Loading...
HomeMy WebLinkAbout48 Castlegate Subdivision 03-38 Sec 13FOR OFFICE USE_..9NJ.;i P&Z Case No .: 0., ~ ? ?f -~------- 0 ate Submitted : '5-P\-o? FINAL PLAT APPLICATION (Check one) D Amending ($30 0 .00) ~Final ($400 .00) D Vacating ($400 .00) D Replat ($600 .00 )* *In clud es publi c hea ring fee The following items must be submitted by an established filing deadline date for P&Z Commission consideration . MINIMUM SUBMITTAL REQUIREMENTS: v . Filing Fee (see above) NOTE : Multiple Sheets -$55 .00 per additional sheet (P(a f is ovie sh~..f ) Variance Request to Subdivision Regulations -$100 (if applicable) ~ Development Permit Application Fee of $200.00 (if applicable). 0 Infrastructure Inspection Fee of $600.00 (applicable if any public infrastructure is being constructed) B Application completed in full. 0 Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review .) ~ One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable). CM Paid tax certificates from City of College Station, Brazos County and College Station l.S.D. ~ A copy of the attached checklist with all items checked off or a brief explanation as to why they are not. Two (2) copies of public infrastructure plans associated with this plat (if applicable). Parkland Dedication requirement approved by the Parks & Recreation Board , please provide proof of approval (if applicable). NAME OF SUBDIVISION~~~~~~~·~-·~~~~~~~~~~;~~~·~~~~~-~~~~~~~~~~~~~~~~~ ED SUBDIVISION (Lot & Block) iJJ2Sf-of-.SH {p OM bretriS ftaine eJ APPLICANT/PROJECT MANAGER 'S INFORMATION (Primary Contact for the Project): Name Gr-.eg,ns fra1\,.fe, Invesf?r-s 7 L)J. ~1 WaJlc:<.-a Plu ~lu'p.s Street Address 4¥f~ Cas.flRlja_b_, f>rc've..,, / _ City f1 l&tje Sfali OYl State TX Zip Code _1~7~B~4-$~--- Phone Number (?rn) ftffQ -J2-5D Fax Number (C/J1) ·~C(O -~ {04 / CURRENT PROPERTY OWNER'S INFORMATION : additional sheet, if necessary) Name 6r.eR.nS Prairie ,lit VeS-for5 Lf-d · I \ Street Address 44~o ea~& ~ft Dn ve___, City Cofleqe.~~ State TX Phone Number -1:t1f_) fd/O -72-So ARCHITECT OR ENGINEER'S INFORMATION : (All owners must be identified. Please attach an E-Mail ------------- Zip Code 7784 ~­ Fax Number (11cr) /pC(Q -/04( E-Mail <>e::Ju.dfi:, <? feX.co/11 .'1 e.f- J Name ~SJw_ffl-. P.E. -Town Street Address J7oi' 6val:J"-'M i2wd city Co fl&je Stall_~ state __ U...L.>.-----Zip code 171/1 ~ - Phone Number (q7q) (/l0-1111 Fax Number {171)(;/{0-1717 1-Aug -0 2 1 o f 5 Acreage Total Property ~. l ?8 Total # Of Lots ZO R-0-W Acreage lJ _fr.22- Existing Use: Vaca.'f\ t Proposed Use : $1-~ fam «4; vex,den ht:J Number Of Lots By Zoning District ;z_o I __f/2/l:_H __ I __ I -- Average Acreage Of Each Residential Lot By Zoning District: I I I --0. 128 1 PDl>-H Floodplain Acreage 2 -~2at:-. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ A Statement Addressing Any Differences Between The Final Plat And Approved Master Development Plan And/Or Prel i m inary Plat (If Applicable): A Requested Variances To Subdivision Regulations & Reason For Same : PW -t/ ::C011.1r:J Requested Oversize Participation : ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Total Linear Footage of Proposed Public: I 1?S Streets / /},...I _ µu Sidewalks !OS' ~ Sanitary Sewer Lines 570' 115 I Water Lines Channels .-,: / iUVI& Storm Sewers Bike Lanes I Paths Parkland Dedi~tion due prior to filing the Final Plat: ACREAGE : ( PrevioU5l; ded1'ccded) # of acres to be dedicated + $__ development fee __ # of acres in floodplain # of acres in detention __ # of acres in greenways OR FEE IN LIEU OF LAND : #of Single -Family Dwelling Units X $556 = $ __ __ (date) Approved by Parks & Recreation Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true , correct and complete . The undersigned hereby requests approval by the City of College Station of the above -identified final plat and attests that this request does not amend any covenants or · restrictions associated with this plat. d~~~ Signature and Title 1-Au g-02 2 of 5 SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific site/waterway alterations : 1·n£a.5frucb,u-e.. J u..Ald1 Cvris/ru?~~ ACKNOWLEDGMENTS: Wtt/ ftfu Plull1/J5 I, , design er'iginee r/owner , hereby acknowledge or affirm that: ------ The · inform ation and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College St:::?? 04~~ Property Owner( s) Contractor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas .) A. I, __ certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm . Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . Engineer Date Conditions or comments as part of approval: __ In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . 1-Au g -0 2 3 of 5 Contact: ~STYLE CRAFT BUILDERS, INC. TPDES GENERAL PERMIT TXR150000 Notice of Intent (N.0.1.) and Construction Site Notice (Attachment 2) of the Texas Commision on Environmental Quality (TCEQ) Storm Water Pollution Prevention Plan (SWPPP) for Castlegate, Section 13 10/01/03 Eric Wivagg 4090 Highway 6 South College Station , Texas 77845 Phone: (979) 690-1222 ext. 20 Fax: (979) 690-0348 ///3~ IJrn I 0-D3 .;D 3 {)3 -J/6 r}iL ~ --:= Notice of Intent (NOi) for Storm Water Discharges TCEQ Office Use Only =-~ Associated with Construction Activity under the TPDES Permit Number: TXR15·:_·:_·:_·:_· ..... NO TPDES Construction General Permit (TXR150000) For help completing this application , read the TXR150000 NOi Instructions (TCEQ-20022 -lnstruct ions ). GIN Number:·:.._·:_·:.._·:.._·:_·:_·:_·· A. Construction Site Operator ~New 0No Change Customer Reference Number: CN _________ _ Name: Stylecraft Builders, Inc. Mailing Address: 4090 State Highway 6 South City: College Station State : TX Zip Code: 77845 Country Mailing Information (if outside USA) Territory: _________ Country Code: ________ Postal Code : __ _ Phone Number: 979-690-1222 Extension : ___ ~2~0 ___ Fax Number: ____ ~9~79~·~6~9~0-~0~34~8~---- E-mail Address: ewivagg@stylecraft-builders.com Type of Operator: D Individual D Sole Proprietorship -D.B .A. D Partnership ~ Corporation D Federal Government D State Government 0 County Government D City Government 0 Other: ___________________ _ Independent Operator? ~Yes D No Number of Employees: DI 0-20 D 21-100 I!] 101-250 [J 251-500 ClJ 501 or higher Federal Tax ID : 742485231 State Franchise Tax ID Number: 1-74-2485231-1 DUNS Number: B. Billing Address Name: Stvlecraft Builders, Inc. Mailing Address : 4090 State Highway 6 South City: College Station State: TX Zip Code: 77845 Country Mailing Information (if outside USA) Territory: ________ Country Code : Postal Code: C. Project I Site Information ~New DNo Change Regulated Entity Reference Number: RN _________ _ Name: Castlegate, Section 13 Mailing Address: 4090 State Highway 6 South City: College Station State: TX Zip Code : 77845 Physical Address: ________________ City: College Station County: BRAZOS Zip Code: 77845 Location Access Description: Victoria Avenue @ Carisbrooke Loop Latitude: _1Q_ 0 -1!_ '~" N Longitude:~ 0 _.1§_' ~" W Degrees (°), Minutes ('), and Seconds (") Latitude : Longitude : -Decimal Form Standard Industrial Classification (SIC) code :~ Also , describe the construction activity at this site (do not repeat the SIC code): Construction of Single Family Residences Has a storm water pollution prevention plan been prepared as specified in the general permit (TXR150000)? Iii Yes CJ No Estimated area of land disturbed (to the nearest acre): 6 Is the project I site located on Indian Country Lands? CJ Yes ~ No Does this project I site discharge storm water into a municipal separate storm sewer system (MS4 )? Iii Yes Id No If yes , provide the name of the MS4 operator:""'C'""'i_..tv._o""f'"""C~o=lle~g.._e"--"S"""ta""'t"""io""'n"------------------------­ Provide the name or segment number of the water body that receives storm water from this project I site : Spring Creek D. Contact -If the TCEQ needs additional information regarding this application , who should be contacted? Name : Eric Wivagg Titfe :_A_r_c_h_it_e_ct_u_r_al_D_e_s_l_g_n_e_r ____________ _ Phone Number: 979-690-1222 Extension : 20 Fax Number: 979-690-0348 E-mail Address: ewivagg@stylecraft-builders.com E. Payment Information • Check I Money Order Number: ~ 31) 0 Name on Check I Money Order: Stylecraft Builders, Inc. F. Certification I certify under penalty of law that this document was prepared under my direction or supervis ion in accordance with a system designed to assure that qualified personnel property gather and evaluate the infonnation submitted . Based on my inquiry of the person or persons who manage the system , or those persons directly responsible for gathering the infonnation, the infonnation submitted is , to the best of my knowledge and belief, true, accurate , and complete . I am aware there are significant penalties for submitting false infonnation , including the possibility of fine and imprisonment for knowing violations . Construction Site Operator: Prefix: Mr. First: Bob Middle : ________________ _ If you have qu stions on how to fill out this fonn or about the stonn water program, please contact us at (512) 23 Individuals are titled to request and review their personal infonnation that the agency gathers on its fonns . They may also have any errors in their infonnation corrected . To review such information , contact us at (512) 239-3282 . TCEQ -20022 (05/03 ) The completed NOi must be mailed to the following address. Use the attached document to submit the $100 application fee . Please note that the NOi and application fee are submitted separately to different addresses . Texas Commission on Environmental Quality Storm Water & General Permits Team; MC • 228 P.O. Box 13087 Austin , Texas 78711-3087 Page 1of2 PAY TO THE ORDER OF Texas Commission on Environmental Quality Payment Submittal Form The storm water application fee shall be sent under separate cover to the Texas Commission on Environmental Quality. This form must be used to submit your Storm Water Application Fee. Please complete the following information, staple your check in the space provided at the bottom of this document, and mail it to: BY REGULAR U.S. MAIL Texas Commission on Environmental Quality Financial Administration Division Cash ier's Office , MC-214 P.O. Box 13088 Austin , TX 78711-3088 Fee Code : GPA BY OVERNIGHT/EXPRESS MAIL Texas Commission on Environmental Quality Financial Administration Division Cashier's Office, MC-214 12100 Par!< 35 Circle Austin, TX 78753 Storm Water General Permit : TXR150000 Check I Money Order No : ____ 4-_"3_l_3_o ____ Amount of Check/Money Order: __ .:?:,$..:...:10:..::0~- Date of Check or Money Order. ___ I ___,IJ {._1+/ _0_3 __ _ Name on Check or Money Order: ....::S::..::ty._;l.::..ec:::.:.r.::.aft=B.::.u:..:.;ild::..::e:..:.;rs::.i,....:.:lnc:..::c'-'-. ---------------- Facility I Site Name: Castlegate, Section 13 Facility I Site Physical Address:------------------------- City: College Station STYLECRAFT BUILDERS, INC. 4090 ST ATE HIGHWAY 6 SOUTH COLLEGE STATION , TEXAS 77845 (979) 690 -1222 Zip Code: ..:.7..:...78::::..4.:..::5'------------ DATE FIRST AMERIC AN BA NK BRYAN , T EXAS 77805 88-232 11 31 A MOUNT 43730 10/1/03 100.00 One Hurrlred and 00/100-------------------- '.' Texas Ccrrmission of ElnvirollID2Iltal Quality ... ------ TC EQ-20022 (05/03) Page 2 of 2 Attachment 2 TPDES General Permit TXR150000 CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part 11.D.2. of the TCEQ General Permit Number TXRl 50000 for discharges of storm water runoff from construction sites . Additional information regarding the TCEQ storm water permit program may be found on the internet at: www.tnrcc.state.tx.us/ ermittin Iwate erm/ oerm/todestorm !!!!!!!!!!!!!!!!!!!!!!~!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!9 Contact Name and Phone Number: Project Description: (Physical address or description of the site's ocation, estimated start date and projected end ate , or date that disturbed soils will be tabilized) Location of Storm Water Pollution Prevention Plan : Er •'c.. W i'v ~j <'f79 -690 -(J J J @;ct . J 0 Lc._s t ft94 te ,, fe Li c'o" 13 S·t yk cr ... f 1 t3 vi {J ftS 4:0 9o S: H. 6 5'vt~ G tl~c.e. Sr"1''o " 7?tlfi;-iliiiliiiiiiiiiii~iiiiiiiiiiiiiiiiiiiiliiiliiiiiiiil For Construction Sites Authorized Under Part 11.D.2. (Obtaining Authorization to Discharge) the following certification must be completed: I ~r .' (... \JV .'vo. § ~ (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read ana understand the eligibility requirements for claiming an authorization under Part Il.D .2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and implemented according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 system. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations . I u/1 /o 3 Signature and Title Date Pa ge 33 -----~ -----TCEQ Office Use Only ----ft&§§ --TCEQ Notice of Intent (NOi) for Storm Water Discharges Associated with Construction Activity under the TPDES Construction General Permit (TXR150000) For help completing this application , read the TXR150000 NOi Instructions (TCEQ -20022 -ln struct ions ). TPDES Permit Number: TXR15·:_·:_·:_·:_··-NO GIN Number:·:_·:_·:_·:_·:_·:_·:_·· A. Construction Site Operator ~New 0No Change Customer Reference Number: CN _________ _ Name: Stylecraft Builders, Inc. Mailing Address : 4090 State Highway 6 South City: College Station State: TX Zip Code: 77845 Country Mailing Information (if outside USA) Territory: ________ Country Code : ________ Postal Code: __ _ Phone Number: 979-690-1222 Extension : 20 Fax Number: 979-690-0348 E-mail Address: ewivagg@stylecraft-builders.com Type of Operator: D Individual D Sole Proprietorship - D .B.A . D Partnership ~Corporat ion D Federal Government D State Government D County Government D City Government 0 Other. ___________________ _ Independent Operator? ~Yes Cl No Number of Employees: DI 0-20 D 21-100 ~ 101-250 Cl 251-500 DI 501 or higher Federal Tax ID : 742485231 State Franchise Tax ID Number: 1-74-2485231-1 DUNS Number: B. Billing Address Name: Stvlecraft Builders, Inc. Mailing Address : 4090 State Highway 6 South City: College Station State: TX Zip Code : 77845 Country Ma iling Information (if outside USA) Territory: ________ Country Code :--------Postal Code : __ _ C. Project/ Site Information ~New D!No Change Regulated Entity Reference Number: RN _________ _ Name: Castlegate, Section 13 Mailing Address: 4090 State Highway 6 South City: College Station State: TX Zip Code : 77845 Physical Address : ________________ City: College Station County: BRAZOS Zip Code : 77845 Location Access Description : Victoria Avenue @ Carisbrooke Loop Latitude :..lQ_ • ..ll.. '_L" N Longitude :~· ...1§__' ~" W Degrees (0 ), Minutes ('), and Seconds (") Latitude : Long itude : -Decimal Form Standard Industrial Classification (SIC) code:_J_g!_ Also , describe the construction activity at this site (do not repeat the SIC code): Construction of Single Family Residences Has a storm water pollution prevention plan been prepared as specified in the general permit (TXR150000)? 00Yes CJ No Estimated area of land disturbed (to the nearest acre): 6 Is the project I site located on Indian Country Lands? CJ Yes 00 No Does this project I site discharge storm water into a municipal separate storm sewer system (MS4)? 00 Yes CJ No If yes, provide the name of the MS4 operator:....:C~i.:.rty'-o=..f,_C=-o.::..:..:.lle::.;g""'e::....:::S-=:ta"'t::..:io~n-=------------------------­ Provide the name or segment number of the water body that receives storm water from this project I site: Spring Creek D. Contact -If the TCEQ needs additional information regarding this application , who should be contacted? Name : Eric Wivagg Title:_A_r_c_h_it_ec_t_u_ra_l_D_e_s_i..._g_n_er ____________ _ Phone Number: 979-690-1222 Extension : 20 Fax Number. _____ 9_79_-_6_9_0-_0_34_8 ____ _ E-mail Address : ewivagg@stylecraft-builders.com E. Payment Information -Check I Money Order Number: 'f 3110 Name on Check I Money Order: Stylecraft Builders, Inc. F. Certification I certify unde r penalty of law that th is document was prepared under my direction or supervision in accordance with a system des igned to assure that qual ified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system , or those persons di rectly respons ible for gath ering the information , the information submitted is, to the best of my knowledge and belief, true, accurate , and compl ete . I am aware there are significant penalties for submitting false information , including the pos si bility of fine and imprisonment for knowing violations . Construction Site Operator: Prefix : Mr. First: Bob Middle : _______________ _ If you have qu stions on how to fill out th is form or about the storm water program , pleas e contact us at (512) 23 Individuals are titled to request and review their personal information that the agency gathers on its forms . They may also have any errors in their information corrected . To rev iew such information, contact us at (512) 239 -3282 . TCEQ -20022 (05/03) The completed NOi must be mailed to the following address . Use the attached document to submit the $100 application fee . Please note that the NOi and application fee are submitted separately to different addresses. Texas Commission on Environmental Quality Storm Water & General Permits Team; MC -228 P.O. Box 13087 Austin, Texas 78711-3087 Page 1of2 DEVELOPMENT PERMIT PERMIT NO. 03-118 ({~ Project: Castlegate Subdivision Section 13 COLllGl STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: CASTELGATE SECTION 13 ALL LOTS DATE OF ISSUE: 06/03/03 OWNER: GREENS PRAIRIE INVESTORS LTD 4490 CASTLEGATE DR COLLEGE STATION , TX 77845 SITE ADDRESS: CASTELGATE SUBDIVISION DRAINAGE BASIN: Spring Creek VALID FOR 12 MONTHS CONTRACTOR: TEXCON GENERAL CONTRACTORS 1707 GRAHAM ROAD COLLEGE STATION, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction . Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. Erosion control per the approved plans must be in place for duration of the project. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction , erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities. I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Vb-D3-o5 Ad 1 ·strator/Representa~ ~~~~ Date 6 -tfl..S:o 1 Owner/ AgenUContractor Date Sent By: TEXCON; 979 690 9797; Jun -3-03 8:27P M; Page 2 /2 I ; .i l 26 -Ma y~J ! ·; CONSTRUCTION COST ESTJMA TE :! CASTlEGA TE SUBDIVISION > t COLLEGE STATIO N, TEXAS ! SECTION 13 -20 LOTS .l Item Estimated Unit Estimated ! M2., Desgiption ~ Price ~ l Sit.work t ' 1 Mobilization/Layout 1.0 LS $3 ,500 .00 $3 ,500 i 2 Site Preparation 08 AC $3,000 .00 $2.400 l 3 Top.soil Strippi ng & Replacement 350 CY $4 .50 $1 ,575 ·~· 4 Excavation/Grading 1,000 CY $3 .50 $3,5()0 i. 5 Lime Stabilized Subgrade 2,480 SY $3.25 $8.060 ~ 6 Conaete Curb & Gu~r 1,430 LF $8.00 $11 ,440 ~ ·! 7 Concret& CUrb & Gutter -Removal 160 LF $10.00 $1 ,600 l \ 8 Base Material -6" depth 1,970 SY $6.00 $11.820 'i 9 A:iphalt Pavinti • 1 112'' depth 1.970 SY $5 .00 $9 ,850 .i 10 ADA Ramp -regular 5 EA $350 .00 $1 ,750 1 11 Concrete Sidewalk -4' wide 740 SF $3 .00 $2 .220 ·.i 12 Concrete Sidewalk -Removal 620 SF $2 .00 $1 ,240 l l 13 Concrete Apron 675 SF $5.00 $3 ,375 ~ 14 Seeding & Hydromulch 3,6 00 SY $0.50 $1 ,600 ·~ 15 Silt Fence 850 LF $2 .50 $2 ,125 i ., 16 Construction Exit 25 TON $40 .00 i1.QQQ .; Subtotal $67 ,2&5 i stonn Dninage 17 Concrete Orairu1ge Flume -5' wide 700 SF $5 .00 $3,500 18 Dissipator .blocks 4 EA $25.00 11.QQ Subtotal $3,600 WattfiLlnes l 19 S'' Water PVC CL200 (C900) non-structural 570 LF $20 .00 $11 ,400 .1 . 20 M.J. Radue.er -8" x 6" 2 EA $300 .00 $600 . ; i 21 M.J. Bend "611 45 deg . 4 EA $250 .00 $1 ,000 ·l 22 M .J. Tee-6" 1 EA $300 .00 $300 i 23 M.J. Gate Valve -6" 1 EA $350 .00 $300 j 24 Water Services -1" 2 EA $700 .00 $1 .400 25 Water Services -1 112" 9 EA $750 .00 $6 ,750 26 Fire Hydrant AG&embty 1 EA $2 ,200 .00 $2,200 27 Connect to existing tine 2 EA $350 .00 $700 Su btotal $24,700 Sanitary Sewer Lin99 28 8" SOR 26 Pipe .struct; avg depth <10' 45 LF $32 .00 $1 .440 29 8" SUR 26 P~ -non-str; avg depth <10 ' 290 LF $25 .00 $7 ,250 30 8" SOR 26 Pipe.-struct avg depth 10'-12' 75 LF $36 .00 $2,700 31 8" S'OR 26 Pipe -non•str; avg depth 10'·12' 70 LF $29 .00 $2 ,03o 32 8" $DR26 Pipe-stn.1ct, <ivg depth 12'-14 ' 45 LF $40 .00 $1,800 33 8" SOR 26 Pipe ·non-str; avg depth 12'-14' 40 LF $33 .00 $1 ,320 34 8" SDR 26 Pipe -non-str; avg depth 14'-16' 35 LF $38 .00 $1 ,3$0 35 Sewer Services -4" 6 EA $700.00 $4 ,200 36 Sewttr ~iv~ • 6" . 7 EA $750.00 $5 ,2~0 37 Manholes -average depth 8'-10' 2 EA $2 ,200 .00 $4.400 38 ManholeS ~average deptll 10'-12' 1 EA $2 ,400.00 $2 ,400 39 Tie-in to e)(i$ting line 2 EA $200 .00 MQQ Subtotal $34,!liZO Total ·Sibrworit $57,255 Total Stonn Drainage $3,690 TotalWat.r $~,700 Total Ba n lt.ary s.-r TOTAL CONSTRUCTION! H!.s~ $130,ml Engineering and S~y @ 6% $7,81)5 Contingeney @ 5% $6,SIM TOTAL I $1'4,3831 P~9e 1 of 1 Drainage Report for Castlegate Subdivision -Section 13 College Station, Texas May 2003 Developer: Greens Prairie Investors, Ltd. By Greens Prairie Associates, LLC 4490 Castlegate Drive College Station, Texas 77845 (979) 690-7250 Prepared By: TEXCON General Contractors 1707 Graham Road College Station, Texas 77845 (979) 690-7711 CERTIFICATION I , Joseph P . Schultz , Licensed Professional Engineer No . 65889 , State of Texas , certify that this report for the drainage design for the Castlegate Subdivisio11 -Sectio1113 infrastructure, was prepared by me in accordance with the pro v isions of the City of College Station Drainage Policy and Design Standards for the owners hereof. TABLE OF CONTENTS DRAINAGE REPORT CASTLEGATE SUBDIVISION -SECTION 13 CERTIFICATION ................................................................................................................................................................. 1 TABLE OF CONTENTS ....................................................................................................................................................... 2 LIST OF TABLES .................................................................................................................................................................. 2 INTRODUCTION .................................................................................................................................................................. 3 GENERAL LOCATION AND DESCRIPTION ................................................................................................................. 3 FLOOD HAZARD INFORMATION ................................................................................................................................... 3 DEVELOPMENT DRAINAGE PATTERNS ...................................................................................................................... 3 DRAINAGE DESIGN CRITERIA ....................................................................................................................................... 3 STORM WATER RUNOFF DETERMINATION .............................................................................................................. 4 DETENTION FACILITY DESIGN ..................................................................................................................................... 5 STORM SEWER APRON & FLUME DESIGN ................................................................................................................. 5 CONCLUSIONS ..................................................................................................................................................................... 6 APPENDIX A ......................................................................................................................................................................... 7 Storm Sewer Apron & Flume D esign Calculations EXHIBIT A ........................................................................................................................................................................... 11 Post-Development Drainage Area Map LIST OF TABLES TABLE 1 -Rainfall Intensity Calculations .............................................................................................. 4 TABLE 2 -Post-Development Runoff Information ................................................................................ 5 2 DRAINAGE REPORT CASTLEGATE SUBDIVISION -SECTION 13 INTRODUCTION The purpose of this report is to pro vide the hydrological effects of the construction of the infrastructure for the Castlegate Subdivision, Section 13, and to verify that the proposed storm drainage system meets the requirements set forth by the City of College Station Drainage Policy and Design Standards. GENERAL LOCATION AND DESCRIPTION The project is located on a portion of a 111.46 acre tract located west of State Highway 6 a long the north side of Greens Prairie Road in College Station, Texas . This report addresses Section 13 of this subdivision , which is made up of 6.238 acres. The site is pastureland with approximately 30 % of the area wooded with oak trees and yaupons. The existing ground elevations range from elevation 300 to elevation 310 . The general location of the project site is shown on the vicinity map in Exhibit A. FLOOD HAZARD INFORMATION The project site is located in the Spring Creek branch of the Lick Creek Drainage Basin. Most of the proposed developed area of the site is located in a Zone X Area according to the Flood Insurance Rate Map prepared by the Federal Emergency Management Agency (FEMA) for Brazos County, Texas and incorporated areas dated February 9, 2000, panel number 48041C0205 -D . Some of the proposed residential lots are partially in Special Flood Hazard Area, Zone AE, as shown on the panel. This area is shown on Exhibit A as the 100-year floodplain limit. Also shown on this exhibit are the floodplain limits as determined by the Castlegate Floodplain Analysis Report which was previously submitted. The rear portions of some of the residential lots in Section 13 are within the 100-year floodplain limits. However, the floodplain limit determined by the Castlegate Floodplain Analysis results in less of the lot area being in the Flood Hazard Area. The majority of the Flood Hazard Area has been designated as Common Area, which will have no development and it will be left in its current condition. DEVELOPMENT DRAINAGE PATTERNS Prior to development, the storm water runoff flows easterly until it enters the floodplain and then into Tributary D of Spring Creek. Ultimately, the runoff flows in Spring Creek and then north to the regional detention facility. Refer to the v icinity map on Exhibit A for the location of this facility . DRAINAGE DESIGN CRITERIA The design parameters for the storm sewer are as follows: • The Rational Method is utilized to determine peak storm water runoff rates for the storm sewer apron & flume design. 3 • Design Storm Frequency Storm Sewer system 10 and 100-year storm events • Runoff Coefficients Pre-development Post-development (single family residential) c = 0.30 c = 0.55 • Rainfall Intensity values for Brazos County for a minimum time of concentration of 10 minutes can be found in Table 1. Where a longer time of concentration was necessary, it is noted in the respective table, and the intensities are calculated with the higher values where required. • Time of Concentration, tc -Due to the small si z es of the drainage areas , the calculated times of concentration, tc, are less than 10 minutes . Therefore, a minimum tc of 10 minutes is used in most cases to determine the rainfall intensity values. Where a longer time of concentration was necessary, it is noted and used accordingly. STORM WATER RUNOFF DETERMINATION The peak runoff values were determined in accordance with the criteria presented in the prev ious section for the 5 , 10 , 25 , 50, and 100-year storm events. The runoff coefficients are based on the future development of this tract. Exhibit B shows the post-development drainage areas for the storm sewer apron and flume designs . Post-development runoff conditions are summarized in Table 2. TABLE 1 -Rainfall Intensity Calculations Rainfall Intensity Values (in/hr) Storm tc = Event 10 min Is 7 .693 110 8 .635 125 9 .861 lso 11 .148 1100 11.639 Brazos County: 5 }'.'.ear storm 10 }'.'.ear storm b = 76 b = 80 d = 8 .5 d = 8.5 e = 0 .785 e = 0 .763 I = b I (tc+d)e I = Rainfall Intensity (in/hr) tc = U(V*60) to= Time of concentration (min) L = Length {ft) V = Velocity (ft/sec) 25 }'.'.ear storm 50 }'.'.ear storm 100 }'.'.ear storm b = 89 b = 98 b = 96 d = 8 .5 d = 8 .5 d = 8.0 e = 0 .754 e = 0 .745 e = 0 .730 (Data taken from State Department of Highwa}'.'.s and Public Transportation H}'.'.draulic Manual , page 2-16) 4 TABLE 2 -Post-Development Runoff Information Area# Area c (acres) 13-1 0.60 0 .55 13-2 0.62 0 .55 13-3 0 .53 0.55 13-4 0.62 0 .55 The Rational Method : Q=CIA Q = Flow (cfs) A= Area (acres) C = Runoff Coeff. t c (min) 10 10 10 10 I = Rainfall Intensity (in/hr} 5 year storm 10 year storm Is Os 110 01 0 (in/hr) (cfs) (in/hr) (cfs) 7 .693 2 .54 8.635 2 .85 7 .693 2.62 8.635 2.94 7 .693 2 .24 8.635 2 .52 7 .693 2 .62 8 .635 2.94 I = b I (tc+d)e tc =Time of concentration (min) DETENTION FACILITY DESIGN 25 year storm 50 year storm l2s (in/hr) 9 .861 9 .861 9.861 9 .861 0 2s lso (cfs) (in/hr) 3 .25 11.148 3 .36 11 .148 2 .87 11 .148 3.36 11 .1 48 tc = L/(V*60) L = Length (ft Oso (cfs) 3.68 3.80 3.25 3.80 V =Velocity (fUsec) 100 year storm 1100 0 100 (in/hr) (cfs) 11 .639 3.84 11 .639 3.97 11 .639 3.39 11 .639 3.97 The detention facility handling the runoff from this site is a regional facility designed by LJ A Engineering & Surveying, Inc . Also, a detention pond was constructed upstream of Castlegate Drive to reduce the peak flow resulting from the Castlegate development. In Exhibit A, the location of the regional detention facility is shown on the vicinity map, and the detention pond is shown upstream of Castlegate Drive. The runoff from this project flows into existing drainages and then into Spring Creek. The regional detention facility is located adjacent to Spring Creek prior to Spring Creek entering the State Highway 6 right-of-way. STORM SEWER APRON & FLUME DESIGN There will not be any storm sewer piping for this project. However, there will be a concrete apron to drain the gutter flow across the street where it will enter a concrete flume which will take the runoff to the 100-year floodplain and then into Tributary D of Spring Creek. Dissipater blocks will be constructed at the downstream end of the flume to reduce the velocity of the water prior to entering the existing drainage. The concrete apron will have a 5 ' bottom width with a slope of 1 % and side slopes of 2%. The concrete flume will also have a bottom width of 5 ', but it will have a slope of 1.8 % with vertical side slopes . The flume will be 8" in depth. Appendix A presents a summary of the storm sewer apron and flume design parameters and calculations. These two features were designed based on a 10-year design storm , and they pass the 100-year storm event as well. The streets were designed to maintain a gutter flow depth of 5" or less. This design depth will prevent the spread of water from reaching the crown of the road for the 10-year storm event. The maximum depth of flow in the street gutter will be 2.61 ". The depth of flow in the concrete apron will be 2 .04 ". However, the flow depth in the flume is 3.99'', which results in the depth of water being 3.24 " in the apron. All of these values are for the 10-year storm event. A summary of these flow depths are also shown in Appendix A. 5 CONCLUSIONS The construction of this project will increase the storm water runoff from this site. The proposed apron and flume should adequately control the runoff and release it into existing drainages. As shown in the Castlegate Floodplain Analysis , the Castlegate Subdivision does not have a significant effect on the 100-year floodplain water surface elevations or the floodplain limits . Also , the regional detention facility should adequately control the peak post- development runoff so that it will not have any impact on the properties downstream of the Crowley Tract. 6 APPENDIX A Storm Sewer Apron & Flume Design Calculations 7 Castlegate Subdivision -Section 13 Depth of Flow -Street Gutter 10-year storm 100-year storm Station Gutter Area# A c 0 10 Y10-actual 0 100 Y100 Location Location No. (acres) (cfs} (ft) (in) (cfs) (ft) (in) Sta . 3+67 .13 Apron -Uppe r Right 13-2 0 .62 0 .55 2 .94 0 .218 2 .61 3 .97 0.244 2 .92 Sta . 3+42 .13 Apron -Upper Left 13-3 0.53 0 .55 2 .52 0 .205 2.47 3 .39 0 .230 2.76 Sta . 3+67 .13 Apron -Lower Right 13-1 0 .60 0.55 2 .85 0 .215 2 .58 3.84 0 .241 2 .89 Sta . 3+42 .13 Apron -Lower Left 13 -4 0 .62 0.55 2 .94 0 .218 2.61 3 .97 0 .244 2.92 Transverse (Cro wn) slope (ft/ft) = 0 .0330 Straight Crown Flow (Solved to find actual depth of flow in gutter, y): Q = 0.56 * (z/n) * S112 * y813 ¢ y ={QI [0 .56 * (z/n) * S 112]}318 n = Roughness Coefficient= 0 .018 z = Reciprocal of crown slope = 30 S = Street/Gutter Slope (ft/ft) y = Depth of flow at inlet (ft) Depth of Flow -Apron & Flume 10-year storm 100-year storm Location Area# Total A c 0 10 Y10-actual 0100 Y100 Nos. (acres) (cfs} (ft) (in) (cfs) (ft) (in) Apron 13-1 1.22 0 .55 5.79 0 .170 2 .04 7 .81 0 .194 2 .33 13-4 13-1 Flume 13-2 2 .37 0.55 11 .26 0 .333 3.99 15 .17 0.402 4 .82 13-3 13-4 Concrete Apron -10 Ye ar Storm Channe l Calculator Giv en Input Data: Shape .......................... . Solving for .................... . Flowrate ....................... . Slope .......................... . Manni n g 's n .................... . Height ......................... . Bottom width ................... . Left slope ..................... . Right slope .................... . Computed Results: Dept h .......................... . Velocity ....................... . Full Flowrate .................. . Flow area ...................... . Flow p erimeter ................. . Hy drau lic radi u s ............... . Top widt h ...................... . Area ........................... . Perimet er ...................... . Percent full ................... . Trapezoidal Depth of Flow 5.7900 cfs 0 .0100 ft /f t 0.0130 6 .0000 in 60.0000 in 0.0200 ft /ft (V/H) 0.0200 ft /ft (V/H) 2 .0364 in 2 .5302 fps 72.0996 cfs 2.2883 ft2 263.6764 in 1 .2497 in 263.6357 in 1 5.0000 ft2 660.1200 i n 33 .9393 % Concrete Apron -100 Year Storm Ch annel Ca l c u lator Giv en Input Data: Shape .......................... . Solving for .................... . Flowra t e ....................... . Slope .......................... . Manning ' s n .................... . Hei ght ......................... . Bottom width ................... . Left slope ..................... . Right slope .................... . Computed Results : Dept h .......................... . Velocity ....................... . Full Fl owrate .................. . Flow area ...................... . Flow p erimeter ................. . Hydrau lic radi u s ............... . Top width ...................... . Area ........................... . Perimeter ...................... . Percent full ................... . Castlegate Subdivision -Section 13 College Station, Texas T rapezoidal Depth of Flow 7.8100 cfs 0.0 100 ft/ft 0 . 0130 6 .0000 in 60 .0000 in 0.0200 ft /ft (V/H) 0 .0200 ft /f t (V/H) 2.3304 in 2 .7339 fps 72 .0996 cfs 2.8568 ft2 293.0903 in 1 .4036 in 293.0437 in 15.0000 ft2 660.1200 i n 38.8406 % Concrete Flume -10 Year Storm Channel Calculator Gi ven Input Data: Shape .......................... . Solving for .................... . Flowrate ....................... . Slope .......................... . Manning ' s n .................... . Height ......................... . Bottom width ................... . Co mputed Results : Depth .......................... . Veloc i ty ....................... . Full Fl owra t e .................. . Flow area ...................... . Flow perimeter ................. . Hydraulic radius ............... . Top width ...................... . Area ........................... . Perimeter ...................... . Percent full ................... . Rectangular Depth of Flow 11 .2600 cfs 0 .0180 ft/ft 0 .0130 8 .0000 in 60.0000 in 3.9901 in 6.7727 fps 33 .3238 cfs 1.6626 ft2 67.9803 in 3.5217 in 60.0000 in 3.3333 ft2 76 .0000 in 49.8767 % Concrete Flume -100 Year Storm Channel Calculator Given Input Data: Shape .......................... . Solving for .................... . Flowrate ....................... . Slope .......................... . Manning's n .................... . Height ......................... . Bottom width ................... . Computed Results: Depth .......................... . Velocity ....................... . Full Flowrate .................. . Flow area ...................... . Flow perimeter ................. . Hydraul ic radius ............... . Top width ...................... . Area ........................... . Perimeter ...................... . Percent full ................... . Cast legate Subdivis ion -Section 13 College Station, Texas Rectangular Depth of Flow 1 5 .1700 cfs 0.0 180 f t /ft 0.0130 8.0000 in 60 .0000 in 4.8176 in 7 .5572 fps 33 .3238 cfs 2 .0074 ft2 69.6353 in 4 .1510 in 60.0000 in 3 .3333 ft2 76 .0000 in 60.2206 % EXHIBIT A Post-Development Drainage Area Map 11