---------L---------~ -------L-------L---------~---------~---------~---------~---------~---------~ I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I ---------r---------r--------r--------r---------1---------1---------,---------,---------,---------1
I I I I I I I
I I I I I I I
I I I I I I I I I I ---------r---------r------------r---------,---------,---------,---------,---------,---------~
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
240 .01..-~~~-L~~~~...1.-~~~~.L-~~~---L~~~~.....L.~~~~-'-~~~~1..-~~~-L~~~~-'-~~~---'
0 5 10 6 197
07:46 :55 PM
0.0 50.0
,,
100 .0 150 .0 200 .0 250 .0
Station (ft )
300 .0 350.0
Hae sta d Meth ods , Inc . 37 Brook s ide Road W aterbury , CT 06708 (203) 755 -1666
400 .0 450 .0 500.0
F lo wMaster v5 .13
Page 1 of 1
BEE CREEK CROSS SECTION POST DEVELOPMENT
Worksheet for Irregular Channel
Project Descript ion
Project File c:\haestad\fmw\mwm .fm2
Worksheet BEE CREEK TRIS "A" SECTION
Flow E lement
Method
Solve For
Input Data
Irregular Channel
Manning's Formula
Water Elevation
Channel Slope 0.007500 ft/ft
Elevation range : 241 .50 ft to 256 .00 ft .
Station (ft) Elevation (ft)
0 .00 253 .70
37 .00 252 .00
52 .00 250 .00
65 .00 248 .00
108.00 246 .00
129.00 244.00
148 .00 242 .00
15 3 .00 241 .50
175 .00 241 .50
176 .00 244 .00
178 .00 246 .00
185 .00 248.00
Start Station
0 .00
52 .00
202 .00
End Station
52 .00
202 .00
494 .00
Roughness
0 .030
0 .060
0 .030
202 .00 250 .00
436 .oo 252 .00 /QLoo ci= ~ST Th-~
455 .00 254 .00
494 .00 256 .00 cfs t / /1d6. "CD Tu Qc >L,~(26-c.
Discha rge 2 ,702.49 1.:-Q_ ---=----...;._______ PF r~ G2z:c~
Results
Wtd . Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top .Width
Height
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
0.060
249 .00 ft
520.44 ft2
138 .14 ft
134 .94 ft
7.50 ft
246 .89 ft
0.037950 ft/ft
5.19 ft/s
0.42 ft
249.41 ft
0.47
q l.Oo -= -z..?. o o c~s
qoa -=-"270-z,4 \
W5LJ.-= 2~.crCf
24q.oo
05106197
07 :5 1:19 PM Haes tad M et hods , Inc . 37 Brookside Road W aterbury , CT 06708 (2 03) 755-1666
Fl owMaster v 5.13
Page 1 of 1
BEE CREEK CROSS SECTION POSTDEVELOPMENT
Cross Section for Irregular Channel
Project Description
Project F ile c :\haestad\fmw\mwm.fm2
Worksheet BEE CREEK TRIB "A" SECTION
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation
Section Data
Wtd . Mannings Coefficient
Channel Slope
0 .060
0 .007500 ft/ft ------Lu, .s . 0.0\ F-cc(
Water Surface Elevation
Discharge
249.00 ft
2,702.49 cfs
256 .0
254 .
252 .0
g 250.0
c
0 248.0 ~ > Q) w 246 .0
244 .0
2 42.0
---------r---------r---------r---------r---------T---------T---------,---------,---------,--------
1 I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
---------~---------~---------~---------~---------~---------~---------~---------~---------~ -------~ I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I --L---------L---------L---------L---------i _________ J _________ J _________ J____ -J---------~
I I I I I I I I I
I I I I I I I I
I I I I I I I I
I I I I I I I --------r---------r---------------,---------,---------,---------,---------,---------,
I I I I I I I I I
I I 1' I : : : : : : : ---------r--------r---------r--------r---------~---------~---------~---------~---------~---------~
I I I I I I I I I I
I I I I I I I I I I _______ J '-~---------~ _______ i____ _ __ i _________ 1 _________ 1 _________ J _________ J _________ J _________ J
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I ---------r---------r--------r--------r---------1---------1---------,---------,---------,---------i
I I I I I I I I
I I I I I I I I
I I I I I I I I I I ---------r---------r------------r ---------T---------T---------,---------,---------~---------~
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I 240.0L-~~~-L.~~~~.L-~~~-L~~~~....._~~~~~~~~-L-~~~--J~~~~....L..~~~--I...-~~~-'
05 106197
07 :51 :55 P M
0 .0 50 .0 100.0 150 .0 200 .0 250 .0
Station (ft )
300 .0 350 .0
Haestad Met hods, Inc . 37 Brookside Road W aterbury , CT 06708 (203 ) 755 -1 666
400 .0 450 .0 500.0
Flo wMas ter v5 .13
Pa ge 1 of 1
Figure Xll
Development Permit
City of College Station, Texas
Site Legal Description :~ ~~A
Site Owner: t-J\ ·~ • 1/V\ ' Corte
j:pf, VlftC CP\FJ ~ l (
Address '2.~ ~"QAo.l!'.:()O Oz,
Telephone : ---'S ...... '1-Wo
Arc~itect/ ~ G 0_ () Address"l:ool ¢k,"'1'.£W;QI::'. Si, . 7-S.'2, ~B
Engineer: ~-' [Lt~lt~ (~et . Telephone No : ~ "'b t ( U O
Contractor: ____________ _ Address: -------------
Te 1 e phone No : __________ _
Date Application Filed : S · LS -<q 1 Approved : ___________ _
Application is hereby made for the following development specific waterway alterations :
0 Application Fee
~ Signed Certifications
~ Drainage and erosion control plan , with supporting Drainage Report two (2) copies each.
0 Site and Construction Plans, with supporting Drainage Report two (2) copies each.
0 Other:
------------------------------~
ation and conclusions contained in the above plans and supporting documents comply
rrent requirements of the City of College Station, Texas City Code, Chapter 13 and its
associated Drainage Policy and Design Standards .
As a condition of approval of this permit application, I agree to construct the improvements
proposed in this application according to these documents and the requirements of Chapter 13 of
the College Station City Code .
Contractor
Figure XH Continued
CERTIFICATIONS (for proposed alterations within designated flood hazard areas .)
A. I,M l~ G.~~f Q~ertify that any nonresidential structure on or propo~ed
e on this s· as part of this application is designated to prevent damage to the structure or its
tents as a re ult of ooding from the l 00 year storm .
~ f!e,. 8-ts-97
Date
B . I, certify that the finished floor elevation of the lowest
floor , including any basement, of any residential structure, proposed as part of this application is
at or above the base flood elevation established in the latest Federal Insurance Administration
Flood Hazard Study and maps, as amended .
Engineer Date
C. certify that the alterations or development covered by
this permit shall not diminish the flo -carrying capacity of the waterway adjoining or crossing
this permitted site and that such alterations or development are consistent with requirements of
the C y of Coll Station City Code, Chapter 13 concerning encroachments of flood ways and of
way frin es .
Conditi o ns or comments as part of approval :--------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I here by grant this permit for development. All development shall be in accordance with the plans
and s pecifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the City of College Station shall apply .
fcwmsloW~xnmt/I 0-9}
PAY
TO THE
ORDER
OF
/
· ... .:"
.. MW.M CORj:>ORATIO.f.J.;'··········
OBA ROSEWOOD VILLAS
. . .. , .OPERATING ACCOUNT •..•..
4101 t EXli.s AvE : .. ;. surti:: s >4o9 "2as -0331 ....... ; · BRYAN ;'li(118.02 i i; :}
v1cToRIA eA°Ni< AND i"Rusi" .
... 3o0o B ~IAR q REST • °;;
BRYAN ;'TX77802 ... · ·
a8~2 s11113 ( .a3s .; >
. 'DATE "•': .
.. ·· ...... r: . : .. ;~ t . . : .. ~, ; < '; <\ s:f;t~?ff =:.
. o~LV\lt 6 ~ o V\E\:'.> ;~L Wu. oci/oo':· ' ·.;;:.~~-:::...;.. · ~~+::--~~
.,t.;rrl · OT=i. CJ?}:c ~ :s--rA:-ntl~.r ·.· .. ·. ~·
·'.'"
-:·. ,.;•'.•. ;'.; ·a·i §os
383165
CITY OF C~E STATION
s L[tJ VY! D
RECEIVE
1
D OF ( VY I
:: s:J J (f ,.iil_ ( ,lJil:{) I '
.·'