HomeMy WebLinkAbout2 Westfield Village Ph 4 05-23DEVELOPMENT PERMIT PERMIT NO . 05-23 ~-~ Project: WESTFIELD VILLAGE PH 4&5 COLLlGl STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: WESTFIELD VILLAGE PH 4&5 ALL LOTS DATE OF ISSUE: 07/18/05 OWNER: B/CS DEVELOPMENT COMPANY SITE ADDRESS: VICTORIA@ MOUNTAIN BREEZE WAY DRAINAGE BASIN: Lick Creek VALID FOR 9 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5 .E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to , paint, oil , solvents, asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . ****TCEQ PHASE II REGULATIONS IN EFFECT**** The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage facil ities. I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Item No . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 3 2 3 3 34 3 5 36 37 3 8 39 40 41 42 43 44 45 , , ESTFIELD VILLAGE, PHAS:h..:; 4 & 5 Engineer's Estimate May 27, 2005 Description I Unit Quantity Unit Price p . c avmg onstrucbon Mobilization Lump Sum 1 5,000 .00 Clearing and Grubbing acre 6 .7 1,500 .00 Roadway Excavation C .Y. 4,004 3.50 6" Lime Stabilized Subgrade S.Y. 19 ,693 3.25 Extra Lime Ton 125 90 .00 7" Crushed Limestone Base S.Y. 7,316 8 .25 6" Crushed Limestone Base S.Y. 9 ,011 7.25 1.5" HMAC Surface Course S.Y. 16 ,694 6 .00 Curb and Gutter (all types) L.F. 9,578 8.50 Concrete Pavement (allevs) S.Y. 824 30 .00 Concrete Pavement (aprons) S.Y. 1,462 33.00 Sidewalks S .F . 2,272 3 .25 HCRamps S .F . 130 9.00 I Type III Barricades EACH 2 500 .00 Paving Subtotal D . s ramage iystem c onstruchon Channel E xcavation C.Y. 1,995 3 .50 15" Reinf. Concrete Pipe, Str. Backfill L.F . 108 35.00 18" Reinf. Concrete Pipe, Str. Backfill L.F. 542 40 .00 21" Reinf. Concrete Pipe, Str. Backfill L.F. 388 45 .00 21" Reinf. Concrete Pipe, Non-Str. Backfill L.F. 167 40 .00 24" Reinf. Concrete Pipe, Str. Backfill L.F. 131 50 .00 27" Reinf. Concrete Pipe, Str. Backfill L.F. 387 60 .00 27" Reinf. Concrete Pipe, Non-Str. Backfill L.F . 305 55 .00 30" Reinf. Concrete Pipe, Str. Backfill L.F. 298 70 .00 30" Reinf. Concrete Pipe, Non-Str. Backfill L.F. 91 60 .00 48" Reinf. Concrete Pipe, Str. Backfill L.F. 112 130 .00 5'x 4' RCBC Str. Backfill L.F. 32 250 .00 5'x 4' RCBC Non-Str. Backfill L.F. 44 240 .00 Trench Grate EACH 1 2,500.00 Standard 10 ' Inlet EACH 3 2,500 .00 Standard 5' Inlet EACH 16 2,200 .00 Special 10' Inlet EACH 1 4,000 .00 Special 5' Inlet EACH 2 2,500 .00 Standard Junction Box EACH 4 2,000 .00 Sloned HW for 21" RCP EACH 1 1,000 .00 Sloped HW for 27" RCP EACH 1 1,200 .00 Sloped HW for 30" RCP EACH 1 1,500 .00 Sloped HW for 5'x 4' RCBC EACH 2 3,000 .00 Dry Rip Rap S.F . 886 5 .50 Construction Exit EACH 3 1,500 .00 Inlet Protection EACH 21 75.00 Hydromulch Seeding (Street ROW -10 ft either side) S.Y. 12 ,700 0.50 Hydromulch Seeding (Channel -60 ft wide) S .Y. 4 ,400 0 .50 Silt Fence L.F . 1,600 2 .00 Hay bale barriers EACH 6 200 .00 Stormwater Pollution Prevention Plan Lumo Sum 1 5,000 .00 Drainage System Subtotal 1 of3 Total 5 ,000 10 ,050 14 ,014 64,002 11 ,250 60 ,357 6 5,330 100 ,164 81 ,413 24 ,720 48 ,246 7 ,384 1,170 1,000 $494 ,100 6 ,983 3,780 21 ,680 17 ,460 6 ,680 6 ,550 23 ,220 16 ,775 20,860 5 ,460 14 ,560 8 ,000 10 ,560 2,500 7,500 35 ,200 4 ,000 5,000 8 ,000 1,000 1,200 1,500 6 ,000 4,87 3 4,500 1,575 6 ,350 2,200 3 ,200 1,200 5,000 $263 ,366 EXHIBIT 6~ , Item No . 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 , , 'ESTFIELD VILLAGE, PHASL..; 4 & 5 Engineer's Estimate May 27, 200 5 Description Unit Quantity Unit Price wt s c a er ;ystem onstruction 3" PVC, D2241 Water Line, Str. Backfill L.F. 92 12.00 3" PVC, D2241 Water Line, Non-Str. Backfill L.F . 177 10.00 6" PVC, C909 Water Line, Str. Backfill L.F. 98 22 .00 6" PVC, C909 Water Line, Non-Str. Backfill L.F. 529 16 .00 8" PVC, C909 Water Line, Str. Backfill L.F . 1,258 26 .00 8" PVC, C909 Water Line, Non-Str. Backfill L.F . 1,480 20.00 12" PVC, C909 Water Line, Str. Backfill L.F . 799 32 .00 Fire Hydrant Assembly EACH 6 2,500 .00 3" Gate Valve EACH 2 300 .00 6" Gate Valve EACH 2 600 .00 8" Gate Valve EACH 4 800 .00 12" Gate Valve EACH 1 1,250.00 12"x 13" Anchor Coupling EACH 3 250.00 8"x 13" Anchor Coupling EACH 7 150.00 6"x 13" Anchor Coupling EACH 3 100 .00 8"x 6" Tee EACH 1 350 .00 8"x 4" Tee EACH 2 350 .00 8"x 1.5" Tapped Tee EACH 6 300 .00 8"x 1" Tapped Tee EACH 5 300.00 12"x 45 degree Bend EACH 8 350 .00 8"x 45 degree Bend EACH 5 275 .00 8"x 22 .5 degree Bend EACH 2 275 .00 8"x 11.25 degree Bend EACH 1 275 .00 6"x 45 degree Bend EACH 2 225.00 6"x 22 .5 degree Bend EACH 4 225 .00 6"x 11 .25 degree Bend EACH 1 225 .00 4 "x 3" Reducer EACH 2 200 .00 2" Blow Off EACH 1 500 .00 l" Blow Off EACH 2 400.00 1" Service,< 20 ft. lenlrth (avg. lemrth = 3 ft.) EACH 5 350.00 1" Service,> 20 ft. length (avg . length = 50 ft.) EACH 5 900.00 1.5" Service,~ 20 ft. length (avg . length= 3 ft.) EACH 24 400 .00 1.5" Service > 20 ft. lenlrth (avg. lenlrth = 54 ft.) EACH 24 1,000 .00 Water System Subtotal 2 of3 Total 1,104 1,770 2,156 8,464 32 ,708 29 ,600 25,568 15 ,000 600 1,200 3,200 l ,250 750 1,050 300 350 700 1,800 1,500 2,800 1,375 550 275 450 900 225 400 500 800 1,750 4,500 9,600 24,000 $177 195 EXHIBIT e,~ Item No . 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 ""ESTFIELD VILLAGE, PHASb~ 4 & 5 Engineer's Estimate May 27, 200 5 Description Unit Quantity Unit Price S St C tcf ewer •YS em ODS ru 100 6" PVC, D-3034 , Str. Backfill L.F. 766 40.00 6" PVC, D-3034, Non-Str. Backfill L.F . 1,864 32 .00 6" PVC, D-2241 , Str. Backfill L.F. 80 42 .00 8" PVC, D-3034, Str. Backfill L .F . 70 45.00 8" PVC, D-3034, Non-Str. Backfill L.F. 604 35.00 8" PVC, D-2241, Str. Backfill L.F . 30 47.00 8" PVC, D-2241 , Non-Str. Backfill L.F . 10 37.00 Standard Manhole, 6.01-8.00 ft. deep EACH 4 1,900 .00 Standard Manhole, 8 .01-10 .00 ft. deep EACH 11 2,100 .00 Standard Manhole, 10 .01-12 .00 ft. deep EACH 1 2,400 .00 Standard Clean Out EACH 5 500 .00 Connect to Existing Manhole Lump Sum 1 500 .00 4" Services~ 20 ft. (avg length = 8 ft.) EACH 39 450.00 4" Services >20 ft. (avg. length= 46 ft.) EACH 24 1,400 .00 Trench Safety (sanitarv sewer) L.F. 3,424 2.25 Sewer System Subtotal Summary Paving Subtotal $494 , 100 Drainage System Subtotal 263 ,366 Water System Subtotal 177 , 19 5 Sewer System Subtotal 214 ,672 ------- Total $1,1 49 ,333 3 of3 Total 30,640 59,648 3,360 3,150 21,140 1,410 370 7 ,600 23,100 2,400 2,500 500 17,550 33,600 7,704 $214,672 EXHIBIT f>S E & BROWNE ENGINEER /SURVEYING, INC. HBMcCU ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~- II June 3, 2005 Mr. Alan Gibbs City of College Station P .O. Box 9960 1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845 (979) 693 -3838 •Fax (979) 693 -2554 •Email: mcclurebrnwne@ verizon .net College Station, Texas 77842 Re: Westfield Village Subdivision, Phases 4 & 5 -Water and Sewer Report Dear Alan: The original Water and Sewer Reports submitted with Westfield Village, Phase 1 in 2002 analyzed both systems for Phases 1-5 as a single development . Following are data and comments from those reports regarding Phases 4 and 5 . Water System The lowest pressures that were computed for the water system occurred on top of a hill in Phase 3 near Victoria Avenue. The minimum pressure under fire flow conditions was 78 psi, which far exceeds the minimum pressures required by the City and TCEQ . Pressures in the vicinity of Phases 4 and 5 were approximately 90 psi under fire flow conditions . These were computed assuming an 8" line along Victoria was in place . Since that time, a 12" line has been installed along existing portions of that street, and it will be completed with the construction of these two phases . Therefore, we assume that pressure and flow characteristics within the subdivision are even better than those used for the model. As a result, no additional water report is being submitted for these two phases of construction . Sewer System Likewise, the original sewer report for Phases 1-5 was prepared using 6" lines to serve Phases 4 & 5. The analysis showed that these lines were easily capable of serving both phases . In Phase 5, line segment 2A- 2B required only a 0. 01 slope to carry the required flow , which is far less than the minimum slope of 0 . 60 . From this , we conclude that the realignment of the street in Phase 5 does not significantly alter the flow characteristics in that portion of the system. Therefore, no additional sewer report is being submitted with these two phases of construction . While the roadway alignment for Phase 5 has changed slightly, the effects on the water and sewer systems are minimal . Otherwise, those reports are still valid for this development. I will be happy to go over the original reports with you if necessary . Please let me know if you would like to do that. Thank you . Sincerely, /LJ-J_ KentLaz.a,P .E. r-- Project Administrator 1 --111)6 lMB McCLURE & BROWNE ENGINEERING/SURVEYING, ~d i::9i 1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845 ~ (979) 693-3838 •Fax (979) 693-2554 •Email: mcclurebrowne@veriron.net 7/ ./ (\ 1., QS, os _qs TRANSMITTAL LETTER TO: Bridgette George Assistant Development Manager Planning and Development Services City of College Station Phone: 979-764-3570 Fax: 979-764-3496 DATE: July 11, 2005 RE: Westfield Village , Phase 4-5 Construction Documents PRJT No.: 1053-0004 ATTACH . DESCRIPTION 1. One (1) copy of Revised Westfield Village Phases 4/5 Construction Plans 2. One (1) copy of Revised Drainage Report addendum for Phases 4/5. 3. One (1) copy of Response to City Review Comments Letter dated June 20 , 2005. THESE ARE BEING SENT : o At your request o For your signature 181 For your approval DFor _________ _ REMARKS: o For your information o Per our conversation o For further action as noted o Per contract o For rev iew and comment o For your use o At request of ______ _ o Original will follow by mail WHEN ATTACHED PLANS ARE APPROVED WE WILL PROVIDE ADDITIONAL COPIES FOR ST AMPING. If you have any questions or need any additional information , please do o esitate to call. F:\1053 -Randy French\0004 -Westfield Village Phase 4,5\Correspondence\Copy of COGS -George01 -Tletter.wpd NB 111 McCLURE & BROWNE ENGINEERING/SURVEYING, INC. 1008 Woodcreek Drive, Suite 103 •Coll ege Statio n , Texas 77845 (9 79) 693-3838 •Fax (979) 693-2554 • Email: McCl ureBrowne @ Verizon .net July 8 , 2005 Bridgette George Development Coordinator City of College Station Post Office Box 9960 College Station , TX 77842 Re .: Westfield Village, Phase 4 -Construction Documents MBESI Job #: 1053-0004 Dear Bridgette : Below is the summary of the revisions made per the staff's comments . f-NGINEERING: J COMMENT #1 : If you do not plan on constructing both phases at the same time and having a single CO for both phases, you will need to either separate Phases 4 and 5 or indicate construction requirements for each phase on ACTION : J COMMENT #2 : ACTION : J COMMENT #3 : ACTION : construction documents. The owner plans to construct both phases at the same time . Minimum horizontal radius from centerline is 200 feet. Crested Point Drive shows a radius of 175 feet. This development is a POD . The preliminary plat was approved with the radius as shown . The 12 ' pavement width in the alley will requ ire a variance to the Subdivision Regulations 8-G .10. The owner wishes to build the 12 ' alley, which matches the revised Street Design Guidelines. A variance request has been submitted. /coMMENT #4: Were you going to dedicate the medians in the ROW of Crownridge Court and Bridgeberry Court as common areas in stead of pursuing a PIP? ACTION : The areas inside of the median will be dedicated as RO I The Final Plat has been modified and resubmitted. ~ W estfield V illag e, Phase 4 and 5 Construction D ocu ments R esponse P age 1 of 3 COMMENT #S:The top of the channe l slope near Crest e d Point Drive encroaches into Lots 7 , 8, and 9 . Pull lot lines away from channel or add private slope easement. ACTION : Lots 7, 8 , and 9 were part of phase 2, so the lot lines can not be adjusted. The slopes have been adjusted to avoid encroaching into these lots. COMMENT #6 : What is the velocity in the channel? ACTION : The maximum velocity in the channel is 5 .98 fps during the 10 year storm event as shown in Exhibit E-2 of the Revised Drainage Report. COMMENT#?: ACTION : faMMENT#B : ACTION : What is the 100-year water surface elevation in the channel? A copy of the HEC-RAS study for the channel has been added to the drainage report in Exhibits E-1 and E-2. This study shows the limits of the 100 year water surface . Provide energy dissipation structures at outfall 17. The proposed headwall has energy dissipation blocks incorporated with it. We have added the detail of this to sheet 24 . This has been the City's preferred method of energy dissipation on past projects. /coMMENT #9 : Inlets 15 and 20 show 2 flow lines out and no flow lines in . ACTION: The plans have been revised to show a flow line in and a flow line out. /coMMENT #1 O:Storm pipe between inlets 7 and 8 is a 15" in plan view and a 18" in profile . ACTION : The 18 " is correct. The plans have been revised. /coMMENT #11 :Plan view calls out manhole , profile indicates cleanout. (Sheet 12 , Sta . 129+27) ACTION : The profile view is correct. The manhole label in the plan view has been changed to a cleanout. j COMMENT #12 :Sewer pipe with less than 6 ' of cover shall be constructed of ductile iron pipe . (Sheet 13) ACTION : The sewer pipe in this area has been adjusted to DIP. /coMMENT #13 :Tees are shown in plan for water services . Are you planning tees? ACTION : The "tapped tees " are located where the service ties into the main in a horizontal or vertical bend instead of a drilled connection . Th is reduces the tendency of the main to fail at the location of the service tie-in . /COMMENT #14 :A gate valve is required at the end of temporary dead end lines, within 200 feet for lines 8" and smaller. (Sheet 17). ACTION : A gate valve has been added to the plans. Westfield Village, Phase 4 and 5 Construct ion Documents Re sponse P ag e 2 of 3 h MMENT #15 :Show location and add details for the pathways to construction plans. ACTION: The layout detail of the pathways has been added to the overall plan (sheet 2). A cross section detail showing the typical section of the pathway is shown on Sheet 22. Sincerely , ~::~.PE McClure & Browne Engineering/Surveying , Inc. Westfield Village, Phase 4 and 5 Construction Documents Re sponse Page 3of3 FOR OFFICE USE ONLY P&Z CASE NO.: cn--q8' . . -- DATE SUBMITTED: ( 0:03-0"'-v C ITY OF COLLEGE S TATION Planning & Development Services FINAL PLAT APPLICATION-- (Check one) D Minor ($300.00) D Amending ($300 .00) 00 Final ($400.00) D Vacating ($400 .00) D Replat ($600.00)* *Includes public hearing fee The following items must be submitted by an established filing deadline date for P&Z Commission consideration . MINIMUM SUBMITTAL REQUIREMENTS: ~ Filing Fee (see above) NOTE: Multiple Sheets -$55 .00 per additional sheet N/A Variance Request to Subdivision Regulations -$100 (if applicable) ~ Development Perm it Application Fee of $200 .00 (if applicable). ~ Infrastructure Inspection Fee of $600.00 (applicable if any public infrastructure is being constructed) ~ Application completed in full. N/A Copy of original deed restrictions/covenants for replats (if applicable). ~ Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.) N/A One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable). ~ Paid tax certificates from City of College Station , Brazos County and College Station l.S.D . ~ A copy of the attached checklist with all items checked off or a brief explanation as to why they are not. ~ Two (2) copies of public infrastructure plans associated with this plat (if applicable). N/A Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approva l (if applicable). Date of Preapplication Conference: ________________________ _ NAME OF SUBDIVISION Westfield Village, Phase Four SPECIFIED LOCATION OF PROPOSED SUBDIVISION (Lot & Block) Robert Stevenson League A-54 APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name B/CS Development Company; Attn: Mr. Randy French Street Address __ 4~0~9~0~S~H~6~S~o~u~th~-----------City -~C~o_ll~eg .... e~S~ta~ti~o_n ____ _ State Texas Z ip Code __ 7~7_8_4~5 __ _ E-Mail Address rfrench@stylecraft-builders.com Phone Number _ ___..(=97'-'9""')_.,6=9-=-0-'· 1=2=2=-2 _,x"'"""1'""'1 ___ _ FaxNumber __ _.(-=-97'-'9~)_.,6=9-=-0_.,·9=0-=-6=9 ______ _ PROPERTY OWNER'S INFORMATION : Name (Same as above) Street Add ress -------------------City ----------- State _____ Zip Code ______ _ E-Mail Address _____________ _ Phone Numbe r ------------Fax Number ______________ _ ARCHITECT OR ENGINEER'S INFORMAT ION : Name McClure & Browne Engineering/Surveying, Inc.; Attn : Mike McClure Street Add ress 1008 Woodcreek Drive, Suite 103 City College Station State Texas Zip Code 77845 E-Mail Address MikeM@McClureBrowne.com Phone Number __ (~9~7~9)~6~9'-'3~-3~8'-'3~8 _____ _ Fa x Number __ ~(9~7~9~l-=.6=93~-=2=55~4-'---------- 6/13/03 I of 5