HomeMy WebLinkAbout50 DP Golden Keys Learning 03-60FOR OFFl~E USE ONLY
case No. 0 Y \DDll ltD l1,
Date Submitted 8-1-0 3 L......;;;..;.;.;~------------,:::==:;=:;==:;=:;;;;;:.1 5.-oottim DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
$200.00 development permit fee.
Drainage and erosion control plan, with supporting Drainage Report two (2) copies each
Notice of Intent (N.0.1.) if disturbed area is greater than 5 acres
APPLICANT (Primary Contact for the Project):
Name HM..10TT +.toM.e::~ . (~c .
Street Address "1.-0j ~ Yl2.A (12-1 e-
E-Mail ____________ _
@ AD
City lou...hcC 7ti.l:r / o~ State _ _.Tf=_.._ ____ _ ZipCode ~79_4 ........ S ____ _
Phone Number G'1<0--I""\ Bl Fax Number --"0""--'q._,,3"'"'"""-__..3._~_q-=-=e,;___ __ _
PROPERTY OWNER'S INFORMATION:
Name \1AJuoTT {JoM.~S , (A\c._ . E-Mail __________ _
Street Address hf1 '2.oGU..-fAA 11Lte f2-€AO
City Cc>c_,,U£.G;.€ ~-rr~.J State _:nL~----Zip Code --Z 7 845
Phone Number (09. <O .-l i S 7 Fax Number ~0~~~3_,~'3~?_q~8 ____ _
ARCHITECT OR ENGINEER'S INFORMATION :
Name \-\A R.!Ll{ Bo7Trc..-E-Mail -------------
Street Address ------------------------------
City (Qu,;t:.Ctt£-Srn-r1o;J State 1'f-Zip Code _______ _
Phone Number 704 ---z rS>O FaxNumber __________ _
Application is hereby made for the following development specific site/waterway alterations:
ACKNOWLEDGMENTS :
' '
, ..
CERTIFICATIONS:
A. I, , certify that any nonresidential structure on or proposed to be on this site as part of this
application is designated to prevent damage to the structure or its contents as a result of flooding from
az;~J~ _J_a_L_._J?O_· ~,_2_a:::7_~----------En ~~ -= Date
B. I, , certify that the finished floor elevation of the lowest floor, including any basement, of any
residential structure, proposed as part of this application is at or above the base flood elevation
established in the latest Federal Insurance Administration Flood Hazard Study and maps, as
amended .
a~
Engineer Date
C . I, __ , certify that the alterations or development covered by this permit shall not diminish the flood-
carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13
concerning encroachments of floodwa s anctof floodways fringes .
~
Engineer Date
D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above
elevation established in the latest Federal Insurance Administration Flood Hazard St~"''''
, _ ... ~'.,.t o F r '''e~ ~ . :~ ~"············ ... ~../: ,,,
J LIL • .3tP 2ac5 : C:> .··"· •• ••• : O" l11,
Dt ,,., • •' . ~'I.
ae ,.-;,1 ,£,..: ··*"" ,,,,~: ~ ~
fl9••••••••••••••o ••••••••••••••••••••••••~ ~C HR!ST IAN A . GALIND O i
~·•••••(11••••~ .. •••••••••••••••••••••••a ••.,•••••••2'!
Conditions or comments as part of approval : ~ ~ "· 5 3 4 2 5 .:' . 9 ~ ').)_ • A "' ' f~ 4"' ~,, 0 '•/f'it, ~ V,•' 'V ,::'
#;i ;-.".,:· •• G'/STt.~ / ~~ -v1,. <-s8 ............. ·<'.i· .i!'
'to,. IOfilf\L \:.-::~:'"' ~~~\ ~\.'l;,~V'-
ln accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be
taken to insure that debris from construction , erosion, and sedimentation shall not be deposited iri city streets ,
or existing drainage facilities . All development shall be in accordance with the plans and specifications
" . •
submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply .
02 /20 /04 08:42 FAX 9798452074 TAMU COMP INFO SRVCS 141001
\
~Golden Keys Learning Center, LLC
A child day cattlleo.rning facility <{ '.I\ 7 4 'vi/\
February 19 , 2004 ~/Q'J_i_\_
246 Southwest Parkway East
College Station, Texas 77840
City of College Station
Development Services
1101 Texas Avenue
College Station. Texa.~ 77840
Re: Water flowing through playground area
Attn: Ms. Jennifer RJ.':eves
Dear Ms. Reeves:
1bis is in regards to the water flowing through the playground area at Goldi.en Keys Learning
Center. The .water flowing from the neighboring streets and parking area!S into the required
retention pond keeps the complete middle section of the playground saturated. This has created a
problem for the children playing outside.
So far, the main factors contributing to the saturated playground are:
I. Recent heavy rains, and
2. City workeT5 draining water from nearby fire hydrant to reduce the buildup of corrosion
in the lines. Note: This happened today, February 19, 2004.
We care for children ages 18 months to 5 years old. The retention pond and other drainage
requirements have created numerous hazards on the playground for ow children. The slope in
the play area makes it hard for very young children to keep their balance. That, along with the
saturated playground causes the children to slip and fall constantly. This situation makes the
children more subject to serious injuries. Thcrc:fore, Golden Keys would be held liable for the
costs incurred as a result of injwies.
The Texas Department of Protective and Regulatory Services required us to fo11ce in the flume
area to pT-event injury to the children as they play outside. This was an added expense we had to
incur. We ask for your advice and help to find a solution to the problems r~aused by water
flowing through the playground area.
"'i\.. 24 6 Southwest Parkway E. ~!J· ·' ·Le ' P.O. Box 9105 t 'r-' .· .. O I~ ' College Station , Texas 77842 (Q;=.--;,;:• (979) 693 -9944
--~02 /20 /0 4 08 : 42 FAX 979845207 4 TAMU COMP I NFO SR VCS !41002
.. '
Suggestions include'.
1. Ins Lall a rubber speed bump or some type of blockage across the handicap parking space
entry. This will force the water to flow past the handicap parking entry ~ through the
adjacent parking lot to the east ~ through the drainage path behind the Ashford Square
duplexes~ into the retention pond located east of the duplexes. The blockage across the
entrance of the handicap parking area should be of certain dimensions so that a wheel chair
can roll over it. This option would only minimize the amount of water flowing through the
playground to the flume.
2. Install a drainage pipe from the fence at the end of the handicap parking to the flume. Then,
cover the entire drainage pipe with dirt and sod. This will provide a more leveled play area
for the children and comply with the drainage requirements .
Our priority at Golden Keys is to provide a safe environment for the children. entrusted to our
care. However, we understand we have to comply with the city ordinance~1.
Because we are a new small busin.ess, ow funds arc very limited. Please let us know if the City
of College Station will provide financial assistance . We appreciate any suggestions and
assistance you and your office can provide in resolving this issue .
Sincerely,
~~
Herben Booker
~b<Jok-
Jacqualine Booker
f'IO tJ.?~ "2i'<:1
M~H\ MO.,.:i: 1'.3.l.-V M
~Ill l > .L"i1 ~ <l3 '74S 'V1 N 3 ~l.V'JIG N k
l~lt ~, ........ ..
/ ~->----·
1'
I
I<~---'----,O-Z ---~~~Jc,-( --. a.II ---"ii
.. --... ( ·-... I __ ' _ 1 --"" r : :!I
_,r --~
\
( .,
(
)
'
(
I
I
!
J ;
\?
0
"" "-.
"" 0
"-.
0
""'
0
00 ..
""' w
"rj g;
<c
--1
<c
00
""' 01
"" 0
--1
""'
~ ~
C!
('"l
0
l:i::: .,, ... z
"rj
0
Vl
::i::i < ('"l
Vl
1§1
0
0 w
-,
1
RDEN
vf ~ I{) -3 I -.40
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave ., Suite 213 Bryan , Texas 77802 (979) 846-8868
July 3, 2003
Mr. Spencer Thompson
Engineering Department
City of College Station
College Station , TX
Subject: Drainage Report
Golden Key Learning Center
College Station, TX
Dear Spencer:
Pleased find enclosed the referenced report for your review. This report is to be reviewed
in conjunction with the Grading and Drainage Plan for this project that is being submitted
separately.
This report follows the criteria established in 1983 at the time of the initial drainage
report prepared by the undersigned for Ashford Square Subdivision. Please see the
attached two sheets excerpted from that report.
Sincerely,
GALINDO ENGINEERS AND PLANNERS, INC.
Christian A. Galindo, P.E., R.P.L.S.
President
cc: Bruce Olson
M&.M Design
c----
,,,,,,,,,,~,,,
__ .... t. 0 F r '•1 :-=-~ ~~············ .. t..r-1 ''~,, :c,, .. ·· * .... O' ~,, ;*.: .· \1r ~ ~*l ~.* ~ itfl!-••····································~ iCHRISTIAN A. G ALIN DO ~
~·······-........................................ ~ ~~··. 53425 /c-/ ~-,:> ··.,p... ~~ ... 4..1.,
'IA o""·".<:G 1s1c~ / .;;.·./.:: .. ,. ~... ... ~ ... ,~ -1, 'S'o . .,., ..... ~(',: .~
le u/O ... A1 t.,'( ...... -
'' H ... ~";::.. \\\'''"'"''"''1'.~
cC ;;,
M.H.B.R. Joint Venture
DRAINAGE REPORT
ASHFORD SQUARE SUBDIViSION
College Station, Texas
May 1983
. f
Ashford Square Subdivi s ion
DRAINAGE REPORT
1. LOCATION AND DESCRIPTION
This is a 16.16 acre tract located on the south side of South-
west Parkway, about 560' east of Texas Ave., College Station,
Texas. It lies in the Morgan Rector League, Abstract No.
46, Brazos County, Texas. Exhibit One shows the location
of the tract, its natural topography and its proposed develop-
ment. The soil is a slightly pervious sandy clay covered
mostly with grass. The eastern portion, along the creek
that marks the eastern boundary, contains trees.
2. PURPOSE OF THE REPORT
The purpose of this report is threefold as follows:
a) Establish the optimum width of a proposed drainage
easement on the inner side of the eastern boundary
marked by the creek, which is a tributary of Bee Creek.
b) Estimate the increased surface runoff caused by the
proposed development of the tract and delineate an on-
site detention system to mitigate the impact of the re-
su It i ng increased runoff rate.
c) Provide the guidelines that will enable each future lot
owner to bui Id its own lot runoff detention faci I ity so
as to comply with the overal I development/drainage
scheme.
The subsequent sect ions of this report address the first two
purposes Ii sted above.
3. CREEK EASEMENT
The Federal Insurance Administration's Floodway Boundary/
Floodway Maps do not cover the portion of the previously
referred creek, imp I yi ng that under existing conditions said
creek has no 100 year flood plain.
1. TRACT DESCRIPTION
GOLDEN KEY LEARNING CENTER
DRAINAGE REPORT
This project covers Lots 80 and BE, Block D, Replat of Block D, Replat of Lot 8, Block
D, Ashford Square. The total area studied is 0.36 acre. The project is located just
off of Southwest Parkway west of the intersection with Texas Ave. Access to the
site is through concrete private streets.
The project area is currently vacant except for portions of existing concrete drives
and parking area. The Owner plans to develop the tract into a Learning Center that
is currently being designed by M&M Design.
A separate 24"x36" sheet, Grading and Drainage Plan, is part of this report and will
be referred here as Exhibit 1.
The adopted Flood Insurance Study does not identify the existence of a 100-yr flood
plain affecting this tract (Map# 48041 C 0144 C, July 2, 1992).
2. STORMWATER RUNOFF
All of this tract's runoff flows in a general easterly direction, as sheet flow, through
the existing parking areas in adjoining Lot 7, Block D.
Exhibit 1 shows the tract, its location and existing spot elevations. This exhibit also
shows the proposed construction project and the proposed detention pond grading.
Topographic data was developed under the supervision of the undersigned. The
tract has been divided into three drainage sections:
Section 1 -Existing parking and driving area along frontage concrete street -
0.127 acre,
Section 2 -Proposed playground/detention pond and rear yard -0.128 acre,
Section 3 -Proposed building area -0 .101 acre
Exhibit 2 shows the runoff calculations for 2, 5, 10, 25, 50 and 100-year rainfalls for
each of the sections under pre and post development conditions. Detention has
Page 2
been calculated using the 100-year return period and therefore the maximum
allowed runoff after development is 1.65 cfs. In order to mitigate the effect of the
increase runoff (Q100 3.01 cfs) a detention facility is proposed at the location of the
playground area.
Runoff from the parking and driveways area of Section 1 will discharge into the
detention pond through three 3.0' no-curb sections along the front of the project's
internal driveway. Runoff from the building area, Section 3, will flow into the pond
as sheet flow. The remaining area of Section 1 will drain into the pond as sheet
flow or through roof downspouts. Exhibit 3 offers the characteristics of this flume
designed to convey approximately 50% (5.8 cfs) of the 100 year total Q for this
Section. Under these conditions the water depth in this flume is calculated at
0.38'.
3. INFLOW HYDROGRAPHS
Haestad Methods Quick Tr-55 V. 5.47 was used for the analysis given in Exhibit 3 (in
seven pages). This Exhibit graphically shows individual hydrographs for all storm
frequencies. The estimated required storage for the 100-yr storm is calculated at
0.02-ac-ft.
4. DETENTION FACILITY
The pond will be built as shown in Exhibit 1. The top of the pond is set at 274.0
while the weir flow line elevation is set at 272.8. Exhibit 4 shows that the available
storage for the proposed grading reaches 0.04 ac-ft. Therefore the storage
available will be larger than the storage required.
The weir will be of the vertical-rectangular type consisting of a 0.67' wide and 1.20'
high concrete structure that will drain into the parking lot in adjoining Lot 7 though
a trapezoidal concrete flume as shown in Exhibit 1.
Haestad Methods Pondpack V. 5.21 was used in the ponding calculations. Exhibit 5
(in two pages) shows the input data and estimated performance of the proposed
Vertical-Rectangular weir described above. Exhibit 6 (in three pages) shows the
routing calculations for a multiple storm. Peak outflows for each frequency do not
exceed pre-development conditions.
Page 3
The following is the routing summary in terms of maximum outflow allowed (pre-
development conditions) and peak attained:
Storm Max. Allowed Peak Attained Max. Elevation
5-year 1.09 1.08 273.58
10-year 1.23 1.15 273.64
25-year 1.40 1.25 273.70
50-year 1.58 1.36 273.77
100-year 1.65 1.40 273.80
A concrete spillway 0 .2' high and extending 1.0 ft on either side of the weir will also
be constructed at elevation 273.8. Besides providing 0.2' of free board this spillway
will be able to discharge an additional 3.46 cfs in overflows. See Exhibit 7.
Discharge velocity at the weir for Q100 is calculated at 2.1 fps. At maximum flow,
assuming full use of the spillway, the aggregated discharge velocity would be 4.0
fps.
The flume carrying the outflow from the pond will be a trapezoidal concrete flume,
3' wide by 0.3'. The characteristics of this flume are given in Exhibit 8.
5. CERTIFICATION
This report and design conform to the City of College Station Drainage Policy and
Design Standards.
CHRISTIAN A. GALINDO, P.E. # 53425, R.P.L.S. # 4473
July 3, 2003
Page4
"'''~''"'\~\\\ ~:.--~ '\ t 0 F r ~ ~ .. , .:::-,,( ""-....... .... "'~· ,,,,
fll> ... ,, •••• ••••• -, " = <=::> • • • • . • ••• cJ" 'I; ;*... \"I<~ "! .A-:' .. * ,,., .,,, J.'t.. •
~···········~··························· ~CHRIST I AN A. GALINDO~
~'"'•••t"l '"'"'~' '· ...• ,. .... ,. r ••••n •e 11 e •e•o o••H•••••••••~ ~. :. ' "~·s ; !: "'11 "'d •. ... _, ,...... • ~ ~
v. ~p ··. . " ~ .•· '"-' liP
lfA ("> • ·' <(; • '<; "" 11:i ·~·. • ••• · •• ·, .'r.·T <=\'' ••• • ~. -t J! r • '. •,, /';) \~ ,.• ":\-{,.._ -,,, ¢ ,'·· ...... ..... \\:) .: ~ ..:...; 'A c:~.. -fQt ·: • .,,~A L ~ ~ ~~~~ ~~..,. '\\\\.'\.~~""
Job : 21-03
Date : 03-Jul-03
RUNOFF CALCULATIONS -RATIONAL METHOD
GOLDEN KEY LEARNING CENTER
BRYAN, TEXAS
(County : Brazos) Tc= 10.0 when the calculated value is less than 10.0
Section Soil
Type
On-Site Run -Off
1 Pasture
2 Pasture
3 Pasture
Total
============
On-Site Run-Off
A
Acres
====== ======
c Veloc .
fps
====== ======
Length
ft
--------------
0.127 0.400 2 .500 220
0 .128 0 .400 2 .500 90
0 .101 0 .400 2 .500 100
0.355
====== ======
======= ============== ======= ======= ======= ======== ======= ======= ======= =======
T cone . in min .
Cale . Used 2 yrs 5 yrs 10 yrs 25 yrs 50yrs 100yrs
======= ======= ======= ======= ======= ======= ======== =======
PRE-DEVELOPMENT
1.5 10.0 6 .327 7 .693 8 .635 9 .861 11 .148 11 .639
0.6 10.0 6.327 7 .693 8 .635 9 .861 11 .148 11 .639
0 .7 10.0 6.327 7 .693 8 .635 9 .861 11 .148 11 .639
Q
2 yrs
Q
5yrs
Q
10 yrs
======= ======= =======
-------
0.32 0 .39 0 .44
0 .32 0 .39 0.44
0 .25 0 .31 0 .35 ---
0.90 1.09 1.23
======= ======= ======= ======= ======= ======= ======== ======= ======= ======= =======
POST-DEVELOPMENT
----------------------------------------------------------
Parking Lot 0 .127 0 .900 8 .500
2 Playground 0 .128 0 .500 2 .500
3 Commercial 0.101 0 .800 7.000 ----
Sub-Total 0 .355
============ ====== ======
County:
Brazos
220
90
150
0 .4
0 .6
0 .4
10.0 6 .327
10.0 6 .327
10.0 6 .327
7 .693 8 .635 9 .861 11 .148
7 .693 8.635 9 .861 11 .148
7 .693 8.635 9 .861 11 .148
11 .639 0 .72 0 .88 0 .99
11.639 0.40 0.49 0 .55
11 .639 0 .51 0.62 0 .70 ----
1.64 1.99 2 .23
======= ============== ======= ======= ======= ======== ======= ======= ======= =======
Constants for use in formula : l=b/(t+d)•e
2-yr 5-yr 10-yr 25-yr 50-yr 100-yr
----------
b 65.000 76.000 80 .000 89 .000 98.000 96.000
e 0.806 0 .785 0 .763 0 .754 0 .745 0 .730
d 8.000 8 .500 8 .500 8 .500 8 .500 8 .000
Q
25 yrs
====== ======
Q
50yrs
Q
100yrs
====== ======
-----------
0.50 0 .57 0 .59
0 .50 0 .57 0.59
0.40 0.45 0 .47 -----------
1.40 1.58 1.65
====== ======
----------
1.13 1.28 1.33
0 .63 0 .71 0 .74
0 .79 0.90 0.94
--~---------
2.55 2.88 3.01
====== ======
EXHIBIT 3
Quick TR-55 Ver.5.47
Executed: 17:16:28
S/N:
07-02-2003
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
GOLDEN KEY LEARNING CENTER
**********************************************************************
* RETURN FREQUENCY: 5 yr
'C' Adjustment: 1.000
Allowable Outflow: 1. 09 cfs
0.013 ac-ft
*
* Required Storage: *
*--------------------------------------------------------------------*
* Peak Inflow: 1. 79 cfs Inflow .H YO stored: SIN .HYO *
**********************************************************************
I Td = 13 minutes I
/-------Approx. Duration for Max. Storage ------/
x
. I.
Tc=
I
Q
10.00
7 .693
1. 99
minutes
in/hr
cfs
I
I
I
I
I
I
I
Required Storage I
0. 013 ac-ft I
I
x x x x x x xix x x x x x x x x x x
I
Return Freq: 5 yr
C adj.factor: 1.00
Area (ac):
Weighted C:
Adjusted C:
0.36
0.73
0.73
Td= 13 minutes
I 6.903 in/hr
Q 1.79cfs
x
s o o o o o o o o o o o o o o o o Q= 1.09 cfs
x o I. Ix (Allow.Outflow)
o I I
x o I NOT TO SCALE I x
o I ============ I
o I I x
-----------------------1-----------------------------1------------
14.53 minutes 16.91 minutes
Quick TR-55 Ver .5.47
Executed: 17:16:28
S/N:
07-02-2003
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
I
GOLDEN KEY LEARNING CENTER
**********************************************************************
*
*
RETURN FREQUENCY : 10 yr
'C' Adjustment: 1.000
Allowable Outflow :
Required Storage :
1. 23 cfs
0.015 ac-ft
*
* *--------------------------------------------------------------------*
* Peak Inflow: 2.01 cfs Inflow .HYO stored: lOIN .HYO *
**********************************************************************
Td = 13 minutes I Return Freq: 10 yr
/-------Approx. Duration for Max. Storage ------/ C adj.factor: 1.00
1
I
I
x
. I.
Tc=
I
Q
10.00
8.635
2.24
minutes
in/hr
cfs
I
I
I
I
I
I
I
Required Storage I
0.015 ac-ft I
I
x x x x x x xix x x x x x x x x x x
I
Area (ac):
Weighted C:
Adjusted C:
0.36
0.73
0.73
Td= 13 minutes
I 7.770 in/hr
Q 2.01 cfs
x
s o o o o o o o o o o o o o o o o Q= 1.23 cfs
x o I. Ix (Allow.Outflow)
o I I
x o I NOT TO SCALE I x
o I ============ I
o I I x
-----------------------1-----------------------------1------------
14 .50 minutes 16.89 minutes
Quick TR-55 Ver.5.47
Executed: 17:16 :28
S/N:
07-02-2003
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Re quired Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
GOLDEN KEY LEARNING CENTER
**********************************************************************
* RETURN FREQUENCY: 25 yr
'C' Adjustment: 1.000
Allowable Outflow: 1.40 cfs
0.017 ac-ft
*
* Required Storage: *
*--------------------------------------------------------------------*
* Peak Inflow: 2.30 cfs Inflow .HYO stored: 25IN .HYO *
**********************************************************************
I Td = 13 minutes I
/-------Approx. Duration for Max. Storage ------/
x
. I.
Tc=
I
Q
10.00
9.861
2.55
minutes
in/hr
cfs
I
I
I
I
I
I
I
Required Storage I
0.017 ac-ft I
I
x x x x x x x i x x x x x x x x x x x
I
Return Freq: 25 yr
C adj.factor: 1.00
Area (ac):
Weighted C:
Adjusted C:
0.36
0 .73
0.73
Td= 13 minutes
I 8.885 in/hr
Q 2.30 cfs
x
s o o o o o o o o o o o o o o o o Q= 1.40 cfs
x o I. Ix (Allow.Outflow)
o I I
x o I NOT TO SCALE I x
o I ============ I
o I I x
-----------------------1-----------------------------1------------
14.52 minutes 16.92 minutes
Quick TR-55 Ver.5.47
Executed: 17:16:28
S/N:
07-02-2003
F
L
0
w
c
f
s
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
GOLDEN KEY LEARNING CENTER
**********************************************************************
*
*
RETURN FREQUENCY: 50 yr
'C' Adjustment: 1.000
Allowable Outflow:
Required Storage:
1. 58 cfs
0.019 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 2.61 cfs Inflow .HYO stored: 50IN .HYO *
**********************************************************************
I Td = 13 minutes I
/-------Approx. Duration for Max. Storage ------/
. I.
Tc=
I
Q
10.00
11 .148
2.89
minutes
in/hr
cf s
I
I
I
I
I
I
I
Required Storage I
0.019 ac-ft I
I
x x x xx x xix xx x x xx x xx x
I
Return Freq: 50 yr
C adj.factor: 1.00
Area (ac):
Weighted C:
Adjusted C:
0.36
0.73
0.73
Td= 13 minutes
I 10.056 in/hr
Q 2.61 cfs
I x x
I o o o o o o o o o o o o o o o o Q= 1.58 cfs
I x o I. Ix (Allow.Outflow)
I o I I
I x o I NOT TO SCALE I x
I o I ============ I
I o I I x
'-----------------------1-----------------------------1------------
14.53 minutes 16.94 minutes
Quick TR-55 Ver.5.47
Executed: 17:16:28
S/N:
07-02-2003
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
GOLDEN KEY LEARNING CENTER
**********************************************************************
* RETURN FREQUENCY: 100 yr
'C' Adjustment: 1.000
Allowable Outflow: 1. 65 cfs
0.020 ac-ft
*
* Required Storage: *
*--------------------------------------------------------------------*
* Peak Inflow: 2.72 cfs Inflow .HYO stored: lOOIN .HYO *
**********************************************************************
I Td = 13 minutes I
/-------Approx. Duration for Max. Storage ------/
x
. I.
Tc=
I
Q
10.00
11. 639
3.02
minutes
in/hr
cfs
I
I
I
I
I
I
I
Required Storage I
0.020 ac-ft I
I
x x x x x x xix x x x x x x x x x x
I
Return Freq: 100 yr
C adj.factor: 1.00
Area (ac):
Weighted C:
Adjusted C:
0.36
0.73
0.73
Td= 13 minutes
I 10.495 in/hr
Q 2.72 cfs
x
s o o o o o o o o o o o o o o o o Q= 1.65 cfs
x o I. Ix (Allow.Outflow)
o I I
x o I NOT TO SCALE I x
o I ============ I
o I I x
-----------------------1-----------------------------1---------~--
14.53 minutes 16.93 minutes
Quick TR-55 Ver.5.47 Executed: 17:16:28 S/N: 07-02-2003 ************************************************************************ ************************************************************************ * * * MODIFIED RATIONAL METHOD * ----Grand Summary For All Storm Frequencies * * * * * * * * ************************************************************************ ************************************************************************ First peak outflow point assumed to occur at Tc hydrograph recession leg. GOLDEN KEY LEARNING CENTER Area = 0.36 acres Tc = 10.00 minutes ............................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VOLUMES Frequency Adjusted Duration Intens. Qpeak Allowable I Inflow Storage (years)' 'C' minutes in/hr cfs cfs I (ac-ft) (ac-ft) ------------------------------------------------------1---------------------5 0.728 13 6.903 1.79 1.09 I 0.032 0.013 10 0.728 13 7.770 2.01 1.23 I 0.036 0.015 25 0.728 13 8.885 2.30 1.40 I 0.041 0.017 50 0.728 13 10.056 2.61 1.58 I 0.047 0.019 100 0.728 13 10.495 2.72 1.65 I 0.049 0.020
EXHIBIT 4
POND-2 Version: 5.21
S/N:
GOLDEN KEY LEARNING CENTER
CALCULATED 07-02-2003 17 :12 :41
DISK FILE: C:\1DATA\DATA2003\21-03\POND\21-03 .VOL
Planimeter scale: 1 inch 1 ft.
*
Elevation
(ft)
Planimeter
(sq . in.)
Area
(acres)
Al+A2+sqr(Al*A2)
(acres)
Volume
(acre-ft)
Volume Sum
(acre-ft)
*
272.80
273.00
274.00
0.00
300 .00
3,400.00
0.00
0.01
0.08
0.00
0.01
0 .11
0.00
0.00
0.04
0.00
0.00
0.04
Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume= (1/3 ) * (EL2-EL1) * (Areal+ Area2 +sq.rt. (Areal*Area2))
where: ELl , BL2
Areal ,Area2
Volume
Lower and upper elevations of the increment
Areas computed for ELl , EL2, respectively
Incremental volume between ELl and EL2
Outlet Structure File: 21-03
POND-2 Version: 5.21
Date Executed:
.STR
S/N:
Time Executed:
**************************
GOLDEN KEY LEARNING CENTER
**************************
***** COMPOSITE OUTFLOW SUMMARY ****
Elevation (ft) Q (cfs) Contributing Structures
---------------------------------------------
272. 80 0.0
273.00 0.2
273.20 0.5
273.40 0.8
273 .60 1.1
273.80 1. 4
274.00 1. 7
Outlet Structure File: 21-03
POND-2 Version: 5.21
Date Executed:
1
1
1
1
1
1
1
.STR
S/N:
Time Executed:
Outlet Structure File: C:\1DATA\DATA2003\21-03\POND\21-03 .STR
Planimeter Input File: C:\1DATA\DATA2003\21-03\POND\21-03 .VOL
Rating Table Output File: C:\1DATA\DATA2003\21-03\POND\21-03 .PND
Min. Elev. (ft) = 272.8 Max. Elev. (ft) = 274 Iner. (ft)
Additional elevations (ft) to be included in table:
* * * * * * * * * * * * * * * * * * * * * * * * * *
**********************************************
SYSTEM CONNECTIVITY
**********************************************
Structure No. Q Table Q Table
WEIR-VR 1 -> 1
Outflow rating table summary was stored in file:
C:\1DATA\DATA2003\21-03\POND\21-03 .PND
. 2
Outlet Structure File: 21-03 .STR
S/N: POND-2 Version: 5.21
Date Executed: Time Executed:
**************************
GOLDEN KEY LEARNING CENTER
**************************
>>>>>> Structure No. 1 <<<<<<
(Input Data)
WEIR-VR
Weir -Vertical Rectangular
El elev. (ft)?
E2 elev. (ft) ?
Weir coefficient?
Weir elev. (ft) ?
Length (ft)?
Contracted/Suppressed
272. 8
274.001
3 .087
272. 8
0 .666667
(C/S)? C
Outlet Structure File: 21-03 .STR
S/N: POND-2 Version: 5.21
Date Executed: Time Executed:
Outflow Rating Table for Structure #1
WEIR-VR Weir -Vertical Rectangular
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
---------------------------------------------
272. 80 0.0 H =0 .0
273.00 0.2 H =.2
273.20 0.5 H =. 4
273.40 0.8 H =. 6
273.60 1.1 H =. 8
273.80 1. 4 H =l. 0
274.00 1. 7 H =l. 2
C = 3.087 L (ft) = .666667
H (ft) Table elev. -Invert elev. ( 272.8 ft)
Q (cfs) = C * (L-.2H) * (H**l .5) --Contracted Weir
EXHIBIT 5
,
EXHIBIT 6
********************************
* *
* GOLDEN KEY LEARNING CENT ER *
* *
********************************
POND-2 Version: 5.21 S/N: Page 1
EXECUTED: 07-02-2003 17:09:45 STORM # 1 Return Freq: 5 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: C:\1DATA\DATA2003\21-03 \POND\21-03 .PND
Inflow Hydrograph: C:\1DATA\DATA2003\21-03\POND\5IN .HYD
Outf low Hydrograph: C :\1DATA\DATA2003\21-03\POND\5 OUT .HYD
Starting Pond W.S. Elevation = 272 .80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inf low
Peak Outflow
Peak Elevation
1. 7 9 cfs
1. 08 cfs
273 .58 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.01 ac-ft
0.01 ac-ft
*****
EXECUTED: 07-02-2003 17:09:45 STORM # 2 Return Freq: 10 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: C:\1DATA\DATA2003\21-03\POND\21-03 .PND
Inflow Hydrograph: C:\1DATA\DATA2003\21-03\POND\10IN .HYD
Outflow Hydrograph: C:\1DATA\DATA2003\21-03\POND\10 OUT .HYD
Starting Pond W.S. Elevation = 272 .80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inf low
Peak Outflow
Peak Elevation
2 .01 cfs
1 .15 cfs
273 .64 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.02 ac-ft
0.02 ac-ft
*****
POND-2 Version: 5.21 S/N: Page 2
EXECUTED: 07-02-2003 17:09:45 STORM # 3 Return Freq: 25 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: C:\1DATA\DATA2003\21-03\POND\21-03 .PND
Inflow Hydrograph: C:\1DATA\DATA2003\21 -03\POND\25IN .HYO
Outflow Hydrograph: C:\1DATA\DATA2003 \21-03\POND\25 OUT .HYO
Starti n g Pond W.S. Elevation = 272.80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inflow
Peak Outflow
Peak Elevation
2.30 cfs
1. 25 cfs
273 .7 0 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.02 ac -ft
0.02 ac-ft
*****
EXECUTED: 07-02-2003 17:09:45 STORM # 4 Return Freq: 50 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: C :\1DATA\DATA2003\21-03\POND\21-03 .PND
Inflow Hydrograph: C :\1DATA\DATA2003\21-03\POND\50IN .H YO
Outflow Hydrograph: C:\1DATA\DATA2003\21-03\POND\50 OUT .HYO
Starting Pond W.S. Elevation = 272.80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inflow
Peak Outflow
Peak Elevation
2.61 cfs
1. 36 cfs
273.77 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
To tal Storage in Pond
0.00 ac-ft
0.02 ac -ft
0.02 ac -ft
*****
..
POND-2 Version: 5 .21 S/N:
EXECUTED : 07-02-2003 17:09:45 STORM # 5
Page 3
Return Freq: 100 years
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: C:\1DATA\DATA2003\21-03\POND\21-03 .PND
Inflow Hydrograph: C:\1DATA\DATA2003\21-03\POND\100IN .HYD
Outflow Hydrograph: C:\1DATA\DATA2003\21-03\POND\100 OU T .HYD
Starting Pond W.S. Elevation = 272.80 ft
***** Summary of Peak Outflow and Peak Elevation
Peak Inf low
Peak Outflow
Peak Elevation
2.72 cfs
1.40 cfs
273.80 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-f t
0.02 ac-ft
0.02 ac-ft
*****
. . .
Rectangular Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: GOLDEN KEY CENTER
Comment: SPILLWAY CAPACITY
Solve For Discharge
Given Input Data:
Bottom Width .... .
Manning's n ..... .
Channel Slope ... .
Depth ........... .
Computed Results:
Discharge ....... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
2.67 ft
0.013
0.0330 ft/ft
0.20 ft
3.46 cfs
6.47 fps
0.53 sf
2.67 ft
3.07 ft
0.37 ft
0.0048 ft/ft
2 .55 (flow is Supercritical)
Open Channel Flow Module, Version 3.21 (c) 1990
EXHIBIT 7
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
, ' • 6':
Trapezoidal Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: LEARNING KEY CENTER
Comment: OUTFLOW FLUME
Solve For Depth
Given Input Data:
Bottom Width .....
Left Side Slope ..
Right Side Slope.
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
1. 00 ft
3.00:1 (H :V)
3.00:1 (H:V)
0.013
0.0100 ft/ft
1.40 cfs
0.24 ft
3.42 fps
0.41 sf
2.43 ft
2.51 ft
0 .29 ft
0.0044 ft /ft
1.47 (flow is Supercritical)
Open Chartnel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbur
EX HIBIT 8
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave ., Suite 213 Bryan, Texas 77802 (979) 846-8868
Ms. Carol Cotter
Engineering Department
City of College Station
College Station, TX
August 4, 2003
Subject: Addendum to Drainage Report dated July 3, 2003
Golden Key Learning Center
College Station, TX
Dear Carol:
Further to the subject Drainage Report and following our telephone review of
your comments a few days ago please be advised of the criteria that I followed in
its preparation:
1. The streets in this subdivision are private, concrete built and have "V" cross-
section. Lot lines extend to the middle of the streets.
2. Runoff from and within these streets bypasses the individual lots as it was
envisioned in the original design of may 19B3.
3. The front interior parking lot and driveways in Lots BD and BE, and also in Lots
BA, BB and BC currently exist and are built in concrete. Because of their layout
and grade approximately half of their runoff is expected to bypass the detention
area designed for this project.
4. Most of the runoff from Lots BA, BB and BC located to the west of the subject
tract drains towards the existing channel that flows through the Mobile Home
Park located to the southwest. To minimize the amount of possible offsite flow
into the subject tract, and to expedite the flow into the adjoining channel, a one
foot high berm is proposed along the west end of the subject tract (rear of the
proposed building).
5. The proposed detention facility is designed to handle the 100-yr runoff for an
area equivalent to the total size of the two lots. Since in reality a substantial
part of this runoff bypasses the detention pond its capacity is suitable to handle
Page 1
any possible offsite runoff proceeding from lots BA, BB and BC.
Sincerely,
GALINDO ENGINEERS AND PLANNERS, INC.
Christian A. Galindo, P .E., R.P .L.S.
President
cc: Bruce Olson
M&M Design
Page 2