HomeMy WebLinkAbout25 DP University Town Center 05-37KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Su ite A
Bryan, Texas 77802
TO: City of College Station
Development Services
ATTENTION: Alan Gibbs, P.E.
WE TRANSMIT:
D Under Separate Cover
..f Enclosed
VIA:
D Mail
..f Messenger
D Federal Express
D Lone Star Overnight
D UPS
D Special Courier
D Picked Up By Your Office
Tel. 979 /846 -6212
Fax 979 /846-8252
DATE: May 25 , 2006
PROJECT NO.:
P.O . Box 4234
Bryan, Texas 77805
PROJECT NAME: University Town Center
Complete Pond Wall Design
REFERENCE:
THE FOLLOWING:
D Prints
D Cop i es
D Originals
D Plat
D Field Notes
..f Plans
D Report
D Estimate
D Cut Sheets
D Computer Printout
D File
D Contract
D Other
FOR :
D Your Review & Approval
D Your Review & Comment
D Your Review & Distribution
D Your Review, Revision & Return
D Your Signature & Return
..f Your File and /or Use
D As Requested By:
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies Of This Letter Of Transmittal
Sent To:
NO. DESCRIPTION
2 Construction Plans
If Enclosures Are Not As Noted
Please Notify Us At Once.
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802 Tel. 979/846-6212
Fax 979/846-8252
TO: City of College Station -Development Services DATE:
PROJECT NO .:
May 16, 2006
P.O. Box 4234
Bryan, Texas 77805
PROJECT NAME : University Town Center
ATTENTION: Alan Gibbs, P.E .
WE TRANSMIT :
D Under Separate Cover
./Enclosed
VIA:
D Mail
./ Messenger
D Federal Express
D Lone Star Overnight
D UPS
D Special Courier
D Picked Up By Your Office
NO.
REFERENCE :
THE FOLLOWING :
D Prints
D Copies
D Originals
D Plat
D Field Notes
D Plans
./Report
D Estimate
D Cut Sheets
D Computer Printout
D File
D Contract
D Other -Invoice
DESCRIPTION
3 2-for City of College Station
1-for stamping & return to Kling Engineering
,
Amendment to the Drainage Rpt.
FOR:
./Your Review & Approval
D Your Review & Comment
D Your Review & Distribution
D Your Review , Revision & Return
./Your Signature & Return
D Your File and/or Use
D For Filing at the Courthouse
D As Requested By:
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies Of This Letter Of Transmittal
Sent To:
If Enclosures Are Not As Noted
Please Notify Us At Once .
05/17/2005 14 :05
Date:
To:
Firm:
Fax:
Re:
Sender:
9798 458 252
KllNG ENGINEERING & SURVEY.ING
Consulting Engineers• Land Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802
Telephone 9791846-6212
Fax 979184&-8252
FAX TRANSMISSION COVER SHEET
May 17, 2006
Alan Gibbs, P.E., Jenmfer Reeves
City of College Station -Development Services
764~3496
University Town Center-Abuelo's Building C/0
Fred Paine
PAGE 01/0 2
YOU SHOULD RECEIVE 2 PAGE(S), INCLUDING THIS COVER SHEET. IF YOU DO
NOT RECEIVE All THE PAGES, PLEASE CALL (409) 846-6212
Please review these items and comment this week as we anticipate a request for Abuelo's C/O by next
Wednesday. If there appears to be an issue with any of these items that could hinder the Certificate of
Occupancy; please inform me at the earliest possible moment Also, should ther e be any additional
requirements not listed, please inform and advise prior to the end of the week.
Thanks, g~Q __ _
05/17/2006 14:05 9798468252 PAGE 02/02
KLING ENGINEERING & S URVEYING
Consulting Engineers • f_.,,'lnd Surveyors
4101 Texas Avenue, Suite A
Biyan, Texas 77802
Memo:
B.J. Kling, 1:1'.E .• R.P.L.S.
S.M. Kling, R.P.L.S.
To: City of College Station
Development Services
Telephone 979 / 846-6212
Fax 979/846"8252
Alan Gibbs, P.E., Reeves
From: Fred Pain
RE: Items req uelo's Certificate of Occupancy
Post Office Box 4234
Bryan, Texas 77805
May 17, 2006
The following is the list of items & their status as discussed at the March 17, 2006 meeting regarding building
CIO requirements.
Item
1. Landscaping & Irrigation ~ Provide Letter of Credit for
portions not completed
Status:
to be submitted prior to CIO
Request
2 . All Fire Lanes marked -Lanes providing fire service to To be complete/submitted prior to
Abuelo's to be marked~ Lanes in Phase 2B bonded for with Cl o Request
3.
4.
5.
6.
7.
Item 1 above.
Parking Lot Striping -Striping for Abuel.o's to be
completed; Phase 2B bonded for with Item 1 above
Fencing Plan with barricaded drive aisles
Fencing around Abuelo 's
Tarrow Entrance signed as ''Construction Entrance Only"
prior to signal operation
Erosion & Sediment control plan for pond area
8. Storm Sewer cleaned out
9. Amendment to Drainage Report
1 O. Plat Filed
11 . Letter of Acceptance for Phase 2B Sanitar.y Sewer
12. Dumpster pad with gates
13 . Erosion Control for stock pile at south end of project
To be complete/s ubmitted prior to
CIO Request
Submitted 04/25/06 via email -
Installed
To be complete prior to C!O Request
To be complete prior to C!O 'Request
(si gn in progress )
Submitted 04/2 6/06 via email ·Under
Construction
Completed OS /04/06
Submitted 05 /16/06
Completed
To be submitted this week
Abuelo's on ly-complete
Installed
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Su rveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802 Tel. 979/846 -6212
Fax 979/846-8252
P.O. Box 4234
Bryan, Texas 77805
TO : City of College Station -Development Services DATE : May 17 , 2006
ATTENTION : Alan Gibbs, P.E.
WE TRANSMIT :
D Under Separate Cover
./ Enclosed
VIA:
D Mail
./ Messenger
D Federa l Express
D Lone Star Overnight
D UPS
D Special Courier
D Picked Up By Your Office
NO .
2 Copy of Lower Re,
PROJECT NO .:
PROJECT NAME: University Town Cente r
Pond Area -Lower Wall Plan
REFERENCE :
THE FOLLOWING: FOR :
D Prints
D Copies
D Originals
D Plat
D Field Notes
./ Plans
D Report
D Estimate
D Cut Sheet!>
D Comp1 "
0 FilP q ~
L '\-'
~j " ~ef
.... /
\ /
'J
/ ,.
D Your Review & Approval
D Your Review & Comment
D Your Review & Distribution
D Your Review, Revision & Return
D Your Signature & Return
./Your File and/or Use
D Fo r Filing at t he Cou rt house
D As Requested By:
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies Of This Letter Of Transmittal
nt To : Se
.-
If Enclosures Are Not As Noted
Please Notify Us At Once.
KLING ENGINEERING & SURVEYING
4101 Texas Avenue , Suite A
Bryan , Texas 77802
Consulting Engineers • Land Surveyors
Tel. 979/846-6212
Fax 979/846-8252
P.O . Box 4234
Bryan , Texas 77805
TO: City of College Station -Development Services DATE: May 18 , 2006
ATTENTION: Alan Gibbs , P.E.
WE TRANSMIT:
D Under Separate Cover
./Enclosed
VIA:
D Mail
./ Messenger
D Federal Express
D Lone Star Overnight
D UPS
D Special Courier
D Picked Up By Your Office
NO .
PROJECT NO ..
PROJECT NAME: University Town Center
Dra inage Certification Letter
REFERENCE:
THE FOLLOWING :
D Prints
D Copies
D Originals
D Plat
D Field Notes
D Plans
./Report
D Estimate
D Cut Sheets
D Computer Printout
D File
D Contract
D Other -Invoice
DESCRIPTION
FOR:
./Your Review & Approval
D Your Review & Comment
D Your Review & Distribution
D Your Review , Revision & Return
D Your Signature & Return
./Your File and/or Use
D For Filing at the Courthouse
D As Requested By :
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies OfThis Letter OfTransmittal
Sent To:
2 Drainage Certification Letter
If Enclosures Are Not As Noted
Please Notify Us At Once.
KLING ENGINEERI NG & SURVEY! G
Con sul ting E n gineer s • L an d Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802
B.J. Kling, P.E., R.P.L.S.
S.M. Kling, R.P.L.S.
Detention Certification Letter
Lots l A, lB & Portion of Lot 2
Telephone 979 / 846-6212
Fax 979/846-8252
Univ ers ity Tow n Center Phase One -9.69 Acres,
&
Post Office Box 4234
Bryan, Texas 77805
May 18, 2006
A Portion of The Sahara Realty Group , Ltd. 7.47 A cre U nplatted Tract
(Vol. 6330 , Pg. 177) -6.15 Acres
&
The BD C Properties/Construction , Inc . U nplatted Tract
(Vol. 6298 , Pg. 201) -4.51 Acres
Richard Carter Survey, A-8
College S tation , Brazos County , Te x as
The p urpose of thi s D etent ion Ce rti ficatio n Letter is to assure the attenuatio n of excess storm
wate r runoff is provi ded during the int erim/under constructio n conditio n s of the pond area referenced in
th e May 15 1\ 2006 Ame ndme nt to th e Dra in age R eport.
At the present phase of po nd con stru ct io n , th e ove rfl ow/area drai n is co mpl eted. A leave -ou t area was
p rovided to ac cept the designe d 6'x2' R CB outfall stru cture. The design rectangul ar orifice op ening for
t he pond outl et provides 9 square feet of ope ning in 6'xl.5'. The existing leave-out in the overflow/area
drain will be restricted to limit the ope ni ng to the design squ are footage . The result is a 7.17'x1 .2 5'
openmg.
During construction, the volume of storage provi ded in the pond area is significantl y larger th an the design
volume for two reasons. First , th e pond area is over excavated to allow for construction of the retainin g
wall s. Second, the fina l conditi on of the pond area w ill be to have a constant poo l elevatio n with an
approximate 4' depth.
Based on providing the same orifice open area at ap proximate ly the same e levation as the final design ,
coupled wi th the addit ional vo lum e th at will va ry to not less than the des ign volume; I certify that the
in terim /under constru ct ion po nd w ill prov id e atte nu ati on greate r than or equ al to the design attenuatio n .
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802
B.J. Kling, P.E., R.P.L.S.
S.M. Kling, R.P.L.S.
Detention Certification Letter
Lots lA, lB & Portion of Lot 2
Telephone 979 / 846-6212
Fax 979/846-8252
University Town Center Phase One -9.69 Acres,
&
Post Office Box 4234
Bryan, Texas 77805
May 18, 2006
A Portion of The Sahara Realty Group, Ltd. 7.47 Acre Un platted Tract
(Vol. 6330, Pg. 177) -6.15 Acres
&
The BDC Properties/Construction, Inc. Unplatted Tract
(Vol. 6298, Pg. 201) -4.51 Acres
Richard Carter Survey, A-8
College Station, Brazos County, Texas
The purpose of this Detention Certification Letter is to assure the attenuation of excess storm
water runoff is provided during the interim/under construction conditions of the pond area referenced in
the May 15 1h, 2006 Amendment to the Drainage Report.
At the present phase of pond construction , the overflow/area drain is comp leted . A leave-out area was
provided to accept the designed 6'x2' RCB outfall structure. The design rectangular orifice opening for
the pond outlet provides 9 square feet of opening in 6'xl.5'. The existing leave-out in the overflow/area
drain will be restricted to limit the opening to the design square footage. The res ult is a 7.17'x1.25 '
opening.
During construction, the volume of storage provided in the pond area is si gnificantly larger than the design
volume for two reasons. First, the pond area is over excavated to allow for construction of the retaining
walls. Second , the final condition of the pond area will be to have a constant pool elevation with an
approximate 4' depth .
Based on providing the same orifice open area at approximately the same ele vation as the final design ,
coupled with the additional volume that will vary to not less than the design volume ; I certify that the
interim/under construction pond will provide attenuation greater than or equal to the design attenuation.
........ ___________ _ )
KLING ENGINEERING & SURVEYING
00-s1
-~:.57
1--'l01JJ
4101 Texas Avenue, Suite A
Bryan , Texas 77802
Consulting Engineers • Land Surveyors
Tel. 979/846-6212
Fax 979/846-8252
P.O . Box4234 ~
Bryan , Texas 7780 if.J ::> ...
TO: City of College Station -Development Services DATE: July 19, 2005
ATTENTION: Alan Gibbs
WE TRANSMIT:
0 Under Separate Cover
,/Enclosed
VIA:
OMail
,/ Messenger
0 Federal Express
O Lone Star Overnight
OUPS
O Special Courier
0 Picked Up By Your Office
NO .
PROJECT NO.:
PROJECT NAME: University Town Center
REFERENCE:
THE FOLLOWING :
O Prints
0 Copies
0 Originals
0 Plat
0 Field Notes
0 Plans
0 Report
0 Estimate
0 Cut Sheets
O Computer Printout
0 File
0 Contract
,/Other
DESCRIPTION
FOR :
O Your Review & Approval
O Your Review & Comment
,/ Your Review & Distribution
O Your Review , Revision & Return
O Your Signature & Return
0 Your File and/or Use
O As Requested By:
O Please Acknowledge Receipt of
Enclosures
O Please Return Enclosures To
O Copies Of This Letter Of Transmittal
Sent To :
6 TxDOT Permits for Sidewalk Construction
I f),..~;h, e f<epo tr
I J l O u ,(1-0 Cl,~ c..~ (v.,.. z ?~estC..S/
{)L v~ /.;,,, ~-" .. } /..,.__,. If Enclosures Are Not As Noted
Please Notify Us At Once .
Signed : Fred Pa ~
Scale = 1: 27 4 (Feet)
1 N 89 ° 54' 13" E 26.82
2 S 41 ° 52 ' 32" E 190 .2
3 S 43 ° 48 ' 48" E 500 .04
4 S 42 ° 03 ' 41 " E 399 .91
5 S 41 ° 49 ' 53" E 413.65
6 s 44 ° 49 ' 25 " w 20 .03
--
9
8
o. 005' (o . oo"t)
7 N 41 ° 49' 53" W 414 .78
8 N42°03'41 "W399 .56
9 N 43 ° 48' 48 " W 500 .07
10 N 41 ° 52' 32 " W 208.41
7
I: tOl.P
Pledger Kalkomey, Inc.
Consulting Engineers
·1-~,/\~
7020 Coyote Run '7) lJY lrv
July 25 , 2005
Ms. Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Benson Utility Easement
Valley Park Center
Off-Site Utilities
PK Job No. 51905-231
Dear Mrs. George,
Bryan , Texa s 77808 $'
979-731-8000 , 979 -731 -1500 (Fa x)
www.pkengineering .comtJt5 --{~
Enclosed please find the following for the referenced project .
This item corresponds to the development permit and plans
submitted on July 18th:
1. Public Utility Easement Exhibit and Field Notes fo r the
Benson tract.
Mrs. Benson r equests that the fo l lowing be a condition of the
easement: the water line installed in the easement would
include an 8 -inch connection to the main line for a future water
line extension into her property.
Very Truly Yours,
Steve E. Duncan, P.E.
s ed@p kengineering.com
SED/mon
Enclosures
cc: David Hillman
Brenham • Bryan • Rosenberg
\\Snapl21 7311sharc l\200515 1905 -23 1 SOUTHCORP-Por Nada\CS-07-bcnso n util csmt.doc
DEVELOPMENT PERMIT
PERMIT NO. 05-37
CITY OF C O LLEGE STAT I ON
P'4nning cf ~Wpmmt Services
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
University Town Center
formerly Replat of Henton Sub , Lots 1-3 and
Replat of One Lincoln Place
DATE OF ISSUE: 7/18/05
OWNER:
David Scamardo -Sahara Realty Group , Ltd .
1289 N. Harvey Mitchell Parkway
Bryan, Texas 77805
SITE ADDRESS:
800 Block of University Drive
DRAINAGE BASIN:
Burton Creek
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operat ions of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents ,
asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree requ ired to remain is also
prohibited .
Phase 2 Approval. All associated construction will need to be in accordance with TPDES. The proposed improvements
within the state ROW are approved for construction upon TxDOT permit issuance .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate cons t ruct ion site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetat ion be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage
faci lit ies.
I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development perm it
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
DatJ 1
CJ 1/r1 /os I I Date
vr
CITY OF COLLEGE STATION
Planning & Dewli!pmmt S.rvim
CITY INFRASTRUCTURE
INSPECTION NOTICE
1/l°l !< r I
Date :
To: ~ Bob Mosley vn '?.--
D Diane Broadhurst { 0 ) ~
From: Deborah Grace
RE: UNlV~tlY -rowr.J ~
~VlS87 CoN'S\. £\AN S~ (c 5. l / C0.3 1c6 -~1 cfp.7)
!Ak)T eY Uf'/lV~tT'1 ANO TN4£Jv-l Location:
GI Public Water Lines/Fire Hydrants
GYPublic Sanitary Sewer
D Public Storm Sewer
D Public Streets
D Public Detention Facility
~Driveway Connection to Public Street
D Private Construction within easement
D No Inspection Required
Comments:
D Engineer's Estimates Attached
~ B{onstruction Plans Attached
~IXJ$ite Plan Attached o ____ _
p~vvevvxus wol Hff2-0v£b VtVnL ~
f S7VE S fa<;v\ lT>
p :\group\htltr\pzltr\prod\pz2005 \p0011493 .doc
Df S -57
b~
SITE PLAN APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS
_L Site plan application completed in full .
_x_ $200.00 Application Fee.
_x_ $200.00 Development Permit Application Fee .
_x_ $600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a
public
waterline , sewerline, sidewalk, street or drainage facilities is involved.)
_LEleven (11) folded copies of site plan
_x_ One (1) folded copy of the landscape plan .
_X_One (1) copy of building elevation required for buildings with a footprint of 20,000 sq . ft. or greater
_X_A list of building materials for all facades that are visible from the public right-of-way.
_X-A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they
are not checked off.
N/A Parkland Dedication requirement approved by the Parks & Recreation Board , please provide proof of
approval (if applicable).
Date of Preapplication Conference: .-S....;;.e_._p....;;..te.;;....;m~b-"e..;..r....;;1...;;3 ...... =2....;;.0....;;.0....;;.4 ______________ _
NAME OF PROJECT University Town Center
LEGAL DESCRIPTION 17 .7 acres comprised of Lots 4R (4 .62ac) 3R (5 .85ac) Replat of Lots 1&2 Henton Subd .. Vol.
6347, Pg. 185 and 7.26 ac (Putz) tr, Vol. 6078 , Pg. 247
APPLICANT/PROJECT MANAGER 'S INFORMATION (Primary Contact for the Project):
Name David Scarmardo -Sahara Realty Group, Ltd .
Street Address 1289 N. Harvey Mitchell Parkway
State TX Zip Code ____ 7~7~8_0_3_
Phone Number _9'"-'7~9--7~7~9_-7~2~0-=-9 ______ _
PROPERTY OWNER'S INFORMATION :
City Bryan
E-Mail Address david@scarmardofoods .com
Fax Number 979 -822-1763
Name =S=am:..=::;e _________________________________ _
Street Address -------------------City __________ _
State _____ Zip Code ______ _
Phone Number------------
ARCHITECT OR ENGINEER'S INFORMATION:
Name Kling Engineering & Surveying
Street Address 4101 S. Texas Ave. Suite A
State ___ T~X~_ Zip Code ____ 7_7_8_0_2_
Phone Number --'9'-'7--=-9__,-8'-'4-=-6__,-6=2'-'-12=--------
6/13/03
E-Mail Address ____________ _
Fax Number ______________ _
City Bryan
E-Mail Address stewart@klingeng.com
Fax Number 979-846-8252
1 of 6
KLING ENGINEERING & SURVEYING
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802 Tel. 979/846-6212
Fax 979/846-8252
TO: City of College Station -Development Services DATE:
PROJECT NO.:
7/15/05
P.O. Box 4234
Bryan , Texas 77805
PROJECT NAME: University Town Center
ATTENTION: Bridgette George
WE TRANSMIT:
D Under Separate Cover
./ Enclosed
VIA :
DMail
./ Messenger
D Federal Express
D Lone Star Overnight
DUPS
D Special Courier
D Picked Up By Your Office
NO .
2 Site Plan
REFERENCE:
THE FOLLOWING:
D Prints
D Copies
D Originals
D Plat
D Field Notes
./Plans
D Report
D Estimate
D Cut Sheets
D Computer Printout
D File
D Contract
D Other -Invoice
DESCRIPTION
1 Overall site plan & site plan notes sheet
1 Landscape & Irrigation plan
1 11"x17" Erosion Control Plan
Site Plans
FOR:
D Your Review & Approval
D Your Review & Comment
D Your Review & Distribution
D Your Review , Revision & Return
./Your Signature & Return
./Your File and/or Use
./ As Requested By: Jennifer Reeves
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies Of This Letter Of Transmittal
Sent To:
If Enclosures Are Not As Noted
Please Notify Us At Once.
KLING ENGINEERING & SURVEYING
-r-oll -oq
/I :(()~,
Consulting Engineers • Land Surveyors ~-
P.O .Box4234 04.
Bryan , Texas 77805
4101 Texas Avenue, Suite A
Bryan, Texas 77802 Tel. 979/846-6212
Fax 979/846-8252
TO: City of College Station -Development Services DATE:
PROJECT NO.:
7/6/05
PROJECT NAME: University Town Center
ATTENTION: Alan Gibbs , P.E.
WE TRANSMIT:
D Under Separate Cover
./Enclosed
VIA:
DMail
./ Messenger
D Federal Express
D Lone Star Overnight
DUPS
D Special Courier
D Picked Up By Your Office
NO .
REFERENCE:
THE FOLLOWING :
D Prints
D Copies
D Originals
D Plat
D Field Notes
./Plans
D Report
D Estimate
D Cut Sheets
D Computer Printout
D File
D Contract
D Other -Invoice
DESCRIPTION
Field Changes for Water & Sewer
FOR:
./ Your Review & Approval
D Your Review & Comment
./Your Review & Distribution
D Your Review, Revision & Return
./ Your Signature & Return
./ Your File and/or Use
D As Requested By :
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies Of This Letter Of T ransm ittal
Sent To :
10 Field Change Revisions for Water & Sanitary Sewer
for approved for construction stamp & return
(6 -for City of College Station)
(4 -for stamp & return to KES)
Please call or email later today when plans are
ready for pickup.
Thanks
If Enclosures Are Not As Noted
Please Notify Us At Once .
Signed: Fred Pa i n~
KLING ENGINEERING & SURVEYING
4101 Texas Avenue, Suite A
Bryan, Texas 77802
Consulting Engineers • Land Surveyors
Tel. 979/846-6212
Fax 979/846-8252
P .O. Box 4234
Bryan , Texas 77805
TO: City of College Station -Development Services DATE: 7/14/05
ATTENTION: Bridgette George
WE TRANSMIT:
0 Under Separate Cover
./Enclosed
VIA:
OMail
./ Messenger
0 Federal Express
0 Lone Star Overnight
OUPS
0 Special Courier
0 Picked Up By Your Office
NO.
4 Final Site Plan
PROJECT NO.:
PROJECT NAME: University Town Center
Site Plans
REFERENCE:
THE FOLLOWING:
0 Prints
0 Copies
0 Originals
0 Plat
0 Field Notes
./Plans
0 Report
0 Estimate
0 Cut Sheets
0 Computer Printout
0 File
0 Contract
0 Other -Invo ice
DESCRIPTION
FOR :
./ Your Review & Approval
0 Your Review & Comment
0 Your Review & Distribution
0 Your Review, Revision & Return
0 Your Signature & Return
./Your File and/or Use
0 As Requested By:
0 Please Acknowledge Receipt of
Enclosures
0 Please Return Enclosures To
O Copies Of This Letter Of Transmittal
Sent To:
For approval stamp -Please call when ready
y <-~.I -S'--.. ' j #C. Vw
/
f .ec....,e,.... /1/c..t., If Enclosures Are Not As Noted
Please Notify Us At Once .
Signed' Fred Pain~
KLING ENGINEERING & SURVEYING
4101 Texas Avenue, Suite A
Bryan, Texas 77802
TO: City of College Station
ATTENTION: Bridgette George
WE TRANSMIT:
0 Under Separate Cover
.f Enclosed
VIA:
OMail
.f Messenger
0 Federal Express
D Lone Star Overnight
DUPS
0 Special Courier
0 Picked Up By Your Office
NO .
Consulting Engineers • Land Surveyors
Email : stewart@klingeng.com P .O . Box 4234
Bryan , Texas 77805 Tel. 979/846-6212
Fax 979/846-8252
DATE: July 05, 2005
PROJECT NO.:
PROJECT NAME: University Town Center
Revised Site Plans I Drainage Report I TXDOT Permit
REFERENCE: Re-submittal
THE FOLLOWING:
0 Prints
0 Copies
0 Originals
0 Plat
0 Field Notes
.f Plans
.f Report
D Estimate
0 Cut Sheets
0 Computer Printout
0 File
D Contract
.f Other
DESCRIPTION
FOR :
.f Your Review & Approval
D Your Review & Comment
.f Your Review & Distribution
0 Your Review , Revision & Return
0 Your Signature & Return
0 Your File and/or Use
0 As Requested By :
0 Please Acknowledge Receipt of
Enclosures
0 Please Return Enclosures To
0 Copies Of This Letter Of Transmittal
Sent To :
2 Revised Landscape Plans
2
2
1
4
Revised Site plans
Revised Plats
Drainage Report
Revised TXDOT Permit Application
$200.00 processing fee submitted on 06/01 /05
If Enclosures Are Not As Noted
Please Notify Us At Once .
/
TO :
CITY OF COLLEGE STATION
Planning e:!r Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
FROM : Bridgette George , Assistant Development Manager
SUBJECT: UNIVERSITY TOWN CENTER (SP) -Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review:
~~l'J-.~'(\i;1p /
o(p / o t (O'S _V_ $200 processing fee for the next round of three (3) staff reviews ; and,
Six (6) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached ;
Two (2) revised site; and
One (1) landscaping plan .
Easement Dedication Sheet and required documents .
OR /
_V_ ·Two (2) revised site and landscaping plans .
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information , please call me at 764-3570.
Attachments :
cc:
Staff review comments
Case file #04-00500259
Home of Texas A&M University
KLING ENGINEERING & SURVEYIN G
Consulting Engineers • Land Surveyors
4101 Texas Avenue, Suite A
Bryan, Texas 77802
Memo :
B.J. Kling, P.E., R.P.L.S.
S .M. Kling, R.P.L.S.
To: City of College Station
Development Services
c/o Allen Gibbs
From : Fred Pai
Re : University Town Center
Telephone 979/846-6212
Fax 979 / 846-8252
City Case File #04-00500259
Fire Requirements
Post Office Box 4234
Bryan, Texas 77805
July 12, 2005
University Town Center Phase 2 meet the 2000 International Fire Code as follows :
Building TGIFridays
Assumed Type of Construction Type IIIB
Square Footage (SF) 4692
Fire Flow Required (gpm) 1500
Required Fire Hydrants 1
Proposed Fire Hydrants 1
Building Restaurant
Assumed Type of Construction Type IIIB
Square Footage (SF) 7618
Fire Flow Required (gpm) 1750
Required Fire Hydrants 1
Proposed Fire Hydrants 1
Building Restaurant
Assumed Type of Construction Type IIIB
Square Footage (SF) 6526
Fire Flow Required (gpm) 1750
Required Fire Hydrants 1
Proposed Fire Hydrants 1
Building Restaurant
Assumed Type of Construction Type IIIB
Square Footage (SF) 6504
Fire Flow Required (gpm) 17 50
Required Fire Hydrants 1
Proposed F ire Hydrants 1
Building Restaurant
Assumed Type of Construction Type IIIA
Square Footage (SF) 11288
Fire Flow Required (gpm) 1500
Required Fire Hydrants 1
Proposed Fire Hydrants 1
, .
From:
To:
Date:
Subject:
Lance
"Chuck Ellison" <Chuck@ellisonlaw.com>
"Lance Simms" <Lsimms@cstx.gov>
12/7/2005 8:59 :31 AM
RE: Univers ity Town Center
I should be thank ing you because as always , you go the extra mile to
help resolve issues . We appreciate your assistance and promptness very
much . You have accurately described our discussion in this e-mail.
Thank you again !
Chuck
-----Original Message-----
From : Lance Simms [mailto :Lsimms@cstx.gov]
Sent: Tuesday , December 06 , 2005 12 :31 PM
To : Chuck Ellison
Cc : Alan Gibbs ; Chris Haver; Joey Dunn ; Jenn ifer Reeves ; Kim Foutz ; Lee
Rob inson
Subject: University Town Center
Chuck :
Thanks for meeting with City staff earlier today concerning building
perm its and site plan issues related to Abuelos restaurant in Phase 2B ,
Univers ity Town Center. I wanted to follow-up with a summary of our
discuss ion .
Slab only permit: The City is willing to issue a slab only perm it for
Abuelos provided the site issues identified in the meeting are resolved .
This includes finalizing the location of the backflow prevention device
for the fire sprinkler system and reconciling the c iv il/architectural
plans . The contractor also needs to amend the building perm it
appl ication to request a slab only .
Full bu il ding perm it: The City will issue a full building permit for
Abuelos after site plan approval. To date , the primary issue delaying
site plan approval has been the TxDot permits for the two access points
on Un iversity Drive East. It is my understanding that you are working
with a consultant to expedite the driveway permit process through TxDot.
Certifi cate of Occupancy (CO): A temporary or permanent CO w ill be
issued for Abuelos after the structure and site are found to be in
compl iance with City codes and ordinances (this includes park ing areas ,
landscap ing , drives , etc .). We acknowledge that the other structures
proposed in phase 2B may not be complete at the time a CO is issued for
Abuelos . We also realize that the detention area may not be 100%
complete . However, the detention area must be fully functioning as
determ ined by City engineers prior to the issuance of a CO .
Thanks again Chuck and please let me know if this summary does not
accurately describe our discuss ion .
Lance Simms
From:
To:
Date:
Subject:
Lance
"Chuck Ellison" <Chuck@ellisonlaw.com>
"Lance Simms" <Lsimms@cstx.gov>
12/7/2005 8 :59 :31 AM
RE : University Town Center
I should be thanking you because as always, you go the extra mile to
help resolve issues. We appreciate your assistance and promptness very
much . You have accurately described our discussion in this e-mail.
Thank you again!
Chuck
-----Original Message-----
From : Lance Simms [mailto :Lsimms@cstx.gov)
Sent: Tuesday, December 06 , 2005 12 :31 PM
To : Chuck Ellison
Cc: Alan Gibbs; Chris Haver; Joey Dunn ; Jennifer Reeves ; Kim Foutz; Lee
Robinson
Subject: University Town Center
Chuck :
Thanks for meeting with City staff earlier today concerning building
permits and site plan issues related to Abuelos restaurant in Phase 28,
University Town Center. I wanted to follow-up with a summary of our
discussion .
Slab only permit: The City is willing to issue a slab only permit for
Abuelos provided the site issues identified in the meeting are resolved .
This includes finalizing the location of the backflow prevention device
for the fire sprinkler system and reconciling the civil/architectural
plans . The contractor also needs to amend the building permit
application to request a slab only .
Full building permit: The City will issue a full building permit for
Abuelos after site plan approval. To date , the primary issue delaying
site plan approval has been the TxDot permits for the two access points
on University Drive East. It is my understanding that you are working
with a consultant to expedite the driveway permit process through TxDot.
Certificate of Occupancy (CO): A temporary or permanent CO will be
issued for Abuelos after the structure and site are found to be in
compliance with City codes and ordinances (this includes parking areas ,
landscaping, drives, etc.). We acknowledge that the other structures
proposed in phase 28 may not be complete at the time a CO is issued for
Abuelos . We also realize that the detention area may not be 100%
complete . However, the detention area must be fully functioning as
determined by C ity engineers prior to the issuance of a CO .
Thanks again Chuck and please let me know if this summary does not
accurately describe our discussion .
Lance Simms
I Brittany Korthauer -Re: Fwd : Calling,to ~ co=@::E§ Univ~!Y Dr E {Abuelos)
From:
To:
Date:
Subject:
Wally Urrutia
Brittany Korthauer
5/15/2006 9:34 am
Re: Fwd: Calling for CO@ 840 University Dr E (Abuelos)
CC: Rodney Harris
Here is what we have observed.
They need to have the 12ft. by 12ft. inside dimension requirement on the dumpster enclosure.
Thanks !
>>> Rodney Harris 5/12/2006 5:07 pm >>>
It's not ready yet. They haven't poured concrete in front of the enclosure. The inside dimensions are 11 ft 3 inches wide
and 9 ft 7 inches deep from gate to bollard ..
Rodney Harris
Sanitation Foreman
Public Works
Tel(979 )764-3698
Fa x(979)764-3489
email: rharris@cstx.gov
Wally Urr utia
Sanitation Superintendent
(979) 764-3841
Fax (979) 764-382 2
>>>Wa ll y Urrutia 5/12/2006 9 :29 am >>>
Check th is out!
Wally Urrutia
Sanitation Superintendent
(979) 764-3841
Fa x (979) 764-3822
>>> Brittany Korthauer 5/12/2006 9:26 am >>>
Are there any issues??
Landscaping will not be put in unti l Monday .
BP# 05 -3527
Thanks
Brittany Korthauer
CSR-Planning & Development
City of College Station
P.O. Box 9960
College Station, TX 77842
979.764 .3570
I Br ittan y Korthauer - Re: CalTing fo r c o@s4o:vn;7sTiy Dr E (Abuelo Sf
From:
To:
Date:
Subject:
Jerry Duffey
Brittany Korthauer
5/15/2006 8:31 am
Re: Calling for CO @ 840 University Dr E (Abuelos)
CC: Benjamin McCarty; Chris Haver; Eric Hurt; Gi. ..
Fire Extinguishers need to be placed
Busine ss name and address
Master key for knox bo x
Fire lanes
>>> Brittany Korthauer 05/12/06 9:26 AM >>>
Are there any issues??
Landscaping will not be put in until Monday.
BP # 05 -3527
Thanks
Brittany Korthauer
CSR-Planning & Development
City of College Station
P.O. Bo x 9960
College Station, TX 77842
979.764.3570
Page 1 J
I Brittany Korthauer -Re : Calling for Cd @ S40 University Dr E. (Abue_los
From:
To:
Date:
Subject:
Eaphrame Thomas
Alan Gibbs; Benjamin McCarty; Bob Mosley; Br ...
5/12/2006 4:06:41 pm
Re: Calling for CO @ 840 University Dr E (Abuelos)
CC: Eaphrame Thomas
No for COW/WW Environmental Services serval issues
BACKFLOW ISSUES
l. Need backflow test report for the backflow device on Fire line.
2. Need test report for backflow device on Carbonated soda dispenser
machines .
3. Will need backflow test report on lawn irrigation.
GREASE TRAP ISSUES
1. Could not locate sample well on Grease trap.
2. Al so need tees put in Grease Trap on the inlet pipe and on the outlet pipe.
3 . It also seems like the grease trap is not function properly . The reasoning is that the water is coming over the separation wall
inside of the grease.
Eaphrame A. Thomas
Environmental Technician
City of College Station
Public Utilities and Environmental Services
979.764 .6342
Have A Bless Day!
>>> Brittany Korthauer 5/12/2006 9:26 am >>>
Are there any issues??
Landscaping will not be put in until Monday .
BP# 05-3527
Thanks
Brittany Korthauer
CSR-Planning & Developme nt
City of College Station
P.O. Box 9960
College Station, TX 77842
979.764 .3570
From:
To:
Date:
Subject:
Alan Gibbs
Bkorthauer @cstx .gov
5/12/2006 10:52:42 am
Re : Calli ng tor CO @ 840 University Dr E (Abue los)
The detention pond doesn't appear to funct ional or armored against erosion
This m essage se nt from my wireless Blackberry device
»> Br ittany Korthauer 5/12 9:26 am »>
Are there any issues??
Landscaping will not be put in until Monday.
BP# 05-3527
Thanks
Brittany Korthaue r
CSR-Planning & Development
City of College Stat ion
P.O. Box 9960
College Station , TX 77842
979 .764 .3570
\ Brittany Korthauer -Re: Ca lling for CO @ 840 University Dr E (Abuelo S} =
From:
To:
Date:
Subject:
John Logan
Alan Gibbs; Benjamin McCarty; Bob Mosley; Br ...
5/12/2006 10:03 am
Re: Calling for CO @ 840 University Dr E (Abuelos)
I need to get them a letter of completion to fill out but that's it.