HomeMy WebLinkAbout45 DP KM Custom Homes Office Building 05-70 244 Southwest PKWYRABON MET CALF & GIN EERJRJN:G;:...::~:::::::==:=:::=:=:::::: POSf OFFICE BOX 9253 -~ (979)690 -0329 -Home
COLLEGE Sf ATION ._TEXAS77842 --:::::J (9 79 J 690-0329 -FAX __ -(979) 219-4174 -CELL
EMAIL: r men gin ccr @jun o .com
January 6, 2006
Josh Norton, E.I.T. Graduate Engineer
City of College Station
1101 Texas A venue South
College Station, TX 77842
RE: Drainage Letter for KM Custom Homes -REVISION No. 1
244 Southwest Parkway, College Station, TX
Lot 8C, Block D -Ashford Square Subdivision, Brazos County
RME No. 189-0270
Dear Josh,
The proposed addition, referenced above, consists of a 2,078 square-foot office building,
parking, and associated sidewalks. Some parking and the access driveway to support this facility
are currently in place. Using the Rational Method and the following parameters, an increase in
runoff of approximately 0.50 cfs during the 100-year rainfall event would be experienced.
Ration Method: Q = CIA
CEXIST = 0.30 CNEw ;::;; 0.95
I= 11.63 in/hr Tc= 10 min.
A = 0.066 acres
The contractor of this development (KM Construction) will install gutter and downspouts so that
the new impervious cover, expect for sidewalks, is directed to the front parking area. 90% of the
increase runoff is expected to be captured and directed by this means. The remaining runoff,
from the rear lot and side yards will discharge to the south toward the Manufactured Home
community. This portion of the runoff is a negligible amount and therefore should not create any
adverse impacts to downstream drainage structures and/or facilities.
CD l-l 89-0270-L03 Page -I
V \{Xo-c(o
4 :~-,
RABON M ETCA LF EN GI NEER~:NG~~~=====:::::::::: o~ -//\. (9 79)690 -0329 -H o m e 'U
POST O FFICE BOX 9253 --(979)690 -0 329 _ FA X ~
C OLLEGE STA TION , TEX A S77842 (979)2 19-4 174 -CEL L U~
EMA IL: r men g in ee r @j u no .com
January 6, 2006
Josh Norton, E.l.T. Graduate Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Drainage Letter for KM Custom Homes -REVISION No. 1
244 Southwest Parkway, College Station, TX
Lot SC, Block D -Ashford Square Subdivision, Brazos County
RME No.189-0270
Dear Josh,
The proposed addition, referenced above, consists of a 2,078 square-foot office building,
parking, and associated sidewalks. Some parking and the access driveway to support this facility
are 9urrently in place. Using the Rational Method and the following parameters, an increase in
runoff of approximately 0.50 cfs during the 100-year rainfall event would be experienced.
Ration Method: Q = CIA
CmasT = 0.30 CNEw = 0.95
I= 11.63 in/hr Tc= 10 min.
A = 0.066 acres
The contractor of this development (KM Construction) will install gutter and downspouts so that
the new impervious cover, expect for sidewalks, is directed to the front parking area. 90% of the
increase runoff is expected to be captured and directed by this means. The remaining runoff,
from the rear lot and side yards will discharge to the south toward the Manufactured Home
community. This portion of the runoff is a negligib le amount and therefore should not create any
adverse impacts to downstream drainage structures and/or facilities.
CD l-l 89-0270-L03 Page - 1
CITY OF COLLEGE STAT ION
Planning & Drwlapmmt Service1
SITE LEGAL DESCRIPTION:
Ashford Square
Block D , Lot BC
DEVELOPMENT PERMIT
PERMIT NO. 05-70B
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
244 Southwest Parkway
DRAINAGE BASIN:
Main Bee Creek
DATE OF ISSUE: January 9, 2006 VALID FOR 12 MONTHS
OWNER:
KM Construction
244 Southwest Parkway East
College Station, TX 77840
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7 .5 .E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operat ions of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to rema in is strictly prohibited. The disposal of any waste material such as , but not limited to, paint , oil , solvents ,
asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
Full Development Permit
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construct ion site
in accordance with the approved eros ion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determ ined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
s ilt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
d isturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure
that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Date j j
I /CZ/oCp
Date
DEVELOPMENT PERMIT
PERMIT NO. 05-70A
Project Description
CrTY OF COLLEGE STATION
Planning & Development Services FOR AREAS Outside THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Ashford Square
Block D, Lot 8C
DATE OF ISSUE: December 21, 2005
OWNER:
KM Construction
244 Southwest Parkway East
CS , TX 77840
TYPE OF DEVELOPMENT: Clearing and Grading Only
SPECIAL CONDITIONS:
SITE ADDRESS:
244 Southwest Parkway
DRAINAGE BASIN:
Main Bee Creek
VALID FOR 12 MONTHS
CONTRACTOR:
All construction must be in compliance with the approved construction plans
Clearing and Grading Only at Owners Risk and does not guarantee a Full Development Permit at any time in
the future
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be
taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area Outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
-----
FOR OFFICE USE ONLY
P&Z CASE NO.: 05-7 0 . vr
CITY OF COLLEGE STATION
Plan ning & D~lopmmt Services
LAN APP LI CATION
DATE SUBMITTED: \~ \ 05
\0'.w
~
_x_ Site plan application completed in full.
_x_ $200.00 Application Fee .
_x_ $200.00 Development Permit Application Fee .
NIA $600.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public
waterline, sewerline, sidewalk , street or drainage facilities is involved .)
_x_ Eleven ( 11) folded copies of site plan
_x_ One (1) folded copy of the landscape plan .
__ One (1) copy of building elevation for all buildings.
__ A list of building materials for all facades and screening for non-residential buildings.
__ Color samples for all non-residential buildings .
NIA Traffic Impact Analysis (if applicable for non-residential buildings).
_x_A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they
are not checked off.
N/A Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable). ·
Date of Preapplication Conference: _______________________ _
NAME OF PROJECT KM CUSTOM HOMES -OFFICE BUILDING
ADDRESS 244 SOUTHWEST PARKWAY
LEGAL DESCRIPTION LOT ac. BLOCK D OF ASHFORD SQUARE SUBDIVISION
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name Rabon Metcalf. P .E. (Rabon Metcalf Engineering)
Street Address =-P.:..;:.O=·-=B::..;::o=x,_,9=2=5-=-3 ____________ _ City College Station
State ~T~X ____ Zip Code _,_77.:..;84:-...:.::2,__ ___ _
Phone Number >..:::(9'-'-7=9),._6=9=0;_.;--0::..;::3=2=9-------
PROPERTY OWNER'S INFORMATION:
Name KM Construction
Street Address 244 Southwest Parkway East
State TX Zip Code ~77~84~0 ___ _
Phone Number ...,(9=7-=-91.-> 5=8=7_,-2=27==5 _____ _
ARCHITECT OR ENGINEER'S INFORMATION:
Name Same As Applicant
E-Mail Address nnenqineer@verizon.net
Fax Number (979) 690--0329
City College Station
E-Mail Address-------------
Fax Number (979) 696-6751
Street Address------------------City __________ _
State _____ Zip Code-------E-Mail Address
------------~
Phone Number ___________ _ Fax Number _____________ _
1 of/;