HomeMy WebLinkAbout48 Development Permit 340 Eugenia Jones Oil WellDEVELOPMENT PERMIT
PERMIT NO . 340
Eugenia Jones Well #1
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Situated in the Nathan Clampitt Survey, A-90 and the S. W Robertson Survey, A-202
SITE ADDRESS:
N IA
OWNER:
Union Paci.fie Resources Company
DRAINAGE BASIN:
Lick Creek, Segment I
TYPE OF DEVELOPMENT:
This permit is valid for site construction as per approved plans for the drilling and production pad
associated with the Eugenia Jones Well No. 1.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria . Owner & Contractor shall assure that all disturbed areas
are sodden and establishment of vegetation occurs prior to removal of any silt fencing of hay bales used
for temporary erosion control. Owner & Contractor shall also insure that any disturbed vegetation be
returned to its original condition, placement and state. Owner & Contractor shall be responsible for any
damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as
well as erosion, siltation or sedimentation resulting from the permitted work.
This permit expires six months from the date of issuance.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures
shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in
city streets, or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All
development shall be in accordance with the plans and specifications submitted to and approved by the City
Engineer in the development permit application for the above named project and all of the codes and
ordinances of the ity of College Station that apply .
Date
Contractor Date
Owner/ Agent Date
On behalf of: Union Pacific Resources Co .
DATE:
TO:
FROM:
RE:
·~W'CITY OF COLLEGE STATION
~ ENGil'E:ERING DIVISION
Post Office Box 9960 1101 Texas Avenue
College Station, Texas 77842-0960
(409) 764-3570
MEMORANDUM
August 18, 1993
City Council
Mail List B
David J. Pul n, P.E., Cit En~
EUGENIA ONES #1 S MULATION
The scheduled start date fo e above referenced well is September 2,
1993. Activity on this site will last about (30) days according to the
submitted schedule provided by Union Pacific Resources. The well,
Eugenia Jones # l, is located at the intersection of Greens Prairie Road
and Rock Prairie Road with access from Green's Prairie Road.
DJP!dg
\.
04 /0 6 /93 15 :43 '0'4 09 776 6 2 39
...
Un t on Paci He R_.oul"'C4tC CCll'lfMl"IY
ft~tattve Uell StlDJLatlon schedule (60 O a ~)
for Awtfn Q\allc wells In College Stathln, Tuas
BRUCHEZ & GOSS [aJ 004
~ : : : : : : : :
rec T~1;i~: · ··· ··: ····· · ·· · ·· ··:· ·· · ·· · ·· · ··· :· · ····· ······: ·· ···· ··· ·· ··: ··· · ······ ·· ·:· ··· ··· ··· ··· :··· ········ ·
. r~rac i'
............. : ........ ~~ ~ .. ~~. ~~· ....... :.. . ....... : ............. : ............. : ............. : ............. : ........... .
. • • Salt Uate:r Reg-;OVB( · • • ·
· • · • ornial O;>erati ··c ns-· ----.......;.·------------------l
\IOr'kover os .. o:r93 to os-~·93 ct day]
Move in and cet up uorkover r .fg.
Pull tWi i ng out of we l l.
Worl'.over
05·04·93 to 05·06·93 C2 daycJ
Pull pac:tcer out of 1.1e l l. Hove
worl'.OV*f" r i g out .
Free Tris
05·06-93 to 05· 11 •93 CS daycl
lllcw tn and fill frac t&nlcc wfth
f resh 11111ter (approxtmately 30,000
llLS). Once cmmenced, 110Ve fn and
f H L of free tanlcs i& a 24 hour a
day q>eration 1.Siti l CCll'lfJleted.
F rac E"'f pcnent
05·1.1·93 to 05-12-'93 [1 day]
ltOYe in frac equipncnt (~,
bl~n:. etc:.)
P.=96 %
Sthulatlon
05-.12-93 to 05·13·93 [1 day]
Stl.ulete well. Move out fr ac
equipment.
Frac Tri RMIOVal
05·13~93 -to OS·16 ·93 [3 di.ysl
Hove out free tank&. Or.ce
ccmenced, 110W out of frat t snlcs
is 1 24 hour a day operation
uit.fl tenlcs are retlOYed.
Uell Shut In
05-13-93 to 05 ·25 ·93
Leave well shut fo .
Worlc~er .Rf 11
OS·2S·93 to .OS·26 ·93 [1 .day]
Move in wortover Ng. Run ·pscl::.c:r
and 'Cl.bing into uell.
Uorlcowr -Rig
05-26·93 to ·05-27-93 [1 day]
Flni dl fnserth'Q pac:lcer and
tub;ng. Move out workover rt9.
s ~tt Uater RetlC!val
OS·27.4J.3 to 06-18·93 C22 dayaol
llelllOve produced Mater
(ai:proximteL.y 10,000 IBLS).
·Larae quentftfes at ftrlt,
di1ninfsbi1"111 rapidly.
llorv.al Operatfmc
os ..,z7-93 to OT-03-93 [37 daysl
Opai well to production. Non111l
oparadon&. l.now of l and
produced water.
<:-09 776 6239 04-06 -93 03:01?1/ P004 U31