November 29 , 2005
Mr . Alan Gibbs
City of College Station
P .O . Box 9960
College Station , Texas 77842
Re : DP 05 -00100036 : OVERSIZE PAR T ICIPATION
Val l ey Park Center
Off -Site and On -Site Utilities
PK Job No . 51905 -231
Dear Mr . Gibbs ,
Enclosed please find the estimate of probable cost and the
oversize participation request for $170 , 000 for the difference
in cost of a 6 " diameter water line to a 12 " diameter water
line .
Very Tru l y Yours ,
P .E .
sed@pkengineering .com
SED/jer
Enclosures
cc : Spen c er Thompson
David Hillman
Brenham • Bryan • Rosenberg
S :\2005\51905-231 SOUTHCORP-Por Nada\CS-19-oversize request .doc
Item
No.
Valley Park Center
Public Utilities
PK Job NO. 51905 -231
Estimated
Quantity Descripti on
Off-Site Utilities
Plan s Dated : July 14 , 2005
OFF-S ITE SANITARY SEWER
Mobilization , including insurance ,
1 1 LS move -in , move -out , and related items
(No Bonds):
4 " sanitary sewer force main in
2 2 ,070 LF trench , AWWA C-909 Class 200 PVC
with detector tape :
3 145 LF 4 " sanitary sewer force main by
bore, AWWA C-909 Class 200 PVC :
10 " x 3/8 " steel casing by trench
4 217 LF with carrier pipe , spacers , end
seals, joint restraints :
10 " x 3/8 " steel casing by bore with
5 153 LF carrier pipe , spacers , end seals ,
joint restraints :
6 2 EA Water /fo rce main crossing :
7 2 EA Concrete abutment for aerial force
main/creek crossing :
8 5 EA 4 " DI bends (90 , 4 5, 22 -1/2 , and 11 -
1/ 4) :
4 ' standard manhole (A -1) including
9 1 EA tie-in and bolted/gasketed ring and
cover:
1 0 2 ,287 LF Tr ench safety for force main :
11 1 LS Remove & replace irrigation system
as required :
12 1 LS Clear, grub and dispose of
vegetation/debris :
13 1 LS Pr otect all trees , landscaping ,
lights , etc .:
14 1 LS Traffic control :
15 1 LS Hydrornulch seed all disturbed areas :
16 1 LS Lift station (A-2):
17 1 LS Construction staking :
Lift station electrical, including
17 .5 1 LS conduit , backfill , transformer pad ,
etc. (Sheet El dated 11 -3-05):
SUBTOTAL OFF -SITE SANITARY
OFF-SITE WATER
Mobilization, including insurance ,
18 1 LS move-in , move -out , and related items
(No Bonds):
19 1 ,275 LF 1 2 " water line in trench, AWWA C-909
Class 200 PVC with detector tape :
20 260 LF 12 " water line by bore, AWWA C-909
Class 200 PVC :
20 " x 3/8 " steel casing by trench ,
21 40 LF wit h carrier pipe , casing spacers ,
joint restraints , and end seals :
2005-10-28 tal:eo f f ut111ties on and o !f.x l s
Estimate of
Probable Cost
12" Water Line 6 11 Water Line
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Pri ce
7 ,000 .00
14 . 00
40 .00
75 .00
125 .00
250 .00
300 .00
80 .00
2 ,200 .00
1. 00
5 ,000.00
3 ,000 .00
7 ,500 .00
2 ,500 .00
3 ,500 .00
80 ,000 .00
5 ,000 .00
20 ,000 .00
4 ,500 .00
30 .00
60 .00
140 . 00
1 of 3
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
Pri ce
7 ,000 .00
28 ,980 .00
5 ,800 .00
16 ,275 .00
19 ,1 25 .00
500 .00
600 .00
400 .00
2 ,200 .00
2 ,287 .00
5 ,000 .00
3 ,000 .00
7 ,500 .00
2 ,500 .00
3 ,500 .00
80 ,000 .00
5 ,000 .00
20 ,000 .00
209 ,667 .00 209 ,667 .00
4 ,500 .00 $ 3 ,000 .00 $ 3 ,000 .00
38 ,250 .00 $ 17 .00 $ 21 ,675 .00
15 ,600 .00 $ 47 .00 $ 12 ,220 .00
5 ,600 .00 $ 110 . 00 $ 4 ,400 .00
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
80
1
2
1
1
2
1
1
1
1
1
2
1,315
1
1
1
1
1
1
Valley Park Center
Public Utilities
PK Job NO . 51905 -231
20 " x 3/8 " steel casing by bore ,
LF with carrier pipe, casing spacers,
joint restraints , and end seals :
EA 18 " x 12 " tapping sleeve and valve :
EA 12 " gate valve & box:
EA 8 " gate valve & box:
EA 12 " DI anchor coupling :
EA 8 " DI anchor coupling :
EA 12 " x 8" DI tee :
EA 12 " x 6 " DI tee :
EA 8 " x 6" DI tee :
EA 12 " DI plug or cap :
EA 8 " DI plug or cap :
EA Fire hydrant with lead, gate valve,
and box:
LF Trench safety for water line :
LS Clear , grub and dispose of
vegetation/debris :
LS Hydromulch seed all disturbed areas :
LS Remove and Replace Fencing
LS Tr affic control :
LS Tree Protection
LS Construction staking :
SUBTOTAL OFF -SITE WATER
On -Site Ut ilities
Plans Dated: Oc t ober 2 8 , 200 5
ON -S ITE SANITARY SEWER
Mobilization , including insurance ,
1 1 LS move-in , move-out , and related items
(No Bonds):
6 " sanitary sewer gravity line in
2 196 LF trench (8 '-10 ' cut), ASTM D-2241
Class 160 PVC with detector tape :
6 " sanitary sewer gravity line in
3 358 LF trench (10 '-12 ' cut), ASTM D-2241
Class 160 PVC with detector tape :
6 " sanitary sewer gravity line in
4 374 LF trench (12 '-14 ' cut), ASTM D-2241
Class 160 PVC with detector tape :
Sanitary sewer stub in trench , 5 LF
5 3 EA 6 " ASTM D-2241 Class 160 PVC with
detector tape :
6 340 LF Bank sand backfill entire trench
section under paved areas :
7 4 EA 4 ' standard manhole (0 -6 ' cut):
8 19 VF Ex tra depth for standard manhole :
2005-10-28 ta~eotf ut111t1es on and oft.xls
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2 of 3
Estimate of
Probable Cost
12" Water Lin e 6 11 Water Line
250 .00 $ 20 ,000 .00 $ 160 .00 $ 12,800 .00
5 ,000 .00 $ 5 ,000 .00 $ 4 ,000 .00 $ 4 ,000 .00
1 ,400.00 $ 2,800 .00 $ 550 .00 $ 1,100 .00
750 .00 $ 750 .00 $ 550 .00 $ 550.00
400 .00 $ 400 .00 $ 125 .00 $ 125.00
300 .00 $ 600 .00 $ 125 .00 $ 250.00
500 .00 $ 500.00 $ 225 .00 $ 225 .00
500 .00 $ 500.00 $ 225 .00 $ 225 .00
450.00 $ 450.00 $ 225 .00 $ 225 .00
250.00 $ 250 .00 $ 175 .00 $ 17 5 . 00
200 .00 $ 200 .00 $ 175 .00 $ 175 .00
2 ,400 .00 $ 4 ,800 .00 $ 2 ,400 .00 $ 4,800 .00
1. 00 $ 1 ,315 .00 $ 1. 00 $ 1 ,315 .00
3 ,000 .00 $ 3 ,000 .00 $ 3 ,000 .00 $ 3 ,000 .00
2 ,500 .00 $ 2 ,500 .00 $ 2 ,500 .00 $ 2 ,500 .00
1 ,000.00 $ 1 ,000 .00 $ 1 ,000 .00 $ 1 ,000 .00
1 ,000 .00 $ 1 ,000 .00 $ 1,000 .00 $ 1,000.00
500 .00 $ 500 .00 $ 500 .00 $ 500 .00
2 ,000 .00 $ 2 ,000 .00 $ 3,500 .00 $ 3 ,500 .00
111 , 515 .00 78,760 .00
3 ,000 .00 $ 3 ,000 .00
25 .00 $ 4 ,900 .00
29 .00 $ 10 ,382 .00
33 .00 $ 12 ,342 .00
500 .00 $ 1 ,500 .00
75 .00 $ 25 ,500 .00
2 ,200 .00 $ 8 ,800 .00
175 .00 $ 3 ,325 .00
It em
No .
9
10
Valley Park Center
Public Utilities
PK J ob NO . 51905-231
Es timat ed
Qua ntity De scripti on
928 LF Trench safety :
1 LS Construction staking :
SUBTOTAL ON -SITE SANITARY
ON-SITE WATER
11 1 LS
12 1 ,806 LF
13 349 LF
14 313 LF
15 3 EA
16 4 EA
17 3 EA
18 4 EA
19 6 EA
20 1 EA
21 1 EA
22 3 EA
23 1 EA
24 1 EA
25 1 EA
26 1 EA
27 4 EA
28 2 ,155 LF
29 1 LS
30 1 LS
Mobilization , including insurance ,
move -in, move -out , and related items
(No Bonds):
12 " water line in trench , AWWA C-909
Class 200 PVC with detector tape :
6 " water line in trench , AWWA C-909
Class 200 PVC with detector tape :
Bank sand backfill entire trench
section under paved areas :
12 " gate valve & box:
6 " gate valve & box:
12 " DI anchor coupling :
6 " DI anchor coupling :
12 " x 6 " DI tee:
6 " DI tee :
12 " DI bend ( 90 , 45, 22 . 5 , etc .):
6 " DI bend (90 , 4 5 , 22 .5 , etc.):
12 " DI plug o r cap :
6 " DI plug o r cap:
Wa ter/for ce main crossing :
Wa ter/sewer crossing, including
cement stabilized sand and
appurtenances :
Fire hydrant with lead, gate valve ,
and box :
Trench safety for water line :
Hydr ornulch seed all disturbed areas :
Construction staking:
SUBTOTAL ON -SITE WATER
TOTAL PUBLIC UT ILITIES
CON TINGEN CY 10%
TOTAL
DIFFERENCE
30% MAXIMUM
lOOS -10-28 tak.eo!f utilities on and o f f.xis
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
3 of 3
Estimate of
Probable Cost
12" Water Lin e 6 11 Water Line
Unit
Price
2 .00
1 ,800 .00
4 ,500 .00
35 .00
20 .00
50 .00
1 ,400 .00
550.00
400 .00
125 .00
500 .00
225 .00
450 .00
200 .00
200 .00
90 .00
250 .00
500 .00
2 ,400 .00
1. 00
2 ,500 .00
3 ,000 .00
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
Total
Price
1,856.00
1 ,800 .00
73 ,4 05 .00
4 ,500 .00
63,210 .00
6 ,980 .00
15 ,650 .00
4,200.00
2 ,200 .00
1,200 .00
500 .00
3 ,000 .00
225 .00
450.00
600.00
200 .00
90 .00
250 .00
500 .00
9 ,600 .00
2 ,155 .00
2 ,500 .00
3 ,000 .00
121,010 .00
515 ,597 .00
51 ,559 .70
567 ,156 .70
229 ,092 .60
170 , 147 .01
170 ,000 .00
s 3 ,000 .00
s 20 .00
s 20 .00
s 50 .00
s 550 .00
s 550 .00
s 125 .00
s 125 .00
s 225 .00
s 225 .00
s 200 .00
s 200 .00
s 90 .00
s 90 .00
s 250 .00
s 500 .00
s 2 ,400 .00
s 1. 00
s 2 ,500 .00
s 3 ,000 .00
40 . 4%
30 .0%
30 .0%
OV ERSIZE PARTICIPATI ON REQUEST
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
73 ,405 .00
3 ,000 .00
36 ,120.00
6 ,980 .00
15 ,650 .00
1 ,650 .00
2 ,200 .00
375.00
500 .00
1 ,350 .00
225 .00
200 .00
600.00
90.00
90 .00
250 .00
500 .00
9 ,600 .00
2 ,1 55 .00
2 ,500.00
3 ,000 .00
87 ,035 .00
307 ,331 .00
30 ,733 .10
338 ,064 .10
Date Submitted
Planning & Development Services
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
$200 development permit fee .
$600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a
public waterline , sewerline, sidewalk , street or drainage facilities is involved.)
Drainage and erosion control plan , with supporting Drainage Report two (2) copies each
Notice of Intent (N .0.1.) if disturbed area is greater than 5 acres
Date of *Required Preapplication Conference: ___________________ _
*(Required for areas of special flood hazard)
LEGAL DESCRIPTION Valley Park Center, Northwest Corner FM 2818 and FM 60
APPLICANT'S INFORMATION (Primary Contact for the Project): (ENGINEER)
Name Pledger Kalkomey, Inc. -Steve Duncan
Street Address 7020 Coyote Run City __ B___,ry""'"a_n ______ _
State Texas Zip Code 77808 E-Mail Address sed@pkengineering.com
Phone Number (979) 731-8000 FaxNumber_~<~9~79~>~7~3~1--1~5:....;:0~0 ______ _
PROPERTY OWNER'S INFORMATION
Name . Southcorp Holdinas I, LP. -David Hillman
Street Address 3401 Allen Parkway, Ste. 200 City __ H_o_u_s_t_o_n _____ _
State Texas Zip Code 77019 E-Mail Address dhillman@southcorprealty.com
Phone Number __ (_71_3_)_9_6_0-_1_8_80 ___ _ Fax Number (713) 355-4275
ARCHITECT OR ENGINEER'S INFORMATION OWNER# 2:
Name Por Nada Joint Venture
Street Address P .0. Box 8131 City __ T"-'h-'-e~W"'"'o"'"'o:....;:d=la=n"""d"""s"'-----
State _ _;T:....:e=x=a=s ____ Zip Code 77387 E-Mail Address ------------
Phone Number (281) 363-2220 Fax Number --------------
Application is hereby made for the following development specific site/waterway alterations :
Offsite Sanitary Sewer and Water
ACKNOWLEDGMENTS :
I, Steve E. Duncan , design engineer/ewAeF, hereby acknowledge or affirm that:
The i nformation and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards.
~ 7prj,5
0 {\ E. I I Property•Nner,s, ngmeer
6/13/03 1 of 2
,
./
/
From:
To:
Date:
Subject:
Hello Alan ,
"Jim Riley" <jimriley@tamu .edu>
<Agibbs@cstx.gov>
8/3/2005 4 :52:49 PM
Re : Fwd : Valley Park Center lnterlocal Agreement
You can deliver the set of plans for the proposed sanitary sewer line
to my office in the Physical Plant Building on Agronomy Drive , Room 202 .
Please call 845-1210 if you need directions for delivery. We will
review the drawings and get back with you on the best way to proceed .
Please notify me when the plans will be delivered so we can be looking
for them . Thanks.
Jim Riley
Director for Utilities
Texas A&M University
1371 TAMU
College Station, TX 77843-1371
w) 979-845-1210
f) 979-845-0051
jimriley@tamu.edu
»>"Alan Gibbs" <Agibbs@cstx.gov> 8/3/2005 2:47:27 PM»>
Mr. Riley ,
The City of College Station has received Construction Plans for a
proposed sanitary line to connect to the TAMU system on SH 60. Mr.
Hillman indicated you were the contact for TAMU. I wanted to make sure
you were able to review and comment on the plans. As you are aware,
this will also involve TxDOT permit approval.
Please contact me regarding getting your office a set of plans and how
to proceed in accordance with the interlocal agreement.
Thanks ,
Alan
Alan P . Gibbs, P .E .
Sr. Asst. City Engineer -Development
Public Works Department
City of College Station
P . 0 . Box 9960
College Station , Texas 77842
Ph : (979) 764-3570
Fx : (979) 764-3496
agibbs@cstx.gov
www.cstx.gov
»>"David Hillman" <dhillman@southcorprealty.com> 7/27/2005 1 :00:47 PM
>>>
Alan :
Thanks for taking the time yesterday to work through the plans for
Valley
Park Center. I appreciate your patience with our "what-ifs ." Attached
is a
copy of the ILA, as well as copies of correspondence during the ILA
approval
process . After TAMU agreed to the ILA , I'm not sure how much
correspondence
Dale Schepers had with TAMU , but in Chuck Sippial's letter of April 11 ,
2003
he asked the city to deal with Jim Riley, Director of Utilities , at
979-845-1210 .
Paragraph 3.04 of the ILA states that we must submit a scaled drawing
showing the design of the connection point.
Steve , could you prepare whatever Alan needs for this?
Thanks.David
College Station . Heart of the Research Valley .
CC: "Nathan Jones" <njones@ppfs4 .tamu .edu>, "Randall Hohlt" <rhohlt@ppfs4 .tamu .edu>
Pledger Kalkomey, Inc.
Consu lt in g Engineers
July 2 2, 2005
Ms. Bridgette George
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: TxDOT Utility Permits
Valley Park Center
Off-Site Utilities
PK Job No. 51905-231
Dear Mrs. George ,
7020 Coyote Run
Bryan, Texas 77808
979-731-8000 , 979-731-1500 (Fax)
www.pkengineering .com
Enclosed please find the following for the referenced project.
These items correspond to the development permit submitted on
July 18th:
1. TxDOT Utility Permit for FM 2818
2. TxDOT Utility Permit for FM 60
Very Truly Yours,
s ed@pkengineering.com
SED/mon
Enclosures
cc: David Hillman (without plans)
Brenham • Bry an • Rosenberg
\\Snapl21731 \sharel 12005151905-231 SOUT HCORP-Por ada\CS -06-dev permit offsi te .doc
LJ cs. \ )---c:\
ll~
-i. ~?-0~
\ '.\65.pvv--
As a condition of approval of this permit application , I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code
N/A
Contractor
CERTIFICATIONS:
A. I, Steve E. Duncan , certify that any nonresidential structure on or proposed to be on this site as part of
this application is designated to prevent damage to the structure or its contents as a result of flooding
from the 100-year storm .
~g___ July 18 , 2005
Engineer Date
B. I, Steve E. Duncan , certify that the finished floor elevation of the lowest floor , including any basement ,
of any residential structure, proposed as part of this application is at or above the base flood elevation
established in the latest Federal Insurance Administration Flood Hazard Study and maps , as amended .
-~ July 18 , 2005
Engineer Date
C. I, Steve E. Duncan , certify that the alterations or development covered by this permit shall not diminish
the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such
alterations or development are consistent with requirements of the City of College Station City Code ,
Chapter 13 concerning encroachments of floodways and of floodways fringes .
July 18, 2005
Engineer Date
D. I, Steve E. Duncan , do certify that the proposed alterations do not raise the level of the 100 year flood
above elevation established in the latest Federal Insurance Administration Flood Hazard Study .
Eng#,b&fl --July 18 , 2005
Date
Conditions or comments as part of approval : -----------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be
taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets ,
or ex isting drainage facilities. All development shall be in accordance with the plans and specifications
subm itted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply .
6 /13/0 3 2 of 2
Pledger Kalkomey, Inc.
K i Consulting Engineers
11312
13430
VALLEY PARK CENTER
OFF-SITE UTILITIES
PK JOB NO. 51905-231
Techni cal Specifications
Submersible Pumps
Duplex Float Control Panel
Brenham • Bryan • Rosenberg
S \200S\5190S-23 I SOU TH CORP-Por Nada\D WGSIOFF -SI T E PL ANSIL IFT STATION INFO\s pec toe doc
7020 Coyote Run
Bryan, Texas 77808
979 -731-8000 , 979-731 -1500 (F ax)
www.p kengin eering .com
S ECTI ON I 131 2
SU BM E RSIBLE PUMP S
PARTl GEN E RAL
l.01 S U MMARY
Thi s sec ti on pro v id es for fu rni s h ing and ins ta lli ng constan t s p e e d , no n-clog submers ible
sewage p umpi ng un its and equipment as ind ic a ted on th e d rawi ngs. T he co mp lete
in s ta ll atio n s ha ll inclu de the pl a cemen t o f anch or bolts , s etting o f pumps , motors ,
le vel ing and ali g nin g e q u ipment an d connecti o n to p iping to e ffec t a compl e te ope rati o na l
pumping sys te m , a s we ll a s other s pe c ifie d acces sories .
All the equipment c a lled for under thi s section of the specificati o n s shall be supplied by
the pump manufacturer. This includ es th e basin , station piping, val ve s, pumps , motors ,
le vel co nt rols, panel a nd access fram e and cover. and the supplier shall, in addition to the
Contractor, ass ume the res po nsi bility fo r th e prop er functionin g of the equipment.
1.02 MEAS U REM E NT A ND PA YM E T
Unle s s oth e rwise s peci fie d , n o direct m eas ure me nt or paym e nt will be m a de for
submersible pump s, the co st thereof be in g included in the bid price for the appropriate
b id item listed in th e p ro posa l.
1.03 RELATED S ECTIO N S
Section 02530 -Sanitary Sewerage Sys te m
Section 13 4 30 -Duplex Floa t Control P a ne l
1.04 PERFORMANCE REQUIREM E NTS
The pumps shall be so designed that the y will safe ly operate at the specified conditions , .
s peed s and operatin g pre ss ure range s without ex cessive wea r , di s tortion , or vibration .
Actual pump manufacturer figures shall no t exceed the followin g performance
requirements by more than ten percent (I 0 %).
5:'1005 .51905-231 SO UTH CO RP-Pm Nad .J DWC.S LIF T STATI OJ\ I \Jl :!-!>ubm1:~1 blc punip!> Jo..: l 13 12-1
Srd.-&. :!7.97
Submers ible Pumps
I I
LIFT
I PERFORMAl\CE REQUIREMEl\TS STAT IO N
Number to be In stall e d 2
Rated Capacity at Rated TOH , GPM 128
R a ted T ota l Dy n a mic Head, ft. 19.5
Stat ion O p e ra ting Range . TDH 17 -25
Maximu m omina l Pump Operat in g Speed, RP M 1750
Maximum Brake Hors epower Required at Rated Condition 1.5
Minimum Wire to Water Pump Efficiency at Rated Head, Percent 40%
Solid Size, Inches 2 .5
Maximum Motor Nameplate Horsepowe r 3
Minimum Motor Service Factor 1.15
Model Number CP 3085
Impeller Number 438
Head losses through the pump s are not included in the total pumping heads.
Motors must not operate in the service factor in an y portion of pump operating range.
The sump volume requirements were sized utilizing the OFF level at the volute centerline
based on the specified manufacturer. Any additional depth required to submerge or meet
start per h o ur requirements will not be at the Owner's expense .
1.05 SUBMITTALS
Complete fabrication , assembly , foundations and installation drawings, together with
detailed specifications and data covering material used , parts, devices and other
accessories forming a part of the equipment furnished , shall include but shall not be
limited to the following:
S . ..2 005'5 1905 -23 1 SO UTl-l lORP-P\\r Nada OWG S LIFT ST A TI O!\ 1 131 2 -subm ~·~ib l \! pumps .doc l 13 12-2
Srd.-8-27197
Submersible Pumps
A . Prequalification Package . The pump manufacturer must submit four (4) sets of
the following data to th e Own e r's representative fourteen ( 14 ) days prior to the bid
d a te.
Name o f M anufactu rer Along With Experience Background
Type and Model
Rotative Speed
Size of Discharge ozzl e
Type of Bearings
Com pl ete P erformance Curves Showing Capacity Versus Head
NPSHR
Pump Overall Efficiency an d BHP
Da ta on Shop Painting
Motors
Name of Manufacturer
Type and Model
Type of Bearing and Lu bricati on
Rated Si z e of Motor (HP)
Temperature Ra t ing and Moto r Service Factor
Full Lo ad R otati ve Speed
Efficiency at Full L oad and R ated Pump Condition
Full Load Current
Locked Rotor Current
Ex ploded Vi ew
Guaranteed Wire to W a te r Efficiency
Lift Weight of Pump and Motor
Total Weight of Base
E lectrical connection di agra m s and schematics identifying all items requmng
electrical control or power u se d in the operation of the pumps shall also be
s ubmitted.
B. Shop Drawings and Product D ata. The Contractor shall furnish submittal data for
the Owner's representati ve's approval. Thi s d a ta shall consist of the followin g:
1. Certified dimensioned outline drawings for pumping unit with shipping
weights a nd unit weight.
S.'1005 51QQ5-:'31 SOUT H(ORP -Por N.1J a\OWGS LIFT STATION' 11 3 12 -s ubm..:rsibk pumps.dcx: l 13 12-J
St d.-R,27 97
Submersible Pumps
2 . Performa nce curves for the pump .
3 . Cros s -s ectional drawing with detailed parts listed for pu m ps, motors and
pump manufacturer supplied components .
4. Control s. Control schematic; field wiring diagram, m a nu fa cturer's catalog
d a ta on a ll components ; pane l arrangement and d e tail s.
5 . Frame an d Covers . O ut li ne d imen s io ns and m aterial s o f cons tru c ti on.
6. Warra nty . Manufacturer's standard published warra nrv certified on
supplied equipment.
7 . Parts and Service. The equipment supplier shall satisfy the Owner's
representative of th eir proven record of immediate availability of parts and
field service on a twenty-four (24) hour basis. The Owner's representative
shall inspect the supplier fac ility and contact local references [ten ( 10 )
required] to evaluate their service and spare parts availability.
C. Testing and Final Submittals . The pump manufacturer shall perform the
following inspection and tests on each pump before shipment from the factory .
1. I mpeller, motor rating and electrical connections s hall first be checked for
compliance with the customer's purchase order.
2. A motor and cable insulation test for moisture content or insulation
defects.
3 . Prior to s u bmergence, the pump sha ll be run dry to establish correct
rotation and mechanical integrity .
4 . The pump shall be run for thirty (30) minutes submerged. a minimum of
six (6) feet under water.
5 . After Operational Test No. 4 , th e insulation test (No. 2) is to be performed
again .
Two (2) sets of the following data shall be submitted u pon shipment of pumps and
motors:
1. Installation, operation, maintenance and lubrication manuals.
2 . Copy of the approved submi tt a l drawings.
S. 2005 51905 -23 1 SOU TH CORP -Por Nada OWGS\LI FT STA TI ON ' I IJ I 2-:.ubm1.:rs 1hk pumps .dcx ) 13 12-4
Srd -lt27,Q7
Submersible Pumps
3. As-built e lec tri ca l dra w in gs of the contro l system .
1.0 6 WARRANTY
The pump manu facture r s hall warrant the unit being s uppl ied to th e Owner against
defects in workmanship a nd material for a pro-rated period of five (5) years under normal
use , operation a nd service. The warranty shall be in printed form a nd apply to all similar
unit s .
P A RT 2 PROD UCTS
2 .01 MANUFACTURERS
The pumps shall b e manufactured by Flygt Corp oratio n or approved equ al.
2 .02 MATERIALS AND/OR EQUIPMENT
A. General. The pumps shall be vertical, non-clogged raw sewage centrifugal type
for operation in a submerged condition . Each unit shall be equipped with a
sub mersib le electric mot or, comp letely shop a sse mbled in the pump
manufacturer's plant, accurately aligned and properly prepared for s hipment.
8 . Pump T y p e. The pumps shall be cap able of handling raw, unscreened sewage.
The disch arge connection elbow shall be permanently installed in the wet well
along with the discharge piping. Anch or bo lts for the discharge connection elbow
shall by Type 304 stainless steel. The pump s sha ll be automatically connected to
the discharge connection elbow when lowered int o place and shall be easily
removed for in s pection or se rvice. There s hall be no need for personnel to enter
wet well to eith e r disconnect or reconnect the pump. Sealing of the pumping unit
sha ll b e guided to and pre ssed ti g htly against the discharge connec tion elb ow. No
portion of the pump shall bear directl y on the floor of the wet well. The pump,
with it s appurtenances a nd cables , shall be capable of continuous submergence
under water without lo ss of watertight inte g r ity to a depth of 65 feet.
C. Lift Sys tem. A lift system s hall be supplied comprised of a "grip eye" for
attachment to liftin g equipment hook and sho rt len gth of chain attached to pump
and stainless steel wire rope long enou gh to reach the station top . The grip eye
shall be lo wered over the stainless steel wire rope until reachin g the chain where
the grip eye automa tically connects to th e cha in so the pump can be pulled by the
u se of Ii fting equipment. All components to be stainless stee l or c ast/ductile iron .
S.'2005 51905-23 1 SOUTHCO RP-Pm Nada DW GS ' LIFT STATION' I I J I ~-subm<o'>1 bk pumps.d•>< J J 3 12-5
Std .·M ~7.9 1
Submersible Pumps
This lift system s hall enab le th e operato r to connect/d isconnect th e hook from th e
lifting d ev ice to any one of the submersible pump handles wh il e su bmerged, from
the station top .
D. Casing . Each pu mp casing sha ll be constructed of fine-grained cast iron . The
casting shall be de s igned for a minimum working pre ssure of fifty (50) PSIG and
hy drostatically te sted to 1-l /2 ti me s the working pressure .
E. Pump Sha ft. Th e pump shaft shall be of carbon steel, C 1036, completely is olate d
fro m th e pump m e d ium , or s ta inless steel when exposed to the pump medium.
The pump sha ft s hall rot a te on two (2) permanently lubricated b a ll or roller
bearings. The shaft shall be of s u fficient diamet e r to assure rid ged support of the
impeller and to pre vent excessive vi bra ti on at all op erating speeds.
F . Mechanical Seal. Each pump shall be pro vided with a mechani cal seal system
running in an oil re servoir h av in g separate , _cons tantly hydrodynamically
lubricated lapped seal faces. The lower seal unit shall contain one ( 1) stationary
and one (l) po s iti ve ly dri ve n rotating tu ngste n-carbide ring. Th e upper seal shall
contain one (I) stationery tun gsten-carbide ring and one (l) positively driven
carbon rin g . The sea ls shall be insta lled in the TANDEM configuration . The seal
systems sha ll not rely upon the pumped m edia for lubri cation.
G. Oil C hamber. Each pump shall be pro vided with an oil chamber for the shaft
sealing sys tem . The drain and inspection plug , with positive anti-leak seal , shall
b e easi ly accessible from the outs ide.
H. Impeller -The pump impellers shall be one-piece cast iron, full y -encased , design
with wide passages to prevent clogging w hen pump ing solids, trash , rags and
string material entrained in sewage. The impeller shall be statically and
d ynamic a ll y b a lanced . The impeller hub shall be accurately fitted and
mechanically sec ured to the impeller shaft. Impeller and casing shall be designed
to p ass the minimum 2-1/2 -in ch diameter test sphere. A wear rin g system shall be
used to provide efficient sealing between the volute and suction inlet of th e
impeller. Each pump shall be equipped with a brass , or itrile rubber coated steel
rin g insert that is dri ve fitted to th e volute in let.
Or semi-open , multi-vane, b ack-swept , non-clog des ign. The impelle r va ne
lead ing edges shall be mechanica lly self-cleaned upon each rotatio n as they pass
across a spiral groove located on the volute suction which shall keep them clear of
debris, maintaining an unobstructed le ading edge . The impeller(s) vanes shall
have screw-shaped lead ing edges that are hardened to RC 45 and shall be capable
of ha ndlin g solids, fibrous materials , heavy sl ud ge and other matter found in
was te water. The screw shape of the impeller inlet shall provide an inducing effect
for the handling of sludge and rag-laden wastewater.
$;'2005 15 1905-23 1 SOU THCORP -Pi.>r Na da DWGS 1L1FT STATI ON' 11311 ·s ub111cr..1blc pumps.dl.)I.; } 131 2-6
S td .·&~7.97
Submersible Pumps
l. Volute -The pump volute shall be sin g le -piece grey cas t iron. Class 358 , non-
concentric design with smooth pass ages large enough to pa s s any solids that may
enter the impeller. Minimum inlet and di s charge size shall be a s specified . Volute
for semi-open design shall have an integral spiral shaped cas t groove at the
suction of the volute. The internal volute bottom or in s ert rin g shall provide
effective sea ling between th e pump volute and the multi-vane , semi-open
impeller. The sharp spi ral g roove shall prov ide the shearing ed g e acro ss which
eac h impell e r va ne le a d ing edg e sh a ll cros s during its ro tation in o rd e r to rema in
un o b strn c ted . The clearanc e be t ween th e in te rnal volute bo ttom and th e impe lle r
leadin g edg e s sh a ll be adjustable.
J. Cooling Sys tem. Each unit shall be provided with an adequately designed cooling
system.
Thermal sensors shall be used to monitor stator temperatures. The stator shall be
equipped with three (3) thermal switches , embedded in the end coils of the stator
winding [one (1) switch in each stator phase]. These shall be used in conjunction
with and supplemental to , external motor overload protection and wired to the
control panel.
K. Electrical Cable Seal. The cable entry shall be comprised of a single cylindrical
elastomer, grommet, flanked by washers. The cable entry junction chamber and
motor shall be separated by a stator lead sealing gland or terminal board .
Epoxies , silicones, or other secondary sealing system shall not be considered
acceptable.
L. Motor -Pump motor shall be of NEMA Design B, squirrel-cage , induction , shell-
type design, housed in an air-filled watertight chamber. The stator winding and
stator leads shall be insulated with moi s ture resistant Class H in s ulation which
will resist a temperature of 356°F. The stator shall be in s ulated by the trickle
impregnation method using Class H monomer-free polyester resin resulting in a
winding fill factor of at least 95 %. The stator shall be heat-shrink fitted into the
cast iron stator housing. The use of multiple step dip and bake-type stator
insulation process is not acceptable. The use of bolts , pin s or other fastening
devices requiring penetration of the stator housing is not accepta ble . The motor
and the pump shall be produced by the same manufacturer. The combined service
factor (combined effect of voltage, frequency and specific gravity) shall be a
minimum of 1.15 The motor shall be designed for continuous duty, capable of
sustaining a minimum of 15 evenly spaced starts per hour. The rotor bars and
short circuit rings shall be made of cast aluminum.
S 100~'51905 -::!J I SO UT HCORP -Por Nada'O\\.'GS 'LI FT STATIO N\! 13 I :?·su bm..:rs 1bk pum ps .d1X 113 12-7
Sid -S.27 97
Submersible Pumps
The junction chamber, containing the terminal board, shall be sealed from the
motor. Connection between the cable conductors and stator le ads shall be made
with threaded compressed type binding posts permane ntly affixed to a terminal
board and thus, perfectly leak proof.
The pump motor cables in stalled shall be suitable for submersible pump
application with cable sizing conforming to ICEA-N EC specifications for
submersible pump motors .
Manufacturers requirin g moisture detecti on device s fo r warranty shall supply a
lock-out d evice with man ua l reset in the control pa nel.
M. Exposed Surfaces . All exposed nuts and bolts shall b e of stainless stee l, Type 304
or 316 . All surfaces coming into contact with sewage, other th an stainless steel,
shall be protected with a sewage re s istant coating .
Di sc harge Elbow . The discharge base elbow shall be furnished by the pump
manufacturer. The disch arge elbow shall have a foot for anchoring to the wet
well floor and a means for firmly supporting the guide rails. The design and mass
of the discharge elbow shall be sufficient for rigidly supporting the eccentric load
of the pump unit and di sc harge piping. The discharge elbow inlet flange face
shall be perpendicular and make a metal to metal contact with the pump discharge
nozzle flange face. Sealing of the disch arge interface by means of a diaphragm ,
o-ring or other de vice is not acceptable . The discharge elbow outlet shall connect
to the discharge pipin g riser. The elbow shall hav e ANSI , I 25-pound flange
dimensions and drilling .
0. Pump Guides. The pumps shall be capable of being lowered into position in the
pump chamber and automatically connected to the discharge connection elbow by
the use of sliding bracket and pos itioning devices. The sliding bracket shall be
part of the pump assembly. The sliding bracket and positioning device shall be
constmcted of cast iron or 304 stainless steel.
The upper guide rail bracket and the guide rails shall be construc ted of stainless
steel , sized as shown on the drawings. Inte rmediate guide rail brackets shall be
constructed of 304 stainless steel and be positibned a maximum of twenty (20)
feet apart .
P. Mix-Flush Valve. At least one (1) pump in each sump shall be equipped with an
automatically operating valve that will provide a mixing action within the sump at
the start-up of the pumping cycle .
This valve shall be mounted directly on th e pump volute and shall direct a portion
of the pumpage into the sump to flush and resuspend solids and grease by the
S. 2005'.5 190 5-23 I SOUTH C'O RP -Por Nada 'OWGS'.LIFT STA T ION' 11J12-s ub nl.-ni!blc pum p,.do.; l I 3 12-8
S1dAl27,97
Submersible Pumps
turbulent action of its discharge. The turbulent action caused by the flow shall
also provide some sump aeration benefits. The va lve s hall be mounted on the
pump volute so that it can be removed from the sump along with the pump during
normal and routine mainte nance checks and shall be positioned on the volute to
provide for non-c logging opera tion. The va lve sh a ll be equipped with an
adjustab le , wear-resistant discharge nozzle which shall be used to direct flow
from the valve to optimize mixing action within th e sump .
The val v e shall not require an y external power source or c o ntrol to operate.
neither electric nor pneumatic. The use of any external power source is not
accepta ble. The va l ve shall be sui table for u se in Class I , Divisio n l hazard ous
locations .
The valve shall open at th e beginning of each pumping cycle and shall
automatic ally close during pump operation after a pre-se lected time of operation.
The valve shall operate automatically by differential pressure across the valve and
shall be actuated throu gh a self-contained hydraulic system which u ses an
environmentally safe fluid . A method of adjusting the valve operating time shall
be provided.
Q. Access Frame and Cover. Furni s h aluminum access frames and covers for top of
valve pit and wet well. The cover and frame shall be constructed of 1/4-inch
structura l grade aluminum and utilize stainless steel hinges and stainless steel
hardware . Covers to be equipped with padlock hasp and hold open arm and sized
per the requirements of the drawings . The covers shall be rated for 150 pounds
per square foot li ve load .
PART 3 EXECUTION
3 .0 I ERECTION/INSTALLATIO N / APPLICATION AND/OR CO STRUCTION
A factory trained service engineer employed by the pump m a nufacturer s hall advise the
Contractor in th e insta llation and start-up of the pumping unit s. The pump
manufacturer's service technici an shall include in his bid one (I) work.in g day to advise
the Owner's operator of operation and maintenance of the pumping unit s and controls.
Pumps shall be installed only in the manner required by the manufacturer and only after
the Contractor has been advised by th e factory trained service engineer in the methods of
installation and start-up of the pumping units.
3.02 FIELD QUALITY CONTROL
5:'1005'51905-23 1 SO UTHCORP -Por !'fad• OWG S LIFT STATIO N' 113 1 l ->ubmm;bk pumps.doc I 13 12-9
S1d .·R.~7,97
Submersible Pumps
After all pump and control systems have been completed and put into operation , subject
each system to an operating test under des ign conditions to ensure prope r sequence and
operation throughout the range of operation . M ak e adjustments as r equired to ensure
prope r functioning of all systems. The units must perform in a manner acceptable to the
Owner's repre s entati v e befo re final acceptance will be made by the Owner.
END OF SECTIO
S:l2005\5 IQ05 -!J I SOUTHCORP -Por No J ,'DW GS'LIFT STATION\l IJ I !-,ubm'"'blc pum ps.J ,x 11 3 12-J 0
S1d .-&~7 1 97
Submers ible Pumps
SECTIO 13430
DUPLEX FLOAT CONTROL PANEL
PART I GENERAL
1.01 SUMMARY
Requirements fo r furnishing and in s tallin g duplex float control panel as indicated on th e
drawing s.
All of the equipment called for und er thi s sec tion to be supplied by th e pump
manufacturer.
1.02 MEASUREMENT AND PAYMEN T
Unless otherwise spec ified , no direct measurement or payment will be made for duplex
control p ane l, the cost thereof being included in th e bid price for the appropriate bid item
lis ted in the proposa l.
PART 2 PROD UCTS
2 .01 MATERIALS AND/OR EQUIPMENT
A. Control Panel -Floa t Type
1. Design . Pump manu factur er's duplex float control and alarm system
designed to function with pumping units , factory wire and tested .
Controls to automatically s tart and stop pumping units and permit manual
operation at the pane l. The control panel is to be UL listed , manufactured
in a UL approved facility . The control panel shall be wired for a single
point connection for the electrical contractor.
2 . Sequencing . The control function provides for the operation of the lead
pump under normal conditions. If the incoming flow exceeds the pumping
capacity of the lead pump, the lag pump will automatically start to handle
this increased flow. A s the flow decreases, pumps will be cut off at
elevations as determined on the drawings . Lead pump will be alternated
after each cycle. In the event of a high level condition, an alarm light will
be excited to indicate an alarm condition.
Should the pump OFF regulator fail, the system will operate with a
differential between the lea d pump ON and the lag pump ON levels.
S.1005 51o05·~3 1 SOUT HCORP-Por NaJa'O WGS'LlfT STATION' IJ -130-dupkx pand.doc 134 3 0-1
Std -ll 27 9~
Duplex Float Control Panel
All control voltage to th e liqu id leve l sensors shall b e a maximum o f
twenty-four (24) volt s and shall p ower twenty-four (24) v o lt plug -in styl e
relays to enable alarm and motor sta rter coil s to operate at one hundred
and tw enty (120) volts.
In the event of phas e reversal , los s of phase or low voltage of an y phase ,
control voltage will b e interrupted through the phase m onito r. The phase
m o nit o r wi ll automa tic a lly r ese t u pon remo va l of any and all of th e above
con d it ions.
3. The control pa n e l sh a ll b e NEM A -3 R GASKETED STA I N LESS ST E EL
e nc los ure with drip s h ie ld , with a pol is hed aluminum hinged deadfront
d oor on a continuo u s pi a no hing e a nd re movable subpane l.
The control enclos ure's outer door w ill be held closed and sealed by a
sin g le handle operated three point la tching system with a padlock hasp.
Th e re will be no ne ed for exterior cl ip s requiring a screwdriver or wrench
to sea l the door.
4 . The inner aluminum door, mounted on continuous hinge, will be furnished
for protection against expos ed wiring and will have cutouts for access to
the circuit breakers . Mounted on the inner door will be pump run lights ,
le v el indication lights , hand off automatic switches and a twenty (20)
ampere duplex receptacle.
A laminated schematic sheet will be permanently affixed to the interior of
the enclosure door. A final record drawing encaps ulated in mylar shall be
attached to the inside of the front door.
B. . Motor Circuit Breaker. A thermal magnetic molded case heavy-duty type circuit
breaker shall be supplied as branch circuit protection for each pump motor. The
circuit breaker must have a minimum ampere interrupting c a pacity of 14 ,000
symmetrical RMS amps .
C. Motor Starters . Motor st a rters shall be standa rd NEMA size, FVNR with a three
(3) line bimetal ambient compensated o verload relay and heater element. The
motor starter shall have a horsepower rating not less than the rated motor
horsepower.
D . Control Transformers. A 4801120 (not required with a 240 v olt system) volt
control transformer shall be provided with sufficient capacity to power the motor
starter's holding coils, run lights , elapsed time meters and level controls . A 120
volt/24 volt transformer shall be provided to power le v el floats and twenty-four
(24) volt relays.
S:'1 005 lloO~·'l l SOLTH CORP -Po< i-;ad a'DWGS LI FT STATIONllJ4JO-dupk.< pan,l.d oc 13430-2
S 1 J .-~ ~7 Q7
Duplex Float Control Panel
E. H-0-A Selector Switches. An H-0-A selector switch s hall be pro v id ed for each
pump. Th e H-0-A selector swi,tches s hall be hea vy-d uty type rate d as a NEMA-
4X oil tight switch with ten (I 0) amp contacts.
F. Elapsed Time M e ter. Elapsed time mete rs sha ll be provi ded to record the running
time of each pump . The meters shall be th e non-reset , 120 V AC di gital ty pe with
a minimum range of 9,999.9 hours.
G. Pilot Lights . The motor controller sh all incorporate neon level ind ica ting and
runnin g pilot li ghts fo r each pump. The lights shall have an interchangeable
shatter re sisting len s. Motor running indicator li g ht s shall ha ve green lens and
level indic a tor li g h ts shall ha ve amber lens . LED's will not be acceptable .
H. Space Heater. One ( 1) 120 V AC , fifty (50) wa tt space heater shall be installed in
the bottom of the motor controller. Th e heater shall have a ru st resis ting iron
s heath and slots in each mounting tab to accommodate secondary insulation
bushing for mountin g .
A thermostat ic control shall be installed in the top of the motor c ontroller for
controlling the space h eate r temperature. The thermostat shall ha v e an adjustable
operating range of thirty-fi ve (35) deg rees F to ninety (90) degree s F and shall
also have SPST ; snap-acting conta cts rat ed twenty-five (25) amps at 120 V AC.
1. Phase Monitor. A phase monitor sh a ll b e provided to protect against, single
phasing , under voltage and phase reversal. The monitor shall ha ve an adjustable
operating range and a respon se time of two (2) seconds. The contact arrangement
shall be DPDT with a minimum contact rating of three (3) amps at 600 VAC
resistive.
J. Lead/Lag Pump Alternator. The level control circuit shall include a duplex pump
alternator. The alternators shall be th e solid-state plug-in type with a five (5)
amp; 120 volt output rating and pump sequence indicator lamps . An
al ternator/t est/o ff switch shall be provid ed , for alternator test and byp ass function .
K . Li g htn ing Arres tor/Surge Suppressor. A three (3) phase, three (3) poles , 0-900
volt lightning arrestor shall be connected to each phase of the incoming service .
The arrestor shall be designed to limit the magnitude of the voltage impressed on
th e motor windings in the e vent that the sys tem is subjected to lightning-surge
voltages. Shall have a respon se time of five (5) nanoseconds and with s tanding a
surge of 6 ,5 00 amperes .
L. High Level Alarm Light. A high-level a larm light shall be mounted on the top of
the enclos ure as shown on the drawing . The lamp shall be complete with a 120
V AC , 100-watt incandescent bulb and red lexan shatterproof globe .
S: 1 005 51905-~31 SOL:TH CO RP -Por N:1da OWG S LIFT ST A TI O 134 30-du ph.•, pan el d t~ 134 3 0-3
Sid .s, ~; 97
Duplex Float Control Panel
M . RTU Input s & Output s~ The following Inputs and outputs will be broug ht to a
terminal strip to be used to connect to the City provided RTU .
DIGITAL CONTROL PAN E L OUTPUTS
•
•
•
•
•
•
Pump I Run Status
P u mp 2 Run Statu s
S ite Intru sion Do o r S w it c h
Pump l Overload Tripped
Pump 2 Overload Tripped
Hig h Wet Well Level
DIGIT AL INPUTS
• Not Required
ANALOG INPUT
• Not Required
(Normally open dry contact )
(Normally open dry contact)
(Normally open dry contact)
(Norma lly open dry contact)
(Norma lly open dry contact )
(Normally op en dry contact)
N. Pane l Markings. All component ,parts in the control pane l shall be permanently
marked and identified as they are indicated on the drawing. Marking sh a ll be on
the b ac k pl ate adjacent to the component. All control conductors shall be
id e ntified with wire markers as close as practica l to each end of conductors .
0. Motor Protection
1. Winding Temperature . The motor shall contain wi nding thermal sensors.
In the event of an o v ertemp condition, the motor will be shut down until
it's sufficiently cock to automatically reset.
2. Moisture Probes. Manufacturers requiring moisture detection devices for
warranty shall supply a lockout device with manual reset in the control
pan e l.
P . Le ve l Regulators
1. Sensors. Polypropylene sealed mercury float switches . Provide one ( l)
sensor for each control leve l. Sensors to be of the encl osed weight type
and set in accordance with contract draw ings .
2 . Cable. Heavy neoprene-jacketed cable . Furnished in one (l) continuous
length from sensor to Contro l Panel.
3. Cable Sensor. A stainless steel cable holder with not less than six (6)
h ooks shal 1 be used.
S. 2 00~ 5 1 QQ~-2 31 SOU Tt-ICORP -Por N:1da 1 DWGS' LIFT ST A TION' I 3430-duph:~ pJnd .doc 13 4 3 0-4
Srd -R c7 9 ;
Dupl ex Float Control Pane l
"
PART 3 EXECUTION
3.0 1 FIELD QUALITY CO t TROL
A factory trained service representative sha ll check pane l for correct connections , check
rotation , voltage, amperage and operate pumps through a complete cycle . High-level
alann and alternator shall be demonstrated. Operating instructions shall be given as
required . Record drawin gs and operati on and maintenance manuals will be presented at
time of start up .
END OF SECTION
S:'.1005 SJQOS .:D I SO UT HCOR P·Pur NaJa D\\'GS LIFT STATIO IJ~J O-Jupk' panel JO\: 13430-5
S1JAC.:?7 97
Duplex Float Control Panel
Pledger Kalkomey, Inc.
Consulting Engineers
July 18 , 2005
Ms . Bridgette George
City of College Station
P .O . Box 9960
College Station , Texas 77842
Re : Development Permit
Valley Park Center
Off -Site Utilities
PK Job No . 51905-231
Dear Mrs . George ,
7020 Coyote Run
Bryan , Texas 77808
979-731 -8000 , 979-731 -1500 (Fax)
www .pkengineering.com
Enclosed please find the following for the referenced project :
1 . Development Permit Application i ncluding all of the
Minimum Submittal Requirements .
2 . Two ( 2) copies of the plans and specs for the Off-Site
Utilities . These replace those t h at were transmit t ed to
Allan Gibbs on July 7 , 2005 .
3 . Estimate of Probable Cost for the difference in a 6 -inch
and a 12-inch water line for whic h oversize participation
is being requested .
Very Truly Yours ,
Steve E . Duncan , P.E .
sed@pkengineering.com
SED/mon
Enclosures
cc : David Hillman
Brenham • Bryan • Rosenberg
S:\2005151905-23 1 SOUTHCORP-Por ada\CS-05-dev permit offsite.doc
CIIT OF C OLLEGE STAT ION
Plannint & !Hw'4pmmt &rviuJ
SITE LEGAL DESCRIPTION:
Titan Valley Park
Tract 16 CS
8 .63 Acres
DEVELOPMENT PERMIT
PERMIT NO . 05-36
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
Valley Park Center, NW Corner FM 2818 I FM 60
DRAINAGE BASIN:
White Creek
DATE OF ISSUE: November 11, 2005 VALID FOR 12 MONTHS
OWNER:
Titan Valley Park, Ltd .
3401 Allen Parkway, Ste . 200
Houston , Texas 77019
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance w ith Section
7.5.E., Landscape/Streetscape Plan Requirements of the C ity's Unified Development Ordinance , prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
requ ired to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, pa int , oil , solvents ,
asphalt , concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
proh ibited .
Full Development Permit
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immed iate construction site
in accordance w ith the approved erosion control plan as well as the C ity of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to reta in all sed iment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and estab li shment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equ ipment
as well as erosion , siltation or sedimentation resulting from the permitted work .
In accordance w ith Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be take n to insure
that debris from construction, eros ion , and sedimentation shall not be depos ited in city streets , or existing drainage
fac iliti es .
I hereby grant th is perm it for development of an area outs ide the special flood hazard area . All development shall be in
accordance with the plans and spec ifications submitted to and approved by the C ity Engineer in the development permi t
appl ication for the above named project and all of the codes and ordinances of the City of College Stat ion that app ly.
Dat ( I
1/-zrt ~
Owner/Agen t/Contractor Date
~ The City of
CoHege Station
heart of the Research Valley
CITY OF COLLEGE STATION P .O . Box 9960 • 1101 Texas Avenue • College Station, TX 77842 • (979) 764-3570
Texas Department of Transportation
ATTN: Karl Nelson, P.E.
2102 Tabor Road
Bryan, Texas77803
RE: Notice of Proposed Installation for the Valley Park Center
Site -NW Corner of FM 2818 and FM 60
Valley Park Center Subdivision
College Station, TX, 77845
Dear Mr. Nelson:
Please find the following enclosed the permit applications and set of drawings :
• Permit to Construct Utility Line on Non-Controlled Access Highway - 4 applications
9119105
Please review this submittal at your earliest convenience and return three signed copies of the permit
for our distribution . If you have any questions feel free to contact me at 979-764-3570.
Thank you ,
~~
Alan Gibbs , P .E .
Sr. Asst. City Engineer
cc: TxDOT Driveway Peqnit File
Home of T exas A &M Uni versity
Pledger Kalkomey, Inc.
Consulting Engineers
August 3 0 , 2 0 05
Ms . Bridgette George
City of College Station
P.O. Box 9960
College S t ation , Texas 7 7842
Re: DP 05-00100036 : Rev i sed Plans
Val l ey Park Center
Off -Site Utilities
PK Job No . 51905-231
Dear Mrs . George ,
7020 Coyote Run
Bryan , Te xa s 77808
979-73 1-8000 , 979-731-1500 (Fax)
www.p kengine eri ng.com
4 ::s-i,
0-1 -Dt:S
1JS
OVf -30
Enclosed please find two (2 ) sets of the revised plans for the
reference d project per comm ents by Alan Gi bbs d ated August 5 ,
2005 and Nathan Jones dated today . The following are responses
to Mr . Gibbs ' comments :
A revised TxDOT permit is attached .
The TAMU comments have been incorporated .
This item will be addressed with t h e platting
OK
process .
Th e
Th e
Th e
tee/valve were a d ded . '\'iJ
hydra n t was relocated to the
4' cover was added .
end of the casi n g.
The valve is shown .
A grade was added .
The off set was added .
A note was added .
A bore was added at station 5+00.
The 6" clearance note was added.
Th e TCEQ separation i s OK .
A double 4 5 was added .
Brenham • Bryan • Rosenberg
S:\200515 1905-23 I SOUTHCORP-l>o r Nada\C S-09-offsite revised plan s.doc
, Form 1023
(Rev. 812002)
Page 2 of 2
To: Southcorp Holdings 1, LP.
3401 Allen Parkway , Suite 200
Houston, Texas 77019
Attn: David Hillman (713) 960-1880
APPROVAL Notice No.:
Hwy. No. FM 60 --------------------Beg. RM
End RM
Brazos County, Texas -------------MN T Sec . No. 002 Date September 20, 2005 -------
TxDOT offers no objection to the location on the right of way of your proposed 4" x 1,000' PVC Force Main (Cl 200) + MH
line as shown by accompanying drawings and notice dated September 20, 2005 except as noted below.
It is expressly understood that TxDOT does not purport, hereby, to grant any right, claim, title , or easement in or upon this
highway; and it is further understood that TxDOT may require the owner to relocate this line, subject to provisions of
governing laws, by giving thirty (30) days written notice.
You are requested to notify this office prior to commencement of any routine or periodic maintenance which requires
pruning of trees within the highway right of way, so that we may provide specifications for the extent and methods to
govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to
preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming.
The installation should not damage any part of the highway and adequate provisions must be made to cause minimum
inconveniences to traffic and adjacent property owners. In the event the Owner fails to comply with any or all of the
requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance.
• General Special Provisions:
SEE ATTACHMENTS
• Revegetation Special Provisions: In order to minimize erosion and sedimentation resulting from the proposed
installation, the project area will be revegetated
~ in accordance with TxDOT's Standard Specification Item 164 which specifies the appropriate grass seed mix to
be used or
D as indicated on the attachment.
Please notify Mr. Ronnie Waller, Maintenance Section 778-8054 forty-eight (48) hours prior to
starting construction of the line in order that we may have a representative present.
Karl Nelson, P.E. B an
TxDOT Bryan Area Engineer District
(979) 778 -6233
Area Code Telephone Number
September 20, 2005
RE: FM 60 (North ROW)
FM 2818 to East (1,000') (Research Parkway)
Valley Park Center Subdivision
College Station , Texas
Utility Permit -4" x 1,000' (Cl 200) Sanitary Sewer Force Main + Receiving Manhole
GENERAL SPECIAL PROVISIONS (Utility Permit) :
1) Traffic Control plan is required per TMUTCD prior to start of construction
work in the FM 60 right-of-way.
2) Areas within ROW disturbed by construction shall be restored to equal or
better conditions than existing prior to construction.
3) Contractor shall be responsible for locating all utilities within the right-of-way
construction site. Contacts with local utility companies and utility locators are
required.
4) Sanitary Sewerline (Force Main) shall be located as indicated (4 ' minimum bury &
5 ' from FM 60 ROW , except as shown).
5) Longitudinal lines without a metal sheath shall have a durable metal wire, etc.
installed concurrently for detection purposes.
6) Paved driveways, streets, etc. within ROW shall be bored at force main, etc.
x-ings; unpaved driveways to be open-cut shall be restored to equal or better
conditions than existing prior to construction. All permanent structures, etc.
cr:ossings shall be bored.
7) Encasement @ Sta 1 +00 shall be as per plan details (p.3).
8) Permit covers adjustment of any existing irrigation systems. No installation of new
irrigation systems are covered under this permit.
9) Bore pits in the right-of-way shall not remain open overnight.
1 O) Backfill shall be placed in 12" lifts, and compaction density shall be equal to
the surrounding area.
11) Pavement surface shall be kept clear of mud, debris, etc.
Notice of Proposed Installation
Utility Line on Non-Controlled Access Highway
To the Texas Transportation Commission
c/o District Engineer
Texas Department of Transportation
Bryan , Texas
Date August 31 , 2005
Formal notice is hereby given that Southcorp Holdings 1, L.P. c/o Southcorp Realty Advisors
Company proposes to place a _sa_n_i_ta_ry~se_w_e_r_~_o_rce_m_a1_·n ______________________ _
line within the right of way of FM 60 in -"B-'-ra""z""o'-"s ____________ County,
Texas as follows : (give location, length, general design , etc.)
1000 If 4" AWWA C-909 Class 200 PVC sanitary sewer force main along FM 60 (plan sheet SS-1 of 5)
The line w ill be constructed and maintained on the highway right of way as shown on the attached drawing and in
accordance w ith the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all governing
laws, including but not limited to the "Federal Clean Water Act," the "National Endangered Species Act." and the "Federal
Historic Preservation Act." Upon request by TxDOT, proof of compliance with all governing laws, rules and regulations will
be submitted to TxDOT before commencement of construction .
Our firm will use Best Management Practices to min imize erosion and sedimentation resulting from the proposed
installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions."
Our finn will ensure that traffic control measures complying w ith applicable portions of the Texas Manual of Uniform Traffic
Control Devices will be installed and maintained for the duration of this installation .
The location and description of the proposed line and appurtenances is more fully shown by _2_-_11_"_x_17_" _____ _
complete sets of drawings attached to this notice .
Construction of this line will begin on or after the _______ S_e~p_te_m_be_r_1~,_2_00_5 _____ _
Month/Day/Year
By signing below, I certify that I am authorized to represent the Finn listed below, and that the Firm agrees to the
conditions/provisions included in th is permit.
Southcorp Holdings 1, LP. c/o Southcorp Realty Advisors
By~ --~""~----
Signature
~sider1l .J .c..c. ?,--e.,·-.l..z11 ~
T itle
3401 Allen Parkway, Suite 200
Address
Houston
City,
( 713)
Area Code
TX
State
960 -1880
Telephone Number
77019
Z ip