Loading...
HomeMy WebLinkAbout32 DP University Town Center 05-53AMENDMENT TO THE DRAINAGE REPORT FOR Lots 1A, 1 B & Portion of Lot 2 University Town Center Phase One -9.69 Acres, & The Sahara Realty Group, Ltd. Unplatted Tract (Vol. 6330, Pg. 177) -7.47 Acres & The BOC Properties/Construction, Inc. Unplatted Tract (Vol. 6298, Pg. 201) -4.51 Acres Richard Carter Survey, A-8 College Station, Brazos County, Texas May 15, 2006 DEVELOPED BY: Sahara Realty Group , Ltd. Mr. David Scarmardo 111F.M .2818 Bryan , Texas 77805 and BOC Properties/Construction , Inc. Mr. Bobby Cox 4055 International Plaza , Suite 450 Fort Worth , Texas 76109 PREPARED BY: Kling Engineering & Surveying 4101 S . Texas Avenue , Suite A Bryan , TX 77802 (979) 846-6212 Amendment to the Drainage Report for Lots lA, lB & Portion of Lot 2 University Town Center Phase One -9.69 Acres, & A Portion of The Sahara Realty Group, Ltd. 7.47 Acre Un platted Tract (Vol. 6330, Pg. 177) -6.15 Acres PURPOSE: & The BDC Properties/Construction, Inc. Unplatted Tract (Vol. 6298, Pg. 201) -4.51 Acres Richard Carter Survey, A-8 College Station, Brazos County, Texas May 15, 2006 The purpose of this report amendment is to document the revised detention pond configuration. The revised configuration will achieve a similar level of excess storm water runoff attenuation as the original desi gn documented in the June 2005 drainage report (see Appendix Al for revised pond plan). Detention Facilities Design: The defined pond characteristics documented in the original report (see Table 10 , page 10 of original report) are revised as follows: Detention Pond Characteristics: Elevation Area Volume Volume Sum (ft) (sq.ft) (ac -ft) (ac-ft) 293 .00 6221 0 .000 0.000 294 .00 11882 0.204 0 .177 295 .00 16061 0 .074 0.453 296 .00 16061 0.369 0 .822 297 .00 16061 0.369 1 .190 298 .00 16061 0 .369 1 .559 299 .00 16061 0 .369 1 .928 300 .00 16061 0 .369 2 .297 301 .00 1606 1 0 .369 2 .665 302 .00 26482 0 .547 3.261 303 .00 26482 0 .608 3 .869 304 .00 26482 0 .608 4.477 305 .00 26482 0.608 5 .085 306.00 26482 0 .608 5 .692 307 .00 26482 0 .608 6 .300 308 .00 26482 0.608 6 .908 Table 1 O(rev) Outlet Works: UTC/SRG/BDC -Amendment to Drainage Report -Page 2 1-6'x2 ' Reinforced Concrete Box with 6" tall cast in place concrete stop at entrance flowline forming a 1.5'x6' vertically arranged , rectangular orifice at FL=297.00. 6'x2' RCB installed@ 0.6% slope for outfall (not a controlling structure) 129 lf emergency overflow weir at north side of pond EL=307.00 The following table summarizes results of ultimate development storm water routing & can be used to compare results to pre development peak discharge rates from the Project Area Outfall (pre de velopment table located in Appendix A2). Refer to Appendix A3 "Detention Routing Calculations - Post Development Conditions" for computation summary and graphical representation of hydrogra phs and pond water surface elevations. PEAK DISCHARGE RATE STORM EVENT (CFS) 2YR SYR 10 YR 25YR 50 YR 100 YR DA-1/S8-1 98.83 122 .16 138 .38 158.64 180.00 187 .82 Volume 1 Inflow 98 .83 122 .16 138.38 158.64 180.00 187.82 Volume 1 Discharge I 87.21 I 106.37 I 120.34 I 136 .52 I 147.62 I 151 .63 / WSEL 304 .1 304 .5 304 .8 305 .1 305 .5 305.8 DA-1/S8-3 84 .54 102.81 115.39 131 .7 8 148.97 154.73 Volume 2 Inflow 121 .77 146.95 164 .21 187.33 210.96 218 .7 4 Volume 2 Discharge I 98 .81 I 115.93/ 124.73 I 135.60 I 145.97 I 149 .01 I WSEL 300 .19 301.4 302.18 303 .3 304 .3 304.6 DA-1/S8-2 8.28 10 .06 11 .30 12.90 14.59 15.23 DA-2/S8-1 45.45 55.90 63 .13 61.78 67.88 70.08 DA-2/58-2 12.50 15.34 17.31 19.81 22.44 23.42 Volume 3 Inflow 145 .76 164.47 173 .16 181 .08 190 .91 194.49 Volume 3 Discharge 145 .7 3 I 164.44 I 172.73 I 180.82 I 190.62 I 194 .03 I ( = Project Outfall) I WSEL 296.4 297 .9 298.6 299.3 300.1 300.5 Table 11 (rev) Storm Sewer: As stated in the original report , the storm sewer syste m was designed to accommodate the post developed runoff from the Project Area. The design storm is the 25 yea r event. Additionally. the 2-48" RCP portion of the storm sewer extending from the detention pond to the west boundary line of the BDC Properties tract accommodates existing conditions , off site runoff. UTC/SRG/BDC -Amendment to Drainage Report -Page 3 The storm sewer system was re-analyzed with the revised pond, peak water surface elevations as the starting tailwater. The following table summarizes the inlet characteristics , contributing flow rates , and hydraulic grade line elevations for the 25 year event. Inlet/ Type TC/Rim I FL Capacity Contributing Q HGL Elev Junction (ft) (cfs) (cfs) (ft) Run 'A' *28 Junction 309 .35/309 .35/301 .24 n/a *1.01 303 .29 *29-25 Grate 308 .00/308 .00/301 .90 34 .69 22 .51 303.43 14 Grate 308 . 50/308 . 50/303 . 04 5.00 0 .71 303.48 Run 'B' 33 Curb 308 . 30/307 . 80/300 . 00 10 .72 6 .96 303 .78 30 Curb 308.50/308.00/303.01 10 . 72ea side 9.59 306 .39 32 Curb 308 .95/308.45/303 .34 8.25 5.14 306.41 *44 Grate 315.50/315.50/306.37 *57 .00 53.03 308 .74 31 Curb 308 .95/308.45/306 .2 5 8.25 0.78 306 .79 Run 'C' 46 Obi Grate 306 . 7 5/306 . 75/300 .40 12 .0 8 .29 304.46 36 Curb 307 . 54/307 . 04/300. 80 10.89 12.90 305 .11 38 Curb 307 .54/307 .04/301 .00 10 .89 5.63 305.77 *BDC-M Grate 308.00/308 .00/301.41 9 .13 *77 .21 306.45 BDC-3 Junction 310 .00/310 .00/3 02.40 n/a 119.63 306 .98 Table 12(rev) *28: Contributing Q added to pipe P-28 downstream of junction -assumed building roof downspouts . *29-25: ADA compliant Trench Grate starting at plan inlet #29 terminating injunction box of #25. *44: Ponding depth of 2 ft used for capacity calculation. Grate capacity determined by orifice equation. *BDC-M: For purposes of this anal ysis , contributing Q is not from overland flow to the inlet. Contributing Q is the combined contributing Q from I-BDC-1 & I-BDC-2 .. These two inlets are not included as part of a formal design to date . 30" RCP stub outs have been included in design plans to accommodate future inlets if deemed necessary. Inlet capacity sized to accommodate 1 acre of commercial de v elopment runoff ( Cave=O. 8 7) at 3" ponding depth. UTC/SRG/BDC -Amendment to Drainage Report -Page 4 CONCLUSIONS: The detention pond and storm sewer system comply with the City of College Station Drainage Policy and Design Standards. The detention pond detains through the 100 year storm event and the storm sewer system does not exceed the maximum storage depths for parking and landscaped areas. "I hereby certify that this amendment to the drainage report for Lots lA. lB. and a portion of Lot 2 of the Universitv Town Center Phase One plat consisting of approximately 9 .69 acres -Citv of College Station case #04-269: a portion of the 7.47 acre Sahara Realty Group. Ltd. unplatted tract - Vol. 633 0. Pg. 177, consisting of approximately 6.15 acres: and the BDC Properties/Construction. Inc . unplatted tract consisting of approximately 4.51 acres -Vol. 6298. Pg. 201 was prepared under my supe rvision in accordance with the provisions of the City of Co lle ge Station Drainage Polic y and Desi gn Standards for the owners thereof." APPENDIX A1 Revised Pond Plan . - APPENDIXA2 Pre Development Peak Runoff Rates UTC/SRG/BDC -Dra inage Report -Page 8 The following table summarizes total discharges from the existing Project Area under pre dev eloped conditions (refer t o Appendix 6a "Detention Routing Calculations -Pre Development Conditions"). PEAK DISCHARGE RATE STORM EVENT (CFS) 2YR 5YR 10 YR 25YR 50YR 100YR DA-1/58-1 98 .74 122 .52 139 .12 159 .65 181.33 189 .26 DA-1/58-2 6 .29 7.65 8.59 9.80 11 .09 11 .58 DA-2/58-1 45.45 55 .90 63.13 61 .78 67 .88 70 .08 DA-2/58-2 12 .50 15.34 17.31 19 .81 22.44 23.42 Project Outfall/ 138 .3 I 162.3 / 175 .5 / 187 .0 I 196 .0 I 199 .1 I W5EL 296 .3 298 .4 299.6 300 .7 301.7 302 .0 Tab le 6 APPENDIX A3 Detention Routing Calculations Post Developed Conditions 12/22/20 05 11 :32 97 9 8468252 DEVELOPMENT PERMIT PERMIT NO. 05-53 PAGE 02 /02 CITY OF COLI.EGE STATION rJ.n.J.1 cf O-t.p.,mt SmnM FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: University Town Center Phase 28 DATE OF ISSUE: December 21, 2005 OWNER: David Scarmardo 1289 N. Harvey Mi tchell Parkway Bryan, Texas 77803 SITE ADDRESS: University Drive DRAINAGE BASIN: Burton Creek VALID FOR 12 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Fu ll Development Permit SPECIAL CONDITIONS: All construct ion must be in comp li ance with the approved construct ion plans All trees requ ired to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7 .5. E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this perm it. The clean ing of equipmen t or materials with in the drip line of any tree or group of trees that are protected and required to remain is strictly prohib ited . The disposal of any waste material such as, but not limited to , paint, oil , solvents , asphart , concrete , mortar, or other harmful fiquids or materials .within the drip fine of any tree requ ired to remain is also prohibited . Full Development Perm it The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immed iate construction site in accordance with the approved eros ion control plan as well as the City of College Station Drainage Policy and Design Criter ia. If it is determ ined the prescribed eros ion control measures are ineffective to retain all sediment onsite , it is the contractors respons ibility to irnpfement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner andfor Contractor shall also insure that an y disturbed vegetation be returned to its original condition , placement and state. The Owne r and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, sll tation or sedimentat ion resulting from the permitted work . rn accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existi ng drainage facilities . I hereby grant this pe rmit for developmen t of an area outside the special flood hazard area . All development shall be in accordance with the prans and specifications submitted to and approved by the City ~ngineer in the development perm it application fo r the ab ov e named project and all of the codes and ord inances of the City of College Station tha t apply. ;2/21/GJ Date Date A PUBLIC INFRASTRUCTURE CONSTRUCTION ESTIMATE UNIVERSITY TOWN CENTER DECEMBER 21 , 2005 ITEM EST . ITEM DESCRIPTION & PRICE IN WORDS I UNIT PRICE IN I TOTAL PRICE IN NO . QTY . U NIT FIGURES FIG U RES PHAS _ 28 V\/A l t:K Lii\ c: 1 28 LF Furn ish and Install 8" PVC Water Main (AWWA C-900 , DR 14 , $30.00 $84 0 .00 Pressure C lass 2 00 ) -Stand ard Depth-4'-6' Bury com plete and in place for Doll ars and Cents per linear foot. 2 1 EA Furnish and Insta ll 8" M .J. 45° Bend , to include all necessary $200 .00 $20 0 .00 thrust b locking , complete a nd in p lace for Doll ars and Cents each . 3 1 EA Furn ish and Install Sa lvaged Blowoff V a lv e , comp lete and in $3 00 .00 $3 00 .00 place for Do ll ars and Ce nts per each . PHASE 28 WATERLINE TOTAL: $1,340.00 (ITEMS 1 -3) • -PUBLIC INFRASTRUCTURE CONSTRUCTION ESTIMATE UNIVERSITY TOWN CENTER DECEMBER 21, 2005 ITEM EST. ITEM DESCRIPTION & PRICE IN WORDS I UNIT PRICE IN I TOTAL PRICE IN NO. QTY. UNIT FIGURES FIGURES PHAS ,_ 2B SAi\ IARY )EWER LINE: 4 775 LF Remove Existing 8" Clay Sanitary Sewer Pipe -Average Depth $20.00 $15,5 00.00 -1 O' (min depth -4'/max depth-18') complete for for Dollars and Cents 12er lineal feet. 5 1 EA Demolish and Remove Existing -10' depth Sanitary Sewer $900 .00 $900 .00 Manhole , dispose of off-site complete for Dollars and Cents each . 6 775 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26 , $45.00 $34 ,875.00 ASTM 03034) -Extra Depth-Average 1 O' (min depth -4'/max depth-18') complete and in place for Dollars and Cents per linear foot. (Structural Class Embedment & Backfill) 7 1 LS Install by-pass pump for the removal and installation of 775 LF $1 ,600 .00 $1 ,600 .00 San itary Sewer Pipe (Ref. Item 4&6). for Dollars and Cents 12er lumQ sum . 8 6 EA Connect to Existing Sanitary Sewer Manhole . Furnish and $800 .00 $4,8 00 .00 Install Manhole Connection into Existing Manho le, complete and in place for Dollars and Cents per each. 9 2 EA Reconnect 6" Deep Cut Sanitary Sewer Service Connection (t o $600 .00 $1,2 00 .00 include flowline adjustment) complete and in place __ ..... ~t~ for Dollars ---f,. c ~~d Cents per each . ~~~ ..... , ... o.._ ~ .'.' _J Ir...._ •• li''lt. '-"l ~ .... t.;· ··-· .. ··-·--... .!~.~ PHASE 28 SANITARY SEWER TOTAL: $58,875.00 B. J. KLING Ii.! ...-:~11111•-.voiu••,.•«•••ao"7•;;4I (ITEMS 4-9) t,~~~I! • ~ ~ .-:.• -•-=-&~ c~ ~~...:-~ SUMMARY 2., .-~· .,..A~~-0 ~ ;)" ~ ...... ~. PHASE 28 WATERLINE TOTAL: $1,340.00 PHASE 28 SANITARY SEWER TOTAL: $58,875.00 TOT AL PUBLIC INFRASTRUTURE CONSTRUCTION COST ESTIMATE: $60,215.00 15% CONTINGENCY: $9,032.25 GRAND TOTAL: $69,247.25 12/22 /2005 11 :32 97984 5 8252 KLING ENGINEERING & SURVEYING 4101 Texas Ave., Suite A Bryan, TX nso2 PAGE 01 /0 2 +Phone: (979)846-6212 +Fax: (979)846~8252 +Email: stewart@klingeng.com FAX COVER SHEET DATE: ii 111-\ Dt; Please deliver the following pages to : NAME: G 0 0 \t1 ~ \Wtur\ FIRM: C\~ ~ ~V\\M{p S1111i ['() FAX NUMBER: jlJ lf---{:~1 lJ FROM; h,\j n~ ~I y\{QY] Y\~ We are transmitting 1-page{s), including this cover letter from our fax number listed above. If any pages are missing or incomplete, please contact sender. Regarding: urv dt\lCI pt?D'.ltnt pcrm\t SITE PLAN APPLICATION MINIMUM SUBMITTAL REQUIREMENTS _L Site plan application completed in full . ~ $200.00 Application Fee. ~ $200.00 Development Permit Application Fee. ~ $600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public waterline , sewerline , sidewalk, street or drainage facilities is involved .) ~Eleven (11) folded copies of site plan ~One (1) folded copy of the landscape plan . _X_One (1) copy of building elevation required for buildings with a footprint of 20 ,000 sq . ft. or greater _X_A list of building materials for all facades that are visible from the public right-of-way . ~A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not checked off. N/A Parkland Dedication requirement approved by the Parks & Recreation Board , please provide proof of approval (if applicable). Date of Preapplication Conference: ..;;:5;.,,;;;e_._p"""'te..;;...m~b.....::.e....;..r_;1.....::.3""-, ...;;;;2;,..;.;,0...;;;.0.....::.4 ______________ _ NAME OF PROJECT University Town Center LEGAL DESCRIPTION 17 .7 acres comprised of Lots 4R (4 .62ac) 3R (5 .85ac) Replat of Lots 1 &2 Henton Subd ., Vol. 6347, Pg. 185 and 7.26 ac (Putz) tr, Vol. 6078 , Pg . 247 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name David Scarmardo -Sahara Realty Group , Ltd . Street Address 1289 N. Harvey Mitchell Parkway State TX Zip Code ___ _,_7~78~0'-=3_ Phone Number -'9'-'7-=9-'-7-"7-=9-'-7-=2=-=-0-=-9 ______ _ PROPERTY OWNER'S INFORMATION : City Bryan E-Mail Address david@scarmardofoods.com Fax Number 979-822-1763 Name ~S~am~e--------------------------------~ Street Address ------------------City __________ _ State _____ Zip Code _____ _ Phone Number------------ ARCHITECT OR ENGINEER 'S INFORMATION : Name Kling Engineering & Surveying Street Address 4101 S. Texas Ave . Suite A State ----'T~X'--Zip Code ---~7_7_80_2_ Phone Number -'9'-'7-=9-'-8=-"4'"""6-'-6=2'-'-1 =2 ______ _ 6/13/03 E-Ma il Address ____________ _ Fax Number _____________ _ City Bryan E-Mail Address stewart@klingeng .com Fax Number 979-846-8252 1 of 6 KLIN G ENGINEERI N G & S URVEYING Consulting E ngin eers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Memo: B .J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. Telephone 979/846-6212 Fax 979 / 846-8252 To: City of College Station-Development Services A lan Gibbs, P. E. I Jennifer Reeves Re : University~-Revised Site Plan Submittal From : Fred Pai ~ Post Office Box 4234 Bryan, Texas 77805 September 30, 2005 Accompanyi ng this memo is a revised site plan submittal package. Revisions are clouded and generally summarized as follows: • Splitting Phase 2 into Phase 2A & Phase 2B • Shifting the Tarrow driveway to center the BOC Properties/University Town Center Property Line (Cross Access Agreement currently being drafted for signature by both property owners) • Additional Parking resulting from the driveway shift • Public Electric line routing revisions (coordination with City of College Station Utilities has already taken place) • Lengthen ing of waterline stub out to BOC tract • Raise existing SSMH lids to match proposed top of roadway pavement • Shift in some of the private s ite lighting fixtures Based on the splitting of Phase 2 , I am requesting on behalf of the Owner, Sahara Realty Group, Ltd ., that the current Development Permit for Phase 2 be terminated and replaced with a Development Permit for Phase 2A and a separate Development Permit for Phase 2B . Attachments: 2 -Site Plans (Inclusive of Utilities & Landscaping) 1 -$200.00 Development Permit Fee for 2"d DP 1 -Pat io Area Exhibit for Reference KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Memo : B.J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. To: City of College Station Development Services Telephone 979/846-6212 Fax 979 / 846-8252 c/o Allen Gibbs, Jennifer Reeves From : Fred Paine ~ Re: University Town Center City Case File #04-00500259 Post Office Box 4234 Bryan, Texas 77805 December 15, 2005 Response to Engineering Comments received at December 05 , 2005 meeting ENGINEERING Site Plans 1. Sheet Cl.1 -Expanded public utility easement adjacent to the Phase-I 10,000 sf building to cover the existing fire service line. fbt?r~Le, fl=rrw( ;;i) t»1'1:N•(f ~ 2 . Sheet Cl.3 -Added location of a double check valve & vault to the 7,618 sfrestaurant (Abuelo's). Public utility easement ends prior to double check valve . \/" 3 . Sheet Cl.3 -Expanded public utility easement leading to the 6,526 sf "arched" restaurant building to cover the proposed 6" fire service line to the building & branched water service lines to be generally outside of the expanded easement. / 4 . Sheet Cl.3 -Revised the entrance to the commercial driveway opposite East Tarrow Drive at University Drive per final layout in accordance with TXDOT & Joe Blaschke 's recommendations. / 5. Sheet C3.4 -Revised grading plan to reflect the entrance revision mentioned in item 4 above . V Utility Plans 6 . Sheet SS-1 -Revised description at Sta 0+00 -Previously noted to demo & remove existing SSMH. & install new . Due to the final revised entrance (4 above) we no longer ny ed to demo / the existing SSMH and can use it in it's current location. Mt-p If!, ~i.<-Y!.f? V ~ N,,o.J lS"'"1"f-./. Sheet C6.6 -Resubmitted -no change just not sure it ever got approved as it was ori ~nally t;J.J,.~ 7. submitted with the Phase 2a submittal. ~~ '? ../ \7~.r ~(' ~~ --~ tve f.v ~ -to AP~ pg 1 of 1 KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Tel. 979/846-6212 Fax 979/846-8252 TO: City of College Station -Development Services DATE: PROJECT NO.: December 16 , 2005 P.O. Box 4234 Bryan, Texas 77805 PROJECT NAME: University Town Center ATTENTION: Alan Gibbs WE TRANSMIT: D Under Separate Cover ./ Enclosed VIA: DMail ./ Messenger D Federal Express D Lone Star Overnight DUPS D Special Courier D Picked Up By Your Office REFERENCE: THE FOLLOWING : D Prints D Copies D Originals D Plat D Field Notes ./Plans DReport D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice NO . DESCRIPTION 1 Cover Letter documenting changes Final Site Plans FOR: ./ Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review , Revision & Return D Your Signature & Return D Your File and/or Use D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To : 6 Site Plans (3 for City, 3 for stamping & return to KES If Enclosures Are Not As Noted Please Notify Us At Once. KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Tel. 979/846-6212 Fax 979/846-8252 TO: City of College Station -Development Services DATE: Texas Dept. of Transportation -Area Office PROJECT NO.: 12/13/05 P .O. Box 4234 Bryan, Texas 77805 PROJECT NAME: University Town Center Entrance #1 Driveway & Sidewalk Permit ATTENTION: Alan Gibbs I Jay Page REFERENCE: WE TRANSMIT: D Under Separate Cover ./Enclosed VIA: D Mail ./ Messenger D Federal Express D Lone Star Overnight OUPS D Special Courier D Picked Up By Your Office THE FOLLOWING: D Prints D Copies D Originals D Plat D Field Notes ./Plans ./Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice NO . DESCRIPTION 4 TXDOT Permit FOR: ./ Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review, Revision & Return D Your Signature & Return D Your File and/or Use D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To : If Enclosures Are Not As Noted Please Notify Us At Once. From: To: Date: Subject: Lance "Chuck Ellison" <Chuck@ellisonlaw.com> "Lance Simms" <Lsimms@cstx .gov> 12/7/2005 8 :59 :31 AM RE : Univers ity Town Center I should be thanking you because as always , you go the extra mile to help resolve issues . We appreciate your assistance and promptness very much . You have accurately described our discussion in this e-mail. Thank you again ! Chuck -----Orig inal Message----- From : Lance Simms [mailto :Lsimms@cstx.gov] Sent: Tuesday, December 06 , 2005 12:31 PM To: Chuck Ellison Cc : Alan Gibbs; Chris Haver; Joey Dunn ; Jennifer Reeves; Kim Foutz ; Lee Robinson Subject: University Town Center Chuck: Thanks for meeting with City staff earlier today concerning building permits and site plan issues related to Abuelos restaurant in Phase 28 , Univers ity Town Center. I wanted to follow-up with a summary of our discussion . Slab only permit: The City is willing to issue a slab only permit for Abuelos provided the site issues identified in the meeting are resolved . This includes finalizing the location of the backflow prevention device for the fire sprinkler system and reconciling the civil/architectural plans. The contractor also needs to amend the building permit application to request a slab only. Full building permit: The City will issue a full building permit for Abuelos after~. To date , the primary issue delaying site plan approval has been the TxDot permits..for the two access points on University Drive East. It is my understanding that you are working with a consultant to expedite the driveway permit process through TxDot. Certificate of Occupancy (CO): A temporary or permanent CO will be issued for Abuelos after the structure and site are found to be in compliance with City codes and ordinances (this includes parking areas , landscaping , drives , etc.). We acknowledge that the other structures P.roposed in phase 28 may not be complete at the time a CO is issued far Abuelos . We also realize that the detention area may not be 100% comp leti However, the detention area must be fully functioning as ~termined by City engineers prior to the issuance of a CO. ' Thanks again Chuck and please let me know if th is summary does not accurately describe our discussion . Lance Simms KLING ENGINEERING & SURVEYING 4101 Texas Avenue, Suite A Bryan, Texas 77802 Consulting Engineers • Land Surveyors Tel. 979/846-6212 Fax 979/846-8252 P .O. Box 4234 Bryan, Texas 77805 TO: City of College Station -Development Services DATE: December 16, 2005 ATTENTION: Alan Gibbs WE TRANSMIT: D Under Separate Cover ./Enclosed VIA: DMail ./ Messenger D Federal Express D Lone Star Overnight DUPS D Special Courier D Picked Up By Your Office NO . PROJECT NO.: PROJECT NAME: University Town Center REFERENCE: THE FOLLOWING: D Prints D Copies D Originals D Plat D Field Notes ./Plans D Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice DESCRIPTION Phase 2B Public Infrastructure Plans FOR : ./ Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review , Revision & Return D Your Signature & Return D Your File and/or Use D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To: 9 Plan sets (6 for City, 3 for stamping & return to KES) If Enclosures Are Not As Noted Please Notify Us At Once . Signed : Fred Pain~ From: To: Date: Subject: Alan, "Fred Paine" <fred@klingeng .com> "Gibbs, Alan P" <agibbs@cstx .gov> 11/29/2005 8:50 :29 AM University Town Center -Replat Attached is a pdf version of the proposed revisions to the replat that was previously approved at P&Z . The revisions are as follows : 1. Revision to the Private Access Easement at the Tarrow side commercial driveway 2 . Shifts in various portions of the Public Utility Easements to cover as-built utility locations 3. Addition of dimensions and detail insets dimensioning in greater detail existing easements (sheet 4) I am hoping the revisions will not require another submittal to P&Z as we are not adding nor removing easements that weren't on the original approved version . Please review and let me know at your earliest convenience . Best, Fred Paine KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue , Suite A Bryan , Texas 77802 Telephone 979/846-6212 Fax 979/846-8252 KLING ENGINEERING & SURVEYING 4101 Texas Avenue, Suite A Bryan , Texas 77802 Consulting Engineers • Land Surveyors Tel. 979/846-6212 Fax 979/846-8252 P.O . Box 4234 Bryan , Texas 77805 TO: City of College Station -Development Services DATE: 10/05/05 ATTENTION: Jennifer Reeves WE TRANSMIT: D Under Separate Cover ./Enclosed VIA: OMail ./ Messenger D Federal Express D Lone Star Overnight OUPS D Special Courier D Picked Up By Your Office PROJECT NO.: PROJECT NAME: University Town Center Revised Site Plans REFERENCE: THE FOLLOWING: D Prints D Copies D Originals D Plat D Field Notes ./Plans D Report D Estimate D Cut Sheets D Computer Printout DFile D Contract ./ Other -DP Fee FOR: ./ Your Review & Approval ./Your Review & Comment D Your Review & Distribution D Your Review, Revision & Return D Your Signature & Return D Your File and/or Use D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To : NO. DESCRIPTION 1 2 1 Cover Letter Site Plans -Revised Additional Development Permit Fee If Enclosures Are Not As Noted Please Notify Us At Once . Signed: Fred Pain~