Loading...
HomeMy WebLinkAbout27 DP Waterwood Ph 505-49 1001 Krenek Tap(f ~ DEVELOPMENT PERMIT PERMIT NO . 05-49 Project: WATERWOOD CONDOS PHASE 5 COlllGl STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: E&M JONES FARM PLACE PORTION OF LOT 2 DATE OF ISSUE: 08/31/06 OWNER: JIM STEWART 4200 WOODLAND PARK CT ARLINGTON , TEXAS 76013 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: KRENEK TAP RD AND CENTRAL PARK LN DRAINAGE BASIN: Main Bee Creek VALID FOR 9 MONTHS CONTRACTOR: Full Development Permit All construction must be in compl iance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operati ons of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to rema in is strictly prohibited . The disposal of any waste material such as, but not limited to , paint , oil , solvents, asphalt, concrete , mortar, or other harmful liquids or materials with in the drip line of any tree required to remain is also prohibited . EROSION CONTROL TO BE MAINTAINED . TCEQ PHASE II RULES IN EFFECT The Contractor shal .1. take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sed iment onsite , it is the contractors responsibility to imp lement measures that will meet City, State and Federal requ irements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation result ing from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construct ion, erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the C ity Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that appl y. ~ 'DB -.31-o(o Date Owner/ Agent/Contractor Date ((~ DEVELOPMENT PERMIT PERMIT NO. 05-49 Project: WATERWOOD CONDOS PHASE 5 COLllGl STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: E&M JONES FARM PLACE PORTION OF LOT 2 DATE OF ISSUE: 9/29/05 OWNER: JIM STEWART 4200 WOODLAND PARK CT ARLINGTON I TEXAS 76013 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: KRENEK TAP RD AND CENTRAL PARK LN DRAINAGE BASIN: Main Bee Creek VALID FOR 9 MONTHS CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to rema in is strictly prohibited . The disposal of any waste material such as, but not limited to , paint , oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . EROSION CONTROL TO BE MAINTAINED . TCEQ PHASE II RULES IN EFFECT The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Administrator/Representative Date ~·:.~ Own~;noc:ractOr Date Item No. General 1 Water 2 3 4 5 6 7 8 9 10 Waterwood Townhomes Phase 5 Engineer's Estimate Public Infrastructure Only Description Unit Mobilization LS 6" PVC AWWA C909 CL200 Water Line with Structural Backfill LF 3" PVC ASTM D2241-CL200 LF 6" x 45 MJ Bend EA 6" x 90 MJ Elbow EA 6" x 6" MJ Tee EA 6" MJ Gate Valve & Box EA Connect to Existing System EA Standard Fire Hydrant Assembly EA Trench Safety LF Contingency 15% General Total Water Total I Grand Total Quantity Unit Price Total 1 $10 ,000 $10 ,000 920 $30 $27 ,600 39 $15 $585 6 $350 $2 ,100 1 $350 $350 7 $600 $4 ,200 6 $800 $4 ,800 2 $2 ,000 $4,000 2 $3,000 $6,000 920 $4 $3 ,680 $9,497 $10,000 $53,315 $72,812 ' CITY OF COLLEGE STATION Planning & Development Services FOR OFFICE U~ ONLY Case No. OS -d~J Date Submitted 1'-\'l:' D) DEVELOPMENT PERMIT MINIMUM SUBMITTAL REQUIREMENTS ~ $200 development permit fee . ~ $600.00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public waterline, sewerline, sidewalk, street or drainage facilities is involved .) ~ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each ~ Notice of Intent (N.0.1.) if disturbed area is greater than 5 acres Date of *Required Preapplication Conference: __ _.O ..... n .... a .. o_i_n .... a .... P .... h .... a ..... s .... e_s.__ _________ _ *(Required for areas of special flood hazard) LEGAL DESCRIPTION ______ L_ot_2~B_lo_c_k_1~E_&_M_J~o_n_e_s_F_a_rm_P_la_c_e _________ _ APPLICANT'S INFORMATION (Primary Contact for the Project): Name Veronica J.B. Morgan -Mitchell & Morgan, LLP E-Mail ____ v'"""@~m'""it'"""c'-'-he"""'l"'""la"""""n'"""'d"'""'"m"'"""o'"'"rg..._a=n""'"'".""'""co""""'m-'-'--__ Street Address _____ 5=-1"'-1"'--"'U..:...:n..:....:iv-=e..:....:rs=it:..r..v-=D"""'"r.:..:iv-=e-=E=a=s'-=-t,._S=-u=i=teOo-'2=0=-4"'----------------- City ___ C"'"""o"""'l"'"""le'"""g~e-'S""""'t""a-"-tio._n ______ State TX Zip Code 77840 Phone Number 979-260-6963 Fax Number 979-260-3564 PROPERTY OWNER'S INFORMATION: Name ______ --=..J:..:..;imc.:.....:S..::..:te"""'"w..:....:a=rt-=---------E-Mail _____________ _ Street Address 4200 Woodland Park Court ----------------------~--------- City ______ A~rli"""'n.._g=to'"'"n'------State TX Zip Code 76013 Phone Number 817-994-4663 Fax Number 817-429-8664 ARCHITECT OR ENGINEER'S INFORMATION: Name Veronica J.B. Morgan, PE -Mitchell & Morgan, LLP E-Mail __ v~@_m_it_c_he_l_la_n_d_m_o_rg~a_n_._co_m __ _ Street Address 511 University Drive East, Suite 204 City College Station State ____ T'-'-X-"-----Zip Code ----'-7-'--7""'""84-'--0=----- PhoneNumber ____ ~9"'-79=--=2=6~0--=6-=9~6~3 ___ _ Fax Number 979-260-3564 -----''-'-=-===--=-=-=~---- Application is hereby made for the following development specific site/waterway alterations: None ACKNOWLEDGMENTS : I, Veronica J .B. Morgan, design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with t current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drain Policy and Design Standards. Property Owner(s) (Agent) condition of approval of this permit application , I agree to construct the improvements proposed in this cation according to these documents and the requirements of Chapter 13 of the College Station City A. I, N/A , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100- year storm. Engineer Date B. I, Veronica J.B. Morgan, certify that the finished floor elevation of the lowest floor, including any basement, of any residential struGt~~roposed as part of this application is at or above the base flood elevation established i~~~-4~1deral Insurance Administration Flood Hazard Study and maps , as amended . ~~ .... *·· ····-.. ~"" 1 111 ,l"r; ·· ·. it I ~· / ..... :· ... ···~ ~ * .~ ................. MORG~~-~ ~ I ~-···· RO~IC ~.~:~: .. -······Ta: ~ q DI o5 -------------~--"~~;...,.···-·"_··--f··· 7 689 ... Lu ~ _ _, __ -_Lt.----------------'/, -o··. Q /~:: Engineer 11 ~-. .t:r ~'<,;.· ~"" Date ''• 0..(;·· ... ~.~-'-~.:: ... ··~0.f C. •1 ,f Ss10 N f>-'-:~--- \'\'''\: ':\, ............... I, N/A, certify that the alterations or development covered by this permit shall not diminish the flood- carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodways fringes. Engineer Date D. I, N/A, do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval : ----------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications .. submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply .