HomeMy WebLinkAbout60 StataCorp 03-73 4905 Lakeway Dr.Stata Coq~oration Phase Ill -Engineer's Estimate
February 2005
Item Description Unit Quantity Unit Cost Amount
GENERAL ITEMS
1 Mobilization LS 1 $ 1,172 .50 $ 1,172.50
Subtotal $ 1, 172.50
WATER ITEMS
2 6" PVC Water Line C900 CL200 LF 201 $ 25 .00 $ 5 ,025.00
3 18" x 6" Tapping Sleeve & Valve EA 1 $ 2 ,200 .00 $ 2 ,200.00
4 Standard Fire Hydrant Assembly EA 1 $ 2 ,500 .00 $ 2,500 .00
5 Connection to Existing System EA 1 $ 2 ,000 .00 $ 2 ,000.00
Subtotal $ 11,725.00
TOTAL $ 12,897.50
. '
'·.
·'""~ ,,.,,.'t',,., .......
.,~1 )\ .}~1i'r I ..,.. ·'I~ .-. • "'
t ,:.;~ .. • -; ... :· (,.,. }. ·,
,~ ~-,.. . \ •I~/. '" ~, ,_.,.a
'•._ I\; t_J().t f l-::~~ ; f
' .
',• ·-
~-v DEVELOPMENT PERMIT
PERMIT NO . 04-73
Project: STATA CORPORATION
COLllGl STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
The Business Center @ College Station
Phase Two
Block 4, Lot 2
DATE OF ISSUE: 04/14/04
OWNER:
Stata Corporation c/o Alan Riley
4905 Lakeway Drive
College Station , Texas 77845
SITE ADDRESS:
4905 Lakeway Drive
DRAINAGE BASIN:
Alum Creek
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operat ions of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents,
asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
TCEQ PHASE II RULES IN EFFECT.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilit ies.
I hereby grant this permit for development of an area inside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
appl ication for the above named project and all of the codes and ordinances of the City of College Station that apply .
Date
I 2· -i 1 .. 0 ~
Ow er/AgenUContractor Date
02 /14 /2005 16 :56 FAX 9792603564 MI TCHELL and MOR GAN
Stata Corporation Phase Ill -Engineer's Estimate
February 2005
--
I • • '
~~ 11 (t.1i·t· · li':~ .. {i.-r;J~rc.1~ · ' tfrJi· ·~lt r~n'\• ) t.~·11 ?-1 · ··11·· :'!,~·.,~
~--------~-·-. -. .. · _'. -~~-----·-·-----·---~ ....... --·----· .. ---······ :.._.:...._..: ___ .. _ ... _,_ --. ·--· --·~·--··-
GENERAL ITEMS
1 Mobilizat ion LS 1 $ 1,172.50 $ 1,172 .50
Subtotal $ 1,172.50
WATER ITEMS
2 6" PVC Water Line C900 CL200 LF 201 $ 25.00 $ 5,025 .00
3 18" x 6" Tapp ing Sleeve & Valve EA 1 $ 2,200 .00 $ 2,200.00
4 Standard Fire Hydrant Assembly EA 1 $ 2,500.00 $ 2,500 .00
5 Connecti on to Existing System EA 1 $ 2,000.00 $ 2,000 .00
Subtotal $ 11,725.00
TOTAL $ 12,897.50
DP-03-13
FOR OFFICE USE ONLY
P&Z CASE NO.: 03 -()35
DATE SUBMITIED: 9-~/p-@
lo : 35 /:Jnt
SITE PLAN APPLICATION mtl
MINIMUM SUBMITTAL REQUIREMENTS
0 $200 .00 Site plan application and review fee .
[i6"' $200.00 Development permit fee .
u:Y-~$600.00 Public infrastructure inspection fee, if applicable. (This fee is payable if construction of a public
waterline, sewerline, sidewalk, street or drainage facilities is involved.)
~/Ten (10) folded copies of site plan .
g A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they
are not checked off.
D Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
NAME OF PROJECT 21.::rfa CtJrt?P~dt® 1'bt1e 111
ADDRESS 1qo~ Lgke tva; 1),..;l#i!..
LEGAL DESCRIPTION • 2 -f>J'C;;i 4 -t~~~i1as e ..4.-
er/a eoo.,,..d,
APPLICANT (Primary Contact for the Project):
3me tlld:e. ~eco-1 /-rk _,/,,./,;/~ '5-k~t:1
I
Street Address G // t/ -4' '11 tri>/ .,/ 'r /);-. E... ?f-c ZO I
City C:O//(~ <{,../z:if'/1n 1 I><. , State _7X _____ _ Zip Code -/-? f34o
Phone Number q/P?-260· Z635 Fax Number _q_-;_4_-_84'c_f6_._g_-z_e_4' ___ _
PROPERTY OWNER'S INFORMATION :
Name d/4H ::el~~~ ~~~&?;,
StreetAddress f''!O!i b:tkt:Pa':>/ fJ,,.._l/-<.
CityLO/k942 ?kfbh ~ State_!><______ ZipCode -?784?
PhoneNumber q-Jt1/-64~-1'6c>o Fax Number q7q-Gq6-46o!
ARCHITECT OR ENGINEER'S INFORMATION :
Name fl~ ~;'d /~&i:.,,--k.-5/td:"o;i1c .
Street Address -7/I V/.1,-~trl""'>: /J,... I=., 5/--<.. ec;J;
City&/~~ ~6/-A?;., State_"-P<______ ZipCode_~~~8_40 _____ _
Phone Number q7q-?6cJ·Z63~ Fax Number q7tf,,8'16-f}ZZ.~
OTHER CONTACTS (Please specify type of contact, i.e . project manager, potential buyer, local contact, etc.)
Name
-----------------~
E-Mail ____________ _
~treetAddress ______________________________ _
0ity _____________ State _______ _ Zip Code ________ _
Phone Number Fax Number ___________________ _
Site Plan 7/15/2003 1of6
CURRENTZONING~/l/~~/~---------------------~
PRESENT USE OF PROPERTY Gt?~/ti/' __ ;._;__;_-:....::::;.;__;;__;:;__ _________________ _
PROPOSED USE OF PROPERTY ~M"'e;t::.,...;, I ---'--------'------------------~
VARIANCE(S) REQUESTED AND REASON(S) _________________ _
?e,e, 4~ k--~
#OF PARKING SPACES REQUIRED_/'_~ ____ # OF PARKING SPACES PROVIDED _?_3 __ _
MULTI-FAMILY RESIDENTIAL
Total Acreage __
Floodplain Acreage __
Housing Units __
__ #of 1 Bedroom Units
__ #of 2 Bedroom Units
__ #of 3 Bedroom Units
#of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
__ #Bedrooms= 132 sq. ft.
__ # Bedrooms < 132 sq. ft.
PARKLAND DEDICATION
# of Multi-Family Dwelling Units
x $452 = $
__#of acres in floodplain
# of acres in detention
__ #of acres in greenways
__ date dedication approved by Parks Board
COMMERCIAL
Total Acreage 84«~~ ~.o! d~t7/,/\ LL. ~, ;1.e, Cl""ee:t J
Building Square Feet ..ZO, 771
Floodplain Acreage /. / 1-
NOTE: Parkland Dedication fee is due prior to the issuance of a Building Permit.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true and correct.
~ 26~?6l?r
d~ak ~ltt:,,}Pk/ ~~~;4.,~..j ht:
·Signature of Owner, Agint or Applicant Date
SITE PLAN CHECKLIST 2 of6
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereb; made for ~e following development specific waterway alterations : .Jl~~ ~~
ACKNOY\fLE~MENTS : (nl<,~)
I, -~C~tgrt~r/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards .
Property Owner( s)
As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code.
Contractor
A. t any nonresidential structure on or proposed to be on this site as part of this
Date
B. I, , certify that the inished floor elevation of the lowest floor, including any basement, of any
residential structure, reposed as part of this application is at or above the base flood elevation
established in the est Federal Insurance Administration Flood Hazard Study and maps, as amended.
~
Engineer Date
c.
D.
· Conditions or comments as part of approval: ------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
from construction, erosion , and sed imentation shall not be deposited in city streets, or existing drainage facilities . All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the City of College Station shall apply .
SITE PLAN CHECKLIST 3of6