Loading...
HomeMy WebLinkAbout60 DP 353 CSISD HS Expansion-ff~pJCDOE u (o-5-Cf~ s~ DETENTION STUDY A & M CONSOLIDATED HIGH SCHOOL CITY OF COLLEGE STATION, TEXAS FOR CHEATAM AND ASSOCIATES 1601 EAST LAMAR, SUITE 200 ARLINGTON, TEXAS 76011 BY MORRISON HYDROLOGY/ENGINEERING, INC. 210 ARNOLD ARLINGTON, TEXAS 76010 DATED APRIL 1996 REVISED MAY 1996 Table of Contents Introduction Peak Discharge Determination Proposed Detention Summary Figures Figure 1 Watershed Map Tables Table 1 Summary of Existing Condition Peak Discharges Table 2 Summary of Proposed Condition Peak Discharges Table 3 Detention Storage and Outflows Appendix 1. Existing Condition Discharge Determinations 2 . Proposed Condition Discharge and Storage Estimates 3. Detention Routing Introduction Th e purpos e of this study is to determine the existing 5 , 10 , 25 , 50 and 100 year dis charge for the College Station High School Site and to design sufficient detention storage and outfall along with proposed improvements to the High School to limit the outflow to no more than the existing 5 year discharge . The Rational Method was used for this study to determine existing and proposed d ischarges us ing the Intensity Duration Frequency curves , runoff coefficients and other parameters as described in the city drainage requirements. Storage measurements were made using CADD procedures, and the outfall details were dete rmined from field measurements of existing outfalls. Peaks Discharge Determinations Appendix 1 contains the details of the peaks discharge determinations . Each area on the site was divided into grassed and paved areas , us i ng a coefficient of 0.35 for grassed areas and 0.9 for paved areas . The following table is a summary of the existing condition peak discharges . Table 1 Existing Condition Peak Discharge Summary Subwatershed Area 5 year 10 year 25 year 50 year 100 year A 5.08 22 24 2~ 32 36 B 5.12 28 30 36 40 45 81 2 .53 7 7 9 10 11 c 13.54 53 58 69 77 87 D, F ,G ,H 36 .32 115 129 150 171 193 E 4 .59 15 16 19 21 24 As stated earlier in the report , the objective of this study is to design the proposed mod ifications to limit flow out of the site to no more than 5 year existing conditions flow as shown in t able 1. Proposed Detention In order to limit flow from the site it is necessary to store stormwater that enters the site thereby reducing the peak outflow. An initial analysis was made of required storage to determine the necessary detention storage to reduce flows to the 5 year existing condition . Based on this a grading was developed to achieve this storage. The inflow for the proposed modifications was developed to determine the new peak flow. Table 2 below is a summary of the peak inflow with the proposed modifications . Subwatershed area A* 5.oB B 5.12 B1 c 8.70* DFGH 41 .05 E* L/.70 Table 2 5 yr. 1 O yr. 25 yr. 50 yr. 100 yr. 30 ~I s6 39 '-/Z 31 34 40 45 51 NO CHANGE FROM EXISTING CONDITION 56 60 72 81 91 141 159 184 209 236 Zf.&, z.~ ~ ~ '{'!, 'Tlf-eSE NvM~ees, ~~J\N~~SCD "FTC.Dl"V\ C0"1STfZ.lAc::T 'IDt-.1 ~,~G.S * Watershed A and E will discharge into the floodplain of tributary B of Bee Creek and are not included in the detention study in this report . *The watershed area is proposed to be altered so that an actual area of 6 .06 acres is proposed . However, this study used an earlier version of 8.70 acres which is conservative. In order to determine the actual outflow and storage based on the proposed High School grading . The following information was determined: 1. Elevation-volume information was determined for each watershed based on the site grading proposed . 2 . An outflow rating curve was developed for each outflow structure. Using the above data together with the peak inflow a routing was completed through the detention basins . The details of this analysis are shown in appendix 3. A summary table is provided below : Sub wate ohed 5 year storage outflow AF cfs B 0.2 17 B l NO CHANGE c 0 .2 33 DFGH 2 .94 37 Summary Table 3 10 year 25 yea r 50 year storage outflow storage outflow storage outflow AF cfs AF cfs AF cfs 0 .22 18 0 .3 21 0 .35 23 0 .23 34 0.35 38 0.4 9 39 3.43 40 4 .08 42 4 .98 45 100 year sto rage outflow AF cfs 0.42 25 0 .64 4 1 5 .89 48 This study has shown that the proposed changes to the High School site will reduce proposed peak outflows for the 100 yr . , 50 yr., 25 yr., 10 yr., and 5yr. flows to no more than the 5 year flows that currently exist by storing flows in proposed detention basins. / ( / \. \ ' v---- COLLEGE STATION HIGH SCHOOL WATERSHED MAP FIGURE 1 7-,---/~ ) J I ) ,,}- DISCHARGE DETERMINATIONS WATERSHED A Quick TR -55 Ver .5 .46 EY;ecuted: 10:13:23 SIN: 03-1 "3-1 ':f36 CITY OF COLLEGE STATION DETENTION STORAGE DET ERMINATIONS BASIN A * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=c fs, C=Weighted Runoff Coefficient, I =in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Desc r. F.:un o ff , c, Area acres Tc (min) Wtd. , c:, RETURN FREQUENCY = 5 years 'C' adj u stment, k = 1 Ad .j • ' C' = Wt d . ' C' y; 1 ========================= ======== Adj. , c, I in/hr Tc•t al a cr es Peak Q (c fs) --------------------------:--------------------------------------------- GF~A S SED PAVED 0.350 0. '300 3. 1 (l 1. '38 ---------------:--------------------------------------------- 10.00 0.554 O. 5 E:A 7.700 5.08 22.08 Quick TR -55 Ver.5.46 E~;ecuted: 10: 13: 23 S/N: 03 -1 '3-1 '3'36 CITY OF COLLEGE STATION DETENTION STORAGE DETERMINATIONS BASIN A * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere: Q=c fs, C=Weighted Runoff Coefficient, I=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Descr. Run off 'c' Area acres Tc (mi n) Wtd. 'c' RETURN FREQUENCY = 10 years 'C' adjustment, k = 1 Adj. 'C' = Wtd.'C ' ~; 1 -------------------------•---------------------------------.-------- Adj. 'c' I in/hr Total acres : Peak Q (cf s) ----------------------------------------: :-----------------------:-------- GRASSED PAVE D 0.350 0. '300 3.10 1. '38 -----------------------------: :-----------------------:-------- 10.00 0.564 : : 0.564 8.300 5.08 : 23 .80 Quick TR-55 Ver.5.46 Executed: 10: 13: 23 S/N: 03-1 ":J-1 '3'36 CITY OF COLLEGE STATIO N DETENTION STORAGE DETERMINATIONS BASIN A * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Des•:r. Runoff 'c, Area acres Tc (min) Wtd. 'c' RETURN FREQUENCY = 25 years ~c' adjustment, k = 1 Adj . ' C' = Wt d . ' C' ~; 1 ------------------------------------------------------------------ Adj. , c' I in/hr Total a•: res Peak Q (1:fs) ----------------------------------------: :------------------------------- GF.:ASSED PAVE D 0.350 0. '::JOO 3. 10 1. 98 -----------------------------: :------------------------------- 10.00 0.564 : : 0.564 9.900 5.08 28.38 Quick TR-55 Ver.5.46 EY;ecuted: 10:13:23 S/N: 03 -1 '3 -1 '3'36 CITY OF COLLEGE STATION DETENTION STORAGE DETERMINATIONS BASIN A * * * * * * SUM MARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Descr. F.:un o ff , c, Tc (min) Wtd. 'C' RETURN FREQUENCY = 50 years 'C' adjustment, k = 1 Ad ,j • ' C' = Wt d • ' C ' ~,; 1 -------------------------•---------------------------------.-------- Adj. 'c, I in/hr Total a•: res : Peak Q (c fs) ----------------------------------------: :-----------------------:-------- GRASSED PAVED 0.350 o. '300 3. 10 1. '3 8 -----------------------------: :-----------------------:-------- 10.00 0.564 : : 0.564 11.100 5.08 : 31. 82 {ck TR-55 Ver.5.46 S/N: Executed: 10:13:23 03-19-1996 CITY OF COLLEGE STATION DETENTION STORAGE DETERMINATIONS BASIN A * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere : Q=cfs , C=Weighted Runoff Coefficient, !=in/h o ur, A=acres adj = 'C' adjustment factor for each return frequency Subarea Descr. Runoff ' c:' Area acres Tc (min) Wtd. , c, RETURN FREQUENCY = 100 years 'C' adjustment, k = 1 Adj. 'C' = Wtd. 'C' y; 1 ------------------------------------------------------------------ Adj. 'c, I in/hr Total acres Peak Q (c fs) --------------------------:--------------------------------------------- GPASSED PAVED 0.350 o. '300 3. 10 1. '38 ---------------:--------------------------------------------- 1 o. 00 o. 564 0.564 12.500 5.08 35.84 DISCHARGE DETERMINATION WATERSHED B Quick TR -55 Ve r.5.45 S/N: Exec uted: 10:18 :29 03 -1 9-1995 C ITY OF COLLEGE STATION DISCHARGE DETERMINATION BA S IN B EXISTING CO NDITION S * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere : Q=cfs , C=Weighted Runoff Coefficient, I =in/hour, A=acres adj = 'C ' a djust ment factor for ea c h return frequency Subarea De scr. Run e• ff 'c' Area acres Tc (min) Wtd. 'c' RETURN FREQUENCY = 5 years 'C' adjustment, k = 1 Adj. 'C' = Wtd.'C ' ~; 1 -------------------------•---------------------------------,-------- Adj. 'c' I in/hr Tc•t al ar:res : Peak Q (cf s) --------------------------:--------------: :-----------------------:-------- GRASSED PAVE D 0.350 0. '300 1. 80 , .... ~.-, .;:,, • ...:;,L ---------------:--------------: :-----------------------:-------- 10 .00 0 .707 : : 0.707 7.700 5.12 : 27.85 Qu i ck TR -55 Ve r .5 .46 S/N: Executed: 10:18:29 03 -19 -1996 CITY OF COLLEGE STATION DISCHARGE DETERMINATION BASIN B EXISTING CONDITIONS * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh e r e : Q=cf s , C=Weighted Runoff Coefficient, !=in/hour, A=acres ad j = 'C' a djustment factor for each return frequency Sub area Descr. Runoff , c, Are a acres Tc (min) Wtd. 'C' RETURN FREQUENCY = 10 years 'C' adjustment, k = 1 Adj . ' C' = Wt d • ' C' ~; 1 ------------------------------------------------------------------ Adj. , c, I in/hr Total acres Peak Q (c fs) --------------------------:--------------------------------------------- GRASSED PAVED o. 350 o. ·::;oo 1. 80 ---------------:-----------------------------~---------------- 10.00 0.707 0.707 8. 300 5. 12 30.03 Qu ic k TR -55 Ve r.5.4 6 S/N: Ex ecuted: 10:18:2"3 03 -1"3 -1"3"36 CITY OF COLLEGE STATION DISCHARGE DETERMINATION BASIN B EXISTING CONDITIONS * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere : Q=c f s , C=Weighted Runoff Coefficient, !=in/hour, A=acres ad j = 'C' a dju s tment fa c tor for each return frequency Subare a De sc r . F.:unoff 'c ' Area acre s Tc (min) Wtd. , c' RETURN FREQUENCY = 25 'C' adjustment, k = 1 Adj. 'C' = Wtd. 'C' ~; 1 ========================= Adj. , c' I in/hr Tc•tal acres years ---------------- Peak Q (c fs) --------------------------:--------------: ------------------------------- GPASSED PAVED 0.350 o. '300 1. 80 ---------------:--------------: ------------------------------- 10.00 0.707 : 0.707 "3. '300 5.12 35.82 Quick TR-55 Ver .5.46 SIN: Executed: 10:18:29 03 -19-1996 CITY OF COLLEGE STATION DISCHARGE DETERMINATION BASIN B EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Descr. Rune• ff , c, Area acres Tc (min) Wtd. , c' RETURN FREQUENCY = 50 years ~c' adjustment, k = 1 Adj . ' C' = Wt d. ' C' :-; 1 ------------------------------------------------------------------ Adj. 'C' I in/hr Total acres Peak Q (•: fs) --------------------------:--------------: :------------------------------- GF.:ASSED PAVED 0.350 0. '300 1. 80 r"'t ,.,,-, ..;:, . ..:;,.,;;: ---------------:--------------: :------------------------------- 10.00 0.707 :: 0.707 11.100 5. 12 40.16 Quick TR-55 Ver.5.46 S/N: Executed: 10:18:29 03-19-1996 C ITY OF COLLEGE STATION DISCHARGE DETERMINATION BASIN B EXISTING CONDITIONS * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subar ea Desc 1·. Runoff , c, Area acres Tc (min) Wtd. , c:, RETURN FREQUENCY = 100 'C' adjustment, k = 1 Adj . ' C ' = Wt d • ' C' ~; 1 ========================= Adj. , c, I in/hr years ----·------------ Peak Q (cf s) ----------------------------------------:------------------------------- GRASSED PAVED o . 350 o. '300 1. 80 ,.., ,_,,-, ~.W.L -----------------------------:-----------------------,-------- 10.00 0.707 : 0.707 12.500 5.12 : 45.22 DISCHARGE DETERMINATION WATERSHED 81 Quick TR -55 Ver.5.45 S/N: Exec uted: 10:25:58 03 -19-1995 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN Bl EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Whe re: Q=cfs , C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency RETURN FREQUENCY = 5 years 'C' adjustment, k = 1 Ad j . ' C' = Wt d . ' C' y; 1 ========================= ======== Su bar ea D~?sc r. Run off 'C' Area acres Tc (min) Wtd. , c, Adj. , c, I in/hr Tcot al acres Peak Q (cf s) ----------------------------------------: :------------------------------- GRASSED 0.350 .-. r:'r-i .:. • .._J ..:J -----------------------------: :------------------------------- 10.00 0.350 : : 0.350 7.700 5.82 Quick TR -55 Ver.5.46 E~1;ec ut ed: 10: 25: 58 S/N: 03-1'3-··1 '3'36 C ITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN 81 EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cf s , C=Weighted Runoff Coefficient, I=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Descr. Runoff 'C' Area acres Tc (min) Wtd. , c, RETURN FREQUENCY = 10 years 'C' adjustment, k = 1 Adj . ' C' = Wt d . ' C' :t: 1 -------------------------•---------------------------------·-------- Adj. , c, I in/hr Total acres : Peak Q (c fs) --------------------------:--------------:-----------------------:-------- GF.:ASSED 0.350 .-. C"r"l ..::.. ......... ~ ---------------:--------------:-----------------------:-------- 10.00 0.350 : 0.350 8.300 .-, C"""'I I ...::.. • w,,:, 1 7.35 Qu i c k TR-55 Ve r.5 .46 Exec ut e d : 10:25 :58 S/N: 0 3-1 '3·--1 '3 '3 6 C ITY OF COLLEGE STATION DISCHARGE DETERMINATION S BASIN Bl EXI ST ING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARG E S * * * * * * Q = adj * C * I * A Whe re : Q=c fs , C=We i ght e d Runoff Co efficient, I=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Des•:: r. Runoff , c, Are a a cres Tc (min) Wtd. 'C' RETURN FREQUENCY = 25 years 'C' a djustment, k = 1 Adj. 'C' = Wtd. 'C' ~..: 1 -------------------------•---------------------------------·-------- Adj. , c, I in/hr : Peak Q (c fs) ----------------------------------------: :-----------------------:-------- GRASSED 0.3 50 2.53 -----------------------------: :-----------------------:-------- 10.00 0.350 : : 0.350 "9. '300 .-, c:"'I""'\ ' .:, • ~W I 8.77 Quick TR -55 Ver.5.46 Executed: 10:25:58 S/N: 03 -· 1 '3 -1 '3 '36 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN 81 EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cf s , C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Subarea Descr. GF.:ASSED Runc•f f 'C' 0.350 Area acres .-, C"'I ..::. . ,_,~ Tc (min) Wtd. , c:, RETURN FREQUENCY = 50 years 'C' adjustment, k = 1 Adj . ' C' = Wt d • ' C' :-; 1 ------------------------------------------------------------------ Adj. , c, I in/hr Peak Q (c fs) --------------- --------------:------------------------------- 1 o. (l(l (l. 350 : 0. 350 11 . 100 2.53 9.83 Quick TR-55 Ver.5.46 S/N: Executed: 10:25:58 03 -19-1996 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN Bl EXISTING CONDITIONS * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=c fs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment fa ctor for each return frequency Sub area De scr. Runoff , c ' Are a acres Tc (min) ~~t d. , c:, RETURN FREQUENCY = 100 years 'C' adjustment, k = 1 Adj . ' C' = Wt d . ' C' ~,; 1 ------------------------------------------------------------------ Adj. , c' I in/hr Peak Q (c fs) --------------------------:--------------: :------------------------------- GF.:ASSED 0.3 50 2.53 ---------------:--------------: :------------------------------- 10.00 0.350 : : 0 .350 12.500 .-. t:',.., ..:: • ,_J,,:, 11. 07 DISCHARGE DETERMINATION WATERSHED C EXISTING Qu ick TR -5 5 Ver .5.46 Exec uted: 1 0 :29 :59 S/N: 03 -1 ·-:;-1 ·:r::J6 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN C EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=c fs, C=Weighted Runoff Coefficient, !=in/hour, A=acres a dj = 'C' a dju s tment factor fo r each return frequency Su bar ea Desc r. F.:unoff 'c' Are a a c res Tc (min) ~~t d. , c, RETURN FREQUENCY = 5 years 'C' adjustment, k = 1 Adj • ' C' = Wt d . ' C' ~,; 1 -------------------------•---------------------------------·-------- Adj. 'c, I in/hr Total acres : Peak Q (cf s) --------------------------:--------------: :-----------------------:-------- GRASSED PAVED 0.350 o. ·::ioo ·::i. 54 4.00 ---------------:--------------: :-----------------------:-------- 10.00 0.512 : : 0.512 7.700 13.54 : 53.43 Quick TR -55 Ver.5.46 Executed: 10:2'3:59 S/N: 03 -1 '3 -1 '3'36 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN C EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adj u s tment factor f or each return frequency Subarea D~=sc r . Runoff , c, Area acres Tc (min) L-Jt d • , c' RETURN FREQUENCY = 10 years ~c' adjustment, k = 1 Adj . ' C' = Wt d • ' C' :.-: 1 -------------------------•---------------------------------.-------- Adj. , c:, I in/hr Tc•t al acres : Peak Q (c fs) ----------------------------------------: :-----------------------:-------- 13RASSED PAVED 0.350 0.900 '3. 54 4.00 -----------------------------:-----------------------:-------- 10. 00 0. 512 : : 0. 512 8.300 13.54 : 57.5'3 Quick TR -55 Ver.5.46 SI N: Execu ted : 10:29:59 03-19-1 996 C ITY OF COLLEGE STATION DISCHARG E DETERMINATIONS BASIN C EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METH OD PEAK DI SC HARGES * * * * * * Q = adj * C * I * A Wh ere: Q=cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres a d j = 'C' adjustme nt fa ctor f or eac h return frequency Subarea D<::.>scr. F.:un c• f f 'c' Area acres Tc (min ) Wt d . 'c ' RETURN FREQUENCY = 25 years 'C' adjustment, k = 1 Adj • ' C' = Wt d • ' C' ~; 1 -------------------------·---------------------------------·-------- Adj. , c, I in/hr Tcot al acres : Peak Q (,: fs) --------------------------:--------------:-----------------------:-------- GF.:ASSED PAVE D 0.350 o. '30 0 '3. 54 4.00 ---------------:--------------:-----------------------:-------- 10.00 0.512 : : 0.51 2 '3. '300 13.54 : 68.70 Quick TR -55 Ver .5 .46 E :t:ecuted: 10: 2 '3: 5'3 S/N: 03 -1 '3 --1 '3'36 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN C EXISTING CONDITION S * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wher e : Q=cf s , C=Weighted Runoff Coefficient, !=in/hour, A=acres ad j = 'C' a dju s tment factor for each return frequency S ubarea Descr. F.:un o ff 'c' Area acres Tc (min) Wtd. 'C' RETURN FREQUENCY = 50 years 'C' adjustment, k = 1 Adj. 'C' = Wt d. 'C' y; 1 ------------------------------------------------------------------ Adj. 'c' I in/hr Total acres Peak Q (1: fs) --------------------------:--------------: :------------------------------- GPASSED PAVED 0.350 o. '300 '3. 54 4.00 ---------------:--------------: :------------------------------- 10.00 0.512 : : 0.512 11.100 13.54 : 77.02 Quick TR-55 Ver.5.45 S/N: E xec uted: 10:29:59 03 -19-1996 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN C EXISTING CONDITIONS * * * * * * SUM MARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere: Q=c fs, C=Weig hted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Su bar ea Descr. Punoff , c, Area acres Tc (min) Wtd. 'C' RETURN FREQUENCY = 100 yea rs ~c' adjustment, k = 1 Adj . ' C' = Wt d. ' C' :-; 1 ========================= ======== Adj. 'c, I in/hr T•:•t al acres Peak Q (cf s) --------------------------:--------------: ------------------------------- GRASSED PAVED 0.350 0. '300 '3. 54 4.00 ---------------:--------------: -----------------------:-------- 10.00 0.512 : 0.512 12.500 13.54 : 85.74 DISCHARGE DETERMINATION WATERSHED D,F ,G ,H Quick TP -55 Ver .5.46 S/N : E x ecute d: 11:50:14 04-09 -1996 CITY OF COLLEGE STA TION DISCHARGE DETERMINATIONS BASIN D,F,G ,H EX I STING CO NDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISC HAR GES * * * * * * Q = a dj * C * I * A Wh ere: Q=c f s , C=Weight ed Run of f Coefficient, I=in /hou r , A=acres adj = 'C ' a djustment f a ctor f or each return frequency Subarea De~:;c r. Run off 'C ' f.)rea ao: res T··· (min ) Wt; d. 'c' RETURN FREQUENCY = 5 years 1 C 1 adjust ment, k = 1 Ac! j . , c I ::: Wt d. I c I >; 1 -------------------------•---------------------------------.-------- Adj . 'c' I in/hr Total : Pea k Q C:o: fs) --------------------------:--------------:-----------------------:-------- GRASSE:D D o. 3~5 <) 1 2. l 7 .. F'r~VED D 0 . ·::;oo o. 55 F:ES IDEr.IT F 0. 500 1 . 5··· . ..::. PESIDENT G C) .. 500 14. , .. ,r..:· ,:j .._J r-.:·i:~s r DEr,n H 0 .. E,r)(l ·7 5~3 ---------------:-----------·---: :-----------------------:-------- 11.00 0.522 : : 0.522 s. o·::;o 115. 37 Quick TR-55 Ver.5.46 S/N: Executed: 11:50:14 04-09-1996 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN D,F,G,H EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q:cfs, C=Weighted Runoff Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for each return frequency Sub;:H·ea DE!SC.,,.. F.:uno ff 'C' P1r·ea a.ctwes Tc (min:> Wtd. 'c' RETURN F"REQUENCV = 10 years ~c' adjustment, k = 1 Adj . ' C' ::-" ~,Jt cl • ' C' ~,; 1 -------------------------•---------------------------------.--------(-4d .j • 'c' I in/hr Total acyes : Peak Q (cf s :> --------------------------:--------------: :-----------------------:--------GF.:AS~3ED D (>" 3::i(> l:?. 1 7 Pr-wr:::D D 0. '300 o. f,5 F::ES I DENT 1:.-0.600 l. S:2 F.:ES I DENT 13 o.soo :L4. 35 RESIDENT H o. 500 '7 II s:.:~ --------·-------:--------------: -------------------------------17.00 0.522 : : 0.522 s. s::::o 36.32 : 12'3. 3'3 Qu. i c k T F::····:'-3~3 ie1' • 5 . 4G E:r;ecute d: 11::50:14 S/N: r)4 -.. o ·:j -· 1 ':'.t =.35 CITY OF COLLEGE STAT ION DI SC HARGE DETERMINAT I ONS BASIN D,F,G,H E XI STING CONDITIONS ~· * ·!!-* * ·*· S U l'll'I ARY CW F:(H I rn~{.)L METHLlD F'Ef.)I< DI SC H APGES -M· -*· * * -!!· -M· Q = adj * C * I * A Where: Q=cf s , c~Weighted Runoff Coeffic i e nt, !=in /hour, A=ac re s a dj -'C' adjustme n t factor f or eac h ret u r n f requency Subar e ci. Df?<sc r • P un c•ff 'C ' (~rea Tc (min) Wt d. 'C ' RETURN FRE QU E NC Y = 25 y ea rs 'C' a djustment, k = 1 Ad j • ' C ' = Wt d • ' C' ~,; 1 -------------------------•---------------------------------1-------- Ad j. 'c ' I i n/h r T ota l acres : F'eak Q (cf s) --------------------------:--------------: :-----------------------:-------- G l?A ~3Sf:::D D ()II 35(> 1L 1 7 F'(.iVf~:D D 0. -:;H)O (J. GS 1:-.::ES I DEl\IT F" o. EOU 1 " E2 PES I DENT 1-· .. 'l o. 600 14 . 1'""\C:' ..::,...; PESIDENT H 0. 500 '7 r::-r-, ' . ..J ...:• ---------------:--------------: :-----------------------:-------- 17.00 0.522 : : 0.522 7 . ·:MO 3(;. 32 : 1.50. 4 :2 Quick TR -55 VeY.5.46 E~,;ec utecl: 11:'.SO: 1 ··l S /N: 04-0·=:1·--l '395 CITY OF COLLEGE S TATION DI SC I l(..~F:GE DE TEF.'.M I NAT I DNS BASIN D,F,G,H EXISTING CO NDITIO NS * * * ~ * * S UM MAPY OF RATIONAL MET HOD PE AK D I SC HA RGES * * * * * * Q = adj * C * I * A Wh ere : D=cfs , C=Wei ght e d Runoff Coefficien t, l =in /h our, A=acres adj = 'C' adjustment factor for each ret u r n freque n cy Subay·ea D£·?SC r. Puni:::• ff , c ' T ·- (min) l,,Jt d. , c, RE TU RN F REQUENCY = 5 0 yea r s ~e r a d j u st me n t , k = 1 Ad j . ' C ' = V.Jt cl. ' C' :·1; 1 -------------------------•---------------------------------·-------- {:)d.j. , c , I i n/h r T ota l acres : Peak Q (c f s ) ----------------------------------------:-----------------------:-------- GPAS~3 ED D o. 35(> 12 . :L 7 F'(.WE D D o. ·:ioo 0.55 PESIDENT F- o. 500 1 " 52 PES IDE-:NT 13 0. 500 :L4. r"lt::-..:;.,~ PESIDENT H 0. GOO 7.53 ---------------:--------------: :-----------------------:-------- 17.00 0.522 : : 0 .522 '3 . 0 00 l.70.50 Quick TR -55 Ver.5.46 S/N: Executed: 11:50:14 04 -09-1995 C IT Y OF COLLEGE STA TION DISCHARGE DETERMINA"fIONS BASIN D~F,G,H EXIS TI NG CONDIT .IONS * * * * * * SU MMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj ~ C * I * A Where: Ll=cfsr C=Weig h ted Runoff Coefficient, I=in/hour, A=acr es Su b area De 0.:;cr·. .-;.:1 dj ··· 'C' c:1d.justment factoi-for e ,::1ch return fr equenc y F:unoff ' c' Tc (min ) v-Jtd . 'c' RETURN FREQ UENCY = 100 y ear s 'C' adj u c:;t men t, I:: :::" 1 Ac:J j. 'C ' = l.Jt d.'C' :.-; 1 -------------------------•---------------------------------.-------- 'C' I in/tw Total acres : Pea k Q (cf s) --------------------------:--------------·: :-----------------------:-------- ClR?~SSED D 0. 3::.i<) 12. 1 -7 • I F'AVED D 0. ·=Joo 0. cc::· ;:,,J l?ESIDENT F c). r-: .. oo :l . f;.2 RESIDENT G 0. GOO 14. r '\t::- ~'-' F:ES IDENT H o. 600 7 I" i=r\ ,J ..:;, ---------------:--------------: :-----------------------:-------- :I. 7. 00 0. 522 : : 0. 52:2 1 0. 1 ·::10 35 .. 3 :2 : 1 '33. 04 -------- DISCHARGE DETERMINATION WATERSHED E Qui ck TR -55 Ver .5.46 S/N: Executed: 10:38:58 03 -19 -1996 C ITY OF COLLEGE STATIO N DISCHARGE DETER MINATIONS BASI N E EXISTING CON DI TIONS * * * * * * S UMMARY OF RAT IO NAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere: Q=cfs , C=Weighted Runoff Coe fficient, I=in/hou r , A=acre s adj = 'C' adj u s tment facto r f or each return frequency Subar ea Desc r. F.:un o ff , c , Area acres Tc (min ) Wtd. , c , RETURN FREQUENCY = 5 years 'C' a djustment, k = 1 Ad j . 'C' = Wtd.'C' ~,; 1 -------------------------•---------------------------------.-------- Adj. , c, I in/h r Tc•t al a•: res : Peak Q (cf s) --------------------------:--------------: -----------------------:-------- GF.:ASSED PAVED 0.350 (I. '300 4.00 o. 5•3 ---------------:--------------: -----------------------:-------- 10.00 0.421 0.421 7.700 4. 5'3 : 14.87 Qui ck TR -55 Ver.5.4 6 S/N: Executed: 10:38:58 03 -19 -1996 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN E EXISTING CONDITIONS * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh ere: Q=cf s , C=Weighted Runoff Coefficient, I=in/hour, A=acres ad j = 'C' adjust ment f ac tor for each return frequency Subarea De s cr. GF.'.ASSED PAVED Runoff , c, o. 350 0.900 Area acre s 4. 00 0. 5'3 Tc (min) Wtd. , c' RETURN FREQUENCY = 10 years 'C' adjustment, k = 1 Adj . ' C' = Wt d . ' C' ~; 1 -------------------------·---------------------------------,-------- Adj. 'c, I in/hr Tot al acres : Peak Q ( ·= f s) -----------------------------:------------------------------- 10.00 0.421 : 0.421 8.300 4. 5'3 15 .03 Quick TR -55 Ver.5.46 E x ecuted: 10:38:58 S/N: 03 -1 '3 -1 '3'35 CITY OF COLLEGE STATION DISCHARGE DETERMINA TIONS BASIN E EXISTING CONDITIONS * * * * * * SUM MARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=We ighted Runoff Coefficient, I=in/hour, A=acres adj = 'C' adjust ment factor for ea c h return frequency Subarea Descr. Runoff 'c' Area acres Tc (min) Wtd. 'c' RETURN FREQUENCY = 25 'C' adjustment, k = 1 Adj . ' C' = Wt d • ' C ' :-; 1 ========================= Adj. 'c' I in/hr T o tal acres years ----------------- Peak Q (cf s) ----------------------------------------: :------------------------------- GF.:ASSED PAVED 0.350 0. '300 4.00 o. 5'3 -----------------------------: :------------------------------- 10. 00 0. 421 : 0.421 '3 . '300 4.5'3 1'3 . 12 Qui c k TR -5 5 Ver.5.4 6 E x ecuted: 10:38:58 SIN: 03 --1 '3--1 '3 '3 f:, C ITY OF COLL E GE S TATION DISCHARGE DETERMINATIONS BA S IN E EXISTING CONDITIONS * * * * * * SUMMARY OF RATIONAL ME THOD PEAK DISCHARGES * * * * * * Q = a dj * C * I * A Wh ere : Q=c fs, C=Weighted Run o ff Coefficient, !=in/hour, A=acres adj = 'C' ad j u s tm e nt fa c tor fo r e a c h return frequency Subarea De scr . Runoff 'c, Area ac r es T c (min) Wtd. 'c' RETURN FREQUENCY = 50 years ~c' a djustment, k = 1 Ad j . 'C' = Wtd.'C' ~,; 1 -------------------------•---------------------------------.-------- Ad j . , c' I in/hr Total acres : Peak Q (•: fs) --------------------------:--------------: -----------------------:-------- GF.:ASSED PAVED 0.35 0 0. '300 4.00 0. 5'3 ---------------:--------------: -----------------------:-------- 10.00 0.4 2 1 0.42 1 11. 100 4. 5'3 : 21. 43 -----___________ _.. Quick TR -55 Ver.5.46 Executed: 10:38:58 S/N: 03 -1 "3 -1 "3'36 CITY OF COLLEGE STATION DISCHARGE DETERMINATIONS BASIN E EXISTING CON DITION S * * * * * * S UMMA RY OF RATIONAL MET HOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs , C=Weighted Ru n off Coefficient, !=in/hour, A=acres adj = 'C' adjustment factor for ea c h return frequency Su b area De scr. Runoff 'c' Ar· ea acres Tc (min ) Wtd. 'c' RETURN FREQUEN CY = 100 years ~c' adjust ment, k = 1 Ad j . ' C' = Wt d. ' C' :1: 1 ========================= ======== Adj. , c' I in/hr Total acres Peak Q (cf s) --------------------------:--------------: ------------------------------- GF.:ASSED PAVE D 0.350 o. '300 4.00 o. 5•3 ---------------:--------------: ------------------------------- 10.00 0.421 0.421 1 2.500 4. 5•3 24.14 SUMMARY FREG 100 YR 50 YR 25 YR 10 YR 5 YR STORAGE DETERMINATIONS WATERSHED B VOL. STORAGE 0.347 0.250 0.172 0.078 0.045 Quick TR -55 Ver.5.46 E >;ecuted: 11: 02: 40 !":l./N: 03 -· 1'3 -·1 '3'36 F L 0 [,J c s MODIFIED RAT I ONAL METHOD ----Graphica l Su mmar y f ol'" Ma x imum Re qui red S t orage ---- Fi rst peak outflow point ass um ed to occur a t T c hyd rogY"ap h 'recess ion leg. CITY OF COL LEG E STA TION STO RAGE DET ER MINATIO NS MA XIMUM OUT NO MORE THAN 5 YEAR ********************************************************************** * RETURN FREQUE NCY: 1 00 y r Allowab l e Outflow: 28 .00 cf s * * 'C ' Adjustment: 1.000 Required Storage: 0.347 ac-ft * *--------------------------------------------------------------------* * Peak Inflow: 45.37 cfs In flo w .HYD stoY"e d: CSP100B .HYD * ********************************************************************** Tel = 14 minut!"2s !-------AppY"ox. Du ration fol'" Ma x . Stor age ------/ I • I • T c= I -- Q ·-- 10.00 minut es 12.500 in /h r 50.72 cfs Pequ i ire d St Ol'" age O. 347 ac--·ft x x x x x x x :x x x x x x x x x x x Pet U Y" n Fir eq: 100 y·r C ad.j. factoir: 1. 00 At-ea C: ac ) : Weight e d C: f:"~dj ust e d C: 5 .. 1 2 o . 7 ·3 0. 7'3 Td= I -- Q -- 14 minutes 11.180 in/hr 45.37 cfs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q= 28.00 cfs I I • (Al 1 ow . Out f 1 C•W) l\JOT TO SCA LE ' .. ====--===:."":::.-:::::::=::: '-----------------------:-----------------------------:------------ 14.48 minutes 17 .83 minute s Quick TR -55 Ver .5.46 E x ecuted: 11:02 :40 S/f\l: 03 --· 1'3 -···1 '3'3G F L 0 w f s MODIFIED RAT ION AL ME THOD ----Gra phical Summary for Ma x imum Required Storage ---- First peak outflow p o int ass um ed to occur at T c hydrog ra ph recession leg. CITY OF COLLEGE STAT ION S TO RAGE DETERMINATIONS MAXIMUM OUT NO MORE THAN 5 YEAR ********************************************************************** * RETURN FREQUENCY: 50 yr All owab l e Outf low: 28 .00 cfs * * 'C ' Adjustment: 1 .000 Require d Storage: 0 .250 ac -ft * *--------------------------------------------------------------------* * Peak Infl ow: 41.33 cfs Infl o w .HYD s tor e d: CSP50B .HYD * ********************************************************************** Td == 13 minu tes !-------Approx. Duration for Max . Storage ------/ ,_. "' I • 1 • T,.-::: I == Q -- 10.00 11. 100 45.04 mi nutes in/hr cfs F:equi1"ed Stor age 0 .25 0 ac-ft A X X X X X x :x X X X X X X X X X X F.:et u1 " ri Fi" e q: 50 yr C adj. fac to r : 1. 00 A r-ea C: ac ) : Weighted C: Ad.just e d C: 5. 12 o. 7'3 o. 7 '3 Td = I == Q == 13 minute s 10.200 in/hr 41. 3'3 cf s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q ::: 28.00 c f s (Al 1 ow. Out f 1 c•w) I I • NOT TD SCALE ================ ! C1 ~'~ '-----------------------:-----------------------------:------------ 13.78 mi nute s 1 6.24 min ut es Quick TR -55 Ver.5.46 E~1;ec ut ed: 11:02:40 S/N: 03--· 1'3-·1 '395 F L 0 w f s MODIFIED PAT I ONA L METHOD ----Graph i ca l Summary for Max imum Required Storage ---- First peak outflow point assu me d to occur at T c hydrograph recession leg. CITY OF COLLEGE STAT ION STOR AGE DETERMINATIONS MAXIMUM OUT NO MORE THAN 5 YEAR ********************************************************************** * RETURN FREQUENCY : 25 yr All owab l e Outflow: 28 .00 c f s * * 'C' Adjustment: 1.000 Requir e d Storage: 0 .1 72 ac-ft * *--------------------------------------------------------------------* * P eak Inflow: 37 .90 c f s Inflow .HYD stored: CSP25B .HYD * ********************************************************************** Td = 12 minutes Pet urn Freq: 25 yr !-------Appro x . Dur atio n for Ma x . Storage ------/ C adj.fac tor: 1.00 I I• Tc ::: I -- Q = 10.00 minute s '3. '300 in I hr 40.17 cf s F.:equ i Y-ed S t •:•rage AY-ea ( ac ): Weighted C: Adjusted C: 0.172 ac -ft Td = 5. 12 0. 7•3 0. 7•3 I - x x x x x x x :x x x x x x x x x x x Q - 12 minute s '3 . 340 in/hr 37 . '30 c fs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q·--28.00 cfs I I • (A l low. Out flcrw) NOT TO SCALE :-.:::::::::::=:=::::::::::::::::::::::::: '-----------------------:-----------------------------:------------ 13.03 minutes 1 4 .G1 minutes Quick TR -55 Ver.5.46 E ~,;ecuted: 11:02:40 s n ,1: 03--1 '3 -1 '3'36 MODIFIED RATIONAL METHOD ----Graphical Summ ar y foY Maximum Required Storage C ITY OF COLLEGE STATION STORAGE DETERMINATIONS MAXIMUM OUT NO MORE THAN 5 YEAR ********************************************************************** * * * RE TUR N FREQUENCY: :LO yr * 'C' Adju s tment: 1.000 ·l!- Allowable Outflow: Required Storage: * STORM DURATION = Tc f or Max.Stor age 28.00 cfs 0. 078 ac -.. ft * ____________________ ,,,, ________________________________________________ * * Peak Inflow: 33.68 cfs Inflow .HYD stored: CSPlOB .HYD * ********************************************************************** F L 0 w f s I I . C1 Tc=== 10.00 minute s I ..... 8.300 in/hr Air ea (ac) Q --33.68 cfs Wei ghted Ad.justed R e quired St C•r aqe -----------0.0 78 ac-ft I I • Cr I I• Q ::: 28.00 cfs C: A 11 ow. Out f 1 ow) NOT TO SCALE :.."::::::::::::::=========== -----------------------:------------------------ 11.6'3 minut es : C: c:: 5 . 1 2 o. 7'3 o. 7'3 Quick TR -55 Ver .5.46 S /N: E x ec ut ed : 11:02:40 03 -19 -1 99 6 MODIFIED RA TION AL METHOD ----Gra p h ica l Su mm ary f or Maxim um Required Sto rage C IT Y OF COLLEGE STA TION S TORAGE DETERMINATION S MA XIMUM OUT NO MORE THAN 5 YEAR ********************************************************************** * * RETURN FRE QUE NCY: 5 yr * 'C' Adju s tm en t: 1.000 * All owab l e Outflow: Requir ed Storage: 28 .00 cfs 0 .045 ac-ft * * * * * STORM DURATION = Tc f or Ma x .Stora ge * *--------------------------------------------------------------------* * Pe a k Infl ow: 31 .25 cfs Infl ow .HYD stored: CSP5B .HYD * ********************************************************************** F L 0 w c f s I I . 0 0 0 0 T c= 1 0.00 minute s I -7 .700 in/hr Area (ac) Q = 31.25 cfs We i ghted Adju s t ed Req uired Storage -----------0.045 ac -ft I I• 0 0 0 0 I I • Q -28.00 c f s (A ll ow .Outfl ow) NOT TO SCA LE ============ ~-----------------------:------------------------ 11 .04 minut es : C: C: 5 .12 0.79 0.79 Quick TR -55 Ver .5.46 S/N: E xec uted: 11:02:40 03-19-1996 CITY OF COLLEGE STA TION STORAGE DETERMINATIONS MAXIMUM OUT NO MORE THAN 5 YEAR **** Modified Rati o nal Hy d r ogra ph ***** We ight ed r -0.793 Area= 5.120 acres Tc = 10.00 minutes Adjusted r -0.793 Td= 14.00 min. 1=1 1.18 in/hr Qp == 45.37 cfs RETURN FREQUENCY: 1 00 year storm Ou tpu t file: CS P1008 .HYD Adj.factor= 1.00 Tim e Hour s HYD ROGRAPH FOR MAXI MUM STORAGE For the 1 00 Year Storm Time increment = 0 .017 Hour s Time on left re present s t ime for first Q in eac h row. --------:--------------------------------------------------------------- 0 . 00 0 0. 00 4. 54 ·::;. 07 13. 61 1 8 . 15 22 . 68 27 . . -,.-, ..;:.k 0. 1 :L7 31 . 76 36. 2 '3 40. 83 45 . ':'-1 ...JI 45. 37 45. 37 45. 37 0. 233 45. 37 40. 83 36. 2'3 3 1 . 7 G 27. :22 """)·-:· ..:....:... . 68 18. 1 5 0. 350 13. 61 ·::;. 07 4. 54 0. 00 Quio:k TR -55 VeY.5.46 S /N: E x ecuted: 11:02:40 03 -19-1995 CITY OF COLLEGE STATION STORAGE DETERMIN ATIO NS MAXIMUM OUT NO MORE THAN 5 YEAR **** Mo dified Rational HydYogYaph ***** Weighted r = 0.793 Area= 5.120 ao:Yes To: -10.00 minutes Adju sted r -0.793 Td = 13.00 min. I ::::10. 20 in/ht-Qp= 41. 39 0: f s RETURN FREQUENCY: 50 yeay stoYm Output file: CSP508 .HYD Ad J.fa o:to Y = 1.00 Time Ho:•UY 5 HYDROGRAPH FOR MAXIMUM STORAGE For the 50 YeaY StoYm Time ino:Yement = 0.017 Hour s Time on l eft re pYe se nt s time fo y fiYst Q in eao:h YOW. --------:---------------------------------------------------------------o. 000 0. 00 4. 14 8. 28 1 ·-· ...:.:. . 42 16. 56 2(>. 70 24. 83 0. 1 17 28. '3 7 33. 1 1 37. 25 41 . 3'3 41 . 39 41 . 3 '3 41 . 3•3 0 . . -.,.,. ... ..::_,.:)...;, 37. .-.c:- ..::.\..J ~'";) ....J ... .J • 1 1 28. '37 24 . 83 20. 70 16. 56 1 ·-:· ..:... . 42 0. 350 8. 28 4. 14 0. 00 -------------------~ Quick TR -55 Ver.5.46 S/N: E:1:e•cuted: 11: 02: 40 03 --1'3 --1'3'36 CITY OF COLLEGE STATION STORAGE DETERMINATIONS MAXIMUM OUT NO MORE THAN 5 YEAR **** Modified Rational Hy drog rap h ***** Weighted C -0.793 Area= 5.120 acr es Tc -10.00 minutes Adjusted C = 0.793 Td = 12.00 min. RETURN FREQUENCY: 25 year storm Output file: CSP25B .HYD I = '3. 34 in/hr Adj.factor = 1.00 HYDROGRAPH FO R MAXIMUM STORAGE .... ,,;:.- L...J Yea1' Storm Tim e inc re ment = 0.017 Hour s Qp= 37. '30 c fs Time Hou·rs Time on left represent s time for first Q in eac h row. --------:--------------------------------------------------------------- 0.000 0 .00 3. 7 ·3 7 .58 1 1 . 37 15. 16 18.95 22.74 0. 117 26. 5 3 3c). 32 34. 1 1 37 . '30 37 . '30 37. '30 34. 1 1 (>. ~'233 3(> .. 32 26 .53 22.74 18. '35 15. 16 11. 37 7. 58 0.350 ':> 7'3 0. 00 ..., . Quick TR -55 Ve Y.5 .46 S/N: Executed: 11:02:40 03 -19-1996 CITY OF COLLEGE STAT ION S TO RAGE DETERMINATIONS MAXIMUM OUT NO MORE THAN 5 YE AR ·llHH'i··lE-Modi f i E?d l?at ion a l Hyd 1" og1" aph -*·-*·**'*· Weighted r -0.793 AYea= 5.120 acres Tc -10.00 minutes Adjusted C -0 .793 Tel = 10.00 min. I =::: 8. 30 in I h 1" 33.GB cfs RETURN FREQUENCY: 10 year stor m Output file: CSP10B .HYD Adj. facto r = 1.00 HYDROGRAPH FOR MAXI MUM STORAGE For th e 10 Year S torm Tim e in crement = 0.017 Hours Time Houl's Time on left represents time f or fir s t Q in each row. 0.000 0.117 (>. ~"233 o. . -." .. :.:...::i. 20 . 00 , .... .::i. 58 25. 2 1 16. ~'37 6 . 74 ':.15 3(>. 31 84 13. 47 10. 1 (l 13. 47 16. 84 20. ~,""I ,:j.:J • 58 3(> • 31 25. ·35 23 . 10. 10 6. 74 ""I 37 0. .:;, . 21 58 00 Quic k TR -55 Ve r.5.46 S/N: Exec uted : 11:02:40 03 -19-1996 CITY OF COLLEG E STATION STORAGE DETERMINATIONS MA XIMUM OUT NO MORE THA N 5 YEAR **** Modified Ra tio na l Hydrogra ph ***** Weight e d C -0.793 Area= 5.120 acres Tc -1 0.00 minutes Adju sted r -0.793 Td = 1 0 .00 mi n. I = 7.70 i n /hr Qp = 31.25 cfs RE TU RN FREQ UENCY: 5 year stor m Output fi l e: CSP5B .HYD Adj.f actor= 1.00 Time Hou rs HYDROGRAPH FOR MAX IMU M STORAGE For th e 5 Year Storm Time incre ment = 0.017 Hours Tim e o n l e ft repre se nt s ti me f or first Q in eac h row. --------:--------------------------------------------------------------- 0. 000 0. 00 ~ 1 0 6 . ~~ 9 . 37 1? 50 15 . 6~ 18. 75 w . ~ ~~ L 0. 1 17 21 . 87 ~~ L~. 00 28 . 1 ~ L 31 . 25 28. 1 ~ L ~~ 00 21 87 4W. . 0 . 233 18. 75 1 ~ 6~ 12. 50 9. 3 ·7 6. ~~ ~ 1 ·~ o. 00 ~. L L~ W• L Quick TR -55 Ver.5.46 S/N: E x ecuted: 11: 02: 40 03 -· 1'3-··1 '3 '3G CITY OF COLLEGE S T AT ION STORAGE DETERMINATIONS MAXIMUM OUT NO MORE THA N 5 YEAR * * * * * * SU MM ARY OF RATIONAL METHOD PEAK DI S CHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, I =in/hour, A=acres adj = 'C ' adjustment f actor for eac h return frequency Su b al'· e.:1 D ~?SC r. GRASSED F'AVED Run i::_1 f f , c::' 0.350 0. '300 A1"ea ac l' es 1. 00 4. 12 T c (min) Wtd . 'C' RETURN FREQUENCY = 100 years ~c' adjus tm ent , k = 1 P1d .j • ' C' '.::: ~~t d • ' C ' ~,; 1 -------------------------•---------------------------------.-------- Adj . , c, I in/hr Total ai: r· es : Peak Q (cf s) -----------------------------:-----------------------:-------- 10.00 0.793 : : 0.793 12.500 5.12 : 50.72 Quick TR -5 5 VeY .5.46 E :,;£':)cu t e d : 11:02:40 S/N: 03 -·-l '3 --· 1 '3 '3 6 C ITY OF COL LEGE STATION S TO RAGE DETERMINATIONS MAXI MUM OUT NO MORE THAN 5 YEAR o~· ·K--*· ·1< IE · -M· S LJMMAr~:' OF F.:AT I CJNAL METHOD F'EAI< DI SCHP1PGES ·* -M· -M ·IE-* * Q = a dj * C * I * A Wh e r e: Q=c f s , C=We ighted Pun o ff Coefficient, !=in/hour, A=acres adj = 'C' a djustment factor f or e a c h return frequency Subarea De sr:r . Pun o f f 'c' T c C:min) ~-Jt d. 'c' RETURN FREQUENCY = 50 years 'C' adjustment, k = 1 Adj . ' C' =: Wt d. ' C' :1; 1 -------------------------•---------------------------------·-------- I I I I I I I I Adj. 'c' I in/hr Total : F'eak Q ac ~-es (cf s) --------------------------:--------------: :-----------------------:-------- GPASSED PAVED 0.35 0 0. '300 1. 0 0 4. 12 ---------------:--------------: :-----------------------:-------- 10. 00 0. 7·3 3 : : 0. 7·33 11 . 100 5.12 : 45 .04 Quic k TR-55 Ve r .5 .46 S/N: E x e cut e d: 11 :02:40 03 -1 9-1 396 C IT Y OF COLL EG E S TATION STORAGE DETERMINATIONS MA XIMUM OUT NO MORE THAN 5 YEAR * * * * * * S UMM ARY OF RA TION AL ME THOD PEAK DI S CHARGES * * * * * * Q = a d j * C * I * A Wh ere : Q=c f s , C=Weighte d Runo f f Coe f fic ient, !=in /h o u r , A=ac re s adj = 'C' a d j u s t ment f a ctor f o r e a c h r eturn fr e quency S ub ar ea Des c r. r:::u no ff , c , T c (min ) ~.J t d. , c , RETU RN FREQUE NCY = 2 5 y e a r s ~c ' a d just me n t , k = 1 Ad j . ' C ' = 1-Jt d • ' C ' :1; 1 -------------------------•---------------------------------.-------- Adj . , c, I in/h r T ota l ac r es : F'eak Q (cf s ) --------------------------:--------------: :-----------------------:-------- GPAS SE D P AVED 0 .350 o . ·;ioo 1.00 4 . 1 2 ---------------:--------------: :-----------------------:-------- 1 0 .0 0 0.79 3 : : 0.79 3 '3. '::JOO 5 .. 12 : 40.17 Quick TR -55 Ver.5.46 S /N: E~.;ec ut ed: 11: 02: 40 03 --1 '3-·1 '3'36 C I TY OF COLLEGE STATION STORAGE DETERMIN AT IONS MAXIMUM OUT NO MORE THAN 5 YEAR * * * * * * SUMMARY OF RATIONAL MET HOD PEAK DISCHARGE S * * * * * * Q = adj * C * I * A Whe re: Q=cfs , C=Weigh t e d Runoff Co ef ficient, !=in/h our, A=ac r es adj = 'C' a dju s tment f ac to r for ea c h re turn fre qu e n cy Subar·ea Descr·. F'.un of f 'c' acres T c (min) l~td. 'C ' RE TU RN FREQUENCY = 10 years 'C' a djustment, k = 1 Ad .j • ' C' = Wt cJ • ' C' ~,; 1 -------------------------•---------------------------------.-------- I I I Adj. 'C' I i n/h r Total acres : Pea k Q (c f s) ---------------------------------------------------------------:-------- C:il?ASSED PAVED 0.350 0. '300 1. 00 4. 12 ----------------------------------------------------:-------- 10 . 00 0. 7•33 0. 7 •33 8.300 5.12 : 33.58 Quick TR -55 Ver .5.46 S/N: E :1;e c ut ed: 11: 02: 40 03 -1 '3 --1 '3'36 CITY OF CO LLE GE STA TION STORAGE DE T ERMINA TION S MA XIMUM OU T NO MO RE T HAN 5 YEAR * * * * * * SU MM ARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Wh e re: Q=c f s , C=Weighted Runoff Coefficient, !=in/hour, A=acres a dj = 'C' adju s tm e nt factor for each ret urn frequency S ub .::ff ea D e~;c Y . F::un o f f 'c , Area ac Ye s Tc (min) ~~t d. 'c' RETURN FREQUENCY = 5 ye ars 'C' ad jus tment, k = 1 Ad .j • ' C' = Wt d • ' C ' :1; 1 -------------------------•---------------------------------·-------- Ad,j. 'c' I in/hY Total ao: Ye s : Peak Q (cf s) ----------------------------------------:-----------------------:-------- (:iRP1SSED PAVED 0 .350 0 .900 1 . 00 4 . 12 ---------------:--------------: :-----------------------:-------- 10.00 0 .79 3 : : 0 .793 7.700 5.12 : 31.25 Quick TR -55 Ver.5.4G SIN: Executed: 11 :02:40 03 -19 -1 996 ************************************************************************ ************************************************************************ * MODIFIED RATIONAL METHOD * * * * * ----Grand Summary For All Storm F r equencie s * * * * * * ************************************************************************ ************************************************************************ First peak outflow point ass umed to occur at Tc hydrograph recession leg. CITY OF COLLEGE STAT ION STORAGE DETERMINATIONS MA XIMUM OUT NO MORE THA N 5 YE AR Ar ea = 5.12 acres Tc = 10.00 minutes •••"ll"""•"e11n11111111n 11 n11t11111n •11•••••••"n111111 .. 11111111t111t1•1111111111111111,.111111t1n11 11 1t11••••n••••• 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 ti II 11 II II II II 11 11 II 11 11 11 11 II " 11 II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II Fr eq uency Adjusted DuYa tion Inten s . Qpeak Cyears) 'C' minutes in/hr cfs Allowable cfs VOLUMES Inflow (ac-ft) Storage Cac-ft) ------------------------------------------------------:--------------------- 100 0. 793 14 1 1 . 180 45. 37 28 . 00 0. 8'~ I~ o. 347 50 0. 793 13 10. 200 41 . 39 28. 00 0. 74 1 0. 250 ~~ L~ 0. 793 1 0 ~ 9. 340 37 . 90 28. 00 0. 525 0 . 172 10 0. 793 10 8. 300 ~~ uu . 58 28. 00 0 . 464 o. 078 5 o . 793 10 ~ 700 31 ~~ 28" 00 o. 430 0 . 045 I . L~ Quick TR-55 Vey.5.46 E :-·;e c u ted: 1 1:0 2 :40 S /N: 03-· l '3 -· 1 '3'35 MODIFIED RAT I ONAL METHOD Summ a ry fo r Single StoYm F req u e nc y F" ii·· s t p c·c:d :: o ut f 1 ow point a s sum e d to or: r: w r at Tc h y dy-og i·· aph i·· ec ess ion 1 eg. C ITY OF COLLEGE STA TION STORAGE DETERMINATIONS MA XIMUM OU T NO MORE THAN 5 YEAR RETURN FREQ UENC Y : 1 00 yy-'C' Adju s tment = 1.000 All owable Q = 28 .00 cfs Hyd Y-ograph file d u ration = 14.00 minute s Hy drogYaph file: CSP1008 .HYD Tc == 1 0.00 minutes 11 n• •• • "'" • • 11 n11 """ •• n """ • •• • • ••• ••• • • • • • • 11 11 11 • nn """ 11 • •••n• •• 1111 • • ••••• • •• • 11••••• "llllllll ll lO llll ••llllll llll llll"llllll•llllllllllllllllll•ll ll llllllllllll ll ltall M llllllll llllll•llllllll lllllla llllllll•llll•ll•llllllll Wei ght e d Ad j u s t e d Duration I nten s . Ar·e as 'C' 'C' minut es in /hr acy-e s Qpeak : cf s VOLUMES Inf 1 C•W C:ac--ft:> Stoy-a g e (ac-·ft ) ------------------------------------------------------:--------------------- o. 7 ·33 0 . 7•33 1 0 1 2 .500 5. 1 2 5(>. 7~?. : 0. E/3'3 0.313 ************************************************************ Storage Ma xi mum 0.793 0.7 93 14 1 1 .180 5.12 45.37 : 0.875 0.347 **************************************************************************** 0. :7 ·33 o . 7•33 1 5 10. 850 c.-:· ,_) . 1 ·-· ..::. 44 . 03 0. '3 1 0 0. 347 o. 7 ')3 0 . 1 q r:i 20 '3. 200 i= 12 ,..,..., ,.,,.., 1 028 o . 2·;:,5 I ~'-' ....J. WI • ,_,__, . o. 7 •33 0. 7•33 30 7. 533 r.::- ....J. :L 2 3(>. 57 1 . 2 53 0. 1 75 0 . 7•33 0. 7•33 40 6 . 267 I::" 12 .-.c:-43 Qp e ak .:" Da l l ow ...;. ..::....;. Quick TR -55 Ver.5 .46 S /N: E:1;(~C ut f2cl: 11: 0:2: 'l O 03 -... 1·:;1 -·1 ·:r::iG MOD IF I ED RAT I Ol'~A L METHOD Summary f or Sing l e Stor m F requency First peak o u tflo w point ass um e d to occur a t Tc hydr ograph recession leg. C ITY OF COLL EG E STA TION STORAGE DE TERMINATIONS MA XIM UM OUT NO MORE THAN 5 YE AR RE TURN FREQ UENCY: 50 Yl" ~c' Adjustment = 1.000 Allowabl e Q = 28 .00 c fs Hydrog ra ph file duration= 13.00 minutes Hydrograph file: CSP508 .HYD T c == 10.00 minut es ••,.••"•••"•"•11••ww11111111ua""•••11 111111ft lllll ft••••••••nnt11111111111 11 t11111•""""•••••••••••••• ••••••11111111111••········ .. ······••11••···· .. ••••• .. •••••••••••••••••••••••••••••••• ~sighted Adjusted Duration In tens. ~c~ r C' min u tes in/hi-- Qp eak : c f s VOLUME S Infl ow (ac-ft) Stc•rage (ac -ft) ------------------------------------------------------:--------------------- 0. 7';i3 10 11. 100 5 . 1 2 45.0 4 : 0.620 0 .235 ******~***************************************************** Storage Maxi mum 0. 793 o. 7 •33 1 3 1 0 . 200 5. 12 4 1. 39 : o. 74 1 o. 250 •*************************************************************************** o. -7 ·33 0. ~''3 3 15 •3 . 600 r:::-1 ·-:· 38. •:JE, 0. 805 0. 245 ..J • ..:.. 0 . 7 1 :3~~ 0 . 7·3 3 20 8. 1 00 c::-1 ·-:· '""'.-, 87 0 . '3 05 0. 17'3 . .J • ..:.. w...:.: • o. 7·33 o. 7•33 30 5 . 633 I::':" ..J. 12 25. '32 Opeak < Qal low Qui c k TR -5 5 Ver.5.46 E :1; e c u t e d : 1 l : 0 2 : 4 0 sn~: 03 -·· 1 '3 -···1 '3'35 MODIFIED RAT I ONAL ME THOD Summ ary for Single Storm Frequency Fir s t p ea k o u tf l ow poi n t ass u me d to o ccur a t T c h y d rogra ph recessi on l e g . CITY OF COLLE GE STATIO N S T ORAGE DETERMINAT ION S MAXIMUM OUT NO MORE THA N 5 YEAR RETUR N FREQUE NCY : 'C' Ad j u stme n t = 1 .000 All owab l e Q = 2 8.00 cfs Hydrograph f ile d ura tion = 12.00 minu t es Hy d rograph fi l e: CSP25B .HYD T c == 10 .00 minute s t1•n ••11 ••n•n •"" • ••• n ••"" • •••• • n••• n """" • •• n • • • ••• • • • • • ••••• • ••••••• •• • •• "" ••• .................................................................................... Weighted Adjusted Du ra tion Intens . 'C ' 'C' mi n ute s in/hr· ai:re.~s Qpea k : c f s VOLUM ES Infl o w C: ac -·-ft ) S t or age C:ac ····ft :> -----------------------------·---·----------------------:--------------------- 0. 7·33 10 '3 . '300 5. 12 40.17 : (>. 553 0.1 68 ************************************************************ St o ra g e Ma x imum 0.793 0.793 12 9 .340 5 .1 2 3 7.9 0 : 0 .626 0.1 7 2 **************************************************************************** 0 . 7 •33 0 . 7•33 15 8. 5 0 0 t:::" 1 ·-· 34 . 4'3 0 . 7 1 3 0 . 155 ...J. ..::. 0. -7·33 o. 7':J3 20 7 1 00 r.::-1 .-, 28. 8 1 0 . 7 ·:M . 0 . 075 . ...J • .. :.:. o. 7 ·33 0. 7'3:-~ 3 0 r:::-...J . 8':'':' ....,...., c::-...J • 1 ·-· ..::. .-,,_, .a:.:.w • 57 Qpea k <" Qal l ow Quick TR-55 Ver.5.4 6 S/N: E x ecuted: 11:02:40 03 -19 -1996 MODIFIED RATIONAL METHOD Summary for Single Storm Frequency First peak outflow point assume d to occur at Tc hydrograph r e cession leg. CITY OF COLLEGE STATION STORAGE DETERMINAT IONS MA XIMUM OUT NO MORE THAN 5 YEAR RETURN FREQUENCY: 10 yr 'C' Adjustment = 1.000 Allowable Q = 28.00 cfs Hydrograph file duration= 10.00 minute s Hycirograph fil e : CSP 1 0B .HYD Tc = 10.00 minutes •••n••••tl•aflU11••••••••••tt••••l'l••••••••••••11••••n••"••••••••••••••••••••••••• ···················································-·-······················ Weighted Adjusted Dura tion Intens. Areas 'C' 'C' minutes in/hr acres 0. 793 o . 793 15 7 . 250 ~ W • 1~ L 0. 793 0. 793 20 5. 200 r-1~ w . L Qpeak : cfs 29 . 42 ~c 15 I ~~. I VOLUMES Inflow (ac-ft) 0. 608 Qpeak ~ ' Storage (ac -ft) 0. 053 Qal l ow Quick TR -55 Ver.5.46 S/N: Executed: 11 :02:40 0 3 -19-1 9 96 MODIFIED RA TION AL ME TH OD S umm ary for Single Storm Fr e qu e nc y Fi rst peak outflow point assu med to occur a t Tc h ydrogra ph rec ess ion leg. CITY or COLLEGE S TATION STORAGE DETERMIN ATIONS MA XIMUM OUT NO MORE THAN 5 YEAR RE TURN FREQUENCY: 5 yr 1 C' Adj u st me nt = 1.000 Allo wa bl e Q = 28.00 cf s ll yd.,.-o g ·,·aph f ile du r·a tion =:: 1 0 .00 minute s Hy d l' i::1g t " ,:\p h I i 1 r-::: C SF'~3 B . HYO T i:: :::: 10.00 minu tes ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: Weigh t e d Adju s t ed Duration Int e n s . 1 C' 'C' minut es in/hr ac l' es Opeak cf s '-/OLUMES Inf 1 ot,.; C:ac --ft) Storag e (ac-ft ) ·------------------------------------------------------:--------------------- 0. 7 ·33 15 5.550 ~:i. 12 :2 G. 58 : Qpeak < Qallow --________ _.... SUMMARY FREG 100 YR 50 YR 25 YR 10 YR 5 YR STORAGE DETERMINATIONS WATERSHED C VOL. STORAGE AF 0.573 I 0.402 0.266 0.102 0.042 Quick TR -55 VeY.5.46 S/N: E ~,;ec ut ed: 11: 17: 08 03 --1'3 --·1 '3'35 F L 0 w f s MODIFIED RATIONAL METHOD ----Gyaphical Summayy for Ma ximum Requiyed StoYage ---- First peak outflow point a s sumed to occur at Tc hyciyograph recession leg. CITY OF COLLEGE STATION STORAGE DETERMINATIONS MAXIMUM OUT 5 YEAR EXISTING ********************************************************************** * RETURN FREQUENCY: 100 yy Allow a ble Outflow: 53.00 cfs * * 'C' Adjustment: 1.000 Required Storage : 0.573 ac-ft * *--------------------------------------------------------------------* * Peak Infl ow : 81.39 cfs Inflow .HYO stored: CSP100C .HYD * ********************************************************************** Appl'" 0 ~1;. I . I Td = 14 minutes DuY ation foy Max. St 01' age ........... ·---·----I Tc = I -- Q --. 10.00 12.500 '31. 00 minutes in /tw cfs Requi1'ed StoYage 0.573 ac -ft X A X X X X x :x X X X X A X X X X X F::etu t·n Fi'eq: C ad.j.factoY: Ai-ea (ac) : Weighted c:: Ad.justed c:: 100 yr 1. 00 8.70 0.84 0.84 Td == I - Q = 14 minutes 11. 180 in/hr 81. 3''.:I cf s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ Q== 53 .00 cfs r:1 I I• I ... f 1 1_1 I (Allow.Out flow) NOT TO SCALE ::: = :.= == ===::::: == ===== '-----------------------:-----------------------------,------------ 14 .18 minute s 1 7.4'3 minutes Quick TR -55 VeY.5.46 S/N: C:>·;E•c ut r0d: 1 l: l 7: 08 03-·-1'3 --·1 '3'3G F L f s MODIFIED RATIONAL METHOD ----Graphical Su mm ary f or Maximum Required Storag e ---- First p ea k outflow point assumed to occur a t Tc hydrograph recess ion leg. CITY OF COLLEGE STATI ON STORAGE DETER MI NAT ION S MAXIMUM OUT 5 YEAR EX ISTING ********************************************************************** * RETUR N FR EQ UENCY : 50 y r All owab le Outflow: 53.00 cfs * ·X· 'C' Ad.ju st ment: 1 . 0 0 0 Pequ i l" e d St or age: 0. 402 c:1c -ft -!!· *--------------------------------------------------------------------* * Pe a k Inflow: 7 4.26 cfs Inf l ow .HYD s tored: CSP50C .HYD * ~********************************************************************* Tel = 13 min u tes !-------Appro x . Duration for Ma x . Storage ------/ I • I ' T c:.::: I -- Q -- 10.00 minutes 11. 100 in/tw 80. 81 c f s F.:equ i l" e d St 01·· ,'.:\g e Pet urn F·r e q: 50 yr C a dj. factc•r: 1. 00 ?h· ea ( ac): ~fo ig ht ecl C : Ad.ju s t ed C: 8.70 0.84 0.8 4 0.402 ac-ft Td = 1 3 m inutes 10.200 in/hr 74 .26 c fs I -- X X X X X X x :x X X A X X X X X X X Q - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I I• NOT TO SCA L E =============:::::=::::::.:::= Q ::: 53. 00 cf~> (p,J. low. Out flo•,.,1) ~-----------------------:-----------------------------:------------ 13.44 minu tes 15. 85 minut E?S luic k TR -5 5 Ver.5.4G S/N: E>;ecute d: 11 : 1 7:08 03 -··1'::J -···1'::J '35 F L 0 \,J s MODIFIED RATIONAL METHOD ----Grap hi cal S umm ary f or Max imum Required Storage ---- First pea k outflow poi nt assumed to o ccur at Tc hydrogr a ph recession leg. C IT Y OF COLLEGE STAT ION STORAGE DETERMINATIONS MA XIMUM OUT 5 YEAR EX ISTING ********************************************************************** * RETURN FREQUENCY: 25 yr Allowable Outflow: 53 .00 cf s * * 'C' Adju st ment: 1.000 Re q uire d Storage: 0 . 2GG ac --·ft ·~· *--------------------------------------------------------------------* M· Pea l:: Inf 1 ow: 70. 03 •: f s Inf 101,,1 • H YD s t o r· ed: CSF'25 C • HYD -l!· ******************************************«*************************** Td ,.:: 11 minutes /·-------Appro x . Dur ation fo r Max. Sto ra ge . T·-= I -- Q -·- I I . 1 0 .00 '3. '30 0 72 .07 minut es in/hi' c f s Pequi1'ed Storage 0. 2GG ac--ft X A X X X X x :x X X X X A X X X X X l?et u rn Fre q: 25 yr C adj . fact C•l' : 1 • 00 At· ea (ac) : 8.70 lrJeighted C: 0.84 Ad j u s ted c:: 0. 84 Td= I = Q -- 11 minute s '3.520 in/hir 70 .03 cfs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q--53. 00 c f ·5 I I' NO T TO SCALE :::::::: == = ===:::: :::=:::: :::::::: (Allow.Outflow ) ~-----------------------:-----------------------------:------------ 12.55 minute s 13.43 minutes Quick TR -55 VeY.5.4G S/N : E>:ec ut ecj : 11: 17: 08 03 -1 ·:~--·1 ·3·35 MODIFI ED RA TION AL METHOD ----GYaphical Summayy foy Max imum RequiY e d StoYage C ITY OF COLLEGE S TATION STORAGE DETERMINATIONS MAXIMUM OUT 5 YEAR EX ISTIN G ********************************************************************** RETURN FREQUENCY: 10 YY All owa ble Outflow: 'C' Adju st ment: 1.000 Requ iYe d Stoyage: S TORM DURATION -Tc f or Max.Storage 53 . (l(l 0: f s 0. 102 a·:-ft -M· ·M- * * * *--------------------------------------------------------------------* * Peak Infl ow: 60.42 c fs I nf l ow .HYD stoYed: CSP 1 0C .HYD * ********************************************************************** F L 0 vJ f s Cr I I• Tc =: I -- Q -· 10.00 minut e~; 8.300 in/hy G0.42 cfs Ai -c:?a ( ao:) : Weighted C: Adju sted C: l?equ i ired St OY ~3qe -----------0.1 02 ac-ft I I• I I • Q :::: 53.00 c f s .(Al 1 ow. Out fl ow) NOT TO SCALE :=============== ~-----------------------:------------------------ 11.23 minutes 8 .70 0 .84 0.84 Quick TR -55 Ve r.5.46 E ~1;ec u ted: 11:1 7:08 S /N: 03 ·-1'J --·1 'J ':JG MDD I F I ED PAT I m ·IAL METHOD -··-··---·-('.ii -c:1p h i r: a l Surnma 1·-y f Ol' Ma:·.-; i mum Req u i .,, ed St i::or age CITY or CO L LEGE ST AT ION STORAGE DE T E RMI NA T IO NS MA XIMUM OU T 5 YEAR E XIS T IN G *******~*~***•*************~****************************************** •*• * RET URN FREQ UE NCY: 'C' Adju st me ri t: 1. 000 All o wa bl e Ou tfl o w: Requi Ye d Stora ge: 53.00 r:f s O. 042 ac --·ft * STORM DU RATION -T c for Ma x .Stora g e * *--------------------------------------------------------------------* * Peak In f l ow: 55.06 c f s Inflow .HYD stored: CS P 5C .H YD * ****************************************•***************************** F L 0 w f s I • I • C1 1 c::::: I Q = 1 0 .00 7 .700 5 5.0 5 m inut<-::>s in /hr cfs Ai ··ea (ac): Weigh te d r ·· Ad j u sted C : Requ i t-ed St 01· aqe ----------·-0.042 ac -ft I I • Q ::: 53 .00 c f s I I • (A llow.Ou t f l o w) ~·mT T O S CALE ==:=:.-============= ~-----------------------:------------------------ 1 0.55 min ute s 8 .70 0 .84 0 .84 Qui ck TR -5 5 VeY.5.46 S/N : E:.-;ec uted: 11: 1 7:08 03 ·-·1'3 --·1·3 ·::1G C ITY OF COLLEGE STATI ON STORA GE DETERMINATIONS MAXIMUM OUT 5 YEAR EXISTING *·:HH~· Modified Weighted C = 0.837 Area = F:c:1t i or .. 1c:.:i l Hy d1 " og1" aph -l•HH! .. JH~· 8.700 acres Tc -10.00 minutes Adju s ted r = 0.837 Td ::::: 14.00 min. I =11. 18 in/11 ·( Qp== 81. 3'3 cf s RETURN FREQUENCY: 100 year storm Output fil e: CSP100C .HYD Ad j .f ac tor = 1.00 Time Hou Ys HYDROGRAPH FOR MAXIMUM STORAGE For th e 100 Year Storm Time increment = 0.017 Hours Time on l e ft repre se nt s time for first Q in each row. --------:--------------------------------------------------------------- 0. 000 0 . 00 8 . 14 1G. 28 24. 42 ,--..-, ..::i.L. 5G 40. 70 48. 8:3 0 . l 17 5G. ·:o 65. 1 1 73. 25 8 1 . 3'3 81 . ":l1::, ..... -81 . 3'3 81 . 3•3 o . . -,,..,,."\ 81 3·;;, 7'-:> .-,c:-55. 1 1 5G. ']7 48. 83 40. 70 ?·-:· 55 .. ::...::,,;, . ...... .L...J '-'..:...• o. 350 24. 42 1 E,. 28 8. 14 o. 00 Qui c k TR -55 Ver.5.46 S/N: E xecu ted: 11:17:08 03 -1 9 -1 996 CI TY OF COLLEGE STA TION ST ORAG E DETERMINATIONS MA XIMUM OUT 5 YEAR EX ISTING **** Modified Weight e d r -0.837 Area= Ratio nal Hy drograph ***** 8.700 acres Tc -10.00 minutes Adjusted C -0.837 Td = 1 3 .0 0 min. I =l0.20 in /hr Qp = 7 4.26 cfs RETURN FREQUENCY: 50 yea r s torm Output fi l e: CSP50C .HYD Adj. fac t or = 1.00 Time Hours HYDR OGR APH FOR MAXIM UM STORAGE F or the 50 Year Storm T i me in cre ment = 0.01 7 Hou rs Time on left repr e se n t s time fo r first Q in eac h row. --------:--------------------------------------------------------------- 0. 000 0. 00 7. 43 1 ·4 • 85 22. 28 29. 70 37 . 13 44. 55 o . 1 17 51 . 98 59 . 40 55 . 83 74 . 2 6 7 4. 25 74 . 25 74 . 26 o. ~~~ 66 . a~ 59. 40 51 98 44 . 55 ~7 1 3 29. 70 22. 28 k~~ w~ . ~· . o. 350 14 . 85 7. 43 0 . 00 Quick TR -55 Ver.5.46 SIN : Executed: 11:1 7 :08 03 -19 -1996 C I TY OF COLLEGE STATION STORAGE DETERMINATIONS MAXIMUM OUT 5 YEAR EXISTING 1·*** Modified Rational Hy drograph ***** Weig ht e d C -0.837 Ar ea= 8.700 acres Tc -10.00 minutes Adjusted r -0.837 Td = 11.00 min. I = 9.62 in/hr Qp = 70.03 cfs RETURN FREQUENCY: 25 year storm Output file: CSP25C .HYD Adj.factor = 1.00 Tim e Hours HYDROGRAPH FOR MAXIMUM STORAGE For the 25 Year Storm Time increment = 0.01 7 Hour s Time on left represent s time fo r first Q in each row. --------:--------------------------------------------------------------- 0. 000 0. 00 7. 00 14. 01 21 . 01 28 . 01 35. 02 42. 02 0. 1 17 49. 02 56. 03 63. 03 70 . 03 70 . 03 53. 03 56. 03 0. ~~~ 49 . 02 42. 02 ~~ 02 28 . 01 21 01 14. 01 7 . 00 LW~ w~. . o. 350 0. 00 Quick TR -55 Ver .5.46 S/N: E:,.:E·c u t ed: :L 1 : l 7: 08 0 3 -1 9 --1 '3 '36 CITY OF CO L L E GE STA TION S TO RAGE DETE RMI NA TIONS MA XIMUM OUT 5 YEAR EX I S TIN G ·*-·l'HH (· Modified Rat ional Hy d ·rog 1"e:'ph -l'!··~HHH'I· Weighted C -0.837 Ar ea= 8.70 0 acres Tc = 10.00 minut es Ad j u ste d r -0 .837 Td == 1 0 .00 mi n. I = 8. 30 in/hi,. RETURN F REQUENCY: 1 0 year s t or m Output fil e : CS P10C .HYD Adj .fac tor = 1.00 HYD ROGRAPH FOR MAXIMUM STORAGE F or th e 10 Yea r Storm Tim e incre me n t = 0.017 Hour s Qp = 50.4 2 cfs Time Hour s T i me on l e ft re pr ese nt s time for first Q in each row. --------:--------------------------------------------------------------- 0. 00 0 0. 0 0 5. 04 1 2 . 08 18. 1 ':> ·'-' 24 . 17 30. 21 35.25 0. 1 17 42 . 3 (> 4 8 . 3 4 5 4 . 3 8 60 . 42 54. 38 48. 34 4 ·-· ..::.. . 30 0 . . -,,,r""I ..::....::·..::i 36 . . -,r:- ..:'..-..! 30 . 21 24. 17 18. 13 1 ·-· ..::.. . 08 6. 04 0. 00 Qui c k T R-55 Ve r.5.4 G S /N: E x e c ut e d: 11:1 7:08 03 -19-199 6 CITY OF COLLEGE S TATION STORAGE DETERMINATION S MAXIMUM OUT 5 YEAR EXISTING **** Modified Rational Hydrograph ***** We i gh te d C -0 .837 Area= 8 .7 00 a cres Tc -10.00 minute s Adju st ed C -0.837 Td = 10.00 min . I = 7.7 0 in /hr Qp = 56 .06 cfs RETURN FREQUEN CY: 5 ye a r s t orm Adj .f ac tor = 1.00 Ou t p ut fil e : CSP5C .HYD T i me Hou rs HYDROGRAPH FOR MA XIMUM STORAGE For th e 5 Yea r Stor m Time in cre men t ~ 0 .017 Hours Tim e on left repre s ent s time for fi r st 0 in each row. --------:--------------------------------------------------------------- 0. 00 0 0. 0 0 ~ 51 1 1 21 1G. 82 22. 42 28. 03 ~~ G3 ~. . uu• o. 1 17 39 . 2 4 44. 84 50. 45 56. 06 50. 45 44. 84 39. 24 0. ~~~ ~~ G3 28. 03 22. 42 lG. 82 1 1 21 ~ Gl 0. 00 ~~~ uuo . ~. Quic k T R-55 Ver .5 .46 E:1;e cut e d: 11.: 1 7:08 S/N: 03-·· 1 '3·--1 '3'3G CITY OF COLLEGE S TATION STORAGE DETERMINATIONS MA XI MUM OUT 5 YEAR EX ISTIN G * * * * * * S UMMARY OF RATIONAL METH OD PEAK DISCHARGES * * * * * * Q = ad j * C * I * A Wh e re: Q=cfs , C=Weig h ted Runoff Co eff i c ient, I =in/hour, A=acres a dj = 'C' adjustment fa c tor f or each retu rn frequenc y Suba1' ea Des•: r. F:unoff 'c ' Ar ea T c (m in) Wtd . 'C' RETURN FREQUENCY = 100 yea rs 'C' adjust ment, k = 1 Adj. 'C' = Wtd.'C' :1; 1 -------------------------•---------------------------------.-------- P1dj. , c' I in/hr : Peak Q (cf s) --------------------------:--------------: -----------------------:-------- GPA SS ED PA\..'ED 0 .350 0. '30 0 1. 00 7.70 ---------------:--------------: -----------------------:-------- 10.00 0.83 7 : : 0.8 37 12 .500 8 .70 : '31. 00 Qui c k TR -5 5 Ver.5.46 E :.;ecutE·d: 11 :17 :08 SIN: 03 -·-1 ':J --1 ·:;i •;j[, CI TY OF COLLEGE STATIO N STORAGE DETERMINATIONS MA XIMUM OUT 5 YEAR E XISTING * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCHARGES * * * * * * Q = adj * C * I * A Where: Q=cfs, C=Weighted Runoff Coefficient, I =in/hour, A=acres adj = 'C' adju s tment fa c tor for each ret u rn frequenc y Suba·r· ea Des•: r. Punoff , c , Ar·e.=1 a cres T c (min) Wtd. , c , RETURN FREQUENCY = 50 years 'C' a djustment, k = 1 Adj • ' C' = Wt d. ' C' :1; 1 -------------------------•---------------------------------.-------- Ad j . 'c ' I in/h ·i'" T ota l : Peak Q (cf s) ----------------------------------------:-----------------------:-------- 1::Jr:::AE)SED F'AVED 0.350 o. ·::ioo 1. 00 7 .70 10.00 0.837 : : 0.837 11.100 8.70 : 80.81 Qui c k TR -55 Ver.5.46 S/N: Exe c ut E?d: 11: l 7: 08 0 3 --1 ·3 -... 1 •3•35 CITY OF COLLEGE STA TIO N STORAGE DETE RMINATION S MA XIMUM OUT 5 YEAR EX I S T ING * * * * * * S UMMARY OF RATIONAL METHOD PEAK DISCH ARG ES * * * * * * Q = ~dj * C ~ I * A Wh e re : Q=c fs, C=Weighted Runoff Coefficient, I =in/hour, A=acres adj = 'C' adju s tment f ac tor f o r each return frequency Subar e .:1 Dr2:;•: l' • F::un o f f 'c, T c (min) Wtd. 'c' RE TURN FREQU ENCY = 25 years ~c ' adj u st me nt, k = 1 Adj . ' C' =: Wt d. ' C ' 7; 1 -------------------------•---------------------------------.-------- I I ' Adj. 'C' I in/h r Tota l : Peak Q (cf s) --------------------------:--------------------------------------------- GPASSED F'AVED 0 .350 o. '300 1 . 0 0 ---------------:--------------------------------------------- 10.00 0.837 : 0.837 ·::.r. '300 8.70 72 .07 Quic k TR -5 5 Ver.5.46 SIN: E :,-;ec ut ed: 11: 1 7: 08 0 3 -· 1 '3 -···1 '3 '3G C ITY OF COLLEGE S TATION STORAGE DETERMINATION S MA XIMUM OUT 5 YEAR EXISTIN G * * * * * * SU MM ARY OF RATION AL METHOD P EAK DISCHARGE S * * * * * * Q = a d j * C * I * A Where : Q=c fs , C=Wei ghted Run of f Coe ffi c i ent , !=in /hour, A=acre s adj = 'C' a d justment f ac tor f or ea ch return fr e quency Su b area Des•:r . F'.un of f , c, Ar ec:1 T c (m in) Wtd. 'C' RETURN FREQUENCY = 10 year s ~c ' a dju s tment, k = 1 Adj . ' C ' = Wt d. ' C ' :1; 1 -------------------------•---------------------------------.-------- I I I I I I I I Adj. 'c, I i n /ht- T o tal a cr-es : Peak Q (cf s) --------------------------:--------------: :-----------------------:-------- Cil?A~3 SE D F'AVE D o. 3 5 0 0. '300 1 • 0 0 7 .7 0 ---------------:--------------: :-----------------------:-------- 10.0 0 0.8 3 7 : : 0 .837 8.300 8.70 : 60.42 Quick TR -55 Ver.5.46 S/N: Executed: 11:17:08 0 3 -19 -1996 CITY OF COLLEGE S TATION STORAGE DETERM I NATIONS MAXIMUM OUT 5 YEAR EXISTING * * * * * * S UMMAR Y OF RAT IONAL MET HOD PEAK DISCHARGES * * * * * * Q = a dj * C * I * A Wh ere: Q=c fs, C=Weighted Runoff Coefficient, I=in /hour, A=acres adj = 'C ' ad ju s tm e nt fac tor f o r each return frequency Su b ai'·ea De ~-;c ·r . F::uno ff , c, a cres Tc (min) RETURN FREQUEN CY = 5 years ~c ' a dju stme nt, k = 1 ~)dj. 'C'::: Wtd.'C' ~; 1 -------------------------•---------------------------------.-------- Adj. , c, I in/hi' Total ac l ' es : Peak Q (cf s) --------------------------:--------------: :-----------------------:-------- C:iF::ASSED F'A 'v'E D 0.350 o . ·::ioo 1 . 00 7.70 ------------------------------:-----------------------:-------- 10.00 0.837 : : 0.837 7.700 8.70 : 56. 06 Quick TR -55 Ver.5 .46 S/N: E :1; e c u t e d : 1 1 : 1 7 : 0 8 0 3 -1 '3 --1 ·3 ·3 G ************************************************************************ ************************************************************************ MODIFIED RATIONAL METHOD * ·lf- ·j"l'.-----Grand Su mm ary For All S torm F reque ncie s * * * * ************************************************************************ ************************************************************************ First pea k outf l ow point assumed t o occur a t Tc hydrograph rec es sion leg. CITY OF CO LLEGE STA TION STORAGE DETERMINATIONS MAXI MU M OUT 5 YEAR EX ISTING A1 "ea ···· 8. 70 ac1'es Tc = 10.00 minutes ftnn n """"ana11n a 11•••lll11••••n11 11•n•11n"11•t1 •nn•11nnn11nnn'l11lln111111na1111•aaa11"11a11 a 11naa a 11• •••• ".Ill ........ " ••• "." ................. """ •••••••••• " •••• "".,, .................. . Frequency Ad justed Duration Int ens. Qpeak All owa ble : Cyears) ~c' minut es in/hr c f s c f s 100 o. 837 l4 11. 1 80 81 . 3 '3 53. 00 !50 0. 83~7 13 10.200 74.26 53.00 .-.c:-.::....; 0.837 11 •:J. 520 70. 03 53 .00 :L O 0. 837 10 8. 300 G0.42 53.00 5 o. 837 1 0 7 . 700 55. OS r:;:-,-, .,_)..:;, . 00 VOLUMES Inf 101..J Cac -ft) 1 . 5 70 1.330 1. 06 1 (>. 832 0.772 Sterr age ( ac --ft) 0 .573 o . 402 O. 2GE. o . 102 0.042 Quick TR -55 Ve r.5.46 S/N: E xec uted: 11:17:08 03-19-1996 MOD IF I ED RAT I 01\1(.~L MET l-IOD S ummary for Single St or m Frequency Fi rs t p ea k outflow point assumed to occur at T c hydrograph recession leg. CITY OF COLLEGE STAT ION STORAGE DETERMINATIONS MAXIMUM OUT 5 YEAR EXISTING RETURN FREQUENC Y: 100 yr ~c' Adju s tment = 1.000 Allowable Q = 53.00 cfs Hy drograph file duration = 14 .00 minute s Hy drograph file: CS P100C .HYD Tc :::: 10 .00 minutes ••••••"•"••n11•••••••• .. ••n •••••••••••••••11•11•••••••tt•••,.•••••••1t••11•••••••••• • • • • • • • 11 • • • • • • • • • II • • II II • • a • II II • • • II • • • II II It OI • • • • OI • • • • • • • II • • • • • • • • a • • • • II • • • • • • • • • • Weig ht ed Adju sted Durati o n Inten s . ~c' 'C' minute s in /hr· Ar· eas Qpeak : cfs VOLUMES I nflow ( ac --ft) Storage (a c --ft ) ------------------------------------------------------:--------------------- 0.837 O.E337 10 12.500 8.70 '31 . 00 : 1. 253 (>. 523 ************************************************************ Storage Maximum 0 .837 0.83 7 14 11.180 8.70 81.39 : 1.57 0 0.573 **************************************************************************** 0. 837 0.837 15 10 . 850 8. 70 78. ·::;i-:3 1. E,'-:i·-:· ...., .... 0. 5E/3 0.837 0.837 20 9 .200 8 .70 bb. ':38 1 .845 0.461 0 .837 0.837 30 7.533 8.70 54 .84 2.265 0 .216 0 .83 7 0. 93 -7 40 6 .267 8. 70 45.62 Opeak < Qallow Ou i c I:: TR -·55 Ve i·-. ~:i. 4G E~1;ec ut e d: 1 l: 1 7: 08 S /N: 03--1 '3 --1 '3 '35 MODIFIED RATIONAL METHOD Summ ,::n·y f·:·i·-S ingl e Stot-m Fi-equ e nc y rirst peak outflow point as s umed to occu r a t Tc hydrograph recessio n leg. C IT Y OF COLLEGE STATION STORAGE DETERMINATIONS MAXIMUM OUT 5 YEAR EXISTING RETURN FREQUENC Y: 'C' Adju s tment = l.000 All owable Q = 53.00 cfs Hy drogr«::i.ph file duration = 13.00 minLlte s Hydrograph fil e : CSP50C .HYD Tc ::-.: 10.00 minutes •• ••• ••"n•n n •11 ••••••II••••••• a•••••••••• n• ••a n a """•••••a n a •• ••••naa ••••a ,.. a•• ................................................................................. We ighted Adju sted Duration Intens. 'C ' 'C' minutes in/hr acres Qpeak : c fs ~/OLUMES In flow C:ac -f t) Storage C:ac-ft) ------------------------------------------------------:--------------------- 0 .837 0.837 1 (l 11 . 100 8.70 80 .81 1. 113 0.383 ************************************************************ Storage Maximum 0. 837 0. 837 13 10. 200 8. 70 74. 2E, : 1. 330 O . 402 **************************************************************************** 0. 837 0. 837 15 9 . 500 8.7 0 b'3 . 8'3 1. 444 0.385 0.837 0.8 37 20 8. 100 8.70 58. '37 1 .524 (>. ::253 0 .837 0.83 7 30 E,. 533 8.7 0 48. 2'3 Qpeak .:·' Qallow .. Quic k TR -55 Ver.5.4G E:,:ec ut ed : 11:17:08 ~3/N: 03-· 1'3 -.. ·1 '3'3 5 MODIFIED RATIONAL METHOD Summary fo r Single Storm Fr e qu e n cy First p ea k outflow point ass um e d to occur at Tc hy d rograph recess i on l eg . CITY OF COLLEGE S TATION STORAGE DETERMINATIONS MA XIMUM OUT 5 YEAR EXISTING RET URN FREQ UENC Y: 'C' Adju s tment = 1.000 All owable Q = 53.00 cfs Hy drog rap h fi l e dur a ti o n = 11.00 mi n ut es I !y dir ogr a ph f i 1 e: CSF'2 5C . HYD re =: 10. 00 mi n utes ••••"•••••••1t••••••••••••ri•••••••••••••••••••n •••••••••••••••••••••••••••••• .............................................................................. We ighted Adju s t e d Dur a tion Int ens. Al' ea s 'C' 'C' minutes in/hr aci··es Qpeak : cfs VOLUMES In 'f 1 ow (ac --ft) Storage (ac -ft) ------------------------------------------------------:--------------------- c). 837 0.837 1 0 "3. '300 8.70 72.07 : 0 . •3•33 0 .253 ************************************************************ Storage Maximum 0. 8 3 7 0. 837 11 '3 . 520 8. 70 70. 03 : 1 . 05 1 0 . 255 **************************************************************************** 0.8 37 0.837 0.83 7 0.837 1 5 20 8.500 7 .100 8.70 8 .70 51.88 51 . 5•3 1. 27"3 o . 228 Qpeak < Qa ll ow Quic k TR -55 Ver.5.4 6 S /N: E x ecut e d: 11 :1 7:08 0 3 -19 -1 996 MODI F IED RA TI ONA L METHOD S um mary fo r S ing l e S t or m F re qu e nc y F ir s t pea k outf l o w p o i n t ass um e d to o ccur a t T c h y dr o graph r eces s ion leg. CITY OF COLLEGE ST ATION S TORAGE DETERMI NA TI ON S MA XIMUM OUT 5 YEA R EXISTING RE TURN FRE QUEN CY : 10 y r ~c ' Adju s tm e nt = 1.000 All o wa bl e Q = 53.00 cfs Hy d ro gr aph fil e dur a tion = 10.00 mi nute s Hydr ogra p h fil e : CS P10C .HYD Tc = 10.00 minutes ••t1•n an11tt •a a n a 11 11 11a ann11•n """""""""""""""""""""""""""""•""""""""""""••••••t1••• ................................................................................ We ighted Ad j u s ted Dur ation Inten s . ~c ' 'C' mi n u te s in/hr Ar e a s ac res Qp e ak : c f s VOLUMES Inflow Cac-ft) Storage Cac -ft) ------------------------------------------------------:--------------------- 0 .83 7 0.8 37 15 7.250 8 .70 5 2.78 : Qpeak < Qallow Quick TR -55 Ver.5.45 E >·;ec ut ed: 1 1 : 1 7:08 S/N: 03 -· 1 '3···-1 ·::;i ·::,it, MODIFIED RATIONAL METHOD Summary for Singl e Stor m Freque n cy First pea k outflow poin t a ssumed to occur a t T i: h y dr ograp h recess ion l eg . C IT Y OF COLLEGE S TATION ST ORA GE DETERMINA TION S MAXIMUM OUT 5 YEAR EX ISTIN G RETURN FREQUENCY: 5 y·( ~c' Adjustment = 1.000 Allow able Q = 53.00 i:fs Hydrograph f ile duration = 10 .00 min u tes Hydro graph file: CSP5 C .HYD T·-== 1 0 .00 minutes •••••••••••••a•••t1•na•••••••••••N •••••••••••10n rt••••n'll••••••••••••••••••11•••• ...................... " ...................................................... . Weight ed Adju sted Dura tion Intens. ~c ' 'C ' min utes in/hr .. ac ·f es Qpea k : r: f s VO LUMES Inflow (ac --ft) St ot-age (ai:··-ft ) ------------------------------------------------------:--------------------- 0 .837 (>. 837 ·I c:· J . ..J G .550 8.70 47 .E.8 : Qpeak < Qallow STORAGE DETERMINATIONS WATERSHED D, F, G, H SUMMARY FREQ. VOL STORAGE AF 100 YR. 2.870 50 YR. 2.197 25 YR. 1. 621 10 YR. 1.018 5 YR. 0.616 Du ii: I:: Tl?--55 '.JE"r". 5. ·~G Exec uted : 1 2:04:4 0 S/!•I: 04 ···-o·::_i --:t ·:'.!·:;is F L CJ lrJ f s MODIFIED RATION AL. METHOD ........... -...... l ~j·r .. c:lp 11 i •: ,";t 1 Su mm a l" y f Ol" Ma:·,; i mu m F'.e q u i reel St Oi' ,!\q e -----· F"i.~"!";t p ee:\!:: outfl.o~,· p oi n t as~;um ed to oc i::u ·( a l; T•:: hydYC•\;ii-·ap h Yecess ion leg. C IT Y OF COLLE GE Sl 'ATION ST ORAGE DETERMINATIONS WATE RSHED D,F ,G,H MA X OUT 5 YEAR EXIS TING *************~******************************************************** ·!!-F.:ETUR l\I FPEQLIEl'ICY : l 00 y i-.. Al l o •,J,:!l b l E·? Out fl ow: l 15. 00 c f s * * 'C' Adjustmen t : 1 .00 0 Re q uired S torage: 2 .870 ac-ft * *--------------------------------------------------------------------* * P eak In flow: 1 97.99 c f s Infl ow .HY D stored: CSP100 D .HYD * ********************************************************************** T d = 24 minut es !-------Appro x . DuYation f or Max . Storage ------/ I I • Tc= 17.00 minutes I = 10.130 in /hr Q -2:::6. 42 c fs F'.E?q u i 1·· ed S t or a ge 2. 8 7 0 a •::-·-ft A X X X X X x :x A X X A A X X X X X Return Freq : 100 y Y C a d ,j. fac toY: l. 00 (..)r· ea ( ac ) : l.-J eig hted C: 41.05 0.57 0.57 Adju s t c~d C: T cl ::: I -- Q = 2 4 minut es EL ~333 in/hr· 1 ·:r;r . ·3 ·3 c f s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q == 115.00 cfs C:A llow.Out fl ow) I I • l\ICJT TO SCAL_E () ===:: :::=:---.:::: ==== :::: ==== :-.--.: ~-----------------------:-----------------------------:------------ 25.73 minu te::; 31.13 minutes Quick TP -55 VeY.5.46 S/N: Executed: 1 2:04 :40 04-09 -1996 MODIFIED RA TION AL MET HO D ----GYaphical Sum mary for Maxi mum Requ i re d Storage CITY OF COLLEGE STA TION S TO RAGE DETERMINATION S WAT ERS HED D,F,G ,H MA X OUT 5 YEAR E XI S TING ********************************************************************** * * RETUR N FREQUENCY: 50 yr Al l owa ble Outf l ow: * 'C' Adju st ment : 1.000 Req uiYe d S torage: -~· 115.00 cfs 2. 1 '3 7 ac---ft * ·JE- * * * S TORM DURATION -T c for Max.Storage * *--------------------------------------------------------------------* ·*· F'e a k Infl o~-J : 208 .81 cfs I nf l •:•'""' • HYD s t 01" ec:I: CSF'50D .H YD ********************************************************************** F L. CJ w f s () ' '. Tc= 17.00 I ---'3. 000 Q ···-2 08. 8 1 minut e<:.; in /h 1" cf i;::, r.:ir ~'?a ( ac ) : Weighted C: Ad .ju sted C: F:e qu i r <::?cl St or iO:lg e -----------2 .197 ac-ft ' '. I '. O= :t 1 5. 00 cf~:; (A 11 O'""'. Out f 1 ow ) NOT TO SCALE ::::========::::== ~-----------------------:------------------------ :24 . 54 minute s 41 . 0 5 0 .57 0.57 Quick T R-55 Ver.5 .46 S I N : executed: 12:04:40 04-09 -1 996 MOD I FIE D RA TI ONAL METHO D ··--·-·-·-· 13r cip h i •::a l Su mm a !' y f ol' Ma:··: i mum P equ i ·re d St Ol' age CITY OF CO LLEGE STATIO N ~>TDl:;::(4 (~E DE TE RM I NAT I Ul'.1'::1 vH~TE:F:fJ H[~D D , F-, G , H MAX OUT 5 YEAR EXISTING ***************~*************************~**************************** 1(· .!.(. ·ll:· RETURN F PEQUE NCY: 25 yr 'C' ?~cljust m ent: .I.. 000 Allowab l e Out flow : Re q u i red Stol'age : 1 15.0 U cf s 1.52 1 ac --ft * ST ORM DURATION Tc for Max.Stora g e * *--------------------------------------------------------------------* * Pea k I nflow : 184 .22 cfs I n f low .HYD s tor e d : CSP25 D .HYD * ********************************************************************** F L 0 (..J f s I I • Tc== I -- Q -- 17 .00 m i nutE:s 7 . '340 in /h i' 1 El4 . 22 cf s A r-ea ( a c ) : ~·JE:ight e d C: AdjlJst ed c:: F.:eq u ii--e d S t Ol' a g e -----------1.62 1 a c ·-f t I I• I I • Q· .. -1 1 5. 0 0 c f s C:A ll o w.Outflo w) NO T TO SC AL E ::.-: :=:::: == :::::= == ::::::::::::= Z3 . :3·3 m :i. nut es 41. 05 0.57 0.57 Quick TR -5 5 Ver .5 .46 S/N: Exec uted: 12:04:40 0 4 -09-1996 MODIFIED RATIONAL METHOD -............ C'.ir a p hi ca 1 Summ,;:..1 " y f ot· M21.:1; i mum Req u it" ed St O '( age CITY OF COLLEGE STAT ION S TORAGE DETERMINATIONS WAT ERS HED D,F,G,H MAX OUT 5 YEAR EXIST ING ********************************************************************** '"' ·~· ·~· RETURN FREQUENCY: 10 'C' Adjustment: 1 . 000 Allowable Outflow: Required Storage: 11 5 .00 cfs 1. 018 ac--·ft '*' * -!!· ·II:- * S TORM DURATION -Tc f or Ma x .Storage * *--------------------------------------------------------------------* ii<· F'e.:~k Infl o •-': l5C:i .47 c f s I1 ·1fl ow .HYD s tored: CSP10D .HYD * ********************************************************************** F L Cl [,.J f 5 I I • Cr Tc== I -··· Q = 1 7 .00 5 .830 1 58 .4 7 minut es in /hr cf s (1\'· e~'3. ( ac ) : Wei~~hted C: Adju sted C: F:e qu i r· f?d St •:•r ,::igE:? -----------1.018 ac-ft I I• C1 C1 C1 I I• IJ::: :l :l 5. 00 c f s (Al 1 ow. Out f 1 0 1,.,1) NOT TO SCA LE ============:.--=:::::= ~-----------------------:------------------------ 21.65 minut es 41. 05 0.57 0.57 Qu. i c I:: TP --:':55 1./(::'r • '.S. 4C E~e cuted: 12:04:40 S/N: 04 ·-0'3-· 1 '3'3f;, MODIFIED RATION AL METHOD ----Grap hi cal Su mma ry for Ma x imu m Requi r ed Stor age C IT Y OF CO LL EGE STA TION S TOl?Ai:;E DE TERM HIAT I Ot\IS lrJ ATE P S H ED D ~ F y G ~ H MAX OUT 5 YEA R EX I S TING *************~****.*************************************************** RETURN FREQUENCY: 'C ' Adjustme nt: 1.00 0 "* All owa bl e Ou tf l ow: Required Stora ge: 11 5.00 cfs 0. E,16 ac···f t * ST OPM DURA TION -T c f or Max .S t o rage * ·lE· ·-••.. ----··-.••..•..•• ·-·•·•••·• -·· •.•••. ---· ···-· .•.•.• -······-·-------··-••• ·---•.• ·-· ......• •••·•• ••. ----·-·-· -.•.. -·-••. ---------· ---·---- --------.•.• -* ·*· Pe .:.~ k Inf 1 ow: J. 41 . 30 c f s Inf J. o ' . HYD s t air eel: CSF''.:50 • HYD -M· *****~**************************************************************** f s 1 • I " ('.) Ct Tc= I .... Q - 1 7 .00 min utes 6 . 0'30 i. n I h r 141.30 cfs {..)1 r E~a ( ac ) : lrJe ight e cl C: Adju s t e d C: Pequ i ·re d S t •Yrr age -----------O.G16 ac -ft I I• () I I • [!:::: 115. 00 c f ~; ,C: Pr l l ow. Out f 1 o •,,i) NOT TO SU-~LE :::::::::::::::::::=:=:::::::=:=::::=:::: ~ -·-· -·----·--·"MO·--·-00 .. ···-· .. ----·---· ----· ------: --Ooo-MoOOMOM -·-----·-·-·-·---·-------·--·--··- 20. 1 5 min ute '::'~ 4 1 .05 0 .57 0.57 Duicl:: TP -55 '"v'cO?r.5.46 S/N: Executed: 12:04:40 04 -09-1 996 C IT Y or COLLEGE STA T I ON S TORAG E DETERMINATIONS WATERS HED D,F,G,H MA X OUT 5 YE AR E XI ST IN G .. ,·lHH'<· Modi f :i. t:!cl P ,::\t ion a l H yTfr o~p,. a ph ·11!-·lHHl!·-l!· Weighted C -0 .565 Area= 41.050 acres T c -17.00 minute s Adjust ed C -0 .565 Td == 24 .00 min. I == 8 . ~:;3 i n /h ·I'" Qp = 1 '::17. '3'3 c f s RETURN FRE QUEN CY : 100 year s tor m Output f :i.l e: CSP 1.00D .HYD Adj.fac to r= 1.0 0 HYDRDGRAP H FOR MAX IMUM S TORAG E For t he 100 Ye ar Stor m Ti me in creme nt = 0 .0 1 7 Ho ur s Tim e H OU1' s Time on le f t repre se n t s ti me f or fi rs t Q in ea ch row. o .. 000 ,., 00 1 1 E.5 .-.'1 :2'j 34 . ·:1 4 46. 58 58. .. ... ,, E/3. ..... . ..::.~. LW o . 1 1 7 8 1 . 5:2 '33. 1 7 1 04 . 82 J. 15. 1 '"" 'b 128. 1 1 1 3'3 . 75 1 5 1 . 0 . . ·-,,..~ .L ... J . .:J 1 6 :]. ()5 1 74. 5·3 186. 3,:l 1 ·:o . ·:r :i 1 '37. '3'3 1 '3 7. '39 1 '3 7. 0 . 35(> 1 '37. ·:r:i 1 '37 . ·3 ·3 1 ·~.:i-: ~I • '3 ':3 1 '37 . •=j•::J 1 85. 34 1 7 4. 5•3 l 53 . o. 4 6 7 151 40 13'3 . .. 7r.:-1 ::rn. 1 1 1 1 6 . 4 5 1 04. 82 '33 11 1 7 81 . .' ._} . 0. 583 [)~). m J SB . ·-:·r:-i 45. 58 34 . •34 .-,,.. 2 '3 1 1 E,5 0 . ..:......J ..a:.:.._:. .. . 88 40 '3'3 05 c.::-.-, .. .J ..::. 00 Qui c k TR-55 Ver.5 .46 SIN: E x ecuted : 12:04 :40 04 -09 -199 6 CITY OF COLLEGE STAT ION P TORAGE DETERMINATIONS WATERS HED D,F,G ,H MAX OUT 5 YEAR EXIS TING -l!-*·K-·K· Modi f i ec:I F'.at :i i:::rn ;:1 l ~-l y d r-ogl'· aph -~·-M-~·*-*· Weigh ted C --0.565 Area= 41.050 acres Tc -17.00 minutes Adjusted C -0.555 Td ::-.:. 17.00 min. I=:= '3 .00 in/h 1" Qp == 208.81 cfs PE.:::TUF :N 1=-PEOUErl CY: 50 ye,O\t" •:;tor·m Output file: CSP50D .HYD Adj. factor = 1.00 HYDRDGRAPH FOR MA XIMUM ST ORAGE For the 5 0 Year Storm Time increment = 0.017 Hour s Time Hours Time on left represents time for first Q in eac h row. 0.000 o. 11 7 (> 11 ~.:15 () 0 .457 0 . 00 B'::i. '3fJ 1 7 1 . ·::is 15'3. 5F~ ·7 r_:\ I ,,.J " 70 1 --. L. 28 24. r=-, ...Jt ·=-is. 2·1 1 1 0. r.::-c::· ...J .__J 184. . ·-.~ l '36 • 53 ..::. ••• _I 14 7 . 40 13~5. 1 1 Gl . 42 4'3. 1 :_~ 3G. 8~j 4'3. 1 '":> ,_, E.1 . 42 73. 1 ::2. CJ~l '-''-' 1 ~,c:::-~....) .. l 1 147 . 40 15'3. 208 . Dl 1 •3(:,. 5 :3 1!-34. ····11::.-171 ,:;__; . 1 22 . 83 1 10. t:·c ~J...J ·:H3. 27 85. 35 . ~3'.5 24. 57 12. 2::3 o. 70 58 '35 '38 00 Qui c k TP -55 \Je-.-.5 .46 f:3/N: Executed: 12:04:40 0 4 -09-1 936 C IT Y OF CO L LEG E STA T I ON ST UFJ.\ GE DE T E F:M 11\IA T I m i s vJfY Tl:::F:S HED ]) 'F' C::i' H MAX OU T 5 YE AR EXIS TIN G **** Mo di f ied Ratio n a l Hy d rog ra ph ***** Weight e d C -0.555 Ar ea= 41.050 acr e s T c -1 7 .00 mi nut es Adju sted C -0.555 Td :::: 17.00 m:i n. I:::: 7. '34 :in /h ·r" Qp ::::: 1 84. :2 2 c f s RETUPN F REQUENCY: 25 year storm Ou tput fi l e : CSP25D .HY D Adj .factor= 1.00 Ti me 1-k:i u rs.; HYDROGRAPH FO R MA XIM UM S TORAGE Ye a r St o r m T i me i n cre ment = 0.01 7 Ho ur s Ti me on le ft r e pre s e n ts ti me f or f i rs t Q in ea c h row . --------:--------------------------------------------------------------- o. 000 o. 00 l (>. 8 4 21 57 .... ,·-:· 51 4 3 . 35 54. 1 8 S 5 . 0 2 . ...... 1 • .:.... • o. 1 17 ~75 . BC 85 . r;·:j ·37. c.-...... ~\:.·, 1 08 . ::;5 1 1 ·:L 20 1 30. 04 14 0 . 8 7 o. ;~33 1 ~.'31 7:!. 1 G2 . c.:.-c:..-1 73. 3t3 1 84. .·-.. ·-. 1 73 . 3 8 1 G2 . 1::-1::-151 71 . ._l._J ..:.:.. . ..::. ...J...J . (). 35 (> 140. tl7 1 30. 04 1 1 •:J . 20 108 . 3E, •37 . 0:::-~1 ....;..;:, 85 . b '3 75. 8 6 o . 457 b~S. (l;~ 54 . :L B 43. ... -,,:.-,;:,,..} ~--. ..::1 •• :::.. .. 5 1 2 1 . 5 7 10. B4 0 . 0 0 Qui c I:: Tl :;::·-55 Ver. 5. 45 S/N: E x ecu t ed= 12:04:40 04-09-1995 CITY OF COLLEGE STA T IO N trTlJFA GE llETEF:M l NAT ION S \;Jr'HERS H ED D, F, 13, H MAX OU T 5 YEAR E XIS TIN G **** Modifi e d Fat ion a l Hydrograp h ***** Weig ht ed C -0.555 Area= 41.050 acres T c -1 7 .00 min u te s Adjuste d C -0.565 Td = 1 7 .00 min . I= 5.83 in /hr RETURN FR EQ UENCY: 10 year storm Output fi l e: CSP 10D .HYD Acij.fac t or = 1.00 HYDRDGRAPH F OR MAX IMU M S TOR AGE For th e 10 Year Stor m T ime incr e ment = 0.017 Ho urs Qp= 158. 47 c t s T im e Hou·,-s T i me on lef t represe nt s time for firs t Q i n ea c h row. --------:--------------------------------------------------------------- 0.000 0. 117 (l. ~~:3 3 0. 3~30 0.457 0 .0 0 65.Z:i 130. ~:'j(l 1 2 1. lB 9 .32 7 4 .57 13'3. 82 :L l :l. ElE 4r;. G 1 18.EA 83. s·::1 1 4'3. 14 102 . ~::A 27 . ':JG 1 58 .47 '33 • .2 "2 27. '05 102 .54 149.14 83. 8'3 1 8.£;4 45.51 111 .86 13'3. 82 74 .57 '3. 32 55. '3 3 121.18 130.50 55.25 0.00 Quic k TR -55 Ver.5 .46 S/N : E x ec ut ed : 1 2:0 4:40 0 4 -09-1 9 9 5 C IT Y OF COLLE GE STA T I ON ST ORA GE DE T E RM I NATIO NS WATERS HED D,F,G,H MA X OUT 5 YEAR E XI S TI NG -l'i··~H'··!!· Mo dif i ed F:c-1t ion a l Hye.Jr · o~rr c1p h *··'!!-·II-*•'!· Weigh te d C -0 .56 5 Ar e a= 41.050 a c r es T c -1 7.00 mi n ute s AJju sted C -0.555 Tel =--" :1.7 .00 mi n . I ::::: E.:, .. O'J i n /hr· [1p :::: 14 1 • 3 0 c f s RE T URN FREQU ENCY: Output f i l e : CSP5D 5 y e air s t •:•rm .HYD Ad j .factor= 1.00 HYDROGRAP H F OR MA XI MUM S T ORAGE r.::-,_, Y c;:ia r Stor m Tim e in c rem ent = 0 .0 1 7 Ho u r s T i me Ho u rs Tim e on l e f t r e p re s e n t s t i me for fi rst Q i n eac h row. --------:--------------------------------------------------------------- 0 . 0 0 0 0 . (l (l 8 . 31 15 . 5::~ 24 . '3 '.3 '".:'':) .-.r.:-4 1 55 4'9 . 87 W U t1 L ..J . 0. 1 l.7 58 . H :l 55. 4 '3 74 . 80 83 . l.2 ·:;ii . 4 3 '3 'J . 7 4 1 08 . 05 0 . . -,,,,., 1 16 . 35 124. 57 1 r )·""'.• ·:f 3 1 4 1 3() 1 ,,.-, •J'::J 1 2 4. 67 1 16. 3 6 L \.,J ..:J .,_,..._. . ~..:.:.. 0 . 35 () 1 08 . 05 '3 '3. 74 '31 . .::i :~ 03 . 1 2 7 4 . 80 56 . 4'J 58 . 1 8 0. 467 4'J . 8 7 41 5G ~':) ":' .-,c:-2 4. '::)3 15 . s ·-· 8. 3 1 0 . 00 . ._, ._, . _L ,_I ..::. Qu ic k TR-55 VeY.5.45 SIN: E xe cut e d: 12:04 :40 0 4 -09 -1995 C IT Y OF COLLEGE S TATION STO RAGE DETERMINATION S WATERSHED D,FyG,H MA X OUT 5 YEAR EXIS T ING * * * * * * SUM MARY OF RATIONAL METHOD PEAK D I SC HA RGES * * * * * * Q = adj * C * I * A Wh ere : Q=cfs, C=Weighted Runoff Coef f ic i e n t , I =in /hour, A=acres adj ···· 'C::' ad .j 1...1~;t ment f acl:;i::·r· fo·,-f:::ach t·etu rn frequency hu bar· f:?C::i De scr . F:un of f 'C' T c (m i ri) l~ l; d . 'C' RET URN FREQUENCY = 100 years ~c' adjustment, k = 1 f~d.j. 'C ' = l·Jtd. 'C' ~,; 1 -------------------------•---------------------------------.-------- t 1d .j " 'Cr I in /h r- Tota l acres : F'eak Q ( 0: f s ) -----------·-----··-----------·-·-·-----------:-----------------------:-------- GRASSL::::D D 0. 35() 1 2 . l -, I F'f.V-..i l'.::D D o. ':10 0 r.:;- ..__I" 38 F:EE! I DEl'.ff r··· ,. 0. GOO 1. " c-· • .. ::. PF.::SI DEN T r·· .:T o. GOO 14 . .-·,r.:;- ~,_f P ESIDENT H o. 600 7 . c:;-,.., 1...J..::i -· ---·------·-·--·---·-·-·---·----·-·---•-• -·--· --·-• -·-•••• -W•--: ··-· ••-• ------·-· ··--··· ·--·-----· ---·---· ·-· .... -·· --· -l --·-·-·-.. _ ----- 17.00 0.555 : : 0.565 10. 1 '30 41.05 : z:~ s . 4 2 Qui r:: I:. T F.:--5 5 ')e ·1·. 5. 4f, S/N: E >·;G •::: u t ed: l 2: 0 4: ·~ 0 04 -·-o ·=J --· 1 ·:;1·35 CIT Y OF COL LEGE S TAT I ON S T ORAGE DET E RMINAT I ONS WA T E RSHED D,F,G ,H MAX OU T 5 YEAR E XIS TIN G ~ * ~ * * * S UMM ARY OF RAT I ONAL MET HOD P E AK DI S CH ARGE S * * * * * * Q = adj * C * I * A Wh e r e : Q=c f s , C=We ighted Ru n of f Co e f fici en t, I =i n/h o u r , A=a c re s C1d j "" 'C ' a cJ .j u s tm t-::>nt f a c to ·r f,y ,-each i·e tux n f1·eq u.t:?n cy Su bar·ea De sc r. l?uno ff 'C ' a.c -res T c (mi n) l.<Jtd . 'C ' RETURN FR E QUENC Y = 50 y ea r s 'C ' ad ju s t men t, k = 1 r.:'1cl j . ' C' ::: Wt d • ' C ' 7; 1 -------------------------•---------------------------------.-------- Ad j. , c, T o t a l Cl.Cl'f-::>S : Pea k Q (c f s ) ---------------------------:--------------: :-----------------------:-------- (3 P ?"\SSE D D 0. 350 L2. 1 7 F'A \/E~D D 0. ·::ioo 1::-...J . 38 F::E~:; I 01'.::NT F 0.6 0 0 l. e,·-· ..::. F.:ES I DENT (3 0. 5 00 1 4 . , ..... r.::-..;),J RE S I DE ~H H 0 . 600 7 . i:=-r-i ...J ..J 1 7.00 0 .5 6 5 : : 0 .565 '3 . 0 00 4 1.05 : 2 0 8 .81 Quick TR-55 Ver.5.46 S/N: Exec ut e d: 1 2:04:4 0 04-09-1996 C ITY OF COL L EGE STAT I ON S TORAGE DETER MINATION S WATERSHED D,F,G,H MAX OUT 5 YEAR E XIS TI NG * * * * ~ ~ S UMM ARY OF R ATION ~L METH OD PEAK DISC HARGES * * * * * * Q = a dj * C * I * A VJ h et-e: ()::::c fs;, C ·::l·J!.':.;ighted Punoft Co eff i c i ent, I ==in/hou ·r, f.'i=acr es adj -'C' adj u st ment fact or for each 1-e tu rn f reque ncy f3ub c.:n-e ,3 De s •: r . kuno f f 'c' Ay·ea ·r e (min) Wt cl. ' c::' RETURN FREQUE NCY = 25 years 'C' a djus t ment, k = 1 Acl j . ' C' ='-l·Jt d • ' C' :·1; 1 -------------------------•---------------------------------.-------- ?'.I d j. 'C' I in/tw Total : F'E,a k Q (cf s) -----------------·---------:--------------: :-----------------------:-------- GPASSED D o. 35() 1 ·-· ....::.. 17 PA\..'ED D o. ·:;·oo <=-,..,,.., ...J .. ..:iC.1 F:ES IDENT 1:- 0. 500 1 . 5 ·-:· .... r:::ES I DENT G 0. GOO 1 4 . '""lC:" .::i....J f?ESI DENT H o. 500 7 . r.:;-r-\ ._J._;j ---------------:--------------: :-----------------------:-------- t 7. 00 0 . 5S5 : : 0. ~:iS5 41.05 : 184.22 Quick TR -55 VeY.5.46 S/N : E x ecuted: 1 2 :04:4U 0 4 -09 -1996 CITY OF COLLEGE STATIO N ~)TlJF'.t1l~iE DETEF'.M I l'-ff~T I m-,JS l'H-i TEF'.SHED D, F:-, 13, H MAX OUT 5 YEAR E XISTING * * * * * ~ S UMMARY OF RATIONAL METHOD PEAK DISC HA RGES * * * * * * Q = a dj * C * I * A Wh e re: Q=cf s , C~We ig ht ed Runoff Coefficient, !=in /ho ur~ A=acres a d j = 'C' adjust ment factor for ea c h return frequency Subaire a Desc ·r-. GF'.ASSED F'f-'11..'ED F:ES I Dt~N T l?ESIDENT l~:ESIDENT F::un c• ff r C' D 0. 35<) D 0. ·:;r oo r:· 0. 500 Ci 0. 500 H o. GOO Area ac1r es 12. 1 7 c::-J. 38 l . c;:,-. ..::. 14 • I~\ c.- ... J....J '7 t:"r"1 I . '-~'..;:,, T c (min) ~-.Jt d. , C' RETURN FREQUE NCY = 10 years 'C' adjustmen t, k = 1 Adj • ' C' === t.-Jt d • ' C' :1; 1 -------------------------•---------------------------------,-------- (..klj . 'c, I in/hr Teit<~l acres : F't:~dk Q (cf s) ---------------:--------------: :-----------------------:-------- 17.00 0.565 : : 0.565 G.830 4 1..05 : 158.47 ------------- Quick TR -55 Ve r .5.4 6 F.'.. :1; t? c u t e d : .l 2 : 0 "f : 4 1) ~3/N: 04 -··0'3 ---1 '3'35 CITY OF COLLEGE STAT ION STORAGE DETERMINATIONS WATERSHED D,F,G,H MAX OUT 5 YEAR E XISTING Q = adj * C * I * A Wh e re: Q=cf s , C =Weighted Runoff Coefficient, I =in/hour, A=acres adj ~ 'C' a dju s tment factor for each return frequen cy Sul::l a 1' ea Dt:?'.":•C )''. l?un c:iff 'c:' ai:.,... es Tc ( rn in:> ~~t d. , c::, RETURN FREQUENCY = 5 years ~c' adjustment, k = 1 Adj • ' C' ::::: ~·Jt d. ' C' :>; 1 -------------------------•---------------------------------,-------- Acl ,j • ' c, I :in/h;-- Total : Peak Q (c f s) --·------··---···--------·---------------------:-----------------------:-------- GRASSED D o. =~5() 12. 1 7 F'P1\,J f~D D o. '300 r::-,..! • 38 l?E:~'3IDEtH F' 0. r.:.oo l " 5:2 PESIDE NT Ci 0. E,(lt) 14. ,. .. ,r.::· w~J PES IDENT , .. , 0. GOO 7 . C:-~\ ,_),::, ---------------:--------------: :-----------------------:-------- :l 7. 00 0. 5C5 : : 0. 555 5. 0'30 4 :l. 05 : 141.30 Quick TR -55 Ver .5.4 6 S/N: Exec ut e d : 12:04:40 04 -09 -1 996 **************~********************************************************* ************~~**~******************************************************* ~- -~ MODIFIED RATIONA L METHOD ·!(-----Grand Su mm ary F or All Storm F re qu encies .;-.;. ****************~*~~~***********~****~********************************** ****~~**¥~***~··~~***~************************************************** Fir st peak o utfl ow point a s s umed to occur at T c hydrogr ap h recession leg. CITY OF COLLEGE S T ATI ON S TORAGE DE TERMINATIONS WATE RS HED D ,F,G,H MAX OUT 5 YE AR EXIST I NG 41. 05 ac r-es T·-::: 1 7 .00 mi n utes """"""""••••r<•••tt,.n11t111 •n 111111111111••••••••••"""'""""""""""""""""""""••1111 n 1111 ,.11 111111 11 •••11•••••••••"""'"""""""""""""""""""""··· ....................................... . Freque:-"?ncy (yea 1'·s ) 10 0 50 . -.c-.. :.:..._• J.O 5 (-.1cLj us t eel ' c:: , 0 . 5G5 o. ~5G5 0. 5E,5 0. SGS o . 55':.:i Dtxr,::i.t ion Int ens. m inutes in /h 1" 24 8. 533 17 '3. 000 1 7 7 . '34 0 17 G. 830 17 5. ()".j(l fJpE•ak cf s 1 '3 7 " ·:v:i 208 . 81 1 84 . .-···-:· ...:......:.. 1'.58 . 47 1 41 . 30 P1 l l 01,,.Ja bl e c f <;;:, 1 15 . 00 1 1 5 . 00 1 1 5. 00 l 1 5. 00 l 15. 00 VO LUM ES Inf 101..,1 (ac --·ft) G. 545 4. 8 '30 4. 314 ,.., .:;,. 7 1 1 ,.., 30·:-1 .:;, . Storaqe ( ac --ft) ... ) 870 ..:.. . ·-:· 1 ·:17 ..:... 1 . 621 1 . 018 0. 515 Q u i c I·: T F: ·--5 5 \..h:: r · • 5 .. :1 G S / N : CC>-:ec u t e cl: 12: 04 : 4 0 0 4 -·-0'3 --·1'3'36 1·10D Ir· I ED F.:A T I ON P1L t-IETHOD ~:;umm c:i:r·y for S ingli:.-::.· S toi-m r ·r·equf::i nc y r· i i .. ~;t p e .::1 I:: c;u t f 1 c•i.-J pc• int <:i.ss u mecl to oc c u ·r c-1t T c h y dr o gt-a p~i ·r e·c ess ion 1 eg. CITY OF COLLEGE S TAT I ON S TORAGE DETERMINATION S WATERS HED D,F,G,H MAX OUT 5 YEAR E XI S TIN G RETURN F REQ UEN CY~ 100 yr ~c · A dj u s tm e n t ~ 1.000 Allo wa bl e Q = 115.00 cfs l ··lylfrog 1'·,:1p h fil e clu ·1-Ed;i.o n == 24.00 minutes Hy rfr o g1' aph f i l E~: C S F' 1 O OD • H Y D T i:: ::: 17.00 minute s " •••• 11 $1 11 •• II 'II "•" ......... " ...... """ ..................................... " ••• " ...... . ........................................................................................ \IOLIJMES ~e lgh ted Adj u st e d Du ratio n Inten s . 'C' 'C' mi nut es in/hr· ai:::r e s Qpeak : cf s Inf 1 0 1,,1 ( ac --ft ) St or· age (a c --·ft ) ··-----------·----------------------------------------:--------------------- <),, 5(J5 0.555 0. 5E.0 5 1 7 20 1 o . 1 ·::io '3 . :2 0 0 41.0 5 41 . 0 !'.5 2 3 5 .42 213 .4 5 : 5. 53£, 5.880 ~**************~******************************************** St or a ge 0.56 5 0.565 24 8.533 41.0 5 1 97.99 : G.545 2.843 2 .783 Ma ~,; i mum 2 .870 K *K******~****************************************************************** r) 5G 5 0 . 555 30 7. t::"''"'\'; 41 0 5 174. 78 I ·-:· ··-:· --:'• 2. 701 . ..J...jW . I . ..:....:..~ (i. 50,5 0. 5E,~5 40 6 . 2 S7 4 1 . 0 5 145. 40 8. 0 1 1 2. 085 o . ~;b!S 0. 5f:.~5 50 c~ ...J. 400 41. . 0 5 L25. 2'3 8. 62'3 1 . 28'3 o. 5 C5 0. 5b J bO 4. 85 7 4 1 . 05 1 1 ·-· ..::. . '31 Qpea k < Qal 1 Ot,.,I Quick TR-55 Ver.5.46 [::--:ec ut ed: 1 ::;:: : 04: 40 S/r-J: 04 -··0 'J -·· 1 '3 '3C MODIFIED RATIONAL METHOD Summary f or Sing l e Storm Frequenc y r -:i.1·s t p1:::<:1l :: oulflo•.,• point a~;s:.umt:d to i:::ii:i:u ·( c:i t Tc hydyo~~r·a ph 1"ecession l eg. C IT Y OF COLLEGE STA TION STOF.:r~r:3E DETEPM I NAT IONS l·JATEPS HED D, F, (3, H MAX OUT 5 YEAP E ~IST IN G RETURN rRCQUENCY: 'C' Adjust ment = 1.000 A ll owable Q = 115.00 i:fs l·lycir·ogr·c:1ph f:i.lt:; du ·1 .. i:\tion == 1 7.00 m:inutPs ly dr ogr aph file: CSF'SOD . HYO T c == 17.00 minute s •••"•••••n•••n11•••• .. •••••••11'<••••10.a10•••••""""•"••••aat11:1a••••••t1••••••••••••• ............................................... 11,.••····························· .. ···· Weighted AdjusteJ Duration Inten s . 'C' 'C' minutes in /hr (~r-eas Dp<-?a k : i:: fs '"'OLUMES Inflow ( ai:: --ft ) St or-age (ac·-·f t) 1t********~~*1t*~~~*~*~~************************************** Stoy-age Maxi mum 0.565 0.565 17 9.000 41.05 208.81 4.830 2.197 **************************~~************************************************ 0. 5C5 o. '.'5G5 20 8. 100 41 05 1 ff?. '33 1:.:-1 '"17 .·~, 0·:32 . d. I I .. ::. . o. 5G5 0. 5£.5 30 E," E, "'.''"" ...., ...., 41 . 0~5 153. '30 E,. 3E,O 1 . 872 0 . ~30.15 0. 5G5 40 t:' 500 41 05 127 . 5 1 7 03 1 1 1E,7 ~1. . I . . l) . 5E5 0 .. 555 50 ''t. 700 41 " 0~) 1 o·::i. 05 Qpeo:xk .. · Da l 1 C1I,,,.) Quick TR -55 Ver .5.46 E :1; e c u t e d : 1 2 : O 4 : 41) '.3/N: 04 --·(l'~J ... 1 ·:;i-::;i5 MODIFIED RATION AL METHOD S umma ry for Sin gl e Stor m F requency First peak outflow point assume d t o occur a t Tc hydrogYaph recess ion l eg. C IT Y OF COLLEGE STAT ION STO RAGE DE TE RMINATION S WATERS HED D,F,G,H MP1X OUT 5 YE r-1P E XI S THK:i RE TURN FPEQUENC Y~ 'C' Adjust ment = 1 .000 Al l owa bl e Q = 115.00 cfs H y di" o g y· aph -f i 1 E.' dui" <::1t ion = 1 7 . 00 mi nu t f;?s; H/dl" c•g1" ap h f i l. e: C SF'2'.:iD . H YD T c :::: 17 .00 minute s """""""•""•l'lw1111t11111ttn w ttn1111•n11111t111•11"111111tt•••ftotftftftl'll'l1l1lflll ll llll l'l fl KW1t11 •11"11•n•••nn••••• 11"11 11•ll llllllll ll llllllttll•llll llllllltllft•""""""'""11•111111••1111 .. 11otw nllMWll ft lllllllll lllt llll Ol llllllllllll•ll•lllllllllll Weighted Adju sted Durati on In te n s. Ar eas ~c' 'C' m inutes i n /ht· ac i'·es Qpeak : c f s VOLUMES I 11 f 1 ow (ac-ft) Sto·r aqe ( ac -··ft ) -•o ··---·--· • ••••• '' -- -•-• -~ -·• -•• -· •-•• ... _ ----·--·-_,,, ''''" -----· •-----·•• ••-• ---·--· --•••-"'"" ,_., ,,,_ •H--·--· •••' ----· ••--••• -·----· 00---: ··-· 00-••--·--·-·--··-··-·----••--·-· --.,._ ·------ ******************************************~***************** Storage Maximum 0 .565 0 .565 1 7 7.940 4 1.05 1 84 .22 : 4.3 14 l .621 *~************************************************************************** 0 . 565 0. 5 E.5 20 7. :LO O 4 1 05 164 . "7':"1 .:j.. 538 1 4G '3 . I '-' . 0 . 5f:.i5 0. 5 65 30 "" Q ':\'":\ 41 0 5 1 . ...,.,. 34 r_-:-5'33 1 14 4 ....;. '-''-''-' . ..::.i....J . ...J • . o. 5G5 0. 5C,5 40 4 . 867 41 05 1 12. ·:;, 1 Qpea k .. · Dal 1 ow . Qui ck TR -5 5 Ve Y.5.46 S/N: E~':e •:: ut; f2d : 1 2: 04: 4() 0·1-···1)'3-·· 1 '3'35 MODIFIE D RA TI ONAL ME THOD Su mmayy foy Sinqle Stoy m Frequenc y F"i t .. s t p r::'!c:~I ·: c •utfl o 1.H p i:.:i inl a~;~:;u r ned l:;i:.:i oc •::u r· c:1 t Tc hycJ1 "og ra ph l"Pr:ession l eg . C ITY OF COLLEGE S TA T ION S TORAGE DETE RMINATIO NS WATERSHED D,F,G,H MAX OUT 5 YEAR E XIS TI NG RCT URN FREQUENCY: :LO Y l ' •er Adju s tment = 1 .000 A ll owable Q = 115 .00 cfs H yci1"o gi,.e:1ph file c.1ur·ation= 17.00 mi 1··1 ut e~; Hydrograph fil e: CSP 10D .HYD tt • • A • II 11 n " • n • ti • ft • n a • IO II II • • • • • • ft " ft a • p • • • • • 11 • • • n ft ti n 11 • ft • w ft • n • • a 111 a • • Q .. • a a • • • • • • 11 • .. ............................................................................................................ Weighted Adju s ted DL!i'"c:<.t ion I nt ens . 'C' 'C' minut es in/h1 " Dpeak r: f s VO LUM ES I 11 f 1 01,.J ( o.r: --·ft) Sto·rc-1ge (ac·--ft) ~~***************~**********************~******************* Stoyag e Maximum 0.565 0.565 17 G.83 0 41.05 158.47 : 3 .7 11 1.0 1 8 *~*****************~*********************~********************************** 0 ~::3 ()!2_-j 0 '56 5 20 (;. 200 4 1 (>5 1 .::J':' 85 ':' '3G3 0 8'34 . . . . ...., . ,_, . . o. ~5G 5 o. ~5G5 30 t::' 057 41 (>~j 1 :l ., t:"C:-4 858 0. 4 4 5 ·.J. . ' . ,_) . .J . 0 . 5f;5 o . SE.5 40 4 . 200 4 1 . (l~.:i •:'.17 4 5 Dpeak .:·· Da.l 1 C1W ~, . Ou ii:: I: T l? .. ·5 5 '-.'c~r • ~:i . 46 E:·<f?c ut E·cJ : :L 2 : ('·::!·: 40 S/l·.I : 04·-·0'~)""· l ':1':36 l''1DD Ir-I ED r;:P1T I ml i"il_ ME:.THDD Su rTH n<:u -y for· Si 1 -,~~ 1. e St o·I" rn F·, .. t:?que r1 c y r-il"~;t pE•a k 01...tt flo•.v 1oi.nt .:i.s:::.umf:.>cJ to OC•:ur-c:i.t T c h '/d l' ogr"E1.pt·1 r ·ei::e~;si.o n l ea. CI TY or COLLEGE STA TION STORAGE DETERMINATIO N S wnTE RS H ED D,F,G,H MA X OUT 5 YEA R E X I S TING RET URN FREQUE NC Y: ~c· Adjust ment -1.000 Allo wable Q ~ 115.00 i::f s :1_Y·d1"o g r<.ip l ·1 file du1 .. ;,71t:i.or·1"' 1 7 .00 m.inutE2r:: Hydro graph file: CSPSD .H YD 17.00 minute s ••1'1 •H•••••n •lf l1111•••l!l,.nu1tna111111 1t111t•""""""'°"""""""""""""""""~tt••"•"s"11 "1111 n11 ••••• II " I• II 11 II II II lt II II II II II OI II II II M It .. >I II II II II II " II II II II II II tf II " t< H II II II n • II • II II II II II II If II M II II M II II " II ll II II • II II II II II II II II II II l·Je ig h t t::·d . c ' r'.:'1dj ust eel 'C:' Durat i on I nten s . mi11ul:c!~~ in/hr· Qpea.k c fs 'vDLUMES InflovJ (ac--ft) Stoi·-a.qe (ac· .. ·ft ) ~N******~~~~~**x***~•************~*~~****~~**********~****** St or a ge Ma x imum 0.5G 5 0.565 1 7 6.090 41 .05 141.30 : 3 .309 0.616 *~**4*************~********************************************************* -5C..~5 0 5C5 20 ·~ 400 41 (>5 l .-,r.:-2'3 ~. 4 ~5 :L 0 4 :23 ) . . .._j . . ,::...J . ,J . . t). 5f,5 0 5G5 8C> 4 4 00 4 ·1 05 1 02 . 0 '3 ()peak " Q.:::1 1 1 i:11...,.1 . . L . SUBWATERSHED B r ··c 1l I U ·····.::~ '/E:i-!"; . .i. o n: '.::; .. :·:···. U .·I ·!~ E XEC UTED : 03 -·~1 -l ?95 2 0 :0 1:3 7 i=· a c.,1c 1 P e t; u l' ri Fr· f? q : 1 (H) ye ,:.:\ r · s " i:::·uu 1 T 1·.i 1.:] OF ~-J{\Tl ~Y'.~!l ·I E:D B ·~· " UJ Ll._F:13F •:3 T f:'d ! r:J l •I -)f ·l' y.. -?!f.· .1 : I n f l 0 1 .~ H y d r · ·~:ip1 · <·'• pl·1: cs r:· 1 OO B • H Y[' F: <:~ I; i. n ~:1 T ,;1 b 1. r 1 f :i 1. r::? : i::· f::~ F' F' CJ -· !?. • F' l"I D ---··· -·-I N I T .T p,1__ CUl\ln J TI rn ,1 '.:~-· · E J r:;:··/ ,:::1 t; :i. •::·r-, --· :,~7 '.:i . :::;7 f t O ut flu •,; 0 . (:10 r:: .,. <:'» (1 • ()(» i:'\C ·-··f t; (3 I 'v'F.::l ·I F'UN D n n 1· ti :E LEVAT ION : OU 'TFL OW (f t ) ;:;T tJF:ACi E r:,;:ir::·····ft ) --·--------·········--·------·· ---· ... ····· : .·-, -:r ,-.. ,...~ ··-:· . .:.:.. / ·--~-· ...... ::.• ,. 2 7 .::J. 00 ::7C . 00 2 77. ('0 :::::?Fl . (l i) ()" (l J.. 0 14 .U ::n . o 0. ()<)(_!: 0 .. 00 1 : o . cno : <). l 50 : ().'..3 1 0 : (> .. ~-~:=~(> : ·)(.· * ·lo'· INTERMEDIATE POUTING CDt1F'UT?-1T .I. CJ~,1~:; :~:~-:J /t (c fs) + (> ( c "f s) --------:-------------: 0 .0 l . '.:i 4'.:). 5 :2 1 7 .8 450.0 7 E/3. 4 0.0 ::: • (l 44.6 :::31. 8 47 2 .0 p :j 7 . 4 POND -2 Ve rsio n: 5.20 S/N: EX ECUTED: 0 3 -3 1 -1996 20:01:3 7 P o nd File : CSPR0 -8 .PND Inf low H y d r og r-a ph: CSP100B .H YD Ju tflow Hydrograph: CSP10080.HYD F'aqe 2 Petut·n Fre q: 100 years lNFLOW HYDROGRAPH ROU TI NG CO MPUTATION S TIME (hl'~;) 0 . 000 0. 01 7 0 . r)33 0 . 050 c). OE7 0 . oc.i ::i 0. 100 0. 1 1 7 o. 1:::3 ~) .. 1.5 0 o . 1E,7 o. 1 !3'.:.~ 0. 200 0. 2 :1. 7 I 0 . . ·-.... "'' ..::,..;:_,..;, o. :~~:iO o. ~257 0. 2B3 o . 300 0 . 3 1.7 0 . .....,"::',., ,__, \.J...., o . 35() o. :.-157 o. '".)t;:)r' .._}\_.,_. 0. 400 I NF"L.O\.J : (c f s ) 0. 00 I I 4 . 5 4 I I '3. 0 7 I I J.:".:L IS l I I 18 . 1 <::-._} I I :22. G!3 I I . -_.-7 .. :_/. ~"2 2 '.3 1 . 75 3 1:: •• 2 '3 40 . 83 4'.:). ,.._,, \-'I 'l5 . r:,-, '-'I 45. r ;)j I '--'' I 45. r::i7 I '-'' I 45. 37 I I 40. g r i ,::, I I 3S. 2'3 I ' 31 75 I . I •"'"'.•'7 :22 I .4.../" I 2:2. E.a I I :t.8. 1 5 I I 1 3. Gl I I '3. 07 I I 4. 54 I I 0. (l(l I I I1+I 2 25/t .... 0 (o: f!:;) 2S/t + 0 : OUTFL OW ELEVA TION: (cf s ) (c f s) (ft) :---------:------------:-----------:------------------: ··-···-··--·· --0. 0 o. 4 . c::-,.., o:::· 4. .._} ,::, . ._} :1.3. E, 1 ·~-. ...J. :7 17. ~"22 . 7 3£ .. E· 3 8. 3 1 . 8 53 . 0 E08. 40. 8 ':13. E, 103. 4 ·3 . '3 127. 8 143. 5'3 . 0 1 5 5 . 0 185. t.=..a. 1 205. 0 .-,,. .... ,, ..::.~ ... -.,. 77. 1 250. ~7 2!:32 . ~3G .. .·-. 301 '3 33 5. ..:;, ·::io. 7 354. 0 3'32. ·::i o . 7 40 2. 5 444. '30. 7 448. s::..- ._} 4·:;i3. '30. "7 4'32 . 7 53'3 . , 85. -53 1 0 57 E-3. :L . 77. 1 55'3. 1 508. 58. 1 577. 4 527. 5 '3. (l ~i8 5 .. ri .::. 535. 49. '3 585. ·-:. 535. ..:.. 40. 8 5T7. 'J ._, 5--..-7 .4...1. 31 . 8 '.:iGO . 0 50·:1. 2 :~~" 7 534. E, 582. 13. E. 50 1 . 4 54t1. .::j., r.:-4 50. "7 505. ,J I 0 I I 5 I I 1 I I 4 I I r ;:. I ._, I Ei I I r.:-I ,_) I 7 I I 0 I I 1 I I •::'J I _, I -, I I I 7 I I 3 I I 2 I I '3 I I 1 I I 1 I I 4 I I 2 I I 0 I I 1 I I 7 I I .-, I ..::. I ·::i I I o. 0. (>. o. ·-:· .. :... ...-...J. 7 I . 10. 14. 15. 17. 1 9. 2 1 . 2:2 . ··-:·':'t ...:... \-I • .-,r-, .,::. ... J. 24 . ~"24 . .-·.c:- ..:~...J • 25 .. 24. 24. 24. .-,,, L ~ • ·-:··-:· . .:. . ..:... . 00 c;:-ri .. ... ."J..::i 58 ':33 55 1 2 87 87 04 58 50 35 0':1 3'3 24 '37 5 1 85 03 03 85 r.:;-r-, ._}._::, 04 40 53 :273.37 27 4.05 27 4.35 27 4.85 275 . 13 275.32 275.53 275 .75 275.0 1 275.21 275.44 275.57 2 75. 8'3 277.07 27 7.2 1 27 7.33 277 .42 277.48 277.51 2T7. 50 2 77.48 277 .34 27 7.23 27 7.10 POND -2 Versi on: 5.20 S/N: F'age 3 EXEC UTED: 03-31 -1 99 6 20:01:37 F'.et u1 r n F-·r E·q: 100 year ~-3 SUMMARY OF ROUTING COMPUTATIONS ****************** F'oncl F.ile : Inflow Hy drograph: Outflow Hydrogr ap h: Cf.JF'P O--El • PND CSP100B .HYD CSP100BO.H YD Starting Pond W.S. Elevation -273.3 7 ft ***** Summary of P ea k Outflow an d Peak Elevation ***** F'eak Inf 1 c••,J ..... 45. 37 c fs F'eak Out flow ·-.-·.i::- ~: ...J. (>3 c fs Peak Elevat i Ofl ···~ 27 7. 51 ft ***** Summ ar y of Appro x imat e Peak Storage ***** Initi a l Storage - i:::·eak St or age F ·r' om St or· m -· Total Storage in Pond = 0. 00 ac ·-ft 0.42 ac-ft 0.42 a c-ft (12 . (>::~ . 05 " 07 o·::i . 1 :L .-. " ..::. . 1 4 '· t::" ~i . 1 7 . :I. ·:;1 .-. . .. ::. -· ·-, . . .. ::. .. ::. " 24 . 25 .-.-, . . .::.. I . 2'3 . '.31 •'':'•-:1 . ,..).,;.. . '.34 35 T ( :1: l' W O .. I POND -2 Ve r sio n: 5.2 0 S/N: P ond Fi.lE'!!: Inflow Hydrograph: Ou tflow Hy d rogra ph: F·ea k In fl ()l<1J -- F'r.·?t::\k Out fl Ct W ·-·· F'e;:1k El e-...1a t i C•n -·- CSP l?0 ··-8 .. Pl'-1D CS F'100B .H YD U"JP:LOO BO.H YD ,::~5. r:,7 c f s '-', .-,c:- k.J. C>3 c f c·· _, .-.. ,-, 5:l ft ..:... I I " Page 4 Return F r eq: 1 00 years EXEC UTE D: 03 -31 -1996 :2 0: 01: 37 0" 0 5. 0 :l ()" 0 FlovJ (cfs) 15.0 20.0 25.0 30 .0 35.0 40.0 45 .0 50.0 55 .0 .------:-----:------:-----:-----:-----:-----:-----:-----:-----:-----:- y: * :·;: •*• ;1~ ·X· ... -)(· _,, ·II· >·~ -r.- _,, ·lE- :·.-~ ·lE · ·'' * :.,; * -" ·K· ; .. ~ ·IE· :·1: -!(· .. , ·J!'· :1: * ... .y,, ;1: -lE· ·'' •* :1~ * ·'' -!(- I :1: * I >·: ·lE- :·,.: * :·1: ·II· _,, -lE · :1: * :1: * :1: ·li- ... * ·'' * :1: * :1: ·)!'· >'~ "*· >·: ·ll· :1;·* ·li-:1~ -*· :1: *• :1~ "*· .. , ·lE-;1: * .. , ·*-y~ ME h l'" 1:5 ) F :L l e : U3P 1 OOBO " HYD Clma~,; --::~5 . (l I -· fs - F i 1 e : CS P 1 OOB . HYD Qma:.-: ···-45 .. 4 1: fs POND-2 VeYsio n : 5.20 S /N: EXECUTED: 03-31-1996 2 0 :0 1 :37 F:et U Y n F Y e q: 5 0 y eaY s **************************** ·*- * ROUTING OF WAT ERS HED B * * COLLEGE S TAT I ON * ·IE- •*- ·lE- -M· **************************** I nf l o w Hy dr o g r aph : CS P50B .H YD Rati ng T a bl e f il e: CS PR0 -8 .PND ----INITI AL CO NDI TI ONS ---- El eva t i o n --·-:r-7 ":) r;r7 ft ..:.. I ....,. -...JI Ou t fl ()•+) -·-o . 0 0 I -f s - St or "'1.ge ···-o . 0 0 ac -·f t 13 I VEN F'OND DA TA I NTERMEDI ATE ROUTING COMF'UTA T ION S :ELE VAT I ON : OUTFLOW : (ft ) C:c f ~:;) S T OPA GE (<.;i i: --ft ) :---------:---------:---------- 2 7 3 . 3 7 0 . 0 0. 0 0 0 27 4. 00 o . i= o . (l(l 1 ..J 27 5 . 00 :l . 0 o. 030 276 . 00 :l 4 . 0 o. 150 277 . 00 :2:2 . 0 0. 3 1 0 27D . 0 0 2fl . !) 0 . 5 3(> I I 2 S/t (c f s ) 2 S/t + (l (i: f s) ------------:------------- o .o 1. 5 4 3 .6 217 .8 450 .0 7 5 '3 . 4 0 .0 2 . (l 4 4 .E, 23 1. 8 47 2 .0 7'"37. 4 Ti lllE' inc l" e m en t ( t ) == 0 . 0 1 7 h r s. POND -2 Version: 5.20 S /N: EXECUTED: 03 -31 -1996 20 :0 1:37 Pon d File: Tnf low Hydro gr aph: .Jutf lo w Hydr ograph : INFLOW HYDROG RAPH TIME ( hl' s ) I l\IFL..0\.-J (c: fs) CSPPO -·B . PND CS F'50B . HYD U'3P5080 . HYO I1+I2 (c: f s ) P <::1 ge 2 Return Fre q: 50 jear s ROUTING COMP UTA T IONS 23/t ... 0 (c f s) 2S/t + 0 (cf s ) OUTFLOW !ELEVATION! (c:fs) (ft) :---------:------------:-----------:---------:---------: 0.0 0 0 0.017 (> .. (>~;3 0.050 0.01;7 0.083 o. 100 0. l 1 7 o. :1.33 o. 150 0 . 1 G7 0. 18:3 0.200 0.217 (>. 2 33 0.250 I 0 .2G 7 0 .283 0 .300 0.317 (> .. 333 o. 3~i0 0.3 67 0 .383 o.oo: 4. 14: 8 .28! 1 2.42 : 1 G .5G : :2'.C >. 7C >: 24.8 3! 2f:3 . ·:r1: '.:J~:;.11 : ~37" 25: 41 . 3':3: 4l. 3 '3 : 41. 3•3: 41. 3 '3 : "1 .. 7 .-,r= I ._::i I •.£..._)I 33. l l : 28. ·37 : 24.83! 20.70: 16.55 : 1 2. 4:2: 8.28: 4. 1 4: o.oo: ·---·--····-·-- 4. 1 12 . • ::J. 2 0. 7 2 '3. 0 '7)-7 r, ...... , .. ,;:, 45. i= -.} 53 . 8 s·-· L • :L 70. 4 7 8 . G s ·-.. L. 8 !32. 8 8::2. 8 78. 5 70. 4 52. 1 c;-,.., 8 w..;,, • 45 . 5 37 . ':.> '-' 2'3. 0 20. 7 12. 4 4. J. o. 0 o. ':> 1 4 . '-'. 1 4. ~? 15. ':'':' -....J \.+J II 1 34. r.:-·7 -.} , . 7 G2. 85. '3 '34. 1 1 7. 4 131 . 151 . 5 1 7 1 . 1 88. 2 2 1 3. 228. 8 258. 274. 4 307. 320. 8 357 . 354. 1 403. 404. s 445. 438. 8 483. 45 3. 8 5(l 'j . 4 7 '3. '3 c::--·-,r.:- ...JL ... J. 48 7 . 4 C:--'i 11 ...J ...:J ... j. 48 5. 7 533. 4 78 . 1 524. 4 S 1 . 7 507. 4 38. 1 482 . 4 07 . ·:3 450. ~372 . 0 4 12 . 0 I o. 00 273. 37 I 1 I 0. c:' r~ 274. 05 I .._}~ 5 I o . 65 274. 3~? I ·;:,1 I 0. 8'3 274 . 77 I 1 I 2 . ·-:··-:· 275. 0'3 I ...:......:... '3 I 4. 50 ·-:17c:' 27 I ...:... I ._; • 5 I -, 03 275 . 46 I , . ·-:· I '3 . 7·~~ 275 . 68 ..:.. I 7 I 12. 74 .-,-,s= '30 , I L1 ...J. c:-I 14. 8'3 276 . 1 1 -.} I 4 I 16. c::---, 276 . 31 I .. JL 1 I 18. 1 7 27S. c.-.-, I -.J.L s I 1 '3. ~72 27S. 7 ·-· I ..::. •:=J I 2 1 lS 275 . '30 I . ·-:r I ~"22. ::21 .-, . ...,..., 03 .:... I ..:.. , , . ·-:r I 22 . 68 277. 1 1 ..:.. I '3 I 22. '3'3 277. 1 7 I 7 I 23 . 14 27 7. 1':1 I 0 I .·-,,, :L 2 277. 1 ':3 I LW . 0 I .-.. -. '36 277. 16 I ...::....::... 0 I :-::2 . 65 :27 7 . 1 1 I 4 I .-,.-·, 1 ':1 2Tl. 03 I LL. c: I 21 28 2 7S. '31 -.} I . 1 I 20. 00 275. 75 I POND-2 \/er·:-:-ion: 5. ::20 S/N: EXEC UTED: 03 -31 -1935 20 :0 1:37 Paqe 3 Retu r n Freq: 50 years ****************** S UMMARY OF ROUTIN G COMPUTATIONS ****************** Pond File: CSPP 0 -8 .PND Inf lovJ Hyd1"og -r·;:1.ph: Outflow Hy drog raph: CSP S OB .HYD CSP5 0BO .HYD Starting Pond W.S . Elevation -273. :37 ft ***** Summary of Peak Ou tf l ow an d Peak Elevation ***** Peak In fl C•1N --41 . :3'3 I ·-fs - Pea k Out fl Ct'.N ··~· .-·,r-, 14 c f c-. .::...:;,. -~ Pea k El. evat ion ·--2T7. 1 '3 ft ***** Sum mary of Approx im a t e Pea k Stor a ge ***** Irii t i al !:.1to1"<:t.~~e -- Peak Storage Fr o m Stor m = T ota l Storag e in Po nd 0. 00 a·:-ft O. 35 ac -·ft 0. 35 ac--·ft . ()::: . ()~:~: . 05 . 07 . o ·:~ . :I. . :l ~~~ . l 4 5 1 7 1 ·3 . :2 . :2 2 . 2 4 . 2 6 . 2 7 . :2 ·=~ . 3 l "='·-:· . \_.!...; •• . 3·-l . 36 ~!~ ·Jo!- ·- --· T I PO ND-2 Vers i o n : 5.20 S/N: F'a~J e 4 Por-1 d r:-i 1 ('2: I nfl ow Hy d r o gr aph: Outfl ow l ·l ydi'OQi -a p h: F'i:?a k In fl 1;)t,J ..... F'r-;!a k Ou t fl 0 1,.,' ··- F'c;:a k E l E~vat i C•ri ··- CSF'R 0 ···-8 • F'ND C:S F'5 0B .H YD C S f-'50 B Cl • H YD 41 . 3'3 i: f ~; ·-:i r.) 14 i: fs ..:.....__•"' :2 7 7. l '3 f t Re tu rn Fre q : 50 y e ars E XE CUTED: 03 -31 -1996 20 :0 1:37 o . 0 4 .0 8.0 :!.~~:. 0 F l o •.-1 C:i:f s ) 16 .0 20 .0 24.0 28.0 3 2.0 3 6 .0 4 0 .0 4 4.0 ________ ,,_ .... : ····-·-------· : ... ···-··········--: --·---··-.. ·-·· : -··-··--·-.. ·-: --·-··----·-: ---···-----; -··----: ··-·-·----: -----·----l ---·-··-·--: - ~I~ ·K ;1~ ·)(- _,, -~~ >·~ ·*" :·1~ ~- ;1~ ·)"'.- -" •*• >~ ·ll'c :·,-~ ·l!· -" ·)(- -" * ~ .. ~ •* ;1~ "" ·iE· .., '*' .··• * ... :1. •*- :·,·~ '* :"/~ * * .., ;1~ * · .. • -" * ;l~ * :·1~ * )'~ -l!· ,,. ·'' ·K- ;1~ -l!· y~ '*' ;1~ -IE· t '. * I ... ?t~ ·M· ~< * ·K· ·IE· ,,. ·'' I -IE· ;1~ I •* .., I * I "' ·!(-... '*' ... * ;1~ ;'E· y~ ·ltf· ~I~ t1 E ( h '( r:; ) F i. 1 e : C S F'5 0 -<D 1-lYD U ma ~,; ·-.~·, r\ 1 c f s . ...:,'_~ . F i 1 e : C'.3 F'50B . HYD Q m a ~,; --· 4 1 . 4 I -· fs - POND -2 Ver-s io n: 5.20 S/N: Page 1 E XECUTED: 03 -31 -1996 20:0 1:37 l:C:et ur-n Fr-eq: 25 y ear-s ******************~********* * ROUT IN G OF WATERSHED B * * COLLEGE STATION * ·~· ·~ * *• * * *********~****************** Infl o w Hydr-o gr-a ph: CSP25B .HY D Ra ting T a bl e file: CSPR0 -8 .PND --··· --· --I N I T I (.~ L UJ ND I T I ot'JS ----· ···· ···· Elev ati o n -273.37 ft Ou t fl o~..i S to1·age 0 . 00 r: f ~; 0 . 0 0 a o:: ···-ft INTERMEDIATE ROUTING COMPUTAT I Ol \IS :ELE VATION: OUT FL OW : ( ft ) S TOR (KiE : (a c--ft) :---------:---------:---------- .-,-,~ ..:.:..1 ..::J .. :;;7 (l " 0 o. 000 274. 00 o. c::-J 0 . 001 2 -7 5 . 00 l . 0 o. (>3C) 275. 00 14. 0 0 . l 5 0 277. 00 :;;::2. 0 o. 310 27(-3. 00 28 . 0 o. 53(> 2S/t (r: f s ) 25./t + 0 (r:fs) :------------:-------------: 0.0 1. 5 4 :;::. 5 2 1 7 .8 450.0 7f:/3. 4 0 .0 2 . (> 44.5 23 1.8 472.0 7"37 . 4 Time ino::r-emen t Ct) = 0.017 hr-s. P ON D-2 Vers ion: 5.20 S/N: EXE CUTED : 03-31 -1995 20:0 1:37 r=·on cl r--i l e : Inflow Hy d ro g raph: Jutflo w Hy drog r aph: I NFLOW HYDROGR AP H TIME (h rs :> I NFLOlrJ (c f ~;;) CS PF:Cl ····D . P ND CS F'25B • H Y D CSP258 0 .HYD I 1+L2 ( 1: f s ) Page 2 Return Freq: 25 years ROUTING COMPUTATIONS 2S/t --0 ( ·: f s ) 23 /t + 0 C:i: f s ) OUTFLOW ELEVATION: (c f s ) (ft:> :---------:------------:-----------:------------------: 0.000 0 .0 1 7 (>. (>33 0 .0 50 0 . Of:..7 O.OB3 0. 100 0. 1 1 7 0 . 1:·33 0. l!'SO o . 1 E..7 0 . l f33 0.20 0 0 .2 17 o. 2 ::::3 0.2 50 0 .2G7 0 . :~:8 3 0 .300 0 .31 7 (> .. 3 5 (> 0 .3 G7 o.oo : 3 . 7·3 : ·7 . 5t.=l: 11.3 7: 1.5. 1 5 : 1 8 . •35 : ::25 . 53 : ~.:"}() .. 32: '.""3 4. 11 : 37. ')0 : :37. '3 0: 37. ·:JO : 34. 1 1: 3 (). 32: 1 8 .'3 5 15. 1 6 11.37 -., S::-(~ I , ..JO 3. 7 ·:.i 0.0 0 3.8 11. 4 1 ·=1 0 :~3 4. l 41. 7 4'3. 3 5G . '3 G4.4 7 2.0 7 5.B 7 ~.:i. 8 7 2.0 f..4 . 4 5G. '3 49.3 41. 7 3 4 . 1 26.5 1'3.0 1 l. 4 3 ti f:3 o.o 2.7 12.8 30. 1 52. '3 7'3. 1 1 OB. ::_ 13'3 . 8 173.5 20'3. 5 2':31 . 8 363 .2 385.5 401.3 408.0 407. ~~ 3E~4. '3 354 .4 305.7 o.o: 3.8: 14. 1 : 31.8: 55.5: 8 7 .o: 120.s: 157.5: 1 '35. 7: 238.0: 2 81..5: 32 5 II 1 : 357.tS: 402 .5: 427.S: 443.4: 450.G: 44'3. 7: 441. 3: 425. '3: 403. '): 375.8: 342.o: 0.00 0.52 0. EA 0.85 1. 84 3. ·~5 f. .• 30 8.t14 11. 56 14.21 1 5 .55 1 7 . 14 18.5:2 1 '3. E/:1 20.52 21. 05 21. 2'3 21. 25 2(>. '3€-3 2 0. 4E· 1'3 . 73 18. ~30 l7.57 2 7 3.3 7 27 4.04 274. 2'3 274.70 275 .05 275 .23 275 .41 275.50 275.81 275 .03 275.21 275. 3 '3 276 .57 275.71 275.82 275 .88 275. '31 276 .'31 275 .87 275 .81 275.72 275 .50 275.45 POND-2 Ve rsi on: 5.20 S/N: F'i:l.Q•::? ~:: EXECU T ED: 03-31 -1996 20:01:37 R et u rn Freq: 25 ~ea r s ******~*********** S UMMA RY OF ROUT IN G COM P UT ATION S ****************** F'o n d F :i. J. r-:.>: I n floi,J Hy d rogi-e<.ph : Outflow Hyd rograph: CSP::2 ~iB CSP2580 .H YO .HY D Starting P ond W.S . Elevation -273.37 ft ***** Su mmary of Peak Out fl ow an d Pea k Ele va t io n ***** i:=·eak In f 1 Ci'oAJ -·-r':J ~7 '30 I -fs ~I . - F'eci. k Out fl r:1 w --2 1 . 2 ':J c f ,_ :::> r=·eak E: l evat ion --27G . '3 1 f t *•*~*S ummar y of Appro x im ate Pea k Storag e***** Pea k Storage Fro m Stor m - Total Sto r a~e i n P o nd 0 . 00 ac ·-ft 0 . 30 a c--ft 0 .30 a c-f t . 02 " o:::; . (>5 . ')7 . o·:;· . 1. 1 .-·. . .. ::. . :L 4 ' r::- ...J 1 -7 . I . 1 '3 ·""'.• . ... ·1·-· . .::....::. . 2 4 26 ·-:,_, . .... I . :2·:9 ':) 1 . ~1 . r:-a ··-:· ... J .1:... . 3 4 . 35 :·,~ '! ·-·· T I PDND -2 Version: 5.20 S/N: F'age 4 P oncj Fi le: Inflow Hydrog ra ph: Outfl ow Hyd ro graph: F'E•C:t k In fl ()'.,.) .• Pe c:1k Dut fl C•',,,J ..... r:·eak El e v at i C•rl -·· CSF·F.:0 -8 . F'ND CSF'25B CSF'25BO '.:17 . •;::H) c 21 . 2':3 c .H YD .HYD fr• :;::, f ~; 276 . ·:1 1 ft Return Freq: 25 years EXECUTED : 03-31 -1 996 20:01:37 o.o 4.0 8.0 L2.0 Flow C:i:f s) 16 .0 20.0 24.0 28.0 32.0 36.0 40.0 44.0 .------:---·---:-----:-----:-----:-----:-----:-----:-----:-----:-----:- ... * :·1~ * ... ·M· ·" ·l(· v ... .Y.:- ·'' ."° ;.< ·~· ., -l!i· ··,·.: * :·1~ ·)".· :·1~ 11:· :·1~ •*- :·1~ * ~/~ ·IE· ~'~ •* ~(~ ·*- ... * :·;~ ·Ji!· :·1~ * >·~ *• ~/~ ·lE· , .. ... •* :·.1, * ~,.~ ·!!: ~/~ * :'(~ •* ~/~ * ... ·!E- ,, *• :·. ~I~ ·* ·!\· •*-~I~ I *• ~'~ I ·*-·'' ·lE· ~/~ ·!le y~ ·!'!-... * :1~ * :1~ * .-. -1!· ~/~ I * I ... ME (hi·· s ) F i l e : CS F'25 BD l·IYD D ma :t; -2 l r, i: f s . . ..;, F i 1 e : C:SP258 . HYD Oma~~ ... 37 . 9 c f c: POND-2 Version: 5.20 S/N: F'age 1 EXECUTED: 03-31-1935 20:0 1:37 Petui'n Freq: 10 y ear s **************************** M· POUT I NG OF lt!P1TEl?SI IE D B * * COLLEGE S TATI ON * **************************** Inflow Hydrograp h: CSP lOB .HY D Rating T able file: CSPRO -B .PND ----INI TIAL CO NDITIONS ---- E l e v Ct. t i r:1n ··- Du t f 1 o•.,,• 273.3 7 ft 0.00 cfs 0. 00 ac ---ft I NT ERMEDIA TE ROUT ING COMPLJT AT I Of\JS :EL EVATI ON: OUTFLOW : ( ft ) (c f s) 273 . 37 0. 0 274. 00 o. r.::-J 275 . 00 1 . 0 2 75 . 00 1 4. 0 277 . 00 .-·, .~·. 0 ..::.. .. :.:.. 278 . 00 2f:3 . 0 STORA13E : (a c--ft:> 0. 000 I I o. 001 I I o . ()3(> I I o. 150 I I 0. 3 10 I I 0. 5 3c) I I 2S/t 2S/t + 0 (cf s) (cf s) :------------:-------------: o . 0 1. 5 43 . E., 217.8 450.0 75 ·::1. 4 o. 0 2.0 44.5 231. 8 472.0 7 '37. 4 Time in cremen t (t) = 0.017 hr s. POND -2 Ve rsio n: 5.20 SI N: E XEC UTED: 03-31 -1 996 20:01:37 Pond F"ile: In flow Hydr ograph: Jut flow Hydrog ra ph : INFLOW HYDROGRAPH TIME (hr <::;) I f\lF LOl-J (i: fs) C'.::lF'P0 ·--8 • PND CSP1 0 B .HYD CSP 10BO .HYO 1 1 +1 2 P,:\ge 2 Pet ur· n F ir eq : 1 0 years ROUTING CCJMPUT ATION S 2S /t --0 (i: fs) 25/t + CJ C:i: fs) OUT FLOW :ELEVATION: (cfs) (ft) :---------:------------:-----------:---------:---------: o. 000 o. 00 I ... ____ , .. ___ o. 0 o. (l I o . (l(l 27 3. 37 I I 0. 017 r;i 37 I ':.' 4 ::: .. ~. ,.., 4 I 0. 52 274. 03 ~,. I ,_,. ,;:. ~. I o. 033 f,. 74 I 10. l 1 1 2 12 . 4 I 0 . G~2 274 . . -.r.::- I . I .L. ._) o . 0::50 1 0. 10 I 1 6. 8 26. 4 28. 0 I o. 81 274. 61 I I o. 0 67 13. 47 I .... ,,. ... b 47. :::-~ 50. (l I 1 38 275. 03 I .. ::...;:, .. I . 0 .. 0 03 lG. 84 I ~30. ,.., 71 0 7 -r b I r', 2 '3 275. 1 8 I .... :• I • I ..:;, . o . 100 20. 21 I .... , ..... 1 '37. -108 . (l I t:-41 275. 3 4 I ._"j / • .. ::.. I ....! • o. l 17 ··-:·'-=' 58 I i:.1-3 .. 8 1 .-,i::;· G 141 0 I 7 70 275. t="·-· ....:... \.J • I ..:.. ....! • . I I • ....!£.. o . 1 '';"''J 26. '35 I 50. r: 1 55. '3 1 75. 1 I 1.0. 14 275. 70 '·-'~ I ._j I '). l :'iO 30. 3 1 I 57 . r;i 187. -, 2 1 3. 1 I 1 ·-::· 7 1. 275. '30 I __, I I 0. H'.,7 ,. ... ,. ... 68 I CA . 0 ~::~'22 . 4 25 1 .. , I 1 4. GG 275 . 08 ...;, ..::.· . I . I I u. 183 3(>. r 1 • I 54. 0 25 ·l . 7 :286 . 4 I 15. 82 27 5 . . -.r-i .. :d. I I .4.-~ o . ::,~:oo ~~~ f; • '3~:5 I 5·7. .-, :2 78 • b 312 . 0 I 1 5. 57 276 . 33 I ..:;, I o. 2 1 7 • 0"11"'• 58 I 50 . 5 2·:::i4 . 7 32 '3 . .·-, I 1 7. 24 275. 41 . .::. ... ~) . I ..:.. I o . ·-:·':'I~ 20. 21 I :t . .., 8 ~j (>3. 4 3 38. r::-I 1 7 . 55 276 . 44 .. :....._1,_J I ' ..::i • ....! I o. 250 1 f,. 84 I ':'-, 1 3(>5n 2 340. 4 I 17. 5·-· 275. 45 I -~I . I ..:.. o. 2C7 1 .-:;. 47 I 30. 3 300. 5 -. , ..... c:.-r::-I 1 7. 45 275. 43 ...... J • I ~,:J....J • ....! I o. ::::8:3 :l 0 . 10 I .-...... , b ~:~·30 . 0 32 4. ·-:· I 1 ' Oc3 27 5. 38 I ...:.:. ._j . ..:.. I I • 0 . '.30 0 6. 7.::t,. I 1 E.,. 8 2~7 3. 8 3C>b. 8 I 1 5. ~30 27 5. 31 ' I o. 3 :1.7 r, 3 7 I 10. :L 252 . r.;;-283. 'J I 1 5. 74 275. 22 ,::i. ' ..J I 0. ,,,......,, 0. 00 I ·":l 4 225. -. ·-,c:-i:::-~3 I 14. 80 275 . 1 (l ..::.·~...:· I ...,. ..:.. .. ~.J..J • I POND-2 Vers io n: 5.20 SIN: Pagr=:i 3 EXECUTED: 03-31-1995 20:01:37 Pet u rn F-r·e q: 10 yea1's ****************** SUMMARY OF ROUTING COM PUTATION S «***************** Pond r--ile: In f low l-ly d ·r-ogr· aph: Outfl ow Hydro g rap h: CS PPO .,·B . PND CSPlOB .HYD CSP 10BO .H YD S t arting Po nd W.S. Ele v a tion - i=·ea k I nf 1 0 1,.,1 273.37 ft -.. ':'r., ~.1 .. -1 . Peak Out f 1 0 1.v = 17. Peak Ele va t i •:•n = 275. GB c f s 52 c f s 45 ft ***** Su mm ary of Appr ox i mate Peak Storage ***** Initial Storage - Pe ak Storage Fro m Storm - Total Storage in Po nd 0. 00 i01C -ft 0. 22 ac ·--ft 0 . 22 ac --·ft " (':~~ (>:-3 . 05 . 07 . O'J . l . 12 . l •1 1 5 1 -, . .. . l :; ··:i . . :22 . ::.~4 . 25 . 2 .. l .. 2 ·:'.j . 31 . ,-....... .. J .. ..:. T ( :·1~ '*' I P OND -2 VeYs i on: 5.20 SI N: P a g e 4 Pond Fi le : I n flo w Hydrogra p h : Clu t fl o•,; l ·l ydi ... ogr21ph: P eak In f 1 0 '.4 ···- F·ea l :: D u t fJ. i:11...._.1 ..... F'eak El evat i on M .. • CS F'F.:CJ·-·B • PND C S F' 1 OD • H Y D CSF'1 0BO .HYD ':'I ':'1 .....> ..... >. GD c f s 1 7 . (.;2 I ... f c:: ... 27() . 4 5 f t F'.e tu r n FY-eq : 1 0 y ecix s EXEC UTED: 03 -31 -1 936 20 :01:37 o . 0 4 . 0 f:3. (l :1.2. 0 F l ow (cfs) :1.6.0 20.0 24.0 28 .0 32 .0 3 6.0 40.0 4 4 .0 ------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- ..... : .:, . :·.··, ·~~ .. , -lf.· :·,.~ ·!<:· .... -~<- :;~ * x *' >-.'. ·)!' :·1~ * •*-"' .. ,.~ ~~ ;1~ '*' ~I~ ~ ~I~ -~· '.'!~ -)\· ·'• ·*- ;1~ ·ll· :·1~ '*' h * "' ~· ;1~ ·ll· >·~ ·i'!- ·'' '* ~I~ -!<· "' *· ... ·i':· :·1~ -!E· ·~· * "' I ·. .;:. :·1~ I ·!!· 7; ·l<:-:.,~ ·M-;1~ -¥.· ~I~ -:~· >~ .y, :·1~ * ~(~ '* ?:~ ME h r s ) F i l e : CS F' 1 OD O . HYD Qma ~; ..... 1 7 . 6 c fs F i 1 e : CS F' 1 OD . l·-I YD Qma :1; --''::\':l 7 c fs ~,,_, . POND-2 Version: 5.20 S/N: F'ag e 1 EXECU TED: 03-3 1 -1996 2 0:01:3 7 Return Freq : 5 ye ar s **************************** * * ROUTING OF WATE RSH ED B * * COLLEGE S T ATION * ·*- •*- **************************** Inflow Hydro graph: CSP58 .H Y D F:at :i. n~~ T e:1b l e f :i. J. e: CS PF.:0 -···8 • F·~,ID ----INITI AL CONDITIONS ---- El evat ion -273.37 ft Outflow -0.0 0 cfs St ()l'° t::\g e 0. 00 ac --ft 13 IVEN F'OND DAT{i INTERMED IAT E RO UTING CO MPU TATIONS :ELEVATION: OUTFLOW l (ft) (1.:f ~s ) !'.;TOPAGE : (a c --·ft) :---------:------------------- 274.00 275 .00 27 6.00 277 .00 2 7 8. (H) 0.0 0.5 1. 0 14.0 22 .0 28.0 o.ooo : 0. 001: 0 .030: o. 1 50 : 0.310: c). 53(>: £'.S /t ( i:.: f s) 0 .0 1. ~) 43.6 2 1 7.8 450.0 76'3. 4 Time incr-ement (t) = 0 .017 h rs . 2S /t + 0 (c f s) o.o 2 .0 44 .5 231 .8 472.0 7'37 . 4 P D JD -2 Ver s io n: 5 .20 S IN: E XECUTED: 03 -31 -199 6 2 0:01:37 F'o:..o n d F i l E•: Inf lo w Hy d rog raph : Ju t fl o w Hy d r ograph: IN FLOW HYDRO GRAPH TIME O w s ) INFLm·J (o:f ~:.) U3F'F:O -B • F'ND CSP5B CSP5BO .H YD .H YD 11 +!2 ( ·= f s ) Pag~? 2 F::eturn ~-1,eq: 5 y ears F::OU TI NG COMPUTA TIONS 28/t ..... 0 (o: f:;) 2Ei/t + 0 (o: fs) OUTF LOW :ELEVAT ION: ( ·= f s) (f t) --------:-------------------:------------:--------------------:---------: o. 000 o . 0 0 I I ···-···-... _ ·-.. .,,_ 0. 0 (J. 0 o. 00 273 . 37 0 . 0 1 7 ~, 12 I ,, 1 2. 1 ':> 1 0. 51 274 . 03 ,.:,,. I ..;:,. ...., . o. (>33 f;, • .·-.1:= I '3 . 4 1 0 . 2 1 1 "" 0. 5 1 :~74 . 22 ...::.,_1 I . . ..J o. 050 '3 . '':'-7 I 15. f'.) 24. ,, .-,i:;:-'3 o. 78 274. 55 __,, I .:i ,..:_ ...J . o . 057 12 . 5 (> I 21 '3 43. '3 4E. . . -. 1 1 1 275. 01 I . .. ::. . 0 . 083 1=i. E ··'.· I 28. 1 GS. 2 72. 1 ·-:· ·:H .-,-,c::-15 _J..;_ I ..:... .&:..1 ~. o. 100 18. 75 I 3 ,~ .. 4 '30. 8 100. E. I 4. 8'3 275. 30 I I o. 1 1 7 2 1 El7 I 40 . 5 1 1 7 . • ::1. 131 4 I 7. 03 275 . 45 . I . I o. 1 :3 3 ~~~5. 0 0 I 4G. '3 145. G 1G4. 2 I '3. 31 275. 54 I I 0. 150 28. 12 I r.::"',_l 1 175. ,, 1 '3 8. 7 I 1 1 7 1 2-15. Ci ·-, I ...J..:J . ..:;, I . o..::. 0. 15 7 31 :~~~.5 I '.3 '3. ~l 205. c:· 234. -~ I 14 . 1 (l 275. 01 . I ...J / I o . 183 28. 12 I 5'3. 4 .-·,r-.r.::--5 255 . '3 I 1 5. 14 275 . 14 I ...;:...;:,w .. I o. 200 .-.c:-00 I r.:"'I 1 255. '3 288. "7 I 15. '30 :276 . 24 L ·..J • I .....J..:J . , I o. 217 2:1. 8 7 I 45. '3 271 0 3(>3. 8 I 1 5. 40 275. 3(> . I . I 0. .-,,.,,., 18. -, t ':" I 40. 5 278. ':> 31 1 G I 15. GG 275 . ,,., ...::.~")~· I ...J I ...., . I ..:J~ 0. 25(> 15. 5 2 I 3.~1. It 4 27'3. ~. 3 1 2. 7 I 15. 0/J 276 . 34 I ..;:, I 0. 267 1 2. 50 I 2t.L 1 274. 4 307. 4 I lG. t::·-1 276 . 3 1 I I ·.JL 0. 283 '3. ':'•"7 I :21 '3 253. ·::i 2'35 . -I 1 6. 15 276 . 27 ....,, I . ..::. I o. 300 5. .-,r. .. ~ I 1 ·=-b 24!:1 . 4 27 '3. 5 I 15 . 5 '3 275 . 20 .• ~...J I ...J. I o. 317 ,, 12 I '3. 4 228 . 0 257. 7 I 1 4. 87 275 . 1 1 .;:i. I I o. ,...,·11-t 0. 00 I ':> 1 2(>3. 2 23 1 l I 1 3. '35 275 . 00 ~..:J~::J I __, . . I POND -2 Version: 5.20 S/N: E XECU TED: 03 -3 1 -1 996 2 0:01 :37 Page 3 Retu rn Freq: 5 years **~****~~~******** S UMMARY OF ROUTING COMPUTATIO NS ****************** Pond File: CSPR O-B .PND I11flo•,J Hych·o g r·;;.<.ph: C:S PSB Outf l o w Hy drograph: CSP5BO .HYD .HYD St al' ting F'ond ~,J. S. Eleva.ti on -·· 273 ,, 37 ft ***** Su mm ary of P ea k Outf l ow an d P ea k E l evation ***** Peak In fl 1:1 '-h' --31 ·""o I:: I -f<s . ..::.J - Peak Out fl i:1w -15 . 5'3 c fs Pe21 k El evat ion -· ~"27G. 34 ft ***** Sum mary of Approximate Peak Storaqe ***** Ini tia l S t orage -0.00 a c -f t Peak S t o rage From Sto rm -0. 20 ac ·····ft Total Storage in P o nd 0 . 20 ac -··· ft ( -) ( --. ) ,-~ ·-:. . ·····- . (> ~:-i . 1)~.5 . 1)7 . ~)·::1 -:l 1 --:. .I~ I ·l .L r.:.-~I 1 7 . .L ·::1 . ~"2 ··:··-;. . ... :_ .. :.... . 24 . 2(; . 27 . ::;::·:;1 •:; 1 . ,, r,.-;. . _,.._ y F'i::•ncl F i l E~: Jn fl O~·} HycJ ·( 0 '=1 r ,;:\p h: Out fl o•.-J Hyd i·-1.-·~F .~\Ph: F'r2a f:: Pu ,:1.k C3F'F:'.0-B • F'ND cr.:;r·sB c~;i:-·sBu • l ·IYD .H VD 3 1 " ::25 c f ~; 1 r:: ... s ·::i i::: f ~:; 276. 34 ft p D.C_l f:? 4 ~; YE<O\l" s EXECUTED: 03 -3 1 -1996 2 0:0 1:37 F 1 0 1 .... 1 ( c fr:;) o .. 0 4.0 D.O l :::: . 0 16.0 20.0 2 4.0 28 .0 32.0 36.0 40 .0 44.0 -·-I ' -~:- I -~-I ..• :·1.: ... ·'·. "' .... "' •.. . '\ /~ I I ..... I I ·~ T IME F .i. l E2 ~ File: ··,.: o~ ·~~ ·~= -:~ ·' :·,.~ ·l<'c ~· ·Y.- CSF'5BO CSF'5D i" ~-< .'• ~- ~l· ;1~ :·1~ •* • I IVD .H YD ... : -··--·-··-· --- ·!! ·~'· :1~ ·-,.~ * ·)\ ·r' >< ... ·'• :·1~ ... >·~ >"~ ·" _,, *' h -~· :·1.: ·*-:·1~ ;1.: :-.. ~ •.. ... •.. ... ;r~ ... ;1~ ~I~ Dm ~:i >~ ·- Qrna ;.·: ·-- .;,;. 1l · ·*- ·I!· : -·-..... ··-· --···-: --·· --· -·---· : -----· -·--· .. -. : -·· -··· ..... --· -·-: --· ..... --· ..... ·-· : -. ---·----·· -- ·~ {\· -~~- -~· ·lf: ll· 1G .7 c:fs :H. ~:; •: f s ·*' ·!f:- -ll· ·l':· ·lt ·)!;· 11· -~- SUBWATERSHED C POND-2 Vers ion: 5.20 S/N: EX ECUTED : 05-09 -1996 18:06:44 Page 1 Return F req: 100 years ******************************* * * * ROUTING OF SUBWATERSHED C * * COLLEGE STATION * * * * * * * ******************************* Infl o w Hyd rog raph: CSP100C .HYO Rat i ng Table fil e: CSPRO-C .PND ----INITIA L CONDITIONS---- E l eva t ion = 27 6.00 ft Outflow = 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA INTERMEDIATE ROUTING COMPUTATIONS :ELEVATION: OUTFLOW : (ft) (cfs) S TORAGE : (ac-ft) :---------:---------:----------: 276 .00 0.0 o. ooo: 279.00 26.0 0.030: 280 .00 37.0 0. 300: 28 1 . 00 45.0 0.960: 2 8/t (cfs) 28/t + 0 (cfs) ------------:------------- 0.0 43.6 435.5 1393.6 o.o 69.6 472.5 1438.6 Time increment Ct) = 0.017 hrs. POND -2 Version: 5.20 S/N: EXECUTED: 05-0 9-1996 18:06:44 Pond File: CSPRO -C .PND Inflow Hydrograph: CSPlOOC .HYD Outflow Hydrograph: CSP100CO.HYD Page 2 Return Freq: 100 years INFLOW HYDROGRAPH ROUTING COMPUTAT I ONS TIME (hr s ) : INFLOW : (cf s) :--------:---------: 0.000 o.oo: 0.017 8. 14: 0.033 16.28: 0.050 24. 42 0.067 I'""\·-· ..::i..::... 56 0.083 40.70 o. 100 48.83 o. 117 56. '37 o. 1 '?'? ....,...., 65. 1 1 0. 150 73. 25 o. 167 81 • 3'3 o. 183 81. 3'3 0.200 81. 3 '3: 0.217 81. 3'3 : (>. 233 81. 3'3: 0.250 73.25: 0.267 65. 1 1 I I 0.283 56.97: 0.300 48. gr:>• ,_,I 0.317 40. 70: (>. 333 3~"2. 56 : 0.350 24.42: 0.367 1s.2s : 0.383 8. 14: o. 400 o. 00 : Il+I2 (c fs) 2 8/t -0 (cfs) 28/t + 0 : OUTFLOW l ELEVATIONl (c fs) (cf s) (ft) :---------:-----------------------:---------:---------: ---·---0.0 o.o: 0.00 276.00 8. 1 ~"2. 1 8. 1 I 3.04 276 .35 I 2 4.4 6.7 25.5: '3. '30 277 . 14 40.7 12. 0 47. 4: 17.71 278 .04 57.0 17.4 68.9: 25.77 278 . •37 7--:0 '? ..., . ..., 37.5 '30 . 7: 26.58 27'3 . 05 8'3. 5 71 • '3 I 127.o: 27.57 279. 14 105.8 11 '3 . 8 177.7 28. '35 27 '3 . 27 1 ~"2~2 . 1 180.5 241 . '3 30.70 27'3 . 43 138.4 253.2 318.8 32.80 279 .62 154.6 337.4 407. '3 35.23 27'3. 84 162. 8 425. 7 500 .2 37.23 280.03 162.8 512.6 588.5 37. '36 280 . 12 162.8 5'38. 0 675 . ,..., 38.68 280 .21 .:;, 162.8 682.0 750.8 3 '3. 3'3 280 .30 154.6 756.6 836. 6 40.02 280 .38 138.4 814. 0 I 8'35. 0 40.50 280.44 1 ·-··-· L L. 1 854. 4 '336. 0 40.84 280 .48 105.8 I 878. 1 '360. 2 41 . 04 280 .50 8'3. 5 885. 4 '367. 6 41. 10 280.51 73.3 876.5 '358. 7 I 41. 03 280 .50 57.0 852.0 '333. 6: 40.82 280 .48 40.7 81 1 . 7 8'32. 7: 40.48 280 .43 24.4 756. 1 836. 1 I 40.01 280.38 I 8. 1 685. 4 764.3: 3'3. 42 280 .30 POND -2 Version: 5.20 S/N: EXECUTED: 05 -09 -1996 18:06:44 Page 3 Return Freq: 100 years ****************** SUMMARY OF ROUTING CO MPUTATIONS ****************** Pond File: Inflow Hydrograph: Outflow Hydrograph: CS PRO -C .PND CSP100C .HYD CS P100CO.HYD Starting Pond W.S. Elevation -276.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow = 81.39 cfs Peak Outflow = 41. 10 cfs Peak Elevation -280.51 ft ***** Summary of Appr o x imate Pe a k Storage ***** Initi a l Storage - Peak Storage From Storm = Total Storage in Pond = 0.00 ac-ft 0.64 ac -ft 0.64 ac -ft . 0 2 . 03 . 05 . 07 . 09 . 1 . 1 0 ~ . 14 . 15 . 1 7 . 19 . ~ L . 00 k~ . 2 4 . 26 . 27 . 29 . 3 1 ~~ . ~L . 34 . 36 A * POND -2 Ver sion: 5.2 0 S/N: Pond File : Inflow Hydr ograp h: Outfl ow Hyd rograp h : Peak Inflow = Peak Outflow - Peak E le vation = CSPRO-C .PND CSP100C .HYO CS P100CO.HYD 81.39 cfs 41. 10 c f s 280 .51 ft Page 4 Return Freq: 100 years EXECUTED: 05-09-1996 18:06:44 0.0 8.0 Flow (cfs) 16.0 24 .0 32.0 40.0 48.0 56.0 64.0 72.0 80.0 88.0 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- x * x * x * x * x * x * -I I x * x * -I x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * -I I x * I x * '· I x * I ~ A * x * x * x * * * x * x -I ' * x * x * x * x TIME (hrs) File: CSP100CO. HYO Qmax = 41 . 1 I -fs - File: CS P100 C HYO Om ax = 81 . 4 ' -fs . - POND -2 Ver s ion: 5.2 0 S/N: EXECUTED: 05-09-1996 18:06:44 Page 1 Return Freq : 50 years ******************************* * * * ROUTING OF SUBWATERSHED C * * COLLEGE STATION * * * * * * * ******************************* Inflow Hydrograph: CSP50C .HYD Rating Table file: CSPRO-C .PND ----INITIAL CONDITIONS---- Elevation = Outflow = Storage 276.00 ft 0.00 cfs 0.00 ac-ft GIVEN POND DATA INTERMEDIATE ROUTING COM PUTATIONS :ELEVATION OUTFLOW (ft) 276.00 279.00 280.00 28 1 .00 (cfs) 0.0 26.0 37.0 45.0 STORAGE (ac -ft) 2S/t Ccfs) 28/t + 0 (cfs) ------------:-------------: 0.000 0.030 0.300 0 .960: o.o 43 .6 435.5 1393.6 Time increment Ct) = 0.017 hrs. 0.0 69 .6 472 .5 1438.6 POND -2 Version: 5.20 S/N: EXECUTED: 05-09 -1996 18:06:44 Pond File:?: Inflow Hydrograph: Outflow Hydrograph: INFLOW HYDROGRAPH TIME C:hrs) Il'WLOW : (o:fs) CSPHO -C . F'ND CSP50C .HYD CSF'50CO . HYD 11+!2 (o: fs) Page 2 Return Freq: 50 years ROUTING COMPUTATIONS 25/t -0 C:o: fs) 25/t + 0 : OUTFLOW :ELEVATION C:o: fs) (o:fs) (ft) :--------:---------: :---------:-----------------------:---------:--------- 0.000 o.oo: -----0.0 o.o: o.oo 276.00 0.01 7 7.43: 7. 4 1. •3 7. 4: 2.78 276 .32 0.033 14.85: 22.3 6. 1 24.2i •3. 03 277.04 0.050 22 .28 : 37. 1 10. '3 .:t3. 2: 16. 16 277.86 0.067 2 '3. 70: 52.0 15. '3 62. '3: 23.51 278.71 0.083 37. 13 66.8 30.0 82.7: 26.36 27'3. 03 0. 100 44.55 81 .7 57.4 1 11. 7: 27. 15 27'3. 10 o. 117 51. 98 '36. 5 •37. 3 I 153. '3: 28.30 27'3 . 21 0. 1 ,..,,.., ,::,..:;, 5·::.i. 40 11 1 . 4 14'3. 1 2 08. 7: 2'3. 80 27'3. 35 0. 150 66.83 126. 2 212. 1 275.3: 31. 62 279.51 o. 157 74.26 141 1 285. 7 -. C:-'? .-, I 33.74 2 7 '3. 70 . ~'-1-...J •.,.::.I o. 183 74.26 148.5 362.3 434.2' 35. '35 27 '3. '30 0.200 74.26, 148.5 436.2 510.8 37.32 280.04 0.217 74.25: 148. 5 508.8 584.7 37. •33 280 . 12 (>. 233 66.83: 141. 1 573.0 EA'3. '3 38.47 280. 18 0.250 5'3.40: 125. 2 521.5 6':f3. 2 38.88 28(>. 23 0. 267 51. '38: 11 1. 4 654.5 732.8 3'3. 16 280 .27 0.283 44.55: '36. 5 672.4 751. 1 3'3. 31 280 . 2'3 0.300 37. 1 ':>I -.JI 81 .7 675.5 754. 1 3'3. 33 28(>. 2'3 0.317 2'3. 70: 66. 8 663.8 742 .3 3•3. 23 280 .28 (>. 333 22.28: 52.0 637.8 715.8 3•3. 01 280 .25 0.350 14.85: 37. 1 5 '37. 6 674. •3 38. 68 280.21 0.367 7.43: 22. 3 543.4 61 '3. 8 38.22 280 . 15 0.383 o.oo: 7. 4 475.5 550.8 37.65 280 .08 POND -2 Ver sion: 5.20 S/N: EXECUTED: 05 -09 -1996 18:06:44 Page 3 Return Freq: 50 years ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: Inflow Hydrogr a ph: Outflow Hydrograph: CSPRO -C .PND CSP50C .HYO CSP50CO .HYD Starting Pond W.S. Elevation = 276 .00 ft ***** Su mm ary of Peak Outflow and Peak Elevation ***** Peak Inflow = 74.26 cfs Peak Outflow -39.33 cfs Peak Elevation = 280.29 ft ***** Summary o f Ap pr oxi mate Peak Storage ***** Initial Storage = Peak Storage From Storm - Total Stor a ge in Pond 0.00 ac-ft 0.49 ac -ft 0.49 ac -ft . 02 . 0 3 . 05 . 0 7 . 0 9 . 1 . 1 2 . 14 . 15 . 1 7 . 19 0 . ~ . 22 . 2 4 . 25 . 27 . 2'3 . 31 . ~~ ~L . 34 . 35 x * POND -2 Ver s i o n: 5 .20 S/N: Pond Fil e: Inflow Hy drograph : Outflow Hydrogra ph : Peak Inflow = Peak Ou tfl ow = Peak Elevat ion - CSPRO -C .PND CS P50C .HYD CSP50CO .H YO 74 .26 cfs 39.33 cfs 280.29 f ·t Page 4 Return Freq : 50 years EXECUTED: 05-09 -1996 18:06:44 0.0 8.0 Flow (c fs) 16.0 24 .0 32.0 40.0 48.0 56.0 64.0 72 .0 80.0 88.0 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- x * x * ,,. A * x * -I x * I x * A * x * x * x * x * x * -I I x * x * x * w A * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * -I I x * * * x * x * x * x -I I * x * x -I I * x * x TIME Chrs) File: CS P50CO . HYD Qmax = 39 . 3 c fs F i l e : CSP50C HYO Qmax = 7 4 . ~ c f s . ~ POND -2 Version: 5.20 S/N: EXECUTED: 05-09 -1 996 18:06:44 Page 1 Return Freq: 25 years ******************************* * * * ROUTING OF SUBWATERSHED C * * COLLEGE STATION * * ·*- * * * * ******************************* Inflow Hydrograph: CSF'25C .HYD Rat ing T ab l e fil e: CSPRO -C .PND ----INITIAL CONDITIONS ---- El evat ion = 276.0 0 ft Outflow = 0 .00 cfs Storage = 0.00 ac -ft GIVEN F'OND DATA INTERMEDIATE ROUTING COMPUTATIONS :ELEVATION: OUTFLOW : C:ft) C:cfs) STORAGE C:ac -ft) :---------:---------:---------- 27E.. 00 0.0 0. 000 279 .00 26.0 0.030 280.00 37.0 0 .300 281. 00 45.0 0. '3E.O 25/t (cf s) 28/t + 0 (cf s) :------------:------------- 0.0 43.6 435.5 13'33. 6 0.0 6'3. E, 472.5 1438.6 Time increment C:t) = 0.017 hYs. POND-2 Ve rsio n: 5.20 S/N: EXECUTED: 05 -09-1996 18:06:44 Pond File: CSPRO -C .PND Inflow Hydrograph : CSP25C .HYD Outflow Hyd ro graph: CSP25CO .HYD Page 2 Return Freq: 25 years INFLOW HYDROGRAPH RO UTING COMP UTATIONS TIME C:hr s) : 0. 000 0.017 0.033 0.050 0.067 0.083 0. 100 0. 117 0. 133 o. 150 0 . 157 0. 183 0.20 0 0.2 17 (>. 23:3 0.250 0.267 0.283 0.300 0. 317 (>. 333 0 .350 INFLOW : (cf s ) o. 00 : 7.oo: 14.01 I I 21. 01 I I 28 .01 I I '"le:' ..,:,,J . 02: 42. (>:;~ : 4'3. 02: 56 . 03: b3. (>3: 70.03: 70. 03: G3.03: 56.03: 4 '3 . 02: 42. 0 2: 35. (>~*2 : 28. 01 I I 21.01 I I 14. 01 I I 7 .oo: 0. oo: I1+I2 (cf s) 25/t --0 (cf s) 25/t + 0 C:c fs) OUTFLOW ELEVATION (c f s) (ft) :---------:------------:----------------------------- -·--·----o. 0 7. 0 1. 8 2 1. 0 5.7 ,..lC:' ..::i.....J . 0 10. 3 4 '3. 0 15.0 63 .0 .-.C" ..::....i. 5 77 .0 48.8 31. 0 84.0 105. 1 130. 5 1 1 '3. 1 187. 7 1 33 . 1 255. 1 140. 1 325. 4. 1 ':>':' .._,.._,, 1 385.2 l 1 '3. 1 42 '3. 7 105. 1 45 ·3 , 7 '31. 0 475.5 Tl. 0 4Tl. 2 63.0 465 . 1 4 '3, 0 43'3 . 4 35 .0 400. 4 2 1 .0 35 <). 2 7.0 28 '3 . 5 o. 0 7 .0 22.8 40 .8 , 5 '3 . 3: 78 .0 : 102.s: 13'3. 8: 18'3. 0: 24'3 . 6: 32<). 8: 3 '35 . 1 I I 458 .4: 504 .3: 534 .8: 550 .8' C" c:.·~, c=- ....J....J.L • ....J 540 .2 514 . 1 474 .5 421 .4 357.2 0 .00 2.62 8 .51 15.24 22.17 26.23 26. '30 27. '32 29.26 30 . '31 32.86 34. 9·:;, 36 .62 37.26 37.65 37.66 37.56 37.34 37.02 35.G l 33 .85 276 .00 27 6.30 276 . '38 277.76 278.56 279 .02 2 79.08 27'3 . 17 27'3. 30 27'3. 45 27'3 . 6 2 27'3 . 81 2 7'3 . •37 280.03 280 .0G 280.08 2 80.08 280 .07 280 .04 280 .00 27'3. 87 279.71 POND -2 Ver s ion: 5 .2 0 S/N: E XECUTED: 05-09 -1996 18:06:44 Page 3 Return Freq : 25 years ****************** SUMMARY OF ROUTING COMP UT ATIONS ****************** Pond File: Inflow Hydrograph: Outflow Hydrog r aph: CSPRO -C .PND CSP25C .HYO CS P 2 5CO .HYD Star ting P o nd W.S . Elevation = 276.00 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inflow -70 .03 c f s Peak Outflow -37.66 cfs Peak Elevation -280.08 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage From Storm - Total Storage in Pond = 0.00 ac-ft 0.35 ac -ft 0.35 ac -ft 0. 0 . 02 . 0 3 . 05 . 07 . 09 . 1 . 1 :2 . 1 4 . 1 5 . 17 . 1 '3 . 2 . ~~ ~L . 24 . 26 . 27 . 2 '3 . 3 1 . ~~ ~~ . 3 4 ~ A * POND -2 Ver s ion: 5 .2 0 S /N: Pond File: CSPRO-C .P ND Inflow Hyd rograp h: CSP25C .HYO Outfl o w Hydrograph: CSP25CO .HYO Pe a k I nflow -70 .03 cfs Peak Outflow -3 7.66 cfs P ea k Elevation -280.08 ft Page 4 Return F req: 25 years EXECUTED: 05-09-1996 18:06:44 0.0 8 .0 Flow (cfs) 16.0 2 4.0 3 2 .0 40.0 48.0 56.0 64.0 7 2.0 80.0 88.0 ------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- -I I * x * -I I x * x * -I I x * x * x * A * x * A * x * ~ A * x * x * -I I x * x * -I I x * x * x * x * x * x * x * x * x * x * -I * I A x * x * x * '. -I x * I *X * x * x -I I * x * x * x * x -I I * x * x -I I * x I * x I TIME Chr s) Fi le : CSP25CO . HYD Qma x = 37. 7 c fs F i le: CS P25 C . HYO Qma x = 7 0. 0 c f s POND -2 Ver s i o n: 5.20 S/N: EXECUTED: 05-09 -1996 18:06:44 Page 1 F.'.eturn Freq: 10 years ******************************* * * ROUTING OF SUBWAT E RSHED C * * COLLEGE STATION * * * ·M- ******************************* Inflow Hy dr o graph: CSP10C .HYD Rating Table file: CSPRO-C .PND ----INITIAL CONDITIONS ---- El e va t ion = 276.00 ft Outflow -0.00 cfs Storage = 0.00 ac -ft GIVEN POND DATA INTERMEDIATE ROUTI NG CO MF'UTAT IONS lELEVATIONl OUTFLOW : STORAr:3E : (ft) (cf s) C:ac -ft) :---------:---------:----------: 275.00 o. 0 o.ooo: 27'3. 00 26.0 0.030: 280.00 37 . 0 o. 300 : 281 .oo 45.0 0 . ':360: 28/t (cf s) 28/t + 0 (cf s) :------------:------------- 0.0 43.6 435.5 13'33. 6 o.o 6'3. 6 472.5 1438.6 Time increment (t) = O. 017 hrs. POND -2 Ver s i o n: 5 .2 0 S /N: E XECUTED : 05 -09 -1996 18:05:44 F'o nd File: Infl o w Hy d ro g Ya ph : Ou tflow Hydrograph: I NFLOW HYDROGRAF'H TIME (hrs) : INFLOW : ( 0: f s) CSPF.:O -C . F'ND CSF' 1 OC . HYD CSF' 1 OCO . HYD I1+I2 ( 0: f s) Page 2 F::et Ul' n F r eq: 10 years ROU TING COMPUTATIONS 2 S/t -0 (o: f s) 28/t + 0 ( 0: f s ) OUTFLOW :ELEVATION (o:fs) (ft) :--------:---------: :---------:------------:----------------------------- 0. 000 0.00 -------- 0.017 I 6.04 6. 0 0.033 12 .08 18. 1 0. 050 18. 1 3 30.2 O.OG7 24. 17 4 .. :. ,., ..:.... • w 0.083 30. 2 1 54.4 o. 100 36.25 65.5 o. 11 7 4 2 . 30 78.6 0. 1 ,.,,., ....,...., 48 .3 4 '30. G 0. 150 54. 38 102.7 o. 167 G0.42 114.8 o. 1 83 54. 38 114.8 0.200 I 48.34 102.7 0.2 1 7 4 2 . 30, 9 0.6 (>. 233 35.2 5! 78.5 0.250 30.21 I I 66 . c:-..J 0.2 G7 24·. 1 7 : 5 14. 4 0.283 18. 1 3 : 4·-:· ':> ..:.. . ,_, 0 .300 1 2 .oa: 30.2 0.317 5.04 I I 18. 1 c). 333 o.oo: G.O 0.0 1. 5 5. (> 8. ·3 12. '3 17.0 3(>. 7 r.::-c::-....J....J. 1 8'3 . 5 133. 5 185. 6 I 236.7 272.7 2'35. ,., ,_, 3(>5. 3 3(>3 . . -, ..::. 28 '3. '3 265.8 231. 7 188. 0 1 35 .. 2 o. 0 6.0 1 '3. 5 "IC" .-, W..J • L 5 1 .-, . ..::. 57.3 83.4 10'3. 2 1 45.7 1 '32 . 3 248.4 301 . 4 33 13. 5 363 .4 373 . '3 37 1. 7 357.6 332.2 295. 1 24'3 . 8 1 '34. 0 0.00 2.26 7.34 13. 15 1'3.13 25.16 26.38 27.08 28.08 2'3. 35 30.88 33.37 34.02 34.31 34.25 33.86 33. 17 32 .18 30. '32 2 '3. 40 276.00 276.26 276 .85 277.52 278 .2 1 278 . '30 2 7 "3. 03 27'3 . 10 27'3 . 1 '3 27'3 . 30 27'3. 44 27 '3. 58 27 '3.67 27'3 . 73 2 7'3. 76 2 7'3. 75 27'3. 71 2 7'3. 65 27'3. 56 27'3. 45 2 7'3. 31 POND -2 Versio n: 5.20 SIN: EXECUTED : 05-09 -1 996 18:06:44 Page 3 F.:eturn Freq: 10 years ****************** S UMMARY OF ROUTING COMPUTATIONS ****************** Po nd File: CSPRO -C .PND Infl o w Hydrograph: CSP lOC .HYO Outfl ow Hydrograph: CSP10CO .HYD Starting Pond W.S . Elevation -276.00 ft ***** S ummary of Peak Outfl ow and Peak Elevation ***** Peak Inflow = 60.42 cf s Pe a k Out fl ow --34.31 cf s Peak Elevation = 27'-::J. 76 ft ***** Summary of Approximate Peak Storage ***** Initial Storage - P ea k Storage From Storm - Tot a l St orage in Po nd = 0. 00 ac -ft 0. 23 ac--f t 0. 23 ac --·ft 0. 0 . 0:2 . 03 . 05 . 0 7 . 0'3 . 1 . 1 "':0 ..:.. . 14 . 1 r.:· . ...J . 17 . 1.'3 . 2 . 22 . 24 . 26 . 27 . 2'3 . 31 '""l ·-· . ..:.i . .::. y; * POND -2 Version: 5.20 S/N: Pond File: Inflow Hy d rograp h: Outflow Hyd rograp h: Peak Inf 1 o:•w == Peak Outf l ow ··- P eak Elevation -- CSPF.:0 -C .F'N D CSP 1 OC . HYD CSF'l OCO .HYD 50. <t2 cfs 34.31 c 'f s 27 '3. 75 ft Page 4 F.:eturn F r eq: 10 years EXE CUTED: 05-09-1995 18:05:44 0.0 6.0 12 .0 Flow C:cfs) 18 .0 24.0 30.0 3 5.0 4 2 .0 48.0 54 .0 50.0 65.0 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- -I I * :1~ ·Jf- -I I :1~ * ~~ ·Jf- )'~ * ~I~ ·K- -I I :";~ * :;-; ·Jf- :1~ ·!!- :1~ ·K- ~'~ -l!· :1; * ~'~ * )'~ ·lt- -I I x * )~ * --I I :1~ * y~ * ;,~ * :1~ * :1; * :1; * :1~ * ~I, * ~/~ * y~· ·K- -I I :1~ * )': * -I I ~;* I * :1~ '· I * :1~ I * :1; ·lt-:1; * :1; -I * :1; I ·K-:"I~ * y; * :1~ * :1; * '."!: TIME (hrs) Fi 1 e: CSP 10CO HYD Qma ~1; = 3 4. ~. c fs . ..:;, Fi 1 e: CS F'10C . HYD Qma~,; == 60. 4 c f s POND-2 Version: 5 .20 S/N: Page 1 EXECUTED: 05 -09 -1996 18:06:44 Peturn Fr e q: 5 years ******************************* * * RO UTING OF SUB WAT ERS HED C * * COL LEGE ST ATION * * * * -IE· ******************************* Infl o w Hyd rograp h: CSP5C .HYD Rating Table file: CSPRO -C .PND ----INITIAL CON DITION S ---- Elevat ion = 276 .00 ft Outfl o w -0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA INT ER MEDIATE ROUTING CO MPUTATION S :EL EVATI ON: OUTF LOW : (ft) (cf s) STOF.:AGE : (ac-ft) :---------:---------:----------: 275.00 o.o o .ooo: 27 '3. 00 26.0 0.030: 2BO.OO 37 . 0 0.300: 281 . 00 45.0 o. '350: 2S/t (cf s) 2S/t + 0 (c f s) :------------:------------- 0 .0 43.6 435 .5 13'33. 5 0.0 6 '3. 6 472.5 1438.6 Time increment Ct) = 0.017 hrs. - ---------------' POND -2 Version: 5.20 S/N: EXECUTED: 05-09-1996 18:06:44 Pond File: Inflow Hydrograph: Outflow Hyd ro graph: INFLOW HYDROGRAPH TIME (hrs) INFLOt..J : (o: fs) CSPRO -·-C • PND CSP5C CSP5CO .HYD .HYD I1+I2 (o: fs) Page 2 Return Freq: 5 years ROUTING COMPUTATIONS 2S/t --0 (o:fs) 28/t + 0 : OUTFLOW :ELEVATION: ( ·= f s) ( ·= f s) (ft) :--------:---------: :---------:------------:-----------:------------------: o. 000 o. 00 ----- o. 017 0:::-.J. 51 c · .J • 6 o . 033 1 1 2 1 15. 8 I . o. 050 16. s·-.. ..::. 28. 0 o. OC7 22. 42 3'3 . . -, .. ~ o. 083 28. 03 50. c:-,J o. 100 ,..,,, 63 61 "7 ..:;,.,::, . . I o. 1 17 3 ':21. 24 T-· .,;:. . '3 o. 133 44. 84 84. 1 o. 150 50. 45 95. 3 o. 157 5G. 06 106. 0:::-..; o. 183 50. 45 106. c.- .J o. 200 44. 84 '35. 3 0. 217 3'3. 24 I 84. 1 I 0. :2 33 '?? ....,...., . 63 I I 7·-· ..:... . '3 0. 25c) 28. 03 I 61 7 I . 0. 267 2:;~. 4·-:· I 50. 5 ..:.. I 0. 283 15. s--· I 3•3. ·-:· ..::. I ..:.. o. 300 1 1 21 I 28. 0 . I 0. 317 0::-61 I 16. 8 .J. I o. 333 o. 00 I C" 6 I .J. 0. 0 0. 1 . 4 5. 4. 6 18. 8. 2 l"""'l ·-· ,:;_,.L • 1:2. 0 47. 15. 8 6 ·-:· ..:.. . . -.i= ..::..J • 0 77. 44. 3 '37. 7':• ...., . 2 128. 1 1 1 . 1 158. 157. 5 217. 201 . 4 254 . 232. 3 296. 250. '3 316. 257. 9 '?·-:·r:i u..:...u. .-.c-'""l .L...J~. ·:;, 31 '3. 23'3. 5 304. 215. ,.., 278. ,.:; 181 . '3 243. 13'3. 6 1 '38. 8°3. 1 145. 0 I o. I 6 I 2. I ..... I 6. ..::. I 6 I 12. I 5 I 17. I 4 I 23. I 4 26 • '3 25. 4 27. 5 28. 6 30. 0 31 . 7 ,.....-. ~..::.. 4 '".:'·-:· ....i..:... 8 r;:.·-:1 .,,_,...:_ . 5 32. 3 I f""\·-· .,::, ...::. . 8 I 31 I . 4 I 30. I , I 2'3. I I 3 I 28. I 00 1 (l s .. ~. ..:.. 20 75 34 21 77 51 70 04 31 20 74 '34 s--:· ..:.. 41 71 74 53 07 I 276 .00 276 .24 276 .79 I 277 .41 278.05 278. 6'3 27'3. 02 27 '3. 07 27'3. 15 27'3. 25 27'3. 37 27'3 . 48 27 '3. 56 27'3 . 61 27'3 . 63 279.62 27'3. 58 27'3. 52 27'3. 43 27'3. 32 27'3. 1 '3 POND-2 Ver s ion: 5 .20 S/N: EXECUTED: 05-09-1996 18:06:44 Page 3 Return Freq : 5 years ****************** SUMMARY OF ROUTI NG COMPUTATIONS ****************** Pond File: CSPRO -C .PND Inf l ow Hydrograph: Outflow Hydrograph: CSP5C CSP5CO .HYD .HYD Starting Pond W.S. Elevation -276.00 ft ***** Summary of Peak Outf l ow and Peak E l evation ***** Peak Inflow = 56.06 cfs Peak Out fl ow = 32.94 cfs Peak Elevation -279.63 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage Fro m Storm = Total Storage in Pon d 0.00 ac -ft 0 .20 ac-ft 0.2 0 ac -ft 0 . 0 . 0 2 . 0 3 . 05 . 0 7 . 09 . 1 . 12 . 14 . 15 . 17 . 1 '3 . 2 . 22 . 24 . 26 . 27 . 2'3 . 31 . ~~ ~k x * POND -2 Version: 5.20 S/N: Pond File: CSPRO-C .PND Inflow Hydrograph: CSP5C .HYD Outflow Hydr ograph: CSP5CO .HYD Peak Inflow -56 . 0 6 c fs Peak Out flow -~~ ~~-94 c f s Peak Ele v at i o n -279. 63 ft Page 4 Return Freq: 5 years EXECUTED: 05-09-1996 18:06:44 Flow Cc fs) 0.0 6.0 12.0 18.0 24.0 30.0 36.0 4 2.0 48.0 54.0 60.0 66 .0 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- -1 * 1 A * x * A * x * x * x * x * x * x * x * x * x * A * x * x * x * x * x * x * x * A * x * A * x * x * x * x * *X I 1, * x I * x I * x -I * x * x * x * x * x * x * x * x TI ME Chrs) Fi 1 e: CSP5CO HYD Qmax = ~~ 9 c fs . ~~ . Fi 1 e: CSP5C . HYD Qmax = 56. 1 c fs . I SUBWATERSHED D, F, G, H POND-2 Version: 5.20 S/N: EXECUTED: 04-16-1996 16:40:33 Page 1 Return Freq: 100 years ************************************** * * * ROUTING FOR SUBWATERSHED D,F,G,H * * COLLEGE STATION * * * * * * * ************************************** Inflow Hydrograph: CSP100D .HYD Rating Table file: CSPRO-D .PND ----INITIAL CONDITIONS---- Elevat ion = 277.57 ft Out f 1 c•w Stc•rage = = 0.00 cfs 0.00 ac-ft GIVEN POND DATA INTERMEDIATE ROUTING COMPUTATIONS :ELEVATION: OUTFLOW (ft) (cfs) STOF.:AGE : ( ac -ft ) :---------:------------------- 277.57 278.00 27'3. 00 280.00 281. 00 282.00 283.00 284.00 0. (l 1. (l 3.0 7.0 21. 0 3'3. 0 50.0 60.0 0.000 0.001 o. 160 0.710 1.510 3. 150 6.590 11.410 2S/t (cfs) 28/t + 0 (c fs) ------------:-------------o.o 0.0 1. 5 -, C" Lo ;;:J ":•'?·-J '=' .L.Wk• '""1 .-.. ,..,C" ~ .L...:;, "\J • ,.:, 1030.7 1037.7 21 '32. 1 2213. 1 4572. '3 4611. '3 '3566. 8 '3616.8 16564.0 16624.0 Time increment (t) = 0.017 hrs. ------------- POND-2 Version: 5.20 S/N: EXECUTED: 04-16-1996 16:40:33 Pond File: CSPRO-D .PND Inflow Hydrograph: CSPlOOD .HYD Outflow Hydrograph: CSPlOODO.HYD Page 2 Return Freq: 100 years INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------------------------------------------------------------ TIME INFLOW (hrs) : (r: fs) :--------:--------- 0.000 I 0.017 0.033 0.050 0.067 0.083 o. 1 (l(l 0.117 0.133 o. 150 0. 167 o. 183 0.200 0.217 C). 233 0.250 I 0.267 0.283 o. 300 0.317 0.333 0 .350 0.367 0.383 0.400 0.417 (l.433 0.450 0.467 0.483 o. 500 0.517 0.533 0.550 I 0.567 0.583 0.600 0.617 0.633 0.650 0.667 0.683 0.700 o.717 0.733 0.00 8.08 16. 16 24.24 32.32 40. 40 48.48 56.56 64.64 72.72 80.80. 88.88: '36. •35: 105.03: 113.11: 121.19: 12'3. 27 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35. 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 137.35 11+12 (c fs) 28/t -0 (cf s) 28/t + 0 OUTFLOW ELEVATION (cf s) (r:fs) (ft) :---------------------'----------------------------- 8. 1 24.2 40.4 56.6 72.7 88. '3 105.0 121.2 137.4 153.5 16'3. 7 185.8 2<)2. (> 218.1 234 .3 250 .5 266.6 274.7 274.7 274.7 274.7 274.7 274 .7 274.7 274.7 274.7 274.7 274.7 274.7 274.7 274.7 274.7 274.7 274.7 274.7 274 .7 274.7 274.7 274.7 274.7 274 .7 274.7 274.7 274 .7 o. 0 6.0 27.7 65.0 117.5 185.0 267.5 365.2 477. '3 605.5 747.8 '304. 6 1075.2 1257.5 1451.2 1656. 1 1871.8 20'38.2 2328.5 2555.4 2778 .8 29'38 . '3 3215.7 342'3. 2 363'3.5 3846.7 4050,, 8 4251. 8 444'3. 7 4646.0 4841.3 5035.8 522'3.4 5422.2 5614.1 5805.2 5•3•35. 5 6184. '3 6373.4 6561.2 6748.1 6'334.2 711'3.5 7304.0 7487.6 0. 0 8. 1 30.2 68.1 121.6 1'30.3 273. '3 372.6 486.4 615.2 75'3.0 '317.4 10'30. 5 1277.2 1475.6 1685.5 1'306.5 2138.4 2372. •3 26<)3. 2 2830.1 3053.5 3273.6 34'30. 4 3703.'3 1 3914.2 4121.4 4325.5 4526.5 4724.4 4'320. 7 5116.0 5310.5 5504. 1 56'36. '3 5888.8 607"3. '3 6270.2 645'3. 6: 6648.1: 6835. '3: 7022.8: 7208. '3: 73 '34. 2: 7578.7: o. 00 1. 05 1. 24 1. 56 2. (>2 2.61 3. 1 '3 3.68 4.25 4.89 5.61 6.40 7.63 '3. 85 1 .-.. ·"":•·"':• "-• ..:;....:.. 14.72 17.35 20. 11 22. 2<) 23. '33 25 .63 27.31 28. '36 I 30.58 32. 1 '3 33.77 35.32 36.85 I 38.36 3'3. 25 3'3. 68 40. 11 40.54 40. '36 41. 38 41.81 4 .-.. ·-::1'""\ ..... -~ 42.64 43.06 43.48 43. 8'3 44.30 44.71 45.12 45.52 277.57 278.02 278.12 278.28 278.51 278. 81 I 27'3. 05 279. 17 27"3. 31 279.47 279.65 27'3.85 280.04 280.20 280.37 280.55 280.74 280. '34 281. 07 281.16 281.26 281.35 281.44 281. 53 281.62 281.71 281.80 281. 88 281. 96 282. (>2 282.06 282.10 282. 14 282.18 282.22 282.26 282. 2 '3 282.33 282.37 282.41 I 282.44 282.48 282.52 282.56 282. 5•3 I : ------------------------------~------------------------ POND-2 Version: 5.20 S/N: EXECUTED: 04-16 -1996 16:40:33 Pond File: CSPF.:0-D .PND Inflow Hydrograph: CSPlOOD .HYO Outflow Hydrograph: CSP100DO.HYD INFLOW HYDROGRAPH TIME (hrs) INFLOW I (r:fs) Il+I 2 (r: fs) Page 3 Return Freq: 100 years ROUTING COMPUTATIONS 25/t -0 25/t + 0 l OUTFLOW :ELEVATION: (r:fs) (r:fs) (ft) :-----------------:--------------------------------:------------------: 0.750 0.767 0.783 0.800 0.817 0.833 O.S50 0.867 O.SS4 0.900 o. '317 o. •334 o. '350 o. '367 0.9S4 1.000 1. 017 129.2 7 1 2 1.1 '3 113.11 105.03 '36. '35: 8S.S8: so.so: 72.72: 64. EA: 56.56 48.4S 40.40 32.32 ~'2 4. 24 16. 16 S.08 0. (l(l 266.6 250.5 234.3 21S. 1 202.0 185.8 I 169.7 153.5 137.4 1 2 1.2 105.0 8S. '3 72.7 56.6 40.4 24.2 s. 1 7662.4 7820.4 7'361.6 8086.0 Sl '33. 8 8285.1 S35'3. '3 8418.3 8460.3 8486.0 8495.6 84S9.0 S466.4 8427.7 S373.2 8302.8 8216.6 7754.3l 7 '312. 9: 8054.7: 817'3.7: s2ss.o: S379.7: S454.S 8513.4 S555.6 8581.5 S5'31. 1 S5S4.5 S561. 7 8522.'3 846S. 1. S3'37. 4: S310.9: 45. '31 282. 63 46.26 2S2.66 46. 57 282. 6'3 46.84 2S2.71 I 47.08 282.73 47.28 282.75 47.45 I 2S2.77 47.57 282.78 47. 67 282. 7•3 47. 7 2 2S2. 7•3 47.75 2S2.SO 47.73 282.7'3 47.68 282.79 47.60 282.7S 47.4S 282.77 47.32 2S2.76 47.13 2S2.74 POND-2 Version: 5.20 S/N: EXECUTED: 04-16-1996 16:40:33 Page 4 Return Freq: 100 ~ears ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: CSPRO-D .PND Inflow Hydrograph: CSP100D .HYD Outflow Hydrograph: CSP100DO.HYD Starting Pond W.S. Elevation = 277.57 ft ***** Summary of Peak Outflow and Peak Elevation Peak Inflow = 137.35 cfs Peak Outflow = 47.75 cfs Peak Elevation = 282.80 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage From Storm = Total Storage in Pond = 0.00 ac-ft 5.89 ac-ft 5.89 ac-ft ***** POND-2 Version: 5.20 S/N: Pc•n d Fi 1 e: Inflow Hydrograph: Outflow Hydrograph: Peak Inflow = Peak Outflc•w = Peak El evat i•:in = 0 15 30 CSPF.:0-D . PND CSP100D .HYO CSP100DO.HYD 137.35 cfs 47.75 cfs 282 .80 ft 45 60 75 '30 105 Page 5 Return Freq: 100 years EXECUTED: 04-16-1996 16:40:33 Fl c•w (c fs) 120 135 150 165 ------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- . 1 . 1 ·-· ..::. . 14 . 15 . 17 . 1 '3 -, . ..:.. . 22 .24 .26 .27 . 2'~ .31 ,.....-. . ..:;,..::.. . 34 .36 .37 • 3•3 .41 .43 .44 . 46 x ~I~ ~I~ -: _, -: TIME (hrs) ~1: ~: Y: :"!~ ~I~ 7~ y: ~~ x x x x x x x File: CSP100DO .HYD * File: CSP 100D .HYO * * * * * * Qmax = * * * * * 47.8 •:fs 137. 4 •: fs * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * POND -2 Version: 5.2 0 SIN: EXECUTED: 04-16 -1996 16:40:33 Page 1 Return Freq: 50 years ************************************** * * * ROUTING FOR SUBWATERSHED D,F,G,H * * COLLEGE STATION * * * * * * * ************************************** Inflow Hydrograph: CSF'50D .HYO Rating Table file: CSF'RO-D .F'ND ----INITIAL CONDITIONS---- El evat ion = 277.57 ft Outflow = 0.00 cfs Storage = 0.00 ac-ft GIVEN POND DATA INTERMEDIATE ROUTING COMPUTATIONS lELEVATION (ft) :--------- 277.57 278.00 279.00 280 .00 281. 00 28 2 .00 283.00 284.00 OUTFLOW STOF~AGE (c fs) (ac-ft) -------------------o.o 0.000 1. 0 0.001 3. 0 o. 160 7.0 0.710 21. 0 1.510 3'3. 0 3. 150 50.0 6.590 60. 0 11.410 25/t (1: fs) 25/t + 0 (c fs) ------------:-------------: o.o o.o 1. 5 2.5 ·-·"""·-· '"" L~...::. • ..::, 235.3 1030.7 1037.7 21 '32. 1 2213. 1 4572.9 4611. '3 '3566. 8 9616.8 16564.0 16624.0 Time increment (t) = 0.017 hrs. POND-2 Version: 5.20 5/N: EXECUTED: 04-16-1996 16:40:33 Pr:•nd File: Inflow Hydrograph: Outflow Hydrograph: INFLOW HYDROGRAPH TIME (hrs) INFLOW (r:fs) C5PF.:O-D . PND CSP50D .HYD CSP50DO .HYD I1+I2 (•: fs) Page 2 Return Freq: 50 years ROUTING COMPUTATIONS 25/t -0 25/t + 0 : OUTFLOW ELEVATION C:i: fs) (i:fs) (ft) :-------------------------------------------------:------------------ o. 000 0.017 0.033 o. 050 0.067 0.083 o. 100 o . 117 o. 133 0 • 150 I o. 167 0. 183 o. 200 0.217 0.233 0.250 0.267 0.283 0.300 0.317 0.333 0.350 0.367 0.383 o. 400 I 0.417 0.433 0.450 0.467 0.483 0.500 0.517 0.533 0.550 0.567 0.583 0. 600 0.617 0.633 o. 650 0.667 0.683 0.700 0.717 0.733 o. 00 7.40 14. 7•3 22. 1 '3 36. •3•3 44.38 51. 78 5'3, 18 I 66.57 73. •37 81.37 88.77 '36. 16 103.56 110.96 118.35: 125.75' 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75. 125.75 125.75 125.75 125.75 125.75 125.75 125.75 125.75 118. 35 110. '36 103.56 7.4 22.2 37.0 51. 8 66.6 81. 4 96.2 111.0 125.8 140.5 155.3 170. 1 184. '3 1 '3'3. 7 214.5 22·~. 3 244.1 251. 5 251.5 251. 5 251. 5 251.5 251.5 251. 5 251.5 251.5 . 251. 5 251. 5 251. 5 251. 5 251.5 251. 5 251. 5 251.5 251. 5 251.5 251.5 251.5 251.5 251. 5 251. 5 244. 1 22 '3. 3 214.5 o. 0 5.3 25. 1 5'3. 0 106. '3 168.6 243.8 332. ·3 435.8 552.3 682.3 825.6 982.2 1150.0 1328.3 I 1516.8 1715.2 1'323. 4 2133.8 I 2340.7 2544.5 2745.3 2'343. 0 3137.8 332'3.6 3518.6 3704..7 3888.1 4068.7 4246.5 4421.7 4595.0 4767.4 I 4 '339. 2 5110.1 5280.3 544'3. 8 5618.5 5786.4 5'353. 7 6120.2 6285. '3 6443.6 6585.9 6712.8 o.o: 7.4' 27.5 62.1 110.8 173.5 250. 0 340.0 443.'3' 561. 6 6'32. 8 837.6 '3'35. 8 1167.1 134'3. 7 1542.8 1746.1 1 '35'3. 3 2174.9 2385.3: 25'32. 2: 27'36. 0: 29'36, 8 I 31 '34. 5 338'3. 3 3581.1 3770.1 3956.2 413'3. 6 432<). 2: 44'38. (l' 4673.2 4846.5 5018. '3 5190. 7 5361.6 5531. 8 5701.3. 5870.0 6037.9 62(>5. 2 6371.7 6530.0 6672.9 6800.4 0.00 277.57 1.04 278.02 1.22 278.11 1.51 I 278.26 1. •33 278. 47 2.47 278.73 3, 07 27'3, 02 I 3.52 27'3.13 4.04 279.26 4. 63 27'3. 41 5. 28 27'3. 57 6.00 I 279,75 6. 7'3 27'3. '35 8.54 280.11 10.72 280.27 13.02 280.43 15.44 280.60 1 7. '38 280. 78 20. 54 280. •37 22.29 I 281,07 23.84 281.16 25.37 281.24 26.88 281.33 28.36 281.41 2'3, 83 I 281. 49 31,27 281,57 I 32.68 281.65 34.08 281.73 35.46 281.80 36. 81 281. 88 38. 15 281. 95 3•3. 13 282. 01 3'3. 52 282. (>5 3•3. 8'3 282. 08 40.27 282.12 40.65 282.15 41. 02 282. 18 41. 3'3 282. 22 41.77 282.25 42.13 282.28 42. 5(> 282. 32 .:~2. 87 282. 35 43.22 282.38 43.53 282.41 43.81 282.44 I -----·------------------------------------------------- POND -2 Version: 5.20 S/N: EXECUTED: 04-16-1996 16:40:33 Pond File: CSPRO-D .PND Inflow Hydrograph: CS P50D .HYO Outflow Hydrograph: CSP50DO .HYO Page 3 Return Freq: 50 years INFLOW HYDROGRAPH ROUTING COMPUTATIONS TIME INFLOW : (hrs) (r: fs) !-----------------: 0.750 96.16: 0.767 88.77: 0.783 81.37: 0.800 73.'37 0.817 66.57 0.833 59.18 0.850 51.78 0.867 44.38 0.884 36.99 o. 900 2'3. 5 '3 0. '3 1 7 22 . 1 '3 o. '334 14. 79 0.950 7.40 0.967 0.00 I1+I2 25/t -0 (r:fs) (r:fs) 199.7 6824.4 184.9 6920.8 170.1 7002.0 155.3 7068.2 140.5 7119.3 125.8 7155.5 111.0 7176.7 96.2 7183.2 81.4 7174.9 66.6 7151.9 51.8 7114.3 37.0 7062.1 22.2 6995.5 7.4 6914.4 25/t + 0 OUTFLOW ELEVATION (r:fs) (r:fs) (ft) 6912.5 44.06 282.46 7009.3 44.27 282.48 7090.9 44.45 282.50 7157.3 44.59 282.51 7208.7 44.71 282.52 7245.0 44.79 282.53 7266.4 44.83 282.53 7272.9 44.85 282.53 I 7264.6 44.83 282.53 7241.5: 44.78 2 82.53 7203.7: 44.70 282.52 7151.3: 44.58 282.51 7084.3: 44.43 282.49 7002.9: 44.26 282.48 POND -2 Version: 5.20 S/N: EXECUTED: 04-16 -1996 16:40:33 Page 4 Return Freq: 50 years ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: Inflow Hydrograph: Outflow Hydrograph: CSPRO -D .PND CSP50D .HYD CSP50DO .HYD Starting Pond W.S. Elevation = 277.57 ft ***** Summary of Peak Outflow and Peak Elevation Peak Inflow = 125.75 cfs Peak Outflow = 44.85 cfs Peak Elevation = 282.53 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage From Storm = Total Storage in Pond = 0.00 ac-ft 4.98 ac-ft 4.98 ac -ft ***** . 1 . 1 ·-:· ..:... . 14 . 15 . 17 . 1 '3 .-, . ..::. .22 . 24 . 25 .27 . 2'3 .31 '"".-. • u..::. .34 .36 .37 .39 .41 .43 .44 .46 )'~ * POND-2 Version: 5.20 S/N: Pond File: CSPRO-D .PND Inflow Hydrograph: CSP50D .HYD Outflow Hydr o graph: CSP50DO .HYO Peak Inflow = 125.75 cfs Peak Outflow -·-44.85 cfs Peak Elevat ion = 2 8 2 .53 ft 0 15 30 45 E,O 75 '30 105 Page 5 Return Freq: 50 years EXE CUTED: 04 -16-1996 16:40:33 120 Flow (cfs) 150 165 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- -: x ·II- I )'~ * I -: y~ * y~ * -: )'~ ·II- y~ * -: )'~ -II· y~ * :1~ * :~ * y~ * y~ * :1~ * y: * -: :1~ * x * -: )'~ * y: * -: x ·II- )'~ * y~ * y~ * x * :1: * )'~ * Y: * )'~ * y; ·If- ~/~ * )'~ * x -II· ~/~ * :,; * )~ * )'~ * :1~ * y; * :1~ * :1~ * y; * )'~ * x * :1~ * TIME (hrs) Fi 1 e : CS P50DO .HYD Qma :1; --44.8 c fs File: CSP50D .HYD Qma :r. = 125.8 c f s POND-2 Version: 5.20 S/N: EXECUTED: 04 -16-1996 16:40:33 Page 1 Return Freq: 25 years ************************************** * * ROUTING FOR SUBWATERSHED D,F,G,H * * COLLEGE STATION * * * * * * * ************************************** Inflow Hydrograph: CSP25D .HYD Rating Table file: C8PRO-D .PND ----INITIAL CONDITIONS---- El evat ion = 277.57 ft Outflow = 0.00 cfs Storage = 0.00 ac -ft GIVEN POND DATA INTERMEDIATE ROUTING COMPUTATIONS ELEVATIONl OUTFLOW l (ft) (cfs) 277.57 278.00 279.00 280.00 281.00 282.00 283.00 2 84.00 o.o 1. 0 3. 0 7. 0 21. 0 39.0 50.0 60. 0 STORAGE (ac-ft) o. 000 o. 001 o. 150 o. 710 1.510 3. 150 5.590 11.410 28/t (cf s) 28/t + 0 (•:fs) -------------------------: o. 0 1. 5 1030.7 2192.1 4572.'3 •3555. 8 16564.0 o.o .-. C' ..::. . ""' 235.3 1037.7 2213.1 4511. 9 •3515. 8 16624.0 Time increment (t) = 0.017 hrs. POND-2 Version: 5.20 S/N: Page 2 Return Freq: 25 years EXECUTED: 04 -16-1996 16:40:33 Pond File: Inflow Hydrograph: Outflow Hydrograph: INFLOW HYDROGRAPH TIME INFLOW C:hrs) : C:c fs) :--------·--------- 0. 000 0.017 0.033 0.050 0.067 0.083 0. 100 o. 117 0. 133 0. 150 0. 167 o. 183 o. 200 0.217 (>. 233 0.250 0.267 0.283 o. 300 0.317 0.333 0.350 0.367 0.383 0.400 0.417 0.433 0.450 0.467 0.483 0.500 0.517 0.533 0.550 0.567 0.583 0.600 0.617 0.633 o. 650 0.667 0.683 0.700 0.717 0.733 o. 00 7. •35 15. '32 23.88 31. 85 3'3. 81 47.77 55.73 63.6'3 71.65 79.51 87.57 '35. 54 103.50 111.46. 11 '3. 42: 127.38 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 135.34 127.38 119.42 111.46 103. 50 '35. 54 87.57. 7'3. 61 71. 65 63. 6'3 55.73 47.77 39.81 31.85. 23.88: CSPRO -D .PND CSP25D .HYD CSP25DO .HYD ROUTING COMPUTATIONS ------------------------------------------------------- I1+I2 (cf s) 25/t -0 C:•: fs) 25/t + 0 (c fs) OUTFLOW :ELEVATION: C:i: fs) (ft) :-----------------------------------------:---------: 8.0 23. •3 3'3. 8 55.7 71. 7 87.6 103.5 119.4 135.3 151.3 167.2 183. 1 1 '3'3. 0 215.0 23<). •3 246.8 252.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 270.7 252.7 246.8 23(>. •3 215.0 1 '39. 0 183. 1 167.2 151. 3 135.3 11'3.4 103.5 87.6 71. 7 55.7 0.0 27.3 64.0 115.7 182.2 253.4 35'3. 6 470.6 596.2 736.4 890.'3 105'3. 1 1238. •3 1430.0 1 E.32. 0 1844.8 2068.0 22·:M. 8 2518.2 2738.2 2'355. 0 3168.5 3378.7 3585. '3 378'3. '3 3'3'30. 8 4188.8 4383.7 4576.2 4767. '3 4'350. 8 5117.0 5266.6 539'3. 8 5516.5 5616.8 I 5700.8 5768.6 582(>. 3 5855. '3 5875.4 5879. 1 5866.9 5838.8 0.0 8.0 29.7 67. 1 11'3.7 187.3 26'3. 7 366.9 47'3. 0 605. '3 747.5 '303. 6 I 1074.0 1258.2 1453. '3 1660.9 1878.8 2107.5 2338.7 2565.5 2788. '3 3008. '3 3225.6 343'3. 1 3649.4 3856.5 4060.6 4261.5 4459.4 4654.4 4846.9 5030.6 51'37.6 5347. '3 5481. 6 55'38. 8 56'39. 6 5784.01 5852. 1 5'304. 0 5'339. 7 5'359. 4 5963.0 5'350. 7 5'322. 6 o.oo 1.05 I 1 .-,,., . .:~ 1. 56 2.01 2. 5'3 3. 17 3.66 4.21 4.85 5.55 6.33 7.43 '3. 63 11. 96 14.42 17.02 1 '3. 74 21. •34 23.64 I 25.32 26. •37 28.50 30.20 31. 78 33.33 34.86 36.37 37.86 39.09 39.52 39. '32 40. 2'3 40.62 40. '31 41. 17 41. 3'3 41. 58 41. 73 41.84 41. '32 41. '36 41. 97 41.94 41. 88 277.57 278.02 278.12 278.28 I 278.50 278. 7•3 27'3. 04 27'3. 15 279.30 279.46 27'3. EA 279.83 280.03 280. 1'3 280.35 280.53 280.72 280.91 281.05 281.15 281. 24 281.33 281. 42 281.51 281.60 281.6'3 281.77 281.85 281. 94 282.01 282. (>5 282.08 282. 12 282.15 282.17 282. 2C> 282.22 282.23 282.25 282.26 282.27 282.27 282.27 282.27 282.26 ------------------------------------------------------ POND-2 Version: 5.20 S/N: EXECUTED: 04-16 -1996 16:40:33 Pond File: Inflow Hydrograph: Outflow Hydrograph: INFLOW HYDROGRAPH TIME (hrs) INFLOW : (o: fs) CSPRO-D .PND CSP 2 5D .HYD CSP25DO .HYD I1+I2 (1: fs) Page 3 Return Freq: 25 ~ears ROUTING COMPUTATIONS 28/t -0 28/t + 0 : OUTFLOW :ELEVATION: (o:fs) (o: fs) (o:fs) (ft) :-----------------: ---------------------------------:---------:---------: 0.750 0.767 0.783 15. '32: 7.96: o. 00 : 3'3, 8 23. '3 8. (l 57•35. 1 5735.6 5660.6 5878.E.: 5818.9: 5743.6: 41.78 282.25 41.65 : 282.24 : 41.49 : 282.23 : POND -2 Version: 5.20 S/N: EXECUTED: 04 -16-1996 16:40:33 Page 4 Return Freq: 25 years ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: Inflow Hydrograph: Outflow Hydrograph: CSPRO-D .PND CSP25D .HYD CSP25DO .HYD Starting Pond W.S. Elevation = 277.57 ft ***** Summary of Peak Outflow and Peak Elevation Peak Inflow = 135.34 cfs Peak Outflow = 41.97 cfs Peak Elevation = 282.27 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage From Storm - Total Storage in Pond = 0.00 ac-ft 4.08 ac-ft 4.08 ac -ft ***** POND -2 Ver-s i o:•n: 5.20 SIN: Po:•nd File: Inflow Hydrogr-aph: Outflow Hydrograph: Peak Inflow = Peak Outflow -- Peak El evat i•:•n = 0 15 30 CSPRO-D .PND CSP25D .HYD CSP25DO .HYD 135.34 0: f s 41.'37 0: f s 282.27 ft 45 GO 75 '30 105 Page 5 F.'.etur-n Freq: 25 years EXECUTED: 04-16-1'3'36 16:40:33 Fl ow (o: f s) 120 135 150 165 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- . 1 .12 ~~ . 14 y~ y~ .15 :"!~ :"!~ .17 :'!~ ..,. ·' • 1 '3 ~/~ y~ .2 x ~I~ .22 .24 .26 * ·IE- * * * * * * * * * * * * * * x * . 27 y~ . 2'3 . 31 .36 .37 • 3'3 . 41 .43 .44 • 4€, TIME (hrs) :1; File: * File: 't: ·' ~I~ . CSP25DO .HYD CSP25D .HYD G.1ma :1; = Qma~; = 42.0 o:fs 135.3 o:f s * * * ·IE- * * * * * ·IE- * * * ·IE- * ·IE- * * * * * * * POND-2 Version: 5.20 S/N: EXECUTED: 04-16-1996 16:40:33 Page 1 Peturn Freq: 10 years ************************************** * * * POUTING FOP SUBWATEPSHED D,F,G,H * * COLLEGE STATION * * ·l!- ·K· * * * ************************************** Inflow Hydrograph: CSPlOD .HYD Pating Table file: CSPPO-D .PND ----INITIAL CONDITIONS---- El evat ion -277.57 ft Outflow -0.00 cfs Storage = 0.00 ac -ft GIVEN POND DATA INTEPMEDIATE ROUTING COMPUTATIONS :ELEVATION (f t) --------- 277.57 278.00 279.00 280.0(l 281.00 2 82.00 283.00 284.00 OUTFLOW I ST OF.: AGE I (cf s) (ac-ft) -------------------- o. 0 0. 000 1. 0 0.001 3. 0 o. 1 c;o 7. 0 0.710 21. (l 1.510 3'3. 0 3. 150 50.0 6. 5'30 60.0 11.410 I I I I 28/t (c fs) 2S/t + 0 (c fs) ------------:-------------: 0. 0 1. 5 232.3 1030.7 21'32. 1 4572. '3 9566.8 16564.0 0. 0 2.5 235.3 1037.7 2213.1 4611. '3 '3616.8 16624.0 Time increment (t) = 0.017 hrs. POND-2 Version: 5.20 S/N: EXECUTED: 04-16-1996 16:40:33 Pond File: CSPRO-D .PND Inflow Hydrograph: CSP10D .HYD Outflow Hydrograph: CSP10DO .HYD INFLOW HYDROGRAPH TIME INFLOW : C:hrs) C:c fs) :----------------- 0.000 o.oo 0.017 7.22 0.033 14.45 o. 050 I 21 • b 7 (l. 06 7 28. '30 o. 083 36. 12 0.100 43.35 0.117 50.57 0.133 57.79 0.150 65.02 0.167 72.24. o. 183 7'3. 47 0.200 86.6'3 o. 21 7 '33. '32 o. 233 1 01 . 1 4 0.250 108.36 o. 26 7 115. 5•3 0.283 122.81 0.300 122.81 0.317 122.81 o. 333 122. 81 0.350 122 .81 0. 36 7 122 . 81 0.383 122.81 0.400 122.81 0.417 122.81, o .4 33 122.81: 0.450 122.81: o. 467 122. 81: 0 .483 115.59: 0.500 I 108.36: o. 517 101. 14 o. 533 •3 3. '32 o. 550 86. 6'3 0.567 7'3.47 0.583 72.24 0.600 65.02 0. 617 57. 7 •3 0.633 50.57 0.650 43.35 0.667 I 36.121 0.683 28.90: 0.700 2 1.67: 0.717 14.45: 0.733 7.22: I1+I2 <i: f s) 7.2 21. 7 36.1 50.6 65.0 7'3. 5 '33. '3 108. 4 122.8 137.3 151.7 166.2 180.6 1'35. 1 20'3. 5 224.0 238.4 245.6 245.6 245.6 245.6 245.6 245.6 245.6 245 .6 245.6 245 .6 245.6 I 238.4 224.0 2(>'3. 5 t 1 '35. 1 180.6 166.2 151.7 137.3 122.8 108.4 '33. '3 7 '3 . 5 65.0 50.6 36. 1 21. 7 Page 2 F.:eturn Fre q: 10 years ROUTING COMPUTATIONS 28/t -0 (i:fs) o. (l 5. 1 24 .4 57.5 104. 3 164.4 237.8 324.8 425.2 538.8 665.7 805.6 '358. 4 1122.6 12'37. 0 1481.4 1675.4 I 1878. '3 2084.7 2286 .5 2485.3 268 1.2 2874.1 3064.1 3251.3 3435.6 3617.2 37'36. 1 I 3'372. 3 4138.7 4288 .4 4421.6 4538.6 4EAO. 8 4728.1 4800.6 4858.4 4'301. 6 4930.2 I 4•344. 3 4944.0 492'3. 3 4900.2 4856. '3 4799.4 25/t + 0 C:i: fs) 0. 0 7.2 26 .8 60.5 108. 1 15'3. 3 243. '3 331.7 433.1' 548.0 676. 1 817.4 '371. 8 1139.0 1317.7 1506.5 1705.3 1913.8 2124 .5 233(>. 3 2532.1 2731.0' 2'326. 8 311'3. 7 330'3. 7 34'36. •3 3681.3 3862.8 4041.7l 4210.7: 4362.6: 44•37. '3: 4616.6: 471'3.2: 4806.9: 4879.8l 4•337. '3: 4'381. 2: 5010.0l 5024.ll 5(>2 3. 8: 500'3. 0: 4'37'3. 8: 4 '336. 3: 4878.6: OUTFLOW ELEVATION (i:fs) (ft) 0.00 277 .57 1.04 278.02 1. 21 278 . 10 1.50 278.25 1. 91 278. 45 2.43 I 278.72 3.04 279.01 3.48 27'3 .12 3. '3'3 27'3. 25 4. 56 27'3 . 3•3 5. 2(> 27'3 . 55 5.'30 279.73 E,. E, 7 27'3. 92 8.21 280.0'3 10.33 280 .24 12.58 280 .40 14. '35 280. 57 17.44 280 ,75 I 1 '3. •35 280. '32 21.88 281.05 23. 3•3 281 . 13 24.89 281.22 26.36 281.30 27.80 281 .38 2'3. 23 281. 45 30.63 28 1.54 32.02 281.51 33. 38 281. 6'3 34.72 281.76 35. •3•3 281. 83 37. 13 281. '30 38. 14 281. '35 3'3, 01 I 282, 00 39. 2 4 282. (>2 3'3. 43 282. 04 3'3. 5•3 282. 05 3'3. 72 282 . 07 3'3. 81 282. 07 39.87 282.08 3'3. '31 282. 08 3•3. '31 282. 08 3•3. 87 282. 08 39.81 282.07 3'3. 71 282. 06 3 •3. 5'3 282 . 05, ------------------------------------------------------ POND-2 Version: 5.20 S/N: EXECUTED: 04 -16 -199 6 16:40:33 Pond File: Inflow Hydrograph: Outflow Hydrograph: INFLOW HYDROGRAPH TIME (hrs) INFLOW : (cf s) CSPF.'.0 -D . PND CSF'lOD .HYD CSP10DO .HYD I1+I 2 (c f s ) Page 3 Return Freq: 10 years ROUTING COMPUTATIONS 2S/t -0 (c f s) 28/t + 0 : OUTFLOW :ELEVATION: (c fs) (,:fs) (ft) :--------:---------: :---------:------------:-----------:---------:---------: 0.750 : o.oo: 7 .-, I • L I 4727.8 : 4806.6: 39.43 : 282.04 : POND -2 Version: 5.20 S/N: Page 4 EXECUTED: 04-16 -1996 16:40:33 F.:et urn Freq: 10 years ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: Inflow Hydr ograp h: Outflow Hydr ogra ph: CS PRO ·-D . PND CSPlOD .HYD CSP10DO .HYD Starting Pond W.S. Elevation = 277.57 ft ***** Summary of Peak Outflow and Peak Elevation ***** Peak Inf 1 O:•W = 122.81 0: f s Peak Out flow = 3'). '31 o: fs Peak El evat i o:•n = 282.08 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage From Storm = Total Storage in Pond = 0. 00 ao:-ft 3. 43 a•:-ft 3. 43 ao:-ft . 1 . 1 ·-:· .... . 14 . 15 . 17 . 1 '3 . 2 . .-.. -, ~...::. . 24 . 26 . 27 . 2'3 . 31 . r').-, ~ . .::. . 34 . 36 . 37 . 3'3 . 41 . 43 . 44 . 46 J~ * POND -2 Ve rs i on : 5.20 S/N: Po nd File: CSPRO -D .PND Inflow Hydr ogra ph: CSP10D .HYD Olltf low Hydrog raph: CSP 10DO .HYD P eak Inflow = 1 22.81 0: f s Pe ak Outflow --3'3. 91 o: fs Pe ak Elevation = 2 8 2 .08 ft 0 15 3 0 45 60 7 5 '30 105 Page 5 F.:etLtrn Freq: 10 years EXECUTED: 04 -16-1996 16: 40: 33 Flow (o:fs) 120 135 150 165 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- -I I ~; * I y~ ·If-I I y~ * I I y~ * I ~/~ * ~/~ * y~ * y~ * :"!~ * x * ~I~ * >'~ ·If- )'~ -M· ~~ * )'~ * y; * y; * y; * ~; * )'; * --I I y; * )'; * -I I :-t; * y; * --I I ~1; * ;-,; * ~1; * y; * ~1; ·If- '· y; * ~1; -M· ...,. ·If- y; * ~,; ·If- y; -M· y; ·IE- ~1; * y; * y; * y; * ~1; * ~1; * ~1; * TIME (h rs) File: CSF'lODO . HYD Oma>-: = 3'3 . '3 0: fs File: CS P10D . HYO Qma ~; = 1 ·-··-· .:. ..;.'.. . 8 0: f s POND -2 Version: 5.20 S/N: Page 1 EXECUTED: 04-16-1996 16:40:33 Return Freq: 5 ~ears ************************************** * * * ROUTING FOR SUBWATERSHED D,F,G,H * * COLLEGE STATION * * * * ************************************** Inflow Hydrograph: CSP5D .HYD Rating Table file: CSPRO-D .PND ----INITIAL CONDITIONS---- Elevation = 277.57 ft Out f 1 r:rw = 0.00 cf s Storage -0. (l(l ac -ft GIVEN POND DATA INTERMEDIATE ROUTING COMPUTATIONS :ELEVATION: OUTFLOW (ft) (cfs) STOF.:AGE (ac -ft) :--------- ------------------- 277.57 278.00 27'3. 00 280.00 281.00 282.00 283.00 284.00 o.o 1. 0 3.0 7.0 21. 0 3'3. (l 50.0 60.0 0.000 0.001 0.160 0.710 1.510 3. 150 6. 5'30 11.410 2 S/t (c fs) 2S/t + 0 (c fs) :------------:------------- 0. 0 0. 0 1. 5 .-. C" ..::.. u 232.3 235.3 1030.7 1037.7 21 '32. 1 2213. 1 4572. '3 4611. '3 '3 566. 8 '3616. 8 16564.0 1E,624.0 Time increment (t) = 0.017 hrs. POND-2 Version: 5.20 S/N: EXECUTED: 04 -16-1996 16:40:33 Pond File: CSPRO -D .PND Inflow Hydrograph: CSP5D .HYD Outflow Hydrograph: CSP5DO .HYO Page 2 Return Freq: 5 ~ears INFLOW HYDROGRAPH ROUTING COMPUTATIONS ------------------------------------------------------------------------ TIME (hrs) INFLOW (o:fs) :----------------- 0.000 0.017 0.033 0.050 0.067 0.083 0. 100 0.117 o. 133 o. 150 o. 167 0.183 0.200 0.217 (>. 233 0.250 0.267 c). 283 0.300 0.317 (>. 333 0.350 0.367 0.383 0.400 0.417 0.433 0.450 0.467 0.483 0.500 0.51? 0.533 o. 550 0.567 0.583 0.600 0.617 0.633 o. 650 0.667 0.683 0.700 0.717 0.733 o.oo 6.41 12.83 19.2 4 25.66. 32.07: 38. 4'3: 44.90: 51. 32 57.73 64.15 70.56 76.97 83. 3'3 8'3. 80 96.22 102.63 10'3. 05 109. 05 10'3. 05 10'3. 05 109.05 10'3. 05 10'3. 05 10'3 o 05 I 10'3. 05 109.05 109.05 102.63 •35. 22 89.80 83. 3'3 I 76. •37 70.55 EA. 15 57.73 51. 32 44. '30 38. 4•3 32.07 25.65. 19.24: 12.83: 5.41: o.oo: Il+I2 (o:fs) 28/t -0 ( ·= f s) 28/t + 0 : OUTFLOW ELEVATION (o: fs) (o:fs) (ft) ---------------------:-----------:------------------ 6.4 l '3. 2 32. 1 44. •3 57.7 70.6 83.4 '35. 2 10'3. 1 121. •3 134.7 147.5 160.4 I 173.2 186.0 1 '38. 9 211. 7 218 .1 218.1 218. 1 218.1 218 .1 218 .1 218. 1 218.1 218. 1 218 . 1 211 .7 198. •3 186.0 173.2 150. 4 147.5 134.7 121. '3 10'3. 1 •35. 2 83.4 70.5 57.7 44. •3 32. 1 1 '3. 2 5. 4 o.o 4 ':.> . ...., 2 1. 2 50.4 '31. 7 144. '3 20'3, 8 286.6 375.4 476.0 588.2 712. 1 847.4 '3'34. 0 1150. 1 1315.0 1488.6 1570.4 1854.3 2C>33. 7 22 <)'3. 3 2 382.1 2552.4 272(>. 2 2885.4 3048.1 3208.4 3355.3 3515.5 364'3. 8 375•3. 5 3874.7 3965.7 4042.7 4105.0 4155.5 41'31.'3 4215.0 422 5.1 4222 • .:.l 4207. 1 417"3. 4 413'3. 4 4087.5 40 2 3.7 o. 0: 6.4l 23.6: 53.3 95.3 14'3. 5 2 15.5 2'3 3. 2 382. '3 484.4 5•37. 8 722. '3 85'3. 6 1007.7 1167.2 1336.2 1513.'3 1700.2 1888.5 2072.4 2251.8 2427.4 2600.2 2770.5 2'338. 3 3103.5l 3266.2: 3425.5l 3578.0l 3714.3: 3835.8: 3'342. 7 4035.1 4113.3 4177.5 4227. '3 4264.7 4288.1 42'38. 3 42'35. 5 4280.1 -=l252 . C) 4211.4 4158.7 40'33. '3 o.oo 277.57 1.03 278.02 1.18 278.09 1.44 278.22 1.80 278.40 I 2.26 278.53 2.83 278.92 3. 2'3 27'3. 07 3.74 279.18 4.24 279.31 4. 81 27'3. 45 5. 43 27'3. 61 6 • 11 27'3 o 78 I 6. 85 27'3. 96 8 o 54 I 280. 11 10.55 280.25 12.67 280.41 14. 8'3 280. 56 17.13 280.72 1 •3. 32 280. 88 21.29 281.02 22.61 I 281.09 23. '31 281. 16 25.18 281.23 26.44 281.30 27.68 281.37 28. '30 I 281, 44 30.11 281.51 31 . 24 281 • 57 32.27 281.63 33.18 281.68 33.98 281.72 34,67 I 2 81,76 35. 2E. 281 . 7•3 35.74 281.82 35.12 281.84 36. 3•3 28 1. 86 36.57 281.87 36.65 281.87 36.63 281.87 36. 51 281 . 86 35.30 281.85 36.00 281.83 35.60 281.81 35. 11 2 81 • 78 ------------------------------------------------------ POND-2 Version: 5.20 S/N: Page 3 EXECUTED: 04 -16-1996 16:40:33 Return Freq: 5 years ****************** SUMMARY OF ROUTING COMPUTATIONS ****************** Pond File: CSPRO-D .PND Inflow Hydrograph: Outflow Hydrograph: CSP5D CSP5DO .HYD .HYD Starting Pond W.S. Elevation = 277.57 ft ***** Summary of Peak Outflow and Peak Elevation Peak Inflow = 109.05 cfs Peak Outflow = 36.65 cfs Peak Elevation -281.87 ft ***** Summary of Approximate Peak Storage ***** Initial Storage = Peak Storage From Storm = Total Storage in Pond = 0.00 ac-ft 2.94 ac-ft 2.94 ac-ft ***** . 1 . 1~ .k . 14 . 15 . 1 7 . 1 9 . ~ 4 ~~ . kk . 24 .2b . 2 7 . 29 . 31 .32 .34 . 36 . 37 . 3'3 . 41 . 43 . 44 . 46 x * POND -2 Version: 5.20 S/N: Pond File: Inflow Hydrog ra ph: Outflow Hydr ograp h: Peak Inflow - Peak Outflow = Peak Elevation = 0 15 30 CSPRO-D .PND CSP5D .HYD CSP5DO .HYD 109.05 c f s 36.65 c fs 2 81.87 ft 45 60 75 90 105 Page 4 Return Freq: 5 years EXECUTED: 04-16-1996 16:40:33 120 Flow Ccfs) 135 150 165 .------:-----:-----:-----:-----:-----:-----:-----:-----:-----:-----:- I x * I x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * x * TIME (hrs) File: CSP5DO . HYD Qmax = 36. 7 c f s . HYD Qma x = 109. 1 c f s