HomeMy WebLinkAbout36 Development Permit 326 Edelweiss Estates Ph 10aDRAINAGE STUDY
FOR
EDELWEISS ESTATES, PHASE 10-A
COLLEGE STATION, BRAZOS COUNTY, TEXAS
PREPARRT> FOR:
BEGONIA CORPORATION
1901 San Jacinto
Houston, TX 77002
NOVEMBER 14, 1995
PREPARED BY:
McCtURE ENGINEERING, INC.
1722 Broadnwor, Suite 210
Bryan,: TX 77802
CERTIFICATION
I, Michael R. McClure, Registered Professional Engineer No. 32740, State of Texas,
certify that this report for the drainage design of EDELWEISS ESTATES, PHASE 10-A was
prepared by me in accordance with the provisions of the City of College Station Drainage Policy
and Design Standards for the owners thereof.
INTRODUCTION:
DRAINAGE STUDY
FOR
EDELWEISS ESTATES PHASE 10-A
This drainage report is intended to show the adequacy of the designed drainage
improvements for the proposed and future conditions of the EDELWEISS ESTATES
DEVELOPMENT. The body of the report is general in nature , with specific computations
shown as exhibits at the end of the report.
GENERAL LOCATION AND DESCRIPTION:
The project is a proposed phase of the EDEL WEISS ESTA TES development. This phase
called Edelweiss Estates, Phase 10-A is located in southern College Station, west of the existing
Welsh A venue and adjacent to the Elm Crest Subdivision (See Exhibit "A"). To the south is
Rock Prairie Elementary School and a City of College Station Park. To the north is Southwood
Valley Sections 24C and E. To the west is future development of Edelweiss Estates. All of the
above mentioned subdivisions are single family residential.
This phase of development is entirely within the Bee Creek Tributary "A" drainage shed
as noted in the City of College Station Stormwater Management Plan and the Federal Emergency
Management Agency, Flood Insurance Rate Maps for Brazos County, Texas and Incorporated
Areas, Map No. 48041C0182 (See Exhibit "B"). The FEMA FIRM clearly shows that the site
is not within a 100-year flood plain. Exhibit "A" shows the area of EDELWEISS ESTATES
subdivision drainage to Bee Creek Tributary "A". Drainage areas for future EDELWEISS
development are shown but no calculations are presented with this report.
The development of this phase of EDELWEISS ESTATES entails grading, street, storm
drain, and utility improvements. The improvements on the site will include the enlargement of
the existing detention pond built with the Elm Crest Subdivision. Note that with the development
of Elm Crest Subdivision, the drainage of the entire area was studied in detail (Drainage Study
for Elm Crest, May, 1993 and Drainage Report Addendum for Elm Crest, September 03, 1993).
The Drainage Study for Elm Crest shows that the culvert under Deacon Drive (a triple 30"
R.C.P. culvert) has the capacity to pass flows less than the existing two-year storm event without
water flowing over Deacon Drive. Note that this condition is severely inadequate by the current
requirements of the City of College Station Drainage Ordinance.
To improve the situation, "over-detention" of proposed flows is required in the
EDELWEISS development. Hence the proposed flows are less than existing flows. This is
desirable for several reasons:
1. With "over-detention", existing flooding problems downstream of the development
should improve. Consequently, in no respect, can the downstream problems be
attributed to development in EDELWEISS ESTATES.
2. By lessening the peak runoff to the existing undersized facilities (at Deacon Drive
and/or Welsh Avenue), the flow conditions at the structures will be improved.
DRAINAGE DESIGN CRITERIA:
The streets and storm drains are designed in accordance with the City of College Station
Drainage Policy and Design Standards (DPDS). The storm drains and inlets are sized to
accommodate the ten-year storm (see Exhibit "C"). The rational method (Q=CIA) is used in the
2
design of all storm drains and inlets. The time of concentration for each area is computed based
on published Soil Conservation Service (SCS) Technical Release #55 (TR-55) data. Street
capacity is computed using the manning equation for open channel flow with an "n" value of
0.018. Inlets are sized based on the guide lines of the DPDS. Storm drains < 27" in diameter
are sized to convey 1.25 times the actual flow (see Exhibit "C"). The over-flow section (see
Section "C-C" on sheet 1 of the construction drawings) was sized to convey runoff from the 100-
year frequency storm within the limits of the proposed easements and right-of-way. Calculations
have been made using the manning equation for open channel flow with an "n" value of 0.030
(see Exhibit "E").
The detention pond design is based on the SCS Type II Storm (for precipitation data) with
input data from the DPDS, SCS Unit Hydrograph (for spatial distribution), and SCS Curve
Number loss rates as prescribed in the DPDS. Lag times are generated using the SCS Lag time
equation (see Exhibit "F"). Exhibit "G" shows the drainage areas referenced in Exhibits "D" and
"F". This technique generates the highest flows of the available techniques. By sizing the
detention facility and modeling the downstream facilities for the higher flows, a more
conservative evaluation is obtained. The intent of this drainage analysis and design is to clearly
"point out" the precautions that have been taken to reduce the potential for downstream flooding
due to the design of the detention pond.
FUTURE CONDITIONS:
Future phases of Edelweiss Estates will require more detention storage (volume) than is
provided with this phase. The area provided (see Drainage Study for Elm Crest, May, 1993)
3
is adequate, however, the grading improvements required for future phases will not be done with
this phase.
SUMMARY:
The peak flows at the STUDY points are given in Table One below. "ORIG." refers to
the original flow before construction south of Southwood Valley Section 24 . "PROP." refers to
the flow after the development of this phase of EDELWEISS ESTATES. This data is taken
directly from Exhibit "D". Note that the "outlet" referenced is the combined flow at the outlet
of the pond, the "culv" is the existing triple 30" R.C.P. culvert in Deacon Drive , and "Welsh"
is the existing box culvert structure at Welsh Avenue. Note that at the outlet, the proposed
detention facility reduces the peak discharge for all storms.
TABLE ONE
STUDY STORM 100 50 25 10 5 2
PT EVENT
OUTLET ORIG. 277 238 205 160 122 71
OUTLET PROP. 277 233 195 140 92 44
CULV ORIG. 387 334 290 228 177 106
CULV PROP. 416 347 285 200 143 92
WELSH ORIG., 730 634 555 445 350 220
;
WELSH PROP. 761 650 553 417 319 207
4
CONCLUSION:
The storm water detention facility proposed in this development successfully reduces the
post-development peak discharge rate to less than or equal to the predevelopment rate for the 2 ,
5, 10, 25, 50 and 100-year storm events. Future expansion of the detention facility will further
improve the conditions downstream of the EDELWEISS development.
6
Edelweiss Estates Phase JOA Exhibit 'A " Drainage Area Map
Phase 1 Boundary
Drainage Area Lim its
w/ Areo~lnlet 1.0 .
- - - -Project Limits
/
)
Existing Contour Lines
October, 1995 1"=300'
r
....
J ... ·. .• :-1 ·1 .. -f-~--:;.z
• ..!.
"'· ' .
EXHIBIT ''B"
EXCERpr F'ROO F.E.M.A., FIRM 48041C0182 C
-EXHIBIT C PROPOSED DRAINAGE COMPUATIONS ACRES DRAINED OVERLAND GUTTER ~ re ~ ti: H ~ S· .. a .. "O u ~-~ ~ ~ ~ E-t u ~ Q ~ E-t ~ ~ H t!> i t!> i u 0 0 ~ fl) ~ ~ r-i 41 0 0 Ill Ill 0 0 g ~ ~ ~ Id Ill Ill Ill ...-1 ...-1 N N ...-1 ...-1 u 0 H OI H OI H OI H OI Ac. 0.40 0.55 0.87 CA I I I I min min "/hr cfa "/hr cfs 11/hr cfa 11/hr cfa 1 8.36 8.00 0.00 0.36 3.51 720 8 100 3 16.6 16.6 6.05 21.24 6.83 24.00 7.83 27.48 10.00 35.14 2 0.44 0.00 0.44 0.00 0.24 50 1 250 2 3.5 5.0 9.85 2.37 10.98 2.65 12.51 3.01 15.78 3.80 3 0.42 0.00 0.42 0.00 0.23 50 1 300 2 4.4 5.0 9.85 2.25 10.98 2.51 12.51 2.86 15.78 3.61 4 2.53 0.00 2.53 0.00 1. 39 230 4 470 6 7.6 7.6 8.57 11. 92 9.59 13.34 10.94 15.21 13.86 19.27 5 1. 96 0.00 1. 96 0.00 1. 08 140 2 550 6 7.6 7.6 8.57 9.23 9.59 10.33 10.94 11. 78 13.86 14.92 INLET SIZING PIPE SIZE COMPUTATIONS N= 0.014 ~ re Q s H H ... 0 ~ ~ rn ~ ~ ~ ~ ~ ~ : ~ z OI OI E-t E-t H H i Q .... ~ re H 8 ~ ~ a a ~ ~ ~ ~ § ~ a a u ~ .... l':il ~ OI s N z g g ~ re g g u g H H DESCRIPTION fl) fl) E-t ~fl) fl) II cfs/lf. I I min cfs % II cfs 1 3.5 24.0 LOW POINT INLET 39 1. 52% 7.1 2 12.0 15 1 3 3.51 16.6 24.0 2.03 24 30.0 2 0.2 2.6 RECESSED INLET ON GRADE 28 1. 30% 9.6 1. 5 1. 8 5 2 3 0.24 5.0 2.6 0.30 15 3.3 3 0.2 2.5 RECESSED INLET ON GRADE 28 1.30% 9.6 1. 5 1. 7 5 3 4 3.98 16.8 27.1 0.88 27 27.1 4 1. 4 13.3 RECESSED INLET ON GRADE 28 1. 30% 9.6 1. 5 8.9 10 4 5 5.37 18.1 35.1 0.84 30 35.1 5 1.1 10.3 LOW POINT INLET 28 1. 30% 9.6 2 5.2 10 5 HW 6.45 18.4 41. 8 0. 72 33 41. 8 * Capacity of storm drains <27" is increased by 25% ** See plans for actual slopes EXHIBIT C
EXHIBIT D
1•········································ . ......•.•..•........•.••...............
1
FLOOD llYDROGRAPll PACXAGB (HBC -1)
MAY 1991
VBRSION 4 . 0 .18
Lahey 1'77L-BM/32 veraion 5 .01
Dodson k A8aociatea, Inc .
RON DATB 11/14/95 TIMB 10:43 :08 * .........................................
x x xxxxxxx x x x
x x x
XXlCXXXX xxxx x x x x x x
x x xxxxxxx
lCXXXX x x x x xxxxx x x x
xxxxx
x
xx x x
x x
xxx
U .S . ARMY CORPS OF llllGlNBBRS
HYDROLOGIC llllGINBKRDIG CBNTKR
609 SBCOllD STRBBT
DAVIS, CALIFORNIA 95616
(916) 551-1748
............•••...•........•...........
THIS PROGRAM RBPLACBS ALL PREVIOUS VBRSIONS OP HBC -1 ICNOtlN AS HBC1 (JAN 73), HBClGS, HBClDB, AND HBCllOI.
THB DSFINITIONS OF VARIABLBS -RTIMP-AND -RTIOR-HAVB CllANGBD FROM THOSS USBD llITH THB 1973-STYLB INPUT STRUCTURB.
THB DSFINITION OF -AMSl(l(-ON RM -CARD llAS CHANGBD KITH RBVISIONS DATBD 28 SSP 81 . THIS IS THB FORTRAN77 VBRSION
NBll OPTIONS : DAMBRllA1': OUTFLOW SUBMBRGBNCll , SINGLB XVKN'I' DAMAGB CALCULATION, DS S :WRITB STAGS P'RBQUllNCY,
DSS :RBAD TIMB SBRIBS AT DBSIRBD CALCULATION INTBRVAL LOSS RATB :GRBBN AND AMPT INFILTRATION
XINllMATIC llAVB : NBll FINITB DIFFBRKNCB ALGORITHM
HBC-1 INPUT PAGB
LINB m ....... 1 .•..... 2 .•..... 3 ...••.. 4 ....... 5 .••.•.. 6 .....•. 1 •...... 8 ...••.• 9 ••.•.. 10
1 m BDBLllBISS BSTATBS PBASB 10-A
2 IT 2 Ol.A0095 0000 720
3 IO 5 0 0
4 JP 3
5 JR PRJIC 11 9 .8 8 .8 7 .4 6.2 4 .5
6 u: DA lPUTUR.11 PHASBS OF ROCX PRAIRIS SSTATBS
7 1CP 1
8 BA .0332 1
9 FB 1
10 IN 3 0 0 1A0095 0000
11 PC .0053 .0108 .0164 .0223 .0284 .0347 .0414 .0483 .0555 .0632
12 PC .0712 .0797 .0881 .0984 .1089 .120 3 .1328 .1467 .1625 .1808
13 PC .2042 .2351 .2833 .6632 .7351 .7724 .7989 .8197 .8380 .8538
14 PC .8676 .8801 .8914 .9019 .9115 .920 6 .9291 .9371 .9446 .9519
15 PC .9588 .9653 .9717 .9777 .9836 .9892 .9947 1.000
16 LS 0 75 0
17 OD .48
18 1(1( DA 2 BX . BLM CRBST
19 l\'.M PLAN 1 • UllDBVBLOPBD SLM CRBST, UllDBVBLOPBD RPS
20 1CP 1
21 BA .010 2
22 LS 0 75 0
23 OD . 3
24 l\'.M PLAN 2 • DBVBLOPBD BLM CRBST, UllDBVBLOPBD RPB
25 1CP 2
26 LS 0 84 0
27 OD .12
28 l\'.M PLAN 3 • DBVBLOPBD SLM CRBST, DBVBLOPBD RPB PRASS 0NB
29 1CP 3
30 LS 0 84 0
31 OD .12
32 u: BCPOllD
33 1CP 1
34 RN
35 1CP 2
36 RS 1 FLOW -1
37 SA 0 .0744 .2564 .3053 .3496 .3978 .4471 .5318 . 7
38 SB 299 300 301 302 303 304 305 306 307
39 SL 300 .7854 .7 .5
40 SS 304 .85 20 3 1.5
41 ST 305 8 3 1 .5
42 1CP 3
43 RN
44 1(1( DA 3 BDBLllBISS llSTATBS PHASB 10A
45 1CP 1
46 BA .0 356
47 LS 0 75 0
48 OD .48
49 1CP 3
50 LS 0 77 0
51 OD .22
HBC-1 INPUT PAGB 2
LINS ID ....... 1 ....... 2 ....... 3 ....... 4 ....... 5 .....•. 6 ....... 7 ....... 8 ....... 9 ...... 10
52 1(1( POND
53 BC 2
54 1(1( NBll POND
55 1CP 1
-----------------
56 RN
57 Ja>
58 RS
59 SA
60 SB
61 SL
62 SS
63 ST
6• n
65 Ja>
66 BA
67 LS
68 OD
69 Ja>
70 LS
7l. OD
72 Ja>
73 LS
" OD
75 u
76 HC
77 ICIC
78 RD
79 RC
80 RX
8l. RY
82 u
83 BA
8• LS
85 OD
86 ICIC
87 HC
88 ICIC
89 BA
90 LS
9l. OD
92 ICIC
93 HC
l.
3
l. PLOW -l.
0 .l.l.03 .'273
299 300 30l.
299 .76 • 785 .7
30• 10 3
305 5 3
DA ' UNCOllTROLLBD PLOllS
l
.0122
0
.22
2
0
.08
3
0
.08
OOTLBT
3
VBB
.02
.001
300
DA 5
.0302
0
.15
CULV
2
DA 6
.0030
0
.11
CllA1Gf
2
75
8'
8'
DITCH
.OH
10
296
SWV 2'
8•
DI DBACON
DBACOll
8'
0
0
0
.02
23
29•
0
0
.6723 .7809
302 303
.5
l.5
l.5
BYPASSDG POND
700
25
293 .5
.015•
25 .1
293.5
HBC -l IllPOT
.8626
30•
27
29'
.9•85
305
•O
296
l..070
3 0 6
50
300
l..•
307
PAGB 3
LDOI ID •••••.. l. •••••• 2 ••.•••• 3 ••.•••.•..••••• 5 ••••••• 6 •••.•.• 7 •••..•• 8 ..•..•. 9 ...... 10
9• ICIC DA 6 CHURCH
95 BA .0699
96 LS 0
97 OD .19
98 ICIC llllLSH
99 HC 2
l.00 zz
i••······································· .
P'LOOD HYDROGRAPH PACICAGB (HBC-1)
MAY 1991
VllRSION '. 0 .18
Lahey P77L-llM/32 version 5 .01
Dodson & Associates, Inc .
RUN DATI 11/H/95 TIMB 10:'3 :08 .....................•...................
8' 0
BDBLllBISS BSTATSS PllASB 10-A
3 IO OOTPO'T CONTROL VAllIABLBS
IPRNT 5
I PLOT 0
QSCAL 0 .
IT HYDROGRAPH TIMB DATA
PllINT . CONTROL
PLOT CamtoL
HYDROGRAPH PLOT SCALB
NMIN
IDATI
IT I MB
2
1AIJG95
0000
720
1AIJG95
2358
19
MIIWl'BS DI COMPUTATION Iln'BRVAL
STARTIIG DATB
NQ
NDDATB
NDTIMB
ICBllT
STAltTillG TIMB
~ OP HYDROGRAPH ORDINATBS
llllDDIG DATB
llllllillG TIMB
Cllln'tJRY !QIU:
COMPUTATION INTBRVAL 0. 03 BOORS
TOTAL TIMB BASB 23. 97 . BOORS
BNGLISB UNITS
DRAINllGB ARllA
PRBCIPITATION DBPTB
LBNGTB , BLBVATION
PLOll
STORAGB VOLOMll
SUltPACB ARllA
TBMPBRATURll
MULTI-PLAN OPTION
NP LAN
SQUARB MILBS
lllCBBS
PBBT
CUBIC PJ:BT . PIR SBCOND
ACRB-PBBT •
ACRBS
DllGRBBS PABRllNHllIT
lla'IBU OP PLANS
Page2
U .S . ARMY CORPS OP BNGINBBRS
HYDROLOGIC BNGINBBRING CBln'BR
609 SBCOND STRBBT
DAVIS, CALIFORNIA 95616
(916) 551-17'8
Exhibit D
JR MULTI-RATIO OPTION
RATIOS OP PRECIPITATION
11 .00 9 .80 8 .80 7.40 6 .20 4.50
PSAJ: PLOW AND STAGB (BND-OP-PBRIOD) SlH'IARY POR MULTIPLB PLAN-RATIO BCONOMIC caa>tJTATIONS
PLOllS IN CUBIC PBBT PBR SBCOND , ARBA IN SQUARB MILXS
TIMB TO PllAlt IN HOURS
RATIOS APPLIBD TO PRBCIPITATION
OPBRATION STATION ARBA PLAN RATIO l RATIO 2 RATIO 3 RATIO 4 RATIO 5 RATIO 6
11.00 9.80 8 .80 7.40 6 .20 4 .50
KYDROGRAPH AT
DA l 0 .03 l PLOll 101. 87 . 75 . 58. 44 . 26 .
TIMB 11 .80 11.80 11.80 11.80 11.80 11.83
PLOW 101. 87 . 75 . 58 . 44 . 26 .
TIMB 11 .83 11.83 11 .83 11 .83 11 .83 11.83
3 PLOW 101. 87 . 75 . 58. 44 . 26.
TIMB 11 .83 11.83 11 .83 11 .83 11.83 11.83
KYDROORAPH AT
DA 2 0 .01 PLOW 39 . 33. 29 . 22 . 17 . 10.
TIMB 11.63 11 .63 11 .63 11 .63 11.63 11.67
PLOll 51. 45 . 40 . 32. 26 . 17 .
TIMB 11 .50 11.50 11 .50 11.50 11.50 11 .50
PLOW 51. 45 . 40 . 32. 26. 17 .
TIMB 11.50 11.50 11 .50 11.50 11.50 11.50
ROUI'BD TO
BCPOND 0 .01 PLOW 39 . 33 . 29 . 22. 17. 10 .
TIMB 11.63 11 .63 11.63 11.63 11.63 11 .67
PLOll 26. 12 . 9 . 8 . 8. 6.
TIMB 11 .67 11 .80 11.83 11 .80 11. 77 11 . 73
PLOW 51. 45 . 40. 32 . 26. 17 .
TIMB 11.50 11.50 11 .50 11.50 11 .50 11 .50
PBAJ: STAGBS IN PBBT
1 STAGB 0.00 0 .00 0 .00 0 .00 o.oo 0 .00
TIMB o.oo 0 .00 0.00 0.00 0 .00 0 .00
STAGll 305 .21 304.95 304 .46 303 . 67 302 .97 301 .96
TIMB 11 .67 11.80 11.83 11.80 11. 77 11 . 73
STAGB 0.00 o.oo 0.00 0 .00 0 .00 0.00
TIMB 0 .00 0.00 o.oo o.oo o.oo 0 .00
KYDROORAPH AT
DA 3 0 .04 l PLOW 108. 93. 80. 62. 48. 28 .
TIMB 11 .80 11.80 11 .80 11.80 11.80 11 .83
2 PLOll 108. 93 . 80 . 62 . 48. 28 .
TIMB 1.1 .83 11.83 11.83 11.83 11 .83 11.83
3 PLOW 152. 132 . 115 . 91 . 70 . 43 .
TIMB 11.57 11.57 11 .57 11 .57 11 .57 11 .60
2 CC»GIINBD AT
+ POND 0 .05 l PLOll 141 . 121. 105 . 82 . 62. 36 .
TIMB 11. 73 11 . 73 11. 73 11. 73 11.77 11 . 77
2 PLOW 129 . 105. 89 . 71. 55. 34.
TIMB 11. 73 11.80 11.80 11 .80 11.80 11.83
PLOll 202 . 175 . 153 . 122. 95. 59 .
TIMB 11.53 11.53 11 .53 11.53 11 .53 11 .57
ROUTBD TO
11BW PO 0 .05 l PLOll 141. 121. 105 . 82. 62 . 36 .
TIMB 11 .73 11 .73 11 . 73 11. 73 11. 77 11 . 77
PLOll 129 . 105 . 89 . 71 . 55 . 34 .
TIMB 11 . 73 11 .80 11 .80 11.80 11 .80 11.83
PLOll 165 . 137 . 111 . 73 . 41 . 9.
TIMB 11 .67 11.67 11.70 11 . 73 11 .83 12 .37
PBAJC STAGBS IN PBBT
1 STAGB 0 .00 0 .00 o.oo o.oo 0 .00 0 .00
TIMB 0 .00 0 .00 0 .00 0.00 0 .00 0 .00
STAGll 0 .00 0 .00 0 .00 0 .00 0 .00 0 .00
TIMB 0 .00 0.00 0 .00 0 .00 o.oo 0 .00
STAGB 306 .58 306 .28 306 .00 305 .53 305 .03 304 .00
TIMB 11 .67 11.67 11.70 11. 73 11 .83 12 .37
KYDROQllAPH AT
DA 4 0 .01 1 PLOll 51. 44 . 38 . 30. 23. 14 .
TIMB 11.57 11.57 11 .57 11.57 11.57 11.60
PLOW 62 . 55 . 48 . 40. 32 . 21.
TIMB 11.50 11.50 11 .50 11.50 11.50 11.50
3 PLOll 62 . 55 . 48 . 40. 32. 21 .
TIMB 11.50 11.50 11 .50 11.50 11.50 11.50
3 CC»GIINBD AT
OOTLBT 0 .09 1 PLOll 277 . 238 . 205 . 160 . 122 . 71 .
TIMB 11 . 70 11. 70 11. 70 11. 73 11. 73 11. 73
2 PLOll 243 . 202 . 174 . 137 . 106 . 64.
TIMB 11 .73 11 .80 11. 80 11.80 11 .80 11.80
PLOW 277 . 233 . 195 . 140. 92 . 44 .
TIMB 11 .63 11 .67 11 . 70 11. 77 11 .83 11.53
ROUTBD TO
VBB 0.09 1 PLOW 27 7 . 238 . 205. 160. 122 . 71 .
TIMB 11. 73 11 . 73 11 . 73 11. 73 11 . 73 11 . 77
PLOW 243 . 202. 174. 137 . 106 . 64 .
TIMB 11. 77 11.80 11 .80 11.80 11.83 11.83
PLOll 277 . 233. 194 . 140. 92 . 43 .
TIMB 11 .63 11. 70 11 . 73 11 . 77 11.83 11 .57
KYDROORAPH AT
Page 3 Exhibit D
DA 5 0.03 l
3
2 COMBINl!D AT
CULV 0 .12 l
2
BYDROGRAPH AT
DA 6 0 .00 1
2
3
2 COMBINlID AT
CHl\NN 0 .12
BYDROGRAPH AT
+ DA 6 0 .07
2 COMBINJ!D AT
+ 0 .19 1
2
3
l
ISTAQ OT
(HIN)
POR PLAN • l RATIO• 0 . 00
VBB MANB 1 .01
FLOW 149 . 131. 115 . 94. 76 .
TIMB 11.50 1 1.50 ll.53 11.53 11.53
PLOtl 149 . 131 . 115 . 94 . 76 .
TIMB 11 .53 11 .53 ll.53 11 .53 11.53
FLOW 149. 131 . 115 . 94. 76 .
TIMB ll.53 ll.53 11.53 11 .53 11 .53
PLOtl 387. 334 . 290 . 228 . 177.
TIMB ll.60 ll.60 11.60 11 .60 11 .60
PLOtl 361. 313 . 274 . 219 . 172 .
TIMB 11 .57 11.57 11 .57 11.57 11 .57
PLOlf 416 . 347 . 285 . 200 . 143 .
TIMB 11.57 ll.57 11.60 ll.60 ll.53
PLOlf 1S . 13. 12 . 10 . 8 .
TIMB 11.SO 11 .SO 11.SO 11.SO 11.SO
FLOW lS . 13 . 12 . 10 . 8 .
TIMB 11.SO 11.SO 11 .SO 11.50 11.SO
PLOW lS. 13 . 12 . 10 . 8 .
TIMB 11.SO 11 .SO 11 .50 11 .50 11.SO
FLOW 398 . 344 . 298 . 236 . 182.
TIMB 11 .60 ll.60 11 .60 11 .60 11 .60
FLOW 37S . 32S. 284 . 227 . 179 .
TIMB 1l.S7 ll.57 ll.S7 11 .S7 ll .S7
FLOW 429 . 3S9 . 296 . 208 . 1Sl.
TIMB 11.S7 ll.S7 11.S7 ll.S7 11.S3
FLOW 334 . 293 . 2S9 . 210 . 1 69 .
TIMB 1l.S 3 ll.S3 ll.S3 ll.S3 11 .53
FLOW 334. 293 . 2S9 . 210 . 169.
TIMB ll.S7 ll.S7 11 .S7 ll.S7 ll.S7
FLOW 334 . 293 . 2S9. 210. 169 .
TIMB 11 .S7 ll.S7 ll.57 11.S7 11.S7
PLOW 730. 634 . SSS . 44S. 350 .
TIMB ll.57 ll.57 11 .57 11.57 11 .S7
FLOW 707 . 617. S42 . 437 . 347.
TIMB 11 .S3 J.l .S3 1l.S3 ll.S3 ll.57
FLOW 761 . 6SO . 553 . 417 . 319 .
TIIGI 11 .57 l.l.57 J.l .57 ll.57 l.1.SJ
salMARY OF ICillllMATIC llAVB -MUSlt~-CIJIC8 ROOI'n«:l
( !'LOii IS DIRJICT RIJllOFP llITllOl1l' BAS8 PLOW)
INTBRPOLATBO TO
OlMPl1l'ATION INTBRVAL
PBAlt TIMB TO VOL0411 OT PBAlt TIMB TO
PBAlt PBAlt
(CFS) (HIN) (IN) (HIN) (CFS) (HIN)
277 .37 703 .61 7 . 79 2 .00 277 .19 704 .00
50.
11.53
50 .
11.53
50 .
11.53
106 .
11 .60
108 .
11 .57
92 .
11 .53
s .
11.SO s .
ll.50 s .
11 .SO
110 .
ll.60
112 .
11 .S7
98 .
ll.53
110 .
11.57
110 .
11.S7
110 .
11 .S7
220 .
ll.S7
222 .
ll.S7
207 .
11 .53
VO LOMB
(IN)
7 . 79
CONTINUITY StlM'IARY (AC-FT) -INFLOW•0 .37918+02 BXCBSS•0 .00008+00 OUTFLOW•0 .37908+02 BASIN STORAG8•0 .11658-01 PBRCBNT BRROR• 0 .0
POR PLAN • l. RATIO• 0 . 00
VB8 MANB l..04 238 . 05 703 . 86 6 .67 2 .00 237 . 98 704 .00 6 .67
CONTINUITY Sll*ARY (AC-FT) -INFLOW•O . 32478+02 BlCCBSS•O . 00008+00 OOTPLOll•O . 32468+02 BASIN STORAG8•0 .10608-0l. PBRCBNT BRROR• 0 . 0
POR PLAN • l. RATIO• 0.00
VBI MANB 1. 07 20S .40 704 .35 S .75 2 .00 205 .33 704 .00 5.75
CONTillUITY sui.IARY (AC-FT) -INFLOW•0 .27998+02 BlCCBSS•0 .00008+00 OOTPLOll•0 .27988+02 BASIN STORAG8•0 .9892B-02 PBRCBNT BRROR• 0 .0
POR PLAN • l. RATIO• 0 . 00
VBB MANB l..12 160 .20 704 .l.7 4 .49 2 .00 160 .l.S 704 .00 4 .49
CONTINUITY SUMHARY (AC-FT) -INFLOW•0 .218S8+02 BXCBSS•0 .00008+00 OOTPLOll•0 .21848+02 BASIN STORAGB•0 .88108-02 PBRCBNT BRROR• 0 .0
POR PLAN • l. RATIO• 0 . 00
VB8 MANB 1 .l.8 122 .l.6 704 .20 3 .44 2 .00 122 .10 704 .00 3 .44
CONTillUITY sui.IARY (AC -FT) -INFLOW•O . l.6758+02 BXCBSS•O. 00008+00 OOTPLOll•O . l.6758+02 BASIN STORAG8•0 . 77028-02 PBRCBNT BRROR• 0 . 0
POR PLAN • l. RATIO• 0 . 00
VBB MANB l. 2 9 70 .89 70S . 78 2 .041 2 .00 70 .87 706 .00 2 .04
CONTINUITY SIMIARY (AC-FT) -INFLOW•O . 99438+01 BXCBSS•O . 00008+00 OOTPLOll•O . 99398+01 BASIN STORAG8•0 . Sl.928-02 PBRCBNT BRROR• 0 . 0
POR PLAN • 2 RATIO• 0 . 00
VB8 MANB 1 .04 242 .S7 706 .36 8 .10 2 .00 242 .S6 706.00 8.10
CONTINUITY SUMMARY (AC-FT) -INFLOW•0 .39418+02 BXCBSS•0 .00008+00 Otl'l'PLOll•0.39408+02 BASIN STORAG8•0 .1090B-Ol PBRCBNT 8RROR• 0 .0
Page4 Exhibit D
POR PLAN • 2 RAT I O• 0 .00
Vlll! MANB 1 • 07 202 .40 708 .28 6 .97 2 .00 202 .31 708 .00 6 .97
CO!l'TINUITY SUMMARY (AC-PT) -INl'LOll·O . JJ908+02 BXCBSS•O . 00008+00 OOTPLOlf•O . JJ898+02 BASIN STORAG8•0 .10138-01 PBRCBNT BRROR• 0 . 0
POR PLAN • 2 RATIO• 0 . 00
VH8 MANB 1.10 174 .13 708 .14 6 .0J 2 .00 174 .08 708 .00 6 .OJ
CONTINUITY StlHMARY (AC -PT) -INl'LOll•0 .29J68+02 BXCBSS•0 .00008+00 OtTl'PLOW•0.2 9J58+02 BASIN STORAG8·0 .9J518 -02 PBRCBNT BRROR• 0 .0
POR PLAN• 2 RATIO• 0.00
Vlll! MANB 1. 16 137 .J8 708 .J7 4 . 75 2 .00 137 . 2 7 708 .00 4 .75
CO!l'TINUITY S~Y (AC-PT) -INl'LOll•O . 2Jl18+02 BXCBSS•O . 00008+00 OU'l'l"LOlll•O . 2J108+02 BASIN STORAG8•0 . 82988 -02 PBRCBNT BRROR • 0 . 0
POR PLAN • 2 RAT I O• 0 . 00
VH8 MANB 1 .2 1 106 . J7 709 .0 0 J .6 8 2 .00 1 06 . 22 710 .0 0 J .68
CONTINUITY S~Y (AC -PT) -INFLOll•0 .17898+02 BXCBSS•0 .00008+00 OtTl'PLOW •0 .17898+02 BAS I N STORAG8•0 . 70718 -0 2 P8RCBNT BRROR• 0 .0
POR PLAN • 2 RATIO• 0 . 00
VH8 MANB 1. J 2 64 .06 709 . 6J 2 .24 2 .00 64 .05 710 .00 2 .24
CONI'INUITY S~Y (AC -PT) -INFLOll•O .10888+02 11'.XCBSS•O. 00008+00 OU'l'l"LOlll•O .10888+02 BASIN STORAG8•0 . 46148-0 2 PBRCBNT BRROR • 0 . 0
POR PLAN • J RATIO• 0 .00
VH8 MANB 1 . 01 277 .49 698 . 58 8 .12 2 .00 2 7 7 .44 698 .00 8 .12
CONTINUITY SUMMARY (AC -PT) -INFLOll•O.J9548+02 BXCBSS•0 .00008+00 OOTP'LOK•O .J95 28+0 2 BASIN STORAG8•0 .18J98-01 PBRCBNT BRROR • 0 .0
P0R PLAN • J RATIO-0 . 00
Vlll! MANB 1 . 05 2J2 .89 701.60 7 .OJ 2 .00 2J2 .75 702 .00 7 .0J
COllTINUITY StlHMARY (AC-PT) -INFLOll•O .J4228+02 BXCBSS•O .OOOOB+OO OtTl'PLOW•O .J4218+02 BASIN STORAG8•0 .16448-01 PBRCBNT BRROR• 0 .0
FOR PLAN • J RATIO• 0 .00
VH8 MANB 1.08 194 .65 70J .15 6 .1 2 2 .00 194 .44 704 .00 6 .12
CONTINUITY StlHMARY (AC -PT) -INPLOll•0.29818+02 BXCBSS•0 .00008+00 OtTl'PLOW •0 .29798+02 BASIN STORAG8 •0 .14208-01 PBRCBNT BRROR• 0 .0
POR PLAN • J RATIO-0 . 00
VH8 MANB 1 .15 1J9 . 77 706 .12 4 .86 2 .00 139 . 72 70 6 .00 4 .86
CONTINUITY SUMMARY (AC-PT) -INPLOll•O .2J678+02 BXCBSS•O . 00008+00 OUTPLOK•O . 2J668+02 BAS I N STORAG8·0 . 95908-02 PBRCB!l'T BRROR• O. O
POR PLAN • J RATIO• 0 . 00
VH8 MANB 1 .2J 92.17 711 .11 J .79 2 .00 92 .1 2 710 .00 J. 79
CONTINUITY SUMMARY (AC -PT) -INFLOll•0 .18448+02 BXCBSS•0 .00008+00 OOTPLOlf•0 .18448+02 BASIN STORAG8•0.68J88-02 PBRCBNT BRROR• 0 .0
POR PLAN • J RATIO• 0 .00
Vlll! MANB 1. 42 69J .4J 2 .J 2 2 .00 4J .05 694 .00 2 .J2
CONTINUITY SUMMARY (AC-PT) -INPLOll•0 .11298+02 BXCBSS•0 .00008+00 OOTl'LOll•0.11288+02 BASIN STORAG8•0.29958-02 PBRCB!l'T BRROR• 0 .0
PLAN 2 ............... INITIAL VALUB SPILLWAY CRBST TOP OP DAM
BLBVATIOK J00 .00 J04. 85 J05 .00
STORAG8 o. 2 . 2 .
OOT1'LOlf 0 . 10 . 13 .
RATIO MAXIMllM MAXIMllM MAXIMIJM MAXIMllM DURATION TIMB OP TIMll OP
OP RBSBRVOIR DBPTR STORAG8 OtTl'PLOW OVllR TOP MAX OUTFLOW PAILORB
PMP K.S .BLBV OVBR DAM AC-PT CPS HOURS HOURS HOURS
11 .00 J05 .21 ;0 .21 2 . 2 6 . 0 .J7 11.67 0 .00
9 .80 J04 .95 ! 0 .00 2 . 1 2 . 0.00 11 .80 0.00
8 .80 J04 .46 0.00 1. 9 . 0.00 11.8J 0.00
7 .40 JOJ . 67 0 .00 1. 8 . 0 .00 11.80 0 .00
6 .20 J02 .97 0 .00 1. 8 . 0 .0 0 11 . 77 0 .00
4 .50 JOl.96 :o.oo 0 . 6 . 0 .00 11 . 73 0 .00
PLAN J ............... INITIAL VALUB SPILLWAY CRBST TOP OP DAM
8LBVATION 299 . 76 J04 . 00 J OS. 00
STORAG8 0 . 2 . J .
OITl'l"LOlll 0 . 9 . 40 .
Page 5 Exhibit D
RATIO MAXIMCM MAXIMUM MAXIMUM MAXIMUM DURATION TIMB OP TIMB OP OP RBSBRVOilt DBPTB STORAGB Otrl'PLOll OVBR TOP MAX OtrrPLOll PAILUIUI PMP lf.6.BLBV OVllR. DAM AC-PT CPS HOURS HOURS HOURS 11.00 306.58 1.58 5. 165. 1.03 11.67 0.00 9.80 306.28 1.28 5. 137. 0.93 11.67 o.oo 8.80 306. 00 1.00 4. 111. 0.80 11. 70 o.oo 7.40 305.53 0.53 4. 73. 0.57 11. 73 o.oo 6.20 305. 03 0.03 3. 41. 0.13 11.83 0.00 4.50 304.00 0.00 2. 9. 0.00 12.37 0.00 ••• NORMAL END OP HKC-1 ••• Page6 Exhibit D
TRAPEZOIDAL CHANNEL ANALYSIS
NORMAL DEPTH COMPUTATION
October 25, 1995
EXHIBIT E
EDELWEISS ESTATES PHASE 10
===================================================~===============~
PROGRAM INPUT DATA:
DESCRIPTION
Flow Rate (cubic feet per second) •••••••••••..••••••••••
Channel Bottom Slope (feet per foot) ••.••.....•••..•.•.•
Manning's Roughness Coefficient (n-value) •••.••••••.•••.
Channel Side Slope -Left Side (horizontal/vertical) ... .
Channel Side Slope -Right Side (horizontal/vertical) .. .
Channel Bottom Width (feet) ••.•••••••••.••••..•••••••...
VALUE
17.0
0.0070
0.0300
4.00
4.00
6.0
==========z=======================x=================================
PROGRAM RESULTS:
DESCRIPTION
Normal Depth (feet) •...•••••••••••••••••••...•••••..•••.
Flow Velocity (feet per second) •••.••••••••...•••..•..•.
Froude Number (Flow is Sub-Critical) •••••••......••..•.•
Velocity Head (feet) •..••••.••••.. .-•.•.••••..••••••••...
Energy Head ( feet ) •••..•••••••••••••••••••••.••••.•.••••
Cross-Sectional Area of Flow (square feet) .......•....•.
Top Width of Flow (feet) ••••••••..•••••.••••...•••.••••.
VALUE
0. 71
2.71
0.653
0 .11
0.82
6.26
11. 67
====================================================================
TRAPEZOIDAL CHANNEL ANALYSIS COMPUTER PROGRAM, Version 1.3 (c) 1986
Dodson & Associates, Inc., 7015 w. Tidwell, t107, Houston, TX 77092
(713) 895-8322. A manual with equations & flow chart is available.
EXHIBIT ''E"
Exhibit F
Computation of Lag Times
.... l"zi ~ ...:i ..... 0 ..... ~ t: ~ ~ u
tll ~ ~ ~ ....... ~ dP I~ dP I~-u t: u
()I H ~ E--4 0 ~ ~ a a . ~-~ t: u tll ~ ~ ....... E--4 l"zi u ·o . H rz1
H re 2 2 5 tll ~ tll ~ 2 2 u tll E--4 ..... ~ 0 ~ ~ t: 3 ~ re s ~ u ~ ~ ~ ~ re s 't
tll
Poi -
r:: l"zi Poi E--4 E--4 E--4
Future EE 32.8 0.0512 1900 32 0.017 75 0.48 0.67 84 75 0.62 38 0 .81 0 .18 0 .30 1. 76
Elm Crest 7 .5 0.0117 1100 19 0.017 75 0.30 0.51 0. 6.1 84 75 0.62 38 0.81 0.12 0.19 1. 59
Phase lOA 14.5 0.0227 1610 20 0.012 75 0.48 0 .81 0. 55 ' 84 50 0 .73 38 0 .81 0.22 0 .36 1. 24
Unc. EC 3 .0 0 .0047 620 8 0 .013 75 0 .22 0 .37 0 .47 84 75 0.62 38 0.81 0 .08 0.14 1. 23
swv 24 19 .3 0 .0302 1100 11 0.010 75 0 .40 0 .66 0 . 46 84 75 0.62 38 0.81 0.15 0.25 1. 21
De acon 1. 9 0.0030 900 12 0.013 75 0.29 0.49 0 .51 84 75 0.62 38 0.81 0 .11 0.19 1. 35
Church 44.7 0 .0699 1500 15 0.010 75 0 .5 1 0.85 0 .49 84 75 0 .62 38 0.81 0 .19 0 .32 1. 29
Exhibit F
/
SCALE: 1"=400'
GANDY RD
-0 .__---+---1?S
~>---~ "' ~ f-----i~ 1-------1----;
~f-----i
CJ)
--i
"' ;o
~
"'
1-------l
LEGENP
Drainage Divide
Ex . Contour (1 O' lnterv
Drainage Area #
Drainage Area #
EXHIBIT "G"
OVERALL DRAINAGE MAP
EDELWEISS ESTATES
BEE CREEK TRIB "A" BASIN
November, 1995
DEVELOPMENT PERMIT
PERMIT NO . 326
Edelweiss Estates Phase 10-A
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Edelweiss Estates Phase 10-A
SITE ADDRESS:
(not available at this time)
OWNER:
Begonia Corporation
1901 San Jacinto
Houston, TX 77002
DRAINAGE BASIN:
North Fork of Lick Creek, beyond Reach III
TYPE OF DEVELOPMENT:
This permit is valid for the construction of water, sanitary sewer, storm drainage, and
streets according to the approved construction documents . Contractor shall prevent silt
and debris from leaving the site in accordance with the City of College Station Drainage
Policy and Design Criteria . Owner and/or contractor shall be responsible for any damage
to existing city streets or infrastructure due to heavy machinery and/or equipment.
In accordance with Chapter 13 of the Code of Ordinances of the City of College
Station, measures shall be taken to insure that debris from construction, erosion, and
sedimentation shall not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood
hazard area . All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer in the development permit application for
the above named project and all of the codes and ordinances of the City of College Station
that apply .
~~~
Administrator/Representative Dat~
ACCOUNT NO.-----------------------
--·-·-·----· --·-··------:--·---·-------· . -.. --------. ·-. ---. - -
THANK YOU )
I
.i Figure XII
Application Form
Development Permit
Inside/Outside Established Flood Haza1·d Areas
City of College Station, Texas
(re: Ordinance No. 1728)
Site Legal Description: _-...::ED:::'.::EL::::::WE:::::::::I:::.:S:::,S::.....:'.:E~S~T:.::'Pi.:.:TE=SL, .....:P:...:HAS:.::.:::::E::......:1:...::0:_-.:..:A:..__ ________________ _
at southwest end of Mint Avenue
Site Address:----------~----------------------~--
Owner: BEGONIA CORPORATION
1901 San Jacinto
Address: Houston, TX 77002
Telephone No.: ( 713) 654-0060
1722 Broadmoor, Suite 210 Architect/ Michael R. McClure, P.E., R.P.L.S.· Address: B:r:yan, TX 17802
Engineer: __ McCL __ URE __ EN_G_INEER ___ I_N_G..:...,_I_N_c_. ________ Telephone No.: _ _!.7....!.7~6.::.-6~7~0~0~-----
P .O. Box 456
Contractor: _A--"--.L_._HEIMCAMP ___ _,_, _IN_C_. ___________ Address: Buffalo. TX 75831
Telephone No.: __ · ________ _
Date Application Filed:----------------Approved:------------
Application is hereby made for the following specific waterway alterations: Subdivision construction
along Bee Creek Tributary A
Attached as part of this application:
Ill Application Fee
!XI Signed Certificate
O Site and Construction Plans, with supporting document:1ti on : two (2) copies of each
O Other:
~-~~~----~~---~--~~
ACKNOWLEDGEMENTS:
1, Jim Crowell, Pres. BEGONIA CORP~s owner, hereby acknowledge or affirm that:
The above Drainage Plan and supporting documents complies wiht the requirements of Ordinance No. 1728,
and ·
o'/ fl.+~.~
Ow r · 7
Page 1of2
..
Figure XII Continued
CERTIFICATIONS:
A I, certify that any nonresidential structure on or
proposed to be on this site as part of this application meets flood-proofing requirements as
set out in Section of Ordinance No. 1728
Architect/Engineer Date
B. I, certify that the finished floor level of the lowest
floor, including any basement, of any residential structure as part of this application is or
proposed to be at or· above the base flood elevation as established in the latest Federal
Insurance Administration flood hazard study and maps, as amended.
Architect/Engineer Date
Architect/Engineer Date·
REVIEWED FOR APPROVAL:
~---------------Flood p 1 a in Administrator Date
APPROVAL: Special conditions or comments as part of approval: __________ _
,.; '·. ENGINEER'S CONSTRUCTION COST ESTIMATE
,EDELWEISS ESTATES, PHASE 10-A
DECEMBER 11, 1995
ITEM DESCRIPTION UNIT QUANTITY UNIT AMOUNT
NO. COST
STREET CONSTRUCTION
Erosion & Sedimentation Control LS. $6.000.00 $6.000.00
2 Clearing & Grubbing Ac. 4.25 2.000.00 8.500.00
3 Excavation (Roadway) C.Y. 1.915 3.00 5,745.00
4 Excavation (Detention Area) C.Y. 2,872 5.00 14.360.00
5 Re-Vegetation Ac. 0.8 800.00 640.00
6 6" Lime Stab. Subgrade (53 Lime) S.Y. 4,186 2.25 9.418.50
7 Extra Lime Ton 28 75.00 2.100.00
8 6" Flexible Base Crushed Stone S.Y. 3.499 5.50 19,244.50
9 11.h'' Hot Mix Asphaltic Concrete (Type DJ S.Y. 3.499 3.60 12,596.40
10 Reinforced Concrete Curb & Gutter LF. 1.960 6.75 13,230.00
11 Reinf. Concrete Sidewalk S.F. 6,075 2.15 13,061 .25
STREET CONSTRUCTION SUBTOTAL $104,89 5.65
DRAINAGE CONSTRUCTION
12 15' RCP (C76, Cl. Ill) LF. 31 25.00 $775.00
13 24" RCP (C76, Cl. Ill) L.F. 65 36.00 2,340.00
14 27' RCP (C76. Cl. Ill) L.F. 564 39.00 21,996.00
15 30" RCP (C76, Cl. Ill) LF. 108 41.00 4.428.00
16 33" RCP (C76, Cl. Ill) LF. 144 45.00 6.480.00
17 5 ' Recessed Cone. Inlet Ea. 4 1.600.00 6.400.00
18 15' Recessed Cone. Inlet Ea. 3.000.00 3.000.00
19 Concrete Sloped Headwall (4:1, 33" Pipe)
& 140 Sq. Ft. Reinf. Cone. Flume LS. 1,500.00 1,500.00
DRAINAGE CONSTRUCTION SUBTOTAL $46,919.00
SEWER LINE CONSTRUCTION
20 6''. PVC (SDR-26, D3034)(6' to 8' depth) L.F. 562 15.00 8,430.00
21 6" PVC (SDR-26, D3034)(8' to 10' depth) LF. 290 16.50 4.785.00
22 Standard Sewer Manhole(< 8' depth) Ea. 2 1,200.00 2.400.00
23 Standard Sewer Manhole (8' to 1 O' depth) Ea. 2 1.350.00 2.700 .00
24 Connect to Existing Manhole LS. 500.00 500.00
25 6''.Cap Ea. 1 75.00 75.00
26 4•i Service Line (Type 1)(23' Avg.) Ea. 5 700.00 3,500.00
27 4" Service Line (Type 11)(44.7' Avg.) Ea. 2 800.00 1,600 .00
28 Trench Safety (Sewer System) LF. 840 1.00 840.00
SEWER LINE CONSTRUCTION SUBTOTAL $24,830.00
Page 1
ITEM
NO.
ENGINEER'S CONSTRUCTION COST ESTIMATE
EDELWEISS ESTATES, PHASE 10-A
DECEMBER 11, 1995
DESCRIPTION UNIT QUANTITY UNIT
COST
WATER LINE CONSTRUCTION
29 6" PVC (C900, Cl. 200) L.F. 713 14.50
30 8" PVC (C900. Cl. 200) L.F. 312 17.50
31 Rre Hydrant Assembly (Type I) Ea. 1,600.00
32 Connect to Existing 8" A.C. Line LS. 1 350.00
33 6" M.J. Gate Valve Ea. 2 350.00
34 8" M.J. Gate Valve Ea. 500.00
35 Z' Blow-off Assembly with 6" Cap Ea. 400.00
36 'l' Blow-off Assembly with 8" Cap Ea. 410.00
37 8" X 8" X 6" M. J. Tee Ea. 240.00
38 6" X 221h 0 M.J. Bend Ea. 2 175.00
39 6" X 11 1/.
0 M.J. Bend Ea. 1 170.00
40 11/:z" Type K Copper Service (46' Avg. Length] Ea. 4 715.00
41 Trench Safety (Water Line) L.F. 495 1.00
WATER LINE CONSTRUCTION SUBTOTAL
TOTAL ESTIMATED COST OF CONSTRUCTION
Page 2
AMOUNT
$10,338.50
5.460.00
1.600.00
350.00
700.00
500.00
400.00
410.00
240 .00
350.00
170.00
2.860.00
495.00
$23.873.50
$200,518.15
D RAINAGE STUDY
.. ,FQR
EDELWEISS ESTATES, PHASE 10-A
.,
COLLEGE STATION~ BRAZOS COUNTY, TEXAS
. ~
PREPARED FOR:
BEGONIA CORPORATION
1901 San Jacinto
Houston, TX 77002
NOVEMBER 14, 1995
r\. iY .£) \J'\D l\,p I v:, /~!V No . . r (:;ff~ ,,' Jovl I p\ (fa~
('\ {1 ~(ts ~~ 1 A~~,
1,-t+-c 5Nt5i~~ f\f!0·rJ. it V\ (' e-J. it ' ..
PREPARED BY:
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 21 0
Bryan, TX 77802
DATE:
TO:
ATTN:
12/29/95
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 210
Bryan, Texas 77802
(409) 776-6700
FAX 776-6699
TRANSMITTAL LETTER
Mrs. Veronica Morgan, P.E.
Assistant City Engineer
CITY OF COLLEGE STATION
ATTACHED PLEASE FIND: RE: EDELWEISS ESTATES, PHASE 10-A
1. 'IWo (2) sets of red-lined construction plans
2. One (1) set of construction plans revised per red-lined plans
3. 'IWo (2) copies of ENgineer's Construction Cost Estimate
We will deliver more revised sets when you have confirmed the revisions-please call!
THESE ARE TRANSMITTED TO YOU FOR THE FOLLOWING REASON:
xx For Approval Your Use Revisions Made
As Requested For Review and Comment
Returned after Loan to Us
RECEIVED BY:
DATE:
SIGNED BY:
MICHAEL R. McCLURE, P.E., R.P.L.S.
~ ENGINEER'S CONSTRUCTION COST ESTIMATE
/ EDELWEISS ESTATES, PHASE 10-A
DECEMBER 11, 1995
ITEM DESCRIPTION UNIT QUANTITY UNIT AMOUNT
NO. COST
STREET CONSTRUCTION
1 Erosion & Sedimentation Control LS. 1 $6 ,000.00 $6,000.00
2 Clearing & Grubbing Ac. 4.25 2,000.00 8,500.00
3 Excavation (Roadway) C.Y . 1,915 3.00 5,745.00
4 Excavation (Detention Area) C.Y . 2,872 5.00 14,360 .00
5 Re-Vegetation Ac. 0.8 800.00 640.00
6 6" Lime Stab. Subgrade (53 Lime) S.Y. 4.186 2.25 9,418 .50
7 Extra Lime Ton 28 75.00 2,100.00
8 6" Flexible Base Crushed Stone S.Y. 3.499 5.50 19,244.50
9 11h'' Hot Mix Asphaltic Concrete (Type D) S.Y. 3,499 3.60 12,596.40
10 Reinforced Concrete Curb & Gutter LF. 1,960 6.75 13 .230.00
11 Reinf. Concrete Sidewalk S.F. 6,075 2.15 13,061.25
STREET CONSTRUCTION SUBTOTAL $104,895.65
DRAINAGE CONSTRUCTION
12 15' RCP (C76, Cl. Ill) LF. 31 25.00 $775.00
13 24" RCP (C76, Cl. Ill) LF. 65 36.00 2,340.00
14 27' RCP (C76, Cl. Ill) LF. 564 39 .00 21,996.00
15 30" RCP (C76, Cl. Ill) LF. 108 41 .00 4,428.00
16 33" RCP (C76, Cl. Ill) LF. 144 45.00 6,480.00
17 5' Recessed Cone. Inlet Ea . 4 1,600 .00 6,400.00
18 15' Recessed Cone. Inlet Ea. 3,000.00 3,000.00
19 Concrete Sloped Headwall (4:1, 33" Pipe)
& 140 Sq. Ft. Reinf. Cone. Flume LS . 1,500.00 1,500.00
DRAINAGE CONSTRUCTION SUBTOTAL $46 ,919.00
SEWER LINE CONSTRUCTION
20 6" PVC (SDR-26, D3034)(6' to 8' depth) LF. 562 15.00 8,430.00
21 6" PVC (SDR-26 , D3034) (8' to 1 O' depth) LF. 290 16.50 4,785.00
22 Standard Sewer Manhole (< 8' depth) Ea . 2 1,200.00 2,400.00
23 Standard Sewer Manhole (8' to 1 O' depth) , Ea. 2 1,350.00 2,700.00
24 Connect to Existing Manhole ' LS . 500.00 500.00
25 6"Cap Ea . 1 75.00 75 .00
26 4" Service Line (Type 1)(23 ' Avg.) Ea . 5 700.00 3 ,500.00
27 4" Service Line (Type 11)(44.7' Avg.) Ea. 2 800.00 1,600.00
28 Trench Safety (Sewer System) LF. 840 1.00 840.00
SEWER LINE CONSTRUCTION SUBTOTAL $24,830.00
Page 1
ITEM
NO.
ENGINEER'S CONSTRUCTION COST ESTIMATE
EDELWEISS ESTATES, PHASE 10-A
DECEMBER 11, 1995
DESCRIPTION UNIT QUANTITY UNIT
COST
WATER LINE CONSTRUCTION
29 6" PVC (C900, Cl. 200) L.F . 713 14.50
30 8" PVC (C900, Cl. 200) L.F. 312 17 .50
31 Fire Hydrant Assembly (Type I) Ea. 1,600.00
32 Connect to Existing 8" A.C. Line LS. 1 350.00
33 6" M.J. Gate Valve Ea . 2 350.00
34 8" M.J. Gate Valve Ea . 500.00
35 2" Blow-off Assembly with 6" Cap Ea. 400.00
36 Z' Blow-off Assembly with 8" Cap Ea. 410.00
37 8" X 8" X 6" M. J. Tee Ea. 1 240.00
38 6" X 221h 0 M.J . Bend Ea. 2 175.00
39 6" X 11 1.4° M .J. Bend Ea. 1 170.00
40 11h" Type K Copper Service (46' Avg. Length) Ea. 4 715.00
41 Trench Safety (Water Line) L.F. 495 1.00
WATER LINE CONSTRUCTION SUBTOTAL
TOTAL ESTIMATED COST OF CONSTRUCTION
Page 2
AMOUNT
$10,338.50
5.460.00
1,600.00
350.00
700.00
500 .00
400.00
410.00
240.00
350.00
170.00
2,860.00
495 .00
$23.873.50
$200,518.15
DATE:
TO:
ATTN:
1 /30/96
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 210
Bryan, Texas 77802
(409) 776-6700
FAX 776-6699
TRANSMITTAL LETTER
Ms. Veronica Morgan, P.E.
Assistant City Engineer
CITY OF CDLLEGE STATION
ATTACHED PLEASE FIND:
1. Two (2) copies each of five (5) easement field note descriptions needed for .
the Edelweiss Estates, Phase 10 ~A project.
THESE ARE TRANSMITTED TO YOU FOR THE FOLLOWING REASON:
For Approval xx Your Use Revisions Made
As Requested For Review and Comment
Returned after Loan to Us
RECEIVED BY:
DATE:
SIGNED BY:
MICHAEL R. McCLURE, P.E., R.P.L.S.