Loading...
HomeMy WebLinkAbout48 Development Permit 340 Eugenia Jones Oil WellDEVELOPMENT PERMIT PERMIT NO . 340 Eugenia Jones Well #1 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Situated in the Nathan Clampitt Survey, A-90 and the S. W Robertson Survey, A-202 SITE ADDRESS: N IA OWNER: Union Paci.fie Resources Company DRAINAGE BASIN: Lick Creek, Segment I TYPE OF DEVELOPMENT: This permit is valid for site construction as per approved plans for the drilling and production pad associated with the Eugenia Jones Well No. 1. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . Owner & Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing of hay bales used for temporary erosion control. Owner & Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. Owner & Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. This permit expires six months from the date of issuance. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the ity of College Station that apply . Date Contractor Date Owner/ Agent Date On behalf of: Union Pacific Resources Co . DATE: TO: FROM: RE: ·~W'CITY OF COLLEGE STATION ~ ENGil'E:ERING DIVISION Post Office Box 9960 1101 Texas Avenue College Station, Texas 77842-0960 (409) 764-3570 MEMORANDUM August 18, 1993 City Council Mail List B David J. Pul n, P.E., Cit En~ EUGENIA ONES #1 S MULATION The scheduled start date fo e above referenced well is September 2, 1993. Activity on this site will last about (30) days according to the submitted schedule provided by Union Pacific Resources. The well, Eugenia Jones # l, is located at the intersection of Greens Prairie Road and Rock Prairie Road with access from Green's Prairie Road. DJP!dg \. 04 /0 6 /93 15 :43 '0'4 09 776 6 2 39 ... Un t on Paci He R_.oul"'C4tC CCll'lfMl"IY ft~tattve Uell StlDJLatlon schedule (60 O a ~) for Awtfn Q\allc wells In College Stathln, Tuas BRUCHEZ & GOSS [aJ 004 ~ : : : : : : : : rec T~1;i~: · ··· ··: ····· · ·· · ·· ··:· ·· · ·· · ·· · ··· :· · ····· ······: ·· ···· ··· ·· ··: ··· · ······ ·· ·:· ··· ··· ··· ··· :··· ········ · . r~rac i' ............. : ........ ~~ ~ .. ~~. ~~· ....... :.. . ....... : ............. : ............. : ............. : ............. : ........... . . • • Salt Uate:r Reg-;OVB( · • • · · • · • ornial O;>erati ··c ns-· ----.......;.·------------------l \IOr'kover os .. o:r93 to os-~·93 ct day] Move in and cet up uorkover r .fg. Pull tWi i ng out of we l l. Worl'.over 05·04·93 to 05·06·93 C2 daycJ Pull pac:tcer out of 1.1e l l. Hove worl'.OV*f" r i g out . Free Tris 05·06-93 to 05· 11 •93 CS daycl lllcw tn and fill frac t&nlcc wfth f resh 11111ter (approxtmately 30,000 llLS). Once cmmenced, 110Ve fn and f H L of free tanlcs i& a 24 hour a day q>eration 1.Siti l CCll'lfJleted. F rac E"'f pcnent 05·1.1·93 to 05-12-'93 [1 day] ltOYe in frac equipncnt (~, bl~n:. etc:.) P.=96 % Sthulatlon 05-.12-93 to 05·13·93 [1 day] Stl.ulete well. Move out fr ac equipment. Frac Tri RMIOVal 05·13~93 -to OS·16 ·93 [3 di.ysl Hove out free tank&. Or.ce ccmenced, 110W out of frat t snlcs is 1 24 hour a day operation uit.fl tenlcs are retlOYed. Uell Shut In 05-13-93 to 05 ·25 ·93 Leave well shut fo . Worlc~er .Rf 11 OS·2S·93 to .OS·26 ·93 [1 .day] Move in wortover Ng. Run ·pscl::.c:r and 'Cl.bing into uell. Uorlcowr -Rig 05-26·93 to ·05-27-93 [1 day] Flni dl fnserth'Q pac:lcer and tub;ng. Move out workover rt9. s ~tt Uater RetlC!val OS·27.4J.3 to 06-18·93 C22 dayaol llelllOve produced Mater (ai:proximteL.y 10,000 IBLS). ·Larae quentftfes at ftrlt, di1ninfsbi1"111 rapidly. llorv.al Operatfmc os ..,z7-93 to OT-03-93 [37 daysl Opai well to production. Non111l oparadon&. l.now of l and produced water. <:-09 776 6239 04-06 -93 03:01?1/ P004 U31