Loading...
HomeMy WebLinkAbout25 DP University Town Center 05-37KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Su ite A Bryan, Texas 77802 TO: City of College Station Development Services ATTENTION: Alan Gibbs, P.E. WE TRANSMIT: D Under Separate Cover ..f Enclosed VIA: D Mail ..f Messenger D Federal Express D Lone Star Overnight D UPS D Special Courier D Picked Up By Your Office Tel. 979 /846 -6212 Fax 979 /846-8252 DATE: May 25 , 2006 PROJECT NO.: P.O . Box 4234 Bryan, Texas 77805 PROJECT NAME: University Town Center Complete Pond Wall Design REFERENCE: THE FOLLOWING: D Prints D Cop i es D Originals D Plat D Field Notes ..f Plans D Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other FOR : D Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review, Revision & Return D Your Signature & Return ..f Your File and /or Use D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To: NO. DESCRIPTION 2 Construction Plans If Enclosures Are Not As Noted Please Notify Us At Once. KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Tel. 979/846-6212 Fax 979/846-8252 TO: City of College Station -Development Services DATE: PROJECT NO .: May 16, 2006 P.O. Box 4234 Bryan, Texas 77805 PROJECT NAME : University Town Center ATTENTION: Alan Gibbs, P.E . WE TRANSMIT : D Under Separate Cover ./Enclosed VIA: D Mail ./ Messenger D Federal Express D Lone Star Overnight D UPS D Special Courier D Picked Up By Your Office NO. REFERENCE : THE FOLLOWING : D Prints D Copies D Originals D Plat D Field Notes D Plans ./Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice DESCRIPTION 3 2-for City of College Station 1-for stamping & return to Kling Engineering , Amendment to the Drainage Rpt. FOR: ./Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review , Revision & Return ./Your Signature & Return D Your File and/or Use D For Filing at the Courthouse D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To: If Enclosures Are Not As Noted Please Notify Us At Once . 05/17/2005 14 :05 Date: To: Firm: Fax: Re: Sender: 9798 458 252 KllNG ENGINEERING & SURVEY.ING Consulting Engineers• Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Telephone 9791846-6212 Fax 979184&-8252 FAX TRANSMISSION COVER SHEET May 17, 2006 Alan Gibbs, P.E., Jenmfer Reeves City of College Station -Development Services 764~3496 University Town Center-Abuelo's Building C/0 Fred Paine PAGE 01/0 2 YOU SHOULD RECEIVE 2 PAGE(S), INCLUDING THIS COVER SHEET. IF YOU DO NOT RECEIVE All THE PAGES, PLEASE CALL (409) 846-6212 Please review these items and comment this week as we anticipate a request for Abuelo's C/O by next Wednesday. If there appears to be an issue with any of these items that could hinder the Certificate of Occupancy; please inform me at the earliest possible moment Also, should ther e be any additional requirements not listed, please inform and advise prior to the end of the week. Thanks, g~Q __ _ 05/17/2006 14:05 9798468252 PAGE 02/02 KLING ENGINEERING & S URVEYING Consulting Engineers • f_.,,'lnd Surveyors 4101 Texas Avenue, Suite A Biyan, Texas 77802 Memo: B.J. Kling, 1:1'.E .• R.P.L.S. S.M. Kling, R.P.L.S. To: City of College Station Development Services Telephone 979 / 846-6212 Fax 979/846"8252 Alan Gibbs, P.E., Reeves From: Fred Pain RE: Items req uelo's Certificate of Occupancy Post Office Box 4234 Bryan, Texas 77805 May 17, 2006 The following is the list of items & their status as discussed at the March 17, 2006 meeting regarding building CIO requirements. Item 1. Landscaping & Irrigation ~ Provide Letter of Credit for portions not completed Status: to be submitted prior to CIO Request 2 . All Fire Lanes marked -Lanes providing fire service to To be complete/submitted prior to Abuelo's to be marked~ Lanes in Phase 2B bonded for with Cl o Request 3. 4. 5. 6. 7. Item 1 above. Parking Lot Striping -Striping for Abuel.o's to be completed; Phase 2B bonded for with Item 1 above Fencing Plan with barricaded drive aisles Fencing around Abuelo 's Tarrow Entrance signed as ''Construction Entrance Only" prior to signal operation Erosion & Sediment control plan for pond area 8. Storm Sewer cleaned out 9. Amendment to Drainage Report 1 O. Plat Filed 11 . Letter of Acceptance for Phase 2B Sanitar.y Sewer 12. Dumpster pad with gates 13 . Erosion Control for stock pile at south end of project To be complete/s ubmitted prior to CIO Request Submitted 04/25/06 via email - Installed To be complete prior to C!O Request To be complete prior to C!O 'Request (si gn in progress ) Submitted 04/2 6/06 via email ·Under Construction Completed OS /04/06 Submitted 05 /16/06 Completed To be submitted this week Abuelo's on ly-complete Installed KLING ENGINEERING & SURVEYING Consulting Engineers • Land Su rveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Tel. 979/846 -6212 Fax 979/846-8252 P.O. Box 4234 Bryan, Texas 77805 TO : City of College Station -Development Services DATE : May 17 , 2006 ATTENTION : Alan Gibbs, P.E. WE TRANSMIT : D Under Separate Cover ./ Enclosed VIA: D Mail ./ Messenger D Federa l Express D Lone Star Overnight D UPS D Special Courier D Picked Up By Your Office NO . 2 Copy of Lower Re, PROJECT NO .: PROJECT NAME: University Town Cente r Pond Area -Lower Wall Plan REFERENCE : THE FOLLOWING: FOR : D Prints D Copies D Originals D Plat D Field Notes ./ Plans D Report D Estimate D Cut Sheet!> D Comp1 " 0 FilP q ~ L '\-' ~j " ~ef .... / \ / 'J / ,. D Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review, Revision & Return D Your Signature & Return ./Your File and/or Use D Fo r Filing at t he Cou rt house D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal nt To : Se .- If Enclosures Are Not As Noted Please Notify Us At Once. KLING ENGINEERING & SURVEYING 4101 Texas Avenue , Suite A Bryan , Texas 77802 Consulting Engineers • Land Surveyors Tel. 979/846-6212 Fax 979/846-8252 P.O . Box 4234 Bryan , Texas 77805 TO: City of College Station -Development Services DATE: May 18 , 2006 ATTENTION: Alan Gibbs , P.E. WE TRANSMIT: D Under Separate Cover ./Enclosed VIA: D Mail ./ Messenger D Federal Express D Lone Star Overnight D UPS D Special Courier D Picked Up By Your Office NO . PROJECT NO .. PROJECT NAME: University Town Center Dra inage Certification Letter REFERENCE: THE FOLLOWING : D Prints D Copies D Originals D Plat D Field Notes D Plans ./Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice DESCRIPTION FOR: ./Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review , Revision & Return D Your Signature & Return ./Your File and/or Use D For Filing at the Courthouse D As Requested By : D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies OfThis Letter OfTransmittal Sent To: 2 Drainage Certification Letter If Enclosures Are Not As Noted Please Notify Us At Once. KLING ENGINEERI NG & SURVEY! G Con sul ting E n gineer s • L an d Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 B.J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. Detention Certification Letter Lots l A, lB & Portion of Lot 2 Telephone 979 / 846-6212 Fax 979/846-8252 Univ ers ity Tow n Center Phase One -9.69 Acres, & Post Office Box 4234 Bryan, Texas 77805 May 18, 2006 A Portion of The Sahara Realty Group , Ltd. 7.47 A cre U nplatted Tract (Vol. 6330 , Pg. 177) -6.15 Acres & The BD C Properties/Construction , Inc . U nplatted Tract (Vol. 6298 , Pg. 201) -4.51 Acres Richard Carter Survey, A-8 College S tation , Brazos County , Te x as The p urpose of thi s D etent ion Ce rti ficatio n Letter is to assure the attenuatio n of excess storm wate r runoff is provi ded during the int erim/under constructio n conditio n s of the pond area referenced in th e May 15 1\ 2006 Ame ndme nt to th e Dra in age R eport. At the present phase of po nd con stru ct io n , th e ove rfl ow/area drai n is co mpl eted. A leave -ou t area was p rovided to ac cept the designe d 6'x2' R CB outfall stru cture. The design rectangul ar orifice op ening for t he pond outl et provides 9 square feet of ope ning in 6'xl.5'. The existing leave-out in the overflow/area drain will be restricted to limit the ope ni ng to the design squ are footage . The result is a 7.17'x1 .2 5' openmg. During construction, the volume of storage provi ded in the pond area is significantl y larger th an the design volume for two reasons. First , th e pond area is over excavated to allow for construction of the retainin g wall s. Second, the fina l conditi on of the pond area w ill be to have a constant poo l elevatio n with an approximate 4' depth. Based on providing the same orifice open area at ap proximate ly the same e levation as the final design , coupled wi th the addit ional vo lum e th at will va ry to not less than the des ign volume; I certify that the in terim /under constru ct ion po nd w ill prov id e atte nu ati on greate r than or equ al to the design attenuatio n . KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 B.J. Kling, P.E., R.P.L.S. S.M. Kling, R.P.L.S. Detention Certification Letter Lots lA, lB & Portion of Lot 2 Telephone 979 / 846-6212 Fax 979/846-8252 University Town Center Phase One -9.69 Acres, & Post Office Box 4234 Bryan, Texas 77805 May 18, 2006 A Portion of The Sahara Realty Group, Ltd. 7.47 Acre Un platted Tract (Vol. 6330, Pg. 177) -6.15 Acres & The BDC Properties/Construction, Inc. Unplatted Tract (Vol. 6298, Pg. 201) -4.51 Acres Richard Carter Survey, A-8 College Station, Brazos County, Texas The purpose of this Detention Certification Letter is to assure the attenuation of excess storm water runoff is provided during the interim/under construction conditions of the pond area referenced in the May 15 1h, 2006 Amendment to the Drainage Report. At the present phase of pond construction , the overflow/area drain is comp leted . A leave-out area was provided to accept the designed 6'x2' RCB outfall structure. The design rectangular orifice opening for the pond outlet provides 9 square feet of opening in 6'xl.5'. The existing leave-out in the overflow/area drain will be restricted to limit the opening to the design square footage. The res ult is a 7.17'x1.25 ' opening. During construction, the volume of storage provided in the pond area is si gnificantly larger than the design volume for two reasons. First, the pond area is over excavated to allow for construction of the retaining walls. Second , the final condition of the pond area will be to have a constant pool elevation with an approximate 4' depth . Based on providing the same orifice open area at approximately the same ele vation as the final design , coupled with the additional volume that will vary to not less than the design volume ; I certify that the interim/under construction pond will provide attenuation greater than or equal to the design attenuation. ........ ___________ _ ) KLING ENGINEERING & SURVEYING 00-s1 -~:.57 1--'l01JJ 4101 Texas Avenue, Suite A Bryan , Texas 77802 Consulting Engineers • Land Surveyors Tel. 979/846-6212 Fax 979/846-8252 P.O . Box4234 ~ Bryan , Texas 7780 if.J ::> ... TO: City of College Station -Development Services DATE: July 19, 2005 ATTENTION: Alan Gibbs WE TRANSMIT: 0 Under Separate Cover ,/Enclosed VIA: OMail ,/ Messenger 0 Federal Express O Lone Star Overnight OUPS O Special Courier 0 Picked Up By Your Office NO . PROJECT NO.: PROJECT NAME: University Town Center REFERENCE: THE FOLLOWING : O Prints 0 Copies 0 Originals 0 Plat 0 Field Notes 0 Plans 0 Report 0 Estimate 0 Cut Sheets O Computer Printout 0 File 0 Contract ,/Other DESCRIPTION FOR : O Your Review & Approval O Your Review & Comment ,/ Your Review & Distribution O Your Review , Revision & Return O Your Signature & Return 0 Your File and/or Use O As Requested By: O Please Acknowledge Receipt of Enclosures O Please Return Enclosures To O Copies Of This Letter Of Transmittal Sent To : 6 TxDOT Permits for Sidewalk Construction I f),..~;h, e f<epo tr I J l O u ,(1-0 Cl,~ c..~ (v.,.. z ?~estC..S/ {)L v~ /.;,,, ~-" .. } /..,.__,. If Enclosures Are Not As Noted Please Notify Us At Once . Signed : Fred Pa ~ Scale = 1: 27 4 (Feet) 1 N 89 ° 54' 13" E 26.82 2 S 41 ° 52 ' 32" E 190 .2 3 S 43 ° 48 ' 48" E 500 .04 4 S 42 ° 03 ' 41 " E 399 .91 5 S 41 ° 49 ' 53" E 413.65 6 s 44 ° 49 ' 25 " w 20 .03 -- 9 8 o. 005' (o . oo"t) 7 N 41 ° 49' 53" W 414 .78 8 N42°03'41 "W399 .56 9 N 43 ° 48' 48 " W 500 .07 10 N 41 ° 52' 32 " W 208.41 7 I: tOl.P Pledger Kalkomey, Inc. Consulting Engineers ·1-~,/\~ 7020 Coyote Run '7) lJY lrv July 25 , 2005 Ms. Bridgette George City of College Station P.O. Box 9960 College Station, Texas 77842 Re: Benson Utility Easement Valley Park Center Off-Site Utilities PK Job No. 51905-231 Dear Mrs. George, Bryan , Texa s 77808 $' 979-731-8000 , 979 -731 -1500 (Fa x) www.pkengineering .comtJt5 --{~ Enclosed please find the following for the referenced project . This item corresponds to the development permit and plans submitted on July 18th: 1. Public Utility Easement Exhibit and Field Notes fo r the Benson tract. Mrs. Benson r equests that the fo l lowing be a condition of the easement: the water line installed in the easement would include an 8 -inch connection to the main line for a future water line extension into her property. Very Truly Yours, Steve E. Duncan, P.E. s ed@p kengineering.com SED/mon Enclosures cc: David Hillman Brenham • Bryan • Rosenberg \\Snapl21 7311sharc l\200515 1905 -23 1 SOUTHCORP-Por Nada\CS-07-bcnso n util csmt.doc DEVELOPMENT PERMIT PERMIT NO. 05-37 CITY OF C O LLEGE STAT I ON P'4nning cf ~Wpmmt Services FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: University Town Center formerly Replat of Henton Sub , Lots 1-3 and Replat of One Lincoln Place DATE OF ISSUE: 7/18/05 OWNER: David Scamardo -Sahara Realty Group , Ltd . 1289 N. Harvey Mitchell Parkway Bryan, Texas 77805 SITE ADDRESS: 800 Block of University Drive DRAINAGE BASIN: Burton Creek VALID FOR 12 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operat ions of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree requ ired to remain is also prohibited . Phase 2 Approval. All associated construction will need to be in accordance with TPDES. The proposed improvements within the state ROW are approved for construction upon TxDOT permit issuance . The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate cons t ruct ion site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetat ion be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage faci lit ies. I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development perm it application for the above named project and all of the codes and ordinances of the City of College Station that apply. DatJ 1 CJ 1/r1 /os I I Date vr CITY OF COLLEGE STATION Planning & Dewli!pmmt S.rvim CITY INFRASTRUCTURE INSPECTION NOTICE 1/l°l !< r I Date : To: ~ Bob Mosley vn '?.-- D Diane Broadhurst { 0 ) ~ From: Deborah Grace RE: UNlV~tlY -rowr.J ~ ~VlS87 CoN'S\. £\AN S~ (c 5. l / C0.3 1c6 -~1 cfp.7) !Ak)T eY Uf'/lV~tT'1 ANO TN4£Jv-l Location: GI Public Water Lines/Fire Hydrants GYPublic Sanitary Sewer D Public Storm Sewer D Public Streets D Public Detention Facility ~Driveway Connection to Public Street D Private Construction within easement D No Inspection Required Comments: D Engineer's Estimates Attached ~ B{onstruction Plans Attached ~IXJ$ite Plan Attached o ____ _ p~vvevvxus wol Hff2-0v£b VtVnL ~ f S7VE S fa<;v\ lT> p :\group\htltr\pzltr\prod\pz2005 \p0011493 .doc Df S -57 b~ SITE PLAN APPLICATION MINIMUM SUBMITTAL REQUIREMENTS _L Site plan application completed in full . _x_ $200.00 Application Fee. _x_ $200.00 Development Permit Application Fee . _x_ $600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public waterline , sewerline, sidewalk, street or drainage facilities is involved.) _LEleven (11) folded copies of site plan _x_ One (1) folded copy of the landscape plan . _X_One (1) copy of building elevation required for buildings with a footprint of 20,000 sq . ft. or greater _X_A list of building materials for all facades that are visible from the public right-of-way. _X-A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not checked off. N/A Parkland Dedication requirement approved by the Parks & Recreation Board , please provide proof of approval (if applicable). Date of Preapplication Conference: .-S....;;.e_._p....;;..te.;;....;m~b-"e..;..r....;;1...;;3 ...... =2....;;.0....;;.0....;;.4 ______________ _ NAME OF PROJECT University Town Center LEGAL DESCRIPTION 17 .7 acres comprised of Lots 4R (4 .62ac) 3R (5 .85ac) Replat of Lots 1&2 Henton Subd .. Vol. 6347, Pg. 185 and 7.26 ac (Putz) tr, Vol. 6078 , Pg. 247 APPLICANT/PROJECT MANAGER 'S INFORMATION (Primary Contact for the Project): Name David Scarmardo -Sahara Realty Group, Ltd . Street Address 1289 N. Harvey Mitchell Parkway State TX Zip Code ____ 7~7~8_0_3_ Phone Number _9'"-'7~9--7~7~9_-7~2~0-=-9 ______ _ PROPERTY OWNER'S INFORMATION : City Bryan E-Mail Address david@scarmardofoods .com Fax Number 979 -822-1763 Name =S=am:..=::;e _________________________________ _ Street Address -------------------City __________ _ State _____ Zip Code ______ _ Phone Number------------ ARCHITECT OR ENGINEER'S INFORMATION: Name Kling Engineering & Surveying Street Address 4101 S. Texas Ave. Suite A State ___ T~X~_ Zip Code ____ 7_7_8_0_2_ Phone Number --'9'-'7--=-9__,-8'-'4-=-6__,-6=2'-'-12=-------- 6/13/03 E-Mail Address ____________ _ Fax Number ______________ _ City Bryan E-Mail Address stewart@klingeng.com Fax Number 979-846-8252 1 of 6 KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Tel. 979/846-6212 Fax 979/846-8252 TO: City of College Station -Development Services DATE: PROJECT NO.: 7/15/05 P.O. Box 4234 Bryan , Texas 77805 PROJECT NAME: University Town Center ATTENTION: Bridgette George WE TRANSMIT: D Under Separate Cover ./ Enclosed VIA : DMail ./ Messenger D Federal Express D Lone Star Overnight DUPS D Special Courier D Picked Up By Your Office NO . 2 Site Plan REFERENCE: THE FOLLOWING: D Prints D Copies D Originals D Plat D Field Notes ./Plans D Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice DESCRIPTION 1 Overall site plan & site plan notes sheet 1 Landscape & Irrigation plan 1 11"x17" Erosion Control Plan Site Plans FOR: D Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review , Revision & Return ./Your Signature & Return ./Your File and/or Use ./ As Requested By: Jennifer Reeves D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To: If Enclosures Are Not As Noted Please Notify Us At Once. KLING ENGINEERING & SURVEYING -r-oll -oq /I :(()~, Consulting Engineers • Land Surveyors ~- P.O .Box4234 04. Bryan , Texas 77805 4101 Texas Avenue, Suite A Bryan, Texas 77802 Tel. 979/846-6212 Fax 979/846-8252 TO: City of College Station -Development Services DATE: PROJECT NO.: 7/6/05 PROJECT NAME: University Town Center ATTENTION: Alan Gibbs , P.E. WE TRANSMIT: D Under Separate Cover ./Enclosed VIA: DMail ./ Messenger D Federal Express D Lone Star Overnight DUPS D Special Courier D Picked Up By Your Office NO . REFERENCE: THE FOLLOWING : D Prints D Copies D Originals D Plat D Field Notes ./Plans D Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other -Invoice DESCRIPTION Field Changes for Water & Sewer FOR: ./ Your Review & Approval D Your Review & Comment ./Your Review & Distribution D Your Review, Revision & Return ./ Your Signature & Return ./ Your File and/or Use D As Requested By : D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of T ransm ittal Sent To : 10 Field Change Revisions for Water & Sanitary Sewer for approved for construction stamp & return (6 -for City of College Station) (4 -for stamp & return to KES) Please call or email later today when plans are ready for pickup. Thanks If Enclosures Are Not As Noted Please Notify Us At Once . Signed: Fred Pa i n~ KLING ENGINEERING & SURVEYING 4101 Texas Avenue, Suite A Bryan, Texas 77802 Consulting Engineers • Land Surveyors Tel. 979/846-6212 Fax 979/846-8252 P .O. Box 4234 Bryan , Texas 77805 TO: City of College Station -Development Services DATE: 7/14/05 ATTENTION: Bridgette George WE TRANSMIT: 0 Under Separate Cover ./Enclosed VIA: OMail ./ Messenger 0 Federal Express 0 Lone Star Overnight OUPS 0 Special Courier 0 Picked Up By Your Office NO. 4 Final Site Plan PROJECT NO.: PROJECT NAME: University Town Center Site Plans REFERENCE: THE FOLLOWING: 0 Prints 0 Copies 0 Originals 0 Plat 0 Field Notes ./Plans 0 Report 0 Estimate 0 Cut Sheets 0 Computer Printout 0 File 0 Contract 0 Other -Invo ice DESCRIPTION FOR : ./ Your Review & Approval 0 Your Review & Comment 0 Your Review & Distribution 0 Your Review, Revision & Return 0 Your Signature & Return ./Your File and/or Use 0 As Requested By: 0 Please Acknowledge Receipt of Enclosures 0 Please Return Enclosures To O Copies Of This Letter Of Transmittal Sent To: For approval stamp -Please call when ready y <-~.I -S'--.. ' j #C. Vw / f .ec....,e,.... /1/c..t., If Enclosures Are Not As Noted Please Notify Us At Once . Signed' Fred Pain~ KLING ENGINEERING & SURVEYING 4101 Texas Avenue, Suite A Bryan, Texas 77802 TO: City of College Station ATTENTION: Bridgette George WE TRANSMIT: 0 Under Separate Cover .f Enclosed VIA: OMail .f Messenger 0 Federal Express D Lone Star Overnight DUPS 0 Special Courier 0 Picked Up By Your Office NO . Consulting Engineers • Land Surveyors Email : stewart@klingeng.com P .O . Box 4234 Bryan , Texas 77805 Tel. 979/846-6212 Fax 979/846-8252 DATE: July 05, 2005 PROJECT NO.: PROJECT NAME: University Town Center Revised Site Plans I Drainage Report I TXDOT Permit REFERENCE: Re-submittal THE FOLLOWING: 0 Prints 0 Copies 0 Originals 0 Plat 0 Field Notes .f Plans .f Report D Estimate 0 Cut Sheets 0 Computer Printout 0 File D Contract .f Other DESCRIPTION FOR : .f Your Review & Approval D Your Review & Comment .f Your Review & Distribution 0 Your Review , Revision & Return 0 Your Signature & Return 0 Your File and/or Use 0 As Requested By : 0 Please Acknowledge Receipt of Enclosures 0 Please Return Enclosures To 0 Copies Of This Letter Of Transmittal Sent To : 2 Revised Landscape Plans 2 2 1 4 Revised Site plans Revised Plats Drainage Report Revised TXDOT Permit Application $200.00 processing fee submitted on 06/01 /05 If Enclosures Are Not As Noted Please Notify Us At Once . / TO : CITY OF COLLEGE STATION Planning e:!r Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM FROM : Bridgette George , Assistant Development Manager SUBJECT: UNIVERSITY TOWN CENTER (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: ~~l'J-.~'(\i;1p / o(p / o t (O'S _V_ $200 processing fee for the next round of three (3) staff reviews ; and, Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached ; Two (2) revised site; and One (1) landscaping plan . Easement Dedication Sheet and required documents . OR / _V_ ·Two (2) revised site and landscaping plans . If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information , please call me at 764-3570. Attachments : cc: Staff review comments Case file #04-00500259 Home of Texas A&M University KLING ENGINEERING & SURVEYIN G Consulting Engineers • Land Surveyors 4101 Texas Avenue, Suite A Bryan, Texas 77802 Memo : B.J. Kling, P.E., R.P.L.S. S .M. Kling, R.P.L.S. To: City of College Station Development Services c/o Allen Gibbs From : Fred Pai Re : University Town Center Telephone 979/846-6212 Fax 979 / 846-8252 City Case File #04-00500259 Fire Requirements Post Office Box 4234 Bryan, Texas 77805 July 12, 2005 University Town Center Phase 2 meet the 2000 International Fire Code as follows : Building TGIFridays Assumed Type of Construction Type IIIB Square Footage (SF) 4692 Fire Flow Required (gpm) 1500 Required Fire Hydrants 1 Proposed Fire Hydrants 1 Building Restaurant Assumed Type of Construction Type IIIB Square Footage (SF) 7618 Fire Flow Required (gpm) 1750 Required Fire Hydrants 1 Proposed Fire Hydrants 1 Building Restaurant Assumed Type of Construction Type IIIB Square Footage (SF) 6526 Fire Flow Required (gpm) 1750 Required Fire Hydrants 1 Proposed Fire Hydrants 1 Building Restaurant Assumed Type of Construction Type IIIB Square Footage (SF) 6504 Fire Flow Required (gpm) 17 50 Required Fire Hydrants 1 Proposed F ire Hydrants 1 Building Restaurant Assumed Type of Construction Type IIIA Square Footage (SF) 11288 Fire Flow Required (gpm) 1500 Required Fire Hydrants 1 Proposed Fire Hydrants 1 , . From: To: Date: Subject: Lance "Chuck Ellison" <Chuck@ellisonlaw.com> "Lance Simms" <Lsimms@cstx.gov> 12/7/2005 8:59 :31 AM RE: Univers ity Town Center I should be thank ing you because as always , you go the extra mile to help resolve issues . We appreciate your assistance and promptness very much . You have accurately described our discussion in this e-mail. Thank you again ! Chuck -----Original Message----- From : Lance Simms [mailto :Lsimms@cstx.gov] Sent: Tuesday , December 06 , 2005 12 :31 PM To : Chuck Ellison Cc : Alan Gibbs ; Chris Haver; Joey Dunn ; Jenn ifer Reeves ; Kim Foutz ; Lee Rob inson Subject: University Town Center Chuck : Thanks for meeting with City staff earlier today concerning building perm its and site plan issues related to Abuelos restaurant in Phase 2B , Univers ity Town Center. I wanted to follow-up with a summary of our discuss ion . Slab only permit: The City is willing to issue a slab only perm it for Abuelos provided the site issues identified in the meeting are resolved . This includes finalizing the location of the backflow prevention device for the fire sprinkler system and reconciling the c iv il/architectural plans . The contractor also needs to amend the building perm it appl ication to request a slab only . Full bu il ding perm it: The City will issue a full building permit for Abuelos after site plan approval. To date , the primary issue delaying site plan approval has been the TxDot permits for the two access points on Un iversity Drive East. It is my understanding that you are working with a consultant to expedite the driveway permit process through TxDot. Certifi cate of Occupancy (CO): A temporary or permanent CO w ill be issued for Abuelos after the structure and site are found to be in compl iance with City codes and ordinances (this includes park ing areas , landscap ing , drives , etc .). We acknowledge that the other structures proposed in phase 2B may not be complete at the time a CO is issued for Abuelos . We also realize that the detention area may not be 100% complete . However, the detention area must be fully functioning as determ ined by City engineers prior to the issuance of a CO . Thanks again Chuck and please let me know if this summary does not accurately describe our discuss ion . Lance Simms From: To: Date: Subject: Lance "Chuck Ellison" <Chuck@ellisonlaw.com> "Lance Simms" <Lsimms@cstx.gov> 12/7/2005 8 :59 :31 AM RE : University Town Center I should be thanking you because as always, you go the extra mile to help resolve issues. We appreciate your assistance and promptness very much . You have accurately described our discussion in this e-mail. Thank you again! Chuck -----Original Message----- From : Lance Simms [mailto :Lsimms@cstx.gov) Sent: Tuesday, December 06 , 2005 12 :31 PM To : Chuck Ellison Cc: Alan Gibbs; Chris Haver; Joey Dunn ; Jennifer Reeves ; Kim Foutz; Lee Robinson Subject: University Town Center Chuck : Thanks for meeting with City staff earlier today concerning building permits and site plan issues related to Abuelos restaurant in Phase 28, University Town Center. I wanted to follow-up with a summary of our discussion . Slab only permit: The City is willing to issue a slab only permit for Abuelos provided the site issues identified in the meeting are resolved . This includes finalizing the location of the backflow prevention device for the fire sprinkler system and reconciling the civil/architectural plans . The contractor also needs to amend the building permit application to request a slab only . Full building permit: The City will issue a full building permit for Abuelos after site plan approval. To date , the primary issue delaying site plan approval has been the TxDot permits for the two access points on University Drive East. It is my understanding that you are working with a consultant to expedite the driveway permit process through TxDot. Certificate of Occupancy (CO): A temporary or permanent CO will be issued for Abuelos after the structure and site are found to be in compliance with City codes and ordinances (this includes parking areas , landscaping, drives, etc.). We acknowledge that the other structures proposed in phase 28 may not be complete at the time a CO is issued for Abuelos . We also realize that the detention area may not be 100% complete . However, the detention area must be fully functioning as determined by C ity engineers prior to the issuance of a CO . Thanks again Chuck and please let me know if this summary does not accurately describe our discussion . Lance Simms I Brittany Korthauer -Re: Fwd : Calling,to ~ co=@::E§ Univ~!Y Dr E {Abuelos) From: To: Date: Subject: Wally Urrutia Brittany Korthauer 5/15/2006 9:34 am Re: Fwd: Calling for CO@ 840 University Dr E (Abuelos) CC: Rodney Harris Here is what we have observed. They need to have the 12ft. by 12ft. inside dimension requirement on the dumpster enclosure. Thanks ! >>> Rodney Harris 5/12/2006 5:07 pm >>> It's not ready yet. They haven't poured concrete in front of the enclosure. The inside dimensions are 11 ft 3 inches wide and 9 ft 7 inches deep from gate to bollard .. Rodney Harris Sanitation Foreman Public Works Tel(979 )764-3698 Fa x(979)764-3489 email: rharris@cstx.gov Wally Urr utia Sanitation Superintendent (979) 764-3841 Fax (979) 764-382 2 >>>Wa ll y Urrutia 5/12/2006 9 :29 am >>> Check th is out! Wally Urrutia Sanitation Superintendent (979) 764-3841 Fa x (979) 764-3822 >>> Brittany Korthauer 5/12/2006 9:26 am >>> Are there any issues?? Landscaping will not be put in unti l Monday . BP# 05 -3527 Thanks Brittany Korthauer CSR-Planning & Development City of College Station P.O. Box 9960 College Station, TX 77842 979.764 .3570 I Br ittan y Korthauer - Re: CalTing fo r c o@s4o:vn;7sTiy Dr E (Abuelo Sf From: To: Date: Subject: Jerry Duffey Brittany Korthauer 5/15/2006 8:31 am Re: Calling for CO @ 840 University Dr E (Abuelos) CC: Benjamin McCarty; Chris Haver; Eric Hurt; Gi. .. Fire Extinguishers need to be placed Busine ss name and address Master key for knox bo x Fire lanes >>> Brittany Korthauer 05/12/06 9:26 AM >>> Are there any issues?? Landscaping will not be put in until Monday. BP # 05 -3527 Thanks Brittany Korthauer CSR-Planning & Development City of College Station P.O. Bo x 9960 College Station, TX 77842 979.764.3570 Page 1 J I Brittany Korthauer -Re : Calling for Cd @ S40 University Dr E. (Abue_los From: To: Date: Subject: Eaphrame Thomas Alan Gibbs; Benjamin McCarty; Bob Mosley; Br ... 5/12/2006 4:06:41 pm Re: Calling for CO @ 840 University Dr E (Abuelos) CC: Eaphrame Thomas No for COW/WW Environmental Services serval issues BACKFLOW ISSUES l. Need backflow test report for the backflow device on Fire line. 2. Need test report for backflow device on Carbonated soda dispenser machines . 3. Will need backflow test report on lawn irrigation. GREASE TRAP ISSUES 1. Could not locate sample well on Grease trap. 2. Al so need tees put in Grease Trap on the inlet pipe and on the outlet pipe. 3 . It also seems like the grease trap is not function properly . The reasoning is that the water is coming over the separation wall inside of the grease. Eaphrame A. Thomas Environmental Technician City of College Station Public Utilities and Environmental Services 979.764 .6342 Have A Bless Day! >>> Brittany Korthauer 5/12/2006 9:26 am >>> Are there any issues?? Landscaping will not be put in until Monday . BP# 05-3527 Thanks Brittany Korthauer CSR-Planning & Developme nt City of College Station P.O. Box 9960 College Station, TX 77842 979.764 .3570 From: To: Date: Subject: Alan Gibbs Bkorthauer @cstx .gov 5/12/2006 10:52:42 am Re : Calli ng tor CO @ 840 University Dr E (Abue los) The detention pond doesn't appear to funct ional or armored against erosion This m essage se nt from my wireless Blackberry device »> Br ittany Korthauer 5/12 9:26 am »> Are there any issues?? Landscaping will not be put in until Monday. BP# 05-3527 Thanks Brittany Korthaue r CSR-Planning & Development City of College Stat ion P.O. Box 9960 College Station , TX 77842 979 .764 .3570 \ Brittany Korthauer -Re: Ca lling for CO @ 840 University Dr E (Abuelo S} = From: To: Date: Subject: John Logan Alan Gibbs; Benjamin McCarty; Bob Mosley; Br ... 5/12/2006 10:03 am Re: Calling for CO @ 840 University Dr E (Abuelos) I need to get them a letter of completion to fill out but that's it.