Loading...
HomeMy WebLinkAbout14 BCS Heart DP 05-31 3534 Longmire Dr{)5-31 ~-aq-os- ~ BCS HEART DRAINAGE ANALYSIS June 2005 Prepared for CJr/J o":: c LLE TA I N thr heart of tht Rm arch Valley By MITCHELL MM MORGAN ENGINEERS & CONSTRUCTORS 511 UNI VERSI TY DRIV E, SUITE 204 COLLEGE STATION , TX 7784 0 O FF ICE (97 9) 260-69 6 3 FA X (9 7 9) 260-3564 CERTIFICATION "I hereby certify that I am fam ili ar with the adopted ordinances, regu lat ion s, standards, and policies of the City of College Station govern in g development, that these plan s have been prepared under my supervision , and that this drainage plan complies with govern ing ordinances and regu lations to the be st of my k nowledge ." "The site of BCS Heart, Lot 8, Block 3 of the L.O. Ba ll Subdivision does not lie w ith in the establi shed area of the spec ia l flood hazard as estab lished by the current f lood in surance study or fl ood insu rance rate map pane l number 201 D, dated FebruQ,[__..w,...,W.000 ." ~7~~,~~' '°!>'ft.~ •••••• ~~' ..... ··· * ·····* "2__~ av J\2 6 05 ......•••.••••••• ~;, I·· ~2.E.~ ~~~'IP.~~~~ .. 'I. '\ .. -9 80649 ~ .. fl: 'f\~A.·f~1 STE~~~<G."'.,.p , ... ~~$1(,N·~r;.~~ ..,, .,,~., Introduction BCS HEART BUILDING DRAINAGE ANALYSIS The purpose of th is drainage report is to present an analy sis of the nece ssary drainage infrastructure for the proposed BCS Heart Building . This office development will be located in south College Station, near the "Rock Prairie Crossing" (Kroger) adjacent to State Highway 6 . The drainage report provides analysis for the infrastructure required to facilitate attenuation and removal of both onsite flow and the flow from contributing offsite drainage areas. This report includes analysis for complete development of the 2 .75 acre tract, not including rights-of-way of the already constructed street. Per the City of College Station Drainage Policy and Design Standards (DPDS ) the parameters used for the design and analysis of pre-v. post-development conditions include adherence to the stated zero peak flow rate increa se due to development set fo rth in the guidelines . General Location and Description The BCS Heart Building will be located in College Station, Te xas, south of Rock Prairie Road, and West of State Highway 6 . The development is located at the existing intersection of Birmingham Drive and Longmire Drive between the Kroger Signature Store and the Med, on Lot 8, Block 3 of the L.O . Ball Memorial Subdivision . No new publ ic infrastructure is planned with the development except for the extension of the water system to serve the building . Stormwater runoff from the site will be detained in an on-site detention pond. The project location is shown in Exhibit A 1, Vicinity Map . Drainage Design Criteria All drainage design is in accordance with the City of College Station DPDS. As such : • Design ra instorm events consist of the 10-, 25-, and 100-year frequency storm events in order to analyze the effectiveness of the detention facilities as well as capture conservative peak flow values . The 10-, 25-, and 100-year frequency storm event routing can be found in Exhibits E-1 through E-3, respectively. • Flow calculations are based on the rational method using the guidelines provided in the DPDS, and can be found in Exhibit C-1 . • The target peak runoff rate for the post-development condition is that of the pre- development peak flow rate at the study confluence . This can be found in Exhibits E-1 through R-3 . The analysis confluence for this report is identified as the existing inlet on Birmingham at the Northeast corner of Birmingham I Longmire Intersection , further referred to as "Study Point A". Achievement of design objectives will be based on the effects of the proposed storm drainage system on "Study Point A". Primary Drainage Basin Description The project site is located within the North Fork of Lick Creek Drainage Basin . A s demonstrated in Exhibit B, no portion of the project lies within the regulatory 100-year floodplain per the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) panel 201 D, with an effect ive date of February 9, 2000 . Currently the stormwater flow is carried acro ss the property through a drainage swale parallel to Longmire Drive, into the inlet at Study Point A. Thi s inlet capture s and conveys the flow south to the North Fork of Lick Creek through a closed storm drain system . l=~~I Mit chell & M o rga n, LLP Stormwater Runoff Analysis General Information Drainage characterist ics for th is ana lysis were sel ected fro m the DPDS guide li nes. Drainage areas were delineated from the City of Co ll ege Station Aerial Topographic files . This information can be seen in Exhibit C, the Drainage Area Map . Prede velopment Drainage Analysis Per Exhibit A2, Dra inage Area Map, Lot 7 and 8 drains through the project site before reaching the inlets on Birm ingham Drive . Flow entering these inlets drains south through an existing storm sewer system, ultimately draining into the north fork of Lick Creek . Runoff calculation s were performed using the Ra ti onal Method . Offs ite flow is from entire ly undeveloped areas; rational C values were se lected acco rdingly . Peak runo f f va lues fo r t he two dra inage bas in s are prov ided in Exhibit C-1, Rational Formula Drainage Area Ca lculations . Sub-bas in areas were based on exis ting lot lines, with drainage area 1 (DA #1) developed with this project, and drainage area 2 (DA #2 ) remaining undeve loped at th is time . Postdevelopment Drainage Analysis As demonstrated in Exhibit A2, approximately 25% of the lot will remain undeve loped with construct ion of the BCS Heart building . Drainage ana lysis for the site will assume ultimate de velopme nt, allowing no changes to drainage infrastructure w ith comp lete deve lopment at a later date. Postde velopment drainage areas were kept the same to simplify ana lysis . Postdevelop m ent drainage patterns will remain similar to those of predeve lopment cond itions . Flow from the BCS Heart building wi ll be directed by curbs and swa les t o a detention pond at the southeast corner of the property . Water w ill be released from the detention pond through a twenty-four inch (24") pi pe to the existing storm sewer system at Study Point A. Drainage Facility Design Rational and Storage Indication Curve Modeling As previousl y mentioned, design flows were calculated using the rational method, as shown in Ex h ibit C-1. Th e flows from rational analysis were rou t ed thro ug h the detention pond using storage indication curve routing techniq ues. Stage /storage, stage/Discha rge, and storage indication curves for the proposed detention pond may be found in Ex h ibit D-1 . St orage-outflow routing was used to determine outflows from the pond to Study Point A for the 10-, 25-, and 100-year frequency storm events, as shown in Exhibits E-1 through E-3 . Proposed Storm Drainage Infrastructure Flow from the BCS Heart building w ill be directed by curb s and swales to a detention pond at the southeast co rn er of the property . Offsite flow (Lot 7) is received vi a the ex isting earthen swa le, routed into t h e parking area, and directed toward t h e detent io n pond . Flow from the proposed park ing area at the rea r of the site w ill be d irected to a new ea rth en swale, j oining w ith offsite flows into t he existing earthen swa le to t h e south. Outflow from t he detention pond is contro ll ed by a proposed twenty-four inch (24") RCP headwa ll and pipe . Fo r the benefit of calculation no overflow weir is required . In the event that the sto rm drain system is clogged, site grading has been established such that flows from the pond will overflow the detention pond berm and enter the curb lines of Longmire and Birmingham safe ly without j eopardizing any adja cent structures. 1:::1 Mitchell & M o rgan, LLP 2 Drainage Analysi s Results Prede velopmen t Resu l ts As discu ssed earl ier, much of the predeve lopment stormwater r u noff occurs from cro ss-lot drainage generated by offsite parcel s north of the site . Flow from lots 7 and 8 sheet flow south to the inlet at Study Po int A. The peak fl ows for 100-year ev e nt is 38 .0 cfs at Study Point A. Pos tdevelopment Results A s demonstrated in Exhibits E-1 to E-3, there are no peak flow rate increa ses at the study confluence . Peak flow rates at Study Point A were reduced in all storm frequencie s studied, as shown i n Table 1 below. The design of the storm sewer system resulted in a 100-year peak flow rate of 25 .2 cfs at the Study Point outfa ll and a 100-yea r peak wat e r surface in the pond of 299 feet, which provides a foot of freeboard fo r t he be rm of the dete nt ion pond. Pe a k Discharqes at Study Point A Discharge Study 10-Year Peak Flo w 25-Year Peak Flo w 100-YearPeak Flo w Point (cfs) (cfs) (c fs ) Predevelop ment 26.2 29 .9 38.0 Postdevelo pment 2 0 .7 22.3 25.2 Chan qe in Peak Fl ow -5.5 -7.6 -12.8 Conclusions The development of the BCS Heart Building will cause a substantial increase in peak stormwater runoff due to the add ition of a significant amount of impervious cover to the site. The analysis of the propose d storm d rainage infrastructure yield s a p icture of the dra i nage conditions during a substantial ra infall event ensure s that no signif icant flooding will occur on the proposed site . Review of the stormwater analysis indicates that the d r ainage d es ign presented in this report will provide am pl e conveyance and detention to meet t h e drainage objective of the City of College Station DPDS . 1::1 Mitchell & M o rgan, LLP 3 ~UJJlB3 J~~1 ~~(Q)~~~u W VICINITY NOT TO SCALE MAP T.979.21JO.IS!l.8J f .979.21J0.3tll4 ,_.J :::'i ..... ____ _ -.----·--·--~·- Sit ELEVATION REFERENCE MARKS fRt:NCE 'fLfVATtON DES.GRIPTION O f OCATIO N AAK I i'. NGVO) 0 S1 .ias. 1a 52 R-'1 1road s p lr.e f,let. la a power p ole l,9c.•u:e:d on :t:b.e south !Side of S ta 6 at L h :k Creek. Rout::c Pr01l! t h e i n"te:rscc;:Hon of St9 ~C Route 6 a:n.d Ro k. P ra irie ltoB--~. eas.t .appro:xim.at:cly Q.9 oi le to t h ~ int ers ect on of Rock Pniir1e R.o.ad and Bi -rd Pond )toad; r.a1 l road apike 1$ 1tt ~~w er po l~ lo~ated r.oxima~e 4 .O feat eiJ-$C of Bird P ond ·FIRM FUIOD llSIJRAIC[ IAtt W BRAZOS COUNTY, T"EXASAND INCORPOIU. TED AREAS IAP liirliHI 481M lCO~J 0 MAP RE~'. t BRW.RV ~. 100!I .. c 0 ... -~ "' T.971.290.9"3 F .971.290.3584 ·-----· ... ·---· -.-·----·---- EXHIBIT C-1 Rational Formula Drainage Area Calculations BCS Heart Building 0 ~ ~ <t: 0 w w w a.. 0 0 a:: a.. 0 ...J ...J ~ ~ <t: <t: 0 ...J u. u. 0 0 w w ...J w I-0 0 ...J ...J (!) a:: w > z <t: z z u. u. >-<t: > w w 0 <t: J: <t: a:: J: a:: I-<t: w 0 u z ...J 0 ..:.. ~ ...J ...J I-...J w I-w u I-u <t: w <t: a:: (!) a:: ...J I-(!) I-...J 0 I-< w ~ I-Cl) > I-Wz w ...J I-z I-...J ...J w a:: e a:: 0 <t: g >w > <t: :::> w :::> <t: ~ "' Cl) N 0 a.. 0 a.. 0 a.. 0 ...J 0 u. (!) ...J (!) u. 0 :::> N 0 II) NO. AC. o.45 I 0 .6 0.9 ft. ft. ft. ft. ft/s min min In/Hr cfs In/Hr Ex . 1 2.75 2 .75 0 .00 0.00 1.24 282 .0 5.5 36 .0 0 .5 1.1 5 .0 10 .0 6 .33 7 .8 7 .7 Ex. 2 4 .00 4 .00 0 .00 0 .00 1.80 50 .0 1.0 442 .0 6 .0 2 .0 4 .0 10 .0 6 .33 11 .4 7 .7 Pro . 1 2 .75 I 0.00 0 .00 2.75 2 .47 1.0 1.0 1.0 1.0 10 .4 0 .0 10 .0 6 .33 15 .6 7.7 Pro . 2 4 .00 4 .00 0 .00 0 .00 1.80 1.0 1.0 1.0 1.0 10 .4 0.0 10 .0 6 .33 11.4 7.7 0 II) II) 0 .... II) N 0 .... 0 N 0 cfs In/Hr cfs In/Hr cfs 9.5 8.6 10.7 9.9 12.2 13 .8 8.6 15.5 9 .9 17 .8 19.0 8 .6 21 .3 9.9 24 .4 13.8 8.6 15 .5 9 .9 17 .8 0 0 II) II) 0 In/Hr cfs 11 .1 13.8 11 .1 20 .1 11 .1 27 .6 11.1 20 .1 I 0 0 0 0 .... .... 0 In/Hr cfs 12 .5 15 .5 12 .5 22 .5 12 .5 31.0 12.5 22 .5 6/28/2005 0522-Dra EX HIBIT C-1 EXHIBIT D-1 STAGE/STORAGE -STAGE/DISCHARGE -STORAGE INDICATION CURVES BCS Heart Building Elevation (ft.) BCS HEART BUILDING Storage Indication Curve 294.5 295 .0 296 .0 297 .0 298.0 299 .0 300.0 301 .0 Area (sf.) 0 318 3804 4963 6215 7576 9926 9926 40 .00 -,..-----------------. ' ' ' Area (acres) 0.000 0 .007 0 .087 0.114 0.143 0.174 0 .228 0.228 Inc . Volm . Volume ( ac. -ft.) ( ac. -ft.) 0.000 0 .000 0 .001 0.001 0 .040 0 .041 0.100 0.142 0 .128 0.270 0 .158 0.428 0 .200 0.628 0 .228 0 .856 BCS HEART BUILDING Stage -S torage Curve Outlet 1 295 24 Orifice ( cfs) 0 .00 0 .00 12.48 17 .65 21.61 24.96 27 .90 30 .57 0 .900 ~-------~ Total Flow Outfall (cfs) 0.00 0.00 12.48 17 .65 21 .61 24 .96 27 .90 30 .57 BCS HEART BUILDING Stage-Discharge Curve 35 .00 0.800 ---------~---------~---------~-------- ' ' ' ' ' ' ' ' ' ' ' ' 50 .000 ---------~ 30 .00 ~ ~ 25.00 ~ 20.00 ~ 15 .00 N 10 .00 5 .00 ------------·------------l------------·------' ' . ' ' ' ' ' ' ' - - - - --- --- -J. - - - --- - - - - -~ - - -- - - -... - - - - - - - - - - - - - - - ---- - - - -' ' ' ' ' ' ' ' ' -----------..,. --------~ ------------·------------------------ ' ' ' ' ' ' ' ' ' ' ----------'"l·-----------r------------,------------------------ ' ' ' ' ' ' ' ' ----------'------------•------------·------------------------' ' ' ' ' ' ' ' ' ' ' ' ----------.. ·-----------·------------·------------------------' ' ' ' ' ' ' ' ' ' ' ----------,. --------. --~ ---. -. ------,---. ---------------. ---- ' ' ' ' ' ' ' ' ' 0 .00 ----ir-----+-----+----+-----1 0 500 1000 1500 2000 2500 Discharge (cfs) ' ' ' ' ' ' 0.400 ---------~---------~--------~--------- ' ' ' ' ' ' ' ' ' 0.200 ---------~--------t---------~--------- ' ' ' ' ' ' ' ' 0.100 -• - - --•• -r --------t ---------~--- -- - -· - ' ' ' 294.0 296.0 298 0 300.0 302.0 Elevatlon(m1I) ~ 40 .000 ~ u -; 30 .000 ~ ~ 20 .000 u l/J c 10 .000 294 .0 299 .0 Elevation (msl) 304 .0 6/28 /2 005 0522-Dra Exhib it D-1 D.A. # 'It .r:. 0. ~ Cl .... N I 0 .... 0 0 "O >. a:: a:: :c a. a. Qp 21.3 15.5 Tc 10.0 10.0 Min inc 1.0 1 .0 Time cfs cfs 0 .0 0.0 0 .0 1.0 2 .1 1.6 2 .0 4 .3 3 .1 3 .0 6 .4 4 .7 4 .0 8 .5 6.2 5.0 10.7 7.8 6.0 12 .8 9 .3 7.0 14.9 10.9 8.0 1 17.1 I 12.4 9.0 19.2 14.0 100 21.3 15.5 11 .0 20.3 14.8 12 .0 19 .2 14 .0 13.0 18.1 13 .2 14 .0 17.1 12.4 15.0 16.0 11 .7 16 .0 14 .9 10.9 17.0 13.9 10.1 18 .0 12 .8 1 9 .3 1 19.0 11.7 8.5 20 .0 10 .7 7 .8 1 21 .0 9.6 7.0 22 .0 8 .5 6 .2 23.0 7 .5 5.4 24 .0 6.4 4 .7 25.0 5.3 3.9 26 .0 4.3 3 .1 27.0 3.2 2 .3 28.0 2.1 1.6 29.0 1.1 0.8 30 .0 0 .0 0 .0 31 .0 0 .0 0 .0 32 .0 0 .0 0 .0 33.0 0.0 0 .0 34 .0 0 .0 0 .0 35.0 0.0 0.0 36.0 0.0 0 .0 37.0 0 .0 0.0 38 .0 0 .0 0.0 39.0 0.0 0 .0 40 .0 0.0 0 .0 41.0 0.0 0 .0 42 .0 0 .0 0 .0 PEAK FLOWS 21.3 15.5 10-YEAR STORM D.A. # 0 w z iii ~ 0 u cfs 0 .0 3.7 7.4 11.1 14 .8 18.4 22.1 25.8 29 .5 33.2 36 .9 35.0 33 .2 31 .4 29 .5 27 .7 25 .8 24.0 EXHIBIT E-1 Proposed Detention Pond Routing BCS HEART BUILDING Pond Routing 1EVENT= 10 c: I c: 0 a ~ t. > c: Cl> ~ ): iii .... i i + .... 0 c: + s "O c: c: + en :I 0 c: N 0 a. - i I cfs I cfs cfs I cfs I ft 3.7 0 .0 0 .0 0 .0 1 295 .00 11 .1 3 .0 3 .7 0.3 295.03 18.4 9 .7 14 .1 2 .2 295 .17 25.8 18.8 28.2 4.7 295.37 33 .2 29.5 1 44.6 7.6 295.61 40.6 41.1 62.7 10.8 295.86 48.0 56 .1 I 81 .7 12 .8 296.06 55.3 76 .9 104.0 13.6 296.21 62.7 103 .2 132 .2 14 5 1 296.40 70 .1 134.5 165.9 15.7 296.62 71 .9 170 .6 204 .6 17 .0 296 .88 68.2 206.4 242.5 18.1 297.10 64 .6 237 .2 274 .6 18 .7 297.27 60.9 263.2 301 .8 19.3 297.41 57 .2 284 .5 324 .0 19 .8 297 .53 53.5 301 .5 341.7 20.1 297.62 49 .8 314 .1 354 .9 20.4 297 .69 46.1 322 .8 363.9 20.6 297.74 22 .1 1 42.4 327 .5 368 .9 20 .7 297 .77 20.3 38.7 328.5 369.9 20.7 297 .77 18.4 35 .0 325 .9 367 .2 20 .7 297.76 16.6 31 .4 319.9 360.9 20.5 297.73 14 .8 27 .7 310 .6 351 .3 20 .3 297.67 12.9 24 .0 298.2 338.3 20.1 297 .61 11.1 20.3 282 .7 322 .1 19 .7 297.52 9.2 16.6 264.4 303.0 19.3 297 .42 7.4 12 .9 243 .3 281 .0 18 .9 297 .30 5.5 9.2 219.5 256.2 18.3 297.17 3 .7 5.5 193 .2 228 .7 17 .8 1 297 .03 1.8 1.8 165.1 198.7 16.8 296.84 0 .0 0 .0 135 .5 166.9 15 .7 296 .63 0.0 0.0 106.2 135.5 14.6 296.42 0 .0 0 .0 78 .9 106.2 13 .6 1 296 .22 0.0 0.0 53.5 78.9 12.7 296.04 0 .0 0 .0 35 .2 53 .5 9 .2 295 .73 0.0 0.0 23.4 35.2 5.9 295.47 0 .0 0 .0 15 .7 23.4 3 .8 295 .31 0.0 0.0 10.8 15 .7 2.5 295.20 0.0 0 .0 7 .6 10 .8 1.6 295 .13 0 .0 0 .0 5.5 7.6 1.0 295.08 0 .0 0 .0 4 .2 5.5 0.7 295.05 0.0 0.0 3.3 4 .2 0 .4 295.03 0 .0 0 .0 2 .8 3 .3 0.3 295 .02 + "O c: -0 "O a. Cl> -c: ..J :5 <( Cl> t-"O 0 c: t-::::> cfs 0.0 0 .3 2 .2 4.7 7 .6 10.8 12.8 13 .6 14 .5 15 .7 17.0 18.1 18 .7 19.3 19.8 20.1 20.4 20.6 20 .7 20.7 20 .7 20.5 20 .3 20.1 19 .7 19.3 18.9 18.3 17.8 16.8 15 .7 14.6 13 .6 12 .7 9.2 5 .9 3.8 2.5 1.6 1.0 0.7 0 .4 0 .3 Total (Detained) 36.9 20.71 297.77 20.7 I .... >< w 10.7 10.0 cfs 0 .0 1.1 2 .1 3.2 4 .3 5.3 6.4 7.5 8 .5 9 .6 10 .7 10.1 9 .6 9 .1 8.5 8 .0 7 .5 6.9 6.4 5.9 5.3 4 .8 4 .3 3.7 3.2 2 .7 2 .1 1.6 1.1 0.5 0 .0 0 .0 0 .0 1 0 .0 0 .0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 0 .0 (!) ..J ~ <( t-N >< t-~ ox w t-w 15.5 1 10.0 I I cfs cfs 0 .0 0 .0 1.6 2.6 3.1 5.2 4 .7 7.9 6 .2 1 10 .5 7 .8 13.1 9.3 15 .7 10.9 ' 18.4 12.4 21 .0 14.0 23.6 15 .5 26 .2 14.8 24.9 14 .0 23 .6 13.2 22 .3 12.4 21.0 11 .7 19.7 10.9 18.4 10.1 17.0 9.3 15 .7 8.5 14.4 7.8 13 .1 7 .0 11.8 6 .2 10 .5 5.4 9.2 4 .7 7 .9 3.9 6.6 3.1 5 .2 2.3 3.9 1.6 1 2.6 0.8 1.3 0.0 0.0 0.0 0 .0 0.0 1 0 .0 0.0 0.0 0.0 0 .0 0 .0 0.0 0.0 0.0 0.0 0 .0 0 .0 0 .0 0 .0 0 .0 0 .0 0 .0 0.0 0 .0 0 .0 0 .0 Total (Predeveloped) 26.2 6/28/2005 0522-Dra Exhibit E-1 D.A. # '**' .c a. <II .... Cl ..... N e d d "C I >. a: a: :I: a. a. Qp 24 .4 17 .8 Tc 10 .0 10.0 Min inc 1 .0 1 .0 Time cfs I cfs 0.0 0 .0 1 0 .0 1.0 2.4 1.8 2 .0 4 .9 3 .6 3.0 7 .3 5.3 4 .0 9.8 7 .1 I 5 .0 12 .2 8 .9 6 .0 14 .6 10 .7 7 .0 17.1 12.4 8 .0 19 .5 14 .2 9 .0 21.9 16.0 10.0 24.4 17 .8 11 .0 23.2 16.9 12 .0 2 1.9 16 .0 13.0 20.7 15.1 14 .0 19 .5 14 .2 15.0 18.3 13.3 16 .0 17 .1 12 .4 17.0 15.8 11 .5 18 .0 14 .6 10 .7 19.0 13 .4 9 .8 20.0 12 .2 8 .9 21 .0 11 .0 8.0 22 .0 9 .8 7 .1 23.0 8 .5 6 .2 24 .0 7 .3 5 .3 25.0 6 .1 4 .4 26 .0 4.9 3 .6 27.0 3.7 2 .7 28 .0 2.4 1 1.8 29.0 1.2 0 .9 30.0 0.0 0 .0 31 .0 0.0 0 .0 32 .0 0 .0 0 .0 33.0 0 .0 0 .0 34 .0 0 .0 0.0 35.0 0 .0 0 .0 36 .0 0.0 0.0 37.0 0 .0 0 .0 38 .0 0 .0 0.0 39.0 0.0 0.0 40 .0 0.0 0.0 41 .0 0 .0 0.0 42 .0 0.0 0 .0 PEAK FLOWS 24.4 17.8 2 5-YEAR STORM EXHIBIT E-2 Proposed Detention Pond Routing BCS HEART BUILDING D.A. # Pond Routing 1EVENT-25 I c:: c:: 0 0 :.-:::; 0 <II w + > c:: ~ GI z ~ w iil ..... 0 + .!. ..... 0 ::!: ~I "C + s "C c:: c:: 0 en I/) ::I 0 () N N 0 a. I cfs cfs cfs cfs cfs I ft 0.0 4 .2 1 0 .0 00 1 0 .0 295 .00 4 .2 12.6 3 .3 4.2 0 .4 295.03 8.4 21 .1 11 .0 16 .0 2 .5 295 .20 12.6 29.5 21.3 32.0 5.4 295.43 16 .9 37 .9 33 .4 50.8 8 .7 295 .70 21.1 46.3 46.7 71 .4 12.3 295.99 25 .3 54.8 66 .7 93.1 13 .2 296 .14 29.5 63.2 93.1 121 .5 14.2 296.33 33 .7 71 .6 125 .6 156 .3 15.4 296 .56 37 .9 80.0 163.7 197.2 16.8 296.83 42.1 82 .2 207 .6 243 .8 18 .1 29 7 .11 40.0 77 .9 251.7 289.8 19.0 297.35 37 .9 73.7 1 289 .9 329 .6 19 .9 29 7 .56 35.8 69.5 322 .4 363 .6 20.6 297.74 33 .7 65 .3 349.6 392.0 21 .2 29 7 .89 31.6 61.1 371 .6 414.9 21 .6 298.01 29 .5 56 .9 388.9 432.7 1 21.9 1 298 .08 27.4 52.7 401 .6 445.8 22 .1 298.14 25 .3 48 .5 409 .9 454 .3 1 22 .2 298 .18 23.2 44.2 413.8 458.3 22.3 298.19 21 .1 40 .0 1 413 .5 458 .0 22 .3 298 .19 19.0 35.8 409.1 453.5 22 .2 298.17 16 .9 31 .6 400 .8 445 .0 22 .1 298 .14 14.7 27.4 388 .6 432.4 21 .9 298.08 12 .6 23 .2 372 .7 1 416 .o l 2 1.7 298 .01 10.5 19.0 353.4 395.9 21 .3 297.91 8.4 14 .7 330 .8 372 .3 20 .8 1 297 .79 6 .3 10.5 305.1 345.5 20 .2 297.64 4 .2 6 .3 276 .5 315 .7 19 .6 297.49 2.1 2 .1 245.0 282.8 18.9 297.31 0 .0 0 .0 210 .8 247 .1 18 .1 297 .13 0.0 0 .0 176.4 210.8 17.2 296.92 0 .0 0 .0 144 .3 176.4 16 .0 296 .69 0 .0 0.0 114.4 144.3 14.9 296.48 0.0 0 .0 86 .5 114.4 13 .9 296 .28 0.0 0.0 60.6 86.5 13.0 296.09 0 .0 1 0 .0 1 39 .8 60 .6 1 10.4 295 .83 0 .0 0 .0 26.3 39.8 6.7 295.54 0.0 0 .0 1 17 6 1 26.3 4 .3 295 .35 0 .0 0.0 12 .0 17 .6 2 .8 295.23 0 .0 1 0 .0 8 .4 12 .0 1 1.8 295 .15 0.0 0 .0 6 .0 8 .4 1.2 295.09 0 .0 0.0 4 .5 6 .0 0.8 295 .06 + "C c: -0 "C Q. GI _c:: -' :B <Cl: GI I-"C 0 c:: I-::::> cfs 0 .0 0 .4 2 .5 5 ~4 8.7 12 ~3 13 .2 14 .2 15.4 16.8 18 .1 19.0 19 .9 20.6 21 .2 21 .6 21.9 22 .1 22 .2 22.3 22 .3 22.2 22 .1 21 .9 2 1.7 21 .3 20.8 20 .2 19 .6 18.9 18 .1 17.2 16 .0 14.9 13 .9 13.0 10.4 6 .7 4 .3 2 .8 1.8 1.2 0.8 To ta l (Detained ) 42.1 22 .27 298 .19 22.3 I I ..... >< w 12 .2 10 .0 cfs I 0 .0 1.2 1 2 .4 3.7 4 .9 6.1 7.3 8 .5 9.8 11 .0 12 .2 11 .6 11 .0 10 .4 9 .8 9.1 8 .5 1 7.9 7.3 6 .7 6 .1 5 .5 4 .9 4 .3 3 .7 3.0 2 .4 1.8 1.2 0 .6 0.0 0 .0 0 .0 0 .0 0 .0 1 0.0 0 .0 1 0 .0 0 .0 0.0 0 .0 0.0 0 .0 (!) -' ~ < I-N I-~ >< ox w I-w 17.8 10.0 1 I cfs I cfs 0 .0 0 .0 1.8 3.0 3.6 6 .0 5.3 9 .0 7 .1 12 .0 8 .9 15.0 10.7 1 18 .0 12 .4 21 .0 14 .2 24 .0 16.0 26.9 17 .8 29 .9 16.9 28 .4 16 .0 26 .9 15.1 1 25.4 14 .2 24 .0 13.3 22.5 12.4 21 .0 11.5 19.5 10.7 18 .0 9 .8 16.5 8 .9 15.0 8.0 13.5 7.1 12 .0 6 .2 10.5 5.3 9.0 4 .4 7.5 3.6 1 6 .0 2.7 4.5 1.8 3.0 0 .9 1.5 0.0 0 .0 0.0 0.0 0.0 0.0 0.0 0 .0 0 .0 0 .0 0 .0 0.0 0.0 0.0 0.0 0.0 0.0 1 0.0 0 .0 · 0 .0 0.0 0 .0 0 .0 0 .0 0.0 0 .0 Tota l (P redeve loped ) 29.9 6/28/2 005 0 522-Dra Exhi b it E-2 D.A. # D.A. # 'II: .s:: 0 a. w Ol z ... C> .... N iii 0 ... 0 0 ::1.: 't:I >. a: a: 0 ::c 0.. 0.. (.) Qo 31 .0 22 .5 Tc 10.0 10.0 Min inc 1.0 1.0 Time cfs I cfs I cfs 0.0 0 .0 1 0 .0 1 0 .0 1.0 3 .1 2 .3 5 .4 2 .0 6 .2 4 .5 10 .7 3 .0 9.3 6 .8 16.1 4 .0 12.4 9 .0 21.4 5 .0 15.5 11 .3 26.8 6 .0 18.6 13.5 32 .1 7 .0 21 .7 15.8 37 .5 8.0 24.8 18 .0 42.8 9 .0 27 .9 20.3 48.2 10.0 31 .0 22 .5 53.5 11.0 29.4 21 .4 50.8 12 .0 27 .9 20 .3 48 .2 13.0 26.3 19.2 45.5 14 .0 24 .8 18 .0 42 .8 15.0 23.2 16.9 40.1 16 .0 21.7 15.8 1 37.5 17.0 20.1 14.7 34.8 18 .0 18 .6 13 .5 32 .1 19.0 17.0 12.4 29.4 20 .0 15.5 11 .3 26 .8 21 .0 13.9 10.1 24.1 22 .0 12.4 9.0 21.4 23.0 10.8 7 .9 18.7 24 .0 9 .3 6.8 16.1 25.0 7 .7 5.6 13.4 26.0 6 .2 4 .5 10 .7 27 .0 4 .6 3.4 8.0 28 .0 3.1 2 .3 5.4 29.0 1.5 1.1 2 .7 30 .0 0.0 0.0 0 .0 31.0 0 .0 0 .0 0 .0 32 .0 0 .0 0 .0 0 .0 33.0 0.0 0 .0 0 .0 34 .0 0.0 0 .0 0 .0 35.0 0.0 0.0 0.0 36 .0 0.0 0 .0 0.0 37.0 0 .0 0 .0 0.0 38 .0 0.0 0 .0 0 .0 1 39.0 0 .0 0.0 0 .0 40.0 0.0 0 .0 1 0 .0 41.0 0 .0 0 .0 0 .0 42 .0 0 .0 0 .0 0 .0 PEAK FLOWS 31.0 22.5 53.5 100 -YEAR STORM EXHIBIT E-3 Proposed Detention Pond Routing BCS HEART BUILDING Pond Routing EVENT= 100 I c: ~ c: a Ol + > c: i5 (II a ~ jjj ~ ~I + ..:. 0 't:I c: 't:I s c: + in :::J 0 c: N 0 0.. I cfs cfs cfs cfs I ft 5.4 0 .0 0.0 0.0 295.00 16.1 4.1 5.4 0.6 295 .05 26.8 13 .6 20 .1 1 3 .3 295 .26 37.5 26.7 40.4 6 .8 295.55 48.2 42 .1 64 .2 11 .0 1 295 .89 58.9 64.1 90.2 13.1 296.12 69 .6 94 .5 122 .9 14 .2 296 .34 80.3 132.8 164.1 15.6 296.61 91 .0 1 178 .5 213 .1 17 .3 296 .93 101 .7 232 .2 269.5 18.6 297.24 104.4 294 .0 333 .9 20 .0 297 .58 99.0 355.7 398.3 21 .3 297.92 93 .7 410 .3 454 .7 22 .2 298 .18 88.3 458 .1 504 .0 22 .9 298.39 82.9 499.4 I 546.4 23.5 298.57 77 .6 534.2 582.3 24 .0 298.73 72 .2 562 .9 1 611 .8 24.5 1 298 .85 66.9 585.5 635.1 24.8 298.95 61 .5 602.4 652.4 25 .0 299 .02 56.2 613.6 663.9 25.1 299.06 50 .8 619.4 669 .8 25 .2 299.08 45.5 619.8 670.3 25.2 299.08 40 .1 615 .0 665 .3 25 .2 299 .07 34.8 605.1 655.2 25 .1 299.03 29.4 590 .1 639 .8 24 .9 298 .97 24.1 570.4 619.5 24.6 298.89 18 .7 546.0 594 .5 24 .2 298 .78 13.4 517.2 564.8 23.8 298.65 8 .0 483.9 1 530.5 23 .3 298 .50 2 .7 446.5 492.0 22.7 298.34 0 .0 1 404 .9 1 449 .1 22 .1 298 .16 0.0 362.0 404.9 21.4 297.96 00 1 320 .9 362 .0 20 .5 297.73 0 .0 281 .5 320.9 19.7 297.51 0.0 243 .8 281.5 18.9 297 .31 0 .0 207.6 243.8 18.1 297.11 0 .0 173 .4 207 .6 17 .1 I 296 .90 0.0 141 .5 173.4 15.9 296.67 0 .0 111 .8 141.5 14 .9 296.46 0.0 84.1 111 .8 13.8 296.26 0 .0 58.4 84 .1 I 12 .9 296 .08 0 .0 38.3 58.4 10.0 295.80 0 .0 25.4 38 .3 6 .5 295 .52 + 't:I c: ~ 0 't:I 0.. (II -c: _J s <(II ..... 't:I 0 c: ..... ::::> cfs 0.0 0 .6 3 .3 6.8 11 .0 13.1 14 .2 15.6 17 .3 18.6 20 .0 21 .3 22.2 22 .9 23 .5 24 .0 24 .5 24.8 25 .0 25.1 25 .2 25.2 25 .2 25.1 24 .9 24.6 24 .2 23.8 23 .3 22 .7 22 .1 21 .4 20 .5 19.7 18.9 18.1 17 .1 15.9 14 .9 13.8 12 .9 10.0 6 .5 Total (Detained ) 25.20 299.0811 25.2 I I .... x w 15 .5 10 .0 cfs I 0 .0 1.5 3 .1 4 .6 6 .2 7.7 9 .3 10.8 12.4 13.9 15 .5 14.7 13 .9 1 13.2 12.4 11 .6 10 .8 10.1 9.3 8 .5 7.7 7.0 6.2 5.4 4.6 3.9 3.1 2.3 1.5 0.8 0 .0 0 .0 0.0 0.0 0 .0 0.0 0 .0 0 .0 0.0 0.0 0 .0 0 .0 0.0 (!) _J ~ N < ..... ..... ~ x 0 >< w ..... w 22.5 10.0 cfs cfs 0 .0 0 .0 2 .3 3.8 4 .5 7 .6 6 .8 11 .4 9 .0 15 .2 11.3 19.0 13 .5 22 .8 15.8 26 .6 18 .0 30.4 20.3 34.2 22 .5 38 .0 21 .4 36.1 20 .3 34 .2 19.2 32.3 18.0 30.4 16.9 28.5 15.8 26 .6 14.7 24.7 13 .5 22 .8 12.4 20.9 11 .3 19 .0 10.1 17.1 9 .0 15 .2 7.9 13.3 6 .8 11.4 5.6 9 .5 4 .5 1 7.6 3 .4 5.7 2 .3 3 .8 1.1 1.9 0.0 0.0 0.0 0.0 0.0 0 .0 0 .0 0.0 0 .0 0 .0 0.0 0.0 0 .0 0 .0 0.0 0 .0 0 .0 0 .0 0.0 1 0.0 0.0 1 0.0 0.0 0 .0 0.0 0 .0 Total (Predeveloped) 38.0 612812005 0522-Dra Ex hibit E-3 INCOR.PORA TED 511 Unimsitr Orin [ut S•ilt 20 1 Coll •1• Slolioo , Tms 77 840 Pim 979 /160 -16 35 Fu 979 /846-8114 www .arkitex .com 28 June 2005 Planning and Development Services The City of College Station 1101 Texas Avenue College Station, TX 77840 Re : BCS Heart Dear Staff, This letter is to explain the parking plan submitted for approval. The building is a medical office building that is over 20,000 sf and is classified as a Hospital in the UDO. BCS Heart, a group of cardiologists , will occupy the first floor of the building. There will be 4 doctors, 8 nurses, 4 technicians , and 8 staff members for a total of 24 employees. The doctor's schedules will be staggered so that only half of the employees will be in the building at one time . There are 17 exam rooms, of which 3 are for testing . The amount of time that a typical patient will be in the building is 30 min . The te sting rooms will have patients for an extend amount of time , averaging 3 hours. This means that the total number of occupants (both patients and staff) will be 29. This equated to about 400 sf per occupant. The second floor is open lease space. It is anticipated that similar medical offices will occupy this level. Using the same theory , but with a conservative estimate of 300 sf per occupant, the total number of occupants on the second floor will be 40. This puts the total number of occupants in the building at 80. The parking layout s hown has a total of 1 parking space for every 250 sf of building area. The total number of parking spaces provided is 89. This is the same ratio as that used for the adjacent hospital (The MED). The Client is currently in the building just to the North of The MED at 1605 Rock Prairie Road. The majority of tenants in this building are medical offices. This building is three stories high and is approximately 64,000 sf . The total number of parking spaces for this building is 235 or 1: 273. The Client has stated that the parking lot has never been full , and that other adjacent buildings have used this lot for parking. In summary, the administrator of BCS Heart is reques ting approval of the 1:250 space ratio. Should you hav e any questions or require additional information, please feel free to contact me . Sincerely, Mike Re cord , AIA Associate Principal Bridgette George City of College Station Planning & Development Services P.O. Box 9960 Co ll ege Station, TX 77840 RE: BCS Heart Water Report Dear Bridgette: MITCHELL M M MORGAN August 1, 2005 Below is the water ana ly sis for the BCS Heart bui lding. Domestic flows were calculated using the Normal Flow method 2 as presented in the February 2004 B/CS Unified Design Guidelines . The deve lopment includes a 22, 151 square foot automatic sprink ler system equipped office building, requiring a peaked domestic flow of approximately 2.9 gpm. In addition to the peaked domestic flow, a fireflow of 2500 gpm, as required by the February 2004 B/CS Unified Design Guidelines, was split be tween two hydrants. Please note that th is development requires only a 1625 gpm fireflo w (building type lllB, 50% sprinkler reduction) per the 2000 International Fir e Code, as shown in Exhibit 7. The updated City of College Station water system MikeNET model was checked against a hydrant flow test on Longm ire Drive midway along the BCS Heart eastern property line . It was found that model results were similar to those found by flow tests under both static and residua l conditions. Plea se see Exhibit 2 for the hydrant flow test report. Flow Test and MikeNET Comparison Method Static Residua/ Demand Flow Test 94.0 psi 92.0 psi 1405 gpm MikeNET 102.6 psi 97.0 psi 1405 gpm Three fireflow scenar ios were run to show a comparison between required demands as outlined in the 2000 International Fire Code and the February 2004 B/CS Unified Design Guidelines. 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STAT ION , TX 77840 • T 979.260.6963 • F 979.260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitchellandmorgan .com • www.mitchellandmorgan .com Using the updated City of College Station water system MikeNET model, flows and pressures were calculated in the adjacent lines under three different scenarios: SCENARIOS 1. Fireflow of 2500 gpm, demand split with 1000 gpm on node 2126 (new BCS Heart hydrant) and 1 500 gpm on node 2136 (existing hydrant on Birmingham) (Exhibit 3) 2 . Fireflow of 2500 gpm, demand split with 1250 gpm on node 2126 (new BCS Heart hydrant) and 1250 gpm on node 2136 (existing hydrant on Birmingham) (Exhibit 4 ) 3 . Fireflow of 1625 gpm, demand split with 800 gpm on node 2126 (new BCS Heart hydrant) and 825 gpm on node 2136 (existing hydrant on Birmingham) (Exhibit 5) It was found that a six inch (6") waterline lines will sufficiently serve the water needs of the BCS Heart building under scenarios 1 and 3 (Exhibits 3 and 5). An even distribution of the fireflow demand (1250 gpm per hydrant) exceeds the 12 fps maximum velocity as outlined in the February 2004 B/CS Unified Design Guidelines by approximately 2 fps . Because velocities remained below or near 12 fps and pressure remained at or above 20 psi in all scenarios, we bel ieve that a six inch waterline will serve the fireflow demands of the BCS Heart building . If you have any comments, or would like to discuss our findings further, please feel free to contact me . Sincerely, cc: file Mike Record S:\Proj\0522-BC S_H eart\docs\0522-water_fire_report-050719 .doc •PPENDIXB FIRE-FLOW REQUIAEMENTS FOR PUIL.DINGS TABLE 8105. 1 MINIMUM REQUIRED FIRE FLOW AND FLOW DURATION FOR BUILDINGS FIRE AREA l541uare 1-tl '· nnEFLOW FLOW Type IA and 19• Tvpe UA a~ IUA• Typo IV end 'I-A• Type 118 ond 111a• Typo Y...S-(9llllD1111 per minut.)~ DURATION (hours) 0-22.700 0-12.700 0-8 ,200 O-S,900 0-3.600 l,SOO 22.701-30,200 12,701 -17,000 8,201-10,900 5 ,901-7,900 3,601-4.800 l,750 30,201-38,700 17 ,001-21 ,800 10,901-12,900 7,901 -9,800 4.801-6,200 2 ,000 38,701-48,300 :l 21,&01-24,200 12.901-17,400 9 ,&01-12.600 6,201-7.700 2,250 48,301-59,000 24,201 -33,200 17 ,401-21,300 12,601-15.400 7,701-9,400 2 ,500 59,001-70,900 33,201-39,700 21,301-25,500 15.401 -18.400 9.401-11.300 2,750 70,901 -83,700 39,70147,100 25.501-30.100 18,401 -21.800 l l,301-13,400 3,000 83,701-97,700 47, l 01-54,900 30,101-35,200 21,801-25.900 13 401-15,600 3.2$0 97 ,701 ~112,700 54,901-63,400 35,201-40,600 25 901-29.300 l!i 601 -18 000 3,.SOO 3 112.701-128.700 63.401-72.400 40,601-46,400 29,301 M33,500 18,001-20,600 3,750 128,701-145 900 72,401M82,100 46 401-52,SOO 33,501-37,900 20,601-23,300 4,000 14!i,901 -164:200 82,101-92,400 52,SOl-59,100 37,901-42.700 23,301-26.,300 4 .250 ' 164.201-183.400 92,401-103,100 59,101-66,000 42.701-47.700 26,301 -29.300 4,500 . 183,401-203.700 103,101-114.600 66,001 -73.300 47,701·53,UOO Z~,:iUl-:S:l CiUO 4;/)U 203,701-225,200 114,601-126.700 73,301-81,100 53,001-58,600 32 601-36,000 S,000 22.S,201.241 :JUu U6;/0t -U9.400 81.101-S9,:l00 SB,liCH-6.S,400 36.001-3~ 600 '2'0 247.701 -271.200 139,4-01 -152.600 89,201-97,700 65,401-70,600 39.601-43,400 5,500 27 l.:Z01-l9,,900 1.12.00l·ll'il'i,-'OO 97,701 -l ()(5,.100 70,601-77,000 4:3 ,401-47,400 5,750 295,SJO .l-Gceater l66,SOl-Orc11ter 106,501-115,800 77,001-83,700 47.401-51,.500 6,000 4 --115,301-125,500 83,701 -90,600 Sl,.'.iOl·SS,700 G,2.!iO --12!i,S01-135,SOO 90,601-97,900 SS,701-60.200 6,:500 --135,SOl-14.S,800 97,901-106,800 60,201 -6-UOO 6 ,7SO --145,801-156, 700 106.801-113,200 64,801-69,600 7,000 --1S6,701 -167,900 113,201 121,300 69,601-74,600 7 ,250 --167,901-179,400 121 301-129,600 74,601-79,800 7 ,500 -170,'101 ··101,-100 120,601-138,300 79,801-iS, 100 7,750 --191,401..0reater 138,301 -0n:atet S!i,101..Qreater 8 ,000 For $1 ? I ~qu:ll'@ foot = 0 .0929 m2• I s~llon [Jt'r m;"""" .. 3 .78~ I /m , I pmmrl ""'' ~11•11 '1? inc h = l'l .R9S kP11. ;a, Typc11 of con!ilr\ICllon i1l'f: based on !he bt1t1rNJJlonal Builtlin11 C1><k . b. Mciisu~ ill 20 pi;i , 358 2000 INTERNATIONAL FIRE CODE9 Z:0 /Z:0 391;1d ~35 1N3Wd013A3Q 58CO 961'E1'9L6 L6 EXHIBIT 1 07 /1 9 /2 005 10:51 FAX 979 764 COLLEGE STATION PUB.UT I# S( College Station Utilities ~ Reliable, Affordable, Community Owned 1601 GRAHAM ROAD COLLEGE STATION TEXAS 77845 Date: 19 JULY 2005 Number pages including cover sheet -1 Fax number: 260-3564 Attention: REBECCA Company: MITCHEL AND MORGAN From: Butch Willis Water Wastewater Division Phone: 979-764-3435 Fax: 979-764-3452 FLOW TEST REPORT Nozzle size: 2.5 inch Location: LONGMIRE @BIRMINGHAM Flow hydrant number: Q-123 Pitot reading: 70 (GPM): 1405 Static hydrant number: Q-125 Static PSI: 94 Residual PSI: 92 ~001 EXHIBIT 2 SCENARIO 1 Analysis Type: Steady State, BCS Heart Project Description: 1000/1500 gpm split on 2500 gpm fueflow . BALL ~··· Horizontal Plan EXHIBIT 3 Results -Junctions Number of Junctions : ?(Selection) Junction ID Description Elevation Demand Grade Pressure I ' [ft] [ft] [psi] 1138 300 .000 3 .082 512.127 91.915 1139 298.000 0 .000 509.432 91.613 1140 298 .000 0 .000 509 .441 91.618 2126 hydrant 302 .000 1002 .900 497 .926 84.895 2129 hydrant 303 .000 0 .000 514 .297 91.555 2135 I 1 296.50~--0.000 526.126 99.497 J 2136 I hydrant 1 294 .000 ! 1500 .000 1 504.770 1 91.3~;· Results -Pipes Number of Pipes : 6(Selection) Pipe ID Description Node 1 No de2 Diameter Length Roughness Fl ow Velocity Headloss [in] [ft] [millift] [gpm] [ft/s] [ft] 2160 P-6310 1140 2135 8.000 906.412 110 .000 -846 .570 -5.403 16 .685 2167 1138 1139 8.000 164 .727 130.000 942.312 6 .015 2 .695 i 2168 l - r ;139 1140 8.000 94 .138 130 .000 -60 .588 -0.387 0 .010 2509 1139 2126 6.000 177 .000 140 .000 1002 .900 11.380 11 .506 2511 2129 1138 8.000 131.772 130 .000 945.394 6 .034 2.169 2519 P-6310 2136 1140 8.000 287 .063 110 .000 -785.982 -5 .017 4 .672 S :\Proj \0522-BCS _ Heart\MikeNET\0522-firetlow-I 000_1500-0507 19.do c EXHIBIT 3 SCENARI02 Analysis Type: Steady State Project Description: BCS Heart, 2500 gpm fireflow . BALL HO ____-· Horizo ntal Plan EXHIBIT4 Results -Junctions Number of Junctions: ?(Selection) Junction ID Description Elevation Demand Grade Pressure [ft] [gpm) [ft] [psi] 1138 300 .000 3.082 511.573 91.675 1139 298.000 0.000 508.789 91.335 1140 298.000 0.000 508.967 91.412 2126 hydrant 302.000 1252.900 491.414 82 .073 2129 hydrant 303 .000 0 .000 513.813 91.345 2135 296 .500 0.000 526.047 99.463 hydrant ---. 1 294.000 ·---~ -----·-·-······- 2136 1250 .000 506.448 92 .054 Results -Pipes Number of Pipes: 6(Selection) Pipe ID Description Node 1 Node 2 Diameter Length 0 -··::'iness Flow VelOClly Headloss [in] [ft) [millift) [gpm) [ft/s) [ft] 2160 P-6310 1140 2135 8.000 : 906.412 110.000 -857 .331 -5.472 17.080 2167 1138 1139 8.000 164.727 130.000 958 .938 6.121 2 .784 j 2168 I T 1139 j 1140 8 .000 94.138 130.000 -293.962 -1.876 0 .178 2509 1139 2126 6.000 177.000 140 .000 1252 .900 14.2l'Z 17.375 2511 2129 1138 8 .000 131.772 130 .000 962.020 6.140 2 .240 2519 P-6310 2136 1140 8 .000 287.063 110.000 -563.369 -3.596 2 .519 S :\Proj \0522-BCS _ Heart\MikeNE1\fireflow-6in-050719 .doc EXHIBIT4 SCENARI03 Analysis Type: Steady State , BCS Heart Project Description: 1625 gpm fireflow -----------··· Horizontal Plan \2133 . BALL EXHIBITS Results -Junctions Number of Junctions : ?(Selection) Junction ID Description Elevation Demand Grade Pressure I I I I I I -- [ft] [gpm] [ft) [psi) 1138 300.000 3.082 525.716 97 .803 1139 298.000 0.000 524.450 98 .121 1140 298.000 0.000 524.517 98 .150 2126 hydrant 302.000 800.000 516.879 93.107 2129 hydrant 303 .000 0.000 526.738 96.946 2135 296 .500 0 .000 532 .030 102.055 -·---- 1 294 .000 · [ 825.000 rs~3.320 I 99.3~~-···-2136 hydrant Results -Pipes Number of Pipes : 6(Selection) Pipe ID Desc -rnde 1 Node 2 -· -ength Roughness Flow Velocity Headloss . [in] [ft) [millift] [gpm] [ft/s] [ft) 2160 P-6310 1140 2135 8 .000 906.412 110 .000 -550.406 -3.513 7.514 2167 1138 1139 8 .000 164 .727 130 .000 626.687 4 .000 1.266 ! 2168 I 94.138 1730.000 ··- 1139 1140 8 .000 -173 .313 -1.106 0.067 2509 1139 2126 6.000 177 .000 140.000 800 .000 9 .078 7.570 2511 2129 1138 8.000 131.772 130 .000~.769 4 .020 1.022 2519 P-6310 2136 1140 8.000 287.063 110 .000 -77 .093 -2.407 1.196 S :\Proj \0522-BCS _ Heart\MikeNEl\0522-fireflow-IFC-050719.doc EXHIBIT 5 Carol Cotter -BCS Heart From: Carol Cotter To: v@mitchellandmorgan.com Date: 11/7/2005 5:19 PM Subject: BCS Heart v- Revisions look fine ..... please submit full sized revised sheets for stamping and distribution. Thanks! Carol Carol Cotter Engineering Services City of College Station (979) 764-3570 Fax:(979) 764-3496 ccotter@cstx.gov Page 1of1 file://C:\Documents%20and%20Settings\ccotter\Local%20Settings\ Temp\GW} 00001.HTM 111712005 10 /1 1 /2005 08:07 FAX 9792603564 MITCHELL and MORGAN B/CS Heart • Engineer's Estimate October 2005 Item Description Quantity Unit Cost GENERAL ITEMS 1 Mobilization 2 Trench Safety WATER ITEMS 3 6" PVC Water Line C909 CL200 with Structural Backfi ll 4 6" PVC Water Line C909 CL200 5 6" x 2" MJ Tee 6 6" x 6" MJ Tee 7 8" x a· MJ Tee 8 6" x 90 Degree MJ Bend 9 8" x 6" Reducer 10 Standard Fire Hydrant Assembly 11 6" MJ Gate Valve & Box 12 Connection to existing system LS LF LF LF EA EA EA EA EA EA EA EA 1 . $ 1,588 .00 $ 180 $ 1.00 $ Subtotal $ 141 $ 30 .00 $ 169 . $ 25 .00 $ 1 $ 275.00 $ 1 $ 300.00 $ 1 $ 325.00 $ 4 $ 275 .00 $ 1 $ 375 .00 $ 1 $ 2,500 .00 $ 1 $ 550 .00 $ 1 $ 2,000 .00 $ Subtotal $ 15% Contingency $ TOTAL $ ~002 /002 Amount 1,588.00 180.00 1,588.00 4,230 .00 4,225 .00 275.00 300.00 325 .00 1,100 .00 375 .00 2,500 .00 550 .00 2,000.00 15,880.00 2,620.20 20,088.20 10 /1 1 /2005 0 8:07 FAX 9792603564 MITCHELL and MOR GA ~ 00 2/00 2 B/CS Heart -Engineer's Estimate Octobe r 2005 Item Descri ption Unit Q uant i!Y Un it Co§t Amount G ENERAL IT EMS 1 Mobilization LS 1 $ 1,588 .00 $ 1,588 .00 2 Trench Safety LF 180 $ 1.00 $ 180 .00 Su bto tal $ 1,588.00 WATER ITE MS 3 6" PVC Wa ter Line C909 CL200 with Structural Bac kfi ll LF 141 $ 30 .00 $ 4,230 .00 4 6" PVC Wa te r Line C909 CL200 LF 169 $ 25 .00 $ 4,225 .00 5 6" x 2" MJ Tee EA 1 $ 275 .00 $ 275 .00 6 6" x 6" MJ Tee EA 1 $ 300 .00 $ 300.00 7 8" x 8" MJ Tee EA 1 $ 325.00 $ 325 .00 8 6" x 90 Degree MJ Bend EA 4 $ 275 .00 $ 1,10 0.00 9 8" x 6" Reduce r EA 1 $ 375 .00 $ 375.00 10 Stand ard Fire Hydrant A.ssembly EA 1 $ 2,500 .00 $ 2 ,500 .00 11 6" MJ Gate Va lve & Box EA $ 550 .00 $ 550 .00 12 Connection to exist ing system EA $ 2,000 .00 $ 2,000 .00 Subto tal $ 15,880 .00 15% Contin ge ncy $ 2 ,620 .20 TOTAL $ 20,088.20 CITY OF COLLEGE STATION Plann ing & DnHlopment &rvius SITE LEGAL DESCRIPTION: L.O Ball Memorial, Phase 1 Lot 8, Block 3 (BCS Heart) DATE OF ISSUE: 10/06/05 OWNER: BCS Heart c/o Sharon Russell 1605 Rock Prairie Rd , Ste. 310 College Station, Texas 77845 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: DEVELOPMENT PERMIT PERMIT NO. 05-31 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE ADDRESS: 3534 Longmire DRAINAGE BASIN: Lick Creek VALID FOR 12 MONTHS CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. ******TCEQ PHASE II RULES INEFFECT****** The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Date Date MITCHELL MM MORGAN 511 University Drive East, Suite 204 College Station, TX 77840 (979) 260-6963 (979) 260-3564 Fax info@mitchellandmorgan.com www.mitchellandmorgan.com To: ~d~ o f Cow ~ S tillion Letter Of Transmittal Date: Lo/zro/os Job: Attention: ::Bn 'd ~ 6Jepr~,, We are sending you: D Attached D Under separate cover via ____ the following: D Drawings D Prints D Samples D Specifications D Letter D Plans D Order D Other _______________ _ Item Date # of Copies Description \ \.O/zs Transmitted as checked below: D For approval D Approved as noted D Resubmit. ___ copies for approval D For your use D Approved as submitted D Submit copies for distribution D As requested D Returned for corrections D Return corrected copies D For review D Other ___________ _ Remarks: Copy to: \ \ \ 2 C) z 0 _J BENCHMARK: N. RIM El..£V: 298.71. . BOX Fl: 293,_75,/ (ICERR SUIM'tliO. U.C) (179) 281-3115 N. ' -4<:...,,<...,~....+--1;--t----L~-f 1--....Y -G~-G-G-G-G-G· __ __...._~........., '°':')": ....... ------20· Scale: 1 inch = 20 feet 8-Wl------8-WL------8-WL ------8-WL-- NG IAL ~ & EROSION CONTROL SITE PLAN) DRAWINGS SCALE : l " = 20 '-0 " PLAN LfGEND -- -- --- - --_H_.1:>._ --- --- - - - 000 00 ----gos ---- ----ELEC ---- ---ss--- ---WL -- ---~>--- ---WL -- ----90~ ---- ----H EC. ---- 000.00 + Proposed T /P Elevat ion T /P = Top of Pavement 1-8"x4s· M.J . BEND EX . 8" WL PROPOSED 24" RCP STORM DRAIN Pr operty Line High Point Exist i ng Grode Proposed Grode Exi sti ng Gos Lines Exi sting Electrical Lines Exist ing San i tary Sewer Lin Exist ing Water Li nes Proposed Sanitary Sewer L Proposed Water Lines Proposed Gos Lines Proposed Electrical Lines ~ Proposed T/C ~Elevation T /C = Top of G,Jrb 1-8"x4s· M.J . BEND 3" EX. 8" WL _L Ii 1-8"x4s· M.J . BEND PROP 8" PVC WL (AWWA C-909) 1 FT MIN. t 1-8"X4s· M.J . BEND PROP . 8" PVC WL A J ~ FL=292.29(MAX) 7 \_~---../ WATER LINE-STORM DRAIN CONFLIC 8 15 WL =293.03 SILT ::NCE ~on e Rip Rap :J =:I'.-t #3 Bors @ 1 2" 0 C E W Fie ld b.::nd r .::in feor c c-n ·1c-1 -, t wirc- and tie t o proposed rein forcen-ren t TION A-A _s ' l> ,f ·':1 I ~ /e~~~b: i RAIN , C FUCT D AIL ____ ,,, .. . ... -----·!' ' i Ii . l: _:· N. Rl l,t ELEV: 298 .77 I I I I ii BOX FL: 293. 75 !I· 1 i! I ' ! i::~J11-11:.J1•11:-J1111111-1111111!j i 20' I --1 · ___, __ .____I I Scale: 1 i inch = 20 feet -~ ... _ EROSION CONTROL PLAN SCALE: 1-8"X45" M.J . BE ND 1 -8"X45" M.J. BE ND PROP 8" PVC WL (AWWA C-909) 1" = 20'-0" 1-8"X45" M.J. BEND EX. 8" WL 1-8"X45" M.J . BEND PROP . 8" PVC WL FL=292.31 (MA X) DRAIN CONFLICT I ......... ,· + '. -SF- INCORPORATED Sil U1i,·enity Drin Eut Saile 201 Ct ll •1• St.lion, Tms 7784 0 P~one 919 /26 0-2635 Fu 979 /846-8m w ww .a rk i t c ::a:.c om LETTER OF TRANSMITTAL TO: City of College Station FROM: Mike Record PROJECT: BCS Heart DA TE: 29 September 2005 PROJECT NO : 0504 Th e f ollo win g items are hereby tra nsm itted for yo ur usage , review a nd/or action as no ted. The following information is enclosed for the site plan review. The nothing further certificate and the corporate resolution were delivered to Brenda Godfrey yesterday by Fred Bayliss Site Plan Review: 1 copy each of the following drawings: Cl.1 -Civil Grading Plan Cl.2 -Civil Sewer and Water Lines Cl.3 -Standard City Details Cl.4-Details (new sheet) Al.1 Site Plan A 1.2 Landscape Plan A 1.3 Enlarged Site Plan and Roof Plan A2.1 -First Floor Plan A2.2 -Second Floor Plan A3.1 -Building Elevations 2 copies of the site plan 1 copy of the landscape plan 1 copy of the grading and erosion plan (llx17) Should you have any questions, please feel free to contact me. Sincerely , Michael S. Record, AIA Associate Principal .J \ 'L- 3 Page 1of1 This looks like one of those cases where we can ask that they not run their water line "the shortest route" for their convenience but circumvent the pavement area until their perpendicular to the building or the entry point. Also, it appears that the off-set under the pond is more troublesome than the issue of being shallow. Let me know what you think. If the line was moved over and run parallel to the curb, the elevation under the flume is 299. The sign may end up in our easement Cl.2 says 8x8 MJ tee. Are they removing the existing 90 and installing the tee in its place? Cl.2 2x2 PVC tee does not meet requirements. This building is another example of the need for an RPZ. After the meter and RPZ the line is private and should meet BC. fi le ://C :\Documents%20and%20Settings\ccotter\Local %20Settings\ Temp\GW} 00001.HTM 811 0/20 05 FOR OFFICE USE ONLY P&Z CASE NO.: {)5"-I I (o DATE SUBMITTED: Vr ()_c>1 ~06 SITE PLAN APPLICATION , MINIMUM SUBMITTAL REQUIREMENTS 0te plan application completed in full . v ~L'$200.00 Application Fee. / -V $200 .00 Development Permit Application Fee . -:l1J $600.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public /waterline, sewerline , sidewalk, street or drainage facilities is involved.) ~-en (10) folded copies of site plan and landscape plan . ;-/,One (1) copy of building elevation required for buildings with a footprint of 20 ,000 sq. ft . or greater V -----::::7" A list of building materials for all facades that are visible from the public right-of-way . / -;;r A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they .,,,};,_are not checked off. / L!!.fK-Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). Date of Preapplication Conference:--11Z~o;;......;Jt.=..::v.;..;.!f...,~=--..;;~;...;;....;;...._ _____________ _ NAME OF PROJECT JSC.'5 ADDRESS • U,,. -~-r.-~--~-':---------.----------.....,..-~--+---, -H l {~ LEGALDESCRIPTION~l~~~£8~~~~~~~~~~~~~~~~~~~~~~~~~ APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name L1ti-.e~d'.'4'r«. fo..~,,~ 1J~ dki,-/~ SU'~ he. Street Address 5 II th/vb-J//y .a.=-, 5'..te ~t City ~k9C szkn~~ State T°X Zip Code °77/34':J E-Mail Address /1?Srti] arJ:=,,•./-ex-. ~....., Phone Number q-?'1-Z6o·Z6~'> Fax Number q?q. B~· ez z<r PROPERTY OWNER'S INFORMATION: Name f?C. 5 /!t?A"'..J, a. fl~: ~An?n 'Eg'j~/I Street Address 16()5 /la:;i:. Pra~·r1 ~ U, sle "310 State yX Zip Code --/ 78 ~~ Phone Number q 74 ~ 7 I (-/11 ~ ARCHITECT OR ENGINEER 'S INFORMATION : Name .;:a .... ~Al ,dµlUb..f A6~. . E-Mail Address ------------ Fax Number q7q .. '164'· t:Tzefq Street Address -----------------City ---------- State _____ Zip Code _____ _ E-Mail Address ------------ Phone Number -----------Fax Number ____________ ~ OTHER CONTACTS (Please specify type of contact, i.e . project manager, potential buyer, local contact, etc .) 1 of 3 Name ~io:tdar: ~~/ g)(?"~ Street Address /7t/& fi;-,'ifv~;~ ,f /Jr. / State 7>< Z ip Code /-? /!)01 Phone Number t/J7"f-Z6t?-7 Wt2 ~t--,k &ns:kvdi·& City Jf>~b E-Ma il Address -l'P~by~r.Ln~e~e4-------­ Fax Number q?q-Ut;-767b CURRENTZONING,_~C::-=--~'--------:---:----:---------------­ PRESENTUSEOF PROPERTY__!:/.//.~d~f-~~~~~,J~~--------------- PROPOSED USE OF PROPERTY t1kd.-cd Of[,~ ~I Zd4~ VARIANCE(S) REQUESTED AND REASON(S) ------------------ ~afkdt'/~ #OF PARKING SPACES REQUIRED &q MUL Tl-FAMILY RESIDENTIAL Total Acreage ____ _ Floodplain Acreage __ _ Housing Units ____ _ ---# of 1 Bedroom Units ---#of 2 Bedroom Units ---# of 3 Bedroom Units ---# of 4 Bedroom Un its FOR 2 BEDROOM UNITS ONLY ___ # Bedrooms = 132 sq . ft . ___ # Bedrooms< 132 sq . ft. #OF PARKING SPACES PROVIDED ~err~-- PARKLAND DEDICATION # of Multi-Family Dwelling Units _ __ x $345 = $ ______ _ __ # of acres in floodplain # of acres in detention --- ___ # of acres in greenways ___ date dedication approved by Parks Board COMMERCIAL Total Acreage --""z._. _?_~---­ Building Square Feet '2. 2, I~ I Floodplain Acreage ____ N-"-'-A.__ __ _ NOTE: Parkland Dedication fee is due prior to the issuance of a Building Permit. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. Site Pl a n Appli ca ti o n 8/1712003 2 of 4 ljdf,~~tZ,~ Signature of Owner, Agent or Appl icant Site Plan Application 8/17/2003 3 of 4 SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific site/waterway alterations : IV'/tt-. :;~ enot;W Vn<.1~~9...., ~4/yst_;s: ACKNOWLEDGMENTS: I,-----------------· design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and its associated Drainage Policy and Des ign Standards. As a condition of approva l of this perm it appl icat ion , I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Code . Property Owner(s) Contractor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas .) A.I , certify that any nonresidential structure on or proposed to be on th is site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 yea r storm . Engineer Date B. I, certify that the finished floor elevation of the lowest floor , includ i ng any basement , of any residential structure , proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . Eng ineer Date C. I, , certify that the alterations or development covered by this perm it shall not dimin ish the flood-carrying capacity of the waterway adjoin ing or cross ing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code , Chapter 13 concerning encroachments of floodways and of floodway fringes . Engineer Date D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Eng ineer Date Cond iti ons or comments as part of approval : --------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Eng ineer for the above named project. A ll of the app licable codes and ord inances of the City of College Station shall apply Si te Pla n A ppli c a ti o n 8117/2003 4 of 4 (Of 'OLLIG£ STATION ~ 1. 2 . cl 3. if ~ [S(" ~ ~ ~ 4 . ~ 5 . ~ 6 . ~ 7. Ci}-' tr ~ ~ ~ ~ ~ s ---- ' 8. t:l ~ ~ CEJ rr SUBMIT APPLICATION AND nus LIST CHECKED OFF WITH 10 FOLDED COPIES OF SITE PLAN FOR REVIEW SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Sheet size -24" x 36" (minimum). A key map (not necessarily to scale). Title block to include : Name, address, location , and legal description Name, address , and telephone number of applicant . Name address, and telephone number of developer/owner (if differs from applicant) Name: address, and telephone number of architect/engineer (if differs from applicant) Date of submittal Total site area North arrow. Scale should be largest standard engineering scale poss ible on sheet. Ownership and current zoning of parcel and all abutting parcels . Existing locations of the following on or adjacent to the subject site: Streets and sidewalks (R.O .W .). Driveways (opposite and adjacent per Section 7 .3 of the Unified Development Ordinance). Buildings . Water courses . Show all easements clearly designating as existing and type (utility , access , etc.). 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site , note if there is none on the site . Utilities (noting size and designate as existing) within or adjacent to the proposed site , including building transformer locations , above ground and underground service connections to buildings , and drainage inlets . Meter locations. Topography (2 ' max or spot elevations) and other pertinent drainage information . (If plan has too much information, show drainage on separate sheet.) Proposed location , type and dimensions of the following .: Phasing . Each phase must be able to stand alone to meet ordinance requirements. The gross square footage of all buildings and structures and the proposed use of each . If different uses are to be located in a single building , show the location and size of the uses within the building. Building separation is a minimum of 15 feet w/o additional fire protection . Setbacks . Show building setbacks as outlined in the Unified Development Ordinance , Article 5 . Off-Street parking areas with parking spaces drawn, tabulated , and dimensioned . Minimum parking space is 9' x 20 ', or on a perimeter row 9 ' x 18 ' with a 2 ' overhang. Designate number of parking spaces required by ordinance and provided by proposal. Handicap parking spaces . NOTE: weather ~ 9. x 10. Parking Islands. Raised landscape islands, (6 " raised curb) a min!mum of 180 sq . ft_. are required at both ends of every parking row (greenspace area contiguous to .the end island maybe applied toward the required 180 sq. ft.). Additionally , 180 sq . ft. of landscaping for every 15 . interior parking spaces must be provided . All required islands .must be 1.andscaped or set with decorative pavers , or stamped dyed concrete or other decorative materials as approved . Drives. Minimum drive aisle width . Curb cuts . For each proposed curb cut (including driveways , streets . alleys , etc.) locate existing curb cuts on the same opposite side of the street to determine separation distances between existing and proposed curb cuts. Indicate driveway throat length as measured in the Unified Development Ordinance , Section 7 .3 Access Management and Circulation . Security gates (show swing path and design specs with colors). Sidewalks (both public and private). Sidewalks are required at time of development if property has frontage on a street shown on the Sidewalk Master Plan or if the review staff determines the necessity . Medians. Show any and all traffic medians to be constructed on site. A fifteen foot parking setback from R.O .W . to curb of parking lot is required . Pavement may encroach into this 15' setback by up to 7 contiguous parking spaces . A double parking island (360 square feet) must be provided between each group of seven spaces . In no case may the pavement be less than 6' from the property line . Common open spaces sites Loading docks Detention ponds Guardrails Retaining walls Sites for solid waste containers with screening . Locations of dumpsters are accessible but not visible from streets or residential areas. Gates are discouraged and visual screening is required . (Minimum 12 x 12 pad required .) Show all easements clearly designating as proposed and type (utility , access, etc.). If dedicated by separate instrument list by volume and page . Utilities (noting size and designate as proposed) within or adjacent to the proposed site , including building transformer locations, above ground and underground service connections to buildings . Meter locations (must be located in public R.O .W. or public utility easement.). Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information . (If plan has too much information , show drainage on separate sheet.) Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1 , R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street , highway or designated fire lane. Show fire department connections . FDC's should be within 150' of the fire hydrant. In no case shall they be any further than 300' apart, and they shall be accessible from the parking lot without being blocked by parked cars or a structure. Show fire lanes . Fire lanes a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway. Fire hydrants must be operable and accepted by the City , and drives must have an all surface as defined in the Zoning Ordinance Section 9 before a building permit can be issued . Will building be sprinkled? Yes ~ No o If the decision to sprinkle is made after the site plan has been approved , then the plan must be resubmitted . Wheelstops may be requir.ed ~hen car~ overhang onto property not owned by the applicant or where there may be conflict with handicap accessible routes or above ground utilities signs or other conflicts . ' ~ 11 . ~ 12. ~ ~ ~ ~ ;g- ;El' ~ ~ 13. ~ 14. ~ 15. if 16. x 17. x 18. D 19 . ~ 20. NOTE: ::;now curo ana pavement aeta11. A o ·· ra1sea curo 1s requ1rea arouna all eages oT all parts oT all paved areas without exception . (To include island , planting areas , access ways, dumpster locations, utility pads, etc.) No exception will be made for areas designated as "reserved for future parking ". Landscape plans as required in Section 7.5 of the Unified Development Ordinance. The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree points , then those trees need to be shown appropriately barricaded on the landscape plan . Attempt to reduce or eliminate plantings in easements. Include information on the plans such as: required point calculations additional streetscape points required . Streetscape compliance is required on all streets . calculations for# of street trees required and proposed (proposed street tree points will accrue toward total landscaping points .) proposed new plantings with points earned proposed locations of new plantings screening of parking lots, 50 % of all shrubs used for screening shall be evergreen. screening of dumpsters, concrete retaining walls , off street loading areas, utility connection points, or other areas potentially visually offensive. existing landscaping to remain show existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are up before the first development permit is issued. Buffer as required in Section 7 .6 of the Unified Development Ordinance. Show irrigation system plan . (or provide note on how irrigation system requirement will be met prior to issuance of C .O .) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must include backflow prevention protection. Is there any landscaping in TxDOT R.O .W.? Yes D No ~ If yes, then TxDOT permit must be submitted . Will there be any utilities in TxDOT R.O.W.? Yes D No ~ If yes, then TxDOT permit must be submitted. Will there be access from a TxDOT R.O .W.? Yes D No~ If yes, then TxDOT permit must be submitted . ~he total number of multi-family buildings and units to be constructed on the proposed project site . The density of dwelling units per acre of the proposed project. Provide a water and sanitary sewer legend to include water demands (minimum, maximum and average demands in gallons per minute) and sewer loadings (maximum demands in gallons per day). Are there impact fees associated with this development? Yes D No~ Signs are to be permitted separately .