HomeMy WebLinkAbout42 DP Rosa's Cafe 701 University 05-69LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
DATE: ?f'· Z·Ociz
RE: COMPLETION OF ____ _ .
?.::;q__,,c/ Ca...,-r r; rlCL..-
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontra,cts and to affirm their warranty on the work . This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by "jh -$1 feX? fosIµ:_
and by their subcontractors as indicated by signatures below.
WORK COMPLETED DATE
F14 L1 Ill£. ( ttv~JJ..l!f?Pr~JL"iJ
'-Ii te t (} M,1 f fl.LE/!. S (._ treCJi)t ,, ~~~ J
S' £ P'Et?--17£ -~
r •
Owner: ·JJo BB 'r f!s)O f'e.s ~.Jc_ Contracto r: ~gg~ d,1c ear I~
Mailing Address : _____ _ Address: --------
'locs-TPrtl!-1'-'11 T1tJPlf'-A;Hll tf1Js-r-Ir,£f_/..lJr-T/OlV!f L /ZJJ--t/J
h-Jcx1t-1; Tl° 1bl(/7
Signature: W If< l---,,
Revise d 10112100
--GME Testing and Engineering, ln ..,,_c.-
1806 Welsh Avenue, Suite C
College Station, Texas 77840
(979)764-8700
BILL TO
Mr. John Logan
City of College Station
P .O . Box 9960
College Station, Texas 77842
PROJECT NUMBER PROJECT
26053 Rosa's Cantina Waterline
DATE INVOICE#
6/22 /2006 2009
BILLING PERIOD TERMS
5/2/06 Net 30
__ 1-1--P-.o_._N_u_M_B_E_R_--1
CORRESPONDING REPORTS
1-2
ITEM DESCRIPTION CATEGORY QTY/HRS RATE AMOUNT
Tech. Labor Engineering Technician Labor/Services Labor I 32 .00 32.00
ASTM 04318 Liquid and Plastic Limits Laboratory test I 22.00 22.00
ASTMDIJ40 Amount of Material in Soils Finer Than No. 200 Laboratory test 1 12.00 12.00
Sieve
ASTMD698 Standard Effort Compaction Curve Laboratory test I 110.00 110.00
-
It is a pleasure working with you! Please send payment to the above address . Thank you!
DK-7o /]I, ~, 77 . cJC:. it/J Total $176.00
I (/-I
03/20/2005 18:32 9724885732 CEI ENGINEERING PAGE 02/02
johVl ~-~,;-2--d~~ CEI Engineering Associates, Inc.
Triwest Plaza • 3030 LBJ Freeway, Suite 1250 • Dallas, TX 75234 • Phone (972) 488-3737 • Fax (972) 488-6732
City of College Station
1101 Texas Avenue
College Station, TX 77842
Phone: (979) 764-3570
Attn: Josh Norton
RE: Rosa's Cafe Located At 710 University Drive East, College Station, TX
CEJ Ptoject #: 19626.0
Dear Mr. Norton.:
P lease accept t his Jetter as tbe opinion cif probable 8" water main and fire hydrant costs.
8" Water main & Fire Hydrant
262 LF 8" w~tcr main @ $.2~/LF
l-Fire h~·dran t@$1 ;500 EA
2-8 "x2 " tet: @ $3 00 EA
2 -8 "x 6 " tee @ $4 50 EA
2"8" va lve @ $80 0 E/\
1-8 "x8" tapping sleeve @~ $2,000 EA
6-Tim1st blockin g@ $250
Trench safety @ $1 /LF
Grand Total ""'
Feel free to contact us if yo u have any questions.
Thank you .
'= $ 6)550 .00
= $ 1,500 .00
::; $ 600.00
"'$ 900 .00,
~.,. $1 ,600 .00
~= $ 2,000 .00
=: $ l ,500 .00
"°' $ 262 .00
$14,912.00
I .
CALIFORNIA• TEXAS• ARKANSAS •TENNESSEE • MINNESOTA • PENNSYLVANIA • GEORGIA• FLORIDA
DEVELOPMENT PERMIT
PERMIT NO. 05-69
Ci1Y OF C OLLEGE STATION
P/;mnint & D<V<!.pmmt Strvim
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Rosa's Subd ivision
DATE OF ISSUE: March 1, 2006
OWNER:
BDC Properties
4055 International Plaza , Suite 450
Ft. Worth , Texas 76109
SITE ADDRESS:
University Dr. E (across from East Tarrow)
DRAINAGE BASIN:
Burton Creek
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7 .5.E ., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
requ ired to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
proh ibited .
Full Development Permit
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sed iment onsite, it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work .
In accordance w ith Chapter 13 of the Code of Ord inances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities.
I hereby grant this perm it for development of an area outside the special flood hazard area. All development shall be in
accordance w ith the plans and specifications submitted to and approved by the City Engineer in the development perm it
appl ication for the above named project and all of the codes and ordinances of the City of College Station that apply.
Date
I
:J r L.._.ooo r .:JL. vc. J. C.1'11::1 J. l'IC.C.r: J.1'1\:1
' lf" mt
L.~~
Form 1osa
(Rev.Di~)
(GSO-EPC)
Piige1 of2
Permit to Construct Access Driveway Facilities
on Highway Right of Way
To: Ro!>c:.'~ ~f.e.
(Name)
Hwy. l=:M ; N.O. Co 0 U.,.b<Y'S;ry Perm it No .
p ............ ~
Lfo'i$' ~wter~Q+to"'c:d PlCl.J.C\ Control ------------Seotion qn.. 'if~. 3~3r ( ... ept"tstt.,~+1-<) CAdd~l Svi+e-'t 'lS-
Jao .... -t-WO,,......., 1 TX /~IOI:\
(City, Statt, Zip)
&l=l-· 1~;... .. '-1..'3.S-C-""11\e.-}
(Phone No.)
r'AC::i E 0 4/07
The Texas Department of Transportation, hereinafter called the State, hereby authorizes -------------
hereinafter called the Permittee, to O construct I 0 reconstruct a (residential, conven ience ------------store, retail mall, farm , etc.) a~ss driveway on the highway right of way abutting highway number in-------
County, located ____________ ~~~-~~-----------~--~---
Subject to the following :
All const ruction and materials shall ba subject to inspection and· approved by the State .
3. Maintenance of facilities constructed hereunder shall be the re5pons lbllity of the Permittee, and the State reserves the right to
requ ire any changes, maintenance or repairs as may be neceS5ary to provide protect ion of life or property on or adjacent to
the hi ghway_ Changes in design will be made only with approval of the State .
4. The Permittee shall hold harmless the State and its duly app~inted agents and employees against any aotion for personal
injury or property damage sustained by rea$0n of the exercise tjf th is permit.
5. Except for regulatory and guide signs at county roads and city streets . the Permittee shall not erect any sign on or extending
over any portion of the highway right of way, and vehicle service fixtures such as fuel pumps. vendor stands , or tanks shall be'
loca ted at least 12 feet from the right of way line to ensure that any vehicle services from these fixtures will be off the highway
right of way.
6. The State reserves the right to require a new access driveway permit in the event of a land use change or change in driveway
tr:;iffic volume or veh icle types .
7 . Th is permit will become null and void if the above-referenced driveway facilities are not constructed within six (6) months from
the issuance date of this permit.
8_ ThePermitteewillcontactthestate'srepresentative kE:"'.~~"T ~ UJ:lo.\tS\7 ~~~
telephone, tt!ll ~&:!:>A, 2t least twenty~four (24) hours prior to beginning the t;Jrk authorized by this permit.
Texas Department of Transportation
Date of Issuance Authorized Representative
The unders igned hereby agrees to comply with the telTT'IS and conditions set forth in th is permit for construct ion of an access
driveway on the highway right of way.
Date : ~~-0;;..;;e....;e.....;~-.;..lr>e=.;...,._.;..S-_...-~=--="-'o"-..:.S" ___ _ Signed :
ntative)
Form 1058
" (Rev. 12/96)
Page 2 of2
Access Driveway Regula tions
The Texas Transportation Commission, in recognition of its responsibility for the safety and utility of public highways under its jurisdiction, has
directed the adoption of rules and regulations to accomplish a coordinated development between highways and abutting property. For this
purpose, the booklet entitled "Regulations for Access Driveways to State Highways", was published and adopted, setting out departmental
policies to regulate construction and maintenance of access driveway faci lities.
Sketch of Installation
ROSA'S CAFE
-SEE ATTACHED PROVISIONS -
SIDEWALK CONSTRUCTION ONLY
December 12, 2005
RE: FM 60 East (University Drive) (South ROW)
SW Corner@ East Tarrow Drive
Rosa's Cafe
College Station, Texas
Access Driveway Permit -Sidewalk Construction (4' x 20')
SPECIAL PROVISIONS (Sidewalk Construction):
1) Traffic Control plan is required per TMUTCD prior to start of construction work
in the FM 60 right-of-way. Lane closure, if required, shall only be between the
hours of 9:00 AM and 4:00 PM.
2) Areas within ROW disturbed by construction shall be restored to equal or better
conditions than existing prior to construction.
3) Contractor shall be responsible for locating all utilities within the right-of-way
construction site. Contacts with local utility companies and utility locators are
required.
4) Sidewalk construction shall be as per City of College Station Standard Details &
Specifications. (ADA Standards required).
5) Pavement surface shall be kept clear of mud, debris, etc. Erosion controls shall
be installed as required.
. 12/05/2005 17 :17 9724885732 CEI ENGINEERING
.·:: . ..-.
L,o.l?,f;:~
Form 105S
(Rev. 8/.2004)
(GSD-EPC)
F':;ige 1 of 2
Permit to Construct Access Driveway Facilities
on Highway Right of Way
To : Ro~ CA'S ~f.e.
(Nam e)
Hwy. ~M ; N.O . fo 0 Unlve..-sN-y Permit No .
t> l""l'"e..
~o'SS' :twte..=~o.+to"" I PlC1:?,"l Control --~--------Section CAddr~sl Svi+e-~1~
&.,.+-wo~ 1 Tx /C.:,to°t
(City, State, Zip)
qn · 'i8'~. 1':)-:n· ("'ep..-est'r'\~#..oe)
fn 3-· T+.;.. ~ '° 'Z..1S-C•M/11\e ..-}
(Phon!! No .)
PAGE 04/07
The Texas Department of Transportation, hereinafter called the State , hereby authorizes --------------
hereinafter called the Perm ittee , to 0 construct I 0 reconstruct a (residential, convenience ------------store , retail mall, farm , etc.) access driveway on the highway right of way abutting highway number in _______ _
County, located-------------------------------------
Subject to th e follow in g :
1. The Permittee is responsible for all costs associated w ith the co,nst ructi on of th is access driveway.
All construction and materials shall ba subject to inspection and approved by the State .
3. Ma intenance of facilities constructed hereunder shall be the ~pons lbllity of the Permittee, and th e state reserves the ri ght to
req uire any changes, maintenance or repairs as may be nece5sary to provide protection of life or property on or adjacent to
the highway_ Changes in design will be made only with approval of the State .
4. The Permittee shall hold harmless th e State and its d uly appbinted agents and employees against any action for personal
injury or property damage susta ined by reason of the exercise tjt th is permit.
5 . Except for regulatory and guide signs at county roads and city streets, the Permittee shall not erect any sign on or extend i ng
over any portion of th e highway right of way, and veh icle service fixtures such as fuel pumps . vendor stands, or tanks shall be
loca ted at least 12 feet from the ri ght of way line to ensure that any vehicle services from these fixtures will be off the highway
rig ht of way.
6 . The State reserves the right to require a new access driveway permit in the event of a land use change or change i n driveway
traffic volume or vehicle types .
7 . Th is permit will become null and void if the above-referenced driveway facilities are not constructed within six (6) months from
th e issuance date of this permi t.
8. The Permittee will contact the state's representa ti ve
-;-----;:;:-:-;--;--~~~~~~~...,....-.....,..-...,.......,....--~~~~~
te lephone, ( __ } , at least twenty~four (24) hours prior to beg inni ng the work authorized by this permit.
Texas Department of Transportation
Date of Issuance Authorized Representative
The undersigned hereby agrees to comply with the terms and conditions set forth in this permit for construction of an access
drivew;:iy on the highway right of way.
Signed :
ntative}
. 12/05/2005 17:17
FOtm 1058
(Rev. 912004)
Pagg 2 Of 2
9724885732 CEI ENGINEERIN G PAG E 05/07
Access Driveway Regulations
The Texas Transportation Commission , in recognition of Its responsibility for the safety and utility of public:: highways under its
jurisdiction, has directed the department to adopt access driveway standards to accomp lish a coord ina ted development between
h ighways and abutting property. For this purpose , the booklet entitled "Regulations for Access Driveways to State Highways", was
published and adopted , setting out departmental po licies to regu late construction and ma intenance of access driveway facilities.
Sketch of Installation
'12/05/2005 17: 17 .
.71
.~
.~
9724885732 CEI ENGINEERING
9'
"'"
NO PA G t I.A
D
~
TY!'.
PAGE 05/07
10~.w
9£.'tUii•';f,S,,f
53?VdS E)Nl~d
)-~l?V:::i Vill.l~..L
3dV0 SiVSO:
c:
• 12/05/2005 17 :17 972488573 2 CEI ENGINEERING PAGE 07/07 .
....
.'>) \.
-~ ~+
-~ #
;>:,& -~ .~I ~ .. i* ; . ~'
~~ IP ~ ~
~ ~ l)o)
CITY OF COLLEGE STATION
Plann ing <fr DevtWpmmt Sero ice1
SITE LEGAL DESCRIPTION:
Rosa's Subdivision
DATE OF ISSUE: March 1, 2006
OWNER:
BOC Properties
DEVELOPMENT PERMIT
PERMIT NO. 05-69
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
University Dr. E (across from East Tarrow)
DRAINAGE BASIN:
Burton Creek
VALID FOR 12 MONTHS
CONTRACTOR:
4055 International Plaza, Suite 450
Ft. Worth , Texas 76109
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to , paint, oil, solvents,
asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
Full Development Permit
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as eros ion, siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities .
I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Date
UVUU..1.. VV ~l. '-'VJUJ. .n.J.'I J..~t.J ~VVv 12/08/2005 1 7 :3 1 PAGE 04/0 5
(Check one) 0 Minor
{$300.00)
FOR OFFICE USE ONLY
PS.ZCASENO.: 05-~3(e
DATE SUBMITTEO:
FINAL PLAT APPLICATION -
0 Amending
($300 .00)
0' Final .
($400.00)
D Vacating
($400.00)
D Replat
($400.00)
The following items must be submitted by an established filing deadline date for P&Z Commission consideration.
MINIMUM SUBMITTAL REQUIREMENTS:
~.¢'g Fee (see above) NOTE : Multiple Sheets -$55.00 per additional~t 'I>" o_,"-~Development Permit Application Fee Of $200 .00 (if applicable). ,VJilDED ~
~ v Infrastructure Inspection Fee of $600.00 (applicable if any public infrastructure is being constructed)
7 Application completed in full .
~Thirteen (13) folded copies of plat. (A signed myler original must be submitted after staff review.)
1::ffL One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
7 Paid tax certificates from City of College Station , Brazos County and College Station l.S.D.
--;/'A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
@ Two (2) copies of public infrastructure plans associated w ith this plat (if applicable).
Id/A_ Parkland Dedication requ irement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable .
@ Sv8M 11/cn? 13y Ct;;r.t: e:Mct~ lZ-1'1 °-S v/llPPL ~IZA'£' c.D""'
Date of Preapplication Conference: ______________ ~-------
NAME OF SUBDIVISION R OfuC\ I~ Su.l?d Iv i tii.m
SPECIFIEP LOC~TlON OF PROPOSED SUBDIVISION ~Lot&. ~lock) \nutted Utt 1\'\v £DU}b (~YV\t.Y o+
:the U~\\/tY~lb/ 2titv I~&+ J1ivnw OYIW: \f\tcr«:t:t1m N lPDO ' ~Eit-G-1:
1/\HDW Drive
AP PLICANTIPR~J~CT MANAGER 'S INFORMATION (Prirmry Contact for the Project):
Name J\LY\ 10t{j= _
Street Address :Um \nttYDvtt\[Y)ti\ e1~16\ I Suite ~cso City _,f.._.4_,_ . ....l..:IW~Dr'-'--'tY!L.!--__ ~
State u Zip Code '1 Li I og E-Mail Address ~t e ~Dliy v (,Q~. WWl
Phone Number { 011J 1()1' ltkDD Fax Number--~---------
PROPERTY OWNER 'S INFORMATION:
Name f?D{; ~Y~ / .lfilIBllU11ifil_ \]j_l;.
Street Address iii~?J fofu\lnt\ffanill fJiilJ JU.tlt/ 4720 City 8 . WPJt\tt
State 1X Zip Code ::1tR I og E-Mail Address _\1:-h ............... Af:.L.J...Lt_..t"--"\!v-"-VJ!:..Jtl"-~+'w=..::..~~-LD~Wl~-
Phone Number (011/ 011 -li'VDD FaxNurnber ___ ~--~---~-
ARCHITECT OR ENGINEER'S INFORMATION:
1 of 4
DATE, TIME
FAX NO . /NAME
DURATION
PAGE (S)
RESULT
MODE
TRANSMISSION VERIFICA TI ON REPORT
03/27 10 : 37
9845 8252
00:00:29
04
OK
STA NDARD
ECM
~l;:;r .····x•:::;&·•
TIME : 03/27/2007 10:37
NA ME :
FA X :
TEL :
SER.# : 000 L5J595800
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: 3 / 1.1 I DI # of pages induding cover:_LJ ............... _
If you did not receive a complete fax, please call our office immediately for a new transmittal.
ro: f'fed f~,lnt FAX: COYLa-51'J1
COMPANY: '?\iVJ~ £V\~\\'\OLViV)Cj
RE:
FROM= :Joo'n Nov±Dn
C011PANY: _____ C~i_ty_o_f_C_o_ll---.eg __ e_S ...... ta~ti_·o_n ______ _
Feb 06 06 11:33a Gerald Matthew5
fMLMatthews Engineering Inc.
l.::J 4a12 Call ~'icld Rd Ste 200
February 6, 2006
Mr. Josh Norton
City of College Station
College Station, TX
Fax;979-764-3496
Wichita Ii'alls, TX 76308
Tel. 940-692-392!)
Fax _ !)40·G!)2·4029
Subject: Fire Flow for Rosa's Restaurant
Dear Josh ,
940-692-4029
I have received two tlow reports from Butch Willis, Water Wastewater Division that were
run on Friday, February 3, 2006. The reports arc attached for hydrnnl nwnhers C-096 and
C-065. The Hows were 1375 and 1405 gpm respectively. Both have adequate residual
pressure for the lire installer to design the sprinkler system in th~ building.
Rosa's Restaurant falls into the building type IIA. Per the International Fire Code Table
B 105.1 fire flow per buildings of 1-12, 700 sq fl is given as 1500 gpm rmnimum. Dividing
this between the two hydrants we sec lhat each exceed the 750 gpm that would be
required as noted above .
A<> J understand this is the only item that you require to complete the building permit other
than any civil dr.1wings changes you have discussed with CEI. Please let me know if you
have any questions.
We are looking forward to receiving your building pennit so construction may move
ahead.
Cc: K Tall, Bobby Cox Co., Fax: 817-377-6280
B Willis Fax: 979-764-3452
0 Rodriquez Fax: 972-488-6732
p. 1
. F~b 06 06 11:33a Gerald Matthews 940 -692 -4029
II~{ College Station Utilities ~ Reliable, Affordable, Community Owned
1601 GRAHAM ROAD
COLLEGE STATION TEXAS 77845
Date: 6 February 2006
From: Butch Willis Water Wastewater Division
Phone: 979-764-3435 Fax: 979 -764-3452
FLOW TEST REPORT
Nozzle size: 2.5 inch
Location: 700 UNIVERSITY
Flow hydrant number: C-065
Pitot reading: 70
(GPM): 1405
Static hydrant number: C-064
Static PSI: 84
Residual PSl: 82
p.3
,Feb 06 06 11:33a Gerald Matthews 940-692-4029
II~( College Station Utilities ~ Reliable, Affordable, Community Owned
1601 GRAHAM ROAD
COLLEGE STATION TEXAS 77845
Date: 6 February 2006
From: Butch Willis Water Wastewater Division
Phone: 979-764-3435 Fax: 979-764-3452
FLOW TEST REPORT
Nozzle size: 2.5 inch
Location: UNIVERSITY NEXT TO TGIF
Flow hydrant number: C-096
Pitot reading: 68
(GPM): 1375
Static hydrant number: C-095
Static PSI: 96
Residual PSl: 88
p.2
CITY OF COLLEGE STATION
Planning & Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: 4-2L-/,{)~ #of pages including cover: 1
If you did not receive a complete Jax, please call our office immediately for a new transmittal.
TO: fJ.a.c:o J ~ FAX: 3)_s-51 ~ -5 7°J5
COMPANY: --------------------,,-' ,,.--:: Cbh-
RE: tV ~ t[o(J) ~ l2D~ ':i
FROM: ~_sh f\j~
COMPANY: _____ C_ity-.1--o_f_C_o_ll_et,>g_e_S_ta_ti_o_n _______ _
REMARKS: D Urgent D For your review D Reply ASAP D FYI
DATE, TI ME
FAX NO ./NAME
DURA TIO N
PAGE (S)
RESULT
MODE
TRAN SMI SSION VERIFI CATION REPORT
TIM E : 04/23/2005 21:53
NAM E : COCS DE VELOPMENT SER
FA X : 9797543495
TEL : 9797543570
SER .# : BRO E2J341073
04/23 21:52
918058552122--23 590
00 :00 :53
04
OK
STANDARD
ECM
.. •, •,•• ..
"',•' I'.
;,:::·:. '}:: .. ::: :::. ;·:::~::..:'
Ci'fi,~1$-~1~6::
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: i~ 'Jt/tJ~ # of pages including cover: 4
If you did not receive a complete fax , please call out office immediately for a new transmittal .
COMP ANY: ___ ~_C~ity~of~· C~ol~le~g:i.::::.e-=S;.:.:ta=ti~·o~n'---------
DATE, TIME
FA X NO ./NAME
DURATION
PA GE (S)
RESULT
MO DE
TRANSMISSION VERIFICAT I ON REPOR T
BUSY : BUSY/NO RESPONSE
TIME : 04/23/2005 20 :25
NAM E : COCS DEVELOPMENT SER
FA X : 9797543495
TEL : 9797543570
SER.# : BROE2J341073
04/23 20 :25
913255725795--23590
00 :00 :00
00
BUSY
STA NDARD
... · ..
I 1 ,,;· .. ;.~:~;>:':~1 ;(\~:·:·: :·:.i::·:
Qi~~zt.Sf~U-,
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: q .... i c/{)~ # of pages including cover: Lj
If you did not recei ve a complete fax, please call ou r office immediately for a new transmittal .
FAX: 2bLS-'51 ().. -5 --r15
COMP ANY: _____ C~ity.;......:;;:..of:;_C=ol::::.:le~g;..:,e-=S-=ta=ti~· o~n:............-_____ _
,....., --....,_ ,---, -,......, ---...
DATE, TIME
FAX NO./NAME
DURATIO N
PAGE (S)
RESULT
MODE
TRANSM I SSION VERIFICA TION REP ORT
TI ME : 04/23/2005 20 :04
NAM E : COCS DEVELOPMENT SER
FA X 9797543495
TE L : 9797543570
SER .# : BROE2J341073
04/23 20 :04
91 3255725795--23590
00 :00 :00
BUSY : BUSY/NO RESPONSE
00
BUSY
STANDARD
··. ·, .
. .. ·.".' '• , ....
............ , ..... . ···;···· ..
CrritlF E:biili<l~'.·~~~ttd~r
·. · . · .P.tanfiti1Ji ift:t>evtli ;~mih.:rsw £", , · : :. . .. . , . · .. o :·:,., ::. : ··: .or ::.. .. : .... v .ces .. :·.
1101 Texas Avenue South,. PO Box 9960
College Station, Texas 77842
Phone 979 .764.3570 / Fax 979 .764.3496
FACSIMILE COVER SHEET
Date: ~ '24'J~ # cf pages including cover: 4
If you did not recei ve a complete fax , pl ease call our office immediately fer a new transmitta l.
t<'_' f n \
RE: tVL(o ()) tr-'\LOLA '.:I
FROM: Jo~b tJ~Y\
CONIPANY: _____ C=r='tyJ-· ..:=.:of!:-C=o~ll~e~g~e..::::S..:.:ta:::..::ti=-=o~n....__ _____ _
DATE, TIME
FAX NO ./NAME
DURATION
PAGE (S)
RESULT
MODE
TRANSMISSION VERIFICAT IO N REPOR T
BUS Y: BUS Y/NO RESPONSE
TIME : 04 /23 /2005 20 :45
NAME : COCS DEVELOPMENT SER
FA X : g7g754 34g5
TEL : g7g754 3570
SER .# : BRO E2J 341073
04 /23 20 :45
gi32557257g5--235g0
00:00:00
00
BUS Y
STANDARD
c~~J~~~j~~J~.
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: q~ 'Zl-/{)~ # of pages including cover: 4
If you did not receive a complete fax, please call our office immediately for a new transmittal .
COMP ANY: _____ C_i_ty~o_f_C_o_ll_eeg..,,...e_S_t_ati_·o_n ____ ~~-
DATE, TIME
FAX NO ./NAME
DURATIO N
PAGE (S)
RESULT
MODE
TRANSMISSION VERIFICATION REPOR T
BUSY : BUSY/NO RESPONSE
TIM E : 04/23/2005 21 :32
NAM E : COCS DEVEL OP ME NT SER
FA X : 9797543495
TEL : 9797543570
SER.# : BRO E2J341073
04/23 21:32
1 32557257 95 --23590
00 :00 :00
00
BUSY
STANDARD
. . '. •' ~ . : . . •'
·. ·:·''
c ~n ~~i~~~t~~~=
1101 Texas Avenue South, PO Box 9960
College StGttion, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: lf-J l/{)~ # of pages including cover: 4
If you did not rece iv e a compkte fax, please call our office imm£diately far a new transmitta l.
FAX: &S --rJl ~ -5 7°J5 TO: ~C; o J o..c.ei V-0-4: -\) (J
COMPANY:.~~~~~~~~~~~~~~~~~~~
,,.::~ f n \
RE: tve..(ow ~ \LoLM-';)
FROM: ~o :>h f\Jovfnn
COMPANY:. ____ ~C~i:':.,J.ty~o=f~C;:::;o.:.:.lle~g;..::e~S:..:!ta=ti=o~n---~~--
,---, --
DATE, TIME
FA X NO ./NAME
DURATION
PAGE (S)
RESULT
MODE
TRANSMISSION VERIFICA TI ON REPORT
BUSY: BUSY /NO RESPONSE
TIME : 04/23/2005 21 :34
NAM E : COCS DEVELOPMENT SER
FA X : 9797543495
TEL : 9797543570
SER.# : BROE2J341073
04/23 21 :34
913255725795--170
00:00:00
00
BUSY
STANDARD
· .. ·;.' .
: .. , ... : . · .... · .. •' ,· ...
' ; :.;;'_·(·Ji(_:i' .
Gittt~!~=~~~~:.·
1101 Texas Avenue South, PO Box 9960
College Station, Texas '.77842
Phone 979.764.3570 / Fax 979.764.3496
FACSIMILE COVER SHEET
Date: ~ Jl-/{}0 # of pages including cover: 4
If you did not receive a complete fax, please call our office immediately for a new transmittal.
TO: Mc&c ~ o J a.41 u..c~ FAX: 3}S-61 ~ -5 7°J5
. G 0
COMPANY: __________________ _
~ ' ~ (\.I A RE: !1/G t'(ot,L) ~ ~-:, ~
FROM: ~sh I\JQY{~~
COMP ANY :~------=C=ity::..,;--;;o:..;:;..f _..,C~o=lle~g;.i.;;;e-=S--=-=ta.::..:::ti=--=-o=-=-n~------
LETTER OF TRANSMITTAL /I -~
DATE: 2 /. E:> I OG JOB NUMBER :0.57'6 /
ATTENTION : ~Cit ?lA1\J i Qujt,. Pc&J
REFERENCE: f2o<Z>Af ~ ~ . .
t oCin' f2F CaLLS~E-~lcW
PUs-N -REY 1 e-u J
&~~fxnB12_
0 STANDARD USPS WJL
0 OVERNIGHT BY: _____ _
TRACKING i : ------
WE ARE SENDING YOU ATI:ACHED V1A:
0 HAND DELIVERY BY: ___ _
D Oll4ER: _____ .............. __
Ti PRINTS D SHOP DRAWINGS ~DOCUMENTS
0 REPRODUCIBLES D SAMPLES D SPECIF1CATIONS
0 CHANGE ORDER D PHOTOGRAPHS D OTHER (AS LISTED)
NUMBER SHEETS JOB DESCRIPTION
OF SETS NUMBER OF ITTM
THESE ITEMS ARE TRANSMITTED FOR USE AS CHECKED BELOW:
~ AS REQUESTED D APPROVED AS suewrnr o
U F'OR APPROVAL 0 SUBMIT _COPIES FOR DISTR IBUTION
0 FOR REVlEW AND COMMENTS 0 APPROVED AS NOTED
0 FOR YOUR fllr 0 RETURN _CORRECTED PRINTS
0 FOR BID 0 RESUBMrT ~COPIES FOR APPRO VAL
0 FOR CONSTRUCTION 0
REMARKS=---------------------
KENNETH R. ·TAFT
ARCHITICT
j ~-!>'" .... _ ... ,.~ .. .:· -.. ~
~
~ ~ .~ 0 co
N
~ IQ
~~ °' i..:
0 I:'-
i ..... en
~ i..: ~ p.. .....
CQ -~ ~ ~· :;:-., ~5 .... Po4
E ~1 ~ ~·
co
i I§ ~ r.:
~ ti i..: a: ~ .....
CQ
~ ~
_J_
LETTER OF TRANSMITTAL
DATE:_l_j_~ tJp JOB NUMBER: 05</Gf
ATTENTION: U ;Jp >&r' 13~.
REFERENCE: ]<o~ Cb.FE .
toCiTV 01F CoUE.-Gf?. <;TM/o,J -Z \ Q Uµ(~.£--~,'fC/ :Q E_
J I 01 I~ A:tl.t=!-. e.t:X..(__'C_<ir£. S?'"~{<JX) ·,. ~.
Ci::>UE-GIJZ..?pfr/~N TX77B4Z . t? 64o
'171-764~3576 0 STANDARD USPS MAIL
WE ARE SENDING YOU ATTACHED VIA: if OVERNIGHT BY: ff-t? 2/C, ·~
TRACKING I : -----
0 HAND DELIVERY BY:. ___ _
0 OTHER: _______ _
~PRINTS
0 REPRODUCIBLES
0 CHANGE ORDER
0 SHOP DRAWINGS
0 SAMPLES
0 DOCUMENTS --·. ·
0 SPECIFICATIONS
0 PHOTOGRAPHS 0 OTHER (AS LISTED)
NUMBER SHEas TOTAL SHEET DATE JOB DESCRIPTION .
OF sas EACH SHEETS SIZE ON ITEM NUMBER · Of ITEM .
THESE ITEMS ARE TRANSMITTED FOR USE AS CHECKED BELOW:
0 AS REQUESTED 0 APPROVED AS SUBMITTED
0 FOR APPROVAL 0 SUBMIT_COPIES FOR DISTRIBUTION
0 FOR REVIEW AND COMMENTS 0 APPROVED AS NOTED
0 FOR YOUR FILE 0 RETURN_CORRECTED PRINTS ·
0 FOR BID 0 RESUBMIT-COPIES FOR APPROVAL
0 FOR CONSTRUCTION 0
REMARKS: -A-r;zp ,9PQ~-=tt+ .. w/~L e..---ru rc-r: · ...
<?£:-c:&>c.?rr= ·~cu ~Lb (pq¢a t-S -E)t,:J ..
~~l\tj,~
K NETH R. TAFT
ARCHITECT
LI / LV V ~ i v .J I nn ... -o--
1. Read the general permit (TXR 150000) to make sure it applies to your situation .
2 . Adhere lo the requirements of the general permit (TXR150000).
3 . Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Pait
111 of the general permit (TXR150000).
4 . Sign and post a construction site notice .
5 . At least 2 days before beginning construction, provide a copy of the site notice to the
operator of any Mun i cipal Separate Storm Water Sewer System (MS4) into which storm
wr:iter will be dischr:irged .
A MS4s include streets , channels , gutters , ditches or anything else that is publicly owned.
desiqned or used to collect or transpo1t storm water.
As long as you meet the condit ions of this general permit , you are authorized to discharge storm
water.
No notice of in te nt (NOi), notice of termination (NOT), or fee is required under this option-as
long as the requirements of this general permit are followed .
This particular general permit will expire at midnight on March 5 , 2008 .
A copy of Genera l Permit TXR150000 can be obtained from TCEQ at :
http/www. tceq .state . tx. us/assets/pu blic/pe rrnitt ing /waterqual ity/attachme nts/stormwate r/txr1 50000 . pdf
A copy of th e construction site notice can be obtained from TCEQ at:
http/www . tceq .state . tx. us/assets/pu bl ic/pe nnitting/waterqual ity /a ttachme nts/stormwate r/txr1 52d2 . pdf
Rev iewed by : Josh Norton Date : December 21 , 2005
NOTE: A ny ch anges m ade t o the plans . that ha ve not been requested by the City o f College Station . must be exp lain ed
in you r next t ransmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the C it y . wi ll constitute a completely ne w review . 3 o f 3
--a,~a -fo ~ 1>P kt -~0-v.e.-t~JJ
sTAFF REv1Ew coMMENTs No. 4 I vtfv-o-· i vispec.
Project: ROSA'S CAFE (SDSP) -05-00500104 .tee. ..:_j
ING
. Please relocate the storage building out of the easement or relocate the electrical line and
easement. No permanent buildings may be located in an easement. Parking facilities may
be located over an easement, so it may be possible to relocate the storage to the other side
~he parking row. V Pl~ase resubmit the easement dedication sheets and required documents. We were unable
to find any of the documents with everything that was submitted last week .
Reviewed by: Lindsay Boyer Date: December 27, 2005
ENGINEERING
~~eet C4) Provide clean-out every 100 ' for sanitary sewer service line.
"' ~(Sheet C4) Under "General Utility Notes -B" our standard sanitary sewer service line is ~~·" ~ ~ SOR 26 not 36.
I" C ~ lY (Sheet C4.2) From the east side of the property the first 8" x 6" Tee that is crossed should ""'It",. include 1 additional valve. In order to be able to further isolate the system. (. t:/. i... ~(Sheet C4 .2) Label material type for 8" public water main.
• ~ (Sheet C4.2) On the profile detail for the 6" fire line , should be a 6" 90 degree bend not 6" x
6" Tee. Check profile .
'1 +-~(Sheet C4.2) On the profile detail for the 6" fire line , 4 ' of cover is required.
~ (Sheet C4.2) Where the new 8" water main ties to the existing 8" water main on the west
side of the property is a gate valve needed , when a tapping saddle and valve is being used?
Check plan and profile.
,Jl1( (Sheet C4.2) Please include a copy of the B/CS Standard Construction detail or make
reference to them.
9. (Repeat Comment) Provide fire flow report .
10 . (Repeat Comment) Provide water demands.
_..!~(Repeat Comment) Provide sanitary sewer demands.
(29'FYI: Prior to issuing the development permit the following storm water management
requirements must be accomplished , please contact Donnie Willis, CoCS Drainage
A.t. (). . Inspector (979-764-6375) if you have any questions:
J-Ut' t:ll't' .... -c...
$torm Water Discharges from Small Construction Activities
11 The Texas Commission on Environmental Quality has issued a general permit for
construction activities under the Texas Pollution Discharge Elimination System. The
general permit (TXR150000) is for construction activities disturbing at least 1 but less
than 5 acres or is part of a common plan of development disturbing at least 1 but less
than 5 acres.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station , must be explained in your
next transmittal letter and "bubbled" on your plans . Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new revie w. 2 of 3
L I /L UU~ ~u :~t Mn vwrnn -, ui1~11u~uu
CrrY oi:; COLLEGE S1A nON
Pl111ming & D evelopmen t Services
1101 Texas Avenue , P .O . Box 9960
College Station , Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
December 27 , 2005
TO John Measels, CEI Engineering, via fax 972-488-6732
FROM : LINDSAY BOYER , Staff Planner
SUBJECT ROSA'S CAFE (SDSP)
PLEASE DISREGARD PREVIOUS COMMENTS FOR SITE PLAN
()5-/0t/
Dl -00-0(p
q:<-/5
[AJJ-
Staff reviewed the above-mentioned site plan as requested . The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and subm it the following information for further staff review and approval:
ft;?Q ~ ec.r.
~'O fix_ 7f.5rF7' One (1) complete set of construction documents for the proposed
~ · development with the revised site and landscaping p lans attached
~o;. ~Easement Ded icati on Sheet and required ~uments
/ Public Infrastructure Inspection Fee ($600~tc.V'S Ul~r {7..Q ""
If there are comments that you are not addressing with the revised site plan , p lea se
attach a letter exp la ining the details . If you have any questions or need additional
information , p lea se call me at 979 .764 .3570 .
Attachments: Staff review comments
cc: Bobby Cox Compan ies , via fax 817-377-6280
Kling Engineering , via fax 979-846-8252
Case file # 05-00500104
NOTE: Any changes made to the plans , that have not been requested by the City or College Stati o n , must be explained
in your next tra nsmittal letter and '"bubb led " on your plans . Any additional changes on these plans that ha ve not
been pointed out to the City , will constitute a completely ne w re view. 1 of3
UWCHA -1 UL/J//ULUV
STAFF REVIEW COMMENTS No. 4
Project: ROSA'S CAFE (SDSP) -05-00500104
PLANNING
1 . Please relocate the storage building out of the easement or relocate the e lectrical
line and easement. No permanent buildings may be located in an easement Park ing
f acilities may be located over an easement , so it may be possible to re locate the
storage to the other side of the parking row .
2 . Please resubmit the easement dedication sheet and required documents . We were
unable to find any of the documents with everything that was submitted last week .
Reviewed by : Lindsay Boyer Date : December 27 , 2005
ENGINEERING
1 . (Sheet C4) Provide clean-out every 100' for sanitary sewer serv ice line .
2 . (Sheet C4) Under "General Utility Notes -B" our standard sanitary sewer service line
is SOR 26 not 36 .
3 . (Sheet C4.2) From the east side of the property the first 8 " x 6 " Tee that is crossed
should include 1 additional valve . In order to be able to further isolate the system
4 (Sheet C4 2) Label material type for 8 " public water main .
5 . (Sheet C4.2) On the profile detail for the 6" fire line, should be a 6" 90 degree bend
not 6'' x 6 " Tee . Check profile.
6 . (Sheet C4 .2) On the profile detail for the 6" fire line, 4 ' of cover is required .
7 . (Sheet C4.2) Where the new 8 " water main ties to the existing 8" water main on the
west side of the property is a gate valve needed , when a tapping saddle and valve is
being used? Check plan and profile .
8 . (Sheet C4.2) Please include a copy of the 8 /CS Standard Construction detail or
make reference to them.
9 . (Repeat Comment) Provide fire flow report .
10. (Repeat Comment) Provide water demands .
11 . (Repeat Comment) Provide sanitary sewer de1 n ds .
12. FYI : Prior to issuing the development permit the following storm water management
requirements must be accomplished , please contact Donnie Will is , CoCS Drainage
Inspector (979-764-6375) if you have any questions:
Storm Water Discharges from Small Construction
Activities
The Texas Commission on Environmental Quality has issued a general permit for constructi on
activities under the Texas Pollution Discharge El imination System. The general perm it
(TX R150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a
common plan of development disturbing at least 1 but less than 5 acres.
Yo u will need to follow these steps to discharge storm water from your construct ion s ite t o the
City of College Station's Municipal Separate Storm Water Sewer Syste m (MS4):
NOTE : A ny c hanges made to the plans, that ha ve not been requested by the City of C oll ege Stati on . must be exp lain ed
in your ne xt transmittal letter and .. bubbled" on your plans. Any additional changes on these plans t ha t have not
been po int ed out to the City , w ill constitute a completely ne w re vi e w . 2 of 3
03/20/2005 1 8:32 9724885732 CEI ENGINEERING PAGE 02/0 2
~ .-® S1/#E=---U l!lif Iii CEI Engineering Associates, Inc.
Triwest Plaza • 3030 LBJ Freeway, Suite 1250 • Dallas, TX 75234 • Phone (972) 488-3737 • Fax (972) 488-6732
City of College Station
1101 Texas Avenue
College Station, TX 77842
Phone: (979) 764-3570
Attn: Josh Norton
RE: Rosa's Cafe Located At 710 University Drive East, College Station, TX
CEI Project #: 19626.0
Dear Mr. Nort on.:
P l ease accept t hi s Jetter as the op i nion cif probable 8') water main and fire hydrant casts .
8 " Water main & Fire Hy drant
26 2 LF 8" witter main @ $2'.'i/LF
l -Fire h~:dr ant@ $1 ,500 EA
2-8 "x2" te~: @ $3 00 E.A
= $ 6)550.00
= $ 1)500 .00
= $ 600 .00
"'$ 900 .00.
~~ $ l ,600 .00
7 $ 2,000 .00
= $ l ,500 .0 0
,,., $ 262.00
2-8 ''x 6" tee @ $45 0 EA
2"8" val'!e @ $800 E .tl ,
1 ·8 "x8" tapping sleeve (4~ $2,000 BA
6-TI1rust blocking@ ~2 50
Trench safoty @ $1 /TY
Grand Total ""' $14,912.00
Feel f re e to contact us i.f you have auy que stions .
Thank you .
,~~~"'
Since re ly, ;' 4'~······--···~,..--~ , * .. . . ..,.
I .· ' ·. * * . .. f ··tEoNG~WEe·v~~.t. l
• ' ~·I Io 00 IO • I.•. o 0 0 o 0 • •. o I.• •• • I..,
Je remy Lm1gW ..•. P .E .~~\ 93589 :f:r: I
De pa rtm ent Leader -i/-w{o ~. a~· "~(O ~'q.· · · &J
Ji •1 •~ •• t:NS •• r~-lfl(!' ., .-U~ ~ •• ".. 0o' dff"
. "'' ;tONAL ~ ,..,,,.. ..... "''~~~~-
j .
CALIFORNIA • TEXAS • ARKANSAS • TENNESSEE • MINNESOTA • PENNSYLVANIA • GEORGIA • FLORIDA
PAGE 01/02
03/20 /2005 18 :32 9724885732 CE! ENGINEERING
.· i ·;
. ,' .;
. F-n gtri.,c:ring A>;s o cfl\res , ln e..
·FAX TRANSMITTAL
ENG INEERS • SUR VE YORS • PLANNERS . .
LANDSCAPE ARCHITECTS .. ENVIRONME NT A.L SC!EN TIS T.S ..
T r\West Pl aza, 3030 LBJ .Freewa y, Suite 125 0, Dallas , TX. 75234
(972) 488-3737 · Fax (972) 488-6732
www .ceieng .com
Date: ~ · 2o · 0 io · Distribution :
Time:
1
'-T_o_: ----~~o-S h-.N c Y"fi:>-...,-·--~_-_]!-roj-e ct:----. _CG l-_t.t-.. ~-.. -S--h..-+~
1
'-.c_ .. o_m_pa_n_y:~_C.._t--'--"l~Of Coll~f~ I CEJ P ~Ciject No.:
1
r-F_ro_m_:. __ ,__O~'lf'~l -'"'~"do FAX No.: . Cz? .. '1 · ? &, lf_· l 'f 'tk
R¢s~~, O.tt . · Refe rence:
·---.:.---------------
Total pages including cove r: "'2..
0 Please Co nfirm
. ~o .Confinn atio n Nece~sary
Si7.e : 'ofl a~· x 11· fl aw x 14 ·
D Oth~·r
Ple ase call us immediately if t he fax Y?LI re ceiv e is incompl et e or ill egibl e.
California • Tew.a s • Arkansas • Tennessee • Minnesota • Pennsy lvania • Georgia • i=-lorida
Rev. 7 10 5/05
(CEI( ENGINEERS • SURVEYORS • PLANNERS
Engineering Associates, Inc.
LANDSCAPE ARCHITECTS • ENVIRONMENTAL SCIENTISTS
TriWest Plaza, 3030 LBJ Freeway , Suite 1250 , Dallas, TX 75234
(972) 488-3737 · Fax (972) 488-6732
www.ceieng.com
TRANSMITI AL LETTER
Date : January 5, 2006
To: City of College Station
1101 Texas Avenue
College Station , TX 77842
(979) 764-3570
Attn: Josh Norton I Lindsay Boyer
We are sending you the following items:
~ Attached Via:~Fe"'""d'""e""'"x __ _
D Fax
D Under Separate Cover Via
Copies: Date :
These are transmitted:
D For Approval and Payment
D For Review and Comment
D Your Use
Remarks:
Signaruffi ~ J
OrlanCJORO:gUeZ
Email : orodriguez@ceieng .com
No.:
Project:
CEI Project No.:
Reference:
Full Size Civil Drawings
SWPPP Report
Distribution :
College Station , TX
19626.0
Rosa's Cafe
Description:
D For Bid Due
D As Requested
D
Title : Project Designer
Cal ifornia • Texas • Arkansas • Tennessee • Minnesota • Pennsy lvan ia • Georg ia • Flori da
-
Rev . 7 15105
-
January 5, 2006
City of College Station
1101 Texas Avenue, P.O. Box 9960,
College Station, Texas 77842
Attn: Josh Norton
Dear Mr. Norton:
Enclosed please accept the revised plans submitted for your review and approval. CEI
has addressed the comments received 1/3 /06 in the following manner:
Planning comments:
1. The storage building has been relocated outside the 10' electric easement.
2 . The easement dedication sheet for all Rosa's Cafe easements will be faxed to you as
requested.
Engineering comments:
1. Clean-outs have been provided every 100' for the proposed 6" sanitary sewer line.
2. The description for the sanitary sewer line type has been changed to its correct type.
3. An additional valve has been added to the water line after the 8"x6" tee.
4 . The description for the water main line type has been changed to its correct type.
5. The 6"x6" tee callout has been changed to read 6" 90 degree bend.
6. The water line has been located within its required depth of 4 'until the point of
connection into the building.
7 . The 8" gate valve previously shown on the utility plan has been removed leaving only
the 8" tapping saddle and valv e.
8. Utility plan sheet C4.2 has a callout to refer to B/CS Standard Construction Details
prior to construction.
9. Fire flow report will be provided by MEP Engineer.
10. Water demands will be provided by MEP Engineer.
11. Sanitary sewer demands will be provided by MEP Engineer.
12. Rosa's Cafe is included as part of University Town Center 's drainage system, but not
included in any Storm Water Discharge reports. A Storm Water Pollution Prevention
Plan report has been included for our 4.51 Acre site .
*The Public Infrastructure Inspection Fee of $600 has been previously paid with a
$1400 .00 check per Ken Taft. If any questions regarding this payment please contact Ken
Taft at 817-377-6235.
If you have any questions or would like to di scuss further, please do not hesitate calling.
011 05 /06 TH U 15 :05 FAX 8173776280
Kenneth R. Taft
4055 International Plaza #435
Fort Worth , Texas 76109
817 -377 -6235
8 17-377-6280 Fax
BOBBY COX COMPAN IES
ADDENDUM NO. 4 January 5, 2006 Civil Drawings (CEI Engineering)
To the UNCHANGED Architectural drawings by Kenneth R. Taft, Architect, Structural foundation
drawings by Russell Leavens, and Structural steel framing drawings by Ray Hudson and
MEP drawings by Gerald Matthews and all specifications dated 2-lS.-05 Addendum 1 , 2 AND 3 &
the CHANGED Site Development plans by CEI Engineering dated ll-14-05. Addendum 3 of2005.
Rosa's Cafe (SDSP PROJ. NO. 05-00500104)
710 University Drive East,
College Station, Texas 77840
Notice to Bidders & City of College Station:
A. THIS ADDENDUM WILL BE CONSIDERED PART OF THE CONTRACT
FOR TIIE ABOVE MENTIONED PROJECT AS TIIOUGH IT HAD BEEN
ISSUED AT THE SAME TIME AND INCORPORATED INTEGRALLY
THEREWITII WHERE PROVISION OF THE FOLLOWING
SUPPLEMENTARY DATA DIFFER FROM TIIOSE OF THE ORIGINAL
CONTRACT DOCUMENTS, THIS ADDENDUM SHALL GOVERN AND
TAKE PRECEDENCE .
B. BIDDERS ARE HEREBY NOTIFIED TIIA T TI-JEY SHALL MAKE ANY
NECESSARY ADJUSTMENTS IN THEIR BIDS ON ACCOUNT OF THIS
ADDENDUM. IT WILL BE CONSTRUED THAT EACH BIDDER'S
PROPOSAL IS WITH FULL KNOWLEDGE OF ALL MODIFICATIONS
AND SUPPLEMENT ARY DATA SPECIFIED HEREIN .
C. THIS ADDENDUM IS ISSUED TO DOCUMENT THE DESIGN CHANGES
REQUIRED AS A RESULT OF THE CITY OF COLLEGE STATION, TX .
REVIEW COMMENTS DATED DECEMBER 27, 2005 REQUIREMENTS . SEE
A TI ACHED DOCUMENTS .
ITEM 4:1 YOU ARE HEREBY DIRECTED TO ATTACH THE DOCUMENTS
PROVIDED WITH ADDENDUM NO. 4, TO THE PREVIOUS ISSUED
SETS AND ADDENDUM NO. 1, 2 AND 3. REFER TO CIVIL PLANS
(CEI ENGINEERS) AND REPLACE THE ENTIRE SET OF CIVIL
DOCUMENTS WITH ADDENDUM 4 (SHEETS: Cl, C.2, C3, C3.1, C4,
C4.1, C4.2, CS, C5.l, C6, C6.1, C7, CS, C9 & C10 DATED 01-05-06 TO
ALL SETS. ALSO ATTACH SWPPP (STORM WATER POLLUTION
PREVENTION PLAN) REPORT, DATED 01-05--06, AT~T~-~
END .c<c-'Y-.f:f?. ~Ro.t.. ~'.··-=-1H R •·;71'.-. &·~~T.. · 1:. ·'-"-,,, .. ~ 1',('·.'o ;::: • 4r? :> • ~ ...... . .
141001