HomeMy WebLinkAbout10 Valley Park Center 05-36 400 Harvey Mitchell Pkwy( :01 ((.~-os Pledger Kalkomey, Inc. 7020 Coyote Run Bryan , Texas 77808 ~ Consulting Engineers 979-731 -8000 , 979 -731-1500 (Fax) fh~ www.pkengineering.com November 29 , 2005 Mr . Alan Gibbs City of College Station P .O . Box 9960 College Station , Texas 77842 Re : DP 05 -00100036 : OVERSIZE PAR T ICIPATION Val l ey Park Center Off -Site and On -Site Utilities PK Job No . 51905 -231 Dear Mr . Gibbs , Enclosed please find the estimate of probable cost and the oversize participation request for $170 , 000 for the difference in cost of a 6 " diameter water line to a 12 " diameter water line . Very Tru l y Yours , P .E . sed@pkengineering .com SED/jer Enclosures cc : Spen c er Thompson David Hillman Brenham • Bryan • Rosenberg S :\2005\51905-231 SOUTHCORP-Por Nada\CS-19-oversize request .doc Item No. Valley Park Center Public Utilities PK Job NO. 51905 -231 Estimated Quantity Descripti on Off-Site Utilities Plan s Dated : July 14 , 2005 OFF-S ITE SANITARY SEWER Mobilization , including insurance , 1 1 LS move -in , move -out , and related items (No Bonds): 4 " sanitary sewer force main in 2 2 ,070 LF trench , AWWA C-909 Class 200 PVC with detector tape : 3 145 LF 4 " sanitary sewer force main by bore, AWWA C-909 Class 200 PVC : 10 " x 3/8 " steel casing by trench 4 217 LF with carrier pipe , spacers , end seals, joint restraints : 10 " x 3/8 " steel casing by bore with 5 153 LF carrier pipe , spacers , end seals , joint restraints : 6 2 EA Water /fo rce main crossing : 7 2 EA Concrete abutment for aerial force main/creek crossing : 8 5 EA 4 " DI bends (90 , 4 5, 22 -1/2 , and 11 - 1/ 4) : 4 ' standard manhole (A -1) including 9 1 EA tie-in and bolted/gasketed ring and cover: 1 0 2 ,287 LF Tr ench safety for force main : 11 1 LS Remove & replace irrigation system as required : 12 1 LS Clear, grub and dispose of vegetation/debris : 13 1 LS Pr otect all trees , landscaping , lights , etc .: 14 1 LS Traffic control : 15 1 LS Hydrornulch seed all disturbed areas : 16 1 LS Lift station (A-2): 17 1 LS Construction staking : Lift station electrical, including 17 .5 1 LS conduit , backfill , transformer pad , etc. (Sheet El dated 11 -3-05): SUBTOTAL OFF -SITE SANITARY OFF-SITE WATER Mobilization, including insurance , 18 1 LS move-in , move -out , and related items (No Bonds): 19 1 ,275 LF 1 2 " water line in trench, AWWA C-909 Class 200 PVC with detector tape : 20 260 LF 12 " water line by bore, AWWA C-909 Class 200 PVC : 20 " x 3/8 " steel casing by trench , 21 40 LF wit h carrier pipe , casing spacers , joint restraints , and end seals : 2005-10-28 tal:eo f f ut111ties on and o !f.x l s Estimate of Probable Cost 12" Water Line 6 11 Water Line $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Unit Pri ce 7 ,000 .00 14 . 00 40 .00 75 .00 125 .00 250 .00 300 .00 80 .00 2 ,200 .00 1. 00 5 ,000.00 3 ,000 .00 7 ,500 .00 2 ,500 .00 3 ,500 .00 80 ,000 .00 5 ,000 .00 20 ,000 .00 4 ,500 .00 30 .00 60 .00 140 . 00 1 of 3 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Total Pri ce 7 ,000 .00 28 ,980 .00 5 ,800 .00 16 ,275 .00 19 ,1 25 .00 500 .00 600 .00 400 .00 2 ,200 .00 2 ,287 .00 5 ,000 .00 3 ,000 .00 7 ,500 .00 2 ,500 .00 3 ,500 .00 80 ,000 .00 5 ,000 .00 20 ,000 .00 209 ,667 .00 209 ,667 .00 4 ,500 .00 $ 3 ,000 .00 $ 3 ,000 .00 38 ,250 .00 $ 17 .00 $ 21 ,675 .00 15 ,600 .00 $ 47 .00 $ 12 ,220 .00 5 ,600 .00 $ 110 . 00 $ 4 ,400 .00 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 80 1 2 1 1 2 1 1 1 1 1 2 1,315 1 1 1 1 1 1 Valley Park Center Public Utilities PK Job NO . 51905 -231 20 " x 3/8 " steel casing by bore , LF with carrier pipe, casing spacers, joint restraints , and end seals : EA 18 " x 12 " tapping sleeve and valve : EA 12 " gate valve & box: EA 8 " gate valve & box: EA 12 " DI anchor coupling : EA 8 " DI anchor coupling : EA 12 " x 8" DI tee : EA 12 " x 6 " DI tee : EA 8 " x 6" DI tee : EA 12 " DI plug or cap : EA 8 " DI plug or cap : EA Fire hydrant with lead, gate valve, and box: LF Trench safety for water line : LS Clear , grub and dispose of vegetation/debris : LS Hydromulch seed all disturbed areas : LS Remove and Replace Fencing LS Tr affic control : LS Tree Protection LS Construction staking : SUBTOTAL OFF -SITE WATER On -Site Ut ilities Plans Dated: Oc t ober 2 8 , 200 5 ON -S ITE SANITARY SEWER Mobilization , including insurance , 1 1 LS move-in , move-out , and related items (No Bonds): 6 " sanitary sewer gravity line in 2 196 LF trench (8 '-10 ' cut), ASTM D-2241 Class 160 PVC with detector tape : 6 " sanitary sewer gravity line in 3 358 LF trench (10 '-12 ' cut), ASTM D-2241 Class 160 PVC with detector tape : 6 " sanitary sewer gravity line in 4 374 LF trench (12 '-14 ' cut), ASTM D-2241 Class 160 PVC with detector tape : Sanitary sewer stub in trench , 5 LF 5 3 EA 6 " ASTM D-2241 Class 160 PVC with detector tape : 6 340 LF Bank sand backfill entire trench section under paved areas : 7 4 EA 4 ' standard manhole (0 -6 ' cut): 8 19 VF Ex tra depth for standard manhole : 2005-10-28 ta~eotf ut111t1es on and oft.xls $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2 of 3 Estimate of Probable Cost 12" Water Lin e 6 11 Water Line 250 .00 $ 20 ,000 .00 $ 160 .00 $ 12,800 .00 5 ,000 .00 $ 5 ,000 .00 $ 4 ,000 .00 $ 4 ,000 .00 1 ,400.00 $ 2,800 .00 $ 550 .00 $ 1,100 .00 750 .00 $ 750 .00 $ 550 .00 $ 550.00 400 .00 $ 400 .00 $ 125 .00 $ 125.00 300 .00 $ 600 .00 $ 125 .00 $ 250.00 500 .00 $ 500.00 $ 225 .00 $ 225 .00 500 .00 $ 500.00 $ 225 .00 $ 225 .00 450.00 $ 450.00 $ 225 .00 $ 225 .00 250.00 $ 250 .00 $ 175 .00 $ 17 5 . 00 200 .00 $ 200 .00 $ 175 .00 $ 175 .00 2 ,400 .00 $ 4 ,800 .00 $ 2 ,400 .00 $ 4,800 .00 1. 00 $ 1 ,315 .00 $ 1. 00 $ 1 ,315 .00 3 ,000 .00 $ 3 ,000 .00 $ 3 ,000 .00 $ 3 ,000 .00 2 ,500 .00 $ 2 ,500 .00 $ 2 ,500 .00 $ 2 ,500 .00 1 ,000.00 $ 1 ,000 .00 $ 1 ,000 .00 $ 1 ,000 .00 1 ,000 .00 $ 1 ,000 .00 $ 1,000 .00 $ 1,000.00 500 .00 $ 500 .00 $ 500 .00 $ 500 .00 2 ,000 .00 $ 2 ,000 .00 $ 3,500 .00 $ 3 ,500 .00 111 , 515 .00 78,760 .00 3 ,000 .00 $ 3 ,000 .00 25 .00 $ 4 ,900 .00 29 .00 $ 10 ,382 .00 33 .00 $ 12 ,342 .00 500 .00 $ 1 ,500 .00 75 .00 $ 25 ,500 .00 2 ,200 .00 $ 8 ,800 .00 175 .00 $ 3 ,325 .00 It em No . 9 10 Valley Park Center Public Utilities PK J ob NO . 51905-231 Es timat ed Qua ntity De scripti on 928 LF Trench safety : 1 LS Construction staking : SUBTOTAL ON -SITE SANITARY ON-SITE WATER 11 1 LS 12 1 ,806 LF 13 349 LF 14 313 LF 15 3 EA 16 4 EA 17 3 EA 18 4 EA 19 6 EA 20 1 EA 21 1 EA 22 3 EA 23 1 EA 24 1 EA 25 1 EA 26 1 EA 27 4 EA 28 2 ,155 LF 29 1 LS 30 1 LS Mobilization , including insurance , move -in, move -out , and related items (No Bonds): 12 " water line in trench , AWWA C-909 Class 200 PVC with detector tape : 6 " water line in trench , AWWA C-909 Class 200 PVC with detector tape : Bank sand backfill entire trench section under paved areas : 12 " gate valve & box: 6 " gate valve & box: 12 " DI anchor coupling : 6 " DI anchor coupling : 12 " x 6 " DI tee: 6 " DI tee : 12 " DI bend ( 90 , 45, 22 . 5 , etc .): 6 " DI bend (90 , 4 5 , 22 .5 , etc.): 12 " DI plug o r cap : 6 " DI plug o r cap: Wa ter/for ce main crossing : Wa ter/sewer crossing, including cement stabilized sand and appurtenances : Fire hydrant with lead, gate valve , and box : Trench safety for water line : Hydr ornulch seed all disturbed areas : Construction staking: SUBTOTAL ON -SITE WATER TOTAL PUBLIC UT ILITIES CON TINGEN CY 10% TOTAL DIFFERENCE 30% MAXIMUM lOOS -10-28 tak.eo!f utilities on and o f f.xis s s s s s s s s s s s s s s s s s s s s s s 3 of 3 Estimate of Probable Cost 12" Water Lin e 6 11 Water Line Unit Price 2 .00 1 ,800 .00 4 ,500 .00 35 .00 20 .00 50 .00 1 ,400 .00 550.00 400 .00 125 .00 500 .00 225 .00 450 .00 200 .00 200 .00 90 .00 250 .00 500 .00 2 ,400 .00 1. 00 2 ,500 .00 3 ,000 .00 s s s s s s s s s s s s s s s s s s s s s s Total Price 1,856.00 1 ,800 .00 73 ,4 05 .00 4 ,500 .00 63,210 .00 6 ,980 .00 15 ,650 .00 4,200.00 2 ,200 .00 1,200 .00 500 .00 3 ,000 .00 225 .00 450.00 600.00 200 .00 90 .00 250 .00 500 .00 9 ,600 .00 2 ,155 .00 2 ,500 .00 3 ,000 .00 121,010 .00 515 ,597 .00 51 ,559 .70 567 ,156 .70 229 ,092 .60 170 , 147 .01 170 ,000 .00 s 3 ,000 .00 s 20 .00 s 20 .00 s 50 .00 s 550 .00 s 550 .00 s 125 .00 s 125 .00 s 225 .00 s 225 .00 s 200 .00 s 200 .00 s 90 .00 s 90 .00 s 250 .00 s 500 .00 s 2 ,400 .00 s 1. 00 s 2 ,500 .00 s 3 ,000 .00 40 . 4% 30 .0% 30 .0% OV ERSIZE PARTICIPATI ON REQUEST s s s s s s s s s s s s s s s s s s s s 73 ,405 .00 3 ,000 .00 36 ,120.00 6 ,980 .00 15 ,650 .00 1 ,650 .00 2 ,200 .00 375.00 500 .00 1 ,350 .00 225 .00 200 .00 600.00 90.00 90 .00 250 .00 500 .00 9 ,600 .00 2 ,1 55 .00 2 ,500.00 3 ,000 .00 87 ,035 .00 307 ,331 .00 30 ,733 .10 338 ,064 .10 Date Submitted Planning & Development Services DEVELOPMENT PERMIT MINIMUM SUBMITTAL REQUIREMENTS $200 development permit fee . $600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public waterline , sewerline, sidewalk , street or drainage facilities is involved.) Drainage and erosion control plan , with supporting Drainage Report two (2) copies each Notice of Intent (N .0.1.) if disturbed area is greater than 5 acres Date of *Required Preapplication Conference: ___________________ _ *(Required for areas of special flood hazard) LEGAL DESCRIPTION Valley Park Center, Northwest Corner FM 2818 and FM 60 APPLICANT'S INFORMATION (Primary Contact for the Project): (ENGINEER) Name Pledger Kalkomey, Inc. -Steve Duncan Street Address 7020 Coyote Run City __ B___,ry""'"a_n ______ _ State Texas Zip Code 77808 E-Mail Address sed@pkengineering.com Phone Number (979) 731-8000 FaxNumber_~<~9~79~>~7~3~1--1~5:....;:0~0 ______ _ PROPERTY OWNER'S INFORMATION Name . Southcorp Holdinas I, LP. -David Hillman Street Address 3401 Allen Parkway, Ste. 200 City __ H_o_u_s_t_o_n _____ _ State Texas Zip Code 77019 E-Mail Address dhillman@southcorprealty.com Phone Number __ (_71_3_)_9_6_0-_1_8_80 ___ _ Fax Number (713) 355-4275 ARCHITECT OR ENGINEER'S INFORMATION OWNER# 2: Name Por Nada Joint Venture Street Address P .0. Box 8131 City __ T"-'h-'-e~W"'"'o"'"'o:....;:d=la=n"""d"""s"'----- State _ _;T:....:e=x=a=s ____ Zip Code 77387 E-Mail Address ------------ Phone Number (281) 363-2220 Fax Number -------------- Application is hereby made for the following development specific site/waterway alterations : Offsite Sanitary Sewer and Water ACKNOWLEDGMENTS : I, Steve E. Duncan , design engineer/ewAeF, hereby acknowledge or affirm that: The i nformation and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. ~ 7prj,5 0 {\ E. I I Property•Nner,s, ngmeer 6/13/03 1 of 2 , ./ / From: To: Date: Subject: Hello Alan , "Jim Riley" <jimriley@tamu .edu> <Agibbs@cstx.gov> 8/3/2005 4 :52:49 PM Re : Fwd : Valley Park Center lnterlocal Agreement You can deliver the set of plans for the proposed sanitary sewer line to my office in the Physical Plant Building on Agronomy Drive , Room 202 . Please call 845-1210 if you need directions for delivery. We will review the drawings and get back with you on the best way to proceed . Please notify me when the plans will be delivered so we can be looking for them . Thanks. Jim Riley Director for Utilities Texas A&M University 1371 TAMU College Station, TX 77843-1371 w) 979-845-1210 f) 979-845-0051 jimriley@tamu.edu »>"Alan Gibbs" <Agibbs@cstx.gov> 8/3/2005 2:47:27 PM»> Mr. Riley , The City of College Station has received Construction Plans for a proposed sanitary line to connect to the TAMU system on SH 60. Mr. Hillman indicated you were the contact for TAMU. I wanted to make sure you were able to review and comment on the plans. As you are aware, this will also involve TxDOT permit approval. Please contact me regarding getting your office a set of plans and how to proceed in accordance with the interlocal agreement. Thanks , Alan Alan P . Gibbs, P .E . Sr. Asst. City Engineer -Development Public Works Department City of College Station P . 0 . Box 9960 College Station , Texas 77842 Ph : (979) 764-3570 Fx : (979) 764-3496 agibbs@cstx.gov www.cstx.gov »>"David Hillman" <dhillman@southcorprealty.com> 7/27/2005 1 :00:47 PM >>> Alan : Thanks for taking the time yesterday to work through the plans for Valley Park Center. I appreciate your patience with our "what-ifs ." Attached is a copy of the ILA, as well as copies of correspondence during the ILA approval process . After TAMU agreed to the ILA , I'm not sure how much correspondence Dale Schepers had with TAMU , but in Chuck Sippial's letter of April 11 , 2003 he asked the city to deal with Jim Riley, Director of Utilities , at 979-845-1210 . Paragraph 3.04 of the ILA states that we must submit a scaled drawing showing the design of the connection point. Steve , could you prepare whatever Alan needs for this? Thanks.David College Station . Heart of the Research Valley . CC: "Nathan Jones" <njones@ppfs4 .tamu .edu>, "Randall Hohlt" <rhohlt@ppfs4 .tamu .edu> Pledger Kalkomey, Inc. Consu lt in g Engineers July 2 2, 2005 Ms. Bridgette George City of College Station P.O. Box 9960 College Station, Texas 77842 Re: TxDOT Utility Permits Valley Park Center Off-Site Utilities PK Job No. 51905-231 Dear Mrs. George , 7020 Coyote Run Bryan, Texas 77808 979-731-8000 , 979-731-1500 (Fax) www.pkengineering .com Enclosed please find the following for the referenced project. These items correspond to the development permit submitted on July 18th: 1. TxDOT Utility Permit for FM 2818 2. TxDOT Utility Permit for FM 60 Very Truly Yours, s ed@pkengineering.com SED/mon Enclosures cc: David Hillman (without plans) Brenham • Bry an • Rosenberg \\Snapl21731 \sharel 12005151905-231 SOUT HCORP-Por ada\CS -06-dev permit offsi te .doc LJ cs. \ )---c:\ ll~ -i. ~?-0~ \ '.\65.pvv-- As a condition of approval of this permit application , I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Code N/A Contractor CERTIFICATIONS: A. I, Steve E. Duncan , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . ~g___ July 18 , 2005 Engineer Date B. I, Steve E. Duncan , certify that the finished floor elevation of the lowest floor , including any basement , of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps , as amended . -~ July 18 , 2005 Engineer Date C. I, Steve E. Duncan , certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code , Chapter 13 concerning encroachments of floodways and of floodways fringes . July 18, 2005 Engineer Date D. I, Steve E. Duncan , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study . Eng#,b&fl --July 18 , 2005 Date Conditions or comments as part of approval : ----------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or ex isting drainage facilities. All development shall be in accordance with the plans and specifications subm itted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . 6 /13/0 3 2 of 2 Pledger Kalkomey, Inc. K i Consulting Engineers 11312 13430 VALLEY PARK CENTER OFF-SITE UTILITIES PK JOB NO. 51905-231 Techni cal Specifications Submersible Pumps Duplex Float Control Panel Brenham • Bryan • Rosenberg S \200S\5190S-23 I SOU TH CORP-Por Nada\D WGSIOFF -SI T E PL ANSIL IFT STATION INFO\s pec toe doc 7020 Coyote Run Bryan, Texas 77808 979 -731-8000 , 979-731 -1500 (F ax) www.p kengin eering .com S ECTI ON I 131 2 SU BM E RSIBLE PUMP S PARTl GEN E RAL l.01 S U MMARY Thi s sec ti on pro v id es for fu rni s h ing and ins ta lli ng constan t s p e e d , no n-clog submers ible sewage p umpi ng un its and equipment as ind ic a ted on th e d rawi ngs. T he co mp lete in s ta ll atio n s ha ll inclu de the pl a cemen t o f anch or bolts , s etting o f pumps , motors , le vel ing and ali g nin g e q u ipment an d connecti o n to p iping to e ffec t a compl e te ope rati o na l pumping sys te m , a s we ll a s other s pe c ifie d acces sories . All the equipment c a lled for under thi s section of the specificati o n s shall be supplied by the pump manufacturer. This includ es th e basin , station piping, val ve s, pumps , motors , le vel co nt rols, panel a nd access fram e and cover. and the supplier shall, in addition to the Contractor, ass ume the res po nsi bility fo r th e prop er functionin g of the equipment. 1.02 MEAS U REM E NT A ND PA YM E T Unle s s oth e rwise s peci fie d , n o direct m eas ure me nt or paym e nt will be m a de for submersible pump s, the co st thereof be in g included in the bid price for the appropriate b id item listed in th e p ro posa l. 1.03 RELATED S ECTIO N S Section 02530 -Sanitary Sewerage Sys te m Section 13 4 30 -Duplex Floa t Control P a ne l 1.04 PERFORMANCE REQUIREM E NTS The pumps shall be so designed that the y will safe ly operate at the specified conditions , . s peed s and operatin g pre ss ure range s without ex cessive wea r , di s tortion , or vibration . Actual pump manufacturer figures shall no t exceed the followin g performance requirements by more than ten percent (I 0 %). 5:'1005 .51905-231 SO UTH CO RP-Pm Nad .J DWC.S LIF T STATI OJ\ I \Jl :!-!>ubm1:~1 blc punip!> Jo..: l 13 12-1 Srd.-&. :!7.97 Submers ible Pumps I I LIFT I PERFORMAl\CE REQUIREMEl\TS STAT IO N Number to be In stall e d 2 Rated Capacity at Rated TOH , GPM 128 R a ted T ota l Dy n a mic Head, ft. 19.5 Stat ion O p e ra ting Range . TDH 17 -25 Maximu m omina l Pump Operat in g Speed, RP M 1750 Maximum Brake Hors epower Required at Rated Condition 1.5 Minimum Wire to Water Pump Efficiency at Rated Head, Percent 40% Solid Size, Inches 2 .5 Maximum Motor Nameplate Horsepowe r 3 Minimum Motor Service Factor 1.15 Model Number CP 3085 Impeller Number 438 Head losses through the pump s are not included in the total pumping heads. Motors must not operate in the service factor in an y portion of pump operating range. The sump volume requirements were sized utilizing the OFF level at the volute centerline based on the specified manufacturer. Any additional depth required to submerge or meet start per h o ur requirements will not be at the Owner's expense . 1.05 SUBMITTALS Complete fabrication , assembly , foundations and installation drawings, together with detailed specifications and data covering material used , parts, devices and other accessories forming a part of the equipment furnished , shall include but shall not be limited to the following: S . ..2 005'5 1905 -23 1 SO UTl-l lORP-P\\r Nada OWG S LIFT ST A TI O!\ 1 131 2 -subm ~·~ib l \! pumps .doc l 13 12-2 Srd.-8-27197 Submersible Pumps A . Prequalification Package . The pump manufacturer must submit four (4) sets of the following data to th e Own e r's representative fourteen ( 14 ) days prior to the bid d a te. Name o f M anufactu rer Along With Experience Background Type and Model Rotative Speed Size of Discharge ozzl e Type of Bearings Com pl ete P erformance Curves Showing Capacity Versus Head NPSHR Pump Overall Efficiency an d BHP Da ta on Shop Painting Motors Name of Manufacturer Type and Model Type of Bearing and Lu bricati on Rated Si z e of Motor (HP) Temperature Ra t ing and Moto r Service Factor Full Lo ad R otati ve Speed Efficiency at Full L oad and R ated Pump Condition Full Load Current Locked Rotor Current Ex ploded Vi ew Guaranteed Wire to W a te r Efficiency Lift Weight of Pump and Motor Total Weight of Base E lectrical connection di agra m s and schematics identifying all items requmng electrical control or power u se d in the operation of the pumps shall also be s ubmitted. B. Shop Drawings and Product D ata. The Contractor shall furnish submittal data for the Owner's representati ve's approval. Thi s d a ta shall consist of the followin g: 1. Certified dimensioned outline drawings for pumping unit with shipping weights a nd unit weight. S.'1005 51QQ5-:'31 SOUT H(ORP -Por N.1J a\OWGS LIFT STATION' 11 3 12 -s ubm..:rsibk pumps.dcx: l 13 12-J St d.-R,27 97 Submersible Pumps 2 . Performa nce curves for the pump . 3 . Cros s -s ectional drawing with detailed parts listed for pu m ps, motors and pump manufacturer supplied components . 4. Control s. Control schematic; field wiring diagram, m a nu fa cturer's catalog d a ta on a ll components ; pane l arrangement and d e tail s. 5 . Frame an d Covers . O ut li ne d imen s io ns and m aterial s o f cons tru c ti on. 6. Warra nty . Manufacturer's standard published warra nrv certified on supplied equipment. 7 . Parts and Service. The equipment supplier shall satisfy the Owner's representative of th eir proven record of immediate availability of parts and field service on a twenty-four (24) hour basis. The Owner's representative shall inspect the supplier fac ility and contact local references [ten ( 10 ) required] to evaluate their service and spare parts availability. C. Testing and Final Submittals . The pump manufacturer shall perform the following inspection and tests on each pump before shipment from the factory . 1. I mpeller, motor rating and electrical connections s hall first be checked for compliance with the customer's purchase order. 2. A motor and cable insulation test for moisture content or insulation defects. 3 . Prior to s u bmergence, the pump sha ll be run dry to establish correct rotation and mechanical integrity . 4 . The pump shall be run for thirty (30) minutes submerged. a minimum of six (6) feet under water. 5 . After Operational Test No. 4 , th e insulation test (No. 2) is to be performed again . Two (2) sets of the following data shall be submitted u pon shipment of pumps and motors: 1. Installation, operation, maintenance and lubrication manuals. 2 . Copy of the approved submi tt a l drawings. S. 2005 51905 -23 1 SOU TH CORP -Por Nada OWGS\LI FT STA TI ON ' I IJ I 2-:.ubm1.:rs 1hk pumps .dcx ) 13 12-4 Srd -lt27,Q7 Submersible Pumps 3. As-built e lec tri ca l dra w in gs of the contro l system . 1.0 6 WARRANTY The pump manu facture r s hall warrant the unit being s uppl ied to th e Owner against defects in workmanship a nd material for a pro-rated period of five (5) years under normal use , operation a nd service. The warranty shall be in printed form a nd apply to all similar unit s . P A RT 2 PROD UCTS 2 .01 MANUFACTURERS The pumps shall b e manufactured by Flygt Corp oratio n or approved equ al. 2 .02 MATERIALS AND/OR EQUIPMENT A. General. The pumps shall be vertical, non-clogged raw sewage centrifugal type for operation in a submerged condition . Each unit shall be equipped with a sub mersib le electric mot or, comp letely shop a sse mbled in the pump manufacturer's plant, accurately aligned and properly prepared for s hipment. 8 . Pump T y p e. The pumps shall be cap able of handling raw, unscreened sewage. The disch arge connection elbow shall be permanently installed in the wet well along with the discharge piping. Anch or bo lts for the discharge connection elbow shall by Type 304 stainless steel. The pump s sha ll be automatically connected to the discharge connection elbow when lowered int o place and shall be easily removed for in s pection or se rvice. There s hall be no need for personnel to enter wet well to eith e r disconnect or reconnect the pump. Sealing of the pumping unit sha ll b e guided to and pre ssed ti g htly against the discharge connec tion elb ow. No portion of the pump shall bear directl y on the floor of the wet well. The pump, with it s appurtenances a nd cables , shall be capable of continuous submergence under water without lo ss of watertight inte g r ity to a depth of 65 feet. C. Lift Sys tem. A lift system s hall be supplied comprised of a "grip eye" for attachment to liftin g equipment hook and sho rt len gth of chain attached to pump and stainless steel wire rope long enou gh to reach the station top . The grip eye shall be lo wered over the stainless steel wire rope until reachin g the chain where the grip eye automa tically connects to th e cha in so the pump can be pulled by the u se of Ii fting equipment. All components to be stainless stee l or c ast/ductile iron . S.'2005 51905-23 1 SOUTHCO RP-Pm Nada DW GS ' LIFT STATION' I I J I ~-subm<o'>1 bk pumps.d•>< J J 3 12-5 Std .·M ~7.9 1 Submersible Pumps This lift system s hall enab le th e operato r to connect/d isconnect th e hook from th e lifting d ev ice to any one of the submersible pump handles wh il e su bmerged, from the station top . D. Casing . Each pu mp casing sha ll be constructed of fine-grained cast iron . The casting shall be de s igned for a minimum working pre ssure of fifty (50) PSIG and hy drostatically te sted to 1-l /2 ti me s the working pressure . E. Pump Sha ft. Th e pump shaft shall be of carbon steel, C 1036, completely is olate d fro m th e pump m e d ium , or s ta inless steel when exposed to the pump medium. The pump sha ft s hall rot a te on two (2) permanently lubricated b a ll or roller bearings. The shaft shall be of s u fficient diamet e r to assure rid ged support of the impeller and to pre vent excessive vi bra ti on at all op erating speeds. F . Mechanical Seal. Each pump shall be pro vided with a mechani cal seal system running in an oil re servoir h av in g separate , _cons tantly hydrodynamically lubricated lapped seal faces. The lower seal unit shall contain one ( 1) stationary and one (l) po s iti ve ly dri ve n rotating tu ngste n-carbide ring. Th e upper seal shall contain one (I) stationery tun gsten-carbide ring and one (l) positively driven carbon rin g . The sea ls shall be insta lled in the TANDEM configuration . The seal systems sha ll not rely upon the pumped m edia for lubri cation. G. Oil C hamber. Each pump shall be pro vided with an oil chamber for the shaft sealing sys tem . The drain and inspection plug , with positive anti-leak seal , shall b e easi ly accessible from the outs ide. H. Impeller -The pump impellers shall be one-piece cast iron, full y -encased , design with wide passages to prevent clogging w hen pump ing solids, trash , rags and string material entrained in sewage. The impeller shall be statically and d ynamic a ll y b a lanced . The impeller hub shall be accurately fitted and mechanically sec ured to the impeller shaft. Impeller and casing shall be designed to p ass the minimum 2-1/2 -in ch diameter test sphere. A wear rin g system shall be used to provide efficient sealing between the volute and suction inlet of th e impeller. Each pump shall be equipped with a brass , or itrile rubber coated steel rin g insert that is dri ve fitted to th e volute in let. Or semi-open , multi-vane, b ack-swept , non-clog des ign. The impelle r va ne lead ing edges shall be mechanica lly self-cleaned upon each rotatio n as they pass across a spiral groove located on the volute suction which shall keep them clear of debris, maintaining an unobstructed le ading edge . The impeller(s) vanes shall have screw-shaped lead ing edges that are hardened to RC 45 and shall be capable of ha ndlin g solids, fibrous materials , heavy sl ud ge and other matter found in was te water. The screw shape of the impeller inlet shall provide an inducing effect for the handling of sludge and rag-laden wastewater. $;'2005 15 1905-23 1 SOU THCORP -Pi.>r Na da DWGS 1L1FT STATI ON' 11311 ·s ub111cr..1blc pumps.dl.)I.; } 131 2-6 S td .·&~7.97 Submersible Pumps l. Volute -The pump volute shall be sin g le -piece grey cas t iron. Class 358 , non- concentric design with smooth pass ages large enough to pa s s any solids that may enter the impeller. Minimum inlet and di s charge size shall be a s specified . Volute for semi-open design shall have an integral spiral shaped cas t groove at the suction of the volute. The internal volute bottom or in s ert rin g shall provide effective sea ling between th e pump volute and the multi-vane , semi-open impeller. The sharp spi ral g roove shall prov ide the shearing ed g e acro ss which eac h impell e r va ne le a d ing edg e sh a ll cros s during its ro tation in o rd e r to rema in un o b strn c ted . The clearanc e be t ween th e in te rnal volute bo ttom and th e impe lle r leadin g edg e s sh a ll be adjustable. J. Cooling Sys tem. Each unit shall be provided with an adequately designed cooling system. Thermal sensors shall be used to monitor stator temperatures. The stator shall be equipped with three (3) thermal switches , embedded in the end coils of the stator winding [one (1) switch in each stator phase]. These shall be used in conjunction with and supplemental to , external motor overload protection and wired to the control panel. K. Electrical Cable Seal. The cable entry shall be comprised of a single cylindrical elastomer, grommet, flanked by washers. The cable entry junction chamber and motor shall be separated by a stator lead sealing gland or terminal board . Epoxies , silicones, or other secondary sealing system shall not be considered acceptable. L. Motor -Pump motor shall be of NEMA Design B, squirrel-cage , induction , shell- type design, housed in an air-filled watertight chamber. The stator winding and stator leads shall be insulated with moi s ture resistant Class H in s ulation which will resist a temperature of 356°F. The stator shall be in s ulated by the trickle impregnation method using Class H monomer-free polyester resin resulting in a winding fill factor of at least 95 %. The stator shall be heat-shrink fitted into the cast iron stator housing. The use of multiple step dip and bake-type stator insulation process is not acceptable. The use of bolts , pin s or other fastening devices requiring penetration of the stator housing is not accepta ble . The motor and the pump shall be produced by the same manufacturer. The combined service factor (combined effect of voltage, frequency and specific gravity) shall be a minimum of 1.15 The motor shall be designed for continuous duty, capable of sustaining a minimum of 15 evenly spaced starts per hour. The rotor bars and short circuit rings shall be made of cast aluminum. S 100~'51905 -::!J I SO UT HCORP -Por Nada'O\\.'GS 'LI FT STATIO N\! 13 I :?·su bm..:rs 1bk pum ps .d1X 113 12-7 Sid -S.27 97 Submersible Pumps The junction chamber, containing the terminal board, shall be sealed from the motor. Connection between the cable conductors and stator le ads shall be made with threaded compressed type binding posts permane ntly affixed to a terminal board and thus, perfectly leak proof. The pump motor cables in stalled shall be suitable for submersible pump application with cable sizing conforming to ICEA-N EC specifications for submersible pump motors . Manufacturers requirin g moisture detecti on device s fo r warranty shall supply a lock-out d evice with man ua l reset in the control pa nel. M. Exposed Surfaces . All exposed nuts and bolts shall b e of stainless stee l, Type 304 or 316 . All surfaces coming into contact with sewage, other th an stainless steel, shall be protected with a sewage re s istant coating . Di sc harge Elbow . The discharge base elbow shall be furnished by the pump manufacturer. The disch arge elbow shall have a foot for anchoring to the wet well floor and a means for firmly supporting the guide rails. The design and mass of the discharge elbow shall be sufficient for rigidly supporting the eccentric load of the pump unit and di sc harge piping. The discharge elbow inlet flange face shall be perpendicular and make a metal to metal contact with the pump discharge nozzle flange face. Sealing of the disch arge interface by means of a diaphragm , o-ring or other de vice is not acceptable . The discharge elbow outlet shall connect to the discharge pipin g riser. The elbow shall hav e ANSI , I 25-pound flange dimensions and drilling . 0. Pump Guides. The pumps shall be capable of being lowered into position in the pump chamber and automatically connected to the discharge connection elbow by the use of sliding bracket and pos itioning devices. The sliding bracket shall be part of the pump assembly. The sliding bracket and positioning device shall be constmcted of cast iron or 304 stainless steel. The upper guide rail bracket and the guide rails shall be construc ted of stainless steel , sized as shown on the drawings. Inte rmediate guide rail brackets shall be constructed of 304 stainless steel and be positibned a maximum of twenty (20) feet apart . P. Mix-Flush Valve. At least one (1) pump in each sump shall be equipped with an automatically operating valve that will provide a mixing action within the sump at the start-up of the pumping cycle . This valve shall be mounted directly on th e pump volute and shall direct a portion of the pumpage into the sump to flush and resuspend solids and grease by the S. 2005'.5 190 5-23 I SOUTH C'O RP -Por Nada 'OWGS'.LIFT STA T ION' 11J12-s ub nl.-ni!blc pum p,.do.; l I 3 12-8 S1dAl27,97 Submersible Pumps turbulent action of its discharge. The turbulent action caused by the flow shall also provide some sump aeration benefits. The va lve s hall be mounted on the pump volute so that it can be removed from the sump along with the pump during normal and routine mainte nance checks and shall be positioned on the volute to provide for non-c logging opera tion. The va lve sh a ll be equipped with an adjustab le , wear-resistant discharge nozzle which shall be used to direct flow from the valve to optimize mixing action within th e sump . The val v e shall not require an y external power source or c o ntrol to operate. neither electric nor pneumatic. The use of any external power source is not accepta ble. The va l ve shall be sui table for u se in Class I , Divisio n l hazard ous locations . The valve shall open at th e beginning of each pumping cycle and shall automatic ally close during pump operation after a pre-se lected time of operation. The valve shall operate automatically by differential pressure across the valve and shall be actuated throu gh a self-contained hydraulic system which u ses an environmentally safe fluid . A method of adjusting the valve operating time shall be provided. Q. Access Frame and Cover. Furni s h aluminum access frames and covers for top of valve pit and wet well. The cover and frame shall be constructed of 1/4-inch structura l grade aluminum and utilize stainless steel hinges and stainless steel hardware . Covers to be equipped with padlock hasp and hold open arm and sized per the requirements of the drawings . The covers shall be rated for 150 pounds per square foot li ve load . PART 3 EXECUTION 3 .0 I ERECTION/INSTALLATIO N / APPLICATION AND/OR CO STRUCTION A factory trained service engineer employed by the pump m a nufacturer s hall advise the Contractor in th e insta llation and start-up of the pumping unit s. The pump manufacturer's service technici an shall include in his bid one (I) work.in g day to advise the Owner's operator of operation and maintenance of the pumping unit s and controls. Pumps shall be installed only in the manner required by the manufacturer and only after the Contractor has been advised by th e factory trained service engineer in the methods of installation and start-up of the pumping units. 3.02 FIELD QUALITY CONTROL 5:'1005'51905-23 1 SO UTHCORP -Por !'fad• OWG S LIFT STATIO N' 113 1 l ->ubmm;bk pumps.doc I 13 12-9 S1d .·R.~7,97 Submersible Pumps After all pump and control systems have been completed and put into operation , subject each system to an operating test under des ign conditions to ensure prope r sequence and operation throughout the range of operation . M ak e adjustments as r equired to ensure prope r functioning of all systems. The units must perform in a manner acceptable to the Owner's repre s entati v e befo re final acceptance will be made by the Owner. END OF SECTIO S:l2005\5 IQ05 -!J I SOUTHCORP -Por No J ,'DW GS'LIFT STATION\l IJ I !-,ubm'"'blc pum ps.J ,x 11 3 12-J 0 S1d .-&~7 1 97 Submers ible Pumps SECTIO 13430 DUPLEX FLOAT CONTROL PANEL PART I GENERAL 1.01 SUMMARY Requirements fo r furnishing and in s tallin g duplex float control panel as indicated on th e drawing s. All of the equipment called for und er thi s sec tion to be supplied by th e pump manufacturer. 1.02 MEASUREMENT AND PAYMEN T Unless otherwise spec ified , no direct measurement or payment will be made for duplex control p ane l, the cost thereof being included in th e bid price for the appropriate bid item lis ted in the proposa l. PART 2 PROD UCTS 2 .01 MATERIALS AND/OR EQUIPMENT A. Control Panel -Floa t Type 1. Design . Pump manu factur er's duplex float control and alarm system designed to function with pumping units , factory wire and tested . Controls to automatically s tart and stop pumping units and permit manual operation at the pane l. The control panel is to be UL listed , manufactured in a UL approved facility . The control panel shall be wired for a single point connection for the electrical contractor. 2 . Sequencing . The control function provides for the operation of the lead pump under normal conditions. If the incoming flow exceeds the pumping capacity of the lead pump, the lag pump will automatically start to handle this increased flow. A s the flow decreases, pumps will be cut off at elevations as determined on the drawings . Lead pump will be alternated after each cycle. In the event of a high level condition, an alarm light will be excited to indicate an alarm condition. Should the pump OFF regulator fail, the system will operate with a differential between the lea d pump ON and the lag pump ON levels. S.1005 51o05·~3 1 SOUT HCORP-Por NaJa'O WGS'LlfT STATION' IJ -130-dupkx pand.doc 134 3 0-1 Std -ll 27 9~ Duplex Float Control Panel All control voltage to th e liqu id leve l sensors shall b e a maximum o f twenty-four (24) volt s and shall p ower twenty-four (24) v o lt plug -in styl e relays to enable alarm and motor sta rter coil s to operate at one hundred and tw enty (120) volts. In the event of phas e reversal , los s of phase or low voltage of an y phase , control voltage will b e interrupted through the phase m onito r. The phase m o nit o r wi ll automa tic a lly r ese t u pon remo va l of any and all of th e above con d it ions. 3. The control pa n e l sh a ll b e NEM A -3 R GASKETED STA I N LESS ST E EL e nc los ure with drip s h ie ld , with a pol is hed aluminum hinged deadfront d oor on a continuo u s pi a no hing e a nd re movable subpane l. The control enclos ure's outer door w ill be held closed and sealed by a sin g le handle operated three point la tching system with a padlock hasp. Th e re will be no ne ed for exterior cl ip s requiring a screwdriver or wrench to sea l the door. 4 . The inner aluminum door, mounted on continuous hinge, will be furnished for protection against expos ed wiring and will have cutouts for access to the circuit breakers . Mounted on the inner door will be pump run lights , le v el indication lights , hand off automatic switches and a twenty (20) ampere duplex receptacle. A laminated schematic sheet will be permanently affixed to the interior of the enclosure door. A final record drawing encaps ulated in mylar shall be attached to the inside of the front door. B. . Motor Circuit Breaker. A thermal magnetic molded case heavy-duty type circuit breaker shall be supplied as branch circuit protection for each pump motor. The circuit breaker must have a minimum ampere interrupting c a pacity of 14 ,000 symmetrical RMS amps . C. Motor Starters . Motor st a rters shall be standa rd NEMA size, FVNR with a three (3) line bimetal ambient compensated o verload relay and heater element. The motor starter shall have a horsepower rating not less than the rated motor horsepower. D . Control Transformers. A 4801120 (not required with a 240 v olt system) volt control transformer shall be provided with sufficient capacity to power the motor starter's holding coils, run lights , elapsed time meters and level controls . A 120 volt/24 volt transformer shall be provided to power le v el floats and twenty-four (24) volt relays. S:'1 005 lloO~·'l l SOLTH CORP -Po< i-;ad a'DWGS LI FT STATIONllJ4JO-dupk.< pan,l.d oc 13430-2 S 1 J .-~ ~7 Q7 Duplex Float Control Panel E. H-0-A Selector Switches. An H-0-A selector switch s hall be pro v id ed for each pump. Th e H-0-A selector swi,tches s hall be hea vy-d uty type rate d as a NEMA- 4X oil tight switch with ten (I 0) amp contacts. F. Elapsed Time M e ter. Elapsed time mete rs sha ll be provi ded to record the running time of each pump . The meters shall be th e non-reset , 120 V AC di gital ty pe with a minimum range of 9,999.9 hours. G. Pilot Lights . The motor controller sh all incorporate neon level ind ica ting and runnin g pilot li ghts fo r each pump. The lights shall have an interchangeable shatter re sisting len s. Motor running indicator li g ht s shall ha ve green lens and level indic a tor li g h ts shall ha ve amber lens . LED's will not be acceptable . H. Space Heater. One ( 1) 120 V AC , fifty (50) wa tt space heater shall be installed in the bottom of the motor controller. Th e heater shall have a ru st resis ting iron s heath and slots in each mounting tab to accommodate secondary insulation bushing for mountin g . A thermostat ic control shall be installed in the top of the motor c ontroller for controlling the space h eate r temperature. The thermostat shall ha v e an adjustable operating range of thirty-fi ve (35) deg rees F to ninety (90) degree s F and shall also have SPST ; snap-acting conta cts rat ed twenty-five (25) amps at 120 V AC. 1. Phase Monitor. A phase monitor sh a ll b e provided to protect against, single phasing , under voltage and phase reversal. The monitor shall ha ve an adjustable operating range and a respon se time of two (2) seconds. The contact arrangement shall be DPDT with a minimum contact rating of three (3) amps at 600 VAC resistive. J. Lead/Lag Pump Alternator. The level control circuit shall include a duplex pump alternator. The alternators shall be th e solid-state plug-in type with a five (5) amp; 120 volt output rating and pump sequence indicator lamps . An al ternator/t est/o ff switch shall be provid ed , for alternator test and byp ass function . K . Li g htn ing Arres tor/Surge Suppressor. A three (3) phase, three (3) poles , 0-900 volt lightning arrestor shall be connected to each phase of the incoming service . The arrestor shall be designed to limit the magnitude of the voltage impressed on th e motor windings in the e vent that the sys tem is subjected to lightning-surge voltages. Shall have a respon se time of five (5) nanoseconds and with s tanding a surge of 6 ,5 00 amperes . L. High Level Alarm Light. A high-level a larm light shall be mounted on the top of the enclos ure as shown on the drawing . The lamp shall be complete with a 120 V AC , 100-watt incandescent bulb and red lexan shatterproof globe . S: 1 005 51905-~31 SOL:TH CO RP -Por N:1da OWG S LIFT ST A TI O 134 30-du ph.•, pan el d t~ 134 3 0-3 Sid .s, ~; 97 Duplex Float Control Panel M . RTU Input s & Output s~ The following Inputs and outputs will be broug ht to a terminal strip to be used to connect to the City provided RTU . DIGITAL CONTROL PAN E L OUTPUTS • • • • • • Pump I Run Status P u mp 2 Run Statu s S ite Intru sion Do o r S w it c h Pump l Overload Tripped Pump 2 Overload Tripped Hig h Wet Well Level DIGIT AL INPUTS • Not Required ANALOG INPUT • Not Required (Normally open dry contact ) (Normally open dry contact) (Normally open dry contact) (Norma lly open dry contact) (Norma lly open dry contact ) (Normally op en dry contact) N. Pane l Markings. All component ,parts in the control pane l shall be permanently marked and identified as they are indicated on the drawing. Marking sh a ll be on the b ac k pl ate adjacent to the component. All control conductors shall be id e ntified with wire markers as close as practica l to each end of conductors . 0. Motor Protection 1. Winding Temperature . The motor shall contain wi nding thermal sensors. In the event of an o v ertemp condition, the motor will be shut down until it's sufficiently cock to automatically reset. 2. Moisture Probes. Manufacturers requiring moisture detection devices for warranty shall supply a lockout device with manual reset in the control pan e l. P . Le ve l Regulators 1. Sensors. Polypropylene sealed mercury float switches . Provide one ( l) sensor for each control leve l. Sensors to be of the encl osed weight type and set in accordance with contract draw ings . 2 . Cable. Heavy neoprene-jacketed cable . Furnished in one (l) continuous length from sensor to Contro l Panel. 3. Cable Sensor. A stainless steel cable holder with not less than six (6) h ooks shal 1 be used. S. 2 00~ 5 1 QQ~-2 31 SOU Tt-ICORP -Por N:1da 1 DWGS' LIFT ST A TION' I 3430-duph:~ pJnd .doc 13 4 3 0-4 Srd -R c7 9 ; Dupl ex Float Control Pane l " PART 3 EXECUTION 3.0 1 FIELD QUALITY CO t TROL A factory trained service representative sha ll check pane l for correct connections , check rotation , voltage, amperage and operate pumps through a complete cycle . High-level alann and alternator shall be demonstrated. Operating instructions shall be given as required . Record drawin gs and operati on and maintenance manuals will be presented at time of start up . END OF SECTION S:'.1005 SJQOS .:D I SO UT HCOR P·Pur NaJa D\\'GS LIFT STATIO IJ~J O-Jupk' panel JO\: 13430-5 S1JAC.:?7 97 Duplex Float Control Panel Pledger Kalkomey, Inc. Consulting Engineers July 18 , 2005 Ms . Bridgette George City of College Station P .O . Box 9960 College Station , Texas 77842 Re : Development Permit Valley Park Center Off -Site Utilities PK Job No . 51905-231 Dear Mrs . George , 7020 Coyote Run Bryan , Texas 77808 979-731 -8000 , 979-731 -1500 (Fax) www .pkengineering.com Enclosed please find the following for the referenced project : 1 . Development Permit Application i ncluding all of the Minimum Submittal Requirements . 2 . Two ( 2) copies of the plans and specs for the Off-Site Utilities . These replace those t h at were transmit t ed to Allan Gibbs on July 7 , 2005 . 3 . Estimate of Probable Cost for the difference in a 6 -inch and a 12-inch water line for whic h oversize participation is being requested . Very Truly Yours , Steve E . Duncan , P.E . sed@pkengineering.com SED/mon Enclosures cc : David Hillman Brenham • Bryan • Rosenberg S:\2005151905-23 1 SOUTHCORP-Por ada\CS-05-dev permit offsite.doc CIIT OF C OLLEGE STAT ION Plannint & !Hw'4pmmt &rviuJ SITE LEGAL DESCRIPTION: Titan Valley Park Tract 16 CS 8 .63 Acres DEVELOPMENT PERMIT PERMIT NO . 05-36 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE ADDRESS: Valley Park Center, NW Corner FM 2818 I FM 60 DRAINAGE BASIN: White Creek DATE OF ISSUE: November 11, 2005 VALID FOR 12 MONTHS OWNER: Titan Valley Park, Ltd . 3401 Allen Parkway, Ste . 200 Houston , Texas 77019 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance w ith Section 7.5.E., Landscape/Streetscape Plan Requirements of the C ity's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and requ ired to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, pa int , oil , solvents , asphalt , concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also proh ibited . Full Development Permit The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immed iate construction site in accordance w ith the approved erosion control plan as well as the C ity of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to reta in all sed iment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and estab li shment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equ ipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance w ith Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be take n to insure that debris from construction, eros ion , and sedimentation shall not be depos ited in city streets , or existing drainage fac iliti es . I hereby grant th is perm it for development of an area outs ide the special flood hazard area . All development shall be in accordance with the plans and spec ifications submitted to and approved by the C ity Engineer in the development permi t appl ication for the above named project and all of the codes and ordinances of the City of College Stat ion that app ly. Dat ( I 1/-zrt ~ Owner/Agen t/Contractor Date ~ The City of CoHege Station heart of the Research Valley CITY OF COLLEGE STATION P .O . Box 9960 • 1101 Texas Avenue • College Station, TX 77842 • (979) 764-3570 Texas Department of Transportation ATTN: Karl Nelson, P.E. 2102 Tabor Road Bryan, Texas77803 RE: Notice of Proposed Installation for the Valley Park Center Site -NW Corner of FM 2818 and FM 60 Valley Park Center Subdivision College Station, TX, 77845 Dear Mr. Nelson: Please find the following enclosed the permit applications and set of drawings : • Permit to Construct Utility Line on Non-Controlled Access Highway - 4 applications 9119105 Please review this submittal at your earliest convenience and return three signed copies of the permit for our distribution . If you have any questions feel free to contact me at 979-764-3570. Thank you , ~~ Alan Gibbs , P .E . Sr. Asst. City Engineer cc: TxDOT Driveway Peqnit File Home of T exas A &M Uni versity Pledger Kalkomey, Inc. Consulting Engineers August 3 0 , 2 0 05 Ms . Bridgette George City of College Station P.O. Box 9960 College S t ation , Texas 7 7842 Re: DP 05-00100036 : Rev i sed Plans Val l ey Park Center Off -Site Utilities PK Job No . 51905-231 Dear Mrs . George , 7020 Coyote Run Bryan , Te xa s 77808 979-73 1-8000 , 979-731-1500 (Fax) www.p kengine eri ng.com 4 ::s-i, 0-1 -Dt:S 1JS OVf -30 Enclosed please find two (2 ) sets of the revised plans for the reference d project per comm ents by Alan Gi bbs d ated August 5 , 2005 and Nathan Jones dated today . The following are responses to Mr . Gibbs ' comments : A revised TxDOT permit is attached . The TAMU comments have been incorporated . This item will be addressed with t h e platting OK process . Th e Th e Th e tee/valve were a d ded . '\'iJ hydra n t was relocated to the 4' cover was added . end of the casi n g. The valve is shown . A grade was added . The off set was added . A note was added . A bore was added at station 5+00. The 6" clearance note was added. Th e TCEQ separation i s OK . A double 4 5 was added . Brenham • Bryan • Rosenberg S:\200515 1905-23 I SOUTHCORP-l>o r Nada\C S-09-offsite revised plan s.doc , Form 1023 (Rev. 812002) Page 2 of 2 To: Southcorp Holdings 1, LP. 3401 Allen Parkway , Suite 200 Houston, Texas 77019 Attn: David Hillman (713) 960-1880 APPROVAL Notice No.: Hwy. No. FM 60 --------------------Beg. RM End RM Brazos County, Texas -------------MN T Sec . No. 002 Date September 20, 2005 ------- TxDOT offers no objection to the location on the right of way of your proposed 4" x 1,000' PVC Force Main (Cl 200) + MH line as shown by accompanying drawings and notice dated September 20, 2005 except as noted below. It is expressly understood that TxDOT does not purport, hereby, to grant any right, claim, title , or easement in or upon this highway; and it is further understood that TxDOT may require the owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. You are requested to notify this office prior to commencement of any routine or periodic maintenance which requires pruning of trees within the highway right of way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. The installation should not damage any part of the highway and adequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. In the event the Owner fails to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. • General Special Provisions: SEE ATTACHMENTS • Revegetation Special Provisions: In order to minimize erosion and sedimentation resulting from the proposed installation, the project area will be revegetated ~ in accordance with TxDOT's Standard Specification Item 164 which specifies the appropriate grass seed mix to be used or D as indicated on the attachment. Please notify Mr. Ronnie Waller, Maintenance Section 778-8054 forty-eight (48) hours prior to starting construction of the line in order that we may have a representative present. Karl Nelson, P.E. B an TxDOT Bryan Area Engineer District (979) 778 -6233 Area Code Telephone Number September 20, 2005 RE: FM 60 (North ROW) FM 2818 to East (1,000') (Research Parkway) Valley Park Center Subdivision College Station , Texas Utility Permit -4" x 1,000' (Cl 200) Sanitary Sewer Force Main + Receiving Manhole GENERAL SPECIAL PROVISIONS (Utility Permit) : 1) Traffic Control plan is required per TMUTCD prior to start of construction work in the FM 60 right-of-way. 2) Areas within ROW disturbed by construction shall be restored to equal or better conditions than existing prior to construction. 3) Contractor shall be responsible for locating all utilities within the right-of-way construction site. Contacts with local utility companies and utility locators are required. 4) Sanitary Sewerline (Force Main) shall be located as indicated (4 ' minimum bury & 5 ' from FM 60 ROW , except as shown). 5) Longitudinal lines without a metal sheath shall have a durable metal wire, etc. installed concurrently for detection purposes. 6) Paved driveways, streets, etc. within ROW shall be bored at force main, etc. x-ings; unpaved driveways to be open-cut shall be restored to equal or better conditions than existing prior to construction. All permanent structures, etc. cr:ossings shall be bored. 7) Encasement @ Sta 1 +00 shall be as per plan details (p.3). 8) Permit covers adjustment of any existing irrigation systems. No installation of new irrigation systems are covered under this permit. 9) Bore pits in the right-of-way shall not remain open overnight. 1 O) Backfill shall be placed in 12" lifts, and compaction density shall be equal to the surrounding area. 11) Pavement surface shall be kept clear of mud, debris, etc. Notice of Proposed Installation Utility Line on Non-Controlled Access Highway To the Texas Transportation Commission c/o District Engineer Texas Department of Transportation Bryan , Texas Date August 31 , 2005 Formal notice is hereby given that Southcorp Holdings 1, L.P. c/o Southcorp Realty Advisors Company proposes to place a _sa_n_i_ta_ry~se_w_e_r_~_o_rce_m_a1_·n ______________________ _ line within the right of way of FM 60 in -"B-'-ra""z""o'-"s ____________ County, Texas as follows : (give location, length, general design , etc.) 1000 If 4" AWWA C-909 Class 200 PVC sanitary sewer force main along FM 60 (plan sheet SS-1 of 5) The line w ill be constructed and maintained on the highway right of way as shown on the attached drawing and in accordance w ith the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all governing laws, including but not limited to the "Federal Clean Water Act," the "National Endangered Species Act." and the "Federal Historic Preservation Act." Upon request by TxDOT, proof of compliance with all governing laws, rules and regulations will be submitted to TxDOT before commencement of construction . Our firm will use Best Management Practices to min imize erosion and sedimentation resulting from the proposed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions." Our finn will ensure that traffic control measures complying w ith applicable portions of the Texas Manual of Uniform Traffic Control Devices will be installed and maintained for the duration of this installation . The location and description of the proposed line and appurtenances is more fully shown by _2_-_11_"_x_17_" _____ _ complete sets of drawings attached to this notice . Construction of this line will begin on or after the _______ S_e~p_te_m_be_r_1~,_2_00_5 _____ _ Month/Day/Year By signing below, I certify that I am authorized to represent the Finn listed below, and that the Firm agrees to the conditions/provisions included in th is permit. Southcorp Holdings 1, LP. c/o Southcorp Realty Advisors By~ --~""~---- Signature ~sider1l .J .c..c. ?,--e.,·-.l..z11 ~ T itle 3401 Allen Parkway, Suite 200 Address Houston City, ( 713) Area Code TX State 960 -1880 Telephone Number 77019 Z ip