Loading...
HomeMy WebLinkAbout37 DP COCS Veterans Park 05-61 3101 Harvey RdDEVELOPMENT PERMIT PERMIT NO. 05-61 CITY OF COLLEGE STAT ION Planning Cr Dewlopmmt ~rvice1 FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: City of College Station Veterans Park and Athletic Complex Vol. 4168, Page 75 & 76 DATE OF ISSUE: January 12, 2006 OWNER: City of College Station Parks Department 1000 Krenek Tap Road College Station, Texas 77840 SITE ADDRESS: 3101 Harvey Rd. DRAINAGE BASIN: Carter's Creek VALID FOR 12 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5 .E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, paint, oil , solvents, asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . Full Development Permit The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment ons ite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilit ies . I hereby grant this permit for development of an area inside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit appl ication for the above named project and all of the codes and ordinances of the City of College Station that apply. Date z. -22 -0' Date CITY OF COLLEGE S TATI ON Planning & Development Services SITE PLAN APPLICATION MINIMUM SUBMITTAL REQUIREMENTS ~Site plan application completed in full. --1::!A._$200 .00 Application Fee . City of College Station N/A $200.00 Development Permit Application Fee. DATE SUBMITTED: I\ N/A $600.00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public waterline, sewerline , sidewalk, street or drainage facilities is involved.) __K_ Eleven (11) folded copies of site plan _x_ One (1) folded copy of the landscape plan. _x_ One (1) copy of building elevation for all buildings . _x_ A list of building materials for all facades and screening for non-residential buildings. N/A Color samples for all non-residential buildings. N/A Traffic Impact Analysis (if applicable for non-residential buildings). _x_A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not checked off. N/A Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). Date of Preapplication Conference:...;.A-'-u"'-g._..u"""s~t .--2 .... 9.._, 2=0 __ 0 __ 5;;.__ _______________ _ NAME OF PROJECT City of College Station Veterans Park & Athletic Complex ADDRESS 3101 Harvey Road LEGAL DESCRIPTION Vol. 4168. Page 75 & 76 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name Eric Ploeger. Asst. Director College Station PARO Street Address 1000 Krenek Tap Road City College Station State Texas Zip Code 77840 E-Ma il Address eploeger@ci.college-station-tx Phone Number .:::..97.:....:9:..:.../7.:....:6~4'-'-3::..:7_:.7...:3 _________ Fax Number 979/764-3737 PROPERTY OWNER'S INFORMATION : Name Same as applicant Street Address------------------City __________ _ State _____ Zip Code ______ _ E-Mail Address------------- Phone Number ___________ ~ Fax Number _____________ _ ARCHITECT OR ENGINEER'S INFORMATION : Name Robert C . Schmidt. P.E.. O'Malley Engineers. L.L.P. Street Address 203 S . Jackson City Brenham State Texas Zip Code "'"""77-'-'8"-'3~3 ____ _ Phone Number 979/836-7937 6/13 /03 E-Mail Address rcs@omalleyengineers.com Fax Number 979/836-7936 I of6 O'Malley Engineers, L.L.P. CITY OF COLLEGE STATION VETERANS PARK ATHLETIC COMPLEX, PHASE II PK 0501 OE JOB NO . 675.02-RB PUBLIC INFRASTRUCTURE COST ESTIMATE -11/4/05 WATER 1 6" C-909 Water Line 880 LF 20 .00 17,600.00 2 6" C-909 Inside Casinq 20 LF 60 .00 1,200.00 3 8" C-90 Water Line 1,710 LF 22.00 37 ,620 .00 4 6" Gate Valve 3 EA 600 .00 1,800.00 5 8" Gate Valve 8 EA 800 .00 6,400 .00 6 Air Release Valve 1 EA 3,000 .00 3,000 .00 7 Fire Hydrants 4 EA 2,500 .00 10,000.00 8 2" Water Meter 2 EA 2,000 .00 4,000 .00 9 D. I. Fittings 1.5 Tons 4 ,500 .00 6,750 .00 10 Conn. To Ex . Line 2 EA 500.00 1,000.00 11 Replace Concrete s/w/pvmt. 80 SY 60 .00 4,800 .00 12 Trench Safety 1,800 LF 1.50 2,700 .00 SUBTOTAL WATER SANITARY SEWER 1 1 O" D.I. Line 2 ,180 LF 43.00 93,740.00 2 Manholes 7 EA 1,400.00 9 ,800 .00 3 Service Wyes 3 EA 200 .00 600 .00 4 Trench Safety LF 1.00 - SUBTOTAL SANITARY SEWER IRRIGATION MAINS 1 6" 1,170 LF 15 .00 17 ,550 .00 2 8" 1,140 LF 17 .00 19 ,380 .00 3 12" 1,770 LF 22 .00 38,940.00 4 6" Gate Valve 8 EA 600 .00 4 ,800.00 5 8" Gate Valve 4 EA 800 .00 3,200.00 6 12" Gate Valve 4 EA 1,200.00 4 ,800 .00 7 Fittings 3 Tons 4,500 .00 13,500.00 8 Auto lrrig . Valve Installations 1 LS 20,000.00 20,000.00 9 Replace Water Meter 1 LS 2 ,000 .00 2,000 .00 10 8" Pressure Reducing Valve 1 LS 8,000.00 8,000 .00 SUBTOTAL IRRIGATION MAINS SMALL DIAMETER WATER LINES 1 1" 950 LF 4 .00 3,800 .00 2 1 1/2" 950 LF 4 .20 3,990 .00 3 2" 450 LF 5.00 2,250.00 4 Hose Bibbs 9 EA 200 .00 1,800.00 5 Quick Couplers 6 EA 350 .00 2, 100.00 6 Small Valves 5 EA 300 .00 1,500.00 SUBTOTAL SMALL DIAMETER WATER LINES os-U-\ \I \'l \ o'S' n · 00 Craig Konkel, P.E. ~ \ · l/v Robert C. Schmi d t, P.E. Ed Addicks, P.E. 96 ,870 .00 104, 140.00 132,170.00 15,440.00 clerical/00675/675-02RB/letter/K:\00675\675-02RB\Letter\Public Infrastructure Cost Estimate 11-4-05.xls 203 S. Jackson P. 0. Box 1976 Brenham, Texas 77834 -1976 (979) 836-7937 FAX (979) 836-7936 PAVING (STREET) 1 Earthwork 1 LS 25,000.00 25,000.00 2 6" Stab. Subgrade 5 ,014 SY 6 .25 31,337 .50 3 6" Base 3,941 SY 11 .00 43,351.00 4 1 1/2" HMAC 3,941 SY 6 .50 25,616.50 5 Curb & Gutter 3,086 LF 12.50 38,575.00 6 sw3p/Erosion Control 1 LS 10,000.00 10,000.00 7 Dead End Barricade 1 EA 2,000.00 2,000.00 SUBTOTAL PAVING (STREET 175,880.00 DRAINAGE 1 4" PVC Storm Sewer 70 LF 12 .00 840.00 2 6" PVC Storm Sewer 674 LF 20.00 13,480.00 3 12" PVC Storm Sewer 454 LF 28 .00 12,712.00 4 12" RCP Storm Sewer 272 LF 32 .00 8,704 .00 5 15" RCP Storm Sewer 100 LF 40.00 4,000 .00 6 18" RCP Storm Sewer 644 LF 45.00 28,980.00 7 24" RCP Storm Sewer 441 LF 55.00 24,255.00 8 36" RCP Storm Sewer 720 LF 69.00 49,680 .00 9 42" RCP Storm Sewer 652 LF 115.00 74,980.00 10 5' X 2' Box Culvert 388 LF 175.00 67,900.00 11 5' Curb Inlet 5 EA 2 ,000.00 10,000.00 12 Junction Box 7 EA 1,500.00 10,500.00 13 2' X 2' Grate Inlet 16 EA 500 .00 8,000.00 14 2' X 3' Grate Inlet 1 EA 600 .00 600 .00 15 3' X 3' Grate Inlet 3 EA 750 .00 2,250 .00 16 4' X 6' Throat Inlet 1 EA 1,200.00 1,200.00 17 5' X 5' Throat Inlet 2 EA 1,500.00 3,000.00 18 4 :1 SET on 24" Pipe 6 EA 800.00 4 ,800.00 19 4 :1 SET on 18" Pipe 9 EA 700.00 6,300.00 20 4 :1 SET on 12" Pipe 1 EA 650.00 650.00 21 4 : 1 SET w/6' Apron on 12" 1 EA 1,000.00 1,000.00 22 4 :1 SET w/6' Apron on 15" 2 EA 1,200.00 2,400.00 23 4 :1 SET w/5' Apron on 24" 1 EA 1,500.00 1,500 .00 24 Headwall w/Flared Wings on 5' X 2' Box 1 EA 3 ,500 .00 3,500.00 SUBTOTAL DRAINAGE 341,231 .00 TOTAL ESTIMATED PROBABLE COST-PUBLIC INFRASTRUCTURE $ 865,731 .00 Prepared for: l City of Coll~ge St~tion , P.O. Box 9960 College Station, Texas 77842 Prepared by: O~'MA TuLEY ENGINEERS., L.L.P. P.O. Box 1976 Bn~nham, Texas 77834-1976 OE Project No: 675.01 RB DRAINAGE PLAN FOR VETERANS PARK AND ATHLETIC COMPLEX -PHASE II Prepared for: City of College Station P.O. Box 9960 College Station, Texas 77842 Prepared by: O'MALLEY ENGINEERS, L.L.P. P.O. Box 1976 Brenham, Texas 77834-1976 OE Project No. 675 .01 RB November 2005 Veterans Park and Athletic Complex -Phase II Drainage Plan TABLE OF CONTENTS CERTIFICATION SHEET ............................................................................................................ 3 INTRODUCTION AND PROJECT DESCRIPTION ................................................................... 4 METHODOLOGY AND CALCULATION PROCEDURES ....................................................... 4 DRAINAGE SUMMARY DISCUSSION ..................................................................................... 6 SUMMARY OF DESIGN FEATURES ......................................................................................... 7 LIST OF FIGURES FIGURE 1 -PROJECT LOCATION MAP ................................................................................... 4 LIST OF TABLES TABLE 1 -RATIONAL EQUATION VALUES FOR BRAZOS COUNTY ............................... 4 LIST OF APPENDICES APPENDIX A -FEMA MAP NOS. 48041C0161C & 48041C0142C WITH SITE ILLUSTRATED ................................................................................................................. 9 APPENDIX B -USGS QUADRANGLE TOPOGRAPHIC MAP OF THE SITE ..................... 11 APPENDIX C -OVERALL SITE LAYOUT .............................................................................. 13 APPENDIX D -SYSTEM "A" DRAINAGE AREA AND STORM SEWER ........................... 15 APPENDIX E -SYSTEM "B" DRAINAGE AREA AND STORM SEWER ........................... 17 APPENDIX F -SYSTEMS "C'', "D", "F", "G", & "H'' DRAINAGE AREAS AND STORM SEWERS ............................................................................................................ 19 APPENDIX G -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "A" ...................................................................................... 21 APPENDIX H -WINS TORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "A" ...................... 25 APPENDIX I -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "B" ...................................................................................... 29 APPENDIX J -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "B" ....................... 33 APPENDIX K -WINSTORM RESULTS FOR 10-YEAR INLET DESIGN "ClO" & "C20" AND CULVERT RESULTS FOR 10-YEAR CULVERT DESIGN FOR "D40" ....................................................................................................................... 37 APPENDIX L -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "GlO" .................................................................................. 41 APPENDIX M -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "GlO" .................. 44 APPENDIX N -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "G20/G30" .......................................................................... 47 APPENDIX 0 -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "G20/G30" .......... 50 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page2 Veterans Park and Athletic Complex -Phas e II Drainage Plan CERTIFICATION SHEET I hereby certify that this plan for the drainage design of Veterans Park and Athletic Complex - Phase II was prepared by under my supervision in accordance with the provisions of the City of College Station Drainage and Design Standards for the owners thereof. , Ronald Wade Becker, P.E. State of Texas No . 70992 K:\00675 \675 -0 2RB \Re po rt \Drain age Re port Phase II.d oc Page ] Veterans Park and Athletic Complex -Phase II Drainage Plan INTRODUCTION AND PROJECT DESCRIPTION This report discusses and documents the existing and proposed drainage conditions for the second phase of development for the Veterans Park and Athletic Complex located in the City of College Station, Brazos County, Texas . The project site is located between State Highway 30 and State Highway 60 and is bounded on the south side by Carters Creek flood plain. Also, the northeast portion of the site is bounded by Hudson Creek. Furthermore, on the north side of the property the land is mainly undeveloped except for the existing Texas A & M University facility located to the northwest of this project site (see Figure 1). Overall, the site contains approximately 150 acres . Phase I development of this park encompassed slightly more than t/3 of this area and was completed in September of 2002 . In this phase, six soccer fields, two softball fields, two parking lots, veteran's memorial area, maintenance building, soccer/restroom building, and roadway/driveway access to these facilities were constructed. The remainder of the site is not developed and was graded to its current condition several years ago. This grading basically consisted of sloping the land's surface toward Carters Creek at a very mild slope . Phase II development will encompass approximately another t/3 of the total site area. This phase of development is proposed to contain a parking lot addition to the existing softball field lot, three softball fields, softball concession building, large pavilion building with a parking lot, walking/running trail, three soccer fields with a parking lot and restroom building, maintenance building addition, and an extension of Veterans Parkway. Currently, the undeveloped portion of the site has very little topsoil or vegetation cover which therefore results in a higher runoff coefficient. This portion of the site drains directly into Carters Creek. Because the lower portion of this property is within the Carters Creek flood plain, detention storage is not necessary and has been waived by the City of College Station. This portion of the site is subject to both on-site and off-site storm water run-off. Part of the off-site storm water will enter the proposed storm sewer System "A". The remaining portion of off-site storm water runoff coming in from the northwest corner of the site remains in, or close to, it's current drainage path and will therefore not affect this phase of the development. METHODOLOGY AND CALCULA TlON PROCEDURES Run-off calculations were performed using the Rational Method and b, d & e factors for Brazos County (TxDOT Hydraulic Design Manual, dated 1 t/02). The rainfall intensity is a function of frequency, geography, climatology, and the specific time of concentration for the watershed. The time of concentration describes the longest time it takes for runoff from the most remote part of K:\00 6 75\675-02RB \Re po rt \Drainage Re port Phase II.d oc Page4 Veterans Park and Athletic Complex -Phase II Drainage Plan the watershed to travel to the outfall of the watershed. TxDOT uses the following equation for rainfall intensity: where: ·· ... . b l =--- (t c + dy i = rainfall intensity (in/hr); tc =time of concentration (min); and b , d , e =empirical factors that characteri ze the intensity-duration-frequency. b, d and e are constants from T xDOT's Hydraulic D esign Manual (refer to Table 1 for 10-year and 100-year b , d, and e values used for this proj e ct.) cmrvER.siiYo ~~: ··········· ······ ,/ -:7 ~H JO ~VE Y ROAD r-·-------- F ig ur e 1. Project Location Map T bl 1 R . I E f VI a e at10na ~qua 100 a u es ~ B or razos c t oun :y Variab le 10-Year Value 100-Year Value B 80 96 D 8.5 8.0 E 0 .763 0.730 ' ' \ \ K:\00675 \675-02 RB\Repo rt \Drain age Re port Ph ase II.d oc Page 5 Veterans Park and Athletic Complex -Phase II Drainage Plan An example of the rainfall intensity calculation for the 10-year rainfall event, using a minimum time of concentration of 10 minutes is a follows: The runoff flow rate, Q, was detennined for the l 0-year storm event using the rational method equation: Q =ciA where: c is the runoff coefficient; i is the rainfall intensity (in/hr), and; A is the land contained within the drainage area (acres). The runoff coefficient, c, value used for grass areas was 0 .3 and a value of 0.9 was used for the impervious areas such as pavements, sidewalks, and buildings. A weighted c value was determined for each area as follows : Cwt = (0.3 x grass area) + (0.9 x impervious area) Total Area An examp le of the runoff coefficient calculation for a total area of 13 acres with l 0 acres of grass area and 3 acres of impervious area is as follows : Cwt= (0.3 x JO acres )+ (0.9 x3 acres ) = 0.44 13 acres An example of the rainfall run-off calculation for a 10-year storm intensity, using a runoff coefficient of 0.44 and a drainage area of 13 .0 acres is a follows : Q,0 = ci 10 A = 0.44 x 8 .6 x 13.0 = 49.2 c .f.s. DRAINAGE SUMMARY DISCUSSION Off-Site Drainage Due to the location and limits of the Phase II portion of this overall development, the Hudson Creek waterway prevents some of the upstream off-site storm water from directly affecting this site. See Appendix A for FEMA flood map of this area and Appendix B for the USGS topographic quadrangle map of the vicinity. However, within a portion of the limits of this phase of development there is a swale located near the center of the north property line that has been eroded from off-site storm water entering the overall tract of land. Proposed storm sewer System "A" is designed to carry this off-site storm water underground from the north side of this site to its outfall at the southern side of the site. See Appendix D for a layout of System "A". This system will also drain on-site runoff within the Phase II area. K:\00675\675-02RB \Report\Drainage Report Ph ase II.d oc Page6 Veterans Park and Athletic Complex -Phase II Drainage Plan On-Site Drainage Since this area is being developed as a park, the overall drainage design concept was to allow the on-site storm water to flow as close to its natural conditions as possible . Therefore, the use of both large and small swales was employed and general overland flow to allow the storm water to enter the adjacent Carters Creek flood plain. However, it was not possible to accommodate all of the storm water within grass-lined swales because of the need to oblige both vehicular and pedestrian traffic. Where necessary, the use of reinforced concrete pipe, PVC pipe, and inlets has been used to collect and carry the storm water from the roadway, parking lots and grass areas around the buildings. The water carried within these closed system storm sewers will then be released into either existing or proposed swales on the site to then be directed and dispersed into the Carters Creek flood plain. Appendix C is an illustration of the entire site showing the existing Phase I development, the proposed grading and layout of Phase II and the proposed future development. The 100-year flood plain boundary is also shown. Carter Creek water surface elevations of 254.0 for the 10- year storm and 255.5 for the 100-year storm were used as the tail water elevations for the design and analysis of System "A". These floodwater elevations were obtained from the City of College Station. Note that the storm water discharge enters the Carters Cre ek floodwater prior to crossing any adjacent property lines. SUMMARY OF DESlGN FEATURES The following is a general summary of the storm sewer elements and culverts that have been included in the Phase II design. Two different TxDOT computer software programs were utilized for the design of this projects drainage features. WinStorm version 3.05 was used for the design of storm sewer Systems "A", "B", "G" and to size the curb inlets for System "C". Results of the WinStorm computer runs are shown in Appendices G through 0. Inlet sizes are denoted in the charts labeled "Inlet Configuration Data." Storm sewer pipe sizes are shown in the charts labeled "Conveyance Configuration Data." WinStorm allows the input of critical elevations at each of the inlets and junction boxes and uses this information in its analysis of the hydraulic grade line. The critical elevations were set 0 .5 feet below the inlet opening elevation. The WinStorm 10-year analysis shows that the hydraulic grade lines for each system are below the critical elevations, thus meeting the City of College Station's design criteria. The 100-year analysis of these storm sewer systems does show that some pipe run capacities and critical elevations are exceeded, which is to be expected. A review of these locations determined that the storm water would exit the top of the inlets, spread out and flow either overland or along swales and enter Carters Creek without any impact to the building structures. K :\006 75 \675-02RB\Report\Drainage Report Phase II.doc Page 7 Veterans Park and Athletic Complex -Phase II Drainage Plan Texas Hydraulic Systems CULVERT version 1.2 was used for the culvert design and analysis . Since there were several culverts involved with this project, only the CULVERT results for the major culvert D40, which passes beneath Veterans Parkway, is shown in Appendix K as an example of the analysis procedure. All proposed culverts are shown in Appendix F. These culvert pipes were designed to have exit velocities less than 6 .0 feet per second for the 10-year storm design. All of these culverts are designed to have slope end treatments (SETs) used on both ends. These SETs were used instead of headwalls to provide a more gradual slope that would be easier to maintain and minimize the slope gradients around the ends of the pipe, thus reducing the potential of erosion. K:I006751675-02RB\Re port \Draina ge Re port Pha se II.doc Page8 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIX A FEMA Map Nos. 48041C0161 C & 48041C0142 C With Site Illustrated K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page9 City of College Station 4800 83 ZONE X ZONE X Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXB USGS Quadrangle Topographic Map of the Site K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 11 '· TO TEX . 507 17'30" .160 151ooom.[. SCALE 1:24000 0 I MILE Veterans Park and Athletic Complex -Phase II K:\00675 \675-02RB \Report\Drainage Report Phase II .doc APPENDIXC Overall Site Layout Drainage Plan Page 13 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXD System "A" Drainage Area and Storm Sewer K:\00675 \675 -02RB \Report\Drainage Report Phase II.doc Page15 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXE System "B" Drainage Area and Storm Sewer K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page 17 Veterans Park and Athletic Complex -Phase II APPENDIXF Systems "C", "D", "F", "G", & "H" Drainage Areas and Storm Sewer K:\00675\675-02RB \Report\Drainage Report Phase II.doc Drainage Plan Pagel9 Veterans Park and Athletic Complex-Phase II APPENDIXG Winstorm Results for 10-Year Storm Design for Storm Sewer System "A" K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Drainage Plan Page 21 Veterans Park and Athletic Complex -Ph ase II Drainag e Plan WinStorm (STORM DRAIN DESIGN) Run@ 11/4/2005 7:12:36 AM Version 3.05, Jan. 25, 2002 PROJECT NAME : VPAC PH II JOB NUMBER 675.02RB PROJECT DESCRIPTION : Storm Sewer Line A 10 YR Design ANALYSYS FREQUENCY : 10 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years ID A-10 A-20 A-30 A-40 A-50 A-60 A-70 A-80 A-90 A-95 A-94 A-97 Inlet ID A-10 A-20 A-3 0 A-40 A-50 A-60 A-70 A-80 A-90 A-95 A-94 A-97 Runoff Computation for Design Frequency . C Value 0.63 0 .33 0.45 0 .45 0.33 0 .9 0.9 0.33 0.9 0.47 0.45 0.9 Area (acre) 10.70 5 .70 0 .40 0.40 8.10 0.20 0.20 1. 80 0.10 0.70 0 .40 0.10 Tc (min) 29.90 14.80 10.00 10.00 16.10 10.00 10.00 11 .90 10.00 10.00 10.00 10.00 Tc Used (min) 29.90 14.80 10.00 10.00 16.10 10.00 10.00 11.90 10.00 10.00 10.00 10.00 Intensity (in/hr} 4.95 7.24 8 .63 8.63 6.95 8.63 8 .63 8.01 8.63 8.63 8.63 8 .63 Supply Q (cfs} 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 0 .0 00 0.000 Total Q (cfs) 33 .340 13. 620 1.554 1 .554 18.570 1.554 1.554 4.760 0 .777 2.841 1.554 0.777 Sag Inlets Configuration Data . Inlet Length/ Grate Type Perim. Area (ft} (sf ) Grate 20.00 Grate 12.00 Grate 8.00 Grate 8.00 Grate 17.00 Curb 5.00 Curb 5.00 Curb 10.00 Curb 5.00 Grate 12.00 Grate 8.00 Grate 8.00 10 .00 3.30 1. 50 1.50 6.60 n /a n/a n/a n/a 3.30 1. 50 1. 50 Left-Slope Long Trans (%) (%} 25 .0025.00 0.50 2.00 0 .50 2 .00 0.50 2.00 0 .50 2.00 0.57 3 .00 0.50 3.00 0.64 3.00 0.56 3.00 0.50 2.00 0 .50 2.00 0 .50 2.00 Right -Slope Long Trans (%) (%) Gutter n DeprW (ft} 25.00 25.00 0.024 0 .50 2.00 0.024 0.50 2.00 0.024 0.50 2 .00 0.024 0.50 2.00 0.014 0.50 3.00 0.014 0.57 3.00 0.014 0.56 3.00 0 .0 14 0 .64 3.00 0.014 0.50 2.00 0.014 0 .50 2.00 0.014 0.50 2.00 0.014 n/a n/a n/a n/a n/a 1. 50 1 .50 1. 50 1. 50 n/a n/a n/a Sag Inlets Computation Data. Depth Allowed (ft} 2.00 2.00 0 .50 0.50 1. 00 0.50 0.50 0.50 0 .50 1. 00 0 .50 0.25 Critic Elev. (ft} 271.06 264.10 265.50 265.50 260.50 260.89 260.89 260.78 260.78 258.50 260.42 262.00 ================================================================================ Inlet ID A-10 A-20 A-30 A-40 A-50 Inlet Type Grate Grate Grate Grate Grate Length Grate Perim Area (ft} (ft} (sf) n/a 20.00 10.00 n/a 12 .00 3.30 n/a 8.00 1.50 n/a 8.00 1.50 n/a 17.00 6.60 K:\00675 \675-02RB\Report\Dra inage Report Phase II.doc Total Q Inlet Capacity (cfs} (cfs} 33.340 13. 620 1 .554 1.554 18.570 76.008 25.082 5 .701 5 .701 35.472 Total Head (ft} 0.663 0.589 0.158 0.158 0.500 Ponded Width Left Right (ft} (ft} 2. 71 19 .60 8.70 8 .70 18.00 2. 71 19.60 8 .70 8.70 18 .00 Page 22 ------__________________ _L Veterans Park and Athletic Complex-Phase II A-60 A-70 A-80 A-90 A-9S A-94 A-97 Curb Curb Curb Curb Grate Grate Grate S.00 S.00 10.00 S.00 n/a n/a n/a n/a n/a n/a n/a 12 .00 8.00 8.00 n/a n/a n/a n/a 3.30 1. so 1. so l.SS4 l .SS4 4.760 0.777 2.841 l.SS4 0.777 6 .261 6.261 10.327 6.261 1 7 .736 S.701 3.087 0.197 0.197 0.298 0.124 0 .181 0.1S8 0.100 Drainage Plan S.37 s.so 8.00 4.17 8.90 7.10 S .4S s.so S.37 8.20 4.07 8.90 7.10 S.4S Cumulative Junction Discharge Computations Node I.D. A-10 A-20 A-30 A-40 A-48 A-49 A-SO A-60 A-70 A-71 A-72 A-BO A-90 A-91 A-9S A-96 A-94 A-97 OU T Node Type Weighted C-Value Grate 0 .630 Grate 0.330 Grate 0.4SO Grate 0.34S JnctBx O.S22 JnctBx O .S22 Grate 0.461 Curb 0.464 Curb 0.468 JnctBx 0 .468 JnctBx 0.468 Curb 0.330 Curb 0 .460 JnctBx 0.460 Grate 0.460 JnctBx 0.462 Grate 0 .4SO Grate 0.900 Outlt 0.462 Cumulat . Cumulat. Dr.Area Tc (acres} (min) 10.70 S .70 0.40 6.SO 17.20 17.20 2S.30 2S.SO 2S.70 2S.70 2S.70 1. 80 27.60 27.60 28.70 28.80 0.40 0.10 28.80 29.90 14.80 10.00 lS.30 30.72 30.72 31. 76 31. 82 31.88 31. 88 31.88 11. 90 32.72 32.72 33.0S 33.39 10.00 10.00 33.39 Intens. (in/hr) 4.9S 7.24 8.63 7.12 4 .8 7 4.87 4 .77 4.77 4.76 4.76 4.76 8.01 4.69 4.69 4.66 4.63 8.63 8.63 4.63 User Supply Q cfs} 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 0 .000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Conveyance Configuration Data Additional Q in Node (cfs} 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0 .00 0.00 0.00 0 .00 0 .00 Total Disch . (cfs} 33.340 13. 620 l.SS4 lS. 967 43.714 43. 714 SS .S99 S6.396 S7.187 S7.187 S7.187 4.760 S9.S06 S9.S06 0 .00 61.Sl2 0.00 61.SSl 0.00 l.S S4 0.00 ~ 0.00 ~ ================================================================================== us 10 A-10 20 A-20 30 A-30 40 A-40 SO A-4B 60 A-49 70 A-SO BO A-60 90 A-70 100 A-71 110 A-72 120 A-BO 130 A-90 140 A-91 150 A-9S 160 A-96 170 A-94 lBO A-97 OS A-4B A-40 A-40 A-4B A-49 A-SO A-60 A-70 A-71 A-72 A-90 A-90 A-91 A-9S A-96 OUT A-9S A-96 Run# us 260.90 261.33 261.83 260.61 2S9.0l 2S6.60 2S6 .16 2SS .9B 2SS.79 2SS.39 2S4.87 2S6.47 254.24 2S3.69 2S3.4S 2S2.62 2SB.90 2S9.SO Node I.D. Flowline Elev. OS Shape # Span Rise (ft) (ft} (ft} 2S9 .11 260. 71 261.71 260 .11 2S7.20 2S6.26 2S6.0B 2SS.B9 2SS .49 2S4.97 2S4 .34 2S6.34 2S3 .79 253.SS 2S2.72 2Sl.Sl 2S6 .0S 253 .72 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Box 1 Box 1 Circ 1 Circ 1 0.00 0.00 0 .00 0.00 0.00 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0.00 0.00 S.00 S .00 0.00 0.00 3.00 2 .00 1. 00 2.00 3.00 3.SO 3.SO 3.SO 3.SO 3.SO 3.SO 1. so 3.SO 3.SO 2.00 2.00 1. 00 1. 00 K:\00675 \675-02RB\Report\Dra inage Report Phase II.doc Length Slope (ft) (ft} 3SB.OO 15S.OO 2B.00 B4.00 362.00 97.00 24 .00 26.00 85 .0 0 120.00 150 .00 26.00 113. 00 37.00 1S6 .00 232.00 Bl.00 102.00 o.so 0 .40 0.43 0.60 o.so 0.3S 0.33 0.3S 0.3S 0.3S 0.3S o.so 0.40 0.3B 0.47 0 .48 3.S2 S.6B n value (%} 0. 013 0. 013 0 .011 0 . 013 0 . 013 0. 013 0 . 013 0 . 013 0. 013 0 . 013 0.013 0. 013 0. 013 0 . 013 0 . 013 0 . 013 0 . 011 0 . 013 Page 23 Vetera ns Park and A thletic Complex -Ph ase II Dra in age Plan Conveyance Hydraulic Computa ti ons. Ta ilwa t er = 254.000 (ft) Hydraulic Gradel i ne Dept h Run# US Elev OS Elev Fr.Slope Unif. Actual (ft) (ft} (%} (ft} (ft) 10* 26 3 .19 262.08 0.250 1. 85 2.97 20 263.44 262.60 0 .362 1.56 1.89 30 262.66 262.60 0.136 0.54 0.89 40 262.60 262.08 0 .498 1.50 1.97 so 262 .08 260.34 0.429 2.30 3.00 60 260 .34 260.00 0.189 2 .24 3.50 70 260.00 259 .67 0.305 2.73 3 .50 80 259.67 259.33 0.314 2.73 3.44 90 259.33 258.82 0.323 2.73 3.33 100 258 .82 258.22 0.323 2.73 3.25 llO 258.22 257.53 0 .323 2.73 3 .19 120 257.76 257.53 0.205 0.87 1.19 130 257.53 256.88 0.350 2.68 3.09 140 256.88 256.35 0.350 2.73 2 .80 150* 256.35 255.35 0.454 1. 59 2 .00 160 * 255.35 254.00 0 .454 1.59 2.00 170 * 260.39 256.35 0 .136 0.30 0.30 180* 259.89 255 .35 0.048 0 .20 1. 00 Velocity Un if. Actual (f /s) (f /s) 7.28 4. 72 5 .17 4.4 3 3 .60 2.10 6 .32 5.10 7 .53 6.18 6.71 4.54 6.89 5.7 8 6 .99 5.88 7.09 6.05 7.09 6.14 7.09 6.21 4.46 3.1 5 7.53 6 .61 7.38 7 .21 Q (cfs } 33.34 13 . 62 1. 55 15.97 43. 71 43.71 55.60 56.40 57.19 57.19 57.19 4.7 6 59.5 1 59 .5 1 q:H ~-~61.51 6 .1[ 61. 55 . 1 1 .55 6.75 0 .99 0.78 Cap (cfs} 47.17 14.3 1 2.76 17.46 47.17 59.57 58.10 59.20 59.78 59.53 59.81 7 .43 63.50 61.90 62 .48 63.18 7.90 8.49 June Loss (ft} 0.434 0 .381 0.034 0.202 0.297 0.160 0 .259 0.269 0.284 0 .293 0.299 0.193 0.340 0 .404 0.294 0 .294 1 .186 0.019 ===================================END============================================ * Super critical flow . NORMAL TERMINATION OF WINSTORM . Warning Messages for current project : Runoff Frequency of: 10 Years Discharge decreased downstream node Id= A-49 Previous intensity used . Discharge decreased downstream node Id= A-71 Previous intensity used. Discharge decreased downstream node Id= A-72 Previou s intensity used. Disch arge decreased downstream node Id= A-91 Prev i o u s intensity used . Decreasing conduit size @ downstream Run II 150 K:\0067 5\67 5-02 RB \Report \Drainage Report Phase I I.doc Pa ge 24 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXH Winstorm Results for 10-Year Storm Design with 100-Year Storm Analysis for Storm Sewer System "A" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 25 Ve tera ns Pa rk and A thlet ic Complex -Ph ase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3.0S, Jan. 2S , 2002 Run@ l l /4/200S 7 :18:S7 AM PROJECT NAME : VPAC PH II JOB NUMBER 67S .02RB PRO J ECT DESCRIPTION : Storm Sewer Line A 100 YR Ch eck ANALYSYS FREQUENCY MEAS UREMENT UNITS: 100 Years ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 100 Years ID A-10 A-20 A-30 A-40 A-SO A-60 A-70 A-80 A-90 A-9S A-94 A-97 Inlet ID A-10 A-20 A-3 0 A-40 A-SO A-60 A-70 A-80 A-90 A-9S A-94 A-97 Runoff Computation for Design Frequency. C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) 0.63 0.33 0.4S 0.4S 0.33 0.9 0.9 0.33 0.9 0.47 0.4S 0.9 10 .70 S.70 0.40 0.40 8.10 0.20 0.20 1.80 0.10 0.70 0.40 0.10 29.90 14.80 10.00 10.00 16.10 10.00 10 .00 11 . 90 10 .00 10.00 10.00 10.00 29.90 14.80 10 .00 1 0 .00 16.10 10.00 10 .00 11. 90 1 0 .00 10 .00 10.00 10.00 6.76 9.79 11. 64 11.64 9.41 11. 64 11 . 64 10.82 11 . 64 11. 64 11. 64 11 .64 Sag Inlets Configuration Data. 0.000 0.000 0.000 0.000 0.000 0 .000 0.000 0.000 0.000 0 .000 0.000 0.000 Inlet Length/ Grate Type Perim. Area (ft) (sf) Left -S lope Long Trans (%) (%) Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) Depth Allowed (ft) Grate 20.00 Grate 12 .00 Grate 8.00 Grate 8.00 Grate 17.00 Curb S.00 Curb S.00 Curb 10.00 Curb S .00 Grate 1 2.00 Grate 8.00 Grate 8.00 10.00 2S .002S.OO 3.30 o.so 2.00 1. so 0 . so 2. 00 1.50 o.so 2.00 6.60 o.so 2.00 n /a 0.57 3.00 n/a 0.50 3.00 n/a 0.64 3.00 n/a O.S6 3.00 3.30 o.so 2.00 1.50 o.so 2.00 1.SO o .s o 2.00 2S.OO 2S.OO 0.024 o.so 2.00 0 .02 4 0 .50 2.0 0 0.024 o.so 2.00 0.024 o.so 2.00 0.014 o.so 3 .00 0.014 O .S7 3.00 0.014 O.S6 3.00 0 .014 0 .64 3.00 0.014 o.so 2.00 0.014 o.so 2.00 0.014 o.so 2 .00 0.014 Sag Inlets Computation Data. n/a n/a n/a n/a n/a 1.SO 1. so 1.SO 1. so n/a n /a n/a 2 .00 2.00 o.so o .s o 1. 00 o .so o.so o.so o.so 1. 00 o.so 0.2S 4S.S61 18 .423 2.09S 2.09S 2S.142 2.09S 2.09S 6.42S 1.048 3.829 2.09S 1.048 Critic Elev. (ft) 273.7S 264.60 266.00 266.00 261.00 261.39 261.39 261.28 261 .28 2S9.00 260.92 262.SO ================================================================================ I nlet ID A-10 A-20 A-30 A-40 Inlet Type Grate Grate Grate Grate Length (ft) n/a n/a n/a n/a Grate Perim Area (ft) (sf) 20 .00 10 .00 12.00 3.30 8 .00 1.SO 8 .00 1.SO K:\006 75 \6 7 5-02 RB \Report \Drainage Report Phase I !.doc Total Q Inlet Capacity (cfs) (cfs) 4S.S61 18 .423 2.09S 2.095 76 .008 2S.082 S .701 5.701 Total Head (ft) 0.817 1.078 0.193 0.193 Ponded Width Left Right (ft) (ft) 3.06 21.9S 9.70 9.70 3 .06 21.9S 9.70 9.70 Page 26 Veterans Park and Athletic Complex -Phas e II Drainage Plan A-50 A -6 0 A-70 A-80 A-90 A-95 A-94 A-97 Node I.D. A-10 A-20 A-30 A-40 A-48 A-49 A-50 A-60 A-70 A-71 A-7 2 A-80 A-90 A-91 Grate Curb Curb Curb Curb Grate Grate Grate n/a 5.00 5.00 10.00 5.00 n/a n/a n/a 17.00 n/a n/a n/a n/a 12.00 8 .00 8.00 6.60 n/a n/a n/a n/a 3.30 1. 50 1 .50 25.142 2 .095 2.095 6.425 1.048 3.8 29 2.095 1.048 35.472 6 .261 6.261 10.327 6.261 17 .736 5.701 3 .087 0.612 0.241 0.241 0.364 0 .15 2 0.220 0.193 0.122 20.15 6.00 6.17 8 .97 4.67 9.95 7.95 6.10 Cumulative Junction Discharge Computations Node Type Weighted C-Value Grate 0.630 Grate 0.330 Grate 0.450 Grate 0.345 JnctBx 0.522 JnctBx 0.522 Grate 0.461 Curb 0.464 Curb 0.468 JnctBx 0 .4 68 JnctBx 0.468 Curb 0.330 Curb 0.460 JnctBx 0 .460 Cumulat. Cumu l at. Intens. Dr.Area (acres) 10 .70 5.70 0.40 6.5 0 17.20 17 .2 0 25.30 25 .50 25.70 25.70 25 .70 1. 80 27.60 27.60 Tc (min) 29.90 14.80 10 .00 15.24 30.69 30.69 31.63 31. 68 31. 73 31.7 3 31.7 3 11. 90 32.46 32.46 (in/hr ) 6.76 9.79 11. 64 9.66 6.66 6 .66 6.54 6.54 6.53 6.53 6.53 10.82 6.44 6.44 User Supply Q cfs) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 0.000 0.000 Additional Q in Node (cfs) 0 .00 0.00 0 .00 0 .00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 20.15 6.17 6.00 9 .20 4.53 9.95 7 .95 6.10 Total Disch . (cfs) 45.561 18.423 2.095 21. 645 59.798 59 .798 76.247 77.35 3 78.451 78.451 78.451 6 .425 81 .829 81 .829 A-95 Grate 0.460 28.70 32.75 6 .41 0.000 0.00 84 .661 A-96 JnctBx 0.462 28 .80 33.06 6.37 0 .0 00 0 .0 0 84.772 A-94 Grate 0.450 0 .40 10.00 11.64 0 .000 0.00 2.095 -~;-~_7_ ----~-~-~-~-~----~-:-~_~}_ ----_2_~_:_~-~----~-~_:_~-~----_l_~_:_~-~-----~-:-~-~-~----------~-:-~-~~ us 10 A-10 20 A-20 30 A-30 40 A-40 50 A-48 60 A-49 70 A-50 80 A -60 90 A-70 100 A-71 110 A-72 120 A-80 130 A -90 140 A-91 150 A-9 5 .l._60 A-96 170 A-94 180 A-97 OS A-48 A-40 A-40 A-48 A-49 A-50 A-60 A-70 A-71 A-7 2 A-90 A-90 A-91 A-95 A-96 OUT A-95 A-96 Conveyance Configuration Data Run# us 260.90 261.33 261.83 260.61 259.01 256 .60 256 .16 255.98 255.79 255.39 254.87 256 .47 254.24 253.69 253.45 252.62 258.90 259.50 Node I.D. Flowline Elev. OS S h ape # Span Rise (ft) (ft) (ft) 259 .11 260. 71 261.71 260 .11 25 7 .20 256.26 256.08 255.89 255.49 254.97 254.34 256.34 253.79 253.55 252. 72 251.51 256.05 253.72 Circ 1 o .oo Circ 1 0.00 Circ 1 0.00 Circ 1 0.00 Circ 1 0.00 Circ 1 0.00 Circ 1 0.00 Circ 1 0 .00 Circ 1 0.00 Circ 1 0.00 Circ 1 0.00 Circ 1 0.00 Circ 1 0. 00 Circ 1 0 .00 Box 1 5.00 Box 1 5.00 Circ 1 0.00 Circ 1 0 .0 0 3 .00 2.0 0 1. 00 2.00 3.00 3.50 3.50 3 .50 3.50 3.50 3.50 1. 50 3.50 3.50 2.00 2.00 1. 00 1. 00 K:\00675\675 -0 2RB \Report\Drainage Report Phase II.d oc Lengt h Slope (f t) (ft) 358 .00 1 55.00 28.00 84.00 362.00 97.00 24 .00 26 .00 85 .00 120.00 150.00 26.00 113. 00 37.00 156.00 232.00 81.00 1 02.00 0.50 0.40 0.43 0 .60 0.50 0.35 0.33 0.35 0.35 0.35 0.35 0.50 0.40 0.38 0.47 0.48 3.52 5.68 n value (%) 0. 013 0 . 013 0 .011 0. 013 0 . 013 0. 013 0. 013 0. 013 0. 013 0 . 013 0. 013 0. 013 0. 013 0. 013 0 . 013 0. 013 0. 011 0 . 013 Pa ge 27 Veterans Park and Athletic Complex -Phas e II Drainage Plan Run II 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Conveyance Hydraulic Computations. Tailwater = 255.500 (ft) Hydraulic Gradeline Depth US Elev OS Elev Fr .Slope Unif. Actual (ft) (ft) (%) (ft ) (ft) 273.64 274.00 272.43 272.31 271.17 267.70 267.06 266.43 265.78 264.74 263.50 262.42 262.0 7 260.76 259.95 258.06 271. 1 7 272. 31 272. 31 271.17 267.70 267.06 266 .43 265.78 264.74 263.50 262.07 262.07 260.76 259.95 258.06 0.466 0 .663 0 .248 0.915 0 .80 4 0.353 0.574 0. 591 0.608 0 .608 0.608 0.374 0.661 0.661 0.859 255.50 0.861 2.39 2.00 0.66 2.00 3 .00 2.84 3.50 3.50 3.50 3.50 3 .50 1. 08 3.5 0 3.50 2.00 1. 98 3.00 2.00 1. 00 2.00 3.00 3.50 3.50 3.50 3.50 3.50 3.50 1. 50 3.50 3.50 2.00 2.00 Velocity Unif . Actual (f/s ) (f/s) 7 .54 5.86 3.83 6 .89 8.46 7 .14 7 .92 8.04 8.15 8.15 8.15 4.73 8.51 8.51 8 6.45 5.86 2.6 7 6.89 8.46 6.22 7.92 8 .04 8.15 8.15 8.15 3.6 4 8.51 8 .51 Q (cfs) 45.56 18.42 2.10 21.64 59.80 59.80 76.25 77.35 78.45 78.45 7 8.45 6.43 81.83 81.83 Cap (cfs) 47.17 14.31 2 .76 17.46 47.17 59.57 58.10 59.20 59.78 59.53 59.81 7 .43 63.50 61 .90 June Loss (ft) 0.807 0.668 0 .055 0.369 0.556 0.300 0 .4 88 0.502 0.517 0.517 0.517 0.257 0.562 0.562 0 .55 7 0 .558 170* 260.29 259.95 0.248 0.35 1.00 7.90 0.138 180 * 259.9 7 258.06 0 .086 0.24 1 .00 7.34 1 .33 1.05 8.49 0 .035 ===================================END============================================ * Super critical flow. NORMAL TERMINA TI ON OF WINSTORM. Warning Messages for current project: Runoff Frequency of: 100 Years Comp uted right ponded width exceeds a llowab l e width at inlet Id= A-2 0 Comp uted left ponded width exceeds allowable width at inlet Id= A-20 Disc harge decreased downstream node Id= A-49 Previous intensity used. Discharge decreased downstream node Id= A-7 1 Previ ous intensity used. Discharge decreased downstream node Id= A-72 Previous intensity used . Disc h arge decreased downstream node Id= A-9 1 Previous intensity used. Decreasing conduit size @ downstream Runll 150 Ru nll 16 0 Insuff i cient capacity. Runll 150 Insuff i cient capacity . Upstream hydraulic gradeline exceeds cri t ical elevation at node Id= A-95 Runll 14 0 Insufficient capacity . Upstream hydraulic gradeli n e exceeds critical elevati on at node Id= A-9 1 Runll 1 30 Insuffi cient capacity. Upstream hydrauli c gradeline exceeds critical elevation at node Id= A-90 Runll 110 Insufficient capac ity . Upstream hydraulic gradeline exceeds critical elevation at node Id= A-72 Upstream hydrauli c gradeline exceeds critical eleva t ion at node Id= A-80 Runll 10 0 Insuffi cient capaci ty . Upstream hydrauli c gradeline exceeds criti cal eleva tion at node Id= A-71 Runll 90 Insuff ici ent capacity. Upstream hydraulic gradeline exceeds crit i cal elevation at node Id= A-70 Runll 80 Insuf fi cient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-60 Runll 70 Insuff ici e nt capacity . Upstream hydraulic gradeline exceeds cri ti cal eleva tion at node Id= A-5 0 Runll 60 Insuff ici ent capacity. Ups tream hydraulic gradeline exceeds crit i cal elevation at node Id= A-49 Runll 50 Insufficient capaci ty . Upstream hydraulic gradeline exceeds critical elevation at node Id= A-48 Run ll 40 Insuffici ent capac ity . Upstream hydraulic gradeline exceeds criti cal eleva tio n at n o de Id= A-40 Runll 20 Insufficient capacity. Upstream hydraul i c gradeline exceeds c ritical elevation at node Id= A-20 Upstream hydraulic gradeline exceeds cr itical elevation at node Id= A-30 K:\00675\675 -02RB \Report\Drainage Report Phase II.d oc Page 28 Veterans Park and Athletic Complex -Phase II APPENDIX I Winstorm Results for 10-Y ear Storm Design for Storm Sewer System "B" K :\00675\675-02RB\Report\Drainage Report Phase II.doc Drainage Plan Page 29 Veterans Park and Ath letic Com plex-Ph ase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3.0S, Jan. 2S, 2002 Run@ 10/14/200S 9:11:03 AM PROJECT NAME : VPAC PH II JOB NUMBER 67S.02RB PROJECT DESCRIPTION : Storm Sewer Line B 10 YR Design ANALYSYS FREQUENCY 10 Years MEASUREMENT UNITS: ENGLISH ================================================================================== ID B-10 B-2 0 B-2S B-30 B-40 B-SO B-SS B-60 B-6 S B-70 B-7S Inlet ID B-10 B-20 B-2S B-30 B-40 B-SO B-SS B-60 B-6S B-70 B -7S OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Ru noff Computation for Design Frequency . C Value Area (acre) Tc (min) Tc Us e d (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) 0.39 0 .9 0.9 0.9 0.9 0.9 0.9 0.9 0 .9 0.7 0.4 1. 30 a.OS a.as a.as a.as a.as a.as a.as a .as 0.20 O.S4 10.00 10 .00 10.00 10 .00 10.00 10 .00 10 .00 10.00 10.00 10 .00 10 .00 10.00 10 .00 10.00 10.00 10.00 10 .00 10 .00 10.00 10 .00 10 .00 10.00 8.63 8.63 8 .63 8.63 8.63 8 .63 8.63 8.63 8.63 8.63 8.63 0.000 0.000 0 .000 0.000 0.000 0 .000 0.000 0.000 0 .000 0.000 0 .000 Sag Inlets Configuration Data . Inlet Length/ Grate Type Perim. Area (ft) (sf) Grate 12.00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Curb 10.33 Curb 10.33 3.30 l.SO 1. so 1. so 1. so 1. so l.SO 1. so l.SO n/a n/a Left-Slope Long Trans (%) (%) a.so 2.00 a .so 2.00 a .so 2.00 a .so 2.00 a.so 2.00 a.so 2.00 a.so 2.00 a.so 2.00 a.so 2.00 2.00 2.00 2.00 2.00 Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) a.so 2.00 0.014 a.so 2 .00 0.014 a.so 2.00 0.014 a.so 2.00 0 .0 14 a .s o 2.00 0.014 a .so 2.00 0.014 a .so 2.00 0.014 a.so 2.00 0.014 a .so 2 .00 0.014 2.00 2.00 0.014 2.00 2.00 0.014 n/a n/a n/a n /a n/a n/a n/a n/a n/a 2.00 2.00 Sag Inlets Computation Data. Depth Allowed (ft) 1. 00 a.so a.so a.so a .so a.so a.so a .s o a.so 0.46 0 .46 4.378 0.3SO 0.3SO 0.389 0 .389 0.389 0.389 0.389 0.389 1.209 l .86S Critic Elev. (ft) 264.SO 267.20 267.20 267 .46 266.66 266.SO 266 .SO 266.SO 266.SO 266.20 263.SO ================================================================================ Inlet ID B-10 B-20 B-2S B-30 B-40 B-SO Inlet Type Grate Grate Grate Grate Grate Grate Length (ft) Grat e Perim Area (ft) (sf) n/a 12 .00 3.30 n/a 8.00 l.SO n/a 8.00 l .SO n/a 8.00 l .SO n/a 8.00 l.SO n/a 8.00 l.S O K:\00675\6 75 -02RB \Report \Dra inage Report Phase II.doc Total Q Inlet Capacity (cfs) (cfs) 4 .3 78 0.3SO 0.3SO 0.389 0.389 0.389 17.736 S.701 S.701 S.701 S.701 S.701 Total Head (ft) 0.241 O.OS9 O.OS9 0.063 0.063 0.063 Ponded Width Left Right (ft) (ft) 10.4S 4.0S 4.0S 4.20 4.20 4.20 10.4S 4 .0S 4.0S 4.20 4.20 4.20 Page 30 Veterans Park and Athletic Complex -Phase II Drainage Plan B-55 B-60 B-65 B-70 B-75 Grate Grate Grate Curb Curb n/a n/a n/a 10.33 10.33 8.00 1.50 8.00 1.50 8.00 1.50 n/a n/a n/a n/a 0.389 0.38 9 0 .389 1 .209 1.865 5.701 5.701 5.701 9.996 9.996 0.063 0.063 0.063 0 .112 0.150 4 .20 4.20 4.20 5.00 5.85 4.20 4.20 4.20 5.00 5.85 Cumula tive Junction Discharge Computations ================================================================================= Node I .D. B-10 B-20 B-25 B-30 B-40 B-50 B-55 B-60 B-65 B -66 B-70 B -71 Node Type Weighted C-Value Grate 0.390 Grate 0.900 Grate 0.900 Grate 0.440 Grate 0 .455 Grate 0.508 Grate 0.900 Grate 0.900 Grate 0.900 JnctBx 0 .508 Curb 0 .528 JnctBx 0.528 Cumulat. Cumulat. Intens. Dr.Area Tc (acres) (min) (in/hr) 1. 30 0.05 0.09 1. 44 1. 49 1. 69 0 .15 0.10 0.05 1. 69 1. 89 1. 89 10.00 10 .00 10 .13 11. 48 11. 75 11. 89 10.28 10 .11 10 .00 11. 89 12.42 12.42 8 .63 8.63 8.59 8.14 8.06 8.02 8.53 8.60 8.63 8.02 7.86 7 .8 6 User Supply Q cfs) 0.000 0.000 0.000 0 .0 00 0.000 0.000 0 .000 0.000 0.000 0.000 0.000 0.000 Additional Q in Node (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 Total Disch. (cfs) 4.378 0 .35 0 0 .69 6 5.154 5 .464 6 .879 1 .152 0. 774 0.389 6.879 7.84 5 7 .845 B-75 Curb 0.500 2.43 13.53 7.56 0.000 0.00 9.174 OUT Outlt 0.500 2.43 13.53 7 .5 6 0.000 0.00 ~ ~<------------~---------------------------------------------------------~ 10 20 25 30 35 40 45 50 55 60 65 70 75 us B-10 B-20 B-25 B-30 B-40 B-65 B-60 B-55 B-50 B-66 B-70 B-71 B-75 OS B-30 B-25 B-30 B-40 B-50 B-60 B-55 B-50 B-66 B-70 B -71 B-75 OUT Conveyance Configuration Data Run# us 262. 72 263.89 263.17 261.87 261.59 264.52 263.98 262 .90 261.40 261.03 260.25 259.68 258.10 Node I.D. Flowl ine Elev. OS S h ape # Span Rise (ft) (ft) (ft) 261.97 263.27 262.47 261.69 261.50 264 .08 263 .00 262.00 261.13 260.35 259.78 258.20 257.63 Circ 1 0 .00 1 .50 Circ 1 0.00 1 .00 Circ 1 0.00 1 .00 Circ 1 0 .00 1 .5 0 Circ 1 0 .00 1.50 Circ 1 0 .00 1.00 Circ 1 0.00 1.00 Circ 1 0.00 1.00 Circ 1 0.00 1 .50 Circ 1 0.00 1 .50 Circ 1 0 .0 0 1.50 Circ 1 0.00 1 .50 Circ 1 0.00 1.50 Length Slope (ft) (ft) 300.00 31.00 35.00 60 .00 31 .00 26 .00 49 .00 45 .00 41.00 121.60 78 .10 264.00 61.00 0 .25 2 .00 2.00 0 .30 0.29 1. 69 2.00 2 .00 0 .66 0 .56 0.60 0.56 0 .77 Conveyance Hydraulic Computations . Tailwater = 252.107 (ft) n value (%) 0 .013 0 .011 0. 013 0 . 013 0. 013 0 . 011 0. 013 0.013 0. 013 0 . 013 0 .013 0. 013 0 .013 ================================================================================== Run# 10 20 25* 30 35 40* 45* Hydraulic Gradeline Depth US Elev OS Elev Fr.Slope Unif. Actual (ft) (ft) (%) (ft) (ft) 263.95 264.39 263.44 263. 11 262.87 264.76 264.4 1 263 .11 263.44 263. 11 262 .87 262.60 264.41 263.2 7 0.174 0.007 0.038 0.241 0. 271 0.009 0 .047 1.03 0.17 0.25 1.10 1.17 0.18 0 .2 6 1.14 0 .17 0.64 1 .18 1.17 0.33 0.27 K:\00675 \6 75 -02RB \Report \Drai nage Report Pha se II.doc Vel ocity Unif. Actual (f/s) (f/s) 3 .38 4 .12 4 .51 3. 71 3.69 4 .02 4.65 3.03 4.12 1. 30 3.46 3.69 1. 74 4.56 Q (cfs) 4.38 0 .35 0.70 5.15 5.46 0.39 0.77 Cap (cfs) June Loss (ft) 5.25 0.178 5 .96 0.330 5.04 0 .013 5.75 0.093 5.66 0.106 5 .48 0.059 5.04 0.162 Page 31 Veterans Park and Athletic Complex -Phase II 50* 55 60 263.2 7 262.60 262.26 262.60 0.105 262.26 0.429 261. 63 0. 429 * Super critica l flow. NORMAL TERMINATION OF WINSTORM. 0 .33 1.02 1. 09 Warning Messages for current project : Runoff Frequency of: 10 Years 0 .60 1.13 1. 28 5.20 5.38 5.00 2.35 4.80 4.27 1.15 6.88 6.88 Disc h arge decreased downstream node Id= B-66 Previous intensity used. Disc harg e decreased downstream n ode Id= B-7 1 Previous intensity used. Tail wat er set to un iform d ept h e levation = 258 .85 {ft) K:\00675\675 -02RB \Report\Dra ina ge Report Ph ase II.d oc Drainage Plan 5.04 0.043 8.53 0.179 7 .86 0.142 Page 32 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXJ Winstorm Results for 10-Year Storm Design with 100-Year Storm Analysis for Storm Sewer System "B" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 33 Ve terans Park and A thletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3.0S, Jan . 2S, 2002 Run @ 10/17/200S 7:40:32 AM PROJECT NAME : VPAC PH II JOB NUMBER 67S .02RB PROJECT DESCRIPTION : Storm Sewer Line B 100 YR Check ANALYSYS FREQUENCY 100 Years MEASUREMENT UNITS: ENGLISH ================================================================================== ID B-1 0 B-2 0 B-2S B-30 B-40 B-SO B-SS B-60 B-6S B-70 B-7S Inlet ID B-10 B-20 B-2S B-30 B-40 B-SO B-SS B-60 B-6S B-70 B-7S OUTPUT FOR ANALYSYS FREQUENCY of: 100 Years Runoff Computation for Design Frequency. C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) 0.39 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.4 1. 30 o.os o.os o.os o.os o.os o.os o.os o.os 0.20 O .S4 10 .00 10 .00 10.00 10.00 10 .00 10.00 10 .00 10.00 10.00 10 .00 10 .00 10.00 10.00 10.00 10 .00 10.00 10 .00 10.00 10.00 10.00 10.00 10 .00 11.64 11 . 64 11. 64 11. 64 11. 64 11 . 64 11.64 11. 64 11. 64 11. 64 11 .6 4 0.000 0.000 0.000 0.000 0.000 0 .000 0 .000 0.000 0 .000 0.000 0 .0 00 Sag Inlets Configuration Data . Inlet Length/ Grate Type Perim. Area (ft) (sf) Grate 12.00 Grate 8 .00 Grate 8.00 Grate 8. 00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Curb 10 .33 Curb 10.33 3.30 1. so 1. so 1. so 1.SO 1.SO 1. so 1. so l.SO n/a n/a Left -S l ope Long Trans (%) (%) o .so 2.00 o.so 2.00 o .s o 2.00 o.so 2 .00 o.so 2.00 o.so 2.00 o.so 2.00 o.so 2.00 o .so 2.00 2.00 2.00 2.00 2.00 Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) o.so 2.00 0.014 o .so 2.00 0 .014 o.so 2.00 0.014 o.so 2.00 0.014 o.so 2.00 0.014 o .so 2 .00 0.014 o.so 2.00 0.014 o.so 2.00 0.014 o.so 2.00 0.014 2.00 2 .00 0.014 2 .00 2.00 0.014 n/a n/a n/a n/a n/a n/a n/a n/a n/a 2.00 2.00 Sag Inlets Computation Data . Depth Allowed (ft) 1. 00 o .so o.so o.so o.so o.so o.so o.so o.so 0.46 0.46 S.901 0. 471 0. 471 0.S24 0.S24 O.S24 0.S24 O.S24 0.S24 1. 629 2.S14 Critic Elev . (ft) 264 .SO 267.20 267.20 267.46 266.66 266.SO 266.SO 266.SO 266.SO 266.20 263.SO In l et ID Inlet Type Length Grate Perim Area (ft) (sf) Total Q I nlet Capacity Total Head (ft) Ponded Width Left Right B-10 B-20 B-2S B-30 B-40 B-SO Grate Grate Grate Grate Grate Grate (ft) n/a 12 .00 3.30 n/a 8.00 l.SO n/a 8.00 l.SO n/a 8.00 l.SO n/a 8.00 1.SO n/a 8.00 l.SO K:\00675\6 75-02RB \Report \Dra inage Report Phase II.doc (cfs) (cfs) S.901 0 .471 0 .4 71 0.S24 0.S 24 0.S24 17.736 S.701 S.701 S.701 S .701 S.701 0.294 0.071 0. 071 0 .077 0.077 0.077 (ft) (ft) 11. 70 4.SS 4.SS 4.70 4.70 4.70 11. 70 4 .SS 4.SS 4 .70 4.70 4.70 Page 34 Veteran s Park and A thlet ic Complex -Ph ase II Drainage Plan B-55 B-60 B-65 B-7 0 B-75 Grate Grate Grate Curb Curb n/a n/a n/a 10.33 10.33 8 .00 1.50 8 .00 1.50 8.00 1.50 n/a n/a n/a n/a 0.524 0 .524 0.524 1.629 2.514 5.701 5.701 5.701 9 .996 9.996 0.0 7 7 0.077 0 .077 0 .137 0.183 4.70 4.70 4 .70 5.55 6.55 4 .70 4.70 4 .70 5 .55 6.55 Node I.D . B-10 B -20 B-25 B-30 B-40 B-50 B-55 B-60 B-65 B -66 B-7 0 B-7 1 B-75 OUT Node Type Cumulative Junction Discharge Computations Weighted C-Value Cumulat. Cumulat. Intens. Dr.Area Tc (acres) (min ) (in/hr) User Supply Q cfs) Additional Q in Node (cfs) Total Disch. (cfs) Grate 0.390 1.30 10 .00 11.64 0.000 0.00 5.901 Grate 0.900 0 .05 10.00 11.64 0.000 0.00 0.471 Grate 0 .900 0.09 10.11 11.59 0.000 0 .00 0.938 Grate 0 .440 1.44 11.50 10 .98 0.000 0.00 6.950 Grate 0 .455 1.49 11.75 10.88 0 .0 00 0.00 7.374 Grate 0.508 1.69 11.88 10 .83 o.ooo 0.00 9.289 Grate 0.900 0 .15 10.26 11.52 0.000 0.00 1.555 Grate 0.900 0 .10 10.10 11.59 0.000 0.00 1.043 Grate 0.900 0 .05 10 .00 11 .6 4 0.000 0.00 0.524 JnctBx 0.508 1.69 11.88 10 .83 0.000 0.00 9.289 Curb 0.528 1 .89 12 .39 10.63 0.000 0 .00 10.605 JnctBx 0.528 1 .89 12.39 10.63 0.000 o .oo 10.605 Outlt 0.500 2.43 13.34 10.28 0 .000 0.00 12.479 Curb 0 .5 00 2.43 13.34 10.28 0.000 0.00 ~ ~~~--~-~-~-~-~--------------------------------------------------------------- 10 20 25 30 35 40 45 50 55 60 65 70 75 us B-10 B-20 B-25 B -30 B-40 B-65 B-60 B-55 B-50 B-66 B-70 B -71 B-75 OS B-30 B-25 B-30 B-40 B-50 B-60 B-55 B-50 B-66 B-7 0 B-7 1 B-7 5 OUT Conveyance Configuration Data Ru nit us 262.72 263.89 263.17 261.87 261.59 264.52 263.98 262.90 261 .40 261.03 260.25 259.68 258.10 Node I.D. Flowline Elev. OS Shape ff Span Rise (ft) (ft) (ft) 261 .97 263.27 262.47 261.69 261.50 264.08 263.00 262.00 261 .13 260.35 259 .78 258.20 257.63 Circ l o.oo 1 .5 0 Circ 1 o.oo 1 .0 0 Circ 1 o .oo 1 .00 Circ 1 0.00 1.50 Circ 1 0 .00 1.50 Circ 1 0.00 1 .0 0 Circ 1 o.oo 1.00 Circ 1 0.00 1.00 Circ 1 0.00 1.50 Circ 1 0.00 1.50 Circ 1 0.00 1.50 Circ 1 0.0 0 1.50 Circ 1 0 .0 0 1.50 Length Slope (ft) (ft) 300.00 31.00 35.00 60.00 31. 00 26.00 49 .00 45.00 41. 00 121.60 78.10 264.00 61.00 0.25 2.00 2.00 0.30 0.29 1. 69 2.00 2.00 0.66 0.56 0 .60 0.56 0.77 n value (%) 0. 013 0. 011 0. 013 0. 013 0. 013 0 . 011 0. 013 0. 013 0 . 013 0. 013 0. 013 0. 013 0 . 013 ---------------------------------------------------------------------------------- Conveyance Hydraulic Computations. Tai l water = 252.128 (ft) ================================================================================== Hydrau l ic Gradeline De p th Ru nit US Elev OS Elev Fr.Slope Unif. Actual (ft) (ft) (%) (ft ) (ft) Velocity Un if. Actual (f /s) (f/s) Q (cfs) Cap (cfs) June Loss (ft) ---------------------------------------------------------------------------------- 10 20* 25* 30 35 40* 45* 267.96 266.84 266.83 266.80 266.41 266.31 266.30 266.80 266.83 266.80 266.41 266.12 266 .30 266.24 0.316 0 . 013 0.069 0.438 0.493 0.015 0.086 K:\006 7 5\67 5-02 RB \Report\Dra inage Report Phase II.doc 1. 50 0.19 0.29 1. 50 1 .50 0.21 0.31 1. 50 1. 00 1. 00 1. 50 1. 50 1. 00 1. 00 3 .34 4 .52 4.92 3 .93 4.17 4.40 5.06 3 .34 0 .60 1.19 3. 93 4 .17 0.67 1.33 5.90 0 .4 7 0.94 6.95 7.37 0.52 1.04 5.25 0.217 5.96 0.007 5.04 0 .011 5 .75 0.120 5.66 0 .135 5.48 0.009 5.04 0.014 Page 35 Veterans Park and Athletic Complex -Phase II 50* 55 60 266 .24 266 .12 265 .59 266 .12 0 .190 265 .59 0 .782 264 .42 0 .782 0.38 1. 50 1. 50 1. 00 1. 50 1. 50 5.66 5.26 5.26 65 264.42 263 .35 1 .019 1.50 1 .50 6.00 75 2 60.38 259 .13 1.411 1 .50 1 .50 7 .06 Drainage Plan 1. 98 1.55 5 .04 0 .030 5.26 9.29 8.53 0.215 5.26 9.29 7.86 0.215 6.00 10 .61 8.15 0.280 6 .~.61 7.87 0.280 7.: 1 .48 9.22 0 .387 ---================== 70 263 .35 260 .38 1.019 1 .50 1.50~0 ===================================END ========~,._,~....,,"""-!~-;-;;"~ * Super criti c al flow . NORMAL TERMINATION OF WINSTORM . Warning Me ssages for current project : Runo ff Frequency of: 100 Years Discharge decreased d o wnstream n o de Id= B-66 Previous intensity used. Discharge decreased downstream node Id= B-71 Previous intensity used . Ta ilwater set to uniform depth elevatio n = 259 .13 (ft) Run# 75 Insufficient capacity . Run# 70 Insufficient capacity. Run# 65 Insufficient capacity. Run# 60 Insufficient capacity . Run# 55 Insufficient capacity. Run# 35 Insufficient capacity . Run# 30 Insufficient capacity. Run# 10 Insufficient capacity. Up s tre am hydraulic gradeline exceeds critical elevation at node Id= B-10 K:\00675 \675-02RB \Report \Dra in age Report Ph ase II.doc Page 36 Veterans Park and Athletic Complex -Phase II APPENDIXK Winstorm Results for 10-Year Inlet Design for C 10 & C20 and CULVERT Results for 10-Year Culvert Design for D40 K:\00675\675 -02RB\Report\Dra inage Report Phase II.doc Drainage Plan Page 37 Veterans Park and Athletic Complex-Phas e II WinStorm (STORM DRAIN DESIGN} PROJECT NAME : VPAC Ph II JOB NUMBER 675.02 RB Drainage Plan Version 3.05, Jan. 25 , 2002 Run @ 1 1/4/2005 11:18:57 AM PROJECT DESCRIPTION : Curb Inlet Analysis for Major Culv Xing Vet Prkwy ANALYSYS FREQUENCY MEASUREMENT UNITS: 10 Years ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Runoff Computation for Design Frequency. ID C-10 C-20 D-40 C Value 0 .9 0 .9 0.44 Area (acre} 0 .20 0.20 12.69 Tc (min} 10 .00 10.00 27.70 Tc Used (min} 10 .00 10.00 27.70 Sag Inlets Configuration Data. Inlet ID Inlet Length/ Grate Type Perim . Area (ft} (sf} Left -Slope Long Trans (%} (%} Intensity (in/hr) 8.63 8.63 5.17 Right -Slope Long Trans (%} (%} Supply Q (cfs} Total Q (cfs} 0.000 0.000 0 .000 Gutter n DeprW (ft} 1. 554 1. 554 28.887 Depth Allowed (ft} Critic Elev . (ft} C-10 C -20 Curb Curb 5 .00 5.00 n/a n/a 0.50 3.00 0.50 3.00 0.50 3.00 0.014 1 .50 0.50 3.00 0.014 1.50 0.50 0.50 261. 33 261.35 Sag Inlets Comp ut ation Data. Inlet ID C-10 C-20 Inlet Type Curb Curb Length (ft} 5.00 5 .00 Grate Perim Area (ft} (sf} n/a n/a n/a n/a NORMAL TERMINATION OF WINSTORM . K:\00675 \675-02RB \Report\Dra in age Report Phase II.doc Total Q Inlet Capacity (cfs} (cfs} 1.554 1.554 6 .261 6 .26 1 Total Head (ft} 0.19 7 0.19 7 Ponded Width Left Right (ft} (ft} 5.50 5.50 5 .50 5 .50 Page 38 Vet erans Park and Athletic Complex -Phase II Drainage Plan TEXAS HYDRAULIC SYSTEM, CULVER T (ver . 1.2. Feb/2002) Fri Nov 04 11:53:37 2005 CULVERT HYDRAULIC COMPUTATIONS CULV ERT NAME: VetPrk2 PROJECT NAME: VPAC Phase II I nput Units: English Ou tput Units: English PROJECT CONTROL: 0675.02 RB COUNTY: Brazos County DESC RIPTI ON : Culvert for Vet erans Parkway ANALYZE MULTIPLE OPENING MATERIAL : CONCRETE SHAPE: RCP CIRC ULAR PIPE. ENTRANCE: MITER PROF ILE : STRA IGHT CULVERT FREQUENCY: 10 Yr FREQUENCY: 100 Yr DISCHARGE: DISCHARGE: TAILWATER ELE VATION (computed} . CULVERT 30.00 cfs 41 .00 cfs n value: 0.0120 Ke va lue: 0 .7000 CULVERT DIAM. = 2.00 ft INLET station: OUT LET station: 45.40 -42.56 Cross section profile (XY x y 135 .00 262.00 158 .00 259.00 169 .00 258 .00 18 4 .0 0 261.00 BARRELS = 2 elevation: elevation : Coordina tes) f t x 148.00 163 .00 17 4 .00 190.00 Road profile (XY Coordinates} ft x y x 91. 32 263.31 100.00 166.23 262 .45 200.00 250 .00 263.09 300.00 CULVERT OUTPUT RUN NO => 1 y 25 7 .59 ft 257.40 ft 2 6 1 .00 258 .00 259.00 262 .00 y 263 .22 262.83 263.34 TAILWATER ELEVATION: 259.19 ft (computed). ANALYSIS for discharge frequency of : 10 Yr x 1 5 4 .00 166.0 0 179 .00 x 150.00 207 .00 y 2 6 0.00 257.39 260 .0 0 y 262.63 262.88 Barls. Qpb Ri se Span Length Max .HW Cal c.HW HW Contro l Veloc. Out.depth cfs ft ft ft 2 15 .00 2.00 0.00 71. 96 Inlet control depth 2 .36 Outlet control depth 2.51 Norma l depth 2.00 ft Critical depth 1. 40 ft K:\0067 5\675-02 RB \Report \Drainage Report Pha se I I.doc elev ft 0 .00 ft ft Culvert Critical elev ft 260 .08 slope s l ope ft ft/s ft 2.5 1 Outlet 4.77 2.00 0 .00216 0 .00538 Pag e 39 Veterans Park and Athletic Complex-Phas e II Road top width => 36.00 ft . Road p avement type =>asphalt Computed Weir Coefficient => 3.00. No discharge o v er the road. CULVERT OUTPU T RUN NO => 2 TAILWA TER ELEVATION: 259.41 ft (computed} . ANALYSIS for discharge frequency of : 100 Yr Drainage Plan Barls. Qpb Rise Span Length Max .HW Calc.HW HW Control Vel oc . Out.depth elev elev cf s ft ft ft ft ft ft 2 20.50 2 .00 0.00 7 1 .96 0.00 261.05 3.47 Outlet Inlet control depth Outlet control depth Normal depth 2.00 ft Critical depth 1.62 ft Road top width => 36.00 ft. Comp uted Weir Coefficient => No discharge over the road. RUNI NG MESSAGES LIST: 3 .37 ft 3.47 ft Culvert slope Critical slope Road paveme n t type => 3.00. 0.00216 0 .00712 asphalt *Computation: Outlet velocity is bas ed on the cu lvert rise. NORMA L TERMINATION OF THYSYS, CULVERT. ft/s ft 6 .53 2.00 K:\00675\675-02RB\Re port\Drainage Report Ph ase II.d oc Page 40 Veterans Park and Athletic Complex-Phase II APPENDIXL Winstorm Results for 10-Y ear Storm Design for Stom1 Sewer System "G 1 O" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Drainage Plan Page 41 Vet erans Park and A thletic Co mplex -Phase II Drainag e Plan WinStorm (STORM DRAIN DESIGN) Version 3.05 , Jan. 25, 2002 Run@ 10/31/20 0 5 4:10:20 PM PROJECT NAME : JOB NUMBER VPAC PH II 675.02 RB PROJEC T DESCRIPTION : Storm Sewer Line GlO 10 Yr Design ANALYSYS FREQUENCY 10 Years MEASUREMENT UNITS : ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Runoff Computation for Design Frequency . Years ID C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) G -10 0.47 0.25 10.00 10.00 8.63 0.000 Inlet ID G-10 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim. Area (ft) (sf) Grate 8.00 1. 50 Le ft-Slope Long Trans (%) (%) 0.50 2.00 Right -S lope Long Trans (%) (%) Gutter n DeprW (ft) 0.50 2.00 0 .014 n/a Sag Inlets Computation Data . Inlet ID Inlet Type Length Grate Perim Area (ft) (sf) Total Q Inlet Capacity (cfs) Total Head (ft) (ft) (cfs) G-10 Grate n/a 8.00 1.50 1.015 5.701 0.119 Cumulative Junction Discharge Computations Depth Allowed (ft) 0.50 Ponded Left (ft) 6.05 1.015 Critic Elev. (ft) 261.07 Width Right (ft) 6.05 ================================================================================= Node Node Weighted Cumulat. Cumulat . Intens. User Additional Total I.D. Type C-Value Dr .Area Tc Supply Q Q in Node Disch. (acres) (min) (in/hr) cfs) (cfs) (cfs) --------------------------------------------------------------------------------- G-10 Grate 0.470 0.25 10.00 8.63 0 .000 0 .00 1.015 OUT Outlt 0.470 0.25 10 .00 8.63 0.000 0.00 1.015 Conveyance Configuration Data ================================================================================== us OS Run# us Node OS (ft) I .D. Flowline Elev. Shape # Span Rise (ft) (ft) Length Slope (ft ) (ft) n value (%) ---------------------------------------------------------------------------------- 10 G-10 OUT 258.57 257.10 Circ 1 0.00 1.00 141 .00 1.04 0. 011 ---------------------------------------------------------------------------------- K:\00675 \6 75-02RB \Report\Drainage Report Phase II.doc Page 42 Veterans Pa rk and Athletic Complex -Ph ase II Drainag e Plan Conveyance Hydraulic Computations. Tailwater = 259.190 (ft) Hydraulic Gradeline Depth Run# US Elev OS Elev Fr .Slope Unif. Actual (ft) (ft) (%) (ft) (ft) Velocity Un if. Actual (f/s) (f/s) Q (cfs) Cap (cfs) June Loss (ft) 10* 259 .30 259.19 0.058 0.33 1.00 4 .49 1.29 1.01 4.30 0 .032 ===================================END============================================ * Super critical flow. NORMAL TERMINATION OF WINSTORM . Warning Messages for current project: Runoff Frequency of: 10 Years K:\006 7 5\6 7 5-02 RB\Report \Dra i nage Report Phase I I.doc Page 43 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXM Winstorm Results for 10-Year Storm Design with 100-Year Storm Analysis for Storm Sewer System "G 1 O" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 44 Veterans Park and Athletic Complex -Phase II WinStorm (STORM DRAIN DESIGN} PROJECT NAME : VPA C PH II JOB NUMBER 675.02 RB Drainage Plan Version 3 .05, Jan. 25, 2002 Run@ 10/31/2005 4:14:21 PM PROJECT DESCRIPTION : Storm Sewer Line GlO 100 Yr Check ANALYSYS FREQUENCY 100 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 100 Years Runoff Computation for Design Frequency. ============================================================================= ID C Value Area (acre} Tc (min}· Tc Used (min} Intensity (in/hr} Supply Q (cf s} Total Q (cfs} G-10 0.47 0.25 10.00 10.00 11 . 64 0.000 1.368 Sag Inlets Configura tion Data. Inlet ID Inlet Length/ Grate Type Perim. Area (ft} (sf} Left-Slope Long Trans (%} (%} Right-Slope Long Trans (%) (%} Gutter n Deprw (ft} G-10 Grate 8.00 1. 50 0 .50 2.00 0.50 2.00 0 .014 n/a Sag Inlets Comp utat ion Data. Inlet ID Inlet Type Length (ft} Grate Perim Area (ft} (sf} Total Q Inlet Capacity (cfs) (cfs} Total Head (ft} Depth Allowed (ft) 0.50 Ponded Width Left Right (ft} (ft} Critic Elev. (ft} 261.57 G-10 Grate n/a 8.00 1.50 1.368 5.70 1 0.145 6.75 6.75 Cumu lative Junction Discharge Computations Node I.D. Node Type Weighted C-Value Cumulat. Cumulat. Intens. G-10 OUT Grate Outlt 0.470 0.470 Dr.Area (acres) 0.25 0.25 Conveyance Configuration Data Tc (min) 10.00 10.00 (in/hr} 11. 64 11. 64 User Supply Q cfs} 0.000 0.000 Additional Q in Node (cfs} 0 .00 0 .00 Total Disch. (cfs) 1. 368 1 .368 ================================================================================== Run# Node I.D. Flowline Elev. US OS US OS (ft) (ft} 10 G-10 OUT 258 .5 7 257.10 K:\00675 \675-02RB \Report\Drainage Report Phase II.doc Shape It Span (ft) Rise (ft) Circ 1 0.0 0 1.00 Length (ft} 141.00 Slope (%) 1.04 n value 0. 011 Page 45 Veterans Park and Athletic Complex -Phase II Conveyance Hydraulic Co mputations . Tailwater = 259.410 (ft) Hydrauli c Gradeline Dept h Run# US Elev DS Elev Fr.Slope Unif . Actual (f t) (ft) (%) (ft) (ft) Velocity Unif. Actual (f/s) (f/s) Q (cfs) Drainage Plan Cap (cfs) June Loss (ft) 10* 259 .62 259.4 1 0.105 0.39 1 .00 4 .88 1.74 1.37 4 .30 0.05 9 ===================================END============================================ * Super critica l flow. NORMAL TERMINATION OF WINSTORM . Warning Messages f o r curre n t proje ct: Runoff Frequency of : 100 Years K:\00675\675-02RB\Report \Drainage Re port Pha se II .doc Page 46 Veterans Park and Athletic Complex -Phase II APPENDIXN Winstorm Results for 10-Year Storm Design for Storm Sewer System "G20/G30" K:\00675\675-02RB \Report\Drainage Report Phase II.doc Drainage Plan Page 47 Veterans Park and Athletic Complex-Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN ) Version 3.05, Jan. 25, 2002 Run@ 10/31/2005 4:34:18 PM PROJECT NAME : VPAC PH II JOB NUMBER 675.02 RB PROJ ECT DESCRIPTION : Storm Sewer Line G20/G30 10 Yr Design ANALYSYS FREQUENCY 10 Years MEAS UREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Runoff Computation for Design Frequency. ID C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) G-20 G-30 Inlet ID G-20 G-30 0.7 0.88 0.12 0 .27 10.00 10.00 10.00 10.00 8.63 8.63 0 .0 00 0.000 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim. Area Grate Curb (ft) (sf) 8.00 5.00 1. 50 n/a Left-Slope Long Trans (%) (%) 0 .5 0 2 .0 0 0.50 2.00 Right-Slope Long Trans (%) (%) Gutter n Deprw (ft) 0 .50 0.50 2.00 0.014 2.00 0 .014 n/a 1. 50 Sag Inlets Computation Data. Depth Allowed (ft) 0.50 0.50 0.725 2.052 Critic Elev . (ft) 261.00 260.07 Inlet ID Inlet Type Length Grate Perim Area (ft) (sf) Total Q Inlet Capacity Total Head (ft) Ponded Width Lef t Right (ft) (cfs) (cfs) (ft) (ft) G-20 G-30 Node I.D . G-20 G-30 OUT Grate Curb n/a 5.00 8.00 1.50 n/a n/a 0. 725 2.052 5.701 6.261 0.095 0.238 5.35 7 .90 Cumulative Junction Discharge Computations Node Type Grate Curb Outlt Weighted C-Value 0.700 0 .825 0 .825 Cumulat. Cumulat. Intens . Dr .Are a Tc (acres) (min) (in/hr) 0.12 0 .39 0.39 10.00 10.43 10 .43 8.63 8.48 8.48 User Supply Q cfs) 0.000 0.000 0 .000 Additional Q in Node (cfs) 0.00 0.00 0.00 K:\006 751675-02RB \Report\Dra in age Report Phase II.doc 5.35 7.90 Total Disch. (cfs) 0.725 2.728 2 .728 Pa ge 48 Veterans Park and Athletic Complex -Phase II Drainage Plan Conveyance Configuration Data Node I .D. Flowline Elev. us OS Run# us OS Shape # Span Rise Length Slope n value 2 0 30 G-20 G-30 G-30 OUT 258.50 256 .46 (ft) (ft) (ft) 256.96 255.20 Circ 1 o.oo 1.00 Circ 1 0.00 1.50 (ft) (ft) 106.00 90.00 1. 45 1. 40 (%) 0. 013 0 . 013 Conveyance Hydraulic Computations. Tailwater = 259.190 (ft) Hydraulic Gradeline Depth Run# US Elev OS Elev Fr.Slope Unif. Actual (ft) (ft) (%) (ft) (ft) Velocity Unif. Actual (f/s) (f/s) Q (cfs) Cap (cfs) June Loss (ft) 20* 259 .33 259.27 0 .041 0.28 1.00 4.06 0.92 0.73 4.30 0 .017 30* 259.27 259.19 0 .067 0.48 1 .50 5.64 1.54 2.73 12.43 0.019 ===================================E ND============================================ * Super critical flow. NORMAL TERMINATION OF WINSTORM. Warni n g Messages for current project: Runoff Frequency of: 10 Years K:\00675\675-02RB\Report\Drainage Report Pha se II .doc Page 49 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXO Winstorm Results for 10-Y ear Storm Design with 100-Y ear Storm Analysis for Storm Sewer System "G20/G30" K :\00675\675-02RB\Report\Drainage Report Phase II.doc Page 50 Veterans Park and Athletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN} Version 3.05, J an . 2 5, 2002 Run@ 10/31/2005 4:37:52 PM PRO JECT NAME : VPA C PH II JOB NUMB ER 675.02 RB PROJECT DESCRI PTI ON : Storm Sewer Line G20/G30 100 Yr Check ANALYSYS FREQUENCY 100 Years MEASUREMENT UNITS : ENGLISH OUTPUT FOR ANALYSYS FREQUE NCY of: 100 Years Runoff Co mpu tation for Design Frequency. ID C Value Area (acre) Tc (min} Tc Used (min) Intensity (in/hr} Supply Q (cfs} Tota l Q (cfs} G-20 G-3 0 0 .7 0.88 0.12 0 .2 7 10 .00 10.00 10.00 10 .00 11. 64 11 . 64 0 .0 00 0.000 Sag Inlets Configuration Data. Inlet Inlet Length/ Grate ID Type Perim . Area G-20 G-30 (ft) (sf } Grate 8.00 Curb 5.00 1.50 n/a Left-Slope Long Trans (%) (%} 0.50 2.00 0.50 2.00 Right-Slope Long Trans (%) (%} Gutter n DeprW (ft) 0.50 2.00 0.014 n/a 0.50 2.00 0.014 1.50 Sag Inlets Co mpu tation Data . Depth Allowed (ft) 0.50 0 .50 0.978 2.765 Critic Elev . (ft} 261.50 260.57 Inlet Inlet Length Grate ID Type Perim Area Total Q Inlet Capacity Total Head (ft} Ponded Width Left Right (ft} (ft} (sf} (cfs} (cfs} (ft} (ft} G-20 G-30 Grate Curb n/a 5.00 8 .0 0 1 .50 n/a n/a 0.978 2.765 5.701 6 .261 0 .116 0 .290 Cu mulative Junction Dis charge Computations 5 .95 8.80 5.95 8.80 ================================================================================= Node I.D. G-20 G-30 OUT Node Type Grate Curb Outlt Weight ed C-Value 0 .700 0.825 0.8 25 Cumula t. Cu mula t. Intens . Dr.Area Tc (acres) (min) (in/hr} 0 .1 2 10.00 11. 64 0 .39 1 0.4 0 11. 45 0 . 3 9 1 0.4 0 11 . 45 User Supply Q cfs} 0.000 0 .000 0.000 Add i tional Q in Node (cfs} 0.00 0 .00 0.00 Tota l Disch. (cfs} 0.978 3 .684 3.684 --------------------------------------------------------------------------------- K:\00675\675-0 2RB\Report \Drainage Report Pha se II.d oc Page 51 Veterans Park and Athletic Complex -Phas e II Drainage Plan Conveyance Configuration Data Node I.D. Flowline Elev. us OS Run# us OS Shape # Span Rise Length Slope n value (%) 20 30 G-20 G-30 G-30 OUT 258.50 256 .46 {ft) (ft) {ft) 256.96 255 .20 Circ 1 o.oo 1.00 Circ 1 0.00 1.50 (ft) (ft) 10 6.00 90.00 1.45 1.40 Co nveyance Hydraulic Computations . Tailwater = 259.410 {ft) Hydraulic Gradeline Depth Run# US Elev OS Elev Fr.Slope Unif. Actual {ft) {ft) {%) {ft) {ft) Vel ocity Unif. Actual {f/s) {f/s ) Q (cfs) Cap (cfs) 0. 013 0. 013 June Loss (ft) 20 * 259.66 259.55 0 .0 7 5 0 .3 2 1.0 0 4.43 1 .2 4 0.98 4 .3 0 0.0 30 30* 259.55 259 .41 0.123 0 .56 1.50 6 .1 3 2.08 3.68 1 2.43 0 .034 ===================================END============================================ * Super crit i ca l flow. NORMA L TERMI NATI ON OF WINSTORM . Warning Messages for current project: Runoff Frequency of: 100 Years K:\006 75 \6 75-02RB\Report\Dr a inage Re po rt Pha se II.doc Page 52 .1 L J.I Lt'.Jt'.J::J L.:l : 4 tl c ues DEVE LO PMEN T SER PAGI:. ld :,u Id::! ENGINEERING ~eet C-7 and Sheet C-28) P lease provide off site contours in the area surroundinQ the retainin!'.l wall as to illustrate that the current and proposed drainage along this property line ORV erify that the proposed grading and retaining wall will not change the existing drainage conditions along this property -~· i:l:s iu <::1<.lv!::!rsely effect the current drainage for the adjacent property. ~eat C-8) Has any of the area near or in the flood plain or floodway been improved with any previous phase of Veterans Park? It appenrs thAr!'! i~ ~ Inna ponded area that is being discharged into with this phase. How does this ponded area operate? In other words, does it naturally overflow or point Jl!Scharge? ~(Sheet C-17) Provide detail of the Sanitary Sewer and Storm Junction Box (A- 96) r:onflir.t ::it E;t:3 . 4+19 57 . Plec:ise verify DIP sanitary · sewer line is cenhm~d on junction box so that joint does not fall within the junction box. A lso, please ~rout fill any voids created by the connection . ~ (sneet C-20 thru 22) Please verify that bacl<t low preventers have been used to ~late irrigation lines where connected to potable water lines. ~ (Sheet C-23 thru C-24) On th9 DIP sanitary SGwGr line in addition ple3ee UM cement stabilized backfill in areas where cover is less than 3.5-ft. ~heet C-23) Provide detail of the Sanitary Sewer and Storm Junction Box (A - . 96) conflict at Sta. 4+19.57. Please verify DIP sanitary sewer line is centered on junction box so that joint does not fall w ithin the j unction box. Also, please ~ut fill any voids created by the connection. ~_(Sheet C-23) At Sta. 17+20, stub-out requires one full pipe joint with a clean -out. ~Sheet C-24) At Sta. 5+00, stub-out requires one full pipe joint with a dean -out. ~ .ffeh eet C-24) Provide profile detail of sanitary sewer/water conflict at Sta . 4+30. ~(Sheet C-24) Per TCEQ 290, sanitary sewer main shall be embedded in cement etabilized sand for total length of one pipe segment plus 12" beyond the joint on each end . eet C-25 ide profile detail of water/sanitary sewer conflict at Sta . 0+60. At Sta. 12+00, illustrate the separation distance between the water I sanitary sewer conflict. Also illustrate the use of cement stabilized backfill as . ~e$Cribed in Comment# D. . . . ~· ~Sheet C-25) At Sta. 13+82.81, each "Cap " 8-in. water main termination shall be -~rminated with a 2-in blow off. ' ~. (Sheef -~>32) Please · confirm that the proposed fiber reinforced paving is fllended to be used in lieu of traditional rebar reinforcement. . \J-6. (Drainage Report I Sheet C-19) There are. 5everal discharge points into the flood plain on this site. Please verify that no erosion is anticipated from the Aischarqe point to the creek, otherwisEf provide the appropriate eros ion control. ~-(Drainage Report) Several of the discharge points currently show minimal need for erosion control however with f uture phase development velocities and flows fa ill increase. Please account for the erosion control needs for full build out. ¢. (Drainage Report) Specifically System "A " Drainage Area Outfall Data and System ''B" Drainage Area Outfall Data, please illustrate method of erosion contro l at each outfall as outfall velocities up to 4 .5 ft/sec must be seeded, outfalls up to e.O ft/sec must be sodded and outfa ll velocities above 6.0 ftfsec ~121/2005 23 :48 '37'376 4 34% COCS DEVELOPM ENT SER PAGE 03/03 t use impermeable means of erosion control per the CoCS drainage gui el ines. 18. F I: Prior to beginning construction we must receive a copy of the NOi I TCEQ torm Water Permit for this site. This NOi I TCEQ Storm Water Permit must also be posted on site. A SWPP (Storm Water Prevention Plan) must also be created and located on site. Reviewed by: 2005 Josh Norton D;:ite: Novemb er 22 , Miscellaneous 1. & 2. The irrigation service with a backflow prevention device meeting the City's requirements was constructed during Phase I. Irrigation lines will only be extended under Phase II and a new service is not required. 3. This item will be addressed in a future phase. To the best of my knowledge, a master plan for this park has been provided to TxDOT for their use in planning Highway 60 improvements. There is an existing access driveway off Highway 60 that will be used for construction traffic on this project. Novem r 22 comments: oth Ronnie Becker, Project Engineer with O'Malley Engineers, and I have visited the site and did a visual survey of the existing off-site drainage entering along the north property line of the Veteran's Park site. There are small drainage swales on the adjacent tract that run parallel with this portion of the north property line . They capture the offsite runoff and direct it to a single point where it enters the project site. There is also a small berm parallel to the north property line on the park tract, which directs flow to the same point. Over time a channel has eroded through the slope into the park site. As shown on plan sheet C-17, we propose to construct a throat inlet, A-10, to capture this off-site runoff. Concrete riprap is proposed around this inlet and will match the existing flow line o the small channel entering our site along the north side . The swales along the rm are to remain and be regraded to flow to the center of the throat inlet. work was performed in this area during a previous phase . The pond shown on the site plan was previously proposed in the master plan and was incorrectly wn on our plans. It does not exist. . Detail notes were added to Sheets C-17 and C-23. ::;t( Backflow preventers were installed on the existing metered irrigation service line constructed in the Phase I project. The existing irrigation main will be extended to provide irrigation service for Phase II facilities . No new irrigation service is ~roposed for Phase 11 . y._ Cement stabilized bedding added to the plans where this condition exists . \£.Answered in no. 3. ~A stub-out with one full pipe joint and a cleanout was added to the plans. "f5'. A stub-out westward with 35 feet of pipe and a cleanout was added to plans. This length of pipe is shown to be stubbed out in order to center one full 20' joint of sanitary sewer line at the potable water line crossing. Cement stabilized sand bedding was added for the bedding of the sanitary sewer line stub-out at the ~ater line crossing. $. Vertical separation of potable water line and sanitary sewer line added to the rofile ement stabilized sand bedding note added to the plans (profile). xisting sanitary sewer line added to profile. Revised as requested. ~Revised as requested. K :\00675\675-02RB\Letter\College Station P&D Comment Responses 12-09-05.doc , , ... ~ber reinforced concrete is proposed for use in sidewalks, trail and concrete riprap. Traditional steel reinforced concrete is proposed for use in pavements ynd curb & gutter. ~Sediment control fence is to be placed along the southern limits of the Phase II construction. Sediment control fences are also proposed in drainage swales at various locations to control the runoff velocities . Seeding of all disturbed areas and sodding at culvert discharges will be placed once the grading is complete and the fences will be removed after stabilization has been achieved. Further, . _~re needed aprons with energy dissipater blocks are proposed. ~~~-mage areas used for design of storm sewers, culverts and swales for Phase II included areas west of Phase II, which are anticipated to be designed to drain into the Phase II area . Future impervious areas were included in the determination of the weighted runoff coefficients, therefore the design velocities ~ for "built out" conditions . ~Sodding is proposed around all culvert outfalls including System "A", which have a design storm outlet velocity less than 6 tusec. The outfall for System "B" was structed during Phase I and outfalls onto existing concrete riprap. e contract has been revised to require the construction contractor to submit is documentation prior to construction and to keep a copy at the project site .. As approved verbally by Mr. Josh Norton, the air release valve originally shown at sta . +/-3+30 on sheet C-25 has been removed from the plans . I trust that these responses answer all of your concerns . Please give me a call if you have any further questions. Sincerely, Robert C . Schmidt, P.E. Project Manager RCS:kl Enclosures cc+ Enclosures : Ric Ploeger, PARO *" f, Jl '2.. \)""' ,. '-"I" *' (°'"IV "~ r~..l fffl ;a ~f' D / s~GV f,dd i K :\00675\675-02RB\Letter\College Station P&D Comment Responses 12-09-05.doc Prepared · for: I City ·Of College ~tatiori P.O. Box 9960- College Station, Texas 7.7842 Prepared by: O'MALLEY ENGINEERS, L.L.P ~ P.O. Box 1976 Brenh?m, Texas 77834-1976 OE Project i:-io. 675.0l RB DRAINAGE PLAN FOR VETERANS PARK AND ATHLETIC COMPLEX -PHASE II Prepared for: City of College Station P.O. Box 9960 College Station, Te x as 77842 Prepared by: O'MALLE Y ENGINEERS, L.L.P. P.O. Box 1976 Brenham, Texas 77834-1976 O E Proj ec t No . 67 5.01 RB No vemb er 20 0 5 Veterans Park and Athletic Complex -Phase II Drainage Plan TABLE OF CONTENTS CERTIFICATION SHEET ............................................................................................................ 3 INTRODUCTION AND PROJECT DESCRIPTION ................................................................... 4 METHODOLOGY AND CALCULATION PROCEDURES ....................................................... 4 DRAINAGE SUMMARY DISCUSSION ..................................................................................... 6 SUMMARY OF DESIGN FEATURES ......................................................................................... 7 LIST OF FIGURES FIGURE 1 -PROJECT LOCATION MAP ................................................................................... 4 LIST OF TABLES TABLE 1 -RA TI ON AL EQUATION VALVES FOR BRAZOS COUNTY ............................... 4 LIST OF APPENDICES APPENDIX A -FEMA MAP NOS. 48041CO161 C & 48041CO142C WITH SITE ILLUSTRATED ................................................................................................................. 9 APPENDIX B -USGS QUADRANGLE TOPOGRAPHIC MAP OF THE SITE ..................... 11 APPENDIX C -OVERALL SITE LAYOUT .............................................................................. 13 APPENDIX D -SYSTEM "A" DRAINAGE AREA AND STORM SEWER ........................... 15 APPENDIX E -SYSTEM "B" DRAINAGE AREA AND STORM SEWER ........................... 17 APPENDIX F -SYSTEMS "C", "D", "F", "G", & "H'' DRAINAGE AREAS AND STORM SEWERS ............................................................................................................ 19 APPENDIX G -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "A" ...................................................................................... 21 APPENDIX H -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "A" ...................... 25 APPENDIX I -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "B" ...................................................................................... 29 APPENDIX J -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "B'' ....................... 33 APPENDIX K -WINS TORM RESULTS FOR 10-YEAR INLET DESIGN "C 1 O" & "C20" AND CULVERT RESULTS FOR 10-YEAR CULVERT DESIGN FOR "D40" ....................................................................................................................... 3 7 APPENDIX L -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "G 1 O" .................................................................................. 41 APPENDIX M -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "G 1 O" .................. 44 APPENDIX N -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN FOR STORM SEWER SYSTEM "G20/G30" .......................................................................... 47 APPENDIX 0 -WINSTORM RESULTS FOR 10-YEAR STORM DESIGN WITH 100-YEAR STORM ANALYSIS FOR STORM SEWER SYSTEM "G20/G30" .......... 50 K:\00675\675-02RB\Re po rt\Drainage Report Phase II.d oc Page2 Veterans Park and Athletic Complex -Phase II Drainage Plan CERTIFlCATION SHEET I hereby certify that this plan for the drainage design of Veterans Park and Athletic Complex - Phase II was prepared by under my supervision in accordance with the provisions of the City o f College Station Drainage and Design Standards for the owners thereof. Ronald Wade Becker, P.E . State of Texas No . 70992 K:\00 675\675-02RB\Re port\Drainage Re port Ph ase II.d oc Page3 Veterans Park and Athletic Complex -Phase II Drainage Plan INTRODUCTION AND PROJECT DESCRIPTION This report discusses and documents the existing and proposed drainage conditions for the second phase of development for the Veterans Park and Athletic Complex located in the City of College Station, Brazos County, Texas. The project site is located between State Highway 30 and State Highway 60 and is bounded on the south side by Carters Creek flood plain. Also, the northeast portion of the site is bounded by Hudson Creek. Furthermore, on the north side of the property the land is mainly undeveloped except for the existing Texas A & M University facility located to the northwest of this project site (see Figure 1). Overall, the site contains approximately 150 acres . Phase I development of this park encompassed slightly more than 1/3 of this area and was completed in September of 2002. In this phase, six soccer fields, two softball fields, two parking lots, veteran's memorial area, maintenance building, soccer/restroom building, and roadway/driveway access to these facilities were constructed. The remainder of the site is not developed and was graded to its current condition several years ago. This grading basically consisted of sloping the land's surface toward Carters Creek at a very mild slope. Phase II development will encompass approximately another 1/3 of the total site area. This phase of development is proposed to contain a parking lot addition to the existing softball field lot, three softball fields, softball concession building , large pavilion building with a parking lot, walking/running trail, three soccer fields with a parking lot and restroom building, maintenance building addition, and an extension of Veterans Parkway. Currently, the undeveloped portion of the site has very little topsoil or vegetation cover which therefore results in a higher runoff coefficient. This portion of the site drains directly into Carters Creek. Because the lower portion of this property is within the Carters Creek flood plain, detention storage is not necessary and has been waived by the City of College Station. This portion of the site is subject to both on-site and off-site storm water run-off. Part of the off-site storm water will enter the proposed storm sewer System "A". The remaining portion of off-site storm water runoff coming in from the northwest corner of the site remains in, or close to, it's current drainage path and will therefore not affect this phase of the development. METHODOLOGY AND CALCULATION PROCEDURES Run-off calculations were performed using the Rational Method and b, d & e factors for Brazos County (TxDOT Hydraulic Design Manual, dated 11/02). The rainfall intensity is a function of frequency, geography, climatology, and the specific time of concentration for the watershed. The time of concentration describes the longest time it takes for runoff from the most remote part of K:\00675 1675-02RB \Report \Drainage Report Phase II.doc Page4 Veterans Park and Athletic Complex -Phase II Drainage Plan the watershed to travel to the outfall of the watershed. TxDOT uses the following equation for rainfall intensity: where: . b l=--- (t c + d)e i =rainfall intensity (in/hr); tc =time of concentration (min); and b, d, e =empirical factors that characterize the intensity-duration-frequency. b, d and e are constants from TxDOT's Hydrau lic Design Manual (refer to Table 1 for 10-year and 100-year b, d, and e values used for this project.) \ \ . ··-··-UNr~~~~~~~~E --------------·--------· / / ,/ / ) ~H 3Q ~VE Y ROAD ,--------- ! j ...... ·····•·-···· .... •··I ____ .J ___ , -----~CJ-lE~-~ Figu re 1. P roject Locatio n Map T b l 1 R . a e . at10na f V l l E .qu a 100 a ues i B or razos c t ou nty Variab le 10-Year Valu e 100-Year Valu e B 80 96 D 8.5 8.0 E 0 .763 0.730 \ \ K:\00675\675-02RB\Report\Drainage Report Pha se II.doc Page5 Veterans Park and Athletic Complex -Phase II Drainage Plan An example of the rainfall intensity calculation for the 10-year rainfall event, using a minimum time of concentration of 10 minutes is a follows: The runoff flow rate, Q, was determined for the 10-year storm event using the rational method equation: Q=ciA where : c is the runoff coefficient; i is the rainfall intensity (in/hr), and; A is the land contained within the drainage area (acres). The runoff coefficient, c, value used for grass areas was 0.3 and a value of 0.9 was used for the impervious areas such as pavements, sidewalks, and buildings. A weighted c value was determined for each area as follows: Cw1 = (0. 3 x grass area) + (0. 9 x impervious area) Total Area An example of the runoff coefficient calculation for a total area of 13 acres with 10 acres of grass area and 3 acres of impervious area is as follows: cw1 = (0 .3 x JO acres) + (0 .9 x3 acres) = 0.44 13 acres An example of the rainfall run-off calculation for a 10-year storm intensity, using a runoff coefficient of 0.44 and a drainage area of 13.0 acres is a follows : QI O = cilOA = 0.44 x 8.6 x 13.0 = 49 .2 c.f.s. DRAINAGE SUMMARY DISCUSSION Off-Site Drainage Due to the location and limits of the Phase II portion of this overall development, the Hudson Creek waterway prevents some of the upstream off-site storm water from directly affecting this site. See Appendix A for FEMA flood map of this area and Appendix B for the USGS topographic quadrangle map of the vicinity. However, within a portion of the limits of this phase of development there is a swale located near the center of the north property line that has been eroded from off-site storm water entering the overall tract of land. Proposed storm sewer System "A" is designed to carry this off-site storm water underground from the north side of this site to its outfall at the southern side of the site . See Appendix D for a layout of System "A". This system will also drain on-site runoff within the Phase II area. K:\00675\6 75-02RB \Report\Drainage Report Phase II.doc Page6 Veterans Park and Athletic Complex -Phase II Drainage Plan On-Site Drainage Since this area is being developed as a park, the overall drainage design concept was to allow the on-site storm water to flow as close to its natural conditions as possible. Therefore, the use of both large and small swales was employed and general overland flow to allow the storm water to enter the adjacent Carters Creek flood plain. However, it was not possible to accommodate all of the storm water within grass-lined swales because of the need to oblige both vehicular and pedestrian traffic. Where necessary, the use of reinforced concrete pipe, PVC pipe, and inlets has been used to collect and carry the storm water from the roadway, parking lots and grass areas around the buildings. The water carried within these closed system storm sewers will then be released into either existing or proposed swales on the site to then be directed and dispersed into the Carters Creek flood plain. Appendix C is an illustration of the entire site showing the existing Phase I development, the proposed grading and layout of Phase II and the proposed future development. The 100-year flood plain boundary is also shown. Carter Creek water surface elevations of 254.0 for the 10- year storm and 255.5 for the 100-year storm were used as the tail water elevations for the design and analysis of System "A". These floodwater elevations were obtained from the City of College Station. Note that the storm water discharge enters the Carters Creek floodwater prior to crossing any adjacent property lines. SUMMARY OF DESIGN FEATURES The following is a general summary of the storm sewer elements and culverts that have been included in the Phase II design. Two different TxDOT computer software programs were utilized for the design of this projects drainage features . WinStorm version 3.05 was used for the design of storm sewer Systems "A", "B", "G" and to size the curb inlets for System "C". Results of the WinStorm computer runs are shown in Appendices G through 0. Inlet sizes are denoted in the charts labeled "Inlet Configuration Data." Storm sewer pipe sizes are shown in the charts labeled "Conveyance Configuration Data." WinStorm allows the input of critical elevations at each of the inlets and junction boxes and uses this information in its analysis of the hydraulic grade line. The critical elevations were set 0.5 feet below the inlet opening elevation. The WinStorm 10-year analysis shows that the hydraulic grade lines for each system are below the critical elevations, thus meeting the City of College Station's design criteria. The 100-year analysis of these storm sewer systems does show that some pipe run capacities and critical elevations are exceeded, which is to be expected. A review of these locations determined that the storm water would exit the top of the inlets, spread out and flow either overland or along swales and enter Carters Creek without any impact to the building structures. K:\00675 \6 75-02RB\Report\Drainage Re port Phas e II.doc Page 7 Veterans Park and Athletic Complex -Phase II Drainage Plan Texas Hydraulic Systems CULVERT version 1.2 was used for the culvert design and analysis. Since there were several culverts involved with this project, only the CUL VERT results for the major culvert D40, which passes beneath Veterans Parkway, is shown in Appendix K as an example of the analysis procedure. All proposed culverts are shown in Appendix F. These culvert pipes were designed to have exit velocities less than 6.0 feet per second for the 10-year storm design. All of these culverts are designed to have slope end treatments (SETs) used on both ends . These SETs were used instead of headwalls to provide a more gradual slope that would be easier to maintain and minimize the slope gradients around the ends of the pipe, thus reducing the potential of erosion. K:\00675 \675-02RB\Re port\Drainage Report Phase II.doc Page8 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIX A FEMA Map Nos. 48041C0161 C & 48041C0142 C With Site Illustrated K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page9 City of College Station 480083 Q ZONE X ZONE X Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXB USGS Quadrangle Topographic Map of the Site K :\00675\675-02RB\Report\Drainage Report Phase II.doc Page 11 / / .. 159 17'30" 0 I MILE Veterans Park and Athletic Complex -Phase II K :\00675\675-02RB\Report\Drainage Report Phase II.doc APPENDIXC Overall Site Layout Drainage Plan Page 13 Veterans Park and Athletic Complex-Phase II APPENDIXG Winstorm Results for 10-Year Storm Design for Storm Sewer System "A" K:\006 75\675-02RB\Repo rt\Drainage Re port Pha se II .doc Drainage Plan Page 21 Veterans Park and Athletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Run® 11/4 /2005 7:1 2:36 AM Version 3.05, Jan . 25, 2002 PROJECT NAME : VPAC PH II JOB NUMBER 675.02RB PROJECT DESCRIPTION : Storm Sewer Line A 10 YR Design ANALYSYS FREQUENCY : 10 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years ID A-10 A-20 A-30 A-40 A-50 A-60 A-70 A-80 A-90 A-95 A-94 A-97 Inlet ID A-10 A-20 A-30 A-40 A-50 A-60 A-70 A-80 A-90 A-95 A-94 A-97 Runoff Computation for Design Frequency. C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) 0.63 0.33 0.45 0.45 0.33 0.9 0.9 0.33 0.9 0.47 0.45 0.9 10.70 5.70 0.40 0.40 8.10 0.20 0.20 1. 80 0.10 0.70 0.40 0 .10 29.90 14.80 10.00 10.00 16.10 10.00 10 .00 11 . 90 10.00 10 .00 10 .00 10 .00 29.90 14.80 10.00 10.00 16.10 10.00 10.00 11. 90 10.00 10.00 10.00 10.00 4.95 7.24 8.63 8.63 6.95 8.63 8.63 8.01 8 .63 8.63 8.63 8.63 Sag Inl ets Configuration Data . 0.000 0 .0 00 0.000 0.000 0.000 0 .000 0.000 0 .00 0 0.000 0.000 0.000 0 .0 00 Inlet Length/ Grate Type Perim. Area (ft) (sf) Left-Slope Long Trans (%) (%) Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) Depth Allowed (ft) Grate 20.00 Grate 12.00 Grate 8.00 Grate 8.00 Grate 17.00 Curb 5.00 Curb 5.00 Curb 10 .00 Curb 5.00 Grate 12.00 Grate 8.00 Grate 8.00 10 .0 0 25.0025.00 3.30 0.50 2.00 1.50 0.50 2.00 1.50 0 .5 0 2.00 6.60 0.50 2.00 n/a 0 .57 3.00 n/a 0.50 3.00 n/a 0.64 3 .00 n/a 0.56 3.00 3.30 0 .5 0 2.00 1.50 0 .50 2.00 1.50 0.50 2.00 25.00 25.00 0.024 0.50 2.00 0 .024 0 .5 0 2.00 0.024 0.50 2.00 0 .024 0.50 2.00 0 .014 0 .50 3.00 0.014 0.57 3.00 0 .014 0.56 3.00 0.014 0 .6 4 3.00 0.014 0.50 2.00 0 .014 0.50 2.00 0.014 0 .5 0 2.00 0.014 Sag Inlets Computation Data . n/a n/a n/a n/a n/a 1. 50 1. 50 1. 50 1. 50 n/a n/a n/a 2.00 2.00 0.50 0 .50 1. 00 0.50 0.50 0.50 0.50 1. 00 0.50 0.25 33.340 13.620 1.554 1.554 18.570 1.554 1.554 4.760 0.777 2.841 1.554 0 .777 Critic Elev. (ft) 271.06 264.10 265.50 265.50 260.50 260.89 260.89 260.78 260.78 258.50 260.42 262.00 ================================================================================ Inlet ID A-10 A-20 A-30 A-40 A-50 Inlet Type Grate Grate Grate Grate Grate Length Grate Perim Area (ft) (ft) (sf) n/a 20.00 10 .00 n/a 12.00 3.30 n/a 8 .00 1.50 n/a 8.00 1.50 n/a 17.00 6.60 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Total Q Inlet Capacity (cfs) (cfs) 33.340 13. 620 1.554 1 .554 18.570 76.008 25.082 5 .701 5 .701 35.472 Total Head (ft) 0.663 0.589 0 .158 0.158 0.500 Ponded Width Left Right (ft) (ft) 2. 71 19.60 8.70 8.70 18 .00 2. 71 19.60 8.70 8.70 18.00 Page 22 Ve tera ns Park and A thletic Com plex -Ph ase II Drainag e Plan A-60 A-7 0 A-80 A-90 A-95 A-94 A-97 Curb Curb Curb Curb Grate Grate Grate 5.00 5 .00 10.00 5 .00 n/a n /a n/a n/a n /a n/a n/a 1 2 .00 8 .00 8 .00 n/a n/a n/a n/a 3 .30 1 .50 1. 50 1.554 1 .554 4 .760 0 .777 2 .841 1 .554 0 .777 6.261 6.261 1 0 .327 6 .261 17 .736 5.7 0 1 3.087 0 .1 9 7 0.197 0.298 0.124 0 .181 0 .1 58 0.100 5.37 5.50 8 .00 4.17 8 .90 7.10 5 .45 Cumulative J u nctio n Discharge Computat i o n s Node I.D. A-10 A-20 A-30 A -40 A -48 A-49 A-50 A-60 A-70 A -71 A -72 A-80 A-90 A-91 A-95 A -96 A-94 A-9 7 OUT No de Type Weighted C-Value Grate 0.630 Grate 0.330 Grate 0 .450 Grate 0 .345 JnctBx 0 .522 JnctBx 0 .52 2 Grate 0.461 Curb 0. 464 Curb O. 468 JnctBx 0.468 JnctBx 0.468 Curb 0.330 Curb O . 460 JnctBx 0.460 Grate 0 .460 JnctBx 0.462 Gra t e 0 .450 Grate 0.90 0 Outlt 0 .462 Cumulat . Cumulat. Int e ns. Dr .Area Tc {acres) {min) {in/hr ) 10.70 5.70 0 .40 6.50 17 .20 17 .20 25.30 25.50 25.70 25 .70 25 .70 1. 80 27.60 27.60 28.70 28.80 0.40 0 .10 28 .80 29 .90 14.80 10.00 15 .3 0 30 .7 2 30 .72 31 .76 31 .82 31 .88 31.88 31.88 11 . 90 32 . 72 32. 72 3 3.05 33.3 9 10.00 10.00 33 .39 4 .95 7.2 4 8.63 7.12 4 .87 4 .87 4.77 4.77 4.76 4 .76 4 .76 8 .01 4 .69 4 .69 4 .66 4 .63 8 .63 8.63 4.63 User Supply Q cfs) 0 .000 0.000 0 .000 0.000 0.000 0 .000 0 .0 0 0 0.000 0.000 0 .000 0.000 0.000 0 .000 0 .000 0 .000 0 .000 0 .000 0 .000 0.000 Conveyance Configuration Data Node I .D . Flowl ine Elev. Additional Q in Node (cfs) 0.00 0.00 0 .00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0 0.00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00 us OS Run# us OS Shape # Span Rise Length Slope (ft) (ft) (ft) 10 A-10 2 0 A-20 30 A-30 40 A-40 50 A-48 60 A-4 9 70 A-50 80 A-60 90 A-70 100 A-71 110 A-7 2 120 A-80 130 A-90 140 A-91 150 A-95 160 A-96 170 A-94 180 A-97 A-48 A-40 A-40 A-48 A -49 A-50 A-60 A-70 A-71 A-72 A-90 A-90 A-91 A-95 A -96 OU T A-95 A-96 260 .90 261.33 261.83 26 0 .61 259 .01 256.60 256.16 255.98 255 .79 255 .39 254.87 256 .4 7 254.24 253.69 253.45 252 .62 258 .90 259 .50 K:\00675\675-02RB\Re port\Drainage Report Pha se II.doc 259 .11 260. 71 261. 71 260 .11 257.20 256.26 256 .08 255 .89 255.49 254 .97 254 .34 256 .34 253.79 253 .55 2 52 . 72 251.51 256 .05 253 .72 Ci rc 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Box 1 Box 1 Circ 1 Circ 1 0.00 3 .00 0.0 0 2.00 0.00 1.00 0.00 2 .00 0.00 3 .00 0 .0 0 3.50 0.00 3 .50 0.00 3 .50 0.0 0 3 .50 0 .0 0 3 .50 0.0 0 3.50 0.00 1.50 0 .00 3.50 0 .0 0 3.50 5 .00 2 .00 5.0 0 2.0 0 0.0 0 1.00 0 .00 1.00 {ft ) {ft) 358 .00 155.00 28.00 8 4.0 0 362 .00 97.00 24 .00 26.0 0 85.00 120.00 150 .00 26 .00 113.00 37 .00 156 .00 232.00 81.00 102 .00 0.50 0.40 0 .43 0 .60 0 .50 0.35 0.33 0 .35 0 .35 0 .35 0 .35 0.50 0.40 0.38 0 .47 0 .48 3 .52 5.68 5 .50 5.37 8.20 4 .07 8.90 7.10 5.45 Total Disch . (cfs) 33 .340 13 . 620 1 .554 15.967 43 .714 43 . 714 55.599 56.396 57.187 57.187 57.187 4.760 59 .506 59.506 6 1 .512 61.551 1 .554 0.777 61.551 n value {%) 0. 013 0.013 o. 011 0 .013 0. 013 0. 013 0. 013 0. 013 0 .013 0.013 0. 013 0 .013 0 .013 0.013 0.013 0.013 0 .011 0.013 Page 23 Veterans Park and Athletic Complex -Phase II Drainage Plan Conveyance Hydraulic Computations. Tailwater = 254.000 (ft) Hydraulic Gradeline Depth Run# US Elev OS Elev Fr.Slope Unif. Actual (ft) (ft) (%) (ft) (ft) 10* 263.19 262.08 0.250 1. 85 2.97 20 263.44 262.60 0 .3 62 1.56 1. 89 30 262 .66 262.60 0 .136 0.54 0.89 40 262.60 262.08 0 .498 1. 50 1. 97 50 262.08 260.34 0 .429 2.30 3.00 60 260.34 260 .00 0 .189 2.24 3 .50 70 26 0.00 259.67 0.305 2.73 3.50 80 259.67 259.33 0 .314 2 .73 3.44 90 259.33 258.82 0.323 2.73 3 .3 3 100 258.82 258.22 0.323 2.73 3.25 110 258 .22 257 .53 0.323 2.73 3 .19 120 257.76 257 .53 0.205 0.87 1.19 130 257.53 256.88 0.350 2 .6 8 3 .09 140 256.88 256.35 0.350 2.73 2.80 150* 256.35 255 .35 0 .454 1. 59 2.00 160* 255.35 254.00 0.454 1. 59 2.00 170* 260.39 256.35 0 .136 0.30 0 .30 180* 259.89 255.35 0 .048 0 .20 1. 00 Velocity Unif. Actual (f/s) (f/s) 7 .2 8 4.72 5.17 4.43 3.60 2.10 6.32 5.10 7 .53 6.18 6.71 4.54 6.89 5.78 6.99 5 .88 7 .09 6.05 7 .09 6.14 7.09 6.21 4.46 3 .15 7 .53 6.61 7.38 7.21 7 .72 6 .15 7. 72 6.16 7.81 7.81 6 .75 0.99 Q (cfs) 33.34 13 .62 1. 55 15.97 43.71 43 .71 55.60 56.40 57.19 57.19 57.19 4.76 59.51 59.51 61 .51 61.55 1. 55 0 .78 Cap (cfs) 47.17 14.31 2.76 17 .46 47 .17 59.57 58 .10 59 .20 59.78 59 .53 59.81 7 .4 3 63.50 61.90 62.48 63.18 7 .90 8 .49 June Loss (ft) 0.434 0.381 0 .034 0.202 0.297 0.160 0.259 0.269 0.284 0.293 0.299 0 .193 0 .340 0.404 0.294 0.294 1 .186 0.019 ===================================END============================================ * Super critical flow. NORMAL TERMINATION OF WINSTORM. Warning Messages for c urrent project: Runoff Frequency of: 10 Years Discharge decreased downstream node Id= A-49 Previous intensity used. Discharge decreased downstream node Id= A-71 Previous intensity used. Discharge decreased downstream node Id= A-72 Previous intensity used. Discharge decreased downstream node Id= A-91 Previous intensity used. Decreasing conduit size @ downstream Run# 150 K :\00675\675-02RB \Report\Drainage Report Phase II .doc Page 24 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXH Winstorm Results for 10-Year Storm Design with 100-Year Storm Analysis for Storm Sewer System "A" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 25 Veterans Park and Athletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3.05, Jan . 25, 2002 Run@ 11/4/2005 7:18:57 AM PROJECT NAME : VPAC PH II JOB NUMBER 675.02RB PROJECT DESCRIPTION : Storm Sewer Line A 100 YR Check ANALYSYS FREQUENCY 100 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 100 Years Runoff Computation for Design Frequency. ID C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) A-10 A-20 A-30 A-40 A-50 A-60 A-70 A-80 A-90 A-95 A-94 A-97 Inlet ID A-10 A-20 A-3 0 A-40 A-50 A-60 A-7 0 A-80 A-90 A-95 A-94 A-97 0.63 0.33 0.45 0.45 0.33 0.9 0.9 0.33 0.9 0.47 0.45 0.9 10.70 5.70 0.40 0.40 8.10 0.20 0.20 1. 80 0.10 0.70 0.40 0.10 29.90 14.80 10 .00 10.00 16.10 10 .00 10.00 11. 90 10.00 10.00 10.00 10 .00 29.90 14.80 10.00 10 .00 16.10 10.00 10.00 11. 90 10.00 10.00 10.00 10.00 6.76 9.79 11. 64 11. 64 9.41 11. 64 11. 64 10.82 11.64 11. 64 11. 64 11. 64 0.000 0 .0 00 0.000 0.000 0 .000 0 .000 0.000 0 .000 0 .000 0 .0 00 0.000 0.000 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim. Area (ft) (sf) Grate 20.00 Grate 12.00 Grate 8.00 Grate 8. 00 Grate 17.00 Curb 5.00 Curb 5.00 Curb 10.00 Curb 5 .00 Grate 12 .00 Grate 8 .00 Grate 8. 00 10.00 3.30 1. 50 1. 50 6.60 n/a n/a n/a n/a 3.30 1. 50 1. 50 Left-Slope Long Trans (%) (%) 25.0025.00 0.50 2.00 0.50 2.00 0 .5 0 2.00 0 .5 0 2.00 0.57 3.00 0.50 3.00 0.64 3.00 0.56 3.00 0.50 2.00 0.50 2.00 0.50 2.00 Right -S lope Long Trans (%) (%) Gutter n DeprW (ft) 25.00 25 .00 0 .024 0.50 2.00 0.024 0.50 2.00 0.024 0 .50 2.00 0 .024 0.50 2.00 0.014 0.50 3.00 0.014 0 .57 3.00 0.014 0.56 3.00 0.014 0.64 3.00 0.014 0.50 2.00 0.014 0.50 2.00 0.014 0.50 2.00 0 .014 n/a n/a n/a n/a n/a 1. 50 1. 50 1. 50 1. 50 n/a n/a n/a Sag Inlets Computation Data. Depth Allowed (ft) 2.00 2.00 0.50 0 .5 0 1. 00 0.50 0.50 0.50 0.50 1. 00 0.50 0.25 45.561 18 .423 2.095 2.095 25.142 2.095 2.095 6.425 1.048 3.829 2.095 1. 048 Critic Elev. (ft) 273.75 264.60 266.00 266.00 261.00 261. 39 261. 39 261.28 261.28 259.00 260.92 262.50 ================================================================================ Inlet ID A-10 A-20 A-30 A-40 Inlet Type Grate Grate Grate Grate Length (ft) Grate Perim Area (ft) (sf) n/a 20.00 10 .00 n/a 12.00 3.30 n/a 8.00 1.50 n/a 8.00 1.50 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Total Q Inlet Capacity (cfs) (cfs) 45 .561 18 .423 2.095 2.095 76.008 25.082 5.701 5 .701 Total Head (ft) 0.817 1.078 0.193 0.193 Ponded Width Left (ft) 3.06 21.95 9.70 9.70 Right (ft) 3.06 21.95 9 .70 9.70 Page 26 Veterans Park and Athletic Complex -Phase II Drainage Plan A-SO A-60 A-70 A-80 A-90 A-9S A-94 A-97 Grate Curb Curb Curb Curb Grate Grate Grate n/a S.00 S .00 10 .00 S .00 n/a n/a n/a 17.00 n/a n/a n/a n/a 12.00 8.00 8.00 6.60 n/a n/a n/a n/a 3.30 1. so 1. so 2S.142 2.09S 2.09S 6.42S 1.048 3.829 2.09S 1.048 3S.472 6.261 6.261 10.327 6.261 17.736 S .701 3.087 0.612 0.241 0.241 0.364 0 .1S2 0.220 0.193 0.122 20 .lS 6.00 6 .17 8.97 4.67 9 .9S 7.9S 6.10 Cumulative Junction Discharge Computations Node I.D. A-10 A-20 A-30 A-40 A-48 A-49 A-SO A-60 A-70 A-71 A-72 A-80 A -90 A -91 A-9S A-96 A-94 A-97 OUT us Node Type Weighted C-Value Grate 0.630 Grate 0.330 Grate 0.4SO Grate 0 .34S JnctBx O.S22 JnctBx O .S22 Grate 0.461 Curb 0.464 Curb O. 468 JnctBx 0.468 JnctBx 0 .468 Curb O. 330 Curb 0. 460 JnctBx 0.460 Grate 0.460 JnctBx 0 .462 Grate 0.4SO Grate 0.900 Outlt 0. 462 DS Cumulat . Cumulat. Intens. Dr.Area (acres) 10.70 S .70 0.40 6.SO 17.20 17.20 2S.30 2S.SO 2S.70 2S .70 2S.70 1. 80 27 .60 27 .60 28 .70 28.80 0.40 0.10 28.80 Tc (min) 29 .90 14.80 10 .00 lS.24 30.69 30.69 31.63 31. 68 31.73 31 .73 31.73 ll. 90 32.46 32.46 32.7S 33.06 10.00 10 .00 33.06 (in/hr) 6 .76 9 .79 ll . 64 9.66 6 .66 6 .66 6.S4 6 .S4 6 .S3 6.S3 6 .S3 10.82 6.44 6 .44 6 .41 6 .37 ll . 64 ll . 64 6.37 User Supply Q cfs) 0.000 0 .000 0.000 0 .000 0.000 0 .000 0.000 0 .000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 0.000 0.000 0.000 Conveyance Configuration Data Run# us Node I.D. Flowline Elev. DS Shape # Span Rise Additional Q in Node (cfs) 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0 .00 0.00 0 .00 0 .00 0.00 0.00 0 .00 0 .00 0 .00 0 .00 0.00 0.00 Length Slope (ft) (ft) (ft) (ft) (ft) 10 A-10 20 A-20 30 A-30 40 A-40 SO A-48 60 A-49 70 A-SO 80 A-60 90 A-70 100 A-71 llO A-72 120 A-80 130 A-90 140 A-91 lSO A-9S 160 A-96 170 A-94 180 A-97 A-48 A-40 A-40 A-48 A-49 A-SO A-60 A-70 A-71 A-72 A-90 A-90 A-91 A-9S A-96 OUT A-9S A-96 260.90 261.33 261.83 260.61 2S9.0l 2S6.60 2S6 .16 2SS.98 2SS.79 2SS .39 2S4.87 2S6.47 2S4 .24 2S3.69 2S3.4S 2S2.62 2S8.90 2S9.SO K:\00 675\675-02RB\Report\Drainage Report Phase II.doc 2S9. ll 260. 71 261.71 260.11 2S7.20 2S6.26 2S6.08 2SS.89 2SS.49 2S4.97 2S4.34 2S6.34 2S3.79 2S3 .SS 2S2.72 2Sl.Sl 2S6.0S 2S3.72 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Circ 1 Box 1 Box 1 Circ 1 Circ 1 0.00 3.00 0.00 2.00 0.00 1.00 0.00 2.00 0.00 3.00 0.00 3.SO 0.00 3.SO 0 .00 3 .SO 0.00 3 .SO 0 .00 3.SO 0.00 3 .SO 0.00 l.SO 0.00 3 .SO 0 .00 3 .SO S.00 2 .00 S.00 2 .00 0.00 1.00 0 .00 1.00 3S8.00 lSS.00 28 .00 84.00 362 .00 97 .00 24.00 26.00 8S.OO 120.00 lS0.00 26.00 ll3. 00 37.00 1S6.00 232.00 81.00 102.00 o.so 0.40 0.43 0.60 o.so 0.3S 0.33 0.3S 0.3S 0.3S 0.3S o.so 0.40 0.38 0.47 0 .48 3.S2 S .68 20.lS 6.17 6.00 9.20 4.S3 9 .9S 7.9S 6.10 Total Disch . (cfs) 4S.S61 18.423 2.09S 21. 64S S9.798 S9 .798 76.247 77.3S3 78.4Sl 78.4Sl 78.4Sl 6.42S 81.829 81 .829 84.661 84. 772 2.09S 1. 048 84.772 n value (%) 0. 013 0 . 013 0. Oll 0. 013 0. 013 0. 013 0.013 0. 013 0. 013 0. 013 0. 013 0. 013 0. 013 0. 013 0.013 0.013 0. Oll 0.013 Page 27 Veterans Park and Athletic Complex -Phase II Drainage Plan Run# 10 20 30 40 50 60 70 80 Conveyance Hydraulic Computations. Tailwater = 255.500 (ft) Hydraulic Gradeline Depth US Elev OS Elev Fr.Slope Unif. Actual (ft) (ft) (%) (ft) (ft) 273 .64 274.00 272.43 272.31 271.17 267.70 267.06 266.43 271 .1 7 272.31 272.31 271.17 267.70 267.06 266.43 265.78 0.466 0.663 0 .248 0 . 915 0.804 0.353 0.574 0.591 2.39 2.00 0.66 2.00 3.00 2.84 3.50 3.50 3.00 2.00 1. 00 2.00 3.00 3.50 3.50 3.50 Velocity Unif. Actual (f/s) (f/s) 7.54 5.86 3.83 6.89 8.46 7.14 7 .92 8.04 6.45 5.86 2.67 6.89 8.46 6.22 7.92 8.04 Q (cfs) 45 .56 18 .4 2 2.10 21.64 59.80 59.80 76.25 77.35 Cap (cfs) 47.17 14.31 2.76 17.46 47.17 59.57 58.10 59.20 June Loss (ft) 0.807 0.668 0.055 0.369 0.556 0.300 0.488 0.502 90 265.78 264.74 0.608 3.50 3.50 8 .15 8.15 78.45 59.78 0.517 100 264.74 263 .50 0.608 3.50 3 .50 8.15 8 .15 78.45 59.53 0.517 110 263.50 262.07 0.608 3.50 3.50 8.15 8.15 78.45 59.81 0.517 120 262.42 262.07 0 .374 1.08 1.50 4.73 3.64 6 .43 7.43 0.257 130 262.07 260.76 0.661 3.50 3 .5 0 8.51 8.51 81 .83 63.50 0.562 140 260.76 259.95 0.661 3.50 3.50 8.51 8.51 81 .83 61.90 0.562 150 259.95 258.06 0.859 2.00 2.00 8 .47 8.47 84.66 62.48 0.557 160 258.06 255.50 0.861 1.98 2.00 8 .54 8.48 84.77 63.18 0.558 170* 260.29 259.95 0 .248 0.35 1.00 8.50 2.67 2.10 7 .9 0 0.138 180* 259.97 258.06 0.086 0.24 1.00 7.34 1.33 1.05 8.49 0.035 ===================================END============================================ * Super critical flow. NORMAL TERMINATION OF WINSTORM. Warning Messages for current project : Runoff Frequency of: 100 Years Computed right ponded width exceeds allowable width at inlet Id= A-20 Computed left ponded width exceeds allowable width at inlet Id= A-20 Discharge decreased downstream node Id= A-49 Previous intensity used . Discharge decreased downstream node Id= A-71 Previous intensity used . Discharge decreased downstream node Id= A-72 Previous intensity used. Discharge decreased downstream node Id= A-91 Previous intensity used. Decreasing conduit size @ downstream Run# 150 Run# 160 Insufficient capacity. Run# 150 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-95 Run# 140 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-91 Run# 130 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-90 Run# 110 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-72 Upstream hydraulic gradeline exceeds critical elevation at node Id= A-80 Run# 100 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-71 Run# 90 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-70 Run# 80 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-60 Run# 7 0 Insufficient capacity . Upstream hydraulic gradeline exceeds critical elevation at node Id= A-50 Run# 60 Insufficient capacity . Upstream hydraulic gradeline exceeds critical elevation at node Id= A-49 Run# 50 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-48 Run# 40 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-40 Run# 20 Insufficient capacity. Upstream hydraulic gradeline exceeds critical elevation at node Id= A-2 0 Upstream hydraulic gradeline exceeds critical elevation at node Id= A-30 K:\00675\675-02RB\Report\Drainage Report Phase II.doc P age 28 Veterans Park and Athletic Complex-Phase II APPENDIX I Winstorm Results for 10-Y ear Storm Design for Storm Sewer System "B" K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Drainage Plan Page 29 Veterans Park and Athletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3.05, Jan. 25, 2002 Run® 10/14/2005 9:11:03 AM PROJECT NAME : VPAC PH II JOB NUMBER 675 .02RB PROJECT DESCRIPTION : Storm Sewer Line B 10 YR Design ANALYSYS FREQUENCY 10 Years MEASUREMENT UNITS : ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Runoff Computation for Design Frequency . ID C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) B-10 B-20 B-25 B-30 B-40 B-50 B-55 B-60 B-65 B-70 B-75 Inlet ID B-10 B-20 B-25 B-30 B-40 B-50 B-55 B-60 B-65 B-70 B-75 0.39 0.9 0 .9 0 .9 0 .9 0.9 0.9 0.9 0.9 0.7 0 .4 1.30 0.05 0 .05 0.05 0.05 0.05 0.05 0.05 0.05 0.20 0 .54 10.00 10.00 10 .00 10.00 10.00 10.00 10.00 10 .00 10 .00 10 .00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 8 .63 8.63 8.63 8.63 8.63 8.63 8.63 8 .63 8.63 8.63 8.63 0.000 0.000 0 .000 0 .000 0.000 0.000 0 .000 0 .000 0.000 0.000 0.000 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim . Area (ft) (sf) Grate 12 .00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8 .00 Grate 8.00 Grate 8.00 Grate 8.00 Grate 8.00 Curb 10.33 Curb 10.33 3.30 1. 50 1. 50 1. 50 1. 50 1. 50 1. 50 1. 50 1. 50 n/a n/a Left -Slope Long Trans (%) (%) 0.50 2.00 0.50 2.00 0.50 2.00 0.50 2.00 0.50 2.00 0.50 2.00 0.50 2.00 0 .50 2.00 0 .5 0 2.00 2 .00 2.00 2.00 2.00 Right -Slope Long Trans (%) (%) Gutter n DeprW (ft) 0.50 2.00 0.014 0.50 2.00 0 .014 0 .5 0 2.00 0.014 0.50 2.00 0.014 0 .50 2.00 0 .014 0 .50 2.00 0 .014 0.50 2.00 0.014 0.50 2.00 0.014 0.50 2.00 0.014 2 .00 2.00 0.014 2.00 2 .00 0.014 n/a n/a n/a n/a n/a n/a n/a n/a n/a 2.00 2.00 Sag Inlets Computation Data. Depth Allowed (ft) 1. 00 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.46 0.46 4.378 0 .350 0 .350 0 .389 0 .389 0.389 0.389 0 .389 0.389 1.209 1.865 Critic Elev . (ft) 264.50 267.20 267 .20 267.46 266.66 266.50 266.50 266.50 266.50 266.20 263.50 ================================================================================ Inlet ID B-10 B-20 B-25 B-30 B-40 B-50 Inlet Type Grate Grate Grate Grate Grate Grate Length Grate Perim Area (ft) (ft) (sf) n/a 12.00 n/a 8.00 n/a 8.00 n/a 8.00 n/a 8.00 n/a 8.00 3.30 1. 50 1. 50 1. 50 1. 50 1. 50 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Total Q Inlet Capacity (cfs) (cfs) 4.378 0.350 0 .3 50 0.389 0.38 9 0.389 17.736 5.701 5.701 5 .701 5 .701 5.701 Total Head (ft) 0.241 0 .059 0.059 0.063 0.063 0.063 Ponded Width Left (ft) 10 .45 4.05 4.05 4.20 4.20 4.20 Right (ft) 10.45 4 .05 4 .05 4.20 4.20 4.20 Page 30 Veterans Park and Athletic Complex-Phase II Drainage Plan 8-55 8-60 8-65 8-70 8-75 Grate Grate Grate Curb Curb n/a n/a n/a 10.33 10.33 8.00 1.50 8.00 1.50 8.00 1 .50 n/a n/a n/a n/a 0.389 0.389 0.389 1. 209 1.865 5.701 5.701 5.701 9.996 9.996 0.063 0 .063 0 .063 0 .112 0.150 4.20 4.20 4.20 5.00 5.85 4.20 4.20 4.20 5.00 5.85 Node I.D. 8-10 8-20 8-25 8-30 8-40 8-50 8 -55 8-60 8-65 8-66 8-70 8-71 8-75 OUT 10 20 25 30 35 40 45 50 55 60 65 70 75 Cumulative Junction Discharge Computations Node Type Weighted C-Value Grate 0.390 Grate 0.900 Grate 0.900 Grate 0.440 Grate 0.455 Grate 0.508 Grate 0.900 Grate 0 .900 Grate 0.900 Jnct8x 0.508 Curb 0.528 Jnct8x 0.528 Curb O. 500 Outlt 0.500 Cumulat. Cumulat. Intens. Dr.Area (acres) 1. 30 0 .05 0 .09 1. 44 1. 49 1. 69 0.15 0.10 0 .05 1.69 1. 89 1. 89 2.43 2 .43 Tc (min) 10.00 10 .00 10 .13 11. 48 11.75 11. 89 10 .28 10 .11 10 .00 11 . 89 12.42 12.42 13. 53 13. 53 (in/hr) 8.63 8.63 8.59 8.14 8.06 8.02 8.53 8.60 8.63 8.02 7.86 7 .86 7.56 7.56 User Supply Q cfs) 0.000 0.000 0.000 0 .0 00 0 .000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Conveyance Conf igu ration Data Node I.D . Flowline Elev. Additional Q in Node (cfs) 0.00 0.00 0.00 0.00 0 .00 0 .00 0.00 0.00 0.00 0 .00 0 .00 0.00 0.00 0 .00 us OS Run# us DS Shape # Span Rise Length Slope 8 -10 8 -20 8-25 8-30 8 -40 8-65 8-60 8 -55 8-50 8 -66 8-70 8-71 8-75 8-30 8-25 8-30 8-40 8-50 8-60 8-55 8-50 8-66 8-70 8-71 8-75 OUT 262 .72 263.89 263 .17 261.87 261.59 264.52 263.98 262.90 261.40 261 .03 260.25 259.68 258.10 (ft) (ft) (ft) 261.97 263.27 262.47 261.69 261.50 264.08 263.00 262.00 261 .13 260.35 259.78 258.20 257.63 Circ 1 0.00 1.50 Circ 1 o.oo 1.00 Circ 1 0.00 1.00 Circ 1 o.oo 1.50 Circ 1 0.00 1.50 Circ 1 0.00 1 .00 Circ 1 0.00 1.00 Circ 1 0.00 1.00 Circ 1 0.00 1.50 Circ 1 0.00 1 .50 Circ 1 0.00 1.50 Circ 1 0.00 1 .5 0 Circ 1 o.oo 1 .5 0 (ft) (ft) 300.00 31.00 35.00 60.00 31.00 26.00 49.00 45.00 41.00 121.60 78.10 264.00 61.00 0.25 2.00 2.00 0.30 0 .2 9 1. 69 2.00 2.00 0.66 0 .56 0.60 0.56 0.77 Conveyance Hydraulic Computations. Tailwater = 252.107 (ft) Total Disch . (cfs) 4.378 0.350 0.696 5.154 5.464 6.879 1 .152 0.774 0.389 6.879 7 .8 45 7.845 9 .174 9.174 n value (%) 0 . 013 0. 011 0. 013 0 .013 0. 013 0 .011 0 . 013 0.013 0. 013 0 .013 0. 013 0.013 0. 013 ================================================================================== Run# 10 20 25* 30 35 40* 45* Hydraulic Gradeline Depth US Elev OS Elev Fr .Slope Unif. Actual (ft) (ft) (%) (ft) (ft) 263.95 264.39 263.44 263. 11 262.87 264.76 264.41 263.11 0.174 263 .44 0 .007 263 .11 0 .038 262.87 0 .241 262.60 0.271 264.41 0.009 263.27 0.047 1. 03 0.17 0.25 1.10 1.17 0 .18 0.26 1.14 0.17 0.64 1.18 1.17 0.33 0.27 K:\00675 \6 75-02R8 \Report\Drainage Report Phase II.d oc Velocity Unif. Actual (f/s) (f/s) 3.38 4.12 4.51 3. 71 3.69 4.02 4 .65 3 .03 4.12 1. 30 3 .46 3.69 1. 74 4.56 Q (cfs) 4.38 0.35 0.70 5.15 5.46 0 .39 0.77 Cap (cfs) June Loss (ft) 5.25 0.178 5.96 0.330 5.04 0.013 5.75 0 .093 5.66 0.106 5.48 0.059 5.04 0.162 Page 31 Veterans Park and Athletic Complex -Phase II Drainage Plan 50* 263 .27 262 .60 0 .105 0.33 0.60 5.20 2 .35 1.15 5.04 0.043 55 262 .60 262 .26 0 .429 1. 02 1 .13 5.38 4 .80 6.88 8.53 0 .179 60 262 .26 261.63 0.429 1. 09 1. 28 5 .00 4.27 6.88 7.86 0.142 65 261.63 261.07 0.558 1.18 1.29 5 .25 4.85 7.85 8.15 0.182 70 261.07 259.60 0.558 1. 22 1. 40 5 .10 4 .58 7 .85 7 .87 0.163 75 259.60 258.85 0.763 1. 22 1. 22 5.97 5 .97 9 .17 9.22 0.277 ===================================END============================================ * Super critical flow. NORMAL TERMINATION OF WINSTORM. Warning Messages for current project: Runoff Frequency of : 10 Years Discharge decreased downstream node Id= B-66 Previous intensity used. Discharge decreased downstream node Id= B-71 Previous intensity used . Tailwater set to uniform depth elevation= 258.85(ft) K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 32 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXJ Winstorm Results for 10-Year Storm Design with 100-Year Storm Analysis for Storm Sewer System "B" K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page 33 Veterans Park and Athletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3 .05, Jan . 25, 2002 Run @ 10/17/2005 7:40:32 AM PROJECT NAME : VPAC PH II JOB NUMBER 675.02RB PROJECT DESCRIPTION : Storm Sewer Line B 100 YR Check ANALYSYS FREQUENCY 100 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of : 100 Years Runoff Computation for Design Frequency. ID C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) B-10 B-20 B-25 B-30 B-40 B-50 B-55 B-60 B-65 B-70 B-75 0 .39 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0 .7 0 .4 1. 30 0 .05 0.05 0.05 0 .05 0.05 0 .05 0.05 0.05 0 .20 0 .54 10 .00 10 .00 10.00 10 .00 10.00 10.00 10.00 10.00 10.00 10 .00 10.00 10 .00 10 .00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 11 . 64 11. 64 11. 64 11. 64 11. 64 11. 64 11. 64 11.64 11 . 64 11. 64 11. 64 Sag Inlets Configuration Data. 0.000 0 .000 0 .000 0.000 0 .000 0 .000 0.000 0.000 0.000 0.000 0 .000 5.901 0 .471 0. 471 0 .524 0.524 0.524 0 .524 0 .524 0 .524 1.629 2 .514 Inlet ID Inlet Length/ Grate Type Perim. Area (ft) (sf) Left-Slope Long Trans (%) (%) Right -Slope Long Trans (%) (%) Gutter n DeprW (ft) Depth Allowed (ft) Critic Elev. (ft) B-10 B-20 B-25 B-30 B-40 B-50 B-55 B-60 B-65 B-70 B-75 Grate 12.00 Grate Grate Grate Grate Grate Grate Grate Grate Curb Curb 8.00 8.00 8.00 8.00 8.00 8 .00 8 .00 8.00 10.33 10.33 Inlet ID Inlet Type B-10 B-20 B-25 B-30 B-40 B-50 Grate Grate Grate Grate Grate Grate 3.30 1. 50 1. 50 1. 50 1. 50 1. 50 1. 50 1 .50 1. 50 n/a n/a 0 .50 2 .00 0.50 2.00 0.50 2 .00 0.50 2 .00 0.50 2.00 0.50 2.00 0 .50 2.00 0 .50 2.00 0.50 2.00 2 .00 2.00 2.00 2.00 0 .50 2.00 0 .014 n/a 0.50 2.00 0.014 n/a 0.50 2.00 0.014 n/a 0.50 2.00 0.014 n/a 0.50 2.00 0.014 n/a 0.50 2.00 0.014 n/a 0.50 2.00 0.014 n/a 0.50 2 .00 0.014 n/a 0 .50 2.00 0.014 n/a 2 .00 2.00 0 .014 2 .00 2.00 2.00 0.014 2.00 Sag Inlets Computation Data . Length Grate Perim Area (ft) (ft) (sf) n/a 12.00 n/a 8.00 n/a 8 .00 n/a 8 .00 n/a 8.00 n/a 8 .00 3.30 1. 50 1. 50 1. 50 1.50 1. 50 Total Q Inlet Capacity (cfs) (cfs) 5.901 0. 471 0 . 471 0.524 0.524 0.524 17.736 5.701 5.701 5.701 5.701 5.701 Total Head (ft) 0 .294 0. 071 0. 071 0.077 0.077 0.077 K:\00 675 \675-02RB \Re port\Drainage Report Phase II.doc 1. 00 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.46 0 .46 264.50 267.20 267.20 267.46 266.66 266.50 266.50 266.50 266.50 266.20 263 .50 Ponded Width Left Right (ft) (ft) 11. 70 4.55 4 .55 4.70 4 .70 4.70 11 . 70 4 .55 4.55 4 .70 4 .70 4.70 Page 34 Veterans Park and Athletic Complex -Phase II Drainage Plan B-55 B-60 B-65 B-70 B -75 Grate Grate Grate Curb Curb n/a n/a n/a 10 .33 10 .33 8.00 1 .50 8.00 1.50 8.00 1.50 n/a n/a n/a n/a 0 .524 0 .524 0.524 1.629 2.514 5.701 5.701 5.701 9.996 9 .996 0.077 0.077 0.077 0 .137 0.183 4.70 4.70 4.70 5.55 6.55 4.70 4.70 4.70 5 .55 6.55 Node I.D. B -10 B -20 B-25 B -30 B -40 B -50 B -55 B -60 B-65 B-66 B-70 B -71 B -75 OUT 10 20 25 30 35 40 45 50 55 60 65 70 75 Run# 10 20* 2 5* 30 35 40* 45* Cumulative Junction Discharge Computations Node Type Weighted C-Value Grate 0 .3 9 0 Grate 0 .900 Grate 0.9 00 Grate 0 .440 Grate 0 .455 Grate 0 .508 Grate 0.900 Grate 0 .900 Grate 0.900 JnctBx 0 .508 Curb 0.528 JnctBx 0.528 Curb 0 .500 Outlt 0 .500 Cumulat . Cumulat. Intens. Dr .Area (acres) 1. 30 0 .05 0 .09 1 .44 1. 49 1. 69 0.15 0.10 0.05 1.69 1. 89 1. 89 2.43 2.43 Tc (min) 10.00 10.00 10 .11 11. 50 11. 75 11. 88 10.26 10 .10 10 .00 11. 88 12 .39 12.39 13. 34 13.34 (i n /hr) 11 . 64 11. 64 11. 59 10 .98 10.88 10.83 11. 52 11 . 59 11. 64 10.83 10 .63 10.63 10 .28 10 .28 User Supply Q cfs) 0 .000 0 .000 0.000 0.000 0.000 0.000 0 .000 0.000 0.000 0.000 0.000 0.000 0.000 0 .000 Conveyance Configuration Data Node I .D. Flowline Elev. Additional Q in Node (cfs) 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 0 .00 0.00 0.00 0.00 0.00 Total Disch. (cfs) 5 .901 0 .471 0.938 6.950 7.374 9 .289 1.555 1.043 0.524 9.289 10.605 10.605 12 .479 12.479 us OS Run# us OS Shape # Span Rise Length Slope n value (%) B-10 B-20 B -25 B-30 B-40 B-65 B-60 B -55 B-50 B-66 B-70 B-71 B-75 B-30 B-25 B-30 B-40 B-50 B-60 B-55 B-50 B-66 B-70 B-71 B-75 OUT 262 . 72 263.89 263 .17 261.87 261 .59 264 .52 263.98 262.90 261.40 261.03 260.25 259.68 258 .10 (ft) (ft) (ft) 261.97 263.27 262.47 261.69 261.50 264.08 263.00 262 .00 261 .13 260 .35 259 .78 258.20 257.63 Circ 1 o .oo 1 .50 Circ 1 0.00 1 .00 Circ 1 0.00 1.00 Circ 1 0.00 1.50 Circ 1 0.00 1.50 Circ 1 o.oo 1.00 Circ 1 0.00 1.00 Circ 1 0 .00 1.00 Circ 1 0 .00 1.50 Circ 1 0 .00 1.50 Circ 1 0.00 1.50 Circ 1 0.00 1.50 Circ 1 0.00 1.50 (ft) (ft) 300.00 31.00 35.00 60.00 31.00 26.00 49.00 45.00 41.00 121.60 78.10 264.00 61.00 0 .25 2 .00 2.00 0 .30 0.29 1. 69 2 .00 2.00 0 .66 0 .56 0.60 0 .56 0 .77 0. 013 0 .011 0 .01 3 0.01 3 0 .013 0 . 011 0. 013 0 . 013 0. 013 0 .013 0. 013 0 .013 0.013 Conveyance Hydraulic Computations. Tailwater = 252.128 (ft) Hydraulic Gradeline Depth US Elev OS Elev Fr.Slope Unif . Actual (ft ) (ft) (%) (ft) (ft) 267 .96 266.84 2 66 .83 266 .80 266 .41 266.31 266.30 266.80 0 .316 266.83 0.013 266 .80 0 .069 266.41 0.438 266 .12 0.493 266.30 0.015 266 .24 0.086 1. 50 0.19 0.29 1. 50 1. 50 0.21 0 .31 1. 50 1. 00 1. 00 1. 50 1. 50 1. 00 1. 00 Velocity Unif . Actual (f/s) (f/s) 3.34 4.52 4.92 3 .93 4 .17 4.40 5.06 3.34 0.60 1.19 3 .93 4.17 0.67 1. 33 Q (cfs) 5 .90 0.47 0 .94 6 .95 7 .37 0.52 1. 04 Cap (cfs) June Loss (ft) 5.25 0.217 5.96 0 .007 5.04 0.011 5 .75 0.120 5.66 0.135 5.48 0.009 5 .04 0 .014 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page 35 Veterans Park and Athletic Complex -Phase II Drainage Plan 50* 266 .24 266.12 0.190 0.38 1. 00 5.66 1. 98 1. 55 5.04 0.030 55 266.12 265 .59 0 .782 1. 50 1. 50 5 .26 5.26 9.29 8.53 0 .215 60 265.59 264.42 0.782 1. 50 1. 50 5.26 5.26 9.29 7.86 0.215 65 264.42 263 .35 1.019 1.50 1.50 6.00 6.00 10.61 8.15 0.280 70 263 .35 260.38 1 .019 1. 50 1. 50 6.00 6.00 10 .61 7.87 0 .280 75 260.38 259 .13 1 . 411 1. 50 1. 50 7.06 7.06 12 .48 9 .22 0.387 ===================================END ============================================ * Super c r itical flow. NORMAL TERMINATION OF WINSTORM. Warning Me ssages for current project: Ru noff Frequency of: 100 Years Discharge decreas e d downstream node Id= B-66 Previous intensity used . Discharge decreased downstream node Id= B-71 Previous intensity used. Tailwater set to uniform depth elevation = 259 .13(ft} Ru n# 75 Insufficient capacity . Run# 70 I nsufficient capacity . Run# 65 Insuffi c ient capacity . Run# 60 Insufficient capacity . Run# 55 Insufficient capacity . Run# 35 Insufficient c apacity. Run# 30 I nsufficient capacity. Run# 10 Insufficient capacity . Upst r eam hydrauli c gradeline exceeds critical elevation at node Id= B-10 K:\00675 \675-02RB \Report\Drainage Report Phase II.doc Page 36 Veterans Park and Athletic Complex -Phase II APPENDIXK Winstorm Results for 10-Year Inlet Design for ClO & C20 and CULVERT Results for 10-Year Culvert Design for D40 K:\00675 \675-02RB\Report\Drainage Report Phase II .doc Drainage Plan Page 37 Veterans Park and Athletic Complex -Phase II WinStorm (STORM DRAIN DESIGN} PROJECT NAME : VPAC Ph II JOB NUMBER 67S .02 RB Drainage Plan Version 3.0S, Jan . 2S, 2002 Run @ ll/4/200S 11 :18:S7 AM PROJECT DESCRIPTION : Curb Inlet Analysis for Major Culv Xing Vet Prkwy ANALYSYS FREQUENCY MEASUREMENT UNITS : 10 Years ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Runoff Computation for Design Frequency. ID C-10 C-20 D-40 C Value 0.9 0.9 0 .44 Area (acre} 0.20 0.20 12.69 Tc (min} 10.00 10 .00 27.70 Tc Used (min} 10.00 10.00 27.70 Intensity (in/hr) 8 .63 8.63 S .17 Sag Inlets Configuration Data. Inlet ID Inlet Length/ Grate Type Perim. Area (ft} (sf} Left-Slope Long Trans (%) (%} Right-Slope Long Trans (%} (%} Supply Q (cfs) Total Q (cfs) 0.000 0.000 0.000 Gutter n DeprW (ft) 1. SS4 1. SS4 28 .887 Depth Allowed (ft} Critic Elev. (ft) C-10 C-20 Curb Curb S.00 S.00 n/a n/a a .so 3 .oo a .so 3 .00 a.so 3 .00 0.014 l.SO a.so 3 .oo 0.014 l.so a.so a.so 261. 33 261. 3S Sag Inlets Computation Data . Inlet ID C-10 C-20 Inlet Type Curb Curb Length Grate Perim Area (ft} (ft) (sf} S.00 S.00 n/a n/a n/a n/a NORMAL TERMINATION OF WINSTORM . K:\00675\675-02RB\Report\Drainage Report Phase II.doc Total Q Inlet Capacity (cfs) (cfs) l.SS4 1. SS4 6 .261 6 .261 Total Head (ft) 0.197 0.197 Ponded Width Left Right (ft} (ft) s.so s.so s.so s .so Page 38 Veterans Park and Athletic Complex -Phase II TEXAS HYDRAULIC SYSTEM, CULVERT (ver. 1.2. Feb/2002) Fri Nov 04 11:53:37 2005 CULVERT HYDRAULIC COMPUTATIONS CULVERT NAME: VetPrk2 PROJECT NAME: VPAC Phase II Input Units: English Output Units: English PROJECT CONTROL: 0675.02 RB COUNTY: Brazos County DESCRIPTION: Culvert for Veterans Parkway ANALYZE MULTIPLE OPENING MATERIAL: CONCRETE SHAPE: RCP CIRCULAR PIPE. ENTRANCE: MITER PROFILE: STRAIGHT CULVERT FREQUENCY: 10 Yr FREQUENCY: 100 Yr DISCHARGE: DISCHARGE: TAILWATER ELEVATION (computed). CULVERT 30.00 cfs 41.00 cfs n value: 0.0120 Ke value: 0.7000 CULVERT DIAM. = 2.00 ft INLET station: OUTLET station: 45.40 -42.56 Cross section profile (XY x y 135 .00 262.00 158.00 259.00 169.00 258.00 184 .00 261.00 BARRELS = 2 elevation: elevation: Coordinates) ft x 148 .00 163.00 174.00 190.00 Road profile (XY Coordinates) ft x y x 91. 32 263.31 100.00 166 .23 262.45 200.00 250.00 263.09 300 .00 CULVERT OUTPUT RUN NO => 1 y 257.59 ft 257.40 ft 261.00 258.00 259.00 262.00 y 263.22 262.83 263.34 TAILWATER ELEVATION: 259.19 ft (computed). ANALYSIS for discharge frequency of : 10 Yr x 154.00 166.00 179.00 x 150.00 207.00 Drainage Plan y 260.00 257.39 260.00 y 262.63 262.88 Barls. Qpb Rise Span Length Max.HW Calc.HW HW Control Veloc. Out.depth cf s ft ft ft 2 15.00 2.00 0.00 71. 96 Inlet control depth 2.36 Outlet control depth 2.51 Normal depth 2.00 ft Critical depth 1. 40 ft K:\00675\675-02RB\Report\Drainage Report Phase II.doc elev ft 0.00 ft ft Culvert Critical elev ft 260.08 slope slope ft ft/s ft 2.51 Outlet 4.77 2.00 0.00216 0.00538 Page 39 Veterans Park and Athletic Complex -Phase II Road top width => 36 .00 ft. Road pavement type=> asphalt Computed Weir Coefficient=> 3.00. No discharge over the road. CULVERT OUTPUT RUN NO => 2 TAILWATER ELEVATION : 259.41 ft (computed). ANALYSIS for discharge frequency of : 100 Yr Drainage Plan Barls. Qpb Rise Span Length Max.HW Calc .HW HW Control Veloc. Out .depth cfs ft ft ft elev ft elev ft ft 2 20.50 2.00 0.00 71.96 0.00 261.05 3.47 Outlet Inlet control depth Outlet control depth Normal depth 2.00 ft Critical depth 1.62 ft Road top width => 36.00 ft. Computed Weir Coefficient => No discharge over the road. RUNING MESSAGES LIST: 3.37 ft 3.47 ft Culvert slope 0.00216 Critical slope 0.00712 Road pavement type => asphalt 3.00. *Computation: Outlet velocity is based on the culvert rise . NORMAL TERMINATION OF THYSYS, CULVERT . ft/s ft 6.53 2 .00 K:\00675 \675-02RB \Report \Drainage Report Phase II.doc Page 40 ' Veterans Park and Athletic Complex -Phase II APPENDIXL Winstorm Results for 10-Y ear Storm Design for Storm Sewer System "GlO" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Drainage Plan Page 41 Veterans Park and Athletic Complex -Phase II Drainage Plan WinStorm (STORM DRAIN DESIGN) Version 3 .05, Jan . 25, 2002 Run@ 10/31/2005 4:10:20 PM PROJECT NAME : VPAC PH II JOB NUMBER 675.02 RB PROJECT DESCRIPTION : Storm Sewer Line GlO 10 Yr Design ANALYSYS FREQUENCY 10 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Runoff Computation for Design Frequency. ID C Value Area (acre) Tc (min) Tc used (min) Intensity (in/hr) Supply Q (cfs) Total Q (cfs) G-10 Inlet ID G-10 0.47 0.25 10.00 10.00 8.63 0 .000 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim. Area (ft) (sf) Grate 8. 00 1. so Left-Slope Long Trans (%) (%) 0.50 2.00 Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) 0.50 2.00 0.014 n/a Sag Inlets Computation Data. Depth Allowed (ft) 0.50 1 .015 Critic Elev. (ft) 261.07 Inlet ID Inlet Type Length Grate Total Q Inlet Capacity Total Head (ft) Ponded Width Perim Area (ft) (ft) (sf) (cfs) (cfs) G-10 Grate n/a 8.00 1.50 1 .015 5.701 0 .119 Cumulative Junction Discharge Computations Left (ft) 6.05 Right (ft) 6 .05 ================================================================================= Node I.D. G -10 OUT us Node Type Grate Outlt OS Weighted C-Value 0.470 0.470 Cumulat. Cumulat. Intens. Dr .Area (acres) 0.25 0.25 Tc (min) 10 .00 10 .00 (in/hr) 8.63 8 .63 User Supply Q cfs) 0.000 0.000 Conveyance Configuration Data Run# us Node I .D . Flowline Elev . OS Shape # Span Rise Additional Q in Node (cfs) 0.00 0 .00 Length Slope (ft) (ft) (ft) (ft) (ft) 10 G-10 OUT 258.57 257.10 Circ 1 0 .00 1 .00 141.00 1. 04 K:\00675 \6 75-02RB\Re port\Drainage Report Phase II.doc Total Disch . (cfs) 1.015 1.015 n value (%) 0 . 011 Page 42 Veterans Park and Athletic Complex -Phase II Drainage Plan Conveyance Hydraulic Computations . Tailwater = 259.190 (ft) Hydraulic Gradeline Depth Run# US Elev OS Elev Fr .Slope Unif. Actual (ft) (ft) (%) (ft) (ft) Velocity Unif. Actual (f/s) (f/s) Q (cfs) Cap (cfs) June Loss (ft) 10* 259.30 259.19 0.058 0.33 1 .00 4.49 1.29 1 .01 4 .30 0.032 ===================================END ============================================ * Super cri tical flow. NORMAL TERMINATION OF WINSTORM. Warning Messages for current project: Runoff Frequency of: 10 Years K:\00675\675-02RB \Rep ort\Drainage Re port Phase II.doc Page 43 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXM Winstorm Results for 10-Year Storm Design with 100-Year Storm Analysis for Storm Sewer System "GlO" K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 44 Veterans Park and Athletic Complex -Phase II WinStorm (STORM DRAIN DESIGN} PROJECT NAME : VPAC PH II JOB NUMBER 675.02 RB Drainage Plan Version 3.05, Jan . 25, 2002 Run @ 10/31/2005 4:14:21 PM PROJECT DESCRIPTION : Storm Sewer Line GlO 100 Yr Check ANALYSYS FREQUENCY MEASUREMENT UNITS: 100 Years ENGLISH ================================================================================== OUTPUT FOR ANALYSYS FREQUENCY of: 100 Years Runoff Comp u tation for Design Frequency. ============================================================================= ID C Value Area (acre} Tc (min} Tc Used (min} Intensity (in/hr} Supply Q (cfs} Total Q (cfs} G -10 0.47 0.25 10.00 10.00 11 . 64 0.000 1. 368 Sag Inlets Configuration Data. ================================================================================== Inlet ID G -10 Inlet Length/ Grate Type Perim. Area (ft) (sf) Grate 8.00 1. 50 Sag Inlets Computation Data. Left-Slope Long Trans (%) (%) 0 .50 2.00 Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) 0 .50 2 .00 0 .014 n/a Depth Allowed (ft) 0 .50 Critic Elev. (ft} 261.57 ================================================================================ Inlet ID Inlet Type Length Grate Perim Area (ft) (sf} Total Q Inlet Capacity Total Head (ft) (ft} (cfs} (cfs} G-10 Grate n/a 8.00 1.50 1 .368 5.701 Cumulative Junction Discharge Computations Node I.D . Node Type Weighted C-Value Cumulat. Cumulat. Intens. G -10 OUT Grate Outlt 0.470 0 .470 Dr .Area (acres} 0.25 0.25 Tc (min} 10 .00 10 .00 Conveyance Configuration Data Run# Node I.D. Flowline Elev. (in/hr} 11 . 64 11. 64 0.145 User Supply Q cfs} 0.000 0.000 Ponded Width Left Right (ft} (ft} 6.75 6.75 Additional Q in Node (cfs} 0.00 0.00 Total Disch . (cfs} 1. 368 1 .368 US OS US OS (ft} (ft) Shape # Span (ft} Rise (ft} Length (ft} Slope (%) n value 10 G-10 OUT 258 .57 257 .10 Circ 1 o.oo 1 .00 141 .00 1.04 0 .011 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page 45 Veterans Park and Athletic Complex-Phase II Conveyance Hydraulic Computations. Tailwater = 259.410 (ft} Hydraulic Gradeline Depth Run# US Elev DS Elev Fr.Slope Unif. Actual (ft} (ft} (%} (ft} (ft} Velocity Unif. Actual (f/s} (f/s} Q (cfs} Drainage Plan Cap (cfs} June Loss (ft} 10* 259.62 259.41 0.105 0.39 1 .00 4.88 1.74 1.37 4.30 0.059 ===================================END============================================ * Super critical flow . NORMAL TERMINATION OF WINSTORM . Warning Messages for current project : Runoff Frequency of: 100 Years K:\00675\675-02RB\Report\Drainage Report Phase II.doc Page 46 Veterans Park and Athletic Complex-Phase II APPENDIXN Winstorm Results for 10-Y ear Storm Design for Storm Sewer System "G20/G30" K:\00675 \675-02RB \Repo rt \Drainage Report Phase II.doc Drainage Plan Page 47 Veterans Park and Athletic Complex-Phase II Drainage Plan WinS t orm (STORM DRAIN DESIGN) Version 3 .05, Jan . 25, 2002 Run @ 10/31/2005 4:34:18 PM PROJECT NAME : VPAC PH II JOB NUMBER 675.02 RB PROJECT DES CRIPTION : Storm Sewer Line G20/G30 10 Yr Design ANALYSYS FREQUENCY 10 Years MEASUREMENT UNITS : ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of: 10 Years Runoff Computation for Design Frequency. ID C Value Area (acre) Tc (min) Tc Used (min) Intensity (in/hr ) Supply Q (cfs) Total Q (cfs) G-20 G-30 Inlet ID G-2 0 G-30 0.7 0 .88 0.12 0.27 10 .00 10.00 10 .00 10.00 8 .63 8 .63 0.000 0.000 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim . Area (ft) (sf) Grat e 8.00 Curb 5 .00 1. 50 n/a Left-Slope Long Trans (%) (%) 0.50 2.00 0.50 2 .00 Right-Slope Long Trans (%) (%) Gutter n DeprW (ft) 0.50 2 .00 0 .014 n/a 0 .50 2 .00 0 .014 1.50 Sag Inlets Computat i on Data. Depth Allowed (ft) 0.50 0.50 0 .725 2 .052 Critic Elev . (ft) 261 .0 0 260 .07 Inlet ID Inlet Type Length Grate Perim Area Total Q Inlet Capacity Total Head (ft) Ponded Width Left Right (ft) (ft) (sf) (cfs) (cfs) (ft) (ft) G-20 G-30 Grate Curb n/a 5.00 8.00 1.50 n/a n/a 0 . 725 2.052 5.701 6 .261 0.095 0.238 Cumulative Junction Discharge Computations 5.35 7.90 5.35 7.90 ================================================================================= Node I.D. G-20 G-30 OUT Node Type Grate Curb Outlt Weighted C-Value 0.700 0.825 0 .825 Cumulat . Cumulat . Intens . Dr.Area (acres) 0.12 0.39 0 .39 Tc (min) 10 .00 10 .43 10 .43 (in/hr) 8 .63 8.48 8.48 K:\00675 \675-02RB\Report\Drainage Report Phase II.doc User Supply Q cfs) 0.000 0 .000 0.000 Additional Q in Node (cfs) 0 .00 0.00 0 .00 Total Disch. (cfs) 0 .725 2 .728 2. 728 Page 48 Veterans Park and Athletic Complex -Phase II Drainage Plan Conveyance Configuration Data Node I .D . Flowline Elev. us OS Run# us OS Shape # Span Rise Length Slope n value (%) 20 30 Run# G-20 G-30 G -30 OUT 258.50 256.46 (ft) (ft) (ft) 256.96 255.20 Circ 1 0.00 1.00 Circ 1 0.00 1.50 (ft) (ft) 106 .00 90 .00 1. 45 1. 40 Conveyance Hydraulic Computations. Tailwater = 259 .190 (ft) Hydraulic Gradeline Depth US Elev OS Elev Fr .Slope Unif. Actual (ft) (ft) (%) (ft) (ft) Velocity Unif. Actual (f/s) (f/s) Q (cfs) Cap (cfs) 0. 013 0.013 June Loss (ft) 20* 259.33 259.27 0 .041 0.28 1.00 4.06 0.92 0.73 4 .30 0.017 30* 259.27 259 .19 0.067 0.48 1.50 5.64 1.54 2.73 12.43 0.019 ===================================END============================================ * Super critical flow . NORMAL TERMINATION OF WINSTORM. Warning Messages for current project : Runoff Frequency of: 10 Years K:\00675 \675-02RB \Report\Drainage Report Phase II.doc Page 49 Veterans Park and Athletic Complex -Phase II Drainage Plan APPENDIXO Winstorm Results for 10-Y ear Storm Design with 100-Year Storm Analysis for Storm Sewer System "G20/G30" K:\00675\675-02RB\Report\Drainage Report Phase II .doc Page 50 Veterans Park and Athletic Complex -Phase II Drainage Plan Wi nStorm (STORM DRAIN DESIGN} Version 3 .05, Jan . 25, 2002 Run @ 10/31/2005 4:37:52 PM PROJECT NAME : VPAC PH II JOB NUMBER 675.02 RB PROJECT DESCRIPTION : Storm Sewer Line G20/G30 100 Yr Check ANALYSYS FREQUENCY MEASUREMENT UNITS: 100 Years ENGLISH OUTPUT FOR ANALYSYS FREQUENCY of : 100 Runoff Computation for Design Frequency. Years ID C Value Area (acre} Tc (min} Tc Used (min} Intensity (in/hr} Supply Q (cfs} Total Q (cfs} G-20 G-30 Inlet ID G-20 G-30 0 .7 0.88 0.12 0.27 10 .00 10 .00 10.00 10.00 11. 64 11. 64 0.000 0.000 Sag Inlets Configuration Data. Inlet Length/ Grate Type Perim. Area (ft} (sf} Grate 8. 00 Cu rb 5 .00 1. 50 n/a Left -Slope Long Trans (%} (%} 0.50 2 .00 0 .50 2 .00 Right -Slope Lo ng Trans (%} (%} Gutter n DeprW (ft} 0 .50 2.00 0 .014 n/a 0.50 2.00 0 .014 1.50 Sag Inl e ts Computation Data. Depth Allowed (ft} 0 .50 0 .50 0.978 2.765 Critic Elev . (ft} 261 .50 260 .57 Inlet ID Inlet Type Length Grate Perim Area Total Q Inlet Capacity Total Head (ft} Ponded Width Left Right (ft} (ft} (sf} (cfs } (cfs} (ft} (ft} G-20 G-30 Grate Curb n/a 5.00 8 .00 1.50 n/a n/a 0.978 2.765 5.701 6 .261 0 .116 0.290 Cumulative Junction Discharge Computations 5.95 8.80 5.95 8.80 ================================================================================= Node I.D . G-20 G-30 OUT Node Type Grate Curb Outlt Weighted C-Value 0 .700 0 .825 0 .825 Cumulat . Cumulat . Intens. Dr.Area (acres} 0.12 0.39 0.39 Tc (min} 10.00 10.40 10.40 (in/hr} 11 . 64 11.45 11 . 45 K:\00 675 \675-02RB \Report \Drainage Report Phase II.doc User Supply Q cfs} 0 .000 0.000 0.000 Additional Q in Node (cfs} 0 .00 0 .00 0.00 Total Disch. (cfs} 0 .978 3.684 3.684 Page 51 Veterans Park and Athletic Complex -Phase II Drainage Plan Conveyance Configuration Data Node I.D. Flowline Elev. us OS Run# us OS Shape # Span Rise Length Slope n value (%) 20 30 G-20 G-30 G-30 OUT 258.50 256.46 (ft) (ft) (ft) 256.96 255 .20 Circ 1 0 .00 Circ 1 0.00 1. 00 1. 50 (ft) (ft) 106 .00 90 .00 1.45 1. 40 Conveyance Hydraulic Computations . Tailwater = 259 .410 (ft) Hydraulic Gradeline Depth Run# US Elev OS Elev Fr.Slope Unif . Actual (ft) (ft) (%) (ft) (ft) Velocity Unif. Actual (f/s) (f/s) Q (cfs) Cap (cfs) 0 .013 0. 013 June Loss (ft) 20* 259.66 259 .55 0.075 0 .32 1 .00 4.43 1 .24 0.98 4.30 0.030 30* 259.55 259 .41 0.123 0 .56 1 .50 6.13 2.08 3.68 12.43 0.034 ===================================END============================================ * Super critical flow . NORMAL TERMINATION OF WINSTORM. Warning Messages for current project: Runoff Frequency of: 100 Years K:\00675 \675-02RB\Report\Drainage Report Phase II.doc Page 52 WATER AND WASTEWATER DESIGN REPORT FOR CITY OF COLLEGE STATION VETERANS PARK AND ATHLETIC COMPLEX, PHASE II CITY OF COLLEGE STATION PARKS AND RECREATION DEPARTMENT CITY OF COLLEGE STATION PROJECT NO. PK 0501 OE JOB NO. 675.02-RB OCTOBER 2005 Prepared by: O'MALLEY ENGINEERS, L.L.P. P.O. Box 1976 Brenham, Texas 77834-1976 WATER AND WASTEWATER DESIGN REPORT FOR CITY OF COLLEGE STATION VETERANS PARK AND ATHLETIC COMPLEX, PHASE II CITY OF COLLEGE STATION PARKS AND RECREATION DEPARTMENT CITY OF COLLEGE STATION PROJECT NO. PK 0501 OE JOB NO. 675.02-RB OCTOBER 2005 Prepared by: O'MALLEY ENGINEERS, L.L.P. P.O. Box 1976 Brenham, Texas 77834-1976 ___________ _____. TABLE OF CONTENTS Page Number I. WATER ........................................................................................................... 1 A. Domestic Water .................................................................................................... 1 1. Pipe Material ................................................................................................. 1 2. Dead End Lines ............................................................................................. 1 3. Pressure/Flow Requirements ......................................................................... 1 a. Domestic (Normal) Flow ....................................................................... 1 b. Required Fire Flows ............................................................................... 1 c. Hydraulic Calculations For Required Fire Flows .................................. 2 4. Pipe Alignment .............................................................................................. 4 5. Air Release Valve .......................................................................................... 4 6. Valves ........................................................................................................... 4 B. Irrigation Water .................................................................................................... 4 II. WAS TEW ATER (SANITARY SEWER) ................................................................... 5 A . Pipe Material. ........................................................................................................ 5 B. Pipe Size ........................................................................................................... 5 C . Flow Rates ........................................................................................................... 5 D. Line Capacity ........................................................................................................ 5 E. Line (Pipe) Slopes ................................................................................................. 5 F. Pipe Alignment ..................................................................................................... 6 G. Manhole Spacing .................................................................................................. 6 Appendix I -Fire Hydrant Flow Data From College Station Utilities Appendix II -Hydraulic Calculations For Required Fire Flows K:\00675 \675-02RB\Letter\TABLE OF CONTENTS .doc I. WATER A. Domestic Water (6" & 8" lines proposed) Location Softball Concession Pavilion 1. Pipe Material: A WW A C-909, Class 200 as required by Bryan/College Station Unified Technical Specifications. 2. Dead End Lines: An 8" line approximately 350' long is proposed to dead end for service to the proposed soccer restroom(s). The line(s) will have a fire hydrant at the end of the line. (The Base Bid provides for construction of the most northerly of the two soccer restroom buildings shown. An alternate bid provides for construction of the most southerly of the two soccer restroom buildings shown. 3. Pressure/Flow Requirements : a. Domestic (Normal) Flow: Normal domestic flows are relatively insignificant and are not included in the hydraulic calculations. (Not required for this project per meeting with Allen Gibbs on 10/04/05 .) Domestic flows are estimated as follows: Equiv. Fixture Peak Flow Rate' Normal Flow Minimum Flow Units 1 (Peak-:-4) Rate 135 84GPM 21 GPM OGPM 113 80GPM 20GPM OGPM Soccer Restroom 107 82GPM 21 GPM OGPM 'Per MEP, Paul Swoboda, P.E. b. Required Fire Flows (per Allen Gibbs on 10/04/05): • Proposed Softball Concession Building (Approximately 8,557 S.F . including covered porch): 2,000 GPM. • Proposed Pavilion (Approximately 9,911 S.F.): 2,250 GPM • Proposed Soccer Restroom(s): 1,500 GPM K:\00675\675-02RB\Letter\Design Report.doc c. Hydraulic Calculations For Required Fire Flows Location Softball Concession Pavilion Soccer Restroom 1 (Base Bid Location) Soccer Restroom 2 (Alt. Bid Location) Hydraulic calculations were performed to carry the required fire flow to each of the proposed buildings using the Kypipe 2000 computer program. A node and line schematic drawing and results print-out are included as Appendix II. A pressure of 89 p.s.i. from the existing water main along Hwy. 30 at the ground elevation of existing F.H. 008 was used as the pressure source (see attached hydrant flow data and map from College Station Utilities, Appendix I). This data shows a 3 psi pressure drop for a flow of 1, 190 gpm. We have assumed an additional 3 psi drop to 89 psi for a 2,250 gpm flow . 1) Calculations Based On Proposed Water Lines: a) Flow Rate and Resulting Residual Pressure: Flow Rate F.H. Node(s) Min. Residual Pressure 2,000 GPM J4 -1,000 GPM 27 p.s.i. J7 -1,000 GPM 2,250 GPM J8 -1,250 GPM 26 p .s.i. J16 -1,000 GPM 1,500 GPM J12 43 p .s.i. 1,500 GPM J14 43 p.s.i. b) Maximum Velocity In Mains With Fire Flows (1) For 2,000 GPM fire flow to Proposed Softball Concession Building: • Existing 8" line along Veterans Parkway installed in Phase I and believed to be C-900 PVC: 13.6 ft./ sec. K:\00675\675-02RB\Le tter\Des ign Re port .doc 2 Location Softball Concession Pavilion Soccer Restroom 1 (Alt.) Soccer Restroom 2 • Existing 6" Phase I line believed to be C-900 PVC: 12.1 ft./sec. (2) For 2,250 GPM fire flow to Proposed Pavilion Building: • Existing 8" line along Veterans Parkway installed in Phase I and believed to be C-900 PVC: 15 .3 ft./ sec. • Existing 6" Phase I line believed to be C-900 PVC: 4.2 ft./sec. NOTE: When the 8" line is looped to the water main along Hwy. 60 in a future construction phase, the velocity in the 8" line for the required fire flow will be within the recommended range as shown in paragraph 2) below . (3) For 1,500 GPM fire flow to either of the Proposed Soccer Restroom Buildings: • Existing 8" line along Veterans Parkway installed in Phase I and believed to be C-900 PVC: 10.2 ft./ sec. 2) Based On Future 8" Loop To Water Main Along Hwy. 60 : a) Flow Rate And Residual Pressure Flow Rate F.H. Node(s) Minimum Residual Pressure 2,000 GPM J4 -1,000 GPM 58 P.S .I. J7 -1,000 GPM 2,250 GPM J8 -1,250 GPM 67 P.S.I. J16 -1,000 GPM 1,500 GPM J12 75 P.S.I. 1,500 GPM J14 75 P.S.I. K:\00675\675-02RB\Letter\Design Report.doc 3 b) Maximum Velocity In Mains With Fire Flows: 11. 7 ft./ sec. in 6" line with fire flow to the Proposed Softball Concession Building. 4. Pipe Alignment: Horizontal and vertical pipe alignment is in accordance with the design requirements with the exception that the cover over a proposed 6" water main at a crossing of an existing storm sewer near the Proposed Softball Concession Building is approximately 3 '-6" instead of 4', and the cover over a proposed 8" water main to be stubbed across Veterans Parkway near the northwestern end of the street extension is approximately 3 '-6" instead of 4' at a location where the water line will cross over a future sanitary sewer line. We recommend that the line in these areas be slightly shallow rather than excessively deep(± 8') for ease of future maintenance. 5 . Air Release Valve: One air release valve is shown on the plans on a short section of proposed 8" line that is between low points in the line where the line is to go under a drainage ditch, come up to normal grade, and then go down under a proposed 42" storm sewer. Should the City determine that the air release valve is not required, it can be removed from the plans. 6. Valves: The recommended distance between valves of 800' is exceeded in one segment of proposed 8" line along Veterans Parkway with approximately 1,000 feet between valves. Since this line services only the City's Park facilities, Allen Gibbs indicated on 10/04/05 that this spacing would be acceptable. B. Irrigation Water Irrigation water is supplied from the City's 12" water main along Hwy. 30. A total irrigation flow rate of approximately 1,800 GPM is estimated after construction of the proposed Phase II facilities. The College Station Utilities Department said that they could provide service for that flow rate from the water line along Hwy. 30 . K:\00 675 \675-02RB\Lett er\Design Report.doc 4 --_______________________ __. II. WAS TEW ATER (SANITAR Y SEWER ) • A. P ipe M a teria l : Pressure class 350 ductile iron. Most of the line will have less than 6' of cover, therefore, per the City's design criteria, ductile iron pipe is required. B. P i pe S ize : 10" for proposed lines. One existing Phase I line is 6". C. F low R ates: Wastewater flows are estimated as follows: Location Equivalent Peak Flow Rate Normal Flow Minimum Flow Fixture Units 1 Rate Rate Softball 135 84GPM 21 GPM OGPM Concession Pavilion 113 80GPM 20GPM OGPM Soccer Restroom 107 82GPM 21 GPM OGPM Phase I Facilities --86GPM 22GPM OGPM 1-PerMEP, Paul Swoboda, P.E. Total sanitary sewer contribution from Phase II is estimated at 9,000 GPD D . Line Cap acity: 1. Existing 6"@ 0.5% will serve the proposed softball concession building and has capacity of approximately 180 GPM (0.26 MGD) which is greater than the peak flow rate and normal flow rate of 84 GPM and 21 GPM, respectively, from the Proposed Softb all Concession Building. Flow from the existing Maintenance Building through this line is insignificant. 2. Existing 1 O" and proposed extension will serve the existing Phase I facilities, pavilion and proposed Soccer restroom, and@ 0.25% has capacity of approximately 490 GPM (0 .7 MGD) which is greater than the peak flow rate and normal flow rate of Phase I and proposed P h ase II of 332 GPM and 84 GPM, respectively. K:\006 75 \675-02RB\Letter\Design Report .doc 5 E. Line (Pipe) Slopes: Slope of 0.25% for proposed 10" line. Approved by Allen Gibbs on 10/04/05. F. Pipe Alignment: In accordance with the City's design criteria. As noted previously, the pipe is proposed to be pressure class 350 ductile iron because the cover over the line is less than 6' in most places. G. Manhole Spacing: Per TCEQ requirements . The maximum distance between manholes is 499' on the 1 O" line . K:\00675 \675-02RB\Letter\Des ign Re port .d oc 6 APPENDIX I FIRE HYDRANT FLOW DATA FROM COLLEGE STATION UTILITIES P.O Bax !=00'.l • 1001 G-ciiamR>a:J • O:ille:ge Sction, lX 77812 Aure: 979-~:m:l • FflX: 979-764-3.:52 Fax Cover Sheet Company: 0 ',i1 c:J,ty Date: IO -~ -QS' From: ~z <:.__.-Number of Pgs: 1-J Subject: \-~ ~~ C:~_s Comments: 3 {J~QS ~·~w6b ~ R:Me-ing the l-B3rt of the Reseach var e; ~VV..I.. lf!:j UU;j Hydrant Flows Flow Hydrant Date Pitot Reading GPM Static Hgdrant Static Pressure Residual Pressure G-001 11/03/98 92 1185 G-037 104 100 G-002 11/03/98 90 1175 G-001 104 98 G -003 11/05/98 90 1175 G-004 108 98 G-004 04/30/03 38 1040 G-003 112 84 G-004 09/08/03 90 1175 G-002 120 105 G-005 11/03/98 95 1190 G-037 104 100 G-005 09/08/03 100 1205 G-006 117 105 G-006 11/04/98 90 1175 G-007 110 102 G-007 11/04/98 95 1190 G-005 106 98 G-007 09/08/03 100 1205 G-030 115 108 G-008 11/04/98 90 1175 G-007 110 100 I L ~ G-008 09/08/03 95 1190 G-010 110 ~r~=1· G-009 07/24/01 95 1190 G-008 -110 105 us~o 8~ G-009 04/14/05 75 1455 G-095 115 108 f?'.$1 · A-'!> $Tr1fi.:T 1AiG: ~-G-010 11/04/98 82 1145 G-007 108 100 P~Si~;l!JL pol!. fZlKlL G-011 1 1/04/98 80 1140 G-035 96 76 {ZL<.:iM ' C fi..L C<.:Z.....1 TJoiv':!:i G-012 11/04/98 73 1110 G-035 96 82 f3ft.$~P cJJ ~lc(l.D'LD G-0 13 07/10/01 80 1140 G-012 95 85 fL~ !~{)6?f-ll-iT G-013 01/10/03 75 1140 G-035 100 65 f-LlJ,._j A f f.!ZS'SLJ /1£... . ,1f:J- G-013 09/08/03 65 1070 G-034 95 :.------75 G-014 11/04/98 75 1120 G-013 96 78 G-014 09/08/03 80 1140 G-015 100 81 G-015 11/04/98 65 1070 G-016 82 64 G-016 1 1/04/98 60 1040 G-017 80 64 G-017 04/30/03 14 640 G-019 90 24 G-017 09/08/03 65 1070 G-016 90 45 G-018 0 9/08/03 60 1040 G-019 90 70 G-019 06/15/05 60 1300 G-017 84 72 ~~~~'?.W~U:.'"!!:Jl.f.!::.~rr.'llmp..'lt;uw!:~~.:w~rni.1"·''''"rns$''"""'·r?O?.~':,:.:?:t1~~m~~7.:?lf~ai;1 ~~-e.i 10106105 .J.. v / v v / L. v vu .J.. u .... ..L , . t\J\. 0 ' 0 ' u... I.} ... u L. VULLC.UC. ..:Ji/1.i.LU I ~ run. U.lL • ~VV'i Flow HJ!.drant Date Pilot Reading GPM Static Hydrant Static Pressure Residual Pressure , G-020 11/05/98 87 1165 G-021 98 86 G-021 09/08/03 85 1160 G-020 113 104 G-022 11/05/98 80 1140 G-023 102 96 G-023 09/08/03 75 1120 G-022 117 108 G-024 08/24/05 85 1550 G-026 105 101 G-025 09/08103 85 1160 G-027 112 105 G-026 11104/98 86 1165 G-027 102 92 G-026 03108105 80 1500 G-024 117 110 G-027 11104/98 80 1140 G-025 104 96 G-028 11/05198 80 1140 G-031 100 92 G-029 11103/98 82 1145 G-005 108 98 G-031 11105198 75 1120 G-028 98 90 G-031 09/09/03 75 1120 G-032 110 102 G-032 11/05198 80 1140 G-028 98 88 G-033 11105198 80 1140 G-038 102 98 G-033 05129/03 90 1175 G-028 100 80 G-035 11/04/98 70 1095 G -013 96 80 G-037 11/03/98 75 1120 G-001 104 98 G-038 11/05/98 92 1180 G-033 100 94 G-039 11/05/98 98 1190 G-033 100 96 G-039 09/09/03 95 1190 G-036 113 103 G-040 09/08/03 95 190 G-047 112 101 G-042 01/05/04 75 1120 G-041 95 85 G-044 09/08/03 65 1070 G-045 107 86 * G-046 09/08/03 70 1095 G-051 115 95 G-048 05130102 85 1550 G-047 100 100 G-049 09/08/03 80 1140 G-050 105 100 G-050 04/06/01 80 1140 G-049 92 88 * G-052 09/08/03 60 1040 G-051 60 1040 r.z;.,"?l~!l'.:"'-''ll'.',...,..,.i··Gli ~~~~-~1~'~·~,~~!.:U:.'l\U·i:.~~~.:w ..... ,,..,...s .7.$l!t'i~~ ..... •l·l .. !Ji'ilr-J""'"':.:rr,cm::l!'(',_,,~ .... n~ 10106105 APPENDIX II HYDRAULIC CALCULATIONS FOR REQUIRED FIRE FLOWS O'MALLEY ENGINEERS BRENHAM, TEXAS K.YPIPE NODE AND LINE NUMBER MAP I~ 400 FILE 0:4 Scale: SEE BAR SCALE Project Number: 675.02 RB Drown Bv : BAG l Dole : 10/05 Revised : Sheet Number: 1 •••• Of •••• 1 VETERANS PARK AND ATHLETIC COMPLEX, PHASE II D3: Current system plus 6" loop around softball field back to street . No loop to Hwy. 60 . * * * * * * * * * * K Y P I P E 4 * * * * * * * * * * * * * * * * Univers i ty o f Kentucky Network Modeling Software Copyrighted by KYPIPE LLC Version 2 -01/31/2 005 * * * * * * ***************************** Date & Time : Sat Oct 08 03:11:42 2005 INPUT DATA FILENAME --------------C:\KYPIPE-2 \675 -0 2-1\D3.DT2 TABULATED OUTPUT FILENAME --------C:\KYPIPE-2\675 -02-1\D3 .0T2 POSTPROCESSOR RESULTS FILENAME ---C:\KYPIPE-2\675 -0 2-1 \D3.RS2 ************************************************ S U M M A R Y 0 F 0 R I G I N A L D A T A ************************************************ U N I T S S P E C I F I E D FLOWRATE ........... . HEAD (HGL ) ......... . PRESSURE ........... . p I p E L I N E D A T A STATUS CODE: xx -CLOSED p I p E NODE NA M E #1 gallons/mi nute feet psig PIPE CV -CHECK VALVE NAMES LENGTH DIAMETER #2 (ft) (in) ROUGHNESS COEFF . MINOR LOSS COEFF. ------------------------------------------------------------------------------- P -1 R -1 J -1 1038.54 7 .75 150 .0000 0 .00 P -2 J -1 J -3 420.17 7.75 150.0000 0.00 P -3 J -3 J -2 103 .03 7.7 5 150.0000 0.00 P -4 J - 2 J -5 479 .41 5. 91 150.0000 0.00 P -5 J -5 J -4 52 .87 5 .91 150.0000 0.00 P -6 J-5 J -7 263.7 8 5 . 91 150.0000 0.00 P -7 J -3 J -6 245 .04 5 .91 150.0000 0.00 P -8 J -2 J -9 305 .10 8.34 150.0000 0 .00 P -9 J -9 J -8 56 .95 8.34 150.0000 0 .00 P -10 J -8 J -11 534.63 8 .3 4 150 .0000 0.00 P -11 J -11 J -10 409 .40 8 .34 150 .0000 0.00 P -12 J -10 J -13 191.91 8.34 150.0000 0 .00 P -13 J -13 J -12 133.54 8.34 150.0000 0 .00 P -14 J -13 J -14 155. 13 8.34 150.0000 0.00 Page I of IO K:\00675\6 75-02RB\Lett er\Kypipe Calc\D3.0T2 --_____________ __. P -15 P -16 J-9 J -7 E N D N 0 D E D A T A NODE NAME J-1 J -2 J -3 J-4 J -5 J-6 J -7 J -8 J-9 J -10 J -11 J -12 J -13 J -14 J -16 R-1 0 U T P U T NODE TITLE 0 P T I 0 N J -16 J -9 EXTERNAL DEMAND (gprn) 0.00 0.00 0.00 1000 .00 0.00 0.00 1000 .00 0 .00 0.00 0.00 0.00 0.00 0.00 0 .00 0.00 D A T A 145.49 696.63 JUNCTION ELEVATION (ft) 261.00 264.00 263.00 264.00 264.00 261.00 267.00 262.00 262.00 264 .00 264.00 263.00 263.00 262.00 26 2.00 265 .00 6.35 150.0000 6.35 150.0000 EXTERNAL GRADE (ft) 455.00 OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT S Y S T E M C 0 N F I G U R A T I 0 N NUMBER OF PIPES ................... (p) 16 NUMBER OF END NODES ............... (j) 15 NUMBER OF PRIMARY LOOPS ........... (1) 1 NUMBER OF SUPPLY NODES ............ (f) 1 NUMBER OF SUPPLY ZONES ............ (z) 1 Case: o RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY 0.00000 S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L) Page 2 of JO K:\00675 \675-02RB \Letter\Kypipe Calc\D3 .0T2 0 .00 0.00 --------------' p I p E L I N E R E s u L T s STATUS CODE : xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO . 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) ------------------------------------------------------------------------------- ---------- P -1 R -1 J -1 2000.00 59 .05 P-2 J -1 J -3 2000 .00 59.05 P -3 J -3 J-2 2000.00 59.05 P -4 J -2 J -5 1035 .83 65.36 P -5 J -5 J -4 1000.00 61 .24 P -6 J -5 J -7 35.83 0 .13 P -7 J -3 J -6 0 .00 0.00 P -8 J -2 J -9 964 .17 10.70 P -9 J -9 J -8 0.00 0.00 P -10 J -8 J -11 0.00 0.00 P -11 J -11 J -10 0 .00 0.00 P-12 J -10 J -13 0.00 0.00 P -13 J -13 J -12 0 .00 0.00 P -14 J -13 J -14 0.00 0.00 P -15 J-9 J-16 0.00 0.00 P -16 J -7 J -9 -964 .1 7 40.35 E N D N 0 D E R E S U L T S NODE NAME J -1 J -2 NODE TITLE K:\00675 \675-02RB\Letter\Kypipe Calc\03 .0T2 EXTERNAL DEMAND (gpm) 0.00 0.00 HYDRAULIC GRADE (ft) 393.67 362.77 Pa ge 3of10 61 .33 0.00 I3 . 60 24.81 0.00 13 . 60 6.08 0 .00 1 3.60 31.34 0.00 12 .11 3.24 0.00 11 .69 0.03 0 .00 0 .4 2 0 .00 0 .00 0.00 3 .2 6 0.00 5 .6 6 0.00 0.00 0 .00 0.00 0 .00 0.00 0.00 0 .00 0.00 0 .00 0 .00 0.00 0.00 0 .00 0 .00 0.00 0 .00 0 .00 0.00 0.00 0.00 28 .11 0.00 9 .77 NODE ELEVATION (ft) PRESSURE HEAD (ft) 261.00 .132.67 264.00 98.77 59.05 59.05 59 .05 65.36 61.24 0 .13 0.00 10 .70 0 .00 0.00 0 .00 0 .0 0 0.00 0.00 0.00 40.35 NODE PRESSURE (psi) 57.49 42.80 ----------------' J -3 0.00 368.86 263 .00 J -4 1000 .00 328.20 264 .00 J-5 0 .00 331.44 264 .00 J -6 0 .00 368.86 261 .00 J-7 1000.00 331 .40 267.00 J-8 0 .00 359 .51 262.00 J -9 0.00 359 .51 262.00 J -10 0 .00 359 .51 264.00 J -11 0 .00 359 .51 264.00 J-12 0 .00 359 .51 263 .00 J-13 0 .00 359 .51 263.00 J -14 0.00 359 .51 262.00 J-16 0 .00 359.51 262.00 R -1 455.00 265 .00 S U M M A R Y 0 F I N F L 0 W S A N D 0 U T F L 0 W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE NAME FLOWRATE (gpm) R-1 2000.00 NET SYSTEM INFLOW 2000.00 NET SYSTEM OUTFLOW 0 .00 NET S YSTEM DEMAND 2 000 .00 Case: 1 NODE TITLE 105.86 64.20 67 .44 107 .86 64 .40 97.51 97 .51 95.51 95.51 96 . 5 1 96 .51 97.51 97.51 190 .00 C H A N G E S F 0 R N E X T S I M U L A T I 0 N (Change Number Change 1 -No fire flow to softball concession. 2250 GPM to Pavilion. JUNCTION DEMANDS CHANGED -PLEASE SEE RESULTS TABLE RESULTS OBTAINED AFTER 5 TRIALS: ACCURACY 0.00003 p I P E L I N E R E S U L T S STATUS CODE: xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL/ N A M E #1 #2 LOSS LOSS VELO . 1000 Page 4of10 K:\0067 5\675-02RB \Letter\Kypipe Calc\D3 .0T2 45.87 27.82 29 .22 46 .74 27 .91 42 .25 42.25 41 .39 41. 39 41.82 41.8 2 42 .25 42 .25 82.33 1 ) HL+ML/ 1000 (gpm) (ft/ft) P-1 R-1 J -1 2250.00 73 .45 P -2 J -1 J -3 2250 .00 73.45 P-3 J-3 J-2 2250.00 73.45 P -4 J -2 J -5 359.37 9.20 P -5 J -5 J-4 0.00 0.00 P -6 J-5 J -7 359.37 9.20 P-7 J-3 J-6 0.00 0.00 P -8 J-2 J-9 1890.63 37 .23 P -9 J -9 J -8 1 250.00 17.30 P-10 J -8 J -11 0.00 0.00 P-11 J-11 J-10 0.00 0.00 P -12 J -10 J -13 0.00 0.00 P -13 J -13 J -12 0.00 0.00 P -14 J -13 J -14 0.00 0.00 P -15 J-9 J-16 1000 .00 43.17 P-16 J -7 J-9 359.37 6.49 E N D N 0 D E R E S U L T S NODE NAME J-1 J-2 J -3 J-4 J -5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 NODE TITLE K:\00675\675-02RB\Letter\Kypipe Calc\D3.0T2 EXTERNAL DEMAND (gpm) HYDRAULIC GRADE (ft) 0.00 378.72 0.00 340.29 0.00 347.86 0.00(0.00) 335.88 0.00 335 .88 0 .00 347.86 0.00(0 .00) 333.45 1250.00 0.00 0.00 0 .00 0 .00 Page 5of10 327 .95 328 .93 327.95 327.95 327 .95 (ft) (ft) (ft/s) (ft/ft) 76.28 0.00 15.30 30.86 0.00 15.30 7.57 0.00 15.30 4 .4 1 0.00 4.20 0.00 0.00 0 .00 2.43 0.00 4.20 0.00 0.00 0 .00 11. 36 0.00 11.10 0.99 0.00 7.34 0.00 0.00 0 .00 0 .00 0 .00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.28 0.00 10 .13 4.52 0 .00 3.64 NODE ELEVATION (ft) 261.00 264.00 263.00 264.00 264.00 261.00 267.00 262.00 262.00 264.00 264 .00 263 .00 PRESSURE HEAD (ft) 117.72 76.29 84.86 71.88 71. 88 86.86 66.45 65.95 66.93 63 .95 63.95 64.95 73.45 73.45 73.45 9 .2 0 0 .00 9.20 0.00 37.23 17.30 0 .00 0 .00 0.00 0.00 0.00 43 .17 6.49 NODE PRESSURE (psi) 51.01 33.06 36.77 31.15 31 .15 37 .64 28.80 28.5 8 29 .00 27. 71 27.71 28 .14 J-13 J-14 J-16 R-1 0.00 0.00 1000.00 327.95 327.95 322.65 455.00 263.00 262.00 262.00 265.00 S U M M A R Y 0 F I N F L 0 W S A N D 0 U T F L 0 W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE NAME FLOWRATE (gpm) R -1 2250.00 NET SYSTEM INFLOW 2250.00 NET SYSTEM OUTFLOW 0.00 NET SYSTEM DEMAND 2250.00 Case: 2 NODE TITLE 64.95 65.95 60.65 190.00 C H A N G E S F 0 R N E X T S I M U L A T I 0 N (Change Number = 28.14 28.58 26.28 82 .33 2 ) 1500 GPM fire flow to new soccer restsroom. No fire flow to other parts of park JUNCTION DEMANDS CHANGED -PLEASE SEE RESULTS TABLE RESULTS OBTAINED AFTER 3 TRIALS: ACCURACY 0 .00000 p I P E L I N E R E S U L T S STATUS CODE : xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) ---------- P -1 R-1 J-1 1500.00 36.00 0.00 10.20 34.66 34.66 P-2 J -1 J-3 1500.00 14 .56 0.00 10 .2 0 34.66 34.66 P-3 J -3 J -2 1500 .00 3.57 0.00 10.20 34.66 34.66 Page 6of10 K :\00675\67 5-02RB\Letter\Kypipe Ca lc\03 .0T2 4.34 0.00 4.34 0.00 17.57 24 .25 24.25 24 .25 24.25 24.25 0.00 0.00 3.06 E N D P -4 P -5 P-6 P -7 P -8 P -9 P -10 P -11 P -12 P-13 P -14 P -15 P -16 N 0 D E NODE NAME J -1 J -2 J-3 J-4 J-5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J -13 J-14 J -16 R-1 J-2 J -5 239.58 J-5 J-4 0.00 J -5 J-7 239 .58 J-3 J-6 0.00 J -2 J -9 1260.42 J-9 J-8 1500.00 J-8 J-11 1500.00 J-11 J-10 1500.00 J-10 J-13 1500.00 J -13 J -12 1500 .00 J-13 J-14 0.00 J -9 J-16 0 .00 J -7 J-9 239.58 R E S U L T S NODE TITLE EXTERNAL DEMAND (gpm) 0 .00 HYDRAULIC GRADE (ft) 419.00 0 .00 400.87 0 .00 404 .44 0.00(0.00) 398.78 0.00 398.78 0.00 404.44 0.00(0.00) 397.64 0.00 394.12 0.00 395.51 0.00 0.00 1500.00 0 .00 0.00 0.00 371.23 381 .16 363.34 366.58 366 .58 395 .51 455.00 2.08 0.00 2.80 0.00 0.00 0.00 1.15 0.00 2 .80 0.00 0.00 0.00 5.36 0.00 7.40 1. 3 8 0.00 8.81 12.96 0.00 8.81 9.93 0.00 8.81 4.65 0.00 8 .81 3.24 0.00 8.81 0.00 0.00 0.00 0.00 0.00 0.00 2 .13 0 .00 2 .43 NODE ELEVATION (ft) PRESSURE HEAD (ft) 261.00 264.00 263.00 264.00 264.00 261.00 267.00 262 .00 262.00 264 .00 264.00 263.00 263.00 262.00 262.00 265.00 158.00 136 .87 141.44 134. 78 134.78 143.44 130. 64 132. 12 133.51 107.23 117 .16 100.34 103.58 104.58 133.51 190.00 S U M M A R Y 0 F I N F L 0 W S A N D 0 U T F L 0 W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES Page 7of10 K:\00675 \675-02RB\Letter\Kypip e Calc\03 .0T2 4.34 0.00 4.34 0.00 17.57 24 .25 24.25 24.25 24.25 24.25 0.00 0 .00 3.06 NODE PRESSURE (psi) 68.47 59.31 61.29 58.41 58.41 62.16 56.61 57 .25 57.85 46.47 50.77 43.48 44.88 45 .32 57.85 82.33 ( -) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE -------------------------------------------- R -1 1500.00 NET SYSTEM INFLOW 1500 .00 NET SYSTEM OUTFLOW 0 .00 NET S YSTEM DEMAND 1500.00 Case: 3 C H A N G E S F 0 R N E X T S I M U L A T I 0 N (Change Number = 3 ) Change 3 -1500 GPM fire flow to other soccer RR. No other fire flow in park. JUNCTION DEMANDS CHANGED -PLEASE SEE RESULTS TABLE RESULTS OBTAINED AFTER 3 TRIALS: ACCURACY 0.00000 p I p E L I N E R E s u L T s STATUS CODE: xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO . 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) ------------------------------------------------------------------------------- ---------- P -1 R -1 J -1 1500 .00 36 .00 0.00 10 .20 34.66 34.66 P -2 J -1 J -3 1500.00 14 .56 0.00 10.20 34.66 34 .66 P -3 J -3 J -2 1500.00 3 .57 0 .00 10.20 34.66 34.66 P -4 J -2 J -5 239.58 2.08 0.00 2.80 4 .3 4 4.34 P -5 J-5 J -4 0.00 0.00 0 .00 0.00 0.00 0 .00 P -6 J -5 J -7 239.58 1.15 0.00 2 .80 4 .34 4.34 P -7 J -3 J -6 0.00 0.00 0.00 0.00 0.00 0 .00 P -8 J-2 J -9 1260 .42 5.36 0.00 7 .40 17.57 17.57 Page 8of10 K:\00675 \675 -0ZRB\Letter\Kypipe Ca lc\D3.0T2 ~ P -9 J -9 J -8 1500.00 1. 38 0.00 8.81 2 4 .25 24.25 P -10 J -8 J -11 1500 .00 1 2.96 0.00 8.81 24.25 2 4.2 5 P -11 J -11 J -10 1500.00 9.93 0.00 8 .81 2 4 .25 24.25 P -1 2 J -10 J -13 1500.00 4 .65 0 .00 8.81 24.25 24.2 5 P -13 J -13 J -12 0 .00 0.00 0.00 0.00 0.00 0 .00 P-14 J -13 J-14 1500.00 3 .76 0 .00 8.81 24.25 24 .25 P -15 J -9 J -16 0 .00 0.00 0.00 0.00 0 .00 0.00 P -16 J -7 J -9 239.58 2 .13 0 .00 2 .43 3.06 3.06 E N D N 0 D E R E s u L T s NODE NODE EXTERNA L HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) ------------------------------------------------------------------------------ J -1 0 .00 419.00 261.00 1 58.00 68.47 J -2 0 .00 400 .87 264.00 136.87 59.31 J -3 0.00 404.44 263.00 141.44 61.2 9 J -4 0.00(0.00) 398 .78 264 .00 134.78 58.41 J -5 0.00 398 .78 264.00 134 . 78 58.4 1 J -6 0 .00 404.44 261.00 143.44 62 .16 J -7 0.00(0.00) 397.64 267.00 130 . 64 56.61 J -8 0.00 394.12 262.00 132 .12 57.25 J-9 0 .00 395.51 262.00 133. 51 57.85 J-10 0.00 371 .23 264 .00 107.23 46.47 J -11 0.00 381.16 264.00 117. 16 5 0 .77 J -1 2 0 .00 366.58 263.00 103 .58 44 .88 J -13 0 .00 366.58 263.00 103 .58 44 .88 J-14 1500 .00 362.82 262.00 100.82 43.69 J-16 0 .00 395.51 262.00 133. 51 57.85 R -1 455.00 265.00 190.00 82.33 S U M M A R Y 0 F I N F L 0 W S AND 0 U T F L 0 W S (+) I NFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE NAME FLOWRATE (gpm) R -1 1500.00 NET SYSTEM I NFLOW 1500.00 NET SYSTEM OUTFLOW 0 .00 NET SYSTEM DEMAND 1500 .00 K:\00675 \675-02RB \Letter\Kypipe Calc\D3 .0T2 NODE TITLE Page 9of10 - -________________ _! ***** HYDRAULIC ANALYSIS COMPLETED ***** Page lOoflO K:\00675 \6 75-02RB\Letter\Kypipe Calc\D3.0T2 VETERANS PARK AND ATHLETIC COMPLEX, PHASE II D4: Current system plus 6" loop around softball field back to street plus loop 8 11 line to Hwy. 60. * * * * * * * * * * K Y P I P E 4 * * * * * * * * * * * * * * * * University of Kentucky Network Modeling Software Copyrighted by KYPIPE LLC Version 2 -01/31/2005 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Sat Oct 08 02:19 :04 2005 INPUT DATA FILENAME --------------C :\KYPIPE-2\675-02-l\D4.DT2 TABULATED OUTPUT FILENAME --------C:\KYPIPE-2\675-02-l\D4 .0T2 POSTPROCESSOR RESULTS FILENAME ---C:\KYPIPE-2\675-02-l\D4.RS2 ************************************************ S U M M A R Y 0 F 0 R I G I N A L D A T A ************************************************ U N I T S S P E C I F I E D FLOWRATE ........... . HEAD (HGL) ......... . ~RESSURE ........... . p I p E L I N E D AT A STATUS CODE : xx -CLOSED p I p E NODE N A M E #1 gallons/minute feet psig PIPE CV -CHECK VALVE NAMES LENGTH DIAMETER #2 (ft) (in) ROUGHNESS COEFF. MINOR LOSS COEFF . ------------------------------------------------------------------------------- P -1 R-1 J-1 1038.54 7 .75 150.0000 0.00 P -2 J -1 J -3 420.17 7.75 150.0000 0.00 P-3 J-3 J -2 103 .03 7.75 150.0000 0.00 P-4 J-2 J -5 479 .41 5. 91 150.0000 0.00 P -5 J -5 J-4 52 .87 5.91 150.0000 0.00 P -6 J -5 J-7 263.78 5.91 150.0000 0.00 P -7 J-3 J -6 245.04 5. 91 150.0000 0.00 P -8 J -2 J -9 305.10 8.34 150.0000 0.00 P -9 J -9 J -8 56.95 8.34 150.0000 0.00 P -10 J-8 J -11 534 .63 8.34 150 .0000 0.00 P-11 J-11 J -10 409.40 8.34 150.0000 0.00 P -12 J -10 J -13 191. 91 8.34 150.0000 0.00 P -13 J -13 J -12 133.54 8 .34 150.0000 0 .00 P -14 J -13 J -14 155. 13 8.34 150 .0000 0.00 Page I of IO K:\00675 \6 75-02RB \Letter\Kypipe Ca lc \D4 .0T2 P-15 P-16 P -17 J -9 J-7 J -10 E N D N 0 D E D A T A NODE NAME J-1 J-2 J-3 J-4 J -5 J-6 J-7 J-8 J-9 J-10 J-11 J-12 J-13 J-14 J -16 R -1 R -2 0 U T P U T NODE TITLE 0 P T I 0 N J-16 J -9 R-2 EXTERNAL DEMAND (gpm) 0.00 0.00 0.00 1000.00 0 .00 0.00 1000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 D A T A 145.49 696.63 910.78 JUNCTION ELEVATION (ft) 261.00 264.00 263 .00 264.00 264.00 261.00 267.00 262.00 262.00 264.00 264.00 263.00 263.00 262.00 262.00 265.00 265.00 6.35 150.0000 6.35 150.0000 8.34 150.0000 EXTERNAL GRADE (ft) 455.00 455.00 OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT S Y S T E M C 0 N F I G U R A T I 0 N NUMBER OF PIPES ................... (p) 17 NUMBER OF END NODES ............... (j) 15 NUMBER OF PRIMARY LOOPS ........... (1) 1 NUMBER OF SUPPLY NODES ............ (f) 2 NUMBER OF SUPPLY ZONES ............ (z) 1 0.00 0.00 0.00 ================================================================================ Case: O RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY 0.00000 S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L) Page 2of10 K:\00675 \675-02RB \Letter\Kypipe Calc\D4 .0T2 p I p E L I N E R E s u L T s STATUS CODE: xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO . 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) ------------------------------------------------------------------------------- ---------- 15.12 15 .12 15.12 61.96 61.24 0 .01 0.00 0.04 12.34 12.34 12.34 0.00 0.00 0.00 0.00 42.66 12.34 E N D P -1 P-2 P-3 P -4 P -5 P -6 P -7 P -8 P-9 P -10 P -11 P -12 P-13 P -14 P -15 P -16 P-17 N 0 D E NODE NAME R-1 J-1 J -1 J -3 J -3 J -2 J-2 J -5 J -5 J -4 J-5 J -7 J -3 J -6 J-2 J-9 J-9 J-8 J -8 J -11 J -11 J -10 J -10 J-13 J-13 J -12 J -13 J -14 J -9 J-16 J-7 J -9 J -10 R-2 R E S U L T S NODE TITLE EXTERNAL DEMAND 958.30 15.70 0.00 6 .52 15 .12 958.30 6.35 0.00 6 .52 15 .12 958.30 1. 56 0.00 6 .52 15 .12 1006.35 29.70 0 .00 11. 77 61.96 1000.00 3.24 0.00 11. 69 61 .24 6 .35 0 .00 0.00 0.07 0.01 0 .00 0.00 0 .00 0.00 0.00 -48.05 0.01 0.00 0.28 0.04 -1041 .70 0.70 0.00 6 .12 12 .34 -1041 .70 6 .60 0.00 6.12 12.34 -1041.70 5.05 0.00 6.12 12.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 .00 0 .00 0.00 0 .00 0.00 0.00 0.00 0.00 0 .00 0.00 0.00 0.00 -993 .65 29.72 0.00 10 .07 42.66 -1041.70 11. 24 0.00 6 .12 12.34 HYDRAULIC NODE PRESSURE NODE GRADE ELEVATION HEAD PRESSURE Page 3of10 K:\00675 \675-02RB\Letter\Kypipe Calc\04.0T2 (gpm) (ft) (ft) (ft) (psi) ------------------------------------------------------------------------------ J -1 0.00 439.30 261.00 178.30 77.26 J-2 0.00 431.39 264.00 167 .39 72.54 J-3 0.00 432.95 263.00 169 .95 73.64 J-4 1000.00 398.45 264 .00 134.45 58.26 J-5 0 .00 401.69 264.00 137.69 59.66 J-6 0.00 432.95 261.00 171. 95 74.51 J -7 1000.00 401.69 267.00 134.69 58.36 J-8 0.00 432 .11 262.00 170. 11 73.71 J-9 0.00 431.40 262.0 0 169.40 73.41 J-10 0.00 443 .76 264.00 179.76 77.90 J-11 0.00 438.70 264.00 174.70 75.71 J-12 0.00 443.76 263.00 180.76 78 .33 J-13 0.00 443.76 263.00 180.76 78.33 J-14 0.00 443.76 262.00 181.76 78.76 J-16 0.00 431.40 262.00 169.40 73.41 R-1 455.00 265.00 190.00 82.33 R-2 455.00 265.00 190.00 82.33 s u M M A R y 0 F I N F L 0 W S A N D 0 U T F L 0 W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES ( -) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE R -1 958.30 R-2 1041.70 NET SYSTEM INFLOW 2000.00 NET SYSTEM OUTFLOW 0.00 NET SYSTEM DEMAND 2000.00 ================================================================================ Case: 1 C H A N G E S F 0 R N E X T S I M U L A T I 0 N (Change Number 1 ) Change 1 -No fire flow to softball concession. 2250 GPM to Pavilion. JUNCTION DEMAND S CHANGED -PLEASE SEE RESULTS TABLE RESULTS OBTAINED AFTER 6 TRIALS: ACCURACY 0.00008 P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE Page 4of10 K:\00675\675-02RB\Letter\Kypipe Calc\04.0T2 P I P E HL/ N A M E 1000 (ft/ft) 17.60 17.60 17.60 2.20 0.00 2.20 0 .00 8.92 0 .03 16.28 16 .28 0.00 0.00 0.00 43.17 1.55 16.28 E N D P -1 P -2 P -3 P -4 P -5 P -6 P -7 P -8 P -9 P -10 P -11 P -12 P -13 P -14 P -15 P -16 P -17 N 0 D E NODE NAME J -1 J -2 J -3 J -4 J -5 NODE NUMBERS FLOWRATE #1 #2 (gpm) R -1 J -1 1040 .18 J-1 J -3 1040 .18 J -3 J -2 1040.18 J -2 J -5 166.14 J -5 J -4 0.00 J -5 J -7 166 .14 J -3 J -6 0.00 J -2 J -9 874.04 J -9 J -8 40.18 J -8 J -11 -1209.82 J -11 J -10 -1 2 09 .82 J -10 J -13 0.0 0 J -13 J -12 0.00 J -13 J -14 0.00 J -9 J -16 1000.00 J -7 J -9 166. 14 J -10 R -2 -1209 .82 R E S U L T S NODE TITLE EXTERNAL DEMAND (gpm) HYDRAULIC GRADE (ft) 0.00 436 .73 0.00 427.52 0.00 429.33 0 .00(0.00) 426 .46 0.00 426.46 Page 5of10 K:\00675 \675-02RB \Letter\Kypipe Calc\D4 .0T2 HEAD MINOR LINE HL+ML/ LOSS LOSS VELO. 1000 (ft) (ft) (ft/s) (ft/ft) 18.27 0 .00 7.07 7 .39 0.00 7 .07 1.81 0.00 7.07 1. 06 0.00 1. 94 0.00 0.00 0.00 0 .58 0.00 1.94 0.00 0.00 0 .00 2.72 0.00 5 .13 0.00 0.00 0.24 8 .71 0 .00 7 .10 6 .6 7 0 .00 7 .10 0.0 0 0.00 0 .00 0.00 0.00 0.00 0.00 0.00 0 .00 6.28 0.00 10 .13 1. 08 0.00 1. 68 14.83 0.00 7.10 NODE ELEVATION (ft) 261.00 264.00 263.00 264 .00 264.00 PRESSURE HEAD (ft) 175 .73 163.52 166 .33 162.46 162.46 17.60 17.60 17.60 2.20 0.00 2 .20 0.00 8.92 0.03 16 .2 8 16.2 8 0 .00 0.00 0 .00 43.17 1. 55 16 .28 NODE PRESSURE (psi) 76 .15 70.86 72. 08 70.40 70.40 J -6 0 .00 429.33 261 .00 J -7 0 .00(0.00) 425.88 267.00 J-8 1250.00 424.80 262.00 J -9 0.00 424.8 0 262 .00 J -10 0 .00 440.17 264 .00 J-11 0 .00 433 .50 264 .00 J-12 0.00 440.17 263.00 J -13 0.00 440.1 7 263.00 J-14 0 .00 440.17 262 .00 J -16 1000.00 418 .52 262 .00 R-1 455.00 265 .00 R-2 455.00 265 .00 S U M M A R Y 0 F I N F L 0 W S A N D 0 U T F L 0 W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE NAME FLOWRATE (gpm) R -1 1040.18 R -2 1209 .82 NET SYSTEM INFLOW 2250.00 NET SYSTEM OUTFLOW 0.00 NET SYSTEM DEMAND 2250.00 Case: 2 NODE TITLE 168 .33 158.88 162.80 162 .80 176 .17 169 .50 177.17 177.17 178.17 156 .52 190.00 190.00 C H A N G E S F 0 R N E X T S I M U L A T I 0 N (Change Number = 72.94 68.85 70.54 70 .55 76.34 73 .45 76 .77 76.77 77.21 67 .82 82 .33 82.33 2 ) 1500 GPM fire flow to new soccer restsroom. No fire flow to other parts of park JUNCTION DEMANDS CHANGED -PLEASE SEE RESULTS TABLE RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY 0.00008 p I P E L I N E R E S U L T S STATUS CODE: xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) Page 6 of 10 K:\00675 \675-02RB\Letter\Kypipe Calc\D4 .0T2 P -1 R -1 J-1 491.14 4.38 P -2 J -1 J -3 491.14 4.38 P-3 J-3 J -2 491.14 4.38 P -4 J -2 J -5 78 .45 0.55 P -5 J-5 J -4 0.00 0.00 P -6 J -5 J -7 78.45 0.55 P -7 J -3 J -6 0.00 0.00 P -8 J -2 J -9 412 .70 2.22 P-9 J -9 J -8 491. 14 3 .07 P -10 J -8 J -11 491.14 3.07 P-11 J -11 J -10 491. 14 3.07 P-12 J -10 J -13 1500.00 24.25 P -13 J -13 J -12 1500.00 24.25 P -14 J -13 J -14 0.00 0 .00 P -15 J -9 J -16 0 .00 0.00 P -16 J -7 J -9 78.45 0. 39 P -17 J -10 R-2 -1008 .86 11. 63 E N D N 0 D E R E S U L T S NODE NAME J-1 J-2 J -3 J -4 J-5 J -6 J-7 J -8 J -9 J -10 J -11 J-12 NODE TITLE K:\00675 \675-02RB\Letter\Kyp ipe Calc\D4 .0T2 EXTERNAL DEMAND (gpm) 0.00 HYDRAULIC GRADE (ft) 450 .45 0.00 448 .15 0 .00 448.61 0.00(0.00) 447 .89 0.00 447.89 0.00 448.61 0 .00(0 .00) 447.75 0.00 447 .30 0.00 0 .00 0.00 1500 .00 Page 7of10 447.48 444 .41 445.66 436.51 4 .55 0.00 3 .34 1.84 0.00 3 .34 0.45 0.00 3.34 0 .26 0.00 0.92 0 .00 0.00 0.00 0 .14 0.00 0 .92 0.00 0 .00 0.00 0.68 0.00 2.42 0.17 0 .00 2.88 1.64 0.00 2.88 1.26 0 .00 2.88 4.65 0 .00 8.81 3.24 0 .00 8 .81 0 .00 0 .00 0 .00 0 .00 0.00 0.00 0.27 0.00 0.79 10.59 0.00 5.92 NODE ELEVATION (ft) PRESSURE HEAD (ft) 261 .00 264 .00 263 .00 264 .00 264 .00 261.00 267 .00 262 .00 262 .00 264 .00 264 .00 263 .00 189.45 184 .15 185 .61 183.89 183.89 187.61 180.75 185.30 185.48 180.41 181 .66 173.51 4 .38 4 .38 4.38 0.55 0 .00 0.55 0 .00 2.22 3.07 3 .07 3 .07 24.25 24 .25 0 .00 0.00 0.39 11.63 NODE PRESSURE (psi) 82 .09 79 .80 80 .43 79.69 79.69 81 .30 78.32 80.30 80.37 78.18 78. 72 75 .19 J -13 0.00 439.75 263.00 J-14 0.00 439.75 262.00 J -16 0.00 447 .48 262.00 R-1 455 .00 265.00 R-2 455 .00 265.00 S U M M A R Y 0 F I N F L 0 W S AND 0 U T F L 0 W S (+) I NFLOWS INTO THE SYSTEM FROM SUPPL Y NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE NAME FLOWRATE (gpm) R -1 491.14 R -2 1008.86 NET SYSTEM INFLOW 1500 .00 NET SYSTEM OUTFLOW 0.00 NET SYSTEM DEMAND 1500.00 Case: 3 NODE TITLE 176 .75 177 .75 185 .48 190.00 190.00 C H A N G E S F 0 R N E X T S I M U L A T I 0 N (Change Number = 76 .59 77 .03 80.37 82.33 82 .33 3 ) Change 3 -1500 GPM fire flow to other soccer RR. No other fire flow in park . JUNCTION DEMANDS CHANGED -PLEASE SEE RESULTS TABLE RESULTS OBTAINED AFTER 3 TRIALS: ACCURACY 0 .00000 p I P E L I N E R E S U L T S STATUS CODE: xx -CLOSED PIPE CV -CHECK VALVE p I p E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) P -1 R -1 J -1 4 91. 14 4 .55 0 .00 3.34 4.38 4.38 P -2 J -1 J -3 491.14 1.84 0.00 3.34 4.38 4 .38 Page 8of10 K:\00675 \675-02RB \Letter\Kypipe Cal c\D4 .0T2 P -3 J-3 J -2 491.14 4.38 P -4 J -2 J -5 78.45 0.55 P -5 J -5 J -4 0.00 0.00 P -6 J -5 J -7 78.45 0 .55 P -7 J -3 J -6 0 .00 0.00 P -8 J -2 J -9 412 .70 2.22 P -9 J -9 J -8 491.14 3.07 P -10 J -8 J -11 491 .14 3 .07 P -11 J -11 J -10 491.14 3.07 P -12 J -10 J -13 1500.00 24.25 P -13 J -13 J -12 0.00 0.00 P-14 J -13 J-14 1500 .00 24.25 P -15 J-9 J -16 0.00 0.00 P -16 J -7 J-9 78.45 0.39 P -17 J -10 R -2 -1008 .86 11.63 E N D N 0 D E R E S U L T S NODE NAME J -1 J -2 J -3 J -4 J-5 J -6 J -7 J -8 J-9 J-10 J-11 J-12 J -13 J-14 J-16 R-1 R-2 NODE TITLE K:\00675 \675-02RB \Letter\Kypipe Calc\D4 .0T2 EXTERNAL DEMAND (gpm) HYDRAULIC GRADE (ft) 0.00 450 .45 0.00 448 .15 0.00 448.61 0.00(0 .00) 447 .89 0.00 447 .89 0.00 448.61 0 .00(0 .00) 447.75 0.00 0.00 0.00 0.00 0 .00 0.00 1500.00 0 .00 Page 9of10 447 .30 447.48 444 .41 445.66 439 .75 439.75 435 .99 447.48 455 .00 455 .00 0.45 0 .00 3 .34 0.26 0.00 0.92 0.00 0.00 0.00 0.14 0.00 0.92 0 .00 0 .00 0 .00 0.68 0.00 2 .42 0 .17 0.00 2 .88 1. 64 0.00 2 .88 1. 26 0.00 2.88 4.65 0 .00 8 .81 0.00 0.00 0.00 3 .76 0 .00 8.81 0.00 0.00 0.00 0 .27 0.00 0 .79 10 .59 0 .00 5.92 NODE ELEVATION (ft) PRESSURE HEAD (ft) 261 .00 264.00 263.00 264 .00 264.00 261.00 267 .00 262.00 262.00 264 .00 264.00 263.00 263 .00 262.00 262 .00 265 .00 265 .00 189.45 184 .15 185.61 183 .89 183.89 187 .61 180.75 185.30 185 .48 180 .41 181.66 176.75 176.75 173.99 185.48 190 .00 190 .00 4.38 0.55 0.00 0.55 0.00 2.22 3 .07 3.07 3.07 24 .25 0.00 24 .25 0.00 0 .39 11. 63 NODE PRESSURE (psi) 82.09 79.80 80.43 79.69 79 .69 81 .30 78 .32 80.30 80 .37 78.18 78. 72 76.59 76.59 75 .40 80.37 82 .33 82.33 S U M M A R Y 0 F I N F L 0 W S AND (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE NAME FLOWRATE (gpm) R-1 491 .14 R -2 1008 .86 NET SYSTEM INFLOW 1500.00 NET SYSTEM OUTFLOW 0 .00 NET SYSTEM DEMAND 1500.00 NODE TITLE 0 U T F L 0 W S ***** HYDRAULIC ANALYSIS COMPLETED ***** Page 10of10 K:\00675 \675-02RB \Letter\Kypipe Calc\D4.0T2 ---------------------